Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2000198-04 Bid Results
Item No.Item Description Unit of Measure Estimated Quantity Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total 1 AREA 1 - COMPLY WITH PERMITS AND CEQA LS 1 715.00$ 715.00$ 5,000.00$ 5,000.00$ 13,644.39$ 13,644.39$ 8,500.00$ 8,500.00$ 2,177.00$ 2,177.00$ 2 AREA 1 - EROSION CONTROL MEASURES LS 1 4,210.00$ 4,210.00$ 5,000.00$ 5,000.00$ 4,771.96$ 4,771.96$ 3,500.00$ 3,500.00$ 2,894.00$ 2,894.00$ 3 AREA 1 - SILT REMOVAL CY 150 275.00$ 41,250.00$ 155.00$ 23,250.00$ 428.17$ 64,225.50$ 200.00$ 30,000.00$ 145.00$ 21,750.00$ 4 AREA 1 - TRAFFIC CONTROL LS 1 6,030.00$ 6,030.00$ 15,000.00$ 15,000.00$ 3,667.07$ 3,667.07$ 8,000.00$ 8,000.00$ 9,480.00$ 9,480.00$ 5 AREA 1 - TREE REMOVAL EA 5 1,400.00$ 7,000.00$ 5,500.00$ 27,500.00$ 284.68$ 1,423.40$ 1,600.00$ 8,000.00$ 547.00$ 2,735.00$ 6 AREA 1 - DEWATERING LS 1 10,088.00$ 10,088.00$ 11,000.00$ 11,000.00$ 7,377.87$ 7,377.87$ 5,000.00$ 5,000.00$ 2,189.00$ 2,189.00$ 7 AREA 1 - CONSTRUCT AND REMOVE TEMPORARY BERM LS 1 4,131.00$ 4,131.00$ 6,000.00$ 6,000.00$ 2,372.30$ 2,372.30$ 3,900.00$ 3,900.00$ 2,836.00$ 2,836.00$ 2-1 AREA 2 - COMPLY WITH PERMITS AND CEQA LS 1 715.00$ 715.00$ 2,800.00$ 2,800.00$ 21,708.57$ 21,708.57$ 8,300.00$ 8,300.00$ 2,177.00$ 2,177.00$ 2-2 AREA 2 - EROSION CONTROL MEASURES LS 1 12,385.00$ 12,385.00$ 4,000.00$ 4,000.00$ 8,837.04$ 8,837.04$ 5,600.00$ 5,600.00$ 3,217.00$ 3,217.00$ 2-3 AREA 2 - SILT REMOVAL CY 190 105.00$ 19,950.00$ 130.00$ 24,700.00$ 107.15$ 20,358.50$ 130.00$ 24,700.00$ 179.00$ 34,010.00$ 2-4 AREA 2 - TRAFFIC CONTROL LS 1 6,030.00$ 6,030.00$ 15,000.00$ 15,000.00$ 1,850.69$ 1,850.69$ 7,200.00$ 7,200.00$ 4,575.00$ 4,575.00$ 2-5 AREA 2 - TREE TRIMMING BRANCH REMOVAL EA 2 1,100.00$ 2,200.00$ 2,500.00$ 5,000.00$ 809.68$ 1,619.36$ 2,500.00$ 5,000.00$ 467.00$ 934.00$ 2-6 VEGETATION REMOVAL (CLEAR AND GRUB)LS 1 3,920.00$ 3,920.00$ 18,000.00$ 18,000.00$ 9,400.00$ 9,400.00$ 6,000.00$ 6,000.00$ 9,733.00$ 9,733.00$ 2-7 AREA 2 - DEWATERING LS 1 5,248.00$ 5,248.00$ 6,500.00$ 6,500.00$ 2,789.91$ 2,789.91$ 3,000.00$ 3,000.00$ 3,549.00$ 3,549.00$ 2-8 AREA 2 - REMOVE AND REPLACE (E) ROCKS LS 1 3,495.00$ 3,495.00$ 2,400.00$ 2,400.00$ 578.34$ 578.34$ 3,200.00$ 3,200.00$ 957.00$ 957.00$ 3-1 AREA 3 - COMPLY WITH PERMITS AND CEQA LS 1 715.00$ 715.00$ 4,200.00$ 4,200.00$ 13,017.70$ 13,017.70$ 8,000.00$ 8,000.00$ 2,177.00$ 2,177.00$ 3-2 AREA 3 - EROSION CONTROL MEASURES LS 1 3,158.00$ 3,158.00$ 4,000.00$ 4,000.00$ 5,127.29$ 5,127.29$ 5,800.00$ 5,800.00$ 3,528.00$ 3,528.00$ 3-3 AREA 3 - SILT REMOVAL CY 400 86.50$ 34,600.00$ 105.00$ 42,000.00$ 88.18$ 35,272.00$ 180.00$ 72,000.00$ 84.00$ 33,600.00$ 3-4 AREA 3 - TRAFFIC CONTROL LS 1 7,120.00$ 7,120.00$ 15,000.00$ 15,000.00$ 2,886.73$ 2,886.73$ 7,200.00$ 7,200.00$ 4,575.00$ 4,575.00$ 3-5 AREA 3 - TREE REMOVAL EA 7 1,572.00$ 11,004.00$ 1,500.00$ 10,500.00$ 549.85$ 3,848.95$ 1,800.00$ 12,600.00$ 523.00$ 3,661.00$ 4-1 AREA 3 - COMPLY WITH PERMITS AND CEQA LS 1 715.00$ 715.00$ 4,400.00$ 4,400.00$ 16,575.32$ 16,575.32$ 7,300.00$ 7,300.00$ 2,177.00$ 2,177.00$ 4-2 AREA 3 - EROSION CONTROL MEASURES LS 1 4,125.00$ 4,125.00$ 4,000.00$ 4,000.00$ 8,269.59$ 8,269.59$ 4,600.00$ 4,600.00$ 3,528.00$ 3,528.00$ 4-3 AREA 3 - SILT REMOVAL CY 150 199.00$ 29,850.00$ 240.00$ 36,000.00$ 447.89$ 67,183.50$ 250.00$ 37,500.00$ 290.00$ 43,500.00$ 4-4 AREA 3 - TRAFFIC CONTROL LS 1 7,120.00$ 7,120.00$ 15,000.00$ 15,000.00$ 3,557.99$ 3,557.99$ 7,700.00$ 7,700.00$ 7,266.00$ 7,266.00$ 4-5 AREA 3 - TREE REMOVAL EA 11 1,050.00$ 11,550.00$ 2,400.00$ 26,400.00$ 237.20$ 2,609.20$ 1,200.00$ 13,200.00$ 400.00$ 4,400.00$ 4-6 AREA 3 - DEWATERING LS 1 5,580.00$ 5,580.00$ 4,000.00$ 4,000.00$ 7,929.98$ 7,929.98$ 2,300.00$ 2,300.00$ 3,549.00$ 3,549.00$ 4-7 POTHOLING EA 3 1,780.00$ 5,340.00$ 800.00$ 2,400.00$ 1,200.00$ 3,600.00$ 1,200.00$ 3,600.00$ 1,241.00$ 3,723.00$ John Madonna Construction, Inc. 78,400.00$ 75,700.00$ Souza Engineering Contracting, Inc 248,244.00$ Total Project Bid = (Base Bid + Add. Alt. 1 + Add. Alt. 2 + Add Alt. 3) 127,367.00$ Base Bid Total 73,424.00$ Base Bid + Add. Alt. “1” + Add. Alt. “2” Total 183,964.00$ Bid Opening Date: 7/2/2026 97,482.49$ 164,624.90$ 224,777.57$ Project: Silt Removal 2026, Specification No. 2000198-04 311,700.00$ 73,424.00$ Base Bid Total Additive Alternative #1 Bid Total 53,943.00$ Additive Alternatvie #2 Bid Total 56,597.00$ Additive Alternative #3 Bid Total 64,280.00$ Base Bid + Add. Alt. “1” Total 339,050.00$ 334,503.15$ 92,200.00$ 97,482.49$ 67,142.41$ 60,152.67$ 109,725.58$ 92,750.00$ Rob Reynolds Construction Inc.R. Burke Corporation 66,900.00$ 63,000.00$ 105,600.00$ Andrew Brown General Engineering Inc. 44,061.00$ 59,152.00$ 47,541.00$ 68,143.00$ 218,897.00$ BASE BID ITEMS BASE BID ITEMS (AREA 1 - TANK FARM AT HOLLYOCK) ADDITIVE ALTERNATIVE #1 (AREA 2 - PREFUMO AT MADONNA PHASE II) ADDITIVE ALTERNATIVE #2 (AREA 3 - SLO CREEK AT LOVR) ADDITIVE ALTERNATIVE #3 (AREA 4 - LARKSPUR AT GOLDENROD) 76,200.00$ 66,900.00$ 129,900.00$ 235,500.00$ 44,061.00$ 103,213.00$ 150,754.00$ 92,750.00$ 171,150.00$ 246,850.00$