HomeMy WebLinkAbout04/05/1994, C-14 - FUNDING FOR JACK HOUSE MAINTENANCE REPAIRS �Illu^ MEETING�IIIIIII�I II�III � P TING DATE:
IIII 1 cIo san Ups osis o -s-Y�
COUNCIL AGENDA REPORT ITEM NUMBER:2/
COUNCIL
Paul LeSage, Parks & Recreation Director
PREPARED BY: Kathy Koop, Principal Recreation Supervisor
SUBJECT: Funding for Jack House Maintenance Repairs
CAO RECOMMENDATION.
By motion approve the use of $13 , 000 in savings from a completed
Capital Project (Recreation Center Rehabilitation) to fund three
maintenance projects at the Jack House : installing sewage lateral
replacement line, repairing plaster and wallpaper damage and
renovating carriage house roof at the Jack House facility.
DISCUSSION
Background
The Jack House and Gardens became a part of the City of San Luis
Obispo City park inventory by grant deed in 1975 . Included in the
original dedication was the house, gardens, carriage house and wood
shed. Addition of the service buildings was completed in 1982 and
interior renovations of the house were completed in 1984 . Since
the renovation completion the house has been operated as a living
Museum providing nearly 200 hours of tours annually and the Gardens
and service buildings are the site of over 55 garden events
annually.
Several maintenance repairs must be accomplished at the facility
which include replacement of the sewage lateral line, plaster
repair in the kitchen and reroofing of the carriage house.
When the service building was constructed in 1982, waste lines were
connected to an undersized backflow check valve which in turn was
connected to the existing clay pipe sewage lateral . During garden
wedding and social events toilets in the service building back up
and overflow. The proposed lateral line replacement will correct
the three existing problems which include an undersized and poorly
located backflow valve, inadequate slope of the existing sewage
lateral and intrusion of tree roots through the joints in the clay
pipe lateral . Correcting these problems will involve replacing the
old lateral, rerouting the new lateral away from planted areas and
installing a larger backflow check valve near the property line
away from the service building. This must be accomplished prior to
the beginning of reservation season in late April or existing paid
reservation dates must be cancelled.
Being an old house constructed on a wood foundation the house is
prone to continued settling. The continuance of this natural
process has caused plaster in the kitchen to crack, buckle and
separate from its lath. Repair would entail plastering damaged
areas.
111111VI1110111Jcity O� SM LUSS OBISPO
Nii% COUNCIL AGENDA REPORT
COUNCIL AGENDA (cont'd) Page Two
The roofing and sheathing on the carriage house is badly
deteriorated. Items stored in the carriage house, including the
vintage carriage, are not protected form .the weather elements.
Repairs would include removing the old roofing materials, repairing
termite damage, replacing damaged sheathing and installing new roll
roofing.
This item did not come forward during mid-year budget adjustments
due to current negotiations between members of the Jack House
Committee and Parks and Recreation Department staff, which have
focused on transferring the Garden Rental fee revenue deposits from
the Jack House Trust Account to the General Fund. • It is
anticipated that this will occur by the beginning of the 1994-95
fiscal year.
FISCAL IMPACT
Staff recommends that the minor building renovations be funded from
the Parkland Development Fund which is financed through park-in-
lieu fees . An additional appropriation is not required as savings
remain in the Recreation Center Rehabilitation Project, which is
now complete.
Cost Summary
Sewage Lateral Replacement $ 51000
Plaster and Wallpaper $ 3 , 000
Carriage House Roof Repair $ 5, 000
Total $13 , 000
CONCURRENCES
Jack House Committee and the Public Works Department concur with
this recommendation.
ALTERNATIVES
Defer the renovations . Deferring the renovations would allow
deteriorating conditions to persist . Future repairs would be more
expensive and affected areas would remain non-functional . Failure
to repair the sewage lateral could result in a revenue loss
exceeding $15, 000 .
e_141 Iz