HomeMy WebLinkAboutQuail_Drive_-_Royal_Way_to_Partridge_Drive_4_6_2026_2_29_30_PM_ad80bac2-f9f0-4dfc-8449-51affc5b1ea9_ExcelName
Record Number
418003
417997
418001
418002
417999
417992
417993
438682
418004
417994
417995
417996
418000
417998
417990
417991
Picture
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Quail Drive - Royal Way to Partridge Drive - Royal Way to Partridge Drive
San Luis Obispo, CA 93401
Category
Sidewalks
Sidewalks
Sidewalks
Sidewalks
Sidewalks
Sidewalks
Sidewalks
Sidewalks
Sidewalks
Sidewalks
Sidewalks
Sidewalks
Sidewalks
Sidewalks
Sidewalks
Sidewalks
Location
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Sub Location
Description
North Side
North Side
North Side
North Side
North Side
South Side
South Side
South Side @ 35.257074713316, -120.695827603340
North Side
North Side
North Side
North Side
North Side
North Side
South Side
South Side
Sub Description
Bush East Of Partridge Drive @ 35.257179843432, -120.695993900299
Curb East Of Partridge Drive @ 35.255933604738, -120.697537511587
Curb East Of Partridge Drive @ 35.256034355854, -120.697388648987
Curb East Of Quail Circle @ 35.256636669697, -120.696537047625
Curb East Of Quail Circle @ 35.256757131928, -120.696417689323
Bush West Of Royal Way @ 35.255513076988, -120.697914361954
Bush West Of Royal Way @ 35.255979599828, -120.697203576565
Quail Circle North Crossing @ 35.255981790070, -120.697469115257
Sidewalk East Of Partridge Drive @ 35.257053906298, -120.696103870869
Sidewalk East Of Quail Circle @ 35.256055163134, -120.697328299284
Sidewalk East Of Quail Circle @ 35.256250094236, -120.697025209665
Tree East Of Quail Circle @ 35.256200813945, -120.697107017040
Tree East Of Quail Circle @ 35.256250094236, -120.697025209665
Sidewalk West Of Royal Way @ 35.255704724020, -120.697616636753
Sidewalk West Of Royal Way @ 35.257068142679, -120.695853084326
Item
Sidewalk Width at Obstruction
Curb is on Path of Travel
Curb is on Path of Travel
Curb is on Path of Travel
Curb is on Path of Travel
Sidewalk Width at Obstruction
Sidewalk Width at Obstruction
60X60 Turn Area
Vehicular Traffic Slope
Cross Slope
Cross Slope
Cross Slope
Overhead Obstruction Height
Overhead Obstruction Height
Cross Slope
Cross Slope
Finding
Sidewalk width at the obstruction is not compliant.
There is a curb on the designated path of travel.
There is a curb on the designated path of travel.
There is a curb on the designated path of travel.
There is a curb on the designated path of travel.
Sidewalk width at the obstruction is not compliant.
Sidewalk width at the obstruction is not compliant.
There is no turning area located at the required intervals.
Slope at vehicular traffic is not compliant.
Sidewalk cross slope is not compliant.
Sidewalk cross slope is not compliant.
Sidewalk cross slope is not compliant.
Overhead obstruction height is not compliant.
Overhead obstruction height is not compliant.
Sidewalk cross slope is not compliant.
Sidewalk cross slope is not compliant.
On Site Finding
29.00 inches
Not Compliant
Not Compliant
Not Compliant
Not Compliant
43.00 inches
37.00 inches
Not Found
5.50 percent
2.80 percent for 66.00 feet
3.40 percent for 20.00 feet
3.00 percent for 30.00 feet
69.00 inches
63.00 inches
3.40 percent for 46.00 feet
3.10 percent for 93.00 feet
Recommendation
Remove obstruction or modify sidewalk.
Provide a compliant curb ramp.
Provide a compliant curb ramp.
Provide a compliant curb ramp.
Provide a compliant curb ramp.
Remove obstruction or modify sidewalk.
Remove obstruction or modify sidewalk.
Provide compliant turning areas at the required intervals.
Repave the surface to provide a compliant slope.
Repave the sidewalk surface with the recommended cross slope.
Repave the sidewalk surface with the recommended cross slope.
Repave the sidewalk surface with the recommended cross slope.
Provide a compliant vertical clearance height.
Provide a compliant vertical clearance height.
Repave the sidewalk surface with the recommended cross slope.
Repave the sidewalk surface with the recommended cross slope.
Recommended Value
At least 48.00 inches
See Recommendation
See Recommendation
See Recommendation
See Recommendation
At least 48.00 inches
At least 48.00 inches
See Recommendation
Up to 5.00 percent
Up to 2.08 percent
Up to 2.08 percent
Up to 2.08 percent
At least 80.00 inches
At least 80.00 inches
Up to 2.08 percent
Up to 2.08 percent
Deviation
-19.00
-5.00
-11.00
0.50
0.72
1.32
0.92
-11.00
-17.00
1.32
1.02
Measure Units
inches
inches
inches
percent
percent
percent
percent
inches
inches
percent
percent
Costing Info
Install curb ramp
Install curb ramp
Install curb ramp
Install curb ramp
Repave surface
Fix Sidewalk
Fix Sidewalk
Fix Sidewalk
Fix Sidewalk
Fix Sidewalk
Blank or Unassigned cost estimate cells indicate further design requirements or modification by original vendor.
Estimated Cost
1260
2500
2500
2500
2500
1260
1260
2400
1092
2376
720
1080
1656
3348
26452
Notes
Code Reference
ADA 206, 302, 403.5, CA 11B-403.5
ADA 402, 303, 406, 403.4, 303.4
ADA 402, 303, 406, 403.4, 303.4
ADA 402, 303, 406, 403.4, 303.4
ADA 402, 303, 406, 403.4, 303.4
ADA 206, 302, 403.5, CA 11B-403.5
ADA 206, 302, 403.5, CA 11B-403.5
ADA 206, 302
ADA 206, 302, CA 11B-403.3
ADA 206, 302, CA 11B-403.3
ADA 206, 302, CA 11B-403.3
ADA 206, 307.4, CA 11B-307.4
ADA 206, 307.4, CA 11B-307.4
ADA 206, 302, CA 11B-403.3
ADA 206, 302, CA 11B-403.3
None
Landlord
Tenant
Both
City
County
District
Resident
Other
Cost Responsibility
Landlord
Landlord
Landlord
Landlord
Landlord
Landlord
Landlord
Landlord
Landlord
Tenant
Tenant
Tenant
None
None
Tenant
Tenant
0
0
0
0
0
0
0
0
0
Priority
Five
Five
Five
Five
Five
Five
Five
Five
Six
Eight
Eight
Eight
Eight
Eight
Eight
Eight
Progress
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Resolution
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Projected Completion Date
12/31/2035
12/31/2035
12/31/2035
12/31/2035
12/31/2035
12/31/2035
12/31/2035
12/31/2035
12/31/2035
12/31/2035
12/31/2035
12/31/2035
12/31/2035
12/31/2035
Actual Completion Date
Actual Cost
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
1. Part of Public Utility2. City to do outreach on ROW vegetation requirements GCRUCESLOCITY.ORG.
1. Part of Public Utility2. City to do outreach on ROW vegetation requirements GCRUCESLOCITY.ORG.
No Comments
No Comments
Contractor
Assignment
Category_2
Category_2
Category_2
Category_2
Category_2
Category_2
Category_2
Category_2
Category_2
Category_3
Category_3
Category_3
Not_Set
Not_Set
Category_3
Category_3
New Value
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Latitude
35.257179843432
35.255933604738
35.256034355854
35.256636669697
35.256757131928
35.255513076988
35.255979599828
35.257074713316
35.255981790070
35.257053906298
35.256055163134
35.256250094236
35.256200813945
35.256250094236
35.255704724020
35.257068142679
Longitude
-120.695993900299
-120.697537511587
-120.697388648987
-120.696537047625
-120.696417689323
-120.697914361954
-120.697203576565
-120.695827603340
-120.697469115257
-120.696103870869
-120.697328299284
-120.697025209665
-120.697107017040
-120.697025209665
-120.697616636753
-120.695853084326
Designated Staff
ENG
ENG
ENG
ENG
ENG
ENG
ENG
ENG
ENG
PO
PO
PO
PO
PO
Quail Drive - Royal Way to Partridge Drive Main Picture