HomeMy WebLinkAboutRailroad_Trail_1_&_2_3_31_2026_10_33_18_AM_5e4b1772-df06-4744-a161-7b887add0df0_ExcelName
Record Number
432803
432804
432785
432788
432768
432769
432770
432771
432772
432776
432778
432779
432780
432781
432782
432777
432766
432765
432774
432775
432773
432784
432783
432767
432807
432805
432808
432801
432797
432799
432793
432790
432794
432792
432791
432795
432796
432786
432789
432787
Picture
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Railroad Trail 1 & 2 - Orcutt to Osos
San Luis Obispo, CA 93401
Category
Trails
Trails
Trails
Trails
Curb Ramps
Curb Ramps
Curb Ramps
Curb Ramps
Curb Ramps
Ramps
Ramps
Ramps
Ramps
Ramps
Ramps
Ramps
Reach Ranges
Reach Ranges
Reach Ranges
Reach Ranges
Reach Ranges
Reach Ranges
Reach Ranges
Reach Ranges
Trails
Trails
Trails
Trails
Trails
Trails
Trails
Trails
Trails
Trails
Trails
Trails
Trails
Trails
Trails
Trails
Location
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Sub Location
Description
Trail from Boulevard Del Campo
Trail from Boulevard Del Campo
Trail Next to Railroad
Trail Next to Railroad
Curb Ramp from Boulevard Del Campo
Curb Ramp from Boulevard Del Campo
Curb Ramp from Boulevard Del Campo
Curb Ramp from Boulevard Del Campo
Curb Ramp from Boulevard Del Campo
Ramp Next to Railroad Bridge
Ramp Next to Railroad Bridge
Ramp Next to Railroad Bridge
Ramp Next to Railroad Bridge
Ramp Next to Railroad Bridge
Ramp Next to Railroad Bridge
Ramp Next to Railroad Bridge
Trail Head at Jennifer Street
Trail Head at Jennifer Street
Trail Head at Orcutt Road
Trail Head at Orcutt Road
Trail Head at Orcutt Road
Trail Head at San Carlos Drive
Trail Head at San Carlos Drive
Trail Intersection
Trail from Boulevard Del Campo
Trail from Boulevard Del Campo
Trail from Boulevard Del Campo
Trail Next to Railroad
Trail Next to Railroad
Trail Next to Railroad
Trail Next to Railroad
Trail Next to Railroad
Trail Next to Railroad
Trail Next to Railroad
Trail Next to Railroad
Trail Next to Railroad
Trail Next to Railroad
Trail Next to Railroad
Trail Next to Railroad
Trail Next to Railroad
Sub Description
Directional Signage at Fork - Trail Head - Directional/Location
Directional Signage from Boulevard Del Campo - Trail Head - Directional/Location
Directional Signage from Jennifer Street - Trail Head - Directional/Location
Directional Signage from Orcutt Road - Trail Head - Directional/Location
Bottom Landing
Bottom Landing
Top Landing
Run 1
Run 1 Bottom Landing
Run 1 Left Handrail
Run 1 Left Handrail
Run 1 Right Handrail
Run 1 Right Handrail
Run 1 Top Landing
Pet Waste Bag Dispenser - Pet Waste Bag Dispenser
Trash Receptacle - Trash/Recycle Receptacle
Pet Waste Bag Dispenser - Pet Waste Bag Dispenser
Pet Waste Bag Dispenser - Pet Waste Bag Dispenser
Trash Receptacle - Trash/Recycle Receptacle
Pet Waste Bag Dispenser - Pet Waste Bag Dispenser
Trash Receptacle - Trash/Recycle Receptacle
Pet Waste Bag Dispenser - Pet Waste Bag Dispenser
Segment 1
Segment 1 to Jennifer Street
Segment 3
Bench 2725 Feet from Orcutt Road
Bench at San Carlos Drive
Bench Next to Railroad Bridge
Segment 11
Segment 13
Segment 2
Segment 3
Segment 5
Segment 7
Segment 9
Trail Head at Jennifer Street - Trail Head - Directional/Location
Trail Head at Orcutt Road - Trail Head - Directional/Location
Trail Head from San Carlos Drive - Trail Head - Directional/Location
Item
Indicate Length of Trail
Indicate Length of Trail
Indicate Length of Trail
Indicate Length of Trail
Detectable Warnings
Curb Ramp - Cross Slope
Bottom Landing Slope
Bottom Landing Change in Level - Curb Ramps
Top Landing Slope
Ramp Run Slope
Landing Slope
Handrail Extension
Handrail Top Extension
Handrail Extension
Handrail Top Extension
Landing Slope
Clear Floor Space Slope
Clear Floor Space Slope
Clear Floor Space Slope
Element Highest Point of Operation
Clear Floor Space Slope
Element
Element
Element
Cross Slope - Concrete/Asphalt or Boardwalk Surface - Segments
Cross Slope - Concrete/Asphalt or Boardwalk Surface - Segments
Cross Slope - Concrete/Asphalt or Boardwalk Surface - Segments
Surface
Surface
Surface
Cross Slope - Concrete/Asphalt or Boardwalk Surface - Segments
Cross Slope - Concrete/Asphalt or Boardwalk Surface - Segments
Cross Slope - Concrete/Asphalt or Boardwalk Surface - Segments
Cross Slope - Concrete/Asphalt or Boardwalk Surface - Segments
Cross Slope - Concrete/Asphalt or Boardwalk Surface - Segments
Cross Slope - Concrete/Asphalt or Boardwalk Surface - Segments
Cross Slope - Concrete/Asphalt or Boardwalk Surface - Segments
Indicate Length of Trail
Indicate Length of Trail
Indicate Length of Trail
Finding
Trail signage does not indicate length of trail.
Trail signage does not indicate length of trail.
Trail signage does not indicate length of trail.
Trail signage does not indicate length of trail.
The curb ramp does not provide a detectable warning surface which includes truncated domes.
The cross slope is greater than allowed.
The slope at the bottom landing is greater than allowed.
The transition from the bottom of the curb ramp to the walk, gutter, or street is abrupt.
The slope at the top landing is greater than allowed.
The slope of the ramp is greater than the allowed slope.
The slope of the landing is greater than required.
The handrail extension is not parallel to the floor or ground surface.
There is not enough handrail extension beyond the top or bottom of the rail.
The handrail extension is not parallel to the floor or ground surface.
There is not enough handrail extension beyond the top or bottom of the rail.
The slope of the landing is greater than required.
The clear floor space slope is not compliant.
The clear floor space slope is not compliant.
The clear floor space slope is not compliant.
The highest point of operation for the element is not compliant.
The clear floor space slope is not compliant.
The element is not located on the accessible route.
The element is not located on the accessible route.
The element is not located on the accessible route.
The cross slope of the trail is not compliant.
The cross slope of the trail is not compliant.
The cross slope of the trail is not compliant.
Clear ground space around the constructed feature is not compliant.
Clear ground space around the constructed feature is not compliant.
Clear ground space around the constructed feature is not compliant.
The cross slope of the trail is not compliant.
The cross slope of the trail is not compliant.
The cross slope of the trail is not compliant.
The cross slope of the trail is not compliant.
The cross slope of the trail is not compliant.
The cross slope of the trail is not compliant.
The cross slope of the trail is not compliant.
Trail signage does not indicate length of trail.
Trail signage does not indicate length of trail.
Trail signage does not indicate length of trail.
On Site Finding
See Above
See Above
See Above
See Above
Not Found
4.40 percent
6.60 percent
Not Beveled
6.90 percent
11.00 percent
4.80 percent
Not Parallel
Not Found
Not Parallel
Not Found
2.90 percent
10.40 percent
10.40 percent
3.40 percent
48.00 inches
3.40 percent
None
None
None
3.00 percent
5.10 percent
4.20 percent
Not Firm
Not Firm
Not Firm
2.70 percent
3.00 percent
5.70 percent
4.80 percent
3.20 percent
3.40 percent
3.10 percent
See Above
See Above
See Above
Recommendation
Provide compliant signage for the trail that includes length of trail.
Provide compliant signage for the trail that includes length of trail.
Provide compliant signage for the trail that includes length of trail.
Provide compliant signage for the trail that includes length of trail.
Provide compliant detectable warnings to surface.
Provide a compliant curb ramp.
Provide a compliant bottom landing that does not exceed the maximum slope requirements.
Patch the transition area at the bottom of the curb ramp so that the transition is flush and free of abrupt changes.
Provide a top landing that has a compliant slope and maneuvering space.
Modify the run of the ramp to provide the required slope and cross slope.
Modify the landing to create a slope in any direction not exceeding the required maximum value.
Provide compliant handrail extensions that are parallel to the floor or ground surface extending the required distance beyond the bottom of the ramp and return smoothly to the post or
wall.
Provide compliant handrail extensions that are parallel to the floor or ground surface extending the required distance beyond the bottom of the ramp and return smoothly to the post or
wall.
Provide compliant handrail extensions that are parallel to the floor or ground surface extending the required distance beyond the bottom of the ramp and return smoothly to the post or
wall.
Provide compliant handrail extensions that are parallel to the floor or ground surface extending the required distance beyond the bottom of the ramp and return smoothly to the post or
wall.
Modify the landing to create a slope in any direction not exceeding the required maximum value.
Provide compliant clear floor space.
Provide compliant clear floor space.
Provide compliant clear floor space.
Make sure that the highest point of operation is within the recommended value.
Provide compliant clear floor space.
The element must be located on the accessible route.
The element must be located on the accessible route.
The element must be located on the accessible route.
Provide a compliant cross slope on the trail.
Provide a compliant cross slope on the trail.
Provide a compliant cross slope on the trail.
Provide compliant clear ground space around the constructed feature.
Provide compliant clear ground space around the constructed feature.
Provide compliant clear ground space around the constructed feature.
Provide a compliant cross slope on the trail.
Provide a compliant cross slope on the trail.
Provide a compliant cross slope on the trail.
Provide a compliant cross slope on the trail.
Provide a compliant cross slope on the trail.
Provide a compliant cross slope on the trail.
Provide a compliant cross slope on the trail.
Provide compliant signage for the trail that includes length of trail.
Provide compliant signage for the trail that includes length of trail.
Provide compliant signage for the trail that includes length of trail.
Recommended Value
See Recommendation
See Recommendation
See Recommendation
See Recommendation
See Recommendation
Up to 2.08 percent
Up to 2.08 percent
See Recommendation
Up to 2.08 percent
Up to 8.33 percent
Up to 2.08 percent
See Recommendation
See Recommendation
See Recommendation
See Recommendation
Up to 2.08 percent
Up to 2.08 percent
Up to 2.08 percent
Up to 2.08 percent
Up to 44.00 inches
Up to 2.08 percent
See Recommendation
See Recommendation
See Recommendation
Up to 2.08 percent
Up to 2.08 percent
Up to 2.08 percent
See Recommendation
See Recommendation
See Recommendation
Up to 2.08 percent
Up to 2.08 percent
Up to 2.08 percent
Up to 2.08 percent
Up to 2.08 percent
Up to 2.08 percent
Up to 2.08 percent
See Recommendation
See Recommendation
See Recommendation
Deviation
2.32
4.52
4.82
2.67
2.72
0.82
8.32
8.32
1.32
4.00
1.32
0.92
3.02
2.12
0.62
0.92
3.62
2.72
1.12
1.32
1.02
Measure Units
percent
percent
percent
percent
percent
percent
percent
percent
percent
inches
percent
percent
percent
percent
percent
percent
percent
percent
percent
percent
percent
Costing Info
Provide detectable warning to surface
Install curb ramp
Provide compliant landing
Patch lip at curb ramp
Provide compliant landing
Correct ramp slope
Modify ramp landing
Provide compliant handrail extensions
Provide compliant handrail extensions
Provide compliant handrail extensions
Provide compliant handrail extensions
Modify ramp landing
Redesign space
Redesign space
Redesign space
Readjust element height
Redesign space
Blank or Unassigned cost estimate cells indicate further design requirements or modification by original vendor.
Estimated Cost
248
1300
240
255
1260
3600
2872
2400
2400
2400
2400
2872
500
500
500
50
500
1260
1260
1260
28077
Notes
Code Reference
ADA 1017.11,F247.4
ADA 1017.11,F247.4
ADA 1017.11,F247.4
ADA 1017.11,F247.4
CA 11B- 406.5
ADA 402, 406.1, 405.3, CA 11B-406.5
ADA 402, 406.4, 406.2, 403.3, 406.1, CA 11B-406.3
ADA 406.2, CA 11B-406.5
ADA 406.4, 402.2, CA 11B-406.5
ADA 405, 405.2, CA 11B-405.2
ADA 402, 405.7, CA 11B-405.7
ADA 405, 405.8, 505.10, CA 11B-405.8,505.10
ADA 405, 405.8, 505.10, CA 11B-405.8,505
ADA 405, 405.8, 505.10, CA 11B-405.8,505.10
ADA 405, 405.8, 505.10, CA 11B-405.8,505
ADA 402, 405.7, CA 11B-405.7
ADA 304, CA 11B-305.2
ADA 304, CA 11B-305.2
ADA 304, CA 11B-305.2
ADA 309, 308, CA 11B-308,309
ADA 304, CA 11B-305.2
ADA 206, 304
ADA 206, 304
ADA 206, 304
ADA 1017.7
ADA 1017.7
ADA 1017.7
CBC 202, ADA 1011.2
CBC 202, ADA 1011.2
CBC 202, ADA 1011.2
ADA 1017.7
ADA 1017.7
ADA 1017.7
ADA 1017.7
ADA 1017.7
ADA 1017.7
ADA 1017.7
ADA 1017.11,F247.4
ADA 1017.11,F247.4
ADA 1017.11,F247.4
None
Landlord
Tenant
Both
City
County
District
Resident
Other
Cost Responsibility
Landlord
Landlord
Landlord
Landlord
Landlord
Landlord
Landlord
Landlord
Landlord
Landlord
Landlord
Landlord
Landlord
Landlord
Landlord
Landlord
None
None
Landlord
Landlord
Landlord
None
None
None
Landlord
Landlord
Landlord
Landlord
Landlord
Landlord
Landlord
Landlord
Landlord
Landlord
Landlord
Landlord
Landlord
Landlord
Landlord
Landlord
0
0
0
0
0
0
0
0
0
Priority
Three
Three
Three
Three
Five
Five
Five
Five
Five
Five
Five
Five
Five
Five
Five
Five
Five
Five
Five
Five
Five
Five
Five
Five
Five
Five
Five
Five
Five
Five
Five
Five
Five
Five
Five
Five
Five
Five
Five
Five
Progress
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Resolution
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Projected Completion Date
12/31/2025
12/31/2025
12/31/2025
12/31/2025
12/31/2040
12/31/2040
12/31/2040
12/31/2040
12/31/2040
12/31/2040
12/31/2040
12/31/2040
12/31/2040
12/31/2040
12/31/2040
12/31/2040
12/31/2040
12/31/2040
12/31/2040
12/31/2040
12/31/2040
12/31/2040
12/31/2040
12/31/2040
12/31/2040
12/31/2040
12/31/2040
12/31/2040
12/31/2040
12/31/2040
12/31/2040
12/31/2040
12/31/2040
12/31/2040
12/31/2040
12/31/2040
12/31/2040
12/31/2040
12/31/2040
12/31/2040
Actual Completion Date
Actual Cost
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
Contractor
Assignment
Category_1
Category_1
Category_1
Category_1
Category_2
Category_2
Category_2
Category_2
Category_2
Category_2
Category_2
Category_2
Category_2
Category_2
Category_2
Category_2
Category_2
Category_2
Category_2
Category_2
Category_2
Category_2
Category_2
Category_2
Category_2
Category_2
Category_2
Category_2
Category_2
Category_2
Category_2
Category_2
Category_2
Category_2
Category_2
Category_2
Category_2
Category_2
Category_2
Category_2
New Value
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Latitude
Longitude
Designated Staff
STRT
STRT
STRT
STRT
ENG
ENG
ENG
ENG
ENG
ENG
ENG
ENG
ENG
ENG
ENG
ENG
ENG
ENG
ENG
ENG
ENG
ENG
ENG
ENG
ENG
ENG
ENG
ENG
ENG
ENG
ENG
ENG
ENG
ENG
ENG
ENG
ENG
ENG
ENG
ENG
Railroad Trail 1 & 2 Main Picture