Loading...
HomeMy WebLinkAboutApplicant QuestionsCity of San Luis Obispo, Community Development, 919 Palm Street, San Luis Obispo, CA, 93401-3218, 805.781.7170, slocity.org August 23, 2018 San Luis Obispo Repertory Theatre 888 Morro Street San Luis Obispo, CA 93401 Pre-Application Meeting: Pre-Application review Pre-application review of a new performing arts theater, the SLO Repertory Theatre (PRE-1686-2018) Questions from the Applicant: 1. If the parking garage project is delayed, and we would like to move forward ahead of it, are we really going to have to re-do all the EIR stuff? Why? Would most of that just be re-working already attained data? 2. How will parking requirements be handled? Obviously, none will occur on site, but can/will we get a break on in-lieu fees? 3. We critically need the roll up access doors on the south and north sides. A theatre can't really function without this kind of access. How can this be accommodated? We really only need these access points available occasionally. Could this be conditioned, such as delivery trucks are only allowed certain days/hours? We don't see use of these doors as creating more "traffic: per se. 4. The current draft EIR mentions a zoning designation of PF, but the development requirements for this zone show 15 ft. setbacks and 25-35 ft. height limits. Other parking garages, we understand, were zoned commercial and our designs have zero setbacks and 40+ ft heights. 5. My understanding of the accessibility codes, based in experience with other jurisdictions, is that the only exterior accessible, wheelchair ramp required is at the main entrance. All other exterior exits can be stairs and/or pedestrian ramps up to 1 in 8 in slope. This is critical to our design in a number of ways. 6. What’s the plan for the BEE BEE statue on MORRO STREET outside of the theatre now? Is the City planning on moving that to the new site? If not, what would be best way to begin the discussion of any public art components in our site plan? 7. What portion of the sidewalk and Stairs at the Corner of Monterey and Nipomo will be saved during Demolition? 8. How will the demolition of the existing structures be handled if the project is phased? PRE-1686-2018 Page 2 610 Monterey 9. What are the requirements for saving the Oak Trees? What type of material can be placed over the root zone at the Oak Trees? 10. Are the driveways allowed in the current locations on both Monterey Street and Nipomo Street? 11. What type of drainage will be allowed if the Access Roll Up Door on the North Side of building is below grade? Can we pump storm water from this area with a duplex pump? 12. What off-site improvements are going to be required? Can the City provide off site design parameters? How are we tapering our proposed improvements into existing? 13. Are we going to be under-grounding all utilities? 14. How will the Storm Water Control Plan be handled? Are we responsible for only our portion of the project? Do we need to show a plan on how the entire project must be in compliance? 15. Primary site question is the Public ROW; we have shown landscape area to accommodate the removal of on street parking, added driveway access (item 3 below)- these items labeled on the plan. 16. The Stormwater questions are Daniel’s realm however we need to move forward with an understanding of how to meet any standards for Stormwater management, LID or bioretention areas.