HomeMy WebLinkAboutETO_Park_3_31_2026_10_26_46_AM_8b6bf2ef-cc88-46a9-a104-3472fb5a337b_ExcelName
Record Number
427292
427295
427294
427296
427293
Picture
0
0
0
0
0
ETO Park - 170 Brook Street
San Luis Obispo, CA 93401
Category
Path of Travel
Doors
Doors
Doors
Signage
Location
Exterior
Exterior
Exterior
Exterior
Exterior
Sub Location
Description
Path Through Park
Park Entrance
Park Entrance
Park Entrance
Directional Signage from the Public Right of Way
Sub Description
Change in Level
Pull Side
Push / Pull
Push Side
Item
Change in Level
Front Approach Latch Side Clearance
Bottom Door Panel
Floor Surface Slope
Directional or Information Signage
Finding
There is a change in elevation greater than recommended value.
There is less than the required latch side clearance on the pull side of the door.
The bottom of the door or gate does not provide a smooth surface on the push side extending the full width of the door or gate.
There is no level landing at this door.
There is no directional signage.
On Site Finding
1.25 inches
0.00 inches
None Found
10.00 percent
None Found
Recommendation
Ensure that the change in elevation is within the recommended value.
Provide the recommended latch side clearance for the door.
Install a smooth uninterrupted surface or panel on the push side, extending the full width of the door or gate.
Provide a level landing.
Install directional signage to each accessible element or room.
Recommended Value
Up to 0.25 inches
At least 24.00 inches
See Recommendation
Up to 2.08 percent
See Recommendation
Deviation
1.00
-24.00
7.92
Measure Units
inches
inches
percent
Costing Info
Provide smooth surface
Install automatic door opener
Install Panel
Correct slopes
Install signage
Blank or Unassigned cost estimate cells indicate further design requirements or modification by original vendor.
Estimated Cost
150
2921
400
1500
158
5129
Notes
Code Reference
ADA 303, 403.4, CA 11B-303,403.4
ADA 404, 404.2, CA 11B-404.2
ADA 404.2, CA 11B-404.2
ADA 302, 404, 305, 404.2, CA 11B-404.2
ADA 703, 216, 216.3, CA 11B-216.3, 703.5,703.5
None
Landlord
Tenant
Both
City
County
District
Resident
Other
Cost Responsibility
Landlord
Landlord
Landlord
Landlord
Landlord
0
0
0
0
0
0
0
0
0
Priority
Six
Six
Six
Six
Six
Progress
Not_Started
Not_Started
Not_Started
Not_Started
Not_Started
Resolution
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Projected Completion Date
12/31/2035
12/31/2035
12/31/2035
12/31/2035
12/31/2035
Actual Completion Date
Actual Cost
0
0
0
0
0
0
Comments
No Comments
No Comments
No Comments
No Comments
No Comments
Contractor
Assignment
Category_2
Category_2
Category_2
Category_2
Category_2
New Value
0
0
0
0
0
Latitude
Longitude
Designated Staff
ENG
ENG
ENG
ENG
ENG