Loading...
HomeMy WebLinkAboutCity of SLO PW_RFQ for On-Call Consultants x RNT Architects_UdpatedCity of San Luis Obispo Response to RFP for: Parking Structure Safety Element Research and Design April 17, 2026 RNT Architects | 762 Higuera Street, Suite 218, San Luis Obispo, CA | 805.626.5330 | rntarchitects.com RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 2 Table of Contents 3 4 7 9 22 23 24 26 Cover Letter Understanding of the Project and Technical Approach Relevant Experience Qualifications Project Schedule Fee Proposal References Assumptions and Exclusions RNT Architects | 872 Higuera Street, San Luis Obispo, CA 93401 | 619.233.1023 | rntarchitects.com Ralph Roesling Chikako Terada Joe Mansfield Raúl Díaz Rommel Olaes Tyson Cline Rick España Gemma Hsiueh Chris Bradbury Brandon Martella RNT Architects | 762 Higuera Street, Suite 218, San Luis Obispo, CA | 805.626.5330| rntarchitects.com Attn: Michael Swartz City of San Luis Obispo Public Works 919 Palm Street San Luis Obispo, CA 93401-3934 RE: RFQ for On-Call Consultants, Parking Structure Safety Element Research and Design Dear Mr. Swartz and Selection Committee, RNT Architect’s (RNT) is pleased to submit its response to the City of San Luis Obispo's Request for Proposal. We acknowledge the original RFP dated March 23, 2026, and the Addendum dated April 02, 2026. The City’s initiative to enhance the safety and security of these three downtown structures is a very important measure for the public sphere in San Luis Obispo. Roesling Nakamura Terada Architects, Inc. (RNT) brings highly relevant life safety and security expertise from civic projects across California, many of which were designed to comply with Division of the State Architect (DSA) requirements. Our portfolio includes public safety facilities, several security enhancement projects, as well as multiple parking structures with roof-level fencing and digital surveillance features. Local Service RNT’s office is located within walking distance of the three project sites, which means our Project Manager, Ansgar Killing, and Project Architect, Brian Iwasaki, can easily attend site meetings and address existing conditions. Additionally, our engineering consultants, with whom we have successful prior experience, are local to San Luis Obispo. Client and Community Prioritization We value projects that serve and strengthen communities, from small-scale interventions and renovations to new-builds and master plans. Our design approach prioritizes intentional listening, clear communication with you as our client, and striking a balance between aesthetic quality and functional value. With 46 years of public sector expertise, we understand the need to execute projects like this within a well-managed budget and schedule, and a quality end product for your end users is paramount. On behalf of RNT, we thank you for the opportunity to submit our proposal for the Parking Structure Safety Element Research and Design project. Sincerely, Chris Bradbury, AIA, NCARB, Principal-In-Charge Roesling Nakamura Terada Architects, Inc. RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 4 Understanding Of The Project Our team has carefully reviewed the RFP, visited the City’s various parking structures multiple times, and conducted a preliminary assessment of the scope and the budget that was communicated via Amendment 1. Challenge It is our understanding that the City would like to establish safety elements that provide a consistent safety approach throughout the City’s parking structures. Given the layout, construction, and varying heights of the three structures, safety elements will require customization to meet unique conditions. At this same time, the City is aware that the cost for the safety standard as implemented at the new Art District Parking Structure may exceed the City’s budget for design and construction. Approach Using as-built drawings provided by the City, our team will create CAD backgrounds for all three existing parking structures. At the site visit, the engineering team will associate typical mounting scenarios to standard conditions and identify special conditions that will require customization of mounting solutions. Our team is proposing an early outreach to preferred vendors and manufacturers to align scope, budget, and schedule. If the City is open to this approach, design fees in particular for electrical engineering could be further reduced. In close collaboration with the Public Works staff, our team will then refine budget, schedule, and quality parameters during the development of 50% and 90% design documents. Project Technical Approach Project Management and Coordination • Dedicated Project Manager: Assign a single point of contact responsible for schedule, budget, and communication throughout project duration • Proactive Schedule Management: Develop and maintain detailed project schedule using Microsoft Project, tracking tasks, milestones, and critical path items • Regular Communication Protocol: Establish clear lines of communication with City staff through monthly progress updates, meeting agendas, and documented meeting summaries • Integrated Team Coordination: Facilitate coordination among all subconsultants to ensure seamless collaboration and timely deliverables • Quality Oversight: Implement continuous internal reviews at each milestone to maintain technical excellence and adherence to City requirements Task 1: Alternatives Analysis Site Assessment and Existing Conditions • Conduct site visits to all three parking structures (919 Palm Street, 842 Palm Street, 871 Marsh Street) • Document existing parapet conditions, edge configurations, and structural characteristics • Evaluate grade changes and varying story heights at each location • Assess current aesthetic character and architectural context of downtown environmentConceptual Design Options RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 5 Safety Barrier Evaluation • Analyze three mounting approaches: surface-mounted, parapet-mounted, and recessed-mounted systems • Develop conceptual fence layouts tailored to each structure's unique geometry • Prepare representative mounting and attachment details with preliminary structural feasibility assessment • Evaluate wind and seismic considerations per current California Building Code (CBC) Code Analysis • Review building, accessibility, and fire/life safety code impacts for each alternative • Apply Crime Prevention Through Environmental Design (CPTED) principles to maximize safety while maintaining visual openness • Assess aesthetic compatibility with downtown architectural character through representative photo simulations Cost and Permitting Strategy • Prepare order-of-magnitude construction cost estimates with clearly stated assumptions and contingencies • Identify anticipated permits and approval requirements from City Building Division and other agencies having jurisdiction • Develop comparative analysis matrix to guide City selection of preferred design direction Deliverable: Alternatives Analysis Report with visual simulations, cost comparisons, and recommendation matrix Task 2: Structural Analysis and 50% PS&E Detailed Structural Evaluation • Perform evaluation of existing parapets and edge conditions at all three structures • Identify anchorage locations considering structural capacity and construction feasibility • Conduct wind load analysis and seismic anchorage review per current CBC requirements • Prepare signed and stamped structural calculations documenting design assumptions and load paths Security Camera Infrastructure Planning • Conduct site assessment for strategic camera placement coverage • Develop preliminary camera layout plans with electrical and data routing concepts • Coordinate with City IT requirements for camera system integration Cost Refinement • Prepare 50% level cost estimate with assumptions, unit costs, and contingency allowances • Identify potential value engineering opportunities for City consideration Deliverable: 50% PS&E package including plans, preliminary specifications, structural calculations, and cost estimate Task 3: 90% PS&E Design Advancement • Incorporate City comments from 50% review into refined design documents • Finalize fence layouts and structural attachment details with dimensioning and specifications • Electrical and data pathway design with conduit routing and connection details • Refine camera placements with coverage diagrams demonstrating field-of-view analysis Construction Planning • Develop construction phasing plan minimizing disruptions to parking operations • Identify temporary traffic control measures and public notification strategies • Coordinate phasing approach with City parking management staff Technical Specifications • Draft technical specifications covering materials, installation methods, quality standards, and testing requirements • Update 90% level cost estimate reflecting refined design and construction approach • Provide stamped structural calculations incorporating any design refinements Deliverable: 90% PS&E package suitable for Building Permit submittal Task 4: 100% PS&E and Permitting Support Final Design Documentation • Address City and plan check comments from 90% review • Finalize plans and specifications suitable for permit issuance and construction bidding • Update 100% level construction cost estimate with final quantities and current market pricing • Provide signed and stamped structural calculations reflecting final design RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 6 Permitting Coordination • Support City staff in responding to Building Division plan check comments • Coordinate with other reviewing agencies as needed (Fire Marshal, accessibility review) • Prepare clarifications or revisions required for permit approval Deliverable: 100% PS&E package ready for permit issuance Task 5: Final PS&E and Bidding Support Bid-Ready Documents • Produce final signed and stamped construction documents incorporating permit comments • Finalize construction cost estimate for City budgeting and bid evaluation • Prepare comprehensive bid package with clear scope definition and technical requirements Bidding Assistance • Respond to bidder questions during bid period • Prepare addenda as needed to clarify scope or address field conditions • Participate in pre-bid meetings to ensure contractor understanding of project requirements Deliverable: Final PS&E package and bidding support services Task 6: Construction Support Services Construction Administration • Review submittals and shop drawings for conformance with design intent and specifications • Respond to Requests for Information (RFIs) and substitution requests in timely manner • Conduct site visits at key construction milestones to observe installation quality and code compliance Project Closeout • Review contractor-prepared record drawings • Prepare final record drawings documenting as-built conditions • Support City final inspection and project acceptance process Deliverable: Construction support services and final record drawings Quality Control Throughout Each Phase • Continuous Internal Reviews: Quality Control Principal reviews deliverables before City submission • BIM Coordination: Utilize Building Information Modeling (Revit) for 3D visualization and coordination among disciplines • Interdisciplinary Coordination: Regular coordination meetings with structural, electrical, and security consultants • Code Compliance Verification: Ongoing review of applicable codes and standards throughout design development • Constructability Focus: Identify practical installation methods to minimize field conflicts. Schedule Management • Milestone Tracking: Monitor progress against established schedule with proactive identification of potential delays • City Review Accommodation: Build in City review periods (3 weeks for Alternatives Analysis, 5 weeks for 50%, 7 weeks for 90% and 100%) • Critical Path Management: Identify long-lead items and permitting requirements early to avoid schedule impacts • Flexible Resource Allocation: Adjust staffing levels as needed to meet deadlines while maintaining quality standards Communication and Collaboration • Regular Progress Updates: Monthly written progress reports documenting accomplishments, upcoming tasks, and any issues requiring City input • Milestone Review Meetings: In-person or virtual meetings after each major submittal (Alternatives Analysis, 50%, 90%, 100%) • Responsive Communication: Timely responses to City questions and requests throughout project duration • Stakeholder Coordination: Facilitate communication among City departments (Public Works, Building, Parking Management) to coordinate unified project approach RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 7 Relevant Experience San Diego Unified School District Wilson Middle School Parking Structure As part of our design for this 14-acre middle school, RNT also designed a 139,000 SF parking structure that is partially underground and three stories above grade. A unique feature of this structure is that it is topped with the school's athletic courts, which warranted intense attention to safety and security, including a full perimeter fence, intentional lighting, and secure access. San Diego City College Parking Structure The seven-story 154,500 SF Parking Garage serves as an east entry point gate to the campus and a buffer to shield the classrooms and common courtyard from street noise. On the ground floor, the Military Education Department is housed as well as leased space currently occupied by a Community Health Clinic. Both of these spaces are serving the public and are conveniently accessed right off Broadway street. The parking structure is naturally ventilated and provides approximate 400 new spaces for faculty, students and visitors. City of Oxnard Oxnard Civic Center Parking Structure Located near the historic downtown heart of the City of Oxnard, the RNT designed parking structure has been a positive addition to the urban fabric for the last 20 years. The project features architecturally sensitive materials and dynamic massing as well as incorporating: • Sculptural spiral form of vehicle ramp between levels • Public art and tile murals • Stainless steel decorative shading mesh in a • Street-level shading including trees and vines • Retail space RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 8 Long Beach Community College Parking Structure RNT designed this five-story parking structure for Long Beach City College adjacent to four existing and future campus and city green spaces. The structure includes bicycle parking stalls, is partially shaded by a PV canopy, and incorporates multiple living green walls, which support the continuity of green spaces across multiple city blocks. Ventura Unified School District Anacapa Middle School Security Fencing This project involves the general accessibility, playground, and parking update, as well as fencing integration, for the Anacapa Middle school. New fencing designed by RNT combines prefabricated and custom perforated metal panels to create a contemporary but playful appearance at all main entrances of the campus, serving as a representation of the school's image. New parking layout and loading areas for students are designed to improve circulation of traffic during school pick-up and drop off hours, which has faced difficulties previously with surrounding traffic conditions. Playground structures such as tennis and basketball courts also received renovation updates. Palomar Community College District Fencing Project The Palomar College Fencing project was completed by RNT Architects for the Palomar Community College District in San Marcos, CA. RNT designed perimeter campus portals and security fencing. RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 9 Qualifications Chris Bradbury, AIA, NCARB, LEED AP Principal-In-Charge Chris is a Principal with the firm and has been at RNT since 2012. He has more than twenty years of experience in architectural design ranging from civic/institutional, higher education, commercial, and multi-family housing development projects throughout California. He has extensive experience with complex sites and climate responsive design for an array of different environments. Chris brings a strong background in developing projects from conceptual design through construction with thorough coordination from consultants. He has astute technical knowledge relating to materials and construction types with a focus on detailing and constructability. Chris also brings keen Construction Administration/Observation skills to review construction progress and identify issues with the owner and contractor early to ensure a successful project outcome. Project Experience • City of Santa Maria Fire Station Programming Needs Assessment Study | Santa Maria, CA • City of Santa Maria Offices Programming | Santa Maria, CA • City of Santa Maria Facilities Feasibility Study | Santa Maria, CA • City of Marina Feasibility Study | Marina, CA • Metropolitan Water District of Southern California Site-Wide Facility Assessments, Planning & Design | Various Locations • City of Agoura Hills Recreation, Administration and Event Center Renovation & Expansion | Agoura Hills, CA • United Water Conservation District, Office Remodel | Oxnard, CA • County of Santa Barbara, New Probation Headquarters | Santa Barbara, CA • Montecito Union School District Facilities Master Plan | Montecitio, CA • Montecito Union School District On-Call Services | Montecitio, CA −Buildings D & E Historic Renovation −North Parking Access & Play Area −Montecito Kitchen Remodel • City of Oxnard, Senior Community Center Concept Study | Oxnard, CA • Patagonia Office Building Feasibility Study and New Design | Santa Clara, CA • UC Santa Barbara Lab Renovations | Santa Barbara, CA • UC Santa Barbara Materials Research Lab Renovation and Seismic Retrofit | Santa Barbara, CA • Ojai Unified School District On-Call Services | Ojai, CA −Nordhoff Library Renovation and Roof Replacement −Matilija Dining Hall −Matilija Roof Replacement Professional Registration Licensed Architect, CA, No. C-35075 Education Bachelor of Architecture, Minor Sustainable Environments, Cal Poly San Luis Obispo, 2007 Years of Experience 22 years Years with RNT 13 years RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 10 Ansgar Killing Project Manager As Project Manager and leader of RNT's San Luis Obispo office, Ansgar's work focuses on local municipalities in the Central Coastal California region at the city and county levels as well as public education institutions. Ansgar also leads RNT's Federal Sector, managing projects with the US Air Force, NAVSEA, and USACE. Since 2007, Ansgar has been a faculty member in Cal Poly’s Architecture Department where he teaches professional practice and design studios. Project Experience • City of San Luis Obispo | San Luis Obispo, CA −Downtown Lighting Project −Morro Roof Replacement −Golf Clubhouse Remodel (Design) −Fire Station No. 1 Upgrades • City of Santa Maria | Santa Maria, CA −Facilities Feasibility Study −Office Programming −Fire Station Programming Needs Assessment Study • City of Grover Beach | Grover Beach, CA −Facility Condition & Needs Assessment • City of Marina | Marina, CA −Facilities Assessment Study & Concept Plan −City of Marina On-Call City Hall Options • Ventura County | Fillmore, CA −Fillmore Fire Station Feasibility Study • San Diego Unified School District | San Diego, CA −Facility Conditions Assessment • Housing Project for the Municipal Water District | Los Angeles, CA • US Space Force | Vandenberg SFB, CA −Vandenberg Base Southern District Master Plan & Infrastructure Projects • US Air Force | Edwards AFB, CA −Hangar Upgrade Projects Professional Registration Licensed Architect, Germany No. BW-154960 Education Masters of Science, Architecture, Cal Poly San Luis Obispo, CA Years of Experience 29 years Years with RNT 5 years RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 11 Years of Experience 11 Years with RNT 5 Professional Registration Licensed Architect Education Bachelor of Architecture, NewSchool Architecture and Design Brian Iwasaki Project Architect Brian is a Project Architect at RNT, with more than 11 years of experience in all phases of architecture and planning. Brian's portfolio includes a range of projects such as educational facilities, feasibility studies, and civic and community centers. He has varied experience throughout California and is passionate about creating projects that enhance communities and facilitate positive impact. Project Experience • City of Ventura | Ventura, CA − Barranca Vista Center Park Renovation • Balboa Park Botanical Building - Historical Restoration • Fallbrook Union Elementary School District | San Diego, CA −San Onofre Elementary School Campus −Mary Fay Pendleton Elementary School Campus • San Diego Unified School District | San Diego, CA −Wilson Middle School Campus −Central Elementary School Campus • Ojai Unified School District | Ojai, CA −Roof Replacement of Multiple Campuses −Matilija MS Locker Room −Meiners Oaks Elementary School Library Conversion • Newhall School District | Newhall, CA* − Long Range Facilities Master Plan • VUSD Lemon Grove Elementary School | Ventura, CA −Classroom Conversion • Colton Joint Unified School District | Colton, CA* −Rogers ES PV Shade Structure −Alice Birney Elementary School Interim Housing • Walnut Valley Unified School District | Walnut Valley, CA* −Various Shade Structure Projects −Various Portable Classroom Projects −Walnut HS Media Center Renovation −CJ Morris Elementary School Classroom Addition • University of California, Santa Barbara | Santa Barbara, CA* −Broida Hall Physics Lab - Renovation −UCSB Chemistry Building - Fume Hood Replacement * Projects completed whilst with another firm RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 12 Qualifications - Thoma Anthony J. Zepeda Project Manager – Electrical Engineer Project Role Electrical Engineering. As a Project Manager of the Electrical Engineering Division of Thoma Electric, Inc., Mr. Zepeda is responsible for working closely with clients as well as other engineering disciplines to take projects from a concept to a complete set of construction documents. He also conducts lighting photometric studies as well as evaluates if a project is Title 24 compliant. Mr. Zepeda has experience in a wide variety of design applications including single and multi-family residential buildings, mixed use buildings, commercial buildings, fire stations, health care facilities, and educational facilities. He has also been involved in multiple projects including design aspects such as emergency generators, photovoltaic systems, and fire pumps. Experience Thoma Electric, Inc., 2014 – present, Design Assistant / CAD Drafter, 2014 – 2016 Project Manager, 2016 - present Responsible for managing multiple projects from initial concept through completion of construction. Involved in sizing electrical services, generating power, lighting, and communications layouts to fit the project’s needs, answering RFI’s, and reviewing submittals. Regularly coordinates with architect, mechanical engineer, plumbing engineer, PG&E representatives, as well as other disciplines to ensure all aspects of a project are addressed. Customers include Peoples’ Self Help Housing, The Housing Authority of the County of Santa Barbara, The Music Academy of the West, and California Polytechnic State University. Design Assistant – University Housing, California Polytechnic State University, 2012 – 2016 Responsible for assisting the Senior Planner/Estimator/Scheduler in assessing and developing an improvement plan for current facility conditions by performing quantity take offs, researching costs, and developing implementation. Involved in creating a complete power distribution analysis of University Housing facilities. Major projects include creating 3D models of student housing dormitories and creating floor plan layouts for all agricultural housing units. Education California Polytechnic State University, San Luis Obispo Bachelor of Science in Electrical Engineering, 2016 Honors: summa cum laude Relevant Projects: - San Luis Coastal Unified School District - Baywood Elementary Campus Replacement, Los Osos, CA - San Luis Coastal Unified School District - C.L. Smith Modernization Phases 1 and 2, San Luis Obispo, CA - San Luis Coastal Unified School District - Pacific Beach High School Campus Replacement, Los Osos, CA - San Luis Coastal Unified School District - Bishops Peak Elementary School Phases 1 and 2 New Classrooms and Modernization, San Luis Obispo, CA - Central Union School District – Neutra Elementary School Modernizations, Lemoore, CA Anthony J. Zepeda Project Manager – Electrical Engineer Project Role Electrical Engineering. As a Project Manager of the Electrical Engineering Division of Thoma Electric, Inc., Mr. Zepeda is responsible for working closely with clients as well as other engineering disciplines to take projects from a concept to a complete set of construction documents. He also conducts lighting photometric studies as well as evaluates if a project is Title 24 compliant. Mr. Zepeda has experience in a wide variety of design applications including single and multi-family residential buildings, mixed use buildings, commercial buildings, fire stations, health care facilities, and educational facilities. He has also been involved in multiple projects including design aspects such as emergency generators, photovoltaic systems, and fire pumps. Experience Thoma Electric, Inc., 2014 – present, Design Assistant / CAD Drafter, 2014 – 2016 Project Manager, 2016 - present Responsible for managing multiple projects from initial concept through completion of construction. Involved in sizing electrical services, generating power, lighting, and communications layouts to fit the project’s needs, answering RFI’s, and reviewing submittals. Regularly coordinates with architect, mechanical engineer, plumbing engineer, PG&E representatives, as well as other disciplines to ensure all aspects of a project are addressed. Customers include Peoples’ Self Help Housing, The Housing Authority of the County of Santa Barbara, The Music Academy of the West, and California Polytechnic State University. Design Assistant – University Housing, California Polytechnic State University, 2012 – 2016 Responsible for assisting the Senior Planner/Estimator/Scheduler in assessing and developing an improvement plan for current facility conditions by performing quantity take offs, researching costs, and developing implementation. Involved in creating a complete power distribution analysis of University Housing facilities. Major projects include creating 3D models of student housing dormitories and creating floor plan layouts for all agricultural housing units. Education California Polytechnic State University, San Luis Obispo Bachelor of Science in Electrical Engineering, 2016 Honors: summa cum laude Relevant Projects: - San Luis Coastal Unified School District - Baywood Elementary Campus Replacement, Los Osos, CA - San Luis Coastal Unified School District - C.L. Smith Modernization Phases 1 and 2, San Luis Obispo, CA - San Luis Coastal Unified School District - Pacific Beach High School Campus Replacement, Los Osos, CA - San Luis Coastal Unified School District - Bishops Peak Elementary School Phases 1 and 2 New Classrooms and Modernization, San Luis Obispo, CA - Central Union School District – Neutra Elementary School Modernizations, Lemoore, CA RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 13 Christopher M. Jose, BSEE Electrical Designer Project Role Project Manager in preparing construction documents. Responsibilities include design of single line diagrams, equipment schedules, lighting fixture applications and specifications, details, etc. for Engineer’s review as well as calculations (voltage drop, short circuit, load summary, etc), panel schedules, circuiting and Title 24 Lighting Energy Compliance Forms. Coordinate with architectural Job Captain through each phase of project, as well as coordination with other team consultants. Manage drafting staff during production of construction documents. Experience Thoma Electric, Inc., 2001 - present Project categories include: Schools, Fire Stations, Banks, Churches, Tenant Improvement projects. Specific projects include, Raymond Knowles Modernization, Delano Community School, Bakersfield Fire Station No. 5 & 14, Fresno Fire Station No. 15, 16, 17 & 19, Livermore/Pleasanton Fire Station #4, Sacramento Fire Station No. 5 & 20, San Jose Fire Station No. 34 & 35, Tulare Fire Station No. 1, Turlock Fire Station No. 1, Santa Clara Fire Station No. 6, Santa Maria Fire Station No. 4 & 5, Wells Fargo Bank, Alta One Bank CA City & Bishop, Mid State Bank, Atascadero Bible Church, Agape Church of SLO, Santa Ynez Presbyterian Church Sanctuary, Cambria Christian Fellowship Church, Highland Presbyterian Church, Mountainbrook Church, Surgery Center of Santa Maria, Madonna Inn Pool & Spa, Giuseppe’s Italian Restaurant, Woodland Nipomo Clubhouse, SLO Court House, Santa Cruz City Hall Annex Bldg, Highway 46 Shell Station, Chevron Gas Station at Pismo Beach. Integrated Design, by SOMAM, 2000 - 2001 Drafting and Design in this Fresno Architectural Firm. Assisting Electrical Engineer in school modernization projects, portable classroom additions, and new school projects in the Fresno/Clovis District. Experience with Elementary Schools, High Schools, Higher Education, and Adult Education. Education California Polytechnic State University, San Luis Obispo Bachelor of Science in Electrical Engineering, 2000 Affiliations Institute of Electrical and Electronic Engineers RELEVANT PROJECTS • Riverstone Fire Station, Madera, CA • Long Beach Fire Stations 12 and 24 • Sanger Fire Station Bridging Documents, Sanger, CA • Santa Barbara Regional Fire Communications Facility, Santa Barbara, CA • Ventura County Fire Department Headquarters and Training Center • Hanford Public Safety Center, Hanford, CA • Healdsburg Fire Substation, Healdsburg, CA • Santa Paula Fire Station #29. Santa Paula, CA • Madera Fire Station #3, Madera, CA • San Jose Fire Stations 8 and 32 • Thousand Oaks Fire Station #34, Thousand Oaks, CA • Redwood Fire Station, Redwood Estates, CA RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 14 Jeff Thoma, P.E. –President Electrical Engineering Division Manager/Electrical Designer Project Role As Electrical Engineering Division Manager, Jeff will oversee the Project Manager of the project for Thoma Electric, Inc. He will coordinate with the Architect and other consultants during each milestone phase of work and will be their escalation path for the course of the project. Jeff will work closely with the Thoma Electric Project Manager and other Consultants in preparing construction documents. Jeff’s responsibilities include reviewing single line diagrams, schedules, details, etc. as well as calculations (voltage drop, short circuit, load summary, etc.), panel schedules, circuiting and Title 24 lighting compliance forms. Jeff will have on-going coordination with the Architectural Principals through each phase of project and managing the Project Manager during production. Experience Thoma Electric, Inc., April 2016 – present Electrical Engineering Project Manager/Electrical Designer Responsible for electrical design from project concept to construction documents and contract administration. Experience with communications networks, power distribution, fire alarm, wireless access technologies, telephone systems, lighting controls, etc. for school campuses. Apple, Inc. – 2009 – 2016 Hardware Systems Integrator Electrical hardware design and test. Managed other electrical engineers both full time and part time. Kyocera Wireless, Inc. – 2006 – 2009 Hardware Engineer Responsible for baseband design and implementation of wireless handsets for multiple major US and worldwide cellular carriers. Duties included project concept kickoff, schematic design, PCB layout, factory support, cross- functional coordination of other electrical and mechanical disciplines, product launch, and failure analysis. Relevant skills include design and analysis of display interfaces, memory interfaces, I/O and peripheral interfaces, power management, and thermals. This role included regular oversight of team members in multiple continents and time zones, executive reporting when necessary, supplier management, as well as deep knowledge of electrical hardware systems for high performing wireless handsets. Relevant Firm Project Experience Camp San Luis Building 754, San Luis Obispo, CA Cheng Park Revitalization, San Luis Obispo, CA County of Education Workforce Building, San Luis Obispo, CA County of San Luis Obispo Campaneros Campground, San Luis Obispo, CA County of San Luis Obispo Grand Jury Building, San Luis Obispo, CA County of San Luis Obispo Hearing Room Upgrade, San Luis Obispo, CA County of San Luis Obispo Office Building New Generator, San Luis Obispo, CA County of San Luis Obispo Parks and Recreation Building Interior Lighting, San Luis Obispo, CA El Chorro Regional Park, San Luis Obispo, CA Mission Plaza Restrooms, San Luis Obispo, CA San Luis Obispo Behavior Health Diversion Building, San Luis Obispo, CA San Luis Obispo Behavior Health Sallyport, San Luis Obispo, CA San Luis Obispo Court Annex A/C Upgrade, San Luis Obispo, CA San Luis Obispo Health Department Lighting, San Luis Obispo, CA San Luis Obispo Veteran’s Memorial Building, San Luis Obispo, CA Education University of California at San Diego, San Diego Bachelor of Science in Electrical Engineering, 2006 Registrations Registered Professional Engineer – License No. E20823 RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 15 Qualifications - Stork, Wolfe & Associates STORK, WOLFE & ASSOCIATES Stork, Wolfe & Associates is a structural and earthquake engineering firm located in San Luis Obispo, California. Stork, Wolfe & Associates provides services to architects, building owners, schools, commercial institutions, government agencies, and other clients in the following areas: Structural Engineering. Structural design services include: • Construction documents and calculations for new buildings • Construction documents and calculations for rehabilitation, tenant improvement, and seismic retrofit for existing buildings • Structural reports for studies and investigations Earthquake Engineering. Earthquake Engineering services include: • Seismic evaluation and vulnerability assessments of existing buildings and facilities • Recommending design criteria for Essential Facilities • Special studies and investigations. Stork, Wolfe & Associates was founded by Gregory Stork and Justin Wolfe, both natives of San Luis Obispo. After attending separate colleges and working for various structural engineering companies throughout California they were reunited in Santa Barbara while working for Howard and Van Sande Structural Consultants. After working together for several years in Santa Barbara, they both decided to relocate their families to San Luis Obispo, and in December 2007 they started Stork, Wolfe & Associates. Stork, Wolfe and Associates has extensive experience in a broad range of structural design and analysis. They have provided structural and earthquake engineering services for historic structures, new and existing Essential Facilities, unreinforced masonry retrofits, performing arts buildings, university and K-12 structures, municipal buildings, healthcare facilities, specialized foundation systems, retaining and site structures, commercial buildings, and high-end custom residential projects. For further information, please contact us at: Stork, Wolfe & Associates 555 Chorro Street, Suite A1 San Luis Obispo, CA 93405 (805) 548-8600 www.swa-engineers.com RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 16 REPRESENTATIVE PROJECTS MUNICIPAL PROJECTS Hearst Castle Bus Maintenance Facility – San Simeon, California Client: California State Parks Architect: Ten Over Studio Date of Completion: Currently in Construction Remodel and addition to the existing bus maintenance facility at Hearst Castle. Righetti Ranch Community Park – San Luis Obispo, California Client: City of San Luis Obispo Architect: RRM Design Group Date of Completion: Currently in Construction Design of post-tensioned slab-on-grade basketball, tennis, and pickleball courts, as well as CMU site and retaining walls. Evidence Vehicle Storage Facility – San Luis Obispo, California Client: County of San Luis Obispo Architect: none Date of Completion: 2025 New 7,800 SF open steel-framed structure for evidence vehicle storage. Santa Barbara County Courthouse Re-Roof Project – Santa Barbara, California Client: County of Santa Barbara Architect: Architectural Resources Group Date of Completion: 2025 Re-roof and exterior structural repairs at the historic Santa Barbara County Courthouse in downtown Santa Barbara. Carrillo Gymnasium Renewal – Santa Barbara, California Client: City of Santa Barbara Architect: Architectural Resources Group Date of Completion: 2025 Exterior restoration and repairs of the historic Carrillo Gymnasium in downtown Santa Barbara. RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 17 GREGORY STORK EDUCATION Bachelor of Science, Civil Engineering 1996 Santa Clara University Master of Engineering, Civil Engineering 1997 Cornell University REGISTRATION California, Civil Engineer, No. 62389 California, Structural Engineer, No. 4981 BACKGROUND & EXPERIENCE After graduating from the Cornell University in 1997, Gregory Stork moved to San Francisco where he worked for R.P. Gallagher Associates. Projects included several seismic retrofits including non-ductile concrete buildings and several unreinforced masonry structures. He also performed several non-linear static pushover analyses using the criteria of FEMA 356 (currently known as ASCE 41-17). After five years of working with existing structures, Mr. Stork began working for KPFF in San Francisco to broaden his exposure to new design projects. These projects included both commercial buildings and hospitals. In 2003, Mr. Stork, a native of San Luis Obispo, moved back to the Central Coast to raise his family. He worked remotely for Howard Structural Group’s Carpinteria office before opening and running their San Luis Obispo office in 2006, providing engineering services to their Central Coast clients. Mr. Stork has extensive experience designing seismic retrofits for several historic buildings in the Santa Barbara and San Luis Obispo area, including the 9-story Granada Theater and Tower, and the City of Santa Barbara Fire Station No.1. Many of the structures Mr. Stork has worked on have lacked original or as- built construction drawings. Because of this, he has spent countless hours of field investigation to get a better understanding of strengths, weaknesses and expected behavior of each individual structure. His experience also includes municipal projects, university structures, public schools, several performing arts structures, health care facilities, high-end custom homes, and commercial buildings constructed of all materials. Currently Mr. Stork is a Co-Principal for Stork, Wolfe & Associates, a Structural Engineering firm located in San Luis Obispo. RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 18 JUSTIN WOLFE EDUCATION Bachelor of Science, Structural Engineering 1996 University of California San Diego Master of Science, Civil Engineering 1997 University of California Los Angeles REGISTRATION California, Civil Engineer, No. 63735 BACKGROUND & EXPERIENCE After graduating from the University of California, Los Angeles in 1997, Justin Wolfe moved to his hometown of San Luis Obispo, California, where he worked for Omni Design Group as a Junior Engineer. Projects included residential, commercial, and cellular site projects. After three successful years in San Luis Obispo, Mr. Wolfe moved to the Santa Barbara area and joined Howard and Van Sande Structural Consultants, Inc., as a Project Engineer. Projects included peer review of University structures, high-end residential including seismic retrofits and remodels, public and government buildings as well as seismic upgrades for unreinforced masonry structures. After four years in the Santa Barbara office, Justin moved back to the San Luis Obispo area to raise his family. Mr. Wolfe joined Allshouse Engineering of Pismo Beach, California where he worked as Project Engineer. Duties included training junior engineers, procuring projects, office development, and various day-to-day business applications. Design projects included residential, commercial, and mixed-use structures throughout the state of California. Currently Mr. Wolfe is a Co-Principal for Stork, Wolfe & Associates, a Structural Engineering firm located in San Luis Obispo RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 19 Qualifications - Hunter Pacific V HHuunntteerr PPaacciiffiicc GGrroouupp -- FFiirrmm PPrrooffiillee As a Woman-Owned Small Business (WOSB), Hunter Pacific has over 25 years in the Local City, County, and Municipal Market Sector including clients in the County of San Luis Obispo, the City of San Diego as well as the Federal Government such as the U.S. Army Corps of Engineers, NAVFAC Southwest and many others. We are a professional firm specializing in Cost Estimating/Engineering, Scheduling and Cost & Schedule Risk Analysis (CSRA). Our team supports public agencies and institutional clients through the planning, design, and construction phases by delivering accurate, reliable, and defensible cost opinions that support informed decision-making. Drawing on proven estimating methodologies and industry- standard tools, we apply our experience to projects that require careful coordination, regulatory awareness, and disciplined cost control throughout the project lifecycle. Hunter Pacific Group’s estimating team is internally trained in all aspects of design and construction, with specialized expertise across all building systems, including structural, mechanical, electrical, and energy systems. Our professionals are proficient in industry-standard tools such as MCACES MII, Primavera P6, Crystal Ball, and other cost and scheduling platforms commonly used on public-sector projects. We provide a full range of estimating and cost management services, including: • Scope versus budget reconciliation • Cost estimating for master planning, feasibility studies, programming, schematic design, design development, and construction documents • Cost management, including budget development, rough order of magnitude (ROM) estimates, grossing, bid packaging, and bid reconciliation • Soft cost estimating, including A/E fees, agency approvals, equipment, and FF&E • Value engineering, risk analysis, cash flow analysis, and lifecycle cost evaluation • Scheduling review, baseline schedules, monthly updates, and time impact analysis • Claims analysis and negotiation support • Independent cost estimating peer review services More specifically, Hunter Pacific Group provides cost estimating support beginning at project initiation, reconciling scope and budget at kickoff and delivering real-time cost estimates at key design milestones. During construction, we continue to support our clients through construction document quality assurance and control reviews, validation of pre-change order documentation, and detailed change order analysis. This comprehensive, end-to-end approach allows us to effectively support municipal clients in delivering public safety, police, and public works operations facilities that meet budget, schedule, and performance objectives. Project References Project: NAVFAC Southeast, P683 Parking Structure, Naval Air Station Jacksonville, FL Description: Developed MII cost estimates at the 65%, 100%, and Final 100% design stages, Primavera P6 construction schedules, and CSRA reports at each design phase, supported by VE study and CSRA workshop for a new 5-story, 28,635.41 m2 precast garage for the Fleet Readiness Center at Naval Air Station Jacksonville in FL. This design-bid-build project accommodates 839 stalls, along with Parking Lot A (150 gravel spaces) and Parking Lot B (288 spaces). Cost: $59.47M; Fee: $70,042 V HHuunntteerr PPaacciiffiicc GGrroouupp -- FFiirrmm PPrrooffiillee As a Woman-Owned Small Business (WOSB), Hunter Pacific has over 25 years in the Local City, County, and Municipal Market Sector including clients in the County of San Luis Obispo, the City of San Diego as well as the Federal Government such as the U.S. Army Corps of Engineers, NAVFAC Southwest and many others. We are a professional firm specializing in Cost Estimating/Engineering, Scheduling and Cost & Schedule Risk Analysis (CSRA). Our team supports public agencies and institutional clients through the planning, design, and construction phases by delivering accurate, reliable, and defensible cost opinions that support informed decision-making. Drawing on proven estimating methodologies and industry- standard tools, we apply our experience to projects that require careful coordination, regulatory awareness, and disciplined cost control throughout the project lifecycle. Hunter Pacific Group’s estimating team is internally trained in all aspects of design and construction, with specialized expertise across all building systems, including structural, mechanical, electrical, and energy systems. Our professionals are proficient in industry-standard tools such as MCACES MII, Primavera P6, Crystal Ball, and other cost and scheduling platforms commonly used on public-sector projects. We provide a full range of estimating and cost management services, including: • Scope versus budget reconciliation • Cost estimating for master planning, feasibility studies, programming, schematic design, design development, and construction documents • Cost management, including budget development, rough order of magnitude (ROM) estimates, grossing, bid packaging, and bid reconciliation • Soft cost estimating, including A/E fees, agency approvals, equipment, and FF&E • Value engineering, risk analysis, cash flow analysis, and lifecycle cost evaluation • Scheduling review, baseline schedules, monthly updates, and time impact analysis • Claims analysis and negotiation support • Independent cost estimating peer review services More specifically, Hunter Pacific Group provides cost estimating support beginning at project initiation, reconciling scope and budget at kickoff and delivering real-time cost estimates at key design milestones. During construction, we continue to support our clients through construction document quality assurance and control reviews, validation of pre-change order documentation, and detailed change order analysis. This comprehensive, end-to-end approach allows us to effectively support municipal clients in delivering public safety, police, and public works operations facilities that meet budget, schedule, and performance objectives. Project References Project: NAVFAC Southeast, P683 Parking Structure, Naval Air Station Jacksonville, FL Description: Developed MII cost estimates at the 65%, 100%, and Final 100% design stages, Primavera P6 construction schedules, and CSRA reports at each design phase, supported by VE study and CSRA workshop for a new 5-story, 28,635.41 m2 precast garage for the Fleet Readiness Center at Naval Air Station Jacksonville in FL. This design-bid-build project accommodates 839 stalls, along with Parking Lot A (150 gravel spaces) and Parking Lot B (288 spaces). Cost: $59.47M; Fee: $70,042 RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 20 V HHuunntteerr PPaacciiffiicc GGrroouupp -- FFiirrmm PPrrooffiillee Project: NAVFAC Southwest, Road Repairs from Damage by MILCON Traffic, Naval Air Weapons Station China Lake, CA Description: Hunter Pacific’s team of cost estimating professionals attended a Charrette Design review meeting, CSRA Workshop, prepared a Cost, Schedule and Risk Analysis report, and Cost Estimate submittals for 100% Pre-Final and Final DB RFP. This project aims to repair 50 miles of roadways that were damaged by construction traffic at Naval Air Weapons Station China Lake, stemming from the initial MILCON repairs addressing earthquake damage across the base. Damaged roads will be repaired with new asphalt. This project will be divided into 5 different sections to allow for the flexibility of value engineering: (1) Demolition Improvements, (2) Earthwork Improvements, (3) Street Improvements, (4) Drainage Improvements, and (5) Traffic Improvements. Cost: $113M; Fee: $128K Project: NAVFAC Southwest, P2002 Combat Logistics Battalion Facilities, Marine Corps Base Camp Pendelton, CA Description: Hunter Pacific Group provided cost estimating and cost, schedule and risk analysis services for the P2002 Combat Logistics Battalion (CLB) Facilities at Marine Corps Base Camp Pendleton, CA. Our team of cost estimators provided a Pre-Final and Final Estimate utilizing MCACES MII. Construction schedule was also provided with P6 software. The team also provided a Cost and Schedule Risk Analysis report. The contingency factors for both cost and schedule were calculated at the 85 percent confidence level, risk-averse, as requested by NAVFAC SW. The CLB Marine Expeditionary Units (MEUs) were activated as part of the 2007 Force Structure Review Group Initiative. Marine Corps Base Camp Pendleton lacked existing vacant facilities necessary to adequately support the operational, logistical, and administrative requirements of the newly established CLB MEUs. Due to a lack of vehicle maintenance bays, most first and second-echelon vehicle maintenance is performed outdoors. Due to a lack of secured indoor storage, gear is stored outdoors in container boxes. The P2002 project supports the improvement plan to provide adequate and efficiently configured administrative, classrooms, auto organizational maintenance, communications and electronic systems maintenance, storage facilities, and paved parking to support two Combat Logistics Battalions (CLB-1 and CLB-5). Cost: $198.4M; Fee: $105K RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 21 Senior Cost Estimator DAVID COLERA | CEP, EIT, CQM-C Hunter Pacific Group Education BS, Civil Engineering San Diego State University Certifications Certified Estimating Professional (CEP) #CEP-781 Engineering in Training (EIT), No.170544 Construction Quality Management for Contractors (CQM-C) Areas of Expertise Cost Estimating Scheduling Rough Order of Magnitude (ROM) Conceptual Design Schematic Design Detailed Estimates Construction Documents Training Excel MCACES MII Microsoft Project Primavera P6 On-Screen Takeoff Crystal Ball, @Risk, Safran Mr. Colera’s expertise stems from his extensive education in engineering and his deep understanding of all phases of design and construction. He supports project teams in every aspect of cost estimating and cost management, preparing conceptual and planning budgets, ROM estimates, schematic and design development estimates, construction document estimates, and detailed preconstruction analyses. With a strong focus on delivering projects on time and within budget for the past seven years, Mr. Colera contributes to feasibility studies, design charrettes, functional analysis sessions, and value engineering studies, as well as life-cycle cost and risk management analyses. He supports all phases of a project through his technical expertise and proficiency in advanced estimating software. He brings a comprehensive understanding of costs at every stage, from soft and hard costs to contingencies and escalation. COST ESTIMATING PROJECT EXPERIENCE  Cal Poly SLO, Animal Health Center and Plant Science 3rd Party Validation | San Luis Obispo, CA  Cal Poly SLO, Phasing Improvements | San Luis Obispo, CA  Cal Poly SLO, Wastewater Reclamation  Cal Poly SLO, Water Infrastructure Improvements  College of the Desert, Palm Springs Development Project | Palm Springs, CA  College of the Desert, Roadrunner Motors Automotive Training Campus | Palm Springs, CA  UCSF New Ambulatory Care Center, Mission Bay Block 34 | San Francisco, CA  UCSB Biology II Fly Lab Renovation | Santa Barbara, CA  UCSB Mosquito Lab Expansion | Santa Barbara, CA  UCSB Child Care Center | Santa Barbara, CA  UCSB Innovation Lab | Santa Barbara, CA  UCSB Biology II Neuroscience Lab | Santa Barbara, CA  UCSB Broida Hall Patterson Optics Lab | Santa Barbara, CA  UCSB Cloud Renovation | Santa Barbara, CA  UCSD Birch Aquarium New Exhibits | La Jolla, CA RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 22 Project Schedule • 05/08/2026: Purchase Order issued (RFP p.3, section 9), one week delay (Amend1) • 05/15/2026: As-built documentation provided by the City • 05/22/2026: Site visit complete Task 1 • 06/05/2026: Task 1 - Alternatives Analysis submitted to City • 06/26/2026: Task 1 - Alternatives Analysis City Review complete (3 weeks) Task 2 • 07/10/2026: Task 2 - Structural Analysis and 50% PS&E submitted to City • 08/14/2026: Task 2 - Structural Analysis and 50% PS&E City Review complete (5 weeks) Task 3 • 08/28/2026: Task 3 - 90% PS&E submitted to City • 10/16/2026: Task 3 – 90% PS&E City Review complete (7 weeks) Task 4 • 10/30/2026: Task 4 - 100% PS&E submitted to City, ongoing permitting support • 12/18/2026: Task 4 - 100% PS&E City Review complete (7 weeks) Task 5 • 01/08/2027: Task 5 - Final PS&E submitted to City, ongoing Bidding Support Task 6 • 04/01/2027: Task 6 - Construction Support Services start (estimated) • 09/30/2027: Task 6 - Construction Support Services end (estimated) Fee Proposal City of San Luis Obispo Parking Structure Safety Element Research and Design Task 0: Project Management and Coordination 9,180.00$ Task 1: Alternatives Analysis 33,750.08$ Task 2: Structural Analysis and 50% PS&E 25,670.82$ Task 3: 90% PS&E 42,888.88$ Task 4: 100% PS&E and Permitting Support 16,918.24$ Task 5: Final PS&E and Bidding Support 10,813.21$ Task 6: Construction Support Services 22,716.00$ Task 1 - 6 Fee 161,937.24$ City of San Luis Obispo Parking Structure Safety Element Research and Design Task 0: Project Management and Coordination 9,180.00$ Task 1: Alternatives Analysis 33,750.08$ Task 2: Structural Analysis and 50% PS&E 25,670.82$ Task 3: 90% PS&E 42,888.88$ Task 4: 100% PS&E and Permitting Support 16,918.24$ Task 5: Final PS&E and Bidding Support 10,813.21$ Task 6: Construction Support Services 22,716.00$ Task 1 - 6 Fee 161,937.24$ City of San Luis Obispo Parking Structure Safety Element Research and Design RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 24 REFERENCES Describe fully the last three contracts performed by your firm that demonstrate your ability to provide the services included with the scope of the specifications. Attach additional pages if required. The City reserves the right to contact each of the references listed for additional information regarding your firm's qualifications. Reference No. 1 Customer Name Contact Individual Telephone & Email Street Address City, State, Zip Code Date of Services Contract Amount Description of Services Project Outcome Reference No. 2 Customer Name Contact Individual Telephone & Email Street Address City, State, Zip Code Date of Services Contract Amount Description of Services Project Outcome References County of Santa Barbara, New Probation Headquarters Building Shane Mahan, Assistant Director General Services 805-689-1423, smahan@countyofsb.org 105 E. Anapamu Street, B-5 Santa Barbara, CA 93101 September 2020 - Ongoing $2,146,434 RNT was hired by the County of Santa Barbara to assist with the relocation of the Santa Barbara Probation Department through programing, site evaluation, and conceptual design. The project evaluates the feasibility and provides conceptual design and programming for relocating staff from two different campuses on the south coast to a central facility in downtown Santa Barbara. San Diego Unified School District Francisco Campuzano, Senior Project Manager 858-637-3519, fcampuzano@sandi.net 3838 Orange Ave San Diego, CA 92105 November 2013 - April 2021 Varies RNT has completed multiple projects with San Diego Unified School District, with five currently underway. Most of these projects have been large-scale renovations that include enhancing campus security, including improved fencing, lighting, security technology, wayfinding, circulation, and access. We have a long, positive project history with this District, going back more than a decade, and are frequently selected for new work based on prior project successes. Most of our work for the District has been large-scale facility modernizations and site security enhancements balanced with artful design that enhance the public sphere and user experience. RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 25 Parking Structure Safety Element Page 6 of 6 Reference No. 3 Customer Name Contact Individual Telephone & Email Street Address City, State, Zip Code Date of Services Contract Amount Description of Services Project Outcome San Diego Community College District Lance Lareau, Dsitrict Manager 619-388-6546, llareau@sdccd.edu SDCCD, Facilities Management Dept, Room 310, 3375 Camino Del Rio South San Diego, CA 92105 2008 - Current Varies RNT Architects has worked closely with the District and project stakeholders to develop multiple projects in recent years, including the Downtown San Diego’s City College Campus: a 128,000 SF five-story Arts and Humanities building has a below-grade 40- car parking structure and a 62,000 SF new three-story Business Technology building. San Diego Community College has been a long-term client of RNT, following community and energy focused projects that have resulted in many LEED certifications and design awards alike. RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 26 Assumptions and Exclusions Scope Assumptions and Exclusions RNT’s proposal is calculated based on the assumptions and exclusions listed below. 1. General Assumptions and Exclusions 1.1. Assumptions 1.1.1. Art District Parking Structure safety and security elements (netting and surveillance) is intended as the safety element standard for the upgrade of the three existing parking structures 1.1.2. All three parking structures will be upgraded simultaneously or phased in close succession in a single contract, only if required to minimize disruptions for parking operations. Scope for bidding support, CA, and CE is not expected to adjust for execution over multiple years 1.1.3. All three parking structures will be covered under a single construction contract. 1.1.4. The structural analysis is restricted to the attachment of proposed safety elements to the structures 1.1.5. City provides as-built drawings in digital format (CAD or PDF) within three (3) business days of the award 1.1.6. City is responsible for Payment of Authority Having Jurisdiction fees 1.1.7. Council Meetings are attended by the architect per request 1.1.8. Progress payments as percentages complete on a monthly basis 1.2. Exclusions 1.2.1. Any other service not described within the scope described herein 1.2.2. Development of Owners project requirements 1.2.3. Preparation of “as-built” drawings from Contractor’s mark-up. 1.2.4. Changes in design, program, budget, or schedule following interim approvals. 1.2.5. Revising design documents (drawings, specifications, etc.) to incorporate design changes proposed by “value engineering” (V.E.). 1.2.6. Preparation of phased construction documents 1.2.7. Performing a security risk assessment for the three parking structures 1.2.8. Hazardous material evaluation / removal 1.2.9. Changes required due to unanticipated field conditions 1.2.10. Modifications to buildings and/or demolition to gain access to in-wall, underground, etc. conditions that are not plainly observable through facility observation only 1.2.11. Engineering, estimator subconsultant attendance at Council meetings 1.2.12. Reimbursable expenses for the direct benefit of the City (e.g., physical drawing sets/copies for permitting, presentations, stakeholder copies, record documents. These may be billed to the City or use a City’s preferred vendor (with prior approval) 2. Structural Engineering Assumptions and Exclusions 2.1. Assumptions 2.1.1. Client provides structural calculations in digital format if needed 2.2. Exclusions RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 27 2.2.1. Investigation of structural components in inaccessible areas (attic, crawlspaces, destructive surveying) 2.2.2. Services outside the generally accepted scope for the practice of Structural Engineering 2.2.3. Seismic retrofits of other structural upgrade design, including parapet strengthening if needed 2.2.4. Detailed review of engineering design work completed by others. 2.2.5. Preparation of demolition drawings, site surveys or building services surveys 2.2.6. Material testing or Special Inspection Services, including selective demolition and/or removal for structural inspection 3. Electrical Engineering Assumptions and Exclusions 3.1. Assumptions 3.1.1. City staff, and/or its camera vendor, will be available for review and comment regarding camera placement, equipment specification, and video surveillance system performance requirements for our use in preparation of plans and specifications 3.1.2. Interviews (if necessary) will be conducted virtually or on-site during the observation of field conditions while Electrical Engineering is on-site. 3.1.3. Capacity of existing equipment is adequate for proposed new load 3.2. Exclusions 3.2.1. Preparation of full electrical drawings in REVIT/BIM software 3.2.2. Preparation of utility application for new service 3.2.3. Physical access control systems (PACS) and/or elements beyond cameras (e.g., card readers, gate-operators, intercom, speakers, intrusion detection 3.2.4. Upgrade of existing serving electric utility to accommodate added load under this project 3.2.5. Coordination with electrical utility company and application for energy rebate programs 3.2.6. Application for service, fees, excess wire charges, engineering retainers, etc. that may be required of the Owner by each utility 3.2.7. Surveying of any existing utility services within property, through property or along property frontage or as required to accommodate project 3.2.8. Development of specifications booklet for electrical, telecommunications, specialized systems or fire alarm systems. 3.2.9. Load recordings using recording ammeters for the purposes of determining electrical system capacity 4. Cost Estimation Assumptions and Exclusions 4.1. Assumptions 4.1.1. Printed hardcopies of documents required for estimating purposes and pdf files are provided by the client (true half size required) 4.2. Exclusions 4.2.1. Field Investigation 4.2.2. Life Cycle Cost Analysis 4.2.3. Estimation reconciliation with other estimates or contractor bids 4.2.4. Out-of-Office meetings 4.2.5. Cost Estimate Adjustments for Addenda issued after any completed Estimate Milestone had been issued RNT Architects | City of San Luis Obispo Parking Structure Safety Element Research and Design | 28 Roesling Nakamura Terada Architects, Inc. rntarchitects.com San Luis Obispo, CA