Loading...
HomeMy WebLinkAbout3001-5000 Second Half226 From:Marquart, Ben Sent:Tuesday, April 1, 2025 2:22 PM To:Edmunson, Morgan; Kacsinta, Madeline Subject:Tree Removal Attachments - Compiled Attachments:CADPS Tree removal app 23.4.14.pdf; SLO Rep Landscape and Tree Removal Plans.pdf; Tree removal app - Needs Kevin Signature.pdf; Tree #029 Back Story; CADPS Tree removal app 23.6.20 - Pheonix Palm .pdf; FINAL PCO #005 Demo Phoenix Palm 23.06.13 .pdf; FINAL - PCO _ 002 Tree Removal REV 1 _ECG Signed.pdf Madeline / Morgan- Here are the attachments in one place. I will also forward the emailed documentation if you need to refer to for backstory. Thanks, Ben Palm Tree- Arborist field decision to remove after seeing conditions and contaminated soil. Tree #2- we put in a tree removal app, Arborist reviewed, and approved removal as it was to be removed with theater project. (Attachment SLO Rep Landscape and Tree removal Plans) Slo Rep is conditioned to replant at a 2 to one ratio TREE REMOVAL APPLICATION RESIDENTIAL, COMMERCIAL, DEVELOPMENT Follow Non-Construction Tree Removal Criteria and Process here (SLOMC 12.24.090.E) Follow Construction Tree Removal Criteria and Process here (SLOMC 12.24.090.F) Owner: Applicant: Address: Address: City: Zip: City: Zip: Phone: Phone: Email: Email: Address of Tree(s): Number of trees applying to remove? ____ Tree Species: Reason: Is this removal a City Tree?____ YES_____ NO_____ UNKNOWN Dog in yard?___ YES____ NO Is this property governed by a Homeowners Association (HOA)?___ YES____ NO If YES, please provide HOA Board Approved Meeting minutes authorizing tree removal(s) with your tree removal application. 1 Please include a photo log that clearly shows the trees requested for removal. All Tree(s) must be uniquely identified by a number and a ribbon or an identifier wrapped around the truck in the photo and prior to inspection 2 Please include a replanting plan in accordance with Section 12.24.090(J) of the City’s Municipal Code. A minimum of one new tree shall be planted for each tree authorized to be removed on the same property (on site) or two new trees shall be planted for each tree authorized to be removed when planted on a different property or within the public right-of- way (off site). Page 2 Tree Removal Decisions as outlined in Section 12.24.090 of the City’s Municipal Code  SELECT ONE CRITERIA FROM BELOW SUPPORTING TREE REMOVAL APPLICATION DECISION MAKER APPEAL BODY Imminent Hazard to Life or Property Section 12.24.090(E)(1)(a) City Arborist No Appeal Tree Health and Hazard Mitigation Section 12.24.090(E) City Arborist Tree Committee Convenience Removal (Tree Committee makes recommendation to Community Development Director) 12.24.090(E)(3) Community Development Director Planning Commission City Council Minor Ministerial Development Permit (removal for residential or accessory construction on an R-1 or R-2 lot) Section City Arborist Community Development Director Criteria for Discretionary Permits Construction Tree Removal Section 12.24.090(F)(3) Community Development Director Planning Commission City Council Major Development / Tentative Tract Map/ Conditional Use Permit Section 12.24.090(F)(4) Community Development Director City Council Please include a check for $175.69 along with completed application & documentation. Tree Removal applications may be submitted in person at 25 Prado Road at the City’s Corporation Yard in SLO or mailed to: City of San Luis Obispo Public Works- Urban Forest Services 25 Prado Road San Luis Obispo, CA 93401. 12.24.090(F)(1) Pursuant to San Luis Obispo Municipal Code 12.24.180, any person aggrieved by an act or determination of the authorized approving authority exercising the authority herein granted shall have the right to appeal the decision of the authorized approving authority. Appeals must be received by the city clerk within ten calendar days from the date of determination or act shall cause the director to withhold tree removal permits and any permits for construction or demolition activity relying on the subject tree removal until the appeal is heard and a decision is reached. The fee to appeal to the Tree Committee is $135.64 This tree removal application must be signed by the property owner or an Authorized Agent. I declare under penalty of perjury that all the facts stated within this tree removal application are true and correct. Property Owner Signature: _________________________________ Date:___________ Applicant’s Signature: _____________________________________ Date:___________ Please make check payable to the City of San Luis Obispo $175.69 Check#: __________ IDEAS, DESIGNS AND ARRANGEMENTS REPRESENTED THEREBY ARE AND SHALL REMAIN THE PROPERTY OF RRM DESIGN GROUP AND NO PART THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR USED IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN THE SPECIFIED PROJECT FOR WHICH THEY HAVE BEEN PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF RRM DESIGN GROUP. VISUAL CONTACT WITH THESE DRAWINGS OR SPECIFICATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS. SUBMITTAL OF THESE DOCUMENTS FOR PUBLIC AGENCY REVIEW SHALL NOT BE CONSIDERED A WAIVER OF RRM DESIGN GROUP'S RIGHTS. RRM DESIGN GROUP COPYRIGHT 2022. RRM IS A CALIFORNIA CORPORATION PHASE 1B0720-02-UR19 REVISIONS DATENO.CITY OF SAN LUIS OBISPOSAN LUIS OBISPO, CACULTURAL ARTS DISTRICT PS90435-1B EXP. 9/30/2023 TREE PROTECTION PLANC-2.2 0 feet40 SCALE: 1" = 20' 20 60 EXISTING TREES TREE #GENUS DBH APPROX.STATUS 01 AFROCARPUS 40"REMAIN 02 JACARANDA 28"REMAIN 03 JACARANDA 14"REMOVE 04 QUERCUS 36"REMAIN 05 ACACIA 3"REMOVE 06 ACACIA 20"REMOVE 07 PHOENIX 30"REMOVE 08 QUERCUS 10"REMOVE 09 PISTACIA 4"REMOVE 10 SCHINUS 18"REMOVE 11 SEQUOIA 60"REMOVE 12 QUERCUS 10"REMOVE 13 CUPRESSUS 40"REMOVE 14 WASHINGTONIA 8"REMOVE 15 DRACAENA 22"REMOVE 16 QUERCUS 20"REMOVE 17 SEQUOIA 8"REMOVE 18*CINNAMOMUM 16"SEE NOTE BELOW 19 JACARANDA 4"REMOVE 20 PRUNUS 4"REMOVE 21 JACARANDA 6"REMOVE 22*JACARANDA 16"SEE NOTE BELOW 23 JACARANDA 7"REMOVE 24 JACARANDA 5"REMOVE 25*PRUNUS 10"SEE NOTE BELOW 26 PHOENIX 30"REMOVE 27 SYAGRUS 8"REMOVE 28*PRUNUS 16"SEE NOTE BELOW 29**PHOENIX 30"RELOCATE** 30 PISTACIA 3"REMOVE 31*PRUNUS 6"SEE NOTE BELOW 32*PRUNUS 6"SEE NOTE BELOW 33 PISTACIA 3"REMOVE 34 PRUNUS 3"REMOVE 35 LOPHOSTEMON 16"REMAIN 36 PRUNUS 3"REMOVE 37 PRUNUS 3"REMOVE 38 PRUNUS 4"REMOVE 39 PRUNUS 3"REMOVE 40 PRUNUS 3"REMOVE 41 CHITALPA 10"REMOVE 42 PRUNUS 6"REMOVE 43 PRUNUS 3"REMOVE 44 CUPRESSUS 12"REMAIN 45 HANDROANTHUS (3) 12"REMAIN 46 CITRUS 18"REMAIN 1.ALL EXISTING TREES IDENTIFIED TO REMAIN SHALL BE PRESERVED, PROTECTED, AND MAINTAINED. 2.PRIOR TO COMMENCEMENT OF CONSTRUCTION, TEMPORARY TREE PROTECTION FENCING SHALL BE PLACED AROUND THE EXISTING TREES IDENTIFIED TO REMAIN TO DELINEATE THE TREE PROTECTION ZONES. REFER TO PHASE 1B CIVIL SHEETS C-2.2 AND C-2.3. 3.NO STORAGE OF HEAVY EQUIPMENT, MATERIALS, OR CONSTRUCTION PARKING SHALL TAKE PLACE WITHIN THE TREE PROTECTION ZONE OF ANY EXISTING TREE IDENTIFIED TO REMAIN. 4.DEMOLITION AND / OR GRADING WITHIN THE TREE PROTECTION ZONE DRIPLINE OF EXISTING TREES IDENTIFIED TO REMAIN SHALL BE MINIMIZED AND SHALL BE DONE UNDER THE DIRECTION OR SUPERVISION OF THE CITY'S ARBORIST WITH LIGHT (ONE TON OR LESS) RUBBER-TIRED EQUIPMENT, OR BY HAND. 5.ALL PRUNING OF EXISTING TREES IDENTIFIED TO REMAIN SHALL BE KEPT TO A MINIMUM AND MUST FOLLOW CITY OF SAN LUIS OBISPO STANDARDS. 6.ALL ROOT OR CROWN PRUNING SHALL BE PERFORMED UNDER THE DIRECT SUPERVISION OF THE PROJECT ARBORIST. NOTIFY THE PROJECT ARBORIST AT LEAST 48 HOURS IN ADVANCE OF ANY ROOT OR CROWN PRUNING ACTIVITY TO COORDINATE A SITE VISIT. CONTACT JAKE MINNICK (PLA 6426, ISA CERTIFIED ARBORIST WE-11830, ISA TRAQ,) AT (805) 543-1794 OR JRMINNICK@RRMDESIGN.COM 7.ANY TREE ROOTS ENCOUNTERED WITHIN THE TREE PROTECTION ZONE THAT ARE OVER 1" IN DIAMETER SHALL BE CLEANLY SEVERED WITH A HAND OR RECIPROCATING SAW PERPENDICULAR TO THE DIRECTION OF GROWTH TO MINIMIZE THE SURFACE AREA OF THE WOUND. ALL SEVERED ROOTS SHALL BE COVERED WITH SOIL IN THE FINAL GRADING CONDITION AND NO SEVERED ROOTS SHALL BE EXPOSED TO AIR AND SUNLIGHT FOR MORE THAN 48 HOURS. 8.PRIOR TO COMMENCEMENT OF CONSTRUCTION, CONTRACTOR SHALL OBTAIN TREE REMOVAL PERMIT AS REQUIRED. 9.TREE REMOVAL SHOULD COMPLY WITH ALL PROVISIONS OF SLOMC 12.24.090. TREE PROTECTION AND REMOVAL NOTES NOTE FOR TREES # 18, 22, 25, 28, 31, 32: EXISTING TREE WITHIN CITY RIGHT-OF-WAY (ROW) IDENTIFIED TO BE REMOVED SHOWN FOR REFERENCE ONLY, SHALL BE PRESERVED, PROTECTED AND MAINTAINED THROUGHOUT DURATION OF PHASE 1B, UNTIL FUTURE PHASE 2 DEMOLITION WORK, UNDER SEPARATE COVER. NOTE FOR TREE #29: EXISTING TREE TO BE RELOCATED BY CITY TO OFF-SITE LOCATION THAT IS TO BE DETERMINED (TBD) BY CITY. * NOTE: CONTRACTOR TO PROTECT AND PRESERVE EXISTING TREES AND VEGETATION ON ADJACENT PROPERTY (TYP). REFER TO DEMOLITION PLAN SHEET C-2.3. ** TREE REMOVAL APPLICATION RESIDENTIAL, COMMERCIAL, DEVELOPMENT Follow Non-Construction Tree Removal Criteria and Process here (SLOMC 12.24.090.E) Follow Construction Tree Removal Criteria and Process here (SLOMC 12.24.090.F) Owner: Applicant: Address: Address: City: Zip: City: Zip: Phone: Phone: Email: Email: Address of Tree(s): Number of trees applying to remove? ____ Tree Species: Reason: Is this removal a City Tree?____ YES_____ NO_____ UNKNOWN Dog in yard?___ YES____ NO Is this property governed by a Homeowners Association (HOA)?___ YES____ NO If YES, please provide HOA Board Approved Meeting minutes authorizing tree removal(s) with your tree removal application. 1 Please include a photo log that clearly shows the trees requested for removal. All Tree(s) must be uniquely identified by a number and a ribbon or an identifier wrapped around the truck in the photo and prior to inspection 2 Please include a replanting plan in accordance with Section 12.24.090(J) of the City’s Municipal Code. A minimum of one new tree shall be planted for each tree authorized to be removed on the same property (on site) or two new trees shall be planted for each tree authorized to be removed when planted on a different property or within the public right-of- way (off site). City of San Luis Obispo City of San Luis Obispo Public Works 919 Palm Street San Luis Obispo 93401 919 Palm Street San Luis Obispo 93401 1 Make ready work for the upcoming Cultural Arts District Parking Structure Pheonix Palm 609 Palm Street X X X Page 2 Tree Removal Decisions as outlined in Section 12.24.090 of the City’s Municipal Code  SELECT ONE CRITERIA FROM BELOW SUPPORTING TREE REMOVAL APPLICATION DECISION MAKER APPEAL BODY Imminent Hazard to Life or Property Section 12.24.090(E)(1)(a) City Arborist No Appeal Tree Health and Hazard Mitigation Section 12.24.090(E) City Arborist Tree Committee Convenience Removal (Tree Committee makes recommendation to Community Development Director) 12.24.090(E)(3) Community Development Director Planning Commission City Council Minor Ministerial Development Permit (removal for residential or accessory construction on an R-1 or R-2 lot) Section City Arborist Community Development Director Criteria for Discretionary Permits Construction Tree Removal Section 12.24.090(F)(3) Community Development Director Planning Commission City Council Major Development / Tentative Tract Map/ Conditional Use Permit Section 12.24.090(F)(4) Community Development Director City Council Please include a check for $175.69 along with completed application & documentation. Tree Removal applications may be submitted in person at 25 Prado Road at the City’s Corporation Yard in SLO or mailed to: City of San Luis Obispo Public Works- Urban Forest Services 25 Prado Road San Luis Obispo, CA 93401. 12.24.090(F)(1) Pursuant to San Luis Obispo Municipal Code 12.24.180, any person aggrieved by an act or determination of the authorized approving authority exercising the authority herein granted shall have the right to appeal the decision of the authorized approving authority. Appeals must be received by the city clerk within ten calendar days from the date of determination or act shall cause the director to withhold tree removal permits and any permits for construction or demolition activity relying on the subject tree removal until the appeal is heard and a decision is reached. The fee to appeal to the Tree Committee is $135.64 This tree removal application must be signed by the property owner or an Authorized Agent. I declare under penalty of perjury that all the facts stated within this tree removal application are true and correct. Property Owner Signature: _________________________________ Date:___________ Applicant’s Signature: _____________________________________ Date:___________ Please make check payable to the City of San Luis Obispo $175.69 Check#: __________ APN: 002-421-001 SAN LUIS OBISPO CHILDREN'S MUSEUM (NOT A PART) MIXED-USE/ HOTEL (FUTURE PROJECT) APN: 002-421-033 LEITCHER BUILDING (NOT A PART) SEVERED ROOTS SHALL BE EXPOSED TO AIR AND SUNLIGHT FOR MORE THAN 48 HOURS. 8.PRIOR TO COMMENCEMENT OF CONSTRUCTION, CONTRACTOR SHALL OBTAIN TREE REMOVAL PERMIT AS REQUIRED. 9.TREE REMOVAL SHOULD COMPLY WITH ALL PROVISIONS OF SLOMC 12.24.090. TREE PROTECTION AND REMOVAL NOTES NOTE FOR TREES # 18, 22, 25, 28, 31, 32: EXISTING TREE WITHIN CITY RIGHT-OF-WAY (ROW) IDENTIFIED TO BE REMOVED SHOWN FOR REFERENCE ONLY, SHALL BE PRESERVED, PROTECTED AND MAINTAINED THROUGHOUT DURATION OF PHASE 1B, UNTIL FUTURE PHASE 2 DEMOLITION WORK, UNDER SEPARATE COVER. NOTE FOR TREE #29: EXISTING TREE TO BE RELOCATED BY CITY TO OFF-SITE LOCATION THAT IS TO BE DETERMINED (TBD) BY CITY. * NOTE: CONTRACTOR TO PROTECT AND PRESERVE EXISTING TREES AND VEGETATION ON ADJACENT PROPERTY (TYP). REFER TO DEMOLITION PLAN SHEET C-2.3. ** REMOVE CHANGE ORDER REQUEST Date: Customer Name: Contact:Project: Phone Number:Project Address: Email:City & State: C/O Request #: Description of Work: Quantity Unit of Measure Unit Cost Equipment Costs 2 hrs.153.77$ 307.54$ 2 hrs.55.95$ 111.90$ 1 ea.41.94$ 41.94$ -$ 461.38$ Quantity Unit of Measure Unit Cost Material Costs 1 ea.650.00$ 650.00$ 1 ea.65.00$ 65.00$ -$ 715.00$ Quantity Unit of Measure Unit Cost Labor Costs 4 hrs.$65.19 260.76$ 2 hrs.$87.58 175.16$ 2 hrs.$85.76 171.52$ 1 ea.$235.23 182.23$ 789.67$ 1,966.05$ 14 1,966.05$ Equipment Markup (10%) Total Cost: TOTAL for C/O Request # Labor (Group 1) Operator Excavator (Group 8) Labor Markup (30%) 805-335-1161 SUBTOTAL Materials Excavator (Code 5662) Labor Material Markup (10%) Skid Steer (Code 2189) 14 Description of Work Equipment SUBTOTAL Operator Skid Steer (Group 3) SUBTOTAL 40 yd. Dumpster w/ dump fees 690 Palm St. CRB 003 - Added cost to remove tree #029 per Plan Sheet C2.2. Includes removal of stump. mc@edwardscongroup.com Friday, June 09, 2023 Edwards Construction Group Micheleen Collins SLO Phase 1B Downtown Parking Structure San Luis Obispo, Ca P.O. Box 729 Pismo Beach, Ca. 93448 Phone 805.473.9451 Fax 805.489.1098 License No. 972447 IDEAS, DESIGNS AND ARRANGEMENTS REPRESENTED THEREBY ARE AND SHALL REMAIN THE PROPERTY OF RRM DESIGN GROUP AND NO PART THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR USED IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN THE SPECIFIED PROJECT FOR WHICH THEY HAVE BEEN PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF RRM DESIGN GROUP. VISUAL CONTACT WITH THESE DRAWINGS OR SPECIFICATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS. SUBMITTAL OF THESE DOCUMENTS FOR PUBLIC AGENCY REVIEW SHALL NOT BE CONSIDERED A WAIVER OF RRM DESIGN GROUP'S RIGHTS. RRM DESIGN GROUP COPYRIGHT 2022. RRM IS A CALIFORNIA CORPORATION PHASE 1B0720-02-UR19 REVISIONS DATENO.CITY OF SAN LUIS OBISPOSAN LUIS OBISPO, CACULTURAL ARTS DISTRICT PS90435-1B EXP. 9/30/2023 TREE PROTECTION PLANC-2.2 0 feet40 SCALE: 1" = 20' 20 60 EXISTING TREES TREE #GENUS DBH APPROX.STATUS 01 AFROCARPUS 40"REMAIN 02 JACARANDA 28"REMAIN 03 JACARANDA 14"REMOVE 04 QUERCUS 36"REMAIN 05 ACACIA 3"REMOVE 06 ACACIA 20"REMOVE 07 PHOENIX 30"REMOVE 08 QUERCUS 10"REMOVE 09 PISTACIA 4"REMOVE 10 SCHINUS 18"REMOVE 11 SEQUOIA 60"REMOVE 12 QUERCUS 10"REMOVE 13 CUPRESSUS 40"REMOVE 14 WASHINGTONIA 8"REMOVE 15 DRACAENA 22"REMOVE 16 QUERCUS 20"REMOVE 17 SEQUOIA 8"REMOVE 18*CINNAMOMUM 16"SEE NOTE BELOW 19 JACARANDA 4"REMOVE 20 PRUNUS 4"REMOVE 21 JACARANDA 6"REMOVE 22*JACARANDA 16"SEE NOTE BELOW 23 JACARANDA 7"REMOVE 24 JACARANDA 5"REMOVE 25*PRUNUS 10"SEE NOTE BELOW 26 PHOENIX 30"REMOVE 27 SYAGRUS 8"REMOVE 28*PRUNUS 16"SEE NOTE BELOW 29**PHOENIX 30"RELOCATE** 30 PISTACIA 3"REMOVE 31*PRUNUS 6"SEE NOTE BELOW 32*PRUNUS 6"SEE NOTE BELOW 33 PISTACIA 3"REMOVE 34 PRUNUS 3"REMOVE 35 LOPHOSTEMON 16"REMAIN 36 PRUNUS 3"REMOVE 37 PRUNUS 3"REMOVE 38 PRUNUS 4"REMOVE 39 PRUNUS 3"REMOVE 40 PRUNUS 3"REMOVE 41 CHITALPA 10"REMOVE 42 PRUNUS 6"REMOVE 43 PRUNUS 3"REMOVE 44 CUPRESSUS 12"REMAIN 45 HANDROANTHUS (3) 12"REMAIN 46 CITRUS 18"REMAIN 1.ALL EXISTING TREES IDENTIFIED TO REMAIN SHALL BE PRESERVED, PROTECTED, AND MAINTAINED. 2.PRIOR TO COMMENCEMENT OF CONSTRUCTION, TEMPORARY TREE PROTECTION FENCING SHALL BE PLACED AROUND THE EXISTING TREES IDENTIFIED TO REMAIN TO DELINEATE THE TREE PROTECTION ZONES. REFER TO PHASE 1B CIVIL SHEETS C-2.2 AND C-2.3. 3.NO STORAGE OF HEAVY EQUIPMENT, MATERIALS, OR CONSTRUCTION PARKING SHALL TAKE PLACE WITHIN THE TREE PROTECTION ZONE OF ANY EXISTING TREE IDENTIFIED TO REMAIN. 4.DEMOLITION AND / OR GRADING WITHIN THE TREE PROTECTION ZONE DRIPLINE OF EXISTING TREES IDENTIFIED TO REMAIN SHALL BE MINIMIZED AND SHALL BE DONE UNDER THE DIRECTION OR SUPERVISION OF THE CITY'S ARBORIST WITH LIGHT (ONE TON OR LESS) RUBBER-TIRED EQUIPMENT, OR BY HAND. 5.ALL PRUNING OF EXISTING TREES IDENTIFIED TO REMAIN SHALL BE KEPT TO A MINIMUM AND MUST FOLLOW CITY OF SAN LUIS OBISPO STANDARDS. 6.ALL ROOT OR CROWN PRUNING SHALL BE PERFORMED UNDER THE DIRECT SUPERVISION OF THE PROJECT ARBORIST. NOTIFY THE PROJECT ARBORIST AT LEAST 48 HOURS IN ADVANCE OF ANY ROOT OR CROWN PRUNING ACTIVITY TO COORDINATE A SITE VISIT. CONTACT JAKE MINNICK (PLA 6426, ISA CERTIFIED ARBORIST WE-11830, ISA TRAQ,) AT (805) 543-1794 OR JRMINNICK@RRMDESIGN.COM 7.ANY TREE ROOTS ENCOUNTERED WITHIN THE TREE PROTECTION ZONE THAT ARE OVER 1" IN DIAMETER SHALL BE CLEANLY SEVERED WITH A HAND OR RECIPROCATING SAW PERPENDICULAR TO THE DIRECTION OF GROWTH TO MINIMIZE THE SURFACE AREA OF THE WOUND. ALL SEVERED ROOTS SHALL BE COVERED WITH SOIL IN THE FINAL GRADING CONDITION AND NO SEVERED ROOTS SHALL BE EXPOSED TO AIR AND SUNLIGHT FOR MORE THAN 48 HOURS. 8.PRIOR TO COMMENCEMENT OF CONSTRUCTION, CONTRACTOR SHALL OBTAIN TREE REMOVAL PERMIT AS REQUIRED. 9.TREE REMOVAL SHOULD COMPLY WITH ALL PROVISIONS OF SLOMC 12.24.090. TREE PROTECTION AND REMOVAL NOTES NOTE FOR TREES # 18, 22, 25, 28, 31, 32: EXISTING TREE WITHIN CITY RIGHT-OF-WAY (ROW) IDENTIFIED TO BE REMOVED SHOWN FOR REFERENCE ONLY, SHALL BE PRESERVED, PROTECTED AND MAINTAINED THROUGHOUT DURATION OF PHASE 1B, UNTIL FUTURE PHASE 2 DEMOLITION WORK, UNDER SEPARATE COVER. NOTE FOR TREE #29: EXISTING TREE TO BE RELOCATED BY CITY TO OFF-SITE LOCATION THAT IS TO BE DETERMINED (TBD) BY CITY. * NOTE: CONTRACTOR TO PROTECT AND PRESERVE EXISTING TREES AND VEGETATION ON ADJACENT PROPERTY (TYP). REFER TO DEMOLITION PLAN SHEET C-2.3. ** City wants Tree #002 Removed. PCO #002 - Approved. Demo Phoenix Palm - PCO in Review Demo Phoenix Palm Tree #29 PCO in review CHANGE ORDER: REMOVE TREE NUMBER #02 Tree #002 - Demo/PCO #002 - Approved GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS CRAFT: OPERATING ENGINEER# Determination: SC-23-63-2-2023-1 Issue Date: February 22, 2023 Expiration date of determination: June 30, 2023** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774. Localities: All localities within Imperial, Inyo, Kern, Los Angeles, Mono, Orange, Riverside, San Bernardino, San Luis Obispo, Santa Barbara and Ventura Counties. Wages and total hourly rates (including employer payments): Classification a (Journeyperson) Basic Hourly Rate Hours Total Hourly Rate Daily Overtime Hourly Rateb (1½ x) Saturday Overtime Hourly Rate c (1½ x) Sunday/Holiday Overtime Hourly Rate (2 x) Group 1 $53.90 8 $84.69 $111.640 $111.640 $138.590 Group 2 $54.68 8 $85.47 $112.810 $112.810 $140.150 Group 3 $54.97 8 $85.76 $113.245 $113.245 $140.730 Group 4 $56.46 8 $87.25 $115.480 $115.480 $143.710 Group 6 $56.68 8 $87.47 $115.810 $115.810 $144.150 Group 8 $56.79 8 $87.58 $115.975 $115.975 $144.370 Group 10 $56.91 8 $87.70 $116.155 $116.155 $144.610 Group 12 $57.08 8 $87.87 $116.410 $116.410 $144.950 Group 13 $57.18 8 $87.97 $116.560 $116.560 $145.150 Group 14 $57.21 8 $88.00 $116.605 $116.605 $145.210 Group 15 $57.29 8 $88.08 $116.725 $116.725 $145.370 Group 16 $57.41 8 $88.20 $116.905 $116.905 $145.610 Group 17 $57.58 8 $88.37 $117.160 $117.160 $145.950 Group 18 $57.68 8 $88.47 $117.310 $117.310 $146.150 Group 19 $57.79 8 $88.58 $117.475 $117.475 $146.370 Group 20 $57.91 8 $88.70 $117.655 $117.655 $146.610 Group 21 $58.08 8 $88.87 $117.910 $117.910 $146.950 Group 22 $58.18 8 $88.97 $118.060 $118.060 $147.150 Group 23 $58.29 8 $89.08 $118.225 $118.225 $147.370 Group 24 $58.41 8 $89.20 $118.405 $118.405 $147.610 Group 25 $58.58 8 $89.37 $118.660 $118.660 $147.950 GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: Laborer and Related Classifications # Determination: SC-23-102-2-2022-1 Issue Date: August 22, 2022 Expiration date of determination: June 30, 2023** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774. Localities: All localities within Imperial, Inyo, Kern, Los Angeles, Mono, Orange, Riverside, San Bernardino, San Luis Obispo, Santa Barbara, and Ventura counties. Wages and Employer Payments: Classificationa (Journeyperson) Basic Hourly Rate Health and Welfare Pension Vacation and Holiday b Training Other Hours Total Hourly Rate Daily Overtime Hourly Rate (1 ½ X) c Saturday Overtime Hourly Rate (1 ½ X) c d Sunday/ Holiday Overtime Hourly Rate (2 X) Group 1 $39.23 $8.75 $10.82 $5.02 $0.70 $0.67 8.0 $65.19 $84.805 $84.805 $104.420 Group 2 $39.78 $8.75 $10.82 $5.02 $0.70 $0.67 8.0 $65.74 $85.630 $85.630 $105.520 Group 3 $40.33 $8.75 $10.82 $5.02 $0.70 $0.67 8.0 $66.29 $86.455 $86.455 $106.620 Group 4 $41.88 $8.75 $10.82 $5.02 $0.70 $0.67 8.0 $67.84 $88.780 $88.780 $109.720 Group 5 $42.23 $8.75 $10.82 $5.02 $0.70 $0.67 8.0 $68.19 $89.305 $89.305 $110.420 11 LINK-BELT MASSEY FERGUSON MITSUBISHI NORTHWEST P&H TAKEUCHI Model Model Model Model Model Model [ L-B ] [ M-F ] [ MITS ] [ NW ] [ P&H ] [ TAKU ] Code Code Code Code Code Code Rate Rate Rate Rate Rate Rate PC 300 LC-1, LC-2 PC 300 LC-3 PC 300 LC-5 PC 300 LC-6 PC 300 LC-7 PC 360 LC-3 PC 400 LC-1 PC 400 LC-3 PC 400 LC-5 PC 400 LC-6 PC 600 LC-6 PC 650-1 PC 650-1 Front Shovel PC 650-3 PC 750-6 PC 1000-1 PC 1000 LC-1 PC 1100 LC-6 LS 1600 LS 2650 LS 2700C II 2700 QUANTUM LS 2800 LS 2800A LS 2800A PL LS 2800 PL LS 2800B LS 3400 LS 3400C II LS 4300 LS 4300C II LS 4800 LS 4800 PL LS 5400 LS 5800 LS 5800A LS 5800C II LS 6400 LS 7400 LS 7400A MF 450D MF 450S MS 090 MS 180-3 MS 180 LC-8 MS 230 LC-3 MS 240 LC-8 MS 280-2 MS 380-2 MS 450-8 35 DH 45 DH 55 DH 55 DH Series II H 750 H 1250 H 1750 H 2500 HS 2500 TB 15 TB 025 TB 045 TB 070 TB 10S TB 35S TB 68S TB 800 9520 9525 9526 9526A 9526B 9527 9530 9535 9536 9537 9539 9540 9550 9552 9555 9560 9565 9575LC 5390 5395 5398 5399 5400 5402 5404 5405 5410 5475 5477 5660 5662 5750 5755 5805 5810 5812 5814 5820 5830 5840 6245 6250 6290 6295 6296 6300 6305 6310 6320 6330 6335 6340 6345 6360 6628 6630 6635 6645 6650 7686 7686A 7686E 7686H 7688 7690 7692 7695 $128.26 $150.73 $169.16 $184.59 $206.60 $170.41 $172.62 $201.59 $223.05 $250.73 $343.55 $313.87 $328.99 $329.54 $413.06 $492.64 $505.53 $566.05 $41.03 $57.23 $75.95 $82.50 $67.30 $75.94 $66.47 $63.57 $84.16 $110.77 $117.16 $139.51 $153.77 $159.74 $145.74 $187.69 $194.11 $204.31 $213.05 $286.72 $290.93 $347.12 $55.23 $60.00 $38.59 $74.01 $83.93 $96.56 $104.45 $118.44 $165.24 $192.62 $153.48 $165.36 $173.12 $304.32 $72.19 $123.12 $149.60 $192.82 $197.74 $16.63 $28.53 $47.22 $46.35 $13.43 $27.06 $38.06 $18.82 16 HYDRAULIC PERSONNEL LIFTS & AERIAL WORK PLATFORMS LOADERS, CRAWLER Includes self propelled and power take off(PTO) units whether gas, diesel or electric. Rates for any truck or carrier mounted units shall pay for the truck separately. Reach is rated by Mfr's maximum extension in meters(feet). Includes all attachments and accessories excluding clam-action buckets and backhoe(see attachment class). [ HYLFT ] [ LDRCL ] DELAY FACTOR = 0.20 OVERTIME FACTOR = 0.79 DELAY FACTOR = 0.11 OVERTIME FACTOR = 0.90 BOOM TYPE SCISSOR TYPE CASE CATERPILLAR JOHN DEERE DRESSER OVER TO OVER TO Model Model Model Model [ BOOM ] [ SCIS ] [ CASE ] [ CAT ] [ DEER ] [ DRES ] Code Code Code Code Code Code Rate Rate Rate Rate Rate Rate 0 7.6 (25) 7.6 (25) 15.2 (50) 15.2 (50) 22.9 (75) 0 6.1 (20) 6.4 (21) 9.1 (30) 9.4 (31) 15.2 (50) 350B 450B 455B 455C 1155D 1155E 1450 1450B 1455B 259D 289D 299D XHP 299D2 931B 931C 931 LGP 931B LGP 935B 935C 939C 943 943 LGP 951C 86J 1992 serial 951C 86J 2598 serial 951C LGP 86J 2598 ser 953 953 LGP 955L 85J 6247 serial 955L 85J 13X10129 ser 955L LGP 85J 13X10129 963 963 LGP 973 973 LGP 977K 977K 11K serial 977L 11K 3919 serial 977L 11K 5083 serial 977L 14X serial 977L LGP 983 983B JD 350C JD 450C (4 speed PS) JD 455D JD 455E JD 455G JD 555 JD 555A JD 555B JD 555G JD 655 JD 655B JD 755 JD 755A JD 755B JD 855 100E (PS) 100G 125E (PS) 125G 175C (PS) 200 250C (PS) 250E (PS) 00-24 25-49 50-74 00-20 21-30 31-50 2370 2610 2620 2620A 3555 3556 3560 3565 3568 2159 2189 2190 2199A 3735 3735C 3740 3745 3845 3845C 3900 4130 4135 4200 4210 4215 4220 4230 4675 4680 4685 4690 4693 4695 4698 5014 5092 5170 5180 5185 5190 5248 5265 5420 5805 5807 5809 5809A 5810 5812 5814 5814A 5815 5817 5820 5822 5824 5830 9000 9005 9010 9015 9020 9025 9030 9035 $20.54 $47.00 $63.65 $22.10 $26.20 $38.87 $44.05 $39.60 $41.43 $46.62 $81.14 $89.17 $90.32 $99.72 $100.63 $53.35 $55.95 $80.25 $69.79 $45.19 $47.77 $42.63 $46.33 $53.51 $56.64 $78.16 $67.02 $63.73 $62.28 $67.97 $68.84 $90.66 $85.48 $87.67 $93.94 $94.29 $124.96 $115.00 $189.77 $161.76 $104.23 $108.55 $125.45 $135.14 $139.98 $139.63 $192.23 $204.74 $46.72 $46.19 $48.43 $49.34 $58.67 $52.00 $57.24 $56.44 $79.07 $81.81 $93.55 $77.71 $96.05 $108.12 $145.73 $47.57 $54.45 $58.42 $65.33 $114.78 $133.10 $138.02 $158.62 SYMBOLS : NN A A-2 A A-2 A A-2 A A-2 AA TRU E N ORT H CROSS SECTION DETAIL INTERIOR ELEVATION SECTION LETTER SHEET WHERE SECTION IS LOCATED SHEET WHERE DETAIL IS LOCATED DETAIL NUMBER 1 2 3 4 INTERIOR ELEVATION NUMBER SHEET WHERE INTERIOR ELEVATION IS LOCATED DOOR NUMBER WINDOW NUMBER KEYNOTE REVISION NU MBER DOOR NUMBER WINDOW NUMBER NUMBER OR LETTER REVISION NUMBER BENCHES 2 FT. SEPARATION PG&E TRANSFORMER R R OT T 3 BIKE LOCKERS TRASH ENCL. BELOW PER CITY STDS. SITE PLAN SHEET INDEX LABEL TIT LE A-1.0 SITE PLAN , VIC NITY MAP, PROJECT D AT A, GENERAL NOTES A-2 COLOR ELEVATIONS A-3 CODE AN ALYSIS A-4 FL OOR PLAN A-4.1 MEZZANINE-CO NTR OL ROOMS PLANS A-4.2 ROOF PLAN A-5 DOOR AN D WINDOW SCHEDUL ES, RATED WALLS SPECS, ST OR EFRO NT AND GLAZING SYSTEM A-5.1 TERR COTTA RAIN SC REEN DET AIL S A-6 ELEVATIONS A-6.1 ELEVATIONS A-7 RENDERINGS A-8 SEC TIONS A-8.1 SEC TIONS A-8.2 SEC TIONS A-9 EXI TING PLAN A-10 ACCESSIBILITY DETAILS A-11.1 REFLECD TED CEILING PLAN- 2ND F LOOR A-12 INTERIOR ELEVATIONS A-12.1 INTERIOR ELEVATIONS C1 CIVIL NOTES C2 GRADING PLAN C3 CIVIL DETAIL SHEET C4 UTIL ITY PLAN C-5 UTIL ITY PLAN L-1 CONCEPTUAL LANDSCAPE PLAN L2 CONCEPTUAL LANDSCAPE PLAN S1.2 MAIN FL OOR: FOUND AT ION & F RAMING PLAN S1.3 SEC OND FLOOR: FRAMING PLAN S1.4 LOW ROOF & CATWALK: FRAMING PLAN S1.5 HIGH RO OF: FRAMIN G PLAN M-0.0 MECHANICAL NOTES, LEGEND & ABBREVIATIONS M-1.0 MECHANICAL SCHEDULES M-1.1 MECHANICAL SCHEDULES M-2.0 MECHANICAL DETAILS M-2.1 MECHANICAL DETAILS M-3.0 MECHANICAL BASEMENT LEVEL ZONE PLAN M-3.1 MECHANICAL BASEMENT LEVEL FLOOR PLAN M-3.2 MECHANICAL BASEMENT LEVEL HYDR ONIC PIPING PLAN M-4.0 MECHANICAL FRIST FLOOR ZONE PLAN M-4.1 MECHANICAL FIRST FLOOR PLAN M-4.2 MECHANICAL FIRST FLOOR HYD RONIC PIPING PLAN M-5.0 MECHANICAL SECON D FLO OR ZONE PL AN M-5.1 MECHANICAL SECON D FLO OR PLAN M-5.2 MECHANICAL CATWALK LEVEL FLOOR PLAN M-5.3 MECHANICAL SECON D FLO OR HYDR ONIC PIPING PLAN M-6.0 MECHANICAL ROOF DECK LEVEL ZONEN PLAN M-6.1 MECHANICAL ROOF DECK LEVEL PLAN- ALL ELECTRIC CENTRAL PLANT OPT ION 1 EXHIBIT M-6.2 MECHANICAL ROOF DECK LEVEL FLOOR PLAN- ALL ELECTRIC CEN TRAL PLANT O PTION 2 EXHIBIT M-6.3 MECHANICAL ROOF DECK HYD RON IC PIPIN G PLAN M-7.0 MECHANICAL ROOF DECK LEVEL FLOOR PLAN- STANDARD GAS HEATING EXH IBIT MC-1 MECHANICAL CONTR OLS MC-2 MECHANICAL CONTR OLS MC-3 MECHANICAL CONTR OLS MC-4 MECHANICAL CONTR OLS MC-5 MECHANICAL CONTR OLS P1.0 PLUMBING NOT ES, SCHEDULES, LEGEND & ABBR EVIATIONS P2.0 PLUMBING DETAILS P3.0 PLUMBING BASEMEN T WASTE & VEN T PLAN P3.1 PLUMBING BASMEMEN T WAT ER PLAN P4.0 PLUMBING FIRST FLOOR WASTE & VENT PLAN P4.1 PLUMBING FIRST FLOOR WATER PLAN P5.0 PLUMBING SECOND F LOOR PLAN P6.0 PLUMBING ROOF PLAN E-1 GEN ERAL NOTES, SYMBOLS AND ABBREVIATIONS E-5 SINGLE LIN E D IAGRAM E-6 ELECTRICAL SCHEDULES E-9 ELECTRICAL SITE PLAN E-10 BASEMENT LEVEL POWER PLAN E-11 FIR ST FLOOR POWER PL AN E-12 SEC OND FLOOR POWER PLAN E-13 CATWALK LEVEL POWER PLAN E-14 ROOF POWER PLAN E-15 BASEMENT LEVEL LIGHT ING PLAN E-16 FIR ST FLOOR LIGH TING PLAN E-17 SEC OND FLOOR LIGHTING PLAN E-16 CATWALK LEVEL LIGHTING PLAN E-20 ELECTRICAL DETAILS T-GA001 GEN ERAL ARRANGEMEN TS COVER SHEET & INDEX T-GA002 GEN ERAL ARRANGEMEN TS COORD ZONE PLANS T-GA010 GEN ERAL ARRANGEMEN TS THEATRICAL POWER KEYS & DET AILS T-GA011 GEN ERAL ARRANGEMEN TS THEATRICAL POWER PLANS T-GA012 GEN ERAL ARRANGMENTS THEATRIC AL POWER PLANS T-GA020 GEN ERAL ARRANGEMEN TS THEATRICAL LIG HTING KEYS & DET AIL S T-GA021 GEN ERAL ARRANGEMEN TS THEATRICAL ZONE LIGHTIN G PLANS T-GA022 GEN ERAL ARRANGEMEN TS THEATRICAL ZONE LIGHTIN G PLANS T-GA030 GEN ERAL ARRANGEMEN TS CABLE MANAGEMENT KEY & DETAILS T-GA031 GEN ERAL ARRANGEMEN TS CABLE MANAGEMENT/SERVICES PLAN T-GA032 GEN ERAL ARRANGEMEN TS CABLE MANAGEMENT/SERVICE PLAN S T-GA040 GEN ERAL ARRANGEMEN TS INFRASTR UCTUR E, FINISHES, & DETAILS T-GA041 GEN ERAL ARRANGEMEN TS INFRASTR UCTUR E, FINISHES, & DETAILS T-GA042 GEN ERAL ARRANGEMEN TS INFRASTR UCTUR E, FINISHES, & DETAILS T-GA043 GEN ERAL ARRANGMENTS INF RASTRUCTURE, FINISHES & D ET AILS T-TE111 THEATRE EQUIPMENT BASEMENT LEVEL PLAN T-TE112 THEATRE EQUIPMENT STAGE LEVEL PLAN T-TE113 THEATRE EQUIPMENT BALC ONY LEVEL PLAN T-TE114 THEATRE EQUIPMENT CATWALK LEVEL PLAN T-TE121 THEATRE EQUIPMENT CENTERLINE SECTION T-TE122 THEATRE EQUIPMENT TRANSVERSE SECTIONS T-TE123 THEATRE EQUIPMENT BLAC K BO X SECTIONS T-TE131 THEATRE EQUIPMENT STAGE TRAP PLATFORM DETAILS T-TE132 THEATRE EQUIPMENT CHAIN MO TOR CONTROL SYSTEM T-TL010 THEATRIC AL SWITCH ING AND CON TROL NOTES AND D ET AILS T-TL011 THEATRIC AL LI GHTING SYSTEM SWITCH ING & CTRL BOX SCHEDULES T-TL012 THEATRIC AL LI GHTING SYSTEM SWITCH ING @ CTRL BOX SCHEDULES T-TL021 THEATRIC AL LI GHITNG SWITCH ING AND CON TROL PH ILOSO PHY-T HRUST THEATRE T-TL022 THEATRIC AL LI GHTING SWITCH ING AND CON TROL PH ILOSO PHY- BLACK BOX T-TL111 THEATRIC AL LI GHTING SWITCH ING AND CON TROL PL AN T-TL112 THEATRIC AL LI GHTING SWITCH ING AND CON TROL PL AN T-TL113 THEATRIC AL LI GHTING SWITCH ING AND CON TROL PL AN T-TL114 THEATRIC AL LI GHTING SWITCH ING AND CON TROL PL AN T-TL131 THEATRIC AL LI GHTING FACEPLATE DETAILS T-TS010 THEATRE SEATING NOTES AND DET AILS T-TS111 THEATRE SEATING -INF ILL VOMS PLAN-TH RUST TH EATR E T-TS112 THEATRE SEATING-O PEN VOMS PLAN-THRUST THEATRE T-TS113 THEATRE SEATING-BAL CON Y LEVEL-THRU ST THEATRE T-TS121 THEATRE SEATING THRUST THEAT RE CENTERLINE SEC TION T-TS211 THEATRE SEATING BLACK BOX PLAN CONFIGURATION PLANS- F OR REFERENCE NIC L-1 LANDSCAPE PLAN & COLOR ELEVAT ION L-2 PLANT LIST SITE PLAN, VICNITY MAP, PROJECT DATA, GENERAL NOTES DESCRIPTION:BY: BRYCE ENGSTROM ARCHITECTAll common law copyright and other property rightsreserve this document as an original and unpublishedwork product of Bryce Engstrom: Architect, and thiswork shall not be duplicated, copied, disclosed, orused in connection with any other work or projectother than the specific product for which it has beenprepared or assigned to any third party, withoutexpress written consent of Bryce Engstrom:ArchitectARCHITECT:BRYCE ENGSTROM210 TRAFFIC WAY SUITE EARROYO GRANDE, CA 93420(805)235-3385SHEET:REVISION TABLENUMBERDATEREVISED BYDESCRIPTIONOWNER:SAN LUIS OBISPO REPERTORYTHEATRE888 MORRO STREETSAN LUIS OBISPO, CA 93401(805)786-2440A-1.0 SCALE: 1 "=10'-0"SAN LUIS OBISPOREPERTORY THEATREMONTEREY STREETSAN LUIS OBISPO, CAVICINITY MAP (NO SCALE)PROJECT LOCATION X APPLICABLE CODES: 1 ST. FLOOR TOTAL:10,562/20,036= 53% OCCUPANCY GROUP: A1 PR OJECT DATA: A.P.N. TBD- LOTS TO BE COMBINED ZONING DESIGNATION: C-D W/ HISTORIC PRESERVATION OVERLAY W/ GENERAL PLAN AMENDMENT LOT SIZE: 20,036 SQ.FT. (USING ASSUMED P.L. AT PARKING GARAGE) PROPOSED COVERAGE: TOTAL LANDSCAPED AREA: TBD- SEE LANDSCAPING SHEETS CONSTRUCTION TYPE VA- FIRE SPRINKLERS PROJECT DESCRIPTION: CONSTRUCT NEW PERFORMING ARTS THEATRE CO NSULTA NTS LIS T AR CHITEC T: BR YCE ENGSTRO M 210 TRAFFIC WAY SUIT E E AR ROYO GRANDE, CA 93420 (805)235-3385 brycethearchitect@g mail.com CIVIL ENGINE ER: DANIE L SOTELO 3590 SACRAMENTO DRIV E SUITE 210 SAN L UIS OBISPO , CA 934 05 (805)602-6167d dsotelo@edpincorporated.com 2019 CALIF ORN IA BUILD ING C ODE (CBC) 2019 CALIF ORN IA H IST ORIC AL BUILD ING C ODE (CHBC) 2019 CALIF ORN IA EXISTING BUILDING CODE (CEBC) 2019 CALIF ORN IA GREEN BUILDING STANDARDS CODE (CGBSC ) 2019 CALIF ORN IA MECH ANI CAL C ODE (CMC) 2019 CALIF ORN IA PLUMBING CODE (CPC) 2019 CALIF ORN IA ELECTR ICAL COD E (CEC) 2019 CALIF ORN IA ENERGY CODE (C EC PART 6) 2019 CALIF ORN IA FIRE CODE (CFC) PAD CE RT IFICAT ION A SOILS OR CIVIL ENGINEER TO DETERMINE GRADING PERFORMED IS IN SUBSTANTIAL CONFORMANCE WITH THE APPROVED PLANS AND IS SUITABLE TO SUPPORT THE INTENDED STRUCTURE. LANDSCAPE AR CHITEC T: FIRMA CO NSULTANTS 187 TANK FARM RO AD SA N LUIS OBISPO , CA 93401 (805 )781-980 0 lindsay@firmaconsultants.com 1.ALL WORK SHALL CONFORM TO: A) THE MI NIMUM STANDARDS OF THE LATEST EDITION (OR THE CURRENT EDITION IN EFFECT) OF THE CALIFORNIA BUILDING CODE AND ALL RELATED DOCUMENTS THAT ARE PUBLISHED BY THE I.C.C.. WHI CH HAVE BEEN ADOPTED BY THE LOCAL GOVERNING AGENCY; B) ALL REGULATION AND ORDINANCE OF ALL LOCAL GOVERNING AGENCIES; AND C) ANY SPECIAL CONDITIONS REQUIRED BY THE LOCAL GOVERNING AGENCIES. 2.A CERTIFI CATE OF CONSTRUCTION COMPLIANCE, SIGNED BY THE GENERAL CONTRACTOR BASED UPON HIS OBSERVATION OF THE CONSTRUCTION WORK SHALL BE SUBMITTED TO THE INSPECTING BUILDING OFFICIAL PRIOR TO I SSUANCE OF A CERTIFICATE OF OCCUPANCY. 3.ALL WORK DESCRIBED IN THE DRAWINGS SHALL BE VERIFI ED FOR DIMENSION, GRADE, EXTENT AND COMPATIBILI TY TO THE EXI STING SI TE. ANY DISCREPANCIES AND UNEXPECTED CONDITIONS THAT AFFECT OR CHANGE THE WORK DESCRI BED IN THE CONTRACT DOCUMENTS SHALL BE BROUGHT TO THE ARCHITECT'S ATTENTION IMMEDI ATELY. DO NOT PROCEED WITH THE WORK IN THE AREA OF DISCREPANCIES UNTIL ALL SUCH DISCREPANCIES ARE RESOLVED. IF THE CONTRACTOR CHOOSES TO DO SO HE SHALL BE PRECEDING AT HIS OWN RISK. 4.OMISSI ONS FROM THE DRAWINGS AND SPECIFICATI ON OR THE MIS-DESCRIPTI ON OF THE WORK WHICH IS MANIFESTLY NECESSARY TO CARRY OUT THE INTENT OF THE DRAWI NGS AND SPECIFICATIONS, OR WHICH IS CUSTOMARILY PERFORMED, SHALL NOT RELIEVE THE CONTRACTOR FROM PERFORMING SUCH OMITTED OR MIS- DESCRIBED DETAILS OF THE WORK AS I F FULLY AND COMPLETELY SET FORTH AND DESCRIBED IN THE DRAWINGS AND SPECIFI CATIONS. 5.DIMENSIONS SHOWN SHALL TAKE PRECEDENCE OVER DRAWING SCALE OR PROPORTION. LARGER SCALE DRAWING SHALL TAKE PRECEDENCE OVER SMALLER SCALE DRAWINGS. 6.WALL AND CEILING MATERIALS SHALL NOT EXCEED THE FLAME SPREAD CLASSIFICATIONS IN CBC TABLE 803.11 7.THE SOI LS ENGINEER WILL NEED TO VERIFY IN WRITING BY FOOTING INSPECTION, AND PRI OR TO STEEL PLACEMENT, THAT THE FOOTINGS ARE INTO UNI FORM COMPETENT NATIVE MATERIAL OR OTHERWISE PREPARED ACCORDING TO SOILS ENGINEER RECOMMENDATIONS. 8.ANY PERSON USING A TORCH OR OTHER FLAME-PRODUCING DEVICE FOR SWEATING PI PE JOINTS FROM OR IN ANY BUILDING OR STRUCTURE SHALL PROVI DE ONE APPROVED FIRE EXTINGUISHER ON THE PREMISES WHERE SAID BURNING OPERATION IS PERFORMED. COMBUSTIBLE MATERIAL IN THE CLOSE PROXIMI TY OF OPEN FLAME SHALL BE PROTECTED AGAINST IGNITION BY SHI ELDING, WETTING OR OTHER MEANS. IN ALL CASES, A FIRE WATCH SHALL BE MAI NTAINED IN THE VICI NITY OF THE OPERATION FOR ONE-HALF HOUR AFTER THE TORCH OR FLAME-PRODUCING DEVICE HAS BEEN USED. REFER TO C.F.C. CHAPTER 3 FOR ADDI TIONAL MEASURES. 9.SITE CONDITIONS: ALL CONTRACTORS AND SUB-CONTRACTORS SHALL VERIFY DIMENSIONS AND CONDITIONS AT THE SITE PRIOR TO COMMENCEMENT OF THEI R WORK. FAILURE TO DO SO SHALL NOT RELEASE THEM FROM THE RESPONSI BILITY OF ESTIMATING THE WORK. IF ANY VARIATION, DISCREPANCY OR OMISSI ON (BETWEEN THE INTENT OF THESE CONTRACT DOCUMENTS AND THE EXISTING CONDITIONS ARE FOUND, THE CONTRACTOR OR SUB- CONTRACTOR SHALL NOTIFY THE ARCHITECT IN WRITING AND OBTAIN WRITTEN RESOLUTION FROM BRYCE ENGSTROM: ARCHI TECT PRI OR TO PROCEEDING WITH ANY RELATED WORK. 10.TEMPORARY FACI LITIES: CONTRACTOR SHALL PAY FOR, PROVIDE AND MAINTAIN TEMPORARY FACILITIES FOR PROJECT PROTECTION AND CONSTRUCTION, AND AS REQUIRED BY LOCAL REGULATION AND THESE DOCUMENTS, SUCH FACILI TIES INCLUDE BUT ARE NOT LIMITED TO: TOILETS, LIGHTS, HEATERS, POWER, GAS, FANS, WATER, PHONES, FENCES, SIGNS, SHEDS. ETC. REMOVE FROM SITE UPON COMPLETION OF WORK. OBTAIN BUI LDING OFFICIAL OR FIRE MARTIAL APPROVAL PRIOR TO USE OF ANY TEMPORARY HEATING DEVICE. 11.PROTECTION AND SAFETY: CONTRACTOR SHALL PROVI DE AND BE RESPONSIBLE FOR ALL TIMES (SIGNS, LIGHTS, FENCES, BRACING, ANCHORAGE, FIRE-EXTI NGUISHERS, ETC) NECESSARY FOR THE PROTECTION OF THE PUBLIC, WORKERS, MATERIALS, CONSTRUCTION AND PROPERTY PER LOCAL, STATE, AND FEDERAL REQUIREMENTS (I NCLUDING EARTHQUAKES, FI RES, SPILLS, ACCIDENTS, EROSION, MUD, DUST, ETC.) STAGING OF MATERI ALS AND EQUIPMENT SHALL NOT OVERLOAD ANY EXISTI NG, NEW AND/OR TEMPORARY STRUCTURES ON THE BUILDING SI TE. 12.CHANGES: CHANGES TO APPROVED PLANS AND SPECIFICATIONS SHALL BE MADE ONLY I N WRITING AND SHALL BE APPROVED BY THE ARCHITECT. CONTRACTOR SHALL ASSUME RESPONSIBI LITY AND COSTS FOR ALL CHANGES LATER IN THE PROJECT CAUSED BY THE ORIGINAL CHANGE. 13.SUBSTITUTIONS: SUBSTI TUTIONS REQUIRE OWNER AND ARCHITECTS APPROVAL FAILURE TO GAIN APPROVAL IS SUFFICI ENT GROUNDS FOR ORDERING REMOVAL OF PRODUCT AT CONTRACTOR'S EXPENSE. 14.ALL APPLIANCES, PLUMBING FIXTURES, CABINETS/BUILT-I NS, ACCESSORIES AND FINISHES LISTED ON THE DRAWINGS SHALL BE SPECIFIED BY THE OWNER OR OWNER'S REPRESENTATIVE U.O.N. 15.ALL MECHANICAL DUCTWORK SHALL BE CONSTRUCTED AND INSTALLED IN ACCORDANCE WITH 2016 CALIFORNIA MECHANICAL CODE 16.EROSION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICES MUST BE IN PLACE AND FUNCTIONAL PRIOR TO THE FIRST INSPECTION. NO INSPECTIONS CAN BE PERFORMED IF THEY ARE NOT IN PLACE OR HAVE FAI LED TO PROVIDE EROSION CONTROL. FAILURE TO MAINTAIN EROSION CONTROL WILL CAUSE INSPECTIONS TO BE DELAYED UNTIL EROSI ON CONTROL MEASURES ARE FUNCTIONAL. 17.AN OPERATION AND MAINTENANCE MANUAL SHALL BE PROVIDED TO THE BUILDING OCCUPANT OWNER. (THESE NOTES APPLY TO ALL PORTI ONS, PHASES & SUBCONTRACTOS OF THIS PROJECT) USE OF PLANS: THESE PLANS ARE THE PROPERTY OF BRYCE ENGSTROM: ARCHITECT AND MAY NOT BE USED WITHOUT EXPRESS, WRITTEN CONSENT. GENERAL NOTES: RISK CATEGORY: III FIRST FLOOR-10,562 SQ.FT. TOTAL:10,562/20,036= 0.53 FLOOR AREA RATIO: NOTE: NON-LANDSCAPE WATER SAVING FEATURES- COMMISSIONING OPR DOCUCUMENT STATES TARGET WATER SAVING 25% BETTER THAN TITLE 24. SEE LANDSCAPE PLANS FOR LANDSCAPE WATER SAVING FEATURES. NOTE: CONSTRUCTION DOCUMENTS SHALL COMPLY WITH ALL CITY OF SAN LUIS OBISPO GREEN CHECKLIST ITEMS DESCRIPTION OF PROPOSED USE: PERFORMING ARTS THEATRE INCLUDING TWO PERFORMANCE SPACES, LOBBY, AND GREEN ROOM/ACTOR SUPPORT AREAS ON CITY OWNED LOTS. 10,562 SQ.FT. HOURS OF OPERATION- MONDAY THROUGH SUNDAY 9 AM TO 9PM WITH VARIATIONS IN SCHEDULES THROUGHOUT THE WEEK. MAIN EVENING PERFORMANCES ARE THURSDAY-SUNDAY 7-10PM, SATURDAY AND SUNDAY MATINEES AT 2-5 PM. NO PARKING SPACES ON SITE ARE PROPOSED. PARKING: 10,562 GROSS SQ.FT./ 350= 30 CAR PARKING SPACES REQUIRED GREEN BUILDING: PROJECT SHALL COMPLY WITH ALL CITY GREEN BUILDING CHECKLIST REQUIREMENTS PROJECT NARRATIVE: THE NEW SAN LUIS OBISPO REPERTORY THEATRE BUILDING HONORS THE TIME-WORN AND ANCIENT NATIVE BUILDING MATERIALS USED DURING THE MISSION ERA SUCH AS EXTERIOR PLASTER, WHICH IS USED IN ITS TRADITIONAL FORM, AND TERRA COTTA CLAY, WHICH IS USED IN A MODERN, RE-IMAGINED WAY VIA AN INNOVATIVE RAIN SCREEN PANEL SYSTEM. IT ALSO USES 12x12 TERRA COTTA QUARRY TILES AT THE FRONT AND REAR OF THE BUILDING. THE NEW THEATRE LOOKS FORWARD WITH MORE CONTEMPORARY FORMS FOUND IN THE NEIGHBORING CHILDREN'S MUSEUM, AND IN KEEPING WITH CURRENT PLANS FOR THE EVENTUAL ART MUSEUM. IT'S FORMS STEP BACK FROM MONTEREY STREET, HELP BREAK UP THE MORE MONOLITHIC PARKING GARAGE, AND PROVIDES INVITING ENTRANCES TO BOTH BUILDINGS. ACOUSTICIAN: 45dBACOUSTICS/BILLDOHNASSOC. P.O.BOX1406 SANLUISOBISPO,CA93406 (805)801-3434 dl@45dB.com 30 CAR PARKING SPACES X .40= 12 BIKE PARKING SPACES REQUIRED- 9 SHORT TERM, 3 LONG TERM SCALE: 1” – 10’-0” @ 30” x 42” SHEET SIZE 05'10'10' 20' 30' Scale: 1" = 10'-0" NORTH: Conceptual Landscape Plan SAN LUIS OBISPO REPERTORY THEATRE L-1 April 7, 2022 File Path: firma_SLO Repertory Theatre_21803 Last Date Modified: 040622 firma l a n d s c a p e a r c h i t e c t s p l a n n i n g • e n v i r o n m e n t a l s t u d i e s 187 Tank Farm Road, Suite 230, San Luis Obispo, CA 93401 phone: 805.781.9800 fax: 805.781.9803 SOLAR PANEL ARRAY ON PARKING STRUCTURE, REFER TO WATRY DESIGN PLANS April 7, 2022NORTH: L-2 May 23, 20188'24' File Path: firma_SLO Repertory Theatre_21803 Last Date Modified: 04062022 Conceptual Landscape Plan SAN LUIS OBISPO REPERTORY THEATRE L-28'24'04'8' 16' SCALE: 1/8" = 1'-0" 8' SCALE: 1/8” – 1’-0” @ 30” x 42” SHEET SIZEfirma l a n d s c a p e a r c h i t e c t s p l a n n i n g • e n v i r o n m e n t a l s t u d i e s 187 Tank Farm Road, Suite 230, San Luis Obispo, CA 93401 phone: 805.781.9800 fax: 805.781.9803 NV (W)186.30 SUMP91 8 9 . 9 3 F G 201.07F S 200.94FS200.58FS200.81FG2 0 1 . 5 5 FS 2 0 1 . 1 1FS 199.80 TG190.80 SUMP18200.92FG200.64FS193.66FS2 0 1 . 2 5 F S 201.07FS190.16FS190.16F S 190.80FS2.1%200.90FS201.00FG201.00FG200.62F G200.41FS2.1%2 0 0 . 2 5 FS 2 0 0 . 2 4 FS 200.35FS200.64FS1.4%200.90FS19 1 . 8 1 FS 19 1 . 9 4 FS 19 1 . 2 2 FS 19 0 . 4 4 FS 19 0 . 1 1 FS 18 9 . 9 6 FS 18 9 . 9 6 FS191.54F S 19 1 . 2 0 FS 191.04FS19 0 . 8 2 FS 4.1%1 9 0 . 2 8 F S 190.07FS1 9 0 . 3 6 F S 1 9 0 . 2 0 F S 2.0%3.9%190.39FS1 9 0 . 6 8 F S 190.68F S 190.34FS190.34FS190.48FS190.05FS2.0%3.5%2.8%20 1 . 0 7 F S 20 1 . 0 7 F S 20 0 . 9 1 F S 2 0 0 . 9 1 F S 189.98 FS201.07FS193.43 FG 193 . 7 2 FG 19 3 . 1 0 F G 19 3 . 9 1 FG 200.94FG196.29FG2 0 0 . 9 4 F S 2.0%19 0 . 3 1 F S 200.95FS200 . 9 6 FS 200.96 FS 201.07FS511 FT511.5 FT201.22FS200.57FS200.35FS0.8%0.8%194.50 FL 193.29 TG191.29 INV75.0%2.0%195194194 201 E C3 189.93FG59 FT189.86 TG187.36 INV.200.5%19019020120120144201201 2 0 0 2001020 0 . 7 9 FL 20 0 . 4 7 FL 200.03FL10200.83FS200.83FS200.82FS10PG E TRANSFOR0ER BY OT+ERS 2 0 2 . 7 1 F S 200.55FS194.29FL194. 1 9 FL 2.0%1.7%200.26FS200.20FS13.4%15.0%3.9%9.7%200.99FG200.89FS5%MIN193.47FL8200.08 FL 17172.0%190.48 TG187.98 INV .20 F C3 17.3'1515152 0 0 . 8 1 T G 1 9 6 . 1 7 I N V . 2 0 200. 9 8 T G 197. 0 6 I N V . 20 20 0 . 8 2 T G 19 6 . 5 3 I N V . 20BENCHMARKEXISTING UTILITY LOCATIONS SHOWN HERON ARE APPROXIMATE ONLY. IT SHALL BE THECONTRACTOR'S RESPONSIBILITY TO DETERMINE THE EXACT VERTICAL AND HORIZONTALLOCATION OF ALL EXISTING UNDERGROUND UTILITIES PRIOR TO COMMENCING CONSTRUCTION.NO REPRESENTATION IS MADE THAT ALL EXISTING UTILITIES ARE SHOWN HEREON. THEENGINEER ASSUMES NO RESPONSIBILITY FOR UTILITIES NOT SHOWN IN THEIR PROPERLOCATION.DISCLAIMER NOTE:Avoid cutting undergroundutility lines. It's costly.CallOR1-800-642-2444Call before you D gFF2% MINCONCRETE8" MIN5% MINFOR 10'BUILDING SLAB SECTIONGEOTECHNICAL REPORTEARTHWORKSSITE DATAPROJECT No. SL-16264-SADATED: APRIL 21, 2011AS PREPARED BY:EARTH SYSTEMS PACIFIC, INC.CUT = 1,266 CYFILL = 678 CYNET = 588 CY CUTAPN No.002-412-011ACREAGE:0.89ZONINGO-H1005SCALE: 1" =1010'TOPOGRAPHIC SURVEY PROJECT No. 2005512DATED: JUNE 2006AS PREPARED BY:RRM DESIGN GROUPFLOOD ZONE INFORMATIONA PORTION OF THE PROPERTY LIES WITHIN ZONE X, AN AREA OUTSIDE OF 0.2% ANNUAL CHANCEOF FLOOD HAZARD PER FEMA PANEL NO. 06079C1068G, EFFECTIVE DATE 11/16/2012.A PORTION OF THE PROPERTY LIES WITHIN ZONE AE, AN AREA TO BE DETERMINED TO HAVE A 1%ANNUAL CHANCE OF FLOOD HAZARD, BASE FLOOD ELEVATION OF 188 PER FEMA PANEL NO.06079C1068G, EFFECTIVE DATE 11/16/2012.THE BENCHMARK FOR THIS SURVEY BEING A LEAD AND TACK ON THE WESTERLY CURB 50 FEET(15 m) NORTH OF THE NWC OF NIPOMO & DANA, ELEVATION BEING 190.00 FEET (57.910 m)DATE: DRAFTER: CHECKED: SCALE:SHEETSHEET OF SHEETSDESCRIPTION:REV:DATE: E N G I E E R I N GN D E S GI N P R O F E S S I O N A L S ,I N C . L 0 S 0 S C A 0 5 .6 0 2 .6 1 6 7 |E D P I N C 0 R P O R A T E D .C O M 0 S 8 7/6/2022 DS DSC225 7/6/20221" = 10' GRADING PLAN SAN LUIS OBISPO REPERTORY THEATRE MONTEREY STREET SAN LUIS OBISPO, CA APN# 002-412-011 R EGISTE R E D PROFESSIONAL ENGINEERSTATE OF CALIFORN I A EXP.CIVILNO. 81227D A NI EL A. SOTELOPRELI0INARYARCH-0221-202213654DEEPENED FOOTING, MAX DEPTH PER PLAN (SEE STRUCTURALPLANS FOR DETAILS).CONSTRUCT RETAINING WALL, MAX WALL HEIGHT AND LENGTH PER WALLPLAN AND PROFILES, SHEET C3. (SEE STRUCTURAL PLANS FOR WALLDETAILING). CONTRACTOR TO PROVIDE ASPHALTIC WATER PROOFING,BACK OF WALL DRAIN, AND WEEPHOLES PER GEOTECHNICAL REPORT.CONTRACTOR TO PROVIDE EDGE PROTECTION WHERE REQUIRED PER CBCREQUIREMENTS.CONSTRUCT 4" CONCRETE OVER 4" TO 6" OF IMPORTED SAND OVER 18"TYPE II AGGREGATE BASE REINFORCED WITH NO. 3 BARS PLACED AT 24IN O.C. BOTH WAYS PER GEOTECHNICAL REPORT.8CONSTRUCT STAIRS PER CBC REQUIREMENTS.97CONSTRUCTION NOTES21011121613TRASH ENCLOSURE (SEE ARCHITECTURAL PLANS FOR DETAILS)PROTECT TREE PER CITY OF SLO STANDARD 77-1.03A (2) TREE PROTECTION1415RAISED PLANTER BED (SEE LANDSCAPE PLANS FOR DETAILS)DECORATIVE CONCRETE (SEE LANDSCAPE PLANS FOR DETAILS)GRASSCRETE (SEE LANDSCAPE PLANS FOR DETAILS)CONTRACTOR TO INSTALL REMOVABLE BOLLARDSCONSTRUCT FLOW LINE AS SHOWNBENCH (SEE LANDSCAPE PLAN FOR DETAILS)LEGENDPROPERTY BOUNDARYRIGHT OF WAYPROPERTY LINESECTION LINECENTER LINEEASEMENTEXISTING BACK OF CURBEXISTING FACE OF CURBEXISTING LIP OF CURBEXISTING MAJOR CONTOUR LINEEXISTING MINOR CONTOUR LINEEXISTING FENCEEXISTING EDGE OF SIDEWALKBUILDINGSCONCRETEBACK OF CURBFACE OF CURBCURB LIPFLOW LINEGRADE BREAKSAWCUTSIDEWALKSETBACKXXX(100)(101)||||||||||||||||||||||||||||||TOP BACK CURBFINISH GRADEEDGE OF PAVEMENTFLOW LINEASPHALT CONCRETE(00.00)TC(00.00)EG(00.00)EP(00.00)FL(00.00)ACTOP BACK CURBEXISTING GROUNDEDGE OF PAVEMENTFLOW LINEASPHALT CONCRETEPROPOSEDEXISTING00.00TC00.00FG00.00EP00.00FL00.00ACLEGENDHIGH POINT00.00HP(00.00)TRW(00.00)TFTOP OF RET. WALLTOP OF FOOTERTOP OF RET. WALLTOP OF FOOTER00.00TRW00.00TF(0" CURB WHERE APPLIES)INSTALL 12"X12" MIDSTATE CATCH BASIN WITH GRATE OR EQUIVALENTPER MANUFACTURERS SPECIFICATIONS. GRATE TO BE TRAFFIC RATEDNEAR DRIVEWAY LOCATIONS.ADS MANHOLE WITH GRATE COVER PER MANUFACTURER'SSPECIFICATIONS. MANHOLE AND GRATE TO BE TRAFFIC RATED NEARDRIVEWAY LOCATIONS.DECOMPOSED GRANITE (SEE ARCHITECTURAL PLANS FOR DETAILS)174" IRON CAST IRON PIPE18PHASE 2 - ADS MANHOLE19PHASE 2 - RETAINING WALL20PHASE 2 - 12X12 MIDSTATE CATCH BASINA ARCHITECTURAL REVIEW1/14/2020 B ARCHITECTURAL REVIEW - BASEMENT REMOVED3/22/2022 C ARCHITECTURAL REVIEW - LANDSCAPE REVISION4/20/2022 D ARCHITECTURAL REVIEW - 2ND SUBMITTAL7/6/2022LANDINGS (SEE ARCH PLANS FOR DETAILS) 1 From:Ryan Stefanek <rstefanek@kitchell.com> Sent:Tuesday, August 29, 2023 1:00 PM To:Marquart, Ben Cc:Tally Richtsmeier Subject:Tree #029 Back Story Attachments:PCO #005 Cover Sheet DRAFT REV 1.docx Hey Ben, As discussed here it the back story for the Tree #029 removal, and the updated cover sheet (Draft REV 1). The original plan on the contract documents was that Tree #029 would be removed and relocated from site as a separate project, not attached to either phase 1B or phase 2 of our project. Once the soils impacts were discovered replanting was no longer an option and the tree needed to be removed to facilitate the removal of all the lead soils. It looks like the relocation cost is captured in the phase 2 documents (1st screen shot below) but there is a little ambiguity as the design team also attached the Phase 1B demolition documents that indicate the tree is to be relocated by the city (2 nd screen shot). Let me know if you have any other questions. LP-1.3 – Phase 2 2 C2.2 – Phase 1B Thanks, Ryan Stefanek, Project Manager I Kitchell CEM 1540 Marsh St. Suite 150 San Luis Obispo, CA 93401 Cell: 805-674-6598 | Direct: 916-713-6975 Follow us: Facebook | Twitter | LinkedIn | KitchellProgress.com CITY OF SAN LUIS OBISPO, CALIFORNIA CONTRACT CHANGE ORDER (CCO) 1 CCO Number: 005 Sheets: 1 of 1 Date: 8-22-2023 Project: Cultural arts District Parking Structure, Phase 1B To: Edwards Construction Group Specification No.: 90435-1B Requested by: City of San Luis Obispo Approval Authority: X City Engineer City Manager City Council You are authorized and directed to make the described changes from the plans and specifications, or to increase or decrease contract quantities, as follows: Due to the impacted soils on site, the Phoenix Palm (Tree #029) per drawing page C-2.2 is to be removed. The contract documents for Phase 1B indicated that the Phoenix Palm would be relocated by the City to an off-site location. Due to the presence of impacted soils the removal of the Phoenix Palm is being added to Phase 1B to allow the impacted soils to be fully removed from site in preparation for Phase 2. The cost includes labor, equipment, and disposal fees for the full removal of Tree #029. Description of Work Amount Total By reason of this proposed change 0 day(s) extension of time will be allowed. There are 24 working days left on this project. Total cost of change shall not exceed / is estimated as: $2,254.89 We, the undersigned contractor, have given careful consideration to the changes proposed and agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may be noted above and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above. Accepted by: Contractor's Authorized Agent Date accepted Accepted by: Project Construction Manager Date accepted Submitted by: Resident Engineer Date submitted Submitted by: Project Manager Date submitted Approved by: City Engineer Date approved CITY OF SAN LUIS OBISPO, CALIFORNIA CONTRACT CHANGE ORDER (CCO) 2 Date approved by City Manager or Council \\chstore8\PublicWorks\Projects\ActiveProjects\Sewer\1000091 Verde Luneta Ramona Sewer Replacement Project\700 Construction Files\710 Change Orders\CCO-6\Contract Change Order-006.docx TREE REMOVAL APPLICATION RESIDENTIAL, COMMERCIAL, DEVELOPMENT Follow Non-Construction Tree Removal Criteria and Process here (SLOMC 12.24.090.E) Follow Construction Tree Removal Criteria and Process here (SLOMC 12.24.090.F) Owner: Applicant: Address: Address: City: Zip: City: Zip: Phone: Phone: Email: Email: Address of Tree(s): Number of trees applying to remove? ____ Tree Species: Reason: Is this removal a City Tree?____ YES_____ NO_____ UNKNOWN Dog in yard?___ YES____ NO Is this property governed by a Homeowners Association (HOA)?___ YES____ NO If YES, please provide HOA Board Approved Meeting minutes authorizing tree removal(s) with your tree removal application. 1 Please include a photo log that clearly shows the trees requested for removal. All Tree(s) must be uniquely identified by a number and a ribbon or an identifier wrapped around the truck in the photo and prior to inspection 2 Please include a replanting plan in accordance with Section 12.24.090(J) of the City’s Municipal Code. A minimum of one new tree shall be planted for each tree authorized to be removed on the same property (on site) or two new trees shall be planted for each tree authorized to be removed when planted on a different property or within the public right-of- way (off site). Page 2 Tree Removal Decisions as outlined in Section 12.24.090 of the City’s Municipal Code  SELECT ONE CRITERIA FROM BELOW SUPPORTING TREE REMOVAL APPLICATION DECISION MAKER APPEAL BODY Imminent Hazard to Life or Property Section 12.24.090(E)(1)(a) City Arborist No Appeal Tree Health and Hazard Mitigation Section 12.24.090(E) City Arborist Tree Committee Convenience Removal (Tree Committee makes recommendation to Community Development Director) 12.24.090(E)(3) Community Development Director Planning Commission City Council Minor Ministerial Development Permit (removal for residential or accessory construction on an R-1 or R-2 lot) Section City Arborist Community Development Director Criteria for Discretionary Permits Construction Tree Removal Section 12.24.090(F)(3) Community Development Director Planning Commission City Council Major Development / Tentative Tract Map/ Conditional Use Permit Section 12.24.090(F)(4) Community Development Director City Council Please include a check for $175.69 along with completed application & documentation. Tree Removal applications may be submitted in person at 25 Prado Road at the City’s Corporation Yard in SLO or mailed to: City of San Luis Obispo Public Works- Urban Forest Services 25 Prado Road San Luis Obispo, CA 93401. 12.24.090(F)(1) Pursuant to San Luis Obispo Municipal Code 12.24.180, any person aggrieved by an act or determination of the authorized approving authority exercising the authority herein granted shall have the right to appeal the decision of the authorized approving authority. Appeals must be received by the city clerk within ten calendar days from the date of determination or act shall cause the director to withhold tree removal permits and any permits for construction or demolition activity relying on the subject tree removal until the appeal is heard and a decision is reached. The fee to appeal to the Tree Committee is $135.64 This tree removal application must be signed by the property owner or an Authorized Agent. I declare under penalty of perjury that all the facts stated within this tree removal application are true and correct. Property Owner Signature: _________________________________ Date:___________ Applicant’s Signature: _____________________________________ Date:___________ Please make check payable to the City of San Luis Obispo $175.69 Check#: __________ 227 From:Tally Richtsmeier <trichts@kitchell.com> Sent:Tuesday, April 1, 2025 2:19 PM To:Marquart, Ben Subject:Fw: Tree Permit - CADPS Attachments:SLO Rep Landscape and Tree Removal Plans.pdf; Tree removal app - Needs Kevin Signature.pdf From: Ryan Stefanek <rstefanek@kitchell.com> Sent: Thursday, May 18, 2023 1:00 PM To: Tally Perry <tperry@kitchell.com> Subject: FW: Tree Permit - CADPS Thanks, Ryan Stefanek, Project Manager I Kitchell CEM 1540 Marsh St. Suite 150 San Luis Obispo, CA 93401 Cell: 805-674-6598 | Direct: 916-713-6975 Follow us: Facebook | Twitter | LinkedIn | KitchellProgress.com From: Whipple, Anthony <awhipple@slocity.org> Sent: Thursday, April 13, 2023 3:18 PM To: Ryan Stefanek <rstefanek@kitchell.com> Cc: Marquart, Ben <bmarquar@slocity.org>; Sabatini, Hayley <hsabatin@slocity.org> Subject: RE: Tree Permit - CADPS EXTERNAL EMAIL Hi Ryan, Yes that’s the one I have attached the original application as well as the revised landscape plan. Let me know if you have any questions Respectfully, Anthony Anthony Whipple City Arborist/Urban Forest Services Supervisor 228 Public Works Urban Forest Services 25 Prado Road, San Luis Obispo, CA 93401-7314 E awhipple@slocity.org T 805.781.7021 C 805.431.0398 slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From: Ryan Stefanek <rstefanek@kitchell.com> Sent: Thursday, April 13, 2023 2:36 PM To: Whipple, Anthony <awhipple@slocity.org> Cc: Marquart, Ben <bmarquar@slocity.org> Subject: RE: Tree Permit - CADPS This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Hey Anthony, Thanks for taking the time to meet with us onsite to review the tree removal for the CADPS project. I was looking for the permit we need for the removal of the trees and wanted to confirm that the below link was to the correct form. https://www.slocity.org/home/showpublisheddocument/32089/637933840842430000 Also here is the screen shot of the phase 2 documents that show the 2 trees on the corner of Nipomo and Monterey are to be saved. Have you had a chance to look into the back ground on the 28” tree to see if it is to be removed? 229 Thanks, Ryan Stefanek, Project Manager I Kitchell CEM 1540 Marsh St. Suite 150 San Luis Obispo, CA 93401 Cell: 805-674-6598 | Direct: 916-713-6975 Follow us: Facebook | Twitter | LinkedIn | KitchellProgress.com SYMBOLS : NN A A-2 A A-2 A A-2 A A-2 AA TRU E N ORT H CROSS SECTION DETAIL INTERIOR ELEVATION SECTION LETTER SHEET WHERE SECTION IS LOCATED SHEET WHERE DETAIL IS LOCATED DETAIL NUMBER 1 2 3 4 INTERIOR ELEVATION NUMBER SHEET WHERE INTERIOR ELEVATION IS LOCATED DOOR NUMBER WINDOW NUMBER KEYNOTE REVISION NU MBER DOOR NUMBER WINDOW NUMBER NUMBER OR LETTER REVISION NUMBER BENCHES 2 FT. SEPARATION PG&E TRANSFORMER R R OT T 3 BIKE LOCKERS TRASH ENCL. BELOW PER CITY STDS. SITE PLAN SHEET INDEX LABEL TIT LE A-1.0 SITE PLAN , VIC NITY MAP, PROJECT D AT A, GENERAL NOTES A-2 COLOR ELEVATIONS A-3 CODE AN ALYSIS A-4 FL OOR PLAN A-4.1 MEZZANINE-CO NTR OL ROOMS PLANS A-4.2 ROOF PLAN A-5 DOOR AN D WINDOW SCHEDUL ES, RATED WALLS SPECS, ST OR EFRO NT AND GLAZING SYSTEM A-5.1 TERR COTTA RAIN SC REEN DET AIL S A-6 ELEVATIONS A-6.1 ELEVATIONS A-7 RENDERINGS A-8 SEC TIONS A-8.1 SEC TIONS A-8.2 SEC TIONS A-9 EXI TING PLAN A-10 ACCESSIBILITY DETAILS A-11.1 REFLECD TED CEILING PLAN- 2ND F LOOR A-12 INTERIOR ELEVATIONS A-12.1 INTERIOR ELEVATIONS C1 CIVIL NOTES C2 GRADING PLAN C3 CIVIL DETAIL SHEET C4 UTIL ITY PLAN C-5 UTIL ITY PLAN L-1 CONCEPTUAL LANDSCAPE PLAN L2 CONCEPTUAL LANDSCAPE PLAN S1.2 MAIN FL OOR: FOUND AT ION & F RAMING PLAN S1.3 SEC OND FLOOR: FRAMING PLAN S1.4 LOW ROOF & CATWALK: FRAMING PLAN S1.5 HIGH RO OF: FRAMIN G PLAN M-0.0 MECHANICAL NOTES, LEGEND & ABBREVIATIONS M-1.0 MECHANICAL SCHEDULES M-1.1 MECHANICAL SCHEDULES M-2.0 MECHANICAL DETAILS M-2.1 MECHANICAL DETAILS M-3.0 MECHANICAL BASEMENT LEVEL ZONE PLAN M-3.1 MECHANICAL BASEMENT LEVEL FLOOR PLAN M-3.2 MECHANICAL BASEMENT LEVEL HYDR ONIC PIPING PLAN M-4.0 MECHANICAL FRIST FLOOR ZONE PLAN M-4.1 MECHANICAL FIRST FLOOR PLAN M-4.2 MECHANICAL FIRST FLOOR HYD RONIC PIPING PLAN M-5.0 MECHANICAL SECON D FLO OR ZONE PL AN M-5.1 MECHANICAL SECON D FLO OR PLAN M-5.2 MECHANICAL CATWALK LEVEL FLOOR PLAN M-5.3 MECHANICAL SECON D FLO OR HYDR ONIC PIPING PLAN M-6.0 MECHANICAL ROOF DECK LEVEL ZONEN PLAN M-6.1 MECHANICAL ROOF DECK LEVEL PLAN- ALL ELECTRIC CENTRAL PLANT OPT ION 1 EXHIBIT M-6.2 MECHANICAL ROOF DECK LEVEL FLOOR PLAN- ALL ELECTRIC CEN TRAL PLANT O PTION 2 EXHIBIT M-6.3 MECHANICAL ROOF DECK HYD RON IC PIPIN G PLAN M-7.0 MECHANICAL ROOF DECK LEVEL FLOOR PLAN- STANDARD GAS HEATING EXH IBIT MC-1 MECHANICAL CONTR OLS MC-2 MECHANICAL CONTR OLS MC-3 MECHANICAL CONTR OLS MC-4 MECHANICAL CONTR OLS MC-5 MECHANICAL CONTR OLS P1.0 PLUMBING NOT ES, SCHEDULES, LEGEND & ABBR EVIATIONS P2.0 PLUMBING DETAILS P3.0 PLUMBING BASEMEN T WASTE & VEN T PLAN P3.1 PLUMBING BASMEMEN T WAT ER PLAN P4.0 PLUMBING FIRST FLOOR WASTE & VENT PLAN P4.1 PLUMBING FIRST FLOOR WATER PLAN P5.0 PLUMBING SECOND F LOOR PLAN P6.0 PLUMBING ROOF PLAN E-1 GEN ERAL NOTES, SYMBOLS AND ABBREVIATIONS E-5 SINGLE LIN E D IAGRAM E-6 ELECTRICAL SCHEDULES E-9 ELECTRICAL SITE PLAN E-10 BASEMENT LEVEL POWER PLAN E-11 FIR ST FLOOR POWER PL AN E-12 SEC OND FLOOR POWER PLAN E-13 CATWALK LEVEL POWER PLAN E-14 ROOF POWER PLAN E-15 BASEMENT LEVEL LIGHT ING PLAN E-16 FIR ST FLOOR LIGH TING PLAN E-17 SEC OND FLOOR LIGHTING PLAN E-16 CATWALK LEVEL LIGHTING PLAN E-20 ELECTRICAL DETAILS T-GA001 GEN ERAL ARRANGEMEN TS COVER SHEET & INDEX T-GA002 GEN ERAL ARRANGEMEN TS COORD ZONE PLANS T-GA010 GEN ERAL ARRANGEMEN TS THEATRICAL POWER KEYS & DET AILS T-GA011 GEN ERAL ARRANGEMEN TS THEATRICAL POWER PLANS T-GA012 GEN ERAL ARRANGMENTS THEATRIC AL POWER PLANS T-GA020 GEN ERAL ARRANGEMEN TS THEATRICAL LIG HTING KEYS & DET AIL S T-GA021 GEN ERAL ARRANGEMEN TS THEATRICAL ZONE LIGHTIN G PLANS T-GA022 GEN ERAL ARRANGEMEN TS THEATRICAL ZONE LIGHTIN G PLANS T-GA030 GEN ERAL ARRANGEMEN TS CABLE MANAGEMENT KEY & DETAILS T-GA031 GEN ERAL ARRANGEMEN TS CABLE MANAGEMENT/SERVICES PLAN T-GA032 GEN ERAL ARRANGEMEN TS CABLE MANAGEMENT/SERVICE PLAN S T-GA040 GEN ERAL ARRANGEMEN TS INFRASTR UCTUR E, FINISHES, & DETAILS T-GA041 GEN ERAL ARRANGEMEN TS INFRASTR UCTUR E, FINISHES, & DETAILS T-GA042 GEN ERAL ARRANGEMEN TS INFRASTR UCTUR E, FINISHES, & DETAILS T-GA043 GEN ERAL ARRANGMENTS INF RASTRUCTURE, FINISHES & D ET AILS T-TE111 THEATRE EQUIPMENT BASEMENT LEVEL PLAN T-TE112 THEATRE EQUIPMENT STAGE LEVEL PLAN T-TE113 THEATRE EQUIPMENT BALC ONY LEVEL PLAN T-TE114 THEATRE EQUIPMENT CATWALK LEVEL PLAN T-TE121 THEATRE EQUIPMENT CENTERLINE SECTION T-TE122 THEATRE EQUIPMENT TRANSVERSE SECTIONS T-TE123 THEATRE EQUIPMENT BLAC K BO X SECTIONS T-TE131 THEATRE EQUIPMENT STAGE TRAP PLATFORM DETAILS T-TE132 THEATRE EQUIPMENT CHAIN MO TOR CONTROL SYSTEM T-TL010 THEATRIC AL SWITCH ING AND CON TROL NOTES AND D ET AILS T-TL011 THEATRIC AL LI GHTING SYSTEM SWITCH ING & CTRL BOX SCHEDULES T-TL012 THEATRIC AL LI GHTING SYSTEM SWITCH ING @ CTRL BOX SCHEDULES T-TL021 THEATRIC AL LI GHITNG SWITCH ING AND CON TROL PH ILOSO PHY-T HRUST THEATRE T-TL022 THEATRIC AL LI GHTING SWITCH ING AND CON TROL PH ILOSO PHY- BLACK BOX T-TL111 THEATRIC AL LI GHTING SWITCH ING AND CON TROL PL AN T-TL112 THEATRIC AL LI GHTING SWITCH ING AND CON TROL PL AN T-TL113 THEATRIC AL LI GHTING SWITCH ING AND CON TROL PL AN T-TL114 THEATRIC AL LI GHTING SWITCH ING AND CON TROL PL AN T-TL131 THEATRIC AL LI GHTING FACEPLATE DETAILS T-TS010 THEATRE SEATING NOTES AND DET AILS T-TS111 THEATRE SEATING -INF ILL VOMS PLAN-TH RUST TH EATR E T-TS112 THEATRE SEATING-O PEN VOMS PLAN-THRUST THEATRE T-TS113 THEATRE SEATING-BAL CON Y LEVEL-THRU ST THEATRE T-TS121 THEATRE SEATING THRUST THEAT RE CENTERLINE SEC TION T-TS211 THEATRE SEATING BLACK BOX PLAN CONFIGURATION PLANS- F OR REFERENCE NIC L-1 LANDSCAPE PLAN & COLOR ELEVAT ION L-2 PLANT LIST SITE PLAN, VICNITY MAP, PROJECT DATA, GENERAL NOTES DESCRIPTION:BY: BRYCE ENGSTROM ARCHITECTAll common law copyright and other property rightsreserve this document as an original and unpublishedwork product of Bryce Engstrom: Architect, and thiswork shall not be duplicated, copied, disclosed, orused in connection with any other work or projectother than the specific product for which it has beenprepared or assigned to any third party, withoutexpress written consent of Bryce Engstrom:ArchitectARCHITECT:BRYCE ENGSTROM210 TRAFFIC WAY SUITE EARROYO GRANDE, CA 93420(805)235-3385SHEET:REVISION TABLENUMBERDATEREVISED BYDESCRIPTIONOWNER:SAN LUIS OBISPO REPERTORYTHEATRE888 MORRO STREETSAN LUIS OBISPO, CA 93401(805)786-2440A-1.0 SCALE: 1 "=10'-0"SAN LUIS OBISPOREPERTORY THEATREMONTEREY STREETSAN LUIS OBISPO, CAVICINITY MAP (NO SCALE)PROJECT LOCATION X APPLICABLE CODES: 1 ST. FLOOR TOTAL:10,562/20,036= 53% OCCUPANCY GROUP: A1 PR OJECT DATA: A.P.N. TBD- LOTS TO BE COMBINED ZONING DESIGNATION: C-D W/ HISTORIC PRESERVATION OVERLAY W/ GENERAL PLAN AMENDMENT LOT SIZE: 20,036 SQ.FT. (USING ASSUMED P.L. AT PARKING GARAGE) PROPOSED COVERAGE: TOTAL LANDSCAPED AREA: TBD- SEE LANDSCAPING SHEETS CONSTRUCTION TYPE VA- FIRE SPRINKLERS PROJECT DESCRIPTION: CONSTRUCT NEW PERFORMING ARTS THEATRE CO NSULTA NTS LIS T AR CHITEC T: BR YCE ENGSTRO M 210 TRAFFIC WAY SUIT E E AR ROYO GRANDE, CA 93420 (805)235-3385 brycethearchitect@g mail.com CIVIL ENGINE ER: DANIE L SOTELO 3590 SACRAMENTO DRIV E SUITE 210 SAN L UIS OBISPO , CA 934 05 (805)602-6167d dsotelo@edpincorporated.com 2019 CALIF ORN IA BUILD ING C ODE (CBC) 2019 CALIF ORN IA H IST ORIC AL BUILD ING C ODE (CHBC) 2019 CALIF ORN IA EXISTING BUILDING CODE (CEBC) 2019 CALIF ORN IA GREEN BUILDING STANDARDS CODE (CGBSC ) 2019 CALIF ORN IA MECH ANI CAL C ODE (CMC) 2019 CALIF ORN IA PLUMBING CODE (CPC) 2019 CALIF ORN IA ELECTR ICAL COD E (CEC) 2019 CALIF ORN IA ENERGY CODE (C EC PART 6) 2019 CALIF ORN IA FIRE CODE (CFC) PAD CE RT IFICAT ION A SOILS OR CIVIL ENGINEER TO DETERMINE GRADING PERFORMED IS IN SUBSTANTIAL CONFORMANCE WITH THE APPROVED PLANS AND IS SUITABLE TO SUPPORT THE INTENDED STRUCTURE. LANDSCAPE AR CHITEC T: FIRMA CO NSULTANTS 187 TANK FARM RO AD SA N LUIS OBISPO , CA 93401 (805 )781-980 0 lindsay@firmaconsultants.com 1.ALL WORK SHALL CONFORM TO: A) THE MI NIMUM STANDARDS OF THE LATEST EDITION (OR THE CURRENT EDITION IN EFFECT) OF THE CALIFORNIA BUILDING CODE AND ALL RELATED DOCUMENTS THAT ARE PUBLISHED BY THE I.C.C.. WHI CH HAVE BEEN ADOPTED BY THE LOCAL GOVERNING AGENCY; B) ALL REGULATION AND ORDINANCE OF ALL LOCAL GOVERNING AGENCIES; AND C) ANY SPECIAL CONDITIONS REQUIRED BY THE LOCAL GOVERNING AGENCIES. 2.A CERTIFI CATE OF CONSTRUCTION COMPLIANCE, SIGNED BY THE GENERAL CONTRACTOR BASED UPON HIS OBSERVATION OF THE CONSTRUCTION WORK SHALL BE SUBMITTED TO THE INSPECTING BUILDING OFFICIAL PRIOR TO I SSUANCE OF A CERTIFICATE OF OCCUPANCY. 3.ALL WORK DESCRIBED IN THE DRAWINGS SHALL BE VERIFI ED FOR DIMENSION, GRADE, EXTENT AND COMPATIBILI TY TO THE EXI STING SI TE. ANY DISCREPANCIES AND UNEXPECTED CONDITIONS THAT AFFECT OR CHANGE THE WORK DESCRI BED IN THE CONTRACT DOCUMENTS SHALL BE BROUGHT TO THE ARCHITECT'S ATTENTION IMMEDI ATELY. DO NOT PROCEED WITH THE WORK IN THE AREA OF DISCREPANCIES UNTIL ALL SUCH DISCREPANCIES ARE RESOLVED. IF THE CONTRACTOR CHOOSES TO DO SO HE SHALL BE PRECEDING AT HIS OWN RISK. 4.OMISSI ONS FROM THE DRAWINGS AND SPECIFICATI ON OR THE MIS-DESCRIPTI ON OF THE WORK WHICH IS MANIFESTLY NECESSARY TO CARRY OUT THE INTENT OF THE DRAWI NGS AND SPECIFICATIONS, OR WHICH IS CUSTOMARILY PERFORMED, SHALL NOT RELIEVE THE CONTRACTOR FROM PERFORMING SUCH OMITTED OR MIS- DESCRIBED DETAILS OF THE WORK AS I F FULLY AND COMPLETELY SET FORTH AND DESCRIBED IN THE DRAWINGS AND SPECIFI CATIONS. 5.DIMENSIONS SHOWN SHALL TAKE PRECEDENCE OVER DRAWING SCALE OR PROPORTION. LARGER SCALE DRAWING SHALL TAKE PRECEDENCE OVER SMALLER SCALE DRAWINGS. 6.WALL AND CEILING MATERIALS SHALL NOT EXCEED THE FLAME SPREAD CLASSIFICATIONS IN CBC TABLE 803.11 7.THE SOI LS ENGINEER WILL NEED TO VERIFY IN WRITING BY FOOTING INSPECTION, AND PRI OR TO STEEL PLACEMENT, THAT THE FOOTINGS ARE INTO UNI FORM COMPETENT NATIVE MATERIAL OR OTHERWISE PREPARED ACCORDING TO SOILS ENGINEER RECOMMENDATIONS. 8.ANY PERSON USING A TORCH OR OTHER FLAME-PRODUCING DEVICE FOR SWEATING PI PE JOINTS FROM OR IN ANY BUILDING OR STRUCTURE SHALL PROVI DE ONE APPROVED FIRE EXTINGUISHER ON THE PREMISES WHERE SAID BURNING OPERATION IS PERFORMED. COMBUSTIBLE MATERIAL IN THE CLOSE PROXIMI TY OF OPEN FLAME SHALL BE PROTECTED AGAINST IGNITION BY SHI ELDING, WETTING OR OTHER MEANS. IN ALL CASES, A FIRE WATCH SHALL BE MAI NTAINED IN THE VICI NITY OF THE OPERATION FOR ONE-HALF HOUR AFTER THE TORCH OR FLAME-PRODUCING DEVICE HAS BEEN USED. REFER TO C.F.C. CHAPTER 3 FOR ADDI TIONAL MEASURES. 9.SITE CONDITIONS: ALL CONTRACTORS AND SUB-CONTRACTORS SHALL VERIFY DIMENSIONS AND CONDITIONS AT THE SITE PRIOR TO COMMENCEMENT OF THEI R WORK. FAILURE TO DO SO SHALL NOT RELEASE THEM FROM THE RESPONSI BILITY OF ESTIMATING THE WORK. IF ANY VARIATION, DISCREPANCY OR OMISSI ON (BETWEEN THE INTENT OF THESE CONTRACT DOCUMENTS AND THE EXISTING CONDITIONS ARE FOUND, THE CONTRACTOR OR SUB- CONTRACTOR SHALL NOTIFY THE ARCHITECT IN WRITING AND OBTAIN WRITTEN RESOLUTION FROM BRYCE ENGSTROM: ARCHI TECT PRI OR TO PROCEEDING WITH ANY RELATED WORK. 10.TEMPORARY FACI LITIES: CONTRACTOR SHALL PAY FOR, PROVIDE AND MAINTAIN TEMPORARY FACILITIES FOR PROJECT PROTECTION AND CONSTRUCTION, AND AS REQUIRED BY LOCAL REGULATION AND THESE DOCUMENTS, SUCH FACILI TIES INCLUDE BUT ARE NOT LIMITED TO: TOILETS, LIGHTS, HEATERS, POWER, GAS, FANS, WATER, PHONES, FENCES, SIGNS, SHEDS. ETC. REMOVE FROM SITE UPON COMPLETION OF WORK. OBTAIN BUI LDING OFFICIAL OR FIRE MARTIAL APPROVAL PRIOR TO USE OF ANY TEMPORARY HEATING DEVICE. 11.PROTECTION AND SAFETY: CONTRACTOR SHALL PROVI DE AND BE RESPONSIBLE FOR ALL TIMES (SIGNS, LIGHTS, FENCES, BRACING, ANCHORAGE, FIRE-EXTI NGUISHERS, ETC) NECESSARY FOR THE PROTECTION OF THE PUBLIC, WORKERS, MATERIALS, CONSTRUCTION AND PROPERTY PER LOCAL, STATE, AND FEDERAL REQUIREMENTS (I NCLUDING EARTHQUAKES, FI RES, SPILLS, ACCIDENTS, EROSION, MUD, DUST, ETC.) STAGING OF MATERI ALS AND EQUIPMENT SHALL NOT OVERLOAD ANY EXISTI NG, NEW AND/OR TEMPORARY STRUCTURES ON THE BUILDING SI TE. 12.CHANGES: CHANGES TO APPROVED PLANS AND SPECIFICATIONS SHALL BE MADE ONLY I N WRITING AND SHALL BE APPROVED BY THE ARCHITECT. CONTRACTOR SHALL ASSUME RESPONSIBI LITY AND COSTS FOR ALL CHANGES LATER IN THE PROJECT CAUSED BY THE ORIGINAL CHANGE. 13.SUBSTITUTIONS: SUBSTI TUTIONS REQUIRE OWNER AND ARCHITECTS APPROVAL FAILURE TO GAIN APPROVAL IS SUFFICI ENT GROUNDS FOR ORDERING REMOVAL OF PRODUCT AT CONTRACTOR'S EXPENSE. 14.ALL APPLIANCES, PLUMBING FIXTURES, CABINETS/BUILT-I NS, ACCESSORIES AND FINISHES LISTED ON THE DRAWINGS SHALL BE SPECIFIED BY THE OWNER OR OWNER'S REPRESENTATIVE U.O.N. 15.ALL MECHANICAL DUCTWORK SHALL BE CONSTRUCTED AND INSTALLED IN ACCORDANCE WITH 2016 CALIFORNIA MECHANICAL CODE 16.EROSION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICES MUST BE IN PLACE AND FUNCTIONAL PRIOR TO THE FIRST INSPECTION. NO INSPECTIONS CAN BE PERFORMED IF THEY ARE NOT IN PLACE OR HAVE FAI LED TO PROVIDE EROSION CONTROL. FAILURE TO MAINTAIN EROSION CONTROL WILL CAUSE INSPECTIONS TO BE DELAYED UNTIL EROSI ON CONTROL MEASURES ARE FUNCTIONAL. 17.AN OPERATION AND MAINTENANCE MANUAL SHALL BE PROVIDED TO THE BUILDING OCCUPANT OWNER. (THESE NOTES APPLY TO ALL PORTI ONS, PHASES & SUBCONTRACTOS OF THIS PROJECT) USE OF PLANS: THESE PLANS ARE THE PROPERTY OF BRYCE ENGSTROM: ARCHITECT AND MAY NOT BE USED WITHOUT EXPRESS, WRITTEN CONSENT. GENERAL NOTES: RISK CATEGORY: III FIRST FLOOR-10,562 SQ.FT. TOTAL:10,562/20,036= 0.53 FLOOR AREA RATIO: NOTE: NON-LANDSCAPE WATER SAVING FEATURES- COMMISSIONING OPR DOCUCUMENT STATES TARGET WATER SAVING 25% BETTER THAN TITLE 24. SEE LANDSCAPE PLANS FOR LANDSCAPE WATER SAVING FEATURES. NOTE: CONSTRUCTION DOCUMENTS SHALL COMPLY WITH ALL CITY OF SAN LUIS OBISPO GREEN CHECKLIST ITEMS DESCRIPTION OF PROPOSED USE: PERFORMING ARTS THEATRE INCLUDING TWO PERFORMANCE SPACES, LOBBY, AND GREEN ROOM/ACTOR SUPPORT AREAS ON CITY OWNED LOTS. 10,562 SQ.FT. HOURS OF OPERATION- MONDAY THROUGH SUNDAY 9 AM TO 9PM WITH VARIATIONS IN SCHEDULES THROUGHOUT THE WEEK. MAIN EVENING PERFORMANCES ARE THURSDAY-SUNDAY 7-10PM, SATURDAY AND SUNDAY MATINEES AT 2-5 PM. NO PARKING SPACES ON SITE ARE PROPOSED. PARKING: 10,562 GROSS SQ.FT./ 350= 30 CAR PARKING SPACES REQUIRED GREEN BUILDING: PROJECT SHALL COMPLY WITH ALL CITY GREEN BUILDING CHECKLIST REQUIREMENTS PROJECT NARRATIVE: THE NEW SAN LUIS OBISPO REPERTORY THEATRE BUILDING HONORS THE TIME-WORN AND ANCIENT NATIVE BUILDING MATERIALS USED DURING THE MISSION ERA SUCH AS EXTERIOR PLASTER, WHICH IS USED IN ITS TRADITIONAL FORM, AND TERRA COTTA CLAY, WHICH IS USED IN A MODERN, RE-IMAGINED WAY VIA AN INNOVATIVE RAIN SCREEN PANEL SYSTEM. IT ALSO USES 12x12 TERRA COTTA QUARRY TILES AT THE FRONT AND REAR OF THE BUILDING. THE NEW THEATRE LOOKS FORWARD WITH MORE CONTEMPORARY FORMS FOUND IN THE NEIGHBORING CHILDREN'S MUSEUM, AND IN KEEPING WITH CURRENT PLANS FOR THE EVENTUAL ART MUSEUM. IT'S FORMS STEP BACK FROM MONTEREY STREET, HELP BREAK UP THE MORE MONOLITHIC PARKING GARAGE, AND PROVIDES INVITING ENTRANCES TO BOTH BUILDINGS. ACOUSTICIAN: 45dBACOUSTICS/BILLDOHNASSOC. P.O.BOX1406 SANLUISOBISPO,CA93406 (805)801-3434 dl@45dB.com 30 CAR PARKING SPACES X .40= 12 BIKE PARKING SPACES REQUIRED- 9 SHORT TERM, 3 LONG TERM SCALE: 1” – 10’-0” @ 30” x 42” SHEET SIZE 05'10'10' 20' 30' Scale: 1" = 10'-0" NORTH: Conceptual Landscape Plan SAN LUIS OBISPO REPERTORY THEATRE L-1 April 7, 2022 File Path: firma_SLO Repertory Theatre_21803 Last Date Modified: 040622 firma l a n d s c a p e a r c h i t e c t s p l a n n i n g • e n v i r o n m e n t a l s t u d i e s 187 Tank Farm Road, Suite 230, San Luis Obispo, CA 93401 phone: 805.781.9800 fax: 805.781.9803 SOLAR PANEL ARRAY ON PARKING STRUCTURE, REFER TO WATRY DESIGN PLANS April 7, 2022NORTH: L-2 May 23, 20188'24' File Path: firma_SLO Repertory Theatre_21803 Last Date Modified: 04062022 Conceptual Landscape Plan SAN LUIS OBISPO REPERTORY THEATRE L-28'24'04'8' 16' SCALE: 1/8" = 1'-0" 8' SCALE: 1/8” – 1’-0” @ 30” x 42” SHEET SIZEfirma l a n d s c a p e a r c h i t e c t s p l a n n i n g • e n v i r o n m e n t a l s t u d i e s 187 Tank Farm Road, Suite 230, San Luis Obispo, CA 93401 phone: 805.781.9800 fax: 805.781.9803 NV (W)186.30 SUMP91 8 9 . 9 3 F G 201.07F S 200.94FS200.58FS200.81FG2 0 1 . 5 5 FS 2 0 1 . 1 1FS 199.80 TG190.80 SUMP18200.92FG200.64FS193.66FS2 0 1 . 2 5 F S 201.07FS190.16FS190.16F S 190.80FS2.1%200.90FS201.00FG201.00FG200.62F G200.41FS2.1%2 0 0 . 2 5 FS 2 0 0 . 2 4 FS 200.35FS200.64FS1.4%200.90FS19 1 . 8 1 FS 19 1 . 9 4 FS 19 1 . 2 2 FS 19 0 . 4 4 FS 19 0 . 1 1 FS 18 9 . 9 6 FS 18 9 . 9 6 FS191.54F S 19 1 . 2 0 FS 191.04FS19 0 . 8 2 FS 4.1%1 9 0 . 2 8 F S 190.07FS1 9 0 . 3 6 F S 1 9 0 . 2 0 F S 2.0%3.9%190.39FS1 9 0 . 6 8 F S 190.68F S 190.34FS190.34FS190.48FS190.05FS2.0%3.5%2.8%20 1 . 0 7 F S 20 1 . 0 7 F S 20 0 . 9 1 F S 2 0 0 . 9 1 F S 189.98 FS201.07FS193.43 FG 193 . 7 2 FG 19 3 . 1 0 F G 19 3 . 9 1 FG 200.94FG196.29FG2 0 0 . 9 4 F S 2.0%19 0 . 3 1 F S 200.95FS200 . 9 6 FS 200.96 FS 201.07FS511 FT511.5 FT201.22FS200.57FS200.35FS0.8%0.8%194.50 FL 193.29 TG191.29 INV75.0%2.0%195194194 201 E C3 189.93FG59 FT189.86 TG187.36 INV.200.5%19019020120120144201201 2 0 0 2001020 0 . 7 9 FL 20 0 . 4 7 FL 200.03FL10200.83FS200.83FS200.82FS10PG E TRANSFOR0ER BY OT+ERS 2 0 2 . 7 1 F S 200.55FS194.29FL194. 1 9 FL 2.0%1.7%200.26FS200.20FS13.4%15.0%3.9%9.7%200.99FG200.89FS5%MIN193.47FL8200.08 FL 17172.0%190.48 TG187.98 INV .20 F C3 17.3'1515152 0 0 . 8 1 T G 1 9 6 . 1 7 I N V . 2 0 200. 9 8 T G 197. 0 6 I N V . 20 20 0 . 8 2 T G 19 6 . 5 3 I N V . 20BENCHMARKEXISTING UTILITY LOCATIONS SHOWN HERON ARE APPROXIMATE ONLY. IT SHALL BE THECONTRACTOR'S RESPONSIBILITY TO DETERMINE THE EXACT VERTICAL AND HORIZONTALLOCATION OF ALL EXISTING UNDERGROUND UTILITIES PRIOR TO COMMENCING CONSTRUCTION.NO REPRESENTATION IS MADE THAT ALL EXISTING UTILITIES ARE SHOWN HEREON. THEENGINEER ASSUMES NO RESPONSIBILITY FOR UTILITIES NOT SHOWN IN THEIR PROPERLOCATION.DISCLAIMER NOTE:Avoid cutting undergroundutility lines. It's costly.CallOR1-800-642-2444Call before you D gFF2% MINCONCRETE8" MIN5% MINFOR 10'BUILDING SLAB SECTIONGEOTECHNICAL REPORTEARTHWORKSSITE DATAPROJECT No. SL-16264-SADATED: APRIL 21, 2011AS PREPARED BY:EARTH SYSTEMS PACIFIC, INC.CUT = 1,266 CYFILL = 678 CYNET = 588 CY CUTAPN No.002-412-011ACREAGE:0.89ZONINGO-H1005SCALE: 1" =1010'TOPOGRAPHIC SURVEY PROJECT No. 2005512DATED: JUNE 2006AS PREPARED BY:RRM DESIGN GROUPFLOOD ZONE INFORMATIONA PORTION OF THE PROPERTY LIES WITHIN ZONE X, AN AREA OUTSIDE OF 0.2% ANNUAL CHANCEOF FLOOD HAZARD PER FEMA PANEL NO. 06079C1068G, EFFECTIVE DATE 11/16/2012.A PORTION OF THE PROPERTY LIES WITHIN ZONE AE, AN AREA TO BE DETERMINED TO HAVE A 1%ANNUAL CHANCE OF FLOOD HAZARD, BASE FLOOD ELEVATION OF 188 PER FEMA PANEL NO.06079C1068G, EFFECTIVE DATE 11/16/2012.THE BENCHMARK FOR THIS SURVEY BEING A LEAD AND TACK ON THE WESTERLY CURB 50 FEET(15 m) NORTH OF THE NWC OF NIPOMO & DANA, ELEVATION BEING 190.00 FEET (57.910 m)DATE: DRAFTER: CHECKED: SCALE:SHEETSHEET OF SHEETSDESCRIPTION:REV:DATE: E N G I E E R I N GN D E S GI N P R O F E S S I O N A L S ,I N C . L 0 S 0 S C A 0 5 .6 0 2 .6 1 6 7 |E D P I N C 0 R P O R A T E D .C O M 0 S 8 7/6/2022 DS DSC225 7/6/20221" = 10' GRADING PLAN SAN LUIS OBISPO REPERTORY THEATRE MONTEREY STREET SAN LUIS OBISPO, CA APN# 002-412-011 R EGISTE R E D PROFESSIONAL ENGINEERSTATE OF CALIFORN I A EXP.CIVILNO. 81227D A NI EL A. SOTELOPRELI0INARYARCH-0221-202213654DEEPENED FOOTING, MAX DEPTH PER PLAN (SEE STRUCTURALPLANS FOR DETAILS).CONSTRUCT RETAINING WALL, MAX WALL HEIGHT AND LENGTH PER WALLPLAN AND PROFILES, SHEET C3. (SEE STRUCTURAL PLANS FOR WALLDETAILING). CONTRACTOR TO PROVIDE ASPHALTIC WATER PROOFING,BACK OF WALL DRAIN, AND WEEPHOLES PER GEOTECHNICAL REPORT.CONTRACTOR TO PROVIDE EDGE PROTECTION WHERE REQUIRED PER CBCREQUIREMENTS.CONSTRUCT 4" CONCRETE OVER 4" TO 6" OF IMPORTED SAND OVER 18"TYPE II AGGREGATE BASE REINFORCED WITH NO. 3 BARS PLACED AT 24IN O.C. BOTH WAYS PER GEOTECHNICAL REPORT.8CONSTRUCT STAIRS PER CBC REQUIREMENTS.97CONSTRUCTION NOTES21011121613TRASH ENCLOSURE (SEE ARCHITECTURAL PLANS FOR DETAILS)PROTECT TREE PER CITY OF SLO STANDARD 77-1.03A (2) TREE PROTECTION1415RAISED PLANTER BED (SEE LANDSCAPE PLANS FOR DETAILS)DECORATIVE CONCRETE (SEE LANDSCAPE PLANS FOR DETAILS)GRASSCRETE (SEE LANDSCAPE PLANS FOR DETAILS)CONTRACTOR TO INSTALL REMOVABLE BOLLARDSCONSTRUCT FLOW LINE AS SHOWNBENCH (SEE LANDSCAPE PLAN FOR DETAILS)LEGENDPROPERTY BOUNDARYRIGHT OF WAYPROPERTY LINESECTION LINECENTER LINEEASEMENTEXISTING BACK OF CURBEXISTING FACE OF CURBEXISTING LIP OF CURBEXISTING MAJOR CONTOUR LINEEXISTING MINOR CONTOUR LINEEXISTING FENCEEXISTING EDGE OF SIDEWALKBUILDINGSCONCRETEBACK OF CURBFACE OF CURBCURB LIPFLOW LINEGRADE BREAKSAWCUTSIDEWALKSETBACKXXX(100)(101)||||||||||||||||||||||||||||||TOP BACK CURBFINISH GRADEEDGE OF PAVEMENTFLOW LINEASPHALT CONCRETE(00.00)TC(00.00)EG(00.00)EP(00.00)FL(00.00)ACTOP BACK CURBEXISTING GROUNDEDGE OF PAVEMENTFLOW LINEASPHALT CONCRETEPROPOSEDEXISTING00.00TC00.00FG00.00EP00.00FL00.00ACLEGENDHIGH POINT00.00HP(00.00)TRW(00.00)TFTOP OF RET. WALLTOP OF FOOTERTOP OF RET. WALLTOP OF FOOTER00.00TRW00.00TF(0" CURB WHERE APPLIES)INSTALL 12"X12" MIDSTATE CATCH BASIN WITH GRATE OR EQUIVALENTPER MANUFACTURERS SPECIFICATIONS. GRATE TO BE TRAFFIC RATEDNEAR DRIVEWAY LOCATIONS.ADS MANHOLE WITH GRATE COVER PER MANUFACTURER'SSPECIFICATIONS. MANHOLE AND GRATE TO BE TRAFFIC RATED NEARDRIVEWAY LOCATIONS.DECOMPOSED GRANITE (SEE ARCHITECTURAL PLANS FOR DETAILS)174" IRON CAST IRON PIPE18PHASE 2 - ADS MANHOLE19PHASE 2 - RETAINING WALL20PHASE 2 - 12X12 MIDSTATE CATCH BASINA ARCHITECTURAL REVIEW1/14/2020 B ARCHITECTURAL REVIEW - BASEMENT REMOVED3/22/2022 C ARCHITECTURAL REVIEW - LANDSCAPE REVISION4/20/2022 D ARCHITECTURAL REVIEW - 2ND SUBMITTAL7/6/2022LANDINGS (SEE ARCH PLANS FOR DETAILS) TREE REMOVAL APPLICATION RESIDENTIAL, COMMERCIAL, DEVELOPMENT Follow Non-Construction Tree Removal Criteria and Process here (SLOMC 12.24.090.E) Follow Construction Tree Removal Criteria and Process here (SLOMC 12.24.090.F) Owner: Applicant: Address: Address: City: Zip: City: Zip: Phone: Phone: Email: Email: Address of Tree(s): Number of trees applying to remove? ____ Tree Species: Reason: Is this removal a City Tree?____ YES_____ NO_____ UNKNOWN Dog in yard?___ YES____ NO Is this property governed by a Homeowners Association (HOA)?___ YES____ NO If YES, please provide HOA Board Approved Meeting minutes authorizing tree removal(s) with your tree removal application. 1 Please include a photo log that clearly shows the trees requested for removal. All Tree(s) must be uniquely identified by a number and a ribbon or an identifier wrapped around the truck in the photo and prior to inspection 2 Please include a replanting plan in accordance with Section 12.24.090(J) of the City’s Municipal Code. A minimum of one new tree shall be planted for each tree authorized to be removed on the same property (on site) or two new trees shall be planted for each tree authorized to be removed when planted on a different property or within the public right-of- way (off site). Page 2 Tree Removal Decisions as outlined in Section 12.24.090 of the City’s Municipal Code  SELECT ONE CRITERIA FROM BELOW SUPPORTING TREE REMOVAL APPLICATION DECISION MAKER APPEAL BODY Imminent Hazard to Life or Property Section 12.24.090(E)(1)(a) City Arborist No Appeal Tree Health and Hazard Mitigation Section 12.24.090(E) City Arborist Tree Committee Convenience Removal (Tree Committee makes recommendation to Community Development Director) 12.24.090(E)(3) Community Development Director Planning Commission City Council Minor Ministerial Development Permit (removal for residential or accessory construction on an R-1 or R-2 lot) Section City Arborist Community Development Director Criteria for Discretionary Permits Construction Tree Removal Section 12.24.090(F)(3) Community Development Director Planning Commission City Council Major Development / Tentative Tract Map/ Conditional Use Permit Section 12.24.090(F)(4) Community Development Director City Council Please include a check for $175.69 along with completed application & documentation. Tree Removal applications may be submitted in person at 25 Prado Road at the City’s Corporation Yard in SLO or mailed to: City of San Luis Obispo Public Works- Urban Forest Services 25 Prado Road San Luis Obispo, CA 93401. 12.24.090(F)(1) Pursuant to San Luis Obispo Municipal Code 12.24.180, any person aggrieved by an act or determination of the authorized approving authority exercising the authority herein granted shall have the right to appeal the decision of the authorized approving authority. Appeals must be received by the city clerk within ten calendar days from the date of determination or act shall cause the director to withhold tree removal permits and any permits for construction or demolition activity relying on the subject tree removal until the appeal is heard and a decision is reached. The fee to appeal to the Tree Committee is $135.64 This tree removal application must be signed by the property owner or an Authorized Agent. I declare under penalty of perjury that all the facts stated within this tree removal application are true and correct. Property Owner Signature: _________________________________ Date:___________ Applicant’s Signature: _____________________________________ Date:___________ Please make check payable to the City of San Luis Obispo $175.69 Check#: __________ 230 From:Tally Richtsmeier <trichts@kitchell.com> Sent:Tuesday, April 1, 2025 2:15 PM To:Marquart, Ben Cc:Paul Graebner; Meghan Schmeiser Subject:Tree Removal Attachments - Compiled Attachments:CADPS Tree removal app 23.4.14.pdf; SLO Rep Landscape and Tree Removal Plans.pdf; Tree removal app - Needs Kevin Signature.pdf; Tree #029 Back Story; CADPS Tree removal app 23.6.20 - Pheonix Palm .pdf; FINAL PCO #005 Demo Phoenix Palm 23.06.13 .pdf; FINAL - PCO _ 002 Tree Removal REV 1 _ECG Signed.pdf Follow Up Flag:Follow up Flag Status:Flagged This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Ben, See attached compiled documents that I have regarding tree removal on my end. Thanks, Tally TREE REMOVAL APPLICATION RESIDENTIAL, COMMERCIAL, DEVELOPMENT Follow Non-Construction Tree Removal Criteria and Process here (SLOMC 12.24.090.E) Follow Construction Tree Removal Criteria and Process here (SLOMC 12.24.090.F) Owner: Applicant: Address: Address: City: Zip: City: Zip: Phone: Phone: Email: Email: Address of Tree(s): Number of trees applying to remove? ____ Tree Species: Reason: Is this removal a City Tree?____ YES_____ NO_____ UNKNOWN Dog in yard?___ YES____ NO Is this property governed by a Homeowners Association (HOA)?___ YES____ NO If YES, please provide HOA Board Approved Meeting minutes authorizing tree removal(s) with your tree removal application. 1 Please include a photo log that clearly shows the trees requested for removal. All Tree(s) must be uniquely identified by a number and a ribbon or an identifier wrapped around the truck in the photo and prior to inspection 2 Please include a replanting plan in accordance with Section 12.24.090(J) of the City’s Municipal Code. A minimum of one new tree shall be planted for each tree authorized to be removed on the same property (on site) or two new trees shall be planted for each tree authorized to be removed when planted on a different property or within the public right-of- way (off site). Page 2 Tree Removal Decisions as outlined in Section 12.24.090 of the City’s Municipal Code  SELECT ONE CRITERIA FROM BELOW SUPPORTING TREE REMOVAL APPLICATION DECISION MAKER APPEAL BODY Imminent Hazard to Life or Property Section 12.24.090(E)(1)(a) City Arborist No Appeal Tree Health and Hazard Mitigation Section 12.24.090(E) City Arborist Tree Committee Convenience Removal (Tree Committee makes recommendation to Community Development Director) 12.24.090(E)(3) Community Development Director Planning Commission City Council Minor Ministerial Development Permit (removal for residential or accessory construction on an R-1 or R-2 lot) Section City Arborist Community Development Director Criteria for Discretionary Permits Construction Tree Removal Section 12.24.090(F)(3) Community Development Director Planning Commission City Council Major Development / Tentative Tract Map/ Conditional Use Permit Section 12.24.090(F)(4) Community Development Director City Council Please include a check for $175.69 along with completed application & documentation. Tree Removal applications may be submitted in person at 25 Prado Road at the City’s Corporation Yard in SLO or mailed to: City of San Luis Obispo Public Works- Urban Forest Services 25 Prado Road San Luis Obispo, CA 93401. 12.24.090(F)(1) Pursuant to San Luis Obispo Municipal Code 12.24.180, any person aggrieved by an act or determination of the authorized approving authority exercising the authority herein granted shall have the right to appeal the decision of the authorized approving authority. Appeals must be received by the city clerk within ten calendar days from the date of determination or act shall cause the director to withhold tree removal permits and any permits for construction or demolition activity relying on the subject tree removal until the appeal is heard and a decision is reached. The fee to appeal to the Tree Committee is $135.64 This tree removal application must be signed by the property owner or an Authorized Agent. I declare under penalty of perjury that all the facts stated within this tree removal application are true and correct. Property Owner Signature: _________________________________ Date:___________ Applicant’s Signature: _____________________________________ Date:___________ Please make check payable to the City of San Luis Obispo $175.69 Check#: __________ APN: 002-421-001 SAN LUIS OBISPO CHILDREN'S MUSEUM (NOT A PART) MIXED-USE/ HOTEL (FUTURE PROJECT) APN: 002-421-033 LEITCHER BUILDING (NOT A PART) TREE4" TREE8" SYAGRUS PALM30" TREE8" PALM6" TREEAPN: 002-412-003 APN: 002-412-004 APN: 002-412-001 APN: 002-412-002 APN: 002-412-011 APN: 002-412-012 OH OHOHOHOHOHOHOHOHOHOHOHXX X XXX XXXXXXXXXXXX X X X X X X XXXXXXXXXXXX#01 #02 #03#04 #05#06#07#08#09#10#11#12#13#14#15#16#17#18*#19#20#21#22*#23#24#25*#26#27#28*#29#30#31*#32*#33#34#35 #36#37#38#39#40#41#42#43#44 #45#46CITY SPECIFICATION NO. DATE:PROJECT TITLE:SHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION SKY KM SKY SKY AS NOTED 11/18/2022 N:\0701\0720-02-UR19-Palm-Nipomo-Parking-Structure-(2019)\Engineering\ConDocs\Phase 1 - Rough Grading\Sheet-Files\C-2.1 Existing Conditions.dwg, C-2.2, Nov 18, 2022 3:55pm, skyoshidarrmdesign.com | (805) 543-1794 3765 S. Higuera, San Luis Obispo, CA 93401 THE INCLUDED DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS AND ARRANGEMENTS REPRESENTED THEREBY ARE AND SHALL REMAIN THE PROPERTY OF RRM DESIGN GROUP AND NO PART THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR USED IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN THE SPECIFIED PROJECT FOR WHICH THEY HAVE BEEN PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF RRM DESIGN GROUP. VISUAL CONTACT WITH THESE DRAWINGS OR SPECIFICATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS. SUBMITTAL OF THESE DOCUMENTS FOR PUBLIC AGENCY REVIEW SHALL NOT BE CONSIDERED A WAIVER OF RRM DESIGN GROUP'S RIGHTS. RRM DESIGN GROUP COPYRIGHT 2022. RRM IS A CALIFORNIA CORPORATION PHASE 1B0720-02-UR19 REVISIONS DATENO.CITY OF SAN LUIS OBISPOSAN LUIS OBISPO, CACULTURAL ARTS DISTRICT PS90435-1B EXP. 9/30/2023 TREE PROTECTION PLANC-2.2 0 feet40 SCALE: 1" = 20' 20 60 EXISTING TREES TREE #GENUS DBH APPROX.STATUS 01 AFROCARPUS 40"REMAIN 02 JACARANDA 28"REMAIN 03 JACARANDA 14"REMOVE 04 QUERCUS 36"REMAIN 05 ACACIA 3"REMOVE 06 ACACIA 20"REMOVE 07 PHOENIX 30"REMOVE 08 QUERCUS 10"REMOVE 09 PISTACIA 4"REMOVE 10 SCHINUS 18"REMOVE 11 SEQUOIA 60"REMOVE 12 QUERCUS 10"REMOVE 13 CUPRESSUS 40"REMOVE 14 WASHINGTONIA 8"REMOVE 15 DRACAENA 22"REMOVE 16 QUERCUS 20"REMOVE 17 SEQUOIA 8"REMOVE 18*CINNAMOMUM 16"SEE NOTE BELOW 19 JACARANDA 4"REMOVE 20 PRUNUS 4"REMOVE 21 JACARANDA 6"REMOVE 22*JACARANDA 16"SEE NOTE BELOW 23 JACARANDA 7"REMOVE 24 JACARANDA 5"REMOVE 25*PRUNUS 10"SEE NOTE BELOW 26 PHOENIX 30"REMOVE 27 SYAGRUS 8"REMOVE 28*PRUNUS 16"SEE NOTE BELOW 29**PHOENIX 30"RELOCATE** 30 PISTACIA 3"REMOVE 31*PRUNUS 6"SEE NOTE BELOW 32*PRUNUS 6"SEE NOTE BELOW 33 PISTACIA 3"REMOVE 34 PRUNUS 3"REMOVE 35 LOPHOSTEMON 16"REMAIN 36 PRUNUS 3"REMOVE 37 PRUNUS 3"REMOVE 38 PRUNUS 4"REMOVE 39 PRUNUS 3"REMOVE 40 PRUNUS 3"REMOVE 41 CHITALPA 10"REMOVE 42 PRUNUS 6"REMOVE 43 PRUNUS 3"REMOVE 44 CUPRESSUS 12"REMAIN 45 HANDROANTHUS (3) 12"REMAIN 46 CITRUS 18"REMAIN 1.ALL EXISTING TREES IDENTIFIED TO REMAIN SHALL BE PRESERVED, PROTECTED, AND MAINTAINED. 2.PRIOR TO COMMENCEMENT OF CONSTRUCTION, TEMPORARY TREE PROTECTION FENCING SHALL BE PLACED AROUND THE EXISTING TREES IDENTIFIED TO REMAIN TO DELINEATE THE TREE PROTECTION ZONES. REFER TO PHASE 1B CIVIL SHEETS C-2.2 AND C-2.3. 3.NO STORAGE OF HEAVY EQUIPMENT, MATERIALS, OR CONSTRUCTION PARKING SHALL TAKE PLACE WITHIN THE TREE PROTECTION ZONE OF ANY EXISTING TREE IDENTIFIED TO REMAIN. 4.DEMOLITION AND / OR GRADING WITHIN THE TREE PROTECTION ZONE DRIPLINE OF EXISTING TREES IDENTIFIED TO REMAIN SHALL BE MINIMIZED AND SHALL BE DONE UNDER THE DIRECTION OR SUPERVISION OF THE CITY'S ARBORIST WITH LIGHT (ONE TON OR LESS) RUBBER-TIRED EQUIPMENT, OR BY HAND. 5.ALL PRUNING OF EXISTING TREES IDENTIFIED TO REMAIN SHALL BE KEPT TO A MINIMUM AND MUST FOLLOW CITY OF SAN LUIS OBISPO STANDARDS. 6.ALL ROOT OR CROWN PRUNING SHALL BE PERFORMED UNDER THE DIRECT SUPERVISION OF THE PROJECT ARBORIST. NOTIFY THE PROJECT ARBORIST AT LEAST 48 HOURS IN ADVANCE OF ANY ROOT OR CROWN PRUNING ACTIVITY TO COORDINATE A SITE VISIT. CONTACT JAKE MINNICK (PLA 6426, ISA CERTIFIED ARBORIST WE-11830, ISA TRAQ,) AT (805) 543-1794 OR JRMINNICK@RRMDESIGN.COM 7.ANY TREE ROOTS ENCOUNTERED WITHIN THE TREE PROTECTION ZONE THAT ARE OVER 1" IN DIAMETER SHALL BE CLEANLY SEVERED WITH A HAND OR RECIPROCATING SAW PERPENDICULAR TO THE DIRECTION OF GROWTH TO MINIMIZE THE SURFACE AREA OF THE WOUND. ALL SEVERED ROOTS SHALL BE COVERED WITH SOIL IN THE FINAL GRADING CONDITION AND NO SEVERED ROOTS SHALL BE EXPOSED TO AIR AND SUNLIGHT FOR MORE THAN 48 HOURS. 8.PRIOR TO COMMENCEMENT OF CONSTRUCTION, CONTRACTOR SHALL OBTAIN TREE REMOVAL PERMIT AS REQUIRED. 9.TREE REMOVAL SHOULD COMPLY WITH ALL PROVISIONS OF SLOMC 12.24.090. TREE PROTECTION AND REMOVAL NOTES NOTE FOR TREES # 18, 22, 25, 28, 31, 32: EXISTING TREE WITHIN CITY RIGHT-OF-WAY (ROW) IDENTIFIED TO BE REMOVED SHOWN FOR REFERENCE ONLY, SHALL BE PRESERVED, PROTECTED AND MAINTAINED THROUGHOUT DURATION OF PHASE 1B, UNTIL FUTURE PHASE 2 DEMOLITION WORK, UNDER SEPARATE COVER. NOTE FOR TREE #29: EXISTING TREE TO BE RELOCATED BY CITY TO OFF-SITE LOCATION THAT IS TO BE DETERMINED (TBD) BY CITY. * NOTE: CONTRACTOR TO PROTECT AND PRESERVE EXISTING TREES AND VEGETATION ON ADJACENT PROPERTY (TYP). REFER TO DEMOLITION PLAN SHEET C-2.3. ** TREE REMOVAL APPLICATION RESIDENTIAL, COMMERCIAL, DEVELOPMENT Follow Non-Construction Tree Removal Criteria and Process here (SLOMC 12.24.090.E) Follow Construction Tree Removal Criteria and Process here (SLOMC 12.24.090.F) Owner: Applicant: Address: Address: City: Zip: City: Zip: Phone: Phone: Email: Email: Address of Tree(s): Number of trees applying to remove? ____ Tree Species: Reason: Is this removal a City Tree?____ YES_____ NO_____ UNKNOWN Dog in yard?___ YES____ NO Is this property governed by a Homeowners Association (HOA)?___ YES____ NO If YES, please provide HOA Board Approved Meeting minutes authorizing tree removal(s) with your tree removal application. 1 Please include a photo log that clearly shows the trees requested for removal. All Tree(s) must be uniquely identified by a number and a ribbon or an identifier wrapped around the truck in the photo and prior to inspection 2 Please include a replanting plan in accordance with Section 12.24.090(J) of the City’s Municipal Code. A minimum of one new tree shall be planted for each tree authorized to be removed on the same property (on site) or two new trees shall be planted for each tree authorized to be removed when planted on a different property or within the public right-of- way (off site). City of San Luis Obispo City of San Luis Obispo Public Works 919 Palm Street San Luis Obispo 93401 919 Palm Street San Luis Obispo 93401 1 Make ready work for the upcoming Cultural Arts District Parking Structure Pheonix Palm 609 Palm Street X X X Page 2 Tree Removal Decisions as outlined in Section 12.24.090 of the City’s Municipal Code  SELECT ONE CRITERIA FROM BELOW SUPPORTING TREE REMOVAL APPLICATION DECISION MAKER APPEAL BODY Imminent Hazard to Life or Property Section 12.24.090(E)(1)(a) City Arborist No Appeal Tree Health and Hazard Mitigation Section 12.24.090(E) City Arborist Tree Committee Convenience Removal (Tree Committee makes recommendation to Community Development Director) 12.24.090(E)(3) Community Development Director Planning Commission City Council Minor Ministerial Development Permit (removal for residential or accessory construction on an R-1 or R-2 lot) Section City Arborist Community Development Director Criteria for Discretionary Permits Construction Tree Removal Section 12.24.090(F)(3) Community Development Director Planning Commission City Council Major Development / Tentative Tract Map/ Conditional Use Permit Section 12.24.090(F)(4) Community Development Director City Council Please include a check for $175.69 along with completed application & documentation. Tree Removal applications may be submitted in person at 25 Prado Road at the City’s Corporation Yard in SLO or mailed to: City of San Luis Obispo Public Works- Urban Forest Services 25 Prado Road San Luis Obispo, CA 93401. 12.24.090(F)(1) Pursuant to San Luis Obispo Municipal Code 12.24.180, any person aggrieved by an act or determination of the authorized approving authority exercising the authority herein granted shall have the right to appeal the decision of the authorized approving authority. Appeals must be received by the city clerk within ten calendar days from the date of determination or act shall cause the director to withhold tree removal permits and any permits for construction or demolition activity relying on the subject tree removal until the appeal is heard and a decision is reached. The fee to appeal to the Tree Committee is $135.64 This tree removal application must be signed by the property owner or an Authorized Agent. I declare under penalty of perjury that all the facts stated within this tree removal application are true and correct. Property Owner Signature: _________________________________ Date:___________ Applicant’s Signature: _____________________________________ Date:___________ Please make check payable to the City of San Luis Obispo $175.69 Check#: __________ SEVERED ROOTS SHALL BE EXPOSED TO AIR AND SUNLIGHT FOR MORE THAN 48 HOURS. 8.PRIOR TO COMMENCEMENT OF CONSTRUCTION, CONTRACTOR SHALL OBTAIN TREE REMOVAL PERMIT AS REQUIRED. 9.TREE REMOVAL SHOULD COMPLY WITH ALL PROVISIONS OF SLOMC 12.24.090. TREE PROTECTION AND REMOVAL NOTES NOTE FOR TREES # 18, 22, 25, 28, 31, 32: EXISTING TREE WITHIN CITY RIGHT-OF-WAY (ROW) IDENTIFIED TO BE REMOVED SHOWN FOR REFERENCE ONLY, SHALL BE PRESERVED, PROTECTED AND MAINTAINED THROUGHOUT DURATION OF PHASE 1B, UNTIL FUTURE PHASE 2 DEMOLITION WORK, UNDER SEPARATE COVER. NOTE FOR TREE #29: EXISTING TREE TO BE RELOCATED BY CITY TO OFF-SITE LOCATION THAT IS TO BE DETERMINED (TBD) BY CITY. * NOTE: CONTRACTOR TO PROTECT AND PRESERVE EXISTING TREES AND VEGETATION ON ADJACENT PROPERTY (TYP). REFER TO DEMOLITION PLAN SHEET C-2.3. ** REMOVE CHANGE ORDER REQUEST Date: Customer Name: Contact:Project: Phone Number:Project Address: Email:City & State: C/O Request #: Description of Work: Quantity Unit of Measure Unit Cost Equipment Costs 2 hrs.153.77$ 307.54$ 2 hrs.55.95$ 111.90$ 1 ea.41.94$ 41.94$ -$ 461.38$ Quantity Unit of Measure Unit Cost Material Costs 1 ea.650.00$ 650.00$ 1 ea.65.00$ 65.00$ -$ 715.00$ Quantity Unit of Measure Unit Cost Labor Costs 4 hrs.$65.19 260.76$ 2 hrs.$87.58 175.16$ 2 hrs.$85.76 171.52$ 1 ea.$235.23 182.23$ 789.67$ 1,966.05$ 14 1,966.05$ Equipment Markup (10%) Total Cost: TOTAL for C/O Request # Labor (Group 1) Operator Excavator (Group 8) Labor Markup (30%) 805-335-1161 SUBTOTAL Materials Excavator (Code 5662) Labor Material Markup (10%) Skid Steer (Code 2189) 14 Description of Work Equipment SUBTOTAL Operator Skid Steer (Group 3) SUBTOTAL 40 yd. Dumpster w/ dump fees 690 Palm St. CRB 003 - Added cost to remove tree #029 per Plan Sheet C2.2. Includes removal of stump. mc@edwardscongroup.com Friday, June 09, 2023 Edwards Construction Group Micheleen Collins SLO Phase 1B Downtown Parking Structure San Luis Obispo, Ca P.O. Box 729 Pismo Beach, Ca. 93448 Phone 805.473.9451 Fax 805.489.1098 License No. 972447 APN: 002-421-001 SAN LUIS OBISPO CHILDREN'S MUSEUM (NOT A PART) MIXED-USE/ HOTEL (FUTURE PROJECT) APN: 002-421-033 LEITCHER BUILDING (NOT A PART) TREE4" TREE8" SYAGRUS PALM30" TREE8" PALM6" TREEAPN: 002-412-003 APN: 002-412-004 APN: 002-412-001 APN: 002-412-002 APN: 002-412-011 APN: 002-412-012 OH OHOHOHOHOHOHOHOHOHOHOHXX X XXX XXXXXXXXXXXX X X X X X X XXXXXXXXXXXX#01 #02 #03#04 #05#06#07#08#09#10#11#12#13#14#15#16#17#18*#19#20#21#22*#23#24#25*#26#27#28*#29#30#31*#32*#33#34#35 #36#37#38#39#40#41#42#43#44 #45#46CITY SPECIFICATION NO. DATE:PROJECT TITLE:SHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION SKY KM SKY SKY AS NOTED 11/18/2022 N:\0701\0720-02-UR19-Palm-Nipomo-Parking-Structure-(2019)\Engineering\ConDocs\Phase 1 - Rough Grading\Sheet-Files\C-2.1 Existing Conditions.dwg, C-2.2, Nov 18, 2022 3:55pm, skyoshidarrmdesign.com | (805) 543-1794 3765 S. Higuera, San Luis Obispo, CA 93401 THE INCLUDED DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS AND ARRANGEMENTS REPRESENTED THEREBY ARE AND SHALL REMAIN THE PROPERTY OF RRM DESIGN GROUP AND NO PART THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR USED IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN THE SPECIFIED PROJECT FOR WHICH THEY HAVE BEEN PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF RRM DESIGN GROUP. VISUAL CONTACT WITH THESE DRAWINGS OR SPECIFICATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS. SUBMITTAL OF THESE DOCUMENTS FOR PUBLIC AGENCY REVIEW SHALL NOT BE CONSIDERED A WAIVER OF RRM DESIGN GROUP'S RIGHTS. RRM DESIGN GROUP COPYRIGHT 2022. RRM IS A CALIFORNIA CORPORATION PHASE 1B0720-02-UR19 REVISIONS DATENO.CITY OF SAN LUIS OBISPOSAN LUIS OBISPO, CACULTURAL ARTS DISTRICT PS90435-1B EXP. 9/30/2023 TREE PROTECTION PLANC-2.2 0 feet40 SCALE: 1" = 20' 20 60 EXISTING TREES TREE #GENUS DBH APPROX.STATUS 01 AFROCARPUS 40"REMAIN 02 JACARANDA 28"REMAIN 03 JACARANDA 14"REMOVE 04 QUERCUS 36"REMAIN 05 ACACIA 3"REMOVE 06 ACACIA 20"REMOVE 07 PHOENIX 30"REMOVE 08 QUERCUS 10"REMOVE 09 PISTACIA 4"REMOVE 10 SCHINUS 18"REMOVE 11 SEQUOIA 60"REMOVE 12 QUERCUS 10"REMOVE 13 CUPRESSUS 40"REMOVE 14 WASHINGTONIA 8"REMOVE 15 DRACAENA 22"REMOVE 16 QUERCUS 20"REMOVE 17 SEQUOIA 8"REMOVE 18*CINNAMOMUM 16"SEE NOTE BELOW 19 JACARANDA 4"REMOVE 20 PRUNUS 4"REMOVE 21 JACARANDA 6"REMOVE 22*JACARANDA 16"SEE NOTE BELOW 23 JACARANDA 7"REMOVE 24 JACARANDA 5"REMOVE 25*PRUNUS 10"SEE NOTE BELOW 26 PHOENIX 30"REMOVE 27 SYAGRUS 8"REMOVE 28*PRUNUS 16"SEE NOTE BELOW 29**PHOENIX 30"RELOCATE** 30 PISTACIA 3"REMOVE 31*PRUNUS 6"SEE NOTE BELOW 32*PRUNUS 6"SEE NOTE BELOW 33 PISTACIA 3"REMOVE 34 PRUNUS 3"REMOVE 35 LOPHOSTEMON 16"REMAIN 36 PRUNUS 3"REMOVE 37 PRUNUS 3"REMOVE 38 PRUNUS 4"REMOVE 39 PRUNUS 3"REMOVE 40 PRUNUS 3"REMOVE 41 CHITALPA 10"REMOVE 42 PRUNUS 6"REMOVE 43 PRUNUS 3"REMOVE 44 CUPRESSUS 12"REMAIN 45 HANDROANTHUS (3) 12"REMAIN 46 CITRUS 18"REMAIN 1.ALL EXISTING TREES IDENTIFIED TO REMAIN SHALL BE PRESERVED, PROTECTED, AND MAINTAINED. 2.PRIOR TO COMMENCEMENT OF CONSTRUCTION, TEMPORARY TREE PROTECTION FENCING SHALL BE PLACED AROUND THE EXISTING TREES IDENTIFIED TO REMAIN TO DELINEATE THE TREE PROTECTION ZONES. REFER TO PHASE 1B CIVIL SHEETS C-2.2 AND C-2.3. 3.NO STORAGE OF HEAVY EQUIPMENT, MATERIALS, OR CONSTRUCTION PARKING SHALL TAKE PLACE WITHIN THE TREE PROTECTION ZONE OF ANY EXISTING TREE IDENTIFIED TO REMAIN. 4.DEMOLITION AND / OR GRADING WITHIN THE TREE PROTECTION ZONE DRIPLINE OF EXISTING TREES IDENTIFIED TO REMAIN SHALL BE MINIMIZED AND SHALL BE DONE UNDER THE DIRECTION OR SUPERVISION OF THE CITY'S ARBORIST WITH LIGHT (ONE TON OR LESS) RUBBER-TIRED EQUIPMENT, OR BY HAND. 5.ALL PRUNING OF EXISTING TREES IDENTIFIED TO REMAIN SHALL BE KEPT TO A MINIMUM AND MUST FOLLOW CITY OF SAN LUIS OBISPO STANDARDS. 6.ALL ROOT OR CROWN PRUNING SHALL BE PERFORMED UNDER THE DIRECT SUPERVISION OF THE PROJECT ARBORIST. NOTIFY THE PROJECT ARBORIST AT LEAST 48 HOURS IN ADVANCE OF ANY ROOT OR CROWN PRUNING ACTIVITY TO COORDINATE A SITE VISIT. CONTACT JAKE MINNICK (PLA 6426, ISA CERTIFIED ARBORIST WE-11830, ISA TRAQ,) AT (805) 543-1794 OR JRMINNICK@RRMDESIGN.COM 7.ANY TREE ROOTS ENCOUNTERED WITHIN THE TREE PROTECTION ZONE THAT ARE OVER 1" IN DIAMETER SHALL BE CLEANLY SEVERED WITH A HAND OR RECIPROCATING SAW PERPENDICULAR TO THE DIRECTION OF GROWTH TO MINIMIZE THE SURFACE AREA OF THE WOUND. ALL SEVERED ROOTS SHALL BE COVERED WITH SOIL IN THE FINAL GRADING CONDITION AND NO SEVERED ROOTS SHALL BE EXPOSED TO AIR AND SUNLIGHT FOR MORE THAN 48 HOURS. 8.PRIOR TO COMMENCEMENT OF CONSTRUCTION, CONTRACTOR SHALL OBTAIN TREE REMOVAL PERMIT AS REQUIRED. 9.TREE REMOVAL SHOULD COMPLY WITH ALL PROVISIONS OF SLOMC 12.24.090. TREE PROTECTION AND REMOVAL NOTES NOTE FOR TREES # 18, 22, 25, 28, 31, 32: EXISTING TREE WITHIN CITY RIGHT-OF-WAY (ROW) IDENTIFIED TO BE REMOVED SHOWN FOR REFERENCE ONLY, SHALL BE PRESERVED, PROTECTED AND MAINTAINED THROUGHOUT DURATION OF PHASE 1B, UNTIL FUTURE PHASE 2 DEMOLITION WORK, UNDER SEPARATE COVER. NOTE FOR TREE #29: EXISTING TREE TO BE RELOCATED BY CITY TO OFF-SITE LOCATION THAT IS TO BE DETERMINED (TBD) BY CITY. * NOTE: CONTRACTOR TO PROTECT AND PRESERVE EXISTING TREES AND VEGETATION ON ADJACENT PROPERTY (TYP). REFER TO DEMOLITION PLAN SHEET C-2.3. ** City wants Tree #002 Removed. PCO #002 - Approved. Demo Phoenix Palm - PCO in Review Demo Phoenix Palm Tree #29 PCO in review CHANGE ORDER: REMOVE TREE NUMBER #02 Tree #002 - Demo/PCO #002 - Approved GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS CRAFT: OPERATING ENGINEER# Determination: SC-23-63-2-2023-1 Issue Date: February 22, 2023 Expiration date of determination: June 30, 2023** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774. Localities: All localities within Imperial, Inyo, Kern, Los Angeles, Mono, Orange, Riverside, San Bernardino, San Luis Obispo, Santa Barbara and Ventura Counties. Wages and total hourly rates (including employer payments): Classification a (Journeyperson) Basic Hourly Rate Hours Total Hourly Rate Daily Overtime Hourly Rateb (1½ x) Saturday Overtime Hourly Rate c (1½ x) Sunday/Holiday Overtime Hourly Rate (2 x) Group 1 $53.90 8 $84.69 $111.640 $111.640 $138.590 Group 2 $54.68 8 $85.47 $112.810 $112.810 $140.150 Group 3 $54.97 8 $85.76 $113.245 $113.245 $140.730 Group 4 $56.46 8 $87.25 $115.480 $115.480 $143.710 Group 6 $56.68 8 $87.47 $115.810 $115.810 $144.150 Group 8 $56.79 8 $87.58 $115.975 $115.975 $144.370 Group 10 $56.91 8 $87.70 $116.155 $116.155 $144.610 Group 12 $57.08 8 $87.87 $116.410 $116.410 $144.950 Group 13 $57.18 8 $87.97 $116.560 $116.560 $145.150 Group 14 $57.21 8 $88.00 $116.605 $116.605 $145.210 Group 15 $57.29 8 $88.08 $116.725 $116.725 $145.370 Group 16 $57.41 8 $88.20 $116.905 $116.905 $145.610 Group 17 $57.58 8 $88.37 $117.160 $117.160 $145.950 Group 18 $57.68 8 $88.47 $117.310 $117.310 $146.150 Group 19 $57.79 8 $88.58 $117.475 $117.475 $146.370 Group 20 $57.91 8 $88.70 $117.655 $117.655 $146.610 Group 21 $58.08 8 $88.87 $117.910 $117.910 $146.950 Group 22 $58.18 8 $88.97 $118.060 $118.060 $147.150 Group 23 $58.29 8 $89.08 $118.225 $118.225 $147.370 Group 24 $58.41 8 $89.20 $118.405 $118.405 $147.610 Group 25 $58.58 8 $89.37 $118.660 $118.660 $147.950 GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: Laborer and Related Classifications # Determination: SC-23-102-2-2022-1 Issue Date: August 22, 2022 Expiration date of determination: June 30, 2023** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774. Localities: All localities within Imperial, Inyo, Kern, Los Angeles, Mono, Orange, Riverside, San Bernardino, San Luis Obispo, Santa Barbara, and Ventura counties. Wages and Employer Payments: Classificationa (Journeyperson) Basic Hourly Rate Health and Welfare Pension Vacation and Holiday b Training Other Hours Total Hourly Rate Daily Overtime Hourly Rate (1 ½ X) c Saturday Overtime Hourly Rate (1 ½ X) c d Sunday/ Holiday Overtime Hourly Rate (2 X) Group 1 $39.23 $8.75 $10.82 $5.02 $0.70 $0.67 8.0 $65.19 $84.805 $84.805 $104.420 Group 2 $39.78 $8.75 $10.82 $5.02 $0.70 $0.67 8.0 $65.74 $85.630 $85.630 $105.520 Group 3 $40.33 $8.75 $10.82 $5.02 $0.70 $0.67 8.0 $66.29 $86.455 $86.455 $106.620 Group 4 $41.88 $8.75 $10.82 $5.02 $0.70 $0.67 8.0 $67.84 $88.780 $88.780 $109.720 Group 5 $42.23 $8.75 $10.82 $5.02 $0.70 $0.67 8.0 $68.19 $89.305 $89.305 $110.420 11 LINK-BELT MASSEY FERGUSON MITSUBISHI NORTHWEST P&H TAKEUCHI Model Model Model Model Model Model [ L-B ] [ M-F ] [ MITS ] [ NW ] [ P&H ] [ TAKU ] Code Code Code Code Code Code Rate Rate Rate Rate Rate Rate PC 300 LC-1, LC-2 PC 300 LC-3 PC 300 LC-5 PC 300 LC-6 PC 300 LC-7 PC 360 LC-3 PC 400 LC-1 PC 400 LC-3 PC 400 LC-5 PC 400 LC-6 PC 600 LC-6 PC 650-1 PC 650-1 Front Shovel PC 650-3 PC 750-6 PC 1000-1 PC 1000 LC-1 PC 1100 LC-6 LS 1600 LS 2650 LS 2700C II 2700 QUANTUM LS 2800 LS 2800A LS 2800A PL LS 2800 PL LS 2800B LS 3400 LS 3400C II LS 4300 LS 4300C II LS 4800 LS 4800 PL LS 5400 LS 5800 LS 5800A LS 5800C II LS 6400 LS 7400 LS 7400A MF 450D MF 450S MS 090 MS 180-3 MS 180 LC-8 MS 230 LC-3 MS 240 LC-8 MS 280-2 MS 380-2 MS 450-8 35 DH 45 DH 55 DH 55 DH Series II H 750 H 1250 H 1750 H 2500 HS 2500 TB 15 TB 025 TB 045 TB 070 TB 10S TB 35S TB 68S TB 800 9520 9525 9526 9526A 9526B 9527 9530 9535 9536 9537 9539 9540 9550 9552 9555 9560 9565 9575LC 5390 5395 5398 5399 5400 5402 5404 5405 5410 5475 5477 5660 5662 5750 5755 5805 5810 5812 5814 5820 5830 5840 6245 6250 6290 6295 6296 6300 6305 6310 6320 6330 6335 6340 6345 6360 6628 6630 6635 6645 6650 7686 7686A 7686E 7686H 7688 7690 7692 7695 $128.26 $150.73 $169.16 $184.59 $206.60 $170.41 $172.62 $201.59 $223.05 $250.73 $343.55 $313.87 $328.99 $329.54 $413.06 $492.64 $505.53 $566.05 $41.03 $57.23 $75.95 $82.50 $67.30 $75.94 $66.47 $63.57 $84.16 $110.77 $117.16 $139.51 $153.77 $159.74 $145.74 $187.69 $194.11 $204.31 $213.05 $286.72 $290.93 $347.12 $55.23 $60.00 $38.59 $74.01 $83.93 $96.56 $104.45 $118.44 $165.24 $192.62 $153.48 $165.36 $173.12 $304.32 $72.19 $123.12 $149.60 $192.82 $197.74 $16.63 $28.53 $47.22 $46.35 $13.43 $27.06 $38.06 $18.82 16 HYDRAULIC PERSONNEL LIFTS & AERIAL WORK PLATFORMS LOADERS, CRAWLER Includes self propelled and power take off(PTO) units whether gas, diesel or electric. Rates for any truck or carrier mounted units shall pay for the truck separately. Reach is rated by Mfr's maximum extension in meters(feet). Includes all attachments and accessories excluding clam-action buckets and backhoe(see attachment class). [ HYLFT ] [ LDRCL ] DELAY FACTOR = 0.20 OVERTIME FACTOR = 0.79 DELAY FACTOR = 0.11 OVERTIME FACTOR = 0.90 BOOM TYPE SCISSOR TYPE CASE CATERPILLAR JOHN DEERE DRESSER OVER TO OVER TO Model Model Model Model [ BOOM ] [ SCIS ] [ CASE ] [ CAT ] [ DEER ] [ DRES ] Code Code Code Code Code Code Rate Rate Rate Rate Rate Rate 0 7.6 (25) 7.6 (25) 15.2 (50) 15.2 (50) 22.9 (75) 0 6.1 (20) 6.4 (21) 9.1 (30) 9.4 (31) 15.2 (50) 350B 450B 455B 455C 1155D 1155E 1450 1450B 1455B 259D 289D 299D XHP 299D2 931B 931C 931 LGP 931B LGP 935B 935C 939C 943 943 LGP 951C 86J 1992 serial 951C 86J 2598 serial 951C LGP 86J 2598 ser 953 953 LGP 955L 85J 6247 serial 955L 85J 13X10129 ser 955L LGP 85J 13X10129 963 963 LGP 973 973 LGP 977K 977K 11K serial 977L 11K 3919 serial 977L 11K 5083 serial 977L 14X serial 977L LGP 983 983B JD 350C JD 450C (4 speed PS) JD 455D JD 455E JD 455G JD 555 JD 555A JD 555B JD 555G JD 655 JD 655B JD 755 JD 755A JD 755B JD 855 100E (PS) 100G 125E (PS) 125G 175C (PS) 200 250C (PS) 250E (PS) 00-24 25-49 50-74 00-20 21-30 31-50 2370 2610 2620 2620A 3555 3556 3560 3565 3568 2159 2189 2190 2199A 3735 3735C 3740 3745 3845 3845C 3900 4130 4135 4200 4210 4215 4220 4230 4675 4680 4685 4690 4693 4695 4698 5014 5092 5170 5180 5185 5190 5248 5265 5420 5805 5807 5809 5809A 5810 5812 5814 5814A 5815 5817 5820 5822 5824 5830 9000 9005 9010 9015 9020 9025 9030 9035 $20.54 $47.00 $63.65 $22.10 $26.20 $38.87 $44.05 $39.60 $41.43 $46.62 $81.14 $89.17 $90.32 $99.72 $100.63 $53.35 $55.95 $80.25 $69.79 $45.19 $47.77 $42.63 $46.33 $53.51 $56.64 $78.16 $67.02 $63.73 $62.28 $67.97 $68.84 $90.66 $85.48 $87.67 $93.94 $94.29 $124.96 $115.00 $189.77 $161.76 $104.23 $108.55 $125.45 $135.14 $139.98 $139.63 $192.23 $204.74 $46.72 $46.19 $48.43 $49.34 $58.67 $52.00 $57.24 $56.44 $79.07 $81.81 $93.55 $77.71 $96.05 $108.12 $145.73 $47.57 $54.45 $58.42 $65.33 $114.78 $133.10 $138.02 $158.62 SYMBOLS : NN A A-2 A A-2 A A-2 A A-2 AA TRU E N ORT H CROSS SECTION DETAIL INTERIOR ELEVATION SECTION LETTER SHEET WHERE SECTION IS LOCATED SHEET WHERE DETAIL IS LOCATED DETAIL NUMBER 1 2 3 4 INTERIOR ELEVATION NUMBER SHEET WHERE INTERIOR ELEVATION IS LOCATED DOOR NUMBER WINDOW NUMBER KEYNOTE REVISION NU MBER DOOR NUMBER WINDOW NUMBER NUMBER OR LETTER REVISION NUMBER BENCHES 2 FT. SEPARATION PG&E TRANSFORMER R R OT T 3 BIKE LOCKERS TRASH ENCL. BELOW PER CITY STDS. SITE PLAN SHEET INDEX LABEL TIT LE A-1.0 SITE PLAN , VIC NITY MAP, PROJECT D AT A, GENERAL NOTES A-2 COLOR ELEVATIONS A-3 CODE AN ALYSIS A-4 FL OOR PLAN A-4.1 MEZZANINE-CO NTR OL ROOMS PLANS A-4.2 ROOF PLAN A-5 DOOR AN D WINDOW SCHEDUL ES, RATED WALLS SPECS, ST OR EFRO NT AND GLAZING SYSTEM A-5.1 TERR COTTA RAIN SC REEN DET AIL S A-6 ELEVATIONS A-6.1 ELEVATIONS A-7 RENDERINGS A-8 SEC TIONS A-8.1 SEC TIONS A-8.2 SEC TIONS A-9 EXI TING PLAN A-10 ACCESSIBILITY DETAILS A-11.1 REFLECD TED CEILING PLAN- 2ND F LOOR A-12 INTERIOR ELEVATIONS A-12.1 INTERIOR ELEVATIONS C1 CIVIL NOTES C2 GRADING PLAN C3 CIVIL DETAIL SHEET C4 UTIL ITY PLAN C-5 UTIL ITY PLAN L-1 CONCEPTUAL LANDSCAPE PLAN L2 CONCEPTUAL LANDSCAPE PLAN S1.2 MAIN FL OOR: FOUND AT ION & F RAMING PLAN S1.3 SEC OND FLOOR: FRAMING PLAN S1.4 LOW ROOF & CATWALK: FRAMING PLAN S1.5 HIGH RO OF: FRAMIN G PLAN M-0.0 MECHANICAL NOTES, LEGEND & ABBREVIATIONS M-1.0 MECHANICAL SCHEDULES M-1.1 MECHANICAL SCHEDULES M-2.0 MECHANICAL DETAILS M-2.1 MECHANICAL DETAILS M-3.0 MECHANICAL BASEMENT LEVEL ZONE PLAN M-3.1 MECHANICAL BASEMENT LEVEL FLOOR PLAN M-3.2 MECHANICAL BASEMENT LEVEL HYDR ONIC PIPING PLAN M-4.0 MECHANICAL FRIST FLOOR ZONE PLAN M-4.1 MECHANICAL FIRST FLOOR PLAN M-4.2 MECHANICAL FIRST FLOOR HYD RONIC PIPING PLAN M-5.0 MECHANICAL SECON D FLO OR ZONE PL AN M-5.1 MECHANICAL SECON D FLO OR PLAN M-5.2 MECHANICAL CATWALK LEVEL FLOOR PLAN M-5.3 MECHANICAL SECON D FLO OR HYDR ONIC PIPING PLAN M-6.0 MECHANICAL ROOF DECK LEVEL ZONEN PLAN M-6.1 MECHANICAL ROOF DECK LEVEL PLAN- ALL ELECTRIC CENTRAL PLANT OPT ION 1 EXHIBIT M-6.2 MECHANICAL ROOF DECK LEVEL FLOOR PLAN- ALL ELECTRIC CEN TRAL PLANT O PTION 2 EXHIBIT M-6.3 MECHANICAL ROOF DECK HYD RON IC PIPIN G PLAN M-7.0 MECHANICAL ROOF DECK LEVEL FLOOR PLAN- STANDARD GAS HEATING EXH IBIT MC-1 MECHANICAL CONTR OLS MC-2 MECHANICAL CONTR OLS MC-3 MECHANICAL CONTR OLS MC-4 MECHANICAL CONTR OLS MC-5 MECHANICAL CONTR OLS P1.0 PLUMBING NOT ES, SCHEDULES, LEGEND & ABBR EVIATIONS P2.0 PLUMBING DETAILS P3.0 PLUMBING BASEMEN T WASTE & VEN T PLAN P3.1 PLUMBING BASMEMEN T WAT ER PLAN P4.0 PLUMBING FIRST FLOOR WASTE & VENT PLAN P4.1 PLUMBING FIRST FLOOR WATER PLAN P5.0 PLUMBING SECOND F LOOR PLAN P6.0 PLUMBING ROOF PLAN E-1 GEN ERAL NOTES, SYMBOLS AND ABBREVIATIONS E-5 SINGLE LIN E D IAGRAM E-6 ELECTRICAL SCHEDULES E-9 ELECTRICAL SITE PLAN E-10 BASEMENT LEVEL POWER PLAN E-11 FIR ST FLOOR POWER PL AN E-12 SEC OND FLOOR POWER PLAN E-13 CATWALK LEVEL POWER PLAN E-14 ROOF POWER PLAN E-15 BASEMENT LEVEL LIGHT ING PLAN E-16 FIR ST FLOOR LIGH TING PLAN E-17 SEC OND FLOOR LIGHTING PLAN E-16 CATWALK LEVEL LIGHTING PLAN E-20 ELECTRICAL DETAILS T-GA001 GEN ERAL ARRANGEMEN TS COVER SHEET & INDEX T-GA002 GEN ERAL ARRANGEMEN TS COORD ZONE PLANS T-GA010 GEN ERAL ARRANGEMEN TS THEATRICAL POWER KEYS & DET AILS T-GA011 GEN ERAL ARRANGEMEN TS THEATRICAL POWER PLANS T-GA012 GEN ERAL ARRANGMENTS THEATRIC AL POWER PLANS T-GA020 GEN ERAL ARRANGEMEN TS THEATRICAL LIG HTING KEYS & DET AIL S T-GA021 GEN ERAL ARRANGEMEN TS THEATRICAL ZONE LIGHTIN G PLANS T-GA022 GEN ERAL ARRANGEMEN TS THEATRICAL ZONE LIGHTIN G PLANS T-GA030 GEN ERAL ARRANGEMEN TS CABLE MANAGEMENT KEY & DETAILS T-GA031 GEN ERAL ARRANGEMEN TS CABLE MANAGEMENT/SERVICES PLAN T-GA032 GEN ERAL ARRANGEMEN TS CABLE MANAGEMENT/SERVICE PLAN S T-GA040 GEN ERAL ARRANGEMEN TS INFRASTR UCTUR E, FINISHES, & DETAILS T-GA041 GEN ERAL ARRANGEMEN TS INFRASTR UCTUR E, FINISHES, & DETAILS T-GA042 GEN ERAL ARRANGEMEN TS INFRASTR UCTUR E, FINISHES, & DETAILS T-GA043 GEN ERAL ARRANGMENTS INF RASTRUCTURE, FINISHES & D ET AILS T-TE111 THEATRE EQUIPMENT BASEMENT LEVEL PLAN T-TE112 THEATRE EQUIPMENT STAGE LEVEL PLAN T-TE113 THEATRE EQUIPMENT BALC ONY LEVEL PLAN T-TE114 THEATRE EQUIPMENT CATWALK LEVEL PLAN T-TE121 THEATRE EQUIPMENT CENTERLINE SECTION T-TE122 THEATRE EQUIPMENT TRANSVERSE SECTIONS T-TE123 THEATRE EQUIPMENT BLAC K BO X SECTIONS T-TE131 THEATRE EQUIPMENT STAGE TRAP PLATFORM DETAILS T-TE132 THEATRE EQUIPMENT CHAIN MO TOR CONTROL SYSTEM T-TL010 THEATRIC AL SWITCH ING AND CON TROL NOTES AND D ET AILS T-TL011 THEATRIC AL LI GHTING SYSTEM SWITCH ING & CTRL BOX SCHEDULES T-TL012 THEATRIC AL LI GHTING SYSTEM SWITCH ING @ CTRL BOX SCHEDULES T-TL021 THEATRIC AL LI GHITNG SWITCH ING AND CON TROL PH ILOSO PHY-T HRUST THEATRE T-TL022 THEATRIC AL LI GHTING SWITCH ING AND CON TROL PH ILOSO PHY- BLACK BOX T-TL111 THEATRIC AL LI GHTING SWITCH ING AND CON TROL PL AN T-TL112 THEATRIC AL LI GHTING SWITCH ING AND CON TROL PL AN T-TL113 THEATRIC AL LI GHTING SWITCH ING AND CON TROL PL AN T-TL114 THEATRIC AL LI GHTING SWITCH ING AND CON TROL PL AN T-TL131 THEATRIC AL LI GHTING FACEPLATE DETAILS T-TS010 THEATRE SEATING NOTES AND DET AILS T-TS111 THEATRE SEATING -INF ILL VOMS PLAN-TH RUST TH EATR E T-TS112 THEATRE SEATING-O PEN VOMS PLAN-THRUST THEATRE T-TS113 THEATRE SEATING-BAL CON Y LEVEL-THRU ST THEATRE T-TS121 THEATRE SEATING THRUST THEAT RE CENTERLINE SEC TION T-TS211 THEATRE SEATING BLACK BOX PLAN CONFIGURATION PLANS- F OR REFERENCE NIC L-1 LANDSCAPE PLAN & COLOR ELEVAT ION L-2 PLANT LIST SITE PLAN, VICNITY MAP, PROJECT DATA, GENERAL NOTES DESCRIPTION:BY: BRYCE ENGSTROM ARCHITECTAll common law copyright and other property rightsreserve this document as an original and unpublishedwork product of Bryce Engstrom: Architect, and thiswork shall not be duplicated, copied, disclosed, orused in connection with any other work or projectother than the specific product for which it has beenprepared or assigned to any third party, withoutexpress written consent of Bryce Engstrom:ArchitectARCHITECT:BRYCE ENGSTROM210 TRAFFIC WAY SUITE EARROYO GRANDE, CA 93420(805)235-3385SHEET:REVISION TABLENUMBERDATEREVISED BYDESCRIPTIONOWNER:SAN LUIS OBISPO REPERTORYTHEATRE888 MORRO STREETSAN LUIS OBISPO, CA 93401(805)786-2440A-1.0 SCALE: 1 "=10'-0"SAN LUIS OBISPOREPERTORY THEATREMONTEREY STREETSAN LUIS OBISPO, CAVICINITY MAP (NO SCALE)PROJECT LOCATION X APPLICABLE CODES: 1 ST. FLOOR TOTAL:10,562/20,036= 53% OCCUPANCY GROUP: A1 PR OJECT DATA: A.P.N. TBD- LOTS TO BE COMBINED ZONING DESIGNATION: C-D W/ HISTORIC PRESERVATION OVERLAY W/ GENERAL PLAN AMENDMENT LOT SIZE: 20,036 SQ.FT. (USING ASSUMED P.L. AT PARKING GARAGE) PROPOSED COVERAGE: TOTAL LANDSCAPED AREA: TBD- SEE LANDSCAPING SHEETS CONSTRUCTION TYPE VA- FIRE SPRINKLERS PROJECT DESCRIPTION: CONSTRUCT NEW PERFORMING ARTS THEATRE CO NSULTA NTS LIS T AR CHITEC T: BR YCE ENGSTRO M 210 TRAFFIC WAY SUIT E E AR ROYO GRANDE, CA 93420 (805)235-3385 brycethearchitect@g mail.com CIVIL ENGINE ER: DANIE L SOTELO 3590 SACRAMENTO DRIV E SUITE 210 SAN L UIS OBISPO , CA 934 05 (805)602-6167d dsotelo@edpincorporated.com 2019 CALIF ORN IA BUILD ING C ODE (CBC) 2019 CALIF ORN IA H IST ORIC AL BUILD ING C ODE (CHBC) 2019 CALIF ORN IA EXISTING BUILDING CODE (CEBC) 2019 CALIF ORN IA GREEN BUILDING STANDARDS CODE (CGBSC ) 2019 CALIF ORN IA MECH ANI CAL C ODE (CMC) 2019 CALIF ORN IA PLUMBING CODE (CPC) 2019 CALIF ORN IA ELECTR ICAL COD E (CEC) 2019 CALIF ORN IA ENERGY CODE (C EC PART 6) 2019 CALIF ORN IA FIRE CODE (CFC) PAD CE RT IFICAT ION A SOILS OR CIVIL ENGINEER TO DETERMINE GRADING PERFORMED IS IN SUBSTANTIAL CONFORMANCE WITH THE APPROVED PLANS AND IS SUITABLE TO SUPPORT THE INTENDED STRUCTURE. LANDSCAPE AR CHITEC T: FIRMA CO NSULTANTS 187 TANK FARM RO AD SA N LUIS OBISPO , CA 93401 (805 )781-980 0 lindsay@firmaconsultants.com 1.ALL WORK SHALL CONFORM TO: A) THE MI NIMUM STANDARDS OF THE LATEST EDITION (OR THE CURRENT EDITION IN EFFECT) OF THE CALIFORNIA BUILDING CODE AND ALL RELATED DOCUMENTS THAT ARE PUBLISHED BY THE I.C.C.. WHI CH HAVE BEEN ADOPTED BY THE LOCAL GOVERNING AGENCY; B) ALL REGULATION AND ORDINANCE OF ALL LOCAL GOVERNING AGENCIES; AND C) ANY SPECIAL CONDITIONS REQUIRED BY THE LOCAL GOVERNING AGENCIES. 2.A CERTIFI CATE OF CONSTRUCTION COMPLIANCE, SIGNED BY THE GENERAL CONTRACTOR BASED UPON HIS OBSERVATION OF THE CONSTRUCTION WORK SHALL BE SUBMITTED TO THE INSPECTING BUILDING OFFICIAL PRIOR TO I SSUANCE OF A CERTIFICATE OF OCCUPANCY. 3.ALL WORK DESCRIBED IN THE DRAWINGS SHALL BE VERIFI ED FOR DIMENSION, GRADE, EXTENT AND COMPATIBILI TY TO THE EXI STING SI TE. ANY DISCREPANCIES AND UNEXPECTED CONDITIONS THAT AFFECT OR CHANGE THE WORK DESCRI BED IN THE CONTRACT DOCUMENTS SHALL BE BROUGHT TO THE ARCHITECT'S ATTENTION IMMEDI ATELY. DO NOT PROCEED WITH THE WORK IN THE AREA OF DISCREPANCIES UNTIL ALL SUCH DISCREPANCIES ARE RESOLVED. IF THE CONTRACTOR CHOOSES TO DO SO HE SHALL BE PRECEDING AT HIS OWN RISK. 4.OMISSI ONS FROM THE DRAWINGS AND SPECIFICATI ON OR THE MIS-DESCRIPTI ON OF THE WORK WHICH IS MANIFESTLY NECESSARY TO CARRY OUT THE INTENT OF THE DRAWI NGS AND SPECIFICATIONS, OR WHICH IS CUSTOMARILY PERFORMED, SHALL NOT RELIEVE THE CONTRACTOR FROM PERFORMING SUCH OMITTED OR MIS- DESCRIBED DETAILS OF THE WORK AS I F FULLY AND COMPLETELY SET FORTH AND DESCRIBED IN THE DRAWINGS AND SPECIFI CATIONS. 5.DIMENSIONS SHOWN SHALL TAKE PRECEDENCE OVER DRAWING SCALE OR PROPORTION. LARGER SCALE DRAWING SHALL TAKE PRECEDENCE OVER SMALLER SCALE DRAWINGS. 6.WALL AND CEILING MATERIALS SHALL NOT EXCEED THE FLAME SPREAD CLASSIFICATIONS IN CBC TABLE 803.11 7.THE SOI LS ENGINEER WILL NEED TO VERIFY IN WRITING BY FOOTING INSPECTION, AND PRI OR TO STEEL PLACEMENT, THAT THE FOOTINGS ARE INTO UNI FORM COMPETENT NATIVE MATERIAL OR OTHERWISE PREPARED ACCORDING TO SOILS ENGINEER RECOMMENDATIONS. 8.ANY PERSON USING A TORCH OR OTHER FLAME-PRODUCING DEVICE FOR SWEATING PI PE JOINTS FROM OR IN ANY BUILDING OR STRUCTURE SHALL PROVI DE ONE APPROVED FIRE EXTINGUISHER ON THE PREMISES WHERE SAID BURNING OPERATION IS PERFORMED. COMBUSTIBLE MATERIAL IN THE CLOSE PROXIMI TY OF OPEN FLAME SHALL BE PROTECTED AGAINST IGNITION BY SHI ELDING, WETTING OR OTHER MEANS. IN ALL CASES, A FIRE WATCH SHALL BE MAI NTAINED IN THE VICI NITY OF THE OPERATION FOR ONE-HALF HOUR AFTER THE TORCH OR FLAME-PRODUCING DEVICE HAS BEEN USED. REFER TO C.F.C. CHAPTER 3 FOR ADDI TIONAL MEASURES. 9.SITE CONDITIONS: ALL CONTRACTORS AND SUB-CONTRACTORS SHALL VERIFY DIMENSIONS AND CONDITIONS AT THE SITE PRIOR TO COMMENCEMENT OF THEI R WORK. FAILURE TO DO SO SHALL NOT RELEASE THEM FROM THE RESPONSI BILITY OF ESTIMATING THE WORK. IF ANY VARIATION, DISCREPANCY OR OMISSI ON (BETWEEN THE INTENT OF THESE CONTRACT DOCUMENTS AND THE EXISTING CONDITIONS ARE FOUND, THE CONTRACTOR OR SUB- CONTRACTOR SHALL NOTIFY THE ARCHITECT IN WRITING AND OBTAIN WRITTEN RESOLUTION FROM BRYCE ENGSTROM: ARCHI TECT PRI OR TO PROCEEDING WITH ANY RELATED WORK. 10.TEMPORARY FACI LITIES: CONTRACTOR SHALL PAY FOR, PROVIDE AND MAINTAIN TEMPORARY FACILITIES FOR PROJECT PROTECTION AND CONSTRUCTION, AND AS REQUIRED BY LOCAL REGULATION AND THESE DOCUMENTS, SUCH FACILI TIES INCLUDE BUT ARE NOT LIMITED TO: TOILETS, LIGHTS, HEATERS, POWER, GAS, FANS, WATER, PHONES, FENCES, SIGNS, SHEDS. ETC. REMOVE FROM SITE UPON COMPLETION OF WORK. OBTAIN BUI LDING OFFICIAL OR FIRE MARTIAL APPROVAL PRIOR TO USE OF ANY TEMPORARY HEATING DEVICE. 11.PROTECTION AND SAFETY: CONTRACTOR SHALL PROVI DE AND BE RESPONSIBLE FOR ALL TIMES (SIGNS, LIGHTS, FENCES, BRACING, ANCHORAGE, FIRE-EXTI NGUISHERS, ETC) NECESSARY FOR THE PROTECTION OF THE PUBLIC, WORKERS, MATERIALS, CONSTRUCTION AND PROPERTY PER LOCAL, STATE, AND FEDERAL REQUIREMENTS (I NCLUDING EARTHQUAKES, FI RES, SPILLS, ACCIDENTS, EROSION, MUD, DUST, ETC.) STAGING OF MATERI ALS AND EQUIPMENT SHALL NOT OVERLOAD ANY EXISTI NG, NEW AND/OR TEMPORARY STRUCTURES ON THE BUILDING SI TE. 12.CHANGES: CHANGES TO APPROVED PLANS AND SPECIFICATIONS SHALL BE MADE ONLY I N WRITING AND SHALL BE APPROVED BY THE ARCHITECT. CONTRACTOR SHALL ASSUME RESPONSIBI LITY AND COSTS FOR ALL CHANGES LATER IN THE PROJECT CAUSED BY THE ORIGINAL CHANGE. 13.SUBSTITUTIONS: SUBSTI TUTIONS REQUIRE OWNER AND ARCHITECTS APPROVAL FAILURE TO GAIN APPROVAL IS SUFFICI ENT GROUNDS FOR ORDERING REMOVAL OF PRODUCT AT CONTRACTOR'S EXPENSE. 14.ALL APPLIANCES, PLUMBING FIXTURES, CABINETS/BUILT-I NS, ACCESSORIES AND FINISHES LISTED ON THE DRAWINGS SHALL BE SPECIFIED BY THE OWNER OR OWNER'S REPRESENTATIVE U.O.N. 15.ALL MECHANICAL DUCTWORK SHALL BE CONSTRUCTED AND INSTALLED IN ACCORDANCE WITH 2016 CALIFORNIA MECHANICAL CODE 16.EROSION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICES MUST BE IN PLACE AND FUNCTIONAL PRIOR TO THE FIRST INSPECTION. NO INSPECTIONS CAN BE PERFORMED IF THEY ARE NOT IN PLACE OR HAVE FAI LED TO PROVIDE EROSION CONTROL. FAILURE TO MAINTAIN EROSION CONTROL WILL CAUSE INSPECTIONS TO BE DELAYED UNTIL EROSI ON CONTROL MEASURES ARE FUNCTIONAL. 17.AN OPERATION AND MAINTENANCE MANUAL SHALL BE PROVIDED TO THE BUILDING OCCUPANT OWNER. (THESE NOTES APPLY TO ALL PORTI ONS, PHASES & SUBCONTRACTOS OF THIS PROJECT) USE OF PLANS: THESE PLANS ARE THE PROPERTY OF BRYCE ENGSTROM: ARCHITECT AND MAY NOT BE USED WITHOUT EXPRESS, WRITTEN CONSENT. GENERAL NOTES: RISK CATEGORY: III FIRST FLOOR-10,562 SQ.FT. TOTAL:10,562/20,036= 0.53 FLOOR AREA RATIO: NOTE: NON-LANDSCAPE WATER SAVING FEATURES- COMMISSIONING OPR DOCUCUMENT STATES TARGET WATER SAVING 25% BETTER THAN TITLE 24. SEE LANDSCAPE PLANS FOR LANDSCAPE WATER SAVING FEATURES. NOTE: CONSTRUCTION DOCUMENTS SHALL COMPLY WITH ALL CITY OF SAN LUIS OBISPO GREEN CHECKLIST ITEMS DESCRIPTION OF PROPOSED USE: PERFORMING ARTS THEATRE INCLUDING TWO PERFORMANCE SPACES, LOBBY, AND GREEN ROOM/ACTOR SUPPORT AREAS ON CITY OWNED LOTS. 10,562 SQ.FT. HOURS OF OPERATION- MONDAY THROUGH SUNDAY 9 AM TO 9PM WITH VARIATIONS IN SCHEDULES THROUGHOUT THE WEEK. MAIN EVENING PERFORMANCES ARE THURSDAY-SUNDAY 7-10PM, SATURDAY AND SUNDAY MATINEES AT 2-5 PM. NO PARKING SPACES ON SITE ARE PROPOSED. PARKING: 10,562 GROSS SQ.FT./ 350= 30 CAR PARKING SPACES REQUIRED GREEN BUILDING: PROJECT SHALL COMPLY WITH ALL CITY GREEN BUILDING CHECKLIST REQUIREMENTS PROJECT NARRATIVE: THE NEW SAN LUIS OBISPO REPERTORY THEATRE BUILDING HONORS THE TIME-WORN AND ANCIENT NATIVE BUILDING MATERIALS USED DURING THE MISSION ERA SUCH AS EXTERIOR PLASTER, WHICH IS USED IN ITS TRADITIONAL FORM, AND TERRA COTTA CLAY, WHICH IS USED IN A MODERN, RE-IMAGINED WAY VIA AN INNOVATIVE RAIN SCREEN PANEL SYSTEM. IT ALSO USES 12x12 TERRA COTTA QUARRY TILES AT THE FRONT AND REAR OF THE BUILDING. THE NEW THEATRE LOOKS FORWARD WITH MORE CONTEMPORARY FORMS FOUND IN THE NEIGHBORING CHILDREN'S MUSEUM, AND IN KEEPING WITH CURRENT PLANS FOR THE EVENTUAL ART MUSEUM. IT'S FORMS STEP BACK FROM MONTEREY STREET, HELP BREAK UP THE MORE MONOLITHIC PARKING GARAGE, AND PROVIDES INVITING ENTRANCES TO BOTH BUILDINGS. ACOUSTICIAN: 45dBACOUSTICS/BILLDOHNASSOC. P.O.BOX1406 SANLUISOBISPO,CA93406 (805)801-3434 dl@45dB.com 30 CAR PARKING SPACES X .40= 12 BIKE PARKING SPACES REQUIRED- 9 SHORT TERM, 3 LONG TERM SCALE: 1” – 10’-0” @ 30” x 42” SHEET SIZE 05'10'10' 20' 30' Scale: 1" = 10'-0" NORTH: Conceptual Landscape Plan SAN LUIS OBISPO REPERTORY THEATRE L-1 April 7, 2022 File Path: firma_SLO Repertory Theatre_21803 Last Date Modified: 040622 firma l a n d s c a p e a r c h i t e c t s p l a n n i n g • e n v i r o n m e n t a l s t u d i e s 187 Tank Farm Road, Suite 230, San Luis Obispo, CA 93401 phone: 805.781.9800 fax: 805.781.9803 SOLAR PANEL ARRAY ON PARKING STRUCTURE, REFER TO WATRY DESIGN PLANS April 7, 2022NORTH: L-2 May 23, 20188'24' File Path: firma_SLO Repertory Theatre_21803 Last Date Modified: 04062022 Conceptual Landscape Plan SAN LUIS OBISPO REPERTORY THEATRE L-28'24'04'8' 16' SCALE: 1/8" = 1'-0" 8' SCALE: 1/8” – 1’-0” @ 30” x 42” SHEET SIZEfirma l a n d s c a p e a r c h i t e c t s p l a n n i n g • e n v i r o n m e n t a l s t u d i e s 187 Tank Farm Road, Suite 230, San Luis Obispo, CA 93401 phone: 805.781.9800 fax: 805.781.9803 9 F S 2 0 0 . 6 6 T G 1 9 4 . 7 5 I N V . 7 200 . 0 0 T G 194. 5 6 I N V 7 190.10 TG182.35 SUMP18195.55 TG189.50 INV (N)189.50 INV (W)186.30 SUMP91 8 9 . 9 3 F G 201.07F S 200.94FS200.58FS200.81FG2 0 1 . 5 5 FS 2 0 1 . 1 1FS 199.80 TG190.80 SUMP18200.92FG200.64FS193.66FS2 0 1 . 2 5 F S 201.07FS190.16FS190.16F S 190.80FS2.1%200.90FS201.00FG201.00FG200.62F G200.41FS2.1%2 0 0 . 2 5 FS 2 0 0 . 2 4 FS 200.35FS200.64FS1.4%200.90FS19 1 . 8 1 FS 19 1 . 9 4 FS 19 1 . 2 2 FS 19 0 . 4 4 FS 19 0 . 1 1 FS 18 9 . 9 6 FS 18 9 . 9 6 FS191.54F S 19 1 . 2 0 FS 191.04FS19 0 . 8 2 FS 4.1%1 9 0 . 2 8 F S 190.07FS1 9 0 . 3 6 F S 1 9 0 . 2 0 F S 2.0%3.9%190.39FS1 9 0 . 6 8 F S 190.68F S 190.34FS190.34FS190.48FS190.05FS2.0%3.5%2.8%20 1 . 0 7 F S 20 1 . 0 7 F S 20 0 . 9 1 F S 2 0 0 . 9 1 F S 189.98 FS201.07FS193.43 FG 193 . 7 2 FG 19 3 . 1 0 F G 19 3 . 9 1 FG 200.94FG196.29FG2 0 0 . 9 4 F S 2.0%19 0 . 3 1 F S 200.95FS200 . 9 6 FS 200.96 FS 201.07FS511 FT511.5 FT201.22FS200.57FS200.35FS0.8%0.8%194.50 FL 193.29 TG191.29 INV75.0%2.0%195194194 201 E C3 189.93FG59 FT189.86 TG187.36 INV.200.5%19019020120120144201201 2 0 0 2001020 0 . 7 9 FL 20 0 . 4 7 FL 200.03FL10200.83FS200.83FS200.82FS10PG E TRANSFOR0ER BY OT+ERS 2 0 2 . 7 1 F S 200.55FS194.29FL194. 1 9 FL 2.0%1.7%200.26FS200.20FS13.4%15.0%3.9%9.7%200.99FG200.89FS5%MIN193.47FL8200.08 FL 17172.0%190.48 TG187.98 INV .20 F C3 17.3'1515152 0 0 . 8 1 T G 1 9 6 . 1 7 I N V . 2 0 200. 9 8 T G 197. 0 6 I N V . 20 20 0 . 8 2 T G 19 6 . 5 3 I N V . 20BENCHMARKEXISTING UTILITY LOCATIONS SHOWN HERON ARE APPROXIMATE ONLY. IT SHALL BE THECONTRACTOR'S RESPONSIBILITY TO DETERMINE THE EXACT VERTICAL AND HORIZONTALLOCATION OF ALL EXISTING UNDERGROUND UTILITIES PRIOR TO COMMENCING CONSTRUCTION.NO REPRESENTATION IS MADE THAT ALL EXISTING UTILITIES ARE SHOWN HEREON. THEENGINEER ASSUMES NO RESPONSIBILITY FOR UTILITIES NOT SHOWN IN THEIR PROPERLOCATION.DISCLAIMER NOTE:Avoid cutting undergroundutility lines. It's costly.CallOR1-800-642-2444Call before you D gFF2% MINCONCRETE8" MIN5% MINFOR 10'BUILDING SLAB SECTIONGEOTECHNICAL REPORTEARTHWORKSSITE DATAPROJECT No. SL-16264-SADATED: APRIL 21, 2011AS PREPARED BY:EARTH SYSTEMS PACIFIC, INC.CUT = 1,266 CYFILL = 678 CYNET = 588 CY CUTAPN No.002-412-011ACREAGE:0.89ZONINGO-H1005SCALE: 1" =1010'TOPOGRAPHIC SURVEY PROJECT No. 2005512DATED: JUNE 2006AS PREPARED BY:RRM DESIGN GROUPFLOOD ZONE INFORMATIONA PORTION OF THE PROPERTY LIES WITHIN ZONE X, AN AREA OUTSIDE OF 0.2% ANNUAL CHANCEOF FLOOD HAZARD PER FEMA PANEL NO. 06079C1068G, EFFECTIVE DATE 11/16/2012.A PORTION OF THE PROPERTY LIES WITHIN ZONE AE, AN AREA TO BE DETERMINED TO HAVE A 1%ANNUAL CHANCE OF FLOOD HAZARD, BASE FLOOD ELEVATION OF 188 PER FEMA PANEL NO.06079C1068G, EFFECTIVE DATE 11/16/2012.THE BENCHMARK FOR THIS SURVEY BEING A LEAD AND TACK ON THE WESTERLY CURB 50 FEET(15 m) NORTH OF THE NWC OF NIPOMO & DANA, ELEVATION BEING 190.00 FEET (57.910 m)DATE: DRAFTER: CHECKED: SCALE:SHEETSHEET OF SHEETSDESCRIPTION:REV:DATE: E N G I E E R I N GN D E S GI N P R O F E S S I O N A L S ,I N C . L 0 S 0 S C A 0 5 .6 0 2 .6 1 6 7 |E D P I N C 0 R P O R A T E D .C O M 0 S 8 7/6/2022 DS DSC225 7/6/20221" = 10' GRADING PLAN SAN LUIS OBISPO REPERTORY THEATRE MONTEREY STREET SAN LUIS OBISPO, CA APN# 002-412-011 R EGISTE R E D PROFESSIONAL ENGINEERSTATE OF CALIFORN I A EXP.CIVILNO. 81227D A NI EL A. SOTELOPRELI0INARYARCH-0221-202213654DEEPENED FOOTING, MAX DEPTH PER PLAN (SEE STRUCTURALPLANS FOR DETAILS).CONSTRUCT RETAINING WALL, MAX WALL HEIGHT AND LENGTH PER WALLPLAN AND PROFILES, SHEET C3. (SEE STRUCTURAL PLANS FOR WALLDETAILING). CONTRACTOR TO PROVIDE ASPHALTIC WATER PROOFING,BACK OF WALL DRAIN, AND WEEPHOLES PER GEOTECHNICAL REPORT.CONTRACTOR TO PROVIDE EDGE PROTECTION WHERE REQUIRED PER CBCREQUIREMENTS.CONSTRUCT 4" CONCRETE OVER 4" TO 6" OF IMPORTED SAND OVER 18"TYPE II AGGREGATE BASE REINFORCED WITH NO. 3 BARS PLACED AT 24IN O.C. BOTH WAYS PER GEOTECHNICAL REPORT.8CONSTRUCT STAIRS PER CBC REQUIREMENTS.97CONSTRUCTION NOTES21011121613TRASH ENCLOSURE (SEE ARCHITECTURAL PLANS FOR DETAILS)PROTECT TREE PER CITY OF SLO STANDARD 77-1.03A (2) TREE PROTECTION1415RAISED PLANTER BED (SEE LANDSCAPE PLANS FOR DETAILS)DECORATIVE CONCRETE (SEE LANDSCAPE PLANS FOR DETAILS)GRASSCRETE (SEE LANDSCAPE PLANS FOR DETAILS)CONTRACTOR TO INSTALL REMOVABLE BOLLARDSCONSTRUCT FLOW LINE AS SHOWNBENCH (SEE LANDSCAPE PLAN FOR DETAILS)LEGENDPROPERTY BOUNDARYRIGHT OF WAYPROPERTY LINESECTION LINECENTER LINEEASEMENTEXISTING BACK OF CURBEXISTING FACE OF CURBEXISTING LIP OF CURBEXISTING MAJOR CONTOUR LINEEXISTING MINOR CONTOUR LINEEXISTING FENCEEXISTING EDGE OF SIDEWALKBUILDINGSCONCRETEBACK OF CURBFACE OF CURBCURB LIPFLOW LINEGRADE BREAKSAWCUTSIDEWALKSETBACKXXX(100)(101)||||||||||||||||||||||||||||||TOP BACK CURBFINISH GRADEEDGE OF PAVEMENTFLOW LINEASPHALT CONCRETE(00.00)TC(00.00)EG(00.00)EP(00.00)FL(00.00)ACTOP BACK CURBEXISTING GROUNDEDGE OF PAVEMENTFLOW LINEASPHALT CONCRETEPROPOSEDEXISTING00.00TC00.00FG00.00EP00.00FL00.00ACLEGENDHIGH POINT00.00HP(00.00)TRW(00.00)TFTOP OF RET. WALLTOP OF FOOTERTOP OF RET. WALLTOP OF FOOTER00.00TRW00.00TF(0" CURB WHERE APPLIES)INSTALL 12"X12" MIDSTATE CATCH BASIN WITH GRATE OR EQUIVALENTPER MANUFACTURERS SPECIFICATIONS. GRATE TO BE TRAFFIC RATEDNEAR DRIVEWAY LOCATIONS.ADS MANHOLE WITH GRATE COVER PER MANUFACTURER'SSPECIFICATIONS. MANHOLE AND GRATE TO BE TRAFFIC RATED NEARDRIVEWAY LOCATIONS.DECOMPOSED GRANITE (SEE ARCHITECTURAL PLANS FOR DETAILS)174" IRON CAST IRON PIPE18PHASE 2 - ADS MANHOLE19PHASE 2 - RETAINING WALL20PHASE 2 - 12X12 MIDSTATE CATCH BASINA ARCHITECTURAL REVIEW1/14/2020 B ARCHITECTURAL REVIEW - BASEMENT REMOVED3/22/2022 C ARCHITECTURAL REVIEW - LANDSCAPE REVISION4/20/2022 D ARCHITECTURAL REVIEW - 2ND SUBMITTAL7/6/2022LANDINGS (SEE ARCH PLANS FOR DETAILS) 1 From:Ryan Stefanek <rstefanek@kitchell.com> Sent:Tuesday, August 29, 2023 1:00 PM To:Marquart, Ben Cc:Tally Richtsmeier Subject:Tree #029 Back Story Attachments:PCO #005 Cover Sheet DRAFT REV 1.docx Hey Ben, As discussed here it the back story for the Tree #029 removal, and the updated cover sheet (Draft REV 1). The original plan on the contract documents was that Tree #029 would be removed and relocated from site as a separate project, not attached to either phase 1B or phase 2 of our project. Once the soils impacts were discovered replanting was no longer an option and the tree needed to be removed to facilitate the removal of all the lead soils. It looks like the relocation cost is captured in the phase 2 documents (1st screen shot below) but there is a little ambiguity as the design team also attached the Phase 1B demolition documents that indicate the tree is to be relocated by the city (2 nd screen shot). Let me know if you have any other questions. LP-1.3 – Phase 2 2 C2.2 – Phase 1B Thanks, Ryan Stefanek, Project Manager I Kitchell CEM 1540 Marsh St. Suite 150 San Luis Obispo, CA 93401 Cell: 805-674-6598 | Direct: 916-713-6975 Follow us: Facebook | Twitter | LinkedIn | KitchellProgress.com CITY OF SAN LUIS OBISPO, CALIFORNIA CONTRACT CHANGE ORDER (CCO) 1 CCO Number: 005 Sheets: 1 of 1 Date: 8-22-2023 Project: Cultural arts District Parking Structure, Phase 1B To: Edwards Construction Group Specification No.: 90435-1B Requested by: City of San Luis Obispo Approval Authority: X City Engineer City Manager City Council You are authorized and directed to make the described changes from the plans and specifications, or to increase or decrease contract quantities, as follows: Due to the impacted soils on site, the Phoenix Palm (Tree #029) per drawing page C-2.2 is to be removed. The contract documents for Phase 1B indicated that the Phoenix Palm would be relocated by the City to an off-site location. Due to the presence of impacted soils the removal of the Phoenix Palm is being added to Phase 1B to allow the impacted soils to be fully removed from site in preparation for Phase 2. The cost includes labor, equipment, and disposal fees for the full removal of Tree #029. Description of Work Amount Total By reason of this proposed change 0 day(s) extension of time will be allowed. There are 24 working days left on this project. Total cost of change shall not exceed / is estimated as: $2,254.89 We, the undersigned contractor, have given careful consideration to the changes proposed and agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may be noted above and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above. Accepted by: Contractor's Authorized Agent Date accepted Accepted by: Project Construction Manager Date accepted Submitted by: Resident Engineer Date submitted Submitted by: Project Manager Date submitted Approved by: City Engineer Date approved CITY OF SAN LUIS OBISPO, CALIFORNIA CONTRACT CHANGE ORDER (CCO) 2 Date approved by City Manager or Council \\chstore8\PublicWorks\Projects\ActiveProjects\Sewer\1000091 Verde Luneta Ramona Sewer Replacement Project\700 Construction Files\710 Change Orders\CCO-6\Contract Change Order-006.docx TREE REMOVAL APPLICATION RESIDENTIAL, COMMERCIAL, DEVELOPMENT Follow Non-Construction Tree Removal Criteria and Process here (SLOMC 12.24.090.E) Follow Construction Tree Removal Criteria and Process here (SLOMC 12.24.090.F) Owner: Applicant: Address: Address: City: Zip: City: Zip: Phone: Phone: Email: Email: Address of Tree(s): Number of trees applying to remove? ____ Tree Species: Reason: Is this removal a City Tree?____ YES_____ NO_____ UNKNOWN Dog in yard?___ YES____ NO Is this property governed by a Homeowners Association (HOA)?___ YES____ NO If YES, please provide HOA Board Approved Meeting minutes authorizing tree removal(s) with your tree removal application. 1 Please include a photo log that clearly shows the trees requested for removal. All Tree(s) must be uniquely identified by a number and a ribbon or an identifier wrapped around the truck in the photo and prior to inspection 2 Please include a replanting plan in accordance with Section 12.24.090(J) of the City’s Municipal Code. A minimum of one new tree shall be planted for each tree authorized to be removed on the same property (on site) or two new trees shall be planted for each tree authorized to be removed when planted on a different property or within the public right-of- way (off site). Page 2 Tree Removal Decisions as outlined in Section 12.24.090 of the City’s Municipal Code  SELECT ONE CRITERIA FROM BELOW SUPPORTING TREE REMOVAL APPLICATION DECISION MAKER APPEAL BODY Imminent Hazard to Life or Property Section 12.24.090(E)(1)(a) City Arborist No Appeal Tree Health and Hazard Mitigation Section 12.24.090(E) City Arborist Tree Committee Convenience Removal (Tree Committee makes recommendation to Community Development Director) 12.24.090(E)(3) Community Development Director Planning Commission City Council Minor Ministerial Development Permit (removal for residential or accessory construction on an R-1 or R-2 lot) Section City Arborist Community Development Director Criteria for Discretionary Permits Construction Tree Removal Section 12.24.090(F)(3) Community Development Director Planning Commission City Council Major Development / Tentative Tract Map/ Conditional Use Permit Section 12.24.090(F)(4) Community Development Director City Council Please include a check for $175.69 along with completed application & documentation. Tree Removal applications may be submitted in person at 25 Prado Road at the City’s Corporation Yard in SLO or mailed to: City of San Luis Obispo Public Works- Urban Forest Services 25 Prado Road San Luis Obispo, CA 93401. 12.24.090(F)(1) Pursuant to San Luis Obispo Municipal Code 12.24.180, any person aggrieved by an act or determination of the authorized approving authority exercising the authority herein granted shall have the right to appeal the decision of the authorized approving authority. Appeals must be received by the city clerk within ten calendar days from the date of determination or act shall cause the director to withhold tree removal permits and any permits for construction or demolition activity relying on the subject tree removal until the appeal is heard and a decision is reached. The fee to appeal to the Tree Committee is $135.64 This tree removal application must be signed by the property owner or an Authorized Agent. I declare under penalty of perjury that all the facts stated within this tree removal application are true and correct. Property Owner Signature: _________________________________ Date:___________ Applicant’s Signature: _____________________________________ Date:___________ Please make check payable to the City of San Luis Obispo $175.69 Check#: __________ 231 From:Bryce Engstrom <brycethearchitect@gmail.com> Sent:Wednesday, March 12, 2025 10:30 AM To:Building Subject:Re: 614 Monterey BLDG-2740-2024 V1 Comments This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Received, thank you. Bryce To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet. Bryce Engstrom- Architect 210 Traffic Way Suite E Arroyo Grande, CA 93420 (805) 235-3385 On Wed, Mar 12, 2025 at 9:04 AM Building <building@slocity.org> wrote: Hello,   Please find the attached comment letters for this project. Please address corrections and provide responses with your re-submittal. Thank you, Erin Stanley Permit Technician I Community Development E EStanley@slocity.org T 805.781.7159 slocity.org Stay connected with the City by signing up for e-notifications 232 From:Mark Sadowski <marksadowski@csgengr.com> Sent:Monday, February 10, 2025 2:36 PM To:Building Cc:CSG Plan Review; Nichols, Vanessa Subject:RE: Due date extension request - Performing Arts Theater, 614 Monterey, #BLDG-2740-2024 Thank you so much, Ilianna. Have a great afternoon! Mark Sadowski Regional Building Services Manager Past President Central Coast ICC CSG Consultants, Inc. 806 9th Street, Suite #2A, Paso Robles, CA 93446 www.csgengr.com marksadowski@csgengr.com 805.693.2670 ext. #2352 main 805.693.2652 direct 805.674.9846 cell From: Building <building@slocity.org> Sent: Monday, February 10, 2025 2:31 PM To: Mark Sadowski <marksadowski@csgengr.com> Cc: CSG Plan Review <planreview@csgengr.com>; Nichols, Vanessa <vnichols@slocity.org> Subject: RE: Due date extension request - Performing Arts Theater, 614 Monterey, #BLDG-2740-2024 Yes, that is acceptable. Thank you for letting us know. Ilianna Silva Permit Technician I Community Development 919 Palm, San Luis Obispo, CA 93401-3218 E ISilva@slocity.org T 805.781.7101 slocity.org Stay connected with the City by signing up for e-notifications From: Mark Sadowski <marksadowski@csgengr.com> Sent: Monday, February 10, 2025 1:14 PM To: Building <building@slocity.org> Cc: CSG Plan Review <planreview@csgengr.com> Subject: Due date extension request - Performing Arts Theater, 614 Monterey, #BLDG-2740-2024 233 This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Good afternoon, I hope you had a great weekend! In reviewing the project referenced above, there are a number of intricacies with the structural design, and we were wondering if it would be possible to get an extension on this one. Would this Friday, 2/14/25 be acceptable to have the comments returned by? Please let me know if you have any questions and thank you in advance for the consideration. All the best, Mark Sadowski Regional Building Services Manager Past President Central Coast ICC CSG Consultants, Inc. 806 9th Street, Suite #2A, Paso Robles, CA 93446 www.csgengr.com marksadowski@csgengr.com 805.693.2670 ext. #2352 main 805.693.2652 direct 805.674.9846 cell 234 From:Cohen, Rachel Sent:Wednesday, February 5, 2025 11:45 AM To:Gault, Walter Subject:FW: BLDG-2740-2024 (614 Monterey St) V1 New Submittal - New Performing Arts Theater Hi Walter- Linked below are the plans for the SLO Rep Theatre. I have also added you to the routing so it will show up in your “Manage my Reviews”. Comments are due February 24th. Thanks, Rachel Cohen pronouns she/her/hers Principal Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org Stay connected with the City by signing up for e-notifications From: Building <building@slocity.org> Sent: Monday, January 27, 2025 3:29 PM To: McCaffrey, Seano <smccaffrey@slocity.org>; Planning <planning@slocity.org>; Engineering <Engineering@slocity.org>; Hutchinson, Julianna <JHutchin@slocity.org>; Schwartz, Luke <LSchwart@slocity.org>; Beech, Ryan <RBeech@slocity.org>; Fortner, Kellie <kfortner@slocity.org> Cc: Stanley, Erin <EStanley@slocity.org>; Nichols, Vanessa <vnichols@slocity.org> Subject: BLDG-2740-2024 (614 Monterey St) V1 New Submittal - New Performing Arts Theater Hello Everyone, Please review the above-mentioned project for review. PLEASE READ: This is not a blue beams session, but comments should still go in corrections. Do not create a separate word document. Thank you! LINK: V1 DUE DATE: 2/24/2025 SIDE NOTE FOR BLDG/FIRE REVIEW Architecture review only – Sean Structural review only – CSG Consultant Fire review – CSG Consultant 1st review only Please let me know if you have any questions. Thank you. 235 Ilianna Silva Permit Technician I Community Development 919 Palm, San Luis Obispo, CA 93401-3218 E ISilva@slocity.org T 805.781.7101 slocity.org Stay connected with the City by signing up for e-notifications 236 From:Oetzell, Walter Sent:Thursday, January 30, 2025 10:41 AM To:Wynn, Eva Cc:Cohen, Rachel Subject:RE: BLDG-2740-2024 (614 Monterey St) V1 New Submittal - New Performing Arts Theater … has been assigned to Rachel for review. Thanks. -- Walter Oetzell Assistant Planner (805) 781-7593 | woetzell@slocity.org From: Planning <planning@slocity.org> Sent: Tuesday, January 28, 2025 8:16 AM To: Oetzell, Walter <woetzell@slocity.org> Subject: FW: BLDG-2740-2024 (614 Monterey St) V1 New Submittal - New Performing Arts Theater Hi Walter, The workflow hasn’t been assigned yet on this project, but I anticipate it will go to you. Below is the submittal for the Performing Arts Theater at 614 Monterey. Happy Tuesday 뇤눎눐눑눒눏 Eva Wynn Planning Technician Community Development 919 Palm, San Luis Obispo, CA 93401-3218 E EWynn@slocity.org T 805.781.7172 slocity.org Stay connected with the City by signing up for e-notifications From: Building <building@slocity.org> Sent: Monday, January 27, 2025 3:29 PM To: McCaffrey, Seano <smccaffrey@slocity.org>; Planning <planning@slocity.org>; Engineering <Engineering@slocity.org>; Hutchinson, Julianna <JHutchin@slocity.org>; Schwartz, Luke <LSchwart@slocity.org>; Beech, Ryan <RBeech@slocity.org>; Fortner, Kellie <kfortner@slocity.org> Cc: Stanley, Erin <EStanley@slocity.org>; Nichols, Vanessa <vnichols@slocity.org> Subject: BLDG-2740-2024 (614 Monterey St) V1 New Submittal - New Performing Arts Theater Hello Everyone, 237 Please review the above-mentioned project for review. PLEASE READ: This is not a blue beams session, but comments should still go in corrections. Do not create a separate word document. Thank you! LINK: V1 DUE DATE: 2/24/2025 SIDE NOTE FOR BLDG/FIRE REVIEW Architecture review only – Sean Structural review only – CSG Consultant Fire review – CSG Consultant 1st review only Please let me know if you have any questions. Thank you. Ilianna Silva Permit Technician I Community Development 919 Palm, San Luis Obispo, CA 93401-3218 E ISilva@slocity.org T 805.781.7101 slocity.org Stay connected with the City by signing up for e-notifications 238 From:Building <building@slocity.org> Sent:Tuesday, January 28, 2025 3:18 PM To:Samantha Sanchez Subject:RE: City of San Luis Obispo - 25F-00470 - BLDG-2740-2024 - 614 Monterey St - In Review Thank you! Erin Stanley Permit Technician I Community Development E EStanley@slocity.org T 805.781.7159 slocity.org Stay connected with the City by signing up for e-notifications From: Samantha Sanchez <centralvalleydrt@csgengr.com> Sent: Tuesday, January 28, 2025 2:45 PM To: Building <building@slocity.org> Subject: City of San Luis Obispo - 25F-00470 - BLDG-2740-2024 - 614 Monterey St - In Review This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Confirmation of Plan Check Submittal 1/28/2025 Our plan check office has processed your plan check for review. We will keep you informed by sending our correction letters, notification, and/or correspondence to you as we completed and process the reviews. Please attach this email to your plan check file for future references. Plan Check Name: Structural review only – CSG Consultant – please review hourly Fire review – CSG Consultant 1st review only New performing arts theatre Plan Check # : 25F-00470 / BLDG-2740-2024 Items Received: 1/28/2025 Due Date: 2/11/2025 Thank you, 239 Central Valley Office 930 Fresno St, Newman CA 95360 Ph: 888-794-2016 240 From:Building <building@slocity.org> Sent:Tuesday, January 28, 2025 1:55 PM To:Samantha Sanchez Subject:RE: City of San Luis Obispo - 4500931 - BLDG-2740-2024 - 614 Monterey St - In Review Thank you, Samantha! Erin Stanley Permit Technician I Community Development E EStanley@slocity.org T 805.781.7159 slocity.org Stay connected with the City by signing up for e-notifications From: Samantha Sanchez <centralvalleydrt@csgengr.com> Sent: Tuesday, January 28, 2025 1:49 PM To: Building <building@slocity.org> Subject: City of San Luis Obispo - 4500931 - BLDG-2740-2024 - 614 Monterey St - In Review This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Confirmation of Plan Check Submittal 1/28/2025 Our plan check office has processed your plan check for review. We will keep you informed by sending our correction letters, notification, and/or correspondence to you as we completed and process the reviews. Please attach this email to your plan check file for future references. Plan Check Name: Structural review only – CSG Consultant – please review hourly Fire review – CSG Consultant 1st review only New performing arts theatre Plan Check # : 4500931 / BLDG-2740-2024 Items Received: 1/28/2025 Due Date: 2/11/2025 Thank you, 241 Central Valley Office 930 Fresno St, Newman CA 95360 Ph: 888-794-2016 242 From:Planning Sent:Tuesday, January 28, 2025 8:16 AM To:Oetzell, Walter Subject:FW: BLDG-2740-2024 (614 Monterey St) V1 New Submittal - New Performing Arts Theater Hi Walter, The workflow hasn’t been assigned yet on this project, but I anticipate it will go to you. Below is the submittal for the Performing Arts Theater at 614 Monterey. Happy Tuesday 뇤눎눐눑눒눏 Eva Wynn Planning Technician Community Development 919 Palm, San Luis Obispo, CA 93401-3218 E EWynn@slocity.org T 805.781.7172 slocity.org Stay connected with the City by signing up for e-notifications From: Building <building@slocity.org> Sent: Monday, January 27, 2025 3:29 PM To: McCaffrey, Seano <smccaffrey@slocity.org>; Planning <planning@slocity.org>; Engineering <Engineering@slocity.org>; Hutchinson, Julianna <JHutchin@slocity.org>; Schwartz, Luke <LSchwart@slocity.org>; Beech, Ryan <RBeech@slocity.org>; Fortner, Kellie <kfortner@slocity.org> Cc: Stanley, Erin <EStanley@slocity.org>; Nichols, Vanessa <vnichols@slocity.org> Subject: BLDG-2740-2024 (614 Monterey St) V1 New Submittal - New Performing Arts Theater Hello Everyone, Please review the above-mentioned project for review. PLEASE READ: This is not a blue beams session, but comments should still go in corrections. Do not create a separate word document. Thank you! LINK: V1 DUE DATE: 2/24/2025 SIDE NOTE FOR BLDG/FIRE REVIEW Architecture review only – Sean Structural review only – CSG Consultant Fire review – CSG Consultant 1st review only Please let me know if you have any questions. Thank you. 243 Ilianna Silva Permit Technician I Community Development 919 Palm, San Luis Obispo, CA 93401-3218 E ISilva@slocity.org T 805.781.7101 slocity.org Stay connected with the City by signing up for e-notifications 244 From:Kevin Harris <kevinharris@slorep.org> Sent:Monday, January 27, 2025 3:54 PM To:Building; Nichols, Vanessa; brycethearchitect@gmail.com Cc:Cohen, Rachel; Loew, Michael; Hill, Robert; Tyler Benson Subject:RE: BLDG-2740-2024 (614 Monterey St) Fantastic- thank you for the update! Kevin Harris (he/him/his) Managing ArƟsƟc Director www.slorep.org SAN LUIS OBISPO REPERTORY THEATRE Unforgettable Characters. Extraordinary Stories. Since 1947. Facebook | Instagram | Blog | Twitter | YouTube SLO REP is a proud member of: From: Building <building@slocity.org> Sent: Monday, January 27, 2025 3:45 PM To: Kevin Harris <kevinharris@slorep.org>; Nichols, Vanessa <vnichols@slocity.org>; brycethearchitect@gmail.com Cc: Cohen, Rachel <rcohen@slocity.org>; Loew, Michael <Mloew@slocity.org>; Hill, Robert <rhill@slocity.org> Subject: BLDG-2740-2024 (614 Monterey St) Hello Everyone, I can confirm we received the payment. Attached is the receipt. For reference the building permit number is BLDG- 2740-2024 (614 Monterey St) The due date of completion of the first review is 2/24/2024. We will contact you once the review is completed and send you comments via email to the applicant on file. Any questions, please email building@slocity.org. Thank you. Ilianna Silva Permit Technician I 245 Community Development 919 Palm, San Luis Obispo, CA 93401-3218 E ISilva@slocity.org T 805.781.7101 slocity.org Stay connected with the City by signing up for e-notifications From: Kevin Harris <kevinharris@slorep.org> Sent: Monday, January 27, 2025 12:22 PM To: Nichols, Vanessa <vnichols@slocity.org>; brycethearchitect@gmail.com Cc: Cohen, Rachel <rcohen@slocity.org>; Loew, Michael <Mloew@slocity.org>; Silva, Ilianna <ISilva@slocity.org>; Hill, Robert <rhill@slocity.org> Subject: RE: SLO REP PLANS UPDATE This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Hi Vanessa- just confirming that the check # for $6,703.36 for intake was dropped oƯ this afternoon. Thank you! Kevin Harris (he/him/his) Managing ArƟsƟc Director www.slorep.org SAN LUIS OBISPO REPERTORY THEATRE Unforgettable Characters. Extraordinary Stories. Since 1947. Facebook | Instagram | Blog | Twitter | YouTube SLO REP is a proud member of: 246 From: Nichols, Vanessa <vnichols@slocity.org> Sent: Friday, January 24, 2025 1:21 PM To: brycethearchitect@gmail.com; kevinharris@slorep.org Cc: Cohen, Rachel <rcohen@slocity.org>; Loew, Michael <Mloew@slocity.org>; Silva, Ilianna <ISilva@slocity.org> Subject: RE: SLO REP PLANS UPDATE Hi, Thank you for following up on the plan submittal for SLO Repertory Theatre. We were able to find your submittal, however it was not processed by our system correctly and we were not notified of the submittal. So, with that said we are now getting it processed. In reviewing the documents submitted we found that the only documenting we are missing is a soils report. We will need this to complete the submittal and put it into plan review. Please email it to the Building Department email building@slocity.org and we will get it added to the submittal. I have attached the invoice for the intake fee. This fee will need to be paid for us to put the project into plan review. The invoice can be paid online by following this link https://infoslo.slocity.org/EnerGov_Prod/selfservice#/home and clicking on Pay Invoices on the top menu bar. Please note that I will be adjusting the initial timeline for the first plan review to make up for the submittal not getting processed on our end correctly. Please let me know if you have any questions or if you need any assistance with the above requests. Thank you. Vanessa Nichols Building Permit Services Supervisor Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E vnichols@slocity.org T 805.781.7588 slocity.org Stay connected with the City by signing up for e-notifications 247 From:Silva, Ilianna Sent:Monday, January 27, 2025 3:39 PM To:centralvalleydrt@csgengr.com Cc:Stanley, Erin; Nichols, Vanessa Subject:BLDG-2740-2024 (614 Monterey St) V1 New Submittal - New Performing Arts Theater Hello, Please confirm you received the uploaded plans for the following project. Thank you. BLDG-2740-2024 (614 Monterey St) V1 New Submittal - New Performing Arts Theater Architecture review only – Sean Structural review only – CSG Consultant – please review hourly Fire review – CSG Consultant 1st review only Ilianna Silva Permit Technician I Community Development 919 Palm, San Luis Obispo, CA 93401-3218 E ISilva@slocity.org T 805.781.7101 slocity.org Stay connected with the City by signing up for e-notifications 248 From:Building Sent:Monday, January 27, 2025 3:29 PM To:McCaffrey, Seano; Planning; Engineering; Hutchinson, Julianna; Schwartz, Luke; Beech, Ryan; Fortner, Kellie Cc:Stanley, Erin; Nichols, Vanessa Subject:BLDG-2740-2024 (614 Monterey St) V1 New Submittal - New Performing Arts Theater Hello Everyone, Please review the above-mentioned project for review. PLEASE READ: This is not a blue beams session, but comments should still go in corrections. Do not create a separate word document. Thank you! LINK: V1 DUE DATE: 2/24/2025 SIDE NOTE FOR BLDG/FIRE REVIEW Architecture review only – Sean Structural review only – CSG Consultant Fire review – CSG Consultant 1st review only Please let me know if you have any questions. Thank you. Ilianna Silva Permit Technician I Community Development 919 Palm, San Luis Obispo, CA 93401-3218 E ISilva@slocity.org T 805.781.7101 slocity.org Stay connected with the City by signing up for e-notifications 249 From:Kevin Harris <kevinharris@slorep.org> Sent:Friday, January 24, 2025 12:08 PM To:Bryce Engstrom Cc:Tyler Benson; Cohen, Rachel; Hill, Robert Subject:RE: FW: SLO REP PLANS UPDATE? Great- thanks, Bryce. Bryce also texted me the current project under his name in the portal. He has not submitted any projects into the new portal except for the theatre project. Maybe this will help track it down. Kevin Harris (he/him/his) Managing Artistic Director www.slorep.org To help protect your priv acy, Microsoft Office prevented automatic download of this picture from the Internet. SAN LUIS OBISPO REPERTORY THEATRE Unforgettable Characters. Extraordinary Stories. Since 1947. Facebook | Instagram | Blog | Twitter | YouTube SLO REP is a proud member of: To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet. To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet. 250 From: Bryce Engstrom <brycethearchitect@gmail.com> Sent: Thursday, January 23, 2025 4:08 PM To: Kevin Harris <kevinharris@slorep.org> Cc: Tyler Benson <tb@edwardscongroup.com>; Cohen, Rachel <rcohen@slocity.org>; Hill, Robert <rhill@slocity.org> Subject: Re: FW: SLO REP PLANS UPDATE? Yes to both questions. Also emailed the building official to confirm, but never got any confirmation (other than when I first one immediately after uploading) from him. On Fri, Jan 24, 2025, 12:16 PM Kevin Harris <kevinharris@slorep.org> wrote: Hery dude- I know you’re out of the country but sending this in case you happen to check email. I haven’t gotten any confirmation or invoice about the plans, so I thought I would check with the City to make sure they got in. They’re looking for them now, but, Rachel had a couple of questions (below). Thanks! Kevin Harris (he/him/his) Managing Artistic Director From: Cohen, Rachel <rcohen@slocity.org> Sent: Thursday, January 23, 2025 2:36 PM To: Kevin Harris <kevinharris@slorep.org>; Hill, Robert <rhill@slocity.org>; Loew, Michael <Mloew@slocity.org> Cc: Nichols, Vanessa <vnichols@slocity.org> Subject: RE: SLO REP PLANS UPDATE? Hi Kevin, Do you know how Bryce submitted the plans? Did he submit them through the City’s Portal (https://infoslo.slocity.org/EnerGov_Prod/selfservice#/home )? And can you confirm if Bryce submitted under the 614 Monterey Address? Thank you, Rachel Cohen pronouns she/her/hers Principal Planner Community Development 251 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org Stay connected with the City by signing up for e-notifications From: Kevin Harris <kevinharris@slorep.org> Sent: Friday, January 17, 2025 3:44 PM To: Hill, Robert <rhill@slocity.org>; Cohen, Rachel <rcohen@slocity.org>; Loew, Michael <Mloew@slocity.org> Subject: SLO REP PLANS UPDATE? This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Hi there Bob, Rachel, and Mike, As you know, Bryce submitted our plan set to City back in December. I haven’t received any confirmation of receipt or initial invoice for the review, so, I just wanted to see if there was a easy way for us to check that: -the plans were successfully submitted -when we might receive an invoice (we’re in a slow period for expenses in the campaign right now, and the Board would like to move as much money out of our checking account into an account that makes some money during this period.) Unfortunately, Bryce is out of the country and completely off the grid for until mid-February, so I can’t contact him (which is why I’m bothering you three.) Thanks in advance for any help! Kevin Harris (he/him/his) Managing Artistic Director www.slorep.org 252 SAN LUIS OBISPO REPERTORY THEATRE Unforgettable Characters. Extraordinary Stories. Since 1947. Facebook | Instagram | Blog | Twitter | YouTube SLO REP is a proud member of: 253 From:Cohen, Rachel Sent:Friday, January 24, 2025 8:50 AM To:Nichols, Vanessa; Loew, Michael Subject:RE: SLO REP PLANS UPDATE? Thank you so much Vanessa for your help with this. Technology can be soooo frustrating. Can you cc me when you reach out to them about the invoice? Thanks! Rachel Cohen pronouns she/her/hers Principal Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org Stay connected with the City by signing up for e-notifications From: Nichols, Vanessa <vnichols@slocity.org> Sent: Friday, January 24, 2025 8:43 AM To: Cohen, Rachel <rcohen@slocity.org>; Loew, Michael <Mloew@slocity.org> Subject: RE: SLO REP PLANS UPDATE? Good Morning Rachel, I located the submittal by the address. It was submitted online but did not go into our review coordinator so basically, we were not notified of the submittal. I am investigating why this happen because that is a big problem. We are going to send the invoice to be paid, and they are missing the soils report which we will need to process the review. We will send an email with that information as well. I will do a timeline adjustment on their first review to make up for the miss of the submittal on our part. Let me know if you need for us to do anything else. Vanessa Nichols Building Permit Services Supervisor Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E vnichols@slocity.org T 805.781.7588 slocity.org Stay connected with the City by signing up for e-notifications 254 From: Cohen, Rachel <rcohen@slocity.org> Sent: Friday, January 24, 2025 7:36 AM To: Loew, Michael <Mloew@slocity.org>; Nichols, Vanessa <vnichols@slocity.org> Subject: RE: SLO REP PLANS UPDATE? Hi Mike and Vanessa, Can you help me see if we have any record of this submittal? Looks like it was on December 3 rd that they submitted. Bryce mentioned in an email to me and Kevin that he sent an email to Mike after he submitted but never heard back. The address I told them to submit under is 614 Monterey. Thanks for your help with this. Super strange that the submittal is not showing up. Cheers, Rachel Cohen pronouns she/her/hers Principal Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org Stay connected with the City by signing up for e-notifications From: Kevin Harris <kevinharris@slorep.org> Sent: Thursday, January 23, 2025 3:15 PM To: Cohen, Rachel <rcohen@slocity.org>; Hill, Robert <rhill@slocity.org>; Loew, Michael <Mloew@slocity.org> Cc: Nichols, Vanessa <vnichols@slocity.org> Subject: RE: SLO REP PLANS UPDATE? Hi Rachel, I’m looking at old text messages, and it looks like Bryce submitted the plans through the permit application online. He confirmed that he got confirmation from the portal on December 3 at 10:31 AM. I know that he had questions about the APN- we checked with you, Bob, and Michael about the correct number on December 2 while gathering materials to submit and I believe you gave us the 614 Monterey Address. I can try to contact Bryce to confirm. Thanks! Kevin Harris (he/him/his) Managing ArƟsƟc Director www.slorep.org 255 SAN LUIS OBISPO REPERTORY THEATRE Unforgettable Characters. Extraordinary Stories. Since 1947. Facebook | Instagram | Blog | Twitter | YouTube SLO REP is a proud member of: From: Cohen, Rachel <rcohen@slocity.org> Sent: Thursday, January 23, 2025 2:36 PM To: Kevin Harris <kevinharris@slorep.org>; Hill, Robert <rhill@slocity.org>; Loew, Michael <Mloew@slocity.org> Cc: Nichols, Vanessa <vnichols@slocity.org> Subject: RE: SLO REP PLANS UPDATE? Hi Kevin, Do you know how Bryce submitted the plans? Did he submit them through the City’s Portal (https://infoslo.slocity.org/EnerGov_Prod/selfservice#/home)? And can you confirm if Bryce submitted under the 614 Monterey Address? Thank you, Rachel Cohen pronouns she/her/hers Principal Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org Stay connected with the City by signing up for e-notifications From: Kevin Harris <kevinharris@slorep.org> Sent: Friday, January 17, 2025 3:44 PM To: Hill, Robert <rhill@slocity.org>; Cohen, Rachel <rcohen@slocity.org>; Loew, Michael <Mloew@slocity.org> Subject: SLO REP PLANS UPDATE? This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Hi there Bob, Rachel, and Mike, 256 As you know, Bryce submitted our plan set to City back in December. I haven’t received any confirmation of receipt or initial invoice for the review, so, I just wanted to see if there was a easy way for us to check that: -the plans were successfully submitted -when we might receive an invoice (we’re in a slow period for expenses in the campaign right now, and the Board would like to move as much money out of our checking account into an account that makes some money during this period.) Unfortunately, Bryce is out of the country and completely oƯ the grid for until mid-February, so I can’t contact him (which is why I’m bothering you three.) Thanks in advance for any help! Kevin Harris (he/him/his) Managing ArƟsƟc Director www.slorep.org SAN LUIS OBISPO REPERTORY THEATRE Unforgettable Characters. Extraordinary Stories. Since 1947. Facebook | Instagram | Blog | Twitter | YouTube SLO REP is a proud member of: 257 From:Nichols, Vanessa Sent:Friday, January 24, 2025 8:43 AM To:Cohen, Rachel; Loew, Michael Subject:RE: SLO REP PLANS UPDATE? Good Morning Rachel, I located the submittal by the address. It was submitted online but did not go into our review coordinator so basically, we were not notified of the submittal. I am investigating why this happen because that is a big problem. We are going to send the invoice to be paid, and they are missing the soils report which we will need to process the review. We will send an email with that information as well. I will do a timeline adjustment on their first review to make up for the miss of the submittal on our part. Let me know if you need for us to do anything else. Vanessa Nichols Building Permit Services Supervisor Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E vnichols@slocity.org T 805.781.7588 slocity.org Stay connected with the City by signing up for e-notifications From: Cohen, Rachel <rcohen@slocity.org> Sent: Friday, January 24, 2025 7:36 AM To: Loew, Michael <Mloew@slocity.org>; Nichols, Vanessa <vnichols@slocity.org> Subject: RE: SLO REP PLANS UPDATE? Hi Mike and Vanessa, Can you help me see if we have any record of this submittal? Looks like it was on December 3 rd that they submitted. Bryce mentioned in an email to me and Kevin that he sent an email to Mike after he submitted but never heard back. The address I told them to submit under is 614 Monterey. Thanks for your help with this. Super strange that the submittal is not showing up. Cheers, Rachel Cohen pronouns she/her/hers Principal Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org 258 Stay connected with the City by signing up for e-notifications From: Kevin Harris <kevinharris@slorep.org> Sent: Thursday, January 23, 2025 3:15 PM To: Cohen, Rachel <rcohen@slocity.org>; Hill, Robert <rhill@slocity.org>; Loew, Michael <Mloew@slocity.org> Cc: Nichols, Vanessa <vnichols@slocity.org> Subject: RE: SLO REP PLANS UPDATE? Hi Rachel, I’m looking at old text messages, and it looks like Bryce submitted the plans through the permit application online. He confirmed that he got confirmation from the portal on December 3 at 10:31 AM. I know that he had questions about the APN- we checked with you, Bob, and Michael about the correct number on December 2 while gathering materials to submit and I believe you gave us the 614 Monterey Address. I can try to contact Bryce to confirm. Thanks! Kevin Harris (he/him/his) Managing ArƟsƟc Director www.slorep.org SAN LUIS OBISPO REPERTORY THEATRE Unforgettable Characters. Extraordinary Stories. Since 1947. Facebook | Instagram | Blog | Twitter | YouTube SLO REP is a proud member of: From: Cohen, Rachel <rcohen@slocity.org> Sent: Thursday, January 23, 2025 2:36 PM To: Kevin Harris <kevinharris@slorep.org>; Hill, Robert <rhill@slocity.org>; Loew, Michael <Mloew@slocity.org> Cc: Nichols, Vanessa <vnichols@slocity.org> Subject: RE: SLO REP PLANS UPDATE? Hi Kevin, Do you know how Bryce submitted the plans? Did he submit them through the City’s Portal (https://infoslo.slocity.org/EnerGov_Prod/selfservice#/home)? And can you confirm if Bryce submitted under the 614 Monterey Address? Thank you, 259 Rachel Cohen pronouns she/her/hers Principal Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org Stay connected with the City by signing up for e-notifications From: Kevin Harris <kevinharris@slorep.org> Sent: Friday, January 17, 2025 3:44 PM To: Hill, Robert <rhill@slocity.org>; Cohen, Rachel <rcohen@slocity.org>; Loew, Michael <Mloew@slocity.org> Subject: SLO REP PLANS UPDATE? This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Hi there Bob, Rachel, and Mike, As you know, Bryce submitted our plan set to City back in December. I haven’t received any confirmation of receipt or initial invoice for the review, so, I just wanted to see if there was a easy way for us to check that: -the plans were successfully submitted -when we might receive an invoice (we’re in a slow period for expenses in the campaign right now, and the Board would like to move as much money out of our checking account into an account that makes some money during this period.) Unfortunately, Bryce is out of the country and completely oƯ the grid for until mid-February, so I can’t contact him (which is why I’m bothering you three.) Thanks in advance for any help! Kevin Harris (he/him/his) Managing ArƟsƟc Director www.slorep.org SAN LUIS OBISPO REPERTORY THEATRE Unforgettable Characters. Extraordinary Stories. Since 1947. Facebook | Instagram | Blog | Twitter | YouTube SLO REP is a proud member of: 260 261 From:Bryce Engstrom <brycethearchitect@gmail.com> Sent:Thursday, January 23, 2025 4:08 PM To:Kevin Harris Cc:Tyler Benson; Cohen, Rachel; Hill, Robert Subject:Re: FW: SLO REP PLANS UPDATE? Yes to both questions. Also emailed the building official to confirm, but never got any confirmation (other than when I first one immediately after uploading) from him. On Fri, Jan 24, 2025, 12:16 PM Kevin Harris <kevinharris@slorep.org> wrote: Hery dude- I know you’re out of the country but sending this in case you happen to check email. I haven’t gotten any confirmation or invoice about the plans, so I thought I would check with the City to make sure they got in. They’re looking for them now, but, Rachel had a couple of questions (below). Thanks! Kevin Harris (he/him/his) Managing Artistic Director From: Cohen, Rachel <rcohen@slocity.org> Sent: Thursday, January 23, 2025 2:36 PM To: Kevin Harris <kevinharris@slorep.org>; Hill, Robert <rhill@slocity.org>; Loew, Michael <Mloew@slocity.org> Cc: Nichols, Vanessa <vnichols@slocity.org> Subject: RE: SLO REP PLANS UPDATE? Hi Kevin, Do you know how Bryce submitted the plans? Did he submit them through the City’s Portal (https://infoslo.slocity.org/EnerGov_Prod/selfservice#/home )? And can you confirm if Bryce submitted under the 614 Monterey Address? Thank you, Rachel Cohen pronouns she/her/hers Principal Planner 262 Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org Stay connected with the City by signing up for e-notifications From: Kevin Harris <kevinharris@slorep.org> Sent: Friday, January 17, 2025 3:44 PM To: Hill, Robert <rhill@slocity.org>; Cohen, Rachel <rcohen@slocity.org>; Loew, Michael <Mloew@slocity.org> Subject: SLO REP PLANS UPDATE? This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Hi there Bob, Rachel, and Mike, As you know, Bryce submitted our plan set to City back in December. I haven’t received any confirmation of receipt or initial invoice for the review, so, I just wanted to see if there was a easy way for us to check that: -the plans were successfully submitted -when we might receive an invoice (we’re in a slow period for expenses in the campaign right now, and the Board would like to move as much money out of our checking account into an account that makes some money during this period.) Unfortunately, Bryce is out of the country and completely off the grid for until mid-February, so I can’t contact him (which is why I’m bothering you three.) Thanks in advance for any help! Kevin Harris 263 (he/him/his) Managing Artistic Director www.slorep.org SAN LUIS OBISPO REPERTORY THEATRE Unforgettable Characters. Extraordinary Stories. Since 1947. Facebook | Instagram | Blog | Twitter | YouTube SLO REP is a proud member of: 264 From:Kevin Harris <kevinharris@slorep.org> Sent:Thursday, January 23, 2025 3:16 PM To:Bryce Engstrom Cc:Tyler Benson; Cohen, Rachel; Hill, Robert Subject:FW: SLO REP PLANS UPDATE? Hery dude- I know you’re out of the country but sending this in case you happen to check email. I haven’t gotten any confirmation or invoice about the plans, so I thought I would check with the City to make sure they got in. They’re looking for them now, but, Rachel had a couple of questions (below). Thanks! Kevin Harris (he/him/his) Managing ArƟsƟc Director From: Cohen, Rachel <rcohen@slocity.org> Sent: Thursday, January 23, 2025 2:36 PM To: Kevin Harris <kevinharris@slorep.org>; Hill, Robert <rhill@slocity.org>; Loew, Michael <Mloew@slocity.org> Cc: Nichols, Vanessa <vnichols@slocity.org> Subject: RE: SLO REP PLANS UPDATE? Hi Kevin, Do you know how Bryce submitted the plans? Did he submit them through the City’s Portal (https://infoslo.slocity.org/EnerGov_Prod/selfservice#/home)? And can you confirm if Bryce submitted under the 614 Monterey Address? Thank you, Rachel Cohen pronouns she/her/hers Principal Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org Stay connected with the City by signing up for e-notifications From: Kevin Harris <kevinharris@slorep.org> Sent: Friday, January 17, 2025 3:44 PM To: Hill, Robert <rhill@slocity.org>; Cohen, Rachel <rcohen@slocity.org>; Loew, Michael <Mloew@slocity.org> Subject: SLO REP PLANS UPDATE? This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Hi there Bob, Rachel, and Mike, 265 As you know, Bryce submitted our plan set to City back in December. I haven’t received any confirmation of receipt or initial invoice for the review, so, I just wanted to see if there was a easy way for us to check that: -the plans were successfully submitted -when we might receive an invoice (we’re in a slow period for expenses in the campaign right now, and the Board would like to move as much money out of our checking account into an account that makes some money during this period.) Unfortunately, Bryce is out of the country and completely oƯ the grid for until mid-February, so I can’t contact him (which is why I’m bothering you three.) Thanks in advance for any help! Kevin Harris (he/him/his) Managing ArƟsƟc Director www.slorep.org SAN LUIS OBISPO REPERTORY THEATRE Unforgettable Characters. Extraordinary Stories. Since 1947. Facebook | Instagram | Blog | Twitter | YouTube SLO REP is a proud member of: 266 From:Kevin Harris <kevinharris@slorep.org> Sent:Thursday, January 23, 2025 3:15 PM To:Cohen, Rachel; Hill, Robert; Loew, Michael Cc:Nichols, Vanessa Subject:RE: SLO REP PLANS UPDATE? Hi Rachel, I’m looking at old text messages, and it looks like Bryce submitted the plans through the permit application online. He confirmed that he got confirmation from the portal on December 3 at 10:31 AM. I know that he had questions about the APN- we checked with you, Bob, and Michael about the correct number on December 2 while gathering materials to submit and I believe you gave us the 614 Monterey Address. I can try to contact Bryce to confirm. Thanks! Kevin Harris (he/him/his) Managing ArƟsƟc Director www.slorep.org To help protect your priv acy, Microsoft Office prevented automatic download of this picture from the Internet. SAN LUIS OBISPO REPERTORY THEATRE Unforgettable Characters. Extraordinary Stories. Since 1947. Facebook | Instagram | Blog | Twitter | YouTube SLO REP is a proud member of: To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet. To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet. From: Cohen, Rachel <rcohen@slocity.org> Sent: Thursday, January 23, 2025 2:36 PM To: Kevin Harris <kevinharris@slorep.org>; Hill, Robert <rhill@slocity.org>; Loew, Michael <Mloew@slocity.org> Cc: Nichols, Vanessa <vnichols@slocity.org> Subject: RE: SLO REP PLANS UPDATE? Hi Kevin, Do you know how Bryce submitted the plans? Did he submit them through the City’s Portal (https://infoslo.slocity.org/EnerGov_Prod/selfservice#/home)? And can you confirm if Bryce submitted under the 614 Monterey Address? 267 Thank you, Rachel Cohen pronouns she/her/hers Principal Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org Stay connected with the City by signing up for e-notifications From: Kevin Harris <kevinharris@slorep.org> Sent: Friday, January 17, 2025 3:44 PM To: Hill, Robert <rhill@slocity.org>; Cohen, Rachel <rcohen@slocity.org>; Loew, Michael <Mloew@slocity.org> Subject: SLO REP PLANS UPDATE? This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Hi there Bob, Rachel, and Mike, As you know, Bryce submitted our plan set to City back in December. I haven’t received any confirmation of receipt or initial invoice for the review, so, I just wanted to see if there was a easy way for us to check that: -the plans were successfully submitted -when we might receive an invoice (we’re in a slow period for expenses in the campaign right now, and the Board would like to move as much money out of our checking account into an account that makes some money during this period.) Unfortunately, Bryce is out of the country and completely oƯ the grid for until mid-February, so I can’t contact him (which is why I’m bothering you three.) Thanks in advance for any help! Kevin Harris (he/him/his) Managing ArƟsƟc Director www.slorep.org SAN LUIS OBISPO REPERTORY THEATRE Unforgettable Characters. Extraordinary Stories. Since 1947. Facebook | Instagram | Blog | Twitter | YouTube 268 SLO REP is a proud member of: 269 From:Cohen, Rachel Sent:Thursday, January 23, 2025 2:36 PM To:Kevin Harris; Hill, Robert; Loew, Michael Cc:Nichols, Vanessa Subject:RE: SLO REP PLANS UPDATE? Hi Kevin, Do you know how Bryce submitted the plans? Did he submit them through the City’s Portal (https://infoslo.slocity.org/EnerGov_Prod/selfservice#/home)? And can you confirm if Bryce submitted under the 614 Monterey Address? Thank you, Rachel Cohen pronouns she/her/hers Principal Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org Stay connected with the City by signing up for e-notifications From: Kevin Harris <kevinharris@slorep.org> Sent: Friday, January 17, 2025 3:44 PM To: Hill, Robert <rhill@slocity.org>; Cohen, Rachel <rcohen@slocity.org>; Loew, Michael <Mloew@slocity.org> Subject: SLO REP PLANS UPDATE? This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Hi there Bob, Rachel, and Mike, As you know, Bryce submitted our plan set to City back in December. I haven’t received any confirmation of receipt or initial invoice for the review, so, I just wanted to see if there was a easy way for us to check that: -the plans were successfully submitted -when we might receive an invoice (we’re in a slow period for expenses in the campaign right now, and the Board would like to move as much money out of our checking account into an account that makes some money during this period.) Unfortunately, Bryce is out of the country and completely oƯ the grid for until mid-February, so I can’t contact him (which is why I’m bothering you three.) Thanks in advance for any help! Kevin Harris 270 (he/him/his) Managing ArƟsƟc Director www.slorep.org SAN LUIS OBISPO REPERTORY THEATRE Unforgettable Characters. Extraordinary Stories. Since 1947. Facebook | Instagram | Blog | Twitter | YouTube SLO REP is a proud member of: 271 From:Hill, Robert Sent:Monday, December 16, 2024 10:31 AM To:Kevin Harris Subject:Resolution No. 11537 (2024 Series) Attachments:R-11537 - SLO REP Lease Agreement 12-10-2024.pdf Hi Kevin, Attached for your records is a copy of the City Council’s approving Resolution No. 11537 (2024 Series) for the lease agreement. It was great working with you guys on this and I can’t wait to see what happens next! Thank you, sir. Bob Robert Hill Sustainability & Natural Resources Official City Administration Office of Sustainability & Natural Resources 990 Palm Street, San Luis Obispo, CA 93401-3249 E rhill@slocity.org T 805.781.7211 slocity.org R 11537 RESOLUTION NO. 11537 (2024 SERIES) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN LUIS OBISPO, CALIFORNIA, FINDING THAT A LEASE AGREEMENT WITH SAN LUIS OBISPO REPERTORY THEATRE FOR CERTAIN REAL PROPERTY OWNED BY THE CITY LOCATED AT 610 AND 614 MONTEREY STREET, A PORTION OF 972 NIPOMO STREET, AND A PORTION OF CITY PARKING LOT NO. 14 IS OF PUBLIC BENEFIT IN ACCORDANCE WITH CALIFORNIA GOVERNMENT CODE SECTION 53078 AND APPROVING THE LEASE AGREEMENT WHEREAS, the City of San Luis Obispo (“City”) is the owner in fee simple of that certain real property located at 610 and 614 Monterey Street, a portion of 972 Nipomo Street, and a portion of City Parking Lot No. 14 identified as Assessor’s Parcel Nos. 002- 412-011, 002-412-012, 002-412-002 (portion) and 002-412-004 (portion) (collectively, the Property”); and WHEREAS, the San Luis Obispo Repertory Theatre (“SLO REP”) has been a long- standing tenant of the City’s property at 888 Morro Street located next door to City Hall. SLO REP first began to set forth a vision for a new 300-seat community theatre in the early 1990s. In March 2000, the City Council identified several options for such a theatre within what would become known as the Cultural Arts District Parking Structure site located at the corner of Palm and Nipomo Streets and committed to working with SLO REP; and WHEREAS, on May 22, 2019, the City and SLO REP entered into an Exclusive Negotiating Agreement (“ENA”) to set the parameters and conditions for SLO REP’s long- term use of a portion of the City property for construction and operation of a new Downtown Theatre where the Cultural Arts District Parking Structure will also be located; and WHEREAS, on January 25, 2022, SLO REP submitted to the City Council a formal Challenge Grant” request for funding in the amount of $3,940,000 towards construction of the Downtown Theatre project. At its regularly scheduled meeting on February 15, 2022, the City Council appropriated the requested funding as part of the FY 2021-2022 Mid-Year Budget Review. On April 21, 2022, the City and SLP REP entered into a Grant Agreement for funding in the aggregate amount of $3,940,000; and WHEREAS, on January 23, 2024, the City Council made findings pursuant to the California Surplus Land Act, declaring the subject property surplus exempt under California Government Code sections 54221 and 54234 (Resolution No. 11471 (2024 Series)); and Docusign Envelope ID: 77460BAD-D0F3-40AC-AE4D-B2A28B91B126 Resolution No. 11537 (2024 Series) Page 2 R 11537 WHEREAS, on May 22, 2024, the City and SLO REP entered into Amendment No. 1 to the Exclusive Negotiating Agreement to extend the term for up to a one-year term in total, with additional provisions that require a written document that demonstrates an operating reserve of 20% for the first year of operating the Downtown Theatre and a three-year operating plan, including the establishment of a fund for building and facilities maintenance and repair. The ENA, as amended, anticipates a long-term lease with a term not-to-exceed 99 years when SLO REP can demonstrate that all conditions of the ENA, as amended, have been met; and WHEREAS, on May 30, 2024, the City Council received from SLO REP an update to their Challenge Grant request. In making its request for additional funding, SLO REP’s letter describes the following investment rationale: 1. Direct economic impact of more than $4 million annually once fully operational. 2. Attraction of 50,000 people annually to the downtown area. 3. Consistency with Major City Goals for arts and culture, as well as relevant DEI activities through multi-cultural programming, diverse casting, theatre offerings, and support of other local non-profits / community-based organizations. 4. Activation of “Theatre in the Park” events to reach new audiences at no-cost or low-cost at staged outdoor venues such as Mission Plaza or Mitchell Park. WHEREAS, on June 4, 2024, the City Council adopted Resolution No. 11501 2024 Series) approving the Fiscal Year 2024-25 Budget, including an additional $2.76 million in grant funding to SLO REP towards the project; and WHEREAS, on October 1, 2024, the City Council approved Amendment No. 1 to Grant Agreement, which contractually added the $2.76 million in additional grant funds for a total, combined amount of $6,700,000, and also clarified reporting requirements by SLO REP during the course of construction of the Downtown Theatre that will be due to the City for review; and WHEREAS, October 24, 2024, SLO REP submitted a memorandum to City staff detailing how SLO REP has met and exceeded all applicable fundraising milestones and other applicable conditions precedent to entering into a lease agreement with the City, per the Exclusive Negotiating Agreement and Amendment No. 1 to the ENA. At this time, SLO REP has provided evidence that it has assembled approximately $14.1 million that can be used towards total project costs (including design, construction, contingency, fees, and operating reserve) of the approximately $17.8 million that is estimated to be needed, or 79% of the overall total; and WHEREAS, the lease agreement for the Property has been developed by both staff from the City and SLO REP, together with each party’s respective legal counsel, in a manner consistent with the Exclusive Negotiating Agreement, as amended, and prior direction from the City Council (the “Lease Agreement”). Docusign Envelope ID: 77460BAD-D0F3-40AC-AE4D-B2A28B91B126 Resolution No. 11537 (2024 Series) Page 3 R 11537 NOW, THEREFORE, BE IT RESOLVED by the Council of the City of San Luis Obispo as follows: SECTION 1. The above recitals are true and correct and are a substantive part of this Resolution. SECTION 2. Findings. 1. The Lease Agreement set forth in Attachment 1 is hereby approved by the Council of the City of San Luis Obispo and the City Manager is authorized to execute the Lease Agreement upon the effective date of this Resolution. 2. The Lease Agreement serves a public purpose by furthering the City Council’s goal of supporting arts and culture and advancing a Cultural Arts District along lower Monterey Street, as well as the associated economic development benefits that will accrue to the downtown area. 3. The City is authorized to enter into a 99-year term for the Lease Agreement pursuant to California Government Code Section 37380. Paragraph 5 Consideration) and Paragraph 15 (Insurance Requirements) will be reviewed every twenty years to take into consideration then current market conditions and industry standards. 4. The City has committed $6,700,000 in grant funding toward the Downtown Theatre and rent required under the Lease Agreement is being offered at a discounted rate due to the long-standing community partnership with SLO REP and the anticipated public benefit the Downtown Theatre will provide. As such, terms included in the Grant Agreement as amended, and the Lease Agreement constitute an “economic development subsidy” as defined by California Government Code Section 53083 and disclosure of the following information and a public hearing are required, as follows shown in italics): 1) The name and address of all corporations or any other business entities, except for sole proprietorships, that are the beneficiary of the economic development subsidy, if applicable. San Luis Obispo Repertory Theatre, A California Non-Profit P.O. Box 122 San Luis Obispo, CA 93406 2) The start and end dates and schedule, if applicable, for the economic development subsidy. The start date is upon commencement of possession of the leased premises, anticipated in 2026. City of San Luis Obispo grant funding would be expended within three years following commencement of construction. Rent of $1.00 per year is for a 99-year term. Docusign Envelope ID: 77460BAD-D0F3-40AC-AE4D-B2A28B91B126 Resolution No. 11537 (2024 Series) Page 4 R 11537 3) A description of the economic development subsidy, including the estimated total amount of the expenditure of public funds by, or of revenue lost to, the local agency as a result of the economic development subsidy. The total amount of direct expenditures of public funds is 6,700,000.00. The leased premises is currently vacant land that does not produce revenue. 4) A statement of the public purposes for the economic development subsidy. The public purpose for the economic development subsidy is to support arts and cultural activities in the downtown area of San Luis Obispo, which is expected to also generate direct and indirect economic impact benefits. 5) Projected tax revenue to the local agency as a result of the economic development subsidy. Projected tax revenue, whether sales tax or property tax, is not yet known. According to data provided by SLO REP and Americans for the Arts: Arts and Economic Prosperity 6 Survey (January 2024), the operation of the new Downtown Theatre will generate $4 million in economic activity on an annual basis. SLO REP will be subject to possessory interest property tax, however as the Downtown Theatre is not yet constructed, it is not yet known what the assessment and taxing rate will be. 6) Estimated number of jobs created by the economic development subsidy, broken down by full-time, part-time, and temporary positions. According to data provided by SLO REP, the operation of the new Downtown Theatre will generate 7 full time positions and 5 full time equivalent positions. Show-specific artist contracts will generate 16.73 full time equivalent positions, for a total of 28.73 full time equivalent positions comprised of 277 positions hired. The public hearing and disclosure of economic development subsidy contained herein have been duly noticed and carried out in accordance with the requirements of California Government Code Section 53083. Docusign Envelope ID: 77460BAD-D0F3-40AC-AE4D-B2A28B91B126 Resolution No. 11537 (2024 Series) Page 5 R 11537 SECTION 3. Environmental Review. The passage of this resolution will not cause a direct physical change in the environment in and of itself. However, it is reasonably foreseeable that the approval of the Lease Agreement will lead to a physical change in the environment through implementation of the Project described and evaluated in the Final Environmental Impact Report (“FEIR”) that was certified by the City Council by Resolution No. 10923 (2018 Series) pursuant to the requirements of the California Environmental Quality Act SECTION 4. Lease Agreement. City staff are hereby authorized to execute the Lease Agreement in the form and manner approved by the City Attorney and to duly oversee and carry out the terms and conditions of the Lease Agreement. Upon motion of Council Member Marx, seconded by Council Member Francis, and on the following roll call vote: AYES: Council Member Boswell, Francis, Marx, Vice Mayor Shoresman, and Mayor Stewart NOES: None ABSENT: None The foregoing resolution was adopted this 10th day of December 2024. Mayor Erica A. Stewart ATTEST: Teresa Purrington City Clerk APPROVED AS TO FORM: J. Christine Dietrick City Attorney IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of San Luis Obispo, California, on ______________________. Teresa Purrington City Clerk Docusign Envelope ID: 77460BAD-D0F3-40AC-AE4D-B2A28B91B126 12/14/2024 | 12:24 PM PST 279 From:Hill, Robert Sent:Monday, November 18, 2024 3:04 PM To:Wilbanks, Megan Subject:RE: Council Agenda Item Notification Form - 12/10/2024 Council Meeting Attachments:Council Agenda Item Notification Form - item 6e 12-10-24.pdf Hi Megan, Please find the Council Agenda Item notification form for the SLO REP lease under consideration on 12/10. Do you have a few minutes this afternoon to go over the requirements of CA Gov Code 53078 and make sure we will have all of the requirements met? See: https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV&sectionNum=53083 . Thanks! Bob From: Wilbanks, Megan <mwilbanks@slocity.org> Sent: Thursday, November 14, 2024 9:08 AM To: Hill, Robert <rhill@slocity.org> Subject: Council Agenda Item Notification Form - 12/10/2024 Council Meeting Hey Bob, Please complete the Council Agenda Item Notification Form and send it back to me on Monday (11/18), the same day the report is due to start routing in eScribe. Unless there are special noticing requirements for this item, I will plan have the legal ad published in the New Times and on the City’s website/e-notification on Wednesday (11/27); this is an adjusted publishing date due to the Thanksgiving Holiday. Megan Wilbanks Deputy City Clerk City Administration 990 Palm, San Luis Obispo, CA 93401-3249 E mwilbank@slocity.org T 805.781.7103 slocity.org Stay connected with the City by signing up for e-notifications Council Agenda item notification Notification for the Preliminary Agenda is due to the Office of the City Clerk by NOON ON MONDAY – 22 DAYS BEFORE THE COUNCIL MEETING Email to cityclerk@slocity.org Meeting Date Project Address Application Number Department Head Department Contact Contact Phone & Email Project Description (Legal Description) Public Hearing Business Consent Study Session Verification I (department contact/ project manager) have confirmed that the notification has been created per the requirements indicated above. ________ Initials __________ Date Notification Strategy Legal Notification Is Required (check all that apply) Expanded Outreach (Department Use Only- See PEN MANUAL for Process): Newspaper Legal Ad (Clerk) Postcards to owners and occupants within 300’ (Department provides postcards and notification list to Clerk’s Office) Estimated number of signs _________ (Department Posts) Location Map (Department Provides) Press Release City News Item Email Notification Other Specify: ____________ (Attach list of “stakeholders” for the record.) 283 From:Kacsinta, Madeline Sent:Wednesday, November 6, 2024 1:46 PM To:Ryan Stefanek Cc:Tully Wyatt; Marquart, Ben; Edmunson, Morgan Subject:QA/QC Plan Attachments:RE and CM Services Cultural Arts District - Signed Agreement.pdf Hi Ryan, After discussions with the team on the 2nd deck pour, we are looking into gaps in our QA/QC and how we can prevent this from happening again. I am looking through old files to see if Kitchell ever submitted a QA/QC plan per your proposal, but am unable to locate one. Can you please send that over if you have it? We would like to also take a look at the responsibility matrix that includes internal and external responsibilities. I want to make sure we have all areas covered. Since I am not on-site all the time, getting a better understanding of the daily operation is super important at this time. Tomorrow at our City-Kitchell meeting we can discuss and make sure that we have a path forward. Hoping Tully can join us via Teams or in-person. Thanks! Madeline Kacsinta Capital Improvement Program Administrative Manager Public Works 919 Palm, San Luis Obispo, CA 93401-3218 E MKacsint@slocity.org T 805.781.7094 slocity.org Stay connected with the City by signing up for e-notifications 284 From:Chip Visci < Sent:Tuesday, October 1, 2024 10:11 PM To:Hill, Robert Cc:Kevin Harris; Paul Ready; Kersten, Markie Subject:Re: City & SLO REP Lease Negotiations Attachments:SLO REP 6.21.23 Draft lease.pdf; SLO REP LEASE MEMO- 6.21.23.pdf; SLO REP ENA FINAL SIGNED.pdf; Amendment No. 1 to Exclusive Negotiating Agreement dated May 22, 2024.pdf; SLO REP Grant Agreement - FINAL SIGNED.pdf; Draft Amendment No. 1 to Grant Agreement with SLO Rep.pdf This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Bob, I can make these meetings. Thanks for setting up. Chip On Oct 1, 2024, at 7:25 PM, Hill, Robert <rhill@slocity.org> wrote: Hi Kevin, Chip, and Paul, With the affirmative City Council action tonight on additional grant funding, we’d like to quickly turn our attention to lease negotiations. Assistant City Attorney Markie Jorgensen and I will be working from City Council direction and guidance pertinent to this work effort. As background information, please find attached the following documents to be sure we’re all working from the same starting points of reference: 1. Draft Lease prepared by Paul Ready, June 21, 2023 2. Memo from Kevin Harris re: key deal points for SLO and responses showing in red, June 21, 2023 3. Exclusive Negotiating Agreement, May 22, 2019 4. First Amendment to Exclusive Negotiating Agreement, May 22, 2024 5. Grant Agreement, April 21, 2022 6. Grant Agreement No. 1 (draft, unsigned, with amendment by City Council action 10/1/24) Momentarily, I will send calendar invitations to schedule a series of three meetings over the course of the next three weeks. I envision our first meeting will allow us to set the stage, ask questions, and ensure that we are all prepared to move this item forward. From there we can roll up our sleeves and get to work. Specifically, I am targeting meetings on 10/8 4-5:30pm, 10/16 4-5:30pm, and 10/22 4- 5:30pm together with SLO REP. At present, we are on the City Council’s agenda forecast for 11/19 and the staff report and final agreement will need to start in our internal routing process on 10/28. Our hope is that this series of three meetings, each one week apart, will be sufficient to get the job done. If not, that’s OK but it will push our timeline into early 2025. We look forward to productively working with you all on this important agreement. Many thanks! 285 Bob Robert Hill Sustainability & Natural Resources Official City Administration Office of Sustainability & Natural Resources 990 Palm Street, San Luis Obispo, CA 93401-3249 E rhill@slocity.org T 805.781.7211 slocity.org AMENDMENT NO. 1 TO EXCLUSIVE NEGOTIATING AGREEMENT THIS AMENDMENT NO. 1 TO EXCLUSIVE NEGOTIATING AGREEMENT is made and entered in the City of San Luis Obispo on _______________________________________, by and between the City of San Luis Obispo, a charter municipal corporation (“the City”) and San Luis Obispo Repertory Theatre, a California non-profit organization (“SLO REP”). The City and SLO REP are jointly referred to as the “Parties”. WITNESSETH: WHEREAS, on May 22, 2019, the City and SLO REP entered into an Exclusive Negotiating Agreement (“ENA”) that set forth certain parameters, conditions, milestones, and conditions precedent to entering into a long-term lease for SLO REP to use of a portion of City property to construct and operate a new theatre building adjacent to the City’s Cultural Arts District Parking Structure, and WHEREAS, the ENA has a five-year term that may be extended by mutual agreement of the Parties and both the City and SLO REP have a desire to continue working together towards the construction and long-term operation of a new theatre building; and WHEREAS, both the City and SLO REP have completed and will continue to maintain their respective obligations specified in the ENA, as well as satisfy the necessary conditions precedent to lease negotiations and execution (paragraphs 5, 6, and 8), and the Parties are presently working together to move towards the preparation of a mutually agreeable lease agreement. NOW THEREFORE, in consideration of their mutual promises, obligations, and covenants hereinafter contained, the parties hereto agree as follows: 1. The Exclusive Negotiating Agreement is hereby amended as follows: i. The term shall be extended for a period of six (6) months from the date of this Amendment No. 1, provided that SLO REP shall disclose to City other sites or options, if any, that it may be considering for the theatre. The ENA may be extended for an additional six (6) month period thereafter with approval by the City Manager. The additional six (6) month extension may only be considered upon SLO REP delivering a written notice of intent to proceed with final lease negotiations with the City. DocuSign Envelope ID: 30F8ABF1-2039-4524-B672-CFEA30A9FDE3 5/22/2024 | 12:09 PM PDT ii. Paragraph 8a., General Lease Terms, shall be amended as follows: “SLO REP shall commence construction of the Theatre no later than one (1) year after the completion of the Palm Nipomo Cultural Arts District Parking Structure and shall complete construction of the Theatre within three (3) years after that. SLO REP shall not commence construction of the Theatre unless SLO REP demonstrates, to the City’s Finance Manager Director’s reasonable satisfaction prior to expiration of the year within which SLO REP is to commencement of construction, that SLO REP has all of the funds necessary to design and construct, as well as operate for at least one (1) years after completion of construction, the Theatre, plus a 15% construction contingency, available in cash or approved financing (the “Required Funds”), and SLO REP shall also submit to the City Manager (or their delegate) a written document that demonstrates an operating reserve of 20% for the first year of operating the new theatre and three year operating plan including the establishment of a fund for building and facilities maintenance and repair.” iii. Paragraph 8b., General Lease Terms, shall be replaced as follows: “A lease term not-to-exceed ninety-nine (99) years.” 2. All other terms and conditions of the Exclusive Negotiating Agreement remain in full force and effect. IN WITNESS WHEREOF, the parties hereto have caused this instrument to be executed the day and year first written above. CITY OF SAN LUIS OBISPO SLO REPERTORY THEATRE _________________________________ ________________________________ Erica A. Stewart, Mayor Kevin Harris, Managing Artistic Director ATTEST _________________________________ Teresa Purrington, City Clerk APPROVED AS TO FORM _________________________________ J. Christine Dietrick, City Attorney DocuSign Envelope ID: 30F8ABF1-2039-4524-B672-CFEA30A9FDE3 EXCLUSIVE NEGOTIATING AGREEMENT This Exclusive Negotiating Agreement (“Agreement”) is entered into this ___day of ______, 2019 (the “Effective Date”), by and between the City of San Luis Obispo, a California charter municipal corporation ("the City'') and San Luis Obispo Repertory Theatre, a California non-profit corporation (“SLO REP”). The City and SLO REP are jointly referred to as the “parties”. RECITALS WHEREAS, the City is the legal owner of the property located at 888 Morro Street in San Luis Obispo, California (the “Property”); and WHEREAS, the City identified a portion of the Property as the site of a proposed public parking structure (“Palm Nipomo Parking Structure”) and anticipates that an estimated 18,000 square foot portion of the Property will not be needed for the Palm Nipomo Parking Structure (“Remainder Property”); and WHEREAS, SLO REP desires to construct a not-for-profit live performance theatre facility and related on- site and off-site (if any) improvements (“Theatre”) on the Remainder Property; and WHEREAS, the parties recognize that the exact location, size and availability of the Remainder Property for the Theatre cannot be determined at this time, and understand that the Remainder Property has development restrictions including maintenance of trees, street setbacks and provision of pedestrian connections/plazas from the Palm Nipomo Parking Structure to Monterey Street that affect the net buildable land; and WHEREAS, the City wishes to support community-based performing arts groups by encouraging development of a live performance theatre facility in the downtown; and WHEREAS, the City and SLO REP recognize that identifying a location for the Theatre, as well as some of the terms of a future lease, may help SLO REP’s capital fundraising efforts; and WHEREAS, construction of the Palm Nipomo Parking Structure and the Theatre and related rezoning and general plan amendments will require environmental review, and SLO REP must provide certain information about the Theatre before City can conduct the environmental review; and WHEREAS, the City’s Financial Management Manual allows exclusive negotiations for long term lease of City property when the there is a clear link between the proposal and accomplishment of significant City goals, plans or policies; and WHEREAS, the City considers the development of a not-for-profit live performance theatre on the Remainder Property to be in the public interest and in accordance with the City's goals and the existing and proposed Downtown Concept Plan. NOW, THEREFORE, in consideration of the mutual covenants, conditions, promises and agreements herein set forth, the parties agree as follows: DocuSign Envelope ID: 0D5F9552-0A12-4481-A99B-695D14987222 5/22/2019 AGREEMENT 1. RECITALS. The above Recitals are true. 2. TERM. This Agreement shall commence upon the Effective Date and shall continue in effect for a period of five (5) years (the “Term”), unless sooner terminated as provided herein. The Parties may extend the Term of this Agreement in writing upon mutual consent. 3. PURPOSE. The purpose of this Agreement is to enable the City to proceed with the Palm Nipomo Parking Structure, and to allow SLO REP to explore the feasibility of SLO REP financing, designing, constructing and operating the Theatre, at its sole cost and expense, on the Remainder Property. 4. CITY’S OBLIGATIONS. The City shall, during the Term of this Agreement: a. Exclusivity. Negotiate exclusively with SLO REP as the future tenant of the Remainder Property. b. Initiate Rezoning, General Plan amendments, and Lot Line Adjustment. Upon City Council authorization, initiate all rezoning, General Plan amendments, and a lot line adjustment necessary to allow the construction of the Palm Nipomo Parking Structure on a portion of the Property and the Theatre on the Remainder Property. The intent of this Agreement is for the Remainder Property to be created as a “finished lot,” although the City legally cannot, and therefore does not, contractually agree as to how it will exercise its legislative authority to rezone or amend the General Plan and its land use authority to complete a lot line adjustment. c. Environmental Review. The City has completed environmental review of the Palm Nipomo Parking Structure and the Theatre and has certified a Final Environmental Impact Report (“FEIR”) by Resolution No. 10923 (2018 Series). If SLO REP makes any changes to the Theatre design or if any of the conditions set forth in CEQA Guidelines § 15162 are triggered, then SLO REP may negotiate the portion of costs it will bear in the event substantial new environmental issues are discovered during construction, or if any project-specific environmental review related to the Theatre is deemed necessary. 5. SLO REP’s OBLIGATIONS. SLO REP shall, during the term of this Agreement: a. Non-Profit Status. Be a California non-profit corporation in good standing and be exempt from state and federal income taxes under section 501 (c) (3) of the Internal Revenue Code. b. Proof of Financial Ability. Provide to City’s reasonable satisfaction that it has the financial ability to design, construct and operate the Theatre on the Remainder Property. At a minimum SLO REP shall: Fundraising Plan. Provide the City with a fundraising plan by December 31, 2019 that is acceptable to, and approved by, the City Manager, whose approval shall not be unreasonably withheld, delayed or conditioned. The fundraising plan shall include a timeline with milestones that shall be met no later than 1 year from the estimated completion of the Palm Nipomo Parking Structure. These DocuSign Envelope ID: 0D5F9552-0A12-4481-A99B-695D14987222 milestones shall include, at a minimum, prior to commencement of lease negotiations, but no later than one (1) year after City’s award and execution of a contract to construct the Palm Nipomo parking Structure, that SLO REP shall demonstrate, to the City Finance Director’s reasonable satisfaction, that SLO REP has available at least 50% of all the funds necessary to design and construct the Theatre. i. Preliminary Cost Estimates. Provide the City with preliminary costs estimates by December 31, 2020 to design, construct and operate the Theatre for at least the first two (2) years after completion of construction. Update those estimates as design progresses, but at least every 6 months. SLO REP will include the payment of prevailing wages in its estimates. ii. Annual Financials. Annually, on or before December 31st of each year, provide the City with a current financial statement, copy of most recent filed state and federal tax returns, and copies of current bank statements, to demonstrate fundraising results for the Theatre. iii. Formal Development Application. Finalize and submit a formal development application for the Theatre to the City. iv. Compensation for City Review Costs. Discuss and finalize how City processing and review costs will be funded. c. Environmental Review Information. Provide the City promptly with all information necessary to conduct any subsequent environmental review of the Theatre that may be necessary. This information includes, but is not limited to, square footage of structure; square footage of various uses such as office, storage, classroom, and theatre; number of seats; maximum number of performances per week, and any other information deemed necessary by City. 6. TERMINATION. Either party may terminate this Agreement without liability to the other party at any time by written notice to the other. This Agreement shall automatically terminate in the event SLO REP fails to secure building permits for the Theatre one year after the completion of the Palm Nipomo parking structure. 7. CONDITIONS PRECEDENT TO LEASE NEGOTIATION AND EXECUTION. All of the following conditions must be met as conditions precedent prior to lease execution for the Remainder Property: a. Lease negotiation: i. Rezoning and Lot Line Adjustment. City has rezoned and/or amended the City’s general plan and has perfected a lot line adjustment that will create the Remainder Property as a “finished lot” allowing for construction and its use as the Theatre. ii. Obligations Met. Both City and SLO REP have met all of their respective obligations under the Agreement. DocuSign Envelope ID: 0D5F9552-0A12-4481-A99B-695D14987222 b. Availability of Funds for Design, Construction, and Operation of the Theatre Prior to execution of the lease, SLO REP demonstrates to the City Manager’s reasonable satisfaction that SLO REP has met all applicable fundraising milestones in the fundraising plan approved by the City Manager. c. Non-Profit Status. SLO REP has maintained its non-profit and tax-exempt status under applicable state and federal law. d. Design and Construction Schedule. Prior to lease execution, provide to the City’s Community Development Director’s reasonable satisfaction, a design and construction schedule, demonstrating, at a minimum, the Theatre will be constructed and completed within 3 years of the completion of the Palm Nipomo Parking Structure. e. Design Coordination. Coordinate design of the Theatre with the City to ensure it is compatible with the Palm Nipomo Parking Structure. 8. GENERAL LEASE TERMS. If the parties enter into the exclusive negotiations, the parties desire that the lease include the following general provisions; provided, the actual language of each provision is subject to further negotiation, and most material terms and provisions of the lease have not yet been discussed. The City shall not lease the land for minimal rent unless the lease is completely acceptable to the City and approved by the City Attorney. Nothing in this paragraph shall be interpreted as an agreement or offer to lease upon the terms, provisions or language set forth below. a. SLO REP shall commence construction of the Theatre no later than one (1) year after the completion of the Palm Nipomo Parking Structure and shall complete construction of the Theatre within three (3) years after that. SLO REP shall not commence construction of the Theatre unless SLO REP demonstrates, to the City’s Finance Manager’s reasonable satisfaction prior to expiration of the year within which SLO REP is to commence construction, that SLO REP has all of the funds necessary to design and construct, as well as operate for at least one (1) years after completion of construction, the Theatre, plus a 15% contingency, available in cash or approved financing (the “Required Funds”). If SLO REP does not timely demonstrate that SLO REP has the Required Funds, or if SLO REP fails to timely begin or timely complete construction, SLO REP shall be in substantial default, and the lease shall automatically terminate unless City agrees otherwise in writing. The Theatre shall be deemed complete only upon issuance of a Certificate of Occupancy. b. Minimum 40-year term with the right of first refusal for additional lease years provided that Theatre is in good standing at the time of the renewal window, which shall open after 35 years and conclude after 37 years unless the window is extended. c. Rent of $1.00 per year provided SLO REP: i. Is a California non-profit corporation in good standing; and ii. Is a federal and state income tax exempt 501 (c)(3) entity; and uses the Remainder Property solely as a live performance theatre and related City approved community uses. DocuSign Envelope ID: 0D5F9552-0A12-4481-A99B-695D14987222 iii. SLO REP’s failure to maintain its non-profit corporate status in good standing or its tax-exempt status under applicable state and federal law or to use the Remainder Property for any purpose other than as a live performance theatre and related City approved community uses during the term or any extended term of the lease, shall be a material breach of the lease. In the event any such breach occurs, City may, at its option, either terminate the lease or raise the rent to fair market rates for neighboring commercial uses. d. SLO REP shall design, construct, operate and maintain the Theatre and all street frontage and landscaping, utility extensions and connections, and other improvements, based on agreed upon and approved plans and specifications, at its sole cost and expense without any assistance from the City. e. SLO REP shall be responsible for meeting or mitigating all conditions, impacts, mitigations and requirements identified in the environmental review and entitlement processes for issues associated with the SLO REP’s operation of a theatre on the Property, at SLO REP’s sole cost and expense. f. The design of the Theatre must be compatible with the design of the Palm Nipomo Parking Structure, including the parking structure’s entrance and exiting needs, as determined by the sole discretion of the Public Works Director. g. SLO REP shall take all reasonable efforts to preserve, protect, and maintain the large oak tree on 614 Monterey, along with the tree on the corner of Monterey and Nipomo. h. If the SLO REP is not in material compliance with the Lease or ceases to be financially solvent and to maintain the Property in a commercially reasonable manner, the lease shall contain provisions for the City to declare a default of the Lease, for SLO REP to effect a reasonable cure of the default(s), and for the City to terminate the Lease if the default(s) are not cured pursuant to the terms and conditions of the Lease, and for the Remainder Property to revert to the City. i. Prevailing wages shall be paid by SLO REP for construction of the Theatre and related improvements, mitigations etc. j. SLO REP shall pay all applicable parking in lieu fees for a Community Partner, as determined by the sole discretion of the City’s Public Works Director. k. Payment of possessory interest and other taxes by SLO REP. l. Other long-term landlord protection ground lease provisions, such as City standard insurance requirements, indemnity provisions, attorneys’ fees, prohibitions against nuisance, waste, requiring maintenance at SLO REP expense, etc. m. If the City Council does not move ahead with the construction of the Palm/Nipomo structure, a new agreement will need to be negotiated between the parties for a mutually acceptable alternate site or an alternate set of requirements for a portion of the Property. n. The City will not subordinate its interest in the Remainder Property to any financing. DocuSign Envelope ID: 0D5F9552-0A12-4481-A99B-695D14987222 10. AMENDMENT. This Agreement may be extended or modified with the mutual consent of the parties. Any such extension, amendment, modification or variation from the terms of this Agreement shall be in writing and shall be effective only upon approval by the City Council. 11. COMPLETE AGREEMENT. This written Agreement, including all writings specifically incorporated herein by reference, shall constitute the complete agreement between the parties. No oral agreement, understanding or representation not reduced to writing and specifically incorporated herein shall be of any force or effect, nor shall any such oral agreement, understanding or representation be binding upon the parties. 12. NOTICE. All notices to the parties shall be in writing and shall be sent by United States mail, postage prepaid by registered or certified mail addressed as follows: City: Derek Johnson City Manager 990 Palm Street San Luis Obispo, CA 93401 SLO REP: Kevin Harris Managing Artistic Director 888 Morro Street San Luis Obispo, CA 93401 13. AUTHORITY TO EXECUTE AGREEMENT. Both City and SLO REP warrant and represent that each individual executing the Agreement on behalf of each party is a person duly authorized and empowered to execute agreements for such party. IN WITNESS WHEREOF, the parties execute this Agreement on the day and year first above written. ATTEST CITY OF SAN LUIS OBISPO Teresa Purrington City Clerk Date Heidi Harmon Mayor Date APPROVED AS TO FORM: SLO REPERTORY THEATRE J. Christine Dietrick City Attorney Date Kevin Harris Managing Artistic Director Date DocuSign Envelope ID: 0D5F9552-0A12-4481-A99B-695D14987222 Council Minutes City Hall, 990 Palm Street, San Luis Obispo Tuesday, December 4, 2018 Regular Meeting of the City Council CALL TO ORDER A Regular Meeting of the San Luis Obispo City Council was called to order on Tuesday, December 4, 2018 at 6:00 p.m. in the Council Hearing Room, located at 990 Palm Street, San Luis Obispo, California, by Mayor Harmon. ROLL CALL Council Members Present: Council Members Carlyn Christianson Aaron Gomez, Erica A Stewart, Vice Mayor Andy Pease, and Mayor Heidi Harmon. Council Members Absent: None City Staff Present: Derek Johnson, City Manager; Christine Dietrick, City Attorney; and Teresa Purrington, City Clerk; were present at Roll Call. Other staff members presented reports or responded to questions as indicated in the minutes. PLEDGE OF ALLEGIANCE Vice Chair Pease led the Pledge of Allegiance. APPOINTMENTS 1. APPOINTMENTS TO THE ZONE 9 ADVISORY COMMITTEE City Clerk Purrington presented the contents of the report. Public Comments: None End of Public Comments --- ACTION: MOTION BY VICE CHAIR PEASE, SECOND BY COUNCIL MEMBER CHRISTIANSON, CARRIED 5-0 to: San Luis Obispo Page I DocuSign Envelope ID: 0D5F9552-0A12-4481-A99B-695D14987222 San Luis Obispo City Council Minutes of December 4, 20] 8 Page 2 Make appointments to the Zone 9 Advisory Committee, effective December 31, 2018, and recommend the County Board of Supervisors confirm, as follows: 1. Appoint Christine Mulholland to serve as public member to represent the City of San Luis Obispo on the Zone 9 Advisory Committee for a term to expire on December 31, 2022; and 2. Appoint Dave Romero to serve as the alternate member to represent the City of San Luis Obispo on the Zone 9 Advisory Committee for a term to expire on December 31, 2022; and 3. Appoint Matt Horn, City Engineer, to serve as the staff representative on the Zone 9 Advisory Committee; and 4. Appoint Brian Nelson, Supervising Civil Engineer, to serve as the alternate staff representative on the Zone 9 Advisory Committee for a term to expire on December 31, 2022. 2. APPOINTMENTS TO THE CITIZENS' REVENUE ENHANCEMENT OVERSIGHT COMMISSION, JACK HOUSE COMMITTEE, AND MASS_ TRANSPORTATION COMMITTEE City Clerk Purrington presented the contents of the report. Public Comments: Tom Tyran Kincaid End of Public Comments --- ACTION: MOTION BY COUNCIL MEMBER CHRISTIANSON, SECOND BY COUNCIL MEMBER GOMEZ, CARRIED 5-0 to: 1. Confirm the appointment of Winston Newland to the Citizens' Revenue Enhancement Oversight Commission, to complete an unexpired term through June 30, 2019. 2. Confirm the appointment of Julie Moore, as the representative of the San Luis Obispo County History Center, to the Jack House Committee effective December 4, 2018; and 3. Confirm the appointment of Ryan Hund, as the ASI student representative, to the Mass Transportation Committee, to complete an unexpired term through March 31, 2019. INTRODUCTION 3. INTRODUCTION OF ERIC HAGEN CHIEF BUILDING OFFICIAL Community Development Director Michael Codron introduced Eric Hagen as the new Chief Building Official. PRESENTATIONS 4. PROCLAMATION - RECOGNITION OF SERVICE - CARRIE MATTINGLY City Manager Derek Johnson presented a proclamation to retiring Utilities Director Carrie Mattingly, in recognition of her service. DocuSign Envelope ID: 0D5F9552-0A12-4481-A99B-695D14987222 San Luis Obispo City Council Minutes of December 4-2018 Pabe 3 PUBLIC COMMENT ON ITEMS NOT ON THE AGENDA None End of Public Comment --- CONSENT AGENDA ACTION: MOTION BY COUNCIL MEMBER CHRISTIANSON, SECOND BY VICE CHAIR PEASE, CARRIED 5-0 to approve Consent Calendar Items 5 thru 12. Public Comment Lea Brooks — 8 Myron Amerine — 8 Kevin Harris — 10 Myron Amerine — 12 End of Public Comment --- 5. WAIVE READING IN FULL OF ALL RESOLUTIONS AND ORDINANCES CARRIED 5-0, to waive reading of all resolutions and ordinances as appropriate. 6. SCHEDULE OF CITY COUNCIL MEETINGS FOR 2019 CARRIED 5-0, to adopt the proposed 2019 regular City Council meeting schedule with meetings normally held the first and third Tuesday of every month, with the following exceptions: 1. Reschedule the Regular City Council meeting of January 1 to January 8, 2019, and 2. Cancel the Regular City Council meetings of August 6 and December 17, 2019. 7. APPROVAL OF THE FINAL MAP FOR TRACT 3089 PHASE 1, AVILA RANCH, 175 VENTURE DRIVE (SBDV 2042-2015) CARRIED 5-0, to adopt a Resolution entitled, "A Resolution of the City Council of the City of San Luis Obispo, California, approving the final map for Tract 3089 Phase 1 Avila Ranch (175 Venture Drive, SBDV-2042-2015)," and authorizing the Mayor to execute the easements, agreements, and associated fee offers, including the recommended changes in the staff agenda correspondence. 8. PLANS AND SPECIFICATIONS FOR BUCHON TRAFFIC CALMING CARRIED 5-0, to 1. Approve Plans and Specifications for Buchon Traffic Calming Measures; and 2. Authorize staff to advertise for bids and the City Manager to award the contract if the lowest responsible bid is within the Engineer's Estimate of $160,000; and 3. Authorize the use and transfer of $142,000 from the City's Neighborhood Traffic Calming budget and $18,000 from the City's Traffic Safety & Operations Budget to the project account. DocuSign Envelope ID: 0D5F9552-0A12-4481-A99B-695D14987222 San Luis Obispo City Council Minutes of Deceniber 4. 2018 Page 4 9. ADJUSTMENTS TO SUPPLEMENTAL SALARY SCHEDULE AND POLICY AS A RESULT OF MINIMUM WAGE INCREASES CARRIED 5-0, to 1. Adopt a Resolution entitled, "A Resolution of the City Council of the City of San Luis Obispo, California, establishing and adopting a supplemental employee salary schedule and superseding previous resolutions in conflict," as necessary to comply with California Fair Wage Act of 2016 requiring a minimum wage of $12.00 per hour effective January 1, 2019; and 2. Adopt the revised Supplemental Employee Policy. 10. SAN LUIS OBISPO REPERTORY THEATRE EXCLUSIVE NEGOTIATING AGREEMENT CARRIED 5-0, to Authorize the Mayor to sign an Exclusive Negotiating Agreement with the San Luis Obispo Repertory Theatre, SLO REP, for long-term use of a portion of the Palm/Nipomo Parking Structure site to construct and operate a new theatre, based on parameters previously set forth by the City Council. 11. REPEALING AND REPLACING RESOLUTION NO. 10894 TO REFLECT UPDATED ZONING REGULATION SECTION FOR PROPERTY MAINTENANCE STANDARDS CARRIED 5-0, to Adopt a Resolution entitled, "A Resolution of the City Council of the City of San Luis Obispo, California, repealing and replacing Resolution No. 10894 (2018) to reflect updated zoning regulation sections." 12. ACQUISITION OF EASEMENTS FOR THE RAMONA DRIVE TO FOOTHILL BOULEVARD CLASS 1 PATH CARRIED 5-0, to Authorize the Mayor to execute easement and deed agreements in a total amount not to exceed $423,700 including title and escrow charges in a form subject to the approval of the City Attorney. PUBLIC HEARING ITEMS AND BUSINESS ITEMS 13. WATER RESOURCE RECOVERY FACILITY PROJECT - AUTHORIZATION TO BID Utilities Director Carrie Mattingly and Deputy Director Dave Hix provided an in-depth staff report and responded to Council questions. Public Comments: Autumn Brown Rosemary Wrenn Scott Zimmerman Daniel Mora Richard Van Humbeck DocuSign Envelope ID: 0D5F9552-0A12-4481-A99B-695D14987222 San Luis Obispo City Council_ Minutes of December 4, 2018 Pie 5, Jesse Brooks Quinn Brady Tony Skinner Sean Perry Dave Baldwin David Gilliland Nick Andre End of Public Comment --- ACTION: MOTION BY MAYOR HARMON SECOND BY COUNCIL MEMBER CHRISTIANSON, CARRIED 5-0 to: 1. Approve plans and specifications for the Water Resource Recovery Facility (WRRF) Project, Specification No. 91620; and 2. Authorize staff to advertise for construction bids pending City Engineer's approval of the bid set; and 3. Authorize the City Manager to award the contract if the lowest responsible bid is within the project construction budget of $111,600,000; and 4. Approve amended WRRF Project -specific Construction Contract Change Order policy and authorize the Utilities Director to be responsible for construction contract change orders (CCOs) for the WRRF Project in any amount with the limitation that the sum total of all CCOs not exceed the contingency budget amount of $13,390,000; and 5. Incorporate the Community Workforce Agreement into WRRF Project Spec. No 91620 as approved by signatory Craft Councils and Unions affiliates and the Tri -Counties Building and Construction Trades Council, AFL-CIO as included in the Council agenda packet for the November 13, 2018 Meeting. STUDY SESSION ITEMS 14. BOB JONES TRAIL (CALLE JOAQUIN TO OCEANAIRE) PREI+ERREI) ALTERNATIVE SELECTION Public Works Director Daryl Grigsby, Transportation Manager Jake Hudson and Active Transportation Manager Adam Fukushima provided an in-depth staff report and responded to Council questions. Public Comments: Myron Amerine Lea Brooks Ken Kienow End of Public Comment --- ACTION: By consensus, Council directed staff to evaluate other route alternatives which are not consistent with the Bicycle Transportation Plan as part of the planning of the forthcoming Active Transportation Plan. DocuSign Envelope ID: 0D5F9552-0A12-4481-A99B-695D14987222 San Luis Obis o City Council Minutes of December 4 2018 Parc 6 RECESS Council recessed at 8:35 p.m. and reconvened at 8:50 p.m., with all Council Members present. PUBLIC HEARING ITEMS AND BUSINESS ITEMS 15. 2019-21 FINANCIAL PLAN PROCESS: ECONOMIC OUTLOOK BUDGET POLICIES AND CAPITAL IMPROVEMENT PLAN REVIEW Finance Director Brigitte Elke and Budget Manager Alex Ferreira provided an in-depth staff report and responded to Council questions. Public Comments: None End of Public Comment --- ACTION: By consensus, the Council reviewed and approved the 2019-21 Financial Plan Goal Setting Process. COUNCIL COMMUNICATIONS AND LIAISON REPORTS Vice Mayor Pease invited the public to the Police Department Community Meeting and Station tour on Thursday, December 6, 2018 and also indicated that the City Council would be participating in the annual holiday parade on Friday, December 7, 2018. ADJOURNMENT The meeting was adjourned at 10:02 p.m. The next Rescheduled Regular City Council Meeting is scheduled for Tuesday, January 8, 2019 at 6:00 p.m., in the Council Chamber, 990 Palm Street, San Luis Obispo, California. l Teresa Purrington City Clerk APPROVED BY COUNCIL: 01/08/2019 DocuSign Envelope ID: 0D5F9552-0A12-4481-A99B-695D14987222 GRANT AGREEMENT SAN LUIS OBISPO REPERTORY THEATRE This agreement dated ____________________________ is between SAN LUIS OBISPO REPERTORY THEATRE, a California non-profit corporation (“SLO REP”) and CITY OF SAN LUIS OBISPO, a California Municipal Corporation and Charter City (“CITY”) (the “Grant Agreement”) with reference to the following: WHEREAS, SLO REP and CITY previously entered into an Exclusive Negotiating Agreement (the “ENA”) on May 22, 2019, that identified a mutual interest in the development of a new theatre site, to be leased by SLO REP, and a new City parking structure to be located on CITY property, together with obligations to be performed by both CITY and SLO REP and recitation of conditions precedent for purposes of SLO REP entering into a long-term lease with CITY for a portion of CITY’s property; and WHEREAS, SLO REP issued a written Challenge Grant Request to the City Council dated January 25, 2022, that set forth a rationale and basis for SLO REP’s request of CITY to contribute to the construction of its new downtown theatre project (the “Downtown Theatre”), to be located at the corner of Palm Street and Nipomo Street, San Luis Obispo, and contiguous with CITY’s planned Cultural Arts District Parking Structure (“Parking Structure”); and WHEREAS, at its regularly scheduled meeting on February 15, 2022, the City Council appropriated $3.94 million, as requested by SLO REP, as part of its approval of the FY 2021-2022 Mid-Year Budget Review; and WHEREAS, CITY’s financial support towards construction of the Downtown Theatre to be leased and used by SLO REP is intended to be a challenge grant that will serve to motivate and catalyze other funders and donors in furtherance of SLO REP’s overall capital campaign and fundraising goals for the construction of the Downtown Theatre site development; and WHEREAS, the new Downtown Theatre will ultimately be available to both residents of the City and visitors alike, thereby serving public purposes in furtherance of CITY’s goals for facilitating both arts and cultural amenities, as well as contributing to a thriving and prosperous downtown area through economic development activities, and WHEREAS, SLO REP’s long-standing plans for construction of a new Downtown Theatre are consistent with CITY’s Downtown Concept Plan (2017) and its “Economic Recovery, Resiliency & Fiscal Sustainability” Major City Goal specified in the 2021-23 Financial Plan, and WHEREAS, CITY completed environmental review as lead agency for both the development of the Parking Structure and the Downtown Theatre and certified a Final Environmental Impact Report by Resolution No. 10923 (2018 Series). NOW, THEREFORE, CITY and SLO REP for and in consideration of the mutual benefits, promises and agreements set forth herein, do agree as follows: DocuSign Envelope ID: F82B8F41-15AC-46A0-911C-A827C23FF4D5 4/21/2022 | 2:47 PM PDT 2 | P a g e 1. Construction of the Downtown Theatre On or before the date that is ten (10) years following the execution of this Grant Agreement, SLO REP shall complete construction of the Downtown Theatre. SLO REP’s failure to comply with this term may result in amendment, provided substantial progress or extenuating circumstances can be documented, or termination of this Agreement as provided herein. 2. Grant Amount and Allowed Expenses City agrees to pay SLO REP a one-time only grant in installments as provided in Section 4, the aggregate sum of $3,940,000 (“Grant Funds”), to be used towards the construction of the Downtown Theatre, subject to the conditions set forth herein. The Grant Funds shall only be used for Eligible Costs directly related to construction of the Downtown Theatre as specified below. CITY’s Grant Funds may only be used for direct construction costs defined as contractor expenses for labor, project management, material, equipment, utilities and other direct construction costs ("Eligible Costs"). Payments for “soft” costs are not Eligible Costs and shall not be paid from CITY Grant Funds. “Soft” costs are expense items that are not considered direct construction costs such as architectural and engineering expenses or project fees associated with the project. If there is a dispute about whether a project cost is an Eligible Cost, CITY shall have final determination of whether the cost is an Eligible Cost. SLO REP acknowledges that construction of the Downtown Theater is subject to payment of prevailing wages on the entirety of the project due to the City’s contribution of funding to the project and that such obligation will be expressly conveyed by SLO REP to and will be binding on any covered contractor engaged to perform work on the Downtown Theatre project. 3. Conditions Precedent to Funding SLO REP shall satisfy the following required conditions prior to any disbursement of Grant Funds by CITY. With respect to any requested reimbursement, SLO REP shall: a. Maintain its 501(c)(3) non-profit status. b. Shall secure all other grant funds, donations, pledges, or financing necessary to complete construction of the Downtown Theatre, inclusive of the amount of Grant Funds provided by the CITY pursuant to this Grant Agreement, and shall first utilize (or provide for first utilizing) all other grant funds, donations, or financing then available (collectively “Other Available Funding”) for the construction of the Downtown Theatre prior to any request for reimbursement from CITY. However, SLO REP’s initial reimbursement request for Grant Funds may be made prior to complete exhaustion of Other Available Funding, as necessary, to ensure continued availability of funding to complete construction of the Downtown Theatre in conformance with the construction schedule to be provided under Section 3(e) and the schedule of values to be provided under Section 3(f). However, in no instance shall reimbursement requests for CITY’s Grant Funds exceed the estimated value of completed improvements. DocuSign Envelope ID: F82B8F41-15AC-46A0-911C-A827C23FF4D5 3 | P a g e c. Continue to adhere to all of the requirements of the ENA, attached hereto as Exhibit A and hereby incorporated by reference, until such time as a long-term lease is entered into with CITY, as contemplated by the ENA. Once the long-term lease is in place, SLO REP shall abide by all lease terms and conditions. d. Have secured all necessary project entitlements and building permit(s) for construction of the Downtown Theatre that may be applicable as further described in Paragraph 6, below. e. Have submitted to the Public Works Director’s reasonable satisfaction a critical path construction schedule that includes all Downtown Theatre project-related tasks, and thereafter update this critical path construction schedule and furnish the same to the City on a quarterly basis (4 times a year) until construction is complete and a certificate of occupancy for the Downtown Theatre is furnished. f. Submit to the Public Works Director's reasonable satisfaction a “schedule of values” for items of work the general contractor will thereafter be completing. Identify in the schedule of values each of the items that are proposed to be funded, and when, by CITY Grant Funds. 4. Reimbursement Requests Upon satisfaction of the conditions identified in Section 3, reimbursement payment requests for Eligible Costs identified in the construction schedule required pursuant to Section 3(e) shall be submitted to CITY’s Deputy City Manager. Reimbursement payment requests shall include supporting documentation including contractor invoices and the most current building inspection documentation available at that time, as well as a statement that the construction work progress has been accepted by SLO REP. Reimbursement payment requests may be submitted on a bi-monthly (twice per month) basis and will be reviewed and approved for reimbursement by the CITY in a timely manner, and CITY will make best efforts to process and pay reimbursement requests within fifteen (15) business days from the date of such payment request, provided that sufficient documentation supporting the reimbursement request is provided to CITY. Sufficiency of payment documentation shall be in the sole but reasonable discretion of the CITY and CITY reserves the right to request and receive additional reasonable documentation to support SLO REP’s reimbursement requests and as may be appropriate to aid in City’s determination of whether the requested reimbursement payment is for an Eligible Cost. 5. Construction at Other Sites If SLO REP determines that construction of the Downtown Theatre at the specified site is impractical or inadvisable for any reason, then SLO REP may not use the Grant Funds for any other purpose without prior written approval of the City Council. 6. Permits SLO REP shall apply for and obtain all necessary building and other related permits and project entitlements necessary to construct the Downtown Theatre in conformance with local, state, and federal laws. This Grant Agreement does not authorize the construction of the Downtown Theatre or otherwise alter or impact the exercise of the City’s independent regulatory and land use authority. DocuSign Envelope ID: F82B8F41-15AC-46A0-911C-A827C23FF4D5 4 | P a g e 7. Funding Source Recognition SLO REP will ensure recognition of the role of CITY in providing funding through this Grant Agreement. CITY shall be identified as a funding source in all applicable publications, press releases, social media outreach and similar fundraising promotions. 8. Amendments CITY and SLO REP may amend this Agreement at any time provided that such amendments make specific reference to this Grant Agreement, and are executed in writing, signed by a duly authorized representative of each organization, and approved by the City Council. Such amendments will not invalidate this Agreement, nor relieve or release either CITY or SLO REP from its obligations under this Grant Agreement, except as expressly provided in writing in any such duly executed amendments. 9. Quarterly Reports and Financial Assurance The SLO REP shall provide quarterly reports on both Downtown Theatre construction project progress including the use of CITY Grant Funds. These reports shall be due at the end of the first month after the end of the calendar quarter (i.e. January, April, July, and September) and submitted to the Deputy City Manager. The quarterly reports should include percentage of construction completion, other available funding on hand or then receivable, and work anticipated to be completed in the following quarter. CITY reserves the right to request and receive copies of invoices, account statements, or audits of SLO REP’s financial records pertinent to the Downtown Theatre’s construction and in CITY’s sole discretion, to withhold reimbursement payments until satisfactory reports and supporting documentation are received. 10. Assignability The SLO REP shall not assign or transfer any interest in this Grant Agreement without the prior written consent of the City Council. 11. Conflict of Interest No member of the CITY’s governing body and no other public official of such locality, who exercises any functions or responsibilities in connection with the planning or carrying out of the Downtown Theatre project, will have any personal financial interest, direct or indirect, in this Grant Agreement; and the SLO REP will take appropriate steps to assure compliance. SLO REP agrees to abide by the provisions of 24 CFR 84.42 and 570.611, which require in part, that SLO REP to maintain a written code or standards of conduct that will govern the performance of its officers, employees or agents engaged in the award and administration of contracts supported by Federal funds. 12. Severability If any provision of this Grant Agreement is held invalid, the remainder of the Grant Agreement will not be affected thereby and all other parts of this Grant Agreement will nevertheless remain in full force and effect. DocuSign Envelope ID: F82B8F41-15AC-46A0-911C-A827C23FF4D5 5 | P a g e 13. Entire Agreement This Agreement constitutes the entire agreement between CITY and SLO REP for the use of funds received under this Grant Agreement and shall supersede all prior communications and proposals, whether electronic, oral, or written between CITY and SLO REP with respect to this Grant Agreement. 14. No Agency or Employment The SLO REP is solely responsible for all activities supported by this Grant Agreement. Nothing in this Grant Agreement creates a partnership, agency, joint venture, employment, or any other type of relationship between SLO REP and CITY. SLO REP shall not represent itself as an agent of CITY for any purpose, and has no authority to bind CITY in any manner whatsoever. SLO REP and all of its agents, representatives, or participants in any manner in the performance of its obligations and duties hereunder, shall be employees, independent contractors, or volunteers solely of SLO REP. They shall not for any purpose be considered employees or agents of CITY. 15. Indemnification The SLO REP agrees, to the fullest extent permitted by law, to defend, indemnify, and hold harmless CITY its officers, directors, affiliates, employees, and agents (“City Indemnitees”), from and against any and all claims, liabilities, losses and expenses (including reasonable attorney’s fees) directly, indirectly, wholly or partially arising from or in connection with any act or omission of SLO REP, its employees or agents, in applying for, accepting, or use of the Grant Funds, or in carrying out the Downtown Theatre project as set forth. In the event the City Indemnitees are made a party to any action, lawsuit, or other adversarial proceeding arising from SLO REP’s performance under this Grant Agreement, SLO REP shall provide a defense to the City Indemnitees or at the City’s option, reimburse the City Indemnitees their costs of defense, including reasonable legal fees, incurred in defense of such claims. 16. Termination The City Manager may, within his or her reasonable discretion, initiate termination of this Grant Agreement in the event of any material breach of the terms of this Grant Agreement by SLO REP. Material breach includes breach of Sections 1-7, 9 and 15 of this Grant Agreement, but does not include minor delays in reporting or other delays in obligations set forth herein caused through no fault of SLO REP as well as administrative or clerical errors made in good faith. Upon the City Manager’s written notice of breach, SLO REP shall have forty-five (45) calendar days to cure any such breach (the “Notice of Breach”). Should SLO REP fail to cure, or provide documentation of substantial progress towards curing such breach within forty-five (45) calendar days of the date of the Notice of Breach, the City Manager shall provide written notice of termination of this Grant Agreement (the “Notice of Termination”). Said termination shall be effective thirty (30) calendar days after the City Manager mails the Notice of Termination to SLO REP. Any remaining Grant Funds in excess of then unpaid Eligible Costs, as defined in Section 2, actually incurred as of the date of notice of termination shall revert to CITY upon the effective date of termination. DocuSign Envelope ID: F82B8F41-15AC-46A0-911C-A827C23FF4D5 6 | P a g e 17. Notices For purposes of notice under this agreement, all notices shall be considered effective upon being sent by certified mail to the following addresses: CITY: City of San Luis Obispo 990 Palm Street San Luis Obispo, CA 93401 Attn: City Manager SLO REP: San Luis Obispo Repertory Theatre 888 Morro Street San Luis Obispo, CA 93401 Attn: Managing Artistic Director CITY OF SAN LUIS OBISPO, A MUNICIPAL CORPORATION By: Derek Johnson, City Manager SAN LUIS OBISPO REPERTORY THEATRE, A CALIFORNIA NON-PROFIT CORPORATION By: ___________ Kevin Harris, Managing Artistic Director APPROVED AS TO FORM: By: J. Christine Dietrick, City Attorney DocuSign Envelope ID: F82B8F41-15AC-46A0-911C-A827C23FF4D5 DATE: June 21, 2023 TO: Robert Hill, City Staff FROM: Kevin Harris, SLO REP SUBJECT: City of SLO/SLO REP Lease Purpose of this memo: to detail important points SLO REP would like to see included in LEASE, and to identify specific questions that warrant further discussion between City of SLO and SLO REP. As requested, SLO REP organized a small committee made up of staff, Board members, and legal counsel to discuss the items we would like included in the lease between the City of SLO and SLO REP. HIGHEST PRIORITY ITEMS TO BE INCLUDED/DISCUSSED: • Clear description in lease of consideration for lease. See paragraph 5 of lease. • Confirm lease period of 99 years. See paragraph 4 of lease. • Specify appropriate uses for building. o SLO REP would like the lease to make clear that the organization can use the building for a wide variety of events. Our business plan includes private events, concerts, speakers, meetings for outside organizations, parties (rental), wedding, comedy nights, etc. • Specify that the City will have no control over content except as specified. See Paragraph 7 of lease. o While this is not a concern with the current Council/administration, SLO REP must be protected against the City stepping in should any content be deemed inappropriate by future City officials/staff. See paragraph 7 of lease last sentence • Specify that this is a land lease, not a building lease. See paragraph 2 of lease. o Who is responsible for exterior building maintenance (roof, siding, landscaping.) If SLO REP is responsible for landscaping utilities, where are the specific boundaries between the City’s plots and SLO REP’s? The Premises will need to be tightly defined and delineated in lease. 12(f) provides the SLO REP is responsible to install and maintain landscaping; 10 makes SLO REP responsible for building and roof maintenance • Section 13: Ownership Improvements. o The current language states that SLO REP needs approval from the City Manager for any improvements to the premises. What kind of reach do they have here? Could the City Manager argue that they have to approve stage design/construction or interior modifications even if building code did not require a permit. See end of paragraph 12 of lease. • Specify that SLO REP, if fulfilling the requirements of the lease, will have first right of refusal for renewal of the lease at the end of the term. See paragraph 38 of lease. ADDITIONAL QUESTIONS TO DISCUSS: • If SLO REP would like to exit the lease in the future, what is that process? • Does the lease adequately cover sub-leasing/rentals? See paragraph 19 of Lease. • We have a few property tax questions. o It states that we are responsible for paying property taxes etc but we are also a non- profit organization and have historically qualified for an exemption. Should we be investigating or discussing this and how it might impact this language? • Does the lease include restrictions for the hiring of outside contractors for future work? Does the City have any say in who we hire? 1 Subject:SLO REP Oak Tree Location:Microsoft Teams Meeting Start:Tue 7/22/2025 9:00 AM End:Tue 7/22/2025 9:25 AM Show Time As:Tentative Recurrence:(none) Meeting Status:Not yet responded Organizer:Hill, Robert Required Attendees:Gault, Walter; Cohen, Rachel Internal discussion on the Rodney Thurman report + next steps. Thanks! ________________________________________________________________________________ Microsoft Teams Need help? Join the meeting now Meeting ID: Dial in by phone +1 209-645-4165,,544287130# United States, Stockton Find a local number Phone conference ID: For organizers: Meeting options | Reset dial-in PIN ________________________________________________________________________________ 1 Subject:SLO Rep Replanting Plan Location:614 Monterey Start:Tue 9/23/2025 9:00 AM End:Tue 9/23/2025 9:50 AM Recurrence:(none) Meeting Status:Meeting organizer Organizer:Gault, Walter Required Attendees:rodney@heritagetreeconsulting.com 1 Subject:Check-in on SLO REP Oak Tree Location:Microsoft Teams Meeting Start:Wed 10/29/2025 2:00 PM End:Wed 10/29/2025 2:25 PM Show Time As:Tentative Recurrence:(none) Meeting Status:Not yet responded Organizer:Gault, Walter Required Attendees:Gault, Walter; Hill, Robert; Cohen, Rachel Hi Bob and Rachel, Getting a time on the calendar to discuss leads on the staff report and timing for public noticing. Whitney provided recent direction that Council should be made aware of high profile tree removals prior to public noticing. I’d to establish a timeline, potentially over the next month, to bring this Council as a consent item on December 2. ________________________________________________________________________________ Microsoft Teams Need help? Join the meeting now Meeting ID: For organizers: Meeting options ________________________________________________________________________________ 1 Subject:Check-in on SLO REP Oak Tree Location:Microsoft Teams Meeting Start:Wed 10/29/2025 3:00 PM End:Wed 10/29/2025 3:25 PM Show Time As:Tentative Recurrence:(none) Meeting Status:Not yet responded Organizer:Gault, Walter Required Attendees:Hill, Robert; Cohen, Rachel Hi Bob and Rachel, Getting a time on the calendar to discuss leads on the staff report and timing for public noticing. Whitney provided recent direction that Council should be made aware of high profile tree removals prior to public noticing. I’d to establish a timeline, potentially over the next month, to bring this Council as a consent item on December 2. ________________________________________________________________________________ Microsoft Teams Need help? Join the meeting now Meeting For organizers: Meeting options ________________________________________________________________________________ 1 Subject:City Council Tree for SLO Rep? Start:Wed 12/17/2025 8:30 AM End:Wed 12/17/2025 8:55 AM Recurrence:(none) Organizer:Cohen, Rachel Categories:Important!!! Call Handling Mode 2:2 1 Subject:SLO rep Oak Staff Report Finalization Start:Mon 1/26/2026 8:00 AM End:Mon 1/26/2026 10:50 AM Recurrence:(none) Organizer:Gault, Walter