HomeMy WebLinkAboutCheng_Park_3_31_2026_10_24_52_AM_2abe684c-a642-46dd-ad11-f1b48fe65e26_ExcelName
Record Number
430363
430361
430362
430358
430359
430360
430357
430364
Picture
0
0
0
0
0
0
0
0
Cheng Park - 1095 Marsh Streeet at Santa Rosa Street
San Luis Obispo, CA 93401
Category
Path of Travel
Stairs
Stairs
Stairs
Stairs
Stairs
Signage
Benches
Location
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Sub Location
Description
Sidewalk Around Park
Stairs to Gazebo
Stairs to Gazebo
Stairs to Gazebo
Stairs to Gazebo
Stairs to Gazebo
Directional Signage from the Public Right of Way
Park Benches
Sub Description
Tree Limb
Run 1 Left Handrail
Run 1 Left Handrail
Run 1 Right Handrail
Run 1 Right Handrail
Run 1 Right Handrail
Item
Protruding Objects - Vertical Clearance
Bottom Handrail Extension
Handrail Extension Length
Handrail Extension Length
Handrail Bottom Extension
Handrail Extension
Directional or Information Signage
Clear Floor Space
Finding
The vertical clearance height is less than required.
There are no bottom handrail extensions provided.
The top handrail extension is not the required length beyond the top riser.
The top handrail extension is not the required length beyond the top riser.
The bottom handrail does not extend the depth of one stair tread beyond the bottom step.
The ends of the handrail are not rounded or returned smoothly to the wall or post.
There is no directional signage.
No clear floor space provided at the bench.
On Site Finding
65.00 inches
None Found
11.00 inches
10.50 inches
None Found
None Found
None Found
Not Found
Recommendation
Provide recommended vertical clearance.
Install handrail extension to the bottom of the handrail that extends beyond the bottom riser at least one tread depth.
Install a compliant handrail extension to the top of the handrail that extends beyond the top riser and is parallel to the floor surface of the landing.
Install a compliant handrail extension to the top of the handrail that extends beyond the top riser and is parallel to the floor surface of the landing.
Provide a compliant handrail extension.
Install handrail extensions that are rounded or returned smoothly to the wall post.
Install directional signage to each accessible element or room.
Provide compliant clear floor space for the bench at one end.
Recommended Value
At least 80.00 inches
See Recommendation
At least 12.00 inches
At least 12.00 inches
See Recommendation
See Recommendation
See Recommendation
See Recommendation
Deviation
-15.00
-1.00
-1.50
Measure Units
inches
inches
inches
Costing Info
Provide recommended clearance
Add compliant extension to existing railing
Add compliant extension to existing railing
Add compliant extension to existing railing
Add compliant extension to existing railing
Add compliant handrail
Install signage
Blank or Unassigned cost estimate cells indicate further design requirements or modification by original vendor.
Estimated Cost
108
1425
800
800
1425
1916
158
1840
8472
Notes
Code Reference
ADA 307, 307.4, CA 11B-307.4
ADA 504, 505.10, 504.6, CA 11B-505.10
ADA 504, 504.6, 505.10, CA 11B-505.10
ADA 504, 504.6, 505.10, CA 11B-505.10
ADA 504, 504.6, CA 11B-505.10
ADA 504, 504.6, 505.10, CA 11B-504.6,505.10
ADA 703, 216, 216.3, CA 11B-216.3, 703.5,703.5
ADA 206, 305, 903.2, CA 11B-903.2,305,206
None
Landlord
Tenant
Both
City
County
District
Resident
Other
Cost Responsibility
Landlord
Landlord
Landlord
Landlord
Landlord
Landlord
Landlord
Landlord
0
0
0
0
0
0
0
0
0
Priority
Six
Six
Six
Six
Six
Six
Six
Six
Progress
Not_Started
Not_Started
Not_Started
Not_Started
Not_Started
Not_Started
Not_Started
Not_Started
Resolution
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Projected Completion Date
12/31/2023
12/31/2023
12/31/2023
12/31/2023
12/31/2023
12/31/2023
12/31/2023
12/31/2023
Actual Completion Date
Actual Cost
0
0
0
0
0
0
0
0
0
Comments
Park CIP in planning process. GCRUCESLOCITY.ORG.
Park CIP in planning process. GCRUCESLOCITY.ORG.
Park CIP in planning process. GCRUCESLOCITY.ORG.
Park CIP in planning process. GCRUCESLOCITY.ORG.
Park CIP in planning process. GCRUCESLOCITY.ORG.
Park CIP in planning process. GCRUCESLOCITY.ORG.
Park CIP in planning process. GCRUCESLOCITY.ORG.
Park CIP in planning process. GCRUCESLOCITY.ORG.
Contractor
Assignment
Category_6
Category_6
Category_6
Category_6
Category_6
Category_6
Category_6
Category_6
New Value
0
0
0
0
0
0
0
0
Latitude
Longitude
Designated Staff
ENG
ENG
ENG
ENG
ENG
ENG
ENG
ENG
Cheng Park Main Picture