HomeMy WebLinkAboutItem 5h. Authorization to award a Silt Removal Project 2026, Specification 2000198-04Gt� Y O.o
CouncilAgenda • •
CIS �
Department:
Public Works
Cost Center:
5301
For Agenda of:
8/4/2026
Placement:
Consent
Estimated Time:
N/A
FROM: Aaron Floyd, Public Works & Utilities Director
Prepared By: Anthony Ramos, Senior Civil Engineer
Item 5h
SUBJECT: AUTHORIZATION TO AWARD SILT REMOVAL PROJECT 2026,
SPECIFICATION 2000198-04
RECOMMENDATION
1. Approve the protect plans and special provisions for the Silt Removal 2026 project,
Specification 2000198-04; and,
2. Award a construction contract (Attachment A) to Andrew Brown General Engineering
Inc. in the amount of $218,897 for the Silt Removal 2026 project, Specification
2000198-04; and,
3. Authorize the City Engineer to issue Contract Change Orders up to the available
project budget (Account 2000198), and up to any amended budget subsequently
approved by the City Manager per City Purchasing Policy approval thresholds; and,
4. Find this action consistent with the Final Programmatic Environmental Impact
Statement/Environmental Impact Report (EIS/R), dated October 9, 2003, as certified
by City Council through Resolution No. 9494
POLICY CONTEXT
On May 17, 2022, Council approved a Purchasing Policy Update to the Financial
Management Manual (Resolution No. 11328), requiring Council authorization to award
Public Works contracts exceeding $200,000.
This routine maintenance work is supported by the San Luis Obispo County Zone 9 Flood
Control and Water Conservation District, Zone 9 Advisory Committee and is funded
through annual budget allocations from the County, as described by the City/County Zone
9 Reimbursement Agreement. Furthermore, this annual effort implements
recommendations of the Waterway Management Plan, Volume II, Stream Management
and Maintenance Program, which was adopted by the City and County in 2003.
DISCUSSION
Background
During rain events, stormwater carries silt and other fine materials into creeks which then
create silt deposits at points where flow velocity decreases. Over time, the accumulation
Page 111 of 1059
Item 5h
of these silt deposits reduces the creeks' overall capacity to convey flow, resulting in a
higher risk of localized flooding in severe storm events. That risk can be mitigated through
regular removal of build-up, silt, and debris. This silt removal project will remove
accumulated silt at critical points in the City's creek system, as part of an annual
maintenance effort to remove debris, sediment, and flow restrictive vegetation in advance
of winter weather.
As the work occurs within an active creek environment, the project is regulated by the
Regional Water Quality Control Board, California Department of Fish and Wildlife, and
the U.S. Army Corps of Engineers. Construction must occur between June 15 and
October 1 to comply with environmental permits and minimize potential impacts to wildlife
and water quality.
The City is also pursuing a separate Capital Improvement Project to dredge Laguna Lake.
While this annual Silt Removal Project is covered under the City's existing routine
maintenance regulatory approvals, including Nationwide Permits and associated
programmatic authorizations, the Laguna Lake Dredging project requires separate
environmental permits because of its scope. The permitting process for the dredging
project has been initiated and is being coordinated independently, allowing this annual
maintenance project to proceed under its existing environmental approvals.
Project
The project was bid using a Base Bid and three Additive Alternates to provide a better
understanding of project costs and allow the maximum amount of silt removal to be
completed within the available project budget. These locations were selected based on
site visits, observed sediment accumulation, and the time elapsed since sediment was
last removed at each location. This year's project will address up to four of the following
sites:
Tank Farm at Hollyhock (Base Bid)
This site is located on a tributary of the east fork of San Luis Obispo creek as it passes
under Tank Farm Road at the junction with Hollyhock Road. The project proposes to
remove accumulated sediment from beneath the bridge and immediately downstream to
the natural level of the creek bed upstream. In addition, a knoll with trees on it will be
removed to reduce sediment accumulation. Removing the sediment, knoll, and trees from
this location reduces the potential for flooding during severe storms that poses a
significant threat to the safety of residents and property in the immediate area.
Prefumo at Madonna Phase II Sediment Removal (Additive Alternate #1 )
This site is located downstream of Madonna Road Bridge with the nearest physical
address adjacent to 1610 Oceanaire Drive. The project proposes to remove accumulated
sediment and debris that has become established with vegetation that further restricts the
outflow of water from Laguna Lake. Removing sediment from this location reduces the
potential for flood waters inundating the surrounding neighborhood homes located at the
top of the engineered channel on the west bank.
Page 112 of 1059
Item 5h
SLO Creek at LOVR (Additive Alternate #2)
This site is located downstream of the City's Wastewater Reclamation Facility
immediately under Los Osos Valley Road in the east barrel. This project proposes to
remove accumulated sediment from the easterly barrel to provide more capacity for San
Luis Obispo Creek. Removing the sediment reduces the potential for water backing up
and potentially flooding the downtown area during larger storms.
Larkspur at Goldenrod (Additive Alternate #3)
This site is located on Islay Creek as it passes under Larkspur Street at the junction with
Goldenrod Lane in a residential neighborhood. The project proposes to remove
accumulated sediment from beneath the bridge and immediately upstream and
downstream. In addition, several trees will be removed to reduce sediment accumulation.
Removing sediment and trees from this location reduces the potential for flooding during
larger storms that poses a significant threat to the safety of residents and property in the
immediate area and the residential neighborhoods surrounding the project.
PREFUMO AT
MADONNA PHASE11
• LARKSPUR AT
1�
LOVR (ADD. ALT. 2) GOLDENROD
Vicinity Map
The Silt Removal 2026 project, Specification 2000198-04, was advertised on June 4,
2026, with bids opened on July 2, 2026. As identified above, the project was advertised
with a Base Bid and three Additive Alternates to maximize the scope of silt removal that
can be accomplished this season, based on the available funding. Five bids were
received and opened, and Andrew Brown General Engineering was the apparent low
bidder with a bid of $218,897 for the total project, which was $26,103 below the Engineer's
Estimate of $245,000. The proposed contract award consists of $218,897 (inclusive of
base bid and all additive alternates), as the total project bid is within the Publicly Disclosed
Funding amount of $350,000, as disclosed to contractors in the Notice to Bidders, in
compliance with Public Contract Code Section 20103.8C.
Page 113 of 1059
Item 5h
The Contractor's references, license, and registration with the Department of Industrial
Relations have been verified. Consequently, the contract is proposed to be awarded to
Andrew Brown General Engineering as the lowest responsive and responsible bidder
(Attachment A).
Bid Summary
Bid Total
Engineer's Estimate
$245,000
John Madonna Construction
$339,050
Rob Reynolds Construction
$334,503
R. Burke Corporation
$311,700
Souza Engineering Contracting
$248,244
Andrew Brown General Engineering
$218,897
Previous Council or Advisory Body Action
The annual silt removal projects are identified in the City's financial plans with Council
approving $170,000 in Fiscal Year 2025-26 and $150,000 in Fiscal Year 2026-27 for this
project as part of the 2025-27 Financial Plan for this project as reflected in the fiscal
impact section.
Public Engagement
Public engagement was conducted during planning associated with the 2025-27 Financial
Plan as well as through the Zone 9 Advisory Committee meeting where annual silt
removal budget allocations are recommended and discussed. As this is an annual project,
similar outreach efforts have been carried out in previous financial plans as well.
To ensure direct communication with the community, affected residents within the limits
of work will be notified of upcoming construction via door hangers. These notices,
designed in accordance with City standards, will be distributed to all properties adjacent
to the work area and will clearly outline the project's start and end dates. Additionally, in
areas where parking must be restricted, "No Parking" signs will be clearly posted at least
24 hours in advance of the work.
Community impacts are expected to be minimal and short-term. Nearby residents may
notice construction equipment operating in the creek corridor, minor noise, and temporary
restrictions to portions nearby trails or creek banks during work.
Community benefits include reducing the risk of localized flooding, supporting
neighborhood protection, and contributing to the City's overall creek maintenance efforts.
CONCURRENCE
The project has been reviewed and has concurrence from the Public Works Branch and
the City Administration's Office of Sustainability and Natural Resources.
Page 114 of 1059
Item 5h
ENVIRONMENTAL REVIEW
The project consists of minor annual sediment removal activities that are classified as
Category 2 activities under the City of San Luis Obispo Creek Waterway Management
Program (WMP). The WMP was evaluated through a Programmatic Environmental
Impact Statement/Environmental Impact Report (EIS/R), including the Draft
Programmatic EIS/R circulated for public review and the Final Programmatic EIS/R dated
October 9, 2003. The Final Programmatic EIS/R was certified by the City Council on
October 21, 2003, through Resolution No. 9494.
The Programmatic EIS/R provides environmental clearance for Category 2 routine
maintenance activities. The proposed sediment removal activities are within the scope of
the Programmatic EIS/R incorporated in the project contract documents and will be
implemented in accordance with WMP standards, mitigation measures, and best
management practices by the contractor during construction. As determined by the City
Council in Resolution No. 9494, Category 2 activities will not significantly alter flooding
conditions, will maintain existing channel conveyance capacity, and do not result in
significant environmental impacts. Therefore, no subsequent environmental review is
required under CEQA.
Permits for work within the creek were also acquired as part of this project from the
California Department of Fish and Wildlife, Regional Water Quality Control Board and
U.S. Army Corps of Engineers.
FISCAL IMPACT
Budgeted: Yes Budget Year: 2026-27
Funding Identified: Yes
Fiscal Analysis:
The City's Silt Removal program is fully funded through Zone 9 funding administered from
San Luis Obispo County. With the addition of the $150,000 allocated in the financial plan
for Fiscal Year 26-27 and remaining balances from prior fiscal years, there is currently an
available balance of $450,920.91 in the Zone 9 Silt Removal Account (2000198). The
current available balance is sufficient to fund the project.
Current
Remaining
Annual
Funding
Total Budget
Funding
Balance
Ongoing
Sources
Available
Request
Cost
General Fund
$19.39
$19.39
$0
$0
(Capital Outlay)
-2000198
General Fund
$450,901.52
$255,377.61
$195,523.91
$0
(Regional
Grant 1) -
200198
Total
$450,920.91
$255,397
$195,523.91
$0
Page 115 of 1059
Item 5h
ESTIMATED PROJECT COST BY FUNDING SOURCES
'Silt Removal 2026, Specification No. 2000198-04
Zone 9 Silt Removal
2000198-04
Project Total
Costs
401Fund
Base Bid
$44,061
$44,061
Additive Alternate 1 Bid
$59,152
$59,152
Additive Alternate 2 Bid
$47,541
$47,541
Additive Alternate 3 Bid
$68,143
$68,143
Total Project Bid
$218,897
$218,897
Construction Contingency (15%)
$33,000
$33,000
Total Construction Estimate
$251,897
$251,897
Permitting Fees
$3,000
$3,000
Printing:
$500
$500
Total Project Cost
$255,397
$255,397
Current Project Balance
$450,920.91
Post Project Balance
$195,523.91
Publicly Disclosed Funding Amount
$350,000
Remaining funding within the account will be utilized for surveying, design, and
environmental services for the next round of silt removal work in summer/fall 2027.
ALTERNATIVES
1. Deny authorization to award — The City Council could choose to not award the Silt
Removal 2026 project. This alternative could result in increased sediment
accumulating in the channel that can lead to flooding of the creek.
2. Scope reduction - Award Base Bid Only, or Base Bid + Additive Alternate 1, or
Base Bid + Additive Alternate 1 + Additive Alternate 2 — The City Council could
choose to award any of the options listed above, each of which would reduce the
overall project cost. However, reducing the project scope would allow sediment to
continue accumulating within the channel at locations excluded from the contract,
increasing the potential for localized flooding. Additionally, all required permits have
already been obtained for the full project. Any locations omitted from the current
contract would require new permitting efforts before future work could proceed,
resulting in additional time and cost.
ATTACHMENTS
A - Draft Construction Contract, Specification No. 2000198-04
Page 116 of 1059
AGREEMENT
THIS AGREEMENT, made on , by and between the City of San Luis
Obispo, a municipal corporation and charter city, San Luis Obispo County, California
(hereinafter called the City) and ANDREW BROWN GENERAL ENGINEERING, INC.
(hereinafter called the Contractor).
WITNESSETH:
That the City and the Contractor for the consideration stated herein agree as follows:
ARTICLE 1, SCOPE OF WORK: The Contractor shall perform everything required to be
performed, shall provide and furnish all of the labor, materials, necessary tools,
expendable equipment, and all utility and transportation services required to complete all
the work of construction of
SILT REMOVAL 2026,
SPECIFICATION NO. 2000198-04
in strict compliance with the plans and specifications therefor, including any and all
Addenda, adopted by the City, in strict compliance with the Contract Documents hereinafter
enumerated.
It is agreed that said labor, materials, tools, equipment, and services shall be furnished and
said work performed and completed under the direction and supervision and subject to the
approval of the City or its authorized representatives.
ARTICLE II, CONTRACT PRICE: The City shall pay the Contractor as full consideration
for the faithful performance of this Contract, subject to any additions or deductions as
provided in the Contract Documents, the contract prices as follows:
Item
Item
Unit of
Estimated
Item Price
Total
No.
SS(,)
Description
Measure
Quantity
in fi ures
in figures)
1
5,14
AREA 1— COMPLY WITH
LS
1
$2,177.00
$2,177.00
PERMITS AND CEQA
2
13
AREA 1 - EROSION CONTROL
LS
1
MEASURES
$2,894.00
$2,894.00
3*
19
AREA 1 -SILT REMO AL
CY
150
$145.00
$21,750.00
4
7,12
AREA 1 - TRAFFIC CONTROL
LS
1
$9,480.00
$9,480.00
5
20,
AREA 1 - TREE REMO AL
EA
5
$547.00
$2,735.00
6
13
AREA 1 - DEWATERING
LS
1
$2,189.00
$2,189.00
7
AREA 1 - CONSTRUCT AND
LS
1
REMO E TEMPORARY BERM
$2,836.00
$2,836.00
2-1
5, 14
AREA 2 - CO LY WITH
LS
1
PERMITS AND CEQA
$2,177.00
$2,177.00
Page 117 of 1059
Item
Item
Unit of
Estimated
Item Price
Total
No.
SS(1)
Description
Measure
Quantity
in fi ures
in figures)
2-2
13
AREA 2 - EROSION CONTROL
LS
1
MEASURES
$3,217.00
$3,217.00
2-3*
19
AREA 2 - SILT REMOVAL
CY
190
$179.00
$34,010.00
2-4
7,12
AREA 2 - TRAFFIC CONTROL
LS
1
$4,575.00
$4,575.00
2-5
20,
AREA 2 - TREE TRIMMING
EA
2
77
BRANCH REMOVAL
$467.00
$934.00
2-6
17
VEGETATION REMOVAL
LS
1
CLEAR AND GRUB
$9 733.00
$9,733.00
2-7
13
AREA 2 - DEWATERING
LS
1
$3,549.00
$3,549.00
2-8
AREA 2 - REMOVE AND
LS
1
REPLACE E ROCKS
$957.00
$957.00
3-1
5, 14
AREA 3 - COMPLY WITH
LS
1
PERMITS AND CEQA
$2,177.00
$2,177.00
3-2
13
AREA 3 - EROSION CONTROL
LS
1
MEASURES
$3,528.00
$3,528.00
3-3*
19
AREA 3 - SILT REMOVAL
CY
400
$84.00
$33,600.00
3-4
7,12
AREA 3 - TRAFFIC CONTROL
LS
1
$4,575.00
$4,575.00
3-5
20,
AREA 3 - TREE REMOVAL
EA
$523.00
$3,661.00
4-1
5, 14
AREA 3 - COMPLY WITH
LS
1
$
$
PERMITS AND CEQA
2,177.00
2,177.00
4-2
13
AREA 3 - EROSION CONTROL
LS
1
MEASURES
$3,528.00
$3,528.00
4-3*
19
AREA 3 - SILT REMOVAL
CY
150
$290.00
$43,500.00
4-4
7,12
AREA 3 - TRAFFIC CONTROL
LS
1
$7,266.00
$7,266.00
4-5
20,
AREA 3 - TREE REMOVAL
EA
11
$400.00
$4,400.00
4-6
13
AREA 3 - DEWATERING
LS
1
$3,549.00
$3,549.00
4-7
77
POTHOLING
EA
3
$1,241.00
$3,723.00
(1) refers to section in the Standard Specifications, with modifications in the Special Provisions, that describe required
work.
* Bid item exempt from Section 9-1.06B and 9-1.06C of the Standard Specifications. The unit price will not be adjusted
regardless of the final bid item quantity.
BID TOTAL: $218,897.00
Payments are to be made to the Contractor in compliance with and subject to the provisions
embodied in the documents made a part of this Contract.
If any dispute arises regarding the work or contract price, Contractor must follow the
procedures in the contract documents, including the requirements on change order
requests and dispute resolution.
ARTICLE III, COMPONENT PARTS OF THIS CONTRACT: The Contract consists of the
following documents, all of which are as fully a part thereof as if herein set out in full, and if
not attached, as if hereto attached:
Page 118 of 1059
1. Notice to Bidders and Information for Bidders
2. Standard Specifications and Engineering Standards
3. Special Provisions, any Addenda, Plans and Contract Change Orders
4. Caltrans Standard Specifications and Standard Plans 2024
5. Accepted Bid and Bid Bond
6. List of Subcontractors
7. Labor Code Section 1725.5 Statements
8. Bidder Acknowledgements
9. Qualifications
10. Noncollusion Declaration
11. Agreement and Bonds
12. Insurance Requirements and Forms
ARTICLE IV INDEMNIFICATION: The Contractor shall indemnify, defend with legal
counsel approved by City, and hold harmless City, its officers, officials, employees and
volunteers from and against all liability, loss, damage, expense, cost (including without
limitation reasonable legal counsel fees, expert fees and all other costs and fees of
litigation) of every nature arising out of or in connection with the acts or omissions of
Contractor, its employees, subcontractors, representatives, or agents, in bidding or
performing the work or in failing to comply with any obligation of Contractor under this
Agreement, except such loss or damage which is caused by the sole or active negligence
or willful misconduct of the City. Should conflict of interest principles preclude a single legal
counsel from representing both the City and the Contractor, or should the City otherwise
find the Contractor's legal counsel unacceptable, then the Contractor shall reimburse the
City its costs of defense, including without limitation reasonable legal counsel fees, expert
fees and all other costs and fees of litigation. The Contractor shall promptly pay any final
judgment rendered against the City (and its officers, officials, employees and volunteers)
with respect to claims determined by a trier of fact to have been the result of the Contractor's
acts or omissions in bidding or performing the work or in failing to comply with any obligation
of Contractor under this Agreement. It is expressly understood and agreed that the
foregoing provisions are intended to be as broad and inclusive as is permitted by the law
of the State of California and will survive termination of this Agreement.
The Contractor obligations under this section apply regardless of whether such claim,
charge, damage, demand, action, proceeding, loss, stop notice, cost, expense, judgment,
civil fine or penalty, or liability was caused in part or contributed to by an Indemnitee.
However, without affecting the rights of the City under any provision of this agreement, the
Contractor shall not be required to indemnify and hold harmless the City for liability
attributable to the active negligence of City, provided such active negligence is determined
by agreement between the parties or by the findings of a court of competent jurisdiction. In
instances where the City is shown to have been actively negligent and where the City's
active negligence accounts for only a percentage of the liability involved, the obligation of
the Contractor will be for that entire portion or percentage of liability not attributable to the
active negligence of the City.
Page 119 of 1059
ARTICLE V: It is further expressly agreed by and between the parties hereto that should
there be any conflict between the terms of this instrument and the bid of said Contractor,
then this instrument shall control and nothing herein shall be considered as an acceptance
of the said terms of said bid conflicting herewith.
ARTICLE VI LABOR CODE COMPLIANCE: This Agreement is subject to all applicable
requirements of Chapter 1 of Part 7 of Division 2 of the Labor Code, including requirements
pertaining to wages, working hours and workers' compensation insurance, as further
specified in the contract documents.
The project is subject to the prevailing wage requirements applicable to the locality in which
the work is to be performed for each craft, classification or type of worker needed to perform
the work, including employer payments for health and welfare, pension, vacation,
apprenticeship and similar purposes. Copies of these prevailing rates are on file with the
City and are available online at http://www.dir.ca.gov/DLSR.
City may not enter into the Agreement with a bidder without proof that the bidder and its
subcontractors are registered with the DIR to perform public work pursuant to Labor Code
section 1725.5, subject to limited legal exceptions.
Pursuant to Labor Code § 1861, by signing this Agreement, Contractor certifies as follows:
"I am aware of the provisions of Labor Code § 3700 which require every employer to be
insured against liability for workers' compensation or to undertake self-insurance in
accordance with the provisions of that code, and I will comply with such provisions before
commencing the performance of the work on this contract."
IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands this
year and date first above written.
APPROVED AS TO FORM CONTRACTOR:
ANDREW BROWN GENERAL ENGINEERING,
INC
J. Christine Dietrick Andrew W. Brown
City Attorney President
CITY OF SAN LUIS OBISPO
A Municipal Corporation
Whitney McDonald, City Manager