Loading...
HomeMy WebLinkAboutGeoSolutions - Soils Eng Report Addendum - CSL Channel BridgeGE0_._____ 80L—LJTIONS March 10, 2020 SL08639-14 Client: MI San Luis Ranch LLC PO Box 3460 San Luis Obispo California Project name: Cerro San Luis (CSL) Channel Bridge San Luis Ranch On -Site San Luis Obispo California 220 High Street San Luis Obispo CA 93401 B05.543.8539 1021 Tama Lane, Suite 105 Santa Marla, CA 93455 805.614.6333 PO Box 30159 Santa Barbara, CA 93105 805.965.2200 info@geosoiutions.net SOILS ENGINEERING REPORT ADDENDUM — CERRO SAN LUIS (CSL) CHANNEL BRIDGE Dear MI San Luis Ranch LLC: This letter serves as an addendum to the Soils Engineering Report Update (GeoSolutions, Inc. May 2015) for the proposed Cerro San Luis (CSL) Channel Bridge associated with the San Luis Ranch development located east of Madonna Road, west of the 101 freeway, and south of Dalidio Drive, in the city of San Luis Obispo, California. Geotechnically, the site is suitable for the proposed development provided the recommendations in the above referenced report for site preparation, earthwork, and foundations are incorporated into the design, with the inclusion of the additional information presented below. This addendum summarizes our geotechnical recommendations for the proposed bridge with regards to the following: • Bridge Abutment Foundation Design Criteria • Site Preparation — Bridge Abutments BRIDGE ABUTMENT FOUNDATION DESIGN CRITERIA The proposed bridge is to be constructed with shallow foundations supported by engineered fill material comprised of imported Class II aggregate base and biaxial geotextile reinforcing fabric. Foundation bearing values for the shallow foundation system are presented below: Ultimate bearing - 12,000 psf Bearing at Service Limit State - 4,000 psf Bearing at Strength Limit State - 6,000 psf SITE PREPARATION Soils within the bridge abutment foundation areas should be over -excavated to a depth of 24 inches below bottom of proposed foundation, or to competent (stiff/dense) soil; whichever is deeper. The exposed surfaces should then be scarified; moisture conditioned or allowed to dry back to approximately 3% above optimum value and compacted to a minimum relative density of 95 percent, based on the ASTM D1557 test method. The horizontal limits of the excavation may be limited to the dimensions of the foundation. Following compaction of the bottom of the over -excavation, a layer of Type 2 biaxial geotextile reinforcing grid, such as Tenser BX1200, Syntec SBX12, ADS BX124GG, or equivalent should be installed on the prepared surface, in accordance with manufacturer's specifications. A 12-inch thick layer of Class II aggregate base material should then be placed over the geogrid and compacted to a minimum relative density of 95 percent, followed by another layer of geogrid and a final 12-Inch thick layer of Class II aggregate base, all compacted to a minimum relative density of 95 percent. For additional long-term protection of the foundation supporting soils, we recommend installation of a non -woven geotextile fabric such as Mirafi 180N or equal over the aggregate base fill materials along the creek -facing side of the abutment. The fabric should be installed during the placement of the geotextile grid and aggregate base sbinfo@geosolutlons.net Cerro San Luis (CSL) Channel Bridge March 10. 2020 Proiect SLOB839-14 material. The fabric should be placed beneath the geogrid layers and extend approximately 3 feet into the aggregate base material, so that the interior (creek) side of both 12-inch layers of aggregate base are covered with the fabric, and the fabric is 'wrapped' over the upper layer of compacted aggregate base material. CLOSURE This addendum is issued with the understanding that it is the responsibility of the owner or his/her representative to ensure that the information and recommendations contained herein are brought to the attention of the architect and engineer for the project, and incorporated into the project plans and specifications. The owner or his/her representative is responsible to ensure that the necessary steps are taken to see that the contractor and subcontractors carry out such recommendations in the field. As of the present date, the findings of this letter are valid for the property studied. With the passage of time, changes in the conditions of a property can occur whether they are due to natural processes or to the works of man on this or adjacent properties. Therefore, this letter should not be relied upon after a period of three years without our review nor should it be used or is it applicable for any properties other than those studied. However, many events such as floods, earthquakes, grading of the adjacent properties and building and municipal code changes could render sections of this report invalid in less than three years. Thank you for the opportunity to have been of service in preparing this report. If you have any questions or require additional assistance, please feel free to contact the undersigned at (805) 543-8539. Sincerely, GeoSol oo—*- - Essz tC� el Q-, a No. 61361 Kraig R. r, PE Princip 1 IVt� r OF CAL\F�� References: eering Report, San Luis Ranch — Dalidio, Madonna Road, San Luis Obispo, California, by GeoSolutlons, Inc., project number SL08639-6, dated May 29, 2015. Soils Engineering Report Update Letter — 2016 CBC, Tract 3096, San Luis Ranch, San Luis Obispo, California, by GeoSolutions. Inc., project number SL08639-12, dated June 12, 2018. \\192.168.0.5\s\SLOB500-SL08999\SLOB639-14 - San Luis Ranch On S1te\Eng1neering\SL08639-14 - Cerro San Luis Bridge SER Addendum Letter.doc GEO