Response to RFP for: Parking Structure Safety
Element Research and Design
April 17, 2026
RNT Architects | 762 Higuera Street, Suite 218, San Luis Obispo, CA | 805.626.5330 | rntarchitects.com
RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 2
Table of Contents
3
4
7
9
22
23
24
26
Cover Letter
Understanding of the Project and Technical Approach
Relevant Experience
Qualifications
Project Schedule
Fee Proposal
References
Assumptions and Exclusions
RNT Architects | 872 Higuera Street, San Luis Obispo, CA 93401 | 619.233.1023 | rntarchitects.com
Ralph Roesling
Chikako Terada
Joe Mansfield
Raúl Díaz
Rommel Olaes
Tyson Cline
Rick España
Gemma Hsiueh
Chris Bradbury
Brandon Martella
RNT Architects | 762 Higuera Street, Suite 218, San Luis Obispo, CA | 805.626.5330| rntarchitects.com
Attn: Michael Swartz
City of San Luis Obispo Public Works
919 Palm Street
San Luis Obispo, CA 93401-3934
RE: RFQ for On-Call Consultants, Parking Structure Safety Element Research and
Design
Dear Mr. Swartz and Selection Committee,
RNT Architect’s (RNT) is pleased to submit its response to the City of San Luis Obispo's
Request for Proposal. We acknowledge the original RFP dated March 23, 2026, and the
Addendum dated April 02, 2026.
The City’s initiative to enhance the safety and security of these three downtown structures
is a very important measure for the public sphere in San Luis Obispo.
Roesling Nakamura Terada Architects, Inc. (RNT) brings highly relevant life safety and
security expertise from civic projects across California, many of which were designed to
comply with Division of the State Architect (DSA) requirements. Our portfolio includes public
safety facilities, several security enhancement projects, as well as multiple parking structures
with roof-level fencing and digital surveillance features.
Local Service
RNT’s office is located within walking distance of the three project sites, which means our
Project Manager, Ansgar Killing, and Project Architect, Brian Iwasaki, can easily attend site
meetings and address existing conditions. Additionally, our engineering consultants, with
whom we have successful prior experience, are local to San Luis Obispo.
Client and Community Prioritization
We value projects that serve and strengthen communities, from small-scale interventions
and renovations to new-builds and master plans. Our design approach prioritizes intentional
listening, clear communication with you as our client, and striking a balance between aesthetic
quality and functional value. With 46 years of public sector expertise, we understand the
need to execute projects like this within a well-managed budget and schedule, and a quality
end product for your end users is paramount.
On behalf of RNT, we thank you for the opportunity to submit our proposal for the Parking
Structure Safety Element Research and Design project.
Sincerely,
Chris Bradbury, AIA, NCARB, Principal-In-Charge
Roesling Nakamura Terada Architects, Inc.
RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 4
Understanding Of
The Project
Our team has carefully reviewed the RFP, visited the City’s
various parking structures multiple times, and conducted a
preliminary assessment of the scope and the budget that was
communicated via Amendment 1.
Challenge
It is our understanding that the City would like to establish
safety elements that provide a consistent safety approach
throughout the City’s parking structures. Given the layout,
construction, and varying heights of the three structures,
safety elements will require customization to meet unique
conditions. At this same time, the City is aware that the cost
for the safety standard as implemented at the new Art District
Parking Structure may exceed the City’s budget for design
and construction.
Approach
Using as-built drawings provided by the City, our team
will create CAD backgrounds for all three existing parking
structures. At the site visit, the engineering team will associate
typical mounting scenarios to standard conditions and identify
special conditions that will require customization of mounting
solutions.
Our team is proposing an early outreach to preferred vendors
and manufacturers to align scope, budget, and schedule. If
the City is open to this approach, design fees in particular for
electrical engineering could be further reduced.
In close collaboration with the Public Works staff, our team
will then refine budget, schedule, and quality parameters
during the development of 50% and 90% design documents.
Project Technical
Approach
Project Management and Coordination
• Dedicated Project Manager: Assign a single point of contact
responsible for schedule, budget, and communication
throughout project duration
• Proactive Schedule Management: Develop and maintain
detailed project schedule using Microsoft Project, tracking
tasks, milestones, and critical path items
• Regular Communication Protocol: Establish clear lines of
communication with City staff through monthly progress
updates, meeting agendas, and documented meeting
summaries
• Integrated Team Coordination: Facilitate coordination
among all subconsultants to ensure seamless collaboration
and timely deliverables
• Quality Oversight: Implement continuous internal reviews
at each milestone to maintain technical excellence and
adherence to City requirements
Task 1: Alternatives Analysis
Site Assessment and Existing Conditions
• Conduct site visits to all three parking structures (919 Palm
Street, 842 Palm Street, 871 Marsh Street)
• Document existing parapet conditions, edge configurations,
and structural characteristics
• Evaluate grade changes and varying story heights at each
location
• Assess current aesthetic character and architectural
context of downtown environmentConceptual Design Options
RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 5
Safety Barrier Evaluation
• Analyze three mounting approaches: surface-mounted,
parapet-mounted, and recessed-mounted systems
• Develop conceptual fence layouts tailored to each
structure's unique geometry
• Prepare representative mounting and attachment details
with preliminary structural feasibility assessment
• Evaluate wind and seismic considerations per current
California Building Code (CBC)
Code Analysis
• Review building, accessibility, and fire/life safety code
impacts for each alternative
• Apply Crime Prevention Through Environmental Design
(CPTED) principles to maximize safety while maintaining
visual openness
• Assess aesthetic compatibility with downtown
architectural character through representative photo
simulations
Cost and Permitting Strategy
• Prepare order-of-magnitude construction cost estimates
with clearly stated assumptions and contingencies
• Identify anticipated permits and approval requirements
from City Building Division and other agencies having
jurisdiction
• Develop comparative analysis matrix to guide City
selection of preferred design direction
Deliverable: Alternatives Analysis Report with visual
simulations, cost comparisons, and recommendation
matrix
Task 2: Structural Analysis and 50% PS&E
Detailed Structural Evaluation
• Perform evaluation of existing parapets and edge
conditions at all three structures
• Identify anchorage locations considering structural
capacity and construction feasibility
• Conduct wind load analysis and seismic anchorage
review per current CBC requirements
• Prepare signed and stamped structural calculations
documenting design assumptions and load paths
Security Camera Infrastructure Planning
• Conduct site assessment for strategic camera placement
coverage
• Develop preliminary camera layout plans with electrical
and data routing concepts
• Coordinate with City IT requirements for camera system
integration
Cost Refinement
• Prepare 50% level cost estimate with assumptions, unit
costs, and contingency allowances
• Identify potential value engineering opportunities for City
consideration
Deliverable: 50% PS&E package including plans,
preliminary specifications, structural calculations, and
cost estimate
Task 3: 90% PS&E
Design Advancement
• Incorporate City comments from 50% review into refined
design documents
• Finalize fence layouts and structural attachment details
with dimensioning and specifications
• Electrical and data pathway design with conduit routing
and connection details
• Refine camera placements with coverage diagrams
demonstrating field-of-view analysis
Construction Planning
• Develop construction phasing plan minimizing disruptions
to parking operations
• Identify temporary traffic control measures and public
notification strategies
• Coordinate phasing approach with City parking
management staff
Technical Specifications
• Draft technical specifications covering materials, installation
methods, quality standards, and testing requirements
• Update 90% level cost estimate reflecting refined design
and construction approach
• Provide stamped structural calculations incorporating any
design refinements
Deliverable: 90% PS&E package suitable for Building
Permit submittal
Task 4: 100% PS&E and Permitting Support
Final Design Documentation
• Address City and plan check comments from 90% review
• Finalize plans and specifications suitable for permit
issuance and construction bidding
• Update 100% level construction cost estimate with final
quantities and current market pricing
• Provide signed and stamped structural calculations
reflecting final design
RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 6
Permitting Coordination
• Support City staff in responding to Building Division plan
check comments
• Coordinate with other reviewing agencies as needed (Fire
Marshal, accessibility review)
• Prepare clarifications or revisions required for permit
approval
Deliverable: 100% PS&E package ready for permit
issuance
Task 5: Final PS&E and Bidding Support
Bid-Ready Documents
• Produce final signed and stamped construction documents
incorporating permit comments
• Finalize construction cost estimate for City budgeting and
bid evaluation
• Prepare comprehensive bid package with clear scope
definition and technical requirements
Bidding Assistance
• Respond to bidder questions during bid period
• Prepare addenda as needed to clarify scope or address
field conditions
• Participate in pre-bid meetings to ensure contractor
understanding of project requirements
Deliverable: Final PS&E package and bidding support
services
Task 6: Construction Support Services
Construction Administration
• Review submittals and shop drawings for conformance
with design intent and specifications
• Respond to Requests for Information (RFIs) and
substitution requests in timely manner
• Conduct site visits at key construction milestones to
observe installation quality and code compliance
Project Closeout
• Review contractor-prepared record drawings
• Prepare final record drawings documenting as-built
conditions
• Support City final inspection and project acceptance
process
Deliverable: Construction support services and final
record drawings
Quality Control Throughout Each
Phase
• Continuous Internal Reviews: Quality Control Principal
reviews deliverables before City submission
• BIM Coordination: Utilize Building Information Modeling
(Revit) for 3D visualization and coordination among
disciplines
• Interdisciplinary Coordination: Regular coordination
meetings with structural, electrical, and security
consultants
• Code Compliance Verification: Ongoing review of
applicable codes and standards throughout design
development
• Constructability Focus: Identify practical installation
methods to minimize field conflicts.
Schedule Management
• Milestone Tracking: Monitor progress against established
schedule with proactive identification of potential delays
• City Review Accommodation: Build in City review periods
(3 weeks for Alternatives Analysis, 5 weeks for 50%, 7
weeks for 90% and 100%)
• Critical Path Management: Identify long-lead items and
permitting requirements early to avoid schedule impacts
• Flexible Resource Allocation: Adjust staffing levels as
needed to meet deadlines while maintaining quality
standards
Communication and Collaboration
• Regular Progress Updates: Monthly written progress
reports documenting accomplishments, upcoming tasks,
and any issues requiring City input
• Milestone Review Meetings: In-person or virtual meetings
after each major submittal (Alternatives Analysis, 50%,
90%, 100%)
• Responsive Communication: Timely responses to City
questions and requests throughout project duration
• Stakeholder Coordination: Facilitate communication
among City departments (Public Works, Building, Parking
Management) to coordinate unified project approach
RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 7
Relevant Experience
San Diego Unified School District
Wilson Middle School Parking Structure
As part of our design for this 14-acre middle school, RNT
also designed a 139,000 SF parking structure that is partially
underground and three stories above grade. A unique
feature of this structure is that it is topped with the school's
athletic courts, which warranted intense attention to safety
and security, including a full perimeter fence, intentional
lighting, and secure access.
San Diego City College
Parking Structure
The seven-story 154,500 SF Parking Garage serves as an
east entry point gate to the campus and a buffer to shield
the classrooms and common courtyard from street noise.
On the ground floor, the Military Education Department is
housed as well as leased space currently occupied by a
Community Health Clinic. Both of these spaces are serving
the public and are conveniently accessed right off Broadway
street. The parking structure is naturally ventilated and
provides approximate 400 new spaces for faculty, students
and visitors.
City of Oxnard
Oxnard Civic Center Parking Structure
Located near the historic downtown heart of the City of
Oxnard, the RNT designed parking structure has been a
positive addition to the urban fabric for the last 20 years.
The project features architecturally sensitive materials and
dynamic massing as well as incorporating:
• Sculptural spiral form of vehicle ramp between levels
• Public art and tile murals
• Stainless steel decorative shading mesh in a
• Street-level shading including trees and vines
• Retail space
RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 8
Long Beach Community College
Parking Structure
RNT designed this five-story parking structure for Long
Beach City College adjacent to four existing and future
campus and city green spaces. The structure includes
bicycle parking stalls, is partially shaded by a PV canopy,
and incorporates multiple living green walls, which support
the continuity of green spaces across multiple city blocks.
Ventura Unified School District
Anacapa Middle School Security Fencing
This project involves the general accessibility, playground,
and parking update, as well as fencing integration, for
the Anacapa Middle school. New fencing designed by
RNT combines prefabricated and custom perforated
metal panels to create a contemporary but playful
appearance at all main entrances of the campus, serving
as a representation of the school's image. New parking
layout and loading areas for students are designed to
improve circulation of traffic during school pick-up and
drop off hours, which has faced difficulties previously with
surrounding traffic conditions. Playground structures such
as tennis and basketball courts also received renovation
updates.
Palomar Community College District
Fencing Project
The Palomar College Fencing project was completed by
RNT Architects for the Palomar Community College District
in San Marcos, CA. RNT designed perimeter campus
portals and security fencing.
RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 9
Qualifications
Chris Bradbury, AIA, NCARB, LEED AP
Principal-In-Charge
Chris is a Principal with the firm and has been at RNT since 2012. He has more than
twenty years of experience in architectural design ranging from civic/institutional, higher
education, commercial, and multi-family housing development projects throughout
California. He has extensive experience with complex sites and climate responsive
design for an array of different environments. Chris brings a strong background
in developing projects from conceptual design through construction with thorough
coordination from consultants. He has astute technical knowledge relating to materials
and construction types with a focus on detailing and constructability. Chris also brings
keen Construction Administration/Observation skills to review construction progress
and identify issues with the owner and contractor early to ensure a successful project
outcome.
Project Experience
• City of Santa Maria Fire Station Programming Needs Assessment Study |
Santa Maria, CA
• City of Santa Maria Offices Programming | Santa Maria, CA
• City of Santa Maria Facilities Feasibility Study | Santa Maria, CA
• City of Marina Feasibility Study | Marina, CA
• Metropolitan Water District of Southern California Site-Wide Facility
Assessments, Planning & Design | Various Locations
• City of Agoura Hills Recreation, Administration and Event Center Renovation &
Expansion | Agoura Hills, CA
• United Water Conservation District, Office Remodel | Oxnard, CA
• County of Santa Barbara, New Probation Headquarters | Santa Barbara, CA
• Montecito Union School District Facilities Master Plan | Montecitio, CA
• Montecito Union School District On-Call Services | Montecitio, CA
−Buildings D & E Historic Renovation
−North Parking Access & Play Area
−Montecito Kitchen Remodel
• City of Oxnard, Senior Community Center Concept Study | Oxnard, CA
• Patagonia Office Building Feasibility Study and New Design | Santa Clara, CA
• UC Santa Barbara Lab Renovations | Santa Barbara, CA
• UC Santa Barbara Materials Research Lab Renovation and Seismic Retrofit |
Santa Barbara, CA
• Ojai Unified School District On-Call Services | Ojai, CA
−Nordhoff Library Renovation and Roof Replacement
−Matilija Dining Hall
−Matilija Roof Replacement
Professional Registration
Licensed Architect, CA, No.
C-35075
Education
Bachelor of Architecture, Minor
Sustainable Environments, Cal
Poly San Luis Obispo, 2007
Years of Experience
22 years
Years with RNT
13 years
RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 10
Ansgar Killing
Project Manager
As Project Manager and leader of RNT's San Luis Obispo office, Ansgar's work
focuses on local municipalities in the Central Coastal California region at the city and
county levels as well as public education institutions. Ansgar also leads RNT's Federal
Sector, managing projects with the US Air Force, NAVSEA, and USACE. Since 2007,
Ansgar has been a faculty member in Cal Poly’s Architecture Department where he
teaches professional practice and design studios.
Project Experience
• City of San Luis Obispo | San Luis Obispo, CA
−Downtown Lighting Project
−Morro Roof Replacement
−Golf Clubhouse Remodel (Design)
−Fire Station No. 1 Upgrades
• City of Santa Maria | Santa Maria, CA
−Facilities Feasibility Study
−Office Programming
−Fire Station Programming Needs Assessment Study
• City of Grover Beach | Grover Beach, CA
−Facility Condition & Needs Assessment
• City of Marina | Marina, CA
−Facilities Assessment Study & Concept Plan
−City of Marina On-Call City Hall Options
• Ventura County | Fillmore, CA
−Fillmore Fire Station Feasibility Study
• San Diego Unified School District | San Diego, CA
−Facility Conditions Assessment
• Housing Project for the Municipal Water District | Los Angeles, CA
• US Space Force | Vandenberg SFB, CA
−Vandenberg Base Southern District Master Plan & Infrastructure Projects
• US Air Force | Edwards AFB, CA
−Hangar Upgrade Projects
Professional Registration
Licensed Architect, Germany No.
BW-154960
Education
Masters of Science, Architecture,
Cal Poly San Luis Obispo, CA
Years of Experience
29 years
Years with RNT
5 years
RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 11
Years of Experience 11
Years with RNT 5
Professional Registration
Licensed Architect
Education
Bachelor of Architecture, NewSchool
Architecture and Design
Brian Iwasaki
Project Architect
Brian is a Project Architect at RNT, with more than 11 years of experience in all
phases of architecture and planning. Brian's portfolio includes a range of projects
such as educational facilities, feasibility studies, and civic and community centers.
He has varied experience throughout California and is passionate about creating
projects that enhance communities and facilitate positive impact.
Project Experience
• City of Ventura | Ventura, CA
− Barranca Vista Center Park Renovation
• Balboa Park Botanical Building - Historical Restoration
• Fallbrook Union Elementary School District | San Diego, CA
−San Onofre Elementary School Campus
−Mary Fay Pendleton Elementary School Campus
• San Diego Unified School District | San Diego, CA
−Wilson Middle School Campus
−Central Elementary School Campus
• Ojai Unified School District | Ojai, CA
−Roof Replacement of Multiple Campuses
−Matilija MS Locker Room
−Meiners Oaks Elementary School Library Conversion
• Newhall School District | Newhall, CA*
− Long Range Facilities Master Plan
• VUSD Lemon Grove Elementary School | Ventura, CA
−Classroom Conversion
• Colton Joint Unified School District | Colton, CA*
−Rogers ES PV Shade Structure
−Alice Birney Elementary School Interim Housing
• Walnut Valley Unified School District | Walnut Valley, CA*
−Various Shade Structure Projects
−Various Portable Classroom Projects
−Walnut HS Media Center Renovation
−CJ Morris Elementary School Classroom Addition
• University of California, Santa Barbara | Santa Barbara, CA*
−Broida Hall Physics Lab - Renovation
−UCSB Chemistry Building - Fume Hood Replacement
* Projects completed whilst with another firm
RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 12
Qualifications - Thoma
Anthony J. Zepeda
Project Manager – Electrical Engineer
Project Role
Electrical Engineering. As a Project Manager of the Electrical Engineering Division of Thoma Electric,
Inc., Mr. Zepeda is responsible for working closely with clients as well as other engineering disciplines
to take projects from a concept to a complete set of construction documents. He also conducts
lighting photometric studies as well as evaluates if a project is Title 24 compliant. Mr. Zepeda has
experience in a wide variety of design applications including single and multi-family residential
buildings, mixed use buildings, commercial buildings, fire stations, health care facilities, and
educational facilities. He has also been involved in multiple projects including design aspects such as
emergency generators, photovoltaic systems, and fire pumps.
Experience
Thoma Electric, Inc., 2014 – present,
Design Assistant / CAD Drafter, 2014 – 2016
Project Manager, 2016 - present
Responsible for managing multiple projects from initial concept through completion of construction.
Involved in sizing electrical services, generating power, lighting, and communications layouts to fit the
project’s needs, answering RFI’s, and reviewing submittals. Regularly coordinates with architect,
mechanical engineer, plumbing engineer, PG&E representatives, as well as other disciplines to
ensure all aspects of a project are addressed. Customers include Peoples’ Self Help Housing, The
Housing Authority of the County of Santa Barbara, The Music Academy of the West, and California
Polytechnic State University.
Design Assistant – University Housing, California Polytechnic State University, 2012 – 2016
Responsible for assisting the Senior Planner/Estimator/Scheduler in assessing and developing an
improvement plan for current facility conditions by performing quantity take offs, researching costs,
and developing implementation. Involved in creating a complete power distribution analysis of
University Housing facilities. Major projects include creating 3D models of student housing
dormitories and creating floor plan layouts for all agricultural housing units.
Education
California Polytechnic State University, San Luis Obispo
Bachelor of Science in Electrical Engineering, 2016
Honors: summa cum laude
Relevant Projects:
- San Luis Coastal Unified School District - Baywood Elementary Campus Replacement, Los
Osos, CA
- San Luis Coastal Unified School District - C.L. Smith Modernization Phases 1 and 2, San
Luis Obispo, CA
- San Luis Coastal Unified School District - Pacific Beach High School Campus Replacement,
Los Osos, CA
- San Luis Coastal Unified School District - Bishops Peak Elementary School Phases 1 and 2
New Classrooms and Modernization, San Luis Obispo, CA
- Central Union School District – Neutra Elementary School Modernizations, Lemoore, CA
Anthony J. Zepeda
Project Manager – Electrical Engineer
Project Role
Electrical Engineering. As a Project Manager of the Electrical Engineering Division of Thoma Electric,
Inc., Mr. Zepeda is responsible for working closely with clients as well as other engineering disciplines
to take projects from a concept to a complete set of construction documents. He also conducts
lighting photometric studies as well as evaluates if a project is Title 24 compliant. Mr. Zepeda has
experience in a wide variety of design applications including single and multi-family residential
buildings, mixed use buildings, commercial buildings, fire stations, health care facilities, and
educational facilities. He has also been involved in multiple projects including design aspects such as
emergency generators, photovoltaic systems, and fire pumps.
Experience
Thoma Electric, Inc., 2014 – present,
Design Assistant / CAD Drafter, 2014 – 2016
Project Manager, 2016 - present
Responsible for managing multiple projects from initial concept through completion of construction.
Involved in sizing electrical services, generating power, lighting, and communications layouts to fit the
project’s needs, answering RFI’s, and reviewing submittals. Regularly coordinates with architect,
mechanical engineer, plumbing engineer, PG&E representatives, as well as other disciplines to
ensure all aspects of a project are addressed. Customers include Peoples’ Self Help Housing, The
Housing Authority of the County of Santa Barbara, The Music Academy of the West, and California
Polytechnic State University.
Design Assistant – University Housing, California Polytechnic State University, 2012 – 2016
Responsible for assisting the Senior Planner/Estimator/Scheduler in assessing and developing an
improvement plan for current facility conditions by performing quantity take offs, researching costs,
and developing implementation. Involved in creating a complete power distribution analysis of
University Housing facilities. Major projects include creating 3D models of student housing
dormitories and creating floor plan layouts for all agricultural housing units.
Education
California Polytechnic State University, San Luis Obispo
Bachelor of Science in Electrical Engineering, 2016
Honors: summa cum laude
Relevant Projects:
- San Luis Coastal Unified School District - Baywood Elementary Campus Replacement, Los
Osos, CA
- San Luis Coastal Unified School District - C.L. Smith Modernization Phases 1 and 2, San
Luis Obispo, CA
- San Luis Coastal Unified School District - Pacific Beach High School Campus Replacement,
Los Osos, CA
- San Luis Coastal Unified School District - Bishops Peak Elementary School Phases 1 and 2
New Classrooms and Modernization, San Luis Obispo, CA
- Central Union School District – Neutra Elementary School Modernizations, Lemoore, CA
RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 13
Christopher M. Jose, BSEE
Electrical Designer
Project Role
Project Manager in preparing construction documents. Responsibilities include design of single line
diagrams, equipment schedules, lighting fixture applications and specifications, details, etc. for
Engineer’s review as well as calculations (voltage drop, short circuit, load summary, etc), panel
schedules, circuiting and Title 24 Lighting Energy Compliance Forms. Coordinate with architectural
Job Captain through each phase of project, as well as coordination with other team consultants.
Manage drafting staff during production of construction documents.
Experience
Thoma Electric, Inc., 2001 - present
Project categories include: Schools, Fire Stations, Banks, Churches, Tenant Improvement projects.
Specific projects include, Raymond Knowles Modernization, Delano Community School, Bakersfield
Fire Station No. 5 & 14, Fresno Fire Station No. 15, 16, 17 & 19, Livermore/Pleasanton Fire Station
#4, Sacramento Fire Station No. 5 & 20, San Jose Fire Station No. 34 & 35, Tulare Fire Station No. 1,
Turlock Fire Station No. 1, Santa Clara Fire Station No. 6, Santa Maria Fire Station No. 4 & 5, Wells
Fargo Bank, Alta One Bank CA City & Bishop, Mid State Bank, Atascadero Bible Church, Agape
Church of SLO, Santa Ynez Presbyterian Church Sanctuary, Cambria Christian Fellowship Church,
Highland Presbyterian Church, Mountainbrook Church, Surgery Center of Santa Maria, Madonna Inn
Pool & Spa, Giuseppe’s Italian Restaurant, Woodland Nipomo Clubhouse, SLO Court House, Santa
Cruz City Hall Annex Bldg, Highway 46 Shell Station, Chevron Gas Station at Pismo Beach.
Integrated Design, by SOMAM, 2000 - 2001
Drafting and Design in this Fresno Architectural Firm. Assisting Electrical Engineer in school
modernization projects, portable classroom additions, and new school projects in the Fresno/Clovis
District. Experience with Elementary Schools, High Schools, Higher Education, and Adult Education.
Education
California Polytechnic State University, San Luis Obispo
Bachelor of Science in Electrical Engineering, 2000
Affiliations
Institute of Electrical and Electronic Engineers
RELEVANT PROJECTS
• Riverstone Fire Station, Madera, CA
• Long Beach Fire Stations 12 and 24
• Sanger Fire Station Bridging Documents, Sanger, CA
• Santa Barbara Regional Fire Communications Facility, Santa Barbara, CA
• Ventura County Fire Department Headquarters and Training Center
• Hanford Public Safety Center, Hanford, CA
• Healdsburg Fire Substation, Healdsburg, CA
• Santa Paula Fire Station #29. Santa Paula, CA
• Madera Fire Station #3, Madera, CA
• San Jose Fire Stations 8 and 32
• Thousand Oaks Fire Station #34, Thousand Oaks, CA
• Redwood Fire Station, Redwood Estates, CA
RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 14
Jeff Thoma, P.E. –President
Electrical Engineering Division Manager/Electrical Designer
Project Role
As Electrical Engineering Division Manager, Jeff will oversee the Project Manager of the project for Thoma Electric,
Inc. He will coordinate with the Architect and other consultants during each milestone phase of work and will be their
escalation path for the course of the project. Jeff will work closely with the Thoma Electric Project Manager and other
Consultants in preparing construction documents. Jeff’s responsibilities include reviewing single line diagrams,
schedules, details, etc. as well as calculations (voltage drop, short circuit, load summary, etc.), panel schedules,
circuiting and Title 24 lighting compliance forms. Jeff will have on-going coordination with the Architectural Principals
through each phase of project and managing the Project Manager during production.
Experience
Thoma Electric, Inc., April 2016 – present
Electrical Engineering Project Manager/Electrical Designer
Responsible for electrical design from project concept to construction documents and contract administration.
Experience with communications networks, power distribution, fire alarm, wireless access technologies,
telephone systems, lighting controls, etc. for school campuses.
Apple, Inc. – 2009 – 2016
Hardware Systems Integrator
Electrical hardware design and test. Managed other electrical engineers both full time and part time.
Kyocera Wireless, Inc. – 2006 – 2009
Hardware Engineer
Responsible for baseband design and implementation of wireless handsets for multiple major US and worldwide
cellular carriers. Duties included project concept kickoff, schematic design, PCB layout, factory support, cross-
functional coordination of other electrical and mechanical disciplines, product launch, and failure analysis.
Relevant skills include design and analysis of display interfaces, memory interfaces, I/O and peripheral
interfaces, power management, and thermals. This role included regular oversight of team members in multiple
continents and time zones, executive reporting when necessary, supplier management, as well as deep
knowledge of electrical hardware systems for high performing wireless handsets.
Relevant Firm Project Experience
Camp San Luis Building 754, San Luis Obispo, CA
Cheng Park Revitalization, San Luis Obispo, CA
County of Education Workforce Building, San Luis Obispo, CA
County of San Luis Obispo Campaneros Campground, San Luis Obispo, CA
County of San Luis Obispo Grand Jury Building, San Luis Obispo, CA
County of San Luis Obispo Hearing Room Upgrade, San Luis Obispo, CA
County of San Luis Obispo Office Building New Generator, San Luis Obispo, CA
County of San Luis Obispo Parks and Recreation Building Interior Lighting, San Luis Obispo, CA
El Chorro Regional Park, San Luis Obispo, CA
Mission Plaza Restrooms, San Luis Obispo, CA
San Luis Obispo Behavior Health Diversion Building, San Luis Obispo, CA
San Luis Obispo Behavior Health Sallyport, San Luis Obispo, CA
San Luis Obispo Court Annex A/C Upgrade, San Luis Obispo, CA
San Luis Obispo Health Department Lighting, San Luis Obispo, CA
San Luis Obispo Veteran’s Memorial Building, San Luis Obispo, CA
Education
University of California at San Diego, San Diego
Bachelor of Science in Electrical Engineering, 2006
Registrations
Registered Professional Engineer – License No. E20823
RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 15
Qualifications - Stork, Wolfe & Associates
STORK, WOLFE & ASSOCIATES
Stork, Wolfe & Associates is a structural and earthquake engineering firm located in San
Luis Obispo, California. Stork, Wolfe & Associates provides services to architects,
building owners, schools, commercial institutions, government agencies, and other clients
in the following areas:
Structural Engineering. Structural design services include:
• Construction documents and calculations for new buildings
• Construction documents and calculations for rehabilitation, tenant
improvement, and seismic retrofit for existing buildings
• Structural reports for studies and investigations
Earthquake Engineering. Earthquake Engineering services include:
• Seismic evaluation and vulnerability assessments of existing buildings and
facilities
• Recommending design criteria for Essential Facilities
• Special studies and investigations.
Stork, Wolfe & Associates was founded by Gregory Stork and Justin Wolfe, both natives
of San Luis Obispo. After attending separate colleges and working for various structural
engineering companies throughout California they were reunited in Santa Barbara while
working for Howard and Van Sande Structural Consultants. After working together for
several years in Santa Barbara, they both decided to relocate their families to San Luis
Obispo, and in December 2007 they started Stork, Wolfe & Associates.
Stork, Wolfe and Associates has extensive experience in a broad range of structural
design and analysis. They have provided structural and earthquake engineering services
for historic structures, new and existing Essential Facilities, unreinforced masonry
retrofits, performing arts buildings, university and K-12 structures, municipal buildings,
healthcare facilities, specialized foundation systems, retaining and site structures,
commercial buildings, and high-end custom residential projects.
For further information, please contact us at:
Stork, Wolfe & Associates
555 Chorro Street, Suite A1
San Luis Obispo, CA 93405
(805) 548-8600
www.swa-engineers.com
RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 16
REPRESENTATIVE PROJECTS
MUNICIPAL PROJECTS
Hearst Castle Bus Maintenance Facility – San Simeon, California
Client: California State Parks
Architect: Ten Over Studio
Date of Completion: Currently in Construction
Remodel and addition to the existing bus maintenance facility at Hearst Castle.
Righetti Ranch Community Park – San Luis Obispo, California
Client: City of San Luis Obispo
Architect: RRM Design Group
Date of Completion: Currently in Construction
Design of post-tensioned slab-on-grade basketball, tennis, and pickleball courts,
as well as CMU site and retaining walls.
Evidence Vehicle Storage Facility – San Luis Obispo, California
Client: County of San Luis Obispo
Architect: none
Date of Completion: 2025
New 7,800 SF open steel-framed structure for evidence vehicle storage.
Santa Barbara County Courthouse Re-Roof Project – Santa Barbara, California
Client: County of Santa Barbara
Architect: Architectural Resources Group
Date of Completion: 2025
Re-roof and exterior structural repairs at the historic Santa Barbara County
Courthouse in downtown Santa Barbara.
Carrillo Gymnasium Renewal – Santa Barbara, California
Client: City of Santa Barbara
Architect: Architectural Resources Group
Date of Completion: 2025
Exterior restoration and repairs of the historic Carrillo Gymnasium in downtown
Santa Barbara.
RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 17
GREGORY STORK
EDUCATION
Bachelor of Science, Civil Engineering 1996
Santa Clara University
Master of Engineering, Civil Engineering 1997
Cornell University
REGISTRATION
California, Civil Engineer, No. 62389
California, Structural Engineer, No. 4981
BACKGROUND & EXPERIENCE
After graduating from the Cornell University in 1997, Gregory Stork moved to San
Francisco where he worked for R.P. Gallagher Associates. Projects included several
seismic retrofits including non-ductile concrete buildings and several unreinforced
masonry structures. He also performed several non-linear static pushover analyses using
the criteria of FEMA 356 (currently known as ASCE 41-17).
After five years of working with existing structures, Mr. Stork began working for KPFF
in San Francisco to broaden his exposure to new design projects. These projects included
both commercial buildings and hospitals.
In 2003, Mr. Stork, a native of San Luis Obispo, moved back to the Central Coast to raise
his family. He worked remotely for Howard Structural Group’s Carpinteria office before
opening and running their San Luis Obispo office in 2006, providing engineering services
to their Central Coast clients. Mr. Stork has extensive experience designing seismic
retrofits for several historic buildings in the Santa Barbara and San Luis Obispo area,
including the 9-story Granada Theater and Tower, and the City of Santa Barbara Fire
Station No.1. Many of the structures Mr. Stork has worked on have lacked original or as-
built construction drawings. Because of this, he has spent countless hours of field
investigation to get a better understanding of strengths, weaknesses and expected
behavior of each individual structure. His experience also includes municipal projects,
university structures, public schools, several performing arts structures, health care
facilities, high-end custom homes, and commercial buildings constructed of all materials.
Currently Mr. Stork is a Co-Principal for Stork, Wolfe & Associates, a Structural
Engineering firm located in San Luis Obispo.
RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 18
JUSTIN WOLFE
EDUCATION
Bachelor of Science, Structural Engineering 1996
University of California San Diego
Master of Science, Civil Engineering 1997
University of California Los Angeles
REGISTRATION
California, Civil Engineer, No. 63735
BACKGROUND & EXPERIENCE
After graduating from the University of California, Los Angeles in 1997, Justin Wolfe
moved to his hometown of San Luis Obispo, California, where he worked for Omni
Design Group as a Junior Engineer. Projects included residential, commercial, and
cellular site projects.
After three successful years in San Luis Obispo, Mr. Wolfe moved to the Santa Barbara
area and joined Howard and Van Sande Structural Consultants, Inc., as a Project
Engineer. Projects included peer review of University structures, high-end residential
including seismic retrofits and remodels, public and government buildings as well as
seismic upgrades for unreinforced masonry structures.
After four years in the Santa Barbara office, Justin moved back to the San Luis Obispo
area to raise his family. Mr. Wolfe joined Allshouse Engineering of Pismo Beach,
California where he worked as Project Engineer. Duties included training junior
engineers, procuring projects, office development, and various day-to-day business
applications. Design projects included residential, commercial, and mixed-use structures
throughout the state of California.
Currently Mr. Wolfe is a Co-Principal for Stork, Wolfe & Associates, a Structural
Engineering firm located in San Luis Obispo
RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 19
Qualifications - Hunter Pacific
V
HHuunntteerr PPaacciiffiicc GGrroouupp -- FFiirrmm PPrrooffiillee
As a Woman-Owned Small Business (WOSB), Hunter Pacific has over 25 years in the Local City, County,
and Municipal Market Sector including clients in the County of San Luis Obispo, the City of San Diego as
well as the Federal Government such as the U.S. Army Corps of Engineers, NAVFAC Southwest and many
others. We are a professional firm specializing in Cost Estimating/Engineering, Scheduling and Cost &
Schedule Risk Analysis (CSRA). Our team supports public agencies and institutional clients through the
planning, design, and construction phases by delivering accurate, reliable, and defensible cost opinions
that support informed decision-making. Drawing on proven estimating methodologies and industry-
standard tools, we apply our experience to projects that require careful coordination, regulatory
awareness, and disciplined cost control throughout the project lifecycle.
Hunter Pacific Group’s estimating team is internally trained in all aspects of design and construction, with
specialized expertise across all building systems, including structural, mechanical, electrical, and energy
systems. Our professionals are proficient in industry-standard tools such as MCACES MII, Primavera P6,
Crystal Ball, and other cost and scheduling platforms commonly used on public-sector projects. We
provide a full range of estimating and cost management services, including:
• Scope versus budget reconciliation
• Cost estimating for master planning, feasibility studies, programming, schematic design, design
development, and construction documents
• Cost management, including budget development, rough order of magnitude (ROM) estimates,
grossing, bid packaging, and bid reconciliation
• Soft cost estimating, including A/E fees, agency approvals, equipment, and FF&E
• Value engineering, risk analysis, cash flow analysis, and lifecycle cost evaluation
• Scheduling review, baseline schedules, monthly updates, and time impact analysis
• Claims analysis and negotiation support
• Independent cost estimating peer review services
More specifically, Hunter Pacific Group provides cost estimating support beginning at project initiation,
reconciling scope and budget at kickoff and delivering real-time cost estimates at key design milestones.
During construction, we continue to support our clients through construction document quality assurance
and control reviews, validation of pre-change order documentation, and detailed change order analysis.
This comprehensive, end-to-end approach allows us to effectively support municipal clients in delivering
public safety, police, and public works operations facilities that meet budget, schedule, and performance
objectives.
Project References
Project: NAVFAC Southeast, P683 Parking Structure, Naval Air Station Jacksonville, FL
Description: Developed MII cost estimates at the 65%, 100%, and Final 100% design stages,
Primavera P6 construction schedules, and CSRA reports at each design phase, supported by VE
study and CSRA workshop for a new 5-story, 28,635.41 m2 precast garage for the Fleet
Readiness Center at Naval Air Station Jacksonville in FL. This design-bid-build project
accommodates 839 stalls, along with Parking Lot A (150 gravel spaces) and Parking Lot B (288
spaces). Cost: $59.47M; Fee: $70,042
V
HHuunntteerr PPaacciiffiicc GGrroouupp -- FFiirrmm PPrrooffiillee
As a Woman-Owned Small Business (WOSB), Hunter Pacific has over 25 years in the Local City, County,
and Municipal Market Sector including clients in the County of San Luis Obispo, the City of San Diego as
well as the Federal Government such as the U.S. Army Corps of Engineers, NAVFAC Southwest and many
others. We are a professional firm specializing in Cost Estimating/Engineering, Scheduling and Cost &
Schedule Risk Analysis (CSRA). Our team supports public agencies and institutional clients through the
planning, design, and construction phases by delivering accurate, reliable, and defensible cost opinions
that support informed decision-making. Drawing on proven estimating methodologies and industry-
standard tools, we apply our experience to projects that require careful coordination, regulatory
awareness, and disciplined cost control throughout the project lifecycle.
Hunter Pacific Group’s estimating team is internally trained in all aspects of design and construction, with
specialized expertise across all building systems, including structural, mechanical, electrical, and energy
systems. Our professionals are proficient in industry-standard tools such as MCACES MII, Primavera P6,
Crystal Ball, and other cost and scheduling platforms commonly used on public-sector projects. We
provide a full range of estimating and cost management services, including:
• Scope versus budget reconciliation
• Cost estimating for master planning, feasibility studies, programming, schematic design, design
development, and construction documents
• Cost management, including budget development, rough order of magnitude (ROM) estimates,
grossing, bid packaging, and bid reconciliation
• Soft cost estimating, including A/E fees, agency approvals, equipment, and FF&E
• Value engineering, risk analysis, cash flow analysis, and lifecycle cost evaluation
• Scheduling review, baseline schedules, monthly updates, and time impact analysis
• Claims analysis and negotiation support
• Independent cost estimating peer review services
More specifically, Hunter Pacific Group provides cost estimating support beginning at project initiation,
reconciling scope and budget at kickoff and delivering real-time cost estimates at key design milestones.
During construction, we continue to support our clients through construction document quality assurance
and control reviews, validation of pre-change order documentation, and detailed change order analysis.
This comprehensive, end-to-end approach allows us to effectively support municipal clients in delivering
public safety, police, and public works operations facilities that meet budget, schedule, and performance
objectives.
Project References
Project: NAVFAC Southeast, P683 Parking Structure, Naval Air Station Jacksonville, FL
Description: Developed MII cost estimates at the 65%, 100%, and Final 100% design stages,
Primavera P6 construction schedules, and CSRA reports at each design phase, supported by VE
study and CSRA workshop for a new 5-story, 28,635.41 m2 precast garage for the Fleet
Readiness Center at Naval Air Station Jacksonville in FL. This design-bid-build project
accommodates 839 stalls, along with Parking Lot A (150 gravel spaces) and Parking Lot B (288
spaces). Cost: $59.47M; Fee: $70,042
RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 20
V
HHuunntteerr PPaacciiffiicc GGrroouupp -- FFiirrmm PPrrooffiillee
Project: NAVFAC Southwest, Road Repairs from Damage by MILCON Traffic, Naval Air
Weapons Station China Lake, CA
Description: Hunter Pacific’s team of cost estimating professionals attended a Charrette Design
review meeting, CSRA Workshop, prepared a Cost, Schedule and Risk Analysis report, and Cost
Estimate submittals for 100% Pre-Final and Final DB RFP. This project aims to repair 50 miles of
roadways that were damaged by construction traffic at Naval Air Weapons Station China Lake,
stemming from the initial MILCON repairs addressing earthquake damage across the base.
Damaged roads will be repaired with new asphalt. This project will be divided into 5 different
sections to allow for the flexibility of value engineering: (1) Demolition Improvements, (2)
Earthwork Improvements, (3) Street Improvements, (4) Drainage Improvements, and (5) Traffic
Improvements. Cost: $113M; Fee: $128K
Project: NAVFAC Southwest, P2002 Combat Logistics Battalion Facilities, Marine Corps Base
Camp Pendelton, CA
Description: Hunter Pacific Group provided cost estimating and cost, schedule and risk analysis
services for the P2002 Combat Logistics Battalion (CLB) Facilities at Marine Corps Base Camp
Pendleton, CA. Our team of cost estimators provided a Pre-Final and Final Estimate utilizing
MCACES MII. Construction schedule was also provided with P6 software. The team also
provided a Cost and Schedule Risk Analysis report. The contingency factors for both cost and
schedule were calculated at the 85 percent confidence level, risk-averse, as requested by
NAVFAC SW. The CLB Marine Expeditionary Units (MEUs) were activated as part of the 2007
Force Structure Review Group Initiative. Marine Corps Base Camp Pendleton lacked existing
vacant facilities necessary to adequately support the operational, logistical, and administrative
requirements of the newly established CLB MEUs. Due to a lack of vehicle maintenance bays,
most first and second-echelon vehicle maintenance is performed outdoors. Due to a lack of
secured indoor storage, gear is stored outdoors in container boxes. The P2002 project supports
the improvement plan to provide adequate and efficiently configured administrative,
classrooms, auto organizational maintenance, communications and electronic systems
maintenance, storage facilities, and paved parking to support two Combat Logistics Battalions
(CLB-1 and CLB-5). Cost: $198.4M; Fee: $105K
RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 21
Senior Cost Estimator
DAVID COLERA | CEP, EIT, CQM-C
Hunter Pacific Group
Education
BS, Civil Engineering
San Diego State University
Certifications
Certified Estimating
Professional (CEP)
#CEP-781
Engineering in Training
(EIT), No.170544
Construction Quality
Management for
Contractors (CQM-C)
Areas of Expertise
Cost Estimating
Scheduling
Rough Order of Magnitude
(ROM)
Conceptual Design
Schematic Design
Detailed Estimates
Construction Documents
Training
Excel
MCACES MII
Microsoft Project
Primavera P6
On-Screen Takeoff
Crystal Ball, @Risk, Safran
Mr. Colera’s expertise stems from his extensive education in
engineering and his deep understanding of all phases of
design and construction. He supports project teams in every
aspect of cost estimating and cost management, preparing
conceptual and planning budgets, ROM estimates, schematic
and design development estimates, construction document
estimates, and detailed preconstruction analyses.
With a strong focus on delivering projects on time and within
budget for the past seven years, Mr. Colera contributes to
feasibility studies, design charrettes, functional analysis
sessions, and value engineering studies, as well as life-cycle
cost and risk management analyses. He supports all phases of
a project through his technical expertise and proficiency in
advanced estimating software. He brings a comprehensive
understanding of costs at every stage, from soft and hard costs
to contingencies and escalation.
COST ESTIMATING PROJECT EXPERIENCE
Cal Poly SLO, Animal Health Center and Plant Science
3rd Party Validation | San Luis Obispo, CA
Cal Poly SLO, Phasing Improvements | San Luis Obispo,
CA
Cal Poly SLO, Wastewater Reclamation
Cal Poly SLO, Water Infrastructure Improvements
College of the Desert, Palm Springs Development
Project | Palm Springs, CA
College of the Desert, Roadrunner Motors Automotive
Training Campus | Palm Springs, CA
UCSF New Ambulatory Care Center, Mission Bay Block
34 | San Francisco, CA
UCSB Biology II Fly Lab Renovation | Santa Barbara, CA
UCSB Mosquito Lab Expansion | Santa Barbara, CA
UCSB Child Care Center | Santa Barbara, CA
UCSB Innovation Lab | Santa Barbara, CA
UCSB Biology II Neuroscience Lab | Santa Barbara, CA
UCSB Broida Hall Patterson Optics Lab | Santa Barbara,
CA
UCSB Cloud Renovation | Santa Barbara, CA
UCSD Birch Aquarium New Exhibits | La Jolla, CA
RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 22
Project Schedule
• 05/08/2026: Purchase Order issued (RFP p.3, section 9), one week delay (Amend1)
• 05/15/2026: As-built documentation provided by the City
• 05/22/2026: Site visit complete
Task 1
• 06/05/2026: Task 1 - Alternatives Analysis submitted to City
• 06/26/2026: Task 1 - Alternatives Analysis City Review complete (3 weeks)
Task 2
• 07/10/2026: Task 2 - Structural Analysis and 50% PS&E submitted to City
• 08/14/2026: Task 2 - Structural Analysis and 50% PS&E City Review complete (5 weeks)
Task 3
• 08/28/2026: Task 3 - 90% PS&E submitted to City
• 10/16/2026: Task 3 – 90% PS&E City Review complete (7 weeks)
Task 4
• 10/30/2026: Task 4 - 100% PS&E submitted to City, ongoing permitting support
• 12/18/2026: Task 4 - 100% PS&E City Review complete (7 weeks)
Task 5
• 01/08/2027: Task 5 - Final PS&E submitted to City, ongoing Bidding Support
Task 6
• 04/01/2027: Task 6 - Construction Support Services start (estimated)
• 09/30/2027: Task 6 - Construction Support Services end (estimated)
Fee Proposal City of San Luis Obispo
Parking Structure Safety Element Research and Design
Task 0: Project Management and Coordination 9,180.00$
Task 1: Alternatives Analysis 33,750.08$
Task 2: Structural Analysis and 50% PS&E 25,670.82$
Task 3: 90% PS&E 42,888.88$
Task 4: 100% PS&E and Permitting Support 16,918.24$
Task 5: Final PS&E and Bidding Support 10,813.21$
Task 6: Construction Support Services 22,716.00$
Task 1 - 6 Fee 161,937.24$
City of San Luis Obispo
Parking Structure Safety Element Research and Design
Task 0: Project Management and Coordination 9,180.00$
Task 1: Alternatives Analysis 33,750.08$
Task 2: Structural Analysis and 50% PS&E 25,670.82$
Task 3: 90% PS&E 42,888.88$
Task 4: 100% PS&E and Permitting Support 16,918.24$
Task 5: Final PS&E and Bidding Support 10,813.21$
Task 6: Construction Support Services 22,716.00$
Task 1 - 6 Fee 161,937.24$
City of San Luis Obispo
Parking Structure Safety Element
Research and Design
RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 24
REFERENCES
Describe fully the last three contracts performed by your firm that demonstrate your ability to provide the services
included with the scope of the specifications. Attach additional pages if required. The City reserves the right to
contact each of the references listed for additional information regarding your firm's qualifications.
Reference No. 1
Customer Name
Contact Individual
Telephone & Email
Street Address
City, State, Zip Code
Date of Services
Contract Amount
Description of Services
Project Outcome
Reference No. 2
Customer Name
Contact Individual
Telephone & Email
Street Address
City, State, Zip Code
Date of Services
Contract Amount
Description of Services
Project Outcome
References
County of Santa Barbara, New Probation Headquarters Building
Shane Mahan, Assistant Director General Services
805-689-1423, smahan@countyofsb.org
105 E. Anapamu Street, B-5
Santa Barbara, CA 93101
September 2020 - Ongoing
$2,146,434
RNT was hired by the County of Santa Barbara to assist with the relocation of the
Santa Barbara Probation Department through programing, site evaluation, and
conceptual design.
The project evaluates the feasibility and provides conceptual design and programming
for relocating staff from two different campuses on the south coast to a central facility
in downtown Santa Barbara.
San Diego Unified School District
Francisco Campuzano, Senior Project Manager
858-637-3519, fcampuzano@sandi.net
3838 Orange Ave
San Diego, CA 92105
November 2013 - April 2021
Varies
RNT has completed multiple projects with San Diego Unified School District, with
five currently underway. Most of these projects have been large-scale renovations
that include enhancing campus security, including improved fencing, lighting, security
technology, wayfinding, circulation, and access.
We have a long, positive project history with this District, going back more than a
decade, and are frequently selected for new work based on prior project successes.
Most of our work for the District has been large-scale facility modernizations and site
security enhancements balanced with artful design that enhance the public sphere
and user experience.
RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 25
Parking Structure Safety Element Page 6 of 6
Reference No. 3
Customer Name
Contact Individual
Telephone & Email
Street Address
City, State, Zip Code
Date of Services
Contract Amount
Description of Services
Project Outcome
San Diego Community College District
Lance Lareau, Dsitrict Manager
619-388-6546, llareau@sdccd.edu
SDCCD, Facilities Management Dept, Room 310, 3375 Camino Del Rio South
San Diego, CA 92105
2008 - Current
Varies
RNT Architects has worked closely with the District and project stakeholders to develop
multiple projects in recent years, including the Downtown San Diego’s City College
Campus: a 128,000 SF five-story Arts and Humanities building has a below-grade 40-
car parking structure and a 62,000 SF new three-story Business Technology building.
San Diego Community College has been a long-term client of RNT, following
community and energy focused projects that have resulted in many LEED certifications
and design awards alike.
RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 26
Assumptions and Exclusions
Scope Assumptions and Exclusions
RNT’s proposal is calculated based on the assumptions and exclusions listed below.
1. General Assumptions and Exclusions
1.1. Assumptions
1.1.1. Art District Parking Structure safety and security elements (netting and
surveillance) is intended as the safety element standard for the upgrade
of the three existing parking structures
1.1.2. All three parking structures will be upgraded simultaneously or phased in
close succession in a single contract, only if required to minimize
disruptions for parking operations. Scope for bidding support, CA, and
CE is not expected to adjust for execution over multiple years
1.1.3. All three parking structures will be covered under a single construction
contract.
1.1.4. The structural analysis is restricted to the attachment of proposed safety
elements to the structures
1.1.5. City provides as-built drawings in digital format (CAD or PDF) within three
(3) business days of the award
1.1.6. City is responsible for Payment of Authority Having Jurisdiction fees
1.1.7. Council Meetings are attended by the architect per request
1.1.8. Progress payments as percentages complete on a monthly basis
1.2. Exclusions
1.2.1. Any other service not described within the scope described herein
1.2.2. Development of Owners project requirements
1.2.3. Preparation of “as-built” drawings from Contractor’s mark-up.
1.2.4. Changes in design, program, budget, or schedule following interim
approvals.
1.2.5. Revising design documents (drawings, specifications, etc.) to
incorporate design changes proposed by “value engineering” (V.E.).
1.2.6. Preparation of phased construction documents
1.2.7. Performing a security risk assessment for the three parking structures
1.2.8. Hazardous material evaluation / removal
1.2.9. Changes required due to unanticipated field conditions
1.2.10. Modifications to buildings and/or demolition to gain access to in-wall,
underground, etc. conditions that are not plainly observable through
facility observation only
1.2.11. Engineering, estimator subconsultant attendance at Council meetings
1.2.12. Reimbursable expenses for the direct benefit of the City (e.g., physical
drawing sets/copies for permitting, presentations, stakeholder copies,
record documents. These may be billed to the City or use a City’s
preferred vendor (with prior approval)
2. Structural Engineering Assumptions and Exclusions
2.1. Assumptions
2.1.1. Client provides structural calculations in digital format if needed
2.2. Exclusions
RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 27
2.2.1. Investigation of structural components in inaccessible areas (attic,
crawlspaces, destructive surveying)
2.2.2. Services outside the generally accepted scope for the practice of
Structural Engineering
2.2.3. Seismic retrofits of other structural upgrade design, including parapet
strengthening if needed
2.2.4. Detailed review of engineering design work completed by others.
2.2.5. Preparation of demolition drawings, site surveys or building services
surveys
2.2.6. Material testing or Special Inspection Services, including selective
demolition and/or removal for structural inspection
3. Electrical Engineering Assumptions and Exclusions
3.1. Assumptions
3.1.1. City staff, and/or its camera vendor, will be available for review and
comment regarding camera placement, equipment specification, and
video surveillance system performance requirements for our use in
preparation of plans and specifications
3.1.2. Interviews (if necessary) will be conducted virtually or on-site during the
observation of field conditions while Electrical Engineering is on-site.
3.1.3. Capacity of existing equipment is adequate for proposed new load
3.2. Exclusions
3.2.1. Preparation of full electrical drawings in REVIT/BIM software
3.2.2. Preparation of utility application for new service
3.2.3. Physical access control systems (PACS) and/or elements beyond
cameras (e.g., card readers, gate-operators, intercom, speakers,
intrusion detection
3.2.4. Upgrade of existing serving electric utility to accommodate added load
under this project
3.2.5. Coordination with electrical utility company and application for energy
rebate programs
3.2.6. Application for service, fees, excess wire charges, engineering retainers,
etc. that may be required of the Owner by each utility
3.2.7. Surveying of any existing utility services within property, through property
or along property frontage or as required to accommodate project
3.2.8. Development of specifications booklet for electrical,
telecommunications, specialized systems or fire alarm systems.
3.2.9. Load recordings using recording ammeters for the purposes of
determining electrical system capacity
4. Cost Estimation Assumptions and Exclusions
4.1. Assumptions
4.1.1. Printed hardcopies of documents required for estimating purposes and
pdf files are provided by the client (true half size required)
4.2. Exclusions
4.2.1. Field Investigation
4.2.2. Life Cycle Cost Analysis
4.2.3. Estimation reconciliation with other estimates or contractor bids
4.2.4. Out-of-Office meetings
4.2.5. Cost Estimate Adjustments for Addenda issued after any completed
Estimate Milestone had been issued