Loading...
HomeMy WebLinkAboutPBK_City of SLO_Specification No. 2001075_Parking Structure Safety_lo-resApril 17, 2026 Parking Structure Safety Element Research and Design CITY OF SAN LUIS OBISPO | SPECIFICATION NO. 2001075 PBK Architects California, Inc. | 408 Higuera St, Suite 100, San Luis Obispo, CA 93401 | (805) 329-3076 Mr. Michael Swartz, Project Manager III City of San Luis Obispo Public Works Department 919 Palm Street San Luis Obispo, CA 93401 mswartz@slocity.org RE: Architecture & Engineering Services: Specification No. 2001075 Dear Mr. Swartz and the Selection Committee, On behalf of PBK and our entire team, I am pleased to submit our proposal for the Parking Structure Safety Element Research and Design project. Our team specializes in evaluating existing structures and delivering safety retrofits that are practical to build, minimally disruptive to operations, and responsive to the surrounding urban context. We bring extensive and directly relevant experience delivering safety enhancement projects in active public environments. Our work has included the evaluation and design of barrier systems, structural anchorage, and phased construction strategies where maintaining operations, ensuring public safety, and delivering clear, constructable documents are critical to project success. Having visited the sites and carefully reviewed the RFP, we have developed a strong understanding of the unique conditions and challenges associated with each structure. We recognize that each facility presents distinct edge conditions, visibility considerations, and operational constraints that will require thoughtful, tailored solutions rather than a one-size-fits-all approach. We are confident in our ability to evaluate alternatives, provide clear and actionable recommendations, and efficiently advance a preferred solution through design, permitting, and construction. Equally important, we believe in being a collaborative and dependable partner. Our team is structured to provide consistent leadership, responsive communication, and proactive coordination throughout the life of the project. With our office within walking distance of all three structures, we are strategically positioned to respond swiftly to field conditions, verify design assumptions in real time, and provide the City with a high level of accessibility and ongoing support. We are committed to delivering a successful project while building a strong and lasting working relationship. We appreciate your consideration and are confident in our ability to deliver a thoughtful, durable, and cost-effective solution. PBK hereby acknowledges receipt of Addendum No. 1, issued on April 2, 2026. We look forward to the opportunity to partner with the City on this important effort. Sincerely, AUSTIN DUNCKLEE, ARCHITECT Principal in Charge City of San Luis Obispo | Parking Structure Safety Element Research & Design Contents Section 01........................................................................................................................................................................p. 04 Project Understanding and Technical Approach Section 02........................................................................................................................................................................p. 08 Relevant Experience Section 03........................................................................................................................................................................p. 14 Proposed Project Team Qualifications Section 04........................................................................................................................................................................p. 23 Proposed Project Schedule Section 05........................................................................................................................................................................p. 25 Fee Proposal Section 06........................................................................................................................................................................p. 28 References City of San Luis Obispo | Parking Structure Safety Element Research & Design POLICE HEADQUARTERS City of St. Petersburg PROJECT UNDERSTANDING AND TECHNICAL APPROACH01 SECTION 1: PROJECT UNDERSTANDING AND TECHNICAL APPROACH City of San Luis Obispo | Parking Structure Safety Element Research & Design | 5 Project Understanding The City is looking to improve safety across three existing downtown parking structures in a way that is practical, constructible, and sensitive to the fact that these facilities need to stay fully operational. From our review of the RFP, site walks, and experience with similar retrofit work, we understand the core challenge is delivering meaningful safety upgrades within the realities of aging structures, active public use, and a defined $1.5 million budget. Each of the three parking structures, constructed between the mid- 1980s and late 2000s presents unique conditions related to geometry, edge protection, parapet configuration, and structural systems. These differences will directly influence the feasibility of barrier attachment strategies, constructability, and cost. Existing parapets and edge conditions must be carefully evaluated to determine their capacity to support new barrier systems without triggering disproportionate structural upgrades. We understand the City’s goal is to evaluate multiple barrier system approaches, including surface-mounted, parapet-mounted, and recessed-mounted systems, along with integrated security camera infrastructure. Success will require not only technical evaluation, but also clear decision-making tools that allow the City to confidently select a preferred approach based on performance, cost, constructability, and long-term implications. Just as important, we recognize that any solution needs to align with CPTED principles. The intent isn’t just to add protection, but to do it in a way that maintains openness, visibility, and clear sightlines throughout the structures. That sense of transparency is key to both actual safety and how safe people feel using the facilities. All of this also needs to be delivered while keeping the garages open, minimizing disruption, and being respectful of the surrounding downtown environment. A key part of this work will be anticipating the typical risks that come with retrofitting existing parking structures and addressing them early in the design process. That includes unknown conditions at slab edges or within existing reinforcing, limited capacity of existing parapets, potential impacts to waterproofing systems, and the logistics of maintaining safe public access during construction. Our approach is centered on getting ahead of those issues early, testing assumptions upfront, and working through clear, practical solutions with the City so the design and construction process stays predictable, coordinated, and free of unnecessary surprises. Technical Approach Our approach is centered on reducing risk, making smart decisions early, and delivering solutions that are practical to build, easy to maintain, and well-suited to an active parking environment. Just as important, we see this as an opportunity to enhance safety in a way that feels cohesive with the existing structures, respecting their architectural character rather than layering on something that feels out of place. Understanding Existing Conditions We start by getting a clear, real-world understanding of what we’re working with. While drawings and past documents are helpful, there’s no substitute for thorough field verification. Our team will spend time at each parking structure documenting its parapet conditions, edge details, existing rails, and any possible constraints that could impact how new systems are attached. At the same time, we’ll review the structural systems, whether cast-in- place, precast, or post-tensioned, and look closely at reinforcing, edge distances, and anchorage limitations. We’ll also identify existing utilities and anything that could conflict with new camera infrastructure. Doing this work up front allows us to make smart decisions early and avoid surprises later in the process. Evaluating Options and Supporting Decisions As we move into alternatives analysis, our goal is to give the City clear, easy-to-understand options, not just technically sound solutions, but ones that can be confidently selected and implemented. Project Understanding & Technical Approach SECTION 1: PROJECT UNDERSTANDING AND TECHNICAL APPROACH City of San Luis Obispo | Parking Structure Safety Element Research & Design | 6 We’ll look at each barrier approach through a practical lens: how it performs structurally, how difficult it is to install, how it affects waterproofing and long-term durability, and how it feels from a user’s perspective. Visibility, openness, and functionality are key considerations, and we’ll prioritize solutions that maintain clear sightlines and avoid creating hidden or enclosed conditions. Equally important is how these improvements look. These structures are part of the downtown fabric, and the final design should feel intentional and integrated. We will study the existing architectural language of each facility and develop barrier solutions that complement, rather than compete with, the original design. To support decision-making, we’ll present options side-by-side with clear visuals, simple comparisons, and straightforward explanations of trade-offs. The goal is to make the decision process as intuitive and informed as possible. Structural Design and Attachment Strategy Once a direction is selected, we move into detailed design with a focus on efficiency and restraint, doing what’s needed structurally without overcomplicating the solution. We’ll design attachment systems that work with the existing structure, avoiding conflicts with reinforcing or post-tensioning wherever possible. Loads will be distributed in a way that doesn’t overstress localized areas, and we’ll pay close attention to detailing that protects against water intrusion and long-term wear. Whenever feasible, we’ll lean toward lighter, more distributed systems that achieve the safety goals without triggering unnecessary structural upgrades. The intent is to keep the solution both effective and economical for the City. Testing and Early Validation To further reduce uncertainty, we like to validate key assumptions early. This may include targeted field testing or a small mock-up of the proposed anchorage approach. This step would give everyone confidence that the system can be installed as intended and allows us to fine-tune details before full implementation. It is a simple step that can prevent costly adjustments during construction. Security Camera Integration Security camera design will be handled in-house, which allows for tight coordination between disciplines and a much more streamlined design process. Because the camera designer is part of our core team, we can integrate layout, conduit routing, and mounting strategies directly into the structural and architectural design as it develops. This results in cleaner drawings, fewer coordination gaps, and a more cohesive final installation. Camera placement will be carefully considered to maximize coverage while working in tandem with lighting and overall visibility strategies, reinforcing natural surveillance rather than relying on cameras alone. Constructability and Phasing From the beginning, we design with construction in mind. These structures need to remain operational, so phasing and constructability aren’t afterthoughts, they’re part of the design process. We’ll develop a sequencing approach that allows work to happen in manageable sections, maintaining parking capacity and minimizing disruption to circulation and access. The goal is to keep the facilities functioning while improvements are installed safely and efficiently. By thinking through installation early, we can reduce field complications, shorten construction duration, and make the project easier for everyone involved. Cost Awareness With a defined project budget, staying aligned on cost is essential. We keep a close connection between design decisions and cost impacts throughout the process. SECTION 1: PROJECT UNDERSTANDING AND TECHNICAL APPROACH City of San Luis Obispo | Parking Structure Safety Element Research & Design | 7 As the team develops the options, we’ll highlight key cost drivers and provide clear comparisons so the City understands where dollars are being spent and why. As the design progresses, we’ll continue to check alignment with the budget to avoid surprises and ensure the project remains on track. Responsiveness and Local Presence One of our key advantages on this project is our close proximity to the sites. Our office is located less than a mile from each parking structure, placing us within walking distance and enabling us to remain actively engaged and responsive as the work progresses. We can quickly verify conditions in the field, respond to questions as they come up, and provide real-time support during both design and construction. Our level of accessibility will help keep the project moving forward, reduces delays, and allow for faster resolution of any unforeseen conditions. Permitting and Construction Support We take pride in producing clear, coordinated documents that move smoothly through plan check and into construction. During construction, we stay actively involved, reviewing submittals, responding to RFIs, and helping resolve field conditions as they arise. Our goal is to maintain momentum all the way through completion and ensure the final result reflects the intent of the design. Closing Statement At the core of our approach is a simple idea: the best safety solutions are the ones that work. They must be structurally sound, visually appropriate, cost-conscious, and straightforward to build. By focusing on early validation, thoughtful design, and responsive service, we will provide a reliable, low-risk path to delivering a successful project. COURTHOUSE PARKING FACILITY County of Sumter RELEVANT EXPERIENCE02 SECTION 2: RELEVANT EXPERIENCE City of San Luis Obispo | Parking Structure Safety Element Research & Design | 9 With over 50 years of experience, PBK is a leader in the field of essential service facilities. Our work has been recognized at state and national levels by the American Institute of Architects, International Association of Fire Chiefs, International Association of Police Chiefs, California Energy Commission, the Environmental Protection Agency, and the California Parks and Recreation Society. Below is a condensed list of PBK’s experience with parking structures and structural retrofit projects: Parking Structure • Victoria Gardens Community Cultural Center • State Street Parking Garage • Mid Core Parking Garage • South Core Parking Garage • Florida Gulf Coast University Parking Garage #2 • Florida Gulf Coast University Parking Garage #3 • Florida Gulf Coast University Student Housing Parking Garage B • Hertz Corporation Parking Garage • Jackson Street Parking Garage • City of Clearwater Parking Garage • Sumter County Courthouse Parking Facility • St. Petersburg Police Department Parking Garage • City Centre Parking Garage Conceptual Design • Avion Parking Garage • FP & L (Florida Power and Light) Parking Garage 15+ Parking Garage Projects Nationwide 350+ Completed Public Works Projects in California 10 Local Team Members 250+ Licensed Architects and Construction Administrators in California Relevant Experience Florida Gulf Coast University Parking Garage #4 Sumter County Courthouse Parking FacilitySt. Anthony Hospital Parking Garage SECTION 2: RELEVANT EXPERIENCE City of San Luis Obispo | Parking Structure Safety Element Research & Design | 10 Project / Scope Overview The Victoria Gardens Cultural Center is a community center, library, and performing arts center located at the north axis of the Victoria Gardens shopping complex. The building links the Lewis Family Playhouse, Paul A. Biane Library, a new 500-car multi-story parking garage, and the 4,500-square-foot Celebration Hall under one roof. The Celebration Hall can be rented out for private parties or weddings and the City hosts a number of community events, such as Star Wars Day and Harry Potter Day in the outdoor Imagination Courtyard. The design team emphasized pedestrian access either through or around the facility designing an “Arbor Court” to link the residential area to the public spaces and encourage nearby residents to walk through the buildings and Imagination Courtyard. Victoria Gardens Community Cultural Center City of Rancho Cucamonga PROJECT SIZE 500 Parking Spaces 100,000 SF* FINAL CONSTRUCTION COST $33,000,000* *This is for the entire cultural center, not just the parking garage PROJECT SIZE 907 Parking Spaces 60,000 SF FINAL CONSTRUCTION COST $9,500,000 Project / Scope Overview Located on a full city block in downtown St. Petersburg, the Mid Core Parking Garage serves as a key mixed-use parking and retail facility directly across 2nd Avenue North from Sundial St. Pete, a premier shopping and dining destination. The garage supports the surrounding urban core by providing structured parking while activating the street level with retail space for national brands and local dining and entertainment venues. Designed to integrate with the pedestrian-oriented character of the area, the project enhances the streetscape and contributes to the vibrancy of downtown by combining functional parking with an engaging, active ground-floor experience. Mid Core Parking Garage City of St. Petersburg SECTION 2: RELEVANT EXPERIENCE City of San Luis Obispo | Parking Structure Safety Element Research & Design | 11 Project / Scope Overview This project involved the design of a new parking garage and pedestrian bridge connecting to the hospital’s medical office building. The two-bay garage was oriented to improve access while presenting an office-like appearance from the street. The scope included a 110-foot pedestrian bridge and covered walkways linking the garage to the broader hospital campus. Key design challenges included a compact site, phased construction alongside adjacent hospital projects, and coordination with extensive underground utilities. The structure utilized precast wall panels, and the design addressed elevation differences between buildings while maintaining parking below the bridge and required emergency vehicle clearances. Jackson Street Parking Garage St. Anthony’s Hospital PROJECT SIZE 816 Parking Spaces 269,500 SF FINAL CONSTRUCTION COST $10,000,000 PROJECT SIZE 900 Parking Spaces 300,000 SF FINAL CONSTRUCTION COST $9,771,700 Project / Scope Overview Hertz Corporation required a new parking garage for its employees and visitors as it relocated its Global Headquarters to Estero, Florida. PBK worked closely with the client and Turner Construction, the general contractor, to develop and execute an eye-catching design that complements the new headquarters. The new state-of-the-art structure houses a central energy plant that powers the surrounding headquarters. The design includes many sustainable design features, such as a space frame system that harvests both solar power and rain to help offset the energy costs for the garage and its surrounding facilities. Hertz Corporation Parking Garage Hertz Corporation SECTION 2: RELEVANT EXPERIENCE City of San Luis Obispo | Parking Structure Safety Element Research & Design | 12 Project / Scope Overview As part of on-call structural design services with the City of San Luis Obispo, Ashley & Vance Engineering performed a comprehensive evaluation and analysis of a railroad safety trail pedestrian bridge. The scope included assessing existing conditions, identifying structural damage, and evaluating load capacity to ensure continued safe public use. The project also addressed safety system rehabilitation, including review and recommendations for guardrails, barriers, and related components to meet current codes and safety standards. The analysis provided the City with clear guidance for necessary repairs, upgrades, and long-term maintenance strategies to enhance the bridge’s safety, durability, and performance within the trail network. *Project by Ashley & Vance Engineering Project / Scope Overview The Ashley & Vance Engineering team performed a detailed assessment of the Andrews Street Pedestrian Bridge following damage from a vehicle impact. The scope included evaluation of structural integrity, identification of damaged components, and analysis to determine the extent of required repairs. The team also developed a comprehensive report with findings and provided schematic-level guardrail design details to support repair planning and ensure compliance with current safety standards. The assessment equipped the City with clear recommendations to restore the bridge’s safety, functionality, and long-term performance. *Project by Ashley & Vance Engineering Railroad Safety Trail Bridge City of San Luis Obispo Andrews Street Pedestrian Bridge City of San Luis Obispo FINAL CONSTRUCTION COST $12,500 PROJECT OUTCOME The project was completed on time and within budget, with no delays due to errors or omissions. FINAL CONSTRUCTION COST This project was completed as part of an on-call structural engineering roster. PROJECT OUTCOME The project was completed on time and within budget, with no delays due to errors or omissions. SECTION 2: RELEVANT EXPERIENCE City of San Luis Obispo | Parking Structure Safety Element Research & Design | 13 Project / Scope Overview Structural services were provided for design upgrades to the ticket booth located at the primary entry to the Baggett Stadium Sports Complex on the Cal Poly San Luis Obispo campus. The work included evaluation of existing conditions and development of structural solutions to enhance durability, functionality, and integration with the surrounding entry sequence, supporting improved operations and visitor experience. *Project by Ashley & Vance Engineering Project / Scope Overview The project included structural design for a new entry arch at the Cotton Rosser Rodeo Complex at Cal Poly San Luis Obispo. Services encompassed structural analysis and detailing to support the architectural feature, creating a durable and visually prominent gateway element that reinforces the identity of the rodeo complex. *Project by Ashley & Vance Engineering Baggett Stadium Ticket Booth California Polytechnic State University, San Luis Obispo Cotton Rosser Rodeo Complex Sign California Polytechnic State University, San Luis Obispo FINAL CONSTRUCTION COST $14,000,000* *This project was completed as part of a larger five-year enhancement program. PROJECT OUTCOME The project was completed on time and within budget, with no delays due to errors or omissions. FINAL CONSTRUCTION COST $14,000,000* *This project was completed as part of a larger five-year enhancement program. PROJECT OUTCOME The project was completed on time and within budget, with no delays due to errors or omissions. MID CORE PARKING GARAGE City of St. Petersburg PROPOSED PROJECT TEAM QUALIFICATIONS03 SECTION 3: PROPOSED PROJECT TEAM QUALIFICATIONS City of San Luis Obispo | Parking Structure Safety Element Research & Design | 15 PBK has delivered comprehensive architectural and engineering services across various sectors to clients nationwide since 1974. With over 52 years of experience and more than 1,000 clients served, we have built a reputation for performance-driven design and attentive, responsive service. Our “firm without walls” model connects over 920 professionals across disciplines, combining national expertise with the responsiveness of a local partner. In California, PBK operates nine offices with more than 260 team members, offering both statewide reach and community-rooted insight. This structure ensures projects of all scales receive thoughtful attention and highly coordinated delivery. Our firm brings extensive experience supporting clients through planning, design, contract administration, and project management services. Our work is grounded in close collaboration with our clients, stakeholders, and local agencies to produce solutions that support safe and functional facilities. Throughout construction, our team provides consistent and hands-on contract administration to maintain schedule, budget, and quality control. We coordinate closely with contractors, consultants, and owner representatives to facilitate clear communication, reduce risk, and address issues promptly. This proactive approach helps limit change orders and supports efficient project delivery. Parking Structure Safety Enhancements Project The City of San Luis Obispo can expect a commitment to high-quality architectural and engineering services that directly support your goals and the expectations outlined in the RFP. Our approach prioritizes precision, responsiveness, and clear communication so every requirement is met efficiently and on schedule. The City will benefit from a coordinated, interdisciplinary team that reduces risk, improves clarity, and streamlines the project process. Experienced personnel will be dedicated to this project, providing a reliable team that understands your priorities and works seamlessly alongside your staff. Our goal is to provide the City with comprehensive, dependable support to successfully complete the much needed improvements for the three existing downtown parking structures. Firm History FIRM NAME PBK Architects California, Inc. MANAGING OFFICE 408 Higuera Street, Suite 100 San Luis Obispo, California 93401 TYPE OF ORGANIZATION Corporation OFFICE LOCATIONS Anaheim Bakersfield Berkeley Folsom Fresno Los Angeles Rancho Cucamonga San Diego San Luis Obispo SECTION 3: PROPOSED PROJECT TEAM QUALIFICATIONS City of San Luis Obispo | Parking Structure Safety Element Research & Design | 16 Organizational Chart NATHAN REASONS, ARCHITECT Project Manager DANIEL DE LA GARZA, LEED AP BD+C Design Director CYNDE SPENCE, CPHD Construction Administrator JOSEPH MONFREDA, ASSOC. AIA, LEED AP BD+C Quality Assurance / Quality Control GAREN LENCIONI, PE, FPE Vice President, MEP/T Engineering AUSTIN DUNCKLEE, AIA Principal in Charge Project Leadership Proposed Team ASHLEY & VANCE ENGINEERING Structural Engineering SILVA COST CONSULTING Cost Estimating Proposed Subconsultant Team SECTION 3: PROPOSED PROJECT TEAM QUALIFICATIONS City of San Luis Obispo | Parking Structure Safety Element Research & Design | 17 Integrated Planning, Design, & Engineering PBK is a family of disciplines focusing on planning, architecture, engineering, and strategic analysis. Experts in each area partner with full-service architectural and planning teams to take a holistic view of each project. The result: a united, interdisciplinary approach that merges form and function, bettering plans and designs on all project types. The following in-house divisions bring national expertise - bringing enhanced value as we take design solutions to the next level. ARCHITECTURAL DESIGN & PLANNING PBK provides integrated architectural, planning, and design services for civic, municipal, and public-use facilities. Our work is grounded in a clear understanding of regulatory requirements, operational constraints, and community context. We develop practical, performance-driven solutions that prioritize public safety, sustainability, and long-term value for public agencies. IN-HOUSE MEP/T/FP PBK’s engineers includes mechanical, electrical, and plumbing, technology consulting, low voltage, and fire protection. Our firm also offers LEED consulting services, energy modeling services, third-party energy code compliance services, energy audits, and the protection of sustainable-designed buildings with low utility consumption and extensive automation for ease of operation. BUILDING ENVELOPE PBK specializes in roofing, waterproofing, exterior envelopes, and forensic investigation. With over 50 years of serving public agencies, we are dedicated to delivering viable solutions that are cognizant of your budget. PBK provides industry- leading protection against future water penetration through the roof, walls, and ground, and a longer-lasting building. CIVIL & STRUCTURAL ENGINEERING PBK’s civil and structural engineering teams provide comprehensive site and building engineering services. Their expertise spans infrastructure, grading, utilities, structural systems, and constructability, delivering efficient and resilient solutions from planning through construction. COMMUNITY ENGAGEMENT PBK supports public agencies in coordinating design elements that acknowledge community partners and public contributors. Working closely with project teams, we help identify appropriate locations for recognition elements and develop visual concepts for plaques, signage, and commemorative features that align with civic standards and project goals. LANDSCAPE ARCHITECTURE PBK also provides landscape architecture and planning services for municipal clients. Our work supports safe, accessible, and welcoming outdoor spaces through resilient, context-sensitive design, balancing aesthetics, sustainability, and long-term maintenance to deliver site solutions that enhance public use. SECTION 3: PROPOSED PROJECT TEAM QUALIFICATIONS City of San Luis Obispo | Parking Structure Safety Element Research & Design | 18 PBK will work hand-in-hand with the City of San Luis Obispo and our proposed consultants to support your projects. With long-standing relationships with each consulting firm, we prioritize selecting the most qualified partners and express confidence in our chosen team’s abilities. If the City prefers different consulting engineers, we are ready to coordinate with firms of your choice, maintaining strong relationships with numerous local, award- winning firms. Sub-Consultants COST ESTIMATING Silva Cost Consulting, Inc. Background Silva Cost Consulting, Inc. is a California-based cost estimating and construction consulting firm established in April 2002 to serve architects, developers, and governing agencies with accurate, market-responsive construction cost estimates. The firm brings extensive “hard bidding” experience from large general contractors and has contributed to the estimating of more than $5 billion in construction value throughout the state. They utilize advanced estimating tools, including ProEst, MII estimating software used by the U.S. Army Corps of Engineers, BIM integration, and customized cost models to support informed decision-making across all project phases. Experience Silva Cost Consulting has extensive experience supporting civic and public-sector projects, providing cost estimating, value engineering, and peer review services for municipalities, school districts, and government agencies throughout California. The firm’s portfolio includes civic facilities, correctional and judicial buildings, libraries, K–12 schools, community colleges, and university campuses, where accuracy, accountability, and compliance with public funding requirements are critical. With a strong understanding of public procurement processes, Silva Cost Consulting delivers estimates that align closely with competitive bid results, helping public owners manage risk, maintain budgets, and advance complex projects from planning through construction. STRUCTURAL ENGINEERING Ashley & Vance Engineering Background Since 2005, Ashley & Vance Engineering (AV) has provided innovative and cost-effective engineering solutions across various industries. With over 110 skilled professionals, including 10 licensed Structural Engineers, they specialize in structural and civil engineering, from entitlements to construction documents, delivering practical designs on time and on budget. Their approach emphasizes clear communication, collaboration, and real-world solutions that meet client needs. Known for their proactive, responsive service, they leverage the latest technology while maintaining a strong presence across nine offices in the West and beyond, including a dedicated local presence in San Luis Obispo that places their team within walking distance of all three parking structures. Experience Ashley & Vance has extensive experience supporting civic and public-sector projects, providing civil and structural engineering services for public works, institutional, and infrastructure facilities that serve local communities. The firm’s portfolio includes municipal facilities, public safety buildings, and other publicly funded developments, where durability, regulatory compliance, and long-term resilience are essential. AV brings strong regional knowledge and design expertise to help public agencies navigate technical complexity, environmental constraints, and permitting requirements while delivering practical, cost-effective solutions from planning through construction. SECTION 3: PROPOSED PROJECT TEAM QUALIFICATIONS City of San Luis Obispo | Parking Structure Safety Element Research & Design | 19 Austin Duncklee AIA Principal in Charge A Civic and PreK-12 leader with more than 15 years serving clients, Austin Duncklee leads PBK’s San Luis Obispo studio. Here, he oversees the design process from programming through closeout, providing tailored solutions to this unique region of the state. Austin’s focus is on creative problem solving, and he is dedicated to creating spaces that help all users achieve their full potential. As the Principal-in-Charge for this pursuit, he will be the key contact with the City’s executive leadership and participate at key milestones on the project gatherings. He will review at critical phases to ensure the project is on track relative to the budget, schedule, and design. Nathan Reasons ARCHITECT Project Manager Nathan brings over 20 years of experience in the design of civic, educational, and commercial projects. He will serve as Project Manager for the project, providing overall coordination and leadership throughout all phases of work. He will be responsible for maintaining the project schedule, supporting budget awareness, and ensuring clear, consistent communication across the team. He supports each design milestone, ensuring deliverables are complete, coordinated, and responsive to City review. His proactive management approach helps maintain momentum, address issues early, and support uninterrupted parking operations during design and construction. EDUCATION California Polytechnic State University, San Luis Obispo Bachelor of Architecture REGISTRATION Registered Architect, CA: #38729 AFFILIATION American Institute of Architects (AIA) REGISTRATION Registered Architect, CA: #36039 Licensed through California Architects Board Eight-Year Apprenticeship Pathway in lieu of a traditional undergraduate degree Experience Menlo Park Fire Protection District ˗Headquarters Facility & Underground Parking Structure Cambria Community Healthcare District ˗Cambria Ambulance Station Replacement and Parking Improvements Department of Motor Vehicles ˗City of Roseville DMV City of Fairfield ˗Fairfield Police Department Expansion + Parking Improvements Buellton Unified School District ˗Electric Bus Parking & Charging Facility Santa Maria Joint Union High School District ˗District Bus Barn & EV Charging Santa Maria-Bonita School District ˗Roof Safety Retrofit ˗Parking Improvements (10 campuses) San Juan Unified School District ˗John Barrett Middle School Roof Safety Retrofit ˗Parking Improvements Experience Menlo Park Fire Protection District ˗Headquarters Facility & Underground Parking Structure Cambria Community Healthcare District ˗Cambria Ambulance Station Replacement and Parking Improvements Coastside Fire Protection District ˗Fire Station 44 Replacement ˗Fire Station 40 Kitchen Remodel Jay Paul Company* ˗181 Fremont; High-Rise with Multi-Story Below Grade Parking Lincoln Properties* ˗350 Bush; High-Rise with 1-Story Below Grade Parking Garage Palo Alto Medical Foundation* ˗301 Old San Francisco Rd; Building with 2-Story Below Grade Parking Garage Hines Real Estate* ˗400 and 450 Concar; Podium Building with 2 Stories of Below Grade Parking Garage VMWare* ˗Headquarters Building - 2-Story Above Grade, Post Tension and Precast *Completed prior to PBK SECTION 3: PROPOSED PROJECT TEAM QUALIFICATIONS City of San Luis Obispo | Parking Structure Safety Element Research & Design | 20 Daniel De La Garza LEED AP BD+C Design Director Daniel brings over 16 years of experience at PBK, where he began his professional career as a Project Designer. Now a Design Director, he guides projects from programming and early visioning through design development and construction documentation, remaining actively involved in all phases of design. Daniel coordinates teams and translates design intent into clear, buildable solutions, balancing function and aesthetics through a practical, client-focused approach that supports performance, equity, and long-term maintainability. As a LEED-accredited professional, he is committed to sustainability and responsible stewardship of environmental resources. Cynde Spence CPHD Construction Administrator Cynde has over 10 years of architectural experience in civic and educational projects and has a proven track record of leading project teams, navigating public agency processes, and managing construction administration from design through closeout. Cynde is a Certified Passive House Designer with a deep commitment to sustainable, high-performance building design and green education advocacy. As a member of the Central Coast Green Build Council (a local chapter of the USGBC), Cynde served as the co-chair of the Green Schools steering committee, assisting local schools complete energy-waste audits to create their own sustainability plans. EDUCATION University of Houston Bachelor of Architecture REGISTRATION LEED Accredited Professional Building Design + Construction (LEED AP BD+C) EDUCATION California Polytechnic State University, San Luis Obispo Master of City and Regional Planning, Urban Design (MCRP) Bachelor of Architecture, Sustainable Environments, Environmental Design, City and Regional Planning CERTIFICATION Certified Passive House Designer (CPHD) Experience Stinson Beach Fire Protection District ˗New Fire Station City of San Juan ˗New Public Safety Building Foothill-De Anza Community College District ˗Dental Hygiene Clinic Pajaro Valley Unified School District ˗Pajaro Valley High School Performing Arts Center Dublin Unified School District ˗Emerald High School, Phase II and III ˗Shamrock Hills TK-8 School Santa Rosa City Schools ˗District Office ˗James Monroe Elementary School T-K Campus Santa Maria-Bonita School District ˗New K-8 Educational Campus Chino Valley Unified School District ˗Ayala High School Performing Arts Center Experience City of Pismo Beach* ˗Chapman House ADA Restrooms ˗Emergency Repairs Gull Cottage ˗Emergency Repairs Beach Stairs ˗Emergency Repairs City Hall Roof ˗City Hall Planning Department ADA Compliant Doors ˗City Corporation Yard Maintenance Building Remodel and Addition ˗City Hall 1st Floor Remodel Menlo Park Fire Protection District ˗Fire Station 77 Coastside Fire Protection District ˗Fire Station 44 Replacement City of Tiburon ˗Fire Station 10 Buellton Unified School District ˗Electric Bus Parking & Charging Facility Santa Maria Joint Union High School District ˗District Bus Barn & EV Charging *Completed prior to PBK SECTION 3: PROPOSED PROJECT TEAM QUALIFICATIONS City of San Luis Obispo | Parking Structure Safety Element Research & Design | 21 Joseph Monfreda ASSOC. AIA, LEED AP BD+C Quality Assurance / Quality Control Joe brings over 25 years of experience managing teams and projects from planning and design through construction administration and certification. For this project, Joe will serve in a dedicated QA/QC role, reviewing production drawings and construction documents, providing technical recommendations, and verifying compliance with client constructability standards. His municipal experience and disciplined approach will help ensure design quality and consistency throughout all phases of the City of San Luis Obispo’s Parking Structure Safety Enhancements. Garen Lencioni PE, FPE Vice President, MEP/T Engineering Garen has 27 years of experience in mechanical and fire protection engineering. He has been responsible for the design of hundreds of projects in a variety of applications and has expertise in HVAC, plumbing, fire sprinklers, energy analysis, LEED, and commissioning. Garen’s understanding of building systems and knowledge of system types allows him to have detailed understanding of how the system and building will operate. Garen will oversee all details of the firms projects from start to finish. EDUCATION Simon Greenleaf University Bachelor of Arts, Apologetics Mt. San Antonio College Architecture Major REGISTRATION LEED AP BD+C (Building Design + Construction) AFFILIATION Associate Member, American Institute of Architects (Assoc. AIA) EDUCATION California Polytechnic State University, San Luis Obispo Master of Science, Fire Protection Engineering California State University, Fresno Bachelor of Science, Business Administration REGISTRATION Professional Mechanical Engineer, CA: #33380 Fire Protection Engineer, CA: #1901 Experience City of Rancho Cucamonga ˗Victoria Gardens Civic Center City of Clovis ˗Clovis Fire and Police Carports ˗Clovis Fire and Police Headquarters ˗City Hall Expansion Pre-Design Services West Valley Water District ˗West Valley Water District Headquarters Master Plan City of Big Bear Lake ˗Big Bear Lake Water Operations Facility City of Anaheim ˗Elva Haskett Branch Library City of Fontana ˗Fire Station 80 ˗FIre Station 81 ˗First Responders Memorial Experience Cambria Community Healthcare District ˗Cambria Ambulance Station Replacement and Parking Improvements City of Fresno ˗911 Emergency Call Center ˗Tower Theater Assessment City of Clovis ˗Alternate Dispatch Center Buellton Unified School District ˗Electric Bus Parking & Charging Facility Clovis Unified School District ˗Terry P. Bradley Educational Center ˗Clovis East High School Stadium, Phase II Del Norte Unified School District ˗Mountain Elementary School Modernization ˗Del Norte Performing Arts Center ˗Redwood Elementary School Modernization Corona-Norco Unified School District ˗Centennial High School Aquatic Center SECTION 3: PROPOSED PROJECT TEAM QUALIFICATIONS City of San Luis Obispo | Parking Structure Safety Element Research & Design | 22 Ian Shoebridge SE, PE Principal - Structural Engineer Ian is well prepared to tackle any complex project and strives to develop buildable designs by thinking from the client’s perspective, working through all phases of work. His design, project management, leadership, and mentorship work is respected by those he works with as he pushes teams and individuals through complicated designs or demanding coordination efforts. He has a relentlessly analytical approach and is an approachable, solution-oriented, communicative, and pragmatic team member. Having spent time in the field, he has an appreciation for what it takes to translate construction drawings into a completed structure, as well as an understanding of the importance of communication. Javier Silva CPE Principal - Cost Estimating Javier has 30 years of estimating experience and a proven track record for preparing quality and accurate estimates for his clients. Javier has been involved in the estimating and management of $15 billion dollars in construction projects. These projects include a wide variety of types including: fire stations, K-12 schools, librarires, recreational centers, community colleges, universities, correctional, commercial, civic, and retail. Javier gained his experience by working for some of California’s largest construction management and general contracting firms. To further solidify his understanding of construction estimating, he spent time in the field in a project management role. EDUCATION California Polytechnic State University, San Luis Obispo Master of Science, Civil Engineering Bachelor of Science, Civil Engineering REGISTRATION Professional Structural Engineer, CA: #6293 Professional Engineer, CA: #79205 AFFILIATIONS American Society of Civil Engineers (ASCE) EDUCATION California Polytechnic State University, San Luis Obispo Bachelor of Science, Construction Management REGISTRATION Certified Professional Estimator (CPE), 1.4-000877-0812 Experience City of San Luis Obispo ˗Railroad Safety Trail Bridge ˗US-101 On-Ramp at Broad ˗Andrews Street Pedestrian Bridge ˗Creek Sidewalk ˗Creek Bank Repair ˗Concrete Coring Repair California Polytechnic State University, San Luis Obispo ˗Capital Improvement Projects (TOSA/TOCA) - Ongoing Structural Engineering Services ˗Spanos Stadium Bleacher Retrofit ˗Baggett Stadium Ticket Booth ˗Cotton Rosser Rodeo Complex Sign Experience City of Petaluma ˗Corporation Yard City of Sacramento ˗24th Street Corporation Yard, Building 4 City of Emeryville ˗Corporation Yard Sacramento Fire Department ˗Fire Station 15 ˗Fire Station 14 Coastside Fire Protection District ˗Fire Station 44 Modesto Fire Department ˗Fire Station 1 Rohnert Park Department of Public Safety ˗Fire Station 3 Sequoia Union High School District ˗Menlo Atherton High School New 3-Story Classroom Building JACKSON STREET PARKING GARAGE AND CONNECTORS St. Anthony’s Hospital PROPOSED PROJECT SCHEDULE04 SECTION 4: PROPOSED PROJECT SCHEDULE City of San Luis Obispo | Parking Structure Safety Element Research & Design | 24 LEGEND Schedule Update Estimate Update Drawing / Spec Deliverable To support a smooth and well-coordinated delivery of the Parking Structure Safety Element Research and Design project, our team schedule is provided below. The schedule outlines key milestones, review periods, agency coordination, procurement activities, and construction phases, ensuring all stakeholders share clear expectations and timelines. We will regularly update the schedule to reflect progress, decisions, and any evolving project needs, allowing the team to proactively address challenges, maintain momentum, and support timely project completion while minimizing disruption to ongoing parking structure operations. Schedule TASK 2026 2027 MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Task 0: Project Management and Coordination Task 1: Alternatives Analysis Task 2: Structural Analysis + 50% PS&E Task 3: 90% PS&E Task 4: 100% PS&E Task 5: Final PS&E / Bidding Support Task 6: Construction Support City Review: Alternatives Analysis City Review: 50% Submittal Review City Review: 90% / Permit Review City Review: 100% Review 50 8 WEEKS 8 WEEKS 6 WEEKS 7 WEEKS 7 WEEKS 6 WEEKS 6 WEEKS 4 MONTHS 5 WEEKS 3 WEEKS 50 90 100 CREEK SIDEWALK REPAIRS City of San Luis Obispo* *This is an Ashley & Vance project FEE PROPOSAL05 SECTION 5: FEE PROPOSAL City of San Luis Obispo | Parking Structure Safety Element Research & Design | 26 Subtask Role Hours Cost Fee Phase 1 – Conceptual Design + Alternatives Analysis Task 0: Project Management and Coordination PBK Principal-in-Charge PBK Project Manager 8 76 $2,080.00 $13,680.00 $15,760.00 Task 1: Alternatives Analysis PBK Principal-in-Charge PBK Project Manager PBK Technical Designer Structural Principal Engineer Structural Project Engineer 12 40 28 20 60 $3,120.00 $7,200.00 $3,920.00 $5,000.00 $10,500.00 $29,740.00 Task 2: Structural Analysis and 50% PS&E PBK Project Manager PBK Technical Designer Structural Principal Engineer Structural Project Engineer Structural Design Engineer Low Voltage/Technology Project Manager LV/T Technical Designer Cost Estimator 24 48 20 80 40 20 40 16 $4,320.00 $6,720.00 $5,000.00 $14,000.00 $5,600.00 $4,200.00 $5,600.00 $2880.00 $48,320.00 Task 3: 90% PS&E PBK Principal-in-Charge PBK Project Manager PBK Technical Designer Structural Principal Engineer Structural Project Engineer Structural Design Engineer LV/T Project Manager LV/T Technical Designer Cost Estimator 12 32 60 12 40 60 24 48 16 $3,120.00 $5,760.00 $10,800.00 $3,000.00 $7,000.00 $8,400.00 $5,040.00 $6,720.00 $2,880.00 $52,720.00 Task 4: 100% PS&E and Permitting Support PBK Principal-in-Charge PBK Project Manager PBK Technical Designer Structural Principal Engineer Structural Project Engineer Structural Design Engineer LV/T Project Manager LV/T Technical Designer Cost Estimator 8 20 32 8 24 24 12 18 16 $2,080.00 $3,600.00 $4,480.00 $2,000.00 $4,200.00 $3,360.00 $2,520.00 $2,520.00 $2,880.00 $27,640.00 Task 5: Final PS&E and Bidding Support PBK Project Manager Structural Project Engineer LV/T Project Manager 16 16 12 $4,160.00 $2,800.00 $2,520.00 $9,480.00 Task 6: Construction Support Services PBK Project Manager PBK Construction Administration Structural Project Engineer LV/T Project Manager 48 96 96 24 $8,640.00 $17,280.00 $16,800.00 $5,040.00 $47,760.00 TOTAL FEE (NOT-TO-EXCEED) $231,420.00 Cost Proposal City of San Luis Obispo DATE: APRIL 17, 2026 Parking Structure Safety Element Research and Design | Specification No. 2001075 PBK’s philosophy towards fees is largely different from any other architectural or engineering firms—our proposed fee is meant to merely be a beginning to negotiations, not the end. Our final negotiated fee is our fee—we know small changes happen along the way, and we don’t want to stop and negotiate an extra fee each time. SECTION 5: FEE PROPOSAL City of San Luis Obispo | Parking Structure Safety Element Research & Design | 27 We sincerely thank the City of San Luis Obispo for considering our firm for this project. We look forward to the opportunity to work with you and your team. Please do not hesitate to call any time if you have any questions or need additional information. AUSTIN DUNCKLEE, ARCHITECT Principal in Charge (805) 329-3076 Austin.Duncklee@pbk.com Hourly Rates ARCHITECTURE (PBK)HOURLY RATE Principal-in-Charge $260.00 Project Manager $180.00 Construction Administrator $180.00 Technical Designer $140.00 LOW-VOLTAGE / TECHNOLOGY (PBK)HOURLY RATE LV/T Principal-in-Charge $260.00 LV/T Project Manager $210.00 LV/T Technical Designer $140.00 STRUCTURAL ENGINEERING (ASHLEY & VANCE ENGINEERING)HOURLY RATE Structural Principal Engineer $250.00 Structural Project Engineer $175.00 Structural Design Engineer $140.00 COST ESTIMATING (SILVA COST CONSULTING)HOURLY RATE Cost Estimator $180.00 The following hourly rate tables for all proposed personnel are included for potential future additional services not specifically identified in the base Scope of Work. Any additional services will be performed only upon written authorization from the City. VICTORIA GARDENS COMMUNITY CULTURAL CENTER City of Rancho Cucamonga REFERENCES06 SECTION 6: REFERENCES City of San Luis Obispo | Parking Structure Safety Element Research & Design | 29 References Customer Name Cambria Community Healthcare District (CCHD) Contact Individual Linda Hendy, District Administrator Telephone & Email 805.927.8304, lhendy@cambria-healthcare.org Street Address 2511 Main St City, State, Zip Code Cambria, CA 93428 Date of Services June 2025 - ongoing Contract Amount $5,200,000.00 Description of Services Progressive Design-Build for a New Ambulance Station: As part of a Design-Build, PBK is currently engaged with Cambria Community Healthcare District to improve and modernize an aging ambulance station so that it can also meet current applicable codes and standards. This includes site improvements such as required paving, paved parking, and parking screen walls. Project Outcome The new station is envisioned to be a modern facility that would include administrative areas, crew quarters, with supporting space, and multiple apparatus bays. It would house two 24-hour ambulance crews to improve 911 ambulance response times. Customer Name City of Clearwater Contact Individual Tara Kivett, Engineering Construction Manager Telephone & Email 727.444.8202, tara.kivett@myclearwater.com Street Address 100 South Myrtle Avenue #220 City, State, Zip Code Clearwater, FL, 33756 Date of Services February 2023 - ongoing; substantial completion anticipated Jan 2027 Contract Amount est. $19,000,000 Description of Services South Osceola Parking Garage: The project is a 397-space, seven- level mixed-use parking structure in downtown Clearwater serving the surrounding area. It includes ground-floor retail along Osceola Avenue and incorporates architectural elements influenced by the adjacent church. The design maximizes parking capacity while enhancing pedestrian experience, circulation, and safety, with integrated parking technology and an emphasis on natural light and visibility. Project Outcome The facility will provide a high-capacity, user-friendly parking solution that supports downtown activity and adjacent community uses. The integration of retail space and context-sensitive design enhances the street scape, while improved visibility, technology, and circulation con- tribute to a safe and efficient parking experience. Reference No. 1 Reference No. 2 Describe fully the last three contracts performed by your firm that demonstrate your ability to provide the services included with the scope of the specifications. Attach additional pages if required. The City reserves the right to contact each of the references listed for additional information regarding your firm's qualifications. SECTION 6: REFERENCES City of San Luis Obispo | Parking Structure Safety Element Research & Design | 30 Customer Name Public Works, City of San Luis Obispo Contact Individual James Yanez, Construction Engineering Manager Telephone & Email 805.781.5252, jyanez@slocity.org Street Address 919 Palm Street City , State, Zip Code San Luis Obispo, CA 93401 Date of Services November 2025 - January 2026 Contract Amount $12,500 Description of Services Railroad Safety Trail Bridge and US-101 On-Ramp at Broad: As part of their on-call structural design services, Ashley & Vance Engineering performed an evaluation and analysis for damage assessment, load capacity, and safety system rehabilitation of a pedestrian bridge and on- ramp damaged by a fire and vehicle collision, respectively. Project Outcome The project was completed on time and within budget. There were no project delays due to errors or omissions. Reference No. 3 San Luis Obispo Office: 408 Higuera St., Suite 100 San Luis Obispo, CA 93401 (805) 329 - 3076