Loading...
HomeMy WebLinkAbout06-08-2026 Agreement with Souza Engineering Contracting for Islay Street Sewer Replacement, Specification No. 20000170AGREEMENT THIS AGREEMENT, made on _____________, by and between the City of San Luis Obispo, a municipal corporation and charter city, San Luis Obispo County, California (hereinafter called the City) and SOUZA ENGINEERING CONTRACTING, INC. (hereinafter called the Contractor). WITNESSETH: That the City and the Contractor for the consideration stated herein agree as follows: ARTICLE 1, SCOPE OF WORK: The Contractor shall perform everything required to be performed, shall provide and furnish all of the labor, materials, necessary tools, expendable equipment, and all utility and transportation services required to complete all the work of construction of ISLAY STREET SEWER REPLACEMENT, SPECIFICATION NO. 2000170 in strict compliance with the plans and specifications therefor, including any and all Addenda, adopted by the City, in strict compliance with the Contract Documents hereinafter enumerated. It is agreed that said labor, materials, tools, equipment, and services shall be furnished and said work performed and completed under the direction and supervision and subject to the approval of the City or its authorized representatives. ARTICLE II, CONTRACT PRICE: The City shall pay the Contractor as full consideration for the faithful performance of this Contract, subject to any additions or deductions as provided in the Contract Documents, the contract prices as follows: Item Item Unit of Estimated Item Price Total No. SS(1) Description Measure Quantity (in figures) (in figures) 1 7 TRAFFIC CONTROL PLAN AND  IMPLEMENTATION LS 1 $50,740.00  $50,740.00  2 77 POTHOLING LS 1 $35,060.00  $35,060.00  3 84 REPLACE TRAFFIC STRIPING &  MARKERS LS 1 $19,450.00  $19,450.00  4 7 COMPLY WITH OSHA LS 1 $7,503.00  $7,503.00  5 77 ABANDON SEWERLINE,  MANHOLES AND FACILITIES LS 1 $7,320.00  $7,320.00  6 77 SEWER BYPASS PUMPING LS 1 $23,810.00  $23,810.00  7 77 TREE PROTECTION LS 1 $760.00  $760.00  8* 19 ROCK EXCAVATION CY 100 $99.00  $9,900.00  9 5,15 REPLACE MONUMENT AND  WELL EA 2 $2,388.00  $4,776.00  Docusign Envelope ID: 09A05CD6-2BD6-8E10-81D6-2682B7137DEADocusign Envelope ID: 56B34C2B-B65D-8438-8090-A38C01782A47 6/8/2026 | 2:32 PM PDT Item Item Unit of Estimated Item Price Total No. SS(1) Description Measure Quantity (in figures) (in figures) 10 77 REMOVE EXISTING SEWERLINE  AND INSTALL NEW 8" HDPE  SEWERLINE BY OPEN  TRENCHING LF 888 $229.00  $203,352.00  11  77  REMOVE EXISTING SEWERLINE  AND INSTALL NEW 12" HDPE  SEWERLINE BY OPEN  TRENCHING  LF  1853  $314.00  $581,842.00  12  77  INSTALL NEW SEWER MANHOLE  EA  7  $16,894.00  $118,258.00  13  77  INSTALL NEW STORMDRAIN  MANHOLE EA  1  $13,367.00  $13,367.00  14  77  INSTALL COATING ON NEW  SSMH MANHOLE EA  7  $5,320.00  $37,240.00  15  77  REMOVE EXISTING MANHOLE  EA  10  $1,308.00  $13,080.00  16  77  INSTALL NEW CLEANOUT  EA  3  $4,765.00  $14,295.00  17  77  CONNECT EXISTING SEWER  LATERAL TO SEWER MAIN EA  71  $2,418.00  $171,678.00  18  77  CONNECT TO (E) SEWER  MANHOLE PER ENG. STD. 6610 EA  1  $1,308.00  $1,308.00  19*  73  REPLACE CURB AND GUTTER  PER ENG. STD. 4030 LF  75  $190.00  $14,250.00  20*  73  REPLACE SIDEWALK PER ENG.  STD. 4110 SQFT  325  $36.00  $11,700.00  21  73  REPLACE SPEED HUMP PER  ENG. STD. 7321 SQFT  250  $25.00  $6,250.00  22  73  REPLACE CROSS GUTTER PER  ENG. STD. 4310 SQFT  30  $202.00  $6,060.00  23  77  REPLACE WATER WELL AND  COVER PER ENG. STD. 6340 EA  1  $1,600.00  $1,600.00  24  77  REMOVE EXISTING AND INSTALL  NEW 12" DIP STORMDRAIN LF  112  $357.00  $39,984.00  25  77  REMOVE EXISTING AND INSTALL  NEW 12" PVC STORMDRAIN LF  251  $330.00  $82,830.00  26*  77  CULVERT LID REPAIR PER  DETAIL B, SHEET 6 SQFT  30  $679.00  $20,370.00  27 77 CONNECT TO (E) SD CULVERT  PER DETAIL A, SHEET 6 EA  2  $1,992.00  $3,984.00  28 77  CONNECT TO (E) STORMDRAIN  STRUCTURE PER ENG. STD.  3540  EA  1  $944.00  $944.00  29 77 PIPE PENETRATION REPAIR PER  DETAIL C, SHEET 6 EA  1  $2,173.00  $2,173.00  30 15 RE‐SET (E) PAVERS (ISLAY AND  CHORRO) SQFT  75  $41.00  $3,075.00  Docusign Envelope ID: 09A05CD6-2BD6-8E10-81D6-2682B7137DEADocusign Envelope ID: 56B34C2B-B65D-8438-8090-A38C01782A47 Item Item Unit of Estimated Item Price Total No. SS(1) Description Measure Quantity (in figures) (in figures) 31 82 REPLACE SIGN POST PER ENG.  STD. 7210 EA  1  $580.00  $580.00  32* 77 RE‐GRADE SEWER LATERAL  BEYOND 5 FEET LF  100  $50.00  $5,000.00  (1) refers to section in the Standard Specifications, with modifications in the Special Provisions, that describe required work. * Bid item exempt from Section 9-1.06B and 9-1.06C of the Standard Specifications. The unit price will not be adjusted regardless of the final bid item quantity. BID TOTAL: $1,512,539.00 Payments are to be made to the Contractor in compliance with and subject to the provisions embodied in the documents made a part of this Contract. If any dispute arises regarding the work or contract price, Contractor must follow the procedures in the contract documents, including the requirements on change order requests and dispute resolution. ARTICLE III, COMPONENT PARTS OF THIS CONTRACT: The Contract consists of the following documents, all of which are as fully a part thereof as if herein set out in full, and if not attached, as if hereto attached: 1. Notice to Bidders and Information for Bidders 2. Standard Specifications and Engineering Standards 3. Special Provisions, any Addenda, Plans and Contract Change Orders 4. Caltrans Standard Specifications and Standard Plans 2024 5. Accepted Bid and Bid Bond 6. List of Subcontractors 7. Labor Code Section 1725.5 Statements 8. Bidder Acknowledgements 9. Qualifications 10. Noncollusion Declaration 11. Agreement and Bonds 12. Insurance Requirements and Forms ARTICLE IV INDEMNIFICATION: The Contractor shall indemnify, defend with legal counsel approved by City, and hold harmless City, its officers, officials, employees and volunteers from and against all liability, loss, damage, expense, cost (including without limitation reasonable legal counsel fees, expert fees and all other costs and fees of litigation) of every nature arising out of or in connection with the acts or omissions of Contractor, its employees, subcontractors, representatives, or agents, in bidding or performing the work or in failing to comply with any obligation of Contractor under this Agreement, except such loss or damage which is caused by the sole or active negligence or willful misconduct of the City. Should conflict of interest principles preclude a single legal counsel from representing both the City and the Contractor, or should the City otherwise find the Contractor’s legal counsel unacceptable, then the Contractor shall reimburse the City its costs of defense, including without limitation reasonable legal counsel fees, expert Docusign Envelope ID: 09A05CD6-2BD6-8E10-81D6-2682B7137DEADocusign Envelope ID: 56B34C2B-B65D-8438-8090-A38C01782A47 fees and all other costs and fees of litigation. The Contractor shall promptly pay any final judgment rendered against the City (and its officers, officials, employees and volunteers) with respect to claims determined by a trier of fact to have been the result of the Contractor’s acts or omissions in bidding or performing the work or in failing to comply with any obligation of Contractor under this Agreement. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement. The Contractor obligations under this section apply regardless of whether such claim, charge, damage, demand, action, proceeding, loss, stop notice, cost, expense, judgment, civil fine or penalty, or liability was caused in part or contributed to by an Indemnitee. However, without affecting the rights of the City under any provision of this agreement, the Contractor shall not be required to indemnify and hold harmless the City for liability attributable to the active negligence of City, provided such active negligence is determined by agreement between the parties or by the findings of a court of competent jurisdiction. In instances where the City is shown to have been actively negligent and where the City’s active negligence accounts for only a percentage of the liability involved, the obligation of the Contractor will be for that entire portion or percentage of liability not attributable to the active negligence of the City. ARTICLE V: It is further expressly agreed by and between the parties hereto that should there be any conflict between the terms of this instrument and the bid of said Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said bid conflicting herewith. ARTICLE VI LABOR CODE COMPLIANCE: This Agreement is subject to all applicable requirements of Chapter 1 of Part 7 of Division 2 of the Labor Code, including requirements pertaining to wages, working hours and workers’ compensation insurance, as further specified in the contract documents. The project is subject to the prevailing wage requirements applicable to the locality in which the work is to be performed for each craft, classification or type of worker needed to perform the work, including employer payments for health and welfare, pension, vacation, apprenticeship and similar purposes. Copies of these prevailing rates are on file with the City and are available online at http://www.dir.ca.gov/DLSR. City may not enter into the Agreement with a bidder without proof that the bidder and its subcontractors are registered with the DIR to perform public work pursuant to Labor Code section 1725.5, subject to limited legal exceptions. Pursuant to Labor Code § 1861, by signing this Agreement, Contractor certifies as follows: “I am aware of the provisions of Labor Code § 3700 which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work on this contract.” Docusign Envelope ID: 09A05CD6-2BD6-8E10-81D6-2682B7137DEADocusign Envelope ID: 56B34C2B-B65D-8438-8090-A38C01782A47 IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands this year and date first above written. APPROVED AS TO FORM CONTRACTOR: Souza Engineering Contracting, Inc dba Souza Construction ______________________________ J. Christine Dietrick City Attorney _______________________________ Steve A. Souza President CITY OF SAN LUIS OBISPO A Municipal Corporation ______________________________ Whitney McDonald, City Manager ________________________________ Nickie Zepeda Secretary Docusign Envelope ID: 09A05CD6-2BD6-8E10-81D6-2682B7137DEADocusign Envelope ID: 56B34C2B-B65D-8438-8090-A38C01782A47