Whale Rock Commission Report
Whale Rock Commission Meeting – May 28, 2026
Agenda Item 6d – Authorize On-call Engineering Professional Services for the Design of Stilling Basin Improvements
FROM: Shawna Scott, Assistant Director of Utilities
PREPARED BY: Noah Evans, Whale Rock Reservoir Supervisor
SUBJECT: AUTHORIZE ON-CALL ENGINEERING PROFESSIONAL
SERVICES FOR THE DESIGN OF STILLING BASIN
IMPROVEMENTS
RECOMMENDATION
Authorize selection of a consultant from the City of San Luis Obispo’s Qualified Civil
Engineering On-Call Consultant List to provide engineering professional services
consisting of the design of stilling basin improvements, and issuance of a purchase
order, and any subsequent change orders, in an amount not to exceed the total
authorized budget of $120,000.
DISCUSSION
Background
Whale Rock Dam’s stilling basin is located
at the base of the concrete spillways and
is designed to dissipate the energy of high-
velocity water and prevent scouring and
structural erosion that could damage the
spillway or the dam. In recent years, the
Reservoir has spilled twice, releasing
water through the stilling basin. When the
Reservoir was spilling, staff observed
water backing up in the stilling basin before
flowing downstream. During the 2025
Stilling Basin Drain, Clean, and Inspect
project, the basin was drained, exposing
significant sediment and vegetation just
downstream of the structure's end. When
Whale Rock Reservoir releases water,
flows are slowed by vegetation and
sediment, leading to high water levels and
erosion below the stilling basin.
To restore downstream water flows,
sediment and vegetation need to be removed downstream of the stilling basin,
restoring the stilling basin to its designed discharge capacity.
SPILLWAY AND STILLING BASIN DURING HIGH FLOWS
Page 25 of 103
City of San Luis Obispo, Title, Subtitle
Whale Rock Commission Report
Whale Rock Commission Meeting – May 28, 2026
Agenda Item 6d – Authorize On-call Engineering Professional Services for the Design of Stilling Basin Improvements
Based on review by the Utilities
Branch’s Engineering and
Planning team, staff
recommend retaining an
engineering consultant to
design a project to restore the
stream bed's original condition
and topography below the
stilling basin. The effort will
remove obstructions in the
stream bed to improve water
flow and add riprap or boulders
to prevent future erosion of the
structure.
ENVIRONMENTAL REVIEW
The proposed action is limited to
design only at this phase. Once
designed, the City will retain an environmental consultant to prepare the California
Environmental Quality Act (CEQA) analysis and determination for the Project. The
previously mentioned Stilling Basin Drain, Clean, and Inspect project included
adoption of an Initial Study Mitigated Negative Declaration, and permits and
authorizations from regulatory agencies. While no special-status species were
observed during implementation of the Project, it is anticipated that implementation
of the restoration project may result in impacts to wetland and riparian habitat, and
may potentially impact special-status species, cultural and tribal cultural resources,
and water quality. Prior to implementation of the project, staff will prepare analysis
and documentation in compliance with CEQA, and obtain all required regulatory
permits and authorizations.
The Whale Rock Commission’s approval to move forward with the project design
does not commit the Commission to implementation of the Project, and the Whale
Rock Commission will be required to consider the pending CEQA determination prior
to approving and authorizing implementation of the Project.
SEDIMENT AND VEGETATION BELOW THE STILLING BASIN
Page 26 of 103
City of San Luis Obispo, Title, Subtitle
Whale Rock Commission Report
Whale Rock Commission Meeting – May 28, 2026
Agenda Item 6d – Authorize On-call Engineering Professional Services for the Design of Stilling Basin Improvements
FISCAL IMPACT
Design of Stilling Basin Maintenance
Funding
Category
Contribution
Source
Amount
Budgeted
Amount Spent
Capital Asset
Expense
2026-27 CIP
Contributions
$120,000 $0
ALTERNATIVES
The Commission may direct staff not to use the City of San Luis Obispo’s Qualified
Civil Engineering On-Call Consultant List and to release an RFP. Firms on the
Qualified Civil Engineering on-Call Consultant List have been selected through a
competitive qualifications-based bidding process. Staff would determine the
appropriate consultant from the On-Call list based on their specific experience
successfully performing studies and designing projects for dam spillway and stilling
basins, and demonstration of their expertise and knowledge of the Whale Rock
Reservoir facility.