Parking Structure Safety Element
Research and Design
919 Palm Street · 842 Palm Street · 871
Marsh Street
San Luis Obispo, CA 93401
Specification Number 2001075
April 17, 2026
For:
City of San Luis Obispo, Public Works
919 Palm Street,
San Luis Obispo, CA 93401
P. 805.781.7200
Omni Design, Inc. | CITY OF SAN LUIS OBISPO PARKING STRUCTURE SAFETY ELEMENT 2
TABLE OF CONTENTS
COVER LETTER 3 –4
QUALIFICATIONS 5 –7
EXPERIENCE OF FIRM 8
WORKPLAN 9 –11
TIME SCHEDULE 12
REFERENCES 13 –14
DETAILED FEE BY TASK 15
Omni Design, Inc. | CITY OF SAN LUIS OBISPO PARKING STRUCTURE SAFETY ELEMENT 3
April 17,2026
City of San Luis Obispo –Public Works Department
919 Palm Street
San Luis Obispo,CA 93401
RE:Request for Proposals –San Luis Obispo Parking Structure Safety Element
Research and Design –Specification No.2001075
Members of the Selection Committee ,
Omni Design,together with our structural subconsultant Buehler Structural,is pleased to
submit this proposal to the City of San Luis Obispo for the Parking Structure Safety Element
Research and Design project .We have thoroughly reviewed the RFP requirements and
Addendum No.1 (issued April 2 ,2026),and the following highlights why our team is uniquely
qualified to deliver this project .
A Nimble and Seasoned Team
One of Omni Design ´s strengths as small design firm is that our principals are directly involved
in managing projects and stakeholders .Having no middle managers allows us to deliver quality
design while being responsive to keep projects on-time and on-budget .Our design team will be
led by Darren Tully as project manager and direct point of contact.Darren is a principal at
Omni Design and has over 22 years of experience supporting public agencies in the design of
facilities of all types .
Leading the structural team will be John Harvey from Buehler Structural Engineering.John
brings to the table 31 years of experience as a Project Manager at Buehler Parking Studio,
serving as the Structural Engineer of Record for numerous parking projects in the Western
U.S.,and earning him multiple awards from the International Parking &Mobility Institute .
A Parking Structural Specialist :Buehler Parking Studio (BPS)
Buehler,our structural design sub-consultant,brings their Parking Studio expertise with over
100 years of combined design experience with a singular focus:delivering exceptional parking
planning that integrates seamlessly with any structural system .BPS has successfully served
public and private clients across aviation,commercial,residential,healthcare,and institutional
sectors..
We appreciate the opportunity to submit our proposal and look forward to the possibility of partnering
with the City of San Luis Obispo on this important project.
Sincerely,
Juan Pablo Cal y Mayor
CEO
jcalymayor@omnidesign.us
P.805.235.76.03
Omni Design, Inc. | CITY OF SAN LUIS OBISPO PARKING STRUCTURE SAFETY ELEMENT
Omni Design Personnel
Omni Design Consultants
and Design/Build Personnel
OMNI DESIGN SUBCONSULTANTS
Darren Tully, P.E.
Engineering Principal
Alexandra Hategan
Drafter
•Plan Production
•Exhibits
Organizational Chart
QUALIFICATIONS
4
Shane Maples, AIA
Principal Architect
•QA/QC peer review
•Scheduling
Leader and point of contact
T 707.599.8565
E: dtully@omnidesign.us
.
John Harvey, SE, DBIA, LEED AP
BD+C
Structural Project Manager
Michael Brennan
President
John Maloney, P.E.
Principal
Buehler Engineering | StructuralBrennan Construction | Cost
Estimating
JMPE | Electrical
•Conduct meetings
•Review processes
and deliverables
•Direct the project
team
Omni Design, Inc. | CITY OF SAN LUIS OBISPO PARKING STRUCTURE SAFETY ELEMENT 5
Shane Maples is an Architect with nearly two
decades in the design and construction of
public and facilities.He has experience with
projects of up to $40m in construction cost as
the Architect of Record.
His knowledge and team approach to projects
includes;programming,master-planning,
consensus building,design,project delivery,
and quality control.
Certifications
California Architect C 37563
Selected Project Experience
PUBLIC FACILITIES PROJECTS
▪Co-located Dispatch Center in Templeton.
▪Nipomo Sheriff Station Bridging Documents
▪City of San Luis Obispo Wastewater
Maintenance Shop Project
▪New Corporation Yard for the City of Paso
Robles.
▪Fire Station #3, City of Paso Robles
▪Wastewater Storage Buildings, City of Fresno
▪City of Santa Maria Transit Station Renovation
▪City of Santa Maria BRT corridor stations
EDUCATION PROJECTS
▪Technology Park Criteria Documents:
California Polytechnic, San Luis Obispo, CA.
▪District Master Plan; Gilroy School District,
Gilroy, CA,
▪Santa Maria-Bonita School District various
education projects.
▪Aurora Program School; Kern County
Superintendent of Schools, Bakersfield, CA
SHANE MAPLES,
AIA
Director ofArchitecture
Darren Tully
P.E.
Engineering Principal
Darren is a recent hire with Omni this year.
He is a native to the Central Coast,
graduated Humboldt State University and
worked in Humboldt since 2003 as a Civil
Engineer.Since then he has delivered a
wide range of projects in terms of size and
scope,including PGE's Humboldt Bay
Nuclear Power Plant Decommissioning,to
Coastal Development permitting,design
drawings and construction administration on
industrial,commercial,public works and
large-scale land development projects.
Certifications
P.E., QSD/QSP
Selected Project Experience
▪ACCESSIBILITY
▪Safeway Grocery Store Accessibility Upgrades,
various stores throughout Humboldt County
▪City of Arcata Library Accessibility Barrier Removal
project, City of Arcata
▪PGE Humboldt Bay Power Plant, King Salmon
Coastal Access Trail upgrades
PUBLIC WORKS EXPERIENCE
▪County of Humboldt Juvenile Hall Civil Design
and Survey
▪Humboldt Community Services
District,various water and sewer correction
projects
▪County of Humboldt Administration Office
Accessibility Projects; Big Lagoon, Clam Beach,
Arcata Airport
CONSTRUCTION MANAGEMENT
▪Eureka Co-Op Grocery Store, onsite engineer from
start to end of project
▪PGE Humboldt Bay Power Plant
Decommissioning, various roadway, drainage, and
indoor gun range
20 years of experience 22 years of experience
Omni Design, Inc. | CITY OF SAN LUIS OBISPO PARKING STRUCTURE SAFETY ELEMENT 6
John Harvey,SE,DBIA,LEED AP BD+C
Structural Project Manager and Parking Expert
PROFILE
Years of Experience
With Firm:24 years
In Industry:31 years
Education
Bachelor of Science,Civil Engineering,
California State University,San Jose
Professional Registrations
Structural Engineer
California |No.4660
Professional Engineer
California |No.58001
Virginia |No.0402053458
Utah |No. 12288593-2202
Associations
National Parking Association
International Parking &
Mobility Institute
Design-Build Institute of America
Structural Engineers Association
of Northern California
National Council of Examiners for
Engineering and Surveying
U.S.Green Building Council
Certifications
DBIA –Designated
Design-Build Professional
U.S.Green Building
Council –LEED AP BD+C
PROFESSIONAL BACKGROUND
As a Principal at Buehler,John leads Buehler Parking Studio and is the
Director of the San Francisco office.He has been the lead designer and
Structural Engineer of Record on countless parking projects throughout
the Western US and has won numerous awards, including from the
International Parking &Mobility Institute.Collaborating directly with
team leadership and stakeholders,his notable skills and experience
comprise parking geometrics,criteria document development,
structural design,feasibility studies,and more.John always seeks to
develop the most efficient parking layout that incorporates suitable
ramping configurations to meet the project's goals and values while
simultaneously adhering to codes and standards.
SELECTED RELEVANT EXPERIENCE
City of Livermore ‘L’Street Parking Structure
Livermore,California |Size:450 Stalls
City of Livermore ‘I’Street Parking Structure
Livermore,California |Size:274 Stalls
Santa Barbara Airport Terminal Expansion Parking Garage
Santa Barbara,California |Size:1,000 Stalls
SFO Long-Term Parking Garage No.2
San Francisco,California |Size:3,600 Stalls
Sutter Roseville Parking Garage Expansion
Roseville,California |Size:550 Stalls
UC Davis Health Aggie Square Parking Structure 6
Sacramento,California |Size:1,550 Stalls
UC Davis Health Aggie Square Parking Structure 5 Plan Check
Sacramento,California |Size:1,100 Stalls
UC Davis Health Aggie Square Parking Structure 7 Plan Check
Sacramento,California |Size:1,200 Stalls
UC San Francisco Parnassus Parking Structure Feasibility Study
San Francisco,California |Size:750 Stalls
DGS 10th &O Street Office Building -Parking Geometrics
Sacramento,California |Size:135 Stalls
PARKING
STUDIO
Omni Design, Inc. | CITY OF SAN LUIS OBISPO PARKING STRUCTURE SAFETY ELEMENT
SUBCONTRACTORS
Michael Brennan
President
Construction Estimation
Brennan Construction and Design
1623 13th Street
Los Osos, California, 93402
P. 805.439.3209
Electrical and Lighting
JMPE Electrical Engineering
2280 Santa Maria Way #4
Santa Maria, California, 93455
P. 805.568.7500
Michael Parolini, S.E.
Structural Engineer
Structural Engineering
Buehler Engineering
811 El Capitan Way, Ste 240
San Luis Obispo, California, 93401
P. 805.439.2110
Founder and Principal of JMPE, John
brings over 40 years of experience in
electrical and lighting design across
public and private sectors . He
specializes in power distribution,
lighting , fire alarm and communication
systems, and Title 24 compliance.
Michael is a Principal at Buehler and the
Director of our San Luis Obispo office .
His experience comprises all aspects of
structural engineering with a specialty in
government, education, existing building,
and public works projects. He has served as
a Lecturer at Cal Poly San Luis Obispo
since 2005 where he has taught classes in
structural graphics, industry communication,
timber, and steel; he greatly enjoys sharing
his knowledge and mentoring young
structural engineers, helping them grow in
their careers. Michael has published papers
on various topics, including forensic
engineering, rain-induced roof collapses,
nonconventional structural systems, and the
state of structural engineering licensure.
Mr. Brennan is as Construction
management professional with
experience across higher education,
private industry, and the military. A
lecturer at Cal Poly with a background
leading major capital projects and
serving as a U.S. Army Corps of
Engineers Captain.
John Maloney, P.E.
Principal
9
Omni Design, Inc. | CITY OF SAN LUIS OBISPO PARKING STRUCTURE SAFETY ELEMENT 8
WORKPLAN
TASK 0 –PROJECT MANAGEMENT AND COORDINATION
Omni Design's project management approach centers on direct principal involvement and transparent
communication.Darren Tully,PE will serve as the primary point of contact with the City throughout all phases of
the project.He will be responsible for maintaining schedule,tracking budget milestones,and coordinating the full
design team including structural,electrical,and cost estimating subconsultants.
Project management services include:overall project coordination and administration;development and
maintenance of a detailed project schedule updated throughout the project;monthly progress updates to the
City;subconsultant coordination;and preparation of meeting agendas and summaries after each milestone.
TASK 1 –ALTERNATIVES ANALYSIS
Our team will initiate the project with a kickoff meeting that includes the full design team and the City project
manager to review the project goals,confirm priorities,and establish the communication framework and
meeting schedule.Ideally,this kickoff will occur at the start of site walks,allowing our team to visit all three
parking structures—919 Palm,842 Palm,and 871 Marsh—with the City PM present.These site visits will
allow the structural team to assess existing parapet conditions,edge details,and mounting constraints in
the field,while also confirming areas of work,desired solutions,and resolving questions not explicitly
identified in the RFP.The site visits will also allow for the design team to conduct a high level visual review
of the structures for code impacts with building,accessibility,and fire/life safety.
Following the site visits and review of available as-built documents,our team will develop preliminary
concept plans for each structure and level.These concepts will serve as the framework for the alternatives
evaluation,future project phases,and the development of working drawings.We will evaluate three
mounting approaches—surface-mounted,parapet-mounted,and recessed-mounted—for each structure.
This evaluation will include representative conceptual fence layouts,mounting and attachment details,and
a preliminary structural feasibility analysis addressing wind and seismic considerations in accordance with
the current California Building Code (CBC).
The alternatives analysis and concept package will also include:
•High-level code review addressing building,accessibility,and fire/life safety impacts
•CPTED and aesthetic considerations,including representative photo simulations
•Identification of anticipated permits and approvals required for each structure
•Preliminary recommendations and feasibility findings for each mounting approach
Once the concept alternatives and feasibility analysis are complete,the concept package will be provided to
our cost estimator to develop order-of-magnitude (ROM)construction cost estimates,including clearly
stated assumptions.A meeting with be conducted with the City to go over the Alternatives Analysis Report.
Deliverable:Alternatives Analysis Report,High Level Review statement of Building,Accessibility,and
Fire/Life Safety Code Impacts,Project Review Meeting with City |City Review Period:3 weeks
Omni Design, Inc. | CITY OF SAN LUIS OBISPO PARKING STRUCTURE SAFETY ELEMENT 9
WORKPLAN
TASK 2 –STRUCTURAL ANALYSIS AND 50%PSE
Buehler Parking Studio will lead the structural evaluation of each of the three parking structures.Using
available as-built documents,prior inspection reports,and field investigations completed during Task 1,
the structural team will perform a comprehensive analysis of each structure’s overall condition,load
capacity,and compliance with current California Building Code requirements.
Following development of the concept plans and selection of preferred mounting alternatives,the
structural engineer will evaluate parapets,anchorage systems,wind loads,and seismic forces.The team
will identify all safety-related deficiencies and develop recommended corrective measures,including
structural spall repair and concrete restoration,seismic strengthening,vehicle impact protection
improvements,signage enhancements,and drainage corrections where identified.
JMPE Electric will integrate the electrical scope into the 50%PS&E package,including lighting and
security camera design consistent with the Axis NVR system currently used within the Cultural Arts
District.The design team will also prepare site-specific assessments and security plans for each
structure,including electrical and data routing.
Omni Design will coordinate the permitting strategy with the City Public Works and the Building Division,
as needed,for the three structures.
Brennan Construction and Design will prepare a 50%level preliminary cost estimate to validate budget
assumptions prior to submittal.
Deliverable:50%PS&E Package (structural plans and calculations,draft specifications,site
assessment and security plans,and a preliminary cost estimate)|City Review Period:5 weeks
TASK 3 –90%PSE
Following City review and comment on the 50%submittal,the design team will incorporate all review
comments and advance the design to 90%completion.The 90%PS&E package will refine layouts and
provide near-complete structural and electrical drawings,including refined camera placements,updated
technical specifications,and a construction phasing plan developed to minimize parking disruptions.The
90%submittal will fully address all City,and Building Division,comments and will be suitable for final plan
check,providing the City with a comprehensive review opportunity prior to bidding.The deliverable will
include an updated 90%submittal package and engineer’s estimate.A meeting will be scheduled with
the City to go over the 90%package.
Deliverable:90%PS&E Package (Plans and calculations,specifications,site and security plans,
and cost estimate),90%meeting with City |City Review Period:7 weeks
TASK 3.1 –STRUCTURAL PEER REVIEW COORDINATION (OPTIONAL)
If required by the City or the Building Division,Omni Design will coordinate and manage the structural
peer review process.We will prepare and submit the required peer review package,serve as the primary
contact for the peer reviewer,and incorporate peer review comments into the construction documents.
Our team’s experience with peer review processes on similar civic structures ensures this step will not
delay the overall project schedule.
Optional Deliverable:Peer Review package and coordination;incorporation of peer review
comments
Omni Design, Inc. | CITY OF SAN LUIS OBISPO PARKING STRUCTURE SAFETY ELEMENT 10
WORKPLAN
TASK 4 –100% PS&E and PERMITTING SUPPORT
Omni Design will support the City throughout the permitting phases.
As part of this task, Omni and our consultant team will also respond to agency plan check comments to
obtain required permits. This phase includes preparation of a fully stamped and signed 100% PS&E
permit submittal package and the final design construction cost estimate.
During construction, the design team will conduct periodic site observation visits to verify that the work
conforms to the Contract Documents. We will review and respond promptly to contractor RFIs and
submittals to support construction progress and minimize delays. Buehler Parking Studio will provide
specialized structural field observations and coordinate any required special inspections, while JMPE
Electric will observe the electrical and camera system installations and verify compliance with system
specifications.
Deliverable:100%final PSE for permit issuance,Stamped and Signed structural calculations,100%
Meeting with City |City Review Period:7 weeks
TASK 5 –FINAL PS&E AND BIDDING SUPPORT
Prior to Bidding,we will provide Stamped and signed Construction Documents (CDs)for the Bid process.
During bidding,we will assist City staff with responses to bid questions,preparing and issuing addenda
as required,and participate in a pre-bid meeting to walk prospective contractors through the project scope
and site conditions.
Deliverable:Final stamped and signed construction documents,Bid question responses,Issue
addenda,final cost estimate
TASK 6 –CONSTRUCTION SUPPORT SERVICES
The team will review contractor submittals,shop drawings and substitution requests to confirm
compliance with the contract documents and design intent.We will review and respond to Requests For
Information (RFIs)and provide site visits at key construction milestones,and continue to update the
project schedule.We will work with the contractor to provide and update our construction drawings,as
the project work commences,so at the time of project completion,accurate Record Drawings can be
provided to the City at the time of project completion.
Deliverable:Record Drawings,Contractor Punchlist,Site Visits,RFI Responses,Issue Addenda
Omni Design, Inc. | CITY OF SAN LUIS OBISPO PARKING STRUCTURE SAFETY ELEMENT 11
TIME SCHEDULE AND WORKLOAD
Omni Design understands that the City’s proposed schedule is ambitious yet achievable,provided
that review timelines remain consistent with the City’s internal self-review process.Based on our
experience with similar public safety and tenant improvement projects,we believe the design
milestones are attainable with proactive coordination and timely feedback.However,any unforeseen
findings during the facility assessment—such as structural,electrical,or code compliance issues—or
delays in plan review responses could affect the overall timeline.Our team will monitor these factors
closely and communicate promptly with the City should schedule adjustments become necessary to
maintain quality and compliance.
Time Schedule
The schedule below is based on a May 11 ,2026 NTP.Dates will be confirmed upon NTP issuance
and mutual agreement with the City.The Design Team will provide monthly progress updates and
coordinate all subconsultant activities within the durations shown.The schedule includes all City-
stated review periods and will be updated at each phase milestone.
WBS TASK START END DAYS Weeks WORK
DAYS
1 Alternatives Analysis --
1.0 Project Mgmt, Kickoff & Site Walks Mon 5/11/26 Fri 5/15/26 5 1 5
1.2 Feasibility, Code & CPTED Analysis Mon 5/11/26 Sun 6/07/26 28 4 20
1.3 Alternatives Report Production Mon 6/08/26 Fri 7/03/26 70 10 50
1.4 City Review (3 wks) + Plan Mtg Mon 7/06/26 Fri 7/24/26 21 3 15
2 Structural Analysis &PS&E --
2.1 Structural Evaluation & Camera Layout Mon 7/27/26 Sun 8/23/26 28 4 20
2.2 50% PS&E Package Production Mon 8/24/26 Sun 10/18/26 56 8 40
2.3 City Review (5 weeks) + Plan Meeting Mon 10/19/26 Sun 12/12/26 35 5 21
2.4 90% Plans, Specs & Cost Estimate Mon 12/14/26 Sun 12/28/26 14 2 10
2.5 City Review (7 weeks) + Plan Meeting Mon 12/29/26 Tue 2/9/27 49 7 35
2.6 100% Plans, Specs & Cost Estimate Wed 2/10/27 Wed 2/17/27 7 1 5
2.7 City Review (7 weeks) + Plan Meeting Thu 2/18/27 Thu 4/8/27 49 7 35
2.8 Permit Issuance (estimate)Fri 4/9/27 Fri 4/16/27 7 1 5
3 Construction Administration
Support --
3.1 Bid Phase Support Mon 4/19/27 Mon 6/7/27 42 6 30
3.2 Construction Support Mon 6/7/27 Mon 11/8/27 154 22 110
3.3 Project Closeout Deliverables Tue 11/9/27 Tue 11/23/27 14 2 10
Total Weeks 83
Omni Design, Inc. | CITY OF SAN LUIS OBISPO PARKING STRUCTURE SAFETY ELEMENT 12
References
UC Davis Health —Aggie Square Parking Structures 5 and 7 Plan Check and Seismic Review
Customer Name: UC Davis Health
Contact Individual: Josh Pilorin, Project Manager
Telephone & Email: 916.397.2001
JPPilorin@ucdavis.edu
Date of Services: November 2022 to August 2025
Contract Amount: $80,000.00 + $25,950.00
Description of Services: Buehler provided structural plan check and seismic peer review services for two
new parking structures. While the structural plan check was performed for code-compliance with the
California Building Code, the seismic review was defined in accordance with the University of California
Seismic Safety Policy.
Project Outcome: These projects added 2,000+ stalls to support the expansion of the UC Davis
Health campus. The structures provide additional parking and increase campus accessiblity for
patients and staff.
City of Livermore —“L” and “I” Street Parking Structures and Downtown Core Public
Improvements
Customer Name: City of Livermore
Contact Individual: Joel Waxdeck, Assistant City Engineer
Telephone & Email: 925.960.4521 |
JHWaxdeck@livermoreca.gov Street Adress: 1052 S.
Livermore Av. , Livermore, CA 94550
Date of Services: February 2016 to July 2022
Contract Amount: $203,750.00 + $45,100.00 + $1,312,556.00
Description of Services: These projects entailed performing services involving design development,
parking geometrics, preparation of construction documents, and construction administration. This
effort involved the assessment and improvement of several existing structures as well as the
construction of multiple new buildings across the downtown Livermore area.
Project Outcome: This endeavor aimed to enhance the economy and aesthetics of downtown Livermore,
including the design and construction of the “L” and “I” Street Parking Structures, Livermore Street
Landscape Improvements, and the Eastside Hotel Underground Parking Garage.
Omni Design, Inc. | CITY OF SAN LUIS OBISPO PARKING STRUCTURE SAFETY ELEMENT 13
References
San Francisco International Airport —Long Term Parking Garage No. 2
Customer Name: San Francisco International Airport
Contact Individual: Justin Erickson, Project Manager
Telephone & Email: 650.823.0402 | Justin.Erickson1@flysfo.com
Street Adress: 676 North McDonnell Road
City, State, Zip Code: San Francisco, CA
94128 Date of Services: June 2015 to May
2019 Contract Amount: $1,196,114.00
Description of Services: This garage is a six-story, 3,600-stall parking structure located northwest of
the existing long-term parking garage. The solar-powered, 1.25 million SF garage is composed of four
seismically isolated structures and features an automated guidance system that guides drivers to the
nearest open spot, roof-level photovoltaic arrays, and EV charging stations at each level.
Project Outcome: Winner of National DBIA and International Parking & Mobility Institute awards, this
state-of-the-art garage was delivered to expand the capacity of the airport and provide a transcendent
impression on both travelers and drivers alike, meeting the world-class expectations and functionality of
SFO.
Omni Design, Inc. | CITY OF SAN LUIS OBISPO PARKING STRUCTURE SAFETY ELEMENT 14
DETAILED FEE BY TASK
Phase / Consultant
Om
n
i
D
e
s
i
g
n
JM
P
E
E
n
g
i
n
e
e
r
i
n
g
Bu
e
h
l
e
r
Br
e
n
n
a
n
C
o
n
s
t
r
u
c
t
i
o
n
To
t
a
l
F
e
e
Project Managament and
Coordination Task 0 $ 19,908 $ -$ -$ -$ 19,908
Alternatives Analysis, PM and
Cordination Task 1 $ 5,439 $ -$ 5,400 $ 2,500
Structural Analysis and 50% PS&E Task 2 $ 6,035 $ -$ 39,650 $ 2,000 $ 47,685
90% PS&E Task 3 $ 5,677 $ 4,800 $ 15,365 $ 2,000 $ 27,842
100% PS&E and Permitting Support Task 4 $ 4,009 $ 3,800 $ 6,815 $ 2,000 $ 16,624
Final PS&E and Bidding Support Task 5 $ 3,411 $ 800 $ 3,830 $ 2,000 $ 10,041
Construction Support Services*Task 6 $ 7,808 $ 1,800 $ 13,050 $ -$ 22,658
Subconsultant Mark-up $ 1,680 $ 12,617 $ 1,575 $ 15,872
Total $ 52,287 $ 12,880 $ 96,727 $ 12,075 $ 173,969
★Services marked with a star are billed on an hourly, not -to-exceed basis.
Below is a detailed fee breakdown by task for a total that will not exceed $173,969.The tasks will
be billed as a fixed fee unless specified as hourly,not-to-exceed tasks.