Loading...
HomeMy WebLinkAboutBroad_Street_-_Palm_Street_to_Monterey_Street_4_7_2026_8_32_34_AM_f53cc645-0761-4d1e-a432-393aea909cf2_ExcelName Record Number 518619 518626 518625 518627 518623 518621 518628 518622 518624 518620 Picture 0 0 0 0 0 0 0 0 0 0 Broad Street - Palm Street to Monterey Street - Palm Street to Monterey Street San Luis Obispo, CA 93406 Category Sidewalks Sidewalks Sidewalks Sidewalks Sidewalks Sidewalks Sidewalks Sidewalks Sidewalks Sidewalks Location Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Exterior Sub Location Description East Side West Side West Side West Side West Side West Side West Side West Side West Side West Side Sub Description Change in Level South of Palm Street @ 35.280221949473, -120.664740800858 Change in Level North of Monterey Street @ 35.280235086991, -120.664923191071 Change in Level North of Monterey Street @ 35.280337997474, -120.665019750595 Change in Level North of Monterey Street @ 35.280484699426, -120.665137767792 Sidewalk North of Monterey Street @ 35.280175968144, -120.664869546890 Sidewalk North of Monterey Street @ 35.280556955514, -120.665218234062 Palm Street West Crossing @ 35.280754017244, -120.665389895439 Sidewalk North of Monterey Street @ 35.280175968144, -120.664869546890 Sidewalk North of Monterey Street @ 35.280484699426, -120.665137767792 Sidewalk North of Monterey Street @ 35.280556955514, -120.665218234062 Item Change in Level - Non Beveled Change in Level - Non Beveled Change in Level - Non Beveled Change in Level - Non Beveled Running Slope Running Slope Vehicular Traffic Slope Cross Slope Cross Slope Cross Slope Finding There is a change in elevation greater than recommended value. There is a change in elevation greater than recommended value. There is a change in elevation greater than recommended value. There is a change in elevation greater than recommended value. Sidewalk running slope is not compliant. Sidewalk running slope is not compliant. Slope at vehicular traffic is not compliant. Sidewalk cross slope is not compliant. Sidewalk cross slope is not compliant. Sidewalk cross slope is not compliant. On Site Finding 0.62 inches 0.75 inches 0.62 inches 0.37 inches 6.70 percent for 8.00 feet 6.90 percent for 5.00 feet 10.90 percent 6.70 percent for 119.00 feet 3.10 percent for 8.00 feet 4.20 percent for 61.00 feet Recommendation Ensure that the change in elevation is within the recommended value. Ensure that the change in elevation is within the recommended value. Ensure that the change in elevation is within the recommended value. Ensure that the change in elevation is within the recommended value. Repave the sidewalk surface with the recommended running slope. Repave the sidewalk surface with the recommended running slope. Repave the surface to provide a compliant slope. Repave the sidewalk surface with the recommended cross slope. Repave the sidewalk surface with the recommended cross slope. Repave the sidewalk surface with the recommended cross slope. Recommended Value Up to 0.25 inches Up to 0.25 inches Up to 0.25 inches Up to 0.25 inches Up to 5.00 percent Up to 5.00 percent Up to 5.00 percent Up to 2.08 percent Up to 2.08 percent Up to 2.08 percent Deviation 0.37 0.50 0.37 0.12 1.70 1.90 5.90 4.62 1.02 2.12 Measure Units inches inches inches inches percent percent percent percent percent percent Costing Info Remove hazard Remove hazard Remove hazard Remove hazard Fix Sidewalk Fix Sidewalk Repave surface Fix Sidewalk Fix Sidewalk Fix Sidewalk Blank or Unassigned cost estimate cells indicate further design requirements or modification by original vendor. Estimated Cost 198 198 198 198 288 180 1092 4284 288 2196 9120 Notes Code Reference ADA 206, 302 ADA 206, 302 ADA 206, 302 ADA 206, 302 ADA 206, 302 ADA 206, 302 ADA 206, 302, CA 11B-403.3 ADA 206, 302, CA 11B-403.3 ADA 206, 302, CA 11B-403.3 None Landlord Tenant Both City County District Resident Other Cost Responsibility Tenant Tenant Tenant Tenant Landlord Landlord Landlord Tenant Tenant Tenant 0 0 0 0 0 0 0 0 0 Priority Three Three Three Three Five Five Six Eight Eight Eight Progress Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Resolution Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Not_Set Projected Completion Date 12/31/2037 12/31/2037 12/31/2037 12/31/2037 12/31/2035 12/31/2035 12/31/2035 12/31/2035 12/31/2035 12/31/2035 Actual Completion Date Actual Cost 0 0 0 0 0 0 0 0 0 0 0 Comments Streets will grind or ramp and notify property owner if necessary GCRUCESLOCITY.ORG. Streets will grind or ramp and notify property owner if necessary GCRUCESLOCITY.ORG. Streets will grind or ramp and notify property owner if necessary GCRUCESLOCITY.ORG. Streets will grind or ramp and notify property owner if necessary GCRUCESLOCITY.ORG. No Comments No Comments No Comments No Comments No Comments No Comments Contractor Assignment Category_1 Category_1 Category_1 Category_1 Category_2 Category_2 Category_2 Category_3 Category_3 Category_3 New Value 0 0 0 0 0 0 0 0 0 0 Latitude 35.280221949473 35.280235086991 35.280337997474 35.280484699426 35.280175968144 35.280556955514 35.280754017244 35.280175968144 35.280484699426 35.280556955514 Longitude -120.664740800858 -120.664923191071 -120.665019750595 -120.665137767792 -120.664869546890 -120.665218234062 -120.665389895439 -120.664869546890 -120.665137767792 -120.665218234062 Designated Staff STREETS STREETS STREETS STREETS ENG ENG ENG PO PO PO Broad Street - Palm Street to Monterey Street Main Picture