Loading...
HomeMy WebLinkAboutRailroad_Trail_1_&_2_3_31_2026_10_33_18_AM_5e4b1772-df06-4744-a161-7b887add0df0_ExcelName Record Number 432803 432804 432785 432788 432768 432769 432770 432771 432772 432776 432778 432779 432780 432781 432782 432777 432766 432765 432774 432775 432773 432784 432783 432767 432807 432805 432808 432801 432797 432799 432793 432790 432794 432792 432791 432795 432796 432786 432789 432787 Picture 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Railroad Trail 1 & 2 - Orcutt to Osos San Luis Obispo, CA 93401 Category Trails Trails Trails Trails Curb Ramps Curb Ramps Curb Ramps Curb Ramps Curb Ramps Ramps Ramps Ramps Ramps Ramps Ramps Ramps Reach Ranges Reach Ranges Reach Ranges Reach Ranges Reach Ranges Reach Ranges Reach Ranges Reach Ranges Trails Trails Trails Trails Trails Trails Trails Trails Trails Trails Trails Trails Trails Trails Trails Trails Location Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Sub Location Description Trail from Boulevard Del Campo Trail from Boulevard Del Campo Trail Next to Railroad Trail Next to Railroad Curb Ramp from Boulevard Del Campo Curb Ramp from Boulevard Del Campo Curb Ramp from Boulevard Del Campo Curb Ramp from Boulevard Del Campo Curb Ramp from Boulevard Del Campo Ramp Next to Railroad Bridge Ramp Next to Railroad Bridge Ramp Next to Railroad Bridge Ramp Next to Railroad Bridge Ramp Next to Railroad Bridge Ramp Next to Railroad Bridge Ramp Next to Railroad Bridge Trail Head at Jennifer Street Trail Head at Jennifer Street Trail Head at Orcutt Road Trail Head at Orcutt Road Trail Head at Orcutt Road Trail Head at San Carlos Drive Trail Head at San Carlos Drive Trail Intersection Trail from Boulevard Del Campo Trail from Boulevard Del Campo Trail from Boulevard Del Campo Trail Next to Railroad Trail Next to Railroad Trail Next to Railroad Trail Next to Railroad Trail Next to Railroad Trail Next to Railroad Trail Next to Railroad Trail Next to Railroad Trail Next to Railroad Trail Next to Railroad Trail Next to Railroad Trail Next to Railroad Trail Next to Railroad Sub Description Directional Signage at Fork - Trail Head - Directional/Location Directional Signage from Boulevard Del Campo - Trail Head - Directional/Location Directional Signage from Jennifer Street - Trail Head - Directional/Location Directional Signage from Orcutt Road - Trail Head - Directional/Location Bottom Landing Bottom Landing Top Landing Run 1 Run 1 Bottom Landing Run 1 Left Handrail Run 1 Left Handrail Run 1 Right Handrail Run 1 Right Handrail Run 1 Top Landing Pet Waste Bag Dispenser - Pet Waste Bag Dispenser Trash Receptacle - Trash/Recycle Receptacle Pet Waste Bag Dispenser - Pet Waste Bag Dispenser Pet Waste Bag Dispenser - Pet Waste Bag Dispenser Trash Receptacle - Trash/Recycle Receptacle Pet Waste Bag Dispenser - Pet Waste Bag Dispenser Trash Receptacle - Trash/Recycle Receptacle Pet Waste Bag Dispenser - Pet Waste Bag Dispenser Segment 1 Segment 1 to Jennifer Street Segment 3 Bench 2725 Feet from Orcutt Road Bench at San Carlos Drive Bench Next to Railroad Bridge Segment 11 Segment 13 Segment 2 Segment 3 Segment 5 Segment 7 Segment 9 Trail Head at Jennifer Street - Trail Head - Directional/Location Trail Head at Orcutt Road - Trail Head - Directional/Location Trail Head from San Carlos Drive - Trail Head - Directional/Location Item Indicate Length of Trail Indicate Length of Trail Indicate Length of Trail Indicate Length of Trail Detectable Warnings Curb Ramp - Cross Slope Bottom Landing Slope Bottom Landing Change in Level - Curb Ramps Top Landing Slope Ramp Run Slope Landing Slope Handrail Extension Handrail Top Extension Handrail Extension Handrail Top Extension Landing Slope Clear Floor Space Slope Clear Floor Space Slope Clear Floor Space Slope Element Highest Point of Operation Clear Floor Space Slope Element Element Element Cross Slope - Concrete/Asphalt or Boardwalk Surface - Segments Cross Slope - Concrete/Asphalt or Boardwalk Surface - Segments Cross Slope - Concrete/Asphalt or Boardwalk Surface - Segments Surface Surface Surface Cross Slope - Concrete/Asphalt or Boardwalk Surface - Segments Cross Slope - Concrete/Asphalt or Boardwalk Surface - Segments Cross Slope - Concrete/Asphalt or Boardwalk Surface - Segments Cross Slope - Concrete/Asphalt or Boardwalk Surface - Segments Cross Slope - Concrete/Asphalt or Boardwalk Surface - Segments Cross Slope - Concrete/Asphalt or Boardwalk Surface - Segments Cross Slope - Concrete/Asphalt or Boardwalk Surface - Segments Indicate Length of Trail Indicate Length of Trail Indicate Length of Trail Finding Trail signage does not indicate length of trail. Trail signage does not indicate length of trail. Trail signage does not indicate length of trail. Trail signage does not indicate length of trail. The curb ramp does not provide a detectable warning surface which includes truncated domes. The cross slope is greater than allowed. The slope at the bottom landing is greater than allowed. The transition from the bottom of the curb ramp to the walk, gutter, or street is abrupt. The slope at the top landing is greater than allowed. The slope of the ramp is greater than the allowed slope. The slope of the landing is greater than required. The handrail extension is not parallel to the floor or ground surface. There is not enough handrail extension beyond the top or bottom of the rail. The handrail extension is not parallel to the floor or ground surface. There is not enough handrail extension beyond the top or bottom of the rail. The slope of the landing is greater than required. The clear floor space slope is not compliant. The clear floor space slope is not compliant. The clear floor space slope is not compliant. The highest point of operation for the element is not compliant. The clear floor space slope is not compliant. The element is not located on the accessible route. The element is not located on the accessible route. The element is not located on the accessible route. The cross slope of the trail is not compliant. The cross slope of the trail is not compliant. The cross slope of the trail is not compliant. Clear ground space around the constructed feature is not compliant. Clear ground space around the constructed feature is not compliant. Clear ground space around the constructed feature is not compliant. The cross slope of the trail is not compliant. The cross slope of the trail is not compliant. The cross slope of the trail is not compliant. The cross slope of the trail is not compliant. The cross slope of the trail is not compliant. The cross slope of the trail is not compliant. The cross slope of the trail is not compliant. Trail signage does not indicate length of trail. Trail signage does not indicate length of trail. Trail signage does not indicate length of trail. On Site Finding See Above See Above See Above See Above Not Found 4.40 percent 6.60 percent Not Beveled 6.90 percent 11.00 percent 4.80 percent Not Parallel Not Found Not Parallel Not Found 2.90 percent 10.40 percent 10.40 percent 3.40 percent 48.00 inches 3.40 percent None None None 3.00 percent 5.10 percent 4.20 percent Not Firm Not Firm Not Firm 2.70 percent 3.00 percent 5.70 percent 4.80 percent 3.20 percent 3.40 percent 3.10 percent See Above See Above See Above Recommendation Provide compliant signage for the trail that includes length of trail. Provide compliant signage for the trail that includes length of trail. Provide compliant signage for the trail that includes length of trail. Provide compliant signage for the trail that includes length of trail. Provide compliant detectable warnings to surface. Provide a compliant curb ramp. Provide a compliant bottom landing that does not exceed the maximum slope requirements. Patch the transition area at the bottom of the curb ramp so that the transition is flush and free of abrupt changes. Provide a top landing that has a compliant slope and maneuvering space. Modify the run of the ramp to provide the required slope and cross slope. Modify the landing to create a slope in any direction not exceeding the required maximum value. Provide compliant handrail extensions that are parallel to the floor or ground surface extending the required distance beyond the bottom of the ramp and return smoothly to the post or wall. Provide compliant handrail extensions that are parallel to the floor or ground surface extending the required distance beyond the bottom of the ramp and return smoothly to the post or wall. Provide compliant handrail extensions that are parallel to the floor or ground surface extending the required distance beyond the bottom of the ramp and return smoothly to the post or wall. Provide compliant handrail extensions that are parallel to the floor or ground surface extending the required distance beyond the bottom of the ramp and return smoothly to the post or wall. Modify the landing to create a slope in any direction not exceeding the required maximum value. Provide compliant clear floor space. Provide compliant clear floor space. Provide compliant clear floor space. Make sure that the highest point of operation is within the recommended value. Provide compliant clear floor space. The element must be located on the accessible route. The element must be located on the accessible route. The element must be located on the accessible route. Provide a compliant cross slope on the trail. Provide a compliant cross slope on the trail. Provide a compliant cross slope on the trail. Provide compliant clear ground space around the constructed feature. Provide compliant clear ground space around the constructed feature. Provide compliant clear ground space around the constructed feature. Provide a compliant cross slope on the trail. Provide a compliant cross slope on the trail. Provide a compliant cross slope on the trail. Provide a compliant cross slope on the trail. Provide a compliant cross slope on the trail. Provide a compliant cross slope on the trail. Provide a compliant cross slope on the trail. Provide compliant signage for the trail that includes length of trail. Provide compliant signage for the trail that includes length of trail. Provide compliant signage for the trail that includes length of trail. Recommended Value See Recommendation See Recommendation See Recommendation See Recommendation See Recommendation Up to 2.08 percent Up to 2.08 percent See Recommendation Up to 2.08 percent Up to 8.33 percent Up to 2.08 percent See Recommendation See Recommendation See Recommendation See Recommendation Up to 2.08 percent Up to 2.08 percent Up to 2.08 percent Up to 2.08 percent Up to 44.00 inches Up to 2.08 percent See Recommendation See Recommendation See Recommendation Up to 2.08 percent Up to 2.08 percent Up to 2.08 percent See Recommendation See Recommendation See Recommendation Up to 2.08 percent Up to 2.08 percent Up to 2.08 percent Up to 2.08 percent Up to 2.08 percent Up to 2.08 percent Up to 2.08 percent See Recommendation See Recommendation See Recommendation Deviation 2.32 4.52 4.82 2.67 2.72 0.82 8.32 8.32 1.32 4.00 1.32 0.92 3.02 2.12 0.62 0.92 3.62 2.72 1.12 1.32 1.02 Measure Units percent percent percent percent percent percent percent percent percent inches percent percent percent percent percent percent percent percent percent percent percent Costing Info Provide detectable warning to surface Install curb ramp Provide compliant landing Patch lip at curb ramp Provide compliant landing Correct ramp slope Modify ramp landing Provide compliant handrail extensions Provide compliant handrail extensions Provide compliant handrail extensions Provide compliant handrail extensions Modify ramp landing Redesign space Redesign space Redesign space Readjust element height Redesign space Blank or Unassigned cost estimate cells indicate further design requirements or modification by original vendor. Estimated Cost 248 1300 240 255 1260 3600 2872 2400 2400 2400 2400 2872 500 500 500 50 500 1260 1260 1260 28077 Notes Code Reference ADA 1017.11,F247.4 ADA 1017.11,F247.4 ADA 1017.11,F247.4 ADA 1017.11,F247.4 CA 11B- 406.5 ADA 402, 406.1, 405.3, CA 11B-406.5 ADA 402, 406.4, 406.2, 403.3, 406.1, CA 11B-406.3 ADA 406.2, CA 11B-406.5 ADA 406.4, 402.2, CA 11B-406.5 ADA 405, 405.2, CA 11B-405.2 ADA 402, 405.7, CA 11B-405.7 ADA 405, 405.8, 505.10, CA 11B-405.8,505.10 ADA 405, 405.8, 505.10, CA 11B-405.8,505 ADA 405, 405.8, 505.10, CA 11B-405.8,505.10 ADA 405, 405.8, 505.10, CA 11B-405.8,505 ADA 402, 405.7, CA 11B-405.7 ADA 304, CA 11B-305.2 ADA 304, CA 11B-305.2 ADA 304, CA 11B-305.2 ADA 309, 308, CA 11B-308,309 ADA 304, CA 11B-305.2 ADA 206, 304 ADA 206, 304 ADA 206, 304 ADA 1017.7 ADA 1017.7 ADA 1017.7 CBC 202, ADA 1011.2 CBC 202, ADA 1011.2 CBC 202, ADA 1011.2 ADA 1017.7 ADA 1017.7 ADA 1017.7 ADA 1017.7 ADA 1017.7 ADA 1017.7 ADA 1017.7 ADA 1017.11,F247.4 ADA 1017.11,F247.4 ADA 1017.11,F247.4 None Landlord Tenant Both City County District Resident Other Cost Responsibility Landlord Landlord Landlord Landlord Landlord Landlord Landlord Landlord Landlord Landlord Landlord Landlord Landlord Landlord Landlord Landlord None None Landlord Landlord Landlord None None None Landlord Landlord Landlord Landlord Landlord Landlord Landlord Landlord Landlord Landlord Landlord Landlord Landlord Landlord Landlord Landlord 0 0 0 0 0 0 0 0 0 Priority Three Three Three Three Five Five Five Five Five Five Five Five Five Five Five Five Five Five Five Five Five Five Five Five Five Five Five Five Five Five Five Five Five Five Five Five Five Five Five Five Progress Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Resolution Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Projected Completion Date 12/31/2025 12/31/2025 12/31/2025 12/31/2025 12/31/2040 12/31/2040 12/31/2040 12/31/2040 12/31/2040 12/31/2040 12/31/2040 12/31/2040 12/31/2040 12/31/2040 12/31/2040 12/31/2040 12/31/2040 12/31/2040 12/31/2040 12/31/2040 12/31/2040 12/31/2040 12/31/2040 12/31/2040 12/31/2040 12/31/2040 12/31/2040 12/31/2040 12/31/2040 12/31/2040 12/31/2040 12/31/2040 12/31/2040 12/31/2040 12/31/2040 12/31/2040 12/31/2040 12/31/2040 12/31/2040 12/31/2040 Actual Completion Date Actual Cost 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments Contractor Assignment Category_1 Category_1 Category_1 Category_1 Category_2 Category_2 Category_2 Category_2 Category_2 Category_2 Category_2 Category_2 Category_2 Category_2 Category_2 Category_2 Category_2 Category_2 Category_2 Category_2 Category_2 Category_2 Category_2 Category_2 Category_2 Category_2 Category_2 Category_2 Category_2 Category_2 Category_2 Category_2 Category_2 Category_2 Category_2 Category_2 Category_2 Category_2 Category_2 Category_2 New Value 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Latitude Longitude Designated Staff STRT STRT STRT STRT ENG ENG ENG ENG ENG ENG ENG ENG ENG ENG ENG ENG ENG ENG ENG ENG ENG ENG ENG ENG ENG ENG ENG ENG ENG ENG ENG ENG ENG ENG ENG ENG ENG ENG ENG ENG Railroad Trail 1 & 2 Main Picture