1.Adopt a Resolution approving the project; and
2.Introduce an Ordinance rezoning the property for
the proposed uses.
2
Previous Advisory Body Review
•July 17, 2018 – City Council reviewed and adopted
the Final Environmental Impact Report (FEIR)
•August 19, 2019 – ARC reviewed and continued
the project with direction.
•September 16, 2019 – ARC recommended the PC
approve the project with direction to look at the use
of exterior materials on the SLO Rep Theatre.
3
Previous Advisory Body Review
•September 23, 2019 – CHC Review recommended the PC
find the Palm Nipomo parking structure compatible with the
Downtown Historic District. They recommended
continuance on the review of the Heyd Adobe component of
the project and continuance of the review of the facade
design of the SLO Rep Theatre.
•October 23, 2019 – Planning Commission reviewed the
project and recommended that the City Council approve the
project as proposed and recommended that the forthcoming
liner building include residential units. In a second motion,
they recommended the Council consider developing a
process to identify parties to move the adobe and find
creative adaptation for its use.
4
Site Information
5
Zone: Office with a Historic
Overlay (O-H) and Medium-High
density Residential Zone (R-3)
Size: 1.38 acres
General Plan: Office and Medium-
High Density Residential. The
General Plan designation is
proposed to be changed to
General Retail
Current Use: A surface parking lot
and three residential units
Project Summary and Review
•General Plan Amendment;
•Rezone;
•Architecture;
•Deviation to the F.A.R. and height for the parking
structure;
•Use permits to allow a theater and a parking
structure within the Downtown Commercial zone;
and
•An addendum to the certified Final Environmental
Impact Report.
6
Project Description
General Plan Amendment
7
General
Retail
General
Retail
OfficeOffice
Medium High
Residential
Medium High
Residential
Project Description
Site Rezone
8
Downtown
Commercial with
Historic Overlay
Downtown
Commercial with
Historic OverlayOffice with
Historic Overlay
Office with
Historic Overlay
Medium-High
Density
Residential
9
SLO Rep
Parking Structure
Liner
Building
Project Description: SLO Rep Theatre
10
Project Description: Parking Structure
11
Project Description: Parking Structure
12
Flexible Public
Use Area
Viewing
Area
Viewing
Area
Project Analysis: Consistency with General Plan
•LUE dedicates Chapter 4 to policies regarding land
use and development of Downtown.
•LUE Chapter 5 outlines policies regarding Public
and Cultural Facilities.
13
Project Analysis: Consistency with General Plan
•LUE dedicates Chapter 4 to policies regarding land
use and development of Downtown.
•Policy 4.14:… Any major increments in parking
supply should take the form of structures, located
at the edges of the commercial core…
•Circulation Element, Policy 13.2.4.
14
Project Analysis: Parking
•2015 – A parking analysis completed by Walker
Parking Consultants which reviewed parking
demand for current and future development,
including closures of public surface lots.
•The analysis looked at where to distribute parking
into existing and proposed structures and forecast
new demand from private development projects.
•Based on the proposed development within
Downtown, the Palm Nipomo Parking Structure
could see up to a 92% effective supply rate on a
daily basis.
15
Project Analysis: Parking
•Downtown Concept Plan
16
Project Analysis: Consistency with Downtown
Concept Plan
17
Project Analysis: Consistency with Zoning Reg
•A performing arts facility use requires a Minor Use
Permit.
•Services and activities include:
•administrative office work;
•theatre rehearsals;
•theatre performances;
•youth classes/camps;
•adult classes/camps; and
•internal and outside meetings and events.
•Projected Attendees: 50 to 300
18
Project Analysis: Consistency with Zoning Reg
•A parking structure use requires a Conditional Use
Permit.
•The parking structure will be accessible 24 hours a
day, seven days a week.
•The parking structure will also operate DROP.
•Includes short-term and long-term bicycle parking.
19
Project Analysis: Consistency with Zoning Reg
•Section 17.86.200: …discretionary permit approval
may include deviations from otherwise applicable
development standards.
•The Parking Structure has a 4.1 F.A.R. vs. the
maximum F.A.R. of 3.0 for the C-D zone.
•Additionally, the project includes elevator and stair
towers that extend 7 feet, 4 inches above 10-foot
allowed projections above the building height.
•These deviations are necessary to meet the project
goal of maximizing the parking on the site and meeting
as close as possible the goal of 400 parking spaces.
20
Architectural Review
21
Architectural Review
22
Historic Preservation Consistency
•Find the Parking Structure architectural designs
compatible with the Downtown Historic District.
•Recommended continuance of the Heyd Adobe
component of the project.
•Recommended continuance of the SLO Rep
Theater component of the project.
23
Historic Preservation Consistency
•Certification and adoption of the Final EIR.
•The CHC’s purview was to provide a
recommendation on the proposed project’s
consistency with development in the vicinity within
the Downtown Historic District.
•The CHC provided direction regarding the design
of the SLO Rep Theatre.
24
Historic Preservation Consistency
•Preservation of the Heyd Adobe in situ or on site
makes the proposed parking structure and SLO Rep
Theatre as currently designed infeasible.
•The City is required to notice the proposed demolition
of all structures that are 50 years old.
•The PC approved a second motion and recommends
the Council consider developing a process to identify
parties to move the adobe and find creative
adaptation for its use.
•If the City Council were to decide to relocate the
structure with City funds, the estimated costs for
relocation and restoration are likely to exceed a $1
million dollars.
25
Environmental Review
•City Council certified the FEIR, adopted a MMRP,
adopted Findings and Mitigation Measures, and
made a Statement of Overriding Considerations.
•Class 1 - Significant and unavoidable impacts to:
aesthetics, cultural and tribal cultural resources, and
noise.
•Class 2 - Significant impacts that can be mitigated
include: aesthetics, cultural and tribal cultural
resources, transportation, air quality, biological
resources, geology and soils, and hazardous
materials.
26
Environmental Review
•The project now proposes to change:
•Land use designation from Public to Downtown
Commercial; and
•Zoning from PF-H to C-D-H.
27
Fiscal Impact
•The fiscal impact associated with the construction and operation of a
new parking structure on the project site has been evaluated as part of
the Parking Fund analysis associated with the 2019-21 Financial Plan
(the new theatre will be funded separately by SLO Rep).
•The total design budget for the parking structure is $1,581,989.15
which is supported by the parking fund.
•The design consultant, Watry, has a contract for $1,473,950. Watry
has billed us $75,361.25 so far. Additionally, $14,300 of the design
budget was used for a seminar with Kimley-Horn regarding EV
charging strategies and future parking trends. Additional fiscal analysis
will occur as part of awarding a contract to construct the facility.
•Currently the parking fund has approximately $8.6 million for
construction and $28.6 million shown in FY 2020-21, however the bulk
of the construction funds will come from debt financing.
28
Recommendation
1.Adopt a Resolution approving the project; and
2.Introduce an Ordinance rezoning the property for
the proposed uses.
29
30
Heyd Adobe
31
Project Description: Parking Structure
32
The building plan submittal shall include public
viewing areas located by the northeast stairwell and
the southwest stairwell and a flexible public use area
along the Palm Street edge on the top deck of the
parking structure to the satisfaction of the Community
Development and the Public Works Directors.