HomeMy WebLinkAboutSan_Jose_Court_-_La_Entrada_Avenue_To_Cul-de-sac_4_6_2026_3_47_36_PM_df8b9f0f-7990-4ff9-9d15-e0d365f667b4_ExcelName
Record Number
395502
395505
395503
395504
395506
395507
Picture
0
0
0
0
0
0
San Jose Court - La Entrada Avenue To Cul-de-sac - La Entrada Avenue To Cul-de-sac
San Luis Obispo, CA 93405
Category
Sidewalks
Sidewalks
Sidewalks
Sidewalks
Sidewalks
Sidewalks
Location
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Sub Location
Description
East Side
East Side
East Side
East Side
East Side
North Side
Sub Description
Sidewalk South Of La Entrada Avenue @ 35.291177899050, -120.684216320515
Sidewalk South Of La Entrada Avenue @ 35.291182277630, -120.684031248093
Sidewalk South Of La Entrada Avenue @ 35.291315824217, -120.683661103249
Sidewalk South Of La Entrada Avenue @ 35.291368367076, -120.683594048023
Tree South Of La Entrada Avenue @ 35.291436234884, -120.683518946171
Sidewalk East Of Cul-de-sac @ 35.291234820576, -120.684921741486
Item
Missing Sidewalk
Missing Sidewalk
Missing Sidewalk
Cross Slope
Overhead Obstruction Height
Missing Sidewalk
Finding
Section of sidewalk is missing and consists of dirt, grass or gravel.
Section of sidewalk is missing and consists of dirt, grass or gravel.
Section of sidewalk is missing and consists of dirt, grass or gravel.
Sidewalk cross slope is not compliant.
Overhead obstruction height is not compliant.
Section of sidewalk is missing and consists of dirt, grass or gravel.
On Site Finding
See Above
5.00 feet
60.00 feet
6.90 percent for 10.00 feet
69.00 inches
See Above
Recommendation
Provide a compliant sidewalk for the missing section.
Provide a compliant sidewalk for the missing section.
Provide a compliant sidewalk for the missing section.
Repave the sidewalk surface with the recommended cross slope.
Provide a compliant vertical clearance height.
Provide a compliant sidewalk for the missing section.
Recommended Value
See Recommendation
See Recommendation
See Recommendation
Up to 2.08 percent
At least 80.00 inches
See Recommendation
Deviation
-5.00
-60.00
4.82
-11.00
Measure Units
feet
feet
percent
inches
Costing Info
Install Sidewalk
Install Sidewalk
Install Sidewalk
Fix Sidewalk
Install Sidewalk
Blank or Unassigned cost estimate cells indicate further design requirements or modification by original vendor.
Estimated Cost
180
2160
360
2700
Notes
Code Reference
ADA 206, 302, CA 11B-302,206
ADA 206, 302, CA 11B-302,206
ADA 206, 302, CA 11B-302,206
ADA 206, 302, CA 11B-403.3
ADA 206, 307.4, CA 11B-307.4
ADA 206, 302, CA 11B-302,206
None
Landlord
Tenant
Both
City
County
District
Resident
Other
Cost Responsibility
Tenant
Tenant
Tenant
Tenant
None
Tenant
0
0
0
0
0
0
0
0
0
Priority
Eight
Eight
Eight
Eight
Eight
Eight
Progress
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Resolution
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Projected Completion Date
12/31/2035
Actual Completion Date
Actual Cost
0
0
0
0
0
0
0
Comments
No action until triggered by development GCRUCESLOCITY.ORG.
No action until triggered by development GCRUCESLOCITY.ORG.
No action until triggered by development GCRUCESLOCITY.ORG.
No Comments
1. Part of Public Utility2. City to do outreach on ROW vegetation requirements GCRUCESLOCITY.ORG.
No action until triggered by development GCRUCESLOCITY.ORG.
Contractor
Assignment
Category_3
Category_3
Category_3
Category_3
Not_Set
Category_3
New Value
0
0
0
0
0
0
Latitude
35.291177899050
35.291182277630
35.291315824217
35.291368367076
35.291436234884
35.291234820576
Longitude
-120.684216320515
-120.684031248093
-120.683661103249
-120.683594048023
-120.683518946171
-120.684921741486
Designated Staff
PO
PO
PO
PO
PO
San Jose Court - La Entrada Avenue To Cul-de-sac Main Picture