Loading...
HomeMy WebLinkAboutQuail_Drive_-_Royal_Way_to_Partridge_Drive_4_6_2026_2_29_30_PM_ad80bac2-f9f0-4dfc-8449-51affc5b1ea9_ExcelName Record Number 418003 417997 418001 418002 417999 417992 417993 438682 418004 417994 417995 417996 418000 417998 417990 417991 Picture 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Quail Drive - Royal Way to Partridge Drive - Royal Way to Partridge Drive San Luis Obispo, CA 93401 Category Sidewalks Sidewalks Sidewalks Sidewalks Sidewalks Sidewalks Sidewalks Sidewalks Sidewalks Sidewalks Sidewalks Sidewalks Sidewalks Sidewalks Sidewalks Sidewalks Location Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Sub Location Description North Side North Side North Side North Side North Side South Side South Side South Side @ 35.257074713316, -120.695827603340 North Side North Side North Side North Side North Side North Side South Side South Side Sub Description Bush East Of Partridge Drive @ 35.257179843432, -120.695993900299 Curb East Of Partridge Drive @ 35.255933604738, -120.697537511587 Curb East Of Partridge Drive @ 35.256034355854, -120.697388648987 Curb East Of Quail Circle @ 35.256636669697, -120.696537047625 Curb East Of Quail Circle @ 35.256757131928, -120.696417689323 Bush West Of Royal Way @ 35.255513076988, -120.697914361954 Bush West Of Royal Way @ 35.255979599828, -120.697203576565 Quail Circle North Crossing @ 35.255981790070, -120.697469115257 Sidewalk East Of Partridge Drive @ 35.257053906298, -120.696103870869 Sidewalk East Of Quail Circle @ 35.256055163134, -120.697328299284 Sidewalk East Of Quail Circle @ 35.256250094236, -120.697025209665 Tree East Of Quail Circle @ 35.256200813945, -120.697107017040 Tree East Of Quail Circle @ 35.256250094236, -120.697025209665 Sidewalk West Of Royal Way @ 35.255704724020, -120.697616636753 Sidewalk West Of Royal Way @ 35.257068142679, -120.695853084326 Item Sidewalk Width at Obstruction Curb is on Path of Travel Curb is on Path of Travel Curb is on Path of Travel Curb is on Path of Travel Sidewalk Width at Obstruction Sidewalk Width at Obstruction 60X60 Turn Area Vehicular Traffic Slope Cross Slope Cross Slope Cross Slope Overhead Obstruction Height Overhead Obstruction Height Cross Slope Cross Slope Finding Sidewalk width at the obstruction is not compliant. There is a curb on the designated path of travel. There is a curb on the designated path of travel. There is a curb on the designated path of travel. There is a curb on the designated path of travel. Sidewalk width at the obstruction is not compliant. Sidewalk width at the obstruction is not compliant. There is no turning area located at the required intervals. Slope at vehicular traffic is not compliant. Sidewalk cross slope is not compliant. Sidewalk cross slope is not compliant. Sidewalk cross slope is not compliant. Overhead obstruction height is not compliant. Overhead obstruction height is not compliant. Sidewalk cross slope is not compliant. Sidewalk cross slope is not compliant. On Site Finding 29.00 inches Not Compliant Not Compliant Not Compliant Not Compliant 43.00 inches 37.00 inches Not Found 5.50 percent 2.80 percent for 66.00 feet 3.40 percent for 20.00 feet 3.00 percent for 30.00 feet 69.00 inches 63.00 inches 3.40 percent for 46.00 feet 3.10 percent for 93.00 feet Recommendation Remove obstruction or modify sidewalk. Provide a compliant curb ramp. Provide a compliant curb ramp. Provide a compliant curb ramp. Provide a compliant curb ramp. Remove obstruction or modify sidewalk. Remove obstruction or modify sidewalk. Provide compliant turning areas at the required intervals. Repave the surface to provide a compliant slope. Repave the sidewalk surface with the recommended cross slope. Repave the sidewalk surface with the recommended cross slope. Repave the sidewalk surface with the recommended cross slope. Provide a compliant vertical clearance height. Provide a compliant vertical clearance height. Repave the sidewalk surface with the recommended cross slope. Repave the sidewalk surface with the recommended cross slope. Recommended Value At least 48.00 inches See Recommendation See Recommendation See Recommendation See Recommendation At least 48.00 inches At least 48.00 inches See Recommendation Up to 5.00 percent Up to 2.08 percent Up to 2.08 percent Up to 2.08 percent At least 80.00 inches At least 80.00 inches Up to 2.08 percent Up to 2.08 percent Deviation -19.00 -5.00 -11.00 0.50 0.72 1.32 0.92 -11.00 -17.00 1.32 1.02 Measure Units inches inches inches percent percent percent percent inches inches percent percent Costing Info Install curb ramp Install curb ramp Install curb ramp Install curb ramp Repave surface Fix Sidewalk Fix Sidewalk Fix Sidewalk Fix Sidewalk Fix Sidewalk Blank or Unassigned cost estimate cells indicate further design requirements or modification by original vendor. Estimated Cost 1260 2500 2500 2500 2500 1260 1260 2400 1092 2376 720 1080 1656 3348 26452 Notes Code Reference ADA 206, 302, 403.5, CA 11B-403.5 ADA 402, 303, 406, 403.4, 303.4 ADA 402, 303, 406, 403.4, 303.4 ADA 402, 303, 406, 403.4, 303.4 ADA 402, 303, 406, 403.4, 303.4 ADA 206, 302, 403.5, CA 11B-403.5 ADA 206, 302, 403.5, CA 11B-403.5 ADA 206, 302 ADA 206, 302, CA 11B-403.3 ADA 206, 302, CA 11B-403.3 ADA 206, 302, CA 11B-403.3 ADA 206, 307.4, CA 11B-307.4 ADA 206, 307.4, CA 11B-307.4 ADA 206, 302, CA 11B-403.3 ADA 206, 302, CA 11B-403.3 None Landlord Tenant Both City County District Resident Other Cost Responsibility Landlord Landlord Landlord Landlord Landlord Landlord Landlord Landlord Landlord Tenant Tenant Tenant None None Tenant Tenant 0 0 0 0 0 0 0 0 0 Priority Five Five Five Five Five Five Five Five Six Eight Eight Eight Eight Eight Eight Eight Progress Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Resolution Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Projected Completion Date 12/31/2035 12/31/2035 12/31/2035 12/31/2035 12/31/2035 12/31/2035 12/31/2035 12/31/2035 12/31/2035 12/31/2035 12/31/2035 12/31/2035 12/31/2035 12/31/2035 Actual Completion Date Actual Cost 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments No Comments 1. Part of Public Utility2. City to do outreach on ROW vegetation requirements GCRUCESLOCITY.ORG. 1. Part of Public Utility2. City to do outreach on ROW vegetation requirements GCRUCESLOCITY.ORG. No Comments No Comments Contractor Assignment Category_2 Category_2 Category_2 Category_2 Category_2 Category_2 Category_2 Category_2 Category_2 Category_3 Category_3 Category_3 Not_Set Not_Set Category_3 Category_3 New Value 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Latitude 35.257179843432 35.255933604738 35.256034355854 35.256636669697 35.256757131928 35.255513076988 35.255979599828 35.257074713316 35.255981790070 35.257053906298 35.256055163134 35.256250094236 35.256200813945 35.256250094236 35.255704724020 35.257068142679 Longitude -120.695993900299 -120.697537511587 -120.697388648987 -120.696537047625 -120.696417689323 -120.697914361954 -120.697203576565 -120.695827603340 -120.697469115257 -120.696103870869 -120.697328299284 -120.697025209665 -120.697107017040 -120.697025209665 -120.697616636753 -120.695853084326 Designated Staff ENG ENG ENG ENG ENG ENG ENG ENG ENG PO PO PO PO PO Quail Drive - Royal Way to Partridge Drive Main Picture