HomeMy WebLinkAboutCCO 1 - Grading AdditionCITY OF SAN LUIS OBISPO, CALIFORNIA CONTRACT CHANGE ORDER (CCO) 1 CCO Number: 1 Sheets: 1 of 1 Date: 2/24/2026 Project: Whale Rock Stilling Basin Dewatering and Inspection To: MidCal Dredging Specification No.: 200-1009 Requested by: City Approval Authority: X City Engineer (Within available budget) City Manager (Exceeds available budget) City Council (Exceeds available budget by $200,000) You are authorized and directed to make the described changes from the plans and specifications, or to increase or decrease contract quantities, as follows: The contractor is directed to dispose of the non-hazardous silt and dredged material within the 5 acre laydown area located between the stilling basin and the effluent valve vault. Fine grade the soil to slope towards the south at 1% and provide a erosion control measures are listed on the contract plan s and specifications.. The work includes connection to a planned manhole and full roadway restoration. MidCal Dredging has submitted a total cost of $12,596.00 for this scope, which includes all labor and materials. Staff supports this directive, as it is within the existing project area and represents a cost -effective enhancement to the contract. All labor, equipment, and material will be paid at the Lump Sum price submitted by MidCal Dredging as PCO#1 on 11/04/2025. By reason of this proposed change 0 days extension of time will be allowed. Total cost of this change is: $12,596.00 We, the undersigned contractor, have given careful consideration to the changes proposed and agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may be noted above and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above. Accepted by: Contractor's Authorized Agent Date accepted Submitted by: Resident Engineer Date submitted Submitted by: Project Manager Date submitted Approved by: Deputy Director Date approved Date approved by City Manager or Council CCO over available budget or $200,000 2023103 WR Stilling Basin\4-Construction\Change Order\CCO 1 Grading MidCal Dredging Inc. Signature 11/4/2025 2/24/2026