Loading...
HomeMy WebLinkAboutItem 5g. Authorization to award Islay Street Sewer Replacement, Specification No. 2000170 Item 5g Department: Public Works Cost Center: 6102 For Agenda of: 6/2/2026 Placement: Consent Estimated Time: N/A FROM: Aaron Floyd, Public Works & Utilities Director Prepared By: Hai Nguyen, Senior Civil Engineer Miguel Barcenas, Utilities Deputy Director / Engineering and Planning SUBJECT: AUTHORIZATION TO AWARD ISLAY STREET SEWER REPLACEMENT, SPECIFICATION NO. 2000170 RECOMMENDATION 1. Approve the project plans and special provisions for the Islay Street Sewer Replacement, Specification No. 2000170; and, 2. Award a construction contract (Attachment A) to Souza Construction in the amount of $1,512,539 for the Islay Street Sewer Replacement, Specification No. 2000170; and , 3. Authorize the Finance Director to transfer $250,000 from the Storm Drains Annual Asset Maintenance Account (2090742) to the Islay Street Sewer Replacement Account (2000170); and, 4. Authorize the City Engineer to issue Contract Change Orders up to the available project budget, and up to any amended budget subsequently approved by the City Manager per City Purchasing Policy approval thresholds. 5. Find the action exempt from the California Environmental Quality Act. POLICY CONTEXT The City Council initially approved the Wastewater Collection System Infrastructure Renewal Strategy in January 2016 and approved the updated Renewal Strategy in August 2025. These plans identify a strategy for prioritizing pipeline replacement in the wastewater collection system to serve existing customers an d future development in the City. The 2025 Renewal Strategy took into consideration previously planned capital projects, including the Islay Street Sewer Replacement project. On May 17, 2022, Council approved a Purchasing Policy Update to the Financial Management Manual (Resolution No. 11328), requiring Council authorization to award Public Works contracts exceeding $200,000. Page 49 of 454 Item 5g DISCUSSION Background Replacement and rehabilitation of wastewater collection (sewer) pipes is part of an ongoing program to maintain aging and deteriorating infrastructure. This program has several objectives: 1) ensure reliable removal of wastewater, 2) reduce the need for emergency repairs, 3) reduce the need for preventative maintenance , and 4) ensure uninterrupted wastewater flow without health or environmental hazards from wastewater leakage. This project will accomplish these objectives for a por tion of the City’s wastewater collection system. Project The project plans and specifications include the replacement of 2,741 linear feet of sewer mains on Chorro Street, Islay Street, Santa Rosa Street, and Leff Street. As part of this work, the sewer mains on Islay Street and Santa Rosa Street will be upsized from 8 inch to 12 inch diameter to reduce the risk of sewer backups and localized overflows and improve overall system reliability and hydraulic capacity. The project also includes 363 linear feet of storm drain replacement, consisting of failing corrugated metal pipe (CMP) on Morro Street and deteriorated concrete storm drain pipe on Santa Rosa Street. The failing 8-inch concrete storm drain pipe on Santa Rosa Street will also be upsized to 12-inch diameter to improve hydraulic capacity and reduce the potential for capacity related failures during storm events. The pipelines identified for replacement have been video inspected and confirmed to be at the end of their service life. The Islay Street Sewer Replacement (Project), Specification No. 2000170, was advertised on March 26, 2026, with bids opened on April 23, 2026. Two bids were received and opened. Souza Engineering Contracting, Inc. (Souza) was the apparent low bidder with a bid of $1,512,539 which is $719,461 below the Engineer’s Estimate of $2,232,000. The Contractor’s references, license, and registration with the Department of Industrial Relations have been verified. Staff recommends that the project be awarded to Souza as the lowest responsive and responsible bidder (Attachment A). Bid Summary Bid Total 1 Engineer’s Estimate $2,232,000 2 Souza Engineering Contracting, Inc. $1,512,539 3 Specialty Construction, Inc. $1,909,475 Previous Council or Advisory Body Action This Project was identified in the 2025-27 Financial Plan that was approved by Council with a budget of $2,100,000. Page 50 of 454 Item 5g Public Engagement Public engagement was conducted during the initial identification of this project to be included in the 2025-27 Financial Plan. During construction, staff will proactively coordinate with and inform the public about traffic control changes, access considerations, and other temporary impacts to help minimize disruptions. The project will also be featured on the SLO in Motion Website to keep the community informed about the project, including construction updates, anticipated impacts, and responses to frequently asked questions. To ensure direct communication, affected residents within the limits of work will be notified of upcoming construction via door hangers. These notices, designed in accordance with City standards, will be distributed to all properties adjacent to the work area and will clearly outline the project's start and end dates. Additionally, in areas where parking must be restricted, "No Parking" signs will be clearly posted at least 24 hours in advance of the work. CONCURRENCE The Public Works Branch coordinated with the Utilities Branch to develop the project plans and specifications, and the Utilities Branch concurs with the recommended action. ENVIRONMENTAL REVIEW The project is categorically exempt from environmental review under Section 15303 (New Construction or Conversion of Small Structures) and 15304 (Minor Alterations to Land) of the California Environmental Quality Act (CEQA) Guidelines. The proposed project consists of the replacement and upsizing of existing sewer mains and storm drains within existing roadways, including trenching, backfilling, and road repair, and would not result in any significant impacts to the environment. FISCAL IMPACT Budgeted: Yes Budget Year: 2025-26 Funding Identified: Yes Fiscal Analysis: Funding Sources Total Budget Available Current Funding Request Remaining Balance Annual Ongoing Cost LRM (2090742 - Storm Drains) $530,819 $250,000 $280,819 State Federal Sewer Fund $2,080,197 $1,723,039 $357,158 N/A Total $2,611,016 $1,973,039 $637,977 N/A Page 51 of 454 Item 5g Islay Street Sewer Replacement (2000170) Project Account (2000170) Storm Account (2090742) Project Total Costs 602 Sewer Fund General Fund Construction Bid Total $1,312,539 $200,000 $1,512,539 Contingencies $400,000 $50,000 $450,000 Material Testing $10,000 $0 $10,000 Printing $500 $0 $500 Total Cost of Project $1,723,039 $250,000 $1,973,039 Current Project Balance $2,080,197 $530,819 Remaining Balance $357,158 $280,819 Sewer line improvements contained within this project are included in the 2025–27 Financial Plan. Funding is available in Project Account (2000170), which currently has a balance of $2,080,197 which is sufficient to cover the sewer replacement costs. The project also includes storm drain replacement work on Morro Street and Santa Rosa Street. This portion of the work will require a budget transfer of $250,000 from the Storm Drains Annual Asset Maintenance Account (2090742). Utility improvement projects are generally associated with a higher level of construction cost uncertainty due to unknown subsurface conditions. Past sewer line replacement projects have shown that unforeseen utility conflicts and unexpected soil or groundwater conditions are commonly encountered during excavation, which can increase construction costs. These conditions can require additional excavation, trench stabilization or shoring, dewatering, potholing and hand excavation around existing utilities, and other field adjustments that are difficult to fully quantify during design. Based on past experience and typical change orders encountered during similar utility projects, an additional $450,000 contingency has been included in the project budget. This amount represents roughly 30% of the estimated construction cost, within the 20 – 30% range typically applied to utility projects of this nature, which has historically been sufficient. Following project completion, any remaining sewer funds will be transferred to the Sewer Fund’s Undesignated Capital Account and remaining LRM funds returned to Account 2090742 for future infrastructure improvements and maintenance work. ALTERNATIVES Reject all bids and readvertise the project. The City Council may choose to reject all bids and readvertise this project. This option would increase the potential for unplanned costs, as the sewer mains are at the end of their useful life and more susceptible to failure. ATTACHMENTS A – Draft Agreement, Specification No. 2000170 Page 52 of 454 AGREEMENT THIS AGREEMENT, made on _____________, by and between the City of San Luis Obispo, a municipal corporation and charter city, San Luis Obispo County, California (hereinafter called the City) and SOUZA ENGINEERING CONTRACTING, INC. (hereinafter called the Contractor). WITNESSETH: That the City and the Contractor for the consideration stated herein agree as follows: ARTICLE 1, SCOPE OF WORK: The Contractor shall perform everything required to be performed, shall provide and furnish all of the labor, materials, necessary tools, expendable equipment, and all utility and transportation services required to complete all the work of construction of ISLAY STREET SEWER REPLACEMENT, SPECIFICATION NO. 2000170 in strict compliance with the plans and specifications therefor, including any and all Addenda, adopted by the City, in strict compliance with the Contract Documents hereinafter enumerated. It is agreed that said labor, materials, tools, equipment, and services shall be furnished and said work performed and completed under the direction and supervision and subject to the approval of the City or its authorized representatives. ARTICLE II, CONTRACT PRICE: The City shall pay the Contractor as full consideration for the faithful performance of this Contract, subject to any additions or deductions as provided in the Contract Documents, the contract prices as follows: Item Item Unit of Estimated Item Price Total No. SS(1) Description Measure Quantity (in figures) (in figures) 1 7 TRAFFIC CONTROL PLAN AND  IMPLEMENTATION LS 1 $50,740.00  $50,740.00  2 77 POTHOLING LS 1 $35,060.00  $35,060.00  3 84 REPLACE TRAFFIC STRIPING &  MARKERS LS 1 $19,450.00  $19,450.00  4 7 COMPLY WITH OSHA LS 1 $7,503.00  $7,503.00  5 77 ABANDON SEWERLINE,  MANHOLES AND FACILITIES LS 1 $7,320.00  $7,320.00  6 77 SEWER BYPASS PUMPING LS 1 $23,810.00  $23,810.00  7 77 TREE PROTECTION LS 1 $760.00  $760.00  8* 19 ROCK EXCAVATION CY 100 $99.00  $9,900.00  9 5,15 REPLACE MONUMENT AND  WELL EA 2 $2,388.00  $4,776.00  Docusign Envelope ID: 09A05CD6-2BD6-8E10-81D6-2682B7137DEA Page 53 of 454 Item Item Unit of Estimated Item Price Total No. SS(1) Description Measure Quantity (in figures) (in figures) 10 77 REMOVE EXISTING SEWERLINE  AND INSTALL NEW 8" HDPE  SEWERLINE BY OPEN  TRENCHING LF 888 $229.00  $203,352.00  11  77  REMOVE EXISTING SEWERLINE  AND INSTALL NEW 12" HDPE  SEWERLINE BY OPEN  TRENCHING  LF  1853  $314.00  $581,842.00  12  77  INSTALL NEW SEWER MANHOLE  EA  7  $16,894.00  $118,258.00  13  77  INSTALL NEW STORMDRAIN  MANHOLE EA  1  $13,367.00  $13,367.00  14  77  INSTALL COATING ON NEW  SSMH MANHOLE EA  7  $5,320.00  $37,240.00  15  77  REMOVE EXISTING MANHOLE  EA  10  $1,308.00  $13,080.00  16  77  INSTALL NEW CLEANOUT  EA  3  $4,765.00  $14,295.00  17  77  CONNECT EXISTING SEWER  LATERAL TO SEWER MAIN EA  71  $2,418.00  $171,678.00  18  77  CONNECT TO (E) SEWER  MANHOLE PER ENG. STD. 6610 EA  1  $1,308.00  $1,308.00  19*  73  REPLACE CURB AND GUTTER  PER ENG. STD. 4030 LF  75  $190.00  $14,250.00  20*  73  REPLACE SIDEWALK PER ENG.  STD. 4110 SQFT  325  $36.00  $11,700.00  21  73  REPLACE SPEED HUMP PER  ENG. STD. 7321 SQFT  250  $25.00  $6,250.00  22  73  REPLACE CROSS GUTTER PER  ENG. STD. 4310 SQFT  30  $202.00  $6,060.00  23  77  REPLACE WATER WELL AND  COVER PER ENG. STD. 6340 EA  1  $1,600.00  $1,600.00  24  77  REMOVE EXISTING AND INSTALL  NEW 12" DIP STORMDRAIN LF  112  $357.00  $39,984.00  25  77  REMOVE EXISTING AND INSTALL  NEW 12" PVC STORMDRAIN LF  251  $330.00  $82,830.00  26*  77  CULVERT LID REPAIR PER  DETAIL B, SHEET 6 SQFT  30  $679.00  $20,370.00  27 77 CONNECT TO (E) SD CULVERT  PER DETAIL A, SHEET 6 EA  2  $1,992.00  $3,984.00  28 77  CONNECT TO (E) STORMDRAIN  STRUCTURE PER ENG. STD.  3540  EA  1  $944.00  $944.00  29 77 PIPE PENETRATION REPAIR PER  DETAIL C, SHEET 6 EA  1  $2,173.00  $2,173.00  30 15 RE‐SET (E) PAVERS (ISLAY AND  CHORRO) SQFT  75  $41.00  $3,075.00  Docusign Envelope ID: 09A05CD6-2BD6-8E10-81D6-2682B7137DEA Page 54 of 454 Item Item Unit of Estimated Item Price Total No. SS(1) Description Measure Quantity (in figures) (in figures) 31 82 REPLACE SIGN POST PER ENG.  STD. 7210 EA  1  $580.00  $580.00  32* 77 RE‐GRADE SEWER LATERAL  BEYOND 5 FEET LF  100  $50.00  $5,000.00  (1) refers to section in the Standard Specifications, with modifications in the Special Provisions, that describe required work. * Bid item exempt from Section 9-1.06B and 9-1.06C of the Standard Specifications. The unit price will not be adjusted regardless of the final bid item quantity. BID TOTAL: $1,512,539.00 Payments are to be made to the Contractor in compliance with and subject to the provisions embodied in the documents made a part of this Contract. If any dispute arises regarding the work or contract price, Contractor must follow the procedures in the contract documents, including the requirements on change order requests and dispute resolution. ARTICLE III, COMPONENT PARTS OF THIS CONTRACT: The Contract consists of the following documents, all of which are as fully a part thereof as if herein set out in full, and if not attached, as if hereto attached: 1. Notice to Bidders and Information for Bidders 2. Standard Specifications and Engineering Standards 3. Special Provisions, any Addenda, Plans and Contract Change Orders 4. Caltrans Standard Specifications and Standard Plans 2024 5. Accepted Bid and Bid Bond 6. List of Subcontractors 7. Labor Code Section 1725.5 Statements 8. Bidder Acknowledgements 9. Qualifications 10. Noncollusion Declaration 11. Agreement and Bonds 12. Insurance Requirements and Forms ARTICLE IV INDEMNIFICATION: The Contractor shall indemnify, defend with legal counsel approved by City, and hold harmless City, its officers, officials, employees and volunteers from and against all liability, loss, damage, expense, cost (including without limitation reasonable legal counsel fees, expert fees and all other costs and fees of litigation) of every nature arising out of or in connection with the acts or omissions of Contractor, its employees, subcontractors, representatives, or agents, in bidding or performing the work or in failing to comply with any obligation of Contractor under this Agreement, except such loss or damage which is caused by the sole or active negligence or willful misconduct of the City. Should conflict of interest principles preclude a single legal counsel from representing both the City and the Contractor, or should the City otherwise find the Contractor’s legal counsel unacceptable, then the Contractor shall reimburse the City its costs of defense, including without limitation reasonable legal counsel fees, expert Docusign Envelope ID: 09A05CD6-2BD6-8E10-81D6-2682B7137DEA Page 55 of 454 fees and all other costs and fees of litigation. The Contractor shall promptly pay any final judgment rendered against the City (and its officers, officials, employees and volunteers) with respect to claims determined by a trier of fact to have been the result of the Contractor’s acts or omissions in bidding or performing the work or in failing to comply with any obligation of Contractor under this Agreement. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement. The Contractor obligations under this section apply regardless of whether such claim, charge, damage, demand, action, proceeding, loss, stop notice, cost, expense, judgment, civil fine or penalty, or liability was caused in part or contributed to by an Indemnitee. However, without affecting the rights of the City under any provision of this agreement, the Contractor shall not be required to indemnify and hold harmless the City for liability attributable to the active negligence of City, provided such active negligence is determined by agreement between the parties or by the findings of a court of competent jurisdiction. In instances where the City is shown to have been actively negligent and where the City’s active negligence accounts for only a percentage of the liability involved, the obligation of the Contractor will be for that entire portion or percentage of liability not attributable to the active negligence of the City. ARTICLE V: It is further expressly agreed by and between the parties hereto that should there be any conflict between the terms of this instrument and the bid of said Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said bid conflicting herewith. ARTICLE VI LABOR CODE COMPLIANCE: This Agreement is subject to all applicable requirements of Chapter 1 of Part 7 of Division 2 of the Labor Code, including requirements pertaining to wages, working hours and workers’ compensation insurance, as further specified in the contract documents. The project is subject to the prevailing wage requirements applicable to the locality in which the work is to be performed for each craft, classification or type of worker needed to perform the work, including employer payments for health and welfare, pension, vacation, apprenticeship and similar purposes. Copies of these prevailing rates are on file with the City and are available online at http://www.dir.ca.gov/DLSR. City may not enter into the Agreement with a bidder without proof that the bidder and its subcontractors are registered with the DIR to perform public work pursuant to Labor Code section 1725.5, subject to limited legal exceptions. Pursuant to Labor Code § 1861, by signing this Agreement, Contractor certifies as follows: “I am aware of the provisions of Labor Code § 3700 which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work on this contract.” Docusign Envelope ID: 09A05CD6-2BD6-8E10-81D6-2682B7137DEA Page 56 of 454 IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands this year and date first above written. APPROVED AS TO FORM CONTRACTOR: Souza Engineering Contracting, Inc dba Souza Construction ______________________________ J. Christine Dietrick City Attorney _______________________________ Steve A. Souza President CITY OF SAN LUIS OBISPO A Municipal Corporation ______________________________ Whitney McDonald, City Manager ________________________________ Nickie Zepeda Secretary Docusign Envelope ID: 09A05CD6-2BD6-8E10-81D6-2682B7137DEA Page 57 of 454