Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
1000163A - Bid Results - Downtown Meter Pole Removal
1000163A - Downtown Meter Pole Removal Taylor Jane Construction R. Burke Corporation Bid Item Description Measurement Quantity Item Price Total Item Price Total 1 Detail 1 - Jackhammer EA 53 $367.00 $19,451.00 $260.00 $13,780.00 2 Detail 1 - Jackhammer - Mission Style Sidewalk EA 142 $198.00 $28,116.00 $300.00 $42,600.00 3 Detail 2 - Core Sidewalk EA 49 $288.00 $14,112.00 $300.00 $14,700.00 4 Detail 2 - Core Sidewalk - Mission Style Sidewalk EA 59 $231.00 $13,629.00 $350.00 $20,650.00 5 Detail 2A - Core Bridge Deck EA 9 $991.00 $8,919.00 $600.00 $5,400.00 6 Detail 3 - Sidewalk Panel Replacement SQFT 112 $85.00 $9,520.00 $80.00 $8,960.00 7 Detail 3 - Reinforced Sidewalk Panel Replacement SQFT 188 $61.00 $11,468.00 $80.00 $15,040.00 8 Detail 3 - Mission Style Sidewalk Panel Replacement SQFT 10 $436.00 $4,360.00 $200.00 $2,000.00 9 Replace Curb and Gutter Allowance LF 25 $61.00 $1,525.00 $200.00 $5,000.00 10 Detail 4 - Remove and Backfill EA 5 $82.00 $410.00 $200.00 $1,000.00 11 Detail 5 - Unbolt and Grout EA 15 $161.00 $2,415.00 $150.00 $2,250.00 12 Detail 5 - Unbolt and Grout - Mission Style Sidewalk EA 5 $483.00 $2,415.00 $200.00 $1,000.00 13 Traffic and Pedestrian Control LS 1 $26,155.00 $26,155.00 $35,000.00 $35,000.00 $142,495.00 $167,380.00