RFP: Parking Structure Safety Element Research and Design
studio 2G Architects, LLP
Main Office Downtown
811 Palm Street, SLO
2S2G | PARKING STRUCTURE SAFETY ELEMENT RESEARCH AND DESIGN
Cover Letter
Ashley Mayou, Partner
805.594.0771 x117
ashley@studio-2g.com
studio 2G Architects, LLP.
811 Palm St. San Luis Obispo, CA 93401
STUDIO 2G ARCHITECTS | COVER LETTER
Dear Mr. Swartz,
studio 2G Architects is pleased to submit our proposal for the Parking Structure Safety Element Research
and Design project for the City of San Luis Obispo. We are a woman-owned (WOSB), LEED-certified
architecture firm based on California’s Central Coast, dedicated to delivering sustainable, cost-effective
design solutions for complex public projects that require careful coordination, technical rigor, and sensitivity
to community context.
As a fully local firm, our entire team is based here in San Luis Obispo, with our office located downtown just
steps from the Palm Street parking structures. Our architects and staff use these structures regularly as
part of our daily work, giving us a direct, personal understanding of their existing conditions, user experience,
and safety concerns. This proximity and familiarity uniquely position us to approach this project with
both technical expertise and a genuine investment in creating meaningful, lasting improvements for the
community.
We understand that the City is seeking to enhance safety at three downtown parking structures through
the evaluation and implementation of perimeter barrier systems and security camera infrastructure.
These structures are highly visible, heavily utilized public assets, and improvements must balance safety,
constructability, and aesthetics while maintaining uninterrupted operations. Our team brings a strong
understanding of these challenges, particularly in working with existing structures, post-tensioned systems,
and phased construction in active facilities.
Our approach is grounded in proactive project management, early coordination, and clear communication.
studio 2G will lead a collaborative team of trusted subconsultants with whom we have longstanding working
relationships. We will manage the project through all phases, from Alternatives Analysis through Construction
Support, with a focus on maintaining schedule, controlling scope, and providing consistent, well-documented
deliverables aligned with the City’s expectations for PS&E development . Our project manager will serve as
a single point of contact and will actively coordinate meetings, track decisions, and ensure alignment across
disciplines.
During the Alternatives Analysis phase, we will evaluate multiple barrier system approaches, including
parapet-mounted and surface-mounted options, while integrating CPTED principles, structural feasibility,
and constructability considerations. We will work closely with the City to align on safety priorities and camera
coverage strategies early in the process, ensuring that subsequent design phases proceed efficiently and with
clear direction.
RFP: Parking Structure Safety Element
Research and Design
City of San Luis Obispo
ATTN: Michael Swartz
Project Manager III
mswartz@slocity.org
3S2G | PARKING STRUCTURE SAFETY ELEMENT RESEARCH AND DESIGN
Cover Letter
signature of date of
4/17/2026
Ashley Mayou | Principal Architect, NCIDQ | studio 2G Architects, LLP.
STUDIO 2G ARCHITECTS | COVER LETTER
As the project advances into structural analysis and design, our team will carefully evaluate existing conditions,
particularly the constraints associated with post-tensioned concrete construction. We will incorporate non-
destructive investigation methods such as x-ray scanning to identify safe anchorage locations and avoid
impacts to existing structural systems. Our electrical and security design partners will develop coordinated
camera layouts and data pathways that optimize coverage at key areas such as entries, corners, and elevated
levels.
studio 2G places strong emphasis on quality assurance and quality control. We allocate dedicated time
within our schedule for internal QA/QC reviews, including interdisciplinary page-turn sessions and the use
of structured checklists for all consultants. This process ensures that documents are coordinated, code-
compliant, and ready for efficient plan check review. We also take an active role in managing the permitting
process by coordinating responses to City comments and maintaining momentum through each review cycle.
Cost control and risk management are integral to our approach. Our cost estimator is engaged from the
outset to establish baseline assumptions, identify potential risks, and inform early decision-making. At each
phase, the design will be evaluated against budget, with clear feedback provided to the team and the City. This
iterative process allows us to proactively address unknowns and maintain alignment with project goals.
We are enthusiastic about the opportunity to support the City of San Luis Obispo in improving safety at these
important downtown facilities. As a local firm whose staff actively uses these structures, we are personally
invested in delivering thoughtful, buildable solutions that enhance safety while respecting the character and
functionality of these essential public assets.
Thank you for your consideration. We look forward to the opportunity to work with the City on this important
project.
CONTENTS
Understanding of the Project and
Technical Approach
04
Relevant Experience 09
Qualifications of the Proposed
Project Team
13
Proposed Project Schedule 15
Detailed Fee Proposal By Task
Historic Federal Courthouse Building
Security Fencing
studio 2G Architects, LLP
UNDERSTANDING OF THE PROJECT AND TECHNICAL
APPROACH »
6S2G | PARKING STRUCTURE SAFETY ELEMENT RESEARCH AND DESIGN
STUDIO 2G ARCHITECTS ff UNDERSTANDING OF THE PROJECT AND TECHNICAL APPROACH
The City of San Luis Obispo is seeking to enhance safety at
three downtown parking structures through the integration
of perimeter fencing and security camera systems, with a
focus on evaluating the elevated parking deck perimeters for
three potential mounting options; surface-mounted, parapet-
mounted, and recessed. The project requires a balanced
approach that improves safety while maintaining structural
integrity, minimizing operational disruptions, and delivering
construction-ready documents suitable for permitting and
implementation.
Our team understands that the primary challenge of this
project lies in integrating new systems into three distinct
existing structures with varying age, geometry, structural
systems, limited documentation, and active daily use. In
response, our approach emphasizes early validation of existing
conditions, disciplined scope control, and coordinated design
across structural and electrical systems to reduce risk and
deliver a practical, buildable solution.
Project Management and Early Validation
We will provide disciplined and proactive project management
to maintain alignment with the City’s goals for safety,
constructability, schedule, and cost control across all three
parking structures. Our approach recognizes that the success
of this project depends on early identification and resolution
of unknown existing conditions, particularly given the age
of the facilities and the likelihood of incomplete or outdated
documentation.
A central component of our methodology is early field
validation paired with critical review of available record
drawings. studio 2G will conduct site observations alongside
our structural subconsultant, FTF Structural, to verify as-built
conditions. We will compare these findings against existing
documentation to identify discrepancies that could impact
design, constructability, or cost. This includes confirmation of
parapet configurations, edge conditions, structural constraints,
and the presence of embedded elements that may affect
anchorage or routing. By grounding the design in verified field
conditions rather than assumptions, we reduce the risk of
unforeseen conflicts during later design phases or construction.
In parallel, we will coordinate closely with our electrical
subconsultant to validate existing infrastructure systems,
including electrical capacity, data pathways, and potential
equipment locations. This early effort will also identify
constraints related to post-tensioned construction, access
limitations, and operational considerations within active parking
environments.
Recognizing that these structures are in continuous use,
our validation process will be carefully planned to minimize
disruption while still capturing the level of detail required to
support design decisions. Where necessary, we will recommend
targeted non-destructive investigation methods to supplement
visual observations and confirm critical conditions.
This early validation phase establishes a reliable technical
baseline for the project, allowing the team to refine design
assumptions, support accurate cost estimating, and avoid
rework. It also enables informed decision-making during
alternatives analysis by ensuring that proposed solutions are
grounded in the realities of each structure.
Through this structured and field-informed approach, we
reduce uncertainty, improve coordination across disciplines,
and position the project for efficient progression into design
and implementation.
Alternatives Analysis and System Definition
Our Alternatives Analysis Report will include a structured
comparison matrix evaluating each mounting strategy (surface,
parapet, recessed) across structural feasibility, constructability,
CPTED effectiveness, visual impact, cost, and operational
disruption. This will be supplemented by representative photo
simulations and conceptual details to support City decision-
making.
A key aspect of this phase is the definition of the CCTV system,
as current requirements are not fully established. We will
work closely with the City to determine system expectations,
including camera coverage, system architecture, and integration
with existing infrastructure. This includes evaluating centralized
versus distributed headend configurations, confirming storage
requirements, and identifying whether new equipment such as
servers, licensing, and software will be required.
We will also verify the availability and responsibility of network
infrastructure within each structure, including IDF capacity
and network switching. Early coordination of these elements
is essential to avoid downstream conflicts and cost escalation.
In addition, we will perform a high-level review of electrical and
life safety considerations, including lighting and emergency
lighting requirements that may be impacted by the proposed
improvements.
Understanding of the Project and Technical Approach
7S2G | PARKING STRUCTURE SAFETY ELEMENT RESEARCH AND DESIGN
STUDIO 2G ARCHITECTS ff UNDERSTANDING OF THE PROJECT AND TECHNICAL APPROACH
In addition, we will perform a high level review of electrical and
life safety considerations, including lighting and emergency
lighting requirements that may be impacted by the proposed
improvements. This review will also evaluate the potential
impacts of proposed fencing systems on means of egress,
occupant safety at elevated levels, and emergency responder
access to ensure that all design options maintain compliance
with applicable fire and life safety codes.
Future system considerations, such as photovoltaic (PV)
solar and battery energy storage systems (BESS), will also
be documented to ensure compatibility with long-term City
objectives, although these systems are not included in the base
scope.
Targeted Structural Analysis and System Integration
Following selection of a preferred alternative, our team will
perform a focused structural analysis limited to the parapet
edges and localized attachment zones required for fencing
and camera systems including wind load analysis and seismic
anchorage in accordance with the current California Building
Code.
This targeted approach ensures that the analysis remains
aligned with the project scope while avoiding unnecessary
expansion into full structural rehabilitation.
Because the parking structures are constructed with post-
tensioned concrete, special care will be taken to avoid conflicts
with existing tendons. All proposed penetrations for CCTV
raceways and anchorage points for fencing will require non-
destructive investigation, such as x-ray scanning, to verify the
installation will not affect the structural integrity of the existing
garages.
In parallel, we will advance camera layouts, electrical routing,
and system coordination. This includes confirming power
availability, data pathways, and equipment locations, as well
as identifying any infrastructure limitations that may impact
implementation.
Consistent with the City’s direction, this phase will also identify
any existing conditions that would prevent implementation
of the proposed improvements. Where necessary, we will
define enabling work required to support installation, including
structural, electrical, or code-related upgrades.
Understanding of the Project and Technical Approach
Local Presence and Proximity to Project Sites
studio 2G Architects’ downtown San Luis Obispo
office at 811 Palm Street places our team in immediate
proximity to all three project sites, allowing for a highly
responsive and informed approach to this work. We are
located directly across the street from the 842 Palm
Street parking structure, within a three minute walk of
the 919 Palm Street structure, and approximately a five
minute walk to the 871 Marsh Street structure.
8S2G | PARKING STRUCTURE SAFETY ELEMENT RESEARCH AND DESIGN
STUDIO 2G ARCHITECTS ff UNDERSTANDING OF THE PROJECT AND TECHNICAL APPROACH
Design Development and Construction Sequencing
As Architect of Record, studio 2G Architects will lead the
advancement of the design through Design Development and
Construction Documents, ensuring that all disciplines remain
coordinated, aligned, and responsive to the City’s goals. Our
role extends beyond document production to active design
leadership, maintaining continuity between the selected
alternative and a fully coordinated, constructable solution.
We will facilitate internal pull planning sessions with the full
consultant team to proactively manage design progression,
identify dependencies, and resolve issues early. This
collaborative approach keeps structural, electrical, and
system design efforts aligned and allows the team to maintain
momentum through each phase while avoiding late-stage
conflicts. These working sessions are complemented by regular
coordination meetings with the City, ensuring that decisions
are confirmed in real time and that the design continues to
reflect City priorities as it evolves.
Throughout this phase, studio 2G will implement our
SmartSheet weekly tracking system, which is distributed
each Friday to the full team and City stakeholders. This
report provides a clear summary of progress, including
completed tasks, upcoming work, key decisions, and any items
requiring input or action. This level of transparency supports
accountability across the team and allows for timely resolution
of issues before they impact schedule or budget.
As the design is refined, we will develop detailed fencing
layouts, structural attachment details, camera placements,
and coordinated electrical and data pathways, with a strong
emphasis on constructability.
We recognize that installing new safety railings and camera
systems in active parking structures presents significant
logistical challenges. Our approach will evaluate phased
installation strategies by level or zone, allowing portions of
each structure to remain operational while work progresses.
We will incorporate the use of temporary barriers and safety
measures to maintain public safety during construction and
carefully coordinate work areas to minimize disruption.
In addition, we will evaluate the use of prefabricated railing
systems and efficient installation methods to reduce
construction duration, limit on-site labor, and improve overall
safety. These strategies will be coordinated with both the
structural and electrical design to ensure that installation
sequencing is feasible and aligned with real-world constraints.
Coordination between disciplines will remain a priority
during this phase, particularly where installation sequencing,
temporary conditions, or access constraints influence design
decisions. Where necessary, we will work with the City to define
acceptable operational impacts and develop solutions that
balance safety, efficiency, and user experience.
Through strong leadership as AOR, structured coordination,
and clear communication tools, studio 2G will guide the project
through design development and documentation in a manner
that is organized, transparent, and focused on successful
implementation.
Understanding of the Project and Technical Approach
“OUR EXPERIENCES THUS FAR WITH STUDIO 2G HAVE BEEN VERY POSITIVE.
I PERSONALLY HAVE APPRECIATED THE HONESTY, INTEGRITY AND
PROFESSIONALISM THEY HAVE EXHIBITED IN THE PROJECTS WE’VE WORKED ON.”
- JASON LAL, DIRECTOR OF FACILITIES, COMMUNITY ACTION PARTNERSHIP OF
SAN LUIS OBISPO
9S2G | PARKING STRUCTURE SAFETY ELEMENT RESEARCH AND DESIGN
STUDIO 2G ARCHITECTS ff UNDERSTANDING OF THE PROJECT AND TECHNICAL APPROACH
Permitting, Final Design, and Implementation Support
As the project advances into final design and permitting, studio
2G Architects will continue to lead as Architect of Record,
ensuring that the construction documents are complete,
coordinated, and responsive to agency requirements. Our
focus during this phase is to deliver a high-quality PS&E
package that supports an efficient plan check process and
minimizes the risk of delays.
A key component of our approach is a structured and
intentional QA/QC process, with dedicated time built into
the project schedule specifically for detailed internal review.
studio 2G will lead a comprehensive quality control effort
that includes discipline-specific QA/QC checklists for each
consultant, ensuring that structural, electrical, and system
components are reviewed for completeness, coordination, and
code compliance prior to submittal.
In addition, we will conduct a formal QA/QC page turn
review, bringing the full team together to review the
documents sheet-by-sheet. This process allows for real-time
identification of coordination gaps, constructability concerns,
and inconsistencies across disciplines, significantly reducing the
likelihood of plan check comments and rework.
We will actively manage the plan review and permitting process
in coordination with the City and the consultant team. This
includes early alignment with applicable codes and permitting
requirements, internal quality control reviews prior to submittal,
and clear documentation of design decisions to support agency
review. By maintaining consistency between earlier design
phases and final documents, we reduce the likelihood of major
comments or redesign during plan check.
studio 2G will lead the response to plan check comments,
coordinating with all disciplines to provide timely, complete, and
well-integrated responses. We will track all comments, assign
responsibility, and verify that each response is fully incorporated
into the documents prior to resubmittal, maintaining control of
the review cycle and avoiding delays.
This effort is strengthened by our established working
relationships with our consultant team, many of whom we have
partnered with over multiple projects. This familiarity allows
for efficient communication, clear accountability, and rapid
resolution of issues during critical review periods.
Throughout permitting and final design, we will continue to
apply our proven project management approach, including
pull planning sessions, regular coordination meetings with
the City, and our SmartSheet weekly tracking system. These
tools provide transparency into
progress, highlight outstanding
items, and ensure alignment
across all stakeholders.
Following permit approval, we will
support the City during bidding
and construction by responding
to contractor questions, reviewing
submittals and shop drawings,
and conducting site visits at key
milestones to ensure that the
design intent is maintained.
Through strong leadership,
disciplined QA/QC, and a
coordinated team with a proven
history of collaboration, studio
2G will guide the project through
permitting and implementation
with a focus on efficiency, clarity,
and successful delivery.
Understanding of the Project and Technical Approach
QA/QC Process:
10S2G | PARKING STRUCTURE SAFETY ELEMENT RESEARCH AND DESIGN
STUDIO 2G ARCHITECTS ff UNDERSTANDING OF THE PROJECT AND TECHNICAL APPROACH
Cost Approach and Risk Management
Our cost approach is grounded in an understanding of the
complexities associated with working within three existing
parking structures with varying and partially unknown
conditions. We recognize that key variables such as structural
constraints, electrical infrastructure capacity, and final CCTV
system requirements have the potential to significantly
influence project cost if not addressed early and proactively.
To manage this, our cost estimator is engaged as an active
member of the team from the outset of the project, not only at
defined submittal milestones. At the beginning of the project,
the estimator will review available information and develop an
initial assessment of potential cost drivers, risks, and unknowns.
This early evaluation informs a set of targeted questions and
assumptions that will be coordinated with the City during the
initial phases, helping to clarify scope and reduce uncertainty
before design progresses.
As the design advances, the cost estimator will continuously
review evolving drawings and system decisions, providing real-
time feedback to the team on cost impacts, constructability
considerations, and potential budget risks. This allows the team
to make informed decisions during alternatives analysis and
design development, rather than reacting to cost issues later
in the process.
Formal cost estimates will be prepared at each required phase,
including Alternatives Analysis, 50%, 90%, and final PS&E,
with clearly documented assumptions and contingencies. Each
estimate will reflect the current level of design development
while also identifying remaining risks, including unknown
existing conditions, infrastructure limitations, and scope
elements that may require further definition.
Our approach also incorporates early field validation and
coordination across disciplines to reduce uncertainty related
to structural conditions, electrical capacity, and system
integration. By aligning cost estimating with verified field
conditions and coordinated design decisions, we improve
the reliability of cost projections and reduce the likelihood of
unexpected changes during construction.
Key cost drivers for this project include fencing and safety
improvements, CCTV system scope and configuration,
electrical and data infrastructure upgrades, and any enabling
work required to support installation. These elements will
be continuously evaluated and communicated to the City
throughout the project.
Through early estimator involvement, continuous cost
feedback, and clear documentation of risks and assumptions,
studio 2G provides a proactive and transparent cost
management approach that supports informed decision-
making and alignment with the City’s budget objectives.
Summary
studio 2G Architects brings a clear and disciplined approach
to the Parking Structure Safety Element project, grounded
in a strong understanding of the technical challenges, risks,
and operational constraints associated with working in active,
existing parking structures.
Our approach is defined by early validation of as-built
conditions, ensuring that design decisions are based on
verified field information rather than assumptions. This reduces
uncertainty, supports accurate cost estimating, and minimizes
the risk of redesign during later phases. As Architect of Record,
we provide consistent leadership from project initiation through
construction, maintaining alignment across all disciplines and
guiding the project toward a coordinated, buildable solution.
We are supported by a well-integrated consultant team with
an established history of collaboration, enabling efficient
coordination, clear communication, and rapid resolution
of issues. Our process is reinforced by structured project
management tools, including pull planning sessions, weekly
SmartSheet reporting, and ongoing engagement with the City
to maintain transparency and momentum.
Quality and risk management are embedded throughout our
workflow. Through dedicated QA/QC processes, including
consultant checklists and full team page turn reviews, we
ensure that documents are complete, coordinated, and ready
for efficient plan check review. In parallel, our cost estimator
is engaged from the outset, providing continuous feedback on
cost drivers, risks, and design decisions to support alignment
with the City’s budget objectives.
Finally, we place strong emphasis on constructability and
implementation, developing phased construction strategies
that maintain parking operations while prioritizing public safety.
From early analysis through final design and construction
support, our focus remains on delivering practical, efficient
solutions that can be successfully built.
Through this comprehensive and coordinated approach, studio
2G Architects will deliver a design that enhances safety,
minimizes disruption, and supports the City’s goals for long-
term performance and reliability.
Understanding of the Project and Technical Approach
RELEVANT EXPERIENCE »
San Francisco Federal Building
Childcare Security Fencing
studio 2G Architects, LLP
12S2G | PARKING STRUCTURE SAFETY ELEMENT RESEARCH AND DESIGN
STUDIO 2G ARCHITECTS ff RELEVANT EXPERIENCE
Toyota Walnut Creek Dealership (FTF Structural)
RELEVANCE
• Structural Analysis
• Evaluation of Existing Parapets and Edge
Conditions
• Identification of Anchorage Locations
• Wind Load Analysis and Seismic
Anchorage Review
• Preliminary Structural Feasibility
• Conceptual Layouts
• Representative Mounting and
Attachment Details
• Construction Phasing Plan Minimizing
Parking Disruptions
• Project Management and Coordination
• Plans, Specifications, and Estimates
(PS&E)
FTF Engineering provided structural engineering services for the new two-story
Toyota Walnut Creek dealership, a 240,000-square-foot state-of-the-art
automotive facility. The building features a ground-floor sales showroom and
service reception area, a second-floor service shop with training rooms, office
space, and a parts warehouse, along with 163,000 square feet of open parking
distributed across the ground, second, and rooftop levels.
A significant component of the project was the design and coordination of the
multi-level parking areas, including the ground, second, and rooftop parking decks.
These elevated parking levels required careful structural planning to accommodate
vehicle loads, circulation patterns, and long-span requirements while maintaining
alignment with the program above and below. The use of post-tensioned concrete
systems allowed for efficient spans and minimized column intrusion, maximizing
parking efficiency and user circulation. Coordination of structural elements with
access ramps, guardrails, and perimeter conditions was critical to ensure safety,
durability, and constructability, while supporting the overall performance of the
parking structure.
The structure is primarily cast-in-place concrete construction, utilizing reinforced
concrete columns, shear walls, and slabs. Post-tensioned girders were incorporated
to achieve long spans and wide bays, optimizing the layout to align the architectural
parking requirements with the service bays above. The foundation system consists
of economical shallow foundations, including spread footings, grade beams, and
a heavily reinforced mat slab. This approach was selected to accommodate the variable subsurface conditions, with bedrock
encountered at depths ranging from the finished floor level to approximately 30 feet below grade.
TOYOTA WALNUT CREEK
DEALERSHIP
WALNUT CREEK, CA
PROJECT DESCRIPTION
FTF Engineering provided structural
engineering services for the new
two-story Toyota Walnut Creek
dealership, a 240,000-square-foot
state-of-the-art automotive facility.
The building features a ground-
floor sales showroom and service
reception area, a second-floor
service shop with training rooms,
office space, and a parts warehouse,
along with 163,000 square feet of
open parking distributed across the
ground, second, and rooftop levels.
The structure is primarily cast-in-
place concrete construction, utilizing
reinforced concrete columns, shear
walls, and slabs. Post-tensioned
girders were incorporated to
achieve long spans and wide bays,
optimizing the layout to align the
architectural parking requirements
with the service bays above.
The foundation system consists of
economical shallow foundations,
including spread footings, grade
beams, and a heavily reinforced mat
slab. This approach was selected
to accommodate the variable
subsurface conditions, with bedrock
encountered at depths ranging
from the finished floor level to
approximately 30 feet below grade.
GROSS SQUARE FOOTAGE
240,000 sf
CONSTRUCTION COST
Confidential
CONSTRUCTION TYPE
Type I-B
DATE CONSTRUCTION
COMPLETED
Expected 2027
PROJECT TEAM
Gensler
[Architect]
McDevitt Construction
[General Contractor]
Image Courtesy of Gensler
Image Courtesy of Gensler
Location: Walnut Creek, CA | Construction Cost: N/A | Size: 240,000 SF | Completed: est. 2027
13S2G | PARKING STRUCTURE SAFETY ELEMENT RESEARCH AND DESIGN
STUDIO 2G ARCHITECTS ff RELEVANT EXPERIENCE
RELEVANCE
• Perimeter Fencing / Barrier Systems
• Evaluation of Mounting Approaches
• Conceptual Fence Layouts
• Representative Mounting and
Attachment Details
• Preliminary Structural Feasibility
• CPTED and Aesthetic Considerations
• Building, Accessibility, and Fire/Life
Safety Code Impacts
• Identification of Anchorage Locations
• Construction Phasing Plan Minimizing
Disruptions
• Project Management and
Coordination
studio 2G Architects has delivered multiple projects focused on perimeter security
enhancements for sensitive and high-profile facilities, including both historic and
federal buildings. Through careful evaluation of mounting strategies, coordination
with existing structures, and attention to constructability and operations, our team
has developed secure, durable, and context-sensitive solutions for public agencies.
Historic Federal Courthouse Fencing:
Location: Oakland, CA | Construction Cost: $303K | Size: 1,320 SF |
Completed: 2026
studio 2G Architects provided design and project management services for
a design-build project involving the addition of a security fence at a historic
courthouse facility. The project required a careful balance between improving
site security and preserving the historic character of the building and surrounding
landscape.
The project included the design and installation of a perimeter security fence with
three secure access gates. The layout and detailing were carefully developed to
provide the required level of security while remaining visually compatible with the
historic setting. Material selection, proportions, and placement were all considered
to ensure the fence complemented the historic architecture rather than detracting
from it. The result is a secure and functional solution that meets safety needs while
respecting the historic significance of the courthouse.
San Francisco Federal Building Childcare Fencing:
General Service Administration (GSA) Security Fencing
Location: San Francisco, CA | Construction Cost: $190K | Size: 2,100 SF | Completed: 2023
studio 2G Architects designed perimeter security improvements for the childcare area at the San Francisco Federal Building,
focusing on creating a safe and controlled outdoor environment.
The project included a continuous security fence system integrated with existing concrete planter walls and the building’s sunscreen
structure to establish a secure boundary without disrupting the overall design. Mesh fencing was added above the planters to
prevent unauthorized access while maintaining visibility into and out of the space.
A double-door emergency exit gate was included to meet life safety requirements, allowing for secure egress while maintaining
controlled access. The result is a well-defined and secure perimeter that prioritizes safety while remaining compatible with the
building’s architecture.
Historic Federal Courthouse Federal Building Childcare
14S2G | PARKING STRUCTURE SAFETY ELEMENT RESEARCH AND DESIGN
STUDIO 2G ARCHITECTS ff RELEVANT EXPERIENCE
USDA OIG Tenant Improvement
studio 2G Architects served as the prime contract holder, providing project
management, architectural design, interior design, and construction administration
services for a 7,600 SF tenant improvement for the relocation and consolidation
of the United States Department of Agriculture, Office of the Inspector General.
A key component of the project was the integration of enhanced security
measures throughout the space. The design incorporated secure wall assemblies
to protect sensitive areas and support controlled access, along with strategically
placed security cameras to provide full coverage of entry points, circulation paths,
and critical work zones. These systems were carefully coordinated with the overall
layout to maintain both security and functionality without compromising the user
experience.
The project included full demolition of existing walls, ceilings, and furnishings,
allowing the team to reconfigure the space to meet program and security
requirements. studio 2G worked closely with USDA leadership to develop a layout
that balanced operational needs, visibility, and control.
Interior design features incorporated USDA branding, using logo colors and
biophilic elements to create a modern and welcoming environment. Open office
areas were arranged at slight angles to preserve key views while maintaining clear
sightlines, which also supported passive supervision and security awareness.
The project was delivered within budget, and the end users are highly satisfied with
a secure, efficient, and modernized workspace.
RELEVANCE
• Security Camera Infrastructure
• Site Assessment for Security Camera
Placement
• Camera Layout Plans
• Refined Camera Placements and
Coverage
• Electrical and Data Routing Concepts
• Building and Fire/Life Safety Code
Impacts
• Project Management and Coordination
• Construction Support Services
• Preparation of Plans, Specifications, and
Estimates (PS&E)
• Working within Existing Conditions
• ADA Upgrades
Location: Oakland, CA | Construction Cost: $3.2M | Size: 7,500 SF | Completed: 2022
15S2G | PARKING STRUCTURE SAFETY ELEMENT RESEARCH AND DESIGN
STUDIO 2G ARCHITECTS ff RELEVANT EXPERIENCE
RELEVANCE
• Security Camera Infrastructure
• Site Assessment for Camera
Placement
• Camera Layout Plans
• Electrical and Data Routing Concepts
• Refined Camera Placements and
Coverage Diagrams
• Electrical and Data Pathway Design
• Structural Analysis and Anchorage
Coordination
• Alternatives Analysis and Feasibility
Evaluation
studio 2G Architects completed the design for a tenant improvement of a
municipal police facility serving multiple City departments, with a strong focus
on enhancing site and building security. The project required careful coordination
to improve safety while working within existing building and code constraints.
A key component of the Cherry Hills project was the integration of a
comprehensive security camera system to support a secure perimeter and
controlled monitoring of the facility. The project included a defined number of
new cameras, requiring the team to evaluate and prioritize placement to achieve
the most effective coverage. studio 2G analyzed building geometry, circulation
paths, and points of vulnerability to determine optimal camera locations. The
design also considered mounting conditions, coordination with existing structures,
and integration with other security elements to maintain both performance and
constructability.
The team also conducted detailed code analysis to ensure that the security
improvements could be implemented without triggering major building
upgrades, allowing the project to remain efficient and cost-effective. This project
demonstrates studio 2G’s ability to plan and design effective security systems
within existing facilities, using a strategic and analytical approach to maximize
coverage, enhance safety, and support long-term operations.
City of Menifee Police Department Renovation
Location: Meniffee, CA | Construction Cost: $2M | Size: 2,500 SF | Completed: 2026
RELEVANCE
• Alternatives Analysis
• Evaluation of Existing Conditions
• Structural Analysis
• Identification of Anchorage Locations
• Building, Accessibility, and Fire/Life
Safety Code Impacts
• Identification of Permits and Approval
Requirements
• Project Management and
Coordination
• Conceptual Layouts
• Structural Feasibility
studio 2G Architects completed a feasibility study for improvements to an
existing pedestrian bridge spanning Broadway Street (HWY 135) in the City
of Santa Maria. The study focused on evaluating existing structural and access
conditions and developing strategies to improve safety, accessibility, and long-
term functionality of the crossing. A key component of the work included
assessment of the existing stair and elevator systems, as well as exploration of a
new elevator and stair connection on the east side of the bridge to replace the
existing connection to the mall’s second level.
The team conducted a detailed review of existing conditions to identify constraints,
code deficiencies, and opportunities for improvement, including required upgrades
to meet current accessibility and life safety standards. Multiple design options
were analyzed to determine feasible approaches for integrating new vertical
circulation elements with the existing structure while minimizing impacts to
ongoing use and adjacent properties. The project also required coordination with
Caltrans due to the bridge’s location over a state highway, including consideration
of right-of-way limitations and permitting requirements. The result was a set
of clear recommendations and conceptual approaches to guide future design,
permitting, and implementation.
Santa Maria Broadway Bridge Feasability Study
Location: Santa Maria, CA | Construction Cost ext. $2M | Completed: 2026
QUALIFICATIONS OF THE PROPOSED PROJECT TEAM »
Santa Maria Broadway Bridge
Feasability Study
studio 2G Architects, LLP
17S2G | PARKING STRUCTURE SAFETY ELEMENT RESEARCH AND DESIGN
STUDIO 2G ARCHITECTS ff ORGINIZATIONAL CHART & RESUMES
Organizational Chart
ROLES OF OUR MANAGEMENT TEAM AND FIRM SIZE
Project Architect
• Primary person of contact for client.
• Maintains regular communication
with client and the team.
• Contract administration and
management.
Project Manager
• Manages schedule compliance and
budget control.
• Provides direction to personnel.
• Day-to-day tasks project
completion.
• Communication with the end user.
• Attends project meetings
Quality Manager
• Prepares contract specific QA/QC
plan.
• Implements all quality tasks.
• Coordinates with PMs for
consistency in quality process across
project.
studio 2G Archtects, LLP
• Our firm is made up of three (3) partners, six (6) support staffi, one (1) technical support staffi, and one (1) administrative staffi.
• Our firm has remained stable at this size for the past 5 years.
PROJECT MANAGER
Serena Kacheros-Warren, NCARB Licensure Candidate
(studio 2G Architects)
QUALITY MANAGER
Heidi Gibson, AIA, LEED BD+C, NCARB
(studio 2G Architects)
PROJECT ARCHITECT
Ashley Mayou, RA, NCIDQ
(studio 2G Architects)
KEY DISCIPLINES
STRUCTURAL ENGINEERING
Jillian van Enckevort, PE (FTF Engineering)
ELECTRICAL ENGINEERING
John Maloney (JMPE Engineering)
FIRE PROTECTION & LIFE SAFETY
Al Yakel, PE (Collings & Associates)
COST ESTIMATING
John Moreno, CCP, LCPE (Sierra West)
18S2G | PARKING STRUCTURE SAFETY ELEMENT RESEARCH AND DESIGN
Resumes
STUDIO 2G ARCHITECTS ff ORGINIZATIONAL CHART & RESUMES
EDUCATION
Bachelor of Architecture
California Polytechnic State University
San Luis Obispo, CA
AFFILIATIONS
City of San Luis Obispo Architectural
Review Commission
Chair (2022-2024)
Vice Chair (2021-2022;
2024-Present)
Commissioner (2020-2021)
SELECT EXPERIENCE
GSA, USDA OIG Tenant Improvement | Oakland, CA
Construction Cost: $3.2M | Size: 7,500 SF | Completed: 2022
Acting as Project Manager for this Design-Bid-Build tenant improvement of the
15th floor of the Dellums Federal Building to include new private offices, open
office workstations, conference rooms, break room, IT, and storage rooms for the
the United States Department of Agriculture. Project featured security camera
infrastructure, site assessment for security camera placement.
GSA, SFFB Childcare Fencing | San Francisco, CA
Construction Cost: $190K | Size: 2,100 SF | Completed: 2023
Acting as Project Architect / Manager for perimeter security improvements at the
San Francisco Federal Building childcare area, overseeing design and coordination
to create a safe and controlled outdoor environment. Led integration of a
continuous security fence system with existing planter walls and building elements,
maintaining visibility, security, and architectural compatibility. Coordinated life safety
requirements, including a double-door emergency egress gate, delivering a secure
and code-compliant solution.
County of Santa Barbara BeWell Facility | Santa Barbara, CA
Construction Cost: $ 1.4 M | Size: 2,804 SF
Acting as Project Manager / Architect for a residential wellness facility with a strong
focus on accessibility compliance. Scope included interior renovation of a board and
care facility. Work included design and implementation of exterior ADA-compliant
path of travel, accessible parking improvements, and coordinated ADA signage to
ensure full site accessibility and code compliance.
SLO City Hall Finance / IT Tenant Improvement | San Luis Obispo, CA
Construction Cost: $1.24M | Size: 7,500 SF
Acting as Project Manager / Architect for tenant improvements to the City Hall
Finance and Information Technology Offices, with an emphasis on delivering
ADA upgrades within an occupied, locally serving civic facility. Scope included
reconfiguration of interior spaces to improve accessibility, including an upgraded
accessible path of travel to the primary stair, and strategic modifications within
existing structural constraints.
Ashley Mayou, Licensed Architect C-27830, Licensed Interior Designer NCIDQ #421364
Partner, studio 2G Architects | Architect | 7+ with studio 2G | 9 yrs of experience
Ashley Mayou will be the Project Architect for this City project. Mayou has received
a reputation in the industry for being a swift communicator and providing thorough
coordination of the design team documents throughout a project. Mayou has
extensive experience working with public/government clients. She is currently the
Project Manager and Interior Designer on active projects with the County of Santa
Barbara, the City of San Luis Obispo, and the City of Menifee. Below you will find
her experience working with government clients and projects of a similar size.
19S2G | PARKING STRUCTURE SAFETY ELEMENT RESEARCH AND DESIGN
Resumes
STUDIO 2G ARCHITECTS ff ORGINIZATIONAL CHART & RESUMES
Serena Kacharos-Warren, NCARB
studio 2G Architects | Project Manager | 2+ with studio 2G | 8 yrs of experience
Serena Kacharos-Warren will serve as Project Manager on this City Project.
Kacharos-Warren has experience overseeing a wide range of architectural projects,
including civic, federal, commercial, hospitality, and mixed-use projects. She
specializes in coordinating design teams, facilitating clear communication with clients,
and managing project schedules to ensure successful delivery from concept through
construction. Serena will serve as the central point of coordination between clients,
consultants, and contractors. She has successfully coordinated across disciplines
on several projects that required complex integration of building systems with
architectural design. Below you will find her experience working with government
clients and projects of a similar size.
SELECT EXPERIENCE
Santa Maria Broadway Bridge Feasability Study | Santa Maria, CA
Construction Cost est. $2M | Size: N/A
Acting as Project Manager for a feasibility study evaluating improvements to
an existing pedestrian bridge spanning Broadway (Hwy 135) in the City of Santa
Maria. The study evaluated adding a new elevator and stair tower on the east side
of Broadway, and assessing code compliance to the existing elevator and stair
systems, while coordinating with Caltrans and overseeing supporting studies including
topographic survey and hazardous materials testing.
Camp Roberts Remodel | San Miguel, CA
Construction Cost: $1.1M | Size: 1,591 SF
Acting as Project Manager for federal office facility renovation. Attended site visits
and meetings with the client. Created and updated project narrative throughout
project. Scope included interior renovation to update the existing condition of the
building. Interior finishes, restrooms, mechanical systems, electrical, plumbing, ADA,
windows & doors, exterior siding, and sitework were all evaluated and assessed for
removal and replacement. Included structural retrofit and abatement.
Woodland Business Park | Nipomo, CA
Construction Cost: $4M | Size: 10,000 SF
Acting as Project Manager for the new build of two shell commercial buildings
designed to provide flexible spaces to accomodate various potential occupants. Point
of contact with the client and consultants.
Auxiliary Office Addition | Paso Robles, CA
Construction Cost: $897,000 | Size: 2,700 SF
Acting as Project Manager for addition to a wine production facility that added new
office space and updated ADA bathrooms for staff. Coordinated throughout the
project with client, consultants, and jurisdiction.
EDUCATION
Bachelor of Architecture
Minor in Business & Economics
University of Oregon
Eugene, OR
AFFILIATIONS
Vice President S&T Water Board
June 2025 - Current
AIA Board - Associates Director
2020-2022
20S2G | PARKING STRUCTURE SAFETY ELEMENT RESEARCH AND DESIGN
Resumes
STUDIO 2G ARCHITECTS ff ORGINIZATIONAL CHART & RESUMES
Heidi Gibson, AIA, NCARB, LEED BD+C, Licensed Architect C-27830
Partner, studio 2G Architects | Architect | 20+ with studio 2G | 32 yrs of experience
Heidi Gibson, AIA, LEED AP BD+C certified, will be the QA/QC Manager for
this City Project. Gibson has extensive experience with renovation work with public
clients. Gibson has received a reputation in the industry for going beyond the status
quo and she strives to take clients on a journey by giving them insights on how their
project can create a healthy environment, conserve resources, and be dramatically
unique. Gibson’s projects have received numerous awards from the AIA and local
award platforms. Heidi leads studio 2G’s Hospitality and Federal POD, overseeing
a diverse portfolio of projects for both public and private clients. Below you will
find her experience working with government clients and projects of a similar size.
SELECT EXPERIENCE
GSA, USDA OIG Office TI | Oakland, CA
Construction Cost: $3.1 M | Size: 7,485 SF
Acting as Project Architect for this Design-Bid-Build tenant improvement of the
15th floor of the Dellums Federal Building to include new private offices, open
office workstations, conference rooms, break room, IT and storage rooms for the
the United States Department of Agriculture.
SLO City Hall Finance and IT Office TI | San Luis Obispo, CA
Construction Cost: $430,000 | Size: 7,500 SF
Tenant improvement to the City Hall Finance and Information Technology offices
to remove walls and incorporate glass material to accentuate natural light along
with new work station furniture. Upgrades were required in the break room and
restrooms to bring the facility into ADA compliance.
GSA, Health and Human Services Office TI | San Francisco, CA
Construction Cost: $9.9 M | Size: 56,000 SF
Acting as Project Architect for this tenant improvement which encompasses five
(5) floors of the San Francisco Federal Building to consolidate the HHS offices and
create shared working spaces.
GSA, Historic Federal Courthouse Fencing | Oakland, CA
Construction Cost: $303K | Size: 1,320 SF | Completed: 2026
Served as Project Architect for an Historic Federal Courthouse fencing project
in Oakland, leading design development and detailing for a perimeter security
system within a sensitive historic context. Developed fence layout, gate locations,
and material selections to achieve required security while maintaining compatibility
with the courthouse architecture and surrounding landscape. Coordinated with the
design-build team to deliver a secure, code-compliant solution for this historic site.
EDUCATION
Bachelor of ArchitectureCalifornia Polytechnic State University San Luis Obispo, CA
Associate of Arts Degree in Interior DesignFashion Institute of Design and Merchandising, Los Angeles
AFFILIATIONS
American Institute of Architects Central Coast Chapter
Past President (2010-2013) CA Director (2014-2016)
Member of the National Council of Architect Registration Board
US Green Build Council
California Air Guard, Retired Lieutenant Colonel
21S2G | PARKING STRUCTURE SAFETY ELEMENT RESEARCH AND DESIGN
Resumes
STUDIO 2G ARCHITECTS ff ORGINIZATIONAL CHART & RESUMES
Jillian van Enckevort, S.E.
Principal
California SE # 5394 / California CE # 67784
Utah SE # 11283864-2203
Nevada SE # 027347
Oregon SE # 100531
Missouri PE # 2026014473
Experience: 24 years
Jillian joined FTF Engineering in 2015 with over
thirteen years of structural engineering experience.
The breadth of her work encompasses residential,
commercial and hospitality projects and numerous
industrial and military base projects, including
commercial launch facilities, satellite processing
facilities and large antenna foundations. Jillian has
performed numerous foundation repairs, bluff
stabilizations and seismic retrofits in wood, steel and
concrete as well as the creation of computer models
for the development of structural damper systems.
She has also implemented a wide range of design
software and drawing tools and is an experienced
project manager.
Jillian serves as the leader of the San Luis Obispo
office of FTF Engineering, managing multiple
projects and multiple engineers across California
and the United States.
Education
B.S. in Architectural Engineering, California
Polytechnic State University, San Luis Obispo, CA,
June 2002
Professional Affiliations
Structural Engineering Association of Southern
California (SEAOSC)
American Society of Civil Engineers (ASCE)
Central Coast International Code Council (ICC)
Project Experience
Toyota Automotive Facility, Walnut Creek, CA
Engineer of Record for 240,000 square foot state of the art automotive facility with 163,000 square feet of parking
on the ground, second floor, and roof top. Scope of work included design and detailing of safety elements
including bollards, parapets, and traffic guardrails.
GSA Security Upgrades, San Francisco and Sacramento, CA
Engineer of Record for security upgrades at numerous GSA facilities including fencing and hardening elements
with review and coordination of anchorage to existing structural elements.
Walmart Headquarters Security Upgrade, San Bruno, CA
Anchorage of entryway security upgrades on an existing six-story concrete office complex over two stories of
parking. Included review and coordination for attachments to existing post-tensioned concrete slabs.
ReSource Recovery Project, Tajiguas Landfill, Santa Barbara County, CA
California Seismic Engineer for the design of equipment supports, anchorage of the processing equipment, and
cast-in-place concrete percolate tanks at the Santa Barbara County ReSource Center, which is a state-of-the-art
material recycling facility and anaerobic digester.
San Francisco Airport International Terminal Building Phase 2 Renovation, San Francisco, CA
Provided engineering oversight and internal QA/QC for the ITB Phase 2 Renovation Design-Build Project which
involves the centralization of US Customs Secondary Operations to the central Second Floor. FTF’s scope
includes all structural design for new metal stud framing, blast-resistant rooms, designing penetrations in floors,
and designing structural support for architectural features.
Foundation and Anchorage at Test Pad 01, Vandenberg Air Force Base, CA
Design of concrete foundations for the support of scaffolding anchorage loads during the processing phase,
upgrading an existing launch support pad to support a new steel pedestal and launch vehicle.
22S2G | PARKING STRUCTURE SAFETY ELEMENT RESEARCH AND DESIGN
Resumes
STUDIO 2G ARCHITECTS ff ORGINIZATIONAL CHART & RESUMES
John Maloney, PE
Principal/Engineer
Licenses
California #E13083 Colorado #26463 Oregon #71274PE
Arkansas #11196 Louisiana #32751 Nevada #019896 Alabama #32073-E
Since 1982, John Maloney has been committed to creating the most cost-effective, energy-efficient
electrical and lighting design solutions for government, commercial, and residential projects. In 1994,
Maloney formed JMPE, his own electrical engineering and lighting design business headquartered in
Santa Barbara, California. In 2002 he opened a branch office in Bakersfield with a staff of four that has
grown to fifteen. In 2014 John opened a third office in Orcutt. Maloney's areas of expertise include
electrical design of power, lighting, and signal systems; distribution system design, short circuit analysis,
coordination studies and Title 24 Lighting Calculations; as well as interior and exterior lighting design for
retail stores, offices, and residences.
Professional Experience:
Santa Barbara Electrical Design Group, Inc., Partner 1987-1994
JMPE Electrical Engineering & Lighting Design, Owner 1994-Present
JMPE is a full-spectrum electrical engineering and lighting design firm with offices in:
Bakersfield, CA
5500 Ming Ave.
Suite 251
(661) 831-7851
Santa Barbara, CA
146 East Carrillo Street
(805) 569-9216
Santa Maria, CA
2880 Santa Maria Way, Suite D4
Suite 204
(805) 886-1390
John’s areas of expertise include, but are not limited to:
Interior and exterior lighting design for retail stores, offices and residences.
Electrical design of power, lighting, and communication systems for schools, hospitals, commercial
and government entities.
Distribution system design.
Fire alarm system design.
Short circuit analyses.
Arc Flash Analyses
Coordination studies.
Title 24 lighting calculations.
Detailed electrical cost estimating.
Industrial power and control systems, commercial and institutional power, lighting, and
communication systems.
Data network cabling designs.
23S2G | PARKING STRUCTURE SAFETY ELEMENT RESEARCH AND DESIGN
Resumes
STUDIO 2G ARCHITECTS ff ORGINIZATIONAL CHART & RESUMES
John Maloney, PE Page 2
Organizations: Former Vice Chair of the Department of the State Architect
Green Committee. 2009
Named Chairperson of the prestigious State of California
Electrical Engineering Technical Advisory Committee. 1997
Served on the State of California Electrical Engineering
Advisory Council 1998 - 2007
Appointed to the Division of State Architect Advisory
Board. 2006
Member of OSHPD SNF Ad Hoc Committee 2008 – 2009
Member of Fire and Code Board, City of Santa Barbara 2017 - Present
Professional
Memberships: IEEE (Institute of Electrical & Electronic Engineers-former Section Chair)
IESNA (Illuminating Engineering Society of North America former Section
Chairman)
California Society of Professional Engineers (former Chapter President)
MathCounts Chairperson
Member of the U.S. Green Building Council.
Member (and past secretary) of ACEC (American Council of Engineering Companies)
Kern County Chapter.
Awards: 1995 - American Institute of Architects - San Luis Obispo Chapter Award (Palm
Street Offices)
1995 - Applee Award - Honorable Mention (Crossroads Restaurant in Santa Barbara
interior lighting)
1994 - Santa Barbara Beautiful Award (Crossroads Restaurant in Santa Barbara)
1994 - Illuminating Engineering Society's Paul Waterbury Award (Santa Barbara City
College's Parking Structure Lighting)
Three-time winner of the Southern California Edison Design for Excellence Award
1993 - Oxnard Post Office Remodel
1992 - Lost Arrow/Patagonia Office Remodel
1991 - Emilie Ritchen Elementary School Oxnard
2000 - Named Engineer of the Year for 2000 for Ventura and Santa Barbara Counties.
2002 - Received the California State AIA Award of Merit for Energy Savings at the
South Coast Watershed Resource Center
2002 - Citation of Merit for California Savings By Design Energy Efficiency Integration
Award
2005 - Savings By Design Energy Efficiency Integration Award of High Honor for Casa
Nueva, Santa Barbara County Office Building
2009 - California Community Colleges Chancellor’s Award for most Innovative Energy
Design
2010 - Energy Efficiency Green Award for UCSB Tipton Meeting House
2013 - Habitat for Humanity, Canon Perdido St., Santa Barbara. Passive House Certified.
2017 - Museum of Exploration & Innovation (MOXI), 125 State St., Santa Barbara;
President's Award
2023 - Preservation Design Award, Hart Park Adobe House Rehabilitation
24S2G | PARKING STRUCTURE SAFETY ELEMENT RESEARCH AND DESIGN
Resumes
STUDIO 2G ARCHITECTS ff ORGINIZATIONAL CHART & RESUMES
Al Yakel, SET, CFPS
Principal-In-Charge, Collings & Associates | Director of Fire and Life Safety | 32 yrs of experience
Al brings more than 32 years of experience in numerous fire protection arenas,
including system design, code consulting, egress modeling, and as a former Authority
Having Jurisdiction with the University of California as a Designated Campus Fire
Marshal. Mr. Yakel has extensive experience in the application of the Building and
Fire Codes and the requirements of California Title 19 and 24. He has been involved
in a wide variety of fire and life safety projects, including the review and approval of
plans and specifications for new construction and tenant improvements. Our firm has
recently completed several library specific projects which have included all levels of
fire protection including fire alarm, fire suppression, life safety and code consulting.
We are well versed in the code requirements and needs of the fire service to provide
a comprehensive fire protection solution.
SELECT EXPERIENCE
Mesa Parking Structure Bldg. 18 | UCSB Campus, CA
Development of installation level (Shop Drawing’s) fire alarm system design
documents, to include automatic detection coverage throughout all elevator landings
as required per the provisions of 2022 CFC, 2022 NFPA 72 and the Designated
Campus Fire Marshal for a fully approved elevator recall system submittal.
V22-020 SLC3 PLARB Bldg. Expansion | Vandenberg SFB, CA | Diatri Building
Corp.
Installed missing pipe hangers. Provided As-Built Drawings to support field change
for the point of connection with the existing 4-inch mail. Completed the Fire
Sprinkler System installation in the Control Room and provided updated as-built
drawings to show changes as discussed in the field. Completed the GN2 connection
to the Fire Sprinkler System riser and test the system both hydrostatically and with
air as required by NFPA.
Moorpark College Gymnasium Renovation
Coordinated underground fire service piping supply routes, pipe sizes and materials,
backflow assembly, sprinkler system riser location, fire department connection,
and related installation requirements, with Amador Whittle Architects. Provided
a complete engineering design of the required fire sprinkler systems for submittal
and review by DSA; incorporate DSA plan review comments. Provided a detailed
fire sprinkler system installation and performance specification, to accompany
construction documents.
Galveston (GDSCC) Fire Alarm Replacement | Jet Propulsion Laboratory/Deep
Blue Integration, Inc.
EDUCATION
BSB Business Administration, University
of Phoenix, Phoenix, AZ
AS Fire Technology, Oxnard College,
Oxnard, CA
Firefighter I, Allan Hancock College,
Santa Maria, CA
AFFILIATIONS
• National Institute for Certification
in Engineering Technologies
(NICET) Fire Alarm Systems Level
IV, No. 142617
• International Code Council (ICC)
Building Inspector No. 0881772-
60
• International Code Council (ICC)
Building Inspector No. 0881772-
10
• National Fire Protection
Association (NFPA) Professional
Member No. 2915186
• International Code Council (ICC)
Professional Member
• Certified Fire Protection Specialist
(CFPS), Certification No.
1140199
2026 BILLING RATES
Principal Engineer: $235.00 per hour
Senior Engineer: $205.00 per hour
Staff Engineer: $175.00 per hour
CAD/Drafting Services: $130.00 per hour
Administration/Clerical: $99.00 per hour
Other:
Reproduction: Cost
Special Travel & Subsistence: Cost
Automobile Mileage: Current IRS Standard
Effective January 1, 2026
260 Maple Court, Suite 241 Ventura, California 93003 (805) 658-0003
25S2G | PARKING STRUCTURE SAFETY ELEMENT RESEARCH AND DESIGN
Resumes
STUDIO 2G ARCHITECTS ff ORGINIZATIONAL CHART & RESUMESSTUDIO 2G ARCHITECTS | MANAGEMENT, TEAM MEMBERS & SUBCONSULTANTS
17S2G | CITY OF SANTA MARIA: ON-CALL DESIGN SERVICES
9700 Business Park Drive #102
Sacramento, CA 95827
JOHN MORENO Vice President and Chief Estimator
(916) 925-4000, ext. 102
jlmoreno@sierrawestgroup.com
EDUCATION
• AA Construction — Butte Community College, Chico,
CA
• RS Means — Electrical
Estimating
• RS Means — Mechanical
Estimating
• CSUS & ARC — Estimating & Construction Management
AFFILIATIONS
• Association of Professional Estimators —
(ASPE)
• Construction Specifications Institute — (CSI)
• Association of General Contractors
— (AGC
PROFILE
Mr. Moreno offers a diverse range of construction expertise. He brings with him over 26 years of experience in construction and
estimating. Specializing in mechanical and electrical work, his participation ranges from the conceptual planning phase through
design and final construction. With an extensive knowledge base, Mr. Moreno has a proven record and is known for his ability to
work with clients to produce quality results.
PROJECT ROLE
John Moreno leads the cost estimating efforts for Sierra West Consulting Group, Inc. He works closely with the entire team
through each phase of the project to provide a series of successively refined estimates as the project scope is clarified to
assure that the project remains within the budget parameters.
RELEVANT EXPERIENCE
● Santa Clara County, Civic Parking Garage ADA
Improvements, On-Call, San Francisco, CA
● Santa Clara County, Department of Revenue
Credit Union, On-Call, San Francisco, CA
● Santa Clara County- Vector Control, On-Call,
San Francisco, CA
● County of Sacramento, RCCC Campus
Expansion and infrastructure improvements,
On-Call, Sacramento, CA
● Stanislaus County, Alternate Emergency
Operations Center, On-Call, Modesto, CA
● County of Sacramento, ADA Path of Travel,
On-Call, Sacramento, CA
● County of Sacramento, Masterplan update,
On-Call, Sacramento, Ca
● County of Sacramento, 700 H Street Bullet
Resistant Upgrades, On-Call, Sacramento, CA
● County of Sacramento, Ecology Lane ADA Path
of Travel, On-Call, Sacramento, CA
● County of Sacramento, ADA Path of Travel
Restroom Upgrades, On-Call, Sacramento, CA
● Napa County, Building site A&B investigation,
On-Call Napa, CA
● Stanislaus County, Community Service Facility
Life Energy Analysis, On-Call, Modesto, CA
● County of Kern, Animal Services Facility, On-Call,
Bakersfield, CA
Subconsultants
San Luis Obispo City Hall
Finance and IT Tenant Improvement
Security and ADA Upgrades
studio 2G Architects, LLP
PROPOSED PROJECT SCHEDULE »
22662255 SSCCPPGG SSLLOO CCiittyy PPaarrkkiinngg GGaarraaggee
Page 1 of 2
Page 2 of 2
Proposed Project Schedule
studio 2G Architects proposes a structured and efficient
schedule that aligns with the City’s anticipated review durations
and supports timely decision making at each phase. Our
approach is designed to maintain momentum while allowing
adequate time for City review and coordination.
We will initiate the project immediately upon notice to proceed
with a focused kickoff meeting to confirm scope, schedule,
communication protocols, and site access. Following kickoff,
the work will proceed through the defined phases as outlined
in the attached Gantt Chart.
Estimated Overall Duration
Based on the durations above and inclusion of City review
periods, the total project timeline from notice to proceed
through completion of bidding is estimated at approximately
9 to 10 months. We estimated construction duration to
be approximately 90 days due to phased construction to
maintain parking operations, limited work hours, multiple
structures (3 sites) and electrical / data complexity.
Schedule Approach
Our team will actively manage the schedule through regular
updates, early identification of potential constraints, and
close coordination with the City. We will prioritize timely
submittals and clear documentation to support efficient
reviews and approvals. This approach ensures a predictable
project timeline while maintaining the flexibility needed to
respond to project complexities and stakeholder input.
Under Construction
SLO Parking
Structure Task 6 -
Construction Support
PS&E and Permitting
Support
PS&E and Permitting
Support
USDA OIG Tenant Improvement
Security and ADA Upgrades
studio 2G Architects, LLP
DETAILED FEE PROPOSAL BY TASK »
29S2G | PARKING STRUCTURE SAFETY ELEMENT RESEARCH AND DESIGN
STUDIO 2G ARCHITECTS ff DETAILED FEE PROPOSAL BY TASK
PROFESSIONAL SERVICES FOR PARKING STRUCTURE SAFETY ELEMENTS
RESEARCH AND DESIGN
DESIGN TEAM COSTS OVERVIEW
HOURLY BREAKDOWNS WERE NOT REQUIRED PER THIS RFP, BUT HOURLY BREAKDOWNS CAN BE PROVIDED UPON REQUEST.
Conpany and Discipline Task 0 –
Project
Management
Task 1 –
Alternatives
Analysis
Task 2 –
50% PS&E
Task 3 –
90% PS&E
Task 4 –
100% PS&E +
Permitting
Task 5 –
Final PS&E +
Bidding
Task 6 –
Construction
Support
Totals
studio 2G - Architecture, Project
Management $15,931.80 $15,326.26 $14,815.66 $15,730.56 $12,185.50 $4,826.74 $9,517.96 $88,334.48
FTF - Structural -$8,600.00 $14,580.00 $7,640.00 $5,600.00 $2,340.00 $6,540.00 $45,300.00
JMPE - Electrical ---$4,800.00 $3,800.00 $800.00 $1,800.00 $11,200.00
Sierra West - Cost Estimating -$1,500.00 $6,000.00 $4,500.00 $3,000.00 $2,000.00 -$17,000.00
Collings - Fire $840.00 $420.00 $1,005.00 $780.00 $840.00 $225.00 $585.00 $4,695.00
Totals (Not Including Bid
Alternates):$16,771.80 $25,846.26 $36,400.66 $33,450.56 $25,425.50 $10,191.74 $18,442.96 $166,529.48
Compliance with On-Call Agreement
studio 2G Architects confirms that this proposal complies with the terms and conditions of the executed On-Call Professional Services Agreement with the City of San Luis
Obispo. Services are proposed on a lump sum (fixed fee) basis by task, consistent with the scope defined in this specific RFP. Billing rates and detailed hourly breakdowns are
readily available and can be provided upon request.
Assumptions
1. One contractor will be selected for all three parking structures.
2. Work will be performed concurrently across all three structures; deliverables may be packaged but analyzed individually.
3. Construction duration is assumed to be approximately 16 weeks.
4. Scope is limited to safety improvements at the three identified parking structures.
5. No comprehensive ADA upgrades are included beyond those directly impacted by the proposed safety improvements.
6. Design will be based on available existing documentation and limited field verification.
7. Site visits are limited to approximately 3–4 key milestone visits per structure.
8. Post-tension scanning (e.g., GPR/X-ray) will be provided by others; anchor design is dependent on results.
9. Design assumes no major structural deficiencies requiring significant repair or strengthening beyond localized improvements necessary to support new safety elements.
10. Alternative analysis is limited to the three options identified in the RFP (surface-mounted, parapet-mounted, recessed-mounted).
11. Camera system design will follow precedent established in the Cultural Arts District.
12. Integration of existing camera systems is limited to pay station areas only.
13. No centralized monitoring system is included in the base scope.
14. Existing power and network infrastructure are assumed to have adequate capacity for proposed improvements.
15. Phased construction is assumed to maintain ongoing parking operations.
16. Design is based on a total project construction budget of approximately $1.5 million.
17. Cost estimates are opinions of probable construction cost only.
18. Deliverables are limited to those identified in RFP Section 5 (PS&E, reports, cost estimates, etc.).
19. One formal review cycle per phase is assumed.
20. If unforeseen conditions or regulatory requirements necessitate additional scope, such services will be treated as additional services.
Exclusions
1. Structural repairs beyond those required to support new safety systems.
2. Full structural retrofit or seismic upgrades.
3. Hazardous materials investigation, testing, or abatement (e.g., asbestos, lead).
4. Destructive testing, coring, or intrusive investigation.
5. Detailed IT/network design beyond a diagrammatic or performance-based level.
6. Procurement, installation, or commissioning of camera/security systems.
7. Software, monitoring systems, or data storage design.
8. Utility upgrades, including new electrical service, transformers, or major infrastructure improvements.
9. Full-time construction observation or inspection.
10. Construction means, methods, techniques, sequencing, or safety.
11. Contractor schedule control, delays, or claims.
12. Permit, plan check, or agency fees.
13. Redesign or additional documentation resulting from agency or client changes beyond the assumed single review cycle.
14. Environmental review or documentation (e.g., CEQA), if triggered.
15. Public outreach, stakeholder engagement, or community meetings beyond those specifically identified in the scope.
16. Grant applications, funding assistance, or financial procurement services.
17. Design for future system expansion beyond what is required for the current project scope.