Planning Commission Purview
The Planning Commission’s role is to review the
project for consistency with:
•LUE Chapters 4 & 5;
•CE Chapter 13;
•Zoning Regs Ch.17.32 and Sec. 17.86.200;
•CDG for Downtown Development;
•HPPG Sec. 3.2.1 and 5.2.2; and
•Downtown Concept Plan.
Provide a recommendation to the City Council.
2
2
7/16/2026
3
Previous Advisory Body Review
•July 17, 2018 – City Council reviewed and adopted the
Final Environmental Impact Report (FEIR)
•August 19, 2019 – ARC reviewed and continued the project
with direction.
•September 16, 2018 – ARC recommended the PC approve
the project with direction to look at the use of materials.
•September 23, 2018 – CHC Review recommended the PC
find the Palm Nipomo parking structure compatible with the
Downtown Historic District. They recommended
continuance on the review of the Heyd Adobe component of
the project and continuance of the review of the facade
design of the SLO Rep Theatre.
3
3
7/16/2026
4
Site Information
4
Zone: Office with a Historic
Overlay (O-H) and Medium-High
density Residential Zone (R-3)
Size: 1.38 acres
General Plan: Office and Medium-
High Density Residential. The
General Plan designation is
proposed to be changed to
General Retail
Current Use: A surface parking lot
and three residential units
4
7/16/2026
5
Project Summary and Review
•A General Plan Amendment changing the project site
from Office and Medium-High Density Residential to
General Retail;
•A zone change from O-H and R-3 to C-D-H;
•Architecture;
•Deviation to the F.A.R. and height for the parking
structure;
•Use permits to allow a theater and a parking structure
within the Downtown Commercial zone; and
•An addendum to the certified Final Environmental
Impact Report (FEIR).
5
5
7/16/2026
6
Project Description
General Plan Amendment
6
General
Retail
General
Retail
OfficeOffice
Medium High
Residential
Medium High
Residential
6
7/16/2026
7
Project Description
Site Rezone
7
Downtown
Commercial with
Historic Overlay
Downtown
Commercial with
Historic OverlayOffice with
Historic Overlay
Office with
Historic Overlay
Medium-High
Density
Residential
7
7/16/2026
8
8
SLO Rep
Parking Structure
Liner
Building
8
7/16/2026
9
Project Description: SLO Rep Theatre
9
9
7/16/2026
10
Project Description: SLO Rep Theatre
10
10
7/16/2026
11
Project Description: SLO Rep Theatre
11
11
7/16/2026
12
Project Description: Parking Structure
12
12
7/16/2026
13
Project Description: Parking Structure
13
13
7/16/2026
14
Project Description: Parking Structure
14
Flexible Public
Use Area
Viewing
Area
Viewing
Area
14
7/16/2026
15
Project Description: Parking Structure
15
The building plan submittal shall include public
viewing areas located by the northeast stairwell and
the southwest stairwell and a flexible public use area
along the Palm Street edge on the top deck of the
parking structure to the satisfaction of the Community
Development and the Public Works Directors.
15
7/16/2026
16
Project Analysis: Consistency with General Plan
•LUE dedicates Chapter 4 to policies regarding land
use and development of Downtown.
•LUE Chapter 5 outlines policies regarding Public
and Cultural Facilities.
16
16
7/16/2026
17
Project Analysis: Consistency with General Plan
•LUE dedicates Chapter 4 to policies regarding land
use and development of Downtown.
•Policy 4.14:… Any major increments in parking
supply should take the form of structures, located
at the edges of the commercial core…
•Circulation Element, Policy 13.2.4.
17
17
7/16/2026
18
Project Analysis: Consistency with Downtown
Concept Plan
18
18
7/16/2026
19
Project Analysis: Consistency with Zoning Reg
•A performing arts facility use requires a Minor Use
Permit.
•Services and activities include:
•administrative office work;
•theatre rehearsals;
•theatre performances;
•youth classes/camps;
•adult classes/camps; and
•internal and outside meetings and events.
•Projected Attendees: 50 to 300
19
19
7/16/2026
20
Project Analysis: Consistency with Zoning Reg
•A parking structure use requires a Conditional Use
Permit.
•The parking structure will be accessible 24 hours a
day, seven days a week.
•The parking structure will also operate DROP.
•Includes short-term and long-term bicycle parking.
20
20
7/16/2026
21
Project Analysis: Consistency with Zoning Reg
•Section 17.86.200: …discretionary permit approval
may include deviations from otherwise applicable
development standards.
•The Parking Structure has a 4.1 F.A.R. vs. the
maximum F.A.R. of 3.0 for the C-D zone.
•Additionally, the project includes elevator and stair
towers that extend 7 feet, 4 inches above 10-foot
allowed projections above the building height.
•These deviations are necessary to meet the project
goal of maximizing the parking on the site and meeting
as close as possible the goal of 400 parking spaces.
21
21
7/16/2026
22
ARC Review
22
22
7/16/2026
23
ARC Review
23
Original Façade Design
23
7/16/2026
24
ARC Review
24
Facade redesign with strict adherence to the ARC's direction
24
7/16/2026
25
ARC Review
25
Facade redesign with strict adherence to the ARC's direction
25
7/16/2026
26
CHC Review
•Find the Parking Structure architectural designs
compatible with the Downtown Historic District.
•Recommended continuance of the Heyd Adobe
component of the project.
•Recommended continuance of the SLO Rep
Theater component of the project.
26
26
7/16/2026
27
CHC Review
•Certification and adoption of the Final EIR.
•The CHC’s purview was to provide a
recommendation on the proposed project’s
consistency with development in the vicinity within
the Downtown Historic District.
•The CHC provided direction regarding the design
of the SLO Rep Theatre.
27
27
7/16/2026
28
Environmental Review
•City Council certified the FEIR, adopted a MMRP,
adopted Findings and Mitigation Measures, and
made a Statement of Overriding Considerations.
•Class 1 - Significant and unavoidable impacts to:
aesthetics, cultural and tribal cultural resources, and
noise.
•Class 2 - Significant impacts that can be mitigated
include: aesthetics, cultural and tribal cultural
resources, transportation, air quality, biological
resources, geology and soils, and hazardous
materials.
28
28
7/16/2026
29
Environmental Review
•The project now proposes to change:
•Land use designation from Public to Downtown
Commercial; and
•Zoning from PF-H to C-D-H.
29
29
7/16/2026
30
Recommendation
Recommend the City Council adopt the Draft
Resolution approving the proposed project subject to
findings and conditions of approval.
30
30
7/16/2026
31
31
31
7/16/2026
32
Heyd Adobe
32
32
7/16/2026
33
Project Description: SLO Rep Theatre
33
Allowed/RequiredProposedSite Details
0 feet0 feetFront Setback
50 feet42 feet 5 inchesMaximum Height of
Structure
100%51%Max Building Coverage
3.01.16F.A.R.
67
13
0 (Pay in-lieu fees)
0
Total # Parking Spaces
Bicycle Parking
33
7/16/2026
34
Project Description: Parking Structure
34
Allowed/RequiredProposedSite Details
0 feet0 feetFront Setback
50 feet50 feet
with 17-foot 4-inch
elevator/stair tower
features and approx. 10-
foot-tall solar structures
Maximum Height of
Structures
100%80%Max Building Coverage
3.04.1F.A.R.
No specific requirement
40 EV Ready
Director’s Determination
404
43 EV Ready
32
Total # Parking Spaces
Electric Vehicle Parking
Bicycle Parking
34
7/16/2026
35
SLO Rep Theatre and Parking Structure
35
35
7/16/2026
36
Project Description: SLO Rep
36
South Elevation
North Elevation
36
7/16/2026
37
Project Description: SLO Rep
37
West Elevation East Elevation
37
7/16/2026
38
Project Description: Parking Structure
38
North Elevation
South Elevation
38
7/16/2026
39
Project Description: Parking Structure
39
East Elevation
West Elevation
39