Loading...
HomeMy WebLinkAbout1000198 - Bid Results - Silt Removal 2021, PDFBid Item Description Measurement Quantity Item Price Total 1 Area 1 Clear and Grub LS 1 $5,000.00 $5,000.00 2 Area 1 Erosion Control Measures LS 1 $3,000.00 $3,000.00 3 Debris Removal LS 1 $4,325.00 $4,325.00 4 Area 1 Silt Removal CY 1280 $40.00 $51,200.00 5 Area 1 Traffic Control LS 1 $3,500.00 $3,500.00 6 Area 1 Comply with Permits and CEQA LS 1 $625.00 $625.00 7 Area 2 Clear and Grub LS 1 $8,000.00 $8,000.00 8 Area 2 Erosion Control Measures LS 1 $4,000.00 $4,000.00 9 Area 2 Silt Removal CY 175 $40.00 $7,000.00 10 Area 2 Comply with Permits and CEQA LS 1 $1,250.00 $1,250.00 11 Area 3 Clear and Grub LS 1 $10,000.00 $10,000.00 12 Area 3 Erosion Control Measures LS 1 $1,500.00 $1,500.00 13 Area 3 Silt Removal CY 150 $45.00 $6,750.00 14 Area 3 Comply with Permits and CEQA LS 1 $625.00 $625.00 15 Area 4 Clear and Grub LS 1 $6,000.00 $6,000.00 16 Area 4 Erosion Control Measures LS 1 $5,000.00 $5,000.00 17 Area 4 Construction of Temporary Access Road LS 1 $2,000.00 $2,000.00 18 Area 4 Demolition of Temporary Access Road LS 1 $2,000.00 $2,000.00 19 Area 4 Silt Removal CY 690 $40.00 $27,600.00 20 Area 4 Comply with Permits and CEQA LS 1 $625.00 $625.00 1000198 - Silt Removal 2021 Souza Construction Additive Alternate 1: Area 3 Base Bid Total: Alt 1 Total: $87,900.00 $18,875.00 Additive Alternate 2: Area 4 Alt 2 Total:$43,225.00 Base Bid + Alt 1 + Alt 2 Total: $150,000.00