Loading...
HomeMy WebLinkAboutCC Final Staff Report Department Name: Community Development Cost Center: 4003 For Agenda of: November 5, 2019 Placement: Public Hearing Estimated Time: 90 minutes FROM: Michael Codron, Community Development Director Prepared By: Rachel Cohen, Associate Planner SUBJECT: REVIEW OF A NEW 23,344-SQUARE FOOT PERFORMING ARTS FACILITY AND A NEW 162,909-SQUARE FOOT PARKING STRUCTURE WITH 404 PARKING SPACES, INCLUDING ARCHITECTURAL REVIEW, A GENERAL PLAN AMENDMENT CHANGING THE PROJECT SITE FROM OFFICE AND MEDIUM-HIGH DENSITY RESIDENTIAL TO GENERAL RETAIL, A ZONE CHANGE FROM OFFICE WITH A HISTORIC DISTRICT OVERLAY (O-H) AND MEDIUM-HIGH DENSITY RESIDENTIAL (R-3) TO DOWNTOWN COMMERCIAL ZONE WITH A HISTORIC OVERLAY (C-D- H), A DEVIATION TO THE HEIGHT AND FLOOR AREA RATIO MAXIMUM FOR THE PARKING STRUCTURE, AND USE PERMITS TO ALLOW A PERFORMING ARTS FACILITY AND A PARKING STRUCTURE WITHIN THE DOWNTOWN COMMERCIAL ZONE WITH AN ADDENDUM TO THE PREVIOUSLY CERTIFIED FINAL ENVIRONMENTAL IMPACT REPORT (EID-0349-2017) TO ADDRESS THE REZONE AND GENERAL PLAN AMENDMENT FOR THE PROJECT. RECOMMENDATION 1. Adopt a Resolution (Attachment A) approving the project; and 2. Introduce an Ordinance (Attachment B) rezoning the property for the proposed uses. REPORT-IN-BRIEF Two new structures are being proposed on the subject properties. SLO Repertory Theatre (SLO Rep Theatre) is proposing a new 23,344-square foot performing arts facility with two performance spaces, rehearsal space, workshop and storage areas, lobby, a balcony and roof deck and administrative offices (Attachment C). The City of San Luis Obispo is proposing a new 162,909-square foot parking structure with 404 parking spaces (Attachment D). The proposed project requires review of the following: 1. Architecture; 2. A General Plan Amendment changing the project site from Office and Medium-High Density Residential to General Retail; 3. A zone change from Office with a Historic District Overlay (O-H) and Medium-High Density Residential (R-3) to Downtown Commercial Zone with Historic Overlay (C-D-H); 4. Exception to the height and floor area ratio for the parking structure; 5. Use permits to allow a theater, parking structure, and ground floor residential within the Downtown Commercial zone; and 6. An addendum to the certified Final Environmental Impact Report (FEIR). The architectural design of project was reviewed by the Architectural Review Commission (ARC), the Cultural Heritage Committee (CHC), for consistency with the Community Design Guidelines and the Historic Preservation Program Guidelines respectively. The ARC provided comments to the applicants and ultimately recommended the Planning Commission recommend approval of the architecture. The CHC recommended the Planning Commission find the Parking Structure architectural designs compatible with the Downtown Historic District and continued the review of the Heyd Adobe and the SLO Rep Theater components of the project with direction. The Planning Commission considered the recommendations from the ARC and CHC as well as reviewed the other project components listed above. After reviewing the project and receiving public comment, the Planning Commission recommends the City Council approve the proposed Palm Nipomo Parking Structure project and recommends the forthcoming building that will line the parking structure include residential units, based on the architectural concept that was presented at the October 23, 2019 Planning Commission meeting. The Planning Commission made a second motion and recommends the Council consider developing a process to identify parties to move the adobe and find creative adaptation for its use (Attachments E and F). DISCUSSION Site Data Applicant SLO Rep and City of SLO Representative SLO Rep – Bryce Engstrom City of SLO – Richard Burde Zoning O-H (Office-Historic District Overlay) and R-3 (Medium-High Density Residential) General Plan Office and Medium-High Residential Site Area 1.38 Environmental Status Certified FEIR and an Addendum Background In 2003 the City Council identified constructing the Palm Nipomo Parking Structure as a Major City Goal. Since that time, City staff has worked with the Council and the public in a variety of study sessions, meetings, and workshops to assemble properties, refine the design and conduct an environmental review of the overall project (Attachment G). Through the design process, the project was expanded to include a performing arts theater. The Parking Structure and Theatre have been included most recently in the Downtown Concept Plan 2017 update. Previous Council or Advisory Body Action The Architectural Review Commission (ARC), Cultural Heritage Committee (CHC), Planning Commission (PC) and City Council have been involved in various components of review of the proposed project. Below is the recent background of the advisory bodies that have been involved in the entitlement process to date.  October 23, 2019 – Planning Commission reviewed the project and recommended that the City Council approve the project as proposed and made a recommendation that the forthcoming building that will line the parking structure include residential units, based on the architectural concept that was presented at the October 23, 2019 Planning Commission meeting. The Planning Commission made a second motion and recommended the Council consider developing a process to identify parties to move the adobe and find creative adaptation for its use.  September 23, 2019 – CHC reviewed the proposed project plans and recommended the PC find the Palm Nipomo parking structure compatible with the Downtown Historic District. They recommended continuance on the review of the Heyd Adobe component of the project and continuance of the review of the facade design of the SLO Rep Theatre.  September 16, 2019 – ARC reviewed the revised plans that incorporated their direction and made a recommendation that the PC find the project consistent with the Community Design Guidelines with direction that the applicant of the SLO Rep Theatre revise the façade of the building with better balance and proportion of the wall cladding - specifically, reduce the variegated terracotta facade at the exterior of the black box theatre and at the upper portion of the walls of the main theatre projecting above the roof deck level (approximately at the 218.45 foot elevation and above) and soften the contrast of the terracotta tiles with each other.  August 19, 2019 – ARC reviewed the proposed architecture of the project and the ARC continued the review and provided seven directional items to the applicants requesting the applicants produce elevations and renderings that showed the two structures together and to include a revised western elevation of the parking structure that had more articulation and design.  July 17, 2018 – City Council reviewed and adopted the Final Environmental Impact Report (FEIR) Palm Nipomo Parking Structure Project (Attachment H). The CHC, ARC and PC each reviewed the document and provided comments and recommendations to the City Council. Project Description Site General Plan Amendment and Rezone The applicants are requesting a General Plan Map Amendment to change the project site land use designations from Office and Medium-High Density Residential to General Retail. This also requires a rezone of the six parcels from Office with a Historic District Overlay (O-H) and Medium-High Density Residential (R-3) to Downtown Commercial zone with a Historic Overlay (C-D-H). Figure 1: General Plan Map Amendment: Left map shows existing General Plan land use designation; Right map shows the proposed change to the General Plan land use designation. Office Medium High Residential General Retail Figure 2: Rezone Changes: Left map shows existing zoning; Right map show the proposed change to the zoning. Office with Historic Overlay Medium High Density Residential Downtown Commercial with Historic Overlay Site Layout The project consists of two new structures that have been planned in consideration of one another. Figure 3 shows the proposed site layout and the location of each of the proposed buildings. The red arrows indicate the vehicle points of entry and exit at the parking structure. The blue arrows indicate where pedestrians leave and enter the parking structure. The green arrow indicates the main entrance to the SLO Rep Theatre. Phase two is the development of a “liner” building – a building that will be constructed in front of the Parking Structure (see Figure 3, diagonal cross-hatched area). The design team has provided sketches of what this building may look like, however the design of the building will require separate review when a specific project is proposed. SLO Rep Theatre – Architecture & Use Permit SLO Rep Theatre is proposing a new 23,344-square foot performing arts facility with two performance spaces, rehearsal space, workshop and storage areas, lobby, a balcony and roof deck and administrative offices. The architecture is a contemporary design with rectilinear form that is broken up with curved walls and upper story setbacks. The façade employs the use of a terra cotta rainscreen, smooth troweled plaster, a glass curtain wall, and aluminum awnings. Per Table 2-1 of the Zoning Regulations, a theatre in the C-D zone requires a Minor Use Permit (MUP). Figure 3: Proposed site layout for the SLO Rep Theatre and the Palm Nipomo Parking Structure. SLO Rep Theatre Parking Structure Table 1: SLO Rep Project Statistics Site Details Proposed Allowed/Required* Front Setback 0 feet 0 feet Maximum Height of Structure 42 feet 5 inches 50 feet Max Building Coverage 51% 100% F.A.R. 1.16 3.0 Total # Parking Spaces Bicycle Parking 0 (Pay in-lieu fees) 0** 67 13 *2018 Zoning Regulations **Bicycle parking is a code requirement and the project will have to comply Palm Nipomo Parking Structure – Architecture, Use Permit & Deviation from Development Standards The City of San Luis Obispo is proposing a new 162,909-square foot parking structure with 404 parking spaces. The architecture is mission style design and the form is based on the functional requirements of a parking structure. The structure is articulated with arched shaped openings, rectilinear openings, columns and architectural towers. Exterior materials include smooth troweled plaster, pre-cast concrete column bases, terra cotta tile roofing, pre-cast masonry along the base of the towers and stairs and decorative tile. Per Table 2-1 of the Zoning Regulations, a parking structure within the C-D zone requires a Conditional Use Permit (CUP). The applicant is also requesting deviations from development standards for additional height and increased Floor Area Ratio (F.A.R.) for the parking structure (see Table 2 below). Table 2: Parking Structure Project Statistics Site Details Proposed Allowed/Required* Front Setback 0 feet 0 feet Maximum Height of Structures 50 feet with 17-foot 4-inch elevator/stair tower features and approx. 10- foot-tall solar structures 50 feet Max Building Coverage 80% 100% F.A.R. 4.11 3.0 Total # Parking Spaces Electric Vehicle Parking Bicycle Parking 404 43 EV Ready 32 No specific requirement 40 EV Ready Director’s Determination *2018 Zoning Regulations 1 A Floor Area Ratio (F.A.R) greater than 3.0 is allowed pursuant to Section 17.86.200 of the Zoning Ordinance. Policy Context Staff carefully evaluated the proposed project’s General Plan Amendment, Rezone, Architecture and Use Permits in the context of General Plan goals and policies and the City’s Zoning Code, and received feedback from the ARC and the CHC regarding consistency of the project with the Community Design Guidelines and Historic Preservation Guidelines. Based on the project’s contribution to and alignment with these goals, policies, and requirements, staff is recommending that the Planning Commission recommend that the City Council adopt a resolution approving the project. Consistency with the General Plan The Land Use Element (LUE) dedicates Chapter 4 to policies regarding land use and development of Downtown. Policy 4.1 states, Downtown is the community’s urban center serving as the cultural, social, entertainment, and political center of the City for its residents, as well as home for those who live in its historic neighborhoods. The City wants its urban core to be economically healthy and realizes that private and public investments in the Downtown support each other. Downtown should also provide a wide variety of professional and government services, serving the region as well as the city. The commercial core is a preferred location for retail uses that are suitable for pedestrian access, off-site parking, and compact building spaces. Civic, cultural and commercial portions of Downtown should be a major tourist destination. Downtown's visitor appeal should be based on natural, historical, and cultural features, retail services, entertainment and numerous and varied visitor accommodations (underlining added to highlight project consistency). Entertainment/Cultural Facilities The LUE further discusses Entertainment and Cultural Facilities located in the downtown. Policy 4.3 states, Cultural facilities, such as museums and galleries should be Downtown. Entertainment facilities, such as nightclubs and theaters shall be in the Downtown. Additional policies regarding Cultural Facilities state: 5.2.2. Mission Plaza Area – The City shall promote the area around the Mission Plaza for cultural facilities (Figure 5). Figure 4: LUE map (Figure 5) showing the location of the Cultural Facilities Area including Mission Plaza and Monterey Street from Mission Plaza to Nipomo Street 5.2.3. Community Arts Support – The City shall continue to support community arts programs through a variety of means, such as loans, grants, and help in obtaining sites. 5.2.5. Land Acquisition – The City will work with community organizations to secure land for cultural facilities in the Downtown area. As proposed, the SLO Rep Theatre will be located near Mission Plaza along Monterey Street in the Cultural Facilities Area. Parking LUE Policy 4.14 states, The City shall ensure there is a diversity of parking opportunities in the Downtown. Any major increments in parking supply should take the form of structures, located at the edges of the commercial core, so people can walk rather than drive between points within the core. Retail uses outside the core, and professional office developments, may have on-site parking for customers and clients. The proposed parking structure is consistent with fulfilling this policy. Circulation Element, Policy 13.2.4. (Public Parking Structures) states the City shall only approve construction of additional public parking structures after considering the findings and results of a parking supply and demand study. Early in the Downtown parking discussion, a parking study was completed that estimated that the City would have an increased parking demand of 250-500 spaces every five years. The Palm Nipomo Parking Structure was initially envisioned to accommodate approximately 450 spaces for 10 years of growth 2. As the project has been refined, the total number of actual spaces is now 404. The parking demand and potential usage of the Palm Nipomo Structure has been studied a number of times over the last decade. Most recently, a parking analysis was done by Walker Parking Consultants (2015) which analyzed project parking demand for current and future development in the area, as well as closures of public parking lots for the Hotel Cerro and Hotel SLO (Chinatown) projects. The analysis redistributed that parking into existing and proposed structures and forecast new demand from private development projects. The consultant concluded that the usage of the project is contingent upon development in the area (short and long term) and if long term projects develop the structure could see up to a 92% effective supply rate on a daily basis. The analysis concluded that: “……the structure represents an opportunity to provide parking for future development, efficiently, and in a way that is likely to be more environmentally friendly and walkable for downtown than would individual sites that each provide their own parking. Given the Phase II development being contemplated, if the City is willing to make a significant investment (or partner with developers) to provide funding for a long-term capital investment, the structure represents an opportunity for careful planning in the downtown using shared, public parking.” 2 919 Palm Street Parking Structure contains 242 parking spaces and was built to accommodate the loss of the Court Street surface parking lot and the Chinatown surface parking lot and was not designed for future growth of the Downtown. Additionally, this study was done prior to the update of the Downtown Physical Concept Plan (2016) that has made significant new recommendations for public infrastructure changes most notably the reduction of on street parking to allow for new amenities such as widened sidewalks for outdoor dining and retail space, new bicycle facilities and public transit facilities (see Figure 5 below). The Palm Nipomo project will allow for future redistribution of this parking space demand into an already available facility. As proposed, the new parking structure is consistent with the policies for providing parking within the Downtown and promoting more efficient use of private and public spaces. Consistency with the Downtown Concept Plan The Downtown concept Plan was adopted in July 2017. The Downtown Concept Plan is the community’s vision for how downtown San Luis Obispo should be developed over the next 25 years and is to be used as a guidance for development projects and for public improvements downtown. The proposed project is described in this Plan within “Block 10;” A new parking structure on the corner of Palm and Nipomo Streets is envisioned to include office mixed use along Nipomo Street, the Theatre relocated along Monterey Street, and public use on a portion of the rooftop. Additionally, the Concept Plan describes the Central Downtown to include an expanded, vibrant, and art-filled Cultural District, the focus of which is along Monterey Street between Nipomo and Chorro Streets (blocks 10, 11, and 19). Visitors arriving in cars can park in the new parking structure at Palm and Nipomo Streets, then walk to the theater, Children’s Museum, expanded History Center, Museum of Art, Mission San Luis Obispo de Tolosa, and Mission Plaza in a short two-block stretch (Blocks 11 and 19). Figure 5 shows one of the concepts from the Downtown Concept Plan that considers relocating parking spaces to other uses in the long-term development of Downtown. Figure 5: Conceptual Street Type B cross section on for Marsh or Higuera Street with two vehicle travel lanes, angled parking on one side of the street, a protected cycle track, and sidewalks that widen to 24’ in between parking areas, allowing for additional pedestrian experiences. Figure 6: Snapshot of Block 10 of the Downtown Concept Plan Consistency with the Zoning Regulations SLO Rep Theatre: The SLO Rep Theatre proposal complies with the lot coverage, floor area ratios, and building height requirements for the Downtown Commercial zone with a Historic District overlay (see Section 6.2.1 Project Statistics above). The performing arts facility use requires a Minor Use Permit. The SLO Rep Theatre mission is to strengthen theatre’s cultural influence and enriches the Central Coast by producing professional theatre, nurturing artists and providing theatre education for children and adults . This is consistent with the definition in the Zoning Regulations that states Theaters are Facilities for indoor display of films, motion pictures, or dramatic, musical, or live performances. This classification may include incidental food and beverage services to patrons. The SLO Rep Theatre has administrative office hours, and public hours (performances). Administrative office hours are Tuesday-Saturday, 8:00 AM-6:00 PM and Public Hours are Wednesday - Friday: 5:30 PM - 10:00 PM and Saturday-Sunday: 12:00 PM - 10:00 PM. Services and activities that occur on the site include: administrative office work; theatre rehearsals; theatre performances; youth classes/camps; adult classes/camps; and internal and outside meetings and events. The new space will have 7 full-time and 17 part-time employees. With the two theater spaces in the new venue, there is the potential for two performances happening simultaneously thus there is a proposed minimum of 50 attendees and a maximum of 300 attendees. The Planning Commission recommends that the City Council find the project consistent with the Zoning Regulations and approve the proposed use permit for a theatre in the Downtown Commercial zone. Parking Structure: Per Table 2.1, Parking Facilities require a Conditional Use Permit for a parking structure within the C-D zone. The Zoning Regulations further state in Section 17.86.200 (Parking as a Primary Use), Where parking as a primary use is permitted in compliance with Table 2-1: Uses Allowed by Zone … discretionary permit approval may include deviations from otherwise applicable development standards. The Palm Nipomo Parking Structure is requesting deviations from the height and F.A.R. requirements of the Downtown Commercial zone. The Parking Structure has a 4.1 F.A.R. and the Zoning Regulations states the maximum F.A.R. of 3.0 for the C-D zone. Additionally, the project includes elevator and stair towers that extend 7 feet, 4 inches above 10-foot allowed projections above the 50-foot building height. These deviations are necessary to meet the project goal of maximizing the parking on the site and meeting as close as possible the goal of 400 parking spaces. The parking structure will be accessible 24 hours a day, seven days a week. Currently the first 60 minutes are free and $1.25/hour or fraction thereof. Parking rates for the structure will apply as follows: 8:00 AM to 7:00 PM Monday through Wednesday 8:00 AM to 11:00 PM Thursday through Saturday 1:00 PM to 7:00 PM Sunday The parking structure will also operate DROP (Downtown Residential Overnight Parking Program) for those residents who live Downtown and include short-term and long-term bicycle parking. The Planning Commission recommends that the City Council find the project consistent with the Zoning Regulations and approve the proposed use permit and the deviation to the height and F.A.R. Consistency with the Community Design Guidelines The ARC recommended that the Planning Commission find the Parking Structure and the SLO Rep Theatre architectural designs consistent with the Community Design Guidelines (CDG) with specific direction to the SLO Rep Theatre applicant. The façade of the SLO Rep Theatre was revised based on the ARC’s direction and determined by the Planning Commission to be consistent with the CDG for Downtown development (Chapter 4.2). The Planning Commission finds the Parking Structure and the SLO Rep Theatre architectural designs consistent with the CDG and recommends that City Council approve the architectural designs of both structures. Figure 8: View of the Parking Structure from the corner of Palm and Nipomo Streets Figure 8: View of SLO Rep Theatre from Monterey Street Consistency with Historic Preservation Program Guidelines The CHC provided three recommendations regarding the proposed project. These recommendations are listed below. 1. Parking Structure - Recommended that the Planning Commission find the Parking Structure architectural designs compatible with the Downtown Historic District. 2. Heyd Adobe - Recommend continuance of the Heyd Adobe component of the project to a date uncertain, having found that the destruction of the Hyde Adobe, an element of the project that makes it incompatible with the historic preservation guidelines and goals of the City, and continue the item directing city staff and the applicant to present feasible options for leaving the adobe in the current location, moving it to another location on the same site or to another site altogether. 3. SLO Rep Theatre - Recommended continuance of the SLO Rep Theater component of the project to a date uncertain, with direction that the applicant present more cohesive coloring and materials treatment of the exterior fabric, a less busy and variegated design such that it’s compatible with the immediately surrounding historic buildings of the downtown historic district. The CHC recommended a continuance of the Heyd Adobe component of the project and recommended that the project evaluate within its design the preservation of the Heyd Adobe in situ (current location), relocation on site, or moving the structure to another site. When certifying the Final EIR, the City Council, was provided information concerning impacts to the historic structures on site and all alternatives, which included a discussion of retaining the Heyd Adobe and other Contributing Historic Resources. The City Council’s decision to certify the Final EIR, including Findings of Overriding Considerations, supported the determination that preserving the historic properties on site did not satisfy project objectives of establishing a performing arts venue (SLO Rep Theatre) and the development of a new parking structure. The CHC’s purview or scope of review for the project, was to provide a recommendation on the proposed project’s consistency with development in the vicinity within the Downtown Historic District. Therefore, it was not within the CHC’s purview to recommend a continuance of the project with direction to explore retaining the Heyd Adobe onsite by redesigning the project or to evaluate relocation alternatives. The CHC also provided feedback regarding the design of the SLO Rep Theatre. Staff requested the CHC provide specific direction on what needed to be changed to be compatible with the Downtown Historic District, but no specifics were given. The direction discusses revising the exterior materials and color variation; very similar to the direction provided by the ARC. As mentioned above, the applicant made changes to the exterior design to provide a more cohesive façade treatment that is less busy and variegated. Staff’s assessment is that the applicant’s submitted changes in response to ARC action also addresses CHC direction. The CDG and the Historic Preservation Program Guidelines (HPPG) overlap in their review criteria for the Historic District and characteristics that make the district unique (Section 5.2.2). HPPG Section 3.2.1 discusses that new structures within a Historic District shall be designed to be architecturally compatible with the district’s prevailing historic character. Based on the changes made by the applicant, the Planning Commission concurred and recommends that the City Council approve the revised design and find it compatible with the Downtown Historic District and consistent with HPPG Sections 3.2.1 and 5.2.2. The preservation of the Heyd Adobe in situ or on site makes the proposed parking structure and SLO Rep Theatre as currently designed totally infeasible. Changing the design to accommodate the Heyd Adobe in situ or onsite would likely delay the project for a year and the City and SLO Rep would incur substantial redesign costs. The City is required to notice the proposed demolition of all residential structures that would be displaced as a result of the respective projects and the public has claimed structures and wholly bore the costs of relocation and preservation. The Planning Commission approved a second motion and recommends the Council consider developing a process to identify parties to move the adobe and find creative adaptation for its use. If the City Council were to decide to relocate the structure with City funds, the estimated costs for relocation and restoration are likely to exceed a $1 million dollars. Public Engagement Consistent with the City’s Public Engagement and Noticing (PEN) Manual and the City’s Municipal Code, the project was noticed per the City’s notification requirements for Development Projects. Newspaper legal advertisements were posted in New Times ten days prior to each advisory body meeting (ARC, CHC, PC, and City Council). Additionally, postcards were sent to both tenants and owners of properties located within 300 feet of the project site ten days before each advisory body hearing. Public comment was provided to the advisory bodies through written correspondence and through public testimony at each of the hearings. CONCURRENCE All City Departments have reviewed the project and have provided comments that are incorporated into the recommended resolution as conditions of approval. ENVIRONMENTAL REVIEW On July 17, 2018, the City Council certified the Final Environmental Impact Report (FEIR State Clearinghouse Number 2017051011), adopted a Mitigation Monitoring and Reporting Program, adopted the following CEQA Findings and Mitigation Measures related to the Palm Nipomo Parking Structure Project, and made a Statement of Overriding Considerations. The adopted FEIR identified that the project will result in significant and unavoidable impacts to: 1) Aesthetics – The scale and massing of the parking structure interrupting the transition from the Dana Street grouping of historic resources from the remainder of the Downtown Historic District to the east; 2) Cultural and Tribal Cultural Resources – Removal of two historic resources from the project site; and 3) Noise – Short-term construction noise. The FEIR also found that there would be significant impacts that can be mitigated to less than significant in the categories of aesthetics, cultural and tribal cultural resources, transportation, air quality, biological resources, geology and soils, and hazardous materials. Some impacts related to aesthetics, cultural resources, noise, and transportation were found to be less than significant. The project is proposed to remain the same as the project assessed in the adopted FEIR; however the project now proposes to change the land use designation from Public to Downtown Commercial and the zoning from Public Facility with a Historic Overlay (PF-H) to Downtown Commercial with a Historic Overlay (C-D-H) to allow for the uses as they are described and analyzed in the FEIR. No physical changes to the project or proposed uses are proposed to occur which were evaluated previously in the certified FEIR. The change in the land use designation necessitated preparation of an Addendum (Attachment I) to the certified FEIR to address the project changes, per State CEQA Guidelines Section 15162. The Addendum includes an updated project description and incorporates the additional analysis for inclusion in the environmental record. The updated analysis does not materially change the findings and conclusions of the FEIR, making a Subsequent EIR unnecessary pursuant to Section 15162 of the State CEQA Guidelines. FISCAL IMPACT Budgeted: Yes Budget Year: 2019-21 Funding Identified: Fee supported activity based on 100% cost recovery. Fiscal Analysis: Funding Sources Current FY Cost Annualized On-going Cost Total Project Cost General Fund N/A State Federal Fees Other: Total The fiscal impact associated with the construction and operation of a new parking structure on the project site has been evaluated as part of the Parking Fund analysis associated with the 2019- 21 Financial Plan (the new theatre will be funded separately by SLO Rep). The total design budget for the parking structure is $1,581,989.15 which is supported by the parking fund. The design consultant, Watry, has a contract for $1,473,950. Watry has billed us $75,361.25 so far. Additionally, $14,300 of the design budget was used for a seminar with Kimley-Horn regarding EV charging strategies and future parking trends. Additional fiscal analysis will occur as part of awarding a contract to construct the facility. Currently the parking fund has approximately $8.6 million for construction and $28.6 million shown in FY 2020-21, however the bulk of the construction funds will come from debt financing. Staff anticipates having a quote from the design team on the total cost of the parking structure within the next week. Overall, there are no fiscal impacts associated with entitling the project. In addition, the proposed uses have been long contemplated and were evaluated as part of the overall fiscal and economic analysis of the City’s 2014 General Plan update. When the General Plan was prepared, it was accompanied by a fiscal analysis, which found that overall the General Plan was fiscally balanced. Accordingly, since the proposed project is consistent with the General Plan, it has a neutral fiscal impact. ALTERNATIVES 1. Deny the project. An action denying the application should include findings that cite the basis for denial and should reference inconsistency with the General Plan, Community Design Guidelines, Historic Preservation Program Guidelines, Zoning Regulations or other policy documents. 2. Continue the item. An action to continue the item should include a detailed list of additional information or analysis required to make a recommendation on the project. Attachments: a - Draft Resolution b - Draft Ordinance c - COUNCIL READING FILE - SLO Rep Plans d - COUNCIL READING FILE - Parking Structure Plans e - Electrical Design Technical Memo f - COUNCIL READING FILE - PC Draft Minutes 10-23-2019 g - COUNCIL READING FILE - PC Final Resolution 10-23-2019 h - Palm Nipomo Parking Structure Project Timeline i - COUNCIL READING FILE - Reso -10923 Final EIR j - Palm Nipomo FEIR Addendum