Loading...
HomeMy WebLinkAboutRailroad_Trail_4_3_31_2026_10_33_25_AM_5a536808-fa53-458d-87af-e859ca7eee9f_ExcelName Record Number 432756 432757 432758 432759 432760 Picture 0 0 0 0 0 Railroad Trail 4 - US 101 to Foothill San Luis Obispo, CA 93401 Category Trails Trails Trails Trails Trails Location Exterior Exterior Exterior Exterior Exterior Sub Location Description Railroad Trail 4 Railroad Trail 4 Railroad Trail 4 Railroad Trail 4 Railroad Trail 4 Sub Description California Boulevard & Foothill Boulevard Trail Head - Trail Head - Directional/Location California Boulevard & Hathway Avenue Trail Head - Trail Head - Directional/Location California Boulevard & Taft Street Trail Head - Trail Head - Directional/Location Segment 1 Segment 3 Item Compliant Signage Compliant Signage Compliant Signage Cross Slope - Concrete/Asphalt or Boardwalk Surface - Segments Cross Slope - Concrete/Asphalt or Boardwalk Surface - Segments Finding There is no compliant signage. There is no compliant signage. There is no compliant signage. The cross slope of the trail is not compliant. The cross slope of the trail is not compliant. On Site Finding See Above See Above See Above 3.40 percent 5.30 percent Recommendation Provide compliant signage with characters and numbers that are properly sized for viewing distance. Provide compliant signage with characters and numbers that are properly sized for viewing distance. Provide compliant signage with characters and numbers that are properly sized for viewing distance. Provide a compliant cross slope on the trail. Provide a compliant cross slope on the trail. Recommended Value See Recommendation See Recommendation See Recommendation Up to 2.08 percent Up to 2.08 percent Deviation 1.32 3.22 Measure Units percent percent Costing Info Blank or Unassigned cost estimate cells indicate further design requirements or modification by original vendor. Estimated Cost 0 Notes Code Reference ADA 1017.11,F247.4 ADA 1017.11,F247.4 ADA 1017.11,F247.4 ADA 1017.7 ADA 1017.7 None Landlord Tenant Both City County District Resident Other Cost Responsibility Landlord Landlord Landlord Landlord Landlord 0 0 0 0 0 0 0 0 0 Priority Three Three Three Five Five Progress Not_Set Not_Set Not_Set Not_Set Not_Set Resolution Not_Set Not_Set Not_Set Not_Set Not_Set Projected Completion Date 12/31/2025 12/31/2025 12/31/2025 12/31/2035 12/31/2035 Actual Completion Date Actual Cost 0 0 0 0 0 0 Comments No Comments No Comments No Comments No Comments No Comments Contractor STRTS STRTS STRTS ENG ENG Assignment Category_1 Category_1 Category_1 Category_2 Category_2 New Value 0 0 0 0 0 Latitude Longitude Designated Staff Railroad Trail 4 Main Picture