Loading...
HomeMy WebLinkAboutCheng_Park_3_31_2026_10_24_52_AM_2abe684c-a642-46dd-ad11-f1b48fe65e26_ExcelName Record Number 430363 430361 430362 430358 430359 430360 430357 430364 Picture 0 0 0 0 0 0 0 0 Cheng Park - 1095 Marsh Streeet at Santa Rosa Street San Luis Obispo, CA 93401 Category Path of Travel Stairs Stairs Stairs Stairs Stairs Signage Benches Location Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Sub Location Description Sidewalk Around Park Stairs to Gazebo Stairs to Gazebo Stairs to Gazebo Stairs to Gazebo Stairs to Gazebo Directional Signage from the Public Right of Way Park Benches Sub Description Tree Limb Run 1 Left Handrail Run 1 Left Handrail Run 1 Right Handrail Run 1 Right Handrail Run 1 Right Handrail Item Protruding Objects - Vertical Clearance Bottom Handrail Extension Handrail Extension Length Handrail Extension Length Handrail Bottom Extension Handrail Extension Directional or Information Signage Clear Floor Space Finding The vertical clearance height is less than required. There are no bottom handrail extensions provided. The top handrail extension is not the required length beyond the top riser. The top handrail extension is not the required length beyond the top riser. The bottom handrail does not extend the depth of one stair tread beyond the bottom step. The ends of the handrail are not rounded or returned smoothly to the wall or post. There is no directional signage. No clear floor space provided at the bench. On Site Finding 65.00 inches None Found 11.00 inches 10.50 inches None Found None Found None Found Not Found Recommendation Provide recommended vertical clearance. Install handrail extension to the bottom of the handrail that extends beyond the bottom riser at least one tread depth. Install a compliant handrail extension to the top of the handrail that extends beyond the top riser and is parallel to the floor surface of the landing. Install a compliant handrail extension to the top of the handrail that extends beyond the top riser and is parallel to the floor surface of the landing. Provide a compliant handrail extension. Install handrail extensions that are rounded or returned smoothly to the wall post. Install directional signage to each accessible element or room. Provide compliant clear floor space for the bench at one end. Recommended Value At least 80.00 inches See Recommendation At least 12.00 inches At least 12.00 inches See Recommendation See Recommendation See Recommendation See Recommendation Deviation -15.00 -1.00 -1.50 Measure Units inches inches inches Costing Info Provide recommended clearance Add compliant extension to existing railing Add compliant extension to existing railing Add compliant extension to existing railing Add compliant extension to existing railing Add compliant handrail Install signage Blank or Unassigned cost estimate cells indicate further design requirements or modification by original vendor. Estimated Cost 108 1425 800 800 1425 1916 158 1840 8472 Notes Code Reference ADA 307, 307.4, CA 11B-307.4 ADA 504, 505.10, 504.6, CA 11B-505.10 ADA 504, 504.6, 505.10, CA 11B-505.10 ADA 504, 504.6, 505.10, CA 11B-505.10 ADA 504, 504.6, CA 11B-505.10 ADA 504, 504.6, 505.10, CA 11B-504.6,505.10 ADA 703, 216, 216.3, CA 11B-216.3, 703.5,703.5 ADA 206, 305, 903.2, CA 11B-903.2,305,206 None Landlord Tenant Both City County District Resident Other Cost Responsibility Landlord Landlord Landlord Landlord Landlord Landlord Landlord Landlord 0 0 0 0 0 0 0 0 0 Priority Six Six Six Six Six Six Six Six Progress Not_Started Not_Started Not_Started Not_Started Not_Started Not_Started Not_Started Not_Started Resolution Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Projected Completion Date 12/31/2023 12/31/2023 12/31/2023 12/31/2023 12/31/2023 12/31/2023 12/31/2023 12/31/2023 Actual Completion Date Actual Cost 0 0 0 0 0 0 0 0 0 Comments Park CIP in planning process. GCRUCESLOCITY.ORG. Park CIP in planning process. GCRUCESLOCITY.ORG. Park CIP in planning process. GCRUCESLOCITY.ORG. Park CIP in planning process. GCRUCESLOCITY.ORG. Park CIP in planning process. GCRUCESLOCITY.ORG. Park CIP in planning process. GCRUCESLOCITY.ORG. Park CIP in planning process. GCRUCESLOCITY.ORG. Park CIP in planning process. GCRUCESLOCITY.ORG. Contractor Assignment Category_6 Category_6 Category_6 Category_6 Category_6 Category_6 Category_6 Category_6 New Value 0 0 0 0 0 0 0 0 Latitude Longitude Designated Staff ENG ENG ENG ENG ENG ENG ENG ENG Cheng Park Main Picture