Loading...
HomeMy WebLinkAbout01/11/1994, 1 - DRAFT URBAN WATER MANAGEMENT PLANL ���n� ►����ulllll�������i��1ll City Of San -.AIS OBISPO - COUNCIL AGENDA REPORT FROM: John Moss, Utilities Director`J� PREPARED BY: Gary Henderson, Water Division Manager Sue Baasch, Administrative Analyst Ron Munds, Water Conservation Coordinator SUBJECT: Draft Urban Water Management Plan CAO RECOMMENDATION MEETING DATE: January 11, 1994 ITEM NUMBER: / Receive this report and provide comments and direction to staff regarding the Draft Urban Water Management Plan. DISCUSSION The City of San Luis Obispo has aggressively monitored and managed its water resources during the past decade. The Draft Urban Water Management Plan (Plan) has been developed and written by City staff based on past water policy decisions, the experience gained from those decisions, water system operational experience, and the proposed General Plan update. The purposes of the draft Urban Water Management Plan are to: ■ Formulate long range City water policy; ■ Identify needed improvements both in the water supply and distribution systems; ■ Determine needed. water supply and distribution system expansion to reach the General Plan goals; and ■ Consolidate previous water policy. The Plan will also bring the City into compliance with state law AB 797, the Urban Water Management Planning Act relating to water conservation. The law requires the City to submit an updated version of the Plan every five years. The State's schedule for the next submittal of plans is in 1995, with the next update due in the year 2000. The Plan is divided into five chapters and has been structured to serve as an easily understood water policy and resource guide. Following the introduction, the major policies are provided followed by a description and analysis of the projects, programs and financial considerations necessary to support the policies and goals of the City's General Plan. ������i�►►►�IIIIIp�Pn�U city of San LUIS OBISpo COUNCIL AGENDA REPORT Draft Urban Water Management Plan The goal of the study session is to evaluate each element of the plan and then provide staff with comments and direction for incorporation into the final document. Following the study session, the Community Development Department will perform the necessary environmental determination work. The Council will be asked to suggest policy guidance as to whether this Plan should be incorporated into the General Plan. There are implications for either course of action, which will be spelled out more fully at the study session. If the answer is "Yes ", then the two major implications will be that the Council must refer the Plan to the Planning Commission for their review and recommendation, and the process for future modifications will be more involved, as for any General Plan amendment. Because of the length and complexity of the document, staff has prepared a condensed policy summary (located in Appendix I of the Plan) and an Executive Summary (located at the beginning of the Plan) which briefly describes the information presented in each chapter. CONCURRENCES The Community Development and . Finance Departments have reviewed and concur with the information provided in the Draft Urban Water Management Plan. FISCAL IMPACT Adoption of the Urban Water Management Plan does not have additional fiscal impact on the Water Fund at this time. Any policies included in this Plan that are not currently included in the Water Fund analysis will be brought to Council separately for consideration and approval. Attachment: Draft Urban Water Management Plan (Executive Summary immediately following Foreword in Plan) 2 city of san tins oBIspo Fl.: URBAN WATER MANAGEMENT PLAN January 1994 TABLE OF CONTENTS EXECUTIVE SUMMARY ....... ............................... iii CHAPTER I. INTRODUCTION .... ..............................1 1.1 Purpose and Scope ...... ............................... 1 1.2 Relationship to General Plan and Other Documents ................. 3 1.3 Current Water Sources ... ............................... 4 CHAPTER 2. WATER POLICY .. ............................... 11 2.1 Safe Annual Yield .................................... 11 2.2 Water Conservation .... ............................... 15 2.3 Water Demand Projections ............................... 16 2.4 Reliability Reserve ..... ............................... 19 2.5 Siltation at Salinas and Whale Rock Reservoirs .................. 20 2.6 Supplemental Water Requirements .......................... 22 2.7 Multi- Source Water Supply Policy .......................... 23 2.8 Allocation of New Water Supplies ........................... 24 2.9 Water Allocation and Offsets .............................. 26 2.10 Reclaimed Water ...... ............................... 28 2.11 Capital Improvement Plan- Water Distribution ................... 30 CHAPTER 3. SUPPLEMENTAL WATER SUPPLY PROJECTS ............ 31 3.1 Salinas Reservoir Expansion Project ......................... 31 3.2 Nacimiento Project ..... ............................... 34 3.3 Water Reuse ......... ............................... 37 3.4 Water Demand Management .............................. 41 3.5 Other Supplemental Water Supply Project Alternatives .............. 42 CHAPTER 4. WATER OPERATIONAL PROGRAMS ................... 44 4.1 Water Treatment ...... ............................... 44 4.2 Water Distribution ..... ........................... ..... 49 4.3 Water Customer Service . ............................... 56 4.4 Telemetry ............ .............................58 4.5 Water Conservation .... ............................... 61 CHAPTER 5. FINANCIAL PLAN . ............................... 65 5.1 Water Fund ......... ............................... 65 5.2 Annual Water Fund and Rate Review ........................ 66 APPENDICES City of San Luis Obispo i /-At FOREWORD This Urban Water Management Plan has been developed by City of San Luis Obispo Utilities, Community Development and Finance Departments staff as a single policy and resource document. It is intended to consolidate information regarding policies and programs as they relate to the City's water resources. As a planning document, this Urban Water Management Plan is intended to provide the basis upon which the Utilities Department will pursue development of water resources, programs and services. As the City progresses with the various projects and programs identified in this document, it will be necessary to review and modify this document, especially as it relates to the policies established herein. The Urban Water Management Plan has been structured to serve as an easily understood water policy and resource guide. Following the introduction, the major policies are provided, followed by a description and analysis of the projects, programs and financial considerations necessary to support those policies and the goals of the City's General Plan. The chapter on policies, Chapter 2, is structured to first identify the policy and its relation to other policies contained in the plan, then to provide the "basis" of that policy or the rationale used in malting the policy decision. This format creates a document where the substantive policy information is readily retrievable without having to search the text for the actual policy statement. The policies and information contained in this Urban Water Management Plan provide the necessary policy support for the water - related ordinances and regulations contained in the Municipal Code (Titles 4, 13 and 17). Planning for the development and wise use of our water resources is of paramount importance to the City of San Luis Obispo. This Urban Water Management Plan and the policies contained herein will provide the foundation for responsible water resource planning. City of San Luis Obispo ii �� S EXECUTIVE SUMMARY DRAFT URBAN WATER MANAGEMENT PLAN This summary describes the purpose, water policies, operations, and a basis for financial analysis of the Urban Water Management Plan (Plan). The goal of the summary is to provide a clear, concise overview of the water planning and management decisions facing the City of San Luis Obispo. PURPOSE AND SCOPE OF THE URBAN WATER MANAGEMENT PLAN The purposes of the Plan are to assist in formulating long range City water policy, determine needed improvements both in the water supply and distribution systems, identify needed expansion to reach General Plan goals, and develop a financial analysis for achieving the recommendations presented in this document. The specific objectives of the Plan can be summarized as follows: ■ Provide estimates of future supplemental water requirements based on population projections developed from the Land Use Planning Element and per capita use figures. ■ Provide an evaluation of alternative supply sources that could meet supplemental water requirements. ■ Summarize water treatment processes and regulations, and identify the water treatment, distribution and storage systems current deficiencies and future needs. ■ Consolidate previous water policy. ■ Evaluate the Water Conservation Program. ■ Comply with State Law, AB 797, the Urban Water Management Planning Act. URBAN WATER MANAGEMENT PLAN SUNEWARY This Executive Summary condenses the Plan into the following six main areas: 1.2 The Plan's Relationship to the General Plan 1.3 Current Water Supply Sources 2. Water Policy 3. Supplemental Water Supply Projects 4. Water Operational Programs 5.- Financial Plan City of San Luis Obispo iii / -b Urban Water Management P,___ - Executive Summary 1.1 THE PLAN'S RELATIONSHIP TO THE GENERAL PLAN AND OTHER DOCUMENTS Chapter 2, Water Policies, constitutes the Water Element of the General Plan, and replaces the water section of the Water & Wastewater Management Element. This plan includes all information needed to comply with state law AB 797, the Urban Water Management Planning Act. Implementation progress of this plan will be presented to the Council on yearly basis as part of the Annual Water Operational Plan. 1.2 CURRENT WATER SUPPLY SOURCES The City of San Luis Obispo currently receives water from three sources, Salinas Reservoir, Whale Rock Reservoir, and local groundwater. The City has depended on imported supplies from Salinas Reservoir, located near the community of Santa Margarita, since 1944 and Whale Rock Reservoir, located near the community of Cayucos, since 1964. With the onset of the drought in 1986, resulting in decreasing surface water supplies, the City activated its groundwater sources in 1989. 2.0 WATER POLICY The following policy statements and basis for policy summaries provide the foundation for delivering an adequate supply of water to meet current and projected demands for the City of San Luis Obispo. 2.1 SAFE ANNUAL YIELD Po 2.1.1 Basis for Planning The City will plan for land development and for water supplies based on the amount of water which can be supplied each year, under critical drought conditions. This amount, called "safe annual yield ", will be adopted by the City Council. The safe annual yield determination will be revised as significant new information becomes available, and as water sources are gained or lost. The determination will consider a staff analysis, which will recommend an amount based on coordinated use of all water sources. Each change to safe annual yield will be reflected in an amendment of this plan. 2.1.2 Safe Yield Amount The City's safe annual yield of potable water is 7,735 acre feet, based on 7,235 acre feet from the coordinated operation of Salinas Reservoir and Whale Rock Reservoir, and 500 acre feet of groundwater. City of San Luis Obispo iv !-7 Urban Water Management Pla,. - Executive Summary 2.1.3 Groundwater The amount of groundwater which the City will rely upon towards safe annual yield is identified in Section 2.1.2. The City will maximize the use of groundwater in conjunction with other available water supplies to maximized the yield and long term reliability of all water resources and to minimize overall costs for meeting urban water demands. Basis for Policy Summary The safe annual yield of a reservoir depends on rainfall, the resulting runoff, evaporation, and releases for purposes other than the supply in question (such as required releases for downstream uses). The estimation of safe annual yield is based on historical hydrological data. The City has developed a mathematical computer model of the Salinas and Whale Rock Reservoirs, which accounts for all the factors that result in a safe yield amount. The current safe annual yield amount results from using data from 1943 through 1991. This period includes the drought periods of 1946 -51, 1959 -61, 1976 -77, and 1986 -91. The current calculation reflects taking advantages of differences between the reservoirs through coordinated. operation which means the City uses Salinas first, since it gains and loses water faster than Whale Rock, which is used as a backup source. The safe annual yield of 7,735 acre feet was adopted by the City Council as part of the 1992/93 Water Operational Plan. 2.2 WATER CONSERVATION P Aa 2.2.1 Long -term Water Efficiency The City will implement water efficiency programs which will maintain long -term , per capita usage at least ten percent below the average per capita usage recorded during 1986/87. The target amount is the long -term planning figure as defined in Section 2.3. 2.2.2 Short -term Water Shortages Short-term mandatory measures, in addition to the long -term programs, will be implemented when the City's water supplies are projected to last three years or less based on projected water consumption, coordinated use of all City water supplies sources, and considering the drought pattern on which safe yield is based (or response to other situations which may interrupt supply). Base for Polity Summary Water conservation was first referenced as a part of the City's water management policy in the 1973 General Plan. In 1985, the City adopted the Annual Water Operational Plan policy which established water conservation as a means to extend water supplies during projected water shortages. During this time, many technological and philosophical changes have occurred which City of San Luis Obispo v 1 -8 Urban Water Management PL.- Executive Summary are proving water conservation to be both a short term corrective measure for immediate water supply shortages and a long term solution to water supply reliability. 2.3 WATER DEMAND PROJECTIONS Poll 2.3.1 -Basis of Projections The City will project water requirements, considering long -term conditions and the full range of water uses in the City. Separate projections of potable and nonpotable requirements will be made. 2.3.2 Water Usage Rate The City shall use 165 gallons per person per day (0.185 acre -feet per person per year) and the number of City residents to plan total future water supplies. This quantity will be revised if warranted by long -term water use trends, including differences in the relationship between residential and nonresidential usage. 2.3.3 Overall Projected Water Demand Applying 165 gallons per person per day to a projected City resident population of 56,000 at General Plan build -out results in a projected-water demand of 10,350 acre -feet. Basis for Polity Summary The City must know how much water will be needed to serve residents, businesses, and other users which could be accommodated by the General Plan. This quantity can be projected using different methods. All methods involve assumptions about both future usage rates and the numbers and types of users expected in the future. The quantity expressed in the policy above corresponds closely with both (1) total citywide usage compared with total resident population and (2) projections of water demand based on usage by various land use categories. 2.4 RELIABILITY RESERVE Policy In seeking and accounting for new water supplies, the City will strive for a "reliability reserve" of 2,000 acre feet of safe annual yield (about 20 percent of projected water demand at full build - out). Basis for Policy Summary The Council supported the reliability reserve concept in March 1993, by amending the Water and Wastewater Management Element to include it. The reserve will help maintain adequate City of San Luis Obispo vi /— Urban Water Management Pla.. - Executive Summary water supplies during unpredictable changes, such as a new worst case drought, loss of a water source, or contamination of a water source. 2.5 SILTATION AT SALINAS AND WHALE ROCK RESERVOIRS LoAa The City shall develop 500 acre -feet of safe annual yield to account for the loss of water storage due to siltation at Whale Rock and Salinas Reservoirs to the year 2025. Basis for Policy Summary Siltation at reservoirs is a natural occurrence which can substantially reduce the storage capacity over long periods. The reduction. of available storage will reduce the safe annual yield of the reservoir. Siltation at reservoirs varies depending on factors such as rainfall intensity, and watershed management practices. There have been numerous reports addressing siltation at Salinas Reservoir, but no studies have been done for Whale Rock Reservoir. During the recent drought, water at Salinas Reservoir fell to a record low level. An aerial survey of the reservoir was prepared in order to update storage capacity information. The latest information indicates that the siltation rate is on the order of 40 acre -feet per year. Since no information is available to indicate what rate of siltation is occurring at the Whale Rock reservoir, it is assumed for planning purposes that the annual average rate of siltation is similar to Salinas Reservoir. 2.6 SUPPLEMENTAL WATER REQUIREMENTS Policy The City shall develop additional water supplies to meet the projected demand at build -out of the City's General Plan. The supplemental water supply amount shall be based on land use assessment and the adopted per capita water use figure identified for planning purposes in Section 2.3. Basis for Policy Summary Based on the draft Land Use Element endorsed by the City Council in February 1992 and the per capita use rate, the projected total amount of water for the City to serve General Plan build - out is 12,350 acre feet. This figure includes the 2,000 acre feet reliability reserve and accounting for siltation at the reservoirs. City of San Luis Obispo _ vii l— too Urban Water Management Pla— • Executive Summary 2.7 MULTI- SOURCE WATER SUPPLY Poucv The City shall continue to develop and use water resources projects to maintain multi- source water supplies, and in this manner, reduce reliance on any one source of water supply and increase its supply options in future droughts or other water supply emergencies. Basis for Policy Summary Having several sources of water can avoid dependence on one source that would not be available during a drought or other water supply reduction. The Council has supported having multiple sources since adopting the General Plan Water Management Element in 1987 and by endorsing the above policy statement in November 1990. 2.8 ALLOCATION OF NEW SUPPLIES Po 2.8.1 Balancing Safe Annual Yield and Overall Demand When new water sources are obtained, the additional safe annual yield shall be allocated first to eliminate the deficit between safe annual yield (Section 2.1) and present demand as defined in Section 2.3 at the time the new source is obtained. 2.8.2 Development and the Reliability Reserve Any additional safe annual yield beyond that needed to balance safe annual yield and and projected water demand will be allocated (A) one -half to development and (B) one -half to the reliability reserve and compensating for reduced yields due to siltation. 2.8.3 Accounting for Reclaimed Water Reclaimed water shall be accounted for as a "nonpotable" supply as identified under Section 2.10.3. Use of reclaimed water shall not be considered as a component of the City's safe annual yield, but may affect demand on potable supplies as reclaimed water use increases. . 2.8.4 Private Water Supplies When developments are supplied by private groundwater wells, the yield of those wells will not be counted toward the City's safe annual yield. Such yield, however, will result in the demand for City water supply being lower than it otherwise would be, which may affect adjustments of the per capita water usage figure used to estimate overall demand. City of San Luis Obispo _ viii Urban Water Management Plan = Executive summary Basis for Policy Summary The City is pursuing additional water supply projects. The City must address how the added yield from these projects will be allocated, since the yield added at any one time may not supply all potential uses. The City has identified the following potential uses for the new supplies: • Eliminating the deficit between adopted planning water usage figures and safe yield; • Compensating for reduced yields due to reservoir siltation; • Establishing a reliability reserve; • Providing for development of more dwellings, businesses, and public facilities. The policies objectives are to balance the needs of all the areas identified while not compounding the potential water shortage problems for existing residents of the City. 2.9 WATER ALLOCATION AND OFFSETS Policy 2.9.1 Supplying New Development The City will make available to new development only that amount of safe yield which exceeds projected water use (as stated in Section 2.3), less the amount to compensate for siltation losses (as stated in Section 2.5) and to provide a reliability reserve (as stated in Section 2.4). Available allocations will be assigned to development in a way that supports balanced growth, consistent with the General Plan. 2.9.2 Exemptions for Offsets A. When there is no safe annual yield to allocate to a project, that project may be built if the developer makes changes, in facilities served by the City, which will reduce long- term water usage tgual to the allocation required for the project. B. The City may exempt a project from needing an allocation or an offset, or it may reduce the amount of the required allocation or offset, to the extent that the project is supplied by a suitable, private well which will not significantly affect the yield of City wells. The City will consider the cumulative effect of wells in the groundwater basin in making this determination. 2.9.3 Basis for Allocations and Offsets Required allocations and offsets will be based on long -term usage for each type of development. (These usage and offset factors will be determined and published by the City, and may be revised as warranted by new information.) City of San Luis Obispo ix i -/z Urban Water Management P1, Summary Basis for Policy Summary In 1988, the City began to formally account for long -term water usage in new development. As a result of the 1986 -1991 drought, the City decided that there should be no new development that would increase water usage. Nearly all construction since 1990 has been replacement buildings, remodels, or projects which retrofitted facilities to save (offset) twice the amount of water or water allocation necessary to serve the project. Requiring an offset -to- allocation ratio greater than one -to -one means that long -term water usage will decline even as development occurs. Requiring a ratio of greater than one -to -one makes projects less feasible, and raises questions of equity. 2.10 RECLAEN IED WATER Poll 2.10.1 Reclaimed Water Quality The City will produce high quality reclaimed water, suitable for a wide range of nonpotable uses. 2.10.2 Uses of Reclaimed Water The City will discharge to San Luis Obispo Creek one cubic foot per second of reclaimed water for aquatic and riparian habitats. The City will make available reclaimed water to substitute for existing .potable water uses and to supply new nonpotable uses. 2.10.3 Accounting for Reclaimed Water As reclaimed water supplies new development or to substitute for potable water in existing development, reliable yield of nonpotable water will be increased. Reclaimed water will be credited to nonpotable reliable yield not when it is potentially available at the treatment plant, but when it is actually available to a user due to completion of the necessary distribution facilities. 2.10.4 City Reclaimed Water Projects When the City provides distribution facilities that allow substitution of reclaimed water for potable water, the resulting reduction in potable water demand will be given offset credit for government projects (including new City parks or buildings), under any policies or rules limiting the amount of water which can be allocated to development projects. 2.10.5 Private Reclaimed Water Projects A. When a developer of a private project provides distribution facilities that allow the substitution of reclaimed water in facilities that have used potable City water, City of San Luis Obispo x / -/3 Urban Water Management PL_ Executive Summary the resulting reduction in potable water usage will be credited to any allocation of potable water needed for the developer's project, at a one -to -one ratio. B. When a developer of a private project provides distribution facilities that allow use of reclaimed water in that project, any required potable water allocation for that project shall be reduced by a corresponding amount. 2.10.6 Combined Reclaimed Water Projects When a component of the reclaimed water distribution system is funded in part by the City and in part by a private developer, the credit for reduction in potable water usage resulting from that component shall be divided in a proportionate share between the City and the developer based on the respective contribution to the component. Basis for Policy Summary Reclaimed water is highly treated wastewater (sewage) which can be used for many nonpotable uses such as landscape irrigation, industrial processes, and toilet flushing in certain types of buildings. Use of reclaimed water will require a separate distribution system from potable water lines. Reclaimed water can be used to supply nonpotable uses in new development and to offset potable uses in existing development. These potential uses require a deliberate method to account for reclaimed water use, consistent with policies concerning total water requirements and other water sources. 2.11 CAPITAL IMPROVEMENT PLAN -WATER DISTRIBUTION P_d The City shall replace aging water lines at the yearly rate of 2% of the value of the water distribution system (about $1.5 million annually in 1993 dollars). Basis for Policy Summary Growth within the City has placed increased demands on the water distribution system. Some pipes are over 100 years old, and may be too small to meet current fire -flow requirements. The City has not funded distribution system replacement sufficiently to ensure replacement prior to reaching the end of the infrastructure's service life. Past funding for water main replacement was based on an estimated 150 miles of pipeline in the City. Updated information reveals that there is actually 290 miles of mains with an estimated replacement value of $75,000,000. Therefore, replacing 2 % of the infrastructure annually would require $1,500,000 per year in 1993 dollars. City of San Luis Obispo xi -/Y Urban Water Management. - Executive Summary 3.0 SUPPLEMENTAL WATER SUPPLY PROJECTS Po& The City shall pursue the expansion of the Salinas Resery oir, the Nacimiento Reservoir Project, water reuse, and water demand management activities as supplemental water supply sources to meet current and projected water demand. Introduction The City has been pursuing several water supply options over the past several years to secure adequate supplies to meet current and projected future demand. The following section discusses the projects presently being considered by the City. 3.1 SALINAS RESERVOIR EXPANSION PROJECT The Salinas Dam was constructed by the War Department in 1941 to provide water to Camp San Luis Obispo and the City of San Luis Obispo. The original construction plans for the dam included the installation of an operable spillway gate to provide an estimated storage capacity of approximately 45,000 acre -feet. A small fracture was discovered beneath the dam during construction, therefore the gates were not installed because of stability concerns. An 1989 study revealed that the dam (following the installation of the gates) was strong enough to withstand a major earthquake without failing or causing a sudden release of water. The analysis also found that raising the dam 19 feet would produce an additional 1,650 acre -feet a year of safe annual yield from the reservoir. Before the project proceeds, two hurdles must be crossed. They are the certification of the environmental impact report, which is tentatively set for March 1994, and the resolution of the ownership issue of the reservoir facilities. The City Council has supported the ownership transfer to the County of San Luis Obispo and have been working closely to develop an agreement acceptable to both parties. 3.2 NACIlMEIENTO RESERVOIR PROJECT The Nacimiento Reservoir provides flood protection and is a source of supply for groundwater recharge for the Salinas Valley and is owned and operated by the Monterey County Flood Control and Water Conservation District. The San Luis Obispo County Flood Control and Water Conservation District (District) has an entitlement of 17,500 acre -feet per year of water from the reservoir. The preliminary feasibility study has been divided into three phases and District has requested that agencies interested in future participation share the costs associated with the studies. Phase I of the study evaluated the reliability of the reservoir to deliver water at a maximum amount of 17,500 acre -feet per year and was completed in December 1992. The purpose of Phase II is to evaluate and recommend equitable apportionment of the District's entitlement to interested City of San Luis Obispo xa /`[J Urban Water Management Plan - Executive Summary agencies, to analyze and determine the best pipeline alignment, to determine facility requirements, estimate costs, and to determine probable environmental impacts and mitigation measures. The reports are scheduled to be completed by December 1993. Work on Phase III which is the final report and recommendations is scheduled to begin in January 1994. 3.3 WATER REUSE Reuse of the highly treated water produced by the City's Water Reclamation Facility (WRF) is a . drought resistant portion of the City's multi-source water plan. The WRF produces approximately 4,000 acre -feet of disinfected tertiary treated reclaimed water per year. This water is suitable for most uses other than drinking and food preparation. Of the 4,000 acre -feet, the City proposes to dedicate 720 acre -feet per year of reclaimed water to San Luis Obispo Creek to maintain and enhance the in -stream habitat. Since most of the recycled water will be used for irrigation, it is estimated that only 1,830 of the remaining 3,280 acre -feet will actually be useable. This is because demand for irrigation water is very limited during the winter while discharge from the WRF is fairly constant. The City does not plan to construct a seasonal storage facility at this time. The Water Reuse Project will construct a distribution system to deliver recycled water to large volume customers throughout San Luis Obispo. The system will be designed for future expansion to serve small volume users, when it becomes economically feasible to do so. The City's Wastewater Division will operate the WRF and the water reuse pumps and filters located at the treatment Facility. The City's Water Division will operate and maintain the water reuse distribution system. The tentative completion date of the projects is June 1996. 3.4 WATER DEMAND MANAGEMENT Water demand management practices and technology have advanced significantly in the last several years in reaction to the drought of 1986 -1991. Historically, water demand management was viewed as an emergency response to extreme water shortage situations. The importance of using our water resources wisely and efficiently is imperative to assure adequate, reliable water supplies in the future. In September 1991, The City Council approved and authorized the Mayor to sign the "Memorandum of Understanding" (MOU) regarding urban water conservation and the implementation of the "Best Management Practices" (BMP's). This signifies a minimum ten year commitment to implement and evaluate the water efficiency measures presented in the MOU. Using the BMP's as a road map for future water demand management program implementation, a balanced program of providing information and assistance to the City's water customers is necessary to maintain the water use reductions levels required to stabilize the City's water supplies. City of San Luis Obispo _ xiii /-//,v Urban Water Management P,_. - Executive Summary 3.5 OTHER SUPPLEMENTAL WATER SUPPLY ALTERNATIVES 3.5.1 Desalination In May 1990, the City began a feasibility study for a short-term desalination facility. The preliminary analysis concluded that 3,000 acre feet per year of water could be provided at an estimated cost of 19.5 million dollars. The "Miracle March" rains of 1991 provided adequate runoff and storage in the City's reservoirs to allow the termination of the desalination project on April 16, 1991. Desalination may be a water supply consideration in the future if other water supply projects currently under review are not accomplished. Though considered an expensive source of water at this time, advances in technology in the future may reduce the costs to a more acceptable level. 3.5.2 Cloud Seeding The City activated a three year cloud seeding program in January 1991 in response to the continuing drought. The program targets the Salinas and Lopez reservoirs watersheds, and the County of San Luis Obispo paid a prorata share of the total cost of the program. Salinas Reservoir's watershed runoff characteristics are favorable for producing significant runoff during average rain seasons. Therefore, cloud seeding is not viewed as an annual program but as a program that the Council may approve following below normal rainfall years. 3.5.3 Salinas to Whale Rock Transfer The idea of transferring water which would otherwise spill downstream from Salinas Reservoir to Whale Rock Reservoir was evaluated by staff and presented to Council in 1993. The analysis revealed numerous obstacles and limitations, and Council directed staff to not proceed at this time with further studies relative to this project. 4.0 WATER OPERATIONAL PROGRAMS Policy The City shall provide an adequate supply of high quality water which • Meets all Federal and State standards; • provides uninterrupted water flow at sufficient pressures; • provides fire protection; • sustains citywide water efficiency programs. The City shall allocate funding to meet the goals and objectives presented in this chapter (also see Chapter 5). City of San Luis Obispo _ xiv Urban Water Management Plan - Executive Summary Introduction This section will describe the existing water system, operation and maintenance procedures, and identify current and future system deficiencies. 4.1 WATER TREATMENT Over the past twenty years, surface water treatment and groundwater treatment standards and regulations have become more stringent. With the enactment of the Safe Drinking Water Act (SDWA) in 1974, Congress authorized the federal government to establish national drinking water regulations. Since that time, many amendments have been made to the act which require additional monitoring and treatment and thereby increased operational costs. For the City, the most significant issue is the regulation aimed at reducing the formation of disinfection by products, specifically trihhalomethanes (THM's). To remain within the acceptable level of THM's, meet anticipated future surface water quality standards, and increase water treatment operational efficiency, the City is upgrading the water treatment facility to use ozone as the primary disinfectant instead of chlorine. In November 1992, nitrate levels in the Auto Parkway well exceeded State standards and was taken off -line. The City's Denny's well experienced a similar increase in nitrate levels and was taken off -line in June 1993. Treatment alternatives for nitrate removal will be recommended to Council during 1994. 4.2 WATER DISTRIBUTION The water distribution program delivers potable water from the water treatment plant and wells to customers and fire hydrants via three storage reservoirs, six pump stations, eight water tanks, and approximately 300 miles of water mains. Some pipes are over 100 years old, and many are too small to meet current fire -flow requirements. The City has not funded distribution system replacement sufficiently to ensure replacement prior to reaching the end of the infrastructure's service life. Because of this, the current water distribution staff workload is limited mainly to corrective maintenance and allows minimal time for preventative maintenance. In order improve the reliability of the water distribution system, a comprehensive preventative maintenance program should be established. A workload analysis indicates that a minimum of two additional staff will be required to implement a cost effective preventative maintenance program. Funding in addition to the Capital Improvement Plan (Section 2.11) may be necessary to correct other recognized system deficiencies. 4.3 WATER CUSTOMER SERVICE The Water Customer Service Program is responsible for accurately measuring water delivered through the distribution system to.the City's 12,500 customers. Other duties include the repair of meter leaks, meter replacement and testing, and the starting and discontinuance of service. The current program needs are being met with the cross -over assistance from the water City of San Luis Obispo _ xv 1—/0 Urban Water Management PI" - Executive Summary distribution crew during peak workload periods. Future growth will add a significant number of water meters which may require additional staffing. As areas are annexed, an analysis of staffing impacts will be performed and recommendations presented to Council. 4.4 TELEMETRY Telemetry literally means "measuring at a distance '. Telemetry became part of the Utilities' operations in 1988 when the Regional Water Quality Control Board required installation of alarms on the City wastewater collection lift stations. It has evolved into complex computer network, monitoring the City's water and wastewater systems. When completed, the telemetry system will save staff time by allowing the monitoring and system adjustments to be made from a central location, add reliability to the water system, and insure the City is in compliance with federal and state regulations. 4.5 WATER CONSERVATION In June 1985, the Council adopted the Annual Water Operational Policy which established a procedure to monitor the City's water supply situation. An integral component of the policy was the establishment of a water demand program aimed at instituting corrective measures ahead of any projected water supply deficit. Water conservation has two primary components, short-term and long -term water demand management. Short-term activities address immediate water shortage situations caused by prolonged below normal rainfall or.disruption in water service due to natural disaster such as an earthquake. Due to the drought and water shortages experienced from 1989 to 1992, the short-term measures developed during that period (formalized in the City's Water Shortage Contingency Plan) will be a model for any future water emergencies the City might face. Long -term programs make permanent reductions in water demand while. minimally impacting customer's lifestyles. In September 1991, The City approved and signed the "Memorandum of Understanding" (MOLT) regarding.urban water conservation and the implementation of the "Best Management Practices" (BMP's). The BMP's act as a road map to the City's long -term water conservation program development and implementation policy. 5.0 FINANCIAL PLAN Po The City's policy is to fully recover all water costs through water revenues. Resolution No. 6447 states the primary goals of the City's water utility are to provide quality water service to its citizens and to function as self- sufficient enterprise. Under the policy, all water revenues are used only for water purposes. The water fund will reimburse the general fund for all indirect costs pursuant to the approved cost allocation plan. City of San Luis Obispo xvi f -!9 CHAPTER 1 INTRODUCTION 1.1 PURPOSE AND SCOPE The City of San Luis Obispo has aggressively monitored and managed its water resources during the past decade. Faced with increasingly restrictive budgets, growing population, limited resources, and the commitment to serving our customers needs, the City has fostered a management style which is pro -active rather than reactive, with an emphasis on actions which achieve practical results. This philosophy is the foundation for the Utilities Department's development of the Urban Water Management Plan. To evaluate the current water supply and.delivery systems and to plan for needed expansion and improvements through the year 2025, the City has undertaken the preparation of this document. The purposes of the plan are to formulate long range City water policy, identify needed improvements both in the water supply and distribution systems, determine needed expansion to reach the General Plan goals, and develop a basis for financial planning to achieve the recommendations made in this document. Objectives and Scope The specific objectives of the Urban Water Management Plan can be summarized as follows: ■ Provide estimates of future supplemental water requirements based on population projections developed from the General Plan Land Use Element and per capita water use figures. ■ Provide an evaluation of alternative water supply sources, both short and long term, that could meet supplemental water requirements. Evaluations shall be based on economic, technical, and environmental factors. ■ Summarize the water treatment processes and regulations, and identify the water treatment, distribution and storage systems current deficiencies and future needs. ■ . Consolidate previously - adopted water policy. ■ Evaluate the water conservation program. ■ Comply with state law, AB 797, the Urban Water Management Planning Act. City of San Luis Obispo -.20 Urban Water Management ..an The Urban Water Management Plan for the City of San Luis Obispo will provide a policy and strategy for adequately developing the City's water resources and its treatment and delivery systems. It will also bring the City into compliance with the requirements of state law (AB 797) relating to water conservation. The Plan will clearly define and analyze the key water issues facing the City and then identify solutions to meet our supply and infrastructure needs. It will also evaluate financial options and address institutional relationships as necessary. The Plan is consistent with the goals, policies, land use, and population projections presented in the proposed General Plan update. City of San Luis Obispo 2 /-X Urban Water Management 1,Qa 1.2 RELATIONSHIP TO GENERAL PLAN AND OTHER DOCUMENTS Chapter 2, Water Policies, constitutes the Water Element of the General Plan, and replaces the water section of the Water and Wastewater Management Element. This plan includes all information needed to comply with State law AB 797, the Urban Water Management Planning Act and will be updated in the Year 2000 in accordance with provisions of AB 797. Progress on the implementation of this plan will be presented to the City Council on a yearly basis as part of the Annual Water Operational Plan. City of San Luis Obispo 3 /—OZZ Urban Water Management , .an 1.3 CURRENT WATER SOURCES 1.3.1 SALINAS RESERVOIR Introduction The Salinas Reservoir (also known as Santa Margarita Lake) is located on the upper Salinas River, approximately nine miles southeast of the community of Santa Margarita. The project was originally built by the U.S. Army to ensure an adequate water supply for Camp San Luis Obispo. The dam and appurtenances were declared surplus by the War Department on April 14, 1947 and the U.S. Army Corps of Engineers assumed responsibility for the facilities. On July 11, 1947, the Corps entered into an agreement with the San Luis Obispo County Flood Control and Water Conservation District (District) for the operation and maintenance of the dam and related facilities. The City has an agreement with the Corps for the full entitlement of water from the reservoir. As part of this agreement, the City pays to the District all operation and maintenance costs associated with the water delivery and storage facilities. Operation and Distribution Salinas Reservoir is formed by a concrete arched dam. Immediately following construction, the reservoir had an estimated storage capacity of 26,000 acre feet, surface area of 793 acres, and a drainage area of 112 square miles. As a result of siltation the reservoir capacity has been reduced. This is discussed in more detail in Chapter 2, Section 5. Water is conveyed from Salinas Reservoir through 48,700 feet (9.2 miles) of 24 -inch diameter reinforced concrete pipe to a 3,000,000 gallon regulating reservoir at Santa Margarita booster pumping station. The pipeline is designed to flow by gravity from the reservoir when the reservoir surface level is above the elevation of 1,267 feet. A booster pump station at the base of the dam, consisting of two horizontal centrifugal pumps, is capable of maintaining the rated flow of 12 cubic feet per second (cfs) when the water surface elevation falls below 1,267 feet. Three electrically driven horizontal centrifugal pumps at the Santa Margarita booster station pump water through 6,810 feet of 24 -inch diameter reinforced concrete pipe to the entrance portal of the Cuesta Tunnel, which runs 5,327 feet through the mountains near Cuesta Grade. From the outlet portal of the tunnel, water is conveyed through an 18 -inch diameter steel pipeline a distance of 5,133 feet to the City's turnout point. From the turnout, an 18 -inch diameter pipe runs 4,180 feet to the Stenner Creek hydroelectric plant. From there, a pipeline that varies from 24- inches to 30- inches in diameter conveys the water by gravity to the water treatment plant 5,930 feet downstream. Operation and Maintenance Evaluation The operation and maintenance of the dam and water conveyance system are the responsibility of San Luis Obispo County Flood Control and Water Conservation District. The City currently pays all operating and capital costs associated with the reservoir and transmission system (excluding any recreational activities). City of San Luis Obispo 4 /-023. Urban Water Management ) ...., Recommendations for System Improvements The City is pursuing a project which will install a gate on the spillway in the Salinas Dam, effectively raising the high water surface of the reservoir by approximately 19 feet. When completed, the expansion of storage capacity from approximately 23,843 acre feet to 41,790 acre feet will increase the safe annual yield of the reservoir by an estimated 1,650 acre feet. 1.3.2 WHALE ROCK RESERVOIR Introduction Whale Rock reservoir is located on Old Creek approximately one half mile east of the community of Cayucos. The project was planned, designed, and constructed under the supervision of the State Department of_ Water Resources. Construction took place between October 1958 and April 1961. The reservoir is jointly owned by the City of San Luis Obispo, the California Men's Colony, and the California Polytechnic State University at San Luis Obispo. These three agencies form the Whale Rock Commission which is responsible for operational policy and administration of the reservoir. Day -to -day operation is provided by the City of San Luis Obispo. Operation Whale Rock reservoir is formed by an earthen dam and can store an estimated 40,662 acre feet of water. The project facilities consist of a 30 -inch pipeline, two pumping stations, a hydroelectric generator, 2.1 miles of trails and a fishing access facility, maintenance facility and offices, a structure previously used as a private residence, and percolation ponds. City staff are responsible for ongoing maintenance and operation of the reservoir, including the inlet and outlet structures, reservoir structural instrumentation, access roads, daily reservoir level readings and climatological data, percolation pond, reservoir patrol and security, hydroelectric power generation, pipeline pumps and pumping stations, water meters, cathodic protection system, and other associated duties. In addition, staff operates a seasonal steelhead hatchery at the reservoir which started operation during the 1991/92 steelhead spawning season. Staff also monitors public fishing access to the lake during trout season (April to November). Conveyance System The conveyance system (Figure 1) conveys water from the reservoir to the Whale Rock Commission member agencies located between the reservoir and the City of San Luis Obispo. Outlets from the pipeline exist for water deliveries to Chorro Reservoir and water treatment plant (operated by the California Men's Colony), Cal Poly State University, and the City's water treatment plant. The Whale Rock pipeline is approximately 17 miles long, connecting the reservoir to the member agencies, and terminates at the City's water treatment plant. The design capacity of the City of San Luis Obispo 5 /_02— Urban Water Management rtan pipeline is 18.94 cubic feet per second (approximately 8,500 gallons per minute). The line consists of modified prestressed concrete cylinder pipe at most locations. Cement mortar lined steel pipe is used at creek crossings and junctions. The pipeline has surge protection consisting of eight -inch, globe type, diaphragm - actuated pressure relief valves which protect the line from excessive pressures. The cathodic protection system consists of sacrificial anodes and .test stations located in areas subject to galvanic corrosion. Recent inspections of the inside of the pipeline indicate the condition of the pipeline to be very good with no rehabilitation needed in the near future. Two pump stations transmit the water along the pipeline to member agencies. The first pump station is located in Cayucos at Chaney Way (elevation 44 feet). The second station is located in Camp San Luis Obispo, approximately six miles southeast of Morro Bay (elevation 181 feet). Each station has five pumps which are capable of varying flow rates requested by member agencies. Upgrades to both pump stations, which included the addition of two pumps at each station, were completed in August 1993. Cayucos Ateseadero N Wavle Reservoir � T Gt �Ef^�•.Y —� i 0 t 2 Miles �.. O Pump Station A .'pTa` A0 SIR 110 +00 per•: 9.1 c °sue Pol ' ✓ ,o, 'air OQ'i ?o / � O Santa r os�. C 77 S/ .�EE� Margarita I � � r2 e�/ CtSl GAEEix-- 9 Va Churro Water O Ij SANE Treatment Plant 0 I Mara any D PgFS / a I// tapf 2 aq ' Chorro Resaryoh PtanP Star B Stoma 729+40 San Floor from Salinas Reservoir Sta 603 +50 Chorro Lateral ~San Luis SIR 796+36 Obispo San Luis Obispo. Foreoay rI Water 1I City Water Treatment Ram Treatment SIR 667 +00 EP PaaemUnt Plant WHALE ROCK ' Otnl"' Clty 0 /1 Water Treatment Plant ameetlon to Abandoned CONVEYANCE City water Treatment Plant CONDUIT San LWs Obisp ' Location Map Figure 1 WHALE ROCK CONVEYANCE SYSTEM Operating Agreements Several agreements establish policy for the operation of the Whale Rock system and actions of the member agencies. A brief description of the existing agreements follows: City of San Luis Obispo _ 6 Cz!� Urban Water Management 1. Agreement for the construction and operation of the Whale Rock Project, 1957, set forth the project's capital cost distribution to the member agencies. 2. A supplemental operating agreement, 1960, established the Whale Rock Commission and apportioned the operating costs. 3. Downstream water rights agreement, 1958, established water entitlements for adjacent and downstream water users. The downstream water users (Cayucos Area Water Organization or CAWO) affected by this agreement consist of three public water purveyors and the cemetery. In addition to the agencies, water entitlements were identified for separate downstream land owners. Entitlements are as follows: ■ Cayucos Area Water Organization ( "CAWO ") 600 Acre feet Paso Robles Beach Water Association Morro Rock Mutual Water Company County Water District #8 Cayucos -Morro Bay Cemetery District ■ Mainini 50 ■ Ogle 14 Total Downstream Entitlement 664 Acre Feet 4. A decision and order by the Fish and Game Commission of the State of California, October 24, 1964, required the Whale Rock Commission to stock the reservoir with 17,500 rainbow trout (between six and eight inches long) each year. 5. Superior Court decision #36101, 1977, required the Whale Rock Commission to allow public entry to the reservoir for fishing. In 1981, construction was completed on access trails and sanitary facilities at the reservoir, and public fishing began at the lake. 6. The City of San Luis Obispo and the San Luis Obispo Community College District (Cuesta College) reached an agreement in 1987 to deliver up to 110 AF of untreated Whale Rock water to the California Men's Colony Water Treatment Facility, for treatment and distribution to the Cuesta College campus. 7. An agreement for water allocation and operational policy betwen the agencies forming the Whale Rock Commission. The agreement established the accounting procedures to allow each agency to carry over excess or deficit water each year. 8. An agreement between the Whale Rock Commission and the California Men's Colony, 1990, to establish maintenance and operation criteria for the Chorro Booster pumps. The Chorro Booster pumps were installed by the Commission on the California Men's Colony turnout from the Whale Rock line to reduce system pressures required to provide full flow to City of San Luis Obispo 7 l' 14 Urban Water Managemen. an the California Men's Colony water treatment plant. Pump and pump station maintenance, per the agreement, are the responsibility of the California Men's Colony. Operation and Maintenance Evaluation Current reservoir staff consists of three full -time, regular employees and one part-time employee. Reservoir staff are responsible for ongoing maintenance and operational duties which include: ■ Inlet and outlet structure maintenance. Routine valve operations, trash rack cleaning, outlet vault valve operation, lubrication, adjustments and repairs. ■ Reservoir structural instrumentation. Weekly recordings and analysis of piezometers, groundwater levels, reservoir and underdrain seepage data, and erosion and slippage control information. ■ Percolation pond operation. Daily regulation of the water releases to the pond areas to optimize water availability to the downstream water agencies. Occasional dredging of the pond areas has been necessary to maintain satisfactory pumping levels for the downstream users. ■ Reservoir patrol and security. Daily surveillance of the reservoir, fences, and dam areas. ■ hydroelectric power generation. Coordinating flows to the downstream percolation ponds. The power generation plant is only operated when storage at the reservoir nears capacity which would warrant excess water releases. ■ Pipeline pumps and pumping stations. Daily inspections during operational periods for readings, adjustments, and pump efficiency evaluation. ■ Water meters. Monthly readings and reporting of deliveries to the various agencies and individuals. The meters monitored include Whale Rock member agencies' meters, Cayucos Area Water Organization well meters and certain private party meters. Periodic maintenance is required for the proper operation of these meters. ■ Cathodic protection. Annual monitoring of stations to ensure that the water transmission line is properly maintained and protected. ■ The seasonal steelhead hatchery. Recently introduced to help alleviate a long term deficiency in the availability of native steelhead trout for fish enhancement at Whale Rock. Native adult steelhead are captured at the reservoir and spawned, then the young are raised at the facility in circular pens until they are old enough to re- introduce to the reservoir. The hatchery program requires daily observation, treatments, and feeding of the young steelhead during the rearing period, usually February through July or August. Volunteer assistance is frequently used to assist in the hatchery operation. City of San Luis Obispo 8 /a7 Urban Water Management , ....i Recommendations for System Improvements With the upgrades of the pump stations which were completed in August, 1993, combined with the cathodic system maintenance program which insures the reliability of the water transmission line, it is anticipated that the raw water delivery system will not require capital improvements in the near future. One area of concern at the reservoir is earth movement occurring close to the fishing facility near Old Creek Road. The facility is located in an area which has been impacted by soil slippage. Due to the current low interest in Whale Rock fishing, and the hazardous condition at the facility's access driveway, the area has been closed to the public. An increase in fishing activity at the reservoir would necessitate repair of the access and parking areas. At the appropriate time, a specific proposal will be presented to Whale Rock commission for approval. Staffing Evaluation Existing staffing levels are considered adequate for current workloads. However, as previously mentioned, increased fishing activity at the reservoir could require additional monitoring and repair of the facility and access trails. The existing Whale Rock staff have adjusted work schedules to permit daily observation of the fishing access areas which eliminates the need for seasonal fishing program personnel. Additional use would demand more of the staff's time which would ultimately have a negative impact on the reservoir's over -all operation and maintenance. Staff will closely monitor the fishing program at the reservoir and present a recommendation to the Whale Rock Commission if the fishing activity increases beyond the capabilities of the current staff to adequately monitor the access areas. 1.3.3 GROUNDWATER Intrdduction The City's major source of water was groundwater until 1944 when the City began to use water from Salinas Reservoir. In 1943, the City pumped 1,380 acre feet of groundwater. Groundwater was used again during the summer of 1948 when 440 acre feet was pumped. In the intervening years, until 1986, most groundwater in the City was used by agriculture and very little was used for domestic consumption. As a result of the drought beginning in 1986 and decreasing surface water supplies, the City activated groundwater wells in 1989 to meet the City's water demand. The principal source of groundwater for the City is the San Luis Obispo Groundwater Basin. The basin is fifteen square miles and is drained by San Luis Obispo Creek. It extends from the northern limits of the City and continues southernly along the alignment of the creek to just south of Buckley Road. In the Los Osos Valley area, the basin extends four miles west to the Los Osos Basin, which includes the community of Los Osos /Baywood Park. City of San Luis Obispo 9 07V Urban Water Managemen, an In 1990, at the height of the drought, the City had seven potable wells which accounted for approximately 50% of the water supplied during that period. The current groundwater program uses four potable wells and two irrigation wells. Two of the City's wells, known as the Auto Park Way and Denny's wells, were shut down in 1992 and 1993 due to elevated nitrate levels. This is discussed in more detail in Chapter 4. Operation Operation and maintenance of the groundwater wells for the City is provided by the Water treatment plant staff. The well sites require daily inspections, at a minimum, to ensure proper operation of the facilities. Each site includes pumps, valves, meters and other related appurtenances, as well as necessary chlorine metering equipment for proper disinfection as required by the State Department of Health Services. Monthly production rates and biweekly water levels are recorded and maintained by staff. The Auto Park Way well required the use of granular activated carbon ( "GAC ") absorption tanks for the removal of tetrachloroethylene ( "PCE ") which has contaminated the groundwater in the area of this well. Operation and maintenance of the GAC treatment facility required more staff time than the other well sites. Elevated nitrate levels in excess of the State's regulations required the discontinuance of the well's use in October 1992. The Denny's well on Calle Joaquin was taken out of service in June 1993 due to increasing nitrate contamination. Operation and Maintenance Evaluation The operation and maintenance of City wells are adequately handled by the existing personnel at the Water Treatment Plant. No increase in staff is anticipated in the near future. Recommended System Improvements There are several options for reducing maintenance and operating costs. One option is the installation of variable frequency drive pumps, which could reduce energy consumption and electrical bills for pumping water. This option should be implemented if analysis reveals a favorable cost benefit ratio. Treatment options for the nitrate contamination at Auto Parkway Well will be presented to Council upon completion of the evaluation of alternatives. Treatment of groundwater is recommended as a viable, cost effective source of supply. Re- establishment of the Auto Parkway well will ensure that minimum safe annual yield projections of groundwater are realized. City of San Luis Obispo 10 /-.29 CHAPTER 2 WATER POLICY Introduction This chapter addresses the water policy elements required to ensure that adequate supplies of water are available to meet both current and projected future water demand for the City of San Luis Obispo. Because of the length and complexity of the policies, a brief summary of all the policy statements contained in this Plan is presented in Appendix I. 2.1 SAFE ANNUAL YIELD Emma 2.1.1 BASIS FOR PLANNING The City will plan for future development and for water supplies based on the amount of water which can be supplied each year, under critical drought conditions. This amount, called "safe annual yield," will be formally adopted by the Council. The safe annual yield determination will be revised as significant new information becomes available, and as water sources are gained or lost. The determination will consider a staff analysis, which will recommend an amount based on coordinated use of all water sources. Each change to safe annual yield will be reflected in an amendment of this plan. 2.1.2 SAFE YIELD AMOUNT The City's safe annual yield of potable water is 7,735 acre feet, based on 7,235 acre feet from the coordinated operation of Salinas Reservoir and Whale Rock Reservoir, and 500 acre feet of groundwater. 2.1.3 GROUNDWATER The amount of groundwater which the City will rely upon towards safe annual yield is identified in Section 2.1.2. The City will maximize the use of groundwater in conjunction with other available water supplies to maximize the yield and long term reliability of all water resources . and to minimize overall costs for meeting urban water demands. City of San Luis Obispo 11 /-,30 Urban Water Management ....a -- Basis for Po& Safe annual yield is the amount of water that can reliably be produced by the City's water supply to meet the water demand. It is estimated by simulating the operation of the City's water supply sources over an historical period to determine the maximum level of demand which could be met during the most severe drought for which records are available. The safe annual yield of an individual source of water supply is defined as the quantity of water which can be withdrawn every year, under critical drought conditions. Safe annual yield analyses of water supply sources are based on rainfall, evaporation and stream flow experienced during an historical period. The City of San Luis Obispo uses a period beginning in 1943, which covers drought periods in 1946 -51, 1959 -61, 1976 -77, and 1986 -91. The historical period used in the latest computer analysis to determine safe annual yield extends from 1943 through 1991 and includes the most recent drought. Although future conditions are unlikely to occur in the precise sequence and magnitudes as have occurred historically, this technique provides a reliable estimate of the future water supply capability of the existing sources, since the long term historical record is considered a good indicator of future conditions. The safe annual yield gradually declines as silt accumulates in the reservoirs, thereby reducing storage capacity. This is discussed in more detail in Section 2.5. Current Safe Annual Yield Analysis Prior to 1991, the "controlling drought period" for determining safe annual yield was 1946 to 1951. The adopted safe annual yield estimate of 7,235 acre feet uses the controlling drought period 1986 to 1991. This safe annual yield estimate was adopted by Council as part of the 1992 -93 Water Operational Plan. The adopted safe annual yield from Salinas and Whale Rock Reservoirs, including 500 acre feet of groundwater, is 7,735 acre feet per year. Water Supply Safe Annual Yield Coordinated Operations of the Salinas 7,235 acre feet and Whale Rock Reservoirs Groundwater 500 acre feet TOTAL SAFE ANNUAL YIELD 79735 acre feet Previous Safe Annual Yield Studies Previous studies of the critical historical drought periods at Salinas and Whale Rock reservoirs have indicated the following safe annual yields were available to the City: City of San Luis Obispo 12 t-3/ Urban Water Management 1._. Water Supply Safe Annual Yield Reference Salinas Reservoir 4,800 acre feet Corps of Engineers, 1977 Whale Rock Reservoir* 2,060 acre feet Dept Water Resources, 1974 Coordinated Operation 500 acre feet CH2M -Hill, 1985 Groundwater 500 acre feet Water Operational Plan, 1993 TOTAL 7,860 acre feet *City's share of Whale Rock Reservoir safe annual yield. Past safe annual yield analysis for the two reservoirs assumed independent operation and historical data to the date of each report. The critical drought period for the previous studies. was 1946 -51. The studies also assumed a minimum pool at Salinas and Whale Rock of 400 and 500 acre feet respectively. "Coordinated operation" is a concerted effort to operate the two reservoirs together for maximum yield. Since Salinas Reservoir spills more often than Whale Rock Reservoir, due to its larger drainage area and more favorable runoff characteristics, and has higher evaporation rates, the combined yield from the two reservoirs can be increased by first using Salinas to meet the City's demand and then using Whale Rock as a backup source during periods when Salinas is below minimum pool or unable to meet all of the demand. The 500 acre feet increase in safe annual yield was a preliminary estimate of the additional yield attributed to coordinated operations of the reservoirs identified in the 1985 report prepared by CH2M -Hill. In 1988, the City contracted with the engineering firm of Leedshill - Herkenhoff, Inc., to prepare a detailed analysis of the City's water supplies and safe annual yield, based on coordinated operation of the reservoirs. The report "Coordinated Operations Study for Salinas and Whale Rock reservoirs" was completed in 1989. The study estimated total safe annual yield for the City from the two reservoirs to be 9,080 acre feet per year. Since the study period was only to 1988 and the City was in a drought period of unknown length, this amount was never adopted by Council. It should be emphasized that this estimate assumed that the "controlling drought period" was 1946 to 1951 and that Whale Rock Reservoir is used only when Salinas is below minimum pool or can not meet the monthly City demand, and does not consider limitations on the use of Salinas water due to water quality constraints. Following the end of the of 1986 -1991 drought, staff updated the computer program created by Leedshill- Herkenhoff to estimate the impact of the drought on safe annual yield of the reservoirs. The analysis determined that the recent drought was the critical drought of record for the two reservoirs, reducing the safe annual yield to 7,235 acre feet per year as identified in the previous section for the current safe annual yield analysis. Groundwater Resources The groundwater basin which underlies the City of San Luis Obispo is relatively small. Therefore, extractions in excess of 500 acre feet per year during extended drought periods cannot be relied upon. Since the basin is small, it tends to fully recharge following significant City of San Luis Obispo 13 1 -3. Urban Water Management _ -a rainfall periods. Following periods of above average rainfall, the groundwater basin may be capable of sustaining increased extraction rates to meet City water demands. The use of the groundwater basin in conjunction with the City's other water supply resources provides an effective management strategy which increases the reliability of all the resources to meet current and future water demands. The operation of the groundwater basin in this manner is similar to the use of Salinas Reservoir. Since both Salinas Reservoir and the groundwater basin fill up and "spill" following significant rain periods, there is a benefit in drawing from these sources first and leaving Whale Rock reservoir as a backup supply. Another benefit to maximizing groundwater use is that it typically requires minimal treatment which reduces costs compared to surface water supplies. Even with treatment for nitrates and PCE, the projected costs associated with that treatment show groundwater to be comparable to other alternative future water supply projects. City of San Luis Obispo 14 /-J Urban Water Management 1. 2.2 WATER CONSERVATION Poll 2.2.1 LONG -TERM WATER EFFICIENCY The City will implement water- efficiency programs which will maintain long -term, per- capita usage at least ten percent below the average per capita usage recorded during 1986/87. The target amount is the long term planning amount as defined in Section 2.3. 2.2.2 SHORT -TERM WATER SHORTAGES Short-term mandatory measures, in addition to the long -term programs, will be implemented when the City's water supplies are projected to last three years or less based on projected water consumption, coordinated use of all city water supply sources, and considering the drought pattern on which safe yield is based (or response to other situations which may interrupt supply). Basis for Polic'X Water conservation was referenced as a part of the City's water management policy in ,1973. In 1985, the City adopted the Annual Water Operational Plan policy which established water conservation as a means of extending water supplies during projected water shortages. During this time, many technological and philosophical changes have occurred which are proving water conservation to be both a short term corrective measure for immediate water supply shortages and a long term solution to water supply reliability. Because of the experience during the drought of 1986 to 1991, the City has developed a short term plan to deal with immediate water shortages and has recognized the importance of water efficiency by supporting long term programs. The City will reevaluate and update its water conservation efforts in response to changing water demand, supplies, technology and economic conditions. City of San Luis Obispo 15 Urban Water Management _ .i 2.3 WATER DEMAND PROJECTIONS Policy 2.3.1 BASIS OF PROJECTIONS The City will project water requirements, considering long -term conditions and the full range of water uses in the City. Separate projections of potable and nonpotable requirements will be made. 2.3.2 WATER USE RATE The City shall use 165 gallons per person per day (this equates to approximately 0. 185 acre -foot per person per year) and the number of City residents to plan total projected future water demand. This quantity will be revised if warranted by long -term water use trends, including differences in the relationship between residential and nonresidential usage. (This Plan uses 165 gallons per person per day in computations of future water demand.) 2.3.3 OVERALL PROJECTED DEMAND Applying 165 gallons per person per day (0.185 acre -foot per person per year) to a projected City resident population of 56,000 at General Plan build -out results in a projected water demand of an estimated 10,350 acre -feet per year. Basis for Polio The City must know how much water will be needed to serve residents, businesses, and other users to accommodate the General Plan. This quantity can be projected using different methods. All methods involve assumptions about both future usage rates and the numbers and types of users expected in the future. The quantity expressed in the policy above corresponds closely with both (1) total citywide usage compared with total resident population and (2) projections of water demand based on usage by various land use categories. There always will be some uncertainty in estimating development capacity (such as the number of dwellings or residents) as well as the usage per customer type (such as acre -feet per dwelling or per resident.) The estimating method must use reasonable assumptions, based on experience, to assure an adequate level of water supply while not overstating demands. Since the early 1970's, usage estimates have ranged from 0.17 to 0.22 acre -foot per resident per year (about 155 to about 195 gallons per person per day). The estimates have varied so widely due to actual differences in consumption over time and to confusion about accounting for Cal Poly usage. (The City treats and delivers much of the water used by Cal Poly, even though Cal Poly has separate entitlements.) Table 2.3.4 shows recent water usage compared with City resident population. Table 2.3.5 compares the "per capita" and "land use" methods of estimating water needs. City of San Luis Obispo 16 Urban Water Management 1-,.d City. GPC /Day 160 ..163 151 154 is8 179' 182' 182 175 116 89' 85 1992... 5,304 4,704 42.922 110 98 Ph. to "Nov''T993> 5,236 4,636 43;414 115 -Prof. 103 -Pro %. 111; :. Includes Cal Poly potable water. (2k: water use assumed constant for this period (600 acre feet/year). The: lines denoting the: 1989 to 1991 block of years indicate man datory'rationmy, I41 January 1 population estimates...- estimates...-i California Department of Finance, Population Research Unitas revised through 1993: Table Z.3.4 City Water Use 1980 -1993 City of San Luis Obispo 17 1-36 CITY.,WATER USE PER DAY: ... Water from ; Total: City WTP an d Wells Water.. Demand Population: Total Year A:F.J 111 (A.F.1:I2J: 441: GPC %Day 1980 6,745:.: 6145 34,252... :176 1981 6,342 34,759! : =178 ,. 1982 5,979: 167: T983 6.766' :. 6:166 35,660 <:. - 169 1984 7 437 :.' :. 6,837 361407: 182 1.985 .8 095.,-:: 7,495 37,378 193 1986 8,382..: - 7 782 38,205:: 196' T9.97 8,397'. ; 7 797 38,282'. 196. 1.988 8 413: .7813 .39,850 - :188 l31 1989 `5,933' ; 5,333. . 41,027 129 1990 4;792'' 4;192 41,958 102 .._.:.:. °1991 :. ...... ................. 4,636 4036- 42,178 98 City. GPC /Day 160 ..163 151 154 is8 179' 182' 182 175 116 89' 85 1992... 5,304 4,704 42.922 110 98 Ph. to "Nov''T993> 5,236 4,636 43;414 115 -Prof. 103 -Pro %. 111; :. Includes Cal Poly potable water. (2k: water use assumed constant for this period (600 acre feet/year). The: lines denoting the: 1989 to 1991 block of years indicate man datory'rationmy, I41 January 1 population estimates...- estimates...-i California Department of Finance, Population Research Unitas revised through 1993: Table Z.3.4 City Water Use 1980 -1993 City of San Luis Obispo 17 1-36 Urban Water Managemen, to Method 1: Water Treatment Plant Production and Population Per Capita Water Use Based on Historic Demand, Population and Conservation. Annual Demand Less Cal Poly Per Capita Use Less 10» Ion¢ term conservation 1997 -Year highest use Subtract 6W am IM hem local, based on average demand convent to gallons and divide by 365. Divide by Dapt oc Finance population astinns (3&=. subtract 10X. 8,397 acre feet 7,797 acre feet 182 gallons /day 164 gallons /day Method 2: Metered Use by Development Type and Land Use Element Per Capita Use Based on Land Use, Historic Demand and Conservation Type Of SFResid 4,033 acre feet Land Use— MFRasid 2,926 General Plan Retail Comm 469 Buildout Office 437 (1992 Hearing Draft) Svc Industry 487 MotayHetel 675 Hosp, Schools, Parke 1.591 Total Acre Feet (1) 10,618 acre feet Per Capita Use convert to gallons and 169 gallons /day divide by 366. Divide by esummed buildwa population (56,0000). Excludes Cal Poly pop. (1) Land use rates include 10% long term conservation compared to 1987 use. Table 2.3.5 Two Methods to Derive Estimate for Individual Water Use Per Based on the analyis of these two approaches, staff assumed a number of 165 gallons per day per person for long term water supply planning purposes. CALCULATION OF CURRENT WATER DEFICIT USING 165 GALLONS PER PERSON PER DAY AS A PLANNING NUMBER Current Demand Gallons per Person per Day 165 X City Gallons Per Population Acre -Foot 43,414 X 1 acre foot 325,851 gal. Current Safe Annual Yield Estimate of Current Deficit Days in Year - X 365 8,024 acre feet (7,735) acre feet 289 acre feet City of San Luis Obispo is /-37 Urban Water Management 1. . 2.4 RELIABILITY RESERVE P ua In seeking and accounting for new water supplies, the City will strive for a "reliability reserve" of 2,000 acre -feet safe annual yield (about 20 percent of projected future water demand at full build -out). Basis for Ebb The concept of "reliability reserve" for long range water planning was presented to the City Council in 1990. At that time, the City was in the midst of an extreme drought and was considering building a desalination plant to meet projected short term water supply deficits. This reserve is intended to maintain adequate City water supplies during unpredictable changes such as a new worst case drought, loss of one of the City's water sources, or contamination of a source, and not to allow additional development. Originally, California water law was created to provide certainty in water supply for individuals or agencies using a source. However, changing water laws now provide little certainty for planning future supplies. Recent decisions requiring additional downstream releases for environmental protection purposes, such as those affecting Mono Lake and the Sacramento -San Joaquin Delta, have shown that the impacts on all users associated with water supply projects sometimes must be addressed. - The City's water supply sources may also be jeopardized by water quality and drought conditions. Contamination or new requirements for water treatment could reduce the available supply to the City for an extended period. Also, current safe annual yield estimates for Salinas and Whale Rock reservoirs are based on historical data since 1943. The recent drought of 1986- 1991 is the controlling period for safe annual yield calculations. If there is a future drought more extreme than this period, the safe annual yield of the reservoirs will likely be reduced. These uncertainties prompted the Council to establish a reliability reserve of 2,000 acre feet to protect the City from water shortages in the future (March 3, 1993, Resolution No. 8135). The reserve will not guarantee that the City will never experience water shortages in the future, but - will reduce the impacts associated with reductions in available supplies. City of San Luis Obispo 19 /r ,70 Urban Water Management 2.5 SILTATION AT SALINAS AND WHALE ROCK RESERVOIRS Poad The City shall develop 500 acre feet safe annual yield to account for the loss of water storage capacity due to siltation at Whale Rock and Salinas reservoirs to the year 2025. Basis forte Siltation at reservoirs is a natural occurrence which can substantially reduce the storage capacity over long periods. The reduction of available storage will reduce the safe annual yield of the reservoirs. Siltation at reservoirs varies depending on factors such as rainfall intensity and watershed management practices.. There have been numerous reports addressing siltation at Salinas reservoir, but no studies have been done for Whale Rock reservoir. Table 2.5.1 lists the studies for Salinas reservoir and the estimated storage capacities. During the recent drought, water at Salinas reservoir fell to record low levels. Recognizing the unique opportunity presented by the low water level, the County contracted with a local engineering consultant to provide an aerial survey of the lake and prepare revised storage capacity information. The latest information reveals that the survey conducted in 1975 may have over estimated the siltation rate at the reservoir. Early studies indicated average annual siltation rates from 23 acre feet per year to 34 acre feet per year. The study done by the U.S. Geological Survey in 1975 estimated that the siltation rate was approximately 82 acre feet per year. The latest information indicates that the siltation rate is on the order of 40 acre feet per year. Since Whale Rock is used as a backup supply for the City, it may be many years until the lake level drops to the point where an aerial survey of siltation can be economically performed. Since no information is available to Table 2.5.1 Summary of Salinas Reservoir Capacity Studies indicate what rate of siltation is occurring at the Whale Rock reservoir, it is assumed for planning that the annual average rate of siltation is similar to Salinas reservoir. The reliability reserve discussed in Section 2.4 can offset the additional long term loss. City of San Luis Obispo 20 / -3g TOTAL-rneRi F AVG ANNUAL LOSS YEAR AGENCY tJ1PACfrY caPaarY USABLE CAPAQTY Aore feat Acre feet Acre f6kfV er 1941 U.S: Army 44;800 26,000 : 1947 : U S .Soil Conservation. Sve 25,860 23.3 .. 1953 . U.S; Soil Conservation Sve, r 25,590 '. 34.2:. end.0 S Forest Service'.. 1975 U S:: Ge.06j. eel Survey .: 41400 23,200 82 4 1990 County of see tins obiape 41,791 24.03S.... 40.1 available to Table 2.5.1 Summary of Salinas Reservoir Capacity Studies indicate what rate of siltation is occurring at the Whale Rock reservoir, it is assumed for planning that the annual average rate of siltation is similar to Salinas reservoir. The reliability reserve discussed in Section 2.4 can offset the additional long term loss. City of San Luis Obispo 20 / -3g Urban Water Management P,,.a The safe annual yield from the two reservoirs will be continually reduced as a result of siltation. The key items which need to be assumed to estimate reduction in safe annual yield are the average annual siltation rate and the future date for the estimate. If the future date is assumed to be the year 2025, then a certain loss in safe annual yield can be calculated using the City's computer model. Since the storage capacity for Salinas reservoir was last estimated in 1990, the annual loss of 40 acre feet per year can be applied from that date. However, since Whale Rock reservoir's siltation has never been factored into the total available water storage, the loss of 40 acre feet per year would apply to the period since the reservoir was constructed in 1961. SAFE ANNUAL YIELD RED UCTION DUE TO SILTATION Reduction of Combined Reservoir Yield (A.F.Y.) -200 -300 -400 -500 -600 -700 -800 2015 2020 2025 2030 2035 2040 2045 2050 Year Table 2.5.2 Safe Annual Yield Reduction due to Siltation Using a planning horizon to the year 2025, there will be an estimated loss of storage capacity at Salinas and Whale Rock reservoirs of 1,400 of and 2,560 of respectively. Based on this storage capacity reduction, there will be an estimated reduction in the City's safe annual yield of 500 af. The results of the analysis are shown in Table 2.5.2. This loss in yield needs to be taken into account when determining if the City has adequate water supplies to meet future water demand. Future water supply projects will need to make up for this loss in safe annual yield. City of San Luis Obispo 21 /.#0 Urban Water Management i .dn 2.6 SUPPLEMENTAL WATER REQUIREMENTS Poll The City shall develop additional water supplies to meet the projected demand at build -out of the City's General Plan. The supplemental water supply amount shall be based on land use assessment and the adopted per capita water use figure identified for planning purposes in Section 2.3. Basis for Ebb Based on the draft Land Use Element endorsed by the City Council in February 1992 and a per capita use rate of 165 gallons per person per day (Section 2.3), the projected total amount of water for the City to serve General Plan build -out is 12,350 acre feet (af). This figure includes the 2,000 acre feet reliability reserve. Table 2.6.1 shows the build -out water requirement, reliability reserve, siltation loss, and the resulting supplemental water requirement necessary to meet projected City water demand. 12,350: `'af.;:::. . __. .. :::::.:.:........... .. . . 5.775 afi: Table 2.6.1 Supplemental Water Required for General Plan Build -Out City of San Luis Obispo 22 Urban Water Management P..., 2.7 MULTI- SOURCE WATER SUPPLY Polio The City shall continue to develop and use water resources projects to maintain multi- source water supplies, and in this manner, reduce reliance on any one source of water supply and increase its supply options in future droughts or other water supply emergencies. Basis for Policy Having several sources of water can avoid dependence on one source that would not be available during a drought or other water supply reduction or emergency. There may be greater reliability and flexibility if sources are of different types (such as surface water and ground water) and if the sources of one type are in different locations (such as reservoirs in different watersheds). The Water Element of the General Plan, adopted in 1987, identified multiple water projects to meet projected short and long term water demand. Again in November 1990, the Council endorsed the multi- source concept. City of San Luis Obispo 23 _ #0Z Urban Water Management _ .i 2.8 ALLOCATION OF NEW WATER SUPPLIES foa -Y 2.8.1 BALANCING SAFE YIELD AND OVERALL DEMAND When new water sources are obtained, the additional safe yield shall be allocated first to eliminate the deficit between the adopted safe annual yield (Section 2.1) and the present demand as defined in Section 2.3 at the time the new source is obtained. 2.8.2 DEVELOPMENT AND RELIABILITY RESERVE Any additional safe annual yield beyond that needed to balance safe annual yield and projected demand will be allocated (A) one -half to development and (B) one -half to the reliability reserve and compensating for reduced yields due to siltation. 2.8.3 ACCOUNTING FOR RECLAIMED WATER Reclaimed water shall be accounted for as a "nonpotable" supply as identified under Section 2.10.3. Use of reclaimed water shall not be considered as a component of the City's safe annual yield, but may affect potable water demand for potable supplies as reclaimed water use increases. 2.8.4 PRIVATE WATER SUPPLIES When developments are supplied by private groundwater wells, the yield of those wells will not be counted toward the City's safe annual yield. Such yield, however, will result in the demand for City water supplies being lower than it otherwise would be, which may necessitate adjustments of the per capita water usage figure used to estimate overall demand. Basis for Polio The City has pursued numerous water supply projects over the years. These projects are discussed in Chapter 3 of this report. This section of the document addresses allocation of these supplies once the yields from projects are realized. The City has identified these potential uses for new supplies: • Eliminating the deficit between adopted planning figures and safe annual yield; • Compensating for reduced yields due to reservoir siltation; • Establishing a reliability reserve; • Providing for water requirements for future development within the urban reserve area designated in the General Plan. Allocation of new supplies can balance the needs of all areas identified while not compounding the potential water shortage problems for existing City water customers. City of San Luis Obispo 24 -7-3 Urban Water Management t.ann A major concern is the deficit between projected water usage levels and safe yield (see Section 2.1 and Section 2.3). As this deficit becomes larger, present and future water customers must cut back more from their typical use levels during droughts or other water supply shortages. In 1993, this deficit is about 289 acre -feet, considering a long -term usage rate of 165 gallons per day per City resident, the 1993 City resident population, and a safe yield of 7,735 acre -feet. Once the City's water supply deficit has been "balanced ", half of the identified safe annual yield from new water supply projects should go toward offsetting the siltation deficit and establishment of the "reliability reserve" and the other half should be designated for development purposes. By following these guidelines, the certainty of water supplies for all City water customers will be increased while still allowing for additional development. The reliability reserve is like an insurance policy (Section 2.4). Some added yield can be assigned to the reserve rather than other desired uses, to help assure that the City will have enough water despite unforeseen losses of supplies. However, there are costs of buying this insurance, both in higher charges for water customers and in foregone uses for the added yield. Considering these costs, it would be prudent to build the reserve in steps rather than commit a very large part of the City's water resources at one time. Using the comparison of buying insurance, the City will make several payments over time rather than one big payment initially, evaluating the level of risk and the desired amount of reserve as years go by. City of San Luis Obispo 25 1— #If Urban Water Management an 2.9 WATER ALLOCATION AND OFFSETS Polio 2.9.1 SUPPLYING NEW DEVELOPMENT The City will make available to new development only that amount of safe yield which exceeds projected water use (Section 2.3), less the amount to compensate for siltation losses (as stated in Section 2.5) and to provide a reliability reserve (as stated in Section 2.4). Available allocations will be assigned to development in a way that supports balanced growth, consistent with the General Plan. 2.9.2 EXEMPTIONS FOR OFFSETS A. When there is no safe yield to allocate to a project, that project may be built if the developer makes changes, in facilities served by the City, which will reduce long -term water usage equal to the allocation required for the project. B. The City may exempt a project from needing an allocation or an offset, or it may reduce the amount of the required allocation or offset, to the extent that the project is supplied by a suitable, private well which will not significantly affect the yield of City wells. The City will consider the cumulative effect of wells in the groundwater basin in making this determination. 2.9.3 BASIS FOR ALLOCATIONS AND OFFSETS Required allocations and offsets will be based on long -term usage for each type of development. (These use and offset factors will be determined and published by the City, and may be revised as warranted by new information.) Basis for Policy In 1988, the City began to formally account for long -term water usage in new development. The allocations have been based on histories of water usage for various kinds of development. At first, the City decided to allocate some water for new land development projects even though city-wide water usage exceeded safe yield. As the 1986 -1991 drought continued, and the projected completion of proposed supplemental supply projects moved farther into the future, the City decided that there should be no new development that would increase water usage. As a result, nearly all construction since 1990 has been: ■ Replacement buildings, using the same or less water; ■ Additions or remodels which do not substantially affect water usage; City of San Luis Obispo _ 26 /—'1--:500 Urban Water Management 1,Wi ■ Projects which have retrofitted facilities served by the City, to save (offset) twice the amount of water which would be allocated to the project. Installation of low -flow toilets, showerheads, and faucets have accounted for most of the offset credit. Substantial credits were also earned by installing water recycling equipment in businesses. Also, a few relatively small projects were able to do little or no retrofitting because they were supplied with groundwater through private wells. Some projects have utilized more than one of these strategies to proceed despite the lack of water allocations. Until available safe annual yield exceeds long -term demand (per Section 2.3), the City will have no water to allocate to new development. Many facilities have been retrofitted (as of 1993, about 26% of all potential facilities). Retrofitting has helped reduce total water usage. A two - to-one offset ratio was established due to the uncertainty of savings factors initially used. Now, a comprehensive toilet replacement study completed in June 1992 by the Metropolitan Water District of Southern California indicates the water savings factors used by the City are accurate. The study analyzed 23,000 dwellings and documented water savings associated with toilet retrofitting. This study is now used state -wide as a basis for water savings associated with toilet retrofit programs. Requiring an offset -to- allocation ratio greater than one -to -one means that long -term water use will decline even as development occurs. Also, requiring a ratio much greater than one - to-one makes projects less feasible and raises questions of equity. An offset ratio of one- to-one would be consistent with the policies of this plan, because: ■ The long -term usage factors used to determine the required offset amounts generally reflect usage in projects built several years before the 1986 -91 drought, when toilets and landscaping were less efficient than those installed under 1993 standards; ■ Retrofitting which does not receive development credit (all rebates and many additions and remodels) will continue to produce net savings. City of San Luis Obispo 27 71.0 Urban Water Management ..an 2.10 RECLAMM WATER P_lmc 2.10.1 RECLAIMED WATER QUALITY The City will produce high quality reclaimed water, suitable for a wide range of nonpotable uses. 2.10.2 USES OF RECLAE IED WATER The City will dedicate to San Luis Obispo Creek one cubic foot per second of reclaimed water for aquatic and riparian habitats. The City will make available reclaimed water to substitute for existing potable water uses and to supply new nonpotable uses. 2.10.3 ACCOUNTING FOR RECLAIMED WATER As reclaimed water supplies new development or substitutes for potable water in existing development, reliable yield of nonpotable water will be increased. Reclaimed water will be credited to non- potable reliable yield not when it is potentially available at the treatment plant, but when it is actually available to a user upon the completion of the necessary distribution facilities. 2.10.4 CITY RECLAIMED WATER PROJECTS When the City provides distribution facilities that allow substitution of reclaimed water for potable water, the resulting reduction in potable water demand will be given offset credit for government projects (including new City parks or buildings), under any policies or rules limiting the amount of water which can be allocated to development projects. 2.10.5 PRIVATE RECLAIMED WATER PROJECTS A. When a developer of a private project provides distribution facilities that allow substitution of reclaimed water in facilities that have used potable City water, the resulting reduction in potable water demand will be credited to any allocation of potable water needed for the developer's project, at a one - to-one ratio, similar to the offset credit. B. When a developer of a private project provides distribution facilities that allow use of reclaimed water in that project, any required potable water allocation for that project shall be reduced by a corresponding amount. 2.10.6 COMBINED RECLAB= WATER PROJECTS When a component of the reclaimed water distribution system is funded in part by the City and in part by a private developer, the credit for reduction in potable water usage resulting from that City of San Luis Obispo 28 Urban Water Management 1-ian component shall be divided in a proportionate share between the City and the developer based on the respective contribution to the component. Basis for Policy Reclaimed water is highly treated wastewater (sewage) which can be used for most nonpotable purposes. The City's Water Reclamation Facility (formerly known as the Wastewater Treatment Plant) has been upgraded to the point the effluent can be used directly for landscape and agricultural irrigation and other uses such as industrial processes and toilet flushing in certain types of buildings. Most treated effluent, in the past, has been discharged to San Luis Obispo Creek. A small amount of effluent has been used at the treatment plant site for landscape irrigation. Reclaimed water will be used for additional landscape irrigation at the Water Reclamation Facility and on City-owned land in the vicinity, and for ponds to benefit wildlife. Use of reclaimed water beyond the treatment plant area will' require a distribution system separate from other water lines. Reclaimed water can be used to supply nonpotable uses in new development -and to offset potable uses in existing development. These potential uses require a deliberate method to account for reclaimed water use, consistent with policies concerning total water requirements and other water sources. Long -term funding for the necessary reclaimed water distribution system is expected to come from charges for the use of reclaimed water. Initial expenses may be funded from bonds, low - interest State loans, and developer contributions. City of San Luis Obispo 29 /—YQ Urban Water Management _ _a 2.11 CAPITAL IMPROVEMENT PLAN - Water Distribution P_lid The City shall replace aging waterlines at the yearly rate of 2% of the replacement value of the water distribution system (about $1.5 million annually in 1993 dollars). Basis for Policy Growth within the city has placed increased demands on the water distribution system. Many pipes throughout the City are over 100 years old, and are too small to meet current fire -flow requirements. Even without growth or fire protection requirements, deteriorated pipes must be replaced to avoid leaks and major service disruptions. Historically, the City has not funded distribution system replacement sufficiently to ensure replacement prior to reaching the end of the infrastructure's service life. Therefore, the system has deteriorated, causing frequent water main breaks. This problem was partially addressed several years ago during the budget process when funding for annual replacement of waterlines was increased to $600,000 (based on an average replacement rate of about 2% and a 50 year life) for an estimated 150 miles of pipelines. Within the past several years, staff has developed a computer data base which includes all pipelines within the City, to facilitate scheduled maintenance and access to historical information. Following input of all the pipeline sections, the data base revealed that there are actually 290 miles of mains (excluding service laterals) with an estimated replacement value of $75,000,000. Therefore, replacing 2% of the infrastructure annually would require about $1,500,000 per year in 1993 dollars. Since funding has not been adequate, the system has deteriorated to the point that funding beyond the 2% level may be warranted in the future. City of San Luis Obispo 30 /-Y9 14-11- -. w z C SUPPLEMENTAL WATER SUPPLY PROJECTS WATER SUPPLY SOURCES Po-lid The City shall pursue the expansion of the Salinas reservoir, the Nacimiento Reservoir Diversion project, water reuse and water demand management activities as supplemental water supply sources to meet current and projected future water demand. Other water supply projects shall be considered in the future if warranted. 3.1 SALINAS RESERVOIR EXPANSION PROJECT Introduction The Salinas Reservoir (also known as Santa Margarita Lake) was constructed in 1941. The original design of the dam included operable spillway gates which would have increased the maximum water surface elevation at the spillway crest from 1,300.74 to approximately 1,320.0 feet. Because of uncertainties at the time of construction, the spillway gates were never installed. The Salinas Reservoir expansion project would involve the installation of gates which would result in an increase of available storage capacity from 23,843 acre -feet (af) to 41,790 of with an increase of an estimated 1,650 acre -feet per year of safe annual yield. Background The Salinas Dam was constructed by the War Department (now U.S. Army Corps of Engineers) in 1941 to provide water to Camp San Luis Obispo and the City of San Luis Obispo. The Corps of Engineers filed and received an application to appropriate water from the Salinas River with the Division of Water Resources (now State Water Resources Control Board, Division of Water Rights) on May 27, 1941. The City of San Luis Obispo filed and received an identical permit on June 4, 1941. The City's right to appropriate water for beneficial use is second in time and right to the Corps permit. Both permits allow a direct diversion of up to 12.4 cubic feet per second (cfs) between January V and December 31' and a diversion to storage for later use of up to 45,000 A.F. between November 1" and June 30* of each season. There is also a third application to appropriate water from the Salinas River filed by San Luis Obispo County Waterworks District No. 6 which serves the town of Santa Margarita. This permit was filed on February 26, 1947 and allows for 1.5 cfs by direct diversion all year round and up to 200 A.F. diverted to storage during the period from November 1" and June 301 of each season. Since this permit was filed after the Corps and City's permits, it is junior to the rights of the other permits. City of San Luis Obispo _ 31 -50 Urban Water Management r,an The original construction plans for the dam included the installation of an operable spillway gate to provide an estimated storage capacity of approximately 45,000 acre -feet. During the "fast track" construction of the dam, a small fault was discovered beneath the right abutment (right side of dam, looking downstream). There was concern at the time for the dam stability and therefore the gates were not installed. As a historical note, the spillway gates intended for the Salinas Dam were installed at Friant Dam in the foothills above Fresno. Studies The Phase I report for "Salinas Reservoir Expansion Project" was completed in February 1989 by Woodward -Clyde Consultants. Part I of the report provided geotechnical, seismicity, and dam safety evaluation. Part 11 analyzed the hydrology, reservoir yield, and an evaluation of alternatives. The outcome of the analysis revealed that the dam was strong enough to withstand a major earthquake (7.4 magnitude) on the nearby Rinconada Fault without failing or causing a sudden release of water from the reservoir. The analysis also found that raising the dam 19 feet would produce an additional 1,650 acre feet per year of safe annual yield from the reservoir. The firm of Woodward -Clyde Consultants was retained by the City in March of 1992 to prepare the environmental impact report for the proposed Salinas Reservoir Expansion Project. Detailed. evaluation of the impacts associated with the raising of the maximum water surface elevation revealed major impacts to the recreational facilities and roadways at the lake. It was determined that a detailed recreational relocation plan was necessary to allow for the evaluation of the impacts associated with this work to be addressed in the EIR. The conceptual recreation relocation plan has been completed to the satisfaction of County Parks staff and the draft EIR was released in November 1993. Council certification of the final EIR is tentatively scheduled for March 1994. The EIR represents one of the two major hurdles that need to be crossed prior to proceeding with the project. The second issue relates to the ownership of the Salinas Dam and related facilities. The Corps of Engineers currently owns the dam and property surrounding the lake. Since the facilities are not utilized to supply water to Camp San Luis Obispo, the Corps has expressed interest for many years in relinquishing ownership of the facilities. The Corps has indicated that they will not allow the expansion project to proceed unless ownership is transferred to a local agency. The discussions concerning which local agency, either the City or County of San Luis Obispo, should ultimately own the facilities has been debated for many years. On November 17, 1992, the City Council supported the ownership transfer to the County of San Luis Obispo, provided an acceptable agreement could be prepared which protects the City's interests in the facilities. City and County staff have been working closely to develop an agreement acceptable to both parties. Protect Schedule Following certification of the EIR and agreement on the transfer of ownership in the facilities, there are a number of additional steps which will have to be accomplished prior to proceeding City of San Luis Obispo 32 -S/ Urban Water Management t,..a with construction. The items are listed in Table 3.1 with estimated time frames necessary to accomplish each task. :,Task Time Frame 1 Ownership Transfer.: Legislation Allowing' Transfer 1. year Studies Necessary.: for Transfer 6 months: 2 Permitting /Design 1: year 3 Construction: 1: year Table 3.1 Salinas Reservoir Expansion Project Schedule City of San Luis Obispo _ 33 i —sat Urban Water Management , ,an 3.2 NACEMMNTO PROJECT Introduction San Luis Obispo County Flood Control and Water Conservation District ( "District ") has an entitlement of 17,500 acre -feet per year of water from Nacimiento Reservoir. Boyle Engineering has been hired by the District to study the feasibility and make recommendations regarding the transportation and use of this water. The City of San Luis Obispo has tentatively requested an allocation of 6,265 acre feet from the Nacimiento project. Background Nacimiento Reservoir is located in San Luis Obispo County on the Nacimiento River about 12 miles above its confluence with the Salinas River. The reservoir provides flood protection and is a source of supply for groundwater recharge for the Salinas River Valley. The dam is owned and operated by Monterey County Flood Control and Water Conservation District. Although Monterey County retains a majority of the water rights to the reservoir, San Luis Obispo County is entitled to 17,500 acre feet of water annually. Approximately 1,300 acre feet per year have been designated for use around the lake, leaving 16,200 acre feet per year for allocation to other areas within the County of San Luis Obispo. The District has contracted with Boyle Engineering to provide engineering services for an evaluation of the Nacimiento project. The District has requested that agencies interested in future participation in the Nacimiento project share in the costs associated with the preliminary studies. The agency costs are proportional to the allocation requests. Asking the agencies to share in the cost of the preliminary studies was intended to limit unrealistic requests. Among other requirements established to limit allocation requests, each agency must show consistency with their approved general plan. Based on the requested allocations, the project is currently about 60% oversubscribed. Some areas lying within the City's Urban Reserve Line requested allocations independently. This resulted in some double requests for the same areas. Though some agencies may eventually decide not to participate, future adjustments to the allocation requests may to be necessary. Several alignment and treatment options are currently being considered. Two alternatives involve use of Nacimiento water in the North San Luis Obispo County and the City of San Luis Obispo only. This water would be delivered either raw or treated at a regional water treatment plant near Lake Nacimiento. The North County alternatives would deliver water to purveyors along the 101 Freeway corridor to the City of San Luis Obispo. A third alternative would deliver treated water to Chorro Valley as well as the North County. The Chorro Valley turnout would provide water to coastal purveyors to the west. The fourth alternative includes delivery of treated water to the North County, Chorro Valley, and to coastal and inland purveyors to the south. City of San Luis Obispo _ 34 i -s3 Urban Water Management Plan Studies Phase I of the study involved an evaluation of the reliability of the Nacimiento Project to deliver water at a maximum amount of 17,500 acre feet per year. Phase I was completed and presented to the County Board of Supervisors in December 1992. At the December meeting, the Board also approved proceeding with Phase 11 of the feasibility study. The results of the reliability assessment concluded that the Nacimiento Project can deliver 17,500 acre feet per year based on historic hydrologic data. The analysis indicated a number of months during the most recent drought when deliveries would have been reduced. However, deliveries from subsequent months could be increased to make up for the reductions resulting in total deliveries of 17,500 acre feet for the year. Phase R of the study provides a preliminary engineering evaluation, a geotechnical study, and initial environmental review. The purpose of Phase II is to analyze and determine the best pipeline alignments, to determine facility requirements, estimate costs, and to determine probable environmental impacts. The draft reports are scheduled to be completed by December 1993 and presented to the Board of Supervisors in February 1994. Work on Phase III is scheduled to begin in January 1994. The third phase will involve -the preparation of a final report identifying the recommended overall project and the presentation of that information to the County Board of Supervisors and other public agencies. The final report and presentations are anticipated to be completed by February 1994. Project Cost Participation in .Phase I of the preliminary study and evaluation was expected to cost the City $3,979. Phase H is expected to cost $43,457 with Phase III estimated to cost $8,425. Therefore, the total cost for participation in the preliminary study and evaluation of the Nacimiento project is $55,862. Even with the preliminary evaluation and feasibility study complete, several steps still remain before the project can be constructed. Preparation and certification of an Environmental Impact Report is the next major step in the Nacimiento project. Geotechnical studies and preliminary design will also be performed before the final determination of project participation can be made. These items are expected to cost between $600,000 and $1,000,000. The City's participation percentage is likely to range between 24% and 36 %. Thus, the City's share of these costs would be between $144,000 and $360,000. A separate participation agreement will be prepared for this phase of the project. Once those studies are performed and the final participation in the project is determined, final design of the facilities and project financing can be prepared. Another participation agreement will be required for this phase. The total cost of the final design is expected to be around $1 to $2 million, depending on which treatment and alignment alternative is selected. The City will be required to pay its prorated share of these costs. City of San Luis Obispo 35 Urban Water Management r,an The remainder of the project involves the construction of the pipeline, related facilities, and treatment plant(s). The construction will be debt - financed and the costs paid for through the water pricing. Preliminary estimates indicate the cost of treated Nacimiento water to be approximately $900 to $1,100 per acre foot in 1993 dollars for the City of San Luis Obispo, depending on the treatment and alignment alternative that is ultimately chosen. City of San Luis Obispo 36 J� Urban Water Management I.., 3.3 WATER REUSE Introduction Reuse of the highly treated water produced by the City's Water Reclamation Facility is a drought resistant portion of the City of San Luis Obispo's multi- source water plan. It is estimated that 50% of water used in the City is used for purposes where non - potable water would be adequate. Recycled water has not been used by the City due to its low quality, regulatory constraints, public acceptance, and cost of distribution. Increased demand for water and recent improvements to the treatment process make it feasible to consider reuse as a source of water for non - potable demands. Recycled water may be used for: • Irrigating parks, school yards, golf courses, and residential yards, • Washing cars, mixing concrete, compacting soil and controlling dust, • Process and cooling water for industrial applications, • Fire protection. The objectives of the San Luis Obispo water reuse project are to: 1. Develop a dependable water supply that will meet non - potable demand, 2. Improve the water quality of San Luis Obispo Creek, 3. Comply with the Federal Clean Water Act and California Inland Surface Water Plan, 4. Efficiently manage the water resources of the City of San Luis Obispo. Background The Water Reclamation Facility produces approximately 4,000 acre -feet of disinfected tertiary treated reclaimed water per year. This water is suitable for most uses other than drinking and food preparation. Production is at a consistent rate of 5.5 cubic feet per second or 3.6 million gallons per day. The City proposes to dedicate a release of 1.0 cubic foot per second to the maintenance and enhancement of the in- stream habitat of San Luis Obispo Creek (720 acre feet per year). Since most of the recycled water will be used for irrigation, only 1,830 of the remaining 3,280 acre -feet will actually be useable because of seasonal fluctuations in water demand for irrigation (see Figure 2). Demand for irrigation water is very limited during the winter. The City does not plan to construct seasonal storage. The City conducted a survey in August, 1991, to determine the level of interest in the use of recycled water. Several large volume irrigation users are potential customers. Ninety-five percent of those responding to the survey were supportive of the project. The use of 1,830 acre - feet per year of recycled water may offset the use of between 500 and 1,000 acre -feet per year of existing potable water. The remainder could offset private groundwater use or new demands for non - potable water. Targeted large volume users of recycled water include Cal Poly, City and County parks, the City golf course, local schools, State of California, Department of Transportation, and areas to be developed within the City. City of San Luis Obispo 37 l S4 Urban Water Management _ .1 WATER REUSE PROJECT 350 t c TOTAL PLANT OUTPUT (4,000 af/yr) 300 0 E 0 'm w f9 Q 200 E 2 y O O: H 15 LU W 100--/ U 2 5 0 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec W W '�'{�iu�n7R�S252�tir���,S�z�Sr„ .�i: .t � r•G DEDICATED TO SAN LUIS OBISPO CREEK 0720 at /Yr Figure 2 PRODUCTION AND DEMAND - RECLAIMED WATER Proposed Distribution System The Water Reuse Project will construct a distribution system to deliver recycled water to large volume customers throughout San Luis Obispo. The system will be designed for future expansion to serve small volume users, when it becomes economically feasible to do so. Components of the distribution system will include pump stations, water storage facilities, treatment equipment, pipelines, and valves. A portion of the recycled water will be discharged to San Luis Obispo Creek to support riparian habitat. The remainder will enter the recycled water distribution system to be delivered to customers. A pump station located near the storage pond at the Water Reclamation Facility will pressurize the distribution system. Booster pumps are needed to provide the proper pressure throughout the City. Initial planning calls for them to be located near the intersection of Industrial Way and Sacramento Drive, and at the Emerson School site. Approximately 8 -1/2 miles of new pipeline will be installed and approximately 2 -1/2 miles of abandoned petroleum pipelines will be converted to recycled water use. Storage will be provided by expanding the City of San Luis Obispo 38 / -S7 � rr/ � IRRIGATION (7,830 eflY�) 0 _,-MAXIMUM TO IRRIGATION / Figure 2 PRODUCTION AND DEMAND - RECLAIMED WATER Proposed Distribution System The Water Reuse Project will construct a distribution system to deliver recycled water to large volume customers throughout San Luis Obispo. The system will be designed for future expansion to serve small volume users, when it becomes economically feasible to do so. Components of the distribution system will include pump stations, water storage facilities, treatment equipment, pipelines, and valves. A portion of the recycled water will be discharged to San Luis Obispo Creek to support riparian habitat. The remainder will enter the recycled water distribution system to be delivered to customers. A pump station located near the storage pond at the Water Reclamation Facility will pressurize the distribution system. Booster pumps are needed to provide the proper pressure throughout the City. Initial planning calls for them to be located near the intersection of Industrial Way and Sacramento Drive, and at the Emerson School site. Approximately 8 -1/2 miles of new pipeline will be installed and approximately 2 -1/2 miles of abandoned petroleum pipelines will be converted to recycled water use. Storage will be provided by expanding the City of San Luis Obispo 38 / -S7 Urban Water Management Pian sedimentation ponds along Highway 101 and reactivating abandoned Reservoir lA on Fox Hollow Road. A single six acre pond will be eight feet deep. The top two feet will provide 3.9 million gallons of short term storage without draining the pond. Reservoir 1A, a concrete lined, covered storage basin that was built in 1910, will be repaired to provide an additional 5.0 million gallons of storage. Recycled water will be delivered to customers through a service meter near their property line. Customers will provide and install the necessary facilities to distribute the recycled water throughout their properties. Each user will install safety devices to ensure the proper use of recycled water. The required safety features may include approved backflow prevention devices, new plumbing to separate potable water from recycled water, and modification to irrigation systems to prevent over -spray and over - watering. Operation and Maintenance The City's Wastewater Division will operate the Water Reclamation Facility and the water reuse pumps and filters located at the Water Reclamation Facility. The City's Water Division will operate and maintain the recycled water distribution system. The City will monitor the customer's compliance with the rules and regulations established for the safe use of recycled water. Future Development Areas Recycled water may be used for irrigation of residential yards with dual plumbing. It is unlikely that it will ever be economical to install the distribution system and separate plumbing for use of recycled water in older residential areas. Recycled water may be used in commercial and industrial facilities for toilet flushing, cooling and rinse water, car washing, concrete mixing, boiler water, and other uses permitted for "Disinfected Tertiary Reclaimed Water ". The most cost effective use of recycled water will be in new construction and development where the dual distribution and plumbing systems can be built as an integral part of the original construction. The Water Reuse Project is configured to be able to serve those areas identified in the General Plan Land Use Element as the principle expansion areas. If recycled water is provided to downstream agriculture outside the city limits, it should be delivered via a pipeline. The water could be metered for accurate billing, environmental degradation would be lessened by keeping nutrients out of the creek, and the potential for water theft would be minimized. Before water is delivered to downstream users, consideration should be given to setting a termination date for each service to prevent the City from becoming obligated to continue such services outside the City in perpetuity. City of San Luis Obispo _ 39 Urban Water Management Tian Proiect Schedule The schedule for the water reuse project is as follows: Activity •Complete project CEQA review •Complete project engineering report •Complete project design *Complete project construction Staffine Evaluation Date June 1994 December 1994 June 1995 June 1996 It is proposed that the Water Distribution Maintenance and Customer Service Division be responsible for the recycled water distribution system. Until agreements are reached for supplying recycled water to various areas of the City, it is impossible to determine the level of staffing which will be required to maintain the system and read the water meters. Staff will return to Council at a future date to evaluate the options. City of San Luis Obispo 40 1-5f Urban Water Management Pian 3.4 WATER DEMAND MANAGEMENT Introduction Water demand management practices and technology have advanced significantly in the last several years in reaction to the drought of 1986 -1991. Historically, water demand management was viewed as an emergency response to extreme water shortage situations. As demand for water resources increase due to growing population and agricultural needs, the importance of using our water wisely and efficiently is imperative to assure adequate, reliable water supplies in the future. Background Water demand management, or water conservation, was first referenced as a part of the City's water management policy in the 1973 General Plan. In 1985, the City Annual Water Operational Plan policy formally established water demand management as a means to extend water supplies during projected water shortages. From 1988 (when an aggressive water conservation program was implemented) to October 1993, approximately 14,400 acre -feet of water savings can be attributed to the water efficiency programs implemented during that period. In 1990, the City endorsed a multi- source water plan in an attempt to solve both short-term water shortages and establish long term solutions to the City's water needs. Because of the difficulty in developing new water supply projects, there has bee a philosophical shift in perception of water demand management as crisis management vehicle in 1985 to a water supply alternative for the future. Water Demand Management Program Direction In September 1991, the Council approved signing the "Memorandum of Understanding" (MOU) regarding water conservation and the implementation of the "Best Management Practices" (BU s). The BMP's are listed in Appendix H. This signifies a minimum ten year commitment to implement and evaluate the water efficiency measures presented in the MOU. Using the BMP's as a road map for future water demand management program implementation, a balanced program of providing information and assistance to the City's water customers is necessary to maintain the water use reductions levels required to stabilize the City's water supplies. Many valuable studies which the City could not afford to perform are being funded and administered by the BMP signatory group, the California Urban Water Conservation Council. These studies will have a direct benefit to the City by providing a method to analyze water conservation programs for cost effectiveness and to quantify reliable savings associated with specific programs. City of San Luis Obispo - 41 /'Co 0 Urban Water Management ..an 3.5 OTHER SUPPLEMENTAL WATER SUPPLY PROJECT ALTERNATIVES 3.5.1 DESALINATION Background In May 1990, the City was faced with the prospect of reaching minimum pool in both of its surface water supply sources within an 18 to 20 month period. In response to the crisis, the City embarked on a short term desalination feasibility investigation. The consulting firm of James Montgomery Engineers was hired to prepare a study which evaluated the various desalination methods, site options, joint venture opportunities, and financing. The project also had termination or "Go /No -Go" date established after the 1990 /91 rainy season to determine if a change in direction was warranted due to any change in water storage resulting from winter storms. The preliminary analysis concluded that 3,000 acre feet per year of desalted water could be provided by using reverse osmosis technology which was considered the most cost effective technology at that time to meet the City's needs. The project cost was estimated to be $19.5 million. The recommendation was based on capital costs, operation and maintenance costs, decommissioning costs, aesthetics and environmental concerns. Due to the limited time available to site the facility and build the necessary infrastructure, a tentative agreement with PG &E was reached to locate the short-term facility at the Morro Bay power plant utilizing their seawater intake and outfall facilities. The "Miracle March" rains of 1991 provided adequate runoff and subsequent increased water storage in the City's reservoirs to allow termination of the desalination project. The City Council officially directed staff to discontinue the project on April 16, 1991. Future Desalination Water Supply Project Using desalted water as a future supply water source will have to be investigated independently of the past research and study projects. Because the previously discussed desalination endeavor was planned to be a short term water supply to meet a crisis situation, the cost analysis, location, environmental review, and technological information would have to be reevaluated for a long term project. Desalination is a viable technology which is not rainfall dependent. The major disadvantages of desalination are the cost, potential environmental degradation, and energy demand. When compared to existing water supplies and other future water supply options under consideration, desalted water is significantly more expensive at this point in time. Desalination may be a water supply consideration in the future if other water supply project currently under review are not accomplished. Also, advances in desalination technology in the future may reduce the costs to a more acceptable level when compared to the cost of other water supply sources. 3.5.2 CLOUD SEEDING The City of San Luis Obispo activated a three year cloud seeding program in January 1991 in response to the continuing drought and limited surface water supplies at Salinas reservoir. The City of San Luis Obispo 42 /-6/ Urban Water Management Pan program "targeted" the Salinas and Lopez Reservoir watersheds, and the County of San Luis Obispo paid their prorata share of the total cost for the cloud seeding program. The City's participation the program ended in January 1993, when the Salinas Reservoir filled to capacity and began spilling. Evaluations of each year's cloud seeding program were completed following each winter season. Estimates of increased rainfall precipitation ranged from 11 % to 14% for the Salinas and Lopez Reservoir watersheds. These were substantial increases and proved to be a cost - effective means of enhancing runoff during periods when Salinas Reservoir or Lopez lake water levels are low. Salinas Reservoir's watershed runoff characteristics are favorable for producing significant runoff during normal rain seasons. Therefore, cloud seeding is not viewed as an annual program but as a program that the Council may approve following below normal rainfall years and /or periods when significant storage is available in Salinas Reservoir to capture additional runoff. Staff will evaluate the need for a cloud seeding program following each year's rainfall season and provide a recommendation to Council for the next year's winter season as part of the annual Water Operation Plan (brought to Council in the spring of each year). 3.5.3 SALINAS TO WHALE ROCK TRANSFER The idea of transferring water which would otherwise spill downstream from Salinas reservoir to Whale Rock Reservoir was evaluated by staff and presented to Council in 1993. Since Salinas Reservoir spills frequently in contrast to Whale Rock Reservoir, the potential exists to transfer significant quantities of Salinas Reservoir water (which would otherwise overtop the Salinas dam spillway and flow downstream) to Whale Rock Reservoir. The analysis revealed numerous obstacles and limitations, and Council directed staff to not proceed at this time with further studies relative to this project. City of San Luis Obispo _ 43 1-46 a?- Urban Water Management .,an • : WMW:_ ' WATER OPERATIONAL PROGRAMS WATER OPERATIONS P-0-Ma The City shall strive to provide an adequate supply of high quality water which • meets all Federal and State standards; • provides uninterrupted water flow at sufficient pressures; • provides fire protection; • sustains city-wide water efficiency programs. The City shall allocate funding to meet the goals and objectives presented in this chapter (also see Chapter 5). Introduction The City has depended on imported water supplies from Salinas reservoir since 1944, Whale Rock reservoir since 1961, and limited local groundwater sources since 1989. Figure 3 shows the City's reservoir water supplies and delivery system. This chapter will describe the existing water system, operation and maintenance procedures, and identify current and future system deficiencies. 4.1 WATER TREATMENT The City currently receives its water from three sources, Salinas Reservoir, Whale Rock Reservoir, and groundwater. Over the past twenty years, surface water treatment and groundwater treatment standards and regulations have become more stringent. With the enactment of the Safe Drinking Water Act (SDWA) in 1974, Congress authorized the federal government to establish national drinking water regulations. Since that time, many amendments have been made to the act which require additional monitoring and thereby increased operational costs. The following sections discuss the impacts of the current regulations on the City's water treatment facilities and potential impacts of any foreseeable amendments to the current regulations. City of San Luis Obispo _ 44 1-63 Urban Water Management Pta,i ,i ,r r , TZ a.n ren:Ro RA r ...a urttm ..:re MORRO E tos otoi i. Treatment. .�..Y . •,,•- Plant r•„ .t i ,� ~- l,••,1. ,. .,° lo',�a tiles CAI Q •t• •Iw r .• n '/tU15N •'. r••1... �f� ii � canto„ I CADERO .., s ' '•`� AT Whale Rock •'- Reservoir .r \ Gal i � � ' rallAy K r w.......�.. M1i Army Line OF Whale. Rock Line _.;'A•• r ', 1 �• ._� t' r•i+r .•. LUn noun �S tos otoi i. Treatment. .�..Y . •,,•- Plant r•„ .t i ,� ~- l,••,1. ,. .,° lo',�a tiles CAI Q •t• •Iw r .• n '/tU15N •'. r••1... �f� ii � canto„ I CADERO .., s \ Gal i � � ' rallAy K r w.......�.. �• Army Line MlIGA L i Ga11y AI �= SANTA "• • MANGAR/r.r Aaf •'� Salinas Reservoir LUIS OBISPO !' r I `•\ Figure 3 CITY'S WATER SUPPLY AND CONVEYANCE SYSTEM 4.1.1 SURFACE WATER Background The City of San Luis Obispo depends on surface water to meet most of its water requirements. The Salinas Reservoir, located nine miles southeast of the community of Santa Margarita, has been providing water to the City since 1944 and Whale Rock Reservoir, located one -half mile east of the town of Cayucos, has been a water source since 1961. Both water supplies are considered to be of high quality. Existing Surface Water Treatment Facility The existing water treatment plant is located on Stenner Creek Road, northwest of the Cal Poly campus. The facility was constructed in 1964 to provide treatment of surface water from Salinas and Whale Rock Reservoirs. ' The plant was originally designed to treat up to eight million gallons per day (mgd). In 1977, the plant was upgraded to provide 11.5 mgd of treatment capacity but has actually treated up to 12 mgd for limited periods during peak water demands. The water treatment plant is a conventional plant that includes coagulation, flocculation, sedimentation, filtration, and disinfection. Currently, the plant uses chlorine as the primary City of San Luis Obispo 45 Urban Water Management _ It disinfectant. The plant has operated successfully for nearly 30 years with only minor modifications. Surface Water Treatment Regulation Since the existing water treatment plant was built, the Safe Drinking Water Act was adopted and was significantly amended. The 1986 amendments are extremely broad in scope and require implementation of new regulations by the U.S. Environmental Protection Agency. The Safe Drinking Water Act also required the Environmental Protection Agency to specify criteria under which filtration is required as a treatment technique for surface supplies. On June 29, 1989, the Environmental Protection Agency issued the Surface Water Treatment Rule which defines the standards for surface water treatment and has specific compliance deadlines. The purpose of the regulation is to protect the public, as much as possible, from waterborne diseases. Waterborne diseases, most notably Giardia lamblia, Cryptosporidium, and Legionella, are most commonly transmitted by surface water contamination. For the City of San Luis Obispo, the most significant issue is the regulation aimed at reducing the formation of disinfection by products, specifically trihalomethanes ( "THM's "), which are a group of compounds formed during disinfection by the reaction of chlorine with naturally occurring organics. While the City has consistently met the current 100 micrograms - per -liter limit, there. have been occasional instances in which the standard has been exceeded due to the high organic content of Salinas Reservoir water during certain times of the year. The new regulations require increased chlorine contact times which will cause the THM levels to exceed the regulations. It is anticipated that the new regulations will reduce the allowable level for THM's in the future. Ozone Water Treatment Facility To comply with the current standards for THM's, meet anticipated future water quality standards, and increase water treatment operational efficiency, the City is upgrading the water treatment facility to use ozone as the primary disinfectant instead of chlorine. The use of ozone provides enhanced disinfection capability to meet federal and state requirements but will not form chlorinated by- products such as trihalomethanes. When completed (projected -July 1994,) the plant also will produce water free of objectionable taste and odor associated with algae blooms at Salinas Reservoir and meet all current as well as anticipated regulations. Appendix III lists the water quality standards specified in the Safe Drinking Water Act. 4.1.2 GROUNDWATER Background Prior to 1986, most groundwater in the San Luis Obispo area was used by agriculture with very little used for domestic consumption. With the onset of the drought in 1986, resulting in decreasing surface water supplies, the City activated groundwater wells in 1989 to meet the City's water demand. City of San Luis Obispo 46 / -6S Urban Water Management Pia., Groundwater Ouality and Treatment Regulations Groundwater quality requirements, as with surface water, are governed by the SDWA. Like surface water, groundwater must meet the same standards set in the Safe Drinking Water Act. Water quality analysis in 1989 indicated that advanced treatment was needed on the now decommissioned Dalidio and Auto Park Way wells due to unacceptable levels of Tetrachloroethylene (PCE). Carbon absorption units were placed on each well to provide necessary treatment, and were granted approval for domestic consumption by the State of California, Department of Health Services. In November 1992, nitrate levels in the Auto Park Way well exceeded State standards, so the well was taken out of service. The well located near Denny's Restaurant adjacent to Los Osos Valley Road (referred to as the " Denny's well ") experienced a similar increase in nitrate levels and was taken off -line in June 1993. Treatment alternatives for nitrate removal will be recommended to Council during 1994. The Auto Park Way well will be the focus for potential treatment and reactivation because of its record of providing a reliable yield of water over an extended time period (even during the recent drought). 4.1.3 POSSIBLE FUTURE REGULATORY CHANGES As analytical techniques allow for lower levels of regulated water contaminants to be detected and new contaminants are added to the regulatory list issued by the U.S. Environmental Protection Agency and state regulatory agencies, there may be impacts on the City's water treatment operations. While the Stenner Canyon Water Treatment Plant upgrade was designed to meet current and anticipated water treatment standards, future regulations may require additional modifications, depending on the action levels adopted by the federal and state regulatory agencies. The following are possible regulatory changes which may influence water treatment plant operations: ■ ,Regulation of total organic carbon. Could require optimizing coagulation, which would add an acid -feed system to the treatment process. ■ Resulation of THM sub - species. Chlorinated bromides would most likely be targeted, which would not necessarily be a problem unless the action level is extremely low. ■ Regulation of hypochlorites. Chlorates caused by the decomposition of hypochlorites solution may require coolers to be installed on holding tanks to stabilize temperature inside the tanks. This is a requirement now being considered by the State. ■ Lowering of the THM allowable levels. Could require changing from hypochlorite to chloramines for final disinfection. The effect of any of the potential regulations on the City's treatment operations is dependent on the action level adopted. More technical and complicated processes may require training or hiring of personnel skilled in the maintenance of sophisticated electronic equipment and City of San Luis Obispo 47 / -66 Urban Water Management in knowledgeable in telemetry and computer programming. This will be addressed in the future, if necessary. 4.1.4 STAFFING EVALUATION California law requires certification of all water treatment plant operators. There are five certification levels with Grade V being the highest. Because of the size or output capabilities of the City's water treatment facility, the plant supervisor must be a Grade V. The following is a list of the current water treatment staff by level of certification: Grade V - 1 (Water Treatment Plant Supervisor) Grade IV - 2 Grade III - 3 Grade II - 1 Lab Tech - 1 (Grade IV certification but not an operator) TOTAL 8 This level and qualification of staffing meets both the legal standards mandated by the State and the operational requirements of the water treatment facility. As the operation and monitoring requirements become more sophisticated, a review of the staffing needs may be required. City of San Luis Obispo 48 I —(e7 Urban Water Management Pia.,. 4.2 WATER DISTRIBUTION Introduction The water distribution system delivers potable water to approximately 12,500 metered customers. The goals of the program are to provide uninterrupted water flow at adequate pressures, to meet all fire and domestic flow requirements, and to minimize system water loss due to leakage. In order to accomplish these goals, the water distribution program has seven major work objectives. They are as follows: • Pump station and tank maintenance ■ -- Water main maintenance and repair • Water service installation and service renewal • Fire hydrant installation • Fire hydrant maintenance • Cross connection control • Underground Service Alert (USA) markouts Because of the geographic setting of San Luis Obispo, the water distribution system is a very complex structure of pipes, pumps, storag 4.2.1 SYSTEM DESCRIPTION The water distribution program delivers potable water from the water treatment plant and wells to customers and fire hydrants via three storage reservoirs, six pump stations, eight water tanks, and approximately 300 miles of water mains. It is unlikely this basic distribution pattern will change, since the water treatment plant will continue to be the principal source of treated water for the City. Pressure Zones Figure 4 illustrates the distribution system's pressure zones. The .water delivered from the treatment plant is split into two main distribution e tanks, and pressure reducing valves. Figure 4 PRESSURE ZONES networks. About J1.70 flows mto the City by gravity and the other 48% is pumped to a storage reservoir at a higher elevation and then flows into the various service areas by gravity and through pressure reducing valves (PRV's). The most apparent strain is in the pumped delivery system. This will be discussed in more detail in the system evaluation section. City of San Luis Obispo 49 M." 1 _,_._._ S. __ I I � 1 .\ 1 `♦ ;' \ - GRAVITY PUMPED i \♦ /' \\ DELIVERY DELIVERY \ \ i Figure 4 PRESSURE ZONES networks. About J1.70 flows mto the City by gravity and the other 48% is pumped to a storage reservoir at a higher elevation and then flows into the various service areas by gravity and through pressure reducing valves (PRV's). The most apparent strain is in the pumped delivery system. This will be discussed in more detail in the system evaluation section. City of San Luis Obispo 49 M." Urban Water Management -a Since electrical power for pumping water is a major expense, a goal is to develop a system which minimizes pumping. The goal of the water supply system is to deliver water at pressures between 40 pounds per square inch and 80 pounds per square inch at the customer's meter without using a pressure reducing valve on the pipe connecting the water main to the meter. This pressure range will meet the needs of most irrigation .sprinklers and other uses, and provide adequate pressure for fire sprinkler systems. Pressure zones are established in the distribution system to maintain these pressure ranges. The City currently has 15 pressure zones divided between the gravity and pumped delivery systems. Water Storage Facilities Water storage facilities are necessary to provide water during peak demand periods and emergency situations such as fires. The City has ten water storage facilities, six of which are steel storage tanks ranging in size from .07 to 4 million gallons, three concrete facilities with a capacity of .03 to 7.5 million gallons, and one hydropneumatic station. The combined storage capacity is 24.21 million gallons. The holding capacity of the various facilities and tank locations throughout the City are shown in Figure 5. Water Transmission System Parts of the City's water transmission system are over 100 years old. Most of the pipes are made of cast iron. Other pipes are made of asbestos cement (located primarily in the Laguna Lake area), or, since the mid - 1970's, PVC. Water pipes serve two basic functions. The larger pipes or transmission mains move Foure 5 STORAGE FACIUTIES large volumes of water from one - portion of the City to another. They range in size from 12 inches to 30 inches. The smaller pipes or distribution mains are to City of San Luis Obispo 50 1 -6 Treatment Plant—* •— Stanner Canyon Ferr ini� 1 Highland :1`� .,iii ♦Reservoir No. I i I Slack St. Serra —♦ 1' Bishop i I Terrace Hill Edna \ Saddle rT Capacity Elevation Location in fna.1 Base Surface Treatment Plant Wet Well 4.00 406 431.5 Stenner Canyon Res. 2 7.50 538 557.0 Reservoir 1 7.50 422 433.0 Slack Street Tank 0.07 535 555.0 Highland Tank 0.03 547 544.0 Semano Tank 0.10 542 564.5 Bishop Tank 0.10 533 556.0 Terrace Hill Tank 0.75 386 415.0 Edna Saddle Tank 4.00 320 345.0 Ferrini Tank 0.16 569 584.0 TOTAL 24.21 Foure 5 STORAGE FACIUTIES large volumes of water from one - portion of the City to another. They range in size from 12 inches to 30 inches. The smaller pipes or distribution mains are to City of San Luis Obispo 50 1 -6 Urban Water Management Piaji distribute water within a local area and deliver it to each property in the City. They range in size from 2 inches (in the older portions of the City) to 12 inches. The current minimum standard is 8 inches for distribution mains. Water from the water treatment plant in Stenner Canyon is transported through a 30 inch transmission line 3,500 feet to the transfer pumps (located on Stenner Canyon Road). The transfer pumps take approximately 48% of the water, increase the pressure, and then provide water to Stenner Canyon Reservoir, Cal Poly, and other portions of the City, generally north and east of the Southern Pacific Railroad tracks. From the transfer pumps, there are two 24 inch transmission lines that move water about one mile to the city limits. One pipe is the high pressure line from the transfer pumps and the other pipe has lower pressure supplied directly from the water treatment plant's clear well. Figure 6 shows a simplified schematic of the water transmission system. Fire Protection System Fire protection is one of the most important services the City provides to its residents. The fire protection system is a network of 1,661 public hydrants and 160 private hydrants. The Las Pilitas fire in 1985 nearly exceeded the City's capability to supply sufficient water for fire suppression. The Johnson Avenue and Orcutt Road area are the weakest areas for emergency water supply, because less than 3.5% of the total storage is in this area and our delivery from the distribution system is limited to about 2,000 gallons a minute. The alternatives for improving this situation are to increase the water storage capacity in that area or increase the capacity of the transmission delivery system. Another area of concern is in the Slack Street and San Luis Drive neighborhoods. Due to existing water main easements and location of these mains in relationship to fire hydrants, fire protection capabilities are not adequate. An alternative is to relocate the water mains in City right -of -ways and re -connect customer service.lines to the new mains. City of San Luis Obispo 51 1-70 Urban Water Management, A Fire flows can now be met in all of the other gravity zones. There are local distribution problems within all zones that will be remedied by removal of deteriorated and undersized pipes as part of the ongoing capital replacement program. 4.2.2 OPERATION AND MAINTENANCE STAFFING EVALUATION In order to retain a reliable water distribution system, a routine maintenance program is essential. The following section discusses the components of a preventative maintenance program necessary to minimize water service disruption and prolong system service life. Preventative Maintenance Components ■ Systemwide Mainline Valve Exercise Maintenance A comprehensive mainline valve exercise program is essential as it ensures proper operation of valves and minimal disruption to water customers during an emergency shutdown. This program also identifies problem areas such as broken valves, broken operating nuts, buried gatewells, and misaligned access sleeves. Identified problem areas can then be scheduled for repair or replacement which will minimize future distribution problems. In addition, a valve exercise program assures that fire hydrants can be isolated for maintenance and repair. ■ Pump Station Maintenance Since electrical and mechanical pumping equipment consists of many moving parts that are subject to wear, they require a comprehensive preventative maintenance program to prolong their useful life and avoid costly breakdowns. Currently, staff performs weekly inspections of the five pumping facilities. Corrective maintenance is performed as needed. ■ Water Storage Tank Inspection and Maintenance The water storage tanks are a very important component of the water distribution system. As a result of the storage facilities, the system's flow and pressures are improved and stabilized to better serve the customers within a storage facility's zone. Additionally, these supplies serve as a reserve for emergencies such as fire suppression and power outages. Regular inspections and preventative maintenance are necessary to protect the City's investment in these facilities. This includes regularly- scheduled inspections and cleaning of probes and relays, paint and protective coatings, facility security systems, and maintenance of access roads and sites. ■ Service Line Change -Out Program The service line (from the water main to the customer water meter) change -out program is currently a reactive program due to the high rate of service line failures. The City's service lines consist of one of five types of materials: copper, polyethylene, polybutalene, lead, and galvanized pipe. Three of the materials, polybutalene, galvanized iron and lead, have been determined to be inferior due to their high failure rate and potential health risk. These types of City of San Luis Obispo 52 1-071 Urban Water Management F,,... lines are replaced upon their discovery or failure and account for 45 % of the workload of the water distribution staff. A capital replacement program which would replace large numbers of services may be necessary in the future if the failure rate increases significantly. ■ Pressure Reducing Valve Maintenance Program Pressure reducing valves (PRV's) are necessary to maintain acceptable pressure levels in both low lying and higher elevation areas of the City. Pressure reducing valves reduce plumbing failures and system leakage in areas that would otherwise experience high pressure. There are 14 PRV's in the City which should be inspected and tested annually, and rebuilt periodically as part of a PRV maintenance program. Only corrective maintenance is currently performed. ■ Fire Hydrants To ensure that fire hydrants operate correctly when needed, annual testing, maintenance, and repair should be performed. It is the responsibility of the water distribution staff to perform all maintenance, repairs, and hydrant replacement as needed. Preventative maintenance is on a limited basis. Periodic flow testing is performed by the Fire Department. Operation and Maintenance Summary The preventative maintenance program goals are only being partially accomplished at this time due to the lack of available staff time to perform the various program components. This is a result of an aging distribution system which requires a significant amount of emergency repair coupled with an increase in system size (additional miles of pipeline). The workload analysis presented in Appendix IV indicates that 60% of the staff s time is spent responding to system failures in either service or main lines. 4.2.3- WATER DISTRIBUTION INFRASTRUCTURE EVALUATION In 1992, the City obtained a water system computer modeling program entitled Cybernet. Cybemet is a graphic modeling program capable of simulating the City's entire water distribution system. As staff enters water system data, a model of the entire system is being constructed to analyze necessary system improvements. Until that process is completed, staff is relying on experience, records, and water distribution crew knowledge to evaluate the system. Priority Areas This section identifies specific existing deficiencies in the water distribution system. These deficiencies are considered high priorities and could require funding beyond the recommended capital improvement project program expenditures. The following is a description of the identified problem areas and the recommended solution: City of San Luis Obispo 53 7A Urban Water Management ..-d ■ Alrita Pump Station Problem - The current system consists of a hydro - pneumatic pump that serves 11 customers. Other customers, immediately outside of the Ahita Zone, have inadequate water pressure. Solution - Enlarge and raise in elevation the Bishop tank to serve a larger pressure zone. The Bishop zone is currently too large for the size of the existing storage facility. The existing 80,000 gallon tank should be replaced with a 250,000 gallon tank. This would allow the City to eliminate the inefficient, uneconomical Alrita hydro - pneumatic pumping station. This would also increase the fire protection capability of the Bishop tank pressure zone. ■ Highland Zone Problem - The Highland Tank is undersized for the area it serves. The tank is also too low, resulting in inadequate pressure for some residences. Solution - The ideal solution would involve the construction of a new water tank at an elevation adequate to eliminate the private booster pumps necessary for some customers. The construction of a new water tank would be costly. Another alternative would involve the construction of a water line from the Ferrini Tank to the end of Oakridge Drive. This would eliminate the Highland Tank and the Highland Zone. The area served by the Highland Tank would become part of the Ferrini zone. About 20 feet of additional head would be experienced in the Highland Zone. Some private boosters would still be necessary, but the higher head would result in decreased pumping costs for the residences requiring boosters. The City would save maintenance cost by eliminating the Fel -mar Pumping Station, which serves the Highland Tank. ■ Laguna Lake Area (west of Los Osos Valley Road) Problem - The area has inadequate water pressure resulting from the distance to the Edna Saddle Tank and the size of the Edna Zone. Solution - A new transmission main may, be necessary to increase water availability in the Laguna Lake area. A main could extend from the 20 -inch line in the intersection of South Higuera and Prado Road or could extend down Foothill Boulevard to Los Osos Valley Road. Another alternative would involve the construction of a new water storage tank in the Laguna Lake area. ■ Slack Street/San Luis Drive Areas Problem - Water mains were originally constructed in easements through the back yards of the properties in the area. Fire hydrant density is inadequate, reading water meters is difficult, and maintenance on the facilities is nearly impossible. Solution - The water lines should be relocated to the public streets in front of the residences. The services should also be changed over to the front of each house. City of San Luis Obispo 54 1-73 Urban Water Management Pion 4.2.4 FUTURE DEVELOPMENT AREAS It is estimated that the water distribution system size will increase by approximately 15% or about 45 miles under the adopted General Plan, which is currently being updated. It is important to note this does not include annexation of the Airport area. In addition, the proposed reclaimed water distribution system, to be maintained by the water distribution staff, will add roughly 11 miles of water line depending on the area served by reclaimed water. Also, additional pumping stations, water storage, and other distribution facilities may be required. 4.2.5 STAFFING EVALUATION A comprehensive workload analysis has been performed on the water distribution and customer service sections using work logs recorded during the past three years. The analysis includes both sections because of the overlap in duties and job assistance. There are five water distribution maintenance workers, three customer service representatives, and one supervisor. The results of the workload analysis are presented in Appendix IV. As indicated, the current water distribution staff workload is limited to primarily corrective maintenance because of the increases in the distribution system's size and age. A preventative maintenance program will add to the reliability of the water system and potentially extend the service life of the infrastructure, thus reducing future costs. To establish a viable preventative maintenance program, an evaluation has been prepared which addresses each component of the program and estimates the time required to perform the various tasks. The evaluation indicates that a minimum of two additional staff will be required to implement a cost effective preventative maintenance program. The recommended increase in staffing will be presented to Council as part of the 1995 -97 Financial Plan. The workload analysis does not take into account future growth in the water delivery system or the maintenance of the proposed water reclamation system. Those additional staffing requirements will be analyzed when more complete water system information is available. City of San Luis Obispo 55 l-7� Urban Water Management 4.3 WATER CUSTOMER SERVICE Introduction The water customer service program is responsible for accurately measuring water delivered through the distribution system to the City's 12,500 customers. The following are the major goals for this section: 1) to accurately measure the amount of water which passes through the customer water meters, and 2) to schedule and perform meter reads which will generate timely and regular water billings. To accomplish these goals, the program has three major objectives. They are as follows: ■ Water Meter Reading. Read approximately 6,250 water meters each month, investigate abnormal readings (high and low), start and stop water service, and maintain access to water meters. ■ Meter replacement and maintenance. Replace all obsolete meters over a seven year period to conserve water and accurately measure water use for billing purposes; replace meters on a 20 year replacement schedule to ensure proper operation, and repair meter leaks as necessary. ■ Compound meter testing and repair. Maintain large commercial meters and contract services for the testing and repair on a four -year schedule. 4.3.1 PROGRAM DESCRIPTION AND EVALUATION The Water customer service program is responsible for the following: • Read approximately 6,250 water meters monthly as part of the City's bimonthly billing process • Repair water meter leaks • Replace obsolete, old and damaged water meters • Test and repair of compound meters • Starting and discontinue water service (turn-on and offs) • Discontinue and restore service for non - payment Appendix IV provides the actual workload indicators in these areas for the fiscal years 1991 -92 and 1992 -93. The program is achieving the work objectives with the assistance of the water distribution maintenance staff during peak work load periods. 4.3.2 FUTURE DEVELOPMENT AREAS Under the adopted General Plan, it is estimated there will be an increase of approximately 23 % in the number of water meters. It is important to note that the current General Plan does not include the airport area. Depending on the annexation size and adopted development plan for that area, an additional increase of 2% to 5% could be anticipated. Given this assumption in City of San Luis Obispo 56 / -7S Urban Water Management Pig,, system growth, it can be projected that the number of water meters in the City will increase by approximately 2,875 to 3,500 when General Plan build -out is achieved. 4.3.3 STAFFING EVALUATION Water customer service is staffed by three full -time employees. Assistance on an "as needed" basis is provided by the water distribution maintenance crew. In addition, customer service personnel are required to perform standby duties on a rotating basis and respond to any water emergency occurring during off duty hours. This means customer service personnel must be fully trained and qualified to perform the same job functions as the water distribution =- maintenance staff. A combined workload analysis is presented in Appendix IV. As indicated, a large percentage of time is spent on scheduled meter reads (25 %), but most of their time is spent in other areas, such as establishing or disconnecting water service and corrective maintenance. The overlap and assistance provided by the water distribution maintenance crew is also identified in the analysis. Again, this figure is derived from a three year average. Assistance is needed mostly during peak periods of start or stop service requests (coinciding with the beginning and end of Cal Poly's quarters), substituting during vacations or illness, and when reading large water meter routes. The cross -over of staffing during peak workload periods and emergency situations is accomplishing the Customer Service Program goals and objectives. Based on the estimated increase in the number of water meters as the City annexes areas within the Urban reserve line, additional staffing will be required. As areas are annexed, an analysis of the staffing impacts will be performed and a recommendation presented to Council. City of San Luis Obispo 57 /-76 Urban Water Management . .n 4.4 TELEMETRY Introduction Telemetry literally means "measuring at a distance ". Telemetry equipment includes the complete measuring, transmitting, receiving, and recording data from an outlying location. The use of a telemetry system will provide operational personnel with a mechanism to monitor and control the entire water system from a central location and to obtain information at a moment's notice. The information can either be sent by telephone lines or via radio signals. Through telemetry, Water Division personnel can by command or by programming of the computer system, automatically turn pumps on or off, change reservoir elevations, respond to abnormal or emergency operations more expediently, and optimize pumping efficiency from a central location. The result is a reduction in staff hours spent accomplishing all these tasks and the reduction of vehicle trips to these outlying sites. In addition, State and Federal regulatory standards require alarm procedures to detect process failures. The telemetry system monitors the required processes, achieving compliance with the various regulations and ensuring reliability of the water system. 4.4.1 SYSTEM DESCRIPTION The Water Division telemetry system is a network of interconnected distributed process controllers (DPC's) and personal computers. DPCs are similar to personal computers, but are specifically designed to interconnect to sensing and control devices, and run programs written in a distinctive computer language. Electronic sensing or measuring devices at a remote site transmit data such as the level of water in a tank via radio signals to another site, such as a pump station. At the pump station, a DPC uses the tank level data to decide when and which pumps to operate. DPC's are capable of operating all types of industrial equipment from the simple pump example to complex water and wastewater treatment processes, and are more reliable and flexible than the old electromechanical or pneumatic control systems previously utilized. The Water Division telemetry system currently consists of twelve DCP's located at pump stations, water storage tanks, water treatment plant, and various offices. These stations are linked by a single network through two radio repeaters located at Tassajera Peak and seven radio transceivers and eight radio links. Figure 6 identifies the current and proposed locations of the telemetry system. During the 1993 -95 Financial Plan period, the telemetry program will complete phase 2 of the Utilities Telemetry project implementation at a cost of $30,000 in 1993- 94 and $20,000 in 1994 -95. Planned projects will include upgrading obsolete and outdated equipment and bringing the remaining water system components on line. When completed, the water treatment plant, pump stations, water storage facilities and groundwater wells will be able to coordinate operations, which will optimize the efficiency of the entire system. The system would be invaluable during a major catastrophic emergencies such as an earthquake or major fire such as Las Pilitas. City of San Luis Obispo 58 1-77 Urban Water Management i _r, LEGEND: italics denote locations to be added to telemetry system during 1993.95. WRCK Whale Rock WTDC WTP Data Controller HLNT Highland Tank MDNV Madonna PRV APMP A Pump Station CHEM Chemical Feed Room HLNP Highland Pump MTPW M4ehell Park Well BPMP B Pump Station TRNP Transfer Pump House MCLP McCollum Pump FS4W Fire Station 4 Well REST Reservoir 1 WDIS • Water Distribution SLKT Slack Tank PBSW Pac Beach Wells RES2 Reservoir 2 FRNT Ferrini Tank BSPT Bishop Tank APWW Autopark Way Well EDST Edna Saddle Tank FRNP Ferrini Pump BSPP Bishop Pump DENW Denny *% Well TRHT Transfer Pump BRSP Bressi Pump ALRP Attila Pump 4.4.2 SYSTEINI OPERATION AND MAINTENANCE EVALUATION The Water Division telemetry system program was implemented in 1989, initially serving Whale Rock Reservoir and the water treatment plant. All design, installation, and programming is done by the City's Telemetry and Instrumentation Technician with assistance provided by Water Division field crews, with the exception of the new equipment being installed as part of the water treatment plant upgrade project. The advantages of City personnel performing these duties are the "hands on" experience gained by the field crews in actual operation of the system, more immediate response to desired changes in the system function or programming, and the cost savings versus using an outside consultant. The system has been very reliable. Necessary repairs and adjustment performed at the existing telemetry .sites are executed by the telemetry technician. It is Utilities Department policy to maintain a reserve supply of components. This enables the technician to immediately replace disabled modules. Any defective equipment removed from the field that is not easily repaired in the telemetry equipment repair facility is returned to the appropriate manufacturer for repair. Every site is inspected at least twice annually and given a visual and functional examination. This especially applies to the radio transmitters, to ensure that FCC licensing standards are maintained. In addition, every DPC and operator interface computer has a set of program files which are updated regularly. City of San Luis Obispo 59 / -78 Urban Water Management . -a 4.4.3 STAFFING EVALUATION The entire Utilities Department, Water and Wastewater, telemetry system is currently designed, installed, programmed, and maintained by one Telemetry and Instrumentation Technician. Based on an evaluation of the current structure and planned expansion of the telemetry system, this level of staffing has been determined to be adequate for the needs of the current and completed system. Some cross- training of existing staff in all utilities sections will ensure adequate staffing in the future. City of San Luis Obispo 60 � -79 Urban Water Management Pi., 4.5 WATER CONSERVATION Introduction In June 1985, the City Council adopted the Annual Water Operational Policy which established a procedure to monitor the City's water supply situation. An integral component of the policy was the establishment of a water demand management or conservation program aimed at instituting corrective measures ahead of any projected water supply deficit to maintain a dependable supply during critically dry periods. Water demand management has played an ever increasing role in the overall water supply development and management strategies since 1985. In 1990, the City adopted a multi- source water plan in an attempt to solve both short term water shortages and establish a long term solution to the City's water needs. The importance of the implemented water efficiency programs has become even more apparent as some of these planned water supply projects have either been rejected because of high cost or environmental impacts which could not be mitigated. Because of the difficulty in developing new water supply projects, water conservation is being viewed more as a water supply alternative. The primary goal of the water conservation program is to eliminate water waste by using water more efficiently, which will postpone the need for additional supplies and reduce the amount of water needed in the future. The specific objectives to achieve the goals of the water conservation program are to: • Educate and inform water customers on short-term and long -term water supply conditions and the importance of efficient water use; • Replace old plumbing hardware with water efficient plumbing hardware; • Evaluate water customer's indoor and outdoor water usage and provide specific recommendations for improved efficiency; • Analyze water efficiency programs for cost effectiveness; • Develop new water efficiency programs; • Monitor and enforce water conservation municipal codes. 4.5.1 PROGRAM DESCRIPTION Water conservation has two primary components, short -term and long -term water demand management. Short-term activities address immediate water shortage situations caused by prolonged below normal rainfall or disruption in water service due to a natural disaster such as an earthquake. Long -term programs make permanent, long -term reductions in water demand while minimally impacting customers' lifestyles. Short Term Water Efficiency Program Due to the drought and subsequent water shortage the City experienced from 1989 to 1992, the short-term measures developed during that period (formalized in the City's Water Shortage Contingency Plan) will be a model for any future water emergencies the City might face. The Water Shortage Contingency Plan was submitted to the State Department of Water Resources in 1992. City of San Luis Obispo 61 l 40 Urban Water Managemen, .1 State law (AB 11) mandates that every water purveyor in California develop a water shortage contingency plan. It is a compilation of all the monitoring systems the City has in place to evaluate its water supply and any corrective actions necessary based on the water supply outlook. As the City becomes more water efficient, it will become more difficult to achieve substantial temporary reductions (mandatory conservation levels). Adjustments will have to be made in the water shortage contingency plan to account for this increased water efficiency and to maintain equity in the program administration. Long Term Water Efficiency Program Many of the public assistance programs implemented during mandatory rationing have proven to be sound long -range water management practices. In September 1991, the City Council approved and authorized the Mayor to sign the "Memorandum of Understanding" (MOU) regarding urban water conservation and the implementation of the "Best Management Practices" ("BMP's "). The BMP's are comprised of sixteen water conservation measures. The BMP's and the implementation progress are listed in Appendix II. Most of the measures were implemented during the water rationing period between 1989 and 1992. Appendix V lists the current programs and services offered by the Water Conservation Office. The programs listed satisfy the MOU and fulfill the annual reporting requirements outlined in the BMP's. 4.5.3 PROGRAM EVALUATION The influence of the water rationing program and higher water rates make it difficult to identify water savings from a specific program or service. As a signatory agency to the MOU, the city is a member of the California Urban Water Conservation Council ( CUWCC). CUWCC is currently working on several studies that will assist the member agencies in evaluating water efficiency programs for water savings potential and cost effectiveness. The consensus is that the current BMP's will yield reliable water savings, but it has been recognized that more in -depth evaluation is needed to quantify the expected water savings of the various efficiency measures. The City has three major components in its water efficiency strategies. Within these three components are the programs previously identified. The components are: 1) water hardware retrofitting; 2) water auditing; and 3) public information and education. ■ Water Hardware Retrofitting. Studies to determine water savings from residential and commercial toilet retrofitting are being performed by member agencies to the CUWCC. Preliminary results from the retrofit evaluations have substantiated that the assumptions used to calculate potential water savings in the residential sector are solid. Commercial retrofitting data is not yet available. Table 4.5.3 summarizes the progress of toilet retrofitting in the City through the Retrofit Rebate Program and the Water Offset Program and examines the estimated water savings based on the preliminary data from the Retrofit Rebate Program, specifically toilet retrofitting, and calculates a cost per acre foot based on the cost to the City versus the water saved. As indicated, the cost per acre foot, as compared to other supply sources, is cost effective and are one time expenditures. City of San Luis Obispo 62 / -8/ Urban Water Management . CITY OF SAN LUIS OBISPO TOILET RETROFIT PROGRESS 1993 Toilet Retrofit (Offset) Program Retrofit Rebate Program TOTAL Estimated number of toilets in the City Percent of City retrofitted 4,500 (estimated) 3,761 (actual) 8.261 32,000 26% TOILET REBATE PROGRAM ESTIMATED WATER SAVINGS AND ESTIMATED COST PER ACRE -FOOT Number of Toilets Retrofitted Estimated Water Savings (range) Total Program Cost (through 1993) One Time Cost Per Acre -Foot Amortized cost Per Acre -Foot (20 years) • No ongoing operation or maintenance costs Estimated Water Savings @ 100% Retrofit Table 4.5.3 Water Savings through Hardware Retrofit 3,761 115 to 145 acre -feet per year $324,390.00 $2,240 to $2,820" $224 to $282" 900 to 950 Acre -Feet per Year ■ Water Auditing. Water auditing services, both indoor and irrigati on, are a major element to the water efficiency programs listed. In particular, irrigation auditing offers a significant opportunity for water savings. Though current available data is not conclusive, preliminary data estimates a 30% savings potential through proper scheduling and irrigation practices. To date, approximately 500 water audits have been conducted. ■ Public Information and Education. Public information and education have historically been the foundation of all the City's water efficiency programs. Though it is impossible to determine precise water savings from this type of program, it is recognized in the water profession that information and education are a key to a utility's effectiveness to serve its customers. The water conservation office offers free information on a variety of conservation topics including leak detection, irrigation scheduling, landscaping, and City of San Luis Obispo 63 ��0 Urban Water Management I water hardware retrofitting. In addition, informational workshops and awareness programs are promoted. 4.5.4 STAFFING EVALUATION The initial water conservation program was staffed with seasonal temporary and contract employees. In August 1988, it was recognized that the coordinator position should be made a regular position to maintain continuity in the development and implementation of short-term and long -term water efficiency programs. Staffing levels beyond the coordinator position have continued to be filled by contract staff on an as- needed basis, and the level of staffing evaluated annually. This staffing policy has given the City the flexibility to meet the short term requirements and changing needs of the water conservation program. In the 1993 -95 Financial Plan, the approved level of staffing is for one regular position, one full-time contract person and one full-time seasonal (May through September) employee. To maintain an effective program and to meet the City's commitment to long -term water efficiency and the BMP's, a change in staffing policy may be required. Also, if the City follows the recommendations made in the Hughes -Heiss reorganization study, Council may want to consider an alternative staffing policy to support a resource management approach to achieve its water conservation and solid waste management goals. These options will be evaluated and presented to Council in the spring of 1994. City of San Luis Obispo 64 1 g3 CHAPTER 5 FINANCIAL PLAN 5.1 _ WATER FUND Policy The City's policy is to fully recover all water costs through water revenues. Resolution No. 6447 states the primary goals of the City's water utility are to provide quality water service to its citizens and to function as a self - sufficient enterprise. Under this policy, all water revenues are used only for water purses. The water fund will reimburse the general fund for all indirect costs pursuant to the approved cost allocation plan. Background The City's Financial Plan policies require the annual review of the Water Fund financial needs. Fees and rate structure must be evaluated to ensure that they are appropriate and equitable. Fees and rates must be set at levels which fully cover the total cost of providing water services, including operations, capital outlay and debt service. Annual review assures rate increases, if required, can be kept to modest levels. City-policy requires that the Water Fund, as all other enterprise funds and the General Fund, maintain a fund balance of at least 20% of operating expenditures. This is considered the minimum level necessary to maintain the City's credit worthiness and to adequately provide for economic uncertainties, local disasters, and other financial hardships or downturns in the local or national economy; contingencies for unforeseen operating or capital needs; cash flow requirements. In addition, fund balance levels must be sufficient to meet funding requirements for projects approved in prior years which are carried forward into the new year; debt service reserve requirements; reserves for encumbrances; and other reserves or designations required by contractual obligations, state law, or generally accepted accounting principles. City of San Luis Obispo 65 Urban Water Managemen, n 5.2 ANNUAL WATER FUND REVIEW In addition to stating that the primary goals of the water utility are to provide quality water service and to function as a self - sufficient enterprise, Resolution No. 6447 states that city water should meet all health standards, be free of bad taste and odors, provide adequate fire protection, and assure reliability and continuity of service to users. The annual review of the Water Fund is conducted with the above goals and philosophy in mind. Appendix VI is a summary projection of revenues, expenditures and changes in financial position for the Water Fund through fiscal year 1996 -97. This projection, revised annually, outlines the operations and capital improvement budget for the Water Fund as presented in the approved 1993 -95 Financial Plan. These projections include funding for the expansion of the Salinas Reservoir and for the completion of the upgrade to the Water Treatment Plant. They do not include funding for participation in the Nacimiento Project or Water Reuse. Key Variables The following is a summary of the key variables in forecasting. water fund revenue and expenses: • Short term and permanent level of water conservation • Base operating costs plus inflation • Debt service requirements • Water customer base growth rate (based on General Plan, not to exceed 1 % per year) • Capital improvement charges ( "impact fees" paid by new development) • Connection and meter charges • Service start-up fees • Major capital projects The most recent water fund analysis, Appendix VI, provided a listing of these variables and what was specifically assumed in the analysis. City - operated Utility Rate Structure Objectives Although both revenue requirements and rate structure are considered in the annual review of the Water Fund, the revenue required to operate the water facilities and the rate structure by which the revenue is generated are two separate issues. Revenue requirements tell how much revenue is needed to fully recover the total cost of providing water services, including operations, capital outlay and debt service. Rate structure describes how these costs will be distributed among different types of customers. It is important to recognize that any rate structure can be designed to ensure revenue adequacy. The Council adopted the following rate review objectives in May, 1988: • Comply with legal requirements • Ensure revenue adequacy to fully meet system operating and capital needs • Encourage conservation City of San Luis Obispo 66 � - SS Urban Water Management . • Provide equity and fairness between classes of customers • Be easy to understand by our customers and easy to administer • Provide for ongoing review in order to facilitate rate stability In January 1993, Council requested a review of the existing rate structure. Upon close examination, it was felt that some of these goals were potentially in conflict. For example, a rate structure that provided rate stability would probably not encourage conservation efforts. A rate structure that was easy to understand by customers would not necessarily be equitable between classes of customers. With that in mind, potential rate structures were analyzed based on the primary "goal" that was intended, viewing the goals as a continuum ranging from a strong bias towards rate stability to a strong bias towards water conservation. At the end of the continuum emphasizing conservation, rates would be composed entirely of commodity charges, with no flat rate charges. At the opposite end of the continuum that emphasizes rate stability, the rates would be composed entirely of flat rate charges with no commodity charges. The rate system based entirely on commodity charges would produce revenue based entirely on consumption which would vary from month to month. The rate system based on commodity charges would not relate to consumption at all, and would be the same every month. Prior to March 1993, the City's water rate structure was a combination of a base charge related to meter size and a two -tiered commodity charge based on an increasing block rate. After March 1993, the city's rate structure was modified to be entirely commodity driven. It is now a two-tiered increasing block rate with no base charge. Although rates changed by customer type, it was a revenue neutral rate structure change. This type of rate structure encourages conservation, recognizes that the marginal cost of adding new water resources is high, and is easier for customers to understand. It is equitable among classes of customers, as no one group is required to carry a disproportionate share of system costs. The primary disadvantage is that the revenues may be very unstable if the customers have inconsistent consumption patterns. Concerns about the predictability of consumption patterns due to conservation levels and rates based wholly on commodity use (and the impact this could potentially have on revenues) could be addressed through the adoption of a higher fund balance requirement. Also, the current 20% fund balance requirement is applied only to operating expenditures. This may need to include debt service as well. Rate Setting Methodology In determining water rate revenue requirements and setting recommended rates, the following general methodology is used: Step 1: Determine Water Fund revenue requirements for: • Operations and maintenance • Capital improvements and replacements • Debt service obligations (existing and projected) Revenue requirements are generally projected for four years into the future. City of San Luis Obispo 67 / ,?4,, Urban Water Management Step 2: Subtract from this amount "non -rate revenues" such as: ■ Interest earnings ■ Connection fees and meter sales ■ Sale of electricity from hydroplant operations ■ Other service charges Step 3: Identify water rate revenue requirements Revenue to be generated from water rates is the difference between water revenue requirements (Step 1) and "non -rate" revenues (Step 2). Step 4: . Determine new rates. Model the rate base (consumption and customer account assumptions ) against the existing rate structure and rate requirements identified in Step 3. City of San Luis Obispo 68 APPENDIX I WATER POLICY SUMMARY Note: * Denotes a new or significantly modified existing policy. 2.1 SAFE ANNUAL YIELD DETERMINATION 2.1.1 Safe annual yield will be based on coordinated operation of all water supply sources. 2.1.2 The current safe annual yield is 7,735 acre -feet per year 2.1.3 The current safe annual yield of groundwater is 500 acre -feet per year and is included as part of identified safe annual yield in Section 2.1.2. 2.2 WATER CONSERVATION POLICY 2.2.1* Long -term water efficiency measures will maintain at least a 10% reduction in water use levels recorded during 1986/87. 2.2.2 Short-term mandatory measures will be implemented when the City's water supplies are projected to last three years. 2.3 WATER DEMAND PROJECTIONS 2.3.1* Separate projections of potable and nonpotable water requirements will be made. 2.3.2* The City shall use 165 gallons per person per day (0.185 acre -feet per person per day) to plan for future water supplies. 2.3.3* Projected water demand at General Plan buildout is about 10,350 acre-feet. 2.4 RELIABILITY RESERVE The City will strive for a reliability reserve of 2,000 acre -feet. City of San Luis Obispo I -1 APPENDIX I 2.5* SILTATION AT SALINAS & WHALE ROCK RESERVOIRS The City shall develop 500 acre feet of safe annual yield to account for the loss of water storage due to siltation at Salinas and Whale Rock reservoirs to the year 2025. 2.6* SUPPLEMENTAL WATER REQUIREMENTS The City shall develop additional water supplies to meet projected demand at buildout of the General Plan. The amount of water to be developed shall be based on land use assessment and the adopted per capita water use figure in Section 2.3.2. 2.7 MULTI- SOURCE WATER SUPPLY The City shall continue to develop and use water resource projects to maintain multi- source water supplies to reduce reliance on any one source. 2.8* ALLOCATION OF NEW WATER SUPPLIES 2.8.1* When new water sources are obtained, the additional yield shall be allocated first to eliminate any projected deficit at the time the new source is obtained. 2.8.2* Any additional safe yield beyond the deficit elimination will be allocated one -half to new development and one -half to the reliability reserve (Section 2.4) and to compensate for siltation (Section 2.5). 2.8.3* Reclaimed water shall be accounted for as a nonpotable supply and shall not be considered as a component of City's potable water safe annual yield. 2.8.4* When developments are supplied by private groundwater wells, the yield of those wells will not be counted toward the City's safe yield. 2.9 WATER ALLOCATION AND OFFSETS 2.9.1* The City will make available to new development only that amount of safe yield which exceeds projected water use (as stated in Section 2.3), the amount to compensate for siltation (Section 2.5) and to provide a reliability reserve (Section 2.5). City of San Luis Obispo I -2 APPENDIX I 2.9.2* When there is no safe annual yield to allocate to new projects, a project may be built if a. developer retrofits existing facilities which will reduce long -term water usage equal to the allocation required for the project. Exemptions to needing a water allocations or an offset, or reducing the amount of the required allocation or offset for a project will be granted to the extent that a project is supplied by a suitable private well. 2.9.3 Required allocations and offsets will be based on long -term usage for each type of development. =2.10* RECLAIMED WATER 2.10.1* The City shall produce high quality reclaimed water, suitable for a wide range of nonpotable uses. .2.10.2* The City will dedicate one cubic foot per second to San Luis Obispo Creek and make available reclaimed water for existing and new nonpotable uses. 2.10.3* As reclaimed water supplies new or existing development, the reliable yield of nonpotable water will increase. The increase in reliable nonpotable yield will only be credited only when it is available to a user. 2.10.4* When the City provides distribution facilities for reclaimed water, the resulting reduction in potable demand will be given offset credit for government projects. 2.10.5* When a private project provides the distribution facilities that allow for the use of reclaimed water in existing development, the resulting reduction in potable water demand will be credited on a one- to-one basis. When a private project provides distribution facilities to that project, any required potable water allocation shall be reduced by a corresponding amount. 2.10.6* When a component of the reclaimed water distribution system is funded by both the City and a private developer, the credit for reduction in potable water usage resulting from that component shall be divided according to the proportionate share based on the contribution. to the component. 2.11* CAPITAL UYIPROVEMENT PLAN- Water Distribution The City shall replace aging waterlines • at the yearly rate of 2% of the value of the Distribution system. City of San Luis Obispo I -3 /-90 APPENDIX I OTHER URBAN WATER MANAGEMENT PLAN POLICIES Chapter 3* Supplemental Water Supply Projects The City shall pursue the expansion of Salinas reservoir, the Nacimiento Reservoir Project, water reuse, and water demand management activities as supplemental water supply sources. Chapter 4* Water Operational Programs The City shall provide an adequate supply of high quality water which meets all government. standards, at sufficient pressures, provide for fire protection, and sustain water efficiency programs. The City shall allocate funding to meet those goals and objectives. Chapter 5, Financial Plan The City's policy is to fully recover all water costs through water revenues. All water revenues are used only for water purposes. The water fund will reimburse the general fund-for all indirect costs pursuant to the approved cost allocation plan. City of San Luis Obispo I-4 /• 91 APPENDIX II BEST MANAGEMENT PRACTICES - Implementation Update The sixteen elements of the Best Management Practices are to be implemented over a three year period and completed by the tenth year. Because of the water crisis the City faced between 1989 to 1992, most of the sixteen measures have already been established. BMPs (BY NUMBER) SCHEDULED FOR YEAR ONE IMPLEMENTATION BMP No. 2. Enforcement of water conserving plumbing fixture standards in all new construction Plumbing, New beginning January 1, 1992. All pipeline projects required to utilized water conserving plumbing and Retrofit futures as of January 1, 1989. All other building projects subject to State standards as of January 1, 1992. Support State and Federal legislation prohibiting the sale of toilets using more than 1.6 gallons per flush. Legislation passed by the State in November 1992 prohibiting the sale of toilets using more than 1.6 gallons per flush as of January 1, 1994. BMP No. 3. In 1988, a water distribution evaluation and leak detection program was developed. This System Water evaluation identified potential problem areas in the system and made recommendations for water Audit Year 1. line replacement projects. BMP No. 7. The City supports an ongoing public information program, including: Public • Speakers to community groups and media Information. ■ Paid and public service advertising • Bill inserts • Billing information comparisons • Water Conservation handouts • Water Conservation workshops and fairs BMP No. 8. School The Water Conservation office offers a Resource Education Guide to provide teachers with Education information on available resource education materials and instructional assistance. BMP No. 13. The water waste codes currently prohibit Water Waste • Use of substandard water fixtures; Prohibition ■ Water run-off from property; • Use of water from fire hydrants except for fire fighting; • Serving of water in restaurants unless requested; • Use of potable water to wash sidewalks, driveways, etc.; • Use of potable water for construction. Accurate records on water waste contacts and violations have been maintained since July 1990. As of January 1993, the records indicate the following: ■ 500 contacts for water run -off violations with a friendly warning; ■ 110 water waste consultations without a warning; ■ 180 warning notices; ■ 27 Notices to Correct; ■ 2 letters from the City Attorney's office; ■ 445 requests from citizens to investigate water waste. City of San Luis Obispo II -1 / -9Pz APPENDIX II BMP No. 14. A regular position was approved in August 1988. Water Conservation Coordinator BMPs SCHEDULED FOR YEAR TWO IMPLEMENTATION BMP No. 2. Plumbing Retrofit - Delivery of low flow showerheads and toilet displacement devices Plumbing, New In 1987, retrofit kits including low -flow showerheads and toilet dams were delivered to 5,800 and Retrofit households in the City through the CARE program. The City continues to offer free low -flow showerheads upon request. BMP No. 3. Water system failure shifted the focus from leak detection to repair and replacement in 1989. Distribution System Audits BMP No. 4. All water services within the City are metered. Metering with Commodity Rates for all new /existing connections BMP No 6. New and Existing Commercial, Industrial, Institutional, Governmental and Multi- Family Landscape In March 1992, Council adopted Ordinance No. 1209 which established water efficient landscape Water standards for all new development. This ordinance was submitted to the State and accepted, Conservation bringing the City into compliance with AB 325, the Water Conservation in Landscaping Act. Requirements BMP No. 11. Effective March 1, 1993, a revised two-tiered rate structure encouraging conservation and Conservation establishing a lifeline usage figure was adopted. It also eliminated the readiness to serve charge. Pricing BMP No. 12. ■ In March 1992, Council adopted Ordinance No. 1209, establishing water efficient landscape Landscape standards for all new development. Water ■ Each spring and fall, water conservation office sponsors a water efficent plant tagging program Conservation for in conjunction with local nurseries to encourage installation of water efficient planting. New and ■ During February 1992, the City's first water conserving demonstration garden was installed as Existing SFR a joint project between the City, local landscape professionals and Cal Poly. Water consumption at the site is down 75 % from previous average water use (was a large turf area). ■ Free information and consultations upon request. BMP No. 16. The City has three programs addressing toilet replacement: Ultra Low Flush ■ Retrofit Rebate Program - to date approximately 3,000 toilets have been replaced. Toilet ■ Water Offset Program - to date approximately 3,500 toilets have been replaced by developers Replacement applying for building permits. ■ Retrofit Upon Sale Ordinance - Since January, approximately 300 toilets have been replaced. City of San Luis Obispo II -2 / 43 APPENDIX II BMPs SCHEDULED FOR YEAR THREE IMPLEMENTATION BMP No. I. Incentive Programs for Single Family, Multi- Family Residential and Governmental/ Interior and Institutional Customers Exterior Water ■ Water Conservation staff performed 400 residential /commercial water audits during 1992. Audits. Results are being monitored with an evaluation set for the end of 1993. Incentive ■ After evaluating the top 20% water users, it was determined that multi - family complexes should Programs for be a primary target of informational materials on the Retrofit Rebate Program and free water SF, MY auditing services. Residential and Governmental/ Institutional Customers BMP No. 5. ■ Water conservation and Parks Division staff have systematically performed irrigation audits on Large City parks. Eleven such audits have been performed. Results were mixed. Several parks are Landscape being retrofitted to improve water distribution efficiency. Audits ■ Water conservation staff is in the process of auditing the larger greenbelt areas in the newer developments in the Tank Farm area. ■ Water conservation staff has been working closely with landscape maintenance professionals in evaluating irrigation system efficiency in several condominium and apartment complexes. BMP No. 9. The 1993/95 water conservation plan focuses on the commercial /industrial customer sector. Commercial and Industrial Water Use Review BMP No. 10. Currently, new construction water allocations and required water offsets are based on the amount New of water the development will use on an annual basis. This means that developers are using the Commercial and most water efficient technology available to lower the water demand of their project. The lower Industrial Water the demand, the lower the required retrofitting that must take place prior to approval to build. Use Review BMP No, 15. In addition to'the rebates for water hardware retrofitting, other incentive programs are being Financial researched and analyzed for cost effectiveness. Incentives City of San Luis Obispo II -3 l'9f APPENDIX III WATER QUALITY STANDARDS Annual Water Quality Report - 1992 City of San Luis Obispo III -1 /. 9S Water Distribution / Customer Service Workload Analysis Current Workload Customer Service Section: Current Staffing: 3 Full -Time Personnel APPENDIX IV * 0.4 FI'E is currently covered by personnel from Distribution Section ** The above analysis is a reflection of the ratio of time spent on programs and services, not an exact accounting of weekly workloads. City of San Luis Obispo IV -1 1.94 Task Description Staff Hours /Week 1. Compound Meter Test and Calibration 5.9 (4%) 2. Turn Ons /Offs 24.2 (18 %) 3. Re -reads / High Bills 14.8 (11%) 4. Meter Leak Repairs 20.5 (15%) 5. Meter Maintenance 2.4 (2%) 6. Meter Retrofit 12.0 (9%) 7. Meter Sets/Resets 3.9 (3%) 8. Miscellaneous Investigations 6.0 (6 %) 9. Scheduled Meter Reads 39.5 (29%) 10. Service Discontinuance 6.2 (5%) TOTAL HOURS /WEEK 136.4 FTE'S 3.4 APPENDIX IV * 0.4 FI'E is currently covered by personnel from Distribution Section ** The above analysis is a reflection of the ratio of time spent on programs and services, not an exact accounting of weekly workloads. City of San Luis Obispo IV -1 1.94 APPENDIX IV Current Workload Water Distribution Section Current Staffing: 5 Full -time Personnel TOTAL HOURS /WEEK 183.7 FTE'S ' 4.6 * Current workload analysis is based on past three years of actual work order records. Analysis does not include supervisors time and assistance provided by supervisor in the field. City of San Luis Obispo IV -2 -97 Task Description Staff Hours /Week 1. Pump Station & Tank Maintenance 18.4 (10 %) 2. PRV /PSV Maintenance 9.2 (5%) 3. Water Main Failures /Repairs 36.7 (20 %) 4. Service Line Failures/Repairs 73.4 (40 %) 5. Hydrant Repair /Installation 14.7 (8%) 6. Miscellaneous Repairs/Upgrades 18.4 (10 %) 7. Large Meter Change -Outs 3.7 (2%) 8. USA Markouts 9.2 (5%) TOTAL HOURS /WEEK 183.7 FTE'S ' 4.6 * Current workload analysis is based on past three years of actual work order records. Analysis does not include supervisors time and assistance provided by supervisor in the field. City of San Luis Obispo IV -2 -97 APPENDIX IV Preventative Maintenance Program: Task Description Staff Hours /Week 1. Pumps, Motors, Controls and Facility Maintenance 15 (17 %) 2. Storage Facilities a. Steel Storage Tanks 5 (6 %) b. Hydro-pneumatic Facility 5 (6 %) 3. PRV /PSV Preventative Maintenance 15 (17 %) 4. Valve Maintenance Program 30 (32%) 5. Valve Replacement/Repair Program 10 (11 %) 6. Equipment and Tool Maintenance 10 (11 %) TOTAL ESTIMATED HOURS /WEEK 90 ESTIMATED FTE'S 2.25 City of San Luis Obispo IV -3 . _ -98 APPENDIX V WATER CONSERVATION OFFICE PROGRAMS AND SERVICES Using the BMPs as a guide, the water conservation office has developed programs and procedures to reach the City's goal of long term water efficiency through out the community. The following section will briefly explain the programs and services. Programs and Services 1. Retrofit Rebate Program. Customers are offered up to $100 per bathroom to replace toilets, showerheads, and faucet aerators with water efficient hardware. 2. Retrofit Upon Sale Ordinance Effective October 15, 1992, any property sold or transferred must be retrofitted prior to the close of escrow with water conserving plumbing hardware. 3. Indoor Water Use Evaluations Water efficiency specialists evaluate all indoor water use and recommend water efficiency measures to residential and commercial customers. 4. Irrigation Evaluation and Audit The water conservation office offers free irrigation systems evaluation and will perform distribution and uniformity audits to determine irrigation scheduling and make recommendations to improve water efficiency. 5. Water Efficient Plant Material Consultations. Printed information and suggestions are offered to customers interested in retrofitting existing landscapes with water conserving plant materials. 6. School Education Program The water conservation office offers programs and materials for grades 1 through 12. 7. Public Information and Education Program Ongoing informational and promotional advertising both paid and public service announcements. Variety of printed informational brochures and pamphlets available free of charge. Educational workshops on water efficiency topics offered to the public. 8. Water Waste Code Enforcement Mostly an educational, water efficiency specialist contact customers experiencing water run -off problems and offer suggestions on how to solve these problems. City of San Luis Obispo V -1 APPENDIX V 9. Low Income Assistance Water Audit Program People applying for low income assistance on their water /wastewater bill are required to have a home water audit performed before being granted a utility bill reduction. 10. Residential Resource Conservation Services Program A joint program which incorporates recycling and water conservation into one effort. Specific neighborhoods are targeted and residents are encouraged to participate in the water audit and recycling programs. 11. Multi - family Resource Conservation Services Program A program developed specifically for multi- family complexes to assist in establishing successful recycling programs and achieving water efficiency. City of San Luis Obispo V -2 APPENDIX VI WATER FUND RATE REVIEW September 7, 1993 City of San Luis Obispo VI -1 /-/0/ unoa►�1IIIIIIIII�� ►�I city of San tins OBISp0 Mmis COUNCIL AGENDA REPORT FROM: William C. Statler, Director of Finance W 6o—z Prepared by: Linda Asprion, Revenue Manager ; 4, 7v SUBJECT: WATER FUND RATE REVIEW CAO RECOMMENDATION METING DATE: ITEM NUMBER: Adopt a resolution increasing water rates by eight and one -half percent (8.5 %) effective October 1, 1993 and six and one -half percent (6.5 %) effective July 1, 1994. DISCUSSION Overview On June 1, 1993, Council examined the Water Fund rate review recommending a six percent (6 %) rate increase and determined that additional time and analysis was required to ensure appropriate groundwater claim costs and capital expenditures were properly assessed. This report analyzes the revenue requirements of the Water Fund based on the predicted 1992 -93 revenues and expenditures, approved 1993 -95 Financial Plan, and the potential groundwater claim costs. An additional factor included in this analysis is the timing of the proposed rate increase. With the proposed rate increase not being in effect from July through September, when the City experiences 30% of the total annual water sales, the Water Fund loses 30% of the revenue generated from the increase. Based upon these factors an eight and one -half percent (8.5 %) rate increase is recommended effective October 1, 1993. It should be noted that this proposed rate increase will not retain the Water Fund at the required 20% unreserved fund balance status by year -end 1493 -94, although this level will be achieved by the end of the 1993 -95 Financial Plan period. It should be noted that rates were last adjusted for revenue purposes in June of 1990; if adopted, the proposed rate increase will reflect a modest adjustment in rates after almost three and one -half years since their last increase. Water Rate Review Objectives As adopted by the Council in May of 1988, the City's rate review should accomplish the following objectives: ■ Comply with legal requirements ■ Ensure revenue adequacy to fully meet system operating and capital needs ■ Encourage conservation ■ Provide equity and fairness between classes of customers ■ Be easy to understand by our customers and easy to administer ■ Provide for ongoing review in order to facilitate rate stability ,::! i !jj�jl►a►��i� MY O� Sal dS 0131SPO COUNCIL AGENDA REPORT This review of the Water Fund has been performed with these goals and philosophy in mind. Provided in Exhibit 1 is a summary projection of revenues, expenditures and changes in financial position for the Water Fund through fiscal year 1996 -97, with the assumptions used in this financial position projection detailed in Exhibit 2. The additional anticipated costs of the groundwater claim have been shown with the approved 1993 -95 capital improvement plan for the Water Fund in Exhibit 3. Support for the water service revenue projections is presented in Exhibit 4, detailing the projected consumption at the various conservation levels and the projected revenue. Based upon this analysis, an eight and one -half percent (8.5 %) rate increase for revenue purposes is proposed effective October 1, 1993. This proposed increase is higher than the six percent (6 %) rate increase originally proposed in June of 1993 because of two factors: ■ Groundwater claim costs have added an additional $800,000 in expenditures. ■ Deferring implementation of a water rate increase from July to October reduced the originally proposed rate increase revenue by 30% or approximately $107,000. This reduction is based on analysis indicating that between July and September the City uses 30% of its annual water consumption. It should be noted that this Water Fund projection indicates that during fiscal year 1993 -94, unreserved fund balance will be expended in order to complete capital projects and that at year -end the unreserved fund balance is projected to fall below the 20% requirement. However, this Water Fund projection, which includes a six and one -half percent (6.5 %) rate increase in 1994 -95, indicates that at fiscal year -end 1994 -95 the unreserved fund balance will meet the 20% requirement. Rate Setting Methodology In determining water . rate revenue requirements and setting recommended rates, the following general methodology is used: Step 1: Determine Water Fund revenue requirements for: ■ Operations and maintenance ■ Capital improvements and replacements 11 Debt service obligations (existing and projected) Step 2: Subtract from this amount "non -rate revenues" such as: ■ Interest earnings ■ Connection fees and meter sales E. Sale of electricity from hydroplant operations ■ Revenues from other agencies (Cuesta /Cal Poly) ■ Other service charges (service start-up fees, late charges, returned check charges) / - /o3 ,11111IUI city of san L.,Is OBispo NOW-; COUNCIL AGENDA REPORT Step 3: Identify water rate requirements. Revenue to be generated from water rates is the difference between water revenue requirements (Step 1) and "non -rate" revenues (Step 2). Step 4: Determine new rates. Model the rate base (consumption and customer account assumptions) against the existing rate structure and rate requirements identified in Step 3. Because we perform this analysis over a multi -year period, other factors are considered such as fund balances available to support capital projects, debt service coverage requirements, and minimum fund balance policy. Summary of Key Assumptions Based upon the assumptions in Exhibit 2 and the three factors discussed above, the financial position projections indicate that water rates require an increase of 8.5% in 1993 -94 and 6.5% in 1994 -95. The following is a summary of key assumptions for expenditures and revenues: ■ Annual decrease in water conservation from 1987 levels over the next three years ranging from 30% in 1993 -94 to 20% in 1995 -96, with 1996 -97 remaining at a 20% conservation level. ■ Operations and maintenance as approved in the 1993 -95 Financial Plan with an inflation rate of 4% thereafter. ■ Debt service for the water treatment plant is based upon the 1993 Water Revenue Bond payment schedule. ■ Rate increases for other agencies who receive their water from the City. The City has signed agreements with both Cal Poly and Cuesta. ■ Water customer growth rate at less than 1010 until 1996 -97. This projection corresponds with the assumptions used in the March 13, 1993 Budget Workshop. ■ Capital improvement charges are estimated as a percentage of the "base projection" of $688,400 which is the estimated amount of fees that would be collected at a 1% growth rate. These revenues are then discounted by 87% due to the retrofit credit currently in place, which is projected to be discontinued with the construction of the Salinas Reservoir expansion. ■ Connection and meter charges are projected at the inflation rate. ■ Service start-up fees in the amount of $25 to be effective October 1, 1993. The revenue from this fee has been prorated for 1993 -94 to reflect the lost revenue from July through September. Future years anticipate revenues of $75,000 annually. / -/a41 ,11,1►01III1 ►'M City of San JIS OBISPO Waiiis COUNCIL AGENDA REPORT ■ Expansion of Salinas Reservoir is estimated to cost $1,300,000 for study and design during the 1993 -95 Financial Plan period. Construction is projected for 1995 -96 with an annual debt service of $700,000 under existing market conditions for the $8 million construction project. ■ The water reclamation program has not been included in these projections as there is insufficient information on cost versus revenues to include in this analysis. ■ The cost of receiving water from Nacimiento is not included in these projections as preliminary cost estimates are unavailable. As reflected above, these assumptions do not include two anticipated projects - water reclamation and Nacimiento. It should be noted that the cost of these projects would not affect water rates for 1993 -94, although they could impact future water rate increases as necessary to cover additional debt service or operating requirements. As plans and specification for these projects are prepared, any required modifications to existing projections for future rate increases will be reviewed and presented. FISCAL IMPACT The proposed 8.5% and 6.5010 rate increases will (rounded to the nearest five cents) affect the monthly water rates as follows: Current Proposed Rates Proposed Rates Rates October 1. 1993 July 1. 1994 1 to 5 ccf $2.25 per ccf $2.45 per ccf $2.60 per ccf over 5 ccf $2.80 per ccf $3.05 per ccf $3.25 per ccf ccf = one hundred cubic feet . Based upon the consumption of the average residential customer at 30% conservation from 1987 consumption (which is the conservation rate used in the Water Fund analysis for 1993- 94), the proposed rate increase effective October 1, 1993 will increase the monthly water bill as follows: Current Proposed Water Bill Water Bill Difference 9 ccf $22.45 $24.45 $2.00 � -�aS Exhibit A RATES FOR WATER SERVICE Monthly water service charges per hundred cubic feet of water (ccf) used per dwelling unit for accounts classified as residential by the director of finance and per account for all other users, are as follows: Commodity Charges Per CCF Effective October 1, 1993 Inside City Outside City Construction Site Meters 0 to 1 ccf In excess of 1 ccf thereafter All Others $ 2.45. $ 4.90 $160.00 $325.00 1 to 5 ccf $ 2.45 $ 4.90 More than 5 ccf $ 3.05 $ 6.10 Commodity Charges Per CCF Effective July 1, 1994 Inside City Outside City Construction Site Meters Only 0 to 1 ccf $ 2.60 $ 5.20 In excess of 1 ccf thereafter $170.00 $345.00 All Others 1 to 5 ccf $ 2.60 $ 5.20 More than 5 ccf $ 3.25 $ 6.50 I m U. W W U4 �i m M LL Z LU 0 U Ex lblLa L OHO O � 8 - N8 8 88 88 88 ? 0 0 0 N 9 Q pO �cO�•pp1�'ct G O V M� h n n N vat� ON N h N N �. �r N N O n� cn [� eay n in er O4 .-+ i N o nn N n [v-, � �c a v yop Oi � 00 pp o n O� OHO O y� BE�p CCCQ Q pO �cO�•pp1�'ct G O V M� h n n N vat� ON N h N N �. �r N N O n� cn [� eay n in er O4 .-+ �c a in *0 8aSJs 8g8�g w-r Or, n N N �� V'f N Vl N N .r-. 00 N O C4 b V'; 'cf < Q v v 'r y� n•--i •-• CD S S OO S Q O OI S pl O O O n O n n N n N ��pp ��ppIS ppS h v°y cn O� ^ cn N C'1 ^ v M 00 N vim.. et re ^ Ig g Flo FE� 815=2 g 81 � rLn N h O — h cam" i bI N N `ct N-i � T1 g h B �SN S a�T o uv cyl� S_ °Ce�^ g � 18o 6 en co�� 06 g ° Iq M N N C\ N N T Bass O OI O S C �7 O[� m wl -11 NO O Vn ^ O v h V in V en v N NO C N V A r� U c to to v 9 '�•� y qq � 1.. p C i • c� C O V U Cq y 0 U .. C m v� U y n ea rCi cl e `0 C `_ y O 0. 20 O C o a bi cn C y 2 ` ft B .__ -5-911 A cj O C es c c U� O �3y'agc T�sE' ��E" v� �p25F �� Z Z v —° �i 3 t`� C3 cn 0 c�a O t3 A e`i O er� a e°� e°, W 0 = >K � u� o ctira o � x /07 en Z O U 3 a Z LL LLJ 2 Q 0 Z O CL Q ExhibitcZ C O O N T' N N m rl 4A O LO A VJ O O ♦� Pi u N T o O T CA m VJ A o T O R m O) cm O N N co E63 O L 41A \ N ^ \o On C v � Q CV o O 0 CA T N LO O a Q N � �o 4A C W ��.A 4A 0° � N per° In N C'�' O O rn EH fV N o tfJ v OOi 0) T N a 4% O a Q Cl N n V7 4A O Q EA 4A o4 O) T 0 (9 N CO) O a7 m /fl -OP O T N Cd C C C R cn m a U 0 0 m C 0 �a .0 •Z c '70 •U a L m T C ; CD m C X O E (a O co CD �' W EC 0 w C CL E y 0 ^ co > d a) > J C V1 U L R m a 2 0 to p R C y C 0 a o �� 0 C O] C N A w I U m N m 0 C R a mrn m ~ i R 3 1 U m U) m 0 O m Gyi Q m c O cc O C y C 7[ w I U m U) m 0 R O .m. R ¢ C Q t 0 CC L 3 � m O U R 3 N m of R L ii m E > a c 0 m aC R .9 O N 4f 0 d m C R m a 7 LL C o a Q O Ln r m Ey ai = Q m m Im m O 7 m m R d O m U (n ExhibitcZ C O Z C R m X a) .Q ymy m tt C C C R cn m a 0 0 0 m C 0 �a .0 c '70 •U a L m T C ; CD C X O E (a O co CD �' 7 L U m A to U CO C a R 8 d E m> 7 L C m U O O — O O U ; C O y a C v CD E R C16 d z = CD ` 3 v _ O O C m. ` N t/1 i C y m d U E N d a a a o° a m m v o >° c Z ty 0 C L N RRy y m U to O a> `- y 7 m N 01 m C = 7 U L o C. m a t N> o 0 m L m in C_ C y O >. d 7 m ; > C R a mi a L E °' E m (i o o orn N a d 2 C d p d` L O C L V Ql m m C m 7 m y O CL = aa) o e`a L ?iyy > U m is >` C a� Q- 0) 'D C @ E I d > m y 7. O i0 y 7 > o m Z U R U o .` d 0 E cli � -io8 0 V P N O OQ O O i O IL r T N W Z y1 O ,C, LL a rr W I— o a CL � W A F— rr Qrn LL 2 a� Z Q T CL Z W 5 W MO o 1..1.. H 0- a C Q U W J ° F— Q U 000000000 00000Loo L f07 n fA N N M N aj fA Vi EA H! Ni C N3 N3 fig O O O O O O O O O O O O O (5 O O O m OOC) c � 4H - T I $ N fA? M °O °O °O °O °O °O °O °O 0 0 U') C.) Lf) . rn l°n 0 f9 TfA NfA fR ff3 ff? f!'3 � T fH 0 0 O T N T 69 O O O O O O O O U; rl 0 O O m Y C O O O O O O O O 0 0 o O O m O c c 0 c Ld $ N M N O � � � cm °O °O °O °O °O °O °O °O 0 0 U') C.) Lf) . rn l°n 0 f9 TfA NfA fR ff3 ff? f!'3 � T fH 0 0 O T N T 69 O O O O O O O O U; rl 0 O O m Y C O O 0 0 0 0 0 0 O IT a7 O N N N ll� M N O °O °O °O °O °O °O °O °O 0 0 U') C.) Lf) . rn l°n 0 f9 TfA NfA fR ff3 ff? f!'3 � T fH 0 0 O T N T 69 O O O O O O O O U; rl 0 O O m Exhibit 3 /- /a9 Y C O O O 0 IT a7 O N N Vi E Exhibit 3 /- /a9 Y C E O C 0 ., a O y a X W o N cc y as . C m cn Q C J _`m, a7 a; ` �a ci I C m y x a O > m ° m= 3r "a c 7 O c7 C l0 X W A d R a m E 5 r- C E Q 0 a� o > nt ca P y c@ m � _ N Rf 3 E a) E CD Q m x .a cn m E > CD O E E a! a C 7 m y o a) E O � aai � c as N E E f- Q F- OF o� U E �o U °? t0 -p c O C7 m R ¢ v c LL m 7 U al Q F A O as C Lo M. ci 0) T a) Ua Exhibit 3 /- /a9 r c U c c V) Z 0 I N U`n = p' L) W � o° O 0 aN V r IL 0 W Lo A Z °' y I = W L) W��N`` V Z O Q � Z O C 0 =, O m U ^ O I..L_ aaCO` V Z 0 F— Q J N O c cm R CC v o u N Co r I O c 69 69 s I. I N O c cm R CC N N c C% Co r I O O 69 69 O i I. I N O c cm R CC N ts cc N Co r I CO 69 69 oC, I. I N O to O lA R CC I N P M °r. r I m 69 69 O 0 cm N I N O N N O m C\i CV) 44 fR n CO m o r` N N 6A f s 16cp O O to O lA O 0 N N n M iV Ch r I OCl) 69 69 t0 cO CA II m N Nf4 IT, O Q 44 03 N co 0 c0 64 L) c7 C 0 CD O c0 N c0 O M nj pj c0 OCl) ,fNO_ it II co N N O IT, O Q 6cf � 03 N co 0 c0 64 L) c7 C 0 N a 644l 64 CD s t0 w II O IT, O Q a cA CV crj (M N N N 64 64 00 0) co CM R co N U N Lf) co 0 N a 644l 64 Exhibit. CD N t0 II _ O O) O a CD ca C j W * >% ca d d R O N U 0 0 _ O O O) = Lff O a Lf m O N :3 LQ O o d E o II LO U to = O = j co O o c d CL E (D 0 0) O1 w N C9 o ~ N 7 m 0 F- E r E E o 0 0 00 o r' > > 0 a` ci U U I w p • : U � j Q O U V U U U U E i° U N U j cc) U N I + y 0p� I+ m 1+ 0� 0 a� 0 U 0 m Q U a [C Exhibit. CD N t0 II T R O O) O a CD ca C j W * >% ca d d R O N U a _ O O O) = Lff O a Lf m O N :3 LQ O o d E o II LO U to = O = j co O o c d CL E (D 0 0) O1 w N o V m c0 7 m 0 m m r E E o 0 0 00 o r' > > co a` ci U U I w p • : Z MEMORANDUM January 6, 1994 TO: VIA: FROM: SUBJECT: Mhi ING AGENDA DATE ITEM K-- / - City Council John Dunn, -City Administrative Off John Moss, Utilities Director's CHANGES TO DRAFT URBAN WATER MANAGEMENT PLAN Attached please find revised pages to insert into your Draft. Urban Water Management Plan distributed with the January 11 study session agenda packet. The revised pages show the specific changes using redlining to highlight the new wording and strike out to eliminate words. The changes are to clarify the meaning of present demand and to distinguish it from projected demand. These changes affect Sections 2.3, 2.8 and 2.9. Since these sections are summarized in the Executive Summary and Appendix I, replacement pages are included for those sections as well as the main body of the document. F. �irm . JAN 7 1994 56A 19 CAO �ATTORNEY CAO CLERKIORIG • MGMTTEAM • JC READ FILE FF /�[ • DIR DD fIN DIR Ef IRE CHIEF Y DIR POLICE CHI EC DIR Nr UTIL DIR ❑ PERS DIR Urban Water Management Ply Executive Summary are proving water conservation to be both a short term corrective measure for immediate water supply shortages and a long term solution to water supply reliability. 2.3 WATER DEMAND PROJECTIONS Mhla 2.3.1 Basis of Projections The City will project water requirements, considering long -term conditions and the full range of water uses in the City. Separate projections of potable and nonpotable requirements will be made. 2.3.2 Water Use Rate The City shall use 165 gallons per person per day (0.185 acre -feet per person per year) and the number of City residents to plan total future water supplies. This quantity will be revised if warranted by long -term water use trends, including differences in the relationship between residential and nonresidential usage. 2.3.3 Overall Projected Water.-Demand Applying 165 gallons per person per day to a projected City resident population of 56,000 at General Plan build -out results in a projected water demand of 10,350 acre -feet. 3<4> "P3r "ese E.W.WwFoiffim Basis for Policy Summary The City must know how much water will be needed to serve residents, businesses, and other users which could be accommodated by the General Plan. This quantity can be projected using different methods. All methods involve assumptions about both future usage rates and the numbers and types of users expected in the future. The quantity expressed in the policy above corresponds closely with both (1) total citywide usage compared with total resident population and (2) projections of water demand based on usage by various land use categories. 2.4 RELIABILITY RESERVE Policy In seeldng and accounting for new water supplies, the City will strive for a "reliability reserve" of 2,000 acre feet of safe annual yield (about 20 percent of projected water demand at full build - out). City of San Luis Obispo vi I- 9 Urban Water Management Plan Accutive Summary Basis for Policy Summary The Council supported the reliability reserve concept in March 1993, by amending the Water and Wastewater Management Element to include it. The reserve will help maintain adequate water supplies during unpredictable changes, such as a new worst case drought, loss of a water source, or contamination of a water source. 2.5 SILTATION AT SALINAS AND WHALE ROCK RESERVOIRS Poll The City shall develop 500 acre -feet of safe annual yield to account for the loss of water storage due to siltation at Whale Rock and Salinas Reservoirs to the year 2025. Basis for Policy Summary Siltation at reservoirs is a natural occurrence which can substantially reduce the storage capacity over long periods. The reduction of available storage will reduce the safe annual yield of the reservoir. Siltation at reservoirs varies depending on factors such as rainfall intensity, and watershed .management practices. There have been numerous reports addressing siltation at Salinas Reservoir, but no studies have been done for Whale Rock Reservoir. During the recent drought, water at Salinas Reservoir fell to a record low level. An aerial. survey of the reservoir was prepared in order to update storage capacity information. The latest information indicates that the siltation rate is on the order of 40 acre -feet per year. Since no information is available to indicate what rate of siltation is occurring at the Whale Rock reservoir, it is assumed for planning purposes that the annual average rate of siltation is similar to Salinas Reservoir. 2.6 SUPPLEMENTAL WATER REQUIREMENTS Policy The City shall develop additional water supplies to meet the projected demand at build -out of the City's General Plan. The supplemental water supply amount shall be based on land use assessment and the adopted per capita water use figure identified for planning purposes in Section 2.3. Basis for Policy Summary Based on the draft Land Use Element endorsed by the City Council in February 1992 and the per capita use rate, the projected total amount of water for the City to serve General Plan build - out is 12,350 acre feet. This figure includes the 2,000 acre feet reliability reserve and accounting for siltation at the reservoirs. City of San Luis Obispo vii Urban Water Management Pl. Executive Summary 2.7 MULTI- SOURCE WATER SUPPLY Poll The City shall continue to develop and use water resources projects to maintain multi- source water supplies, and in this manner, reduce reliance on any one source of water supply and increase its supply options in future droughts or other water supply emergencies. Basis for Policy Summary Having several sources of water can avoid dependence on one source that would not be available during a drought or other water supply reduction. The Council has supported having multiple sources since adopting the General Plan Water Management Element in 1987 and by endorsing the above policy statement in November 1990. 2.8 ALLOCATION OF NEW SUPPLIES Poll 2.8.1 Balancing Safe Annual Yield and Overall Demand When new water sources are obtained, the additional safe annual yield shall be allocated first to eliminate the deficit between safe annual yield (Section 2.1) and present demand as defined in Section ZM4 at the time the new source is obtained. 2.8.2 Development and the Reliability Reserve Any additional safe annual yield beyond that needed to balance safe annual yield and pfejeeted rset3 water demand will be allocated (A) one -half to development and (B) one -half to the reliability reserve and compensating for reduced yields due to siltation. 2.8.3 Accounting for Reclaimed Water Reclaimed water shall be accounted for as a "nonpotable" supply as identified under Section 2.10.3. Use of reclaimed water shall not be considered as a component of the City's safe annual yield, but may affect demand on potable supplies as reclaimed water use increases. 2.8.4 Private Water Supplies When developments are supplied by private groundwater wells, the yield of those wells will not be counted toward the City's safe annual yield. Such yield, however, will result in the demand for City water supply being lower than it otherwise would be, which may affect adjustments of the per capita water usage figure used to estimate overall demand. City of San Luis Obispo viii Urban Water Management Pla, xecutive Summary Basis for Policy Summary The City is pursuing additional water supply projects. The City must address how the added yield from these projects will be allocated, since the yield added at any one time may not supply all potential uses. The City has identified the following potential uses for the new supplies: • Eliminating the deficit between adopted planning water usage figures and safe yield; • Compensating for reduced yields due to reservoir siltation; • Establishing a reliability reserve; • Providing for development of more dwellings, businesses, and public facilities. The policies objectives are to balance the needs of all the areas identified while not compounding the potential water shortage problems for existing Fesidents of the City. 2.9 WATER ALLOCATION AND OFFSETS Policy 2.9.1 Supplying New Development The City will make available to new development only that amount of safe yield which exceeds pFejeeted pr seA water use (as stated in Section A ), less the amount to compensate for siltation losses (as stated in Section 2.5) and to provide a reliability reserve (as stated in Section 2.4). Available allocations will be assigned to development in a way that supports balanced growth, consistent with the General Plan. 2.9.2 Exemptions for Offsets A. When there is no safe annual yield to allocate to a project, that project may be built if the developer makes changes, in facilities served by the City, which will reduce long- term water usage gqual to the allocation required for the project.. B. The City may exempt a project from needing an allocation or an offset, or it may reduce the amount of the required allocation or offset, to the extent that the project is supplied by a suitable, private well which will not significantly affect the yield of City wells. The City will consider the cumulative effect of wells in the groundwater basin in making this determination. 2.9.3 Basis for Allocations and Offsets Required allocations and offsets will be based on long -term usage for each type of development. (These usage and offset factors will be determined and published by the City, and may be . revised as warranted by new information.) City of San Luis Obispo ix i -/z Urban Water Management . i 2.3 WATER DEMAND PROJECTIONS Poll 2.3.1 BASIS OF PROJECTIONS The City will project water requirements, considering long -term conditions and the full range of water uses in the City. Separate projections of potable and nonpotable requirements will be made. 2.3.2 WATER USE RATE The City shall use 165 gallons per person per day (this equates to approximately 0. 185 acre -foot per person per year) and the number of City residents to plan total projected future water demand. This quantity will be revised if warranted by long -term water use trends, including differences in the relationship between residential and nonresidential usage. (This Plan uses 165 gallons per person per day in computations of future water demand.) 2.3.3 OVERALL PROJECTED DEMAND Applying 165 gallons per person per day (0.18$ acre -foot per person per year) to a projected City resident population of 56,000 at General Plan build -out results in a projected water demand of an estimated 10,350 acre -feet per year. x;3:4 >PRES: PIER DOM Basis for PolicX The City must know how much water will be needed to serve residents, businesses, and other users to accommodate the General Plan. This quantity can be projected using different methods. All methods involve assumptions about both future usage rates and the numbers and types of users expected in the future. The quantity expressed in the policy above corresponds closely with both (1) total citywide usage compared with total resident population and (2) projections of water demand based on usage by various land use categories. There always will be some uncertainty in estimating development capacity (such as the number of dwellings or residents) as well as the usage per customer type (such as acre -feet per dwelling or per resident.) The estimating method must use reasonable assumptions, based on experience, to assure an adequate level of water supply while not overstating demands. Since the early 1970's, usage estimates have ranged from 0.17 to 0.22 acre -foot per resident per year (about 155 to about 195 gallons per person per day). The estimates have varied so widely due to actual differences in consumption over time and to confusion about accounting for Cal City of San Luis Obispo 16 Urban Water Management 2 Poly usage. (The City treats and delivers much of the water used by Cal Poly, even though Cal Poly has separate entitlements.) Table 2.3.4 shows recent water usage compared with City resident population. Table 2.3.5 compares the "per capita" and "land use" methods of estimating water needs. Table 2.3.4 City Water Use 1980 -1993 City of San Luis Obispo 17 / 3� Urban Water Management 2.8 ALLOCATION OF NEW WATER SUPPLIES Pvk�c 2.8.1 BALANCING SAFE YIELD AND OVERALL DEMAND When new water sources are obtained, the additional safe yield shall be allocated first to eliminate the deficit between the adopted safe annual yield (Section 2.1) and the present demand as defined in Section 2Y at the time the new source is obtained. 2.8.2 DEVELOPMENT AND RELIABILITY RESERVE Any additional safe annual yield beyond that needed to balance safe annual yield and pr-ejeeted rsirn demand will be allocated A one -half to development and one -half to the reliability reserve and compensating for reduced yields due to siltation. 2.8.3 ACCOUNT NG FOR RECLAIMED WATER Reclaimed water shall be accounted for as a "nonpotable" supply as identified under Section 2.10.3. Use of reclaimed water shall not be considered as a component of the City's safe annual yield, but may affect potable water demand for potable supplies as reclaimed water use increases. 2.8.4 PRIVATE WATER SUPPLIES When developments are supplied by private groundwater wells, the yield of those wells will not be counted toward the City's safe annual yield. Such yield, however, will result in the demand for City water supplies being lower than it otherwise would be, which may necessitate adjustments of the per capita water usage figure used to estimate overall demand. Basis for Polia The City has pursued numerous water supply projects over the years. These projects are discussed in Chapter 3 of this report. This section of the document addresses allocation of these supplies once the yields from projects are realized. The City has identified these potential uses for new supplies: • Eliminating the deficit between adopted planning figures and safe annual yield; • Compensating for reduced yields due to reservoir siltation; • Establishing a reliability reserve; • Providing for water requirements for future development within the urban reserve area designated in the General Plan. Allocation of new supplies can balance the needs of all area identified while not compounding the potential water shortage problems for existing City water customers. City of San Luis Obispo 24 i -Or3 Urban Water Management Pid, A major concern is the deficit between projected water usage levels and safe yield (see Section 2.1 and Section 2.3). As this deficit becomes larger, present and future water customers must cut back more from their typical use levels during droughts or other water supply shortages. In 1993, this deficit is about 289 acre -feet, considering a long -term usage rate of 165 gallons per day per City resident, the 1993 City resident population, and a safe yield of 7,735 acre -feet. Once the City's water supply deficit has been "balanced ", half of the identified safe annual yield from new water supply projects should go toward offsetting the siltation deficit and establishment of the "reliability reserve" and the other half should be designated for development purposes. By following these guidelines, the certainty of water. supplies for all City water customers will be increased while still allowing for additional development. The reliability reserve is like an insurance policy (Section 2.4). Some added yield can be assigned to the reserve rather than other desired uses, to help assure that the City will have enough water despite unforeseen losses of supplies. However, there are costs of buying this insurance, both in higher charges for water customers and in foregone uses for the added yield. Considering these costs, it would be prudent to build the reserve in steps rather than commit a very large part of the City's water resources at one time. Using the comparison of buying insurance, the City will make several payments over time rather than one big payment initially, evaluating the level of risk and the desired amount of reserve as years go by. City of San Luis Obispo 25 /' #,/ Urban Water Management 2.9 WATER ALLOCATION AND OFFSETS P. 2.9.1 SUPPLYING NEW DEVELOPMENT The City will make available to new development only that amount of safe yield which exceeds pr-ejeeted pt sett water use (Section less the amount to compensate for siltation losses (as stated in Section 2.5) and to provide a reliability reserve (as stated in Section 2.4). Available allocations will be assigned to development in a way that supports balanced growth, consistent with the General Plan. 2.9.2 EXEMPTIONS FOR OFFSETS A. When there is no safe yield to allocate to a project, that project may be built if the developer makes changes, in facilities served by the City, which will reduce long -term water usage equal to the allocation required for the project. B. The City may exempt a project from needing an allocation or an offset, or it may reduce the amount of the required allocation or offset, to the extent that the project is supplied by a suitable, private well which will not significantly affect the yield of City wells. The City will consider the cumulative' effect of wells in the groundwater basin in making this determination. 2.9.3 BASIS FOR ALLOCATIONS AND OFFSETS Required allocations and offsets will be based on long -term usage for each type of development. (These use and offset factors will be determined and published by the City, and may be revised as warranted by new information.) Basis for Policy In 1988, the City began to formally account for long -term water usage in new development. The allocations have been based on histories of water usage for various kinds of development. At first, the City decided to allocate some water for new land development projects even though city-wide water usage exceeded safe yield. As the 1986 -1991 drought continued, and the projected completion of proposed supplemental supply projects moved farther into the future, the City decided that there should be no new development that would increase water usage. As a result, nearly all construction since 1990 has been: ■ Replacement buildings, using the same or less water; ■ Additions or remodels which do not substantially affect water usage; City of San Luis Obispo 26 /— 7� Urban Water Management P,.... ■ Projects which have retrofitted facilities served by the City, to save (offset) twice the amount of water which would be allocated to the project. Installation of low -flow toilets, showerheads, and faucets have accounted for most of the offset credit. Substantial credits were also earned by installing water recycling equipment in businesses. Also, a few relatively small projects were able to do little or no retrofitting because they were. supplied with groundwater through private wells. Some projects have utilized more than one of these strategies to proceed despite the lack of water allocations. Until available safe annual yield exceeds long -term demand (per Section 2.3), the City will have no water to allocate to new development. Many facilities have been retrofitted (as of 1993, about 26% of all potential facilities). Retrofitting has helped reduce total water usage. A two - to-one offset ratio was esta blished due to the uncertainty of savings factors initially used. Now, a comprehensive toilet replacement study completed in June 1992 by the Metropolitan Water District of Southern California indicates the water savings factors used by the City are accurate. The study analyzed 23,000 dwellings and documented water savings associated with toilet retrofitting. This study is now used state -wide as a basis for water savings associated with toilet retrofit programs. Requiring an offset -to- allocation ratio greater than one -to -one means that long -term water use will decline even as development occurs. Also, requiring a ratio much greater than one -to -one makes projects less feasible and raises questions of equity. An offset ratio of one -to -one would be consistent with the policies of this plan, because: • The long -term usage factors used to determine the required offset amounts generally reflect usage in projects built several years before the. 1986 -91 drought, when toilets and landscaping were less efficient than those installed under 1993 standards; • Retrofitting which does not receive development credit (all rebates and many additions and remodels) will continue to produce net savings. City of San Luis Obispo 27 Urban Water Management. Step 2: Subtract from this amount "non -rate revenues" such as: ■ Interest earnings ■ Connection fees and meter sales ■ Sale of electricity from hydroplant operations ■ Other service charges Step 3: Identify water rate revenue requirements Revenue to be generated from water rates is the difference between water revenue requirements (Step 1) and "non -rate" revenues (Step 2). Step 4: Determine new rates. Model the rate base (consumption and customer account assumptions ) against the existing rate structure and rate requirements identified in Step 3. City of San Luis Obispo 69 a 07619 JV DOW WATER POLICY SUMMARY Note: * Denotes a new or significantly modified existing policy. 2.1 SAFE ANNUAL YIELD DETERNIINATION 2.1.1 Safe annual yield will be based on coordinated operation of all water supply sources. 2.1.2 The current safe annual yield is 7,735 acre -feet per year 2.1.3 The current safe annual yield of groundwater is 500 acre -feet per year and is included as part of identified safe annual yield in Section 2.1.2. 2.2 WATER CONSERVATION POLICY 2.2.1* Long -term water efficiency measures will maintain at least a 10% reduction in water use levels recorded during 1986/87. 2.2.2 Short-term mandatory measures will be implemented when the City's water supplies are projected to last three years. . 2.3 WATER DEMAND PROJECTIONS 2.3.1* Separate projections of potable and nonpotable water requirements will be made. 2.3.2* The City shall use 165 gallons per person per day (0.185 acre -feet per person per day) to plan for future water supplies. 2.3.3* Projected water demand at General Plan buildout is about 10,350 acre -feet. 2.4 RELIABILITY RESERVE The City will strive for a reliability reserve of 2,000 acre -feet. City of San Luis Obispo I -I 071. APPENDIX I 2.5* SILTATION AT SALINAS & WHALE ROCK RESERVOIRS The City shall develop 500 acre feet of safe annual yield to account for the loss of water storage due to siltation at Salinas and Whale Rock reservoirs to the year 2025. 2.6* SUPPLEMENTAL WATER REQUIREMENTS The City shall develop additional water supplies to meet projected demand at buildout of the General Plan. The amount of water to be developed shall be based on land use assessment and the adopted per capita water use figure in Section 2.3.2. ' 2.7 MULTI- SOURCE WATER SUPPLY The City shall continue to develop and use water resource projects to maintain multi- source water supplies to. reduce reliance on any one source. 2.8* ALLOCATION OF NEW WATER SUPPLIES 2.8.1* When new water sources are obtained, the additional yield shall be allocated first to eliminate any projeeted deficit at the time the new source is obtained. 2.8.2* Any additional safe yield beyond the deficit elimination will be allocated one -half to new development and one -half to the reliability reserve (Section 2.4) and to compensate for siltation (Section 2.5). 2.8.3* Reclaimed water shall be accounted for as a nonpotable supply and shall not be considered as a component of City's potable water safe annual yield. 2.8.4* When developments are supplied by private groundwater wells, the yield of those wells will not be counted toward the City's safe yield. 2.9 WATER ALLOCATION AND OFFSETS 2.9.1* The City will make available to new development only that amount of safe yield which exceeds "'''" prejeeted p�esela� water use (as stated in Section W), the amount to compensate for siltation (Section 2.5) and to provide a reliability reserve (Section 2.5). City of San Luis Obispo I -2 / -89 APPENDIX I 2.9.2* When there is no safe annual yield to allocate to new projects, a project may be built if a. developer retrofits existing facilities which will reduce long -term water usage equal to the allocation required for the project. Exemptions to needing a water allocations or an offset, or reducing the amount of the required allocation or offset for a project will be granted to the extent that a project is supplied by a suitable private well. 2.9.3 Required allocations and offsets will be based on long -term usage for each type of development. 2.10* RECLAIMED WATER 2.10.1* The City shall produce high quality reclaimed water, suitable for a wide range of nonpotable uses. 2.10.2* The City will dedicate one cubic foot per second to San Luis Obispo. Creek and make available reclaimed water for existing and new nonpotable uses. 2.10.3* As reclaimed water supplies new or existing development, the reliable yield of nonpotable water will increase. The increase in reliable nonpotable yield will only be credited only when it is available to a user. 2.10.4* When the City provides distribution facilities for reclaimed water, the resulting reduction in potable demand will be given offset credit for government projects. 2.10.5* When a private project provides the distribution facilities that allow for the use of reclaimed water in existing development, the resulting reduction in potable water demand will be credited on a one - to-one basis. When a private project provides distribution facilities to that project, any required potable water allocation shall be reduced by a corresponding amount. 2.10.6* When a component of the reclaimed water distribution system is funded by both the City and a private developer, the credit for reduction in potable water usage resulting from that component shall be divided according to the proportionate share based on the contribution.to the'component. 2.11* CAPITAL IMPROVEMENT PLAN- Water Distribution The City shall replace. aging waterlines at the yearly rate of 2 % of the value of the Distribution system. City of San Luis Obispo I -3 -90