HomeMy WebLinkAboutBroad_Street_-_Palm_Street_to_Monterey_Street_4_7_2026_8_32_34_AM_f53cc645-0761-4d1e-a432-393aea909cf2_ExcelName
Record Number
518619
518626
518625
518627
518623
518621
518628
518622
518624
518620
Picture
0
0
0
0
0
0
0
0
0
0
Broad Street - Palm Street to Monterey Street - Palm Street to Monterey Street
San Luis Obispo, CA 93406
Category
Sidewalks
Sidewalks
Sidewalks
Sidewalks
Sidewalks
Sidewalks
Sidewalks
Sidewalks
Sidewalks
Sidewalks
Location
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Sub Location
Description
East Side
West Side
West Side
West Side
West Side
West Side
West Side
West Side
West Side
West Side
Sub Description
Change in Level South of Palm Street @ 35.280221949473, -120.664740800858
Change in Level North of Monterey Street @ 35.280235086991, -120.664923191071
Change in Level North of Monterey Street @ 35.280337997474, -120.665019750595
Change in Level North of Monterey Street @ 35.280484699426, -120.665137767792
Sidewalk North of Monterey Street @ 35.280175968144, -120.664869546890
Sidewalk North of Monterey Street @ 35.280556955514, -120.665218234062
Palm Street West Crossing @ 35.280754017244, -120.665389895439
Sidewalk North of Monterey Street @ 35.280175968144, -120.664869546890
Sidewalk North of Monterey Street @ 35.280484699426, -120.665137767792
Sidewalk North of Monterey Street @ 35.280556955514, -120.665218234062
Item
Change in Level - Non Beveled
Change in Level - Non Beveled
Change in Level - Non Beveled
Change in Level - Non Beveled
Running Slope
Running Slope
Vehicular Traffic Slope
Cross Slope
Cross Slope
Cross Slope
Finding
There is a change in elevation greater than recommended value.
There is a change in elevation greater than recommended value.
There is a change in elevation greater than recommended value.
There is a change in elevation greater than recommended value.
Sidewalk running slope is not compliant.
Sidewalk running slope is not compliant.
Slope at vehicular traffic is not compliant.
Sidewalk cross slope is not compliant.
Sidewalk cross slope is not compliant.
Sidewalk cross slope is not compliant.
On Site Finding
0.62 inches
0.75 inches
0.62 inches
0.37 inches
6.70 percent for 8.00 feet
6.90 percent for 5.00 feet
10.90 percent
6.70 percent for 119.00 feet
3.10 percent for 8.00 feet
4.20 percent for 61.00 feet
Recommendation
Ensure that the change in elevation is within the recommended value.
Ensure that the change in elevation is within the recommended value.
Ensure that the change in elevation is within the recommended value.
Ensure that the change in elevation is within the recommended value.
Repave the sidewalk surface with the recommended running slope.
Repave the sidewalk surface with the recommended running slope.
Repave the surface to provide a compliant slope.
Repave the sidewalk surface with the recommended cross slope.
Repave the sidewalk surface with the recommended cross slope.
Repave the sidewalk surface with the recommended cross slope.
Recommended Value
Up to 0.25 inches
Up to 0.25 inches
Up to 0.25 inches
Up to 0.25 inches
Up to 5.00 percent
Up to 5.00 percent
Up to 5.00 percent
Up to 2.08 percent
Up to 2.08 percent
Up to 2.08 percent
Deviation
0.37
0.50
0.37
0.12
1.70
1.90
5.90
4.62
1.02
2.12
Measure Units
inches
inches
inches
inches
percent
percent
percent
percent
percent
percent
Costing Info
Remove hazard
Remove hazard
Remove hazard
Remove hazard
Fix Sidewalk
Fix Sidewalk
Repave surface
Fix Sidewalk
Fix Sidewalk
Fix Sidewalk
Blank or Unassigned cost estimate cells indicate further design requirements or modification by original vendor.
Estimated Cost
198
198
198
198
288
180
1092
4284
288
2196
9120
Notes
Code Reference
ADA 206, 302
ADA 206, 302
ADA 206, 302
ADA 206, 302
ADA 206, 302
ADA 206, 302
ADA 206, 302, CA 11B-403.3
ADA 206, 302, CA 11B-403.3
ADA 206, 302, CA 11B-403.3
None
Landlord
Tenant
Both
City
County
District
Resident
Other
Cost Responsibility
Tenant
Tenant
Tenant
Tenant
Landlord
Landlord
Landlord
Tenant
Tenant
Tenant
0
0
0
0
0
0
0
0
0
Priority
Three
Three
Three
Three
Five
Five
Six
Eight
Eight
Eight
Progress
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Resolution
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Not_Set
Projected Completion Date
12/31/2037
12/31/2037
12/31/2037
12/31/2037
12/31/2035
12/31/2035
12/31/2035
12/31/2035
12/31/2035
12/31/2035
Actual Completion Date
Actual Cost
0
0
0
0
0
0
0
0
0
0
0
Comments
Streets will grind or ramp and notify property owner if necessary GCRUCESLOCITY.ORG.
Streets will grind or ramp and notify property owner if necessary GCRUCESLOCITY.ORG.
Streets will grind or ramp and notify property owner if necessary GCRUCESLOCITY.ORG.
Streets will grind or ramp and notify property owner if necessary GCRUCESLOCITY.ORG.
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
Contractor
Assignment
Category_1
Category_1
Category_1
Category_1
Category_2
Category_2
Category_2
Category_3
Category_3
Category_3
New Value
0
0
0
0
0
0
0
0
0
0
Latitude
35.280221949473
35.280235086991
35.280337997474
35.280484699426
35.280175968144
35.280556955514
35.280754017244
35.280175968144
35.280484699426
35.280556955514
Longitude
-120.664740800858
-120.664923191071
-120.665019750595
-120.665137767792
-120.664869546890
-120.665218234062
-120.665389895439
-120.664869546890
-120.665137767792
-120.665218234062
Designated Staff
STREETS
STREETS
STREETS
STREETS
ENG
ENG
ENG
PO
PO
PO
Broad Street - Palm Street to Monterey Street Main Picture