HomeMy WebLinkAbout5001-6000 Emails and Calendars1 From:Cohen, Rachel Sent:Monday, August 26, 2024 3:42 PM To:Kevin Harris Cc:Hill, Robert; Tyler Benson; Bryce Engstrom Subject:Time Extension Attachments:TIME-0444-2024 (614 Monterey) Final Approval Letter.pdf Hi Kevin- Attached is the Time Extension Approval letter for SLO Rep Theatre. Your new project expiration date is August 28, 2025. Please review the letter and let me know if you have any questions. Sincerely, Rachel Cohen pronouns she/her/hers Principal Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org Stay connected with the City by signing up for e-notifications From: Kevin Harris <kevinharris@slorep.org> Sent: Tuesday, August 13, 2024 6:28 AM To: Cohen, Rachel <rcohen@slocity.org> Cc: Hill, Robert <rhill@slocity.org>; Tyler Benson <tb@edwardscongroup.com>; Bryce Engstrom <brycethearchitect@gmail.com> Subject: RE: SLO REP update 8.8 Thanks, Rachel- this invoice has been paid online. Kevin Harris (he/him/his) Managing ArƟsƟc Director www.slorep.org 2 SAN LUIS OBISPO REPERTORY THEATRE Unforgettable Characters. Extraordinary Stories. Since 1947. Facebook | Instagram | Blog | Twitter | YouTube SLO REP is a proud member of: From: Cohen, Rachel <rcohen@slocity.org> Sent: Monday, August 12, 2024 2:32 PM To: Kevin Harris <kevinharris@slorep.org> Subject: RE: SLO REP update 8.8 Hi Kevin- I have created an invoice for the Minor Use Permit Time Extension. The invoice number is 00036684. The link to the portal is: https://infoslo.slocity.org/EnerGov_Prod/selfservice#/home Cheers, Rachel Cohen pronouns she/her/hers Principal Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org Stay connected with the City by signing up for e-notifications From: Kevin Harris <kevinharris@slorep.org> Sent: Friday, August 9, 2024 3:17 PM To: Cohen, Rachel <rcohen@slocity.org> Subject: RE: SLO REP update 8.8 Sounds good- have a great weekend! Kevin Harris (he/him/his) Managing ArƟsƟc Director www.slorep.org 3 SAN LUIS OBISPO REPERTORY THEATRE Unforgettable Characters. Extraordinary Stories. Since 1947. Facebook | Instagram | Blog | Twitter | YouTube SLO REP is a proud member of: From: Cohen, Rachel <rcohen@slocity.org> Sent: Friday, August 9, 2024 3:16 PM To: Kevin Harris <kevinharris@slorep.org> Subject: RE: SLO REP update 8.8 Hi Kevin- I’ll create the invoice and send it to you Monday. Rachel Cohen pronouns she/her/hers Principal Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org Stay connected with the City by signing up for e-notifications From: Kevin Harris <kevinharris@slorep.org> Sent: Friday, August 9, 2024 3:05 PM To: Cohen, Rachel <rcohen@slocity.org>; Tway, Timothea (Timmi) <TTway@slocity.org>; Hill, Robert <rhill@slocity.org> Cc: Bryce Engstrom <brycethearchitect@gmail.com>; Tyler Benson <tb@edwardscongroup.com> Subject: RE: SLO REP update 8.8 No problem- do you have an invoice # so I can look it up and pay online? Thanks! Kevin Harris (he/him/his) Managing ArƟsƟc Director www.slorep.org 4 SAN LUIS OBISPO REPERTORY THEATRE Unforgettable Characters. Extraordinary Stories. Since 1947. Facebook | Instagram | Blog | Twitter | YouTube SLO REP is a proud member of: From: Cohen, Rachel <rcohen@slocity.org> Sent: Friday, August 9, 2024 10:05 AM To: Kevin Harris <kevinharris@slorep.org>; Tway, Timothea (Timmi) <TTway@slocity.org>; Hill, Robert <rhill@slocity.org> Cc: Bryce Engstrom <brycethearchitect@gmail.com>; Tyler Benson <tb@edwardscongroup.com> Subject: RE: SLO REP update 8.8 Thank you for the update Kevin. In working on your time extension, I realized that as part of your project you also received a minor use permit (for a theater in the Downtown Commercial Zone). This is a separate entitlement and thus a separate time extension request and fee is required. I was so focused on the architectural discussion that I overlooked this other entitlement that was a part of the project. The time extension for the use permit has a fee of $979.61. I can utilize what you have already submitted for the time extension for the architectural approval, but will need to receive payment of this additional fee to process the time extension for the use permit. Once you get building permits in / approved, the use permit will be vested and will not have to be renewed. Please let me know if you have any questions. Sincerely, Rachel Cohen pronouns she/her/hers Principal Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org Stay connected with the City by signing up for e-notifications From: Kevin Harris <kevinharris@slorep.org> Sent: Thursday, August 8, 2024 4:06 PM To: Cohen, Rachel <rcohen@slocity.org>; Tway, Timothea (Timmi) <TTway@slocity.org>; Hill, Robert <rhill@slocity.org> Cc: Bryce Engstrom <brycethearchitect@gmail.com>; Tyler Benson <tb@edwardscongroup.com> Subject: SLO REP update 8.8 Hi folks, Just wanted to let you know where we are. We overnighted the original sample to CeraClad that we’d like color-matched, and they’re working on it and will overnight the physical sample to u as soon as it’s done. 5 We’ve been in contact with Tarlton Plaster and they are working on samples of both the SAFFRON and DAISY ORANGE- will be sending them to us as soon as they’re done. We’re looking at numbers and determining what exactly is possible with the $125k we’ve currently allocated for these exterior entitlement revisions. Should have a package and complete sample selection for you all to check out within 7-10 days. Thanks- let me know if you have any questions! Kevin Harris (he/him/his) Managing ArƟsƟc Director www.slorep.org SAN LUIS OBISPO REPERTORY THEATRE Unforgettable Characters. Extraordinary Stories. Since 1947. Facebook | Instagram | Blog | Twitter | YouTube SLO REP is a proud member of: From: Kevin Harris <kevinharris@slorep.org> Sent: Tuesday, July 30, 2024 1:27 PM To: 'Cohen, Rachel' <rcohen@slocity.org>; 'Tway, Timothea (Timmi)' <TTway@slocity.org>; 'Hill, Robert' <rhill@slocity.org> Cc: 'Bryce Engstrom' <brycethearchitect@gmail.com>; 'Tyler Benson' <tb@edwardscongroup.com> Subject: RE: SLO REP EnƟtlement Renderings/Comparisons 7.26 Hi! Thursday is no good, but Tuesday, August 6 at 1:00 PM works for me. Should we meet at the theatre again? Please let me know if there are any other materials you would like to see before next Tuesday. Thanks! Kevin Harris (he/him/his) Managing ArƟsƟc Director www.slorep.org 6 SAN LUIS OBISPO REPERTORY THEATRE Unforgettable Characters. Extraordinary Stories. Since 1947. Facebook | Instagram | Blog | Twitter | YouTube SLO REP is a proud member of: From: Cohen, Rachel <rcohen@slocity.org> Sent: Tuesday, July 30, 2024 12:01 PM To: Kevin Harris <kevinharris@slorep.org>; Tway, Timothea (Timmi) <TTway@slocity.org>; Hill, Robert <rhill@slocity.org> Cc: Bryce Engstrom <brycethearchitect@gmail.com>; Tyler Benson <tb@edwardscongroup.com> Subject: RE: SLO REP EnƟtlement Renderings/Comparisons 7.26 Hi Kevin- That is great news! I have checked Timmi’s and Bob’s calendars and the following times are open for us: Thursday August 1st: 2-3pm Tuesday, August 6th: 1-2pm Do either of these times work for you? Thanks, Rachel Cohen pronouns she/her/hers Senior Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org Stay connected with the City by signing up for e-notifications From: Kevin Harris <kevinharris@slorep.org> Sent: Tuesday, July 30, 2024 7:47 AM To: Cohen, Rachel <rcohen@slocity.org>; Tway, Timothea (Timmi) <TTway@slocity.org>; Hill, Robert <rhill@slocity.org> Cc: Bryce Engstrom <brycethearchitect@gmail.com>; Tyler Benson <tb@edwardscongroup.com> Subject: SLO REP EnƟtlement Renderings/Comparisons 7.26 This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Hello Rachel, Timmy, and Bob, Please see the attached packet containing updated comparison renderings of the SLO REP Theatre. I’m happy to let you know that shortly after our meeting on July 18th, a potential vendor (Ceraclad) responded to an earlier inquiry and overnighted physical samples to our design team. The update renderings reflect the incorporation of these new rainscreen paneling systems. 7 We would love to schedule an in-person meeting to talk through the new renderings and show you the physical samples of all proposed materials. Please let us know your availability. Thanks for your continued partnership, and talk to you soon! Kevin Harris (he/him/his) Managing ArƟsƟc Director www.slorep.org SAN LUIS OBISPO REPERTORY THEATRE Unforgettable Characters. Extraordinary Stories. Since 1947. Facebook | Instagram | Blog | Twitter | YouTube SLO REP is a proud member of: City of San Luis Obispo, Community Development, 919 Palm Street, San Luis Obispo, CA, 93401-3218, 805.781.7170, slocity.org August 26, 2024 Sent via email Kevin Harris SLO Rep Theatre 888 Morro Street San Luis Obispo, CA 93401 SUBJECT: TIME-0444-2024 and TIME-0477-2024 – Time extensions for ARCH-0221- 2022 / ARCH-0415-2019 / USE-0416-2019 (614 Monterey Street / 609 Palm Street) Dear Kevin Harris: Thank you for your submittal of a time extension request on July 30, 2024, for the following entitlements: ARCH-0221-2022 / ARCH-0415-2019 / USE-0416-2019. The current request for a time extension is the first received for the above-referenced entitlements. On November 5, 2019, the City Council originally approved a new performing arts facility and use permit, with an addendum to a Certified Environmental Impact Report (Council Resolution No. 11059 (2019 Series)) for entitlements ARCH-0415-2019 and USE-0416-2019. On September 16, 2022, the Community Development Director reviewed and approved modifications to the previously approved SLO Rep Theatre building (ARCH-0415-2019) that include the removal of the basement, second floor, roof deck, and one tree and increased the first floor by approximately 940 square feet. Entitlements ARCH-0415-2019 / USE-0416-2019 were set to expire on November 5, 2020, and entitlement ARCH-0221-2022 was set to expire on September 16, 2023. However, on March 4, 2020, the Governor proclaimed a State of Emergency as a result of the threat of COVID-19. On March 17, 2020, the City Council adopted Resolution 11099 (2020 Series) proclaiming a local emergency and affirmed and continued its proclamation of local emergency to extend through the duration of the declared State of emergency. On June 16, 2020, Council adopted Resolution No. 11131 (2020 Series) that tolled the expiration of all discretionary approvals from the declaration of the pandemic emergency (beginning March 17, 2020). On July 6, 2021, Council adopted Resolution No. 11264 (2021 Series) that granted various enforcement moratoriums and permit extensions, including planning applications, for the purpose of economic recovery and the protection of the public health, safety, and welfare. Council adopted Resolution 11396 (2023 Series), effective on February 28, 2023, terminating the Declaration of a Local Emergency for the COVID-19 Pandemic that provided an 18-month time extension for discretionary approvals that ends on August 28, 2024. Based on your timely request for an extension, I hereby grant a one-year extension to your project, subject to the original findings and conditions as defined in Council Resolution No. TIME-0444-2024 / TIME-0477-2024 – (ARCH-0221-2022 / ARCH-0415-2019 / USE-0416-2019) 614 Monterey Street / 609 Palm Street Page 2 11059 (2019 Series) and the final approval letter from the Director dated September 16, 2022. The architectural review and use permit approvals will now expire on August 28, 2025. Pursuant to Zoning Regulations Section 17.104.070 (Expiration), the architectural review entitlement will expire if building permits are not issued prior to the expiration date identified above. Upon written request, received prior to expiration, the Community Development Director may grant renewals of an approval for successive periods of not more than one year each, up to a total of three years (this entitlement has two, one-year time extensions remaining). Requests beyond three years are subject to review by the Planning Commission. If you want to keep the project active after the entitlements expire, then you must start the process over by submitting a new application and plans and paying the required fee(s). If you have any questions, please contact Rachel Cohen by telephone at (805) 781-7574 or by email at rcohen@slocity.org. Sincerely, Tyler Corey Deputy Director Community Development 8 From:Cohen, Rachel Sent:Tuesday, August 13, 2024 8:26 AM To:Corey, Tyler Subject:Time Extension SLO Rep MUP Hi Tyler- SLO Rep submitted an application and payment for a Time Extension request for their MUP: TIME-0477-2024 (614 Monterey St.) https://energov.slocity.org/energov_prod/manageplan/#/plan/3bb3e5bb-ce89-44a3-b115- 5cc2db7c979c/details?null I plan to wrap this request into the approval letter for the architectural approval time extension (TIME-0444-2024). Thanks, Rachel Cohen pronouns she/her/hers Principal Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org Stay connected with the City by signing up for e-notifications 9 From:Cohen, Rachel Sent:Wednesday, August 7, 2024 3:23 PM To:Corey, Tyler Subject:Two new time extension applications Follow Up Flag:Follow up Flag Status:Completed Categories:z NOW Hi Tyler- Two new time extensions were submitted: - TIME-0444-2024 614 Monterey St (SLO Rep) - TIME-0448-2024 3580 Bullock (Bullock Ranch) Both are assigned to me and are scheduled for review on August 12, 2024. Thanks, Rachel Cohen pronouns she/her/hers Principal Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org Stay connected with the City by signing up for e-notifications 11 From:Bryce Engstrom <brycethearchitect@gmail.com> Sent:Tuesday, July 23, 2024 9:07 AM To:Cohen, Rachel Cc:Heather Gray; Kevin Harris; Sarah Evers; Nichols, Vanessa Subject:Re: FW: Job Verification - Application 129229769 Thanks Rachel. Sara & Heather, let me know if you need anything else to get the application moving forward. Bryce To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet. Bryce Engstrom- Architect 210 Traffic Way Suite E Arroyo Grande, CA 93420 (805) 235-3385 On Tue, Jul 23, 2024 at 8:50 AM Cohen, Rachel <rcohen@slocity.org> wrote: Hi Bryce- I think it would be best to use 614 Monterey as the address for SLO Rep. I spoke with building staff and they suggested we pick one of the existing addresses on site that makes the most sense (614 Monterey is where the Adobe used to be and where the theatre will now be). Once you submit your building permit, they will verify and confirm if that address works within the first round of review. The APN for the whole site is 002-412-019. As a side note the parking garage is using 609 Palm as their address. Cheers, Rachel Cohen pronouns she/her/hers Senior Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org Stay connected with the City by signing up for e-notifications 12 From: Bryce Engstrom <brycethearchitect@gmail.com> Sent: Tuesday, July 23, 2024 8:16 AM To: Heather Gray <heather@gececorp.com>; Cohen, Rachel <rcohen@slocity.org> Cc: Kevin Harris <kevinharris@slorep.org>; Sarah Evers <sarah@gececorp.com> Subject: Re: FW: Job Verification - Application 129229769 This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Good Morning Rachel, Please see below from our electrical engineers. My past experience says that street addresses are not assigned until after the initial building permit submittal, which is now going to be delayed due to the entitlements extension. Do we at least have an assigned APN? Or, is it all just one APN with the parking garage, since I believe we are still just doing two buildings on one parcel? Please advise so we don't fall behind on the progress on our PG& E application. Thanks, Bryce Bryce Engstrom- Architect 210 Traffic Way Suite E 13 Arroyo Grande, CA 93420 (805) 235-3385 On Tue, Jul 23, 2024 at 7:24 AM Heather Gray <heather@gececorp.com> wrote: Good morning, Bryce, and Kevin – Please see attached engineering retainer invoice from PG&E with payment instructions in the forwarded email from Shannon Flowers @ PG&E. The following actions are required from our team to complete the filing. I’ve summarized these below with responsibility noted. Bryce, I understand we do not yet have the project address, however, is there anything we can do to request this preemptively? Without this information I do foresee PG&E canceling our application filing for insufficient information.  Project address [Bryce]  Pay the Engineering advance [SLO Rep]  Fill out and return the load sheet [GECE]  Spec sheet for 2000A panel [GECE]  Parcel map with the lot highlighted [Bryce] Please let me know if you have any questions. Looking forward to your feedback. Sincerely, Heather Gray, PE President and Principal Electrical Engineer Gray Electrical Consulting + Engineering, CORP P.O. Box #368 – 2529 Professional Parkway, Suite A Santa Maria, CA 93456 14 P: 805.361.0525 C: 805.234.6058 heather@gececorp.com www.GECECORP.com Be sure to follow us! From: Flowers, Shannon <S3B4@pge.com> Sent: Friday, July 19, 2024 5:12 AM To: Heather Gray <heather@gececorp.com> Subject: Job Verification - Application 129229769 Classification: Public Dear Heather Gray, Thank you for being a valued PG&E Customer. Application Number: 129229769 Address: MONTEREY STREET, SAN LUIS OBISPO Thank you for submitting your application with PG&E. Your project is currently in the verification stage of the process. I will be assisting you in validating the information that you have provided and gathering initial documentation necessary to advance your project to the next phase. At that time, it will be assigned to a project coordinator who will work with you on the rest of the project. Please note that your project will not move forward until this verification step is completed. Below is a list of required information based on your project work scope: list work type (ie. New Commercial Service ) 15 I Need to verify the actual address for this request in order to move this application forward Pay the Engineering advance Fill out and return the load sheet Spec sheet for 2000A panel Parcel map with the lot highlighted I have attached the Engineering Advance Invoice for the above Project. You have two options to pay the engineering advance: USPS Express Service or Standard Mailing: 1. FedEx, UPS, or other Express(Overnight) Services only: PG&E Billing Center ATTN: CFM/PPC 885 Embarcadero Drive West Sacramento, CA 95605 Customer Fund Management - PPC PO Box 997340 Sacramento, CA 95899-7300 2. Pay online: Make a one-time invoice or contract payment. Free e-check bank transfer service with bank account and routing number www.pge.com/ProjectPayments  On the attached invoice, you will find the Customer Number and the Invoice Number used to login and pay the invoice 16 Please note the following information below –  When your local representative has determined the full scope of work, additional Engineering Advance funds may need to be secured  It may take up to 24 hours for your invoice to post to our website  If you decide to cancel this project once the design is complete, the engineering advance cannot be refunded  If you proceed with the project, the engineering advance will be credited to the contract and any excess will be refunded Thank you for your attention to this. Currently we have a 16 week lead time in our Estimating/Engineering department, getting these files to us will help move your project along in a timely fashion. Once we receive all required information your Project Coordinator will review the documentation and schedule a Site Visit. Please keep in mind that every project is unique and while we are attempting to gather all necessary information, it is possible that your Project Coordinator may request additional information based on specific project needs. Thank you and we look forward to providing electricity and/or gas to your project. Thanks, Shannon Flowers PG&E Application Verification Team Phone: (209) 402-5545 Click here to access the PG&E Greenbook Click here to Submit an Application Click here to access Customer Connections Online (BRSC) at 1-877-PGE-SRVC (1-877-743-7782) M.F.7 a.m. to 6 p.m. / All messages received will be returned by the end of next business day./ Email communication may contain privileged or confidential information proprietary to Pacific Gas and Electric Co.. If you have received this communication in error, we ask that you advise the sender by reply e-mail and immediately delete the message and any attachments without copying or disclosing the contents. You can read about PG&E’s data privacy practices at PGE.com/privacy. 29 From:Tally Richtsmeier <trichts@kitchell.com> Sent:Monday, June 3, 2024 10:39 AM To:Edmunson, Morgan Cc:Ryan Stefanek Subject:CADPS Phase 1B Plans Attachments:CADPS Phase 1B Plans.pdf This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Hi Morgan, Please see aƩached Phase 1B Plans. Thanks, Tally Richtsmeier, Project Engineer II Kitchell CEM 1304 Broad Street San Luis Obispo, CA 93401 Cell: 801-557-2289 | Direct: 916-713-6981 Follow us: Facebook | Twitter | LinkedIn | KitchellProgress.com REPORT NAME: GEOTECHNICAL ENGINEERING REPORT: PALM-NIPOMOSTREET PARKING STRUCTURE AND REPERTORY THEATERDATE:DECEMBER 13, 2019 (REVISED JANUARY 7, 2020)PREPARER:NICK ZOETEWEYLICENSE:C-79891FIRM:EARTH SYSTEMS PACIFIC4378 OLD SANTA FE ROADSAN LUIS OBISPO, CA 93401P: (805) 544-3276GEOTECHNICAL REPORTTHESE PHASE 1B SITE PREPARATION PLANS CONSIST OF TREE PROTECTION,DEMOLITION AND CLEARING.PHASE 2 (UNDER SEPARATE COVER) INCLUDE ON-SITE ROUGH GRADING,TEMPORARY AND PERMANENT SHORING, IMPROVEMENTS, BUILDINGS,PRECISE GRADING, LANDSCAPE AND ASSOCIATED FRONTAGEIMPROVEMENTS.CITY PROJECT NUMBER: GRAD-1974-2022ASSOCIATED PERMITS:ARCH-0415-2019GRAD-1653-2022 PHASE 1A - DRY UTILITY UNDERGROUNDINGDEFERRED SUBMITTALS (BY CONTRACTOR):ASBESTOS DEMOLITION / RENOVATION FORMCONSTRUCTION WASTE MANAGEMENT PLANWATER POLLUTION CONTROL DRAWINGS (WPCDs)SITE AREA OF DISTURBANCE: 1.2 ACRESWDID NUMBER: 3 40C399332PROJECT DESCRIPTIONSTORMWATER COMPLIANCEC-1.1PROJECT SITENOT TO SCALERRM CIVIL SHEETSC-1.1TITLE SHEETC-1.2GENERAL NOTESC-2.1EXISTING CONDITIONSC-2.2TREE PROTECTION PLANC-2.3DEMOLITION PLANC-9.1CONDITIONS OF APPROVALC-9.2CONDITIONS OF APPROVALC-9.3CONDITIONS OF APPROVALC-9.4CONDITIONS OF APPROVALC-9.5CONDITIONS OF APPROVALFUTUREPARKINGSTRUCTUREFUTURE SLOREP THEATREIT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR OR PERMITTEE TO CONTACT "UNDERGROUND SERVICEALERT" (U.S.A.) TOLL FREE AT (800) 642-2444 FORTY-EIGHT (48) HOURS PRIOR TO START OF CONSTRUCTION FORLOCATION OF POWER, TELEPHONE, OIL AND NATURAL GAS UNDERGROUND FACILITIES. CONTRACTOR ORPERMITTEE SHALL ALSO CONTACT THE APPROPRIATE AGENCY FOR THE LOCATION OF CABLE T.V., WATER, SEWER,DRAINAGE OR UNDERGROUND FACILITIES.REFERENCE DOCUMENTS:SAN LUIS OBISPO STANDARD SPECIFICATIONS AND ENGINEERING STANDARDS:AUGUST 2020 EDITIONALL CONSTRUCTION SHALL COMPLY WITH THE FOLLOWING CODES:2019 CALIFORNIA RESIDENTIAL CODE AND ITS APPENDICES AND STANDARDS2019 CALIFORNIA PLUMBING CODE AND ITS APPENDICES AND STANDARDS2019 CALIFORNIA MECHANICAL CODE AND ITS APPENDICES AND STANDARDS2019 CALIFORNIA FIRE CODE AND ITS APPENDICES AND STANDARDS2019 CALIFORNIA ELECTRICAL CODE AND ITS APPENDICES AND STANDARDS2019 CALIFORNIA BUILDING ENERGY EFFICIENCY STANDARDS2019 CALIFORNIA GREEN BUILDING STANDARDS2019 CALIFORNIA ADMINISTRATIVE CODE (CAC)TITLE 24, PART 1 CALIFORNIA CODE OF REGULATIONS (CCR)2019 CALIFORNIA BUILDING CODE (CBC)TITLE 24, PART 2 CCR BASED ON 2012 IBC AND 2016 CA AMENDMENTS2019 CALIFORNIA REFERENCE STANDARD CODETITLE 24, PART 12 CCRREFERENCE NOTESPALM STREETNIPOMO STREETDANA STREETMONTEREY STREETAPN 002-412-001 (609 PALM STREET)APN 002-412-002 (972 NIPOMO STREET)APN 002-412-003 (633 PALM STREET)APN 002-412-004 (630 MONTEREY STREET)APN 002-412-011 (970 NIPOMO STREET & 610 MONTEREY STREET)(2 ADDRESSES ON 1 APN)APN 002-412-012 (614 MONTEREY STREET)APN'S AND ADDRESSESTHE BASIS OF BEARINGS FOR THIS PROJECT IS THE CENTERLINEOF NIPOMO STREET BETWEEN FOUND MONUMENTS, BEARINGBEING N36°15'10"W PER R1.THE BENCHMARK FOR THIS PROJECT BEING CITY OF SLOBENCHMARK NO. 372, A LEAD AND TACK ON THE WESTERLYCURB 50 FEET (15 M) NORTH OF THE NWC OF NIPOMO & DANA,ELEVATION BEING 190.00 FEET (NAVD88).Reference Documents:City Standard Specifications - August 2020 EditionCity Engineering Standards - August 2020 Edition1.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR ORPERMITTEE TO CONTACT "UNDERGROUND SERVICE ALERT OFNORTHERN CALIFORNIA" BY PHONE AT 8-1-1 FORTY-EIGHT (48)HOURS PRIOR TO START OF CONSTRUCTION FOR LOCATION OFPOWER, TELEPHONE, OIL AND NATURAL GAS UNDERGROUNDFACILITIES. CONTRACTOR OR PERMITTEE SHALL ALSOCONTACT THE APPROPRIATE AGENCY FOR THE LOCATION OFCABLE T.V., WATER, SEWER, DRAINAGE OR UNDERGROUNDFACILITIES.2.THE CONTRACTOR SHALL POSSESS A CLASS A LICENSE AT THETIME OF BID OPENING.index to planssheet no.descriptiongeneral notes:datum:san luis obispo county, californiaAPPROVED BYSPECIFICATION NO.DATESHEETBrian A. Nelson, City Engineer R.C.E. C79870 Approved DateFILE NO./LOCATIONNo. C 79870B R I AN A. NELSONCIVILR EGISTER E D PROFESSIONAL ENGINEERSTATE OF CALI FORN IA CULTURAL ARTS DISTRICT PSPHASE 1B SITE PREPARATION PLANSCITY OF SAN LUIS OBISPO, CACOUNTY OF SAN LUIS OBISPOrrmdesign.com | (805) 543-17943765 S. Higuera, San Luis Obispo, CA 9340111/18/202290435-1B0720-02-UR19EXP. 9/30/2023December 21, 2022 CITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:SHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONSKYKMSKYSKYAS NOTED11/18/2022\\RRMPZ\on-site\0701\0720-02-UR19-Palm-Nipomo-Parking-Structure-(2019)\Engineering\ConDocs\Phase 1 - Rough Grading\Sheet-Files\C-1.X Title and General Notes.dwg, C-1.2, Nov 18, 2022 3:16pm, skyoshida rrmdesign.com | (805) 543-17943765 S. Higuera, San Luis Obispo, CA 93401THE INCLUDED DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS AND ARRANGEMENTSREPRESENTED THEREBY ARE AND SHALL REMAIN THE PROPERTY OF RRM DESIGNGROUP AND NO PART THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS ORUSED IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN THE SPECIFIEDPROJECT FOR WHICH THEY HAVE BEEN PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF RRM DESIGN GROUP. VISUAL CONTACT WITH THESE DRAWINGSOR SPECIFICATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESERESTRICTIONS. SUBMITTAL OF THESE DOCUMENTS FOR PUBLIC AGENCY REVIEWSHALL NOT BE CONSIDERED A WAIVER OF RRM DESIGN GROUP'S RIGHTS.RRM DESIGN GROUP COPYRIGHT 2022.RRM IS A CALIFORNIA CORPORATIONPHASE 1B0720-02-UR19REVISIONSDATENO.CITY OF SAN LUIS OBISPO SAN LUIS OBISPO, CA CULTURAL ARTS DISTRICT PS90435-1BEXP. 9/30/20231.NO CONSTRUCTION SHALL START WITHOUT PLANS APPROVED BY THE CITY. THE ENGINEER SHALL BE NOTIFIED AT LEAST TWENTY-FOUR HOURS PRIOR TO STARTING OFCONSTRUCTION. ANY CONSTRUCTION DONE WITHOUT APPROVED PLANS OR PRIOR NOTIFICATION TO THE ENGINEER WILL BE REJECTED AND WILL BE AT THECONTRACTOR'S AND/OR OWNER'S RISK.2.A PRE-CONSTRUCTION MEETING SHALL BE COORDINATED BY THE CITY AND SHALL INCLUDE PERTINENT CITY STAFF. AS A MINIMUM, THE ASSIGNED BUILDINGINSPECTOR, PUBLIC WORKS INSPECTOR, NATURAL RESOURCE MANAGER, AND CONTRACT PLANNER SHALL BE INCLUDED IN THIS MEETING TO DISCUSS THE LIMIT OFPUBLIC AND PRIVATE IMPROVEMENTS AND THE CORRESPONDING INSPECTION RESPONSIBILITIES.3.ALL CONSTRUCTION WORK AND INSTALLATIONS SHALL CONFORM TO THE MOST CURRENT CITY STANDARDS AND SPECIFICATIONS, AND ALL WORK SHALL BE SUBJECTTO THE APPROVAL OF THE CITY ENGINEER.4.ALL GRADING SHALL BE DONE IN ACCORDANCE WITH THE RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEERING REPORT (SEE TITLE SHEET FOR GEOTECHNICALENGINEER CONTACT AND REPORT DETAILS).5.RECORD PLANS ARE TO BE PREPARED AFTER CONSTRUCTION IS COMPLETED. THE CIVIL ENGINEER CERTIFYING THE IMPROVEMENTS AND PREPARING THE RECORDPLANS SHALL BE PRESENT WHEN THE FINAL INSPECTION IS MADE.6.IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATION OF ALL EXISTING UTILITIES AND IMPROVEMENTS PRIOR TO START OF CONSTRUCTION. EXISTINGUTILITIES AND IMPROVEMENTS SHOWN ON THE CONSTRUCTION PLANS ARE FROM RECORD SOURCES AND WERE SHOWN FOR DESIGN PURPOSES ONLY.7.ALL UTILITY COMPANIES MUST BE NOTIFIED PRIOR TO THE START OF CONSTRUCTION BY THE CONTRACTOR.8.CONTRACTOR TO TELEPHONE UNDERGROUND SERVICE ALERT (USA) TOLL FREE AT (800) 642-2444 A MINIMUM OF FORTY-EIGHT WORKING HOURS PRIOR TO THE STARTOF CONSTRUCTION. FOR BEST RESPONSE, PROVIDE AS MUCH NOTICE AS POSSIBLE, UP TO TEN WORKING DAYS.9.CONSTRUCTION CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR LOCATING OR HAVING LOCATED ALL UNDERGROUND UTILITIES ANDRELATED FACILITIES AND FOR PROTECTING SAME DURING THE COURSE OF CONSTRUCTION. ALL UTILITIES THAT ARE NOT A MEMBER OF USA MUST ALSO BE NOTED.10.A CITY ENCROACHMENT PERMIT IS REQUIRED. WORK REQUIRING AN ENCROACHMENT PERMIT INCLUDES BUT IS NOT LIMITED TO DEMOLITIONS, UTILITIES, WATER,SEWER, AND FIRE SERVICE LATERALS, CURB, GUTTER, AND SIDEWALK, DRIVEWAY APPROACHES, SIDEWALK UNDERDRAINS, STORM DRAIN IMPROVEMENTS, STREET TREEPLANTING OR PRUNING, CURB RAMPS, STREET PAVING, AND PEDESTRIAN PROTECTION OR CONSTRUCTION STAGING IN THE RIGHT-OF-WAY. ALL WORK LOCATEDWITHIN THE PUBLIC RIGHT-OF-WAY OR WITHIN THE JURISDICTION OF THE CITY UTILITIES AND PUBLIC WORKS DEPARTMENTS SHALL COMPLY WITH THE MOST CURRENTEDITION OF THE ENGINEERING STANDARDS AND STANDARD SPECIFICATIONS.11.CONTACT PUBLIC WORKS INSPECTION HOTLINE AT (805) 781-7200 WITH AT LEAST A 48 HOUR NOTICE FOR ANY REQUIRED ENCROACHMENT PERMIT INSPECTIONS ORFINAL INSPECTIONS.12.THE CONTRACTOR SHALL PROVIDE A LEGIBLE AND COMPLETE SET OF PLANS IDENTIFYING ALL MODIFICATIONS MADE DURING CONSTRUCTION TO THE DESIGNENGINEER FOR THE RECORD DRAWINGS.13.ANY PROPOSED DEVIATIONS FROM THE PLANS MUST BE SUBMITTED TO THE DESIGN ENGINEER FOR REVIEW AND APPROVAL, INCLUDING FIELD REVISIONS REQUESTEDBY THE CITY INSPECTOR.14.THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OR PROPER RESETTING OF ALL EXISTING MONUMENTS AND OTHER SURVEY MARKERS. ANY SURVEYMONUMENTS DESTROYED BY THE CONTRACTOR SHALL BE REPLACED IN ACCORDANCE WITH THE STATE LAND SURVEYORS ACT AND CITY STANDARDS AT THECONTRACTOR'S EXPENSE.15.ALL PROPERTY CORNER MONUMENTS SHALL BE IN PLACE AND IDENTIFIED AT THE TIME OF THE FOUNDATION INSPECTION REQUEST.16.PRIOR TO CONSTRUCTION THE CONTRACTOR SHALL SUBMIT AND OBTAIN APPROVAL OF A PEDESTRIAN PROTECTION PLAN IN CONFORMANCE WITH THE CALIFORNIABUILDING CODE.17.A COMPACTION REPORT SHALL BE PROVIDED BY A SOILS ENGINEER STATING THAT THE BASE AND SUBGRADE WERE PREPARED IN ACCORDANCE WITH THE PROJECTSOILS REPORT.18.IF DE-WATERING IS REQUIRED, A LOW THREAT DISCHARGE PERMIT FROM CITY ENVIRONMENTAL COMPLIANCE MAY BE REQUIRED.19.CONTRACTOR SHALL PROVIDE A TRAFFIC AND PEDESTRIAN CONTROL PLAN TO BE SUBMITTED TO THE PUBLIC WORKS DEPARTMENT FOR REVIEW AND APPROVALPRIOR TO ENCROACHMENT PERMIT ISSUANCE.20.THE ENGINEER MAY REQUIRE REVISIONS IN THE PLANS TO SOLVE UNFORESEEN PROBLEMS THAT MAY ARISE IN THE FIELD.21.ANY SECTIONS OF DAMAGED OR DISPLACED CURB, GUTTER & SIDEWALK OR DRIVEWAY APPROACH SHALL BE REPAIRED OR REPLACED TO THE SATISFACTION OF THECITY.22.DIGITAL DRAWINGS OF HORIZONTAL CONTROL PROVIDED TO SURVEY FOR PURPOSE OF CONSTRUCTION.23.CONTRACTOR SHALL ADHERE TO ALL NOTES AND DETAILS PRESENTED ON THE EROSION CONTROL PLAN AND NOTES SHEETS.1.THIS EXISTING CONDITIONS AND SITE PREPARATION PLAN (DEMOLITION PLAN) WAS PREPARED FOR THE CONVENIENCE OF THE CONTRACTOR. THE ARCHITECT ANDTHE ENGINEER DO NOT REPRESENT THAT ALL ITEMS WHICH MAY REQUIRE DEMOLITION HAVE BEEN SHOWN. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TOCAREFULLY EXAMINE THE SITE AND DETERMINE WHAT MAY BE REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THE WORK.2.DEMOLITION WORK AND ABANDONMENT SHALL CONFORM TO THE LATEST VERSION OF THE UNIFORM BUILDING CODE, TITLE 24, AND ALL WORK SHALL BE SUBJECTTO THE APPROVAL OF THE ENGINEER OF RECORD.3.NO DEMOLITION SHALL BE STARTED WITHOUT APPROVED PLANS. THE OWNER SHALL BE NOTIFIED AT LEAST 24 HOURS PRIOR TO STARTING DEMOLITION.4.THE PLANS DO NOT AUTHORIZE SITE DISTURBANCE BEYOND THE LIMITS AS REPRESENTED ON THESE PLANS UNLESS OTHERWISE NOTED.5. THE CONTRACTOR SHALL REPAIR AND/OR REPLACE ALL ITEMS DAMAGED DURING DEMOLITION AND CONSTRUCTION TO ITS ORIGINAL CONDITION OR TO THESATISFACTION OF THE CITY.6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER STORAGE OF ANY ITEMS TO BE RELOCATED.7. ALL ITEMS ARE THE PROPERTY OF THE OWNER. THE CONTRACTOR SHALL SALVAGE ANY ITEMS AT THE REQUEST OF THE OWNER.8. ALL DEBRIS FROM THE DEMOLITION PROCESS SHALL BE REMOVED FROM THE SITE TO AN APPROVED DUMP SITE AT THE CONTRACTOR'S EXPENSE UNLESS OTHERWISENOTED.9. ALL HAZARDOUS MATERIALS SHALL BE REMOVED PRIOR TO ANY DEMOLITION OR ACTIVITY WHICH WOULD DISTURB THAT MATERIAL BY A LICENSED ABATEMENTCONTRACTOR.10. IF ASBESTOS IS FOUND IN THE EXISTING STRUCTURES TO BE DEMOLISHED, THEN ASBESTOS MUST BE REMOVED IN ACCORDANCE WITH APPLICABLE CITY, COUNTY,STATE AND FEDERAL GUIDELINES OR REQUIREMENTS. REMOVAL OF ASBESTOS MATERIAL SHALL BE COMPLETED BY A CONTRACTOR LICENSED TO HANDLE ASBESTOSMATERIAL.11. ALL STREETS, ALLEYS, VEHICULAR WAYS, SIDEWALKS, AND HAUL ROUTES SHALL BE KEPT CLEAN AND CLEAR OF DEBRIS, DIRT AND DUST IN A MANNER ACCEPTABLE TOTHE CITY. AT A MINIMUM, THESE AREAS SHALL BE CLEANED AT THE END OF EACH WORK DAY. FAILURE TO DO SO WILL RESULT IN A "STOP WORK" NOTICE. SAIDNOTICE WILL NOT BE RELEASED UNTIL THE AREA HAS BEEN ADEQUATELY CLEANED. THE FLUSHING OF DIRT OR DEBRIS INTO STORM DRAIN OR SANITARY SEWERFACILITIES SHALL NOT BE PERMITTED.12. ALL ABANDONED UTILITIES SHALL BE MARKED IN THE FIELD AND LOCATED ON THE DRAWINGS OF RECORD BY THE CONTRACTOR WHICH WILL BE SUPPLIED TO BOTHTHE ENGINEER OF RECORD AND THE OWNER AT THE CONCLUSION OF THE DEMOLITION WORK.13. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATIONS OF ALL EXISTING UTILITIES PRIOR TO START OF CONSTRUCTION. EXISTING UTILITIES ANDIMPROVEMENTS SHOWN ON THESE PLANS ARE FROM RECORD SOURCES SURVEYS. UTILITIES ARE SHOWN FOR DESIGN PURPOSES ONLY.14. DAMAGE TO EXISTING FACILITIES NOTED TO REMAIN SHALL BE CORRECTED AT THE CONTRACTOR'S EXPENSE.15. THE CONTRACTOR MUST NOTIFY ALL UTILITY COMPANIES PRIOR TO THE START OF CONSTRUCTION.16. CONTRACTOR TO TELEPHONE UNDERGROUND SERVICE ALERT (USA) TOLL FREE AT (800) 642-2444 A MINIMUM OF 48 HOURS PRIOR TO THE START OF CONSTRUCTION.FOR BEST RESPONSE, PROVIDE AS MUCH NOTICE AS POSSIBLE, UP TO 10 WORKING DAYS.17. CONTRACTOR SHALL NOT INTERRUPT ANY SERVICES OR DISRUPT THE OPERATION OF ADJACENT BUSINESSES, RESIDENTIAL AREAS OR ON-SITE FACILITIES OUTSIDE THELIMITS OF DEMOLITION.18. CONTRACTOR SHALL OBTAIN A DEMOLITION PERMIT FROM THE CITY PRIOR TO THE START OF WORK.19. THE CONTRACTOR SHALL OBTAIN AN ENCROACHMENT PERMIT FROM THE CITY PRIOR TO THE START OF WORK.20. CONTRACTOR TO REMOVE AND DISPOSE OF ALL WOOD, CONCRETE, AC PAVING, AGGREGATE BASE, AND VEGETATION AS SHOWN UNLESS OTHERWISE NOTED ONTHE PLANS.21. REMOVE TREES, TOGETHER WITH THE BULK OF THE ROOTS, TO A MINIMUM DEPTH OF 4 FEET BELOW EXISTING GRADE AND WITHIN A RADIUS OF 7 FEET BEYOND THEPERIMETER OF THE TRUNK AT GROUND LINE.22. FILL AND COMPACT HOLES RESULTING FROM TREES AND TREE STUMP REMOVAL TO REQUIRED DENSITY. FILLING SHALL NOT BE DONE UNTIL HOLES HAVE BEENAPPROVED BY THE OWNER'S REPRESENTATIVE.23. DUST CONTROL SHALL BE MAINTAINED TO THE SATISFACTION OF THE CITY AND COUNTY APCD.24. CONTRACTOR TO DISPOSE OF ALL MATERIALS PER CONSTRUCTION AND DEMOLITION RECYCLING PLAN FOR THIS PROJECT.25. PROTECT EXISTING FACILITIES OUTSIDE THE LIMITS OF DEMOLITION UNLESS OTHERWISE NOTED.26. EROSION CONTROL MEASURES SHALL BE IMPLEMENTED AND MAINTAINED TO THE SATISFACTION OF THE BUILDING OFFICIAL AND ENGINEER DURING ALLDEMOLITIONS, CONSTRUCTION AND GROUND DISTURBING ACTIVITIES.27. CONTRACTOR MUST SALVAGE TO ENGINEER UPON REQUEST ANY ITEMS WITHIN DEMOLITION AREA AT NO ADDITIONAL EXPENSE TO CITY.28.CONTRACTOR TO COMPLETE AND SUBMIT CONSTRUCTION WASTE MANAGEMENT PLAN ALONG WITH ASBESTOS DEMOLITION / RENOVATION NOTIFICATION FORMSAND ASSOCIATED FEES TO CITY OF SAN LUIS OBISPO PRIOR TO STARTING ANY DEMOLITION WORK.29.REFER TO ASBESTOS AND LEAD REPORTS PREPARED BY WEST COAST SAFETY CONSULTANTS DATED OCTOBER 14, 2022. CONTRACTOR CONDUCTING DEMOLITIONAND REMOVAL WORK SHALL HAVE REQUIRED CERTIFICATIONS AND QUALIFICATIONS IN ACCORDANCE TO APPLICABLE CODES. CONTRACTOR SHALL SAFELY ANDPROPERLY REMOVE IDENTIFIED MATERIALS IN ACCORDANCE WITH APPLICABLE CODES, REFERENCED REPORTS, CONCLUSIONS AND RECOMMENDATIONS.UTILITY NOTESGENERAL NOTESDEMOLITION NOTES1.UTILITIES SHOWN ARE ACCURATE TO THE EXTENT OF AVAILABLE RECORDS AND KNOWLEDGE. THE CONTRACTOR HAS THE RESPONSIBILITY TO VERIFY THE LOCATION OFEXISTING UNDERGROUND UTILITIES AND TO NOTIFY UTILITY COMPANIES WHEN WORKING IN THEIR PROXIMITY. PRIOR TO COMMENCING CONSTRUCTION, THECONTRACTOR SHALL POTHOLE TO VERIFY ALL EXISTING UTILITY POINTS OF CONNECTION AND ELEVATIONS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OFRECORD IF ANY DISCREPANCIES EXIST BETWEEN THE PLANS AND FIELD CONDITIONS PERTAINING TO MATERIALS, ELEVATIONS, LOCATIONS, ETC., PRIOR TOCONTINUING WORK.2.THE ENGINEERED DRY UTILITY PLANS WILL BE A DEFERRED SUBMITTAL ITEM. THE ENGINEERED DRY UTILITY PLANS SHALL BE SUBMITTED TO THE ENGINEER OF RECORD TOREVIEW FOR CONFORMANCE WITH THE APPROVED PLANS. THE DEFERRED SUBMITTAL ITEMS SHALL BE FORWARDED TO THE CITY FOR REVIEW AND APPROVAL PRIORTO COMMENCING ANY ON-SITE OF OFF-SITE UTILITY CONSTRUCTION.3.ALL WATER VALVES THAT ARE DEEPER THAN 4' SHALL BE A EQUIPPED WITH A STEEL VALVE STEM EXTENSION THAT WILL ALLOW VALVE OPERATION WITH STANDARDLENGTH VALVE KEY. VALVE OPERATING NUTS SHALL BE BETWEEN 2' TO 4' BELOW GRADE. THE STEEL VALVE STEM EXTENSION SHALL BE STEEL ONLY BY PIPE LINEPRODUCTS OR APPROVED EQUAL. PROTECT ALL BURIED METALS FROM CORROSION PER HDR CORROSION CONTROL RECOMMENDATIONS (TYP).4.THE DRY UTILITY SERVICE LINES AND BOXES SHOWN IN THESE PLANS ARE SCHEMATIC AND BASED ON PROVIDED PLANS FROM THE UTILITY PROVIDER. THECONTRACTOR IS REQUIRED TO OBTAIN THE FINAL PLANS FROM THE UTILITY PROVIDER AND VERIFY THE FINAL ALIGNMENT PER THEIR APPROVED PLANS PRIOR TOCONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR ROUTING THE SERVICE WIRE THROUGH THE CONDUIT RUNS TO PROVIDE SERVICE TO THE SHOWN EQUIPMENT.ABBREVIATIONSABAGGREGATE BASEACASPHALT CONCRETEAPANGLE POINTARVAIR RELEASE VALVEBCRBEGIN CURVEBSW/BWBACK OF SIDEWALK/WALKCBCATCH BASINCL/CL.CENTERLINE/CLASSCMPCORRUGATED METAL PIPECONC.CONCRETEDBHDIAMETER AT BREAST HEIGHT [OF A TREE]DIDRAIN INLETDIPDUCTILE IRON PIPEEGEXISTING GRADEEX.EXISTINGELEVELEVATIONFDCFIRE DEPARTMENT CONNECTIONFGFINISHED GRADEFLFLOWLINEFSFINISHED SURFACEFPFINISHED PADFWFIRE WATERHPHIGH POINTIPSIRON PIPE SIZEJTJOINT TRENCHLPLOW POINTEL.MAXIMUMMIN.MINIMUMNTSNOT TO SCALEPLPROPERTY LINEPCLPARCELPCCPORTLAND CEMENT CONCRETEPOCPOINT OF CURVE/POINT OF CONNECTIONPOTPOINT OF TANGENTPRCPOINT OF REVERSE CURVEROWRIGHT OF WAYRET. WALLRETAINING WALLRPREDUCED PRESSURERWRECYCLED WATERSDSTORM DRAINSFMSEWER FORCE MAINSLSTREET LIGHT/SERVICE LATERALSSSANITARY SEWERSTASTATIONSTD.STANDARDTBDTO BE DETERMINEDTBMTEMPORARY BENCHMARKTCTOP OF CURBTFTOP OF FOOTINGTPTOP OF PAVEMENTTGTOP OF GRATETYP.TYPICALTWTOP OF WALLUONUNLESS OTHERWISE NOTEDWWATERWSEWATER SURFACE ELEVATIONGENERAL NOTESC-1.2 APN: 002-421-001SAN LUIS PINE4" TREE6" TREE5" TREE30" PHOENIX PALM7" TREE30" PHOENIX PALM3" TREE3" TREE3" TREE3" TREE3" TREE3" TREE4" TREE4" TREE10" TREE3" TREE18" TREE10" TREE4" TREE10" TREE3" TREE20" TREE3" TREE18" TREEN53°05'37"E 214.61'N36°28'15"W 279.70'N53°36'43"E 213.48'N36°15'10"W 281.64'SSMHRIM = 188.15'INV = 178.1'SSMHRIM = 188.13'INV = 179.4'SSMHRIM = 190.66'INV = 182.8'SSMHRIM = 193.14'INV = 178.5'SSMHRIM = 202.15'INV = 191.44'16" TREE6" TREE6" TREE16" TREE10" TREE16" TREE16" TREE40" TREE28" TREE36" OAK TREE12" TREE(3) 12" TREES12" TREE8" TREE12" TREE6" TREE2-6" TREE6" TREE10" TREE6" TREE6" TREE4" TREE8" SYAGRUS PALM30" TREE8" PALM6" TREEAPN: 002-412-003APN: 002-412-004APN: 002-412-001APN: 002-412-002APN: 002-412-011APN: 002-412-012G G G G G G G G G GGGG GGGGGGGGGGGGGOHOH OH OH OHOHOHOHOHOH OHOHPPTCOIVFIRE HYDRANTWATER VALVEWATER METERDOUBLE DETECTOR CHECK VALVEIRRIGATION VALVEGAS METERSEWER MANHOLESEWER CLEANOUTSTREET/PARKING LIGHTPOWER POLEGUY WIRETELEPHONE MANHOLEPARKING METERSIGNCURBCURB & GUTTERRETAINING WALLFENCEAC BERMEDGE OF PAVEMENTWATER LINEGAS LINESEWER LINEOVERHEAD LINEBRICK/STONEGSLBSTREET LIGHT BOXTELTELEPHONE BOX/VAULTPEDTELEPHONE PEDESTALPGEELECTRICAL BOX/VAULTTRANSELECTRICAL TRANSFORMERCATVCABLE TELEVISION BOXUTILUTILITY BOX/VAULTWMGMWSSOHCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:SHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONSKYKMSKYSKYAS NOTED11/18/2022\\RRMPZ\on-site\0701\0720-02-UR19-Palm-Nipomo-Parking-Structure-(2019)\Engineering\ConDocs\Phase 1 - Rough Grading\Sheet-Files\C-2.1 Existing Conditions.dwg, C-2.1, Nov 18, 2022 3:17pm, skyoshida rrmdesign.com | (805) 543-17943765 S. Higuera, San Luis Obispo, CA 93401THE INCLUDED DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS AND ARRANGEMENTSREPRESENTED THEREBY ARE AND SHALL REMAIN THE PROPERTY OF RRM DESIGNGROUP AND NO PART THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS ORUSED IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN THE SPECIFIEDPROJECT FOR WHICH THEY HAVE BEEN PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF RRM DESIGN GROUP. VISUAL CONTACT WITH THESE DRAWINGSOR SPECIFICATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESERESTRICTIONS. SUBMITTAL OF THESE DOCUMENTS FOR PUBLIC AGENCY REVIEWSHALL NOT BE CONSIDERED A WAIVER OF RRM DESIGN GROUP'S RIGHTS.RRM DESIGN GROUP COPYRIGHT 2022.RRM IS A CALIFORNIA CORPORATIONPHASE 1B0720-02-UR19REVISIONSDATENO.CITY OF SAN LUIS OBISPO SAN LUIS OBISPO, CA CULTURAL ARTS DISTRICT PS90435-1BEXP. 9/30/2023EXISTING CONDITIONSC-2.10feet40SCALE: 1" = 20'2060EXISTING CONDITIONS LEGEND SEVERED ROOTS SHALL BE EXPOSED TO AIR AND SUNLIGHT FOR MORE THAN 48 HOURS. 8.PRIOR TO COMMENCEMENT OF CONSTRUCTION, CONTRACTOR SHALL OBTAIN TREE REMOVAL PERMIT AS REQUIRED. 9.TREE REMOVAL SHOULD COMPLY WITH ALL PROVISIONS OF SLOMC 12.24.090. TREE PROTECTION AND REMOVAL NOTES NOTE FOR TREES # 18, 22, 25, 28, 31, 32: EXISTING TREE WITHIN CITY RIGHT-OF-WAY (ROW) IDENTIFIED TO BE REMOVED SHOWN FOR REFERENCE ONLY, SHALL BE PRESERVED, PROTECTED AND MAINTAINED THROUGHOUT DURATION OF PHASE 1B, UNTIL FUTURE PHASE 2 DEMOLITION WORK, UNDER SEPARATE COVER. NOTE FOR TREE #29: EXISTING TREE TO BE RELOCATED BY CITY TO OFF-SITE LOCATION THAT IS TO BE DETERMINED (TBD) BY CITY. * NOTE: CONTRACTOR TO PROTECT AND PRESERVE EXISTING TREES AND VEGETATION ON ADJACENT PROPERTY (TYP). REFER TO DEMOLITION PLAN SHEET C-2.3. ** SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxWVWVWVWVWVWVWVHYDSSSWM WM WM WM WMWMWMWMSSSWMWMWMOHOHOHW W W W W W W W W WWWW WWWWWG G G G G G G G GGGG GGGGGGGGGGGGGWWWWWWWWVWVOHOHOHOHOH OH OHOHOHOHGMH YDWVPALM STREETDANASTREETAPN: 002-421-001SAN LUIS OBISPOCHILDREN'S MUSEUM(NOT A PART)NIPOMO STREETMONTEREY STREETMIXED-USE/ HOTEL(FUTURE PROJECT)APN: 002-421-033LEITCHERBUILDING(NOT A PART)APN: 002-412-013HAYS-LATIMER ADOBE(PRIVATE RESIDENCE)(NOT A PART)APN: 002-412-005APARTMENTS(NOT A PART)APN: 002-401-010REIS FAMILYMORTUARY(NOT A PART)APN: 002-402-015CENTRAL COASTREALTY GROUP(NOT A PART)190191191192192 199202196192189188189190191192193196191196194N36°15'10"W 281.64'N53°05'37"E 214.61'N36°28'51"W 279.70'N53°36'43"E 213.48'3333333333331133333444444666555556671010108888810999914APPROXIMATE BUILDINGENVELOPE SHOWN FORREFERENCE ONLYAPPROXIMATE BUILDINGENVELOPES SHOWNFOR REFERENCE ONLYPROPOSED TREEPROTECTIONFENCINGX XXXXXXXXXXXXX X XXXXXXXX XXXXXXXXXXXX X 277721053555555355EXISTING OVERHEAD ELECTRICALAND TELECOMMUNICATIONFACILITIES TO BE REMOVED BYOTHERS, REFER TO PHASE 1A PLANS(UNDER SEPARATE COVER) ANDPG&E HANDOUT PACKAGE55555355533333512.9'97.2'PROTECT PORTION OFEXISTING WALL 351901911921951 9 1 1 9 2 1 9 3 1 9 419619719819 5 1921931941 9 6 2001992012022032 0 4 2 0 0 1 9 9 2 0 1203204205195194196197198 2 0 0 2 0 1 20 2 20 3 192193188188 DURING PHASE 1B WORK, EXISTING WATER METER MAY BE ABLETO BE USED DURING CONSTRUCTION BY THE CONTRACTOR IFTHEY PAY FOR THE WATER. CONTRACTOR SHALL COORDINATEDIRECTLY WITH CITY AS NEEDED. DURING PHASE 2 WORK,WATER SERVICE WILL BE ABANDONED, STUBBED AND CAPPED.1111111111111111121212CONTRACTOR SHALLFIELD LOCATE SEWERLATERAL AND CLEANOUT.121013131111PROTECT AND PRESERVE EXISTING WALL IN PLACE.CONTRACTOR SHALL DETERMINE IN FIELD PORTIONOF EXISTING BUILDING FOUNDATION TO REMAIN TOPRESERVE STRUCTURAL INTEGRITY OF EXISTING WALLEXISTING 30" TREE #29 TO BE RELOCATEDBY CITY TO OFF-SITE LOCATION THAT ISTO BE DETERMINED (TBD) BY CITY.99PROTECT AND PRESERVEEXISTING WALL IN PLACE.NOTES1.DEMOLITION PLAN APPLIES TO EXISTING ON-SITE COMPONENTS, INFRASTRUCTURE,AND APPURTENANCES ONLY. ALL FUTURE PHASE 2 FRONTAGE AND OFF-SITE ITEMSARE SHOWN FOR REFERENCE.2.CONTRACTOR SHALL PROTECT EXISTING PUBLIC INFRASTRUCTURE THAT IS TOREMAIN FROM DAMAGE BY HEAVY LOADING AND/OR EQUIPMENT DURING THECOURSE OF CONSTRUCTION. CONTRACTOR SHALL REPAIR, AT CONTRACTOR'SEXPENSE, ANY AND ALL DAMAGE TO PUBLIC INFRASTRUCTURE INCURRED DURINGAND/OR DUE TO CONSTRUCTION, TO THE SATISFACTION OF THE RESPECTIVEPERMITTING AGENCY.3.CONTRACTOR IS RESPONSIBLE FOR CALLING 811 OR 1-800-642-2444 BEFORE ANYTRENCHING OR EXCAVATION WORK.4.ALL EXISTING ON-SITE MISCELLANEOUS INFRASTRUCTURE AND APPURTENANCES(INCLUDING BUT NOT LIMITED TO SIGNS, LIGHTS, CONCRETE WHEEL STOPBUMPERS, PARKING METERS, IRRIGATION LINES AND VALVES, ETC.) TO BEREMOVED AND PROPERLY DISPOSED BY CONTRACTOR. CONTRACTOR SHALLCOORDINATE WITH CITY TO SALVAGE SIGNS, PARKING STALL CONCRETE WHEELSTOP BUMPERS AND PARKING METERS.5.ALL EXISTING ON-SITE UNDERGROUND UTILITY SERVICES TO BE REMOVED,STUBBED, AND CAPPED AT PROJECT FRONTAGE. SEE DEMOLITION DIAMONDCALLOUT NOTES #11, 12 AND 13 BELOW.6.CLEAR AND GRUB ALL EXISTING VEGETATION, GRASSES AND SHRUBS PRIOR TOEARTHWORK OPERATIONS.7.CONTRACTOR MUST PREPARE AND IMPLEMENT WATER POLLUTION CONTROLDRAWINGS (WPCDS) FOR SITE PREPARATION, MOBILIZATION, STORMWATERREQUIREMENTS AND ALL SITE EROSION / SEDIMENTATION CONTROL BMPS INCOMPLIANCE WITH THE SWPPP INCLUDED IN THE SPECIFICATIONS.8.REFER TO TREE PROTECTION PLAN SHEET C-2.2. EXISTING TREES WITHIN CITYRIGHT-OF-WAY (ROW) IDENTIFIED TO BE REMOVED SHOWN FOR REFERENCEONLY, SHALL BE PRESERVED, PROTECTED AND MAINTAINED THROUGHOUTDURATION OF PHASE 1B, UNTIL FUTURE PHASE 2 DEMOLITION WORK, UNDERSEPARATE COVER.9.ANY HISTORIC MATERIALS SHALL BE NOTED AND SHALL INCLUDE A MATRIX OF THEPROPOSED DISPOSITION. UNLESS OTHERWISE PROPOSED OR REQUIRED TO BERE-USED WITHIN THE PROJECT, THE HISTORIC GRANITE CURBING, WALLS, ANDSTAIRS LOCATED ON THE PROJECT SITE SHALL BE PRESERVED AND DELIVERED TOAN APPROVED LOCATION TO THE SATISFACTION OF THE CITY.DEMOLITION NOTESPROTECT EXISTING TREE IN PLACE. REFER TO TREE PROTECTION PLAN SHEET C-2.2.PROTECT PORTION OF EXISTING WALL.REMOVE AND PROPERLY DISPOSE OF EXISTING TREE. REFER TO TREE PROTECTIONPLAN SHEET C-2.2.REMOVE AND PROPERLY DISPOSE OF EXISTING ASPHALT PAVING.REMOVE AND PROPERLY DISPOSE OF EXISTING CONCRETE STRUCTURES,FOUNDATIONS AND APPURTENANCES.REMOVE AND PROPERLY DISPOSE OF EXISTING BUILDING STRUCTURES, FOUNDATIONSAND APPURTENANCES.SAFELY REMOVE AND PRESERVE EXISTING HISTORIC BISHOP PEAK GRANITE CURB(APPROXIMATE LENGTH = 56.5-FEET) ALONG WITH GRANITE STAIRS / STEPS,CONTRACTOR TO FIELD VERIFY EXTENTS AND CONFIRM WITH CITY. TEMPORARILYSTOCKPILE ON-SITE FOR FUTURE USE BY REPERTORY THEATRE LANDSCAPE ARCHITECT,OR COORDINATE WITH CITY TO PRESERVE AND DELIVER TO AN APPROVED LOCATIONTO THE SATISFACTION OF THE CITY. (SEE ALSO NOTE #10).REMOVE AND PROPERLY DISPOSE OF EXISTING BRICKWORK.REMOVE AND PROPERLY DISPOSE OF EXISTING FENCE AND FOUNDATIONS.REMOVE AND PROPERLY DISPOSE PORTION OF EXISTING WALL AND FOUNDATIONS.CONTRACTOR SHALL FIELD VERIFY EXISTING WATER METER IN EXISTING BOX ANDCOORDINATE WITH CITY TO SHUT-OFF, AS NEEDED. REMOVE AND PROPERLY DISPOSEWATER SERVICE LINE. STUB AND CAP AT PROPERTY LINE.REMOVE AND PROPERLY DISPOSE SEWER LATERAL LINE AND CLEAN-OUT. STUB ANDCAP AT PROPERTY LINE.IN ACCORDANCE WITH GAS COMPANY STANDARDS, REQUIREMENTS ANDGUIDELINES, REMOVE AND PROPERLY DISPOSE GAS SERVICE LINE AND GAS METER.STUB AND CAP AT PROPERTY LINE.PROTECT AND PRESERVE EXISTING PROPERTY LINE FENCING. TO BE REMOVED INPHASE 2.1234567891011121314DEMOLITION QUANTITIES±5,600SF RESIDENTIAL BUILDING±29,200SF ASPHALT PAVING±1,300SF BRICK PAVING±3,600SF CONCRETE FLATWORK±1,300LF 6" CURB±56.5LF HISTORIC GRANITE CURBING (SEE NOTE 10 AND DEMOLITION NOTE 7)±650LF WALL±500LF FENCE32TREESCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:SHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONSKYKMSKYSKYAS NOTED11/18/2022N:\0701\0720-02-UR19-Palm-Nipomo-Parking-Structure-(2019)\Engineering\ConDocs\Phase 1 - Rough Grading\Sheet-Files\C-2.3 Demolition.dwg, C-2.3 DEMOLITION PLAN, Dec 19, 2022 9:11am, skyoshida rrmdesign.com | (805) 543-17943765 S. Higuera, San Luis Obispo, CA 93401THE INCLUDED DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS AND ARRANGEMENTSREPRESENTED THEREBY ARE AND SHALL REMAIN THE PROPERTY OF RRM DESIGNGROUP AND NO PART THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS ORUSED IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN THE SPECIFIEDPROJECT FOR WHICH THEY HAVE BEEN PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF RRM DESIGN GROUP. VISUAL CONTACT WITH THESE DRAWINGSOR SPECIFICATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESERESTRICTIONS. SUBMITTAL OF THESE DOCUMENTS FOR PUBLIC AGENCY REVIEWSHALL NOT BE CONSIDERED A WAIVER OF RRM DESIGN GROUP'S RIGHTS.RRM DESIGN GROUP COPYRIGHT 2022.RRM IS A CALIFORNIA CORPORATIONPHASE 1B0720-02-UR19REVISIONSDATENO.CITY OF SAN LUIS OBISPO SAN LUIS OBISPO, CA CULTURAL ARTS DISTRICT PS90435-1BEXP. 9/30/2023DEMOLITION PLANC-2.30feet40SCALE: 1" = 20'2060NOTE:THESE QUANTITIES ARE FOR REFERENCE ONLY.IT IS THE CONTRACTOR'S RESPONSIBILITY TODETERMINE ACTUAL QUANTITIES.NOTE:ALL EXISTING ON-SITE UNDERGROUND UTILITYSERVICES TO BE REMOVED, STUBBED ANDCAPPED AT PROJECT FRONTAGE.NOTE:CONTRACTOR TO PROTECT ANDPRESERVE EXISTING TREES ANDVEGETATION ON ADJACENTPROPERTY (TYP). REFER TO TREEPROTECTION PLAN SHEET C-2.2.NOTE:CONTRACTOR TO COMPLETE AND SUBMIT CONSTRUCTION WASTEMANAGEMENT PLAN ALONG WITH ASBESTOS DEMOLITION / RENOVATIONNOTIFICATION FORMS AND ASSOCIATED FEES TO CITY OF SAN LUIS OBISPOPRIOR TO STARTING ANY DEMOLITION WORK.REFER TO ASBESTOS AND LEAD REPORTS PREPARED BY WEST COAST SAFETYCONSULTANTS DATED OCTOBER 14, 2022. CONTRACTOR CONDUCTINGDEMOLITION AND REMOVAL WORK SHALL HAVE REQUIRED CERTIFICATIONSAND QUALIFICATIONS IN ACCORDANCE TO APPLICABLE CODES.CONTRACTOR SHALL SAFELY AND PROPERLY REMOVE IDENTIFIEDMATERIALS IN ACCORDANCE WITH APPLICABLE CODES, REFERENCEDREPORTS, CONCLUSIONS AND RECOMMENDATIONS. CITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:SHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONSKYKMSKYSKYAS NOTED11/18/2022\\RRMPZ\on-site\0701\0720-02-UR19-Palm-Nipomo-Parking-Structure-(2019)\Engineering\ConDocs\Phase 1 - Rough Grading\Sheet-Files\C-9.x Conditions of Approval.dwg, C-9.1, Nov 18, 2022 3:18pm, skyoshida rrmdesign.com | (805) 543-17943765 S. Higuera, San Luis Obispo, CA 93401THE INCLUDED DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS AND ARRANGEMENTSREPRESENTED THEREBY ARE AND SHALL REMAIN THE PROPERTY OF RRM DESIGNGROUP AND NO PART THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS ORUSED IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN THE SPECIFIEDPROJECT FOR WHICH THEY HAVE BEEN PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF RRM DESIGN GROUP. VISUAL CONTACT WITH THESE DRAWINGSOR SPECIFICATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESERESTRICTIONS. SUBMITTAL OF THESE DOCUMENTS FOR PUBLIC AGENCY REVIEWSHALL NOT BE CONSIDERED A WAIVER OF RRM DESIGN GROUP'S RIGHTS.RRM DESIGN GROUP COPYRIGHT 2022.RRM IS A CALIFORNIA CORPORATIONPHASE 1B0720-02-UR19REVISIONSDATENO.CITY OF SAN LUIS OBISPO SAN LUIS OBISPO, CA CULTURAL ARTS DISTRICT PS90435-1BEXP. 9/30/2023CONDITIONS OF APPROVALC-9.1COA No.COA No.SubAgencyConditionMitigation MeasuresPhaseDrawing #1FindingsThe project will not be detrimental to the health, safety, orwelfare of those working or residing in the vicinity since theproposed project is consistent with the site's DowntownCommercial zoning designation and will be subject toconformance with all applicable building, fire, and safetycodes.N/AN/A2General PlanAmendment FindingsThe proposed General Plan Amendment is consistent withpolicy direction for the area included in the General Plan,and in particular with the following General Plan policies:LUE Policy 4.1, because the project provides off-site parking,civic, cultural, entertainment and mixed- use opportunitiesfor Downtown; LUE Policies 4.3, 5.2.2, 5.2.3, and 5.2.5,which promote the development of Entertainment andCultural Facilities in the downtown; and LUE Policy 4.14and Circulation Element policy 13.2.4 which support theconstruction of parking structures.N/AN/A3General PlanAmendment FindingsThe General Plan Amendment allows for theimplementation of the proposed project by updating theCity's General Plan land use map to reflect the developmentanticipated by the proposed Palm Nipomo ParkingStructure Project.N/AN/A4General PlanAmendment FindingsThe site is physically suited for the proposed projectbecause the project is consistent with the 2017 DowntownConcept Plan.N/AN/A5Architectural DesignFindingsThe proposed new building is consistent with HistoricPreservation Program Guidelines Section 3.2.1 because thebuilding is designed to be architecturally compatible withDowntown Historic District structures.N/AN/A6Architectural DesignFindingsThe project design maintains consistency with theCommunity Design Guidelines Chapter 4 ( DowntownDesign Guidelines), Sections 4.2 ( A-D) by providing: humanscale and proportion, architectural design thatcomplements the character of the surroundingneighborhood, transparency and provides architecturalinterest on all four sides of the building.N/AN/A7Architectural DesignFindingsThe project design is consistent with the Community DesignGuidelines Section 6.3(A-B, D-E) because the projectincludes convenient pedestrian linkages to the sidewalkalong each street, pedestrian access and alternative pavingmaterials while minimizing "vast seas of parking" byproposing a structure as opposed to surface parking lots.N/AN/A8SLO Rep TheatreArchitectural DesignFindingsThe proposed new building is consistent with HistoricPreservation Program GuidelinesSections 3.2.1 and 5.2.2 because the building is designed tobe architecturally compatiblewith Downtown Historic District structures.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A9SLO Rep TheatreArchitectural DesignFindingsThe project design maintains consistency with theCommunity Design Guidelines Chapter4 ( Downtown Design Guidelines), Sections 4.2 ( A-D) byproviding: human scale andproportion, various upper story setbacks, includes similarvertical elements that are foundin the surrounding architecture of the existing buildings, anarchitectural design thatcomplements the character of the surroundingneighborhood, transparency is included inthe front fa~ade with the inclusion ofglass curtain walls andprovides architectural intereston all four sides ofthe building.Palm Nipomo Parking Structure Use Permit FinThis will be addressed in a separatesubmittal by SLO Rep TheatreN/A10Use Permit FindingsThe proposed use is allowed with a use permit within theDowntown Commercial ( C-D) zone and complies with allother applicable provisions of the Zoning Regulations.N/AN/A11Use Permit FindingsThe proposed parking structure use is located where aparking structure is called out on the 2017 DowntownConcept Plan.N/AN/A12Use Permit FindingsThe parking structure use is consistent with LUE policy 4.14and Circulation Element policy 13.2.4 that state that anymajor increases in parking should take the form of astructure located at the edge of the commercial core andthat additional parking should be supported by a parkingstudy.N/AN/A13Use Permit FindingsThe site is physically suitable in terms of its design, location,shape, size, and operating characteristics of the proposeduse; traffic generation and the provision of public andemergency vehicle access; public protection services; andthe provision of utilities.N/AN/A14Use Permit FindingsThe establishment and subsequent operation or conduct ofthe use will not, because of the circumstances andconditions applied in the particular case, be detrimental tothe health, safety or welfare of the general public orpersons residing or working in the neighborhood of the use,or be detrimental or injurious to property or improvementsin the vicinity of the use.N/AN/A15SLO Rep Theatre UsePermit FindingsThe proposed use is allowed with a use permit within theDowntown Commercial ( C-D)zone and complies with all other applicable provisions oftheZoning Regulations.This will be addressed in a separatesubmittal by SLO Rep Theatre16SLO Rep Theatre UsePermit FindingsThe proposed SLO Rep Theatre use is located where atheater is called out on the 2017Downtown Concept Plan.This will be addressed in a separatesubmittal by SLO Rep Theatre17SLO Rep Theatre UsePermit FindingsThe proposed SLO Rep Theatre use is consistent with LUEpolicies 5.2.2, 5.2.3, and 5.2.5because the theater will be located near Mission Plazaalong Monterey Street in the CulturalFacilities Area.This will be addressed in a separatesubmittal by SLO Rep Theatre18SLO Rep Theatre UsePermit FindingsThe site is physically suitable in terms of its design, location,shape, size, and operatingcharacteristics of the proposed use; traffic generation andthe provision of public andemergency vehicle access; public protection services; andthe provision ofutilities.This will be addressed in a separatesubmittal by SLO Rep Theatre19SLO Rep Theatre UsePermit FindingsThe establishment and subsequent operation or conduct ofthe use will not, because ofthecircumstances and conditions applied in the particular case,be detrimental to the health,safety or welfare ofthe general public or persons residing orworking in the neighborhoodofthe use, or be detrimental or injurious to property orimprovements in the vicinity oftheuse.This will be addressed in a separatesubmittal by SLO Rep Theatre20Deviation from heightand F.A.R. FindingsThe proposed increase in height and F.A.R. for the project isconsistent with 2018 Zoning Regulations Section 17.86.200(Parking as a Primary Use) that states, Where parking as aprimary use is permitted in compliance with Table 2-1: UsesAllowed by Zone... discretionary permit approval mayinclude deviations from otherwise applicable developmentstandards because the parking structure is designed tomeet certain building and engineering standards.N/AN/A1General PlanAmendment andRezoneThe General Plan shall be amended as shown in Exhibit A.N/AN/A2General PlanAmendment andRezoneThe Amendment shall apply only to the properties currentlyproposed to be occupied by the Project, i.e. to the Projectsite.N/AN/A3Planning DivisionFinal project design and construction drawings submittedfor a building permit shall be in substantial compliance withthe project description and plans approved by the CityCouncil. A separate, full-size sheet shall be included inworking drawings submitted for a building permit that listsall conditions of project approvals listed and mitigationmeasures in the MMRP as sheet number 2. Furthermore, asidentified in the EIR, environmentally mitigating projectfeatures shall be included in the final project design.Sheets containing conditions andapprovals and mitigationsmeasures are included insubmission drawings. Phase 2conditions will be addressed in aseparate submittal. MMRP will beprovided in project specifications.PH 1B/2.PH 1B:C-9.1 TO C-9.5PH 2: A0.X4Planning DivisionReference shall be made in the margin of listed items as towhere in plans requirements are addressed. Any change toapproved design, colors, materials, landscaping, or otherconditions of approval must be approved by the Director orArchitectural Review Commission, as deemed appropriate.This will be addressed in a separatesubmittalPH 2.5Planning DivisionPlans submitted for a building permit shall call out thecolors and materials of all proposed building surfaces andother improvements.This will be addressed in a separatesubmittalPH 2.A3.1 & A3.26Planning DivisionThe building plan submittal shall include privacy screeningthat will restrict the ability for users of the parking structureto overlook into the adjacent property while using thesoutheastern stairway to the satisfaction of the CommunityDevelopment Director.This will be addressed in a separatesubmittalPH 2.A2.3, A2.4, A2.5,A3.1, A8.2,7Planning DivisionThe locations of all exterior lighting, including bollard stylelandscaping or path/parking lighting, shall be included inplans submitted for a building permit. All wall-mountedlighting fixtures shall be clearly called out on buildingelevations included as part of working drawings. Allwall-mounted lighting shall complement buildingarchitecture, subject to the approval of the CommunityDevelopment Director. The lighting schedule for thebuilding shall include a graphic representation of theproposed lighting fixtures and cut sheets on the submittedbuilding plans . The selected fixture( s) shall be shielded toensure that light is directed downward consistent with therequirements of the City's Night Sky Preservation standardscontained in Chapter 17 .23 of the 2015 Zoning Regulations.This will be addressed in a separatesubmittalPH 2. LC plans8Planning DivisionPlans submitted for a building permit shall clearly state thetype/model of bicycle racks proposed, location anddimensions of all 32 short and long-term bicycle parkingspaces. All long-term bicycle parking spaces shall be locatedwithin the parking structure. Sufficient detail shall beprovided about the placement and design of bike racks todemonstrate compliance with relevant EngineeringStandards and Community Design Guidelines and thiscondition of approval, to the satisfaction of the PublicWorks and Community Development Directors.This will be addressed in a separatesubmittalPH 2.LC plans, A4.19Planning DivisionPlans submitted for a building permit shall include windowdetails indicating the type of materials for the window grids,their dimensions, and colors. Plans shall demonstrate theuse of high-quality materials for the window grids thatreflect the architectural style of the project to the approvalof the Community Development Director.This will be addressed in a separatesubmittalPH 2.A3 Series, A5 series10Planning DivisionMechanical and electrical equipment shall be locatedinternally to the structure or site. With submittal of workingdrawings, the applicant shall clearly show the location andsizes of any proposed condensers and other mechanicalequipment. If any mechanical equipment is to be placed onthe roof, plans submitted for a building permit shall confirmthat parapets or other roof features will adequately screenthem. A line-of-sight diagram may be required to confirmthat proposed screening will be adequate. This conditionapplies to initial construction and later improvements.This will be addressed in a separatesubmittalPH 2.A1.1 A3.2 CITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:SHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONSKYKMSKYSKYAS NOTED11/18/20220720-02-UR19REVISIONSDATENO.CITY OF SAN LUIS OBISPO SAN LUIS OBISPO, CA CULTURAL ARTS DISTRICT PS90435-1BEXP. 9/30/2023 CITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:SHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONSKYKMSKYSKYAS NOTED11/18/2022\\RRMPZ\on-site\0701\0720-02-UR19-Palm-Nipomo-Parking-Structure-(2019)\Engineering\ConDocs\Phase 1 - Rough Grading\Sheet-Files\C-9.x Conditions of Approval.dwg, C-9.3, Nov 18, 2022 3:18pm, skyoshida rrmdesign.com | (805) 543-17943765 S. Higuera, San Luis Obispo, CA 93401THE INCLUDED DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS AND ARRANGEMENTSREPRESENTED THEREBY ARE AND SHALL REMAIN THE PROPERTY OF RRM DESIGNGROUP AND NO PART THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS ORUSED IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN THE SPECIFIEDPROJECT FOR WHICH THEY HAVE BEEN PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF RRM DESIGN GROUP. VISUAL CONTACT WITH THESE DRAWINGSOR SPECIFICATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESERESTRICTIONS. SUBMITTAL OF THESE DOCUMENTS FOR PUBLIC AGENCY REVIEWSHALL NOT BE CONSIDERED A WAIVER OF RRM DESIGN GROUP'S RIGHTS.RRM DESIGN GROUP COPYRIGHT 2022.RRM IS A CALIFORNIA CORPORATIONPHASE 1B0720-02-UR19REVISIONSDATENO.CITY OF SAN LUIS OBISPO SAN LUIS OBISPO, CA CULTURAL ARTS DISTRICT PS90435-1BEXP. 9/30/2023C-9.3CONDITIONS OF APPROVAL 36Engineering DivisionThe building plan submittal and project drainage reportshall show and note compliance with the Drainage DesignManual, Floodplain Management Regulation, and the PostConstruction Stormwater Regulations. The stormwaterBMP's shall be located outside the public right-of-wayunless otherwise specifically approved by the City. The PCRcompliance approach and strategy shall consider how thetreatment of runoff from the altered or replaced publicimprovements will be managed. Some stormwater BMP'sdesigned to treat runoff from public streets and sidewalksmay be located within the Public right-of-way.EDP has prepared the on-sitePhase 1 stormwater mitigationdesign, plans and stormwatercontrol plan (SWCP). See EDPplans for reference. Roadsidebiofiltration stormwater mitigationplanters are proposed at theNipomo and Palm Streetintersection to treat the replacedimpervious areas from the publicimprovements. See the Phase 2street improvement plans.PH 2.EDP SHEETSD-1.0 TO D-4.337Engineering DivisionThe building plan submittal shall clarify whether the lowerfloor of the parking structure and future commercial/residential structure are located above the base floodelevation BFE). If not, the structure and openings shall befloodproofed and constructed of flood resistant materials.All building service equipment and elevators shall belocated outside the mapped flood zone, 1' above the BFE,or floodproofed to 1' above the BFE.This will be addressed in a separatesubmittalPH 2.38Engineering DivisionThe building plan submittal shall include a complete gradingand drainage plan. The plan shall evaluate whether there isexisting run-on from the neighboring upslope properties.The plans shall clarify the extent of any run-on and shallclarify how the drainage will be collected and conveyed toan approved outlet. A portion of the roof from an adjoiningstructure with a zero setback appears to discharge onto thissite. An analysis of the entire limits of the watershedtributary to the easterly property line will be required.There is no off-site run-on to thesite. EDP has prepared the on-sitePhase 1 stormwater mitigationdesign, plans and stormwatercontrol plan (SWCP). See EDPplans for reference.PH 2EDP SHEETSD-1.0 TO D-4.339Engineering DivisionThe building plan submittal shall include a complete treesummary showing all existing trees, tree diameters, species,and proposed disposition. The plan shall include trees onneighboring properties with tree canopies/root zones thatmay encroach into the area of construction disturbance. Atree preservation plan shall be provided as part of thebuilding plans to clarify how all trees proposed to remainwill be protected during demolition and construction.See Phase 1B sheet C-2.2Tree Protection Plan.PH 1BPH 1B:C-2.240Engineering DivisionStreet trees are required as a condition of the buildingpermit. The landscape and irrigation plans shall showirrigation improvements and sleeves under the sidewalk toprovide irrigation to any parkway plantings and/or treewells. Street tree species and plantings shall be inaccordance with the City Engineering Standards and mayinclude palm trees.This will be addressed in a separatesubmittalPH 2.LI and LP Plans41TransportationDivisionThe proposed uncontrolled crosswalks on Nipomo Streetand Monterey Street shall be designed to include featuressuch as flashers, decorative pavement treatment, warningsignage, pavement markings, and bulb outs similar to othercrosswalks in the downtown area. The specific designtreatments at all proposed crosswalks shall be approved bythe City Public Works Department in conjunction withreview off the public improvement plans.This will be addressed in a separatesubmittalPH 2.LC Plans42TransportationDivisionDesign of proposed bulb outs, driveways and otherintersection geometric modifications shall include vehicleturning path analysis using appropriate design vehicles asidentified in the City's Engineering Standards to thesatisfaction of the Public Works Director. Designs shallconsider placement of street trees, landscaping and othervertical features near intersections, driveways andpedestrian crossings in order to maintain adequate sightdistance per City Engineering Standards .This will be addressed in a separatesubmittalPH 2.LC and LP Plans43TransportationDivisionSidewalk landscaping, street furniture and/or otherelements shall be designed to discourage pedestriancrossings of Nipomo Street at the northeast comer of theNipomo Street/Monterey Street intersection, thesouthwest comer of the Nipomo Street/Dana Streetintersection, and the southeast comer of the NipomoStreet/Palm Street intersection.This will be addressed in a separatesubmittalPH 2.LC and LP plans44TransportationDivisionFrontage improvements shall include installation ofstandard streetlights and downtown pedestrian lighting perCity Standards to the satisfaction of the Public WorksDirector.This will be addressed in a separatesubmittalPH 2.LC Plans45TransportationDivisionConsistent with Mitigation Measure T-1 per the project'sFinal EIR, prior to issuance of each building permit, theconstruction contractor( s) shall develop a constructionmanagement plan for review and approval of theCommunity Development and Public Works Departments toidentify traffic management strategies to address trafficcongestion, construction staging/ traffic control, parkingdemand and other transportation concerns related toproject construction activities.A construction management planwill be submitted for review by theappointed contracting teamPost BidStage46TransportationDivisionWhere frontage improvements are proposed, sidewalksshall have a minimum of eight (8) feet clear width, unlessotherwise approved by the Public Works Director.This will be addressed in a separatesubmittalPH 2.LC Plans47TransportationDivisionConsistent with Mitigation Measure T-3 per the project'sFinal EIR, the public improvement plans shall incorporateimprovements to the Dana Street/Nipomo and MontereyStreet/Nipomo Street intersections to enhance pedestriansafety and accessibility. At a minimum, the publicimprovements shall include the following elements to thesatisfaction of the Public Works Director:This will be addressed in a separatesubmittalPH 2.47aTransportationDivisionHigh-visibility crosswalk markings or other intersectionenhancements , with directional curb ramps across NipomoStreet from the northwest comer of Dana Street/ NipomoStreet to the southwest comer of the parking structure.This will be addressed in a separatesubmittalPH 2.LC Plans47bTransportationDivisionHigh-visibility crosswalk markings or other intersectionenhancements, with directional curb ramps across NipomoStreet from the southeast comer of MontereyStreet/Nipomo Street across Nipomo Street.This will be addressed in a separatesubmittalPH 2.LC Plans47cTransportationDivisionStandard crosswalks or other intersection enhancements,with directional curb ramps across Monterey Street andDana Street where they intersect with Nipomo Street.This will be addressed in a separatesubmittalPH 2.LC Plans47dTransportationDivisionReduce comer curb radii on the southwest comer of DanaStreet/ Nipomo Street and the northeast comer ofMonterey Street/ Nipomo Street.This will be addressed in a separatesubmittalPH 2.48TransportationDivisionFinal designs for the Palm Street access driveway to theparking structure shall be refined to provide acceptablevisibility sight triangles for both vehicular traffic on PalmStreet and pedestrians crossing the driveway.This will be addressed in a separatesubmittalPH 2.LC and LP Plans49UtilitiesThe proposed utility infrastructure shall comply with thelatest engineering design standards effective at the timethe building permit is obtained and shall have reasonablealignments needed for maintenance of publicinfrastructure.This will be addressed in a separatesubmittalPH 2.50UtilitiesThe project shall construct a new sewer lateral and waterservices for the proposed use.This will be addressed in a separatesubmittalPH 2.51UtilitiesRevisions to the existing sewer and water infrastructure,that may result from the proposed land use modifications,shall be completed to the satisfaction of the UtilitiesDirector to minimize impacts to operations andmaintenance of the services.This will be addressed in a separatesubmittalPH 2.52UtilitiesUnderground dewatering systems for basements shalldischarge to an on-site retention system or shall obtain anenvironmental compliance permit prior to issuance of anoccupancy permit.This will be addressed in a separatesubmittalPH 2.53UtilitiesFinal grades and alignments offal public and/or privatewater, and sewer services shall be approved to thesatisfaction of the Utilities Department. The final location,configuration, and sizing of on-site service laterals andmeters shall be approved by the Utilities Director inconjunction with the review of the building plans, firesprinkler plans, and/or public improvement plans.This will be addressed in a separatesubmittalPH 2.54UtilitiesProjects generating more than two cubic yards of totalwaste shall comply with AB 1826, and local wastemanagement ordinance to reduce greenhouse gasemissions. Trash enclosure(s) shall conform therequirements by the San Luis Garbage Company and refusebins shall be sized to provide a reasonable level of service.Separate refuse bins shall be accommodated within the sitefor waste, recycling, and organics.This will be addressed in a separatesubmittalPH 2.55UtilitiesTree wells shall maintain a 10-foot clearance to the existingsewer and water mains. New curbs along the frontageimprovements shall maintain a 2-foot clearance betweenthe lip of gutter and the existing sewer or water mains.This will be addressed in a separatesubmittalPH 2.LP Plans56SLO Rep TheatreArchitectural DesignPlanning Division -CommunityDevelopmentDepartmentThe applicant shall defend, indemnify, and hold harmlessthe City and/or its agents,officers, and employees from any claim, action, orproceeding against the City and/or itsagents, officers, or employees to attack, set aside, void, orannul the approval by the Cityof this project, and all actions relating thereto, including butnot limited to environmentalreview (" Indemnified Claims"). The City shall promptlynotify the applicant of anyIndemnified Claim upon being presented with theIndemnified Claim, and City shall fullycooperate in the defense against an Indemnified Claim.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A57SLO Rep TheatreArchitectural DesignPlanning Division -CommunityDevelopmentDepartmentFinal project design and construction drawings submittedfor a building permit shall be insubstantial compliance with the project description andplans approved by the City Council.A separate, full-size sheet shall be included in workingdrawings submitted for a buildingpermit that lists all conditions of project approvals listedand mitigation measures in theMMRP as sheet number 2. Furthermore, as identified in theEIR, environmentallymitigating project features shall be included in the finalproject design.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A58SLO Rep TheatreArchitectural DesignPlanning Division -CommunityDevelopmentDepartmentReference shall be made in the margin oflisted items as towhere in plans requirements areaddressed. Any change to approved design, colors,materials, landscaping, or otherconditions of approval must be approved by the Director orArchitectural ReviewCommission, as deemed appropriate.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A59SLO Rep TheatreArchitectural DesignPlanning Division -CommunityDevelopmentDepartmentThe design ofthe proposed SLO Rep Theatre shall beconsistent with the proposed fa~aderedesign included in the plans submitted as part of thePlanning Commission staff reportdated October 23, 2019. The building permit submittal shallaccurately show the locationofall the terra cotta tiles and which colors will be locatedwhere.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A60SLO Rep TheatreArchitectural DesignPlanning Division -CommunityDevelopmentDepartmentPlans submitted for a building permit shall call out thecolors and materials ofall proposedbuilding surfaces and other improvements.This will be addressed in a separatesubmittal by SLO Rep TheatreN/ACOA No.COA No.SubAgencyConditionMitigation MeasuresPhaseDrawing # CITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:SHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONSKYKMSKYSKYAS NOTED11/18/2022N:\0701\0720-02-UR19-Palm-Nipomo-Parking-Structure-(2019)\Engineering\ConDocs\Phase 1 - Rough Grading\Sheet-Files\C-9.x Conditions of Approval.dwg, C-9.4, Nov 18, 2022 3:18pm, skyoshida rrmdesign.com | (805) 543-17943765 S. Higuera, San Luis Obispo, CA 93401THE INCLUDED DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS AND ARRANGEMENTSREPRESENTED THEREBY ARE AND SHALL REMAIN THE PROPERTY OF RRM DESIGNGROUP AND NO PART THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS ORUSED IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN THE SPECIFIEDPROJECT FOR WHICH THEY HAVE BEEN PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF RRM DESIGN GROUP. VISUAL CONTACT WITH THESE DRAWINGSOR SPECIFICATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESERESTRICTIONS. SUBMITTAL OF THESE DOCUMENTS FOR PUBLIC AGENCY REVIEWSHALL NOT BE CONSIDERED A WAIVER OF RRM DESIGN GROUP'S RIGHTS.RRM DESIGN GROUP COPYRIGHT 2022.RRM IS A CALIFORNIA CORPORATIONPHASE 1B0720-02-UR19REVISIONSDATENO.CITY OF SAN LUIS OBISPO SAN LUIS OBISPO, CA CULTURAL ARTS DISTRICT PS90435-1BEXP. 9/30/2023C-9.4CONDITIONS OF APPROVAL 61SLO Rep TheatreArchitectural DesignPlanning Division -CommunityDevelopmentDepartmentThe locations of all exterior lighting, including bollard stylelandscaping or path/parkinglighting, shall be included in plans submitted for a buildingpermit. All wall-mountedlighting fixtures shall be clearly called out on buildingelevations included as part ofworking drawings. All wall-mounted lighting shallcomplement building architecture,subject to the approval ofthe Community DevelopmentDirector. The lighting schedule forthe building shall include a graphic representation oftheproposed lighting fixtures and cutsheets on the submitted building plans. The selectedfixture( s) shall be shielded to ensurethat light is directed downward consistent with therequirements of the City's Night SkyPreservation standards contained in Chapter 17 .23 ofthe2015 Zoning Regulations.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A62SLO Rep TheatreArchitectural DesignPlanning Division -CommunityDevelopmentDepartmentPlans submitted for a building permit shall clearly state thetype/model of bicycle racksproposed, location and dimensions of all 13 short andlong-term bicycle parking spaces.All long-term bicycle parking spaces shall be located withinthe building. Sufficient detailshall be provided about the placement and design ofbikeracks to demonstrate compliancewith relevant Engineering Standards and Community DesignGuidelines, to the satisfactionofthe Public Works and Community Development Directors.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A63SLO Rep TheatreArchitectural DesignPlanning Division -CommunityDevelopmentDepartmentPlans submitted for a building permit shall include windowdetails indicating the type ofmaterials for the window frames and mullions, theirdimensions, and colors. Plans shallinclude the materials and dimensions of all lintels, sills,surrounds recesses and otherrelated window features. Plans shall demonstrate the useof high-quality materials for thewindows that reflect the architectural style of the projectand are compatible with theneighborhood character, to the approval ofthe CommunityDevelopment Director.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A64SLO Rep TheatreArchitectural DesignPlanning Division -CommunityDevelopmentDepartmentMechanical and electrical equipment shall be locatedinternally. With submittal ofworkingdrawings, the applicant shall include sectional views of thebuilding, which clearly showthe sizes of any proposed condensers and other mechanicalequipment. Ifany condensersor other mechanical equipment is to be placed on the roof,plans submitted for a buildingpermit shall confirm that parapets and other roof featureswill adequately screen them. Aline-of-sight diagram may be required to confirm thatproposed screening will be adequate.This condition applies to initial construction and laterimprovements.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A65SLO Rep TheatreArchitectural DesignPlanning Division -CommunityDevelopmentDepartmentThe location of any required backflow preventer anddouble-check assembly shall beshown on all site plans submitted for a building permit,including the landscaping plan.Construction plans shall also include a scaled diagram oftheequipment proposed. Wherepossible, as determined by the Utilities Director, equipmentshall be located inside thebuilding within 20 feet ofthe front property line. Where thisis not possible, as determinedby the Utilities Director, the back-flow preventer anddouble-check assembly shall belocated in the street yard and screened using a combinationofpaint color, landscaping and,ifdeemed appropriate by the Community DevelopmentDirector, a low wall. The size andconfiguration of such equipment shall be subject to reviewand approval by the Utilitiesand Community Development Directors.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A66SLO Rep TheatreArchitectural DesignPlanning Division -CommunityDevelopmentDepartmentA final landscaping plan, including irrigation details andplans, shall be submitted to theCommunity Development Department along with workingdrawings. The legend for thelandscaping plan shall include the sizes and species of allgroundcovers, shrubs, and treeswith corresponding symbols for each plant materialshowing their specific locations onplans. Street trees species shall comply with City standardsand may include palm trees.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A67SLO Rep TheatreArchitectural DesignPlanning Division -CommunityDevelopmentDepartmentThe applicant shall pay parking in-lieu fees for 67 parkingspaces prior to building permitissuance unless another agreement is supported by the Cityto the satisfaction of theCommunity Development and Public Works Directors.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A68Engineering Division -Public Works/CommunityDevelopmentDepartmentThe Parking Structure shall conform to the overall proposedcampus designs and approvalsfor the Palm Nipomo Parking Structure Project and anysubsequent agreements betweenthe SLO Rep Theatre and the City. The project shall alsoconform to previously approvedbulb-out and crossing designs for the Monterey Placeproject located at 667 Monterey.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A69Engineering Division -Public Works/CommunityDevelopmentDepartmentThe project address should be established prior to buildingpermit application ifpossible.Otherwise, the address will be established during permitreview and prior to permitissuance.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A70Engineering Division -Public Works/CommunityDevelopmentDepartmentA separate demolition plan and permits are required for thestructures located on the projectsite. The plan shall include an inventory of all improvementslocated on the City parceland within the public right-of-way. Any historic materialsshall be noted and shall includea matrix ofthe proposed disposition. Unless otherwiseproposed or required to be re-usedwithin the project, the historic granite curbing, walls, andstairs located on the project siteshall be preserved and delivered to an approved location tothe satisfaction ofthe City.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A71Engineering Division -Public Works/CommunityDevelopmentDepartmentThe demolition plans shall show the location ofall existingutilities. Existing utilities shallbe approved for re-use or shall be abandoned per CityEngineering Standards. Theapplicant should confirm whether any utilities remain fromthe previous demolition ofthestructure( s) located on the project site. City improvementplan records and/or sewermainline televising records are available upon request.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A72Engineering Division -Public Works/CommunityDevelopmentDepartmentProjects involving the construction of new structuresgenerally requires that completefrontage improvements be installed or that existingimprovements be upgraded per citystandard. MC 12.16.050This will be addressed in a separatesubmittal by SLO Rep TheatreN/A73Engineering Division -Public Works/CommunityDevelopmentDepartmentNew curb, gutter, sidewalk, curb ramps, bulb-outs, streetparking, signage, striping, parkingmeters, street tree plantings, street lighting, demolitions,etc. shall be completed as acondition of the project. Except where standard streetlightsare required, the frontageimprovements shall include new pedestrian levelstreetlights per the approved master planand City Engineering Standards.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A74Engineering Division -Public Works/CommunityDevelopmentDepartmentThe project is located within the Mission Style SidewalkDistrict of downtown. Unlessdirected otherwise and approved by Public Works orCommunity Development Directors,all new or replaced improvements shall be constructed inthe Mission Style per CityEngineering Standards.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A75Engineering Division -Public Works/CommunityDevelopmentDepartmentAny proposed phasing ofthe public improvements shall beapproved by the City. Ifphased,interim improvements may be required to provide areasonable transition betweenadjoining projects.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A76Engineering Division -Public Works/CommunityDevelopmentDepartmentThe required public improvements may be shown with thebuilding permit submittal orcould be processed as a separate public improvement plan.The on-site plans and off-siteplans shall agree. Unless otherwise approved by the City,the building permit plans shallnot be approved or permits issued until the adjoining publicimprovements are approved.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A77Engineering Division -Public Works/CommunityDevelopmentDepartmentThe building plan submittal shall include a complete site,grading, drainage, and utilityplan. If proposed grading, drainage, and utilities are to bepermitted under a separatesubmittal, this information shall be shown " for referenceonly" on the building plansubmittal. The plan shall show all existing and proposedunderground and overheadutilities for reference. All utility company meters, vaults,equipment, and transformersshall be shown for reference.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A78Engineering Division -Public Works/CommunityDevelopmentDepartment All new wire utilities shall be underground. Unlessotherwise approved by the City, theunderground service( s) shall be achieved without a netincrease ofutility poles within thepublic right-of-way.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A79Engineering Division -Public Works/CommunityDevelopmentDepartmentThe required PGE service work and their preliminary designmemo shall be reviewed andapproved by the City and the engineer of record prior tocommencing with final designs.The final PGE handout package shall be approved prior tobuilding permit issuance or shallbe listed as a deferred submittal item. The plan shall clarifyhow secondary service will bemaintained or re-served to the remaining properties to theeast.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A80Engineering Division -Public Works/CommunityDevelopmentDepartmentHandrails for any on-site stairs or ramps shall not encroachinto the public right-of-way orpublic sidewalk area and shall comply with currentAmericans with Disabilities Act (ADA)code.This will be addressed in a separatesubmittal by SLO Rep TheatreN/ACOA No.COA No.SubAgencyConditionMitigation MeasuresPhaseDrawing # CITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:SHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONSKYKMSKYSKYAS NOTED11/18/2022N:\0701\0720-02-UR19-Palm-Nipomo-Parking-Structure-(2019)\Engineering\ConDocs\Phase 1 - Rough Grading\Sheet-Files\C-9.x Conditions of Approval.dwg, C-9.5, Nov 18, 2022 3:18pm, skyoshida rrmdesign.com | (805) 543-17943765 S. Higuera, San Luis Obispo, CA 93401THE INCLUDED DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS AND ARRANGEMENTSREPRESENTED THEREBY ARE AND SHALL REMAIN THE PROPERTY OF RRM DESIGNGROUP AND NO PART THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS ORUSED IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN THE SPECIFIEDPROJECT FOR WHICH THEY HAVE BEEN PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF RRM DESIGN GROUP. VISUAL CONTACT WITH THESE DRAWINGSOR SPECIFICATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESERESTRICTIONS. SUBMITTAL OF THESE DOCUMENTS FOR PUBLIC AGENCY REVIEWSHALL NOT BE CONSIDERED A WAIVER OF RRM DESIGN GROUP'S RIGHTS.RRM DESIGN GROUP COPYRIGHT 2022.RRM IS A CALIFORNIA CORPORATIONPHASE 1B0720-02-UR19REVISIONSDATENO.CITY OF SAN LUIS OBISPO SAN LUIS OBISPO, CA CULTURAL ARTS DISTRICT PS90435-1BEXP. 9/30/2023C-9.5CONDITIONS OF APPROVAL 81Engineering Division -Public Works/CommunityDevelopmentDepartmentThe building plan submittal and project drainage reportshall show and note compliancewith the Drainage Design Manual, Floodplain ManagementRegulation, and the PostConstruction Stormwater Regulations. The stormwaterBMP's shall be located outside thepublic right-of-way unless otherwise specifically approvedby the City. The PCRcompliance approach and strategy shall consider how thetreatment of runoff from thealtered or replaced public improvements will be managed.Some stormwater BMP'sdesigned to treat runoff from public streets and sidewalksmay be located within the Publicright-of-way.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A82Engineering Division -Public Works/CommunityDevelopmentDepartmentThe building plan submittal shall clarify that the access intothe lower floor and basementexit systems are located above the base flood elevation (BFE). Unless otherwise approvedby the City, a one-foot freeboard should be provided abovethe BFE. All building serviceequipment shall be located outside or above the BFE.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A83Engineering Division -Public Works/CommunityDevelopmentDepartmentThe building plan submittal shall include a complete gradingand drainage plan. The planshall evaluate whether there is existing run-on from theneighboring upslope properties.The plans shall clarify the extent of any run-on and shallclarify how the drainage will becollected and conveyed to an approved outlet. A portion ofthe roof from an adjoiningstructure with a zero setback appears to discharge onto thissite. An analysis of the entirelimits ofthe watershed tributary to the easterly propertyline will be required.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A84Engineering Division -Public Works/CommunityDevelopmentDepartmentThe building plan submittal shall include a complete treesummary showing all existingtrees, tree diameters, species, and proposed disposition.The plan shall include trees onneighboring properties with tree canopies/root zones thatmay encroach into the area ofconstruction disturbance. A tree preservation plan shall beprovided to clarify how all treesproposed to remain will be protected during demolition andconstruction.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A85Engineering Division -Public Works/CommunityDevelopmentDepartmentStreet trees are required as a condition ofthe buildingpermit. The landscape and irrigationplans shall show irrigation improvements and sleeves underthe sidewalk to provideirrigation to any parkway plantings and/or tree wells. Streettree species and plantings shallbe in accordance with the City Engineering Standards andmay include palm trees.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A86Engineering Division -Public Works/CommunityDevelopmentDepartmentPursuant to Chapter 4.56 of the City of San Luis MunicipalCode, the project shall beresponsible for paying applicable transportation impactfees prior to issuance of buildingpermits.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A87Engineering Division -Public Works/CommunityDevelopmentDepartmentPer Mitigation Measure T-1 of the Palm/Nipomo ParkingStructure Project EIR, aConstruction Management Plan shall be submitted forreview and approval by the PublicWorks and Community Development Departments. Prior toissuance of building permitsand encroachment permits for the proposed theaterproject, a Construction ManagementPlan must be approved by the Public Works and CommunityDevelopment Departments -either as a combined plan forthe parking structure and theater project or as astand-aloneplan for the theater project only.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A88Utilities DepartmentThe proposed utility infrastructure shall comply with thelatest engineering designstandards effective at the time the building permit isobtained and shall have reasonablealignments needed for maintenance ofpublic infrastructure.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A89Utilities DepartmentThe project must construct a new sewer lateral and waterservices for the proposed use.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A90Utilities DepartmentMAWA and ETWU calculations shall be provided for theproposed landscape plan per thefollowing formula: http://www. slocity .org/ government/department-directoryThis will be addressed in a separatesubmittal by SLO Rep TheatreN/A91Utilities DepartmentProjects generating more than two cubic yards oftotalwaste shall comply with AB 1826,and local waste management ordinance to reducegreenhouse gas emissions. Trashenclosure(s) shall conform the requirements by the San LuisGarbage Company and refusebins shall be sized to provide a reasonable level of service.Separate refuse bins shall beaccommodated within the site for waste, recycling, andorganics .This will be addressed in a separatesubmittal by SLO Rep TheatreN/A92Utilities DepartmentApplicant will need to obtain in writing that the proposedenclosures and collection methodmeets the San Luis Garbage Company (SLG) requirements.SLG can be contacted at (805)543-0875. The proposed plans show large waste containersat the bottom of the accessramp near the north boundary ofthe project, which will bedifficult to access. Please consultwith SLG to review the access and ensure the large bins willnot create a safety hazard. Allthree waste streams need to be included in the proposedtrash enclosure per Section 2.1.1-D ofthe Uniform DesignCriteria.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A93Utilities DepartmentDriveways and access routes to the trash enclosure shall bedesigned to accommodate thesize and weight of the garbage trucks; a writtenconfirmation from the San Luis GarbageCompany shall be included in the building permit plans forthe proposed project. The trashenclosure area shall have a maximum slope oftwo percentin a way that waste services willnot interfere with vehicular or pedestrian traffic.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A94Utilities DepartmentTree wells shall maintain a 10-foot clearance to the existingsewer and water mains. Newcurbs along the frontage improvements shall maintain a2-foot clearance between the newlip ofgutter and the outside edge ofexisting sewer or watermains .This will be addressed in a separatesubmittal by SLO Rep TheatreN/A95Utilities DepartmentUnderground dewatering systems for basements shalldischarge to an on-site retentionsystem or shall obtain an environmental compliance permitprior to issuance of anoccupancy permit.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A96Use PermitThe proposed parking structure shall operate in substantialcompliance with the project description approved by theCity Council.This will be addressed in a separatesubmittalPH 2.97SLO Rep Theatre UsePermitThe applicant shall defend, indemnify, and hold harmlessthe City and/or its agents,officers, and employees from any claim, action, orproceeding against the City and/ or itsagents, officers, or employees to attack, set aside, void, orannul the approval by the Cityof this project, and all actions relating thereto, including butnot limited to environmentalreview (" Indemnified Claims"). The City shall promptlynotify the applicant of anyIndemnified Claim upon being presented with theIndemnified Claim, and City shall fullycooperate in the defense against an Indemnified Claim.This will be addressed in a separatesubmittal by SLO Rep TheatreN/A98SLO Rep Theatre UsePermitThe proposed SLO Rep theatre shall operate in substantialcompliance with the projectdescription approved by the City Council.This will be addressed in a separatesubmittal by SLO Rep TheatreN/ACOA No.COA No.SubAgencyConditionMitigation MeasuresPhaseDrawing # 30 From:Hill, Robert Sent:Monday, May 13, 2024 10:04 AM To:Chip Visci; Hermann, Greg Cc:Kevin Harris Subject:RE: ENA Language Attachments:A. Draft Amendment No. 1 to Exclusive Negotiating Agreement.docx; SLO REP ENA FINAL SIGNED.pdf Hi Chip and Kevin, Attached is the Draft Amendment No. 1 to the ENA consistent with our meeting and subsequent conversations. (We call it “draft” until it is approved by Council; however, it is not a draft in the sense that we anticipate or can accommodate further edits at this time). I have also attached the existing ENA for your convenience. The City Clerk’s Office is seeking to wrap up all reports by noon today. Thanks for working on this with us. Bob From: Chip Visci <visci805@gmail.com> Sent: Friday, May 10, 2024 7:44 PM To: Hermann, Greg <GHermann@slocity.org> Cc: Hill, Robert <rhill@slocity.org>; Kevin Harris <kevinharris@slorep.org> Subject: Re: ENA Language And thank you! Have a good weekend On May 10, 2024, at 5:02 PM, Hermann, Greg <GHermann@slocity.org> wrote: I’ll talk to Bob on Monday, but I think the Council wants to know if other sites are seriously being considered given the amount of funding we are setting aside for this. I will see if we can get agreement on language that only requires you to disclose if another site is considered and not details as well as timing. We’ll give you a call on Monday. Greg From: Chip Visci < Sent: Friday, May 10, 2024 3:40:24 PM To: Hermann, Greg <GHermann@slocity.org> Cc: Hill, Robert <rhill@slocity.org>; Kevin Harris <kevinharris@slorep.org> Subject: Re: ENA Language This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Greg, 31 PS: I meant to ask — what problem does the disclosure requirement solve? I’m mainly worried that depending on what the actual requirements for disclosure are, that some donors will be unpleasantly surprised. So maybe there’s a different way to solve the City’s needs that doesn’t leave us in a bad spot with our donors. Again, it all depends what the exact language and requirements are. On May 10, 2024, at 3:21 PM, Chip Visci < wrote: Greg, Sorry that I did not see your email yesterday. What’s the actual requirement for disclosure? On May 9, 2024, at 11:18 AM, Hermann, Greg <GHermann@slocity.org> wrote: Hi Chip, Thanks for the conversation yesterday. Please see the narrative portion of the recommended ENA changes from the draft staff report below. This is still in the final stages of approval, but I am not anticipating significant changes. Please feel free to give us a call if you have any questions or want to discuss. Greg Amendment No. 1 to Exclusive Negotiating Agreement The existing ENA has a five-year term and is, therefore, due to expire on May 22, 2024. Staff recommends extending the term of the ENA, and the draft amendment includes the following key points: 1. Provides for an additional 6-month term, with an option to extend for an additional 6-month term, to maintain timely forward progress in reasonable anticipation that the ENA could be replaced by a prospective lease agreement within that timeframe. The extension requires SLO REP to disclose any other sites or options it is considering for the theatre. The additional 6-month term is then predicated on SLO REP issuing a written notice of intent to proceed with final lease negotiations with the City. 2. Clarifies the expected standard for a construction contingency of 15%, operating reserve for the first year of 20%, and required approval of a three-year operating plan including the 32 establishment of a fund for building and facilities maintenance and repair. 3. Forecasts the potential for a longer, 99-year lease term. 4. Acknowledges progress and milestones that have been met and addresses minor inconsistencies. Greg Hermann pronouns he/him/his Deputy City Manager <image001.png> City Administration 919 Palm Street, San Luis Obispo, CA 93401-3218 E ghermann@slocity.org T 805.781.7194 C 805.440.1330 slocity.org <image002.png><image003.png><image004.png><image005.png><ima ge006.png> Stay connected with the City by signing up for e-notifications EXCLUSIVE NEGOTIATING AGREEMENT This Exclusive Negotiating Agreement (“Agreement”) is entered into this ___day of ______, 2019 (the “Effective Date”), by and between the City of San Luis Obispo, a California charter municipal corporation ("the City'') and San Luis Obispo Repertory Theatre, a California non-profit corporation (“SLO REP”). The City and SLO REP are jointly referred to as the “parties”. RECITALS WHEREAS, the City is the legal owner of the property located at 888 Morro Street in San Luis Obispo, California (the “Property”); and WHEREAS, the City identified a portion of the Property as the site of a proposed public parking structure (“Palm Nipomo Parking Structure”) and anticipates that an estimated 18,000 square foot portion of the Property will not be needed for the Palm Nipomo Parking Structure (“Remainder Property”); and WHEREAS, SLO REP desires to construct a not-for-profit live performance theatre facility and related on- site and off-site (if any) improvements (“Theatre”) on the Remainder Property; and WHEREAS, the parties recognize that the exact location, size and availability of the Remainder Property for the Theatre cannot be determined at this time, and understand that the Remainder Property has development restrictions including maintenance of trees, street setbacks and provision of pedestrian connections/plazas from the Palm Nipomo Parking Structure to Monterey Street that affect the net buildable land; and WHEREAS, the City wishes to support community-based performing arts groups by encouraging development of a live performance theatre facility in the downtown; and WHEREAS, the City and SLO REP recognize that identifying a location for the Theatre, as well as some of the terms of a future lease, may help SLO REP’s capital fundraising efforts; and WHEREAS, construction of the Palm Nipomo Parking Structure and the Theatre and related rezoning and general plan amendments will require environmental review, and SLO REP must provide certain information about the Theatre before City can conduct the environmental review; and WHEREAS, the City’s Financial Management Manual allows exclusive negotiations for long term lease of City property when the there is a clear link between the proposal and accomplishment of significant City goals, plans or policies; and WHEREAS, the City considers the development of a not-for-profit live performance theatre on the Remainder Property to be in the public interest and in accordance with the City's goals and the existing and proposed Downtown Concept Plan. NOW, THEREFORE, in consideration of the mutual covenants, conditions, promises and agreements herein set forth, the parties agree as follows: DocuSign Envelope ID: 0D5F9552-0A12-4481-A99B-695D14987222 5/22/2019 AGREEMENT 1. RECITALS. The above Recitals are true. 2. TERM. This Agreement shall commence upon the Effective Date and shall continue in effect for a period of five (5) years (the “Term”), unless sooner terminated as provided herein. The Parties may extend the Term of this Agreement in writing upon mutual consent. 3. PURPOSE. The purpose of this Agreement is to enable the City to proceed with the Palm Nipomo Parking Structure, and to allow SLO REP to explore the feasibility of SLO REP financing, designing, constructing and operating the Theatre, at its sole cost and expense, on the Remainder Property. 4. CITY’S OBLIGATIONS. The City shall, during the Term of this Agreement: a. Exclusivity. Negotiate exclusively with SLO REP as the future tenant of the Remainder Property. b. Initiate Rezoning, General Plan amendments, and Lot Line Adjustment. Upon City Council authorization, initiate all rezoning, General Plan amendments, and a lot line adjustment necessary to allow the construction of the Palm Nipomo Parking Structure on a portion of the Property and the Theatre on the Remainder Property. The intent of this Agreement is for the Remainder Property to be created as a “finished lot,” although the City legally cannot, and therefore does not, contractually agree as to how it will exercise its legislative authority to rezone or amend the General Plan and its land use authority to complete a lot line adjustment. c. Environmental Review. The City has completed environmental review of the Palm Nipomo Parking Structure and the Theatre and has certified a Final Environmental Impact Report (“FEIR”) by Resolution No. 10923 (2018 Series). If SLO REP makes any changes to the Theatre design or if any of the conditions set forth in CEQA Guidelines § 15162 are triggered, then SLO REP may negotiate the portion of costs it will bear in the event substantial new environmental issues are discovered during construction, or if any project-specific environmental review related to the Theatre is deemed necessary. 5. SLO REP’s OBLIGATIONS. SLO REP shall, during the term of this Agreement: a. Non-Profit Status. Be a California non-profit corporation in good standing and be exempt from state and federal income taxes under section 501 (c) (3) of the Internal Revenue Code. b. Proof of Financial Ability. Provide to City’s reasonable satisfaction that it has the financial ability to design, construct and operate the Theatre on the Remainder Property. At a minimum SLO REP shall: Fundraising Plan. Provide the City with a fundraising plan by December 31, 2019 that is acceptable to, and approved by, the City Manager, whose approval shall not be unreasonably withheld, delayed or conditioned. The fundraising plan shall include a timeline with milestones that shall be met no later than 1 year from the estimated completion of the Palm Nipomo Parking Structure. These DocuSign Envelope ID: 0D5F9552-0A12-4481-A99B-695D14987222 milestones shall include, at a minimum, prior to commencement of lease negotiations, but no later than one (1) year after City’s award and execution of a contract to construct the Palm Nipomo parking Structure, that SLO REP shall demonstrate, to the City Finance Director’s reasonable satisfaction, that SLO REP has available at least 50% of all the funds necessary to design and construct the Theatre. i. Preliminary Cost Estimates. Provide the City with preliminary costs estimates by December 31, 2020 to design, construct and operate the Theatre for at least the first two (2) years after completion of construction. Update those estimates as design progresses, but at least every 6 months. SLO REP will include the payment of prevailing wages in its estimates. ii. Annual Financials. Annually, on or before December 31st of each year, provide the City with a current financial statement, copy of most recent filed state and federal tax returns, and copies of current bank statements, to demonstrate fundraising results for the Theatre. iii. Formal Development Application. Finalize and submit a formal development application for the Theatre to the City. iv. Compensation for City Review Costs. Discuss and finalize how City processing and review costs will be funded. c. Environmental Review Information. Provide the City promptly with all information necessary to conduct any subsequent environmental review of the Theatre that may be necessary. This information includes, but is not limited to, square footage of structure; square footage of various uses such as office, storage, classroom, and theatre; number of seats; maximum number of performances per week, and any other information deemed necessary by City. 6. TERMINATION. Either party may terminate this Agreement without liability to the other party at any time by written notice to the other. This Agreement shall automatically terminate in the event SLO REP fails to secure building permits for the Theatre one year after the completion of the Palm Nipomo parking structure. 7. CONDITIONS PRECEDENT TO LEASE NEGOTIATION AND EXECUTION. All of the following conditions must be met as conditions precedent prior to lease execution for the Remainder Property: a. Lease negotiation: i. Rezoning and Lot Line Adjustment. City has rezoned and/or amended the City’s general plan and has perfected a lot line adjustment that will create the Remainder Property as a “finished lot” allowing for construction and its use as the Theatre. ii. Obligations Met. Both City and SLO REP have met all of their respective obligations under the Agreement. DocuSign Envelope ID: 0D5F9552-0A12-4481-A99B-695D14987222 b. Availability of Funds for Design, Construction, and Operation of the Theatre Prior to execution of the lease, SLO REP demonstrates to the City Manager’s reasonable satisfaction that SLO REP has met all applicable fundraising milestones in the fundraising plan approved by the City Manager. c. Non-Profit Status. SLO REP has maintained its non-profit and tax-exempt status under applicable state and federal law. d. Design and Construction Schedule. Prior to lease execution, provide to the City’s Community Development Director’s reasonable satisfaction, a design and construction schedule, demonstrating, at a minimum, the Theatre will be constructed and completed within 3 years of the completion of the Palm Nipomo Parking Structure. e. Design Coordination. Coordinate design of the Theatre with the City to ensure it is compatible with the Palm Nipomo Parking Structure. 8. GENERAL LEASE TERMS. If the parties enter into the exclusive negotiations, the parties desire that the lease include the following general provisions; provided, the actual language of each provision is subject to further negotiation, and most material terms and provisions of the lease have not yet been discussed. The City shall not lease the land for minimal rent unless the lease is completely acceptable to the City and approved by the City Attorney. Nothing in this paragraph shall be interpreted as an agreement or offer to lease upon the terms, provisions or language set forth below. a. SLO REP shall commence construction of the Theatre no later than one (1) year after the completion of the Palm Nipomo Parking Structure and shall complete construction of the Theatre within three (3) years after that. SLO REP shall not commence construction of the Theatre unless SLO REP demonstrates, to the City’s Finance Manager’s reasonable satisfaction prior to expiration of the year within which SLO REP is to commence construction, that SLO REP has all of the funds necessary to design and construct, as well as operate for at least one (1) years after completion of construction, the Theatre, plus a 15% contingency, available in cash or approved financing (the “Required Funds”). If SLO REP does not timely demonstrate that SLO REP has the Required Funds, or if SLO REP fails to timely begin or timely complete construction, SLO REP shall be in substantial default, and the lease shall automatically terminate unless City agrees otherwise in writing. The Theatre shall be deemed complete only upon issuance of a Certificate of Occupancy. b. Minimum 40-year term with the right of first refusal for additional lease years provided that Theatre is in good standing at the time of the renewal window, which shall open after 35 years and conclude after 37 years unless the window is extended. c. Rent of $1.00 per year provided SLO REP: i. Is a California non-profit corporation in good standing; and ii. Is a federal and state income tax exempt 501 (c)(3) entity; and uses the Remainder Property solely as a live performance theatre and related City approved community uses. DocuSign Envelope ID: 0D5F9552-0A12-4481-A99B-695D14987222 iii. SLO REP’s failure to maintain its non-profit corporate status in good standing or its tax-exempt status under applicable state and federal law or to use the Remainder Property for any purpose other than as a live performance theatre and related City approved community uses during the term or any extended term of the lease, shall be a material breach of the lease. In the event any such breach occurs, City may, at its option, either terminate the lease or raise the rent to fair market rates for neighboring commercial uses. d. SLO REP shall design, construct, operate and maintain the Theatre and all street frontage and landscaping, utility extensions and connections, and other improvements, based on agreed upon and approved plans and specifications, at its sole cost and expense without any assistance from the City. e. SLO REP shall be responsible for meeting or mitigating all conditions, impacts, mitigations and requirements identified in the environmental review and entitlement processes for issues associated with the SLO REP’s operation of a theatre on the Property, at SLO REP’s sole cost and expense. f. The design of the Theatre must be compatible with the design of the Palm Nipomo Parking Structure, including the parking structure’s entrance and exiting needs, as determined by the sole discretion of the Public Works Director. g. SLO REP shall take all reasonable efforts to preserve, protect, and maintain the large oak tree on 614 Monterey, along with the tree on the corner of Monterey and Nipomo. h. If the SLO REP is not in material compliance with the Lease or ceases to be financially solvent and to maintain the Property in a commercially reasonable manner, the lease shall contain provisions for the City to declare a default of the Lease, for SLO REP to effect a reasonable cure of the default(s), and for the City to terminate the Lease if the default(s) are not cured pursuant to the terms and conditions of the Lease, and for the Remainder Property to revert to the City. i. Prevailing wages shall be paid by SLO REP for construction of the Theatre and related improvements, mitigations etc. j. SLO REP shall pay all applicable parking in lieu fees for a Community Partner, as determined by the sole discretion of the City’s Public Works Director. k. Payment of possessory interest and other taxes by SLO REP. l. Other long-term landlord protection ground lease provisions, such as City standard insurance requirements, indemnity provisions, attorneys’ fees, prohibitions against nuisance, waste, requiring maintenance at SLO REP expense, etc. m. If the City Council does not move ahead with the construction of the Palm/Nipomo structure, a new agreement will need to be negotiated between the parties for a mutually acceptable alternate site or an alternate set of requirements for a portion of the Property. n. The City will not subordinate its interest in the Remainder Property to any financing. DocuSign Envelope ID: 0D5F9552-0A12-4481-A99B-695D14987222 10. AMENDMENT. This Agreement may be extended or modified with the mutual consent of the parties. Any such extension, amendment, modification or variation from the terms of this Agreement shall be in writing and shall be effective only upon approval by the City Council. 11. COMPLETE AGREEMENT. This written Agreement, including all writings specifically incorporated herein by reference, shall constitute the complete agreement between the parties. No oral agreement, understanding or representation not reduced to writing and specifically incorporated herein shall be of any force or effect, nor shall any such oral agreement, understanding or representation be binding upon the parties. 12. NOTICE. All notices to the parties shall be in writing and shall be sent by United States mail, postage prepaid by registered or certified mail addressed as follows: City: Derek Johnson City Manager 990 Palm Street San Luis Obispo, CA 93401 SLO REP: Kevin Harris Managing Artistic Director 888 Morro Street San Luis Obispo, CA 93401 13. AUTHORITY TO EXECUTE AGREEMENT. Both City and SLO REP warrant and represent that each individual executing the Agreement on behalf of each party is a person duly authorized and empowered to execute agreements for such party. IN WITNESS WHEREOF, the parties execute this Agreement on the day and year first above written. ATTEST CITY OF SAN LUIS OBISPO Teresa Purrington City Clerk Date Heidi Harmon Mayor Date APPROVED AS TO FORM: SLO REPERTORY THEATRE J. Christine Dietrick City Attorney Date Kevin Harris Managing Artistic Director Date DocuSign Envelope ID: 0D5F9552-0A12-4481-A99B-695D14987222 Council Minutes City Hall, 990 Palm Street, San Luis Obispo Tuesday, December 4, 2018 Regular Meeting of the City Council CALL TO ORDER A Regular Meeting of the San Luis Obispo City Council was called to order on Tuesday, December 4, 2018 at 6:00 p.m. in the Council Hearing Room, located at 990 Palm Street, San Luis Obispo, California, by Mayor Harmon. ROLL CALL Council Members Present: Council Members Carlyn Christianson Aaron Gomez, Erica A Stewart, Vice Mayor Andy Pease, and Mayor Heidi Harmon. Council Members Absent: None City Staff Present: Derek Johnson, City Manager; Christine Dietrick, City Attorney; and Teresa Purrington, City Clerk; were present at Roll Call. Other staff members presented reports or responded to questions as indicated in the minutes. PLEDGE OF ALLEGIANCE Vice Chair Pease led the Pledge of Allegiance. APPOINTMENTS 1. APPOINTMENTS TO THE ZONE 9 ADVISORY COMMITTEE City Clerk Purrington presented the contents of the report. Public Comments: None End of Public Comments --- ACTION: MOTION BY VICE CHAIR PEASE, SECOND BY COUNCIL MEMBER CHRISTIANSON, CARRIED 5-0 to: San Luis Obispo Page I DocuSign Envelope ID: 0D5F9552-0A12-4481-A99B-695D14987222 San Luis Obispo City Council Minutes of December 4, 20] 8 Page 2 Make appointments to the Zone 9 Advisory Committee, effective December 31, 2018, and recommend the County Board of Supervisors confirm, as follows: 1. Appoint Christine Mulholland to serve as public member to represent the City of San Luis Obispo on the Zone 9 Advisory Committee for a term to expire on December 31, 2022; and 2. Appoint Dave Romero to serve as the alternate member to represent the City of San Luis Obispo on the Zone 9 Advisory Committee for a term to expire on December 31, 2022; and 3. Appoint Matt Horn, City Engineer, to serve as the staff representative on the Zone 9 Advisory Committee; and 4. Appoint Brian Nelson, Supervising Civil Engineer, to serve as the alternate staff representative on the Zone 9 Advisory Committee for a term to expire on December 31, 2022. 2. APPOINTMENTS TO THE CITIZENS' REVENUE ENHANCEMENT OVERSIGHT COMMISSION, JACK HOUSE COMMITTEE, AND MASS_ TRANSPORTATION COMMITTEE City Clerk Purrington presented the contents of the report. Public Comments: Tom Tyran Kincaid End of Public Comments --- ACTION: MOTION BY COUNCIL MEMBER CHRISTIANSON, SECOND BY COUNCIL MEMBER GOMEZ, CARRIED 5-0 to: 1. Confirm the appointment of Winston Newland to the Citizens' Revenue Enhancement Oversight Commission, to complete an unexpired term through June 30, 2019. 2. Confirm the appointment of Julie Moore, as the representative of the San Luis Obispo County History Center, to the Jack House Committee effective December 4, 2018; and 3. Confirm the appointment of Ryan Hund, as the ASI student representative, to the Mass Transportation Committee, to complete an unexpired term through March 31, 2019. INTRODUCTION 3. INTRODUCTION OF ERIC HAGEN CHIEF BUILDING OFFICIAL Community Development Director Michael Codron introduced Eric Hagen as the new Chief Building Official. PRESENTATIONS 4. PROCLAMATION - RECOGNITION OF SERVICE - CARRIE MATTINGLY City Manager Derek Johnson presented a proclamation to retiring Utilities Director Carrie Mattingly, in recognition of her service. DocuSign Envelope ID: 0D5F9552-0A12-4481-A99B-695D14987222 San Luis Obispo City Council Minutes of December 4-2018 Pabe 3 PUBLIC COMMENT ON ITEMS NOT ON THE AGENDA None End of Public Comment --- CONSENT AGENDA ACTION: MOTION BY COUNCIL MEMBER CHRISTIANSON, SECOND BY VICE CHAIR PEASE, CARRIED 5-0 to approve Consent Calendar Items 5 thru 12. Public Comment Lea Brooks — 8 Myron Amerine — 8 Kevin Harris — 10 Myron Amerine — 12 End of Public Comment --- 5. WAIVE READING IN FULL OF ALL RESOLUTIONS AND ORDINANCES CARRIED 5-0, to waive reading of all resolutions and ordinances as appropriate. 6. SCHEDULE OF CITY COUNCIL MEETINGS FOR 2019 CARRIED 5-0, to adopt the proposed 2019 regular City Council meeting schedule with meetings normally held the first and third Tuesday of every month, with the following exceptions: 1. Reschedule the Regular City Council meeting of January 1 to January 8, 2019, and 2. Cancel the Regular City Council meetings of August 6 and December 17, 2019. 7. APPROVAL OF THE FINAL MAP FOR TRACT 3089 PHASE 1, AVILA RANCH, 175 VENTURE DRIVE (SBDV 2042-2015) CARRIED 5-0, to adopt a Resolution entitled, "A Resolution of the City Council of the City of San Luis Obispo, California, approving the final map for Tract 3089 Phase 1 Avila Ranch (175 Venture Drive, SBDV-2042-2015)," and authorizing the Mayor to execute the easements, agreements, and associated fee offers, including the recommended changes in the staff agenda correspondence. 8. PLANS AND SPECIFICATIONS FOR BUCHON TRAFFIC CALMING CARRIED 5-0, to 1. Approve Plans and Specifications for Buchon Traffic Calming Measures; and 2. Authorize staff to advertise for bids and the City Manager to award the contract if the lowest responsible bid is within the Engineer's Estimate of $160,000; and 3. Authorize the use and transfer of $142,000 from the City's Neighborhood Traffic Calming budget and $18,000 from the City's Traffic Safety & Operations Budget to the project account. DocuSign Envelope ID: 0D5F9552-0A12-4481-A99B-695D14987222 San Luis Obispo City Council Minutes of Deceniber 4. 2018 Page 4 9. ADJUSTMENTS TO SUPPLEMENTAL SALARY SCHEDULE AND POLICY AS A RESULT OF MINIMUM WAGE INCREASES CARRIED 5-0, to 1. Adopt a Resolution entitled, "A Resolution of the City Council of the City of San Luis Obispo, California, establishing and adopting a supplemental employee salary schedule and superseding previous resolutions in conflict," as necessary to comply with California Fair Wage Act of 2016 requiring a minimum wage of $12.00 per hour effective January 1, 2019; and 2. Adopt the revised Supplemental Employee Policy. 10. SAN LUIS OBISPO REPERTORY THEATRE EXCLUSIVE NEGOTIATING AGREEMENT CARRIED 5-0, to Authorize the Mayor to sign an Exclusive Negotiating Agreement with the San Luis Obispo Repertory Theatre, SLO REP, for long-term use of a portion of the Palm/Nipomo Parking Structure site to construct and operate a new theatre, based on parameters previously set forth by the City Council. 11. REPEALING AND REPLACING RESOLUTION NO. 10894 TO REFLECT UPDATED ZONING REGULATION SECTION FOR PROPERTY MAINTENANCE STANDARDS CARRIED 5-0, to Adopt a Resolution entitled, "A Resolution of the City Council of the City of San Luis Obispo, California, repealing and replacing Resolution No. 10894 (2018) to reflect updated zoning regulation sections." 12. ACQUISITION OF EASEMENTS FOR THE RAMONA DRIVE TO FOOTHILL BOULEVARD CLASS 1 PATH CARRIED 5-0, to Authorize the Mayor to execute easement and deed agreements in a total amount not to exceed $423,700 including title and escrow charges in a form subject to the approval of the City Attorney. PUBLIC HEARING ITEMS AND BUSINESS ITEMS 13. WATER RESOURCE RECOVERY FACILITY PROJECT - AUTHORIZATION TO BID Utilities Director Carrie Mattingly and Deputy Director Dave Hix provided an in-depth staff report and responded to Council questions. Public Comments: Autumn Brown Rosemary Wrenn Scott Zimmerman Daniel Mora Richard Van Humbeck DocuSign Envelope ID: 0D5F9552-0A12-4481-A99B-695D14987222 San Luis Obispo City Council_ Minutes of December 4, 2018 Pie 5, Jesse Brooks Quinn Brady Tony Skinner Sean Perry Dave Baldwin David Gilliland Nick Andre End of Public Comment --- ACTION: MOTION BY MAYOR HARMON SECOND BY COUNCIL MEMBER CHRISTIANSON, CARRIED 5-0 to: 1. Approve plans and specifications for the Water Resource Recovery Facility (WRRF) Project, Specification No. 91620; and 2. Authorize staff to advertise for construction bids pending City Engineer's approval of the bid set; and 3. Authorize the City Manager to award the contract if the lowest responsible bid is within the project construction budget of $111,600,000; and 4. Approve amended WRRF Project -specific Construction Contract Change Order policy and authorize the Utilities Director to be responsible for construction contract change orders (CCOs) for the WRRF Project in any amount with the limitation that the sum total of all CCOs not exceed the contingency budget amount of $13,390,000; and 5. Incorporate the Community Workforce Agreement into WRRF Project Spec. No 91620 as approved by signatory Craft Councils and Unions affiliates and the Tri -Counties Building and Construction Trades Council, AFL-CIO as included in the Council agenda packet for the November 13, 2018 Meeting. STUDY SESSION ITEMS 14. BOB JONES TRAIL (CALLE JOAQUIN TO OCEANAIRE) PREI+ERREI) ALTERNATIVE SELECTION Public Works Director Daryl Grigsby, Transportation Manager Jake Hudson and Active Transportation Manager Adam Fukushima provided an in-depth staff report and responded to Council questions. Public Comments: Myron Amerine Lea Brooks Ken Kienow End of Public Comment --- ACTION: By consensus, Council directed staff to evaluate other route alternatives which are not consistent with the Bicycle Transportation Plan as part of the planning of the forthcoming Active Transportation Plan. DocuSign Envelope ID: 0D5F9552-0A12-4481-A99B-695D14987222 San Luis Obis o City Council Minutes of December 4 2018 Parc 6 RECESS Council recessed at 8:35 p.m. and reconvened at 8:50 p.m., with all Council Members present. PUBLIC HEARING ITEMS AND BUSINESS ITEMS 15. 2019-21 FINANCIAL PLAN PROCESS: ECONOMIC OUTLOOK BUDGET POLICIES AND CAPITAL IMPROVEMENT PLAN REVIEW Finance Director Brigitte Elke and Budget Manager Alex Ferreira provided an in-depth staff report and responded to Council questions. Public Comments: None End of Public Comment --- ACTION: By consensus, the Council reviewed and approved the 2019-21 Financial Plan Goal Setting Process. COUNCIL COMMUNICATIONS AND LIAISON REPORTS Vice Mayor Pease invited the public to the Police Department Community Meeting and Station tour on Thursday, December 6, 2018 and also indicated that the City Council would be participating in the annual holiday parade on Friday, December 7, 2018. ADJOURNMENT The meeting was adjourned at 10:02 p.m. The next Rescheduled Regular City Council Meeting is scheduled for Tuesday, January 8, 2019 at 6:00 p.m., in the Council Chamber, 990 Palm Street, San Luis Obispo, California. l Teresa Purrington City Clerk APPROVED BY COUNCIL: 01/08/2019 DocuSign Envelope ID: 0D5F9552-0A12-4481-A99B-695D14987222 39 From:Hill, Robert Sent:Monday, April 15, 2024 4:51 PM To:White, Kelly; Hermann, Greg Cc:Purrington, Teresa; Dietrick, Christine; Wilbanks, Megan Subject:RE: 04/23/2024 Closed Session Titles Received, thank you! From: White, Kelly <kwhite@slocity.org> Sent: Monday, April 15, 2024 4:14 PM To: Hill, Robert <rhill@slocity.org>; Hermann, Greg <GHermann@slocity.org> Cc: Purrington, Teresa <TPurring@slocity.org>; Dietrick, Christine <cdietric@slocity.org>; Wilbanks, Megan <mwilbanks@slocity.org> Subject: RE: 04/23/2024 Closed Session Titles Bob – Looks like I replied earlier to a step in the email thread you weren’t copied on. Sorry… I added the APNs to the 20240423_CS NoƟce.docx but who is the Negotiating Party that City staff will be preparing to negotiate with? Usually this is the property owner but I take it, in this instance, the City owns all the properties. I’ve added you to the list of Agency Negotiators but please review the list for any other edits or additions. Folder for your memo is here: 20240423_Real Property - SLO Rep Kelly White Senior Legal Analyst City Attorney's Office E kwhite@slocity.org T 805.781.7060 From: Hill, Robert <rhill@slocity.org> Sent: Monday, April 15, 2024 3:58 PM To: Hermann, Greg <GHermann@slocity.org>; Dietrick, Christine <cdietric@slocity.org>; Wilbanks, Megan <mwilbanks@slocity.org> Cc: Purrington, Teresa <TPurring@slocity.org>; White, Kelly <kwhite@slocity.org> Subject: RE: 04/23/2024 Closed Session Titles Hi Kelly, Here is the property description for the SLO REP price & terms negotiation discussion: 610 and 614 Monterey Street, a portion of 972 Nipomo Street, and a portion of City Parking Lot No. 14. Assessor’s Parcel Nos. 002-412-011, 002-412-012, 002-412-002 (portion) and 002-412-004 (portion). I am starting to assemble the info that will go into the memo now and will be happy to move that into form once we have a closed folder set up for this item. Thanks all, Bob 40 From: Hermann, Greg <GHermann@slocity.org> Sent: Monday, April 15, 2024 10:24 AM To: Dietrick, Christine <cdietric@slocity.org>; Wilbanks, Megan <mwilbanks@slocity.org> Cc: Purrington, Teresa <TPurring@slocity.org>; White, Kelly <kwhite@slocity.org>; Hill, Robert <rhill@slocity.org> Subject: RE: 04/23/2024 Closed Session Titles Will do and thanks. Greg From: Dietrick, Christine <cdietric@slocity.org> Sent: Monday, April 15, 2024 8:59 AM To: Wilbanks, Megan <mwilbanks@slocity.org> Cc: Hermann, Greg <GHermann@slocity.org>; Purrington, Teresa <TPurring@slocity.org>; White, Kelly <kwhite@slocity.org> Subject: RE: 04/23/2024 Closed Session Titles Megan/Kelly – this is a real property lease price and terms item. Greg can you please have your team work with Kelly on the property info necessary for the notice. Thx. From: Wilbanks, Megan <mwilbanks@slocity.org> Sent: Monday, April 15, 2024 8:56 AM To: Dietrick, Christine <cdietric@slocity.org> Cc: Hermann, Greg <GHermann@slocity.org>; Purrington, Teresa <TPurring@slocity.org>; White, Kelly <kwhite@slocity.org> Subject: 04/23/2024 Closed Session Titles Hi Christine, Greg requested that we add a 30-minute item to the existing Closed Session on 4/23 to discuss something to do with SLO REP. Council just confirmed the new start time of 1:30 p.m.; could you please send me the titles when you get a chance? Thanks! Megan Wilbanks Deputy City Clerk City Administration 990 Palm, San Luis Obispo, CA 93401-3249 E mwilbank@slocity.org T 805.781.7103 slocity.org Stay connected with the City by signing up for e-notifications 64 From:Marquart, Ben Sent:Thursday, November 2, 2023 11:31 AM To:Gorter, James Cc:Kacsinta, Madeline Subject:FW: SWPPP Plan for James Gorter Review Attachments:SWPPP -SLO DOWNTOWN PARKING SWPPP_v20231102.pdf Jim- Attached is a copy of the SWPPP plan for the CADPS project for your review. I’m not sure if you have access to Procore for the project but it resides there as-well. Please respond (Procore or Email) with any questions / Comments. Thanks, Ben From: Tally Richtsmeier <trichts@kitchell.com> Sent: Thursday, November 2, 2023 10:25 AM To: Marquart, Ben <bmarquar@slocity.org> Cc: Ryan Stefanek <rstefanek@kitchell.com> Subject: SWPPP Plan for James Gorter Review This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Hi Ben , Officially, please find attached SWPPP Plan from Swinerton if James Gorter would like to review. I’ve submitted it in Procore for RRM review as well, so the city would be concurrently reviewing with the design team. Thank you, Tally Richtsmeier, Project Engineer II Kitchell CEM 1304 Broad Street San Luis Obispo, CA 93401 Cell: 801-557-2289 | Direct: 916-713-6981 Follow us: Facebook | Twitter | LinkedIn | KitchellProgress.com STORM WATER POLLUTION PREVENTION PLAN Project Name: SLO Downtown Parking Structure Project Legally Responsible Person (LRP) Brian Nelson Deputy Director of Public Works / City Engineer City of San Luis Obispo 919 Palm Street San Luis Obispo, CA 93401 Prepared For: The City of San Luis Obispo 919 Palm Street San Luis Obispo, CA Risk Level: 2 Site Addresses: Cultural Arts District 609 Palm Street San Luis Obispo, CA 93401 Estimated Project Construction Dates: November 13, 2023 – February 13, 2025 SWPPP Prepared by: Hive Engineering 705 Fiero Lane, Suite 10 San Luis Obispo, CA 93401 (805) 550-8546 phone QSP Daniel Parker-King, RCE, QSD/P Permit Registration Submittal Date:8/31/23 WDID No: - 565511 Date: 11/1/23 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 2 TABLE OF CONTENTS Acronyms .............................................................................................................................................................. 4 Legally Responsible Person ................................................................................................................................... 5 Qualified SWPPP Developer .................................................................................................................................. 6 Storm Water Multi-Application and Report Tracking System ............................................................................................ 6 1.0 SWPPP Requirements............................................................................................................................... 7 1.1 Introduction ......................................................................................................................................................... 7 1.2 Permit Registration Documents ........................................................................................................................... 7 1.3 Swppp availability and implementation .............................................................................................................. 8 1.4 Pollution Prevention Team .................................................................................................................................. 8 1.5 Duly Authorized Representatives ........................................................................................................................ 8 1.6 Permits and Governing Documents ..................................................................................................................... 8 1.7 SWPPP Amendments ........................................................................................................................................... 9 1.8 Retention of Records ........................................................................................................................................... 9 1.9 Exceedance Response Actions (ERA’s) ............................................................................................................... 10 1.10 Annual Comprehensive Facility Compliance Evaluation .................................................................................... 10 1.11 Annual Report .................................................................................................................................................... 11 1.12 Termination and Changes to General Permit Coverage ..................................................................................... 11 2.0 Facility Information ................................................................................................................................ 11 2.1 Facility Description ............................................................................................................................................. 11 2.1.1 Facility Location ............................................................................................................................................ 11 2.1.2 Existing Conditions ........................................................................................................................................ 12 2.1.3 Description of Drainage Areas and Existing Drainage ................................................................................... 13 2.1.4 Developed Condition .................................................................................................................................... 14 2.2 Project Risk Level ............................................................................................................................................... 14 2.2.1 Project Sediment Risk: .................................................................................................................................. 15 2.2.2 Receiving Water Risk: .................................................................................................................................... 17 2.2.3 Combined Risk: ............................................................................................................................................. 17 2.3 Construction Site Estimates ............................................................................................................................... 18 2.4 Construction Schedule ....................................................................................................................................... 18 2.5 Identification of Potential Pollutant Source ....................................................................................................... 18 3.0 Best Management Practices .................................................................................................................. 19 3.1 Contractor Information ...................................................................................................................................... 19 3.2 BMP Installation Schedule ................................................................................................................................. 19 3.3 Erosion & Sediment Control Best Management Practices ................................................................................. 21 3.4 Non-Storm Water and Material Management Best Management Practices ..................................................... 21 3.5 Post-Construction Best Management Practices ................................................................................................. 22 3.6 Housekeeping Requirements ............................................................................................................................. 22 3.7 Non-Storm Water Management ........................................................................................................................ 24 3.8 Erosion Control .................................................................................................................................................. 24 3.9 Sediment Control ............................................................................................................................................... 24 3.10 Inspection, Maintenance & Repair .................................................................................................................... 24 3.11 Training .............................................................................................................................................................. 25 3.12 Inspection and Entry .......................................................................................................................................... 25 4.0 Construction Site Monitoring Program .................................................................................................. 26 4.1 Construction Site Monitoring Program (CSMP) ................................................................................................. 26 4.2 Visual Monitoring & Inspection ......................................................................................................................... 27 4.3 Non-Storm Water Discharge Monitoring ........................................................................................................... 28 4.4 Water Quality Sampling and Analysis ................................................................................................................ 28 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 3 4.5 Construction Activity ......................................................................................................................................... 28 4.6 Quality Assurance and Quality Control .............................................................................................................. 29 4.7 Reporting Requirements and Records Retention .............................................................................................. 31 5.0 General Procedures and Requirements .................................................................................................. 31 5.1 SWPPP Availability and Implementation ........................................................................................................... 31 5.2 SWPPP Amendments ......................................................................................................................................... 32 5.1 Retention of Records ......................................................................................................................................... 32 5.2 Reporting Requirements .................................................................................................................................... 32 5.3 Required Non-Compliance Reporting ................................................................................................................ 33 5.4 Annual Report .................................................................................................................................................... 33 5.5 Changes to Permit Coverage .............................................................................................................................. 33 5.6 Notice of Termination ........................................................................................................................................ 33 APPENDIX A NPDES CONSTRUCTION GENERAL PERMIT ............................................................................. 36 APPENDIX B BMPS FROM THE 2009 CALIFORNIA CONSTRUCTION BMP HANDBOOK ......................... 37 APPENDIX C LIST OF POTENTIAL NON-VISIBLE POLLUTANTS ................................................................... 48 APPENDIX D SWPPP CONTRACTOR/SUBCONTRACTOR AGREEMENTS ................................................... 50 APPENDIX E CONTRACTOR/SUBCONTRACTOR INFORMATION .................................................................. 51 APPENDIX F SWPPP TRAINING LOG ................................................................................................................... 53 APPENDIX G SITE MAP EROSION CONTROL PLAN ......................................................................................... 55 APPENDIX H RISK LEVEL CALCULATIONS ....................................................................................................... 61 APPENDIX I CHAIN-OF-CUSTODY (COC) FORM ............................................................................................... 64 APPENDIX J SWPPP AMENDMENT(S) & LOG ............................................................................................................ 66 APPENDIX K CORRECTIVE ACTION LOG .................................................................................................................... 68 APPENDIX L SAMPLING LOG ................................................................................................................................ 75 APPENDIX M ANNUAL FEE STATEMENT AND RECIEPTS .............................................................................. 80 APPENDIX N CONSTRUCTION SITE MONITORING INSPECTION FORM ...................................................... 84 APPENDIX O RAIN EVENT ACTION PLAN .......................................................................................................... 91 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 4 ACRONYMS ASTM American Society of Testing and Materials BAT Best Available Technology BCT Best Conventional Pollutant Control Technology BMP Best Management Practice BPT Best Practicable Control Technology Currently Available CFR Code of Federal Regulations CGP Construction General Permit – NPDES Construction General Permit for Storm Water Discharges associated with Construction Activities COC Chain of custody COT City of Tehachapi CSMP Construction Site Monitoring Program CWA Clean Water Act of 1987 EPA Environment Protection Agency LRP Legally Responsible Person MS4 Municipal Storm Sewer System NAL Numeric Action Levels NEL Numeric Effluent Limitations NOAA National Oceanic and Atmospheric Administration (www.noaa.gov) NOI Notice of Intent NOT Notice of Termination NPDES National Pollution Discharge Elimination System POC Pollutants of Concern PoP Probability of Precipitation PRD Permit Registration Documents QSD Qualified SWPPP Developer QSP Qualified SWPPP Practitioner REAP Rain Event Action Plan RUSLE Revised Universal Soil Loss Equation RWQCB Regional Water Quality Control Board SAP Sampling and Analysis Plan SMARTS Storm water Multi- Application Report Tracking System SWAMP Surface Water Ambient Monitoring Program SWPPP Storm Water Pollution Prevention Plan SWPPM Storm Water Pollution Prevention Manager SWRCB State of California Water Resources Control Board SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 5 LEGALLY RESPONSIBLE PERSON Approval and Certification of the Stormwater Pollution Prevention Plan Facility Name SLO Downtown Parking Structure Waste Discharge Identification (WDID): 565511 “I certify under penalty of law that this document and all Attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, to the best of my knowledge and belief, the information submitted is, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." _______________________________________ Legally Responsible Person/Organization Date _______________________________________ Legally Responsible Person Date ____Brian Nelson________________________ 805-781-7113 Printed Name Phone SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 6 QUALIFIED SWPPP DEVELOPER This SWPPP was prepared under the direction of Daniel Parker-King, a Qualified SWPPP Developer (QSD). ___________________________________________ 8/23/23 Daniel Parker-King, RCE, QSD/P Date Mr. Parker-King possesses the following QSD qualifications per Section VII of the Construction General Permit: California Registered Civil Engineer, C74672, Expiration 12.31.23 QSD Certification Number C74672 Contact Information for questions or concerns: Hive Engineering 705 Fiero Lane, Suite 10 San Luis Obispo, CA 93401 (805) 550-8546 This SWPPP conforms to the required elements of the Construction General Permit Order No. 2009-0009-DWQ and amendments Order No. 2010-0014-DWQ and Order No. 2012-0006-DWQ issued by the State of California, State Water Resource Control Board. A QSD is required to prepare any necessary SWPPP amendments or annual reports. This SWPPP (including all inspections, amendments and reports) and the Construction General Permit shall be maintained for three years from the date submitted. These records shall be available at the construction site until construction is complete. When the original SWPPP is retained by a crewmember in a construction vehicle and it is not currently at the construction site, current copies of the BMPs and map/drawing will be left with the field crew and the original SWPPP shall be made available via a request by radio/telephone.) STORM WATER MULTI-APPLICATION AND REPORT TRACKING SYSTEM The Construction General Permit requires all dischargers to electronically file all Permit Registration Documents (PRDs), Notices of Termination (NOT), changes of information (COI’s), annual reporting, and other compliance documents required by the Construction General Permit through the State Water Board’s Storm water Multi-Application and Report Tracking System (SMARTS) website. SMARTS can be found at https://smarts.waterboards.ca.gov/smarts/faces/SwSmartsLogin.jsp SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 7 1.0 SWPPP REQUIREMENTS 1.1 INTRODUCTION The Cultural Arts District Parking Structure site comprises approximately 1.2 acres and spans several addresses including, 609 Palm Street, 972 Nipomo Street, 633 Palm Street, 630 Monterey Street, 970 Nipomo Street, 610 Monterey Street, 614 Monterey Street, in San Luis Obispo, California. The property is owned by The City of San Luis Obispo. This Stormwater Pollution Prevention Plan (SWPPP) is designed to comply with California’s General Permit for Stormwater Discharges Associated with Industrial Activities (General Permit) Order No. 2014-0057-DWQ (NPDES No. CAS000001) issued by the State Water Resources Control Board (State Water Board). This SWPPP has been prepared following the SWPPP Template provided on the California Stormwater Quality Association Stormwater Best Management Practice Handbook Portal: Industrial and Commercial (CASQA 2014). In accordance with the General Permit, Section X.A, this SWPPP contains the following required elements: · Facility Name and Contact Information · Site Map · Storm Water Pollution Prevention Plan · Signed Certification Statement · Annual Fee (Appendix M) 1.2 PERMIT REGISTRATION DOCUMENTS Required Permit Registration Documents (PRDs) were submitted to the State Water Board via the Stormwater Multi Application and Report Tracking System (SMARTS) by the Legally Responsible Person (LRP), or authorized personnel (i.e., Approved Signatory) under the direction of the LRP. To obtain coverage, the Edwards Construction Group must electronically file Permit Registration Documents (PRDs) prior to the commencement of construction activity. Failure to obtain coverage under the Construction General Permit for storm water discharges to waters of the United States is a violation of the CWA and the California Water Code. The project-specific PRDs include:  Notice of Intent (NOI)  Risk Assessment (Appendix H)  Site Map (Appendix G)  Storm Water Pollution Prevention Plan  Signed Certification Statement  Annual Fee (Appendix M) The annual fee is required no later than seven days prior to the commencement of construction activities. Permit coverage shall not commence until the annual fee and PRDs are received by the State Water Board, and a Waste Discharger Identification (WDID) number is assigned and sent by State Water Board Storm water Multi-Application and Report Tracking System (SMARTS). SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 8 1.3 SWPPP AVAILABILITY AND IMPLEMENTATION The SWPPP is available on-site to all employees during all hours of operation (see Section 2.5 for the Operations Schedule), and will be made available upon request by a State or Municipal inspector. The SWPPP will be implemented by August 1, 2023. 1.4 POLLUTION PREVENTION TEAM Facility staff that have been designated as Pollution Prevention Team members are listed below in Table 1.1., along with their responsibilities and duties. A list of alternate team members is also provided, and these personnel will perform SWPPP activities when regular members of the Pollution Prevention Team are absent or unavailable. This table will be updated as needed when there are changes to staff and staff responsibilities. All team members will be trained to perform the duties assigned to them. Employee training logs are provided in Appendix C. Table 1.1 Pollution Prevention Team Name Title Phone Number Responsibilities and Duties Daniel Parker-King QSP 805-550-8546 Inspection, Testing, Reporting Jesse Kaltenberg QSP 805-250-2891 Inspection, Testing, Reporting 1.5 DULY AUTHORIZED REPRESENTATIVES Duly Authorized Representative(s) who are responsible for SWPPP implementation and have authority to sign PRDs [is/are] listed below in Table 1.2. Written authorizations from the LRP for these individuals are provided in Appendix D. Table 1.2 Duly Authorized Representatives Name Title Phone Number 1.6 PERMITS AND GOVERNING DOCUMENTS In addition to the General Permit, the following documents have been taken into account while preparing this SWPPP: · Regional Water Board requirements; · Basin Plan requirements; · TMDL Requirements; SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 9 · Spill Prevention Control and Countermeasures Plan; · Hazardous Material Business Plan; · Hazardous Waste Regulations and Permits; · Air Quality Regulations and Permits ; and · Clean Water Act Section 401 Water Quality Certifications and 404 Permits. 1.7 SWPPP AMENDMENTS This SWPPP will be amended or revised as needed. A list of amendments (Amendment Log) is included in the front of this SWPPP (page 7), and amendment certifications are included in Appendix E. The Amendment Log will include the date of initial preparation and the date of each amendment. The SWPPP should be revised when: · There is a General Permit violation; · There is a reduction or increase in the total industrial area exposed to stormwater; · BMPs do not meet the objectives of reducing or eliminating pollutants in stormwater discharges; · There is a change in industrial operations which may affect the discharge of pollutants to surface waters, groundwater(s), or a municipal separate storm sewer system (MS4); · There is a change to the parties responsible for implementing the SWPPP; or · Otherwise deemed necessary by the QISP. The following items will be included in each amendment: · Who requested the amendment; · The location of proposed change; · The reason for change; · The original BMP(s) proposed, if any; and · The new BMP(s) proposed. · Amendments will be logged at the front of the SWPPP and certification kept in Appendix E. The SWPPP text will be revised replaced, and/or hand annotated as necessary to properly convey the amendment. SWPPP amendments must be certified and submitted by the LRP or their designated Duly Authorized Representative via SMARTS within 30 days whenever the SWPPP contains significant revisions. With the exception of significant revisions, SWPPP changes will be certified and uploaded to SMARTS once every three (3) months in the reporting year. 1.8 RETENTION OF RECORDS Paper or electronic records of documents required by this SWPPP will be retained for a minimum of five (5) years from the date generated or date submitted, whichever is later, for the following items: · Employee Training Records; · BMP Implementation Records; · Spill and Clean-up Related Records; · Records of Sampling and Analysis Information SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 10 • The date, exact location, and time of sampling or measurement; • The date(s) analyses were performed; • The individual(s) that performed the analyses; • The analytical techniques or methods used; and • The results of such analyses; · Records of Visual Observations • The date • The industrial areas/drainage areas of the facility observed during the inspection (Location); • The approximate time of the observation; • Presence and probable source of observed pollutants; and • Name of the individual(s) that conducted the observations; • Response to the observations including identification of SWPPP revisions if needed. • Level 1 ERA Reports; • Level 2 ERA Action Plan; • Level 2 ERA Technical Report; and • Annual Reports from SMARTS (checklist and any explanations). 1.9 EXCEEDANCE RESPONSE ACTIONS (ERA’S) If a General Permit NAL exceedance occurs in a given reporting year, a Level 1 ERA Evaluation and a Level 1 ERA Report will be required in the following year, or, if in a subsequent year, a Level 2 ERA Action Plan and a Level 2 ERA Report will be required in accordance with the General Permit. The results of either of the ERA reports may require that the SWPPP be amended. 1.10 ANNUAL COMPREHENSIVE FACILITY COMPLIANCE EVALUATION The General Permit (Section XV) requires the Discharger to conduct one Annual Comprehensive Facility Compliance Evaluation (Annual Evaluation) for each reporting year (July 1 to June 30). Annual Evaluations will be conducted at least eight (8) months and not more than sixteen (16) months after the previous Annual Evaluation. The planned window for conducting the Annual Evaluation is between April and June of each year. The SWPPP will be revised, as appropriate based on the results of the Annual Evaluation, and the revisions will be implemented within 90 days of the Annual Evaluation. At a minimum, Annual Evaluations will consist of: · A review of all sampling, visual observation, and inspection and monitoring records and sampling and analysis results conducted during the previous reporting year; · A visual inspection of all areas of industrial activity and associated potential pollutant sources for evidence of, or the potential for, pollutants entering the stormwater conveyance system; · A visual inspection of all drainage areas previously identified as having no exposure to industrial activities and materials in accordance with the definitions in Section XVII; · A visual inspection of equipment needed to implement the BMPs; · A visual inspection of any BMPs; SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 11 · A review and effectiveness assessment of all BMPs for each area of industrial activity and associated potential pollutant sources to determine if the BMPs are properly designed, implemented, and are effective in reducing and preventing pollutants in industrial stormwater discharges and authorized NSWDs; and · An assessment of any other factors needed to comply with the Annual Reporting requirements in General Permit Section XVI.B. 1.11 ANNUAL REPORT The Annual Report will be prepared, certified, and electronically submitted no later than July 15th following each reporting year using the standardized format and checklists in SMARTS based on the reporting requirements identified in Section XVI of the General Permit. Annual reports will be submitted in SMARTS and in accordance with information required by the on- line forms. 1.12 TERMINATION AND CHANGES TO GENERAL PERMIT COVERAGE When any of the following conditions occur, termination of coverage under the General Permit will be requested by certifying and submitting a Notice of Termination (NOT) via SMARTS: · Operation of the facility has been transferred to another entity; · The facility has ceased operations, completed closure activities, and removed all industrial related pollutant generating sources; · The facility’s operations have changed and are no longer subject to the General Permit. The SWPPP and all of the provisions of the General Permit will be complied with until a valid NOT is received and accepted by the Board. If ownership changes, the new owner of the facility will be notified of the General Permit and regulatory requirements for permit coverage. 2.0 FACILITY INFORMATION 2.1 FACILITY DESCRIPTION 2.1.1 Facility Location The Cultural Arts District Parking Structure site comprises approximately 1.2 acres and spans several addresses including, 609 Palm Street, 972 Nipomo Street, 633 Palm Street, 630 Monterey Street, 970 Nipomo Street, 610 Monterey Street, 614 Monterey Street, in San Luis Obispo, California. The property is owned by The City of San Luis Obispo, and is located within Section 26, Township 30S, Range 12E. These phase 1b site preparation plans consist of tree protection, demolition and clearing. Phase 2 (under separate cover) includes on-site rough grading, temporary and permanent shoring, improvements, buildings, precise grading, landscape, and associated frontage improvements. The general construction activities to be performed at the Project Site may include, but are not limited to the following: · Demolition of existing structure · Demolition of existing underground utilities (Sewer, Water, Electric, etc…) SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 12 · Tree removal · Site grading · Washout Areas · Construction entrance/exit Figure 2.1: Vicinity Map Figure 2.2: Site Map 2.1.2 Existing Conditions The existing site consists of four structures, a garage, a parking lot, trees, minor landscaping and associated utilities. Most of the site slopes gently to the west towards the corner of Pismo and Nipomo St. The southwest corner of the property slopes towards the corner of Monterey and Nipomo. At the time of this report, all structures and paving have been removed. Existing sources of contamination at the site include: · Contaminated Soil · Erosion and Sediment from stormwater runoff · Hydrocarbons from vehicular parking SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 13 · Existing utilities (sewer) · Dewatering Figure 2.3: Existing Conditions (Pre demolition) 2.1.3 Description of Drainage Areas and Existing Drainage The site is divided into two drainage areas ranging from 5%-10%. Drainage area A1 (44,900 SF) flows to the northwest, while drainage area B1 (13,700 SF) flows to the south and southwest. Offsite drainage is received from area A2 (13,692 SF), flowing into area A1. Area A2 previously contained an apartment and home but they have been removed. The elevations of the project ranges from 188 to 205 above mean sea level (msl). Stormwater is conveyed through surface runoff, and flows off site into the city’s municipal stormwater system. Demolition to occur as a part of this project will keep the drainage patterns relatively the same, creating pervious area. The construction of a parking structure during the second phase will add impervious areas. Drainage areas and their directions can be seen in Figure 4. SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 14 Figure 2.4: Drainage Areas The site is located within the Stenner Lake Watershed.. 2.1.4 Developed Condition Post demolition surface drainage will generally be directed as it has historically. Storm water will flow offsite to the City of San Luis Obispo storm drain system, and ultimately to Brizziolari Creek. Post construction drainage patterns and conveyance systems are presented on the Improvement Plans. 2.2 PROJECT RISK LEVEL This SWPPP utilized a Risk-Based Permitting Approach under the Construction General Permit (SWRCB Order No. 2009-0009 DWQ), as set forth by the SWRCB and RWQCB. There are two major steps to site planning and risk determination. The project’s overall risk is broken up into two elements – (1) project sediment risk (the relative amount of sediment that can be discharged, given the project and location details) and (2) receiving water risk (the risk sediment discharges pose to the receiving waters) SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 15 2.2.1 Project Sediment Risk: Project Sediment Risk can be determined using two separate methods. Method 1 establishes sediment risk based on the following Soil Loss Equation (RUSLE) to obtain an estimate of project-related bare ground soil loss expressed in tons/acre. The RUSLE equation is as follows: A = (R)(K)(LS)(C)(P) Where: A = the rate of sheet and rill erosion R = rainfall-runoff erosivity factor K = soil erodibility factor LS = length-slope factor C = cover factor (erosion controls) (taken as 1.0 to simulate bare ground) P = management operations and support practices (sediment controls) (taken as 1.0 to simulate bare ground) Method 2 (also known as the “map option”) utilizes GIS maps where the product of K and LS are predetermined (located below in Figure 2 and 3) and an online calculator for determining R factor for determining soil loss. For this option, the R factor for the project is calculated using the online calculator at https://www.epa.gov/npdes/rainfall-erosivity-factor-calculator-small-construction-sites. To determine soil loss in tons per acre, the discharger multiplies the R factor times the value for K times LS from the map. Figure 2.5. K Factor SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 16 Figure 2.6. LS Factor Calculated Using Google Earth KML Figure 2.7. R Value from EPA Website Method 2 was utilized in this SWPPP. Using the SWRCB “Risk Assessment R-Factor Calculation Notification” for the R factor with construction start dates of 11/13/23 and an end construction date of 2/13/2025, the R factor was determined to be 71.48. The K factor and LS factor were determined to be 0.24 and 1.25 respectively. Multiplying the above numbers together yields a Project Sediment Risk Factor of 21.44 tons/acre. Since 21.44 tons/acre is greater than 15 tons/acre, the site can be classified as to having a Medium Sediment Risk. SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 17 2.2.2 Receiving Water Risk: The project area can neither discharge (either directly or indirectly) to a 303(d)-listed waterbody impaired by sediment nor to a waterbody with designated beneficial use. This project site has been classified as a High Receiving Water Risk. 2.2.3 Combined Risk: The Combined Risk Level Matrix table in the Construction General Permit Order No. 2009-0009-DWQ (Appendix A) was utilized to determine the combined risk. Using this table, it was determined that the Project Site is a Risk Level 2. Table 1. Combined Risk Level Matrix Receiving Water Risk Sediment Risk Low Medium High Low Level 1 Level 2 High Level 2 Level 3 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 18 2.3 CONSTRUCTION SITE ESTIMATES “Construction activities” refers to actions that result in a disturbance of the land, including demolition, clearing, grading, excavating, vertical construction, landscaping and other similar activities. It also includes “construction-related activities,” areas that support the construction project such as stockpiles, borrow areas, concrete truck washouts, fueling areas, material storage areas and equipment storage areas. The following estimates are from the planned construction-related activities in the staging yard. More specific information pertaining to the other proposed well pads can be found in their respective site map/ erosion control plans within Appendix G. · Total project area: 1.2 acres · Site area to be disturbed: 1.2 acres • Percentage impervious area before and after demolition: 67% and 100% • Runoff coefficient before and after construction: NIC 2.4 CONSTRUCTION SCHEDULE • Grading Utilities & Vertical Construction 11/13/2023 to 2/13/2025 2.5 IDENTIFICATION OF POTENTIAL POLLUTANT SOURCE The pollutant of greatest concern on most construction sites is sediment which may become detached during construction related activities. Non-visible pollutants may be attached to the soils and run-off the site, potentially polluting the receiving body of water. Pollutant sources include, but are not limited to the following: a. Disturbances caused by demolition, clearing, grading and excavation activities related to site preparation. b. Storm-related precipitation c. Dust control through water spraying d. Leaks from equipment and/or portable toilets e. Wash out and maintenance areas f. Transporting of concrete and/ or asphalt materials g. Transporting of construction materials and fuels h. Flushing of water lines i. Vehicle fluids j. Cement materials k. Raw landscape materials l. General litter m. PVC pipe n. RCP pipe For a list of potential non-visible pollutants, refer to Appendix C: List of Potential Non-visible Pollutants & Pollutant Testing Guidance Table. SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 19 3.0 BEST MANAGEMENT PRACTICES 3.1 CONTRACTOR INFORMATION Appendix E includes the names and contact information of the Storm Water Pollution Prevention Plan Manager (SWPPPM) and a list of names of all contractors, subcontractors, and individuals who will be directed by the SWPPPM. This list shall include telephone numbers and work addresses. Specific areas of responsibility of each subcontractor and emergency contact numbers shall also be included. The discharger shall ensure that all BMPs required by the Construction General Permit are implemented by a Qualified SWPPPM. The SWPPPM shall be a person responsible for non-storm water and storm water visual observations, sampling and analysis and shall have primary responsibility and significant authority for the implementation, maintenance, inspection of the site to ensure full compliance with the SWPPP and the Permit. Best Management Practices (BMPs) were chosen for this project to reduce or eliminate pollutants in storm water discharge, and to comply with the Provisions of Attachment D of the General Order (Risk Level 2 Requirements) as well as those in the Construction General Permit Order. BMPs are shown in the erosion and sediment control plan provided in Appendix B. The Construction General Permit Order requires: Dischargers minimize or prevent pollutants in storm water discharges and authorized non-storm water discharges through the use of controls, structures, and management practices that achieve Best Available Technology Economically Achievable (BAT) for toxic and non-conventional pollutants and Best Conventional Pollutant Control Technology (BCT) for conventional pollutants. Storm water discharges and authorized non-storm water discharges regulated by the Construction General Permit not contain a hazardous substance equal to or in excess of reportable quantities established in 40 C.F.R. §§ 117.3 and 302.4, unless a separate NPDES Permit has been issued to regulate those discharges. As a Risk Level 2 discharger this project is subject to Numeric Action Levels (NALs) for pH and turbidity as described in Section 4.5. 3.2 BMP INSTALLATION SCHEDULE The Contractor is responsible for ensuring that appropriate BMPs are in place during the operations requiring the BMPs. Below is a schedule intended to provide the minimum BMPs necessary during each phase of the contractor’s operation. Additional BMPs may be necessary. Some BMPs installed early in the project shall remain in place upon completion of the project, while others must be removed prior to the completion of the project. Appendix B provides BMP Fact Sheets on design and implementation guidelines for each BMP. Those identified by “*” should only be implemented when applicable. The following BMPs shall be installed / utilized prior to clearing and grubbing operations: EC-1 Scheduling EC-2 Preservation of Existing Vegetation SE-7 Street Sweeping and Vacuuming SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 20 NS-9 Vehicle and Equipment Fueling NS-10 Vehicle & Equipment Maintenance WM-1 Material Delivery and Storage WM-2 Material Use WM-3 Stockpile Management WM-4 Spill Prevention and Control WM-5 Solid Waste Management WM-6 Hazardous Waste Management WM-9 Sanitary/Septic Waste Management The following BMPs shall be installed / utilized during grading/mobilization operations: WE-1 Wind Erosion Control TC-1 Stabilized Construction Entrance/Exit NS-1 Water Conservation Practices SE-1 Silt Fences SE-5 Fiber Rolls The following BMPs shall be installed / utilized upon completion of drainage work: (NOT IN CONTRACT) EC-9 Drainage Swales The following BMPs shall be installed / utilized during vertical construction: (NOT IN CONTRACT) EC-1 Scheduling EC-2 Preservation of Existing Vegetation WM-1 Material Delivery and Storage WM-2 Material Use WM-3 Stockpile Management WM-4 Spill Prevention and Control WM-5 Solid Waste Management WM-8 Concrete Waste Management* WM-9 Sanitary/Septic Waste Management The following BMPs may be utilized during utility operations: (NOT IN CONTRACT) WM-1 Material Delivery and Storage WM-2 Material Use WM-3 Stockpile Management WM-4 Spill Prevention and Control WM-5 Solid Waste Management WM-8 Concrete Waste Management* WM-9 Sanitary/Septic Waste Management All BMPs, except those designated as post-construction BMPs in Section 3.5, are to be removed prior to contract acceptance. It is not anticipated that this project will necessitate the stockpiling of materials. However, if materials are stockpile on-site and the stockpiles are inactive (not scheduled to be re-disturbed for at least 14 days), then the stockpiled areas shall be covered and a berm placed around the materials in accordance with WM-3 “Stockpile Management.” SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 21 3.3 EROSION & SEDIMENT CONTROL BEST MANAGEMENT PRACTICES Appendix B provides BMP Fact Sheets on design and implementation guidelines for each BMP to reduce or eliminate pollutants in storm water discharges. All BMPs are required to be implemented. The following BMPs are to be incorporated into this SWPPP: EC-1 Scheduling EC-2 Preservation of Existing Vegetation EC-8 Wood Mulching EC-16 Non-Vegetative Stabilization SE-1 Silt Fences SE-5 Fiber Rolls SE-7 Street Sweeping and Vacuuming SE-10 Storm Drain Inlet Protection TC-1 Stabilized Construction Entrance/Exit TC-3 Entrance/Outlet Tire Wash WE-1 Wind Erosion Control WM-9 Sanitary/Septic Waste Management 3.4 NON-STORM WATER AND MATERIAL MANAGEMENT BEST MANAGEMENT PRACTICES Non-storm water discharges may contribute significant pollutant loads to receiving waters. Measures to control spills, leakage, and dumping, and to prevent illicit connections during construction must be addressed through structural as well as non-structural Best Management Practices (BMPs). BMPs are designated in this SWPPP to prevent non-storm water discharges. All BMPs are required to be implemented. Those identified by “*” should only be implemented when applicable. NS-1 Water Conservation Practices NS-2 Dewatering Operations NS-3 Paving and Grinding Operations NS-7 Potable Water/Irrigation NS-8 Vehicle and Equipment Cleaning NS-9 Vehicle and Equipment Fueling WM-1 Material Delivery/Storage WM-2 Material Use WM-3 Stockpile Management WM-4 Spill Prevention and Control WM-5 Solid Waste Management WM-6 Hazardous Waste Management WM-7 Contaminated Soil Management WM-8 Concrete Waste Management WM-10 Liquid Waste Management SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 22 Vehicle and Equipment Cleaning is prohibited from occurring on-site. Fueling and maintenance of equipment and vehicles shall take place in designated areas only. Materials storage on–site will be minimized. 3.5 POST-CONSTRUCTION BEST MANAGEMENT PRACTICES This SWPPP contains Post-Construction BMPs, which are designated to reduce or eliminate pollutants after construction is completed. BMPs serving dual purpose roles (construction and post-construction protection) include: EC-6 Straw Mulch/Hydroseed/Tackifier/Soil Amendment EC-7 Geotextiles & Mats EC-9 Drainage Swales EC-10 Velocity Dissipation Devices 3.6 HOUSEKEEPING REQUIREMENTS All Risk Level 2 dischargers are required to adhere to the minimum housekeeping requirements as specified in Attachment C of the Construction General Permit. They include, but are not limited to: Construction Materials: Risk Level 2 dischargers shall implement good site management measures for construction materials that could potentially be a threat to the water quality if discharged. They include: · Conduct an inventory of products to be used. · Cover and berm loose stockpiled construction material that are not actively being used. · Store Chemicals in watertight containers (with appropriate secondary containment to prevent any spillage or leakage) or in a storage shed. · Minimize exposure of construction materials to precipitation. · Implement BMPs to prevent the off-site tracking of loose construction and landscape materials. Waste Management: Risk Level 2 dischargers shall implement good housekeeping for waste management. They include, but are not limited to: · Prevent disposal of any rinse or wash waters or materials on impervious or pervious site surfaces or into the storm drain system. · Ensure containment of sanitation facilities. · Clean or replace sanitation facilities and inspect them for leaks regularly. · Cover waste disposal containers at the end of every business day and during rain events. · Prevent discharges from disposal containers to the drainage system or receiving water. · Contain and protect stockpile waste from wind or rain, unless actively being used. · Implement procedures that effectively address hazardous and non-hazardous spills. SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 23 · Develop a spill response plan. · Ensure containment of concrete washout areas and other washout areas that may contain pollutants. There shall be no discharge to the underlying soil. Vehicle Storage and Maintenance: Risk Level 2 dischargers shall implement good housekeeping for vehicle storage and maintenance. They include, but are not limited to: · Prevent oil, grease or fuel to leak in to the ground, storm drains or surface waters. · Place all equipment or vehicles, which are to be fueled, maintained and stored in a designated area fitted with appropriate BMPs. · Clean leaks immediately, and dispose of material properly. Landscape Materials: Risk Level 2 dischargers shall implement good housekeeping for landscape materials. They include, but are not limited to: · Contain stockpiled materials when they are not actively being used. · Contain fertilizers when they are not actively being used. · Discontinue the application of erodible landscape materials within 2 days before a forecast rain event or during periods of precipitation. · Apply erodible landscape materials according to the manufacture recommendations. · Stack erodible landscaped materials on pallets and covering or storing such materials when not being used or applied. Potential Pollutant Sources: Risk Level 2 dischargers shall conduct an assessment and create a list of potential pollutant sources (see Appendix C) and identify any areas of the site where additional BMPs are necessary to reduce or prevent pollutants in storm water discharges and authorized non-storm water discharges. When developing BMPs, Risk Level 2 dischargers shall do the following: · Consider the quantity, physical characteristics (e.g., liquid, powder, solid), and locations of each potential pollutant source handled, produced, stored recycled, or disposed of at the site. · Consider the degree to which pollutants associated with those materials may be exposed to and mobilized by contact with storm water · Consider the direct and indirect pathways that pollutants may be exposed to storm water or authorized non-storm water discharges. This shall include an assessment of past spills or leaks, non-storm water discharges, and discharges form adjoining areas. · Ensure retention of sampling, visual observations, and inspection records. · Ensure effectiveness of existing BMPs to reduce or prevent pollutants in storm water discharges and authorized non-storm water discharges. SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 24 3.7 NON-STORM WATER MANAGEMENT Risk Level 2 dischargers shall implement measure to control all non-storm water discharges during construction. Non-storm water discharges are any discharges not directly associated with a rain even. Non- storm water discharges can include but are not limited to leaks from equipment or vehicles, flushing of water lines or washing of equipment. Risk Level 2 requirements include: · Dischargers shall implement measures to control all non-storm water discharges during construction. · Dischargers shall wash vehicles in such a manner as to prevent pollutants from entering surface waters. · Streets shall be cleaned in such a manner as to prevent unauthorized non-storm water discharges from reaching surface waters or the storm drain system. 3.8 EROSION CONTROL The primary pollutant identified during construction is sediment. Erosion and sedimentation controls will be implemented as necessary along the boundaries of the construction areas within the Project Site to minimize, as necessary, the amount of sediment transported off-site by storm water runoff. These control measures will be put in place as needed at the onset of construction activities and will remain in place (as needed) during construction and through periods of inactivity. Dischargers shall provide effective soil cover for inactive areas. Descriptions and diagrams of the BMPs are included in Appendix B. All disturbed areas shall provide effective soil cover for inactive areas and all finished slopes, open space, utility backfill and completed lots. All disturbed areas of the construction Project Site will be stabilized in a manner similar to its original condition. Both temporary (water trucks) and permanent measures will also be applied to control dust generation. Final stabilization will need to be completed prior to submitting a Notice of Termination (NOT). 3.9 SEDIMENT CONTROL Dischargers shall establish and maintain effective perimeter controls. Silt barriers consisting of silt fences, fiber rolls, sandbags, hay bales, and/or berms will be set up around the construction site as necessary so that sediment will not be discharged off-site. Sedimentation control will be in place and maintained on all disturbed areas during the rainy season. Sediment control BMPs will be implemented as needed. Construction sites that require silt barriers around them are sites where the ground surface has been disturbed by construction activities such as grading and /or excavation. Sediment buildup along silt barriers will be monitored and removed as necessary. Removed sediment will be deposited in an area that will not allow sediment to be discharged off-site. All loose soil and debris, which may create a potential hazard, will be hauled offsite and disposed of at an approved location. All construction entrances and exits shall be stabilized to sufficiently control sediment discharge from the site. 3.10 INSPECTION, MAINTENANCE & REPAIR All storm water control measures shall be properly maintained at regular intervals by trained personnel consistent with Project Site operational maintenance schedules. Inspections will be performed by a QSP or someone under his direction weekly, before, during, after qualifying storm events (0.5 inches per storm SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 25 event), and once each 24-hour period during extended storm events during business. These inspections will be conducted to identify BMP effectiveness. If any structural defects are observed interfering with design performance of BMPs, repairs or design changes will be implemented by the SWPPM within 72 hours. 3.11 TRAINING The SWPPM is responsible for training project personnel on the following topics: · Erosion Control BMPs · Sediment Control BMPs · Non-Storm Water BMPs · Waste Management and Materials Pollution Control BMPs · Emergency Procedures specific to the construction site storm water management Inspections will be conducted by a QSP. A QSP may train individuals to conduct the inspections, and collect storm water samples for non-visible pollutants. Trained individuals will also have received training and have experience with respect to erosion control methods, either through scholastic institutions, previous job experiences, or through workshops conducted by recognized regulatory agencies or professional organizations. Training records (Appendix F) will document attendees, the subjects covered and the date of training. Training logs/records are to be recorded and stored with the rest of the record materials · To ensure that the preparation, implementation, and oversight of the SWPPP is sufficient for effective pollution prevention, Section II, Part H of the Construction General Permit specifies that the Qualified SWPPP Developer and Qualified SWPPP Practitioners responsible for creating, revising, overseeing, and implementing the SWPPP must attend a State Water Board sponsored or approved QSD and QSP training course. · 3.12 INSPECTION AND ENTRY The discharger shall allow the Regional Water Board, State Water Board, U.S. EPA, and/or, in the case of construction sites which discharge through a municipal separate storm sewer, an authorized representative of the municipal operator of the separate storm sewer system receiving the discharge, upon the presentation of credentials and other documents as may be required by law, to: · Enter upon the discharger’s premises at reasonable times where a regulated construction activity is being conducted or where records must be kept under the conditions of the Construction General Permit; · Access and copy at reasonable times any records that must be kept under the conditions of the Construction General Permit; · Inspect at reasonable times the complete construction site, including any off-site staging areas or material storage areas, and the erosion/sediment controls; and · Sample or monitor at reasonable times for the purpose of ensuring Construction General Permit compliance. SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 26 4.0 CONSTRUCTION SITE MONITORING PROGRAM 4.1 CONSTRUCTION SITE MONITORING PROGRAM (CSMP) The Construction General Permit requires the following types of monitoring for Risk Level 2 projects: · Visual inspections of Best Management Practices (BMPs); · Visual monitoring of the site related to qualifying storm events; · Visual monitoring of the site for non-storm water discharges; · Sampling and analysis of construction site runoff; · Sampling and analysis of non-storm water discharges; Storm event monitoring should be conducted during business hours; and when the National Oceanographic and Atmospheric Administration (NOAA) (http://www.srh.noaa.gov/forecast) forecasts a rain event with a 50% or greater probability of producing a ½ inch or more of rain. Table 4.1: Summary of Risk Level 2 Monitoring Type of Monitoring What When Location Visual Inspection BMP Presence and effectiveness of all BMPs Weekly and Every 24 hours during an extended storm event. Overall site Stormwater Pre-storm All drainage areas and BMPs. Within 2 business days before each qualifying storm event. Overall site Post-storm All drainage areas and BMPs. Within 2 business days after each qualifying storm event. Overall site Non-storm water Operations and BMPs identified in Section 3.4 Quarterly Staging areas Sampling & Analysis Storm water runoff (effluent) pH and turbidity of storm water runoff representative of site. Within 2 business days of each qualifying storm event, and at a minimum 3 samples per day. Perimeter of site BMP failure/spill (non-visible) Runoff affected and not affected by the discharge/spill. Use Appendix C as a guide. Within first 2 hours of discharge from site. Perimeter of site Non-storm water Operations and BMPs identified in Section 3.4 If non-storm water is discharged off site. Perimeter of site Rain events and resulting monitoring periods should be separated into qualifying rain events. A qualifying rain event is defined as any event producing precipitation of ½ inch or more within a 48 hour or greater period. Monitoring locations provide clear views of BMPs, disturbed areas and extend through the entire site. Dischargers must maintain on-site records of all visual observations, personnel performing the observations, observation dates, weather conditions, locations observed, and corrective actions taken in response to the observations. The Construction Site Monitoring Inspection Form (Appendix N) should be used to track all monitoring activities. SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 27 Figure 4.1 Overview of Monitoring Locations 4.2 VISUAL MONITORING & INSPECTION All storm water monitoring must be completed within two (2) business days of each qualifying rain event at identified locations. Appendix G shows the monitoring locations. BMP Inspection The purpose of these inspections is to identify BMPs that: · Need maintenance to operate effectively; · Failed; or · Could fail to operate as intended. If deficiencies are identified during BMP inspections, repairs or design changes to BMPs must be initiated within 72 hours of identification and need to be completed as soon as possible. All BMP inspections must be documented on a Construction Site Monitoring Inspection Form (Appendix N). Storm Water Inspection Dischargers must conduct a pre-storm event inspection of: · All storm water drainage areas to identify and resolve prior to the storm event, any spills, leaks, or uncontrolled pollutant sources · All BMPs to identify proper implementation · Any storm water storage and containment areas to detect and remedy leaks if found SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 28 Dischargers must conduct a post-storm event inspection within two business days (48 hours) to identify whether: · BMPs were adequately designed, implemented, and effective, and · If any additional BMPs necessary (and amend the SWPPP accordingly). 4.3 NON-STORM WATER DISCHARGE MONITORING Quarterly non-storm water discharge monitoring will include the visual inspection of each drainage area during daylight hours for the presence of non-storm water discharges and their sources in July – September, October – December, January – March, and April – June quarters. If non-storm water is discharged off site, the effluent must be sampled. Quarterly monitoring should be recorded on Construction Site Monitoring Inspection Form in Appendix N. Potential non-storm water discharges within this project include: · Grading and Land Development · Site Stabilization · Vehicle and equipment cleaning, fueling and maintenance · Sanitary/Septic waste facilities · Concrete wash out areas · Contaminated Soils Quarterly inspections need to include each drainage area of the project and document: · Presence or indications of unauthorized and authorized non-storm water discharges and their sources · Pollutant characteristics of the non-storm water discharge (floating and suspended material sheen, discoloration, turbidity, odor, etc.) · Personnel performing the observations · Dates and approximate time each drainage area and non-storm water discharge was observed · Response taken to observations 4.4 WATER QUALITY SAMPLING AND ANALYSIS The project is required to collect samples of: · runoff for non-visible pollutants in the event of a BMP failure, breach or spill · non-storm water discharge Sampling personnel will collect storm water grab samples at discharge locations according to procedures outlined in Section 4.6 Quality Assurance and Quality Control. Appendix G shows the monitoring locations for all monitoring. Appendix L contains the Sampling Activity Log. Sampling is not required outside of scheduled business hours or under dangerous conditions. An explanation of why samples were not taken will be included with on-site inspection documents. 4.5 CONSTRUCTION ACTIVITY Non-Visible Pollutant Sampling SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 29 If there is a breach, spill or BMP failure, runoff affected by the non-visible pollutants will be sampled within the first two hours of discharge. It is important to note that covered construction materials or those that are in their final constructed form, do not need to be monitored. Materials that are stored exposed to precipitation and may generate runoff need to be considered for non-visible pollutant monitoring. Appendix C provides further guidance. Non-Stormwater Sampling If non-storm water is discharged off site, the effluent must be sampled. All non-storm water sample analyses should be conducted by a state certified laboratory. 4.6 QUALITY ASSURANCE AND QUALITY CONTROL The QSP is responsible for non-storm water and storm water visual observations, sampling and analysis, and for ensuring full compliance with the permit and implementation of all elements of the SWPPP. Prior to the rainy season, all sampling personnel and alternates will review the Monitoring Plan. Qualifications of designated personnel describing environmental sampling training and experience are provided in Appendix F. Sampling personnel will be designated and trained to collect, maintain and ship samples in accordance with the Surface Water Ambient Monitoring Program’s (SWAMP) 2008 Quality Assurance Program Plan (QAPP) (http://www.swrcb.ca.gov/water_issues/programs/swamp/tools.shtml#qa). Supplies and Storage An adequate stock of supplies and equipment for non-visible pollutants will be available on the project site or provided by the approved laboratory (Appendix I) prior to a sampling event. Monitoring supplies and equipment will be stored in a cool-temperature environment that will not come into contact with rain or direct sunlight. Sampling personnel will be available to collect samples in accordance with the sampling schedule. Supplies maintained at the project site will include, but will not be limited to, surgical gloves, sample collection equipment, coolers, appropriate number and volume of sample bottles, identification labels, re- sealable storage bags, paper towels, personal rain gear, ice, Sampling Activity Log forms (Appendix L), and Chain of Custody (COC) forms (Appendix I). Sample Collection and Handling Procedures All sampling and sample preservation must be in accordance with the current edition of Standard Methods for the Examination of Water and Wastewater (American Public Health Association). To maintain sample integrity and prevent cross-contamination, sampling collection personnel will: · Wear a clean pair of surgical gloves prior to the collection and handling of each sample at each location. · Not contaminate the inside of the sample bottle by not allowing it to come into contact with any material other than the water sample. · Discard sample bottles or sample lids that have been dropped onto the ground prior to sample collection. · Not leave the cooler lid open for an extended period of time once samples are placed inside. · Not touch the exposed end of a sampling tube, if applicable. · Avoid allowing rainwater to drip from rain gear or other surfaces into sample bottles. SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 30 · Not eat, smoke, or drink during sample collection. · Not sneeze or cough in the direction of an open sample bottle. · Minimize the exposure of the samples to direct sunlight, as sunlight may cause biochemical transformation of the sample to take place. · Decontaminate sampling equipment prior to sample collection using a TSP-soapy water wash, distilled water rinse, and final rinse with distilled water. · Dispose of decontamination water/soaps appropriately; i.e., not discharge to the storm drain system or receiving water. Any samples provided to a lab will be provided within 48 hours and use only the sample bottle provided by the lab (Appendix I). For an initial verification of laboratory or field analysis, duplicate samples will be collected at a rate of 10 percent or 1 duplicate per sampling event. The duplicate sample will be collected, handled, and analyzed using the same protocols as primary samples, and will be collected where contaminants are likely, and not on the upstream sample. A duplicate sample will be collected immediately after the primary sample has been collected. Duplicate samples will not influence any evaluations or conclusions; however, they will be used as a check on laboratory quality assurance. Non-Visible Pollutants The Contractor shall notify the QSP if non-visible pollutants are expected. Sample Documentation Procedures All original data documented on sample bottle identification labels, Chain of Custody forms (Appendix I), Sampling Activity Logs (Appendix L), and Construction Site Monitoring Inspection Form (Appendix N) will be recorded using waterproof ink. These will be considered accountable documents. If an error is made on an accountable document, the individual will make corrections by lining through the error and entering the correct information. The erroneous information will not be obliterated. All corrections will be initialed and dated. Copies of the Construction Site Monitoring Inspection Form are provided in Appendix N. Sampling and field analysis activities will be documented using the following: • Sample Bottle Identification Labels: Sampling personnel will attach an identification label to each sample bottle. At a minimum, the following information will be recorded on the label, as appropriate… · Project name • Project number • Unique sample identification number and location. [Project Number]-[Six digit sample collection date]-[Location] (Example: 0G5304-081801-Upstream). Quality assurance/quality control (QA/QC) samples shall be identified similarly using a unique sample number or designation (Example: 0G5304-081801-DUP1) · Collection date/time (No time applied to QA/QC samples) · Analysis constituent • Sampling Activity Logs: A log of sampling events will identify… SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 31 o Sampling date · Separate times for sample collection of upstream, downstream, run-on, and QA/QC samples recorded to the nearest minute · Unique sample identification number and location · Analysis constituent · Names of sampling personnel · Weather conditions (including precipitation amount) · Field analysis results · Other pertinent data · Chain of Custody (COC) forms (Appendix I): All samples to be analyzed by a laboratory will be accompanied by a COC form provided by the laboratory. Only the sample collectors will sign the COC form over to the lab. COC procedures will be strictly adhered to for QA/QC purposes. · Storm Water Quality Sampling Log (Appendix L): When applicable, the Contractor’s storm water inspector will document in the log that samples for sedimentation/siltation and/or turbidity were taken during a rain event. 4.7 REPORTING REQUIREMENTS AND RECORDS RETENTION Records of all monitoring inspections are required to remain onsite during the construction period and for a minimum of three years. Records shall include the following items: · The date, place, and time of facility inspections, sampling, visual observations (inspections), and/or measurements, including precipitation; · The individual(s) who performed the facility inspections, sampling, visual observation (inspections), and/or measurements; · The date and approximate time of analyses; · The individual(s) who performed the analyses; · A summary of all analytical results from the last three years, the method detection limits and reporting limits, and the analytical techniques or methods used; · Rain gauge readings from site inspections; · QA/QC records and results; · Non-storm water discharge inspections and visual observations (inspections) and storm water discharge visual observation records; · Visual observation and sample collection exemption records (Appendix O); and · The records of any corrective actions and follow-up activities that resulted from analytical results, visual observations (inspections), or inspections (Appendix K). Most reporting will occur in the Annual Report (Appendix P). 5.0 GENERAL PROCEDURES AND REQUIREMENTS 5.1 SWPPP AVAILABILITY AND IMPLEMENTATION The General Construction Permit Section XIV.C requires the SWPPP be available at the construction site during working hours while construction is occurring and shall be made available upon request by a State or Municipal inspector. When the original SWPPP is retained by a crewmember in a construction vehicle SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 32 and is not currently at the construction site, current copies of the BMPs and map/drawing will be left with the field crew and the original SWPPP shall be made available via a request by radio/telephone. 5.2 SWPPP AMENDMENTS The General Construction Permit Section XIV.A requires that SWPPP be amended or revised by a QSD and that the SWPPP include a listing of the date of initial preparation and the date of each amendment. Amendments must be signed by a QSD. All amendments are to be dated, attached to the SWPPP and logged in Appendix J. This SWPPP should be amended if any BMP is not installed according to the site map or if a BMP is changed due to ineffectiveness. The following items shall be in each amendment: 1.0 Who requested the amendment 2.0 The location of the proposed change 3.0 The reason for the change 4.0 The original BMP proposed, if any 5.0 The new BMP The amendments for this SWPPP, along with the required approval can be found in the SWPPP Amendment Log located in Appendix J. Any amendment to the SWPPP must be approved by the QSD. 5.1 RETENTION OF RECORDS The Construction General Permit Section I.J.69 and IV.G requires that all dischargers maintain a paper or electronic copy of all required records for three years from the date generated or date submitted, whichever is last. The records must be available at the construction site until construction is completed. The discharger shall furnish the RWQCB, SWRCB, OR USEPA, within a reasonable time, any requested information to determine compliance with the Construction General Permit. The final SWPPP shall be maintained for the time period indicated. 5.2 REPORTING REQUIREMENTS As per the Construction General Permit, a Legally Responsible Person must submit electronically all project/permit related documents (also known as Permit Registration Documents, or PRDs) for new projects commencing on or after July 1, 2010 prior to commencement of construction activities through the Storm water Multi- Application Report Tracking System (SMARTS). SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 33 5.3 REQUIRED NON-COMPLIANCE REPORTING Dan Parker-King shall give advanced notice to the RWQCB of any changes in the construction-related activity which may result in a non-compliance with the storm water requirement of the Construction General Permit. Examples of non-compliance include, but are not limited to: · Self-reporting of any discharge violations; · Discharges which contain a hazardous substance. 5.4 ANNUAL REPORT Hive Engineering. shall prepare and electronically submit an Annual Report via SMARTS no later than September 1 of each year. Reporting requirements include: · Sampling and analysis results including laboratory reports, analytical methods and reporting limits and change of custody forms · Corrective actions and compliance activities · Violations of the Construction General Permit · Date, time, place and name(s) of the inspector(s) for all sampling, inspections and field measurements · Visual observation and sample collections records · Training Documentations 5.5 CHANGES TO PERMIT COVERAGE The General Construction Permit Section II. C allows a permittee to reduce or increase the total acreage covered under the Construction General Permit when: · A portion of the project is complete · When conditions for termination of coverage have been met · When ownership of a portion of the project is sold to a different entity · When new acreage is added to the project 5.6 NOTICE OF TERMINATION The General Construction Permit Section II. D requires that within 90 days of when construction is complete or ownership has been transferred, the discharger shall electronically file a Notice of Termination (NOT), a final site map, and photos through the State Water Boards SMARTS system. Filing a NOT certifies that all Construction General Permit requirements have been met. The NOT is submitted when the construction project is complete and all Construction General Permit requirements for termination and final stabilization have been met. These requirements include: · The site will not pose any additional sediment discharge risk than it did prior to construction activity. SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 34 · All construction related equipment, materials and any temporary BMPs no longer needed are removed from the site. · Post-Construction storm water management measures are installed and a long-term maintenance plan that is designed for a minimum of 5-years has been developed. The NOT must demonstrate through photos, RUSLE results, or results of testing and analysis that the project meets all of the requirements of SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 35 Section II.D.1 of the Construction General Permit by one of the following methods: · 70% final cover method (no computational proof required). · RUSLE/RUSLE2 method (computational proof required). · Custom Method SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 36 APPENDIX A NPDES CONSTRUCTION GENERAL PERMIT For the complete construction general permit, see separate binder onsite. SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 37 APPENDIX B BMPS FROM THE CALIFORNIA CONSTRUCTION BMP HANDBOOK SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 38 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 39 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 40 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 41 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 42 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 43 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 44 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 45 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 46 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 47 \ SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 48 APPENDIX C LIST OF POTENTIAL NON-VISIBLE POLLUTANTS SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 49 Construction Activities and Associated Pollutants Phase Activity Associated Materials or Pollutants Pollutant Category(1) Grading and Land Development Vehicle and equipment use · Equipment operation · Equipment maintenance · Equipment washing · Equipment fueling Oil and Grease Soil preparation/amendments · Use of soil additives/amendments Nutrients Demolition Phase Removal of existing structures · Demolition of asphalt, concrete, masonry, framing, roofing, metal structures. Metals, Oil and Grease, Synthetic Organics Solid waste · Litter, trash and debris · Vegetation Gross Pollutants Landscaping and Site Stabilization Phase Planting / Vegetation Management · Vegetation control (pesticides/herbicides) · Planting · Plant maintenance · Vegetation removal Nutrients, Metals, Synthetic Organics (1) Categories per CASQA BMP Handbook (i.e., Sediment, Nutrients, Bacteria and Viruses, Oil and Grease, Metals, Synthetic Organics, Pesticides, Gross Pollutants, and Vector Production) SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 50 APPENDIX D SWPPP CONTRACTOR/SUBCONTRACTOR AGREEMENTS Agreements will be provided at a later date. Page 1 PROFESSIONAL SERVICES AGREEMENT THIS PROFESSIONAL SERVICES AGREEMENT (“Agreement”) is made this 26th day of October, 2023 ("Effective Date"), by and between: Swinerton Builders (“Contractor”) 2001 Clayton Road, 7th Floor Concord, CA, 94520 Attn: Kevin Hermreck Phone: (949) 622-7000 Email: KHermreck@swinerton.com and HIVE ENGINEERING (“Consultant”) 705 Fiero Ln, Suite 10 San Luis Obispo, CA, 93401 Attn: Dan Parker-King Phone: (506) 386-4897 Email: dan@hiveengineering.us For Consultant to perform work as described in Item B below for the following Project: Project: City of San Luis Obispo Cultural Arts District Parking Structure 609 Palm Street San Luis Obispo, CA, 93401 Owner: CITY OF SAN LUIS OBISPO 919 PALM STREET SAN LUIS OBISPO, CA, 93401 Architect: WATRY DESIGN, INC. 2099 GATEWAY PLACE, SUITE 550 SAN JOSE, CA, 95110 NOW, THEREFORE, in consideration of these promises and of the mutual covenants herein, the Parties hereto agree as follows: No.: 23049042 PSA No.: 23049042-003 Phase Code: 015723 Vendor No.: 00033084 DocuSign Envelope ID: 6E8FFFA9-5612-4F97-851F-A019B6C6CFEE In Process Professional Services Agreement Standard Form - 2020 Page 2 ARTICLE 1 - PROJECT AND SCOPE OF SERVICES (a) Except for modifications and change orders issued after execution of this Agreement, the “Contract Documents,” consist of the following documents, all of which are either attached hereto as Attachments or are hereby incorporated by this reference and made a part hereof as follows: (1) This Professional Services Agreement, and the following Attachments: Contract Summary 10/25/2023 ☒ Billing Procedures date ☒ Scope of Work 10/25/2023 ☐ date (2) The Prime Contract No. , CITY OF SAN LUIS OBISPO, , any Amendments to the Prime Contract, and all documents incorporated therein to the extent applicable to the Services (“Prime Contract Documents”), and Consultant agrees to be bound and obligated to Contractor to the fullest extent that Contractor is bound and obligated to the Owner (b) Consultant agrees to perform for Contractor the Services described below including all things necessary or incidental to the complete and proper performance of those services (“Services” or “Work”) in accordance with this Agreement, and such Services are generally described as: SWPPP Consulting (Scope of Services continues on Contract Summary) (c) Contractor agrees to pay Consultant for the proper performance of its services the sum of money computed as follows: (Check One) A Lump Sum of $$23,025.00; or As set forth in the Contract Summary. (d) TIME IS OF THE ESSENCE. Consultant shall proceed with the performance of the Services in a prompt and diligent manner, in accordance with Contractor's schedule which may be reasonably amended from time to time. In Contractor’s sole discretion, it may specify Consultant’s performance time or schedule therefore in the Contract Summary. Consultant’s failure to satisfactorily and timely perform all Services may cause Contractor to suffer substantial damages (including but not limited to actual, consequential and/or liquidated damages) and Consultant shall be liable to Contractor therefor. (e) The Services shall be performed in strict accordance with the Contract Summary and the terms herein, unless modifications thereto are reduced to writing and signed by authorized representatives of both Contractor and Consultant. However, if requested by Contractor, Consultant shall within ten (10) calendar days submit a reasonable price quotation for proposed changes and if accepted by Contractor in writing, perform the changes without delay. Contractor shall have the right to issue a unilateral written change order authorizing Consultant to proceed with performance of changed work. Consultant shall proceed with changed work immediately upon receipt of a written change order signed by Contractor. Consultant shall perform no changed work without written authorization from Contractor. DocuSign Envelope ID: 6E8FFFA9-5612-4F97-851F-A019B6C6CFEE In Process Professional Services Agreement Standard Form - 2020 Page 3 (f) Contractor shall have the right to immediately suspend Consultant’s performance of Services under this Agreement for any reason by giving written notice to Consultant. (g) In the event of conflicts in the Contract Documents, the order of precedence, highest to lowest, shall be as follows: (1) All modifications and change orders; (2) Agreement and Attachments; and (3) The Prime Contract Documents. In the event that there is an inconsistency or conflict among any of the provisions of the Agreement and the obligations and duties arising therefrom, the provision imposing the most stringent obligation on the part of the Consultant will control. ARTICLE 2 - CONTRACTUAL RELATIONSHIP In performing the Services, Consultant shall operate as, and have the status of, an independent contractor and shall not act as or be an agent or employee of Contractor. As an independent contractor, Consultant will be solely responsible for determining the means and methods for performing the Services. ARTICLE 3 - STANDARDS FOR PERFORMANCE Contractor enters into this Agreement with Consultant based on Consultant’s special skills and expertise. Consultant agrees that Consultant will perform all Services in accordance with the highest standards of care and practices, skill and diligence customarily observed by professional services firms sharing Consultant’s special expertise in the region where the Project is located. Consultant will comply with all applicable federal, state and local laws, codes, ordinances, rules, regulations, orders and decrees of any government or quasi-government entity having jurisdiction over the Project, the Project Site or the Services (the “Law”). Consultant further agrees that the Services shall be free of defects in workmanship. Notwithstanding Contractor’s acceptance of Consultant’s work, if the Services do not meet the standards specified herein or otherwise applicable, Contractor may require Consultant to correct at no cost to Contractor any defective or non-conforming Services. In addition, and in Contractor’s sole discretion, Contractor may correct the defective or nonconforming Services itself and charge Consultant for the total cost of such correction. The foregoing remedies are in addition to all other remedies at law or in equity or under this Agreement and shall not be deemed to be exclusive. ARTICLE 4 - COMPENSATION AND PAYMENT (a) In consideration of the full, complete and proper performance of the Services by the Consultant in accordance with the terms and provisions hereof, Contractor agrees to pay or cause to be paid to the Consultant the compensation provided herein. (b) Consultant understands that all payments to Consultant will be made only from a special fund and a specific source, namely, from payments made by Owner from time to time to Contractor in respect of the Services performed by Consultant. Contractor shall make payments to Consultant within ten (10) days after DocuSign Envelope ID: 6E8FFFA9-5612-4F97-851F-A019B6C6CFEE In Process Professional Services Agreement Standard Form - 2020 Page 4 receipt by Contractor of payment from Owner for the Services of Consultant for which payment has been made (or within such shorter period as may be required by law). (c) In the event Contractor is not paid by Owner any sum claimed due to Consultant, then the timing of Contractor’s obligation to pay shall, in addition to any other conditions set forth in this Agreement, be subject to the following conditions: (i) If Contractor does not pay Consultant sums claimed due under this Agreement as a result of nonpayment by the Owner and such nonpayment is thereafter “finally adjudged” (as hereafter defined) to have been caused by a breach by Contractor of the Prime Contract, then Contractor shall pay to Consultant such sum as is due under this Agreement, inclusive of and limited to simple interest thereon at the rate of 10% per annum accruing from the date such sum was first due and owing to Consultant as set forth above. The term “finally adjudged” as used in this Paragraph 4(d)(i) shall mean the date final judgment is entered in any action between Contractor and Owner for disputes under the Prime Contract. (ii) If Contractor does not pay Consultant sums claimed due under this Agreement as a result of nonpayment by the Owner and such nonpayment is caused by the Owner’s insolvency, bankruptcy, or lack of sufficient assets, or for reasons other than a breach by Contractor of the Prime Contract as provided in Paragraph 4(d)(i) above, then Consultant’s right to payment shall be conditioned upon the passage of such time as may be reasonable and necessary for Contractor to fully exercise and exhaust to final judgment its legal, extra judicial and appellate rights and remedies for collection of sums unpaid by Owner, together with the passage of such additional time as reasonably necessary for execution and collection by Contractor of any final judgment entered in its favor. Simple interest only on such sums as are due to Consultant under this Paragraph 4(d)(ii) shall accrue and be payable to Consultant at the rate of 10% per annum commencing from the expiration of the reasonable time reserved to Contractor in this Paragraph 4(d)(ii) for recovery and collection from Owner. (iii) Consultant agrees to preserve and maintain any lien claims it may have, whether mechanic’s, construction or materialmen’s lien claims, as well as bond and stop notice rights, all to the extent any such exist with respect to the Project, and to exercise and exhaust those rights in the event that Contractor does not pay Consultant sums due under this Agreement as a result of payment default on the part of the Owner under the Prime Contract. Nothing contained herein shall be interpreted as releasing or waiving any statutory mechanic’s, construction, and materialmen’s lien, bond or stop notice right reserved to Consultant under the law; provided however, that Consultant agrees in the event Consultant asserts a claim against any statutory or common law payment or performance bond issued in connection with the Project, the surety to such bond and the Contractor (if Contractor is a principal on the bond) shall have the right to assert as a defense to such claim, the nonoccurrence of any conditions to payments set forth in this Agreement, including without limitation the failure or delay of payment to Contractor. (d) Except as otherwise set forth herein, within thirty (30) calendar days after receipt of a progress invoice, Contractor shall pay Consultant the full amount of the invoice; provided, however, that the above conditions are met; provided further, that if Contractor objects to all or any portion of any invoice, it shall notify Consultant within ten (10) calendar days from receipt of invoice of its objections and both Parties DocuSign Envelope ID: 6E8FFFA9-5612-4F97-851F-A019B6C6CFEE In Process Professional Services Agreement Standard Form - 2020 Page 5 shall immediately make every effort to settle the disputed portion of the invoice prior to the date that payment is due. In the event the settlement of a disputed portion of an invoice is not reached by the date that payment is due, then Contractor will pay only that portion of the invoice that is not in dispute. In any dispute over payment, Consultant agrees that it will continue its performance of Services to completion. (e) Consultant agrees to furnish, prior to any payments hereunder, evidence satisfactory to Contractor that payment has been made to all its employees, subconsultants, subcontractors and suppliers in the full amount for which Consultant is invoicing Contractor. Such evidence shall include, without limitation, unconditional and conditional waivers and releases duly signed by all of Consultant’s employees, subconsultants, subcontractors and suppliers that prove Consultant has paid all amounts for which Consultant is invoicing Contractor. (f) All reports, drawings, data sheets, recommendations, photographs, computer print-outs, design criterion, calculations and material of a similar nature covered by payments hereunder shall become the property of Contractor and as such are not to be revealed to, distributed to, identified to or relied upon by other parties without the prior written consent of Contractor, Consultant will comply with all reasonable requests of Contractor so that Contractor may protect and preserve all property interests herein conveyed. ARTICLE 5 – INDEMNIFICATION AND DUTY TO DEFEND (a) To the fullest extent permitted by applicable law, Consultant specifically obligates itself to protect, immediately defend, indemnify and hold Contractor, Owner and their respective officers, directors, employees, agents and representatives and any other person indemnified by Owner (hereinafter referred to as the “Indemnitees”) harmless against claims, damages, losses, costs, expenses, including any fees of accountants, attorneys, experts or other professionals, or investigation expenses, and liabilities in law or in equity arising out of the Consultant’s operations and the Consultant’s Services. Consultant’s obligations to protect, indemnify and hold Indemnitees harmless, in addition to the separate and independent duty to defend, include, but are not limited to, the following: (i) All damages, liability, penalties, costs, losses, expenses (including attorneys’ fees and costs), causes of action, demands, claims or judgments (“Losses”), for any alleged or actual violation or infringement by Consultant (or Consultant’s employees or consultants or vendors of any tier) of any law, statute, codes, safety or occupational health orders, rules, regulations, standards, orders or any patent or patent right; (ii) All Losses resulting from injury to or death of any person (including Consultant’s employees) or damage to property of any kind (including economic loss), including the Services or the work of others on the Project, which injury, death or damage arises out of or is in any way connected with the performance of the Services; (iii) All Losses arising from: (1) construction liens, mechanics’ liens, or other materialman’s lien of any sort, stop notice claims and payment bond claims made by any sub-consultant, suppliers, laborers, rental companies, or the like, and (2) claims and liens for labor taxes, materials, appliances, equipment, and supplies whatsoever, including any costs, attorneys’ fees, and incidental damage resulting therefrom; and for failure by Consultant or any party acting on Consultant’s behalf to comply with DocuSign Envelope ID: 6E8FFFA9-5612-4F97-851F-A019B6C6CFEE In Process Professional Services Agreement Standard Form - 2020 Page 6 all laws, ordinances and regulations of all governmental authorities in any manner relating to the Services; (iv) Any and all claims, suits, and liability for Consultant’s failure or alleged failure to comply with the terms of this Agreement; and (b) To the fullest extent permitted by applicable law, Consultant’s indemnity and hold harmless obligations hereunder shall apply to any acts, omissions, willful misconduct, negligent conduct, other fault, or liability without fault of any person or entity, including but not limited to Consultant’s agents, employees, sub-consultants, and any other individual or entity for whom Consultant may be responsible, whether active or passive, and whether or not sole or concurrent with that of any other person or entity; except that this indemnity obligation shall not require that Consultant indemnify any of the persons or entities named as Indemnitees herein against claims arising from his, her, or its active negligence or willful misconduct. (c) Consultant acknowledges the separate and independent duty to defend set forth in this paragraph, and shall defend the referenced parties upon demand regardless of whether any indemnification obligations later arise. Consultant agrees that it shall, at its own cost, expense and risk, immediately upon tender, defend the Indemnitees in any and all claims, demands, actions, lien actions, suits or other legal, arbitral, administrative or other proceedings which may be brought or instituted against Indemnitees. In providing such defense, Consultant may appoint counsel of its choice, however, such counsel shall be (i) experienced and capable of effectively handling the subject matter assigned, and (ii) free of all conflicts of interests, biases and prejudices against indemnified parties. Consultant’s duty to defend the Indemnitees, as set forth above, shall arise immediately upon notification and demand by an Indemnitee to Consultant. Alternatively, Consultant may elect to pay, within 30 days of receipt of an invoice from Contractor its allocable share of Contractor’s defense fees and costs on an ongoing basis during the pendency of a claim. If Consultant fails to timely and adequately perform its obligations under this Article 5, Contractor shall have the right to pursue a claim against the Consultant for any resulting compensatory damages, interest on defe nse and indemnity costs, from the date incurred, consequential damages, and reasonable attorneys’ fees incurred to recover these amounts. ARTICLE 6 - INSURANCE (a) Prior to commencing the performance of the Services, Consultant shall procure, and thereafter maintain, at its own expense, for as long as this Agreement is in effect, the insurance coverage as set forth below in a form and from insurers acceptable to Contractor; and shall provide Contractor with certificates evidencing such coverage. Each certificate shall state that the insurer will give Contractor thirty (30) days prior written notice of any cancellation or material change in the policy(ies): (i) Worker's Compensation insurance, including Occupational Disease insurance, meeting the statutory requirements of the state in which work is to be performed, together with Broad Form All States Endorsement and containing Employer's liability insurance in an amount of at least $1,000,000 and a Waiver of Subrogation endorsement to the policy in favor of Swinerton Builders, its parent and affiliates. DocuSign Envelope ID: 6E8FFFA9-5612-4F97-851F-A019B6C6CFEE In Process Professional Services Agreement Standard Form - 2020 Page 7 (ii) Commercial General Liability Coverage under ISO form #CG0001- 1001or its equivalent with Liability Limits for Bodily Injury and Property Damage of not less than: $1,000,000 each Occurrence; $1,000,000 Products/Completed Operations Aggregate; $1,000,000 General Aggregate if applicable separately to this project and Defense Costs are in addition to the Aggregate limit. $2,000,000 General Aggregate if not applicable separately to this project or if Defense Costs are included in the Aggregate limit. Payment and/or satisfaction of any deductible shall be the sole and exclusive responsibility of Consultant. No portion of Consultant’s obligation to provide general liability and excess/umbrella insurance shall be satisfied by self-insurance or a self-insured retention absent the express written consent of the Contractor and the Owner. (iii) Business automobile insurance with limits of liability for bodily injury and property damage of $1,000,000 per accident. Such insurance shall apply on an “any auto” basis. (iv) Professional Liability Policy with Limited Contractual Liability Coverage in favor of Contractor and Owner and a deductible no greater than $25,000 per claim. This insurance shall be maintained for not less than the duration of the project and 5 years following completion of construction (tail). Retroactive date of such policy must be on or before the date Consultant began performing professional services on this Project. Insurer shall waive subrogation rights against Contractor and Owner and any other entity required in the prime contract. Limit of liability shall be not less than: Consultants: $1,000,000 per Claim Engineers: $2,000,000 per Claim (b) Consultant’s assumption of liability is independent from, and not limited in any manner by, the Consultant’s insurance coverage obtained pursuant to this Article 6 or otherwise. All amounts owed by Consultant to Contractor as a result of the liability provisions of this Agreement shall be paid on demand. (c) Consultant shall include the following entities as Additional Insureds on the General Liability policy required pursuant to this Agreement:  Swinerton Builders, its parent and affiliated companies;  CITY OF SAN LUIS OBISPO;  other name if applicable  Other parties as required by Owner in Prime Contract. ARTICLE 7 - ASSIGNMENT AND SUBCONTRACTING Consultant shall not assign this Agreement or funds due under this Agreement without the prior written consent of Contractor. Any assignment, subletting or delegation, in whole or in part, by Consultant of this Agreement, of the Services or of any claims arising hereunder without the prior written consent of Contractor shall be void. However, with the written consent of Contractor, which shall not be unreasonably withheld, Consultant may employ suitably trained and skilled persons or firms under contract with Consultant to perform a part of Consultant’s Services. Contractor shall have the right in its DocuSign Envelope ID: 6E8FFFA9-5612-4F97-851F-A019B6C6CFEE In Process Professional Services Agreement Standard Form - 2020 Page 8 sole discretion, and without Consultant’s consent, to assign its rights and obligations under this Agreement, as well as any claims arising hereunder, as allowable under the applicable law. ARTICLE 8 - TERMINATION Contractor shall have the right to terminate this Agreement, in whole or part, for convenience, by providing Consultant three (3) days written notice of termination. Upon expiration of the three (3) days, this Agreement will terminate and Consultant shall be paid the amount earned or reimbursable to it hereunder to the time specified in the Notice of Termination, including all reasonable actual costs incurred by Consultant in connection with discontinuing the Services unless Consultant is otherwise in breach of this Agreement. If Consultant is in breach of this Agreement, Contractor shall have the right to terminate this Agreement for cause, in which case Consultant shall be liable for all costs, damages and remedies at law and equity available to Contractor, including the costs incurred by Contractor to complete the Services. If Contractor is subsequently deemed to have wrongfully terminated Consultant for cause, such termination shall be treated as though it had been one for convenience pursuant to this Article 8, and Consultant shall only be entitled to such compensation as it would have been entitled to for a termination for convenience. Consultant shall have no further claim against Contractor with respect thereto. ARTICLE 9 - TAXES AND PERMITS (a) Consultant agrees to pay and comply with and hold Contractor harmless against the payment of all contributions, premiums or taxes of whatever nature, including any interest or penalties, which may be payable by it under any Federal, State or local laws arising out of the performance of this Agreement. (b) Consultant shall obtain and pay for all permits, plan checks, licenses, fees and certificates of inspection which may be necessary for the prosecution and completion of its duties and obligations hereunder, and shall arrange for any applicable inspections and approvals by public officials. ARTICLE 10 - LAWS, REGULATIONS, ORDINANCES (a) This Agreement shall be construed and enforced in accordance with the laws of the State where the Project is located, excluding choice of law rules. Venue for any legal action shall be in the State where the Project is located. (b) Consultant agrees to be bound by and, at its own cost, comply with all Federal, State and local laws, codes, ordinances, regulations and licensing requirements applicable to the performance of its duties and obligations hereunder. ARTICLE 11 – DISPUTES AND DISPUTE RESOLUTION (a) A Dispute shall arise when Contractor denies or otherwise challenges a timely claim brought by Consultant or the Parties have another form of disagreement arising from the Agreement (collectively “Dispute”). A Dispute shall also include any claim by Consultant that Contractor believes, in its discretion, involves, in whole or in part, disputes or claims between the Contractor and a third-party, including without limitation the Owner. DocuSign Envelope ID: 6E8FFFA9-5612-4F97-851F-A019B6C6CFEE In Process Professional Services Agreement Standard Form - 2020 Page 9 (b) Consultant shall not delay or postpone any Services pending resolution of any Dispute except as the Contractor and Consultant may otherwise agree in writing. Pending final resolution of a Dispute, including exhaustion of all applicable dispute resolution procedures, Consultant shall proceed diligently with the performance of the Services, including any disputed work, and based on such performance, Contractor shall continue to make payments for undisputed Services in accordance with this Agreement. (c) Disputes under the Prime Contract. If any Dispute between Consultant and Contractor arising out of or relating to this Agreement pertains in any way to a claim, dispute, or matter in question between Contractor and Owner arising out of or relating to the Prime Contract (“Related Prime Contract Dispute”), then this Dispute will be decided using the process utilized for the Related Prime Contract Dispute, and the laws governing the resolution of Prime Contract disputes, regardless of whether Consultant formally joins the process as a litigant or named party. Any and all claims of the Consultant related to a Related Prime Contract Dispute shall be handled in this manner. Consultant agrees to: (i) cooperate with Contractor, (ii) assist in the discovery and other preparations for the hearing, (iii) make its employees available for testimony before and after the hearing, (iv) share proportionately the legal fees and costs associated with the preparation for and execution of the hearing to the extent mutually agreed upon related to the amount of damage being pursued by the Contractor on Consultant’s behalf, and (v) stay any action filed by the Consultant against Contractor as long as the Consultant’s position is being diligently pursued by the Contractor in the hearing where the Related Prime Contract Dispute is being heard, and until all such appeals pertaining to the Related Prime Contract Dispute are exhausted. Consultant will be bound by the results of the dispute resolution procedure controlling the Related Prime Contract Dispute as it relates to Consultant, and such results shall be final. Nothing in this Agreement shall allow Consultant to be a named party in a dispute forum being utilized by Contractor and Owner where that Consultant has no legal standing to litigate its disputes before that forum. (1) Disputes between Contractor and Consultant. In the event that either (i) the provisions for resolution of Disputes between Contractor and Owner contained in the Prime Contract Documents do not permit joinder with disputes of third parties, such as Consultant, and Contractor elects not to enter into a liquidating agreement with Consultant, or (ii) if such Dispute is only between Contractor and Consultant, then the Parties shall submit the Disputes to the dispute resolution procedure set forth in Paragraphs 11(d) and 11(e) below. Contractor reserves the right to seek consolidation of any mediation, lawsuit or arbitration arising under this Agreement with any mediation, lawsuit or arbitration relating to disputes between Contractor and Owner. (2) Mediation between Contractor and Consultant. The Parties shall endeavor to resolve their Disputes through mediation. Any such mediation proceedings shall be under the auspices of and governed by the rules of the Prime Contract Documents. If the Prime Contract Documents do not provide rules for mediation, the mediation shall be governed by the Construction Industry Mediation Rules of the American Arbitration Association or the Parties may mutually agree to select another set of mediation rules. However, if the Project is in Hawaii, Parties agree that the mediation shall be conducted by Dispute Prevention & Resolution, Inc., and governed by its Mediation Rules. Neither Party shall proceed with arbitration or litigation until the completion of the mediation process. The costs of the mediator shall be shared equally by the Parties. (i) A request for mediation shall be filed in writing with the other Party to this A greement. The request may be made concurrently with the filing of a demand for arbitration or litigation but, in such event, mediation shall proceed in advance of arbitration or legal or equitable proceedings, which shall be stayed pending mediation for a period of 60 days DocuSign Envelope ID: 6E8FFFA9-5612-4F97-851F-A019B6C6CFEE In Process Professional Services Agreement Standard Form - 2020 Page 10 from the date of filing, unless stayed for a longer period by agreement of the Parties or court order. (ii) The mediation shall be held in the city or county where the Project is located, unless another location is mutually agreed upon. If the Project is located in Hawaii, it shall be held at the Honolulu office of Dispute Prevention & Resolution, Inc., unless Parties otherwise agree in writing. Any agreements reached in mediation shall be enforceable as settlement agreements in any court having jurisdiction thereof. (d) WAIVER OF JURY TRIAL. Unless otherwise agreed to in writing, for disputes that are not governed by Paragraph 11(c) above, Parties agree to resolve such disputes in either the state or federal court having jurisdiction of the matter in the location of the Project. THE PARTIES WAIVE THE RIGHT TO A JURY TRIAL, AND AGREE THAT THEIR DISPUTE WILL BE DETERMINED BY A JUDGE. THE PARTIES SPECIFICALLY AGREE AND ACKNOWLEDGE THAT THE NATURE AND COMPLEXITY OF CONSTRUCTION DISPUTES IS SUCH THAT MATTERS ARE BETTER AND MORE EFFICIENTLY DECIDED BY A JUDGE RATHER THAN A JURY. (e) Joinder of Other Parties. Consultant shall include in each of its contracts with its subconsultants a specific provision whereby the necessary party agrees to be joined or consolidated with any dispute procedure between Contractor and Consultant. Further, the Contractor and Consultant grant to any person or entity made a party to and conducted under this Section, whether by joinder or consolidation, the same rights of joinder and consolidation as the Contractor and Consultant under this Agreement. ARTICLE 12 - LICENSES To the extent required or applicable, Consultant warrants that it is currently licensed and in good standing to practice the profession and provide the Services in the state or jurisdiction where performed. ARTICLE 13 - ENTIRE AGREEMENT This Agreement represents the entire agreement between the Parties hereto with respect to the matters covered herein. No other agreements, representations, warranties or statements, whether oral or written, shall be binding on either party. ARTICLE 14 – SAVINGS CLAUSE If any portion of this Agreement is determined to be void, voidable or illegal, such portion shall be deemed severed from the other portions of this Agreement that are not void, voidable or illegal and such other portions shall be enforceable in accordance with their terms. No waiver of any provision or breach of this Agreement shall constitute a waiver of any other provision or breach of this Agreement. ARTICLE 15 - ATTORNEYS FEES AND COSTS In the event legal action is initiated to enforce the provisions of this Agreement, the prevailing party shall be awarded reasonable attorney’s fees and costs expended, including the costs of experts. ARTICLE 16 – WAIVER OF CONSEQUENTIAL AND PUNITIVE DAMAGES DocuSign Envelope ID: 6E8FFFA9-5612-4F97-851F-A019B6C6CFEE In Process Professional Services Agreement Standard Form - 2020 Page 11 With the exception of the express reservation contained herein, the Parties mutually waive claims against each other for consequential damages arising out of or relating to this Agreement. This waiver applies to all claims for any consequential, special, incidental, indirect, punitive or exemplary damages, and the Parties hereby release each other from any such liability; provided, however, that this limitation of liability shall not affect Consultant’s obligations under Article 5, for any such damages that may be owed to the Owner or other third parties, or to the extent that any such damages are recoverable from insurance. ARTICLE 17 – COUNTERPARTS AND ELECTRONIC SIGNATURES Contractor may establish a procedure by which the Agreement, or any one or more of the document issued under, pursuant to or in connection with the Agreement may be signed by one or both Parties using an electronic signature methodology designated by Contractor in its sole discretion. In such event, upon written notice to Consultant, Contractor may require that such documents be executed using such electronic signature methodology and the Parties’ use of such electronic signature methodology will be considered as binding as an ink or facsimile signature by a Party and may be relied upon by both Parties. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by their duly authorized representatives on the day and year above written. PROJECT NAME: City of San Luis Obispo Cultural Arts District Parking Structure HIVE ENGINEERING, Subcontractor SWINERTON BUILDERS, Contractor By: By: Name Dan Parker-King Name Kevin Hermreck Title President Title Project Manager Subcontractor License No: Swinerton License No: 092 DocuSign Envelope ID: 6E8FFFA9-5612-4F97-851F-A019B6C6CFEE 10/30/2023 C74672 In Process Certificate Of Completion Envelope Id: 6E8FFFA956124F97851FA019B6C6CFEE Status: Sent Subject: 23049042 City of Luis Obispo Cultural Arts District PS | HIVE ENGINEERING PSA Source Envelope: Document Pages: 13 Signatures: 1 Envelope Originator: Certificate Pages: 5 Initials: 2 Maria Sebastian AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) 2300 Clayton Road 8th Floor Concord, CA 94520 maria.sebastian@swinerton.com IP Address: 12.174.77.202 Record Tracking Status: Original 10/26/2023 1:22:34 PM Holder: Maria Sebastian maria.sebastian@swinerton.com Location: DocuSign Signer Events Signature Timestamp Kevin Hermreck khermreck@swinerton.com Project Manager Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 66.27.56.2 Sent: 10/27/2023 3:18:27 PM Viewed: 10/27/2023 3:22:49 PM Signed: 10/27/2023 3:23:24 PM Electronic Record and Signature Disclosure: Accepted: 8/22/2022 2:41:38 PM ID: 366730e7-3521-4806-9a86-a2c4025e19de Dan Parker-King dan@hiveengineering.us Security Level: Email, Account Authentication (None), Access Code Signature Adoption: Pre-selected Style Using IP Address: 68.78.72.225 Sent: 10/27/2023 3:23:26 PM Viewed: 10/30/2023 10:36:49 AM Signed: 10/30/2023 10:38:01 AM Electronic Record and Signature Disclosure: Accepted: 10/30/2023 10:36:49 AM ID: df07f082-0d34-4b06-94ba-583803619780 Kevin Hermreck khermreck@swinerton.com Project Manager Security Level: Email, Account Authentication (None) Sent: 10/30/2023 10:38:03 AM Electronic Record and Signature Disclosure: Accepted: 8/22/2022 2:41:38 PM ID: 366730e7-3521-4806-9a86-a2c4025e19de In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp In Process Carbon Copy Events Status Timestamp Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 10/27/2023 3:18:27 PM Payment Events Status Timestamps Electronic Record and Signature Disclosure In Process CONSUMER DISCLOSURE From time to time, Swinerton Builders (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through your DocuSign, Inc. (DocuSign) Express user account. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to these terms and conditions, please confirm your agreement by clicking the æI agreeÆ button at the bottom of this document. Getting paper copies At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. For such copies, as long as you are an authorized user of the DocuSign system you will have the ability to download and print any documents we send to you through your DocuSign user account for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.10 per-page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. To indicate to us that you are changing your mind, you must withdraw your consent using the DocuSign ôWithdraw Consentö form on the signing page of your DocuSign account. This will indicate to us that you have withdrawn your consent to receive required notices and disclosures electronically from us and you will no longer be able to use your DocuSign Express user account to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through your DocuSign user account all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. How to contact Swinerton Builders: Electronic Record and Signature Disclosure created on: 6/14/2012 9:15:29 AM Parties agreed to: Kevin Hermreck, Dan Parker-King, Kevin Hermreck In Process You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: bjohnston@swinerton.com To advise Swinerton Builders of your new e-mail address To let us know of a change in your e-mail address where we should send notices and disclosures electronically to you, you must send an email message to us at Project Manager or Project Assistant and in the body of such request you must state: your previous e-mail address, your new e-mail address. We do not require any other information from you to change your email address.. In addition, you must notify DocuSign, Inc to arrange for your new email address to be reflected in your DocuSign account by following the process for changing e-mail in DocuSign. To request paper copies from Swinerton Builders To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an e-mail to bjohnston@swinerton.com and in the body of such request you must state your e-mail address, full name, US Postal address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with Swinerton Builders To inform us that you no longer want to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your DocuSign account, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an e-mail to bjohnston@swinerton.com and in the body of such request you must state your e-mail, full name, IS Postal Address, telephone number, and account number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software Operating Systems: Windows2000¬ or WindowsXP¬ Browsers (for SENDERS): Internet Explorer 6.0¬ or above Browsers (for SIGNERS): Internet Explorer 6.0¬, Mozilla FireFox 1.0, NetScape 7.2 (or above) Email: Access to a valid email account Screen Resolution: 800 x 600 minimum In Process Enabled Security Settings: ò Allow per session cookies ò Users accessing the internet behind a Proxy Server must enable HTTP 1.1 settings via proxy connection ** These minimum requirements are subject to change. If these requirements change, we will provide you with an email message at the email address we have on file for you at that time providing you with the revised hardware and software requirements, at which time you will have the right to withdraw your consent. Acknowledging your access and consent to receive materials electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please verify that you were able to read this electronic disclosure and that you also were able to print on paper or electronically save this page for your future reference and access or that you were able to e-mail this disclosure and consent to an address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format on the terms and conditions described above, please let us know by clicking the æI agreeÆ button below. By checking the æI AgreeÆ box, I confirm that:  I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF ELECTRONIC CONSUMER DISCLOSURES document; and  I can print on paper the disclosure or save or send the disclosure to a place where I can print it, for future reference and access; and  Until or unless I notify Swinerton Builders as described above, I consent to receive from exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to me by Swinerton Builders during the course of my relationship with you. In Process SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 51 APPENDIX E CONTRACTOR/SUBCONTRACTOR INFORMATION SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 52 Contractor Name Discipline Contact Title Phone Email Swinerton Builders GC Daniel O’Connel Superintendent 949.491.6584 Daniel.OConnell@swinerton.com Hive Engineering SWPPP Dan Parker-King QSP 805-550-8546 dan@hiveengineering.us Additional subcontractor(s) will be named later. SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 53 APPENDIX F SWPPP TRAINING LOG SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 54 Trained Contractor Personnel Log Stormwater Management Training Log and Documentation Project Name: WDID #: 3 40C399332 Stormwater Management Topic: (check as appropriate)  Erosion Control  Wind Erosion Control  Non-Stormwater Management Stormwater Sampling  Sediment Control Tracking Control  Waste Management and Materials Pollution Control Objective: Location: Date: Instructor: Telephone Course Length Attendee Roster (Attach additional forms if necessary) Name Company Phone As needed, add proof of external training (e.g., course completion certificates, credentials for QSP, QSD). SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 55 APPENDIX G SITE MAP EROSION CONTROL PLAN SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 56 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 57 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 58 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 59 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 60 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 61 APPENDIX H RISK LEVEL CALCULATIONS SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 62 A B C 1 Sediment Risk Factor Worksheet Entry 2 A) R Factor 3 Analyses of data indicated that when factors other than rainfall are held constant, soil loss is directly proportional to a rainfall factor composed of total storm kinetic energy (E) times the maximum 30-min intensity (I30) (Wischmeier and Smith, 1958). The numerical value of R is the average annual sum of EI30 for storm events during a rainfall record of at least 22 years. "Isoerodent" maps were developed based on R values calculated for more than 1000 locations in the Western U.S. Refer to the link below to determine the R factor for the project site. 4 http://cfpub.epa.gov/npdes/stormwater/LEW/lewCalculator.cfm 5 R Factor Value 71.48 6 B) K Factor (weighted average, by area, for all site soils) 7 The soil-erodibility factor K represents: (1) susceptibility of soil or surface material to erosion, (2) transportability of the sediment, and (3) the amount and rate of runoff given a particular rainfall input, as measured under a standard condition. Fine- textured soils that are high in clay have low K values (about 0.05 to 0.15) because the particles are resistant to detachment. Coarse-textured soils, such as sandy soils, also have low K values (about 0.05 to 0.2) because of high infiltration resulting in low runoff even though these particles are easily detached. Medium-textured soils, such as a silt loam, have moderate K values (about 0.25 to 0.45) because they are moderately susceptible to particle detachment and they produce runoff at moderate rates. Soils having a high silt content are especially susceptible to erosion and have high K values, which can exceed 0.45 and can be as large as 0.65. Silt-size particles are easily detached and tend to crust, producing high rates and large volumes of runoff. Use Site- specific data must be submitted. 8 Site-specific K factor guidance 9 K Factor Value 0.24 10 C) LS Factor (weighted average, by area, for all slopes) 11 The effect of topography on erosion is accounted for by the LS factor, which combines the effects of a hillslope-length factor, L, and a hillslope-gradient factor, S. Generally speaking, as hillslope length and/or hillslope gradient increase, soil loss increases. As hillslope length increases, total soil loss and soil loss per unit area increase due to the progressive accumulation of runoff in the downslope direction. As the hillslope gradient increases, the velocity and erosivity of runoff increases. Use the LS table located in separate tab of this spreadsheet to determine LS factors. Estimate the weighted LS for the site prior to construction. 12 LS Table 13 LS Factor Value 1.25 14 15 Watershed Erosion Estimate (=RxKxLS) in tons/acre 21 16 Site Sediment Risk Factor MEDIUM 17 Low Sediment Risk: < 15 tons/acre 18 Medium Sediment Risk: >=15 and <75 tons/acre 19 High Sediment Risk: >= 75 tons/acre 20 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 63 Receiving Water (RW) Risk Factor Worksheet Entry Score A. Watershed Characteristics yes/no A.1. Does the disturbed area discharge (either directly or indirectly) to a 303(d)-listed waterbody impaired by sediment (For help with impaired waterbodies please visit the link below) or has a USEPA approved TMDL implementation plan for sediment?: YES HIGH http://www.waterboards.ca.gov/water_issues/programs/tmdl/integrated2010.shtml OR A.2. Does the disturbed area discharge to a waterbody with designated beneficial uses of SPAWN & COLD & MIGRATORY? (For help please review the appropriate Regional Board Basin Plan) http://www.waterboards.ca.gov/waterboards_map.shtml Region 1 Basin Plan Region 2 Basin Plan Region 3 Basin Plan Region 4 Basin Plan Region 5 Basin Plan Region 6 Basin Plan Region 7 Basin Plan Region 8 Basin Plan Region 9 Basin Plan Receiving Water Risk Sediment Risk Low Medium High Low Level 1 Level 2 High Level 2 Level 3 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 64 APPENDIX I CHAIN-OF-CUSTODY (COC) FORM SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering DESTINATION LAB: ATTN: ADDRESS: Office Phone: Cell Phone: REQUESTED ANALYSIS Notes: SAMPLED BY: Contact: Facility Name Client Sample ID Sample Date Sample Time Sample Matrix Container # Type Pres. SENDER COMMENTS: RELINQUISHED BY Signature: Print: Company: Date: TIME: LABORATORY COMMENTS: RECEIVED BY Signature: Print: Company: Date: TIME: SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering APPENDIX J SWPPP AMENDMENT(S) & LOG SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering Amendment Log Facility Name: Cultural Arts district Parking Structure Waste Discharge Identification (WDID): 565511 Amendment No. Date Page and Section No. Requested By Brief Description of Amendment; include reason for change, site location, and BMP modifications. Prepared and Approved By 1 8/31/23 2.1 C.1.0 DPK Update risk level based on proximity to waterbody. Updated detail for inlet protection based on phasing DPK 11/1/23 SWPPP Document DPK Updated for new contractor, and new phase. DPK SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering APPENDIX K CORRECTIVE ACTION LOG SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering EXAMPLE Corrective Action Log Project Name: ______________________________________________ NPDES ID Number: __________________________________________ Section A – Individual Completing this Log Name: Title: Company Name: Email: Address: Phone Number: Section B – Details of the Problem (CGP Part 5.4.1.a) Complete this section within 24 hours of discovering the condition that triggered corrective action. Date problem was first identified: Time problem was first identified: What site conditions triggered this corrective action? (Check the box that applies. See instructions for a description of each triggering condition (1 thru 6).)  ☐ 1 ☐ 2 ☐ 3 ☐ 4 ☐ 5a ☐ 5b ☐ 6 Specific location where problem identified: Provide a description of the specific condition that triggered the need for corrective action and the cause (if identifiable): Section C – Corrective Action Completion (CGP Part 5.4.1.b) Complete this section within 24 hours after completing the corrective action. For site condition # 1, 2, 3, 4, or 6 (those not related to a dewatering discharge) confirm that you met the following deadlines (CGP Part 5.2.1): ☐ Immediately took all reasonable steps to address the condition, including cleaning up any contaminated surfaces so the material will not discharge in subsequent storm events. AND ☐ Completed corrective action by the close of the next business day, unless a new or replacement control, or significant repair, was required. OR ☐ Completed corrective action within seven (7) calendar days from the time of discovery because a new or replacement control, or significant repair, was necessary to complete the installation of the new or modified control or complete the repair. OR ☐ It was infeasible to complete the installation or repair within 7 calendar days from the time of discovery. Provide the following additional information: Explain why 7 calendar days was infeasible to complete the installation or repair: SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering Provide your schedule for installing the stormwater control and making it operational as soon as feasible after the 7 calendar days: For site condition # 5a, 5b, or 6 (those related to a dewatering discharge), confirm that you met the following deadlines: ☐ Immediately took all reasonable steps to minimize or prevent the discharge of pollutants until a solution could be implemented, including shutting off the dewatering discharge as soon as possible depending on the severity of the condition taking safety considerations into account. ☐ Determined whether the dewatering controls were operating effectively and whether they were causing the conditions. ☐ Made any necessary adjustments, repairs, or replacements to the dewatering controls to lower the turbidity levels below the benchmark or remove the visible plume or sheen. Describe any modification(s) made as part of corrective action: (Insert additional rows below if applicable) Date of completion: SWPPP update necessary? If yes, date SWPPP was updated: 1. ☐ Yes ☐ No 2. ☐ Yes ☐ No Section D - Signature and Certification (CGP Part 5.4.2) “I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information contained therein. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information contained is, to the best of my knowledge and belief, true, accurate, and complete. I have no personal knowledge that the information submitted is other than true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.” MANDATORY: Signature of Operator or “Duly Authorized Representative:” Signature: Date: Printed Name: Affiliation: OPTIONAL: Signature of Contractor or Subcontractor Signature: Date: Printed Name: Affiliation: SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering General Instructions This Corrective Action Log Template is provided to assist you creating a corrective action log that complies with the minimum reporting requirements of Part 5.4 of the EPA’s Construction General Permit (CGP). For each triggering condition on your site, you will need to fill out a separate corrective action log. The entire form must be completed to be compliant with the requirements of the permit. (Note: In Section C, if you do not need the number of rows provided in the corrective action log, you may delete these or cross them off. Alternatively, if you need more space to describe any modifications, you may insert additional rows in the electronic version of this form or use the bottom of the page in the field version of this form.) If you are covered under a State CGP, this template may be helpful in developing a log that can be used for that permit; however, you will likely need to modify this form to meet the specific requirements of any State-issued permit. If your permitting authority requires you to use a specific corrective action log, you should not use this template. Instructions for Section A Individual completing this form Enter the name of the person completing this log. Include the person’s contact information (title, affiliated company name, address, email, and phone number). Instructions for Section B You must complete Section B within 24 hours of discovering the condition that triggered corrective action. (CGP Part 5.4) When was the problem first discovered? Specify the date and time when the triggering condition was first discovered. What site conditions triggered this corrective action? (CGP Parts 5.1 and 5.3) Check the box corresponding to the numbered triggering condition below that applies to your site. 1. A stormwater control needs a significant repair or a new or replacement control is needed, or, in accordance with Part Error! Reference source not found., you find it necessary to repeatedly (i.e., 3 or more times) conduct the same routine maintenance fix to the same control at the same location (unless you document in your inspection report under Part Error! Reference source not found. that the specific reoccurrence of this same problem should still be addressed as a routine maintenance fix under Part Error! Reference source not found.); 2. A stormwater control necessary to comply with the requirements of this permit was never installed, or was installed incorrectly; 3. Your discharges are not meeting applicable water quality standards; 4. A prohibited discharge has occurred (see Part 1.3); 5. During discharge from site dewatering activities: a. The weekly average of your turbidity monitoring results exceeds the 50 NTU benchmark (or alternate benchmark if approved by EPA pursuant to Part Error! Reference source not found.); or b. You observe or you are informed by EPA, State, or local authorities of the presence of any of the following at the point of discharge to a receiving water flowing through or immediately adjacent to your site and/or to constructed or natural site drainage features or storm drain inlets: · sediment plume · suspended solids · unusual color · presence of odor SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering · decreased clarity · presence of foam · visible sheen on the water surface or visible oily deposits on the bottom or shoreline of the receiving water 6. EPA requires corrective action as a result of permit violations found during an inspection carried out under Part 4.8. Provide a description of the problem (CGP Part 5.4.1.a) Provide a summary description of the condition you found that triggered corrective action, the cause of the problem (if identifiable), and the specific location where it was found. Be as specific as possible about the location; it is recommended that you refer to a precise point on your site map. Instructions for Section C You must complete Section C within 24 hours after completing the correction action. (CGP Part 5.4) Deadlines for completing corrective action for condition # 1, 2, 3, 4, or 6 (if not relating to a dewatering discharge) (CGP Part 5.2.1) Check the box to confirm that you met the deadlines that apply to each triggering condition. You are always required to check the first box (i.e., Immediately took all reasonable steps to address the condition, including cleaning up any contaminated surfaces so the material will not discharge in subsequent storm events.). Only one of the next three boxes should be checked depending on the situation that applies to this corrective action. Check the second box if the corrective action for this particular triggering condition does not require a new or replacement control, or a significant repair. These actions must be completed by the close of the next business day from the time of discovery of the condition. Check the third box if the corrective action for this particular triggering condition requires a new or replacement control, or a significant repair. These actions must be completed by no later than seven calendar days from the time of discover of the condition. Check the fourth box if the corrective action for this particular triggering condition requires a new or replacement control, or a significant repair, and if it is infeasible to complete the work within seven calendar days. Additionally, you will need to fill out the table below the checkbox that requires: 1. An explanation as to why it was infeasible to complete the installation or repair within seven calendar days of discovering the condition. 2. Provide the schedule you will adhere to for installing the stormwater control and making it operational as soon as feasible after the seventh day following discovery. Note: Per Part 5.2.1.c, where these actions result in changes to any of the stormwater controls or procedures documented in your SWPPP, you must modify your SWPPP accordingly within seven calendar days of completing this work. Deadlines for completing corrective action for condition # 5a, 5b, or 6 related to a dewatering discharge (CGP Part 5.2.2) These deadlines apply to conditions relating to construction dewatering activities. Check the box to confirm that you met the deadlines that apply to each triggering condition. You are required to check all of the boxes in this section to indicate your compliance with the corrective action deadlines. List of modification(s) to correct problem Provide a list of modifications you completed to correct the problem. Date of completion Enter the date you completed the modification. The work must be completed by the deadline you indicated above. SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering SWPPP update necessary? Check “Yes” or “No” to indicate if a SWPPP update is necessary consistent with Part 7.4.1.a in order to reflect changes implemented at your site. If “Yes,” then enter the date you updated your SWPPP. The SWPPP updates must be made within seven calendar days of completing a corrective action. (CGP Part 5.2.1.c) Instructions for Section D Each corrective action log entry must be signed and certified following completion of Section D to be considered complete. (CGP Part 5.4.2) Operator or “Duly Authorized Representative” – MANDATORY (CGP Appendix G Part G.11.2 and CGP Appendix H Section X) At a minimum, the corrective action log must be signed by either (1) the person who signed the NOI, or (2) a duly authorized representative of that person. The following requirements apply: If the signatory will be the person who signed the NOI for permit coverage, as a reminder, that person must be one of the following types of individuals: · For a corporation: By a responsible corporate officer. For the purpose of this subsection, a responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy- or decision-making functions for the corporation, or (ii) the manager of one or more manufacturing, production, or operating facilities, provided, the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long term environmental compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. · For a partnership or sole proprietorship: By a general partner or the proprietor, respectively. · For a municipality, State, Federal, or other public agency: By either a principal executive officer or ranking elected official. For purposes of this subsection, a principal executive officer of a Federal agency includes (i) the chief executive officer of the agency, or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency (e.g., Regional Administrator of EPA). If the signatory will be a duly authorized representative, the following requirements must be met: · The authorization is made in writing by the person who signed the NOI (see above); · The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity such as the position of plant manager, operator of a well or a well field, superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative may thus be either a named individual or any individual occupying a named position); and · The signed and dated written authorization is included in the SWPPP. A copy must be submitted to EPA, if requested. Sign, date and print your name and affiliation. SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering Contractor or Subcontractor - OPTIONAL Where you rely on a contractor or subcontractor to complete this log and the associated corrective action, you should consider requiring the individual(s) to sign and certify each log entry. Note that this does not relieve you, the permitted operator, of the requirement to sign and certify the log as well. If applicable, sign, date, and print your name and affiliation. Recordkeeping Logs must be retained for at least 3 years from the date your permit coverage expires or is terminated. (CGP Part 5.4.4) Keep copies of your signed corrective action log entries at the site or at an easily accessible location so that it can be made immediately available at the time of an on-site inspection or upon request by EPA. (CGP Part 5.4.3) Include a copy of the corrective action log in your SWPPP. (CGP Part 7.2.7.e) Note While EPA has made every effort to ensure the accuracy of all instructions contained in this template, it is the permit, not this template, that determines the actual obligations of regulated construction stormwater discharges. In the event of a conflict between this template and any corresponding provision of the CGP, you must abide by the requirements in the permit. EPA welcomes comments on this Corrective Action Log Template at any time and will consider those comments in any future revision. You may contact EPA for CGP-related inquiries at cgp@epa.gov SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering APPENDIX L SAMPLING LOG SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering Visual Observation Log - Monthly Date and Time of Inspection: Report Date: Facility Name: Weather Antecedent Conditions (last 48 hours): Current Weather: NSWD Observations Were any authorized non-stormwater discharges observed? Yes □ No □ Were any unauthorized non-stormwater discharges observed? Yes □ No □ If yes to either, identify source: Outdoor Industrial Equipment and Storage Area Observations Complete Monthly BMP Inspection Report Yes □ No □ Drainage Area 1: Were any deficiencies or any other potential source of industrial pollutants observed? Yes □ No □ Drainage Area 2: Were any deficiencies or any other potential source of industrial pollutants observed? Yes □ No □ Drainage Area 3: Were any deficiencies or any other potential source of industrial pollutants observed? Yes □ No □ If yes to any, describe: Exception Documentation (explanation required if inspection could not be conducted). Inspector Information Inspector Name: Inspector Title: Signature: Date: SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering Visual Observation Log – Sampling Events Date and Time of Inspection: Report Date: Facility Name: Weather Antecedent Conditions (last 48 hours): Weather: Precipitation Total: Predicted % chance of rain: Estimate storm beginning: (date and time) Estimate storm duration: (hours) Estimate time since last storm: (days or hours) Rain gauge reading: (inches) Sampling Event Observations Observations: If yes identify location and observe drainage area to identify probable cause Odors Yes □ No □ Floating material Yes □ No □ Suspended Material Yes □ No □ Sheen Yes □ No □ Discolorations Yes □ No □ Turbidity Yes □ No □ NSWD Observations Were any authorized non-stormwater discharges observed? Yes □ No □ Were any unauthorized non-stormwater discharges observed? Yes □ No □ If yes to either, identify source Drainage Area Observations Drainage Area Deficiencies Noted SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering Exception Documentation (explanation required if inspection could not be conducted). Inspector Information Inspector Name: Inspector Title: Signature: Date: SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering Sampling Log Facility Name: Date: Time Start: Sampler Name: Field Meter Calibration pH Meter ID No./Description: Calibration Date/Time: Field pH Measurements Discharge Location Identifier pH Time Samples Collected Discharge Location Identifier Constituent Time Oil and Grease Total Suspended Solids Additional Sampling Notes: Time End: SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering APPENDIX M ANNUAL FEE STATEMENT AND RECIEPTS SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering FOR INFORMATION ONLY. SEE THE WATERBOARDS.CA.GOV WEBSITE FOR FEES AND STIPULATONS. CALIFORNIA CODE OF REGULATIONS TITLE 23. Division 3. Chapter 9. Waste Discharge Reports and Requirements Article 1. Fees Section 2200. Annual Fee Schedules. Each person for whom waste discharge requirements have been prescribed pursuant to Section 13263 of the Water Code shall submit, to the state board, an annual fee in accordance with the following schedules. The fee shall be submitted for each waste discharge requirement order issued to that person.1 (a) The annual fees for persons issued waste discharge requirements (WDRs), except as provided in subdivisions (a)(3), (a)(4), (b), and (c), shall be based on the discharge’s threat to water quality (TTWQ) and complexity (CPLX) rating according to the following fee schedule, plus applicable surcharge(s). SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering Oil and gas produced water storage and disposal facilities regulated by waste discharge requirements are subject to a surcharge per barrels of waste water discharged in the prior 12 months according to the following schedule: TTWQ & CPLX Rating No Barrels 1 to 999,999 Barrels 1,000 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering APPENDIX N CONSTRUCTION SITE MONITORING INSPECTION FORM SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering BMP INSPECTION REPORT Date and Time of Inspection: Date Report Written: Inspection Type: (Circle one) Weekly Complete Parts I,II,III and VII Pre-Storm Complete Parts I,II,III,IV and VII During Rain Event Complete Parts I, II, III, V, and VII Post-Storm Complete Parts I,II,III,VI and VII Part I. General Information Site Information Construction Site Name: Construction stage and completed activities: Approximate area of site that is exposed: Photos Taken: (Circle one) Yes No Photo Reference IDs: Weather Estimate storm beginning: (date and time) Estimate storm duration: (hours) Estimate time since last storm: (days or hours) Rain gauge reading and location: (in) Is a “Qualifying Event” predicted or did one occur (i.e., 0.5” rain with 48-hrs or greater between events)? (Y/N) If yes, summarize forecast: Exemption Documentation (explanation required if inspection could not be conducted). Visual inspections are not required outside of business hours or during dangerous weather conditions such as flooding or electrical storms. Inspector Information Inspector Name: Inspector Title: Signature: Date: SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering Part II. BMP Observations. Describe deficiencies in Part III. Minimum BMPs for Risk Level 2 Sites Failures or other short comings (yes, no, N/A) Action Required (yes/no) Action Implemented (Date) Good Housekeeping for Construction Materials Inventory of products (excluding materials designed to be outdoors) Stockpiled construction materials not actively in use are covered and bermed All chemicals are stored in watertight containers with appropriate secondary containment, or in a completely enclosed storage shed Construction materials are minimally exposed to precipitation BMPs preventing the off-site tracking of materials are implemented and properly effective Good Housekeeping for Waste Management Wash/rinse water and materials are prevented from being disposed into the storm drain system Portable toilets are contained to prevent discharges of waste Sanitation facilities are clean and with no apparent for leaks and spills Equipment is in place to cover waste disposal containers at the end of business day and during rain events Discharges from waste disposal containers are prevented from discharging to the storm drain system / receiving water Stockpiled waste material is securely protected from wind and rain if not actively in use Procedures are in place for addressing hazardous and non- hazardous spills Appropriate spill response personnel are assigned and trained Equipment and materials for cleanup of spills is available onsite Washout areas (e.g., concrete) are contained appropriately to prevent discharge or infiltration into the underlying soil Good Housekeeping for Vehicle Storage and Maintenance Measures are in place to prevent oil, grease, or fuel from leaking into the ground, storm drains, or surface waters All equipment or vehicles are fueled, maintained, and stored in a designated area with appropriate BMPs Vehicle and equipment leaks are cleaned immediately and disposed of properly SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering Part II. BMP Observations Continued. Describe deficiencies in Part III. Minimum BMPs for Risk Level 2 Sites Adequately designed, implemented and effective (yes, no, N/A) Action Required (yes/no) Action Implemented (Date) Good Housekeeping for Landscape Materials Stockpiled landscape materials such as mulches and topsoil are contained and covered when not actively in use Erodible landscape material has not been applied 2 days before a forecasted rain event or during an event Erodible landscape materials are applied at quantities and rates in accordance with manufacturer recommendations Bagged erodible landscape materials are stored on pallets and covered Good Housekeeping for Air Deposition of Site Materials Good housekeeping measures are implemented onsite to control the air deposition of site materials and from site operations Non-Stormwater Management Non-Stormwater discharges are properly controlled Vehicles are washed in a manner to prevent non-stormwater discharges to surface waters or drainage systems Streets are cleaned in a manner to prevent unauthorized non- stormwater discharges to surface waters or drainage systems. Erosion Controls Wind erosion controls are effectively implemented Effective soil cover is provided for disturbed areas inactive (i.e., not scheduled to be disturbed for 14 days) as well as finished slopes, open space, utility backfill, and completed lots The use of plastic materials is limited in cases when a more sustainable, environmentally friendly alternative exists. Sediment Controls Perimeter controls are established and effective at controlling erosion and sediment discharges from the site Entrances and exits are stabilized to control erosion and sediment discharges from the site Sediment basins are properly maintained Linear sediment control along toe of slope, face of slope an at grade breaks (Risk Level 2 & 3 Only) Limit construction activity to and from site to entrances and exits that employ effective controls to prevent offsite tracking (Risk Level 2 & 3 Only) SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering Ensure all storm, drain inlets and perimeter controls, runoff control BMPs and pollutants controls at entrances and exits are maintained and protected from activities the reduce their effectiveness (Risk Level 2 & 3 Only) Inspect all immediate access roads daily (Risk Level 2 & 3 Only) Run-On and Run-Off Controls Run-on to the site is effectively managed and directed away from all disturbed areas. Other Are the project SWPPP and BMP plan up to date, available on-site and being properly implemented? Part III. Descriptions of BMP Deficiencies Deficiency Repairs Implemented: Note - Repairs must begin within 72 hours of identification and, complete repairs as soon as possible. Start Date Action 1. 2. 3. 4. Part IV. Additional Pre-Storm Observations. Note the presence or absence of floating and suspended materials, sheen, discoloration, turbidity, odors, and source(s) of pollutants(s). Yes, No, N/A Do stormwater storage and containment areas have adequate freeboard? If no, complete Part III. Are drainage areas free of spills, leaks, or uncontrolled pollutant sources? If no, complete Part VII and describe below. Notes: Are stormwater storage and containment areas free of leaks? If no, complete Parts III and/or VII and describe below. SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering Part V. Additional During Storm Observations. If BMPs cannot be inspected during inclement weather, list the results of visual inspections at all relevant outfalls, discharge points, and downstream locations. Note odors or visible sheen on the surface of discharges. Complete Part VII (Corrective Actions) as needed. Outfall, Discharge Point, or Other Downstream Location Location Description Location Description Location Description Location Description Location Description Location Description Location Description Location Description Part VI. Additional Post-Storm Observations. Visually observe (inspect) stormwater discharges at all discharge locations within two business days (48 hours) after each qualifying rain event, and observe (inspect) the discharge of stored or contained stormwater that is derived from and discharged subsequent to a qualifying rain event producing precipitation of ½ inch or more at the time of discharge. Complete Part VII (Corrective Actions) as needed. Discharge Location, Storage or Containment Area Visual Observation Notes: SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering Part VII. Additional Corrective Actions Required. Identify additional corrective actions not included with BMP Deficiencies (Part III) above. Note if SWPPP change is required. Required Actions Implementation Date SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering APPENDIX O RAIN EVENT ACTION PLAN SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering Rain Event Action Plan (REAP) Date of REAP WB DID Number: Date Rain Predicted to Occur: Predicted % chance of rain: Predicted Rain Event Triggered Actions Below is a list of suggested actions and items to review for this project. Each active Trade should check all material storage areas, stockpiles, waste management areas, vehicle and equipment storage and maintenance, areas of active soil disturbance, and areas of active work to ensure the proper implementation of BMPs. Project-wide BMPs should be checked and cross- referenced to the BMP progress map. Trade or Activity Suggested action(s) to perform / item(s) to review prior to rain event  Information & Scheduling  Inform trade supervisors of predicted rain  Check scheduled activities and reschedule as needed  Alert erosion/sediment control provider  Alert sample collection contractor (if applicable)  Schedule staff for extended rain inspections  Check Erosion and Sediment Control (ESC) material stock  Review BMP progress map  Other:    Material storage areas  Material under cover or in sheds (ex: treated woods and metals)  Perimeter control around stockpiles  Other:    Waste management areas  Dumpsters closed  Drain holes plugged  Recycling bins covered  Sanitary stations bermed and protected from tipping  Other:    Trade operations  Exterior operations shut down for event (e.g., no concrete pours or paving)  Soil treatments (e.g., fertilizer) ceased within 24 hours of event  Materials and equipment (e.g., tools) properly stored and covered  Waste and debris disposed in covered dumpsters or removed from site  Trenches and excavations protected  Perimeter controls around disturbed areas  Fueling and repair areas covered and bermed  Other:    Site ESC BMPs  Adequate capacity in sediment basins and traps  Site perimeter controls in place  Catch basin and drop inlet protection in place and cleaned  Temporary erosion controls deployed  Temporary perimeter controls deployed around disturbed areas and stockpiles  Roads swept; site ingress and egress points stabilized  Other:    Concrete rinse out area  Adequate capacity for rain  Wash-out bins covered  Other:    Spill and drips  All incident spills and drips, including paint, stucco, fuel, and oil cleaned  Drip pans emptied  Other:  SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering  Other / Discussion / Diagrams              Attach a printout of the weather forecast from the NOAA website to the REAP. I certify under penalty of law that this Rain Event Action Plan (REAP) will be performed in accordance with the General Permit by me or under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Date: Qualified SWPPP Practitioner (Use ink please) 67 From:Dan Parker-King <dan@hiveengineering.us> Sent:Thursday, November 2, 2023 10:02 AM To:Ryan Stefanek; Nelson, Brian; Kacsinta, Madeline; Daniel O'Connell; German Valdez; Kevin Hermreck Subject:SWPPP - SLO Downtown Parking Structure Attachments:SWPPP -SLO DOWNTOWN PARKING SWPPP_v20231102.pdf Follow Up Flag:Follow up Flag Status:Completed This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Good morning, Brian and Ryan, I've made the required updates to the SWPPP. My hope is to submit it as an update under the existing WDID, since I will be continuing my work with Swinerton as the QSP for the next phase. If you are OK with it, Brian, please sign and I will update our project in SMARTs. Updates to the SWPPP include: 1. Construction Dates - The new dates moved the needle from low to medium for erosivity, but the risk level will remain at 2. 2. Contractor changed to Swinerton. 3. Documents D, E, G, are included in the document, rather than as attachments per Brian's previous comments. 4. Erosion control plans (by RRM) added for the next phases of the project. Dan Parker-King, PE Principal Engineer Tel (805)-550-8546 www.hiveengineering.us HIVE ENGINEERING 705 Fiero Ln Suite 10 | San Luis Obispo | CA 93401 STORM WATER POLLUTION PREVENTION PLAN Project Name: SLO Downtown Parking Structure Project Legally Responsible Person (LRP) Brian Nelson Deputy Director of Public Works / City Engineer City of San Luis Obispo 919 Palm Street San Luis Obispo, CA 93401 Prepared For: The City of San Luis Obispo 919 Palm Street San Luis Obispo, CA Risk Level: 2 Site Addresses: Cultural Arts District 609 Palm Street San Luis Obispo, CA 93401 Estimated Project Construction Dates: November 13, 2023 – February 13, 2025 SWPPP Prepared by: Hive Engineering 705 Fiero Lane, Suite 10 San Luis Obispo, CA 93401 (805) 550-8546 phone QSP Daniel Parker-King, RCE, QSD/P Permit Registration Submittal Date:8/31/23 WDID No: - 565511 Date: 11/1/23 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 2 TABLE OF CONTENTS Acronyms .............................................................................................................................................................. 4 Legally Responsible Person ................................................................................................................................... 5 Qualified SWPPP Developer .................................................................................................................................. 6 Storm Water Multi-Application and Report Tracking System ............................................................................................ 6 1.0 SWPPP Requirements............................................................................................................................... 7 1.1 Introduction ......................................................................................................................................................... 7 1.2 Permit Registration Documents ........................................................................................................................... 7 1.3 Swppp availability and implementation .............................................................................................................. 8 1.4 Pollution Prevention Team .................................................................................................................................. 8 1.5 Duly Authorized Representatives ........................................................................................................................ 8 1.6 Permits and Governing Documents ..................................................................................................................... 8 1.7 SWPPP Amendments ........................................................................................................................................... 9 1.8 Retention of Records ........................................................................................................................................... 9 1.9 Exceedance Response Actions (ERA’s) ............................................................................................................... 10 1.10 Annual Comprehensive Facility Compliance Evaluation .................................................................................... 10 1.11 Annual Report .................................................................................................................................................... 11 1.12 Termination and Changes to General Permit Coverage ..................................................................................... 11 2.0 Facility Information ................................................................................................................................ 11 2.1 Facility Description ............................................................................................................................................. 11 2.1.1 Facility Location ............................................................................................................................................ 11 2.1.2 Existing Conditions ........................................................................................................................................ 12 2.1.3 Description of Drainage Areas and Existing Drainage ................................................................................... 13 2.1.4 Developed Condition .................................................................................................................................... 14 2.2 Project Risk Level ............................................................................................................................................... 14 2.2.1 Project Sediment Risk: .................................................................................................................................. 15 2.2.2 Receiving Water Risk: .................................................................................................................................... 17 2.2.3 Combined Risk: ............................................................................................................................................. 17 2.3 Construction Site Estimates ............................................................................................................................... 18 2.4 Construction Schedule ....................................................................................................................................... 18 2.5 Identification of Potential Pollutant Source ....................................................................................................... 18 3.0 Best Management Practices .................................................................................................................. 19 3.1 Contractor Information ...................................................................................................................................... 19 3.2 BMP Installation Schedule ................................................................................................................................. 19 3.3 Erosion & Sediment Control Best Management Practices ................................................................................. 21 3.4 Non-Storm Water and Material Management Best Management Practices ..................................................... 21 3.5 Post-Construction Best Management Practices ................................................................................................. 22 3.6 Housekeeping Requirements ............................................................................................................................. 22 3.7 Non-Storm Water Management ........................................................................................................................ 24 3.8 Erosion Control .................................................................................................................................................. 24 3.9 Sediment Control ............................................................................................................................................... 24 3.10 Inspection, Maintenance & Repair .................................................................................................................... 24 3.11 Training .............................................................................................................................................................. 25 3.12 Inspection and Entry .......................................................................................................................................... 25 4.0 Construction Site Monitoring Program .................................................................................................. 26 4.1 Construction Site Monitoring Program (CSMP) ................................................................................................. 26 4.2 Visual Monitoring & Inspection ......................................................................................................................... 27 4.3 Non-Storm Water Discharge Monitoring ........................................................................................................... 28 4.4 Water Quality Sampling and Analysis ................................................................................................................ 28 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 3 4.5 Construction Activity ......................................................................................................................................... 28 4.6 Quality Assurance and Quality Control .............................................................................................................. 29 4.7 Reporting Requirements and Records Retention .............................................................................................. 31 5.0 General Procedures and Requirements .................................................................................................. 31 5.1 SWPPP Availability and Implementation ........................................................................................................... 31 5.2 SWPPP Amendments ......................................................................................................................................... 32 5.1 Retention of Records ......................................................................................................................................... 32 5.2 Reporting Requirements .................................................................................................................................... 32 5.3 Required Non-Compliance Reporting ................................................................................................................ 33 5.4 Annual Report .................................................................................................................................................... 33 5.5 Changes to Permit Coverage .............................................................................................................................. 33 5.6 Notice of Termination ........................................................................................................................................ 33 APPENDIX A NPDES CONSTRUCTION GENERAL PERMIT ............................................................................. 36 APPENDIX B BMPS FROM THE 2009 CALIFORNIA CONSTRUCTION BMP HANDBOOK ......................... 37 APPENDIX C LIST OF POTENTIAL NON-VISIBLE POLLUTANTS ................................................................... 48 APPENDIX D SWPPP CONTRACTOR/SUBCONTRACTOR AGREEMENTS ................................................... 50 APPENDIX E CONTRACTOR/SUBCONTRACTOR INFORMATION .................................................................. 51 APPENDIX F SWPPP TRAINING LOG ................................................................................................................... 53 APPENDIX G SITE MAP EROSION CONTROL PLAN ......................................................................................... 55 APPENDIX H RISK LEVEL CALCULATIONS ....................................................................................................... 61 APPENDIX I CHAIN-OF-CUSTODY (COC) FORM ............................................................................................... 64 APPENDIX J SWPPP AMENDMENT(S) & LOG ............................................................................................................ 66 APPENDIX K CORRECTIVE ACTION LOG .................................................................................................................... 68 APPENDIX L SAMPLING LOG ................................................................................................................................ 75 APPENDIX M ANNUAL FEE STATEMENT AND RECIEPTS .............................................................................. 80 APPENDIX N CONSTRUCTION SITE MONITORING INSPECTION FORM ...................................................... 84 APPENDIX O RAIN EVENT ACTION PLAN .......................................................................................................... 91 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 4 ACRONYMS ASTM American Society of Testing and Materials BAT Best Available Technology BCT Best Conventional Pollutant Control Technology BMP Best Management Practice BPT Best Practicable Control Technology Currently Available CFR Code of Federal Regulations CGP Construction General Permit – NPDES Construction General Permit for Storm Water Discharges associated with Construction Activities COC Chain of custody COT City of Tehachapi CSMP Construction Site Monitoring Program CWA Clean Water Act of 1987 EPA Environment Protection Agency LRP Legally Responsible Person MS4 Municipal Storm Sewer System NAL Numeric Action Levels NEL Numeric Effluent Limitations NOAA National Oceanic and Atmospheric Administration (www.noaa.gov) NOI Notice of Intent NOT Notice of Termination NPDES National Pollution Discharge Elimination System POC Pollutants of Concern PoP Probability of Precipitation PRD Permit Registration Documents QSD Qualified SWPPP Developer QSP Qualified SWPPP Practitioner REAP Rain Event Action Plan RUSLE Revised Universal Soil Loss Equation RWQCB Regional Water Quality Control Board SAP Sampling and Analysis Plan SMARTS Storm water Multi- Application Report Tracking System SWAMP Surface Water Ambient Monitoring Program SWPPP Storm Water Pollution Prevention Plan SWPPM Storm Water Pollution Prevention Manager SWRCB State of California Water Resources Control Board SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 5 LEGALLY RESPONSIBLE PERSON Approval and Certification of the Stormwater Pollution Prevention Plan Facility Name SLO Downtown Parking Structure Waste Discharge Identification (WDID): 565511 “I certify under penalty of law that this document and all Attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, to the best of my knowledge and belief, the information submitted is, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." _______________________________________ Legally Responsible Person/Organization Date _______________________________________ Legally Responsible Person Date ____Brian Nelson________________________ 805-781-7113 Printed Name Phone SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 6 QUALIFIED SWPPP DEVELOPER This SWPPP was prepared under the direction of Daniel Parker-King, a Qualified SWPPP Developer (QSD). ___________________________________________ 8/23/23 Daniel Parker-King, RCE, QSD/P Date Mr. Parker-King possesses the following QSD qualifications per Section VII of the Construction General Permit: California Registered Civil Engineer, C74672, Expiration 12.31.23 QSD Certification Number C74672 Contact Information for questions or concerns: Hive Engineering 705 Fiero Lane, Suite 10 San Luis Obispo, CA 93401 (805) 550-8546 This SWPPP conforms to the required elements of the Construction General Permit Order No. 2009-0009-DWQ and amendments Order No. 2010-0014-DWQ and Order No. 2012-0006-DWQ issued by the State of California, State Water Resource Control Board. A QSD is required to prepare any necessary SWPPP amendments or annual reports. This SWPPP (including all inspections, amendments and reports) and the Construction General Permit shall be maintained for three years from the date submitted. These records shall be available at the construction site until construction is complete. When the original SWPPP is retained by a crewmember in a construction vehicle and it is not currently at the construction site, current copies of the BMPs and map/drawing will be left with the field crew and the original SWPPP shall be made available via a request by radio/telephone.) STORM WATER MULTI-APPLICATION AND REPORT TRACKING SYSTEM The Construction General Permit requires all dischargers to electronically file all Permit Registration Documents (PRDs), Notices of Termination (NOT), changes of information (COI’s), annual reporting, and other compliance documents required by the Construction General Permit through the State Water Board’s Storm water Multi-Application and Report Tracking System (SMARTS) website. SMARTS can be found at https://smarts.waterboards.ca.gov/smarts/faces/SwSmartsLogin.jsp SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 7 1.0 SWPPP REQUIREMENTS 1.1 INTRODUCTION The Cultural Arts District Parking Structure site comprises approximately 1.2 acres and spans several addresses including, 609 Palm Street, 972 Nipomo Street, 633 Palm Street, 630 Monterey Street, 970 Nipomo Street, 610 Monterey Street, 614 Monterey Street, in San Luis Obispo, California. The property is owned by The City of San Luis Obispo. This Stormwater Pollution Prevention Plan (SWPPP) is designed to comply with California’s General Permit for Stormwater Discharges Associated with Industrial Activities (General Permit) Order No. 2014-0057-DWQ (NPDES No. CAS000001) issued by the State Water Resources Control Board (State Water Board). This SWPPP has been prepared following the SWPPP Template provided on the California Stormwater Quality Association Stormwater Best Management Practice Handbook Portal: Industrial and Commercial (CASQA 2014). In accordance with the General Permit, Section X.A, this SWPPP contains the following required elements: · Facility Name and Contact Information · Site Map · Storm Water Pollution Prevention Plan · Signed Certification Statement · Annual Fee (Appendix M) 1.2 PERMIT REGISTRATION DOCUMENTS Required Permit Registration Documents (PRDs) were submitted to the State Water Board via the Stormwater Multi Application and Report Tracking System (SMARTS) by the Legally Responsible Person (LRP), or authorized personnel (i.e., Approved Signatory) under the direction of the LRP. To obtain coverage, the Edwards Construction Group must electronically file Permit Registration Documents (PRDs) prior to the commencement of construction activity. Failure to obtain coverage under the Construction General Permit for storm water discharges to waters of the United States is a violation of the CWA and the California Water Code. The project-specific PRDs include:  Notice of Intent (NOI)  Risk Assessment (Appendix H)  Site Map (Appendix G)  Storm Water Pollution Prevention Plan  Signed Certification Statement  Annual Fee (Appendix M) The annual fee is required no later than seven days prior to the commencement of construction activities. Permit coverage shall not commence until the annual fee and PRDs are received by the State Water Board, and a Waste Discharger Identification (WDID) number is assigned and sent by State Water Board Storm water Multi-Application and Report Tracking System (SMARTS). SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 8 1.3 SWPPP AVAILABILITY AND IMPLEMENTATION The SWPPP is available on-site to all employees during all hours of operation (see Section 2.5 for the Operations Schedule), and will be made available upon request by a State or Municipal inspector. The SWPPP will be implemented by August 1, 2023. 1.4 POLLUTION PREVENTION TEAM Facility staff that have been designated as Pollution Prevention Team members are listed below in Table 1.1., along with their responsibilities and duties. A list of alternate team members is also provided, and these personnel will perform SWPPP activities when regular members of the Pollution Prevention Team are absent or unavailable. This table will be updated as needed when there are changes to staff and staff responsibilities. All team members will be trained to perform the duties assigned to them. Employee training logs are provided in Appendix C. Table 1.1 Pollution Prevention Team Name Title Phone Number Responsibilities and Duties Daniel Parker-King QSP 805-550-8546 Inspection, Testing, Reporting Jesse Kaltenberg QSP 805-250-2891 Inspection, Testing, Reporting 1.5 DULY AUTHORIZED REPRESENTATIVES Duly Authorized Representative(s) who are responsible for SWPPP implementation and have authority to sign PRDs [is/are] listed below in Table 1.2. Written authorizations from the LRP for these individuals are provided in Appendix D. Table 1.2 Duly Authorized Representatives Name Title Phone Number 1.6 PERMITS AND GOVERNING DOCUMENTS In addition to the General Permit, the following documents have been taken into account while preparing this SWPPP: · Regional Water Board requirements; · Basin Plan requirements; · TMDL Requirements; SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 9 · Spill Prevention Control and Countermeasures Plan; · Hazardous Material Business Plan; · Hazardous Waste Regulations and Permits; · Air Quality Regulations and Permits ; and · Clean Water Act Section 401 Water Quality Certifications and 404 Permits. 1.7 SWPPP AMENDMENTS This SWPPP will be amended or revised as needed. A list of amendments (Amendment Log) is included in the front of this SWPPP (page 7), and amendment certifications are included in Appendix E. The Amendment Log will include the date of initial preparation and the date of each amendment. The SWPPP should be revised when: · There is a General Permit violation; · There is a reduction or increase in the total industrial area exposed to stormwater; · BMPs do not meet the objectives of reducing or eliminating pollutants in stormwater discharges; · There is a change in industrial operations which may affect the discharge of pollutants to surface waters, groundwater(s), or a municipal separate storm sewer system (MS4); · There is a change to the parties responsible for implementing the SWPPP; or · Otherwise deemed necessary by the QISP. The following items will be included in each amendment: · Who requested the amendment; · The location of proposed change; · The reason for change; · The original BMP(s) proposed, if any; and · The new BMP(s) proposed. · Amendments will be logged at the front of the SWPPP and certification kept in Appendix E. The SWPPP text will be revised replaced, and/or hand annotated as necessary to properly convey the amendment. SWPPP amendments must be certified and submitted by the LRP or their designated Duly Authorized Representative via SMARTS within 30 days whenever the SWPPP contains significant revisions. With the exception of significant revisions, SWPPP changes will be certified and uploaded to SMARTS once every three (3) months in the reporting year. 1.8 RETENTION OF RECORDS Paper or electronic records of documents required by this SWPPP will be retained for a minimum of five (5) years from the date generated or date submitted, whichever is later, for the following items: · Employee Training Records; · BMP Implementation Records; · Spill and Clean-up Related Records; · Records of Sampling and Analysis Information SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 10 • The date, exact location, and time of sampling or measurement; • The date(s) analyses were performed; • The individual(s) that performed the analyses; • The analytical techniques or methods used; and • The results of such analyses; · Records of Visual Observations • The date • The industrial areas/drainage areas of the facility observed during the inspection (Location); • The approximate time of the observation; • Presence and probable source of observed pollutants; and • Name of the individual(s) that conducted the observations; • Response to the observations including identification of SWPPP revisions if needed. • Level 1 ERA Reports; • Level 2 ERA Action Plan; • Level 2 ERA Technical Report; and • Annual Reports from SMARTS (checklist and any explanations). 1.9 EXCEEDANCE RESPONSE ACTIONS (ERA’S) If a General Permit NAL exceedance occurs in a given reporting year, a Level 1 ERA Evaluation and a Level 1 ERA Report will be required in the following year, or, if in a subsequent year, a Level 2 ERA Action Plan and a Level 2 ERA Report will be required in accordance with the General Permit. The results of either of the ERA reports may require that the SWPPP be amended. 1.10 ANNUAL COMPREHENSIVE FACILITY COMPLIANCE EVALUATION The General Permit (Section XV) requires the Discharger to conduct one Annual Comprehensive Facility Compliance Evaluation (Annual Evaluation) for each reporting year (July 1 to June 30). Annual Evaluations will be conducted at least eight (8) months and not more than sixteen (16) months after the previous Annual Evaluation. The planned window for conducting the Annual Evaluation is between April and June of each year. The SWPPP will be revised, as appropriate based on the results of the Annual Evaluation, and the revisions will be implemented within 90 days of the Annual Evaluation. At a minimum, Annual Evaluations will consist of: · A review of all sampling, visual observation, and inspection and monitoring records and sampling and analysis results conducted during the previous reporting year; · A visual inspection of all areas of industrial activity and associated potential pollutant sources for evidence of, or the potential for, pollutants entering the stormwater conveyance system; · A visual inspection of all drainage areas previously identified as having no exposure to industrial activities and materials in accordance with the definitions in Section XVII; · A visual inspection of equipment needed to implement the BMPs; · A visual inspection of any BMPs; SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 11 · A review and effectiveness assessment of all BMPs for each area of industrial activity and associated potential pollutant sources to determine if the BMPs are properly designed, implemented, and are effective in reducing and preventing pollutants in industrial stormwater discharges and authorized NSWDs; and · An assessment of any other factors needed to comply with the Annual Reporting requirements in General Permit Section XVI.B. 1.11 ANNUAL REPORT The Annual Report will be prepared, certified, and electronically submitted no later than July 15th following each reporting year using the standardized format and checklists in SMARTS based on the reporting requirements identified in Section XVI of the General Permit. Annual reports will be submitted in SMARTS and in accordance with information required by the on- line forms. 1.12 TERMINATION AND CHANGES TO GENERAL PERMIT COVERAGE When any of the following conditions occur, termination of coverage under the General Permit will be requested by certifying and submitting a Notice of Termination (NOT) via SMARTS: · Operation of the facility has been transferred to another entity; · The facility has ceased operations, completed closure activities, and removed all industrial related pollutant generating sources; · The facility’s operations have changed and are no longer subject to the General Permit. The SWPPP and all of the provisions of the General Permit will be complied with until a valid NOT is received and accepted by the Board. If ownership changes, the new owner of the facility will be notified of the General Permit and regulatory requirements for permit coverage. 2.0 FACILITY INFORMATION 2.1 FACILITY DESCRIPTION 2.1.1 Facility Location The Cultural Arts District Parking Structure site comprises approximately 1.2 acres and spans several addresses including, 609 Palm Street, 972 Nipomo Street, 633 Palm Street, 630 Monterey Street, 970 Nipomo Street, 610 Monterey Street, 614 Monterey Street, in San Luis Obispo, California. The property is owned by The City of San Luis Obispo, and is located within Section 26, Township 30S, Range 12E. These phase 1b site preparation plans consist of tree protection, demolition and clearing. Phase 2 (under separate cover) includes on-site rough grading, temporary and permanent shoring, improvements, buildings, precise grading, landscape, and associated frontage improvements. The general construction activities to be performed at the Project Site may include, but are not limited to the following: · Demolition of existing structure · Demolition of existing underground utilities (Sewer, Water, Electric, etc…) SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 12 · Tree removal · Site grading · Washout Areas · Construction entrance/exit Figure 2.1: Vicinity Map Figure 2.2: Site Map 2.1.2 Existing Conditions The existing site consists of four structures, a garage, a parking lot, trees, minor landscaping and associated utilities. Most of the site slopes gently to the west towards the corner of Pismo and Nipomo St. The southwest corner of the property slopes towards the corner of Monterey and Nipomo. At the time of this report, all structures and paving have been removed. Existing sources of contamination at the site include: · Contaminated Soil · Erosion and Sediment from stormwater runoff · Hydrocarbons from vehicular parking SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 13 · Existing utilities (sewer) · Dewatering Figure 2.3: Existing Conditions (Pre demolition) 2.1.3 Description of Drainage Areas and Existing Drainage The site is divided into two drainage areas ranging from 5%-10%. Drainage area A1 (44,900 SF) flows to the northwest, while drainage area B1 (13,700 SF) flows to the south and southwest. Offsite drainage is received from area A2 (13,692 SF), flowing into area A1. Area A2 previously contained an apartment and home but they have been removed. The elevations of the project ranges from 188 to 205 above mean sea level (msl). Stormwater is conveyed through surface runoff, and flows off site into the city’s municipal stormwater system. Demolition to occur as a part of this project will keep the drainage patterns relatively the same, creating pervious area. The construction of a parking structure during the second phase will add impervious areas. Drainage areas and their directions can be seen in Figure 4. SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 14 Figure 2.4: Drainage Areas The site is located within the Stenner Lake Watershed.. 2.1.4 Developed Condition Post demolition surface drainage will generally be directed as it has historically. Storm water will flow offsite to the City of San Luis Obispo storm drain system, and ultimately to Brizziolari Creek. Post construction drainage patterns and conveyance systems are presented on the Improvement Plans. 2.2 PROJECT RISK LEVEL This SWPPP utilized a Risk-Based Permitting Approach under the Construction General Permit (SWRCB Order No. 2009-0009 DWQ), as set forth by the SWRCB and RWQCB. There are two major steps to site planning and risk determination. The project’s overall risk is broken up into two elements – (1) project sediment risk (the relative amount of sediment that can be discharged, given the project and location details) and (2) receiving water risk (the risk sediment discharges pose to the receiving waters) SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 15 2.2.1 Project Sediment Risk: Project Sediment Risk can be determined using two separate methods. Method 1 establishes sediment risk based on the following Soil Loss Equation (RUSLE) to obtain an estimate of project-related bare ground soil loss expressed in tons/acre. The RUSLE equation is as follows: A = (R)(K)(LS)(C)(P) Where: A = the rate of sheet and rill erosion R = rainfall-runoff erosivity factor K = soil erodibility factor LS = length-slope factor C = cover factor (erosion controls) (taken as 1.0 to simulate bare ground) P = management operations and support practices (sediment controls) (taken as 1.0 to simulate bare ground) Method 2 (also known as the “map option”) utilizes GIS maps where the product of K and LS are predetermined (located below in Figure 2 and 3) and an online calculator for determining R factor for determining soil loss. For this option, the R factor for the project is calculated using the online calculator at https://www.epa.gov/npdes/rainfall-erosivity-factor-calculator-small-construction-sites. To determine soil loss in tons per acre, the discharger multiplies the R factor times the value for K times LS from the map. Figure 2.5. K Factor SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 16 Figure 2.6. LS Factor Calculated Using Google Earth KML Figure 2.7. R Value from EPA Website Method 2 was utilized in this SWPPP. Using the SWRCB “Risk Assessment R-Factor Calculation Notification” for the R factor with construction start dates of 11/13/23 and an end construction date of 2/13/2025, the R factor was determined to be 71.48. The K factor and LS factor were determined to be 0.24 and 1.25 respectively. Multiplying the above numbers together yields a Project Sediment Risk Factor of 21.44 tons/acre. Since 21.44 tons/acre is greater than 15 tons/acre, the site can be classified as to having a Medium Sediment Risk. SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 17 2.2.2 Receiving Water Risk: The project area can neither discharge (either directly or indirectly) to a 303(d)-listed waterbody impaired by sediment nor to a waterbody with designated beneficial use. This project site has been classified as a High Receiving Water Risk. 2.2.3 Combined Risk: The Combined Risk Level Matrix table in the Construction General Permit Order No. 2009-0009-DWQ (Appendix A) was utilized to determine the combined risk. Using this table, it was determined that the Project Site is a Risk Level 2. Table 1. Combined Risk Level Matrix Receiving Water Risk Sediment Risk Low Medium High Low Level 1 Level 2 High Level 2 Level 3 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 18 2.3 CONSTRUCTION SITE ESTIMATES “Construction activities” refers to actions that result in a disturbance of the land, including demolition, clearing, grading, excavating, vertical construction, landscaping and other similar activities. It also includes “construction-related activities,” areas that support the construction project such as stockpiles, borrow areas, concrete truck washouts, fueling areas, material storage areas and equipment storage areas. The following estimates are from the planned construction-related activities in the staging yard. More specific information pertaining to the other proposed well pads can be found in their respective site map/ erosion control plans within Appendix G. · Total project area: 1.2 acres · Site area to be disturbed: 1.2 acres • Percentage impervious area before and after demolition: 67% and 100% • Runoff coefficient before and after construction: NIC 2.4 CONSTRUCTION SCHEDULE • Grading Utilities & Vertical Construction 11/13/2023 to 2/13/2025 2.5 IDENTIFICATION OF POTENTIAL POLLUTANT SOURCE The pollutant of greatest concern on most construction sites is sediment which may become detached during construction related activities. Non-visible pollutants may be attached to the soils and run-off the site, potentially polluting the receiving body of water. Pollutant sources include, but are not limited to the following: a. Disturbances caused by demolition, clearing, grading and excavation activities related to site preparation. b. Storm-related precipitation c. Dust control through water spraying d. Leaks from equipment and/or portable toilets e. Wash out and maintenance areas f. Transporting of concrete and/ or asphalt materials g. Transporting of construction materials and fuels h. Flushing of water lines i. Vehicle fluids j. Cement materials k. Raw landscape materials l. General litter m. PVC pipe n. RCP pipe For a list of potential non-visible pollutants, refer to Appendix C: List of Potential Non-visible Pollutants & Pollutant Testing Guidance Table. SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 19 3.0 BEST MANAGEMENT PRACTICES 3.1 CONTRACTOR INFORMATION Appendix E includes the names and contact information of the Storm Water Pollution Prevention Plan Manager (SWPPPM) and a list of names of all contractors, subcontractors, and individuals who will be directed by the SWPPPM. This list shall include telephone numbers and work addresses. Specific areas of responsibility of each subcontractor and emergency contact numbers shall also be included. The discharger shall ensure that all BMPs required by the Construction General Permit are implemented by a Qualified SWPPPM. The SWPPPM shall be a person responsible for non-storm water and storm water visual observations, sampling and analysis and shall have primary responsibility and significant authority for the implementation, maintenance, inspection of the site to ensure full compliance with the SWPPP and the Permit. Best Management Practices (BMPs) were chosen for this project to reduce or eliminate pollutants in storm water discharge, and to comply with the Provisions of Attachment D of the General Order (Risk Level 2 Requirements) as well as those in the Construction General Permit Order. BMPs are shown in the erosion and sediment control plan provided in Appendix B. The Construction General Permit Order requires: Dischargers minimize or prevent pollutants in storm water discharges and authorized non-storm water discharges through the use of controls, structures, and management practices that achieve Best Available Technology Economically Achievable (BAT) for toxic and non-conventional pollutants and Best Conventional Pollutant Control Technology (BCT) for conventional pollutants. Storm water discharges and authorized non-storm water discharges regulated by the Construction General Permit not contain a hazardous substance equal to or in excess of reportable quantities established in 40 C.F.R. §§ 117.3 and 302.4, unless a separate NPDES Permit has been issued to regulate those discharges. As a Risk Level 2 discharger this project is subject to Numeric Action Levels (NALs) for pH and turbidity as described in Section 4.5. 3.2 BMP INSTALLATION SCHEDULE The Contractor is responsible for ensuring that appropriate BMPs are in place during the operations requiring the BMPs. Below is a schedule intended to provide the minimum BMPs necessary during each phase of the contractor’s operation. Additional BMPs may be necessary. Some BMPs installed early in the project shall remain in place upon completion of the project, while others must be removed prior to the completion of the project. Appendix B provides BMP Fact Sheets on design and implementation guidelines for each BMP. Those identified by “*” should only be implemented when applicable. The following BMPs shall be installed / utilized prior to clearing and grubbing operations: EC-1 Scheduling EC-2 Preservation of Existing Vegetation SE-7 Street Sweeping and Vacuuming SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 20 NS-9 Vehicle and Equipment Fueling NS-10 Vehicle & Equipment Maintenance WM-1 Material Delivery and Storage WM-2 Material Use WM-3 Stockpile Management WM-4 Spill Prevention and Control WM-5 Solid Waste Management WM-6 Hazardous Waste Management WM-9 Sanitary/Septic Waste Management The following BMPs shall be installed / utilized during grading/mobilization operations: WE-1 Wind Erosion Control TC-1 Stabilized Construction Entrance/Exit NS-1 Water Conservation Practices SE-1 Silt Fences SE-5 Fiber Rolls The following BMPs shall be installed / utilized upon completion of drainage work: (NOT IN CONTRACT) EC-9 Drainage Swales The following BMPs shall be installed / utilized during vertical construction: (NOT IN CONTRACT) EC-1 Scheduling EC-2 Preservation of Existing Vegetation WM-1 Material Delivery and Storage WM-2 Material Use WM-3 Stockpile Management WM-4 Spill Prevention and Control WM-5 Solid Waste Management WM-8 Concrete Waste Management* WM-9 Sanitary/Septic Waste Management The following BMPs may be utilized during utility operations: (NOT IN CONTRACT) WM-1 Material Delivery and Storage WM-2 Material Use WM-3 Stockpile Management WM-4 Spill Prevention and Control WM-5 Solid Waste Management WM-8 Concrete Waste Management* WM-9 Sanitary/Septic Waste Management All BMPs, except those designated as post-construction BMPs in Section 3.5, are to be removed prior to contract acceptance. It is not anticipated that this project will necessitate the stockpiling of materials. However, if materials are stockpile on-site and the stockpiles are inactive (not scheduled to be re-disturbed for at least 14 days), then the stockpiled areas shall be covered and a berm placed around the materials in accordance with WM-3 “Stockpile Management.” SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 21 3.3 EROSION & SEDIMENT CONTROL BEST MANAGEMENT PRACTICES Appendix B provides BMP Fact Sheets on design and implementation guidelines for each BMP to reduce or eliminate pollutants in storm water discharges. All BMPs are required to be implemented. The following BMPs are to be incorporated into this SWPPP: EC-1 Scheduling EC-2 Preservation of Existing Vegetation EC-8 Wood Mulching EC-16 Non-Vegetative Stabilization SE-1 Silt Fences SE-5 Fiber Rolls SE-7 Street Sweeping and Vacuuming SE-10 Storm Drain Inlet Protection TC-1 Stabilized Construction Entrance/Exit TC-3 Entrance/Outlet Tire Wash WE-1 Wind Erosion Control WM-9 Sanitary/Septic Waste Management 3.4 NON-STORM WATER AND MATERIAL MANAGEMENT BEST MANAGEMENT PRACTICES Non-storm water discharges may contribute significant pollutant loads to receiving waters. Measures to control spills, leakage, and dumping, and to prevent illicit connections during construction must be addressed through structural as well as non-structural Best Management Practices (BMPs). BMPs are designated in this SWPPP to prevent non-storm water discharges. All BMPs are required to be implemented. Those identified by “*” should only be implemented when applicable. NS-1 Water Conservation Practices NS-2 Dewatering Operations NS-3 Paving and Grinding Operations NS-7 Potable Water/Irrigation NS-8 Vehicle and Equipment Cleaning NS-9 Vehicle and Equipment Fueling WM-1 Material Delivery/Storage WM-2 Material Use WM-3 Stockpile Management WM-4 Spill Prevention and Control WM-5 Solid Waste Management WM-6 Hazardous Waste Management WM-7 Contaminated Soil Management WM-8 Concrete Waste Management WM-10 Liquid Waste Management SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 22 Vehicle and Equipment Cleaning is prohibited from occurring on-site. Fueling and maintenance of equipment and vehicles shall take place in designated areas only. Materials storage on–site will be minimized. 3.5 POST-CONSTRUCTION BEST MANAGEMENT PRACTICES This SWPPP contains Post-Construction BMPs, which are designated to reduce or eliminate pollutants after construction is completed. BMPs serving dual purpose roles (construction and post-construction protection) include: EC-6 Straw Mulch/Hydroseed/Tackifier/Soil Amendment EC-7 Geotextiles & Mats EC-9 Drainage Swales EC-10 Velocity Dissipation Devices 3.6 HOUSEKEEPING REQUIREMENTS All Risk Level 2 dischargers are required to adhere to the minimum housekeeping requirements as specified in Attachment C of the Construction General Permit. They include, but are not limited to: Construction Materials: Risk Level 2 dischargers shall implement good site management measures for construction materials that could potentially be a threat to the water quality if discharged. They include: · Conduct an inventory of products to be used. · Cover and berm loose stockpiled construction material that are not actively being used. · Store Chemicals in watertight containers (with appropriate secondary containment to prevent any spillage or leakage) or in a storage shed. · Minimize exposure of construction materials to precipitation. · Implement BMPs to prevent the off-site tracking of loose construction and landscape materials. Waste Management: Risk Level 2 dischargers shall implement good housekeeping for waste management. They include, but are not limited to: · Prevent disposal of any rinse or wash waters or materials on impervious or pervious site surfaces or into the storm drain system. · Ensure containment of sanitation facilities. · Clean or replace sanitation facilities and inspect them for leaks regularly. · Cover waste disposal containers at the end of every business day and during rain events. · Prevent discharges from disposal containers to the drainage system or receiving water. · Contain and protect stockpile waste from wind or rain, unless actively being used. · Implement procedures that effectively address hazardous and non-hazardous spills. SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 23 · Develop a spill response plan. · Ensure containment of concrete washout areas and other washout areas that may contain pollutants. There shall be no discharge to the underlying soil. Vehicle Storage and Maintenance: Risk Level 2 dischargers shall implement good housekeeping for vehicle storage and maintenance. They include, but are not limited to: · Prevent oil, grease or fuel to leak in to the ground, storm drains or surface waters. · Place all equipment or vehicles, which are to be fueled, maintained and stored in a designated area fitted with appropriate BMPs. · Clean leaks immediately, and dispose of material properly. Landscape Materials: Risk Level 2 dischargers shall implement good housekeeping for landscape materials. They include, but are not limited to: · Contain stockpiled materials when they are not actively being used. · Contain fertilizers when they are not actively being used. · Discontinue the application of erodible landscape materials within 2 days before a forecast rain event or during periods of precipitation. · Apply erodible landscape materials according to the manufacture recommendations. · Stack erodible landscaped materials on pallets and covering or storing such materials when not being used or applied. Potential Pollutant Sources: Risk Level 2 dischargers shall conduct an assessment and create a list of potential pollutant sources (see Appendix C) and identify any areas of the site where additional BMPs are necessary to reduce or prevent pollutants in storm water discharges and authorized non-storm water discharges. When developing BMPs, Risk Level 2 dischargers shall do the following: · Consider the quantity, physical characteristics (e.g., liquid, powder, solid), and locations of each potential pollutant source handled, produced, stored recycled, or disposed of at the site. · Consider the degree to which pollutants associated with those materials may be exposed to and mobilized by contact with storm water · Consider the direct and indirect pathways that pollutants may be exposed to storm water or authorized non-storm water discharges. This shall include an assessment of past spills or leaks, non-storm water discharges, and discharges form adjoining areas. · Ensure retention of sampling, visual observations, and inspection records. · Ensure effectiveness of existing BMPs to reduce or prevent pollutants in storm water discharges and authorized non-storm water discharges. SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 24 3.7 NON-STORM WATER MANAGEMENT Risk Level 2 dischargers shall implement measure to control all non-storm water discharges during construction. Non-storm water discharges are any discharges not directly associated with a rain even. Non- storm water discharges can include but are not limited to leaks from equipment or vehicles, flushing of water lines or washing of equipment. Risk Level 2 requirements include: · Dischargers shall implement measures to control all non-storm water discharges during construction. · Dischargers shall wash vehicles in such a manner as to prevent pollutants from entering surface waters. · Streets shall be cleaned in such a manner as to prevent unauthorized non-storm water discharges from reaching surface waters or the storm drain system. 3.8 EROSION CONTROL The primary pollutant identified during construction is sediment. Erosion and sedimentation controls will be implemented as necessary along the boundaries of the construction areas within the Project Site to minimize, as necessary, the amount of sediment transported off-site by storm water runoff. These control measures will be put in place as needed at the onset of construction activities and will remain in place (as needed) during construction and through periods of inactivity. Dischargers shall provide effective soil cover for inactive areas. Descriptions and diagrams of the BMPs are included in Appendix B. All disturbed areas shall provide effective soil cover for inactive areas and all finished slopes, open space, utility backfill and completed lots. All disturbed areas of the construction Project Site will be stabilized in a manner similar to its original condition. Both temporary (water trucks) and permanent measures will also be applied to control dust generation. Final stabilization will need to be completed prior to submitting a Notice of Termination (NOT). 3.9 SEDIMENT CONTROL Dischargers shall establish and maintain effective perimeter controls. Silt barriers consisting of silt fences, fiber rolls, sandbags, hay bales, and/or berms will be set up around the construction site as necessary so that sediment will not be discharged off-site. Sedimentation control will be in place and maintained on all disturbed areas during the rainy season. Sediment control BMPs will be implemented as needed. Construction sites that require silt barriers around them are sites where the ground surface has been disturbed by construction activities such as grading and /or excavation. Sediment buildup along silt barriers will be monitored and removed as necessary. Removed sediment will be deposited in an area that will not allow sediment to be discharged off-site. All loose soil and debris, which may create a potential hazard, will be hauled offsite and disposed of at an approved location. All construction entrances and exits shall be stabilized to sufficiently control sediment discharge from the site. 3.10 INSPECTION, MAINTENANCE & REPAIR All storm water control measures shall be properly maintained at regular intervals by trained personnel consistent with Project Site operational maintenance schedules. Inspections will be performed by a QSP or someone under his direction weekly, before, during, after qualifying storm events (0.5 inches per storm SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 25 event), and once each 24-hour period during extended storm events during business. These inspections will be conducted to identify BMP effectiveness. If any structural defects are observed interfering with design performance of BMPs, repairs or design changes will be implemented by the SWPPM within 72 hours. 3.11 TRAINING The SWPPM is responsible for training project personnel on the following topics: · Erosion Control BMPs · Sediment Control BMPs · Non-Storm Water BMPs · Waste Management and Materials Pollution Control BMPs · Emergency Procedures specific to the construction site storm water management Inspections will be conducted by a QSP. A QSP may train individuals to conduct the inspections, and collect storm water samples for non-visible pollutants. Trained individuals will also have received training and have experience with respect to erosion control methods, either through scholastic institutions, previous job experiences, or through workshops conducted by recognized regulatory agencies or professional organizations. Training records (Appendix F) will document attendees, the subjects covered and the date of training. Training logs/records are to be recorded and stored with the rest of the record materials · To ensure that the preparation, implementation, and oversight of the SWPPP is sufficient for effective pollution prevention, Section II, Part H of the Construction General Permit specifies that the Qualified SWPPP Developer and Qualified SWPPP Practitioners responsible for creating, revising, overseeing, and implementing the SWPPP must attend a State Water Board sponsored or approved QSD and QSP training course. · 3.12 INSPECTION AND ENTRY The discharger shall allow the Regional Water Board, State Water Board, U.S. EPA, and/or, in the case of construction sites which discharge through a municipal separate storm sewer, an authorized representative of the municipal operator of the separate storm sewer system receiving the discharge, upon the presentation of credentials and other documents as may be required by law, to: · Enter upon the discharger’s premises at reasonable times where a regulated construction activity is being conducted or where records must be kept under the conditions of the Construction General Permit; · Access and copy at reasonable times any records that must be kept under the conditions of the Construction General Permit; · Inspect at reasonable times the complete construction site, including any off-site staging areas or material storage areas, and the erosion/sediment controls; and · Sample or monitor at reasonable times for the purpose of ensuring Construction General Permit compliance. SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 26 4.0 CONSTRUCTION SITE MONITORING PROGRAM 4.1 CONSTRUCTION SITE MONITORING PROGRAM (CSMP) The Construction General Permit requires the following types of monitoring for Risk Level 2 projects: · Visual inspections of Best Management Practices (BMPs); · Visual monitoring of the site related to qualifying storm events; · Visual monitoring of the site for non-storm water discharges; · Sampling and analysis of construction site runoff; · Sampling and analysis of non-storm water discharges; Storm event monitoring should be conducted during business hours; and when the National Oceanographic and Atmospheric Administration (NOAA) (http://www.srh.noaa.gov/forecast) forecasts a rain event with a 50% or greater probability of producing a ½ inch or more of rain. Table 4.1: Summary of Risk Level 2 Monitoring Type of Monitoring What When Location Visual Inspection BMP Presence and effectiveness of all BMPs Weekly and Every 24 hours during an extended storm event. Overall site Stormwater Pre-storm All drainage areas and BMPs. Within 2 business days before each qualifying storm event. Overall site Post-storm All drainage areas and BMPs. Within 2 business days after each qualifying storm event. Overall site Non-storm water Operations and BMPs identified in Section 3.4 Quarterly Staging areas Sampling & Analysis Storm water runoff (effluent) pH and turbidity of storm water runoff representative of site. Within 2 business days of each qualifying storm event, and at a minimum 3 samples per day. Perimeter of site BMP failure/spill (non-visible) Runoff affected and not affected by the discharge/spill. Use Appendix C as a guide. Within first 2 hours of discharge from site. Perimeter of site Non-storm water Operations and BMPs identified in Section 3.4 If non-storm water is discharged off site. Perimeter of site Rain events and resulting monitoring periods should be separated into qualifying rain events. A qualifying rain event is defined as any event producing precipitation of ½ inch or more within a 48 hour or greater period. Monitoring locations provide clear views of BMPs, disturbed areas and extend through the entire site. Dischargers must maintain on-site records of all visual observations, personnel performing the observations, observation dates, weather conditions, locations observed, and corrective actions taken in response to the observations. The Construction Site Monitoring Inspection Form (Appendix N) should be used to track all monitoring activities. SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 27 Figure 4.1 Overview of Monitoring Locations 4.2 VISUAL MONITORING & INSPECTION All storm water monitoring must be completed within two (2) business days of each qualifying rain event at identified locations. Appendix G shows the monitoring locations. BMP Inspection The purpose of these inspections is to identify BMPs that: · Need maintenance to operate effectively; · Failed; or · Could fail to operate as intended. If deficiencies are identified during BMP inspections, repairs or design changes to BMPs must be initiated within 72 hours of identification and need to be completed as soon as possible. All BMP inspections must be documented on a Construction Site Monitoring Inspection Form (Appendix N). Storm Water Inspection Dischargers must conduct a pre-storm event inspection of: · All storm water drainage areas to identify and resolve prior to the storm event, any spills, leaks, or uncontrolled pollutant sources · All BMPs to identify proper implementation · Any storm water storage and containment areas to detect and remedy leaks if found SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 28 Dischargers must conduct a post-storm event inspection within two business days (48 hours) to identify whether: · BMPs were adequately designed, implemented, and effective, and · If any additional BMPs necessary (and amend the SWPPP accordingly). 4.3 NON-STORM WATER DISCHARGE MONITORING Quarterly non-storm water discharge monitoring will include the visual inspection of each drainage area during daylight hours for the presence of non-storm water discharges and their sources in July – September, October – December, January – March, and April – June quarters. If non-storm water is discharged off site, the effluent must be sampled. Quarterly monitoring should be recorded on Construction Site Monitoring Inspection Form in Appendix N. Potential non-storm water discharges within this project include: · Grading and Land Development · Site Stabilization · Vehicle and equipment cleaning, fueling and maintenance · Sanitary/Septic waste facilities · Concrete wash out areas · Contaminated Soils Quarterly inspections need to include each drainage area of the project and document: · Presence or indications of unauthorized and authorized non-storm water discharges and their sources · Pollutant characteristics of the non-storm water discharge (floating and suspended material sheen, discoloration, turbidity, odor, etc.) · Personnel performing the observations · Dates and approximate time each drainage area and non-storm water discharge was observed · Response taken to observations 4.4 WATER QUALITY SAMPLING AND ANALYSIS The project is required to collect samples of: · runoff for non-visible pollutants in the event of a BMP failure, breach or spill · non-storm water discharge Sampling personnel will collect storm water grab samples at discharge locations according to procedures outlined in Section 4.6 Quality Assurance and Quality Control. Appendix G shows the monitoring locations for all monitoring. Appendix L contains the Sampling Activity Log. Sampling is not required outside of scheduled business hours or under dangerous conditions. An explanation of why samples were not taken will be included with on-site inspection documents. 4.5 CONSTRUCTION ACTIVITY Non-Visible Pollutant Sampling SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 29 If there is a breach, spill or BMP failure, runoff affected by the non-visible pollutants will be sampled within the first two hours of discharge. It is important to note that covered construction materials or those that are in their final constructed form, do not need to be monitored. Materials that are stored exposed to precipitation and may generate runoff need to be considered for non-visible pollutant monitoring. Appendix C provides further guidance. Non-Stormwater Sampling If non-storm water is discharged off site, the effluent must be sampled. All non-storm water sample analyses should be conducted by a state certified laboratory. 4.6 QUALITY ASSURANCE AND QUALITY CONTROL The QSP is responsible for non-storm water and storm water visual observations, sampling and analysis, and for ensuring full compliance with the permit and implementation of all elements of the SWPPP. Prior to the rainy season, all sampling personnel and alternates will review the Monitoring Plan. Qualifications of designated personnel describing environmental sampling training and experience are provided in Appendix F. Sampling personnel will be designated and trained to collect, maintain and ship samples in accordance with the Surface Water Ambient Monitoring Program’s (SWAMP) 2008 Quality Assurance Program Plan (QAPP) (http://www.swrcb.ca.gov/water_issues/programs/swamp/tools.shtml#qa). Supplies and Storage An adequate stock of supplies and equipment for non-visible pollutants will be available on the project site or provided by the approved laboratory (Appendix I) prior to a sampling event. Monitoring supplies and equipment will be stored in a cool-temperature environment that will not come into contact with rain or direct sunlight. Sampling personnel will be available to collect samples in accordance with the sampling schedule. Supplies maintained at the project site will include, but will not be limited to, surgical gloves, sample collection equipment, coolers, appropriate number and volume of sample bottles, identification labels, re- sealable storage bags, paper towels, personal rain gear, ice, Sampling Activity Log forms (Appendix L), and Chain of Custody (COC) forms (Appendix I). Sample Collection and Handling Procedures All sampling and sample preservation must be in accordance with the current edition of Standard Methods for the Examination of Water and Wastewater (American Public Health Association). To maintain sample integrity and prevent cross-contamination, sampling collection personnel will: · Wear a clean pair of surgical gloves prior to the collection and handling of each sample at each location. · Not contaminate the inside of the sample bottle by not allowing it to come into contact with any material other than the water sample. · Discard sample bottles or sample lids that have been dropped onto the ground prior to sample collection. · Not leave the cooler lid open for an extended period of time once samples are placed inside. · Not touch the exposed end of a sampling tube, if applicable. · Avoid allowing rainwater to drip from rain gear or other surfaces into sample bottles. SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 30 · Not eat, smoke, or drink during sample collection. · Not sneeze or cough in the direction of an open sample bottle. · Minimize the exposure of the samples to direct sunlight, as sunlight may cause biochemical transformation of the sample to take place. · Decontaminate sampling equipment prior to sample collection using a TSP-soapy water wash, distilled water rinse, and final rinse with distilled water. · Dispose of decontamination water/soaps appropriately; i.e., not discharge to the storm drain system or receiving water. Any samples provided to a lab will be provided within 48 hours and use only the sample bottle provided by the lab (Appendix I). For an initial verification of laboratory or field analysis, duplicate samples will be collected at a rate of 10 percent or 1 duplicate per sampling event. The duplicate sample will be collected, handled, and analyzed using the same protocols as primary samples, and will be collected where contaminants are likely, and not on the upstream sample. A duplicate sample will be collected immediately after the primary sample has been collected. Duplicate samples will not influence any evaluations or conclusions; however, they will be used as a check on laboratory quality assurance. Non-Visible Pollutants The Contractor shall notify the QSP if non-visible pollutants are expected. Sample Documentation Procedures All original data documented on sample bottle identification labels, Chain of Custody forms (Appendix I), Sampling Activity Logs (Appendix L), and Construction Site Monitoring Inspection Form (Appendix N) will be recorded using waterproof ink. These will be considered accountable documents. If an error is made on an accountable document, the individual will make corrections by lining through the error and entering the correct information. The erroneous information will not be obliterated. All corrections will be initialed and dated. Copies of the Construction Site Monitoring Inspection Form are provided in Appendix N. Sampling and field analysis activities will be documented using the following: • Sample Bottle Identification Labels: Sampling personnel will attach an identification label to each sample bottle. At a minimum, the following information will be recorded on the label, as appropriate… · Project name • Project number • Unique sample identification number and location. [Project Number]-[Six digit sample collection date]-[Location] (Example: 0G5304-081801-Upstream). Quality assurance/quality control (QA/QC) samples shall be identified similarly using a unique sample number or designation (Example: 0G5304-081801-DUP1) · Collection date/time (No time applied to QA/QC samples) · Analysis constituent • Sampling Activity Logs: A log of sampling events will identify… SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 31 o Sampling date · Separate times for sample collection of upstream, downstream, run-on, and QA/QC samples recorded to the nearest minute · Unique sample identification number and location · Analysis constituent · Names of sampling personnel · Weather conditions (including precipitation amount) · Field analysis results · Other pertinent data · Chain of Custody (COC) forms (Appendix I): All samples to be analyzed by a laboratory will be accompanied by a COC form provided by the laboratory. Only the sample collectors will sign the COC form over to the lab. COC procedures will be strictly adhered to for QA/QC purposes. · Storm Water Quality Sampling Log (Appendix L): When applicable, the Contractor’s storm water inspector will document in the log that samples for sedimentation/siltation and/or turbidity were taken during a rain event. 4.7 REPORTING REQUIREMENTS AND RECORDS RETENTION Records of all monitoring inspections are required to remain onsite during the construction period and for a minimum of three years. Records shall include the following items: · The date, place, and time of facility inspections, sampling, visual observations (inspections), and/or measurements, including precipitation; · The individual(s) who performed the facility inspections, sampling, visual observation (inspections), and/or measurements; · The date and approximate time of analyses; · The individual(s) who performed the analyses; · A summary of all analytical results from the last three years, the method detection limits and reporting limits, and the analytical techniques or methods used; · Rain gauge readings from site inspections; · QA/QC records and results; · Non-storm water discharge inspections and visual observations (inspections) and storm water discharge visual observation records; · Visual observation and sample collection exemption records (Appendix O); and · The records of any corrective actions and follow-up activities that resulted from analytical results, visual observations (inspections), or inspections (Appendix K). Most reporting will occur in the Annual Report (Appendix P). 5.0 GENERAL PROCEDURES AND REQUIREMENTS 5.1 SWPPP AVAILABILITY AND IMPLEMENTATION The General Construction Permit Section XIV.C requires the SWPPP be available at the construction site during working hours while construction is occurring and shall be made available upon request by a State or Municipal inspector. When the original SWPPP is retained by a crewmember in a construction vehicle SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 32 and is not currently at the construction site, current copies of the BMPs and map/drawing will be left with the field crew and the original SWPPP shall be made available via a request by radio/telephone. 5.2 SWPPP AMENDMENTS The General Construction Permit Section XIV.A requires that SWPPP be amended or revised by a QSD and that the SWPPP include a listing of the date of initial preparation and the date of each amendment. Amendments must be signed by a QSD. All amendments are to be dated, attached to the SWPPP and logged in Appendix J. This SWPPP should be amended if any BMP is not installed according to the site map or if a BMP is changed due to ineffectiveness. The following items shall be in each amendment: 1.0 Who requested the amendment 2.0 The location of the proposed change 3.0 The reason for the change 4.0 The original BMP proposed, if any 5.0 The new BMP The amendments for this SWPPP, along with the required approval can be found in the SWPPP Amendment Log located in Appendix J. Any amendment to the SWPPP must be approved by the QSD. 5.1 RETENTION OF RECORDS The Construction General Permit Section I.J.69 and IV.G requires that all dischargers maintain a paper or electronic copy of all required records for three years from the date generated or date submitted, whichever is last. The records must be available at the construction site until construction is completed. The discharger shall furnish the RWQCB, SWRCB, OR USEPA, within a reasonable time, any requested information to determine compliance with the Construction General Permit. The final SWPPP shall be maintained for the time period indicated. 5.2 REPORTING REQUIREMENTS As per the Construction General Permit, a Legally Responsible Person must submit electronically all project/permit related documents (also known as Permit Registration Documents, or PRDs) for new projects commencing on or after July 1, 2010 prior to commencement of construction activities through the Storm water Multi- Application Report Tracking System (SMARTS). SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 33 5.3 REQUIRED NON-COMPLIANCE REPORTING Dan Parker-King shall give advanced notice to the RWQCB of any changes in the construction-related activity which may result in a non-compliance with the storm water requirement of the Construction General Permit. Examples of non-compliance include, but are not limited to: · Self-reporting of any discharge violations; · Discharges which contain a hazardous substance. 5.4 ANNUAL REPORT Hive Engineering. shall prepare and electronically submit an Annual Report via SMARTS no later than September 1 of each year. Reporting requirements include: · Sampling and analysis results including laboratory reports, analytical methods and reporting limits and change of custody forms · Corrective actions and compliance activities · Violations of the Construction General Permit · Date, time, place and name(s) of the inspector(s) for all sampling, inspections and field measurements · Visual observation and sample collections records · Training Documentations 5.5 CHANGES TO PERMIT COVERAGE The General Construction Permit Section II. C allows a permittee to reduce or increase the total acreage covered under the Construction General Permit when: · A portion of the project is complete · When conditions for termination of coverage have been met · When ownership of a portion of the project is sold to a different entity · When new acreage is added to the project 5.6 NOTICE OF TERMINATION The General Construction Permit Section II. D requires that within 90 days of when construction is complete or ownership has been transferred, the discharger shall electronically file a Notice of Termination (NOT), a final site map, and photos through the State Water Boards SMARTS system. Filing a NOT certifies that all Construction General Permit requirements have been met. The NOT is submitted when the construction project is complete and all Construction General Permit requirements for termination and final stabilization have been met. These requirements include: · The site will not pose any additional sediment discharge risk than it did prior to construction activity. SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 34 · All construction related equipment, materials and any temporary BMPs no longer needed are removed from the site. · Post-Construction storm water management measures are installed and a long-term maintenance plan that is designed for a minimum of 5-years has been developed. The NOT must demonstrate through photos, RUSLE results, or results of testing and analysis that the project meets all of the requirements of SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 35 Section II.D.1 of the Construction General Permit by one of the following methods: · 70% final cover method (no computational proof required). · RUSLE/RUSLE2 method (computational proof required). · Custom Method SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 36 APPENDIX A NPDES CONSTRUCTION GENERAL PERMIT For the complete construction general permit, see separate binder onsite. SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 37 APPENDIX B BMPS FROM THE CALIFORNIA CONSTRUCTION BMP HANDBOOK SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 38 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 39 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 40 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 41 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 42 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 43 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 44 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 45 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 46 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 47 \ SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 48 APPENDIX C LIST OF POTENTIAL NON-VISIBLE POLLUTANTS SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 49 Construction Activities and Associated Pollutants Phase Activity Associated Materials or Pollutants Pollutant Category(1) Grading and Land Development Vehicle and equipment use · Equipment operation · Equipment maintenance · Equipment washing · Equipment fueling Oil and Grease Soil preparation/amendments · Use of soil additives/amendments Nutrients Demolition Phase Removal of existing structures · Demolition of asphalt, concrete, masonry, framing, roofing, metal structures. Metals, Oil and Grease, Synthetic Organics Solid waste · Litter, trash and debris · Vegetation Gross Pollutants Landscaping and Site Stabilization Phase Planting / Vegetation Management · Vegetation control (pesticides/herbicides) · Planting · Plant maintenance · Vegetation removal Nutrients, Metals, Synthetic Organics (1) Categories per CASQA BMP Handbook (i.e., Sediment, Nutrients, Bacteria and Viruses, Oil and Grease, Metals, Synthetic Organics, Pesticides, Gross Pollutants, and Vector Production) SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 50 APPENDIX D SWPPP CONTRACTOR/SUBCONTRACTOR AGREEMENTS Agreements will be provided at a later date. Page 1 PROFESSIONAL SERVICES AGREEMENT THIS PROFESSIONAL SERVICES AGREEMENT (“Agreement”) is made this 26th day of October, 2023 ("Effective Date"), by and between: Swinerton Builders (“Contractor”) 2001 Clayton Road, 7th Floor Concord, CA, 94520 Attn: Kevin Hermreck Phone: (949) 622-7000 Email: KHermreck@swinerton.com and HIVE ENGINEERING (“Consultant”) 705 Fiero Ln, Suite 10 San Luis Obispo, CA, 93401 Attn: Dan Parker-King Phone: (506) 386-4897 Email: dan@hiveengineering.us For Consultant to perform work as described in Item B below for the following Project: Project: City of San Luis Obispo Cultural Arts District Parking Structure 609 Palm Street San Luis Obispo, CA, 93401 Owner: CITY OF SAN LUIS OBISPO 919 PALM STREET SAN LUIS OBISPO, CA, 93401 Architect: WATRY DESIGN, INC. 2099 GATEWAY PLACE, SUITE 550 SAN JOSE, CA, 95110 NOW, THEREFORE, in consideration of these promises and of the mutual covenants herein, the Parties hereto agree as follows: No.: 23049042 PSA No.: 23049042-003 Phase Code: 015723 Vendor No.: 00033084 DocuSign Envelope ID: 6E8FFFA9-5612-4F97-851F-A019B6C6CFEE In Process Professional Services Agreement Standard Form - 2020 Page 2 ARTICLE 1 - PROJECT AND SCOPE OF SERVICES (a) Except for modifications and change orders issued after execution of this Agreement, the “Contract Documents,” consist of the following documents, all of which are either attached hereto as Attachments or are hereby incorporated by this reference and made a part hereof as follows: (1) This Professional Services Agreement, and the following Attachments: Contract Summary 10/25/2023 ☒ Billing Procedures date ☒ Scope of Work 10/25/2023 ☐ date (2) The Prime Contract No. , CITY OF SAN LUIS OBISPO, , any Amendments to the Prime Contract, and all documents incorporated therein to the extent applicable to the Services (“Prime Contract Documents”), and Consultant agrees to be bound and obligated to Contractor to the fullest extent that Contractor is bound and obligated to the Owner (b) Consultant agrees to perform for Contractor the Services described below including all things necessary or incidental to the complete and proper performance of those services (“Services” or “Work”) in accordance with this Agreement, and such Services are generally described as: SWPPP Consulting (Scope of Services continues on Contract Summary) (c) Contractor agrees to pay Consultant for the proper performance of its services the sum of money computed as follows: (Check One) A Lump Sum of $$23,025.00; or As set forth in the Contract Summary. (d) TIME IS OF THE ESSENCE. Consultant shall proceed with the performance of the Services in a prompt and diligent manner, in accordance with Contractor's schedule which may be reasonably amended from time to time. In Contractor’s sole discretion, it may specify Consultant’s performance time or schedule therefore in the Contract Summary. Consultant’s failure to satisfactorily and timely perform all Services may cause Contractor to suffer substantial damages (including but not limited to actual, consequential and/or liquidated damages) and Consultant shall be liable to Contractor therefor. (e) The Services shall be performed in strict accordance with the Contract Summary and the terms herein, unless modifications thereto are reduced to writing and signed by authorized representatives of both Contractor and Consultant. However, if requested by Contractor, Consultant shall within ten (10) calendar days submit a reasonable price quotation for proposed changes and if accepted by Contractor in writing, perform the changes without delay. Contractor shall have the right to issue a unilateral written change order authorizing Consultant to proceed with performance of changed work. Consultant shall proceed with changed work immediately upon receipt of a written change order signed by Contractor. Consultant shall perform no changed work without written authorization from Contractor. DocuSign Envelope ID: 6E8FFFA9-5612-4F97-851F-A019B6C6CFEE In Process Professional Services Agreement Standard Form - 2020 Page 3 (f) Contractor shall have the right to immediately suspend Consultant’s performance of Services under this Agreement for any reason by giving written notice to Consultant. (g) In the event of conflicts in the Contract Documents, the order of precedence, highest to lowest, shall be as follows: (1) All modifications and change orders; (2) Agreement and Attachments; and (3) The Prime Contract Documents. In the event that there is an inconsistency or conflict among any of the provisions of the Agreement and the obligations and duties arising therefrom, the provision imposing the most stringent obligation on the part of the Consultant will control. ARTICLE 2 - CONTRACTUAL RELATIONSHIP In performing the Services, Consultant shall operate as, and have the status of, an independent contractor and shall not act as or be an agent or employee of Contractor. As an independent contractor, Consultant will be solely responsible for determining the means and methods for performing the Services. ARTICLE 3 - STANDARDS FOR PERFORMANCE Contractor enters into this Agreement with Consultant based on Consultant’s special skills and expertise. Consultant agrees that Consultant will perform all Services in accordance with the highest standards of care and practices, skill and diligence customarily observed by professional services firms sharing Consultant’s special expertise in the region where the Project is located. Consultant will comply with all applicable federal, state and local laws, codes, ordinances, rules, regulations, orders and decrees of any government or quasi-government entity having jurisdiction over the Project, the Project Site or the Services (the “Law”). Consultant further agrees that the Services shall be free of defects in workmanship. Notwithstanding Contractor’s acceptance of Consultant’s work, if the Services do not meet the standards specified herein or otherwise applicable, Contractor may require Consultant to correct at no cost to Contractor any defective or non-conforming Services. In addition, and in Contractor’s sole discretion, Contractor may correct the defective or nonconforming Services itself and charge Consultant for the total cost of such correction. The foregoing remedies are in addition to all other remedies at law or in equity or under this Agreement and shall not be deemed to be exclusive. ARTICLE 4 - COMPENSATION AND PAYMENT (a) In consideration of the full, complete and proper performance of the Services by the Consultant in accordance with the terms and provisions hereof, Contractor agrees to pay or cause to be paid to the Consultant the compensation provided herein. (b) Consultant understands that all payments to Consultant will be made only from a special fund and a specific source, namely, from payments made by Owner from time to time to Contractor in respect of the Services performed by Consultant. Contractor shall make payments to Consultant within ten (10) days after DocuSign Envelope ID: 6E8FFFA9-5612-4F97-851F-A019B6C6CFEE In Process Professional Services Agreement Standard Form - 2020 Page 4 receipt by Contractor of payment from Owner for the Services of Consultant for which payment has been made (or within such shorter period as may be required by law). (c) In the event Contractor is not paid by Owner any sum claimed due to Consultant, then the timing of Contractor’s obligation to pay shall, in addition to any other conditions set forth in this Agreement, be subject to the following conditions: (i) If Contractor does not pay Consultant sums claimed due under this Agreement as a result of nonpayment by the Owner and such nonpayment is thereafter “finally adjudged” (as hereafter defined) to have been caused by a breach by Contractor of the Prime Contract, then Contractor shall pay to Consultant such sum as is due under this Agreement, inclusive of and limited to simple interest thereon at the rate of 10% per annum accruing from the date such sum was first due and owing to Consultant as set forth above. The term “finally adjudged” as used in this Paragraph 4(d)(i) shall mean the date final judgment is entered in any action between Contractor and Owner for disputes under the Prime Contract. (ii) If Contractor does not pay Consultant sums claimed due under this Agreement as a result of nonpayment by the Owner and such nonpayment is caused by the Owner’s insolvency, bankruptcy, or lack of sufficient assets, or for reasons other than a breach by Contractor of the Prime Contract as provided in Paragraph 4(d)(i) above, then Consultant’s right to payment shall be conditioned upon the passage of such time as may be reasonable and necessary for Contractor to fully exercise and exhaust to final judgment its legal, extra judicial and appellate rights and remedies for collection of sums unpaid by Owner, together with the passage of such additional time as reasonably necessary for execution and collection by Contractor of any final judgment entered in its favor. Simple interest only on such sums as are due to Consultant under this Paragraph 4(d)(ii) shall accrue and be payable to Consultant at the rate of 10% per annum commencing from the expiration of the reasonable time reserved to Contractor in this Paragraph 4(d)(ii) for recovery and collection from Owner. (iii) Consultant agrees to preserve and maintain any lien claims it may have, whether mechanic’s, construction or materialmen’s lien claims, as well as bond and stop notice rights, all to the extent any such exist with respect to the Project, and to exercise and exhaust those rights in the event that Contractor does not pay Consultant sums due under this Agreement as a result of payment default on the part of the Owner under the Prime Contract. Nothing contained herein shall be interpreted as releasing or waiving any statutory mechanic’s, construction, and materialmen’s lien, bond or stop notice right reserved to Consultant under the law; provided however, that Consultant agrees in the event Consultant asserts a claim against any statutory or common law payment or performance bond issued in connection with the Project, the surety to such bond and the Contractor (if Contractor is a principal on the bond) shall have the right to assert as a defense to such claim, the nonoccurrence of any conditions to payments set forth in this Agreement, including without limitation the failure or delay of payment to Contractor. (d) Except as otherwise set forth herein, within thirty (30) calendar days after receipt of a progress invoice, Contractor shall pay Consultant the full amount of the invoice; provided, however, that the above conditions are met; provided further, that if Contractor objects to all or any portion of any invoice, it shall notify Consultant within ten (10) calendar days from receipt of invoice of its objections and both Parties DocuSign Envelope ID: 6E8FFFA9-5612-4F97-851F-A019B6C6CFEE In Process Professional Services Agreement Standard Form - 2020 Page 5 shall immediately make every effort to settle the disputed portion of the invoice prior to the date that payment is due. In the event the settlement of a disputed portion of an invoice is not reached by the date that payment is due, then Contractor will pay only that portion of the invoice that is not in dispute. In any dispute over payment, Consultant agrees that it will continue its performance of Services to completion. (e) Consultant agrees to furnish, prior to any payments hereunder, evidence satisfactory to Contractor that payment has been made to all its employees, subconsultants, subcontractors and suppliers in the full amount for which Consultant is invoicing Contractor. Such evidence shall include, without limitation, unconditional and conditional waivers and releases duly signed by all of Consultant’s employees, subconsultants, subcontractors and suppliers that prove Consultant has paid all amounts for which Consultant is invoicing Contractor. (f) All reports, drawings, data sheets, recommendations, photographs, computer print-outs, design criterion, calculations and material of a similar nature covered by payments hereunder shall become the property of Contractor and as such are not to be revealed to, distributed to, identified to or relied upon by other parties without the prior written consent of Contractor, Consultant will comply with all reasonable requests of Contractor so that Contractor may protect and preserve all property interests herein conveyed. ARTICLE 5 – INDEMNIFICATION AND DUTY TO DEFEND (a) To the fullest extent permitted by applicable law, Consultant specifically obligates itself to protect, immediately defend, indemnify and hold Contractor, Owner and their respective officers, directors, employees, agents and representatives and any other person indemnified by Owner (hereinafter referred to as the “Indemnitees”) harmless against claims, damages, losses, costs, expenses, including any fees of accountants, attorneys, experts or other professionals, or investigation expenses, and liabilities in law or in equity arising out of the Consultant’s operations and the Consultant’s Services. Consultant’s obligations to protect, indemnify and hold Indemnitees harmless, in addition to the separate and independent duty to defend, include, but are not limited to, the following: (i) All damages, liability, penalties, costs, losses, expenses (including attorneys’ fees and costs), causes of action, demands, claims or judgments (“Losses”), for any alleged or actual violation or infringement by Consultant (or Consultant’s employees or consultants or vendors of any tier) of any law, statute, codes, safety or occupational health orders, rules, regulations, standards, orders or any patent or patent right; (ii) All Losses resulting from injury to or death of any person (including Consultant’s employees) or damage to property of any kind (including economic loss), including the Services or the work of others on the Project, which injury, death or damage arises out of or is in any way connected with the performance of the Services; (iii) All Losses arising from: (1) construction liens, mechanics’ liens, or other materialman’s lien of any sort, stop notice claims and payment bond claims made by any sub-consultant, suppliers, laborers, rental companies, or the like, and (2) claims and liens for labor taxes, materials, appliances, equipment, and supplies whatsoever, including any costs, attorneys’ fees, and incidental damage resulting therefrom; and for failure by Consultant or any party acting on Consultant’s behalf to comply with DocuSign Envelope ID: 6E8FFFA9-5612-4F97-851F-A019B6C6CFEE In Process Professional Services Agreement Standard Form - 2020 Page 6 all laws, ordinances and regulations of all governmental authorities in any manner relating to the Services; (iv) Any and all claims, suits, and liability for Consultant’s failure or alleged failure to comply with the terms of this Agreement; and (b) To the fullest extent permitted by applicable law, Consultant’s indemnity and hold harmless obligations hereunder shall apply to any acts, omissions, willful misconduct, negligent conduct, other fault, or liability without fault of any person or entity, including but not limited to Consultant’s agents, employees, sub-consultants, and any other individual or entity for whom Consultant may be responsible, whether active or passive, and whether or not sole or concurrent with that of any other person or entity; except that this indemnity obligation shall not require that Consultant indemnify any of the persons or entities named as Indemnitees herein against claims arising from his, her, or its active negligence or willful misconduct. (c) Consultant acknowledges the separate and independent duty to defend set forth in this paragraph, and shall defend the referenced parties upon demand regardless of whether any indemnification obligations later arise. Consultant agrees that it shall, at its own cost, expense and risk, immediately upon tender, defend the Indemnitees in any and all claims, demands, actions, lien actions, suits or other legal, arbitral, administrative or other proceedings which may be brought or instituted against Indemnitees. In providing such defense, Consultant may appoint counsel of its choice, however, such counsel shall be (i) experienced and capable of effectively handling the subject matter assigned, and (ii) free of all conflicts of interests, biases and prejudices against indemnified parties. Consultant’s duty to defend the Indemnitees, as set forth above, shall arise immediately upon notification and demand by an Indemnitee to Consultant. Alternatively, Consultant may elect to pay, within 30 days of receipt of an invoice from Contractor its allocable share of Contractor’s defense fees and costs on an ongoing basis during the pendency of a claim. If Consultant fails to timely and adequately perform its obligations under this Article 5, Contractor shall have the right to pursue a claim against the Consultant for any resulting compensatory damages, interest on defe nse and indemnity costs, from the date incurred, consequential damages, and reasonable attorneys’ fees incurred to recover these amounts. ARTICLE 6 - INSURANCE (a) Prior to commencing the performance of the Services, Consultant shall procure, and thereafter maintain, at its own expense, for as long as this Agreement is in effect, the insurance coverage as set forth below in a form and from insurers acceptable to Contractor; and shall provide Contractor with certificates evidencing such coverage. Each certificate shall state that the insurer will give Contractor thirty (30) days prior written notice of any cancellation or material change in the policy(ies): (i) Worker's Compensation insurance, including Occupational Disease insurance, meeting the statutory requirements of the state in which work is to be performed, together with Broad Form All States Endorsement and containing Employer's liability insurance in an amount of at least $1,000,000 and a Waiver of Subrogation endorsement to the policy in favor of Swinerton Builders, its parent and affiliates. DocuSign Envelope ID: 6E8FFFA9-5612-4F97-851F-A019B6C6CFEE In Process Professional Services Agreement Standard Form - 2020 Page 7 (ii) Commercial General Liability Coverage under ISO form #CG0001- 1001or its equivalent with Liability Limits for Bodily Injury and Property Damage of not less than: $1,000,000 each Occurrence; $1,000,000 Products/Completed Operations Aggregate; $1,000,000 General Aggregate if applicable separately to this project and Defense Costs are in addition to the Aggregate limit. $2,000,000 General Aggregate if not applicable separately to this project or if Defense Costs are included in the Aggregate limit. Payment and/or satisfaction of any deductible shall be the sole and exclusive responsibility of Consultant. No portion of Consultant’s obligation to provide general liability and excess/umbrella insurance shall be satisfied by self-insurance or a self-insured retention absent the express written consent of the Contractor and the Owner. (iii) Business automobile insurance with limits of liability for bodily injury and property damage of $1,000,000 per accident. Such insurance shall apply on an “any auto” basis. (iv) Professional Liability Policy with Limited Contractual Liability Coverage in favor of Contractor and Owner and a deductible no greater than $25,000 per claim. This insurance shall be maintained for not less than the duration of the project and 5 years following completion of construction (tail). Retroactive date of such policy must be on or before the date Consultant began performing professional services on this Project. Insurer shall waive subrogation rights against Contractor and Owner and any other entity required in the prime contract. Limit of liability shall be not less than: Consultants: $1,000,000 per Claim Engineers: $2,000,000 per Claim (b) Consultant’s assumption of liability is independent from, and not limited in any manner by, the Consultant’s insurance coverage obtained pursuant to this Article 6 or otherwise. All amounts owed by Consultant to Contractor as a result of the liability provisions of this Agreement shall be paid on demand. (c) Consultant shall include the following entities as Additional Insureds on the General Liability policy required pursuant to this Agreement:  Swinerton Builders, its parent and affiliated companies;  CITY OF SAN LUIS OBISPO;  other name if applicable  Other parties as required by Owner in Prime Contract. ARTICLE 7 - ASSIGNMENT AND SUBCONTRACTING Consultant shall not assign this Agreement or funds due under this Agreement without the prior written consent of Contractor. Any assignment, subletting or delegation, in whole or in part, by Consultant of this Agreement, of the Services or of any claims arising hereunder without the prior written consent of Contractor shall be void. However, with the written consent of Contractor, which shall not be unreasonably withheld, Consultant may employ suitably trained and skilled persons or firms under contract with Consultant to perform a part of Consultant’s Services. Contractor shall have the right in its DocuSign Envelope ID: 6E8FFFA9-5612-4F97-851F-A019B6C6CFEE In Process Professional Services Agreement Standard Form - 2020 Page 8 sole discretion, and without Consultant’s consent, to assign its rights and obligations under this Agreement, as well as any claims arising hereunder, as allowable under the applicable law. ARTICLE 8 - TERMINATION Contractor shall have the right to terminate this Agreement, in whole or part, for convenience, by providing Consultant three (3) days written notice of termination. Upon expiration of the three (3) days, this Agreement will terminate and Consultant shall be paid the amount earned or reimbursable to it hereunder to the time specified in the Notice of Termination, including all reasonable actual costs incurred by Consultant in connection with discontinuing the Services unless Consultant is otherwise in breach of this Agreement. If Consultant is in breach of this Agreement, Contractor shall have the right to terminate this Agreement for cause, in which case Consultant shall be liable for all costs, damages and remedies at law and equity available to Contractor, including the costs incurred by Contractor to complete the Services. If Contractor is subsequently deemed to have wrongfully terminated Consultant for cause, such termination shall be treated as though it had been one for convenience pursuant to this Article 8, and Consultant shall only be entitled to such compensation as it would have been entitled to for a termination for convenience. Consultant shall have no further claim against Contractor with respect thereto. ARTICLE 9 - TAXES AND PERMITS (a) Consultant agrees to pay and comply with and hold Contractor harmless against the payment of all contributions, premiums or taxes of whatever nature, including any interest or penalties, which may be payable by it under any Federal, State or local laws arising out of the performance of this Agreement. (b) Consultant shall obtain and pay for all permits, plan checks, licenses, fees and certificates of inspection which may be necessary for the prosecution and completion of its duties and obligations hereunder, and shall arrange for any applicable inspections and approvals by public officials. ARTICLE 10 - LAWS, REGULATIONS, ORDINANCES (a) This Agreement shall be construed and enforced in accordance with the laws of the State where the Project is located, excluding choice of law rules. Venue for any legal action shall be in the State where the Project is located. (b) Consultant agrees to be bound by and, at its own cost, comply with all Federal, State and local laws, codes, ordinances, regulations and licensing requirements applicable to the performance of its duties and obligations hereunder. ARTICLE 11 – DISPUTES AND DISPUTE RESOLUTION (a) A Dispute shall arise when Contractor denies or otherwise challenges a timely claim brought by Consultant or the Parties have another form of disagreement arising from the Agreement (collectively “Dispute”). A Dispute shall also include any claim by Consultant that Contractor believes, in its discretion, involves, in whole or in part, disputes or claims between the Contractor and a third-party, including without limitation the Owner. DocuSign Envelope ID: 6E8FFFA9-5612-4F97-851F-A019B6C6CFEE In Process Professional Services Agreement Standard Form - 2020 Page 9 (b) Consultant shall not delay or postpone any Services pending resolution of any Dispute except as the Contractor and Consultant may otherwise agree in writing. Pending final resolution of a Dispute, including exhaustion of all applicable dispute resolution procedures, Consultant shall proceed diligently with the performance of the Services, including any disputed work, and based on such performance, Contractor shall continue to make payments for undisputed Services in accordance with this Agreement. (c) Disputes under the Prime Contract. If any Dispute between Consultant and Contractor arising out of or relating to this Agreement pertains in any way to a claim, dispute, or matter in question between Contractor and Owner arising out of or relating to the Prime Contract (“Related Prime Contract Dispute”), then this Dispute will be decided using the process utilized for the Related Prime Contract Dispute, and the laws governing the resolution of Prime Contract disputes, regardless of whether Consultant formally joins the process as a litigant or named party. Any and all claims of the Consultant related to a Related Prime Contract Dispute shall be handled in this manner. Consultant agrees to: (i) cooperate with Contractor, (ii) assist in the discovery and other preparations for the hearing, (iii) make its employees available for testimony before and after the hearing, (iv) share proportionately the legal fees and costs associated with the preparation for and execution of the hearing to the extent mutually agreed upon related to the amount of damage being pursued by the Contractor on Consultant’s behalf, and (v) stay any action filed by the Consultant against Contractor as long as the Consultant’s position is being diligently pursued by the Contractor in the hearing where the Related Prime Contract Dispute is being heard, and until all such appeals pertaining to the Related Prime Contract Dispute are exhausted. Consultant will be bound by the results of the dispute resolution procedure controlling the Related Prime Contract Dispute as it relates to Consultant, and such results shall be final. Nothing in this Agreement shall allow Consultant to be a named party in a dispute forum being utilized by Contractor and Owner where that Consultant has no legal standing to litigate its disputes before that forum. (1) Disputes between Contractor and Consultant. In the event that either (i) the provisions for resolution of Disputes between Contractor and Owner contained in the Prime Contract Documents do not permit joinder with disputes of third parties, such as Consultant, and Contractor elects not to enter into a liquidating agreement with Consultant, or (ii) if such Dispute is only between Contractor and Consultant, then the Parties shall submit the Disputes to the dispute resolution procedure set forth in Paragraphs 11(d) and 11(e) below. Contractor reserves the right to seek consolidation of any mediation, lawsuit or arbitration arising under this Agreement with any mediation, lawsuit or arbitration relating to disputes between Contractor and Owner. (2) Mediation between Contractor and Consultant. The Parties shall endeavor to resolve their Disputes through mediation. Any such mediation proceedings shall be under the auspices of and governed by the rules of the Prime Contract Documents. If the Prime Contract Documents do not provide rules for mediation, the mediation shall be governed by the Construction Industry Mediation Rules of the American Arbitration Association or the Parties may mutually agree to select another set of mediation rules. However, if the Project is in Hawaii, Parties agree that the mediation shall be conducted by Dispute Prevention & Resolution, Inc., and governed by its Mediation Rules. Neither Party shall proceed with arbitration or litigation until the completion of the mediation process. The costs of the mediator shall be shared equally by the Parties. (i) A request for mediation shall be filed in writing with the other Party to this A greement. The request may be made concurrently with the filing of a demand for arbitration or litigation but, in such event, mediation shall proceed in advance of arbitration or legal or equitable proceedings, which shall be stayed pending mediation for a period of 60 days DocuSign Envelope ID: 6E8FFFA9-5612-4F97-851F-A019B6C6CFEE In Process Professional Services Agreement Standard Form - 2020 Page 10 from the date of filing, unless stayed for a longer period by agreement of the Parties or court order. (ii) The mediation shall be held in the city or county where the Project is located, unless another location is mutually agreed upon. If the Project is located in Hawaii, it shall be held at the Honolulu office of Dispute Prevention & Resolution, Inc., unless Parties otherwise agree in writing. Any agreements reached in mediation shall be enforceable as settlement agreements in any court having jurisdiction thereof. (d) WAIVER OF JURY TRIAL. Unless otherwise agreed to in writing, for disputes that are not governed by Paragraph 11(c) above, Parties agree to resolve such disputes in either the state or federal court having jurisdiction of the matter in the location of the Project. THE PARTIES WAIVE THE RIGHT TO A JURY TRIAL, AND AGREE THAT THEIR DISPUTE WILL BE DETERMINED BY A JUDGE. THE PARTIES SPECIFICALLY AGREE AND ACKNOWLEDGE THAT THE NATURE AND COMPLEXITY OF CONSTRUCTION DISPUTES IS SUCH THAT MATTERS ARE BETTER AND MORE EFFICIENTLY DECIDED BY A JUDGE RATHER THAN A JURY. (e) Joinder of Other Parties. Consultant shall include in each of its contracts with its subconsultants a specific provision whereby the necessary party agrees to be joined or consolidated with any dispute procedure between Contractor and Consultant. Further, the Contractor and Consultant grant to any person or entity made a party to and conducted under this Section, whether by joinder or consolidation, the same rights of joinder and consolidation as the Contractor and Consultant under this Agreement. ARTICLE 12 - LICENSES To the extent required or applicable, Consultant warrants that it is currently licensed and in good standing to practice the profession and provide the Services in the state or jurisdiction where performed. ARTICLE 13 - ENTIRE AGREEMENT This Agreement represents the entire agreement between the Parties hereto with respect to the matters covered herein. No other agreements, representations, warranties or statements, whether oral or written, shall be binding on either party. ARTICLE 14 – SAVINGS CLAUSE If any portion of this Agreement is determined to be void, voidable or illegal, such portion shall be deemed severed from the other portions of this Agreement that are not void, voidable or illegal and such other portions shall be enforceable in accordance with their terms. No waiver of any provision or breach of this Agreement shall constitute a waiver of any other provision or breach of this Agreement. ARTICLE 15 - ATTORNEYS FEES AND COSTS In the event legal action is initiated to enforce the provisions of this Agreement, the prevailing party shall be awarded reasonable attorney’s fees and costs expended, including the costs of experts. ARTICLE 16 – WAIVER OF CONSEQUENTIAL AND PUNITIVE DAMAGES DocuSign Envelope ID: 6E8FFFA9-5612-4F97-851F-A019B6C6CFEE In Process Professional Services Agreement Standard Form - 2020 Page 11 With the exception of the express reservation contained herein, the Parties mutually waive claims against each other for consequential damages arising out of or relating to this Agreement. This waiver applies to all claims for any consequential, special, incidental, indirect, punitive or exemplary damages, and the Parties hereby release each other from any such liability; provided, however, that this limitation of liability shall not affect Consultant’s obligations under Article 5, for any such damages that may be owed to the Owner or other third parties, or to the extent that any such damages are recoverable from insurance. ARTICLE 17 – COUNTERPARTS AND ELECTRONIC SIGNATURES Contractor may establish a procedure by which the Agreement, or any one or more of the document issued under, pursuant to or in connection with the Agreement may be signed by one or both Parties using an electronic signature methodology designated by Contractor in its sole discretion. In such event, upon written notice to Consultant, Contractor may require that such documents be executed using such electronic signature methodology and the Parties’ use of such electronic signature methodology will be considered as binding as an ink or facsimile signature by a Party and may be relied upon by both Parties. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by their duly authorized representatives on the day and year above written. PROJECT NAME: City of San Luis Obispo Cultural Arts District Parking Structure HIVE ENGINEERING, Subcontractor SWINERTON BUILDERS, Contractor By: By: Name Dan Parker-King Name Kevin Hermreck Title President Title Project Manager Subcontractor License No: Swinerton License No: 092 DocuSign Envelope ID: 6E8FFFA9-5612-4F97-851F-A019B6C6CFEE 10/30/2023 C74672 In Process Certificate Of Completion Envelope Id: 6E8FFFA956124F97851FA019B6C6CFEE Status: Sent Subject: 23049042 City of Luis Obispo Cultural Arts District PS | HIVE ENGINEERING PSA Source Envelope: Document Pages: 13 Signatures: 1 Envelope Originator: Certificate Pages: 5 Initials: 2 Maria Sebastian AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) 2300 Clayton Road 8th Floor Concord, CA 94520 maria.sebastian@swinerton.com IP Address: 12.174.77.202 Record Tracking Status: Original 10/26/2023 1:22:34 PM Holder: Maria Sebastian maria.sebastian@swinerton.com Location: DocuSign Signer Events Signature Timestamp Kevin Hermreck khermreck@swinerton.com Project Manager Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 66.27.56.2 Sent: 10/27/2023 3:18:27 PM Viewed: 10/27/2023 3:22:49 PM Signed: 10/27/2023 3:23:24 PM Electronic Record and Signature Disclosure: Accepted: 8/22/2022 2:41:38 PM ID: 366730e7-3521-4806-9a86-a2c4025e19de Dan Parker-King dan@hiveengineering.us Security Level: Email, Account Authentication (None), Access Code Signature Adoption: Pre-selected Style Using IP Address: 68.78.72.225 Sent: 10/27/2023 3:23:26 PM Viewed: 10/30/2023 10:36:49 AM Signed: 10/30/2023 10:38:01 AM Electronic Record and Signature Disclosure: Accepted: 10/30/2023 10:36:49 AM ID: df07f082-0d34-4b06-94ba-583803619780 Kevin Hermreck khermreck@swinerton.com Project Manager Security Level: Email, Account Authentication (None) Sent: 10/30/2023 10:38:03 AM Electronic Record and Signature Disclosure: Accepted: 8/22/2022 2:41:38 PM ID: 366730e7-3521-4806-9a86-a2c4025e19de In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp In Process Carbon Copy Events Status Timestamp Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 10/27/2023 3:18:27 PM Payment Events Status Timestamps Electronic Record and Signature Disclosure In Process CONSUMER DISCLOSURE From time to time, Swinerton Builders (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through your DocuSign, Inc. (DocuSign) Express user account. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to these terms and conditions, please confirm your agreement by clicking the æI agreeÆ button at the bottom of this document. Getting paper copies At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. For such copies, as long as you are an authorized user of the DocuSign system you will have the ability to download and print any documents we send to you through your DocuSign user account for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.10 per-page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. To indicate to us that you are changing your mind, you must withdraw your consent using the DocuSign ôWithdraw Consentö form on the signing page of your DocuSign account. This will indicate to us that you have withdrawn your consent to receive required notices and disclosures electronically from us and you will no longer be able to use your DocuSign Express user account to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through your DocuSign user account all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. How to contact Swinerton Builders: Electronic Record and Signature Disclosure created on: 6/14/2012 9:15:29 AM Parties agreed to: Kevin Hermreck, Dan Parker-King, Kevin Hermreck In Process You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: bjohnston@swinerton.com To advise Swinerton Builders of your new e-mail address To let us know of a change in your e-mail address where we should send notices and disclosures electronically to you, you must send an email message to us at Project Manager or Project Assistant and in the body of such request you must state: your previous e-mail address, your new e-mail address. We do not require any other information from you to change your email address.. In addition, you must notify DocuSign, Inc to arrange for your new email address to be reflected in your DocuSign account by following the process for changing e-mail in DocuSign. To request paper copies from Swinerton Builders To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an e-mail to bjohnston@swinerton.com and in the body of such request you must state your e-mail address, full name, US Postal address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with Swinerton Builders To inform us that you no longer want to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your DocuSign account, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an e-mail to bjohnston@swinerton.com and in the body of such request you must state your e-mail, full name, IS Postal Address, telephone number, and account number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software Operating Systems: Windows2000¬ or WindowsXP¬ Browsers (for SENDERS): Internet Explorer 6.0¬ or above Browsers (for SIGNERS): Internet Explorer 6.0¬, Mozilla FireFox 1.0, NetScape 7.2 (or above) Email: Access to a valid email account Screen Resolution: 800 x 600 minimum In Process Enabled Security Settings: ò Allow per session cookies ò Users accessing the internet behind a Proxy Server must enable HTTP 1.1 settings via proxy connection ** These minimum requirements are subject to change. If these requirements change, we will provide you with an email message at the email address we have on file for you at that time providing you with the revised hardware and software requirements, at which time you will have the right to withdraw your consent. Acknowledging your access and consent to receive materials electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please verify that you were able to read this electronic disclosure and that you also were able to print on paper or electronically save this page for your future reference and access or that you were able to e-mail this disclosure and consent to an address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format on the terms and conditions described above, please let us know by clicking the æI agreeÆ button below. By checking the æI AgreeÆ box, I confirm that:  I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF ELECTRONIC CONSUMER DISCLOSURES document; and  I can print on paper the disclosure or save or send the disclosure to a place where I can print it, for future reference and access; and  Until or unless I notify Swinerton Builders as described above, I consent to receive from exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to me by Swinerton Builders during the course of my relationship with you. In Process SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 51 APPENDIX E CONTRACTOR/SUBCONTRACTOR INFORMATION SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 52 Contractor Name Discipline Contact Title Phone Email Swinerton Builders GC Daniel O’Connel Superintendent 949.491.6584 Daniel.OConnell@swinerton.com Hive Engineering SWPPP Dan Parker-King QSP 805-550-8546 dan@hiveengineering.us Additional subcontractor(s) will be named later. SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 53 APPENDIX F SWPPP TRAINING LOG SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 54 Trained Contractor Personnel Log Stormwater Management Training Log and Documentation Project Name: WDID #: 3 40C399332 Stormwater Management Topic: (check as appropriate)  Erosion Control  Wind Erosion Control  Non-Stormwater Management Stormwater Sampling  Sediment Control Tracking Control  Waste Management and Materials Pollution Control Objective: Location: Date: Instructor: Telephone Course Length Attendee Roster (Attach additional forms if necessary) Name Company Phone As needed, add proof of external training (e.g., course completion certificates, credentials for QSP, QSD). SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 55 APPENDIX G SITE MAP EROSION CONTROL PLAN SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 56 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 57 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 58 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 59 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 60 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 61 APPENDIX H RISK LEVEL CALCULATIONS SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 62 A B C 1 Sediment Risk Factor Worksheet Entry 2 A) R Factor 3 Analyses of data indicated that when factors other than rainfall are held constant, soil loss is directly proportional to a rainfall factor composed of total storm kinetic energy (E) times the maximum 30-min intensity (I30) (Wischmeier and Smith, 1958). The numerical value of R is the average annual sum of EI30 for storm events during a rainfall record of at least 22 years. "Isoerodent" maps were developed based on R values calculated for more than 1000 locations in the Western U.S. Refer to the link below to determine the R factor for the project site. 4 http://cfpub.epa.gov/npdes/stormwater/LEW/lewCalculator.cfm 5 R Factor Value 71.48 6 B) K Factor (weighted average, by area, for all site soils) 7 The soil-erodibility factor K represents: (1) susceptibility of soil or surface material to erosion, (2) transportability of the sediment, and (3) the amount and rate of runoff given a particular rainfall input, as measured under a standard condition. Fine- textured soils that are high in clay have low K values (about 0.05 to 0.15) because the particles are resistant to detachment. Coarse-textured soils, such as sandy soils, also have low K values (about 0.05 to 0.2) because of high infiltration resulting in low runoff even though these particles are easily detached. Medium-textured soils, such as a silt loam, have moderate K values (about 0.25 to 0.45) because they are moderately susceptible to particle detachment and they produce runoff at moderate rates. Soils having a high silt content are especially susceptible to erosion and have high K values, which can exceed 0.45 and can be as large as 0.65. Silt-size particles are easily detached and tend to crust, producing high rates and large volumes of runoff. Use Site- specific data must be submitted. 8 Site-specific K factor guidance 9 K Factor Value 0.24 10 C) LS Factor (weighted average, by area, for all slopes) 11 The effect of topography on erosion is accounted for by the LS factor, which combines the effects of a hillslope-length factor, L, and a hillslope-gradient factor, S. Generally speaking, as hillslope length and/or hillslope gradient increase, soil loss increases. As hillslope length increases, total soil loss and soil loss per unit area increase due to the progressive accumulation of runoff in the downslope direction. As the hillslope gradient increases, the velocity and erosivity of runoff increases. Use the LS table located in separate tab of this spreadsheet to determine LS factors. Estimate the weighted LS for the site prior to construction. 12 LS Table 13 LS Factor Value 1.25 14 15 Watershed Erosion Estimate (=RxKxLS) in tons/acre 21 16 Site Sediment Risk Factor MEDIUM 17 Low Sediment Risk: < 15 tons/acre 18 Medium Sediment Risk: >=15 and <75 tons/acre 19 High Sediment Risk: >= 75 tons/acre 20 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 63 Receiving Water (RW) Risk Factor Worksheet Entry Score A. Watershed Characteristics yes/no A.1. Does the disturbed area discharge (either directly or indirectly) to a 303(d)-listed waterbody impaired by sediment (For help with impaired waterbodies please visit the link below) or has a USEPA approved TMDL implementation plan for sediment?: YES HIGH http://www.waterboards.ca.gov/water_issues/programs/tmdl/integrated2010.shtml OR A.2. Does the disturbed area discharge to a waterbody with designated beneficial uses of SPAWN & COLD & MIGRATORY? (For help please review the appropriate Regional Board Basin Plan) http://www.waterboards.ca.gov/waterboards_map.shtml Region 1 Basin Plan Region 2 Basin Plan Region 3 Basin Plan Region 4 Basin Plan Region 5 Basin Plan Region 6 Basin Plan Region 7 Basin Plan Region 8 Basin Plan Region 9 Basin Plan Receiving Water Risk Sediment Risk Low Medium High Low Level 1 Level 2 High Level 2 Level 3 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering 64 APPENDIX I CHAIN-OF-CUSTODY (COC) FORM SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering DESTINATION LAB: ATTN: ADDRESS: Office Phone: Cell Phone: REQUESTED ANALYSIS Notes: SAMPLED BY: Contact: Facility Name Client Sample ID Sample Date Sample Time Sample Matrix Container # Type Pres. SENDER COMMENTS: RELINQUISHED BY Signature: Print: Company: Date: TIME: LABORATORY COMMENTS: RECEIVED BY Signature: Print: Company: Date: TIME: SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering APPENDIX J SWPPP AMENDMENT(S) & LOG SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering Amendment Log Facility Name: Cultural Arts district Parking Structure Waste Discharge Identification (WDID): 565511 Amendment No. Date Page and Section No. Requested By Brief Description of Amendment; include reason for change, site location, and BMP modifications. Prepared and Approved By 1 8/31/23 2.1 C.1.0 DPK Update risk level based on proximity to waterbody. Updated detail for inlet protection based on phasing DPK 11/1/23 SWPPP Document DPK Updated for new contractor, and new phase. DPK SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering APPENDIX K CORRECTIVE ACTION LOG SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering EXAMPLE Corrective Action Log Project Name: ______________________________________________ NPDES ID Number: __________________________________________ Section A – Individual Completing this Log Name: Title: Company Name: Email: Address: Phone Number: Section B – Details of the Problem (CGP Part 5.4.1.a) Complete this section within 24 hours of discovering the condition that triggered corrective action. Date problem was first identified: Time problem was first identified: What site conditions triggered this corrective action? (Check the box that applies. See instructions for a description of each triggering condition (1 thru 6).)  ☐ 1 ☐ 2 ☐ 3 ☐ 4 ☐ 5a ☐ 5b ☐ 6 Specific location where problem identified: Provide a description of the specific condition that triggered the need for corrective action and the cause (if identifiable): Section C – Corrective Action Completion (CGP Part 5.4.1.b) Complete this section within 24 hours after completing the corrective action. For site condition # 1, 2, 3, 4, or 6 (those not related to a dewatering discharge) confirm that you met the following deadlines (CGP Part 5.2.1): ☐ Immediately took all reasonable steps to address the condition, including cleaning up any contaminated surfaces so the material will not discharge in subsequent storm events. AND ☐ Completed corrective action by the close of the next business day, unless a new or replacement control, or significant repair, was required. OR ☐ Completed corrective action within seven (7) calendar days from the time of discovery because a new or replacement control, or significant repair, was necessary to complete the installation of the new or modified control or complete the repair. OR ☐ It was infeasible to complete the installation or repair within 7 calendar days from the time of discovery. Provide the following additional information: Explain why 7 calendar days was infeasible to complete the installation or repair: SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering Provide your schedule for installing the stormwater control and making it operational as soon as feasible after the 7 calendar days: For site condition # 5a, 5b, or 6 (those related to a dewatering discharge), confirm that you met the following deadlines: ☐ Immediately took all reasonable steps to minimize or prevent the discharge of pollutants until a solution could be implemented, including shutting off the dewatering discharge as soon as possible depending on the severity of the condition taking safety considerations into account. ☐ Determined whether the dewatering controls were operating effectively and whether they were causing the conditions. ☐ Made any necessary adjustments, repairs, or replacements to the dewatering controls to lower the turbidity levels below the benchmark or remove the visible plume or sheen. Describe any modification(s) made as part of corrective action: (Insert additional rows below if applicable) Date of completion: SWPPP update necessary? If yes, date SWPPP was updated: 1. ☐ Yes ☐ No 2. ☐ Yes ☐ No Section D - Signature and Certification (CGP Part 5.4.2) “I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information contained therein. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information contained is, to the best of my knowledge and belief, true, accurate, and complete. I have no personal knowledge that the information submitted is other than true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.” MANDATORY: Signature of Operator or “Duly Authorized Representative:” Signature: Date: Printed Name: Affiliation: OPTIONAL: Signature of Contractor or Subcontractor Signature: Date: Printed Name: Affiliation: SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering General Instructions This Corrective Action Log Template is provided to assist you creating a corrective action log that complies with the minimum reporting requirements of Part 5.4 of the EPA’s Construction General Permit (CGP). For each triggering condition on your site, you will need to fill out a separate corrective action log. The entire form must be completed to be compliant with the requirements of the permit. (Note: In Section C, if you do not need the number of rows provided in the corrective action log, you may delete these or cross them off. Alternatively, if you need more space to describe any modifications, you may insert additional rows in the electronic version of this form or use the bottom of the page in the field version of this form.) If you are covered under a State CGP, this template may be helpful in developing a log that can be used for that permit; however, you will likely need to modify this form to meet the specific requirements of any State-issued permit. If your permitting authority requires you to use a specific corrective action log, you should not use this template. Instructions for Section A Individual completing this form Enter the name of the person completing this log. Include the person’s contact information (title, affiliated company name, address, email, and phone number). Instructions for Section B You must complete Section B within 24 hours of discovering the condition that triggered corrective action. (CGP Part 5.4) When was the problem first discovered? Specify the date and time when the triggering condition was first discovered. What site conditions triggered this corrective action? (CGP Parts 5.1 and 5.3) Check the box corresponding to the numbered triggering condition below that applies to your site. 1. A stormwater control needs a significant repair or a new or replacement control is needed, or, in accordance with Part Error! Reference source not found., you find it necessary to repeatedly (i.e., 3 or more times) conduct the same routine maintenance fix to the same control at the same location (unless you document in your inspection report under Part Error! Reference source not found. that the specific reoccurrence of this same problem should still be addressed as a routine maintenance fix under Part Error! Reference source not found.); 2. A stormwater control necessary to comply with the requirements of this permit was never installed, or was installed incorrectly; 3. Your discharges are not meeting applicable water quality standards; 4. A prohibited discharge has occurred (see Part 1.3); 5. During discharge from site dewatering activities: a. The weekly average of your turbidity monitoring results exceeds the 50 NTU benchmark (or alternate benchmark if approved by EPA pursuant to Part Error! Reference source not found.); or b. You observe or you are informed by EPA, State, or local authorities of the presence of any of the following at the point of discharge to a receiving water flowing through or immediately adjacent to your site and/or to constructed or natural site drainage features or storm drain inlets: · sediment plume · suspended solids · unusual color · presence of odor SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering · decreased clarity · presence of foam · visible sheen on the water surface or visible oily deposits on the bottom or shoreline of the receiving water 6. EPA requires corrective action as a result of permit violations found during an inspection carried out under Part 4.8. Provide a description of the problem (CGP Part 5.4.1.a) Provide a summary description of the condition you found that triggered corrective action, the cause of the problem (if identifiable), and the specific location where it was found. Be as specific as possible about the location; it is recommended that you refer to a precise point on your site map. Instructions for Section C You must complete Section C within 24 hours after completing the correction action. (CGP Part 5.4) Deadlines for completing corrective action for condition # 1, 2, 3, 4, or 6 (if not relating to a dewatering discharge) (CGP Part 5.2.1) Check the box to confirm that you met the deadlines that apply to each triggering condition. You are always required to check the first box (i.e., Immediately took all reasonable steps to address the condition, including cleaning up any contaminated surfaces so the material will not discharge in subsequent storm events.). Only one of the next three boxes should be checked depending on the situation that applies to this corrective action. Check the second box if the corrective action for this particular triggering condition does not require a new or replacement control, or a significant repair. These actions must be completed by the close of the next business day from the time of discovery of the condition. Check the third box if the corrective action for this particular triggering condition requires a new or replacement control, or a significant repair. These actions must be completed by no later than seven calendar days from the time of discover of the condition. Check the fourth box if the corrective action for this particular triggering condition requires a new or replacement control, or a significant repair, and if it is infeasible to complete the work within seven calendar days. Additionally, you will need to fill out the table below the checkbox that requires: 1. An explanation as to why it was infeasible to complete the installation or repair within seven calendar days of discovering the condition. 2. Provide the schedule you will adhere to for installing the stormwater control and making it operational as soon as feasible after the seventh day following discovery. Note: Per Part 5.2.1.c, where these actions result in changes to any of the stormwater controls or procedures documented in your SWPPP, you must modify your SWPPP accordingly within seven calendar days of completing this work. Deadlines for completing corrective action for condition # 5a, 5b, or 6 related to a dewatering discharge (CGP Part 5.2.2) These deadlines apply to conditions relating to construction dewatering activities. Check the box to confirm that you met the deadlines that apply to each triggering condition. You are required to check all of the boxes in this section to indicate your compliance with the corrective action deadlines. List of modification(s) to correct problem Provide a list of modifications you completed to correct the problem. Date of completion Enter the date you completed the modification. The work must be completed by the deadline you indicated above. SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering SWPPP update necessary? Check “Yes” or “No” to indicate if a SWPPP update is necessary consistent with Part 7.4.1.a in order to reflect changes implemented at your site. If “Yes,” then enter the date you updated your SWPPP. The SWPPP updates must be made within seven calendar days of completing a corrective action. (CGP Part 5.2.1.c) Instructions for Section D Each corrective action log entry must be signed and certified following completion of Section D to be considered complete. (CGP Part 5.4.2) Operator or “Duly Authorized Representative” – MANDATORY (CGP Appendix G Part G.11.2 and CGP Appendix H Section X) At a minimum, the corrective action log must be signed by either (1) the person who signed the NOI, or (2) a duly authorized representative of that person. The following requirements apply: If the signatory will be the person who signed the NOI for permit coverage, as a reminder, that person must be one of the following types of individuals: · For a corporation: By a responsible corporate officer. For the purpose of this subsection, a responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy- or decision-making functions for the corporation, or (ii) the manager of one or more manufacturing, production, or operating facilities, provided, the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long term environmental compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. · For a partnership or sole proprietorship: By a general partner or the proprietor, respectively. · For a municipality, State, Federal, or other public agency: By either a principal executive officer or ranking elected official. For purposes of this subsection, a principal executive officer of a Federal agency includes (i) the chief executive officer of the agency, or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency (e.g., Regional Administrator of EPA). If the signatory will be a duly authorized representative, the following requirements must be met: · The authorization is made in writing by the person who signed the NOI (see above); · The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity such as the position of plant manager, operator of a well or a well field, superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative may thus be either a named individual or any individual occupying a named position); and · The signed and dated written authorization is included in the SWPPP. A copy must be submitted to EPA, if requested. Sign, date and print your name and affiliation. SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering Contractor or Subcontractor - OPTIONAL Where you rely on a contractor or subcontractor to complete this log and the associated corrective action, you should consider requiring the individual(s) to sign and certify each log entry. Note that this does not relieve you, the permitted operator, of the requirement to sign and certify the log as well. If applicable, sign, date, and print your name and affiliation. Recordkeeping Logs must be retained for at least 3 years from the date your permit coverage expires or is terminated. (CGP Part 5.4.4) Keep copies of your signed corrective action log entries at the site or at an easily accessible location so that it can be made immediately available at the time of an on-site inspection or upon request by EPA. (CGP Part 5.4.3) Include a copy of the corrective action log in your SWPPP. (CGP Part 7.2.7.e) Note While EPA has made every effort to ensure the accuracy of all instructions contained in this template, it is the permit, not this template, that determines the actual obligations of regulated construction stormwater discharges. In the event of a conflict between this template and any corresponding provision of the CGP, you must abide by the requirements in the permit. EPA welcomes comments on this Corrective Action Log Template at any time and will consider those comments in any future revision. You may contact EPA for CGP-related inquiries at cgp@epa.gov SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering APPENDIX L SAMPLING LOG SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering Visual Observation Log - Monthly Date and Time of Inspection: Report Date: Facility Name: Weather Antecedent Conditions (last 48 hours): Current Weather: NSWD Observations Were any authorized non-stormwater discharges observed? Yes □ No □ Were any unauthorized non-stormwater discharges observed? Yes □ No □ If yes to either, identify source: Outdoor Industrial Equipment and Storage Area Observations Complete Monthly BMP Inspection Report Yes □ No □ Drainage Area 1: Were any deficiencies or any other potential source of industrial pollutants observed? Yes □ No □ Drainage Area 2: Were any deficiencies or any other potential source of industrial pollutants observed? Yes □ No □ Drainage Area 3: Were any deficiencies or any other potential source of industrial pollutants observed? Yes □ No □ If yes to any, describe: Exception Documentation (explanation required if inspection could not be conducted). Inspector Information Inspector Name: Inspector Title: Signature: Date: SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering Visual Observation Log – Sampling Events Date and Time of Inspection: Report Date: Facility Name: Weather Antecedent Conditions (last 48 hours): Weather: Precipitation Total: Predicted % chance of rain: Estimate storm beginning: (date and time) Estimate storm duration: (hours) Estimate time since last storm: (days or hours) Rain gauge reading: (inches) Sampling Event Observations Observations: If yes identify location and observe drainage area to identify probable cause Odors Yes □ No □ Floating material Yes □ No □ Suspended Material Yes □ No □ Sheen Yes □ No □ Discolorations Yes □ No □ Turbidity Yes □ No □ NSWD Observations Were any authorized non-stormwater discharges observed? Yes □ No □ Were any unauthorized non-stormwater discharges observed? Yes □ No □ If yes to either, identify source Drainage Area Observations Drainage Area Deficiencies Noted SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering Exception Documentation (explanation required if inspection could not be conducted). Inspector Information Inspector Name: Inspector Title: Signature: Date: SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering Sampling Log Facility Name: Date: Time Start: Sampler Name: Field Meter Calibration pH Meter ID No./Description: Calibration Date/Time: Field pH Measurements Discharge Location Identifier pH Time Samples Collected Discharge Location Identifier Constituent Time Oil and Grease Total Suspended Solids Additional Sampling Notes: Time End: SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering APPENDIX M ANNUAL FEE STATEMENT AND RECIEPTS SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering FOR INFORMATION ONLY. SEE THE WATERBOARDS.CA.GOV WEBSITE FOR FEES AND STIPULATONS. CALIFORNIA CODE OF REGULATIONS TITLE 23. Division 3. Chapter 9. Waste Discharge Reports and Requirements Article 1. Fees Section 2200. Annual Fee Schedules. Each person for whom waste discharge requirements have been prescribed pursuant to Section 13263 of the Water Code shall submit, to the state board, an annual fee in accordance with the following schedules. The fee shall be submitted for each waste discharge requirement order issued to that person.1 (a) The annual fees for persons issued waste discharge requirements (WDRs), except as provided in subdivisions (a)(3), (a)(4), (b), and (c), shall be based on the discharge’s threat to water quality (TTWQ) and complexity (CPLX) rating according to the following fee schedule, plus applicable surcharge(s). SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering Oil and gas produced water storage and disposal facilities regulated by waste discharge requirements are subject to a surcharge per barrels of waste water discharged in the prior 12 months according to the following schedule: TTWQ & CPLX Rating No Barrels 1 to 999,999 Barrels 1,000 SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering APPENDIX N CONSTRUCTION SITE MONITORING INSPECTION FORM SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering BMP INSPECTION REPORT Date and Time of Inspection: Date Report Written: Inspection Type: (Circle one) Weekly Complete Parts I,II,III and VII Pre-Storm Complete Parts I,II,III,IV and VII During Rain Event Complete Parts I, II, III, V, and VII Post-Storm Complete Parts I,II,III,VI and VII Part I. General Information Site Information Construction Site Name: Construction stage and completed activities: Approximate area of site that is exposed: Photos Taken: (Circle one) Yes No Photo Reference IDs: Weather Estimate storm beginning: (date and time) Estimate storm duration: (hours) Estimate time since last storm: (days or hours) Rain gauge reading and location: (in) Is a “Qualifying Event” predicted or did one occur (i.e., 0.5” rain with 48-hrs or greater between events)? (Y/N) If yes, summarize forecast: Exemption Documentation (explanation required if inspection could not be conducted). Visual inspections are not required outside of business hours or during dangerous weather conditions such as flooding or electrical storms. Inspector Information Inspector Name: Inspector Title: Signature: Date: SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering Part II. BMP Observations. Describe deficiencies in Part III. Minimum BMPs for Risk Level 2 Sites Failures or other short comings (yes, no, N/A) Action Required (yes/no) Action Implemented (Date) Good Housekeeping for Construction Materials Inventory of products (excluding materials designed to be outdoors) Stockpiled construction materials not actively in use are covered and bermed All chemicals are stored in watertight containers with appropriate secondary containment, or in a completely enclosed storage shed Construction materials are minimally exposed to precipitation BMPs preventing the off-site tracking of materials are implemented and properly effective Good Housekeeping for Waste Management Wash/rinse water and materials are prevented from being disposed into the storm drain system Portable toilets are contained to prevent discharges of waste Sanitation facilities are clean and with no apparent for leaks and spills Equipment is in place to cover waste disposal containers at the end of business day and during rain events Discharges from waste disposal containers are prevented from discharging to the storm drain system / receiving water Stockpiled waste material is securely protected from wind and rain if not actively in use Procedures are in place for addressing hazardous and non- hazardous spills Appropriate spill response personnel are assigned and trained Equipment and materials for cleanup of spills is available onsite Washout areas (e.g., concrete) are contained appropriately to prevent discharge or infiltration into the underlying soil Good Housekeeping for Vehicle Storage and Maintenance Measures are in place to prevent oil, grease, or fuel from leaking into the ground, storm drains, or surface waters All equipment or vehicles are fueled, maintained, and stored in a designated area with appropriate BMPs Vehicle and equipment leaks are cleaned immediately and disposed of properly SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering Part II. BMP Observations Continued. Describe deficiencies in Part III. Minimum BMPs for Risk Level 2 Sites Adequately designed, implemented and effective (yes, no, N/A) Action Required (yes/no) Action Implemented (Date) Good Housekeeping for Landscape Materials Stockpiled landscape materials such as mulches and topsoil are contained and covered when not actively in use Erodible landscape material has not been applied 2 days before a forecasted rain event or during an event Erodible landscape materials are applied at quantities and rates in accordance with manufacturer recommendations Bagged erodible landscape materials are stored on pallets and covered Good Housekeeping for Air Deposition of Site Materials Good housekeeping measures are implemented onsite to control the air deposition of site materials and from site operations Non-Stormwater Management Non-Stormwater discharges are properly controlled Vehicles are washed in a manner to prevent non-stormwater discharges to surface waters or drainage systems Streets are cleaned in a manner to prevent unauthorized non- stormwater discharges to surface waters or drainage systems. Erosion Controls Wind erosion controls are effectively implemented Effective soil cover is provided for disturbed areas inactive (i.e., not scheduled to be disturbed for 14 days) as well as finished slopes, open space, utility backfill, and completed lots The use of plastic materials is limited in cases when a more sustainable, environmentally friendly alternative exists. Sediment Controls Perimeter controls are established and effective at controlling erosion and sediment discharges from the site Entrances and exits are stabilized to control erosion and sediment discharges from the site Sediment basins are properly maintained Linear sediment control along toe of slope, face of slope an at grade breaks (Risk Level 2 & 3 Only) Limit construction activity to and from site to entrances and exits that employ effective controls to prevent offsite tracking (Risk Level 2 & 3 Only) SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering Ensure all storm, drain inlets and perimeter controls, runoff control BMPs and pollutants controls at entrances and exits are maintained and protected from activities the reduce their effectiveness (Risk Level 2 & 3 Only) Inspect all immediate access roads daily (Risk Level 2 & 3 Only) Run-On and Run-Off Controls Run-on to the site is effectively managed and directed away from all disturbed areas. Other Are the project SWPPP and BMP plan up to date, available on-site and being properly implemented? Part III. Descriptions of BMP Deficiencies Deficiency Repairs Implemented: Note - Repairs must begin within 72 hours of identification and, complete repairs as soon as possible. Start Date Action 1. 2. 3. 4. Part IV. Additional Pre-Storm Observations. Note the presence or absence of floating and suspended materials, sheen, discoloration, turbidity, odors, and source(s) of pollutants(s). Yes, No, N/A Do stormwater storage and containment areas have adequate freeboard? If no, complete Part III. Are drainage areas free of spills, leaks, or uncontrolled pollutant sources? If no, complete Part VII and describe below. Notes: Are stormwater storage and containment areas free of leaks? If no, complete Parts III and/or VII and describe below. SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering Part V. Additional During Storm Observations. If BMPs cannot be inspected during inclement weather, list the results of visual inspections at all relevant outfalls, discharge points, and downstream locations. Note odors or visible sheen on the surface of discharges. Complete Part VII (Corrective Actions) as needed. Outfall, Discharge Point, or Other Downstream Location Location Description Location Description Location Description Location Description Location Description Location Description Location Description Location Description Part VI. Additional Post-Storm Observations. Visually observe (inspect) stormwater discharges at all discharge locations within two business days (48 hours) after each qualifying rain event, and observe (inspect) the discharge of stored or contained stormwater that is derived from and discharged subsequent to a qualifying rain event producing precipitation of ½ inch or more at the time of discharge. Complete Part VII (Corrective Actions) as needed. Discharge Location, Storage or Containment Area Visual Observation Notes: SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering Part VII. Additional Corrective Actions Required. Identify additional corrective actions not included with BMP Deficiencies (Part III) above. Note if SWPPP change is required. Required Actions Implementation Date SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering APPENDIX O RAIN EVENT ACTION PLAN SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering Rain Event Action Plan (REAP) Date of REAP WB DID Number: Date Rain Predicted to Occur: Predicted % chance of rain: Predicted Rain Event Triggered Actions Below is a list of suggested actions and items to review for this project. Each active Trade should check all material storage areas, stockpiles, waste management areas, vehicle and equipment storage and maintenance, areas of active soil disturbance, and areas of active work to ensure the proper implementation of BMPs. Project-wide BMPs should be checked and cross- referenced to the BMP progress map. Trade or Activity Suggested action(s) to perform / item(s) to review prior to rain event  Information & Scheduling  Inform trade supervisors of predicted rain  Check scheduled activities and reschedule as needed  Alert erosion/sediment control provider  Alert sample collection contractor (if applicable)  Schedule staff for extended rain inspections  Check Erosion and Sediment Control (ESC) material stock  Review BMP progress map  Other:    Material storage areas  Material under cover or in sheds (ex: treated woods and metals)  Perimeter control around stockpiles  Other:    Waste management areas  Dumpsters closed  Drain holes plugged  Recycling bins covered  Sanitary stations bermed and protected from tipping  Other:    Trade operations  Exterior operations shut down for event (e.g., no concrete pours or paving)  Soil treatments (e.g., fertilizer) ceased within 24 hours of event  Materials and equipment (e.g., tools) properly stored and covered  Waste and debris disposed in covered dumpsters or removed from site  Trenches and excavations protected  Perimeter controls around disturbed areas  Fueling and repair areas covered and bermed  Other:    Site ESC BMPs  Adequate capacity in sediment basins and traps  Site perimeter controls in place  Catch basin and drop inlet protection in place and cleaned  Temporary erosion controls deployed  Temporary perimeter controls deployed around disturbed areas and stockpiles  Roads swept; site ingress and egress points stabilized  Other:    Concrete rinse out area  Adequate capacity for rain  Wash-out bins covered  Other:    Spill and drips  All incident spills and drips, including paint, stucco, fuel, and oil cleaned  Drip pans emptied  Other:  SWPPP SLO Downtown Parking Structure Prepared by Hive Engineering  Other / Discussion / Diagrams              Attach a printout of the weather forecast from the NOAA website to the REAP. I certify under penalty of law that this Rain Event Action Plan (REAP) will be performed in accordance with the General Permit by me or under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Date: Qualified SWPPP Practitioner (Use ink please) 69 From:Ryan Stefanek <rstefanek@kitchell.com> Sent:Friday, October 27, 2023 2:49 PM To:Kacsinta, Madeline Cc:Tally Richtsmeier; Tom Fee Subject:RE: NEW PO - pending Attachments:SLO Cultural Arts CM Contract-FE.pdf; SLO City CADPS CM RFP-Additional Services 004 Fee Proposal Letter 23.10.11.pdf; 710100 115256.pdf This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Hey Madeline, Thanks for leƫng us know. As we discussed on the phone I back checked and aƩached the contracts. My numbers match for Add Service 004 and Phase 2 scope, but I have a different number of Original PO – Remaining $311,387.95. It looks like it’s a difference of $71,528.92 from your $239,859.03. I am basing my number off our Balance Remaining on Contract from our last billing (see a Ʃached) for September. Let me know if you need me to look further into anything for you. Thanks and have a great weekend! Ryan Stefanek, Project Manager I Kitchell CEM 1304 Broad Street San Luis Obispo, CA 93401 Cell: 805-674-6598 | Direct: 916-713-6975 Follow us: Facebook | Twitter | LinkedIn | KitchellProgress.com From: Kacsinta, Madeline <MKacsint@slocity.org> Sent: Friday, October 27, 2023 10:48 AM To: Ryan Stefanek <rstefanek@kitchell.com>; Tally Richtsmeier <trichts@kitchell.com>; Tom Fee <tfee@kitchell.com> Subject: NEW PO - pending EXTERNAL EMAIL Hi Ryan, I just put through your new PO, and it is pending approval, but I wanted to give you a heads up. Below is a breakdown of the new PO. I am rolling in the Phase 2 scope as well. Attached is the original agreement that I am pulling from on the phase 2 scope. Original PO - Remining $239,859.03 Add Service 4 $237,600.00 Phase 2 Scope $3,436,094.00 70 TOTAL $ 3,913,553.03 I am hoping to get that PO number to you by end of today or Monday at the latest. Please let me know if you have any questions or concerns. Thank you, Madeline Kacsinta Engineer III Public Works 919 Palm, San Luis Obispo, CA 93401-3218 E MKacsint@slocity.org T 805.781.7094 slocity.org Stay connected with the City by signing up for e-notifications Invoice No.115256October 9, 2023 City Of San Luis Obispo 919 Palm Street San Luis Obispo, CA 93401‐3218 Attn: Madeline Kacsinta Email: mkacsinta@slocity.org  Contract 2022‐DPW129 DPW CIP Project #23‐102 Contract Percent  Balance Remaining Billings Previous Current Description Amount Complete on Contract To Date Billings Billing CM Professional Services 449,220.00$         74.01% 116,730.00$               332,490.00$             286,725.00$             45,765.00$                Sub‐contractor Earth Systems 111,553.00$         0.00% 111,553.00$               ‐$ ‐$  Sub‐contractor Rincon 29,638.00$            97.58%717.90$  28,920.10$               27,853.10$               1,067.00$                  Rincon Phase 1B ‐ Add Service 1 49,680.00$            94.22%2,872.93$46,807.07$               39,997.75$               6,809.32$                  Rincon Phase 2 ‐ Add Service 2 62,705.00$            0.00% 62,705.00$                 ‐$ ‐$  Rincon Phase 1B ‐ Add Service 3 91,774.00$            90.47%8,746.59$83,027.41$               70,112.86$               12,914.55$                Reimbursables 9,790.00$              17.65%8,062.53$1,727.47$                 1,650.94$                 76.54$   Total 804,360.00$         61.29% 311,387.95$               492,972.05$             426,339.65$             66,632.41$                TOTAL AMOUNT DUE:66,632.41$                SLO City Of Cultrural Arts District Parking Structure KCEM Project 710100 For Professional Services for the Period: 8/28/2023 ‐ 9/24/2023 Due to the increase in fraudulent activity and cyber theft, please note we have NOT made any changes to our mailing address or ACH  information. If there is a change in the future, you will be contacted by a known Kitchell person. If you need to confirm the payment  information, please reach out to us.  Please Remit Payment to: 1 October 9, 2023 Invoice No.115256 Hourly Current Current Previous Previous Hours Billed Employee Title Rate Hours Billing Hours Billing To Date To Date Randy Rominger Project Executive 230.00$  ‐$                 2.00 460.00$           2.00 460.00$             Tully Wyatt Project Director 230.00$  1.00 230.00$           22.00 5,060.00$        23.00 5,290.00$         Andrew Goh Resident Engineer 205.00$  ‐$                 38.00 7,790.00$        38.00 7,790.00$         Ryan Stefanek Quality Assurance Manager 170.00$  178.00 30,260.00$     1136.50 193,205.00$   1314.50 223,465.00$     Tally Perry Project Engineer II 130.00$  117.50 15,275.00$     617.00 80,210.00$      734.50 95,485.00$       TOTAL LABOR 296.50 45,765.00$     1815.50 286,725.00$   2112.00 332,490.00$     Name Invoice #Billed to Date Previously Billed Current Amount Rincon Consultants 51338 & 51345 144,321.44$   125,420.65$       18,900.79$       TOTAL SUB CONSULTANT 144,321.44$   125,420.65$       18,900.79$       Sub Consultant Mark Up 10%1,890.08$         Description Invoice #Billed to Date Previously Billed Amount ASAP ReproGRaphics 255747 69.58$               TOTAL EXPENSE 516.89$           447.31$              69.58$               Expenses Mark Up 10%6.96$                 Total Subconsultant & Expense 20,867.41$       Total Labor and Expense 66,632.41$       Labor Detail Summary Reimbursables Detail Summary SLO City Of Cultrural Arts District Parking Structure KCEM Project 710100 8/28/2023 ‐ 9/24/2023 Sub Consultant Detail Summary 2 Kitchell Invoice number 51345 Invoice date 10/05/2023 Page 1 of 3 Rincon Consultants, Inc 180 North Ashwood Avenue Ventura, CA 93003 805-644-4455 Date: 10/05/2023 Project No: 22-13447 We are committed to providing excellent environmental services and appreciate the opportunity to work with you. Please contact us if you have any questions about the invoice or the status of our progress. Sincerely, RINCON CONSULTANTS, INC. 50487 08/22/2023 2,134.50 2,134.50 51345 10/05/2023 11,740.50 11,740.50 Total 13,875.00 11,740.50 2,134.50 0.00 0.00 0.00 Outstanding Invoices: please note that you have an outstanding balance of $13,875.00 for this project. The following invoices are outstanding: Aging Summary Invoice Number Invoice Date Outstanding Current Over 30 Over 60 Over 90 Over 120 Kitchell CEM Ryan Stefanek 2450 Venture Oaks Way Suite 500 Sacramento, CA 95833 Subject: Transmittal of Invoice # 51345 - Cultural Arts District Parking Structure Project Dear Ryan Stefanek, This letter accompanies Rincon Consultants' invoice for the Cultural Arts District Parking Structure Project for the period from 8/1/2023 through 9/30/2023. The invoice amount of $11,740.50 brings our total amount billed to $75,478.88, or approximately 90% of the total authorized budget of $83,431.00. Date 10/05/2023 Invoice number 51345Kitchell 22-13447 Cultural Arts District Parking Structure ProjectProject Kitchell Invoice number 51345 Invoice date 10/05/2023 Page 2 of 3 Project Accountant Hour 0.25 115.00 28.75 GIS/CADD Specialist II Hour 2.25 153.00 344.25 Planner II Hour 1.50 160.00 240.00 Environmental Scientist II Hour 4.75 160.00 760.00 Archaeologist IV Hour 4.50 194.00 873.00 Senior Environmental Scientist I Hour 1.50 218.00 327.00 Senior Environmental Scientist II Hour 11.50 234.00 2,691.00 Sr Supervising Environmental Scien Hour 0.50 268.00 134.00 Professional Fees Project Management Production Specialist I Hour 0.25 110.00 27.50 GIS/CADD Specialist I Hour 1.50 138.00 207.00 Environmental Scientist II Hour 9.75 160.00 1,560.00 Senior Environmental Scientist II Hour 7.75 234.00 1,813.50 Professional Fees Totals 3,608.00 Professional Fees Task Subtotal 3,608.00 Reporting Admin Assistant/Billing Specialist Hour 1.00 98.00 98.00 Environmental Scientist I Hour 5.00 143.00 715.00 Environmental Scientist II Hour 0.25 160.00 40.00 Senior Environmental Scientist II Hour 5.75 234.00 1,345.50 Sr Supervising Environmental Scien Hour 2.00 268.00 536.00 Professional Fees Totals 2,734.50 Professional Fees Task Subtotal 2,734.50 Preliminary Tasks Description Unit / Basis Number / Cost Rate / Markup Billed Amount Rincon Consultants, Inc 180 North Ashwood Avenue Ventura, CA 93003 805-644-4455 Invoice Period from 8/1/2023 through 9/30/2023 Project Manager: Alex Cruz Kitchell CEM Ryan Stefanek 2450 Venture Oaks Way Suite 500 Sacramento, CA 95833 Invoice No:51345 Invoice Date:10/05/2023 Due Date:10/20/2023 INVOICE Project Number:22-13447 Project Name:Cultural Arts District Parking Structure Project Date 10/05/2023 Invoice number 51345Kitchell 22-13447 Cultural Arts District Parking Structure ProjectProject Kitchell Invoice number 51345 Invoice date 10/05/2023 Page 3 of 3 Professional Fees Totals 5,398.00 Task Subtotal 5,398.00 Project Management Description Unit / Basis Number / Cost Rate / Markup Billed Amount Invoice Total 11,740.50 Description Amount Total This Invoice $11,740.50 Previous Billings $63,738.38 Total Billings $75,478.88 Total Budget $83,431.00 Remaining Budget $7,952.12 Remaining Budget %9.53% Thank you for selecting Rincon Consultants. Kitchell Invoice number 51338 Invoice date 10/05/2023 Page 1 of 4 Rincon Consultants, Inc 180 North Ashwood Avenue Ventura, CA 93003 805-644-4455 Kitchell Ryan Stefanek 2450 Venture Oaks Way Suite 500 Sacramento, CA 95833 Subject: Transmittal of Invoice # 51338 - Cultural Arts District Parking Structure Project Dear Ryan Stefanek, Date:10/05/2023 Job No:22-13447 During this period, Rincon worked on the following tasks: We are committed to providing excellent environmental services and appreciate the opportunity to work with you. Please contact us if you have any questions about the invoice or the status of our progress. Sincerely, RINCON CONSULTANTS, INC. 50486 08/22/2023 7,181.50 7,181.50 51338 10/05/2023 7,160.29 7,160.29 Total 14,341.79 7,160.29 7,181.50 0.00 0.00 0.00 Outstanding Invoices: please note that you have an outstanding balance of $14,341.79 for this project. The following invoices are outstanding: Aging Summary Invoice Number Invoice Date Outstanding Current Over 30 Over 60 Over 90 Over 120 - Project management including project communication and coordination - Archaeological monitoring - APCD permit coordination This letter accompanies Rincon Consultants' invoice for the Cultural Arts District Parking Structure Project for the period from 8/1/2023 through 9/30/2023.The invoice amount of $7,160.29 brings our total amount billed to $68,842.56 or approximately 100% of the total authorized budget of $68,843.00 Date 10/05/2023 Invoice number 51338Kitchell 22-13447 Cultural Arts District Parking Structure ProjectProject Kitchell Invoice number 51338 Invoice date 10/05/2023 Page 2 of 4 INVOICE Archaeologist IV Hour 6.25 194.00 1,212.50 Task 5.3: Extended Phase 1 Reporting Admin Assistant/Billing Specialist Hour 1.00 98.00 98.00 Production Specialist I Hour 1.00 110.00 110.00 Project Accountant Hour 1.25 115.00 143.75 Environmental Scientist I Hour 4.75 143.00 679.25 GIS/CADD Specialist II Hour 0.93 153.00 142.29 Environmental Scientist II Hour 1.50 160.00 240.00 Environmental Scientist IV Hour 4.00 194.00 776.00 Senior Environmental Scientist I Hour 0.50 218.00 109.00 Supervisor Environmental Scientist Hour 7.77 250.00 1,942.50 Sr Supervising Environmental Scien Hour 2.75 268.00 737.00 Task Subtotal 4,977.79 Task 5.2: Extended Phase 1 Fieldwork Task 5: Extended Phase 1 Testing Subtotal 6,190.29 Task 5: Extended Phase 1 Testing Archaeologist IV Hour 5.00 194.00 970.00 Task 2 Nesting Bird Surveys and Reporting Task 2: Nesting Bird Surveys and Reporting Subtotal 970.00 Task 2: Nesting Bird Surveys and Reporting Invoice Total 7,160.29 Rincon Consultants, Inc 180 North Ashwood Avenue Ventura, CA 93003 805-644-4455 Invoice Period from 8/1/2023 through 9/30/2023 Project Manager: Alex Cruz Kitchell CEM Ryan Stefanek 2450 Venture Oaks Way Suite 500 Sacramento, CA 95833 Invoice No:51338 Invoice Date:10/05/2023 Due Date:10/20/2023 Project Number:22-13447 Project Name:Cultural Arts District Parking Structure Project Description Unit Number Rate Amount Date 10/05/2023 Invoice number 51338Kitchell 22-13447 Cultural Arts District Parking Structure ProjectProject Kitchell Invoice number 51338 Invoice date 10/05/2023 Page 3 of 4 Thank you for selecting Rincon Consultants. Description Amount Total This Invoice $7,160.29 Previous Billings $61,682.27 Total Billings $68,842.56 Total Budget $68,843.00 Remaining Budget $0.44 Remaining Budget %0.00% Date 10/05/2023 Invoice number 51338Kitchell 22-13447 Cultural Arts District Parking Structure ProjectProject Kitchell Invoice number 51338 Invoice date 10/05/2023 Page 4 of 4 San Luis O~ispo: 3121 S. Higuera, San Luis Obispo, CA 93401 Tel: (805) 543-3144 Morro Bay:. 365 Quintana Rd, Morro Bay, CA 93442 Tel: (805) 772-3540 PrlnUng for Professionals by Professionals Bill To Tally Richtsmeier Kitchell CEM, Inc. 1304 Broad Street San Luis Obispo, California 93401 8015572289 Products NOTICE Parldng Lot Pennanenlly CLOSED ~ Sept 5,2023 For c:onslwdlon of tlie ~ CullLNal MG D.iWic:I Parking SlrilctlJl"e ,.,_ ............. ------ Payment/Shipping Product Information Coroplast Yard Signs Size : (24 Width x 36 Height (Inch)) Width (Inch) : 24 Height (Inch) : 36 Material : 4 mil White Corrugated Plastic Color : 4/0 (Full Color Front Side) Grommets : Grommets 4 Corners H-Stakes : No H-Stakes Custom Shapes : No Contour Cutting Turnaround Time : Next Day Turnaround PDF Proof : No PDF Proof, Process As Is Payment Method : On Account• Shipping Method : Local Pickup From Store ( ASAP Reprographics -San Luis Obispo ) Page 1 / 1 Account Number: 2312 Invoice#: Date: Est. Delivery Date Ship To 255747 08-21-2023 08-25-2023 ASAP Reprographics -San Luis Obispo 3121 South Higuera, Ste. D SAN LUIS OBISPO, California 93401 (805) 543-3144 Qty 2 Subtotal: Shipping & Handling : Discount: Tax: Invoice Total : Price $ 63.98 $ 63.98 $ 0.00 $ 0.00 $ 5.60 $ 69.58 Capital Expenditure Managers October 11th, 2023 Ms. Madeline Kacsinta, Project Manager City of San Luis Obispo 919 Palm Street San Luis Obispo, CA 93401 Re: Additional Services Fee Proposal – Cultural Arts District Parking Structure Allowance for Archeological, Paleontological, and Environmental Field Monitoring. Dear Ms.Kacsinta: Congratulations on the progress made toward the much-anticipated Cultural Arts District Parking Structure, with the phase 2 contract being approved by the City Council! In response to the request from the City, Kitchell has collaborated with Rincon and engaged their services for additional field monitoring for Archaeological, Paleontological, and Environmental oversight. These services are needed anytime native soils are disturbed on the project site, in accordance with the Soils Management Plan and the Monitoring and Mitigation Plan for the CADPS project. The attached proposal from Rincon details the scope of work and pricing for the additional services needed for field monitoring. As discussed earlier, the rates from Rincon are fully burdened, and we suggest invoicing the monitoring and reporting based on the sub-consultant billings, with a 10% markup by Kitchell. Days worked will be tracked and confirmed by Kitchell’s onsite staff, and billing against this allowance will be submitted monthly Phase 2 – On-Call Archaeological Monitoring ……………………………………..… $2,200 Per Day Phase 2 – On-Call Environmental Monitoring ………………………………................$2,200 Per Day Phase 2 – Allowance for 108 days of additional Monitoring of either Archaeological or Environmental Monitoring ……………………….……...$237,600.00 Total Not-to-Exceed Additional Services Fee: $ 237,600.00 We appreciate the opportunity to serve the City of San Luis Obispo in successfully delivering the vital Cultural Arts District Parking Structure project. Sincerely, Randy Rominger Regional Executive Enclosures: 1) Rincon’s Proposal Dated 9/29/23 Rincon Consultants, Inc. 1530 Monterey Street, Suite D San Luis Obispo, California 93401 805-547-0900 www.rinconcons ultan ts.com September 29, 2023 Rincon Project No. 22-13447 Tully Wyatt, Senior Project Manager Kitchell 1540 Marsh Street, Suite 150 San Luis Obispo, California 93401 Via email: twyatt@kitchell.com Subject: Proposal to Provide Monitoring Services for the Cultural Arts District Parking Structure Project, San Luis Obispo, California Rincon Consultants, Inc. (Rincon) is pleased to provide on-call monitoring services. As requested, Rincon is providing a fully burdened half day (up to 4 hours) and day rate (up to 8 hours) inclusive of onsite labor, expenses, and management for the project. On call monitoring services are detailed below. Scope of Work On-Call Archaeological Monitoring Rincon will provide an archaeologist to observe project-related ground disturbing activities. Monitors will observe soil disturbances, inspect exposed soils, and will re-direct equipment in the event potential resources are encountered. The monitor will conduct a cursory inspection of any discoveries; however, in the event resources potentially significant under CEQA are encountered, they may require further investigation beyond the scope of work described here. Each monitor will prepare daily monitoring logs that include a description of construction activities, hours on site, soil parameters (color, grain size, sediments, presence of paleosols, etc.), and cultural materials identified, if any. The monitoring logs will be reviewed as necessary by a Rincon senior archaeologist and filed within Rincon’s San Luis Obispo office. Monitors will be billed at a minimum of $1200 half day rate per workday or when work is cancelled with less than 24 hours’ notice. A $2000 day rate will be charged for work conducted on site. This day rate includes 8 hours of monitoring (up to 8 hours on site), up to 2 hours of travel, anticipated mileage, and management time for coordination and monitoring log creation. If required, the archaeologist will be 40-hour HAZWOPER trained. This scope and cost does not include analysis, preparation, or documentation of identified cultural resources discovered during monitoring. Nor does it include the preparation of a monitoring report. Rincon assumes no cultural resources will be encountered during monitoring. A scope and budget augmentation will be requested to address finds during monitoring. Table 1 outlines the cost below. If human remains are unearthed, State Health and Safety Code Section 7050.5 requires that no further disturbances shall occur at the location of the find until the County Coroner has made the necessary findings regarding origin and disposition pursuant to Public Resources Code Section 5097.98. If the remains are determined to be of Native American descent, the coroner has 24 hours to notify the Native American Heritage Commission (NAHC). Kitchell Proposal to Provide Monitoring Services for the Cultural Arts District Parking Structure Project 2 On-Call Excavation Environmental Monitoring Rincon will provide an environmental scientist to conduct excavation monitoring during earthwork in soil potentially classified as non-RCRA hazardous waste. Excavation monitoring will be performed in accordance with project’s Soil Management Plan (SMP) and the San Luis Obispo County Air Pollution Control District permit. For budgetary purposes, this proposal includes a $1200 half day rate for any time on site up to 4 hours or when work is cancelled with less than 24 hours’ notice. A $2000 day rate will be charged for work conducted on site. This day rate includes 8 hours of monitoring (up to 8 hours on site), up to 2 hours of travel (10 hours total time), anticipated mileage, management time for coordination, and equipment calibration and preparation. Mobilization and demobilization time consists of equipment preparation, sample management, travel to and from the site, and other management tasks required to perform the monitoring activities. The vehicle, equipment, and supplies day rate include a photoionization detector, x-ray fluorescence (XRF) field meter, hydrogen sulfide meter, vehicle, and sampling supplies. Table 1 outlines the cost below. Assumptions Rincon makes the following assumptions:  Archaeological and environmental monitors will be billed at a minimum of $1200 for the fully burdened half day rate per workday or when work is cancelled with less than 24 hours’ notice.  The fully burdened archaeological and environmental monitoring day rate includes 8 hours of monitoring (up to 8 hours on site), up to 2 hours of travel, anticipated mileage, and management time for coordination and monitoring log creation.  If Rincon is requested to conduct additional work outside of the scope of this proposal, such as, but not limited to, site meetings due to unanticipated conditions or findings, or any other work not described in the fully burdened rates, a budget augment will be required.  Kitchell will only be billed in the event that a monitor is needed.  Rincon will invoice Kitchell on a monthly basis. Monitoring fees will be billed on a half or daily basis, and a summary of the number of monitoring days will be provided on the invoice. Table 1 Rate Summary Task Estimated Cost Task 1 On-Call Archaeological Monitoring Half Day Rate $1,200 Day Rate $2,000 Task 2 On-Call Excavation Monitoring Half Day Rate $1,200 Day Rate $2,000 Kitchell Proposal to Provide Monitoring Services for the Cultural Arts District Parking Structure Project 3 Thank you for your consideration and for this opportunity to support your project. If you have any questions regarding this proposal, please contact Alex Cruz at 916-905-2683 or acruz@rinconconsultants.com, or Dustin Merrick at 805-762-4064 or dmerrick@rinconconsultants.com. Sincerely, Rincon Consultants, Inc. Dustin Merrick, MA, RPA Archaeologist/Project Manager Christopher Duran, MA, RPA Senior Archaeologist/Principal Alex Cruz Senior Environmental Geologist Julie Doane-Allmon Senior Supervising Geologist AGREEMENT THIS AGREEMENT is made and entered into in the City of San Luis Obispo on _________________ by and between the CITY OF SAN LUIS OBISPO, a municipal corporation, hereinafter referred to as City, and KITCHELL CEM, INC., hereinafter referred to as Consultant. W I T N E S S E T H WHEREAS, on July 28, 2022, requested proposals for Resident Engineer and Construction Management Services, Cultural Arts District Parking Structure, City Project Specification No. 90435-CM. WHEREAS, pursuant to said request, Consultant submitted a proposal that was accepted by City for said services. NOW THEREFORE, in consideration of their mutual promises, obligations and covenants hereinafter contained, the parties hereto agree as follows: 1. Contract Term. The term of this agreement shall be from the date this Agreement is made and entered, as first written above until all work has been completed. 2. Work Delays. Should the Consultant be obstructed or delayed in the work required to be done hereunder by changes in the work or by any default, act, or omission of the City, or by strikes, fire, earthquake, or any other Act of God, or by the inability to obtain materials, equipment, or labor due to federal government restrictions arising out of defense or war programs, then the time of completion may, at the City's sole option, be extended for such periods as may be agreed upon by the City and the Consultant. In the event that there is insufficient time to grant such extensions prior to the completion date of the contract, the City may, at the time of acceptance of the work, waive liquidated damages that may have accrued for failure to complete on time, due to any of the above, after hearing evidence as to the reasons for such delay, and making a finding as to the causes of same. 3. Termination for Cause. If, during the term of the contract, the City determines that the Consultant is not faithfully abiding by any term or condition contained herein, the City may notify the Consultant in writing of such defect or failure to perform. This notice must give the Consultant a 10 (ten) calendar day notice of time thereafter in which to perform said work or cure the deficiency. If the Consultant has not performed the work or cured the deficiency within the ten days specified in the notice, such shall constitute a breach of the contract and the City may terminate the contract immediately by written notice to the Consultant to said effect. Thereafter, neither party shall have any further duties, obligations, responsibilities, or rights under the contract except, however, any and all obligations of the Consultant's surety shall remain in full force and effect, and shall not be extinguished, reduced, or in any manner waived by the termination thereof. In said event, the Consultant shall be entitled to the reasonable value of its services performed from the beginning date in which the breach occurs up to the day it received DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 1/5/2023 | 8:53 AM PST the City's Notice of Termination, minus any offset from such payment representing the City's damages from such breach. "Reasonable value" includes fees or charges for goods or services as of the last milestone or task satisfactorily delivered or completed by the Consultant as may be set forth in the Agreement payment schedule; compensation for any other work, services or goods performed or provided by the Consultant shall be based solely on the City's assessment of the value of the work-in-progress in completing the overall workscope. The City reserves the right to delay any such payment until completion or confirmed abandonment of the project, as may be determined in the City's sole discretion, so as t o permit a full and complete accounting of costs. In no event, however, shall the Consultant be entitled to receive in excess of the compensation quoted in its proposal. 4. Termination for Convenience. The City also reserves the right to terminate the contract for convenience, providing a 30 (thirty) calendar day notice, at any time upon a determination by the Director that termination of the contract is in the best interest of the City. Upon termination notice from the City, Consultant must, unless otherwise directed, cease work and follow the City’s directions as to work in progress and finished goods. For termination of any services pursuant to this Agreement, the City’s liability will be the lesser of a reasonable price for the services rendered prior to termination. 5. Ability to Perform. The Consultant warrants that it possesses, or has arranged through subcontracts, all capital and other equipment, labor, materials, and licenses necessary to carry out and complete the work hereunder in compliance with any and all applicable federal, state, county, city, and special district laws, ordinances, and regulations. 6. Sub-contract Provisions. No portion of the work pertinent to this contract shall be subcontracted without written authorization by the City, except that which is expressly identified in the Consultant’s proposal. Any substitution of sub-consultants must be approved in writing by the City. For any sub-contract for services in excess of $25,000, the subcontract shall contain all provisions of this agreement. 7. Contract Assignment. The Consultant shall not assign, transfer, convey or otherwise dispose of the contract, or its right, title or interest, or its power to execute such a contract to any individual or business entity of any kind without the previous written consent of the City. 8. Inspection. The Consultant shall furnish City with every reasonable opportunity for City to ascertain that the services of the Consultant are being performed in accordance with the requirements and intentions of this contract. All work done and all materials furnished, if any, shall be subject to the City's inspection and approval. The inspection of such work shall not relieve Consultant of any of its obligations to fulfill its contract requirements. 9. Record Retention and Audit. For the purpose of determining compliance with various laws and regulations as well as performance of the contract, the Consultant and sub - consultants shall maintain all books, documents, papers, accounting records and other evidence pertaining to the performance of the contract, including but not limited to the cost of administering the contract. Materials shall be made available at their respective offices at all reasonable times during the contract period and for three years from the date of final DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 payment under the contract. Authorized representatives of the City shall have the option of inspecting and/or auditing all records. For Federally funded projects, access to records shall also include authorized representatives of the State and Federal government. Copies shall be furnished if requested. 10. Conflict of Interest. The Consultant shall disclose any financial, business, or other relationship with the City that may have an impact upon the outcome of this contract, or any ensuing City construction project. The Consultant shall also list current clients who may have a financial interest in the outcome of this contract, or any ensuing City construction project which will follow. The Consultant staff shall provide a Conflict of Interest Statement where determined necessary by the City. The Consultant covenants that it presently has no interest, and shall not acquire any interest—direct, indirect or otherwise—that would conflict in any manner or degree with the performance of the work hereunder. The Consultant further covenants that, in the performance of this work, no sub-consultant or person having such an interest shall be employed. The Consultant certifies that no one who has or will have any financial interest in performing this work is an officer or employee of the City. It is hereby expressly agreed that, in the performance of the work hereunder, the Consultant shall at all times be deemed an independent Consultant and not an agent or employee of the City. 11. Rebates, Kickbacks or Other Unlawful Consideration. The Consultant warrants that this contract was not obtained or secured through rebates, kickbacks or other unlawful consideration, either promised or paid to any City employee. For breach or violation of the warranty, the City shall have the right in its discretion; to terminate the contract without liability; to pay only for the value of the work actually performed; to deduct from the contract price; or otherwise recover the full amount of such rebate, kickback or other unlawful consideration. 12. Covenant Against Contingent Fees. The Consultant warrants by execution of this contract that no person or selling agency has been employed, or retained, to solicit or secure this contract upon an agreement or understanding, for a commission, percentage, brokerage, or contingent fee, excepting bona fide employees or bona fide established commercial or selling agencies maintained by the Consultant for the purpose of securing business. For breach or violation of this warranty, the City has the right to annul this contract without liability; pay only for the value of the work actually performed, or in its discretion, to deduct from the contract price or consideration, or otherwise recover the full amount of such commission, percentage, brokerage, or contingent fee. 13. Compliance with Laws and Wage Rates. The Consultant shall keep itself fully informed of and shall observe and comply with all applicable state and federal laws and county and City of San Luis Obispo ordinances, regulations and adopted codes during its performance of the work. This includes compliance with prevailing wage rates and their payment in accordance with California Labor Code. For purposed of this paragraph, “construction” includes work performed during the design and preconstruction phases of construction, including but not limited to, inspection and land surveying work. 14. Payment of Taxes. The contract prices shall include full compensation for all taxes that the Consultant is required to pay. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 15. Permits, Licenses and Filing Fees. The Consultant shall procure all permits and licenses, pay all charges and fees, and file all notices as they pertain to the completion of the Consultant’s work. The City will pay all application fees for permits required for the completion of the project including building and regulatory permit application fees. Consultant will provide a 10 day notice for the City to issue a check. 16. Safety Provisions. The Consultant shall conform to the rules and regulations pertaining to safety established by OSHA and the California Division of Industrial Safety. 17. Public and Employee Safety. Whenever the Consultant's operations create a condition hazardous to the public or City employees, it shall, at its expense and without cost to the City, furnish, erect and maintain such fences, temporary railings, barricades, lights, signs and other devices and take such other protective measures as are necessary to prevent accidents or damage or injury to the public and employees. 18. Preservation of City Property. The Consultant shall provide and install suitable safeguards, approved by the City, to protect City property from injury or damage. If City property is injured or damaged resulting from the Consultant's operations, it shall be replaced or restored at the Consultant's expense. The facilities shall be replaced or restored to a condition as good as when the Consultant began work. 19. Immigration Act of 1986. The Consultant warrants on behalf of itself and all sub- consultants engaged for the performance of this work that only persons authorized to work in the United States pursuant to the Immigration Reform and Control Act of 1986 and other applicable laws shall be employed in the performance of the work hereunder. 20. Consultant Non-Discrimination. In the award of subcontracts or in performance of this work, the Consultant agrees that it will not engage in, nor permit such sub-consultants as it may employ, to engage in discrimination in employment of persons on any basis prohibited by State or Federal law. 21. Accuracy of Specifications. The specifications for this project are believed by the City to be accurate and to contain no affirmative misrepresentation or any concealment of fact. Consultants are cautioned to undertake an independent analysis of any test results in the specifications, as City does not guaranty the accuracy of its interpretation of test results contained in the specifications package. In preparing its proposal, the Consultant and all sub-consultants named in its proposal shall bear sole responsibility for proposal preparation errors resulting from any misstatements or omissions in the specifications that could easily have been ascertained by examining either the project site or accurate test data in the City's possession. Although the effect of ambiguities or defects in the specifications will be as determined by law, any patent ambiguity or defect shall give rise to a duty of Consultant to inquire prior to proposal submittal. Failure to so inquire shall cause any such ambiguity or defect to be construed against the Consultant. An ambiguity or defect shall be considered patent if it is of such a nature that the Consultant, assuming reasonable skill, ability and diligence on its part, knew or should have known of the existence of the ambiguity or defect. Furthermore, failure of the Consultant or sub - consultants to notify City in writing of specification defects or ambiguities prior to proposal DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 submittal shall waive any right to assert said defects or ambiguities subsequent to submittal of the proposal. To the extent that these specifications constitute performance specifications, the City shall not be liable for costs incurred by the successful Consultant to achieve the project’s objective or standard beyond the amounts provided therefor in the proposal. In the event that, after awarding the contract, any dispute arises as a result of any actual or alleged ambiguity or defect in the specifications, or any other matter whatsoever, Consultant shall immediately notify the City in writing, and the Consultant and all sub- consultants shall continue to perform, irrespective of whether or not the ambiguity or defect is major, material, minor or trivial, and irrespective of whether or not a change order, time extension, or additional compensation has been granted by City. Failure to provide the hereinbefore described written notice within one (1) working day of Consultant's becoming aware of the facts giving rise to the dispute shall constitute a waiver of the right to assert the causative role of the defect or ambiguity in the plans or specifications concerning the dispute. 22. Hold Harmless and Indemnification. (a) Non-design, construction Professional Services: To the extent the Scope of Services involve a “construction contract” as that phrase is used in Civil Code Section 2783, this paragraph shall apply in place of paragraph A. To the fullest extent permitted by law (including, but not limited to California Civil Code Sections 2782 and 2782.8), Consultant shall indemnify, defend, and hold harmless the City, and its elected officials, officers, employees, volunteers, and agents (“City Indemnitees”), from and against any and all causes of action, claims, liabilities, obligations, judgments, or damages, including reasonable legal counsels’ fees and costs of litigation (“claims”), to the extent caused by the Consultant’s performance or Consultant’s failure to perform its obligations under this Agreement or out of the operations conducted by Consultant, except for such loss or damage arising from the active negligence, sole negligence or willful misconduct of the City. In the event the City Indemnitees are made a party to any action, lawsuit, or other adversarial proceeding arising from Consultant’s performance of this Agreement, the Consultant shall provide a defense to the City Indemnitees or at the City’s option, reimburse the City Indemnitees their costs of defense, including reasonable legal fees, incurred in defense of such claims. (b) The review, acceptance or approval of the Consultant’s work or work product by any indemnified party shall not affect, relieve or reduce the Consultant’s indemnification or defense obligations. This Section survives completion of the services or the termination of this contract. The provisions of this Section are not limited by and do not affect the provisions of this contract relating to insurance. 23. Non-Exclusive Contract. The City reserves the right to contract for the services listed in this proposal from other consultants during the contract term. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 24. Standards. Documents shall conform to City Standards and City furnished templates shall be used. 25. Consultant Endorsement. Technical reports, plans and specifications shall be stamped and signed by the Consultant where required. 26. Required Deliverable Products and Revisions. Deliverables include all items necessary to provide the work scope outlined in the Request for Proposal, incorporated herein by reference and attached hereto as Exhibit A. City staff will review any documents or materials provided by the Consultant and, where necessary, the Consultant will respond to staff comments and make such changes as deemed appropriate. 27. Ownership of Materials. Upon completion of all work under this contract, ownership and title to all reports, documents, plans, specifications, and estimates produced as part of this contract will automatically be vested in the city and no further agreement will be necessary to transfer ownership to the City. The Consultant shall furnish the City all necessary copies of data needed to complete the review and approval process. It is understood and agreed that all calculations, drawings and specifications, whether in hard copy or machine readable form, are intended for one-time use in the construction of the project for which this contract has been entered into. The Consultant is not liable for claims, liabilities, or losses arising out of, or connected with the modification, or misuse by the City of the machine-readable information and data provided by the Consultant under this agreement. Further, the Consultant is not liable for claims, liabilities, or losses arising out of, or connected with any use by City of the project documentation on other projects, except such use as may be authorized in writing by the Consultant. 28. Release of Reports and Information. Any reports, information, data, or other material given to, prepared by or assembled by the Consultant as part of the work or serv ices under these specifications shall be the property of City and shall not be made available to any individual or organization by the Consultant without the prior written approval of the City. The Consultant shall not issue any news release or public relations item of any nature, whatsoever, regarding work performed or to be performed under this contract without prior review of the contents thereof by the City and receipt of the City’s written permission. 29. Copies of Reports and Information. If the City requests additional copies of reports, drawings, specifications, or any other material in addition to what the Consultant is required to furnish in limited quantities as part of the work or services under these specifications, the Consultant shall provide such additional copies as are requested, and City shall compensate the Consultant for the costs of duplicating of such copies at the Consultant's direct expense. 30. Attendance at Meetings and Hearings. Consultant shall attend as many "working" meetings with staff as necessary in performing workscope tasks. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 31. Requests for Review. The Consultant shall respond to all requests for submittal review or contractor RFI’s within two weeks of receipt of the information from the City. 32. Project Proposal Submittal. Upon completion of the project scoping meeting, the Consultant shall submit a proposed workscope, compensation and schedule within 10 working days. The cost proposal shall include all costs including miscellaneous direct cost items. 33. Consultant Invoices. The Consultant shall deliver a monthly invoice to the City, itemized by project work phase or, in the case of on-call contracts, by project title. Invoice must include a breakdown of hours billed and miscellaneous charges and any sub-consultant invoices, similarly broken down, as supporting detail. 34. Payment. For providing services as specified in this Agreement, City will pay and Consultant shall receive therefore compensation in a total sum not to exceed the individual agreed upon project fee. Should the Consultant’s designs, drawings or specifications contain errors or deficiencies, the Consultant shall be required to correct them at no increase in cost to the City. For on-call services, the City will pay and the Consultant shall receive compensation as agreed to on a project by project basis. The Consultant shall be reimbursed for hours worked at the hourly rates attached to this agreement. Hourly rates include direct salary costs, employee benefits, overhead and fee. In addition, the Consultant shall be reimbursed for direct costs other than salary and vehicle cost that have been identified and are attached to this agreement. The Consultant’s personnel shall be reimbursed for per diem expenses at a rate not to exceed that currently authorized for State employees under State Department of Personnel Administration rules. 35. Payment Terms. The City's payment terms are 30 days from the receipt and approval by the City of an original invoice and acceptance by the City of the materials, supplies, equipment or services provided by the Consultant (Net 30). 36. Resolution of Disputes. Any dispute, other than audit, concerning a question of fact arising under this contract that is not disposed of by agreement shall be decided by a committee consisting of the City’s Project Manager and the City Director of Public Works, who may consider written or verbal information submitted by the Consultant. Not later than thirty days after completion of all deliverables necessary to complete the p lans, specifications and estimate, the Consultant may request review by the City Council of unresolved claims or disputes, other than audit, in accordance with Chapter 1.20 Appeals Procedure of the Municipal Code. Any dispute concerning a question of fact arising under an audit of this contract that is not disposed of by agreement, shall be reviewed by the City’s Chief Fiscal Officer. Not later than 30 days after issuance of the final audit report, the Consultant may request a review by the City’s Chief Fiscal Officer of unresolved audit issues. The request for review must be submitted in writing. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 Neither the pendency of a dispute, nor its consideration by the City will excuse the consultant from full and timely performance in accordance with the terms of this contract. 37. Disadvantaged Business Enterprise (DBE) Use for Federally Funded Projects. This agreement is subject to Title 49, Part 26 Code of Federal Regulations entitled “Participation by Disadvantaged Business Enterprises in Department of Transportation Financial Assistance Programs” when project work is for a federally funded project. In order to ensure the State Department of Transportation achieves its federally mandated statewide overall DBE goal, the City encourages the participation of DBEs as defined in 49 CFR 26 in the performance of this agreement. The City will make a determination on a project by project basis for reasonably expected DBE participation to compete for the sub-consulting opportunities in this agreement. The Consultant is responsible to be fully informed regarding the requirements of 49 CFR, Part 26. The Consultant shall notify the City of any changes to its anticipated DBE participation on federally funded projects, maintain records of DBE usage and complete and submit to the City the final report of DBE utilization prior to receiving final payment. Records shall show the name and business address of each DBE and the total dollar amount actually paid to each. The Consultant shall pay all sub-consultants within 10 calendar days from receipt of each payment made to the Consultant by the City. The Consultant shall carry out applicable requirements of Title 49 CFR 26 in the award and administration of US DOT assisted agreements. Failure by the Consultant to carry out these requirements is a material breach of this agreement, which may result in the termination of this agreement or such other remedy as the City deems appropriate. 38. Agreement Parties. City: Matt Horn Public Works Director City of San Luis Obispo 919 Palm Street San Luis Obispo, CA 93401 Consultant: Randy Rominger 1540 Marsh Street Stan Luis Obispo, CA 93401 All written notices to the parties hereto shall be sent by United States mail, postage prepaid by registered or certified mail addressed as shown above. 39. Incorporation by Reference. City Request for Proposals Specification No. 90435-CM dated July 28, 2022, Consultant's proposal dated September 1, 2022, and Consultant’s Revised Fee Proposal dated November 9, 2022, are hereby incorporated in and made a part of this Agreement and are attached hereto as Exhibits A, B, and C respectively. Should there be any conflict between terms set forth in the City Request for Proposals Specification No. 90435-CM and Consultant’s proposal dated September 1, 2022, or Revise Fee Proposal dated November 9, 2022, the terms in this agreement and City Request for Proposals Specification No. 90435-CM will govern. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 40. Amendments. Any amendment, modification or variation from the terms of this Agreement shall be in writing and shall be effective only upon approval by the City Engineer. 41. Working Out of Scope. If, at any time during the project, the consultant is directed to do work by persons other than the City Project Manager and the Consultant believes that the work is outside of the scope of the original contract, the Consultant shall inform the Project Manager immediately. If the Project Manager and Consultant both agree that the work is outside of the project scope and is necessary to the successful completion of the project, then a fee will be established for such work based on Consultant's hourly billing rates or a lump sum price agreed upon between the City and the Consultant. Any extra work performed by Consultant without prior written approval from the City Project Manager shall be at Consultant's own expense. 42. Complete Agreement. This written agreement, including all writings specifically incorporated herein by reference, shall constitute the complete agreement between the parties hereto. No oral agreement, understanding or representation not reduced to writing and specifically incorporated herein shall be of any force or effect, nor shall any such oral agreement, understanding or representation be binding upon the parties hereto. For and in consideration of the payments and agreements hereinbefore mentioned to be made and performed by City, Consultant agrees with City to do everything required by this Agreement, the said specification and incorporated documents. Authority to Execute Agreement. Both City and Consultant do covenant that each individual executing this agreement on behalf of each party is a person duly authorized and empowered to execute Agreements for such party. IN WITNESS WHEREOF, the parties hereto have caused this instrument to be executed the day and year first above written. CITY OF SAN LUIS OBISPO: CONSULTANT: ________________________________ Kitchell CEM, Inc. _______________________________ Matt Horn, Director of Public Works Wendy Cohen President APPROVED AS TO FORM: _______________________________ Christine Dietrick, City Attorney ________________________________ Randy Rominger Principal-in-Charge DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 EXHIBIT A DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 REQUEST FOR PROPOSALS RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES CULTURAL ARTS DISTRICT PARKING STRUCTURE CITY PROJECT NO. 90435-CM July 2022 The City of San Luis Obispo (City) is currently soliciting proposals for Resident Engineer and Construction Management Services for its Cultural Arts District Parking Structure Project. Each proposal must specify each and every item as set forth in the attached specifications. Any and all exceptions must be clearly stated in the proposal. Failure to set forth any item in the specifications without taking exception may be grounds for rejection. The City reserves the right to reject any and all proposals and to waive any irregularity or informality in any proposal or in the RFP process, as long as, in the judgment of the City, such action will not negate fair competition and will permit proper comparative evaluation of the proposals submitted. This RFP is posted on the City’s website at: https://www.slocity.org/doing-business/doing-business-with-the-city/bids-and-proposals Any changes, additions, or deletions to this RFP will be in the form of written addenda issued by the City. Any addenda will be posted on the website. Prospective proposers must check the website for addenda or other relevant new information during the response period. The City is not responsible for the failure of any prospective proposer to receive such addenda. All addenda so issued will become a part of this RFP. If your firm is interested and qualified, please submit the following in separately sealed envelopes plainly marked with the proposal title, specification number, Consultant name, and time and date of the proposal opening. All proposals must be submitted to the front counter at the Public Works Department, 919 Palm Street, by, 2:00 p.m. on September 1st, 2022. If you have any questions about the proposal process, please contact the Engineer directly. MANUEL GUZMAN Construction Engineering Manager mguzman@slocity.org EXHIBIT A DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 2  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT Table of Contents I. INTRODUCTION ..............................................................................................4   PURPOSE ............................................................................................................................................... 4   PROJECT LOCATION ........................................................................................................................... 4   BACKGROUND ...................................................................................................................................... 4   CONSTRUCTION CONTRACT DURATION .......................................................................................... 5  II. SCHEDULE AND SUBMITTAL ............................................................................6  A. RFP SCHEDULE .................................................................................................................................... 6  B. PROPOSAL SUBMITTAL ....................................................................................................................... 6  III. GENERAL INSTRUCTIONS ................................................................................7  A. CITY RIGHTS & OPTIONS ..................................................................................................................... 7  B. CHANGES TO THE RFP ........................................................................................................................ 8  C. COMMUNICATIONS ............................................................................................................................... 8  D. INSURANCE ........................................................................................................................................... 9  E. EXCEPTIONS & DEVIATIONS ............................................................................................................. 10  F. AWARD AND STANDARD AGREEMENT ........................................................................................... 10  G. PREVAILING WAGE............................................................................................................................. 10  H. FAIR EMPLOYMENT PRACTICE ........................................................................................................ 10  I. PROTEST OF AWARD ......................................................................................................................... 11  IV. PROPOSAL FORMAT ...................................................................................... 12   COVER LETTER ................................................................................................................................... 12   FIRM QUALIFICATIONS ...................................................................................................................... 12   ORGANIZATION AND APPROACH ..................................................................................................... 12   SCOPE OF WORK ............................................................................................................................... 13   CONTRACT AGREEMENT .................................................................................................................. 13   REFERENCES ...................................................................................................................................... 13   FEE PROPOSAL .................................................................................................................................. 13   OPTIONAL – ADDITIONAL SUPPORTING INFORMATION ............................................................... 14  V. CONSULTANT EVALUATION & CONTRACT AWARD ........................................ 15   PROPOSAL RESPONSIVENESS ........................................................................................................ 15   EVALUATION PROCEDURES ............................................................................................................. 15   CONTRACT AWARD ............................................................................................................................ 16  VII. APPENDICIES ................................................................................................. 17  APPENDIX A – SCOPE OF SERVICES ......................................................................... 17  DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 3  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT APPENDIX B – VICINITY MAP .................................................................................. 23  APPENDIX C – SAMPLE CONTRACT ......................................................................... 24  APPENDIX D – QUALITY ASSURANCE PROGRAM .................................................... 34  APPENDIX E – CONTRACT DOCUMENTS FOR PHASE 1B OF THE CULTURAL ARTS  DISTRICT PARKING STRUCTURE .............................................................................. 35  APPENDIX F – CONTRACT DOCUMENTS FOR PHASE 2 OF THE CULTURAL ARTS  DISTRICT PARKING STRUCTURE .............................................................................. 36  APPENDIX G1 –MITIGATION MONITORING AND REPORTING PROGRAM ............... 37  APPENDIX G2 – PHASE 1B AND 2 MITIGATION AND MONITORING PLAN ............... 37  APPENDIX H – CURRENT PROJECT  DELIVERY SCHEDULE ........................................ 38  DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 4  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT VI. INTRODUCTION PURPOSE The purpose of this Request for Proposal (RFP) is to provide interested parties with sufficient information regarding the resident engineer and construction management services the City of San Luis Obispo Department of Public Works (City) is seeking for its Cultural Arts District Parking Structure Project (Project). This information is intended to enable interested parties to prepare and submit proposals for a single construction management and resident engineer team to manage the construction for this Project. See Scope of Services attached as Appendix A. PROJECT LOCATION The Project is located on the corner of Palm Street and Nipomo Street. See Vicinity Map Attached as Appendix B. BACKGROUND The proposed scope is to provide construction management and resident engineer services to manage the Cultural Arts District Parking Structure Project. It is anticipated that a single team will work together to manage the demolition of an existing parking lot and buildings (the “Existing Site”) and construction of a new cast-in-place parking facility consisting of at least 399 parking spaces (the “Cultural Arts District Parking Structure”) in downtown San Luis Obispo (the “Project”). Two future buildings are planned immediately adjacent to the Cultural Arts District Parking Structure: a “liner building” along the Nipomo Street frontage and part of the Palm Street frontage; and a theater at the corner of Monterey and Nipomo Streets. Although neither of these buildings are part of this scope of work, they both have some shared access points and utilities that need to be coordinated as a part of this Project. The Project will be constructed in phases, under separate construction contracts, as follows: 1. Phase 1A: Dry Utility Undergrounding. This Project will underground PG&E and telecom facilities crossing the site. Note: This contract inspection and management will not be part of this work scope. 2. Phase 1B: Cultural Arts District Parking Structure On-Site Improvement Plans. Phase 1 includes site structure and parking lot demolition, grading, and permanent shoring work in preparation for garage construction in Phase 2. 3. Phase 2: Cultural Arts District Parking Structure. Phase 2 includes vertical construction of the parking structure, including frontage improvements and utility work. Phase 1B: On-Site Improvements, generally consists of: 1) Demolition and disposal of three residential lots and structures located at 633 Palm Street, 610 Monterey Street, and 614 Monterey Street 2) Demolition and site clearing of existing asphalt parking lot, including paving, landscaping, meters, and miscellaneous improvements. 3) Grading of pad area for Phase 2 4) Construction of permanent shoring along the north-east property line. 5) Existing tree protection. Phase 2: Cultural Arts District Parking Structure, generally consists of: 1) A new five-level cast-in-place parking structure with an approximately 32,000sf footprint (approximately 163,000sf gross), and approximately 399 total parking spaces. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 5  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT a. Level 1 (the ground floor) consists of standard parking, accessible parking, EV parking, and bicycle parking. b. Level 2 consists of standard parking, accessible parking, and EV parking. c. Level 3 and Level 4 consist of standard parking and accessible parking. d. Level 5 (the roof deck) consists of standard parking and accessible parking, with photovoltaic overhead panels. e. Two elevators. f. Automated revenue/payment system. 2) On-site and off-site improvements including: a. Off-site road improvements including new bulb-outs and decorative crosswalks and intersections. b. Construction of curb, gutter, driveway aprons, and sidewalk. c. Underground utilities and stormwater chambers. d. Pedestrian entry plazas (temporary where installed with future SLOREP Theatre Improvements). e. Planting and irrigation. Note that the Phase 2 contract will include provisions for the contractor to provide an office space and a conference room for the construction management team and provide electricity, phone, internet, water and sanitation services. CONSTRUCTION CONTRACT DURATION Phase 1B of the Project is planned to begin construction in Spring 2023 and last for approximately 6 months, not including contract close-out. Phase 2 of the Project is planned to begin construction in Fall 2023 and last for approximately 23 months, not including contract close-out. The above durations only reflect anticipated duration of the construction contract work and must be appropriately accounted for in the proposal. As part of the proposal, a general review of construction contract duration may be performed at the proposing firm’s option. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 6  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT VII. SCHEDULE AND SUBMITTAL A. RFP SCHEDULE The following represents the tentative schedule for this RFP. Any change in the scheduled dates for the Proposal Submission Deadline, or Interviews will be advertised in the form of an addendum to this RFP. The schedule for other milestones dates may be adjusted without notice. RFP Schedule Date Issued July 30, 2022 Proposal Submission Date September 1st, 2022, at 2:00 PM Evaluation of Proposals Previous + 4 Weeks Top 3 Ranked Consultants Interviewed Previous + 2 Weeks Finalize Staff Recommendation Previous + 1 Week Award by Public Works Director Previous + 1 Week Notice to Proceed 1 day from Award B. PROPOSAL SUBMITTAL If your firm is interested and qualified, please submit a proposal in a sealed envelope by 2:00 p.m. on September 1st, 2022. The proposal must be a maximum of 15 pages total, not including staff resumés and fee proposal (see Section IV.G for fee proposal requirements). DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 7  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT VIII. GENERAL INSTRUCTIONS A. CITY RIGHTS & OPTIONS 1. All proposals must be submitted to the City’s Public Works Department, 919 Palm Street, in sealed envelopes no later than 2:00 p.m. on September 1st, 2022. Late proposals will not be considered. 2. All costs incurred in the preparation and submission of proposals and related documentation will be borne solely by the proposer. 3. An impartial Selection Committee will develop a ranking of consultant proposals and recommend the most qualified consultant for tentative selection and contract negotiations. 4. The cost proposal of the top ranked consultant will be reviewed and may be negotiated with the consultant. Upon successful contract negotiations, staff will recommend a contract be awarded. 5. Consultant fees will be negotiated with the selected firm and finalized prior to the award of contract. 6. This RFP does not constitute an offer of employment or to contract for services. In addition, this RFP does not commit the City to negotiate a contract. The issuance of this RFP does not constitute an agreement by the City that any subsequent selection processes will occur, or that any contract will be entered into by the City. 7. The City has the right to use any or all ideas or concepts presented in any proposal or interview without restriction, without conversation to all applicants. 8. The City reserves the option to accept or reject any or all proposals, wholly or in part, received by reason of this request, and make more than one award, or no award, as the best interests of the City may appear. 9. All documents submitted to the City in response to this RFP will become the exclusive property of the City. 10. The City reserves the right to award the contract to the firm that presents the proposal which, in the judgment of the City, best accomplishes the desired results. 11. Any contract awarded pursuant to this Request for Proposal will incorporate the requirements and specifications contained in this Request for Proposal. All information presented in a proposer’s proposal will be considered binding upon selection of the successful proposer, unless otherwise modified and agreed to by the City during subsequent negotiations. 12. The City reserves the right to remedy technical errors, modify the published scope of services and approve or disapprove the use of all sub-consultants. 13. The contract will expire upon full completion of the scope of work. 14. Under the provisions of the California Public Records Act (the “Act”), Government Code section 6252 et seq., all “public records” (as defined in the Act) of a local agency, such as the City, must be available for inspection and copying upon the request of any person. Under the Act, the City may be obligated to provide a copy of any and all responses to this RFP, if such requests are made after the contract is awarded. One exception to this required disclosure is information which fits within the definition of a confidential trade secret [Government Code section 6254(k)] or contains other technical, financial or other data whose public disclosure could cause injury to the proposer’s competitive position. If DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 8  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT any proposer believes that information contained in its response to this RFP should be protected from disclosure, the proposer MUST specifically identify the pages of the response that contains the information by properly marking the applicable pages and inserting the following notice in the front of its response: NOTICE: The data on pages _ of this response identified by an asterisk (*) contain technical or financial information, which are trade secrets, or information for which disclosure would result in substantial injury to the proposer’s competitive position. Proposer requests that such data be used only for the evaluation of the response but understands that the disclosure will be limited to the extent the City considers proper under the law. If an agreement is entered into with the proposer, the City shall have the right to use or disclose the data as provided in the agreement, unless otherwise obligated by law. The City will not honor any attempt by proposer to designate its entire proposal as proprietary. If there is any dispute, lawsuit, claim or demand as to whether information within the response to the RFP is protected from disclosure under the Act, proposer shall indemnify, defend, and hold harmless, the City arising out of such dispute, lawsuit, claim or demand. 15. The proposing firm warrants that no official or employee of the City has an interest, has been employed or retained to solicit or aid in the procuring of a contract resulting from this RFP, if any, and further warrants that such person will not be employed in the performance of such contract without immediate written notice to the City. 16. Firms submitting a proposal shall warrant that their offer is made without any previous understanding, agreement, or connection with any person, firm, or corporation submitting a separate proposal for the same Project and is in all respects fair, without outside control, collusion, fraud, or otherwise illegal action. This condition will not apply to proposals which are submitted by firms who have partnered with others to submit a cooperative proposal that clearly identifies a primary contractor and the associated sub-contractors. 17. Unforeseen additional items and/or services may be required. The City therefore reserves the right to negotiate with the successful proposer for additional items and/or services beyond what is described in Appendix A to be added to the final contract. B. CHANGES TO THE RFP This RFP is posted on the City’s website at: https://www.slocity.org/doing-business/doing-business-with-the-city/bids-and-proposals Any changes, additions, or deletions to this RFP will be in the form of written addenda issued by the City. Any addenda will be posted on the website. Prospective proposers must check the website for addenda or other relevant new information during the response period. The City is not responsible for the failure of any prospective proposer to receive such addenda. All addenda so issued will become a part of this RFP. Any proposer who has already submitted their proposal and desires to make corrections, may remove and replace their proposal up to the date and time for which this RFP closes. C. COMMUNICATIONS All communications concerning this RFP must be directed to mguzman@slocity.org. All other communication is not binding and will in no way modify the RFP or the obligations of the City. All DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 9  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT questions will receive a response within five (5) business days. The proceedings of the Selection Committee are confidential, and members of the Selection Committee are not to be contacted by the proposers. After the solicitation has closed, proposers can request to view the RFP award information. Any questions and requests for information must be addressed to the Engineer. D. INSURANCE The Consultant shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Consultant, its agents, representatives, employees or subconsultants. Minimum Scope of Insurance. Coverage shall be at least as broad as: 1. Insurance Services Office Commercial General Liability coverage (occurrence form CG 20 10 Prior to 1993 or CG 20 10 07 04 with CG 20 37 10 01 or the exact equivalent as determined by the City). 2. Insurance Services Office form number CA 0001 (Ed. 1/87) covering Automobile Liability, code 1 (any auto). 3. Workers' Compensation insurance as required by the State of California and Employer's Liability Insurance. 4. Errors and Omissions Liability insurance as appropriate to the consultant's profession. Minimum Limits of Insurance. Consultant shall maintain limits no less than: 1. General Liability: $2,000,000 per occurrence for bodily injury, personal injury and property damage. If Commercial General Liability or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this Project /location or the general aggregate limit shall be twice the required occurrence limit. 2. Automobile Liability: $1,000,000 per accident for bodily injury and property damage. 3. Employer's Liability: $1,000,000 per accident for bodily injury or disease. 4. Professional / Errors and Omissions Liability: $2,000,000 per occurrence. Deductibles and Self-Insured Retentions. Any deductibles or self-insured retentions must be declared to and approved by the City. At the option of the City, either: the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the City, its officers, officials, employees and volunteers; or the Consultant shall procure a bond guaranteeing payment of losses and related investigations, claim administration and defense expenses. Other Insurance Provisions. The general liability and automobile liability policies are to contain, or be endorsed to contain, the following provisions: 1. The City, its officers, officials, employees, agents and volunteers are to be covered as insureds as respects: liability arising out of activities performed by or on behalf of the Consultant; products and completed operations of the Consultant; premises owned, occupied or used by the Consultant; or automobiles owned, leased, hired or borrowed by the Consultant. The coverage shall contain no special limitations on the scope of protection afforded to the City, its officers, official, employees, agents or volunteers. 2. For any claims related to this Project, the Consultant's insurance coverage shall be primary insurance as respects the City, its officers, officials, employees, agents and volunteers. Any insurance or self-insurance maintained by the City, its officers, officials, employees, agents or volunteers shall be excess of the Consultant's insurance and shall not contribute with it. 3. The Consultant's insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 10  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT 4. Each insurance policy required by this clause shall be end orsed to state that coverage shall not be suspended, voided, canceled by either party, reduced in coverage or in limits except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. The Consultant agrees to notify the City in the event that the policy is suspended, voided or reduced in coverage or limits. A minimum of 30 days prior written notice by certified mail, return receipt requested, will be provided. Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M. Best's rating of no less than A:VII. Verification of Coverage. Consultant shall furnish the City with a certificate of insurance showing maintenance of the required insurance coverage. Original endorsements effecting general liability and automobile liability coverage required by this clause must also be provided. The endorsements are to be signed by a person authorized by that insurer to bind coverage on its behalf. All endorsements are to be received and approved by the City before work commences. E. EXCEPTIONS & DEVIATIONS Any exceptions to or deviations from the requirements set forth in this RFP must be declared in the proposal submitted by the proposer. The City may waive any immaterial deviation or defect in a proposal. F. AWARD AND STANDARD AGREEMENT The City reserves the right to make awards within sixty (60) days after the date of the RFP closing. The successful proposer is expected to execute a contract reflecting the template in Appendix C. This sample contract is for reference to the anticipated terms and conditions governing the City and the successful proposer. The proposer must take exception in their proposal to any section of the attached contract they do not agree with. Failing to do so will be deemed as acceptance by the proposer to the terms spelled out in the sample contract. The City reserves the right, in its sole discretion, to add, delete, or modify, or negotiate additional terms and conditions to the attached contract. BEFORE BEGINNING ANY WORK OR SUBMITTING A PROPOSAL, IT IS ADVISED THAT PROPOSERS READ THE CITY INSURANCE AND INDEMNIFICATION REQUIREMENTS IN THE ATTACHED SAMPLE CONTRACT. G. PREVAILING WAGE A portion of this work is prevailing wage work. For any work proposed by the prime consultant or a subconsultant (any tier) under this contract, in accordance with Labor Code Section 1720 et seq., employees must be paid at least the prevailing rate wages for public works performed on the Project . Prime consultant and any applicable subconsultant (any tier) must register with the Department of Industrial Relations (DIR) prior to contract award, must remain registered for the entire term of the contract, and must submit certified payroll records to DIR at least monthly for such work. Firms can register at: http://www.dir.ca.gov/Public-Works/PublicWorks.html H. FAIR EMPLOYMENT PRACTICE The Consultant and all subconsultants must comply with all laws and regulations governing nondiscrimination in employment, including the Americans with Disabilities Act of 1990, the Fair Employment and Housing Act (California Government Code Section 129000 et seq.), and the applicable regulations promulgated thereunder Title 2, Division 4.1, Chapter 5 of the California Code of Regulations Section 11000 et seq. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 11  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT The Consultant, with regard to the work performed by them during the Contract, must not discriminate on the grounds of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or military and veteran status of any person in employment or the selection and retention of subcontractors, including procurement of materials and leases of equipment. I. PROTEST OF AWARD Any objection to the City’s final decision will be handled according to applicable state and local procurement laws. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 12  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT IX. PROPOSAL FORMAT A qualifying proposal must address all the following points and shall be in the format outlined in this section. The technical proposal will be a maximum of 15 pages total, not including staff resumés. COVER LETTER The cover letter will be addressed to: Manuel Guzman Construction Engineering Manager The letter must be on proposer’s letterhead and include the proposer’s contact name, mailing address, telephone number and email address. The letter will address the proposer’s understanding of the services being requested and any other pertinent information the proposer believes should be included. The name, address, telephone number, and email address of the person authorized to represent the firm with respect to all notices, negotiations, discussions, and other communications relating to this proposal, to any negotiation relating to the contract should be included in the letter. The letter must be signed by the individual authorized to bind the Consultant to the representations, commitments, and statements in the proposal. FIRM QUALIFICATIONS The City will only consider proposals that demonstrate firms have successfully completed comparable Project s. These Project s must illustrate the quality, type, and past performance of the Project team. Submittals must include a detailed description of a minimum of three (3) Project s within the past five (5) years which include the following information: 1. Contracting agency 2. Contracting agency Project Manager and contact information 3. Contract amount 4. Date of contract 5. Date of completion 6. Consultant Project Manager and contact information 7. Consultant Resident Engineer and contact information 8. Project Objective 9. Project Outcome: include original construction contract amount and final amount. ORGANIZATION AND APPROACH 1. Provide an organizational chart identifying the Project manager for the work and each key person who would be assigned to carry out the work and their respective roles in performing the work – specifically the Resident Engineer(s) and any Assistant Resident Engineers, inspectors, materials sampling and testing, other key support or contract administration staff. Provide a separate description of the experience and qualifications of the Project manager and each key person, including a summary of experience on similar Project s. Resumés should be included for all key individuals as an appendix to the submittal. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 13  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT 2. Describe your Project and management approach. Provide a detailed description of how the team and scope of work will be managed. 3. A list of no more than three references for the consultant and no more than three references for each subconsultants, including the names, addresses and telephone numbers of recent related clients/Project s, preferably other public agencies and a listing of the specific Project s and key individuals that have participated in them. Include the dollar amount related to the participation. Identify how much experience the firm and subconsultant has had with public agencies. 4. Describe your cost control and budgeting methodology for this Project. 5. Provide responses to the following: a. Describe critical construction related issues associated with the Project and how you will address these. b. Describe critical environmental issues and how you will address these. c. Describe how cost and schedule for the construction contract and your scope of work could be minimized. SCOPE OF WORK This section should establish that the proposer understands the City’s objectives and requirements, demonstrate the proposer’s ability to meet those requirements and outline clearly and concisely the plan for accomplishing the specified work in accordance with the time schedule as outlined in Appendix A, Scope of Services: 1. Include a detailed Scope of Work Statement describing all services to be provided. 2. Indication of information and participation the proposer will require from City staff. 3. Describe Project deliverables for each phase of your work. CONTRACT AGREEMENT Indicate any issues or proposed changes to the sample contract included as Appendix C. The Consultant must provide a brief statement affirming that the proposal terms will remain in effect for one hundred twenty (120) days following the date proposal submittals are due. A contract will not be awarded to a consultant without an adequate financial management and accounting system as required by 48 CFR Part 31 and 2 CFR Part 200. REFERENCES A list of no more than three references for the consultant and three references for each subconsultant, including the names, addresses and telephone numbers. These references may be the same as the references listed above in IV. Proposal Format, Section C. Organization and Approach. FEE PROPOSAL Within separate sealed envelope, submit a complete fee proposal for the scope of services. Provide separate subtotals for Phase 1B and Phase 2 broken down by task and staff billing rates with estimated hours. Clearly identify fees for subconsultant services. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 14  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT OPTIONAL – ADDITIONAL SUPPORTING INFORMATION Provide additional supporting information, not requested above, that you believe is pertinent to evaluating your firm’s ability to provide comparable program services. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 15  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT X. CONSULTANT EVALUATION & CONTRACT AWARD PROPOSAL RESPONSIVENESS Responses to this RFP must be complete. Responses that do not include the proposal content requirements identified within this RFP and subsequent addenda will be considered incomplete and will receive no further consideration. EVALUATION PROCEDURES Proposals will be evaluated according to each weighted Evaluation Criteria and scored on a zero to five-point rating scale shown in the table below. The scores for the Evaluation Criteria will then be multiplied according to their assigned weight to arrive at a weighted score for each firm. A firm’s proposal with a high weighted total will be deemed of higher quality than a proposal or interview with a lesser-weighted total. The top 3 ranked firms may be selected for an interview, which would be used to confirm ratings. Rating Scale 0 Not Acceptable Non-responsive, fails to meet RFP specifications. The approach has no probability of success in achieving Project objectives per the RFP. 1 Poor Below average, falls short of expectations, is substandard to that which is the average or expected norm, has a low probability of success in achieving Project objectives per the RFP. 2 Fair Has a reasonable probability of success, however, some objectives may not be met. 3 Average Acceptable, achieves all objectives in a reasonable fashion per the RFP. This will be the baseline score for each item with adjustments based on interpretation of the proposal by Selection Committee. 4 Above Average/Good Very good probability of success, better than that which is average or expected as the norm. Achieves all objectives per RFP requirements and expectations. 5 Excellent/ Exceptional Exceeds expectations, very innovative, clearly superior to that which is average or expected as the norm. Excellent probability of success and in achieving all objectives and meeting RFP requirements and expectations. The Proposal Evaluation Criteria and their respective weights are as follows: No. Criteria Weight 1 Understanding of Work Involved 5 2 Organization and Approach 5 3 Quality & Experience of Staff for Work 5 4 Firm Qualifications & References 5 TOTAL 20 DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 16  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT CONTRACT AWARD The final selection of the awarded consultant will be contingent upon successful contract negotiations and approval by the Public Works Director. The City Public Works Director will administer and enforce the provisions of the contract. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 17  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT XII. APPENDICIES APPENDIX A – SCOPE OF SERVICES Consultant shall provide an experienced registered Civil Engineer Construction Manager and support staff (as required) to manage the Project. Project Management services will include, but not be limited to, all items associated with construction management and inspection services necessary for Project completion and closeout. Typical Duties – The Work Tasks, defined in section below, generally include the following: 1. Maintain an awareness of safety and health requirements and enforce applicable contract provisions for the protection of the public and Project personnel. 2. Provide technical and administrative management services for the Project, coordination and oversight of all activities related to the construction of the Project and provide constant communication to the Project Manager of activities and concerns on the Project. Review all prepared documents with the Project Manager prior to submission to the Contractor. 3. Evaluate cost reduction incentive proposals and provide recommendations to Project Manager for acceptance or denial. 4. Perform the duties of Resident Engineer and Assistant Resident Engineer in accordance with Caltrans procedures including construction inspection, pay quantity calculations, materials sampling and testing, and compliance monitoring with Project plans, specifications, permits, environmental documents, and agreements. 5. Review and monitor the contractor’s schedule through weekly meetings, and maintain an as-built schedule. 6. Maintain binders of job records. 7. Prepare daily inspection and materials records and weekly status reports, and stormwater compliance documentation. 8. Prepare all correspondence related to Project activities and review with the Project Manager. 9. Identify actual and potential problems associated with the construction Project and consult with the design engineer and Project Manager to implement engineering solutions. 10. Coordinate submittal reviews and timely approvals with the design team and Project Manager. 11. Prepare and approve progress payments and supporting documentation. The City will provide signature authorization of monthly payments. 12. Pre-negotiate and prepare contract change orders. The City will provide signature authorization of contract change orders. 13. Perform labor and subcontracting compliance tasks including labor interviews and verifying certified payrolls and subcontractors utilization. 14. Complete record drawing markups daily, final Project certification, as outlined in Task 5, “Post-Construction Services.” 15. Recommend Project acceptance in accordance with City Standard Specifications and procedures. 16. Ensure full compliance to Americans with Disabilities Act (ADA). Work Tasks - A preliminary scope of services follows and includes identified work tasks. Task 1 – Pre-Construction Services DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 18  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT This task includes pre-construction services including, but not limited to the following:  Review and familiarization with contract plans, specifications, permits and agreements, including subsurface utility relocation work. If contract conflicts, errors, or omissions are discovered, convey to City and design engineer for correction if prior to Project advertisement  Assist the City in evaluation of bids received.  Review Resident Engineer files. Resident Engineer’s files consist of design engineer memos to Resident Engineers, and technical reports, environmental document, permits, and studies.  Prepare a Resident Engineer’s Project schedule which includes all pre-construction and utility relocations by others, and notification timelines noted on all permits, agreements, and contract documents. Upon receipt of Contractor’s schedule, evaluate and confer with the Contractor regarding workability of the schedule or suggest changes that may improve the schedule and update Resident Engineer’s schedule.  Prepare Project instructions and establish proposed contract administration and record keeping procedures to be used during construction for review and approval by Project Manager.  Attend meeting with City and Design Engineer to discuss design features. The intent of this meeting is to answer questions from the Resident Engineer, meet key staff, and review contract administration procedures.  Establish electronic records file structure and protocol for daily uploading to City network.  Prepare meeting agenda identifying attendees and conduct a pre-construction conference with the Contractor awarded the construction contract. Prepare and circulate meeting minutes.  Follow Caltrans Standard Specifications Section 5-1.43, Potential Claims and Dispute Resolution in establishing a Dispute Resolution Advisor (DRA) or Dispute Resolution Board (DRB) as mutually agreed to by the City and the Contractor. The agreed to process shall be reviewed and approved by Project Manager.  Establish correspondence protocols for contractor – construction management communications to allow for clear tracking of correspondence sequences and responses. Task 2 – Construction Services This task includes Project management, construction administration, scheduling, Project observation/inspection, and materials testing during construction. Consultant management services shall be in accordance with the Caltrans Local Assistance Program and Construction Manuals, including but not limited to the following: Project Coordination and Communication  Serve as the focal point for coordination among the contactor, surveyors, material testers, design team, the Project Manager, other agencies, utility companies, and other parties. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 19  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT  Maintain close contact with Project Manager and the design team and review all correspondence with the Project Manager prior to issuance. Maintain and track correspondence in an organized manner throughout the Project.  Receive all Contractor correspondence and prepare and transmit responses. Coordinate with applicable parties, as required, to develop responses.  Conduct weekly, or as necessary, construction contract coordination meetings with the Contractor. Take minutes and distribute to parties designated in the Project instructions. Schedules, Progress Meetings, and Reports  Review Contractor’s planned schedule for conformance with the specifications and for reasonableness of the sequence and duration of the activities. Provide acceptance or correction noticing to Contractor.  Review work progress as compared to the planned schedule and notify Contractor of schedule slippage. Analyze schedule to determine impact of weather and change orders. Obtain from Contactor updates of construction schedule incorporating actual progress, weather delays, and change order impacts. Negotiate time extensions due to change orders and other delays.  Prepare and submit a monthly progress report to Project Manager describing key issues, cost status, and schedule status.  Maintain as-built schedule Payment  Review Contractor’s initial schedule of values for reasonableness and ease of monitoring.  Prepare monthly quantity calculations to support progress payments.  Review and approve quantities submitted with monthly progress payment requests, negotiate differences over amount, and process payments through the Project Manager. Submittals and Requests for Information (RFI)  Receive, stamp, and log submittals, and review and approve, or distribute for review as necessary.  Monitor the review and return of submittals to Contactor. Provide reminders in advance of deadlines for submittal reviewers  Develop and maintain a submittal tracking list to identify parties responsible for review and acceptance, and received and response due dates.  Receive, process, and monitor Requests for Information (RFI) from Contactor.  Prepare responses to RFI related to construction issues in a timely manner.  Transmit design-related RFI to Design Engineer and copy the Project Manager.  Conduct meetings with Contractor and other parties, as needed, to discuss and resolve RFI. Change Orders  Evaluate potential change orders for compliance with permits, environmental documents and other on-site and construction constraints. Provide appropriate feedback for modifications or adjustments to change order proposals. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 20  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT  Prepare Cost Request Bulletins, perform quantity and cost analysis, as required, for negotiation of change orders, and negotiate payment for contract change orders.  Prepare change orders related to construction issues based on drawings, specifications, and other information from the City, design team, Project Manager, or Contractor.  Perform change order administration, including obtaining City approval of change order requests, issuing proposed change orders to Contractor, maintaining logs of proposed change orders, receiving change order quotations from Contractor, negotiating change order costs and time extension, processing final negotiated change orders, and incorporating approved change order into progress payment breakdown.  Prepare recommendations to accompany change order documents and forward to Project Manager for review and approval. Obtain Contractor signature and provide to the City for execution. Construction Observation/Inspection Services  Provide experienced and qualified inspectors who are acceptable to the City.  The inspectors will ensure compliance with all aspects of the construction contract by continuously monitoring, evaluating, approving or rejecting the Contractor’s work in accordance with the approved construction contract documents.  Review laboratory, shop and mill test reports of materials and equipment, and coordinate as required with the Design Engineers.  Review the safety programs developed by the Contractor as required by the contract documents and monitor the Contractor's compliance.  Determine that the Contractor’s work is being performed in accordance with City requirements and in accordance with the requirements of the contract documents. Endeavor to guard the City against defects and deficiencies in the work. As appropriate, require special inspection or testing, or make recommendations to the City regarding special inspection or testing of work not in accordance with the provisions of the contract documents, whether or not such work is fabricated, installed or completed. Subject to review by City, reject work, which does not conform to the requirements of the City or the contract documents.  Record the progress of the Project. Provide accurate and precise daily inspection reports. Submit written daily progress reports to the City, including information on Contractor and the entire Project, showing percentages of completion and the number and status of change orders.  Keep daily logs containing a record of weather, Contractor's work on the site, number of workers, work accomplished, problems encountered, and other relevant data. Make the log available to the City. Prepare and send a Weekly Statement of Working Days to the Contractor.  Check certified payrolls and monitor Contractor's compliance with labor code requirements.  Monitor all inspection activities, both City provided and any consulted out inspections.  Consolidate punch list items indicating work remaining for Project closeout. Claims  Receive and analyze Notices of Potential Claim and Claims submitted. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 21  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT  Review Notices and Claims with the Contract to verify understanding and determine if reasonable solution exists to address and eliminate the Claim. Review resolutions with the Project Manager and prepare appropriate response.  Perform claims administration, including coordinating and monitoring claims response preparation, logging claims, and tracking claims status, and response deadlines. Task 3 – Geotechnical and Materials Testing and Specialty Inspection Materials testing and specialty inspection services will be required for construction of the Project and provided by the Consultant or subconsultant, as directed by the Consultant. Consultant shall review and monitor testing for compliance with the Project requirements. The materials testing requirements include, but are not limited to, the following:  Select and retain the professional services of special consultants and certified testing laboratories. Monitor and coordinate their services.  Provide a quality control service including inspection and testing of all materials, such as but not limited to, steel strength, concrete strength, gravel gradations, soil compaction in accordance with the Project plans and specifications. Task 4 – Surveying Surveying is anticipated to be performed by Consultant’s Staff as directed by the Construction Manager. The Construction Manager shall review and monitor surveys to verify compliance with the Project requirements. The surveying requirements include, but are not limited to, the following:  Provide construction surveying services per the latest Caltrans “Survey Manual” and its revisions.  Surveys performed by the Engineer shall conform to the requirements of the Land Surveyor’s Act. Responsible Charge for the work shall reside with a January 1, 1982 Registered Civil Engineer or a licensed Land Surveyor in the State of California.  The minimum standard of survey quality shall be that of similar surveys performed by Caltrans.  The City will designate the existing horizontal and vertical control monuments that are to be the basis of all surveys. City will provide the California coordinate system values and elevations of these monuments. The Consultant shall adjust all Consultant performed surveys to the designated control monuments and their values.  Monuments established by the Consultant shall be marked by the Consultant with State furnished disks, plugs, or tags. In addition, the Consultant shall identify Consultant established monuments by tagging or stamping the monuments with the license or registration number of the Engineer’s surveyor who is in “responsible charge” of the work. Replacement of survey monuments shall be the responsibility of the Consultant. All new monuments shall be set in accordance with current City and Land Surveyors Act requirements. Task 5 – Construction Environmental Mitigation and Monitoring DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 22  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT The Environmental Monitor shall sign off and approve compliance with the approved MMRP and document implementation of all BMP and on and off-site mitigation measures included in the Project specifications. Work Tasks – Provide a scope of services and work tasks necessary for oversight and compliance with Phase 1B and Phase 2 Mitigation and Monitoring Plan prepared by Rincon (attachment G1 and G2). See appendix G1 and G2 for full listing of services require for inclusion in this task of the proposal. For example, the environmental monitoring requirements include, but are not limited to, the following:  Consultant shall provide qualified biologists to perform pre-construction surveys. The pre-construction surveys should also include a photograph record of the pre- construction condition of the site. Initial field inspections to establish no species are present (nesting surveys, etc.)  Training of the construction crews on what to look out for (including new crew orientation). Live training is required for when the job starts to include: foreman, supervisors, Project managers, and resident engineers. Once this initial training is completed then Project specific training videos shall be created for small crew changes.  Air Quality monitoring  Cultural/Archeological monitoring during all Project earthmoving activities  Verify placement of noise related signage  Paleontological monitoring for initial ground disturbance deeper than 10-feet Task 6 – Post-Construction Services The post-construction services task includes Project closeout after the work is complete. The post-construction services requirements include, but are not limited to, the following:  Compile record drawing information, and provide one copy of red-lined Project drawings to the City.  Compile any outstanding claims and documentation together in a coherent package.  The design consultant will provide Project changes to original design mylars to complete the record set.  Final payment will be recommended by Consultant to the City and all remaining Project files (organized in the manner specified in the Caltrans Construction Manual or otherwise specified in Project Plans & Specifications) will be transmitted to the City.  Project Certification and a Notice of Completion shall be provided in consultation with the City.  All claims shall be processed in accordance with Caltrans 2015 Standard Specifications Section 5-1.43, Potential Claims and Dispute Resolution. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 23  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT APPENDIX B – VICINITY MAP DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 24  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT APPENDIX C – SAMPLE CONTRACT AGREEMENT THIS AGREEMENT is made and entered into in the City of San Luis Obispo on _____________ by and between the CITY OF SAN LUIS OBISPO, a municipal corporation, hereinafter referred to as City, and [CONSULTANT’S NAME IN CAPITAL LETTERS], hereinafter referred to as Consultant. W I T N E S S E T H WHEREAS, on [DATE], requested proposals for Structural Engineering Design Services per Specification No. 90435-CM. WHEREAS, pursuant to said request, Consultant submitted a proposal that was accepted by City for said services. NOW THEREFORE, in consideration of their mutual promises, obligations and covenants hereinafter contained, the parties hereto agree as follows: 1. Contract Term. The term of this agreement shall be from the date this Agreement is made and entered, as first written above until all work has been completed. 2. Work Delays. Should the Consultant be obstructed or delayed in the work required to be done hereunder by changes in the work or by any default, act, or omission of the City, or by strikes, fire, earthquake, or any other Act of God, or by the inability to obtain materials, equipment, or labor due to federal government restrictions arising out of defense or war programs, then the time of completion may, at the City's sole option, be extended for such periods as may be agreed upon by the City and the Consultant. In the event that there is insufficient time to grant such extensions prior to the completion date of the contract, the City may, at the time of acceptance of the work, waive liquidated damages that may have accrued for failure to complete on time, due to any of the above, after hearing evidence as to the reasons for such delay, and making a finding as to the causes of same. 3. Termination for Cause. If, during the term of the contract, the City determines that the Consultant is not faithfully abiding by any term or condition contained herein, the City may notify the Consultant in writing of such defect or failure to perform. This notice must give the Consultant a 10 (ten) calendar day notice of time thereafter in which to perform said work or cure the deficiency. If the Consultant has not performed the work or cured the deficiency within the ten days specified in the notice, such shall constitute a breach of the contract and the City may terminate the contract immediately by written notice to the Consultant to said effect. Thereafter, neither party shall have any further duties, obligations, responsibilities, or rights under the contract except, however, any and all obligations of the Consultant's surety shall remain in full force and effect, and shall not be extinguished, reduced, or in any manner waived by the termination thereof. In said event, the Consultant shall be entitled to the reasonable value of its services performed from the beginning date in which the breach occurs up to the day it received the City's Notice DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 25  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT of Termination, minus any offset from such payment representing the City's damages from such breach. "Reasonable value" includes fees or charges for goods or services as of the last milestone or task satisfactorily delivered or completed by the Consultant as may be set forth in the Agreement payment schedule; compensation for any other work, services or goods performed or provided by the Consultant shall be based solely on the City's assessment of the value of the work-in-progress in completing the overall workscope. The City reserves the right to delay any such payment until completion or confirmed abandonment of the Project, as may be determined in the City's sole discretion, so as to permit a full and complete accounting of costs. In no event, however, shall the Consultant be entitled to receive in excess of the compensation quoted in its proposal. 4. Termination for Convenience. The City also reserves the right to terminate the contract for convenience, providing a 30 (thirty) calendar day notice, at any time upon a determination by the Director that termination of the contract is in the best interest of the City. Upon termination notice from the City, Consultant must, unless otherwise directed, cease work and follow the City’s directions as to work in progress and finished goods. For termination of any services pursuant to this Agreement, the City’s liability will be the lesser of a reasonable price for the services rendered prior to termination. 5. Ability to Perform. The Consultant warrants that it possesses, or has arranged through subcontracts, all capital and other equipment, labor, materials, and licenses necessary to carry out and complete the work hereunder in compliance with any and all applicable federal, state, county, city, and special district laws, ordinances, and regulations. 6. Sub-contract Provisions. No portion of the work pertinent to this contract shall be subcontracted without written authorization by the City, except that which is expressly identified in the Consultant’s proposal. Any substitution of sub-consultants must be approved in writing by the City. For any sub-contract for services in excess of $25,000, the subcontract shall contain all provisions of this agreement. 7. Contract Assignment. The Consultant shall not assign, transfer, convey or otherwise dispose of the contract, or its right, title or interest, or its power to execute such a contract to any individual or business entity of any kind without the previous written consent of the City. 8. Inspection. The Consultant shall furnish City with every reasonable opportunity for City to ascertain that the services of the Consultant are being performed in accordance with the requirements and intentions of this contract. All work done and all materials furnished, if any, shall be subject to the City's inspection and approval. The inspection of such work shall not relieve Consultant of any of its obligations to fulfill its contract requirements. 9. Record Retention and Audit. For the purpose of determining compliance with various laws and regulations as well as performance of the contract, the Consultant and sub-consultants shall maintain all books, documents, papers, accounting records and other evidence pertaining to the performance of the contract, including but not limited to the cost of administering the contract. Materials shall be made available at their respective offices at all reasonable times during the contract period and for three years from the date of final payment under the contract. Authorized representatives of the City shall have the option of inspecting and/or auditing all records. For Federally funded Project s, access to records shall also include authorized representatives of the State and Federal government. Copies shall be furnished if requested. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 26  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT 10. Conflict of Interest. The Consultant shall disclose any financial, business, or other relationship with the City that may have an impact upon the outcome of this contract, or any ensuing City construction Project. The Consultant shall also list current clients who may have a financial interest in the outcome of this contract, or any ensuing City construction Project which will follow. The Consultant staff shall provide a Conflict of Interest Statement where determined necessary by the City. The Consultant covenants that it presently has no interest, and shall not acquire any interest— direct, indirect or otherwise—that would conflict in any manner or degree with the performance of the work hereunder. The Consultant further covenants that, in the performance of this work, no sub-consultant or person having such an interest shall be employed. The Consultant certifies that no one who has or will have any financial interest in performing this work is an officer or employee of the City. It is hereby expressly agreed that, in the performance of the work hereunder, the Consultant shall at all times be deemed an independent Consultant and not an agent or employee of the City. 11. Rebates, Kickbacks or Other Unlawful Consideration. The Consultant warrants that this contract was not obtained or secured through rebates, kickbacks or other unlawful consideration, either promised or paid to any City employee. For breach or violation of the warranty, the City shall have the right in its discretion; to terminate the contract without liability; to pay only for the value of the work actually performed; to deduct from the contract price; or otherwise recover the full amount of such rebate, kickback or other unlawful consideration. 12. Covenant Against Contingent Fees. The Consultant warrants by execution of this contract that no person or selling agency has been employed, or retained, to solicit or secure this contract upon an agreement or understanding, for a commission, percentage, brokerage, or contingent fee, excepting bona fide employees or bona fide established commercial or selling agencies maintained by the Consultant for the purpose of securing business. For breach or violation of this warranty, the City has the right to annul this contract without liability; pay only for the value of the work actually performed, or in its discretion, to deduct from the contract price or consideration, or otherwise recover the full amount of such commission, percentage, brokerage, or contingent fee. 13. Compliance with Laws and Wage Rates. The Consultant shall keep itself fully informed of and shall observe and comply with all applicable state and federal laws and county and City of San Luis Obispo ordinances, regulations and adopted codes during its performance of the work. This includes compliance with prevailing wage rates and their payment in accordance with California Labor Code. For purposed of this paragraph, “construction” includes work performed during the design and preconstruction phases of construction, including but not limited to, inspection and land surveying work. 14. Payment of Taxes. The contract prices shall include full compensation for all taxes that the Consultant is required to pay. 15. Permits, Licenses and Filing Fees. The Consultant shall procure all permits and licenses, pay all charges and fees, and file all notices as they pertain to the completion of the Consultant’s work. The City will pay all application fees for permits required for the completion of the Project including building and regulatory permit application fees. Consultant will provide a 10 day notice for the City to issue a check. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 27  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT 16. Safety Provisions. The Consultant shall conform to the rules and regulations pertaining to safety established by OSHA and the California Division of Industrial Safety. 17. Public and Employee Safety. Whenever the Consultant's operations create a condition hazardous to the public or City employees, it shall, at its expense and without cost to the City, furnish, erect and maintain such fences, temporary railings, barricades, lights, signs and other devices and take such other protective measures as are necessary to prevent accidents or damage or injury to the public and employees. 18. Preservation of City Property. The Consultant shall provide and install suitable safeguards, approved by the City, to protect City property from injury or damage. If City property is injured or damaged resulting from the Consultant's operations, it shall be replaced or restored at the Consultant's expense. The facilities shall be replaced or restored to a condition as good as when the Consultant began work. 19. Immigration Act of 1986. The Consultant warrants on behalf of itself and all sub-consultants engaged for the performance of this work that only persons authorized to work in the United States pursuant to the Immigration Reform and Control Act of 1986 and other applicable laws shall be employed in the performance of the work hereunder. 20. Consultant Non-Discrimination. In the award of subcontracts or in performance of this work, the Consultant agrees that it will not engage in, nor permit such sub-consultants as it may employ, to engage in discrimination in employment of persons on any basis prohibited by State or Federal law. 21. Accuracy of Specifications. The specifications for this Project are believed by the City to be accurate and to contain no affirmative misrepresentation or any concealment of fact. Consultants are cautioned to undertake an independent analysis of any test results in the specifications, as City does not guaranty the accuracy of its interpretation of test results contained in the specifications package. In preparing its proposal, the Consultant and all sub- consultants named in its proposal shall bear sole responsibility for proposal preparation errors resulting from any misstatements or omissions in the specifications that could easily have been ascertained by examining either the Project site or accurate test data in the City's possession. Although the effect of ambiguities or defects in the specifications will be as determined by law, any patent ambiguity or defect shall give rise to a duty of Consultant to inquire prior to proposal submittal. Failure to so inquire shall cause any such ambiguity or defect to be construed against the Consultant. An ambiguity or defect shall be considered patent if it is of such a nature that the Consultant, assuming reasonable skill, ability and diligence on its part, knew or should have known of the existence of the ambiguity or defect. Furthermore, failure of the Consultant or sub-consultants to notify City in writing of specification defects or ambiguities prior to proposal submittal shall waive any right to assert said defects or ambiguities subsequent to submittal of the proposal. To the extent that these specifications constitute performance specifications, the City shall not be liable for costs incurred by the successful Consultant to achieve the Project ’s objective or standard beyond the amounts provided therefor in the proposal. In the event that, after awarding the contract, any dispute arises as a result of any actual or alleged ambiguity or defect in the specifications, or any other matter whatsoever, Consultant DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 28  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT shall immediately notify the City in writing, and the Consultant and all sub-consultants shall continue to perform, irrespective of whether or not the ambiguity or defect is major, material, minor or trivial, and irrespective of whether or not a change order, time extension, or additional compensation has been granted by City. Failure to provide the hereinbefore described written notice within one (1) working day of Consultant's becoming aware of the facts giving rise to the dispute shall constitute a waiver of the right to assert the causative role of the defect or ambiguity in the plans or specifications concerning the dispute. 22. Hold Harmless and Indemnification. (a) Non-design, non-construction Professional Services: To the fullest extent permitted by law (including, but not limited to California Civil Code Sections 2782 and 2782.8), Consultant shall indemnify, defend, and hold harmless the City, and its elected officials, officers, employees, volunteers, and agents (“City Indemnitees”), from and against any and all causes of action, claims, liabilities, obligations, judgments, or damages, including reasonable legal counsels’ fees and costs of litigation (“claims”), arising out of the Consultant’s performance or Consultant’s failure to perform its obligations under this Agreement or out of the operations conducted by Consultant, including the City’s active or passive negligence, except for such loss or damage arising from the sole or active negligence or willful misconduct of the City. In the event the City Indemnitees are made a party to any action, lawsuit, or other adversarial proceeding arising from Consultant’s performance of this Agreement, the Consultant shall provide a defense to the City Indemnitees or at the City’s option, reimburse the City Indemnitees their costs of defense, including reasonable legal fees, incurred in defense of such claims. (b) Non-design, construction Professional Services: To the extent the Scope of Services involve a “construction contract” as that phrase is used in Civil Code Section 2783, this paragraph shall apply in place of paragraph A. To the fullest extent permitted by law (including, but not limited to California Civil Code Sections 2782 and 2782.8), Consultant shall indemnify, defend, and hold harmless the City, and its elected officials, officers, employees, volunteers, and agents (“City Indemnitees”), from and against any and all causes of action, claims, liabilities, obligations, judgments, or damages, including reasonable legal counsels’ fees and costs of litigation (“claims”), arising out of the Consultant’s performance or Consultant’s failure to perform its obligations under this Agreement or out of the operations conducted by Consultant, except for such loss or damage arising from the active negligence, sole negligence or willful misconduct of the City. In the event the City Indemnitees are made a party to any action, lawsuit, or other adversarial proceeding arising from Consultant’s performance of this Agreement, the Consultant shall provide a defense to the City Indemnitees or at the City’s option, reimburse the City Indemnitees their costs of defense, including reasonable legal fees, incurred in defense of such claims. (c) Design Professional Services:   To the fullest extent permitted by law, Consultant shall indemnify, defend, and hold harmless City and any and all of its officials, employees and agents (“Indemnified Parties”) from and against any and all claims, losses, liabilities, damages, costs and expenses, including attorney’s fees and costs, to the extent they arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant. Consultant’s duty to defend shall consist of reimbursement of defense costs incurred DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 29  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT by City in direct proportion to the Consultant’s proportionate percentage of fault. Consultant’s percentage of fault shall be determined, as applicable, by a court of law, jury or arbitrator. In the event any loss, liability or damage is incurred by way of settlement or resolution without a court, jury or arbitrator having made a determination of the Consultant’s percentage of fault, the Parties agree to mediation with a neutral third-party to determine the Consultant’s proportionate percentage of fault for purposes of determining the amount of indemnity and defense cost reimbursement owed to the City. Notwithstanding the foregoing and without diminishing any rights of City in the preceding paragraph, for any liability, claim, demand, allegation against City arising out of, related to, or pertaining to any act or omission of Consultant, but which is not a design professional service, Consultant shall defend, indemnify, and hold harmless the Indemnified Parties from and against any and all damages, costs, expenses (including reasonable attorney fees and expert witness fees), judgments, settlements, and/or arbitration awards, whether for personal or bodily injury, property damage, or economic injury, and arising out of, related to, any concurrent or contributory negligence on the part of the City except for the sole or active negligence of, or willful misconduct of the City. (d) The review, acceptance or approval of the Consultant’s work or work product by any indemnified party shall not affect, relieve or reduce the Consultant’s indemnification or defense obligations. This Section survives completion of the services or the termination of this contract. The provisions of this Section are not limited by and do not affect the provisions of this contract relating to insurance. 23. Non-Exclusive Contract. The City reserves the right to contract for the services listed in this proposal from other consultants during the contract term. 24. Standards. Documents shall conform to City Standards and City furnished templates shall be used. 25. Consultant Endorsement. Technical reports, plans and specifications shall be stamped and signed by the Consultant where required. 26. Required Deliverable Products and Revisions. Deliverables include all items necessary to provide the work scope outlined in the Request for Proposal, incorporated herein by reference and attached hereto as Exhibit [X]. City staff will review any documents or materials provided by the Consultant and, where necessary, the Consultant will respond to staff comments and make such changes as deemed appropriate. 27. Ownership of Materials. Upon completion of all work under this contract, ownership and title to all reports, documents, plans, specifications, and estimates produced as part of this contract will automatically be vested in the city and no further agreement will be necessary to transfer ownership to the City. The Consultant shall furnish the City all necessary copies of data needed to complete the review and approval process. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 30  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT It is understood and agreed that all calculations, drawings and specifications, whether in hard copy or machine readable form, are intended for one-time use in the construction of the Project for which this contract has been entered into. The Consultant is not liable for claims, liabilities, or losses arising out of, or connected with the modification, or misuse by the City of the machine-readable information and data provided by the Consultant under this agreement. Further, the Consultant is not liable for claims, liabilities, or losses arising out of, or connected with any use by City of the Project documentation on other Project s, except such use as may be authorized in writing by the Consultant. 28. Release of Reports and Information. Any reports, information, data, or other material given to, prepared by or assembled by the Consultant as part of the work or services under these specifications shall be the property of City and shall not be made available to any individual or organization by the Consultant without the prior written approval of the City. The Consultant shall not issue any news release or public relations item of any nature, whatsoever, regarding work performed or to be performed under this contract without prior review of the contents thereof by the City and receipt of the City’s written permission. 29. Copies of Reports and Information. If the City requests additional copies of reports, drawings, specifications, or any other material in addition to what the Consultant is required to furnish in limited quantities as part of the work or services under these specifications, the Consultant shall provide such additional copies as are requested, and City shall compensate the Consultant for the costs of duplicating of such copies at the Consultant's direct expense. 30. Attendance at Meetings and Hearings. Consultant shall attend as many "working" meetings with staff as necessary in performing workscope tasks. 31. Requests for Review. The Consultant shall respond to all requests for submittal review or contractor RFI’s within two weeks of receipt of the information from the City. 32. Project Proposal Submittal. Upon completion of the Project scoping meeting, the Consultant shall submit a proposed workscope, compensation and schedule within 10 working days. The cost proposal shall include all costs including miscellaneous direct cost items. 33. Consultant Invoices. The Consultant shall deliver a monthly invoice to the City, itemized by Project work phase or, in the case of on-call contracts, by Project title. Invoice must include a breakdown of hours billed and miscellaneous charges and any sub-consultant invoices, similarly broken down, as supporting detail. 34. Payment. For providing services as specified in this Agreement, City will pay and Consultant shall receive therefore compensation in a total sum not to exceed the individual agreed upon Project fee. Should the Consultant’s designs, drawings or specifications contain errors or deficiencies, the Consultant shall be required to correct them at no increase in cost to the City. For on-call services, the City will pay and the Consultant shall receive compensation as agreed to on a Project by Project basis. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 31  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT The Consultant shall be reimbursed for hours worked at the hourly rates attached to this agreement. Hourly rates include direct salary costs, employee benefits, overhead and fee. In addition, the Consultant shall be reimbursed for direct costs other than salary and vehicle cost that have been identified and are attached to this agreement. The Consultant’s personnel shall be reimbursed for per diem expenses at a rate not to exceed that currently authorized for State employees under State Department of Personnel Administration rules. 35. Payment Terms. The City's payment terms are 30 days from the receipt and approval by the City of an original invoice and acceptance by the City of the materials, supplies, equipment or services provided by the Consultant (Net 30). 36. Resolution of Disputes. Any dispute, other than audit, concerning a question of fact arising under this contract that is not disposed of by agreement shall be decided by a committee consisting of the City’s Project Manager and the City Director of Public Works, who may consider written or verbal information submitted by the Consultant. Not later than thirty days after completion of all deliverables necessary to complete the plans, specifications and estimate, the Consultant may request review by the City Council of unresolved claims or disputes, other than audit, in accordance with Chapter 1.20 Appeals Procedure of the Municipal Code. Any dispute concerning a question of fact arising under an audit of this contract that is not disposed of by agreement, shall be reviewed by the City’s Chief Fiscal Officer. Not later than 30 days after issuance of the final audit report, the Consultant may request a review by the City’s Chief Fiscal Officer of unresolved audit issues. The request for review must be submitted in writing. Neither the pendency of a dispute, nor its consideration by the City will excuse the consultant from full and timely performance in accordance with the terms of this contract. 37. Disadvantaged Business Enterprise (DBE) Use for Federally Funded Project s. This agreement is subject to Title 49, Part 26 Code of Federal Regulations entitled “Participation by Disadvantaged Business Enterprises in Department of Transportation Financial Assistance Programs” when Project work is for a federally funded Project. In order to ensure the State Department of Transportation achieves its federally mandated statewide overall DBE goal, the City encourages the participation of DBEs as defined in 49 CFR 26 in the performance of this agreement. The City will make a determination on a Project by Project basis for reasonably expected DBE participation to compete for the sub-consulting opportunities in this agreement. The Consultant is responsible to be fully informed regarding the requirements of 49 CFR, Part 26. The Consultant shall notify the City of any changes to its anticipated DBE participation on federally funded Project s, maintain records of DBE usage and complete and submit to the City the final report of DBE utilization prior to receiving final payment. Records shall show the name and business address of each DBE and the total dollar amount actually paid to each. The Consultant shall pay all sub-consultants within 10 calendar days from receipt of each payment made to the Consultant by the City. The Consultant shall carry out applicable requirements of Title 49 CFR 26 in the award and administration of US DOT assisted agreements. Failure by the Consultant to carry out these DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 32  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT requirements is a material breach of this agreement, which may result in the termination of this agreement or such other remedy as the City deems appropriate. 38. Agreement Parties. City: Matt Horn Public Works Director City of San Luis Obispo 919 Palm Street San Luis Obispo, CA 93401 Consultant: All written notices to the parties hereto shall be sent by United States mail, postage prepaid by registered or certified mail addressed as shown above. 39. Incorporation by Reference. City Request for Proposals Specification No. 90435-CM and Consultant's proposal dated [DATE], are hereby incorporated in and made a part of this Agreement and are attached hereto as Exhibit [X]. Should there be any conflict between terms set forth in the City Request for Proposals Specification No. 90435-CM and Consultant’s proposal dated [DATE], the terms in this agreement and City Request for Qualifications Specification No. 90435-CM will govern. 40. Amendments. Any amendment, modification or variation from the terms of this Agreement shall be in writing and shall be effective only upon approval by the City Engineer. 41. Working Out of Scope. If, at any time during the Project, the consultant is directed to do work by persons other than the City Project Manager and the Consultant believes that the work is outside of the scope of the original contract, the Consultant shall inform the Project Manager immediately. If the Project Manager and Consultant both agree that the work is outside of the Project scope and is necessary to the successful completion of the Project, then a fee will be established for such work based on Consultant's hourly billing rates or a lump sum price agreed upon between the City and the Consultant. Any extra work performed by Consultant without prior written approval from the City Project Manager shall be at Consultant's own expense. 42. Complete Agreement. This written agreement, including all writings specifically incorporated herein by reference, shall constitute the complete agreement between the parties hereto. No oral agreement, understanding or representation not reduced to writing and specifically incorporated herein shall be of any force or effect, nor shall any such oral agreement, understanding or representation be binding upon the parties hereto. For and in consideration of the payments and agreements hereinbefore mentioned to be made and performed by City, Consultant agrees with City to do everything required by this Agreement, the said specification and incorporated documents. Authority to Execute Agreement. Both City and Consultant do covenant that each individual executing this agreement on behalf of each party is a person duly authorized and empowered to execute Agreements for such party. IN WITNESS WHEREOF, the parties hereto have caused this instrument to be executed the day and year first above written. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 33  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT CITY OF SAN LUIS OBISPO: CONSULTANT: ________________________________ Name of Company _______________________________ Matt Horn, Director of Public Works By: Name of CAO/President Its: CAO/President APPROVED AS TO FORM: _______________________________ Christine Dietrick, City Attorney (2nd signature required if Corporation): ________________________________ By: Name of Corporate Officer Its: ____________________ DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 34  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT APPENDIX D – QUALITY ASSURANCE PROGRAM (Attached as a separate document in BidSync) DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 35  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT APPENDIX E – CONTRACT DOCUMENTS FOR PHASE 1B OF THE CULTURAL ARTS DISTRICT PARKING STRUCTURE (Attached as a separate document in BidSync) DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 36  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT APPENDIX F – CONTRACT DOCUMENTS FOR PHASE 2 OF THE CULTURAL ARTS DISTRICT PARKING STRUCTURE (Attached as a separate document in BidSync) DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 37  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT APPENDIX G1 –MITIGATION MONITORING AND REPORTING PROGRAM APPENDIX G2 – PHASE 1B AND 2 MITIGATION AND MONITORING PLAN (Attached as a separate document in BidSync) DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 38  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT APPENDIX H – CURRENT PROJECT DELIVERY SCHEDULE (Attached as a separate document in BidSync) DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 EXHIBIT B DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 REQUEST FOR PROPOSALS // CITY PROJECT NO. 90435-CM RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES CULTURAL ARTS DISTRICT PARKING STRUCTURE September 1, 2022 EXHIBIT BDocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 1540 MARSH STREET, SUITE 150, SAN LUIS OBISPO, CA 93401 | TEL. 805.706.0276 | WWW.KITCHELL.COM September 1, 2022 Mr. Manuel Guzman, Construction Engineering Manager City of San Luis Obispo 919 Palm Street San Luis Obispo, CA 93401 Re: Proposal for Resident Engineer and Construction Management Services, Cultural Arts District Parking Structure, City Project No. 90435-CM Dear Mr. Guzman and Members of the Selection Committee: As an experienced construction manager with a solid foundation in general contracting, Kitchell is known for delivering quality projects and providing high value services to our clients. It is with great pleasure that we submit our proposal to perform resident engineer and construction management services for the New Cultural Arts District Parking Structure project. Our relational project management approach coupled with an extensive record of successful project delivery will fulfill your expectations and provide you satisfaction with the end result. Our commitment to these goals has resulted in more than eighty-five percent of our work derived from repeat business. We Have the Right Team With over 303 project and construction management professionals, we have the capacity, skill and enthusiasm to implement our time-tested project management tools and techniques to achieve project success. Project Director Tully Wyatt will work with you to ensure your complete satisfaction with our services and deliverables. Resident Engineer Andy Goh will fulfill the Resident Engineer duties and responsibilities as defined by Caltrans. Senior Project Manager/Assistant Resident Engineer Tom Fee will serve as our on-site representative to the City and will function as an extension of your staff, working integrally with City personnel, design professionals, the contractor, special consultants and stakeholders to deliver the project on time, under budget and with high quality. Our proposed project team members have demonstrated a long-term commitment to the pursuit of project excellence, are at the top of their respective professions, and will be dedicated to the task of serving the City through interactive collaboration, effective oversight of design professionals, contractors, outside agencies and effective management of the project as a whole. Local Commitment As a firm invested in the Central Coast for the long term through our established local San Luis Obispo office and widening project base, we understand the local construction market and will serve as a local resource in receiving responsive bids from qualified contractors. Our long-term commitment to local clients by staff members who understand the issues unique to the Central Coast, provides the City with assurance that we share your desire for success. Depth of In-house Resources Unlike most construction management firms, Kitchell has a full complement of in-house engineering and architectural support service professionals consisting of registered architects and licensed engineers in every discipline. In addition, Kitchell has in-house facilities management, commissioning, estimating and scheduling personnel each skilled and qualified in their respective disciplines. This team of dedicated professionals is equipped to resolve highly complex technical challenges on a moment’s notice. Kitchell would consider it an honor to serve the City of San Luis Obispo in carrying out resident engineer and construction management services for the New Cultural Arts District Parking Structure project as a collaborative member of the City’s team. We appreciate your consideration and look forward to the opportunity to personally demonstrate our qualifications as we progress in the selection process. Sincerely, Wendy Cohen, CCM Randy Rominger, LEED AP, Assoc. DBIA President Principal-in-Charge (Authorized to bind the firm) FIRM CONTACT/AUTHORIZED REPRESENTATIVE Name: Randy Rominger, Principal-in-Charge | Address: 1540 Marsh Street, Suite 150 | San Luis Obispo, CA 93401 tel. 805.706.0276 | email. rrominger@kitchell.com | Kitchell acknowledges and accepts receipt of Addendum #1 dated July 25, 2022. Randy is the authorized to represent the firm with respect to all notices, negotiations, discussions and other communications relating to this proposal. E. Cover Letter DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 2 F. Firm Qualifications Industry Leading Expertise Established in 1950, Kitchell is a 100% employee-owned company dedicated to providing construction management and general contracting services in the Western United States. Our firm’s innovations in management and reliability in delivering projects on time and within or under budget have earned us a reputation for superior performance. Since Kitchell’s inception, we have completed over $53 billion in public sector construction representing more 3,600 projects in parking structures, civic centers, education facilities, courthouses, municipal office buildings, detention and criminal justice centers, healthcare facilities, sports complexes, police/fire stations and performing/cultural arts centers. Having been in business for 72 years, Kitchell has proven its long-term stability and financial strength. As a construction management firm, Kitchell is consistently ranked amongst Engineering News Record’s top construction management firms. Focusing on the public sector has allowed us to develop management and project control techniques targeted to its specific needs. Our methods have been very successful—more than 85% of our work comes from repeat clients. We deliver our services using a variety of delivery strategies including agency and multiple prime CM, construction management at risk, lease-leaseback, design-build and the traditional design-bid-build. EXPERIENCE AT A GLANCE 14M SF OF PARKING PARKING STALLS 45,000 CENTRAL COAST CONSTRUCTION $1.7B CAL POLY SAN LUIS OBISPO, YAK?IT?UT?U RESIDENTIAL COMMUNITY SAN LUIS OBISPO, CA (COMPLETED 2020) Construction management services for a $204 million, 562,446 SF project featuring eight structures with four and five levels above grade. The project featured single, double and quad units totaling 1,475 beds for first year students and associated parking totaling 154,363 SF and over 450 stalls. 1. Contracting Agency:California Polytechnic State University, San Luis Obispo 2. Contracting Agency PM:Anthony Palazzo, Executive Director tel. 805.756.6538 | email. arpalazzo@calpoly.edu 3. Contract Amount:$3.9 million 4. Date of Contract:Jan 2013 5. Date of Completion:Jan 2020 6. Consultant PM:Tully Wyatt, Project Manager | tel. 805.440.2278 | email. twyatt@kitchell.com 7. Consultant RE:None 8. Project Objective:See description above. 9. Project Outcome:$165 million (Original Construction) | $172 million (Final Amount) PARKING STRUCTURE COMPLETED IN PAST 5 YEARS 5 yrs Randy Rominger PROJECT TEAM: Tully Wyatt DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 3 CITY OF CHANDLER, OREGON STREET PARKING STRUCTURE CHANDLER, AZ (COMPLETED 2019) Construction management services for a new $23 million, five-level, 293,000 SF, 932-space parking garage for the City of Chandler, which includes a road realignment along Oregon Street as well as intersection improvements at Arizona Avenue and Chicago Street. As Downtown Chandler’s largest garage, the project added much needed parking options for those accessing City Hall as well as restaurants and other venues in the bustling area. The structure is located to the west of City Hall across Arizona Avenue on the northwest corner of Chicago and Oregon streets. SAN LUIS OBISPO RTA, BUS MAINTENANCE FACILITY SAN LUIS OBISPO, CA (COMPLETED 2022) Construction management services for a new $17.5 million (construction cost), 28,650 SF, single story bus maintenance facility with over 2,600 SF of mezzanine/equipment platform located on a 6.44-acre site. The facility accommodates operations, administration and maintenance areas and includes detached enclosures on-site, including a trash enclosure and canopy over bus parking. Work also includes off-site improvements, specifically the T-intersection for future Elks Lane realignment. 1. Contracting Agency:City of Chandler 2. Contracting Agency PM:Paul Ahlas, Construction Project Manager - PW & U - Capital Projects tel. 480.782.3328 | email. paul.ahlas@chandleraz.gov 3. Contract Amount:$1.2 million 4. Date of Contract:June 2018 5. Date of Completion:December 2019 6. Consultant PM:Ralph Schulte tel. 515.822.8735 | email. rschulte@kitchell.com 7. Consultant RE:None 8. Project Objective:See description above. 9. Project Outcome:$19 million (Original Construction) | $20.8 million (Final Amount) 1. Contracting Agency:San Luis Obispo Regional Transit Authority 2. Contracting Agency PM:Geoff Straw, Executive Director tel. 805.781.4472 | email. gstraw@slorta.org 3. Contract Amount:$1.6 million 4. Date of Contract:June 2020 5. Date of Completion:February 2022 6. Consultant PM:Tully Wyatt, Project Manager tel. 805.440.2278 | email. twyatt@kitchell.com 7. Consultant RE:Troy Hart, Resident Engineer | tel. 805.448.8653 | email. thart@kitchell.com 8. Project Objective:See description above. 9. Project Outcome:$16.8 million (Original Construction) | $17.4 million (Final Amount) PARKING STRUCTURE COMPLETED IN PAST 5 YEARS COMPLETED IN PAST 5 YEARS 5 yrs 5 yrs Andy Goh Randy Rominger PROJECT TEAM:PROJECT TEAM: Heather Brown Tully Wyatt Ryan Stefanek DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 4 Additional Parking Structure Experience CITY OF SANTA MONICA, PARKING STRUCTURE 6, SANTA MONICA, CA A $44.6 million project consisting of demolition and rebuilding of a public parking structure located directly behind Santa Monica’s largest tourist attraction, the 3rd Street Promenade. The new structure is 11-stories (eight levels above grade and three levels subterranean) and contains approximately 750 total spaces. Other features include 30 electrical vehicle charging stations and infrastructure for future charging stations, a 90-bicycle bike rack and rooftop solar panels. The structure is LEED Gold Certified. SALINAS VALLEY MEMORIAL HEALTHCARE SYSTEM, PARKING GARAGE ANNEX, SALINAS, CA A new $36 million, 79,700 SF, four-level parking structure serving as an extension to the existing parking structure. The new garage provides a net increase of 166 parking stalls and includes a basement level with 20,000 SF of office and hospital support space. SMUD HEADQUARTERS REHABILITATION & PARKING STRUCTURE, SACRAMENTO, CA A $135 million complete renovation of the 120,000 SF office building and 45,000 SF parking garage. The building is divided into three sections: south wing, core and north wing. The south wing is four levels above grade with a full floor below grade; the core is five levels above grade and one floor below grade; and the north wing has three parking levels and a two-story office portion above the parking garage. UC SAN DIEGO, NORTH TORREY PINES LIVING AND LEARNING NEIGHBORHOOD, SAN DIEGO, CA A new $628 million project consisting of over 1.6 million GSF of student housing, parking, academic space and retail targeting LEED Platinum certification. The Living Learning Neighborhood provides approximately 2,000 new beds, resident facilities and support space for undergraduate students, new instruction and research space for departments and programs within the Divisions of Social Sciences and Arts and Humanities as well as general assignment classrooms. Buildings are varied heights with some individual buildings reaching up to 14 stories. The neighborhood also includes an underground parking structure with 1,200 spaces. G. Organization & Approach TULLY WYATT, dbia, leed ap Project Director CORE TEAM ANDY GOH, pe Resident Engineer TOM FEE Sr. Project Manager/Assist. Resident Engineer RYAN STEFANEK Quality Assurance Manager MATTHEW HARMS Project Engineer SUBCONSULTANTS CHARLES ZANOLI Testing & Inspections (Earth Systems) STEVE WEBSTER, ls BRIAN HELLWIG Surveying (RRM Design Group) COLBY BOGGS MICHAEL TOM, ms CASEY CLARK CHRISTOPHER DURAN, rpa DUSTIN MERRICK, rpa JENNIFER DICENZO Environmental Monitoring (Rincon Consulting) As-Needed In-House Support Services RANDY ROMINGER, leed ap, assoc. dbia Principal-in-Charge HEATHER BROWN, pe, leed ap, cpmp Engineering & Architectural Services Director MATT CHAPPELL, eit, cep Estimating Manager RICK STASSI Scheduling Manager 1. Provide an organizational chart identifying the Project manager for the work and each key person who would be assigned to carry out the work and their respective roles. Resumés should be included for all key individuals as an appendix. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 5 Roles & Responsibilities Our project team has been assembled based on their ability to deliver to the City of San Luis Obispo (SLO) the most efficient, cost effective and best-suited skills of our professional and support personnel. The ultimate success of the Cultural Arts District Parking Structure project is heavily dependent upon the experiences of the team. In developing our project team, staffing continuity is a key element in our approach to managing the project. The proposed team is proven in its capabilities and understands the complexities of parking structure construction. Kitchell’s project team is familiar with the local contracting community and has developed strong local contractor and subcontractor relationships. This maximizes the competitiveness translating to lower bid prices from the other important team members—the contractor and its subcontractors. Project Director Tully Wyatt will facilitate communication and decision making at all levels. He will ensure total team commitment of all resources to achieve the City’s objectives for the project, be present at key meetings and will be available continuously to the project team and City management staff. He will conduct risk assessments, participate in issue resolution and perform periodic site reviews to ensure the City’s objectives for schedule, budget and quality are being achieved. As a California Registered Civil Engineer, Andy Goh will fulfill the Resident Engineer duties and responsibilities as defined by Caltrans. He will study and become completely familiar with project plans, specifications, permits, environmental documents and agreements. He will work with our on- site team to organize and conduct construction inspections, materials testing and special inspections and environmental mitigation monitoring. He will review pay quantity calculations and ensure our team is monitoring the contractor’s compliance with the contract documents. Senior Project Manager/Assistant Resident Engineer Tom Fee will serve as Kitchell’s full-time on-site representative to the City of SLO and will function as an extension of your staff, working integrally with the project team. He will work in close coordination with Andy to fulfill the Resident Engineer responsibilities and will manage cost and time in accordance with the master project budget and schedule. He will drive the advancement of project efforts from preconstruction through completion. Tom will perform preconstruction services and deliverables and will be responsible for the timely completion of all construction phase deliverables. He will manage and administer contracts, report progress, interpret documents, conduct progress meetings, manage the progress payment process, facilitate resolution of field issues, and coordinate project punchlist, completion and turn over. Tom’s parking structure experience and his understanding of the local construction market will prove to be valuable assets to the City and the project team. Quality Assurance Manager Ryan Stefanek will serve on-site full-time during the construction phase and will develop and implement a project-specific quality assurance program. He will manage and coordinate submittal compliance, preinstallation meetings, mock-up reviews, inspections, testing, surveying, environmental mitigation monitoring and SWPPP compliance. Project Engineer Matthew Harms will serve on-site full-time during the construction phase. He will be responsible for the preparation and processing of project-related documentation including requests for information, submittals, design supplements, and project closeout documentation. He will maintain Kitchell’s project information system. As-Needed In-House Support Services Principal-in-Charge Randy Rominger will be responsible for ensuring client satisfaction with our team’s services, personnel, quality and contractual obligations. Estimating Manager Matt Chappel will lead our estimating team to validate project cost in accordance with the established project budget, lead estimating efforts that may be requested of Kitchell, participate in bid analysis and review contractor proposed change quotations. Engineering and Architectural Services Manager Heather Brown will lead our team’s registered architects and licensed engineers to provide engineering support services as needed throughout the course of the project. Scheduling Manager Rick Stassi will lead our scheduling team to provide scheduling support to the project team assisting in the development and maintenance of the Resident Engineer’s schedule. He will also assist the project team with in-depth review and analysis of contractor submitted schedules, monthly updates and delay fragnets. Subconsultants Charles Zanoli with Earth Systems will perform code compliance inspections as well as materials testing and special inspections as described in Task 3 of the RFP. Charles will also support applicable portions of Task 2. Steve Webster and Brian Hellwig with RRM Design Group will perform surveying as described in the RFP, Task 4. Colby Boggs, Michael Tom, Casey Clark, Christopher Duran, Dustin Merrick and Jennifer DiCenzo of Rincon Consulting will perform construction environmental mitigation and monitoring as described in the RFP, Task 5. Our proposed construction management team is 100% dedicated to your success from conception through completion. We will support the City of San Luis Obispo to ensure your Cultural Arts District Parking Structure project moves forward smoothly through closeout. Our team’s commitment goes beyond the job—they strive to see success in the community where they live and work. 100 % Dedicated to the success of your Cultural Arts District Parking Structure DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 6 Project & Management Approach Our approach to project management and the use of proper documentation from our project management information system, developed and proven over time, provides our team with the information necessary to keep the Phase 1B and Phase 2 projects within the established parameters for budget, schedule and quality. Kitchell will act as liaison with the City, design professionals and other consultants to facilitate and coordinate the execution of construction contracts, construction coordination and overall project management. We will act as the City’s representative, advising and consulting with the City and the design professional. We will monitor the work of contractors for deficiencies in the work and conduct a quality assurance program in cooperation with the design professionals and City quality assurance personnel. Earth Systems, our materials testing subconsultant will be carefully scheduled and monitored. We will notify the contractors and City Staff of deficiencies and follow through to ensure corrections are made in a timely manner. Informal ongoing punch lists will be generated to correct deficiencies as the projects proceed instead of waiting until the conclusion of the project to resolve quality issues in a timely manner. We will administer and coordinate the contracts, paying special attention to cost, contractor performance and quality. Through on-site coordination, regular progress meetings, thorough documentation and consistent schedule updates, we will ensure construction is completed on schedule, within budget and within the prescribed expectations of quality. Upon commencing services, our team develops several project management tools to facilitate complete and efficient delivery of services. These documents include a responsibility matrix, deliverables checklist, master schedule, cost control report, quality assurance (QA) plan and risk assessment. The responsibility matrix includes both external (among the entire project team) and internal (among the Kitchell team) responsibilities to bring clarity to assignments. Our Project Director Tully Wyatt attends progress meetings monthly (more often as the needs dictate) and conducts an on-site quality assurance assessment with the on-site team. The on-site team develops and implements a QA mitigation plan for the identified QA deficiencies. Tully conducts project health assessments with the on-site team on a quarterly basis. The project health assessment includes a risk assessment, review of the deliverables checklist, review of the project schedule, review of the cost control plan and review of the QA plan. The on-site team develops and implements a mitigation plan following each quarterly health assessment. 2. Describe your Project and management approach. Provide a detailed description of how the team and scope of work will be managed. 3. A list of no more than three references for the consultant and no more than three references for each subconsultants including a listing of the specific Projects and key individuals that have participated in them. Include the dollar amount related to the participation. Identify how much experience each firm has had with public agencies. Public Agency 1:San Luis Obispo Regional Transit Authority | Geoff Straw, Executive Director Address/tel.:253 Elks Lane | San Luis Obispo, CA 93401 | tel. 805.541.2228 ext. 4465 Project/Amount:Bus Maintenance Facility ($17.5 million) Staff:Randy Rominger, Tully Wyatt and Ryan Stefanek Public Agency 1:County of San Luis Obispo, Department of Airports | Craig Piper, Deputy Director Address/tel.:903 Airport Drive, Suite 5 | San Luis Obispo, CA 93401 | tel. 805.781.5205 Project/Amount:San Luis Obispo County Regional Airport Passenger Terminal ($39.5 million) Staff:Charles Zanoli Public Agency 2:Cal Poly San Luis Obispo | Anthony Palazzo, Executive Director Address/tel.:1 Grand Avenue | San Luis Obispo, CA 93407 | tel. 805.756.6538 Project/Amount:yak?it?ut?u Residential Community ($204 million) Staff:Randy Rominger and Tully Wyatt References Don’t take our word for it...Our clients are our strongest advocates! Our firm’s success is a reflection of the abilities of our staff and Kitchell as a whole. Below are references for which Kitchell has provided construction management services for their large public works capital improvement projects. In addition, we have included two references for each of our subconsultants. We encourage you to contact each of the references to the quality of our work and satisfaction with our services. Public Agency 2:Cal Poly San Luis Obispo | Howie Conroy, Construction Inspector Address/tel.:1 Grand Avenue | San Luis Obispo, CA 93407 | tel. 805.756.2173 Project/Amount:yak?it?ut?u Residential Community ($204 million) Staff:Charles Zanoli Public Agency 3:County of San Luis Obispo | Robert Ruiz, Program Manager Address/tel.:1087 Santa Rosa Street | San Luis Obispo, CA 93408 | tel. 805.788.2114 Project/Amount:New Animal Shelter ($20.3 million) | Probation Department Building ($16 million) Staff:New Animal Shelter: Randy Rominger and Tully Wyatt | Probation Dept. Bldg: Randy Rominger Kitchell Earth Systems DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 7 Public Agency 1:City of San Luis Obispo | Robert Hill, Sustainability & Natural Resources Official Address/tel.:919 Palm Street | San Luis Obispo, CA 93401 | tel. 805.781.7211 Project/Amount:Cerro San Luis Natural Reserve Initial Study/Negative Declaration (dollar amount N/A) Staff:Colby Boggs, Michael Tom, Casey Clark, Christopher Duran, Dustin Merrick & Jennifer DiCenzo Public Agency 1:City of San Luis Obispo | Hal Hannula, Supervising Civil Engineer Address/tel.:919 Palm Street | San Luis Obispo, CA 93401 | tel. 805.781.7201 Project/Amount:Police Station ($300,525), Public Safety Dispatch Center ($611,711), Jennifer Street Bridge ($38,600) Staff:Steve Webster and Brian Hellwig Public Agency 2:County of Santa Barbara | Travis Seawards, Deputy Director Address/tel.:123 East Anapamu Street | Santa Barbara, CA 93101 | tel. 805.568.2518 Project/Amount:Arctic Cold Project EIR Planning & Environmental Services ($280,220) Staff:Colby Boggs, Michael Tom, Casey Clark, Christopher Duran, Dustin Merrick & Jennifer DiCenzo Budgeting at California Polytechnic State University, San Luis Obispo, yak?it?ut?u Residential Community Kitchell was vested in maintaining the project budget at the yak?it?ut?u Residential Community. Aside from providing complete reviews of each contractor initiated change order request, we also tapped into our Estimating Department to review potential large scale changes to the project’s parking structure facility. In addition, we met bi-weekly with the Owner to review all approved, pending and potential changes to the project relative to the project contingency. These efforts at cost control and of continual budget review afforded the University the opportunities to provide additional facilities to the project (added a 2nd story to the administrative building), provide additional redundancies to vital systems like the lift station, emergency systems, and add critical infrastructure pieces to the campus electrical system (manholes, splice boxes). The combined team effort kept the project moving forward while managing these changes within the project budget. Public Agency 2:Lucia Mar Unified School District | Bryan Hagwood, Sr. Bond Project Manager Address/tel.:222 Stanley Avenue | Arroyo Grande, CA 93420 | tel. 805.474.3000 Project/Amount:Shell Beach ES Parking Lot ($225,270), Arroyo Grande HS Track ($7,000), Oceano ES ($91,280) Staff:Steve Webster and Brian Hellwig Public Agency Experience Kitchell brings more than 72 years of experience working with public agencies representing over $53 billion in construction encompassing over 3,600 projects. Focusing on the public sector has allowed us to develop management and project control techniques targeted to its specific needs. Earth Systems brings over 50 years of experience in the public sector. With an office in San Luis Obispo, Earth Systems brings extensive background in materials testing and special inspection, with a staff of over 20 highly qualified technicians and inspectors. They have worked with many jurisdictions throughout San Luis Obispo and Santa Barbara Counties including City of San Luis Obispo, City of Pismo Beach and City of Grover Beach to name a few. RRM Design Group brings more than 45 years of experience working with public agencies. Their work culture emphasizes collaboration, frequent communication and accessibility. Focusing on the public sector has allowed them to work with many clients in the Central Coast including the City and County of San Luis Obispo, City of Grover Beach, City of Paso Robles, City of San Mateo, City of Santa Barbara, City of Cloverdale and City of Ukiah to name a few. Rincon Consulting brings more than 26 years of experience working with public agencies including the City and County of San Luis Obispo, Santa Barbara County, City of Paso Robles and City of Santa Maria to name a few. 4. Describe your cost control and budgeting methodology for this Project. Budget Management One of our initial efforts will be to work with the City to understand/refine the budget, including identification of all cost components with reasonable budget assumptions to use until actual costs are accrued. We establish and maintain a cost control system in Procore to track all costs associated with the project against the established budget. As the project progresses, projected costs will be entered into the model, providing a real time assessment as to the status against budget. We often perform detailed estimates and reconcile to the design professional’s estimates, which provides an unbiased professional opinion of probable construction costs. Construction costs along with project soft costs are updated to reflect the latest information and tracked continuously against the established budget. We provide recommendations on construction feasibility, availability of materials and labor, time requirements for installation and construction, and factors related to cost including costs of alternative designs or materials, preliminary budgets and possible economies. If it appears the project construction budget will not be met, we offer alternatives and solutions to bring costs back in line. Rincon Consulting RRM Design Group DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 8 5. Provide responses to the following: We studied the documents published with the RFP and identified several potential critical construction and environmental issues, identified below with our proposed solutions for: Construction Related Issues Proposed Solution Local traffic surges every morning and afternoon (Mission Prep High and Old Mission Middle School) off Palm Street and adjacent streets, for student drop off and pick up. Establish access/egress restrictions, delivery moratoriums, work hours, etc. in the contract documents. Higuera Street and Marsh Street are natural traffic arteries for construction materials deliveries. During the deck pours, concrete trucks stack up to continuously pour concrete. Both streets contain critical commercial and retail outlets. Plan all deck pours and concrete truck staging either on-site (off streets) or remote with radio notification for minimal disruptions. If any businesses could be affected by steady traffic, discuss with City to review specific activities with affected business. Post-tensioned (PT) concrete placement quality control is exacting and unforgiving. Create stringent protocols for concrete placement, finishing, flatness, curing and sealants. Individuals (person) finishing concrete (swirl) may influence finish variation due to handling of trowel, pressure, etc. Ensure same finishing team is committed start to finish. Note that after placement, PT concrete cannot be readily repaired/ground for finish issues due to finish and cables, etc. Proper coordination for all PT slab systems including MEP, fire protection, ceiling inserts, bollard embeds, railings, bent U embeds, bolted wheel stops, etc. Perform thorough clash detection using Building Information Modeling (BIM) for all systems in or supported by PT decks to ensure there are no overhead clearance issues or in slab conflicts requiring retrofit. (No post install drilling allowed). Any structural changes requiring cutting or drilling into finished PT concrete. Resolve all identified constructability issues prior to bidding to mitigate cutting or drilling later. Any cutting or drilling PT concrete requires X-Ray cable locating and mapping, etc. This parking plan is essentially open building. Consider drainage and watertightness. When performing constructability reviews, check all decks for positive drainage including covered areas susceptible to wind driven water intrusion in all areas of the vehicle and pedestrian egress. Contractor use of tower crane for construction delivery. In bidding instruction include recommendations for tower crane placement (if used). Then have engineer revise structural plan to accommodate tower crane option. Parking structure fire separation/rating at the adjacent residential buildings. Review any portion of non-rated parking structure juxtaposed to the adjacent residential buildings for space separation and/ or rated wall conditions required. b) Describe critical environmental issues and how you will address these.a) Describe critical construction related issues associated with the Project and how you will address these. Environmental Issues Proposed Solution Storm water runoff in direct proximity to San Luis and Brizziolani creek beds Prioritize the SWPPP plan including ample retention basin/s. Monitor plan so it is constantly maintained. Provide effective track out plates to remove on-site soils and other contaminates from vehicles. This particular location is critical for all storm water to be properly contained and handled. Possible high ground water table/underground stream effect on over excavation, foundations, elevator pit, and shored wall on east side. Verify the geotech engineer has reviewed and coordinated with structural engineer. Also review seasonal water table heights with mitigation plans for these soil conditions, etc. Elevators: Plan elevator design, pits, etc. in relation to high water table and/or possible hydrostatic pressure seasonally. Plan any water stop rings, sump pit, and hydraulic cements, etc. to prevent ground water from penetrating the elevator pit from below. Potential tree drip and root damage at property line. Have arborist inspect trees at property line (on private property) for potential issues due to construction, that may require special protection, or removal and replacement. Potential for excessive noise levels due to construction activities. Check equipment noise dBs at adjacent buildings with mitigation options such as temporary sound walls, etc. Specify noise mitigation requirements in the contract documents DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 9 c) Describe how cost and schedule for the construction contract and your scope of work could be minimized. Cost & Schedule for the Construction Contract Construction cost and schedule can be minimized in a variety of ways. We analyzed the documents and have some suggestions, categorized as incentives, risk assignment and value analysis: Incentives: We assessed the Phase 1B and Phase 2 schedule durations and do not recommend they be reduced in the bid documents; however, schedule compression can be achieved through early delivery incentives and/or the use of bid alternates for reduced construction duration. Risk Assignment: As a rule, contractors don’t assume risk—they price it. Our risk assessment includes assignment of risk the contractor may consider to be onerous, or inappropriately assigned to them and thereby assign a premium to managing the risk item. An example is permanent shoring. Permanent shoring is shown on the east side property line on the Phase 1B Plan. The documents instruct the contractor to design all permanent shoring. There are two private structures on the zero-lot-line directly adjacent to the shoring. The contractor is to insure the permanent shoring design covers any additional foundation surcharge, etc. for zero deflection. Prospective bidders would likely consider this an onerous assignment of risk and charge a premium. We suggest the design professional design the permanent shoring or an allowance be established in the bid documents for permanent shoring design. Value Analysis: We identified a number of ideas the City may want to consider in realizing some time and/or cost savings. A few examples include: `Precast stair treads in lieu of poured in place. The cost of precast elements fluctuate; however, even if they’re higher in material cost, time and cost savings can be realized through faster installations and reduced labor. `The quantity of EV charging stations can be phased to meet the demand. We recommend installing the infrastructure for the charging stations but adding the equipment in phases to meet demand. This has the added benefit of taking advantage of future improvements in this emerging technology. `The copper dome details include specific details for copper dome construction, radius, materials, spire, waterproofing, roof gutter, etc. The City may want to consider a prefabricated unit. This could result in time and cost savings. Optimized Staffing Plan Our scope of work and resulting fees can be minimized through an optimized staffing plan, task assignment evaluation and reduced construction duration: Optimized Staffing Plan: We assembled our proposed staffing plan to deliver the highest qualified team at the best value. We accomplished this by assigning Resident Engineer Andy Goh on a part time basis working in close coordination with Assistant Resident Engineer Tom Fee. Through this strategy, the City receives the benefit of Andy’s expertise whenever needed without incurring the cost of a full- time team member. Task Assignment Evaluation: We assembled a team of in-house employees and subconsultants to perform all the tasks described in the RFP. We recommend primary responsibility for surveying be transferred to the contractor. This will appropriately place liability for survey errors on the contractor for remedy. We also recommend the City use in-house code compliance inspectors if this function can be performed by the City at lower cost. Reduced Construction Duration: Any schedule reductions achieved through the above measures could result in reduced duration of CM-RE services and result in fee savings as long as added staffing would not be required for added shifts or acceleration. During preconstruction, the Kitchell team assisted with re-scoping the project to bring the project in budget and developed a delivery plan including multiple bid packages and phasing to optimize the construction schedule. During construction, the Kitchell team provided day-to-day leadership throughout construction including cost, schedule and quality components of the project. The Kitchell team approached every day with the same enthusiasm, modifying plans as necessary to keep the project moving. They effectively communicated and coordinated with all involved in the project including the building department and other agencies having jurisdiction, the design team and contractors. We are grateful to have such capable staff on the project and would like to take this opportunity to recognize their dedication. -Andy Newman, Deputy Director, Butte County Association of Governments Butte Regional Transit Operations Center (BRTOC) Kitchell was a key partner in the successful delivery of the County of San Luis Obispo’s Animal Services Facility project. The first design-build project for the County. Kitchell provided preconstruction guidance on the $20.3M project and then was the day-to-day Construction Manager during construction. Kitchell’s staff was competent, professional and a pleasure to work with. - Robert Ruiz, Manager Project Delivery Division, County of San Luis Obispo ““ ““ Client Testimonials DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 10 H. Scope of Work This section should establish that the proposer understands the City’s objectives and requirements, demonstrate the proposer’s ability to meet those requirements and outline clearly and concisely the plan for accomplishing the specified work in accordance with the time schedule as outlined in Appendix A, Scope of Services: A Plan for Accomplishing the Specified Work We have thoroughly reviewed the Scope of Services contained in Appendix A of the RFP in conjunction with the contract documents, quality assurance plan, mitigation and monitoring plan, and project delivery schedule accompanying the RFP. Through this review and our periodic discussions with City personnel prior to issuance of the RFP, we have developed an understanding of the City’s objectives for the Cultural Arts District Parking Structure project. The succeeding paragraphs describe our plan for accomplishing the scope of work within the prescribed schedule. Scope of Services Statement We will perform the scope of services defined in Appendix A of the RFP, which includes: performing the duties of the Resident Engineer as defined by Caltrans, assist with bid evaluation, review available project documents, prepare and maintain the Resident Engineer’s project schedule, develop project procedures in collaboration with the City, establish and maintain the project management information/document control system, establish a dispute resolution process, provide project administration, coordination & communications, monitor/evaluate the contractor’s schedule, conduct progress meetings, issue progress reports, evaluate payment requests, manage the submittal and RFI processes, manage/mitigate change orders, conduct construction observations/inspections, evaluate & negotiate claims, perform materials testing & specialty inspections, perform surveying, perform construction environmental mitigation & monitoring, and manage project completion & closeout City Staff Participation We often use a responsibility matrix to clarify team participation requirements in granular detail. Our need for City staff participation generally boils down to providing project information and documentation, a designated representative who can render timely decisions, access to City personnel who have the authority to authorize contract modifications, and liaison with City departments and other local authorities involved in the project. Workplan Task 1: Preconstruction Services Upon commencing preconstruction phase services, Resident Engineer Andy Goh and Assistant Resident Engineer Tom Fee will perform an immersive study of all available project documents to become intimately familiar the available project information. They will use this base of information to build and implement a strategy to ensure successful delivery of the project, described in greater detail herein. Construction Management Plan Upon commencing services, we will work with the City to develop the construction management plan. This effort will serve as the project team’s primary point of reference and will establish the framework for project execution. The construction management plan will include the following: `Communications protocols, progress reporting requirements, roles and responsibilities, and project procedures to establish clarity on how the City, designer, contractor and Kitchell interact as a team and administer and coordinate the work of the project. `Master Budget and Master Schedule: Kitchell will evaluate the City’s current schedule, budget, and design to establish time and cost expectations. From this evaluation, Kitchell will develop a master budget and master schedule to track progress and develop strategies to remain on schedule and within budget. `Project Logistics Plan to identify and resolve project logistical challenges such as ensuring undisrupted activity to the surrounding community, access/egress issues, noise mitigation measures, staging operations, and many other logistical challenges. TASK TASK TASK TASK TASK TASK 1 2 3 4 5 6 Preconstruction Services Construction Services Geotech. & Materials Testing & Special Inspections Surveying Construction Environmental Mitigation & Monitoring Post Construction Deliverables DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 11 `General Conditions and Bid Forms/Procedures to convey clear scope of work and concise bidding/contract execution procedures to the bidding community and provide ample project administrative control. `Quality Assurance Plan to establish a clearly defined process for achieving the City’s quality objectives. The construction management plan is an evolving document and will be updated continually throughout the project. Many of these elements are explained in greater detail in relevant sections of our proposal. Resident Engineer’s Master Project Schedule We will develop and maintain the overall Critical Path Method (CPM) Resident Engineer’s master project schedule with milestones. Our project schedules provide information in a concise, clear, and effective format. The schedule will incorporate all remaining preconstruction and construction activities. In the process, we will evaluate and propose alternatives for project logistics, phasing and sequencing. We will advise the project team regarding factors including long-lead materials procurement, rapidly changing materials prices, weather, overall schedule requirements, favorable/unfavorable bidder climate and regulatory requirements. The project team will determine the pertinent factors. They will then be compiled, evaluated, and reduced to a set of recommendations for incorporation. Quality Assurance Plan Kitchell has a standard Quality Assurance (QA) program, which will serve as a vital tool in developing a project-specific QA plan and facilitating the contractor’s implementation of their Quality Control (QC) plan. We will take a proactive approach to quality assurance to see that project receives the best project quality for its investment. Primary aspects of Kitchell’s QA program include: `Conducting design and constructability reviews to improve buildability and help eliminate potential change orders `Establishing clear QA/QC processes and procedures including inspections, materials testing & special inspections; as well as delivered materials verification against approved submittals. `Participating in pre-installation meetings prior to each construction operation to ensure proper installations and applications without costly rework. `Requiring mock-ups of important building components and finishes to ensure that the specified quality expectations will be met. Bid Administration Successful administration of the bid phases will result in a project that meets the City’s goals for receiving responsive and responsible bid proposals from prospective qualified bidders. Kitchell performs a variety of services in administering and assisting in the contractor selection process. Our bid phase services often include: `Extensive bidder solicitation to generate a competitive bidding environment `Conducting pre-bid conferences to clarify bidding requirements and provide bidders with a venue to conduct their pre-bid investigations `Developing methods for tracking, responding to, and expediting questions received prior to receipt of bids `Reviewing addenda and advising the team of time, cost or constructability impacts `Assisting in assembling construction documents, bid documents, general conditions, addenda and distribution to all prospective bidders `Reviewing and analyzing bids and making recommendations to the owner for contract awards `Assist and coordinate the resolution of bid protests `Post-bid meetings and analysis of bid alternates `Assist with contract development, award, and formal issuance of Notice to Proceed Task 2: Construction Services Project Coordination & Communication Conveying clearly defined communications are paramount to project success. Kitchell will organize and establish effective communication among the project team members. We will ensure that responsibilities for completing tasks are assigned to appropriate team members, they are understood by all, and are tracked throughout the design and construction process. Written communications are date stamped, logged, and tracked for responses. Our project personnel are trained in Procore online data control system for generating and/or tracking communications, costs, requests for information, submittals, daily logs, drawings, and other project documents. We are also flexible in adapting to other project administration systems as dictated by City and project demands. Logs are distributed for all outstanding items. These logs are reviewed, prioritized, and correspondence is produced from Procore for all due and delinquent items. This enables the team to proactively address and resolve issues without experiencing the consequences of delayed response. Schedule Management Careful monitoring and regular reporting of activities against the contractor’s schedule will provide early information about overall progress. We will follow up on potential delay issues through active communication with City staff and the project team. We will continually review and monitor progress of the work against the scheduled milestones, and provide recommendations necessary to prevent, minimize, or recover from delays. The accepted critical path schedule will become the baseline upon which we measure progress, as well as record an accurate history of how the project is built through consistent schedule updates. We will use the weekly on-site project construction meetings as a forum to discuss the status of the schedule with the contractor. We will continuously monitor the schedule and enforce the provisions of the contract documents regarding scheduled progress. We will also enforce the provisions of the specifications regarding scheduled progress of the project. We have developed specific language used extensively in contract documents requiring the contractor to follow rigid specifications in the development and maintenance of a CPM schedule that is dollar and manpower loaded. In the event that a contractor submits a delay claim, the contractor must provide justification substantiating that an actual delay to the work occurred. Additionally, the contractor must provide a schedule analysis showing that the delay affected work activities critical to scheduled project completion. Finally, the contractor must substantiate the number of delay days claimed. The contractor’s documentation to substantiate the claim is then reviewed and analyzed, and entitlement, if any, is determined. PRECONSTRUCTION DELIVERABLES: –Resident Engineer’s master project schedule –Project Procedures –Quality Assurance plan DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 12 Progress Meetings We consider meetings an effective means of collaborating on ideas, resolving issues, building relationships, and reporting information in a relational environment. Subject matter for construction progress meetings will include the coordination and implementation of design elements, identification and resolution of issues, schedule coordination and compliance, tracking and management of RFIs, submittals, change orders, payment applications, and general coordination of testing and inspections. To memorialize important statements made and actions required, concise, accurate meeting minutes issued in a timely manner are just as important as the meetings themselves. We adhere to Kitchell’s 48-hour turnaround policy on issuing meeting minutes. Progress Reports Progress reports provide a snapshot of project status. We will generate reports electronically to summarize project activities, report schedule and budget status, address current project issues and forecast future activities. Photographs showing project progress are included along with applicable logs and other pertinent information. Payment Kitchell, in consultation with the design professional and the City, will implement a standard procedure for the review, processing, and payment of the contractor payment applications as well as invoices applicable to the project budget. This procedure will facilitate timely, accurate and appropriate payments, thereby limiting the City’s exposure to overpayments or interest fees. Submittals Kitchell’s submittal activities begin weeks before the contractor begins work. To ensure that the contractor fulfills the specified submittal requirements, we comb the specifications for any required submittals and enter them into our project administration software. This enables us to work from a submittal schedule tied to individualized submittal due dates. Once the contractor transmits submittals for approval, submittal status transitions from “scheduled” to “logged” by simply entering actual receipt dates to the pre-entered submittal information. We utilize our computerized submittal schedules and submittal logs to mitigate delays due to delinquent contractor submittals or consultant reviews. Requests for Information During construction, prompt resolution of the contractor’s requests for information (RFIs) will help mitigate change orders. For this reason, we have implemented an efficient RFI processing and monitoring system through our project administration software. We have also developed specification language to reduce erroneous RFIs. We will use the RFI Log to track requests for information including important receipt and response dates and ball-in-court status. Most importantly, the RFI Log prioritizes when a response is required to be submitted to the contractor. This will help mitigate delays due to delinquent RFI responses. The RFI Log is updated weekly and is distributed to all team members during the weekly meetings. Change Orders Our change order mitigation process will include a thorough evaluation of each change order request against the contract documents for validity. Valid change order requests will be systematically reviewed for onerous or excessive cost items. Kitchell, in conjunction with the City and the design professional, will develop and follow specific procedures for resolving change order disputes. The team will maintain emphasis on critical issues and ensure that all appropriate team members are informed of the proposed changes and the impact on cost and time immediately when the issues arise. Construction Observation/Inspection Our construction management personnel are well equipped to conduct field inspection support, oversight, and quality assurance. We have assisted in selecting, coordinating and administering over $300 million of special consultant contracts. This experience will be very useful in administering and coordinating the work of building inspectors, testing and inspection personnel, mitigation monitoring personnel and others as required by the City. We will conduct field observations and generate daily reports. Our project team will collect and report daily project information to develop a written history of the project. Information included in our daily reports includes activities performed, important events of the day, visitors, materials received, crew size, weather data, and issues to resolve. This collection of daily reports document daily construction events forming an as-built history of construction schedule implementation. Dispute Resolution/Claims We have found that unresolved disputes diminish in an environment of partnership. We recommend implementation of a dispute resolution ladder to enable issues to be escalated from the field to progressive levels of the project hierarchy enabling issues to be resolved without becoming stymied in conflict and indecision. SCHEDULE MANAGEMENT CITY OF SANTA MONICA, PARKING STRUCTURE 6 Kitchell was responsible for setting and maintaining the project schedule. Several factors had to be considered for establishing this schedule. First and foremost was how to facilitate a major construction project in a high-traffic downtown area. Second was the timing for delivery of materials – how it would affect neighboring businesses and residents, safety precautions to accommodate pedestrian traffic, etc. Kitchell met with the entire project team each week to monitor schedule issues, make adjustments as needed and report progress updates and changes to the client. With the demolition, however, there were a lot of unforeseen issues that affected the schedule early on. Once the existing structure was demolished and site excavation had begun, the general contractor discovered underground storage tanks and hazardous materials that required remediation. The additional work to remove the tanks and hazardous materials caused about a four-week delay. Despite these early challenges with unforeseen conditions during demolition and the need to bring in a new electrical connection, the project was delivered and operational on time. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 13 In the event parties disagree over design intent, unforeseen changes, utility conflicts, schedule delays and other issues, and agreement isn’t reached through dialogue, Kitchell will implement a dispute resolution process involving an objective analysis of merit and entitlement. Kitchell will meet with the City to recommend a solution then attempt settlement with the involved parties. If settlement negotiations are unsuccessful, Kitchell will recommend the matter be resolved through a formal dispute resolution process outlined in applicable contracts. Having a wide range of subject-matter experts, construction and engineering professionals, we will be able to review, assess and recommend action on additional cost matters, and scope entitlement or denials. Lastly, we can identify if contractor costs are appropriate based on our database of cost estimates developed for multiple projects in the region. TASK 3: GEOTECHNICAL & MATERIALS TESTING & SPECIALTY INSPECTION Earth Systems will perform the materials testing and specialty inspection scope of services described in the RFP. TASK 4: SURVEYING RRM will perform the survey scope of services as defined in the latest version of the Caltrans Survey Manual. TASK 5: CONSTRUCTION ENVIRONMENTAL MITIGATION & MONITORING Rincon will perform the environmental mitigation and monitoring scope as defined in the RFP including providing qualified biologist(s), air quality monitoring, cultural/archaeological monitoring, paleontological monitoring, and placing noise mitigation signage. TASK 6: POST-CONSTRUCTION SERVICES We will review the front-end documents to ensure they clearly reflect the City’s expectations for contract closeout and warranty issue response. We will also develop procedures that define each team member’s roles and responsibilities during the start-up, closeout and warranty phases. Kitchell will participate in walk-through inspections. From these inspections, a punch list of remaining items to be addressed will be generated. We will work with the City to verify that these items are corrected before moving on to final completion. Kitchell will assist in determining final completion and scheduling final inspection. We will manage submittal of required closeout documents including warranties, guarantees, affidavits, releases, bonds, and waivers, as well as coordinate delivery of all keys, manuals and maintenance stock. We will work with the City to secure as-built drawings, records, logs, photographs, change orders and shop drawings as required by the contract documents. CONSTRUCTION DELIVERABLES: –Project documentation via electronic uploads –Meeting minutes –Reports: Daily Observation, Inspection, Monthly Progress –Logs –Schedule reviews –Review/Recommendations: Changes, Claims, Payment Applications MATERIALS TESTING & SPECIALTY INSPECTION DELIVERABLES: –Materials testing and specialty inspection reports SURVEYING DELIVERABLES: –Survey records POST-CONSTRUCTION DELIVERABLES: –Red-lined project as-built drawings –Compilation of outstanding claims and other financial closeout documentation ENVIRONMENTAL MITIGATION & MONITORING DELIVERABLES: –Environmental mitigation and monitoring reports Three-Step Claim Analysis Process Merit Evaluation: Performed to determine the legal basis of the claim, if any. Settlement Negotiations: Conducted with the contractor. Entitlement Analysis: If the claim has merit, an entitlement analysis is performed to determine time and monetary entitlement. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 14 Contract Agreement Indicate any issues or proposed changes to the sample contract included as Appendix C. The Consultant must provide a brief statement affirming that the proposal terms will remain in effect for one hundred twenty (120) days following the date proposal submittals are due. Kitchell has reviewed the sample contract in Appendix C of the RFP, and has identified the following exceptions. We request the following redlined changes to the indemnity provisions: 22. Hold Harmless and Indemnification. `(a) Non-design, non-construction Professional Services: To the fullest extent permitted by law (including, but not limited to California Civil Code Sections 2782 and 2782.8), Consultant shall indemnify, defend, and hold harmless the City, and its elected officials, officers, employees, volunteers, and agents (“City Indemnitees”), from and against any and all causes of action, claims, liabilities, obligations, judgments, or damages, including reasonable legal counsels’ fees and costs of litigation (“claims”), arising out of to the extent caused by the Consultant’s negligent performance or Consultant’s negligent failure to perform its obligations under this Agreement or out of the operations conducted by Consultant, including the City’s active or passive negligence, except for such loss or damage arising from the sole or active negligence or willful misconduct of the City. In the event the City Indemnitees are made a party to any action, lawsuit, or other adversarial proceeding arising from Consultant’s performance of this Agreement, the Consultant shall provide a defense to the City Indemnitees or at the City’s option, reimburse the City Indemnitees and pay their costs of defense, including reasonable legal fees, incurred in defense of such claims. `(b) Non-design, construction Professional Services: To the extent the Scope of Services involve a “construction contract” as that phrase is used in Civil Code Section 2783, this paragraph shall apply in place of paragraph A. To the fullest extent permitted by law (including, but not limited to California Civil Code Sections 2782 and 2782.8), Consultant shall indemnify, defend, and hold harmless the City, and its elected officials, officers, employees, volunteers, and agents (“City Indemnitees”), from and against any and all causes of action, claims, liabilities, obligations, judgments, or damages, including reasonable legal counsels’ fees and costs of litigation (“claims”), arising out of to the extent caused by the Consultant’s negligent performance or Consultant’s negligent failure to perform its obligations under this Agreement or out of the operations conducted by Consultant, including the City’s active or passive negligence, except for such loss or damage arising from the sole or active negligence or willful misconduct of the City. In the event the City Indemnitees are made a party to any action, lawsuit, or other adversarial proceeding arising from Consultant’s performance of this Agreement, the Consultant shall provide a defense to the City Indemnitees or at the City’s option, reimburse the City Indemnitees and pay their costs of defense, including reasonable legal fees, incurred in defense of such claims. `(c) Design Professional Services: To the fullest extent permitted by law, Consultant shall indemnify, defend, and hold harmless City and any and all of its officials, employees and agents (“Indemnified Parties”) from and against any and all claims, losses, liabilities, damages, costs and expenses, including attorney’s fees and costs, to the extent they are caused by arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant. Consultant’s duty to defend shall consist of reimbursement of defense costs incurred by City in direct proportion to the Consultant’s proportionate percentage of fault. Consultant’s percentage of fault shall be determined, as applicable, by a court of law, jury or arbitrator. In the event any loss, liability or damage is incurred by way of settlement or resolution without a court, jury or arbitrator having made a determination of the Consultant’s percentage of fault, the Parties agree to mediation with a neutral third-party to determine the Consultant’s proportionate percentage of fault for purposes of determining the amount of indemnity and defense cost reimbursement owed to the City. Notwithstanding the foregoing and without diminishing any rights of City in the preceding paragraph, for any liability, claim, demand, allegation against City caused by a negligent arising out of, related to, or pertaining to any act or omission of Consultant, but which is not a design professional service, Consultant shall defend, indemnify, and hold harmless the Indemnified Parties from and against any and all damages, costs, expenses (including reasonable attorney fees and expert witness fees), judgments, settlements, and/or arbitration awards, whether for personal or bodily injury, property damage, or economic injury, and arising out of, related to, any concurrent or contributory negligence on the part of the City except for the sole or active negligence of, or willful misconduct of the City. In addition, we request the non-applicable indemnifications provisions be struck. We believe paragraphs (a) and (c) should be struck. In our opinion, the dispute resolution provisions in Article 36 are somewhat unusual and biased in favor of the Owner. We request the opportunity to meet with the City and explore mutually agreeable changes to the dispute resolution language. Statement of Affirmation Kitchell certifies that the proposal terms will remain in effect for one hundred twenty (120) days following the date proposal submittals due date, September 1, 2022. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 15 References Fee Proposal Optional- Additional Supporting Information A list of no more than three references for the consultant and three references for each subconsultant, including the names, addresses and telephone numbers. These references may be the same as the references listed above in IV. Proposal Format, Section C. Organization and Approach. Within a separate sealed envelope, submit a complete fee proposal for the scope of services. Provide separate subtotals for Phase 1B and Phase 2 broken down by task and staff billing rates with estimated hours. Clearly identify fees for subconsultant services. Please see pages 6 and 7 for details on no more than three references for Kitchell and each of our subconsultants. Please see the separately sealed envelope for details on our complete fee proposal for the scope of services. We have provided separate subtotals for Phase 1B and Phase 2 broken down by task and staff billing rates with estimated hours, as well as clearly identified fees for subconsultant services. None. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX i EDUCATION MBA, Florida Institute of Technology BS, Architecture Engineering, California Polytechnic State University, San Luis Obispo INDUSTRY CERTIFICATIONS Designated Design-Build Professional LEED Accredited Professional OSHA 30 Hour Certification TULLY WYATT, dbia, leed ap PROJECT DIRECTOR As local San Luis Obispo resident, Tully brings over 19 years of industry experience as a dedicated, organized and detail oriented construction professional. He is a skilled leader who believes in transparent, ongoing communication and maximizing technology to expedite information, guaranteeing that all team members, including subcontractors, are constantly informed of decisions or changes in real time. Tully has a wide range of experience in alternate delivery methods, including CMAR and design-build, as well as extensive project experience, including his most recent work at San Luis Obispo Regional Transit Authority Bus Maintenance Facility where he is serving as a Senior Project Manager. As a local resident for many years, Tully is committed to his local community and clients. His commitment to local clients ensures Tully understands the issues unique to San Luis Obispo, providing the City with assurance that he shares your desire for success. PROJECT EXPERIENCE California Polytechnic State University, San Luis Obispo, yak?it?ut?u Residential Community, San Luis Obispo, CA: A $204 million, 562,446 SF design-build project featuring eight structures with four and five levels above grade. The project featured single, double and quad units totaling 1,475 beds for first year students and an associated parking structure totaling 154,363 SF and over 480 stalls. Situated adjacent to the Grand Avenue entrance of the campus, the community is richly programmed with study areas, large scale living rooms for 50 students or more, outdoor courtyards and circulation routes, a mailroom, recreation center, offices and admissions welcome center. Outdoor spaces include a large lawn with an amphitheater and a courtyard with volleyball and basketball courts, natural features, gardens, contemplative spaces, and bike paths – all designed to support new students’ engagement in the Cal Poly experience. This project is LEED Platinum certified. San Luis Obispo Regional Transit Authority, Bus Maintenance Facility, San Luis Obispo, CA: A new $17.5 million (construction cost), 28,650 SF, single story bus maintenance facility with over 2,600 SF of mezzanine/equipment platform located on a 6.44-acre site. The facility accommodates operations, administration and maintenance areas and includes detached enclosures on-site, including a trash enclosure and canopy over bus parking. Work also includes off-site improvements, specifically the T-intersection for future Elks Lane realignment. California Polytechnic State University, San Luis Obispo, Recreation Center, San Luis Obispo, CA: A $57.5 million, LEED Gold certified recreation expansion that added 85,000 SF to the facility and renovated another 90,000 SF. Additions included a lobby/lounge, three fitness rooms, a two-court gym, a multi-activity center, tripled exercise space, a wellness center, an indoor jogging track, restrooms, leisure pool and deck, an additional sand volleyball court, and six racquetball courts rebuilt with Squash and Wallyball configurations. Renovations included men’s and women’s locker rooms. The recreation center remained operational during the construction period. San Luis Obispo County Community College District, Measure L Bond Program, San Luis Obispo, CA: A $275 million bond program which addresses crucial facility needs, including a new instructional building on the San Luis Obispo campus, a new campus center, a new career training facility and new early childhood center at the Paso Robles campus; the replacement of temporary classrooms, and repairs and upgrades to roofs, heating and air conditioning units, aquatic center and other infrastructure and utilities technology upgrades. County of San Luis Obispo, Probation Department Building, San Luis Obispo, CA: A new $16 million, 31,000 SF, two-story office building featuring office space for county probation staff, interview rooms, training, conference and evidence rooms, armory, secured sallyport, break rooms, locker and changing rooms, restrooms with showers, a public lobby, secured parking for employee vehicles and department vehicles as well as an emergency generator. Santa Barbara County, Staff Augmentation Services, Santa Barbara, CA: Tully alongside Kitchell is currently providing staff augmentation services to Santa Barbara County for over 27 projects totaling more than $73.1 million. Our services include project and construction management for capital and facilities/maintenance projects, project development, programming, scope of work development, RFP/bidding document production, overseeing bidding process and closeout. City of Santa Maria, Historic Smith-Enos House Structural Improvements, Santa Maria, CA: A $180,000 project providing structural improvements to the historic Smith-Enos House in Santa Maria. The modernization and revitalization of the structure is phase one of a multi-phase approach to the renovation of the house, which aims to rehabilitate the interior and exterior of the historic residence to recreate a new indoor public recreation venue featuring cultural and historic exhibits. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX ii EDUCATION MBA, Business Administration, Arizona State University MS, Civil Engineering, Arizona State University BS, Civil Engineering, Arizona State University INDUSTRY CERTIFICATIONS Professional Engineer #C 45731, CA Professional Engineer #24771, AZ Professional Engineer #125612, TX ANDY GOH, pe RESIDENT ENGINEER With more than 34 years of strong, relevant management experience in a wide variety of public works service areas and operations, Andy has led teams to the successful completion of hundreds of infrastructure projects, many of which are fast-track, high profile or federally funded. He is well-versed in complex public policy issues and applicable laws governing municipal operations and project delivery. Under his leadership over the years, his teams have provided customer service-first public service with strategic forward-thinking and incorporated best management practices and use of technology to improve and enhance service delivery. Andy has successfully led his teams in completing many major and complex capital improvement projects in various markets including street transportation, public transit, water and wastewater, public safety and aviation. Proactive in establishing constructive and collaborative partnerships, he prides himself on his ability to build solid and lasting relationships. Andy is results-driven and decisive, while remaining an approachable and progressive leader with a strong commitment to the client’s strategic vision.  PROJECT EXPERIENCE City of Chandler, Oregon Street Parking Structure, Chandler, AZ: A new $23 million, five-level, 293,000 SF, 932-space parking garage for the City of Chandler, which includes a road realignment along Oregon Street as well as intersection improvements at Arizona Avenue and Chicago Street. As Downtown Chandler’s largest garage, the project added much needed parking options for those accessing City Hall as well as restaurants and other venues in the bustling area. The structure is located to the west of City Hall across Arizona Avenue on the northwest corner of Chicago and Oregon streets. City of Tempe, Tempe City Hall Parking Structure, Tempe, AZ: A $16 million (construction cost), five-level, 175,000 SF, 440 stalls parking structure. The five-story mixed- use facility includes parking on all five levels with retail and office space in portions of the first two levels. The exterior cladding of the building consists of light gauge metal stud walls with an adhered stone finish. Tempe East Valley Bus Operation & Maintenance Facility, Tempe, AZ: A $39 million, 103,890 SF, 250-bus LEED Gold certified facility featuring administrative offices, operations/ driver facilities for over 500 operators, a bus maintenance building, bus canopies, and a full liquid natural gas and compressed natural gas (LNG/CNG) fueling center with fare retrieval and bus wash on a 25-acre site. City of Tempe, Center for the Arts, Tempe, AZ: A new $68 million, 88,000 SF performing and visual arts center consisting of two theaters, multi-use areas, gallery and administrative space as well as 20 acres of site development. The facility includes a 600-seat main theater, 200-seat black box theater, public space, stage support, a 3,000 SF multi-use space for rehearsals and events, a 3,500 SF visual arts gallery, administration, gift shop, catering kitchen and donor room. Special features include a 20,000 SF underfloor air distribution (UFAD) system, high-end architectural concrete components such as scalloped walls, battered/radius walls and a cast-in-place dome in the main theater. Site development features include a reflecting pool, pedestrian paths and a park located next to a riparian area on the southwest shore of the Tempe Town Lake, adjacent to a downstream dam. City of Tempe, Curry Road Pedestrian Improvements, Tempe, AZ: A $600,000 road improvement project consisting of the removal and replacement of curbs, gutters, sidewalks, roadway medians, landscaping and a 48” concrete irrigation pipe. This project was funded by the ARRA. City of Tempe, Tempe Town Lake Pedestrian Bridge, Tempe, AZ: A new $5.5 million CMAR suspension bridge totaling 1,000 LF pedestrian and bicyclist bridge connecting the north and south shores of Tempe Town Lake. The bridge, which is lit with vibrant blue hues after dark, consists of four spans of 228 feet each and weighs about 165,000 pounds in total. The bridge is 12 feet wide and 34 feet tall, with arches suspended by 32 metal cables. The bridge has a total of 128 steel cables which criss-cross each other and add to the bridge’s distinctive shape. City of Chandler, Chandler Public Safety Training Center, Chandler, AZ: A new $27 million, 58,090 SF shared resource facility for the Chandler Police Department and Chandler Fire Department. It was built in multiple phases with Phase 1 providing an administrative, educational and tactical training building. Phase 2 provides a separate, state-of-the-art indoor police firing range complex. The finished facility includes an auditorium, offices, tactical training, fitness, firearms simulation system, breakroom, secure parking and exterior secure break areas. This new training complex is the hub for integrated police and fire training and the combined public safety training center. City of Tempe, Apache Boulevard Police Substation, 911 Call Center, and Property & Evidence Facility, Tempe, AZ: An 82,800 SF facility prominently located on Apache Boulevard housing various police functions including patrol, SWAT team, a 911 Call Center and a Property & Evidence Facility. The second floor of the Apache Substation includes a 911 Call Center and Dispatch Center with space allowing users to collaborate, flexible access to the console areas and a separate training area. The entire facility includes complete redundant power and cooling systems. Adjacent to the Substation and Call Center is a 28,800SF property and evidence storage facility. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX iii EDUCATION Coursework, Art, Saddleback College AFFILIATIONS Construction Management Association of America (CMAA) TOM FEE SR. PROJECT MANAGER/ASSISTANT RESIDENT ENGINEER Tom has more than 30 years of experience successfully leading teams managing program development and construction for both public and private clients. As a construction expert, he specializes in all processes from predevelopment through construction delivery, authoring construction management guidelines and redevelopment use plans. Tom’s experience encompasses commercial, industrial, civic/municipal, public private partnership, planning, commercial mixed use, telecommunications, criminal justice, healthcare, hospitality and residential, providing services including program development, plan and specification constructability review, bidding and buyout, estimates, change order review, baseline scheduling and dispute resolution. He believes in a proactive project management approach, increasing productivity and providing exemplary results for his clients. PROJECT EXPERIENCE City of Los Angeles, Metropolis LA R2, Los Angeles, CA: Tom managed on-site construction for the R2 portion of the downtown Los Angeles Metropolis LA. R2 is a type I concrete condominium single structure with 40 levels above grade and two levels below grade. A total of 514 luxury condominiums with a connected (post tensioned) 11-story parking structure totaling 658,495 SF and 1,821 stalls. The roof of the parking structure is a landscaped deck featuring a swimming pool, spa, fire features, volleyball, sporting area, a dog park and a play space. The overall project is located within the 6.3 acre, $1 billion Metropolis development. R2 also includes 36,482 SF of retail located at the ground floor and an amenity level. City of Beverly Hills, La Cienega Tennis Center, Beverly Hills, CA: As construction manager for the City of Beverly Hills, Tom managed overall construction of the La Cienega Park and Tennis Center. The project included a 138,000 SF, post tensioned parking garage with City tennis courts located on the parking structure roof. The project also included a park, two baseball fields, soccer field and the Margaret Herrick Museum and Library. Los Angeles Unified School District, Central Los Angeles Region High School #12, Los Angeles, CA: A new $20.2 million concrete podium style construction with below grade parking and steel frame parking structure for upper floors. Tom served as the Cost Estimator responsible for reviewing the contractor’s baseline schedule, monthly pay application and time impact analysis by general contractor, preparation of independent cost estimates for change orders, evaluation of general contractor cost estimates and negotiation of final change order amounts. University of California, Santa Barbara, San Nicolas and San Rafael Residence Halls, Santa Barbara, CA: Two fast-tracked complete interior replacement projects totaling approximately $3 million located on the UCSB campus, San Nicolas Hall, a seven- story building with 265 rooms and San Rafael Hall, which consists of housing clusters accommodating approximately 500 students. Construction volume required CPM schedules to be updated twice per day, working closely with the university and subcontractors to guarantee delivery. Projects were completed sequentially on-time and within budget. University of California, Santa Barbara, Biotech Seawater Laboratory, Santa Barbara, CA: A $7 million biotech seawater lab/marine studies facility which can replicate any global ocean condition. Tom served as the Superintendent responsible for managing site construction to completion and certification for a project with extremely complicated logistics for structural concrete involving corrosion resistance, direct seawater filtering, piping and storage tanks. Due to the complexity of the project, constant interface with staff and facilities management during construction was required. Department of General Services, Caltrans District 11 Headquarters, San Diego, CA: Senior Project Manager responsible for managing program, infrastructure planning, constructability review, master schedule, project budget, public bidding, award and physical delivery of the 12-acre, 320,000 SF, five building campus. Project was completed under project and ahead of schedule. Dynegy, The Plant University, Morro Bay, CA: Programming for a redevelopment of a 12 million cu. ft. waterfront power plant while still in operation. The site consists of 50 acres of oil storage, brownfield certification, city lease arrangements, etc. The final program and site use plan was projected at $175 million and included a post graduate university for sustainable power engineering and water studies, classrooms, labs, housing, commercial mixed-use space and convention center. Kern County, Park Wi-Fi, Kern County, CA: Kitchell is providing project management services for the County’s park Wi-Fi project. The American Rescue Plan Act (ARPA) provided the County with funds thereby allowing them to provide public access internet Wi-Fi coverage to the 43 County-owned parks scattered among the 8,163 square miles that encompass Kern County – roughly the same size as the State of New Jersey. Our services include planning, scope development, consultant/contractor procurement, estimating, commissioning, and project management from concept through completion for each of the park sites. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX iv EDUCATION MBA, Business Analytics, Cal Poly San Luis Obispo BA, Politics, University of California, Santa Cruz Certificate, Business Analytics INDUSTRY CERTIFICATIONS OSHA 30-Hour Certified Construction Manager-in-Training (In Progress) RYAN STEFANEK QUALITY ASSURANCE MANAGER Ryan brings eight years of experience in the construction industry. He started his career as a field laborer with a general contractor performing carpenter duties while pursuing a master’s degree in business analytics at California Polytechnic State University in San Luis Obispo. Over the years, Ryan transitioned to construction management as a project intern and worked his way up to project engineer. He is passionate about construction and feels that working in the industry is a mixture of marathons and sprints. Ryan excels at planning and responding quickly to project demands. Ryan brings a proven ability to lead cross-functional teams through routine and complex processes. Skilled in guiding team building exercises that focus on morale and personal and professional growth. He takes a responsive leadership approach and uses critical thinking skills to solve issues during the initial stages. Equipped with a Master’s Degree in Business Administration and a Certification in Business Analytics Ryan has a solid ability to research and analyze data with strong attention to detail and an eye for spotting inaccuracies. In addition, Ryan has proven expertise in project planning, scheduling and implementation. As a highly skilled professional, Ryan is well versed in the process of providing QA/AC oversight as a component of Kitchell’s services. He provides an informed high-altitude view of the projects issues with quality delivery. Ryan’s recent experience includes serving as Project Engineer III for a four-story cast in place concrete structure in the City of San Luis Obispo. He also brings recent experience from the San Luis Obispo Regional Transit Authority Bus Maintenance Facility project. PROJECT EXPERIENCE California Polytechnic State University, Multi-Use Facility, San Luis Obispo, CA: Construction of a $100 million four-story cast in place concrete structure that housed multiple facilities for the University including a commercial kitchen, videography studio and multiple laboratory spaces. Ryan’s responsibilities included managing multiple disciples of subcontractors including MEPs and finish trades and ensured coordination and compliance with the contract documents. He also led the weekly owner and architect walks and verified quality concerns were communicated and corrected with subcontractors. San Luis Obispo Regional Transit Authority, Bus Maintenance Facility, San Luis Obispo, CA: A new $17.5 million (construction cost), 28,650 SF, single story bus maintenance facility with over 2,600 SF of mezzanine/equipment platform located on a 6.44-acre site. The facility accommodates operations, administration and maintenance areas and includes detached enclosures on-site, including a trash enclosure and canopy over bus parking. Work also includes off-site improvements, specifically the T-intersection for future Elks Lane realignment. San Luis Obispo County Community College District, Measure L Bond Program, San Luis Obispo, CA: A $275 million bond program which addresses crucial facility needs, including a new instructional building on the San Luis Obispo campus, a new campus center, a new career training facility and new early childhood center at the Paso Robles campus; the replacement of temporary classrooms, and repairs and upgrades to roofs, heating and air conditioning units, aquatic center and other infrastructure and utilities technology upgrades. Projects within this program are being delivered via multi-prime delivery method. California Polytechnic State University, San Luis Obispo, Neighborhood UU - Building 65, Building 19 and Plaza Improvements, San Luis Obispo, CA: Preconstruction services for a $30 million, 59,100 SF project consisting of renovation of 34,600 SF of space in Building 19 including complete renovation of the entire top floor, renovation of electrical and plumbing systems (as related to the top floor scope of work) in the bottom floor of Building 19 and the surrounding plaza area to the north of the building as well as new landscaping and site improvements to the plaza. Work in Building 65 consists of 24,500 SF of renovations including the Chumash Auditorium, lobby area and public areas on that floor as well as exterior improvements at the upper level and interior circulation spine at the lower level of the building to increase and improve student seating and study areas. Custom Homes, San Luis Obispo County: Carpenter and supervisor for $3 million of custom home construction encompassing more than 25 projects. Self-preformed work includes demolition, electrical, carpentry, finish carpentry and concrete. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX v EDUCATION BS, Civil Engineering, California Polytechnic State University, San Luis Obispo, CA MATT HARMS PROJECT ENGINEER Matt is a highly skilled professional supporting project managers with one year of industry experience. He has a passion for the construction management industry and finds working in CM strengthens his strategic and analytical skill sets. He is well-versed in the process of reviewing, issuing and processing RFIs and submittals, updating drawings and meeting minutes and negotiating change orders with team members on all sides of the table. Matt is familiar with a variety of software including Bluebeam, Procore, BIM 360, Assemble, Revit and AutoCAD. His recent experience includes serving as a field engineer for a $90.2 million ocean outfall booster pump rehabilitation and $6 million piping replacement. PROJECT EXPERIENCE Orange County Sanitation District, Ocean Outfall Booster Pump Rehabilitation, Huntington Beach, CA: A $90.2 million, 40,000 SF ocean outfall booster pump rehabilitation delivered via design-bid-build. The project encompassed the construction of a new low flow outfall pump station, rehabilitation of the existing central power generation building, rehabilitation of an effluent pump station annex and rehabilitation of the existing electrical distribution system. Matt’s responsibilities included acquiring daily permits for labor, analyzing budget for labor distribution reports, quality control for concrete pours, creating purchase orders, creating and evaluating change orders, safety meeting, safety walks, safety orientation for new employees and subcontractors, schedule meetings and submittals. Orange County Sanitation District, P2-123 Return Activated Sludge Piping Replacement, Huntington Beach, CA: A $6 million, 1,400 LF project encompassing the removal and replacement of a deteriorating return activation sludge piping, valves, valve actuators and wiring, flexible couplings and pipe supports. In addition, the project also included the installation of 12 new 14” isolation valves and installing new sluice gates. Matt’s responsibilities included acquiring daily permits for labor, analyzing budget for labor distribution reports, quality control for concrete pours, creating purchase orders, creating and evaluating change orders, safety meeting, safety walks, safety orientation for new employees and subcontractors, schedule meetings and submittals. California Polytechnic State University San Luis Obispo, Highway Realignment, San Luis Obispo, CA: Design services for highway improvements along the 101 in the Central Coast starting south of El Campo Road near Arroyo Grande to North of Hemi Road near Nipomo. Main goals of the project included improving safety, maintaining overall circulation and operations of US 101, as well as emphasize sustainability. Matt’s responsibilities included performing initial site studies, such as geotechnical site investigation, a water runoff analysis and traffic impact study to name a few. In addition, Matt also assisted in technical write-ups and assisted with corridor modeling design. California Polytechnic State University San Luis Obispo, Higuera and Chorro Street Intersection Improvement Proposal (Cal Poly Project), San Luis Obispo, CA: For this project, Matt determined the level of service for Higuera Street and designed an improved system layout for the intersection. The project goal was to increase safety in all aspects, such as pedestrian and vehicular safety while decreasing congestion. Matt’s responsibilities included analysis of Higuera and Chorro intersection in downtown San Luis Obispo. He recorded pedestrian and vehicle volumes, crash data and traffic signal parameters. Matt’s studies also included a traffic warrant study, traffic signal analysis, synchro analysis, safety analysis, critical lane volume studies and intersection sight distance analysis. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX vi EDUCATION BS, Natural Resources Management, Cal Poly State University, San Luis Obispo AA, Engineering Technology, Cuesta Community College INDUSTRY CERTIFICATIONS ICC Certified Special Inspector: Reinforced Concrete (#1025543-49) ICC Certified Special Inspector: Structural Masonry (#1025543-84) ICC Certified Special Inspector: Prestressed Concrete (#1025543-92) ICC Certified Special Inspector: Structural Steel, Bolting and Welding (#1025543-S1, S2 & W) ICC Certified Master of Special Inspection (#1025543-MI) ICC Certified Special Inspector: Spray Applied Fireproofing (#1025543-86) NICET Level III, Transportation Engineering Technology (#86954) AWS-CWI QCI-88 & 96, Certified Welding Inspector (#95011151) DSA Masonry Inspector (#5852 CHARLES ZANOLI TESTING & INSPECTION With over 30 years in the construction industry, Charles is a highly qualified inspector with a wealth of experience in materials testing and special inspection. Certified by numerous regulatory agencies, he specializes in testing and inspection of reinforced concrete, pre-stressed concrete, structural masonry, asphalt concrete, bolts, spray-approved fire-proofing and soils. He has a broad base of project experience, including numerous structures at California Polytechnic State University at San Luis Obispo, K-12 school projects throughout San Luis Obispo and Santa Barbara counties, and public works facilities and infrastructure. Charles is certified by APWA as a public works inspector and is a ICC- certified Master Inspector, certified by ICC for inspection of reinforced concrete, pre-stressed concrete, structural masonry, structural steel and welding, and spray-applied fire-proofing to name a few. Charles studied engineering technology and obtained a bachelor’s degree in Natural Resource Management from California Polytechnic State University. PROJECT EXPERIENCE California Polytechnic State University, San Luis Obispo, yak?it?ut?u Residential Community, San Luis Obispo, CA: A $204 million, 562,446 SF design-build project featuring eight structures with four and five levels above grade. The project featured single, double and quad units totaling 1,475 beds for first year students and an associated parking structure totaling 154,363 SF and over 480 stalls. Situated adjacent to the Grand Avenue entrance of the campus, the community is richly programmed with study areas, large scale living rooms for 50 students or more, outdoor courtyards and circulation routes, a mailroom, recreation center, offices and admissions welcome center. Outdoor spaces include a large lawn with an amphitheater and a courtyard with volleyball and basketball courts, natural features, gardens, contemplative spaces, and bike paths – all designed to support new students’ engagement in the Cal Poly experience. This project is LEED Platinum certified. Hotel San Luis Obispo (Hotel SLO), Multi-Story Hotel and Parking Structure, San Luis Obispo, CA: Hotel San Luis Obispo is located at 955 Morro Street in downtown San Luis Obispo. The approximately 110,000 SF structure was constructed as part of a mixed-use project in the Chinatown District of the city. The hotel encompasses 78 rooms and suites, two on-site restaurants, a spa, garden courtyard, pool, gym and social event/meeting spaces for up to 350 guests. The multi-story building has a subterranean parking level, accessed via a ramp from Morro Street, that entailed cuts of up to 17 feet. It utilized a conventional reinforced concrete slab with poured-in-place retaining and shear walls and concrete columns. The first floor was constructed utilizing a conventionally reinforced concrete slab, while the upper floors were supported by post-tensioned concrete slabs with wood-framed construction. Vespera on Ocean, Pismo Beach, CA: Vespera on Ocean is a 124-room Marriott Autograph hotel located at 147 Stimson Avenue in Pismo Beach. Earth Systems conducted a geotechnical engineering investigation for the project, which comprises an underground parking level, a street level concrete podium deck and three stories of stud-framed hotel rooms, and exterior pool and recreation areas. Challenges at the beach-front site included the potential for liquefaction and dynamic settlement, subsurface water, and shoring of excavations adjacent to adjacent buildings and infrastructure. Development of the site involved cuts of up to 16 feet to accommodate the subterranean parking level. San Luis Obispo County Regional Airport Passenger Terminal, San Luis Obispo, CA: Earth Systems provided a geotechnical engineering report, materials testing and special inspection for the recently completed San Luis Obispo County Regional Airport passenger terminal. At approximately 56,000 SF, the new terminal is about 45,000 SF larger than the previous facility. The $39.5 building includes a main entry, lobby, ticketing, baggage retrieval, rental car and security screening areas, airport administration offices, a public parking lot and main aircraft parking lot. It is of structural steel and masonry construction with a masonry veneer. The building is supported by conventional continuous footing foundations and concrete slabs-on grade. Hotel Cerro, San Luis Obispo, CA: Earth Systems prepared reports to provide geotechnical engineering criteria for the construction of the Hotel Cerro in downtown San Luis Obispo, California. The 65-room structure includes 65 guest rooms, restaurant space, a conference center, a spa and a rooftop pool deck. The structure consisted of wood and steel frame and concrete cast-in-place construction. William and Linda Frost Center for Research and Innovation, California Polytechnic State University at San Luis Obispo, CA: The $125 million William and Linda Frost Center for Research and Innovation will be an interdisciplinary building that will house three colleges – the College of Science and Mathematics, the College of Agriculture Food and Environmental Sciences, and the College of Liberal Arts. Currently under construction, the 102,000 SF structure will have four levels and will include a total of 20 laboratories, a technology center, studio space, classrooms, faculty offices, and conference rooms. A new plant conservatory is planned for the hillside overlooking the Poly Canyon Village student housing complex. ADDITIONAL INDUSTRY CERTIFICATIONS DSA Pneumatically Pl. Concrete (#5954) ACI Concrete Field Testing Technician, Grade 1 (No. 00931544) Certified Nuclear Gauge Operator Hazardous Waste Operations and Emergency Response, 40-hour and 8-hour refresher courses (OSHA 29 CFR 1910.120 and Title 8, CCR 5192) DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX vii EDUCATION BS, Agricultural Engineering, California Polytechnic State University, San Luis Obispo, CA LICENSES Professional Land Surveyor #LS7561, CA STEVE WEBSTER, ls SUPERVISOR OF SURVEYING Steve has over 38 years of surveying experience in the office and the field. As a project manager, his primary responsibility is the management of construction projects. While at RRM Design Group, he has performed surveying services, such as construction staking and boundary and topographic surveying, for both public and private sector clients. Along with field surveying duties, Steve prepares construction stake calculations, conducts research and analysis of boundaries, and creates boundary, topographic, and ALTA maps. He has experience with surveying equipment such as total and robotic stations and GPS. PROJECT EXPERIENCE Lucia Mar Unified School District, Arroyo Grande High School Parking, Arroyo Grande, CA: RRM provided numerous layout concepts to maximize the existing parking layout to accommodate a bus drop-off site and separate parking for the newly constructed Performing Arts Center. RRM reviewed existing pavement conditions (to determine areas that needed to be overlaid versus reconstructed) and prepared final construction documents showing re-stripping of the area, relocation of parking lot lighting, and pavement reconditioning. The total parking lot spaces provided were 367. California Polytechnic State University, San Luis Obispo, Parking Structure, San Luis Obispo, CA: RRM Design Group worked with Watry Design Group to design a new 1,300 car parking structure and multi-modal facility which will serve as the first of three planned centers of public transportation on the Cal Poly San Luis Obispo campus. Inn at The Pier Engineering, Pismo Beach, CA: RRM was hired for engineering and surveying services for The Inn at The Pier hotel with 104 guest rooms in Pismo Beach. The hotel has 132 parking spaces, including 127 underground spaces. RRM licensed land surveyors prepared and submitted the application to facilitate the lot merger for 6 lots through the City of Pismo Beach approval process. Arroyo Grande Hospital, Parking Lot, Arroyo Grande, CA: RRM prepared studies to review how the parking at Arroyo Grande Community Hospital could be increased to allow for more parking on the site. After the plan was approved, RRM prepared the construction documents to extend the current parking areas. The construction documents consisted of grading, layout, electrical and landscape plans. Lucia Mar Unified School District, Shell Beach Elementary School Parking Lot, Pismo Beach, CA: Lucia Mar Unified School District hired RRM to make several campus upgrades at Shell Beach Elementary School. This past spring, RRM completed updates to reconfigure the student drop-off areas and school parking lot to improve the flow of traffic. Sierra Vista Medical Center Parking Structure Construction Staking, San Luis Obispo, CA: RRM implemented the design and provided construction for phasing, staging, grading, drainage, hydrology, parking, circulation, accessibility, off-site road design, and upgrades to existing and new utility infrastructure. Following a two-year comprehensive planning and design study led by RRM Design Group, the San Luis Obispo City Council approved the Medical Center Master Plan for Tenet Health Care’s Sierra Vista Hospital facilities. The Plan calls for adding a new, 4-story, 85,000 SF tower to accommodate increased healthcare demands, replace existing aging facilities, and add a new 45,000 SF medical office building to serve the increasing demand for medical offices in San Luis Obispo. The Plan also includes a new five-story, 400-space parking structure and a comprehensive reorganization of the vehicle circulation. The Pismo Hotel Land Surveying Services, Pismo Beach, CA: RRM was retained for surveying services for the Pismo Hotel in Pismo Beach. RRM provided site survey control, monitoring of adjacent structures, construction staking of on-site and off-site utilities and improvements, building grid lines, verified placement of all anchor bolts for buildings, benchmarks for finish floor elevations, and framing and hold-down placements. RRM also provided calculations and staking of 965 feet of sheet piles and a post-construction ALTA/ ACSM Land Title Survey (As-Built). DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX viii EDUCATION AS, Surveying and Forest Practices, Kings River Community College, Reedley, CA BRIAN HELLWIG SUPERVISOR OF SURVEYING With a beginning in forestry and two decades of surveying experience, Brian is an expert surveyor. Brian offers experience in boundary surveying and construction staking of various projects such as commercial, residential, and mixed-use developments. He has experience with surveying equipment such as total and robotic stations, high-definition three-dimensional terrestrial laser scanning, GPS, and various surveying software. Brian’s previous work ranges from the expansive Hearst Boundary survey to the beautiful downtown Big Bear Streetscape. His open communication style ensures that all parties involved in a project are updated with up-to-date and relevant information at every intersection. PROJECT EXPERIENCE Inn at The Pier Engineering, Pismo Beach, CA: RRM was hired for engineering and surveying services for The Inn at The Pier hotel with 104 guest rooms in Pismo Beach. The hotel has 132 parking spaces, including 127 underground spaces. RRM licensed land surveyors prepared and submitted the application to facilitate the lot merger for 6 lots through the City of Pismo Beach approval process. The Pismo Hotel Land Surveying Services, Pismo Beach, CA: RRM was retained for surveying services for The Pismo Hotel in Pismo Beach. RRM provided site survey control, monitoring of adjacent structures, construction staking of on-site and off-site utilities and improvements, building grid lines, verified placement of all anchor bolts for buildings, benchmarks for finish floor elevations, and framing and hold-down placements. RRM also provided calculations and staking of 965 feet of sheet piles and a post-construction ALTA/ ACSM Land Title Survey (As-Built). City of Pismo Beach, Pismo Beach Pier Plaza and Parking Lot Upgrade, Pismo Beach, CA: The City of Pismo Beach hired RRM to repurpose a portion of the existing parking lot and expanded an existing small plaza at the base of the Pismo Pier. The plaza is connected to two separate promenade boardwalks that run parallel to the beach. The highlight of the plaza is two concrete slides that whisk giddy beachgoers of all ages from the plaza onto the sand 16 feet below. Improvements include accessible access to the beach, stepped seating, reconfigured parking lot, and a newly constructed restroom building. Lucia Mar Unified School District, Shell Beach Elementary School Parking Lot, Pismo Beach, CA: Lucia Mar Unified School District hired RRM to make several campus upgrades at Shell Beach Elementary School. This past spring, RRM completed updates to reconfigure the student drop-off areas and school parking lot to improve the flow of traffic. Lucia Mar Unified School District, Shell Beach Elementary School Parking Lot, Pismo Beach, CA: Lucia Mar Unified School District hired RRM to make several campus upgrades at Shell Beach Elementary School. This past spring, RRM completed updates to reconfigure the student drop-off areas and school parking lot to improve the flow of traffic. Sierra Vista Medical Center, Parking Structure Construction Staking, San Luis Obispo, CA: RRM implemented the design and provided construction for phasing, staging, grading, drainage, hydrology, parking, circulation, accessibility, off-site road design, and upgrades to existing and new utility infrastructure. Following a two-year comprehensive planning and design study led by RRM Design Group, the San Luis Obispo City Council approved the Medical Center Master Plan for Tenet Health Care’s Sierra Vista Hospital facilities. The Plan calls for adding a new, 4-story, 85,000 SF tower to accommodate increased healthcare demands, replace existing aging facilities, and add a new 45,000 SF medical office building to serve the increasing demand for medical offices in San Luis Obispo. The Plan also includes a new five-story, 400-space parking structure and a comprehensive reorganization of the vehicle circulation. Edward C. Little Water Recycling Facility, Visitor Center Renovation, El Segundo, CA: A $9.6 million renovation of the visitor center resulting in a multipurpose visitor center that will better enable West Basin to educate guests about the District’s mission, various water recycling treatment processes, as well as water-related issues in the region. ADDITIONAL EXPERIENCE `Lucia Mar Unified School District, Oceano Elementary School Infrastructure Rehabilitation, Oceano, CA `City of San Luis Obispo, Police Station, San Luis Obispo, CA `City of San Luis Obispo, Public Safety Dispatch Center, San Luis Obispo, CA `Sierra Vista Hospital Heliport, San Luis Obispo, CA DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX ix EDUCATION MS, Botany, California State University, Chico BS, Ecology and Evolution, University of California, Santa Barbara CERTIFICATIONS/ REGISTRATIONS Certified Ecologist, Ecological Society of America California Rapid Assessment Method, CRAM.org Wetland Delineation Training, Richard Chinn Environmental PERMITS Rare, Threatened, and Endangered Plant Voucher Collecting Permit No. 2081(a)- 16-022-V – CDFW, 2018 COLBY BOGGS SENIOR ECOLOGIST Colby is a Principal and Senior Ecologist with Rincon Consultants. He brings over 23 years of professional experience as a botanist, ecologist, wetlands specialist, and biological sciences educator and researcher. His duties at Rincon include biological field surveys for special status species, habitat and plant community mapping, wetlands assessments, biological resources analyses, construction and mitigation monitoring, conservation planning, regulatory compliance, and the preparation of biological reports, environmental documents and permit applications in support of CEQA, NEPA, Porter-Cologne Water Quality Control Act, California Fish and Game Code, California Coastal Act, Clean Water Act, Rivers and Harbors Act of 1899, and State and federal Endangered Species Acts. PROJECT EXPERIENCE County of San Luis Obispo, QA/QC Biological Resources, On-call and Planning Consultant Services for General Cannabis Case Processing, San Luis Obispo County, CA: Colby worked with County staff, applicants and agents to process applications for proposed cannabis operations which included indoor and outdoor cultivation and ancillary uses such as distribution, processing, nursery, and small-scale non-volatile manufacturing. He reviewed submitted application materials specific to biological resources, determined application completeness in concurrence with County staff and prepared documentation of CEQA analysis (IS-MNDs). Recently processed cases included production of the IS-MNDs for DRC2018-00010 Greenview, LLC and DRC2019-00110 Synergy Farms – Cano. City of Paso Robles, QA/QC Biological Resources, Olsen-South Chandler Ranch, Paso Robles, CA: Colby provided QA/QC for the Biological Resources section of the Paso Robles Olsen/South Chandler Ranch Specific Plan Project. The 358-acre Specific Plan area represented a key development area for the City, identified in the General Plan Land Use Element. The project included a specific plan, general plan amendment, zone change, multiple tentative tract maps, an oak tree removal permit, roadway abandonments and multiple development agreements. The EIR analysis required a hybrid of programmatic and project-specific elements to address the long-term impacts of buildout within the specific plan area as well as specific impacts of the proposed residential, commercial and recreational uses in the specific plan area. City of San Luis Obispo, QA/QC Biological Resources, San Luis Ranch Specific Plan Project EIR, San Luis Obispo County, CA: Colby provided QA/QC for the Biological Resources section of the San Luis Ranch Project on behalf of the City of San Luis Obispo. The 131-acre project site represented a key development area for the City, identified in the land use and circulation element update. The proposed project included a specific plan, general plan amendment and development plan for a 131-acre project site, including annexation of the site into the City of San Luis Obispo. This specific plan included a mixture of residential, commercial, office and hotel uses, with a portion of the site preserved for agriculture and open space uses. Our EIR approach on this project was a unique hybrid of programmatic and project-specific elements developed in close coordination with City staff to address both the specific impacts of the proposed development and the long-term impacts of buildout within the specific plan area. South San Luis Obispo County Sanitation District, QA/QC Biological Resources, Wastewater Treatment Plan Redundancy Project CEQA Technical Studies, Oceano, San Luis Obispo County, CA: Colby served as Biological Resources Technical Advisor for this project. The South San Luis Obispo County Sanitation District Redundancy project involves the construction and operation of backup infrastructure at the District’s wastewater treatment facility in Oceano. In support of Clean Water State Revolving Fund and United States Department of Agriculture funding pursuits for the project, Rincon prepared technical studies compliant with CEQAPlus and NEPA requirements. Technical studies include an Environmental Report for Categorical Exclusion, a Federal Clean Air Act Conformity Analysis, a Cultural Resources Assessment, and a Biological Evaluation. Rincon is also coordinating with U.S. Department of Agriculture staff to facilitate the environmental review process and receive a Biological Opinion from United States Fish and Wildlife Service for impacts to California red- legged frog. County of Santa Barbara, QA/QC Biological Resources, Arctic Cold Agricultural Refrigeration Facility EIR, Santa Barbara County, CA: Colby is currently providing QA/QC for the Biological Resources section of an EIR for the proposed Arctic Cold Agricultural Refrigeration Facility in northern Santa Barbara County. The proposed project includes a Conditional Use Permit and Development Plan for a freezer/processor facility on a 109-acre property east of Santa Maria. Because the property is currently used for active agricultural production with a mix of row crops, livestock grazing, and a vegetable cooling plant that is not a part of the proposed project, and includes abandoned petroleum wells, the environmental evaluation focuses on agricultural resources, air quality and greenhouse gas emissions, biological resources, hazards and hazardous materials, transportation, and utilities and service systems. City of Santa Maria, QA/QC Biological Resources, Area 9 Specific Plan EIR, Santa Maria, CA: Colby provided QA/QC for the Biological Resources section of the EIR for the Area 9 Specific Plan. This project incorporated a range of land use components in a 900-acre Specific Plan area, including agricultural manufacturing, commercial manufacturing, industrial, commercial office, community commercial, open space, and mixed-use residential. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX x EDUCATION MS, Biological Sciences, California Polytechnic State University, San Luis Obispo BS, Ecology and Systematic Biology, Concentration in Wildlife Biology; California Polytechnic State University, San Luis Obispo MICHAEL TOM, ms SENIOR BIOLOGIST Michael has experience conducting general and focused surveys for a variety of plant and animal species. He is proficient in maintaining herpetology collections and providing assistance with a number of vertebrate and invertebrate species. Michael has working knowledge and training with the fauna and flora of the Central Coast, San Joaquin Valley, and desert regions of California. He has also received specific training in survey protocols, habitat requirements and natural histories of the California Redlegged Frog (CRLF) and desert tortoise. Michael has assisted in special status species, general wildlife and preconstruction surveys. He has performed protocol level surveys as well as preconstruction clearance and monitoring for San Joaquin Kit fox. He has also performed protocol level surveys for desert tortoise, blunt nosed leopard lizard and California red-legged frog and has performed preconstruction surveys for giant garter snake, western pond turtles, coast horned lizards, western spade foot toads, and nesting birds. He has been authorized by the U.S. Fish and Wildlife Service under Biological Opinions for projects to handle CRLF and has handled the species on those projects where they were encountered. PROJECT EXPERIENCE SLO Creek California Red-legged Frog Habitat Assessment, San Luis Obispo County. San Luis Obispo County, Supply line 36-9-09 emergency repair, Los Berros Creek, CA: Conducted preconstruction surveys and monitoring for California red-legged frog. Captured and relocated one California red-legged frog. Santa Barbara County, Jail Northern Branch Facility, Santa Barbara, CA: California red-legged frog habitat assessment in Santa Barbara County. San Luis Obispo County, Arroyo Grande Creek at Rodriguez Road Grade Stabilization Project: Conducted preconstruction surveys and monitoring for California red-legged frog. Santa Rosa Creek Road 7.0 Emergency Culvert Repair Project Monitoring, San Luis Obispo County, CA: Michael conducted preconstruction surveys and monitoring for California red-legged frog. San Luis Obispo County, California red-legged frog focused biological monitoring for the Arroyo Grande Creek Levee Maintenance Project, San Luis Obispo County, CA: Biological monitoring for the Old Los Berros Culvert Repair and Duckbill Valve Replacement project. San Luis Obispo County, City of Arroyo Grande, CA: California red-legged frog, western pond turtle and nesting bird preconstruction surveys for the City of Arroyo Grande. California red-legged frog and California tiger salamander focused construction monitoring/relocation for the Salinas Road Interchange project, Salinas, CA: Captured and handled four California red-legged frogs under the supervision of the authorized biologist. San Benito County, Vallecitos Oil Field and Gas Wells, Four Focused Project Locations: California Tiger Salamander and California Redlegged Frog Habitat Assessment. California Academy of Sciences and California Polytechnic State University Biological Sciences Department: Four years of reptile and amphibian husbandry experience (including handling of snakes, frogs, turtles, salamanders and lizards) combined from the California Academy of Sciences and California Polytechnic State University Biological Sciences Department. PROJECT AUTHORIZATIONS `California red-legged frog handling and relocation authorization, Los Osos Valley Road Interchange Project, BO (1- 8-08-F-27) `California red-legged frog handling and relocation authorization, Supply line 36-9-09 emergency repair, Los Berros Creek. Authorization under RGP 63 through Emergency Section 7 Consultation with the USFWS. `USFWS California red-legged frog handling authorization (Under supervision), Rodriguez Waterline Stabilization Project. BO 8-8-12-F-17 `NMFS steelhead monitoring authorization under the supervision of lead fisheries biologist Don Alley, Heritage Ranch Community Services District Gallery Well Repair Project. BO 151422SWR03SR8572 `USFWS California red-legged frog, San Joaquin kit fox and California condor monitoring authorization, Heritage Ranch Community Services District Gallery Well Repair Project. `USFWS California red-legged frog handling authorization (Under supervision), Salinas Road Interchange Project. BO 8-8-09-F-65R DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX xi EDUCATION BS, Forestry and Natural Resources, Concentration in Wildlife Biology, California Polytechnic State University, San Luis Obispo CERTIFICATIONS/ REGISTRATIONS International Society of Arboriculture Certified Arborist WE-12031A USFS and CPUC approved Botanist, Avian Biologist, and Bat Biologist Department of Pesticide Regulation Qualified Applicators License Category E (Forest and Right-of-Way) License #151384 Certified Recycled Water Site Supervisor #5770 Professional Association of Diving Instructors Certified Open Water Diver CPR/First Aid Certified CASEY CLARK BIOLOGIST/ARBORIST/PROJECT MANAGER Casey serves as a biologist, arborist and project manager under Rincon’s Natural Resources group. He is a personable, creative, and multifaceted California based biologist with an expertise in botany and plant ecology. His responsibilities include leading and managing a variety of natural resources projects involving habitat suitability assessments, special-status species surveys, habitat restoration success criteria monitoring, vegetation community classification and mapping, noxious weed surveys and risk assessments, jurisdictional delineations, resource constraints analyses and arboricultural assessments. Mr. Clark has prepared extensive biological resources technical reports in support of the California Environmental Quality Act and the National Environmental Policy Act. He has six years of experience in the environmental consulting industry and graduated cum laude from Cal Poly San Luis Obispo with a Bachelor of Science in Forestry and Natural Resources where the focus of his coursework was in botany, wildlife biology, ecology, and resource conservation. PROJECT EXPERIENCE East Bay Municipal Utilities District, Quarry Site Restoration Project, Oakland, CA: As Lead Biologist and Project Manager Casey prepared a competitive proposal that secured a contract that contained rare plant surveys, a wetland delineation survey, and an arborist survey for a potential East Bay Municipal Utilities District restoration project within an abandoned 60- acre quarry site outside of San Leandro, California. Casey lead the arborist surveys and prepared a comprehensive Arborist Condition Report. He performed background research for potential rare plants within the quarry site and managed the successful execution and delivery of the Wetland Delineation Report. He served as the primary client-facing biologist managing all aspects of the project, including budget, deliverable preparation and staff. The project was successfully completed within budget. Liberty Utilities, 650 Line Rebuild Project, Truckee, CA: Casey served as lead biologist managing all project-related botanical tasks. He led full floristic field surveys, including assessments for noxious weeds and rare plants and performed restoration success criteria monitoring for the rebuild of approximately nine miles of power line reconstruction within the Tahoe National Forest between the north shore of Lake Tahoe and Truckee, California. He also prepared a comprehensive Botanical Resources Technical Report, Rare Plant Survey report, and Invasive Plant Risk Assessment Report in cooperation with project mitigation measures. Casey also utilized the data collected from bat roost habitat assessments and emergence reports to prepare a Bat Emergence Survey Report. San Diego Gas & Electric Company, Del Mar Reconfiguration Project, San Diego County, CA: Lead project biologist managing all botanical tasks for the reconfiguration of an existing 69 kilovolt power line, removal of an existing 69 kilovolt power line and conversion of portions of existing 12 kilovolt distribution lines from an overhead to underground configuration in San Diego County. Lead rare plant surveys and prepared a report documenting over 25 species of special-status plants. Casey conducted and prepared preconstruction surveys and reports, baseline restoration monitoring surveys and reports, monarch butterfly monitoring, focused coastal California gnatcatcher surveys, nesting bird surveys and reports, and conducted habitat assessments and emergence surveys for potential bat roosts. Southern California Gas Company, Confidential Project, Various Counties/Cities, Southern California: Lead surveys and prepared a Biological Resources Technical Report in compliance with CEQA that identified existing or potential sensitive natural vegetation communities, potentially jurisdictional aquatic features, and special-status plant and animal species and their associated habitat for the installation of a proposed 30-inch diameter natural gas pipeline beneath the Colorado River and the removal of the existing 30-inch-diameter natural gas pipeline and it’s supporting suspension bridge over the river, extending southeast from the community of Ehrenberg in Arizona into the City of Blythe in California. Assisted a permitted biologist in focused western yellow-billed cuckoo and southwestern willow surveys and report creation for client and agency submittal. Southwest Gas Company, Helendale Hawes Line High-Pressure Main Replacement Project, Various Counties/Cities Southern California: Casey lead surveys and prepared a Biological Resources Technical Report in compliance with CEQA that identified existing or potential sensitive natural vegetation communities, potentially jurisdictional aquatic features, and special-status plant and animal species and their associated habitat. The project involved the replacement of approximately 12 miles of 30-inch diameter natural gas pipeline traveling immediately adjacent to the Mojave River in Helendale, California. East Bay Municipal Utilities District, Walnut Creek Water Treatment Plant Pretreatment Upgrades Project, Walnut Creek, CA: As Arborist and Project Manager, Casey prepared a competitive proposal successfully securing a contract containing an arborist survey for the 13.5 acre Walnut Creek Water Treatment Plant Upgrade Project in Walnut Creek, California. Lead the arborist surveys and prepared a comprehensive Arborist Condition Report, which made tree protection and removal recommendations based off protected tree classifications, health condition and potential construction impact designations. As the primary client facing biologist managing all aspects of the project, including budget, deliverable preparation, and staff. Successful executive of the project granted additional arborist work at the Lafayette Water Treatment facility in Lafayette, California. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX xii EDUCATION MA, Anthropology, Northern Arizona University BS, Anthropology-Cultural Resources Management California State Polytechnic University, Pomona CERTIFICATIONS/ REGISTRATIONS Registered Professional Archaeologist #415730, CA AFFILIATIONS Section 106 Compliance Advanced Section 106 Society for American Archaeology Society for CA Archeology CHRISTOPHER DURAN, rpa SENIOR ARCHAEOLOGIST Christopher Duran is a Principal and Senior Archaeologist at Rincon Consultants, Inc. He brings more than a decade of professional experience in cultural resources management and exceeds the SOI’s Professional Qualification Standards. In addition, he has worked throughout California for various federal, state, and local agencies and has worked on several projects for private sector clients including developers and utility companies. Christopher has worked on hundreds of projects managing several millions of dollars in cultural resources investigations. He is an expert in cultural resources management and has worked on projects in compliance Sections 106 and 110 of the National Historic Preservation Act (NHPA), the National Environmental Policy Act (NEPA), and the California Environmental Quality Act (CEQA) as they pertain to cultural resources. PROJECT EXPERIENCE Watt Communities, LLC., Braverman Drive Tentative Map Project Phase II and III Cultural Resources Investigations, City of Santee, CA: As Project Manager/Principal Investigator, Christopher managed Phase II test investigations and managed field personnel and reporting during the site evaluation phase of a residential development project in Santee that includes one significant prehistoric site, CA-SDI-5669. Evaluation determined that CA- SDI-5669 is eligible for listing in the California Register of Historical Resources and required mitigation prior to ground disturbance related to construction of the development. Christopher prepared and executed a Data Recovery Plan and Research Design to mitigate the site. Santa Barbara County, Hollister Avenue Road Widening Project Cultural Resources Investigation, Cities of Goleta and Santa Barbara, CA: The project included the survey and documentation of a roadway interchange. Christopher led the field survey effort, document production and recommendations for the project. Southern California Gas Company, On-Call Cultural Resource Studies for Southern California Gas Company, Southern California: As Principal Investigator/Project Manager, Christopher prepared scopes of work, cost estimates and requests for service for archaeological studies throughout Southern California Gas Company’s (SoCalGas) jurisdiction. To date, studies managed for SoCalGas include emergency monitoring projects on Bureau of Land Management (BLM) lands during evaluation of the integrity of Lines 2000 and 3000 that required coordination between SoCalGas, BLM and a qualified subcontractor that performed the work. Additional undertakings performed under this contract include monitoring at Mission Santa Barbara, survey of two deep well anodes in the Mojave Desert, archaeological monitoring during wetland delineation on Burton Mesa (Santa Barbara County), and monitoring during pipeline installation for the Goleta Storage Project. Christopher also managed subcontractor performance, tracked and managed invoicing, reviewed project deliverables and scheduled qualified staff to perform the work. Naval Facilities Engineering Command, Stuart Mesa West Phase II Archaeological Investigation, Camp Pendleton, San Diego County, CA: As Field Director, Christopher managed field crews, conducting test excavations, reporting and collections management. Narven Enterprises, Archaeological Testing at 1441-1447 Sixth Avenue, San Diego, CA: As Principal Investigator/Project Manager, Christopher coordinated the reparation and implementation of an archaeological testing plan (ATP) for potential subsurface deposits on a proposed redevelopment site in downtown San Diego. He reviewed and approved ATP prior to submission to the client. The ATP was based upon the results of reviewing Sanborn Fire Insurance maps dating to the turn of the nineteenth century that documented previous development on the property. Christopher served as on-call Principal Investigator during mechanical excavations on the property, the results of which were negative. Bureau of Indian Affairs, Ewiiaapaayp Reservation Road Construction Cultural Resources Inventory, Ewiiaapaayp Indian Reservation, San Diego County, CA: As Project Manager/Principal Investigator, Christopher managed field crews, budgeting, and maintained contact and coordination with the primary contractor, Bureau of Indian Affairs and Tribal Government. Bureau of Indian Affairs, La Posta Reservation Road Construction Cultural Resources Inventory, La Posta Indian Reservation, San Diego County, CA: As Project Manager/ Principal Investigator, Christopher managed field crews, budgeting, and maintaining contact and coordination with primary contractor, Bureau of Indian Affairs and Tribal Government. Bureau of Indian Affairs, Santa Ysabel Reservation Road Reconstruction Cultural Resources Inventory, Santa Ysabel Reservation, San Diego County, CA: As Project Manager/Principal Investigator, Christopher prepared technical documents and provided agency consultation. Bureau of Land Management, Palm Springs South Coast Field Office, Canyon Lake Fuels Reduction Cultural Resources Inventory Project, Riverside County, CA: As Project Manager/Principal Investigator, Christopher managed fieldwork, field crew, scheduling, budgeting, preparing the technical report and maintained client contact. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX xiii EDUCATION MA, Public Archaeology, California State University Northridge BS, Anthropology – Emphasis in Physical Anthropology, University of California, Santa Barbara AFFILIATIONS Register of Professional Archaeologists Member Society for California Archaeology Member Society for American Archaeology Member DUSTIN MERRICK, rpa ARCHAEOLOGIST/PROJECT MANAGER Dustin is an Archaeologist with Rincon Consultants, Inc. He has extensive experience with pedestrian survey, archaeological excavations, monitoring, site mapping, and site recordation. Dustin also has experience managing projects throughout the Central Coast. He has worked with both prehistoric and historic archaeology throughout the Central Coast and Mojave Desert areas as well as the Channel Islands. He is experienced in protecting and managing cultural resources and specializes in osteological, faunal, and paleoethnobotanical analyses, specializing in prehistoric coastal and near-shore island environments. PROJECT EXPERIENCE Water Resource Recovery Facility Project, San Luis Obispo, CA: Dustin managed archaeological and paleontological resource monitoring and directed all fieldwork associated with the project. In addition, he worked directly with the City of San Luis Obispo and Native American monitor for the reinternment of cultural materials. Pacific Gas and Electric Cambria Access Road Maintenance Project, San Luis Obispo County, CA: Dustin was field lead for the survey within United States Forest Service lands and was the primary author of the technical cultural resource constraints report. Pacific Gas and Electric Tassajara Road Maintenance Project, San Luis Obispo County, CA: Dustin was field lead for the survey within United States Forest Service lands, coordinated with the Native American Heritage Commission and local tribe members and was the primary author of the technical cultural resource constraints report. Central Coast Blue Test Injection Well Extended Phase I Study, City of Pismo Beach, CA: Dustin managed all cultural resources components including survey, testing and monitoring and was the lead author on the cultural resources study. Cathodic Anode Well Project, Santa Barbara County, CA: Dustin was the field lead for the survey within Bureau of Land Management lands, coordinated with the Native American Heritage Commission and local tribe members and was the primary author of the technical report. Organic Liberty Cultivation Project, Santa Barbara County, CA: Dustin was field lead for the survey, coordinated with the Native American Heritage Commission and local tribe members and was the primary author of the technical report. In addition, he was the lead for the cultural resources and tribal cultural resources section in the environmental impact report. Pacific Gas and Electric Vandenberg-Divide Project, Santa Barbara County, CA: Dustin was field lead for the survey within Vandenberg Airforce Base lands and was the primary author of the technical cultural resource constraints report. Pacific Gas and Electric Gates Tulare Project, Tulare County, CA: Dustin was field lead for the survey within Bureau of Land Management lands, coordinated with the Native American Heritage Commission and local tribe members and was the primary author of the technical cultural resource constraints report. California High Speed Rail, Madera County, CA: Dustin was field lead for multiple monitoring and survey efforts, coordinated with the local tribe members and was the primary author of multiple technical cultural resource reports. Rexford Solar project, Tulare County, CA: Dustin coordinated with the Native American Heritage Commission and local tribe members and was the primary author of the technical cultural resource report. In addition, he was the project manager for the project and assisted the survey effort. Bellefield Solar, Mojave, CA: Dustin led the survey and is the project manager for the Phase II testing. In Addition, Mr. Merrick coordinated with the Native American Heritage Commission and local tribe members and was the primary author of the technical cultural resource report. Aratina Solar Project, Mojave, CA: Dustin participated in the survey, coordinated with the Native American Heritage Commission and local tribe members and was the primary author of the technical report. APN 038-260-049 Phase I Cultural Resources Study Project, Kings County, CA: Dustin conducted a pedestrian survey of the property directly west and south of the Avenal Animal Shelter, conducted Native American outreach and co-authored the technical report. Solar Cultural Resources Investigation, Kern County, CA: Dustin served as a crew member for the pedestrian survey and recorded prehistoric and historic sites using ArcPad GIS software. Cave Valley School Extended Phase I Study, Cool, CA: Dustin led the extended Phase I excavation and was the lead author on the cultural resources study. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX xiv EDUCATION BA, Anthropology, San Diego State University, San Diego, California Minor, Geology, San Diego State University, San Diego, California JENNIFER DICENZO PALEONTOLOGICAL PROGRAM MANAGER Jennifer has over 10 years of fieldwork and consulting experience in California paleontology and archaeology. She received her BA degree in anthropology with a focus in archaeology and a minor in geology with a focus on paleontology, at San Diego State University in 2012. She has made substantial contributions supervising field staff, surveying, construction mitigation monitoring, data recovery, fossil salvage, laboratory fossil preparation, writing technical assessments, developing, and administering monitoring and mitigation plans, report writing, managing projects, business development and graphic design. Jennifer has coordinated compliance monitoring on a range of projects including renewable energy, transmission lines, housing and commercial developments, transportation and utility. She has written and supervised the preparation of numerous technical documents including paleontological resources assessments and technical reports, impact analyses, paleontological mitigation and monitoring plans, paleontological section of if environmental impact reports, environmental assessment reports, initial studies for mitigated negative declarations, paleontological monitoring reports and paleontological survey reports. PROJECT EXPERIENCE County of San Luis Obispo, San Luis Obispo County Paso Basin Land Use Management Area Planting Ordinance Program Environmental Impact Report, San Luis Obispo County, CA: As Senior Paleontologist/Project Manager, Jennifer was responsible for overseeing the paleontological study for incorporation into the Program Environmental Impact Report. The study included reviewing existing literature and geological mapping to provide a paleontological resources assessment and sensitivity analysis and provided measures to mitigate impacts to fossil resources. City of San Luis Obispo, Utilities Department –Water Resource Recovery Facility Project, San Luis Obispo County, CA: As Senior Paleontologist, Jennifer was responsible for providing oversight and coordination of paleontological fieldwork for this ongoing mass excavation into Quaternary older alluvial deposits. Southern California Edison – Valle Substation Project, Ventura County, CA: As Senior Paleontologist/Project Manager, Jennifer was responsible for providing oversight and coordination of all fieldwork and prepared a summary of findings for a paleontological survey of a proposed utility improvements project. City of Port Hueneme –Bubbling Springs Routine Maintenance Agreement Project, Ventura County, CA: As Senior Paleontologist/Project Manager, Jennifer oversaw a paleontological initial study to be incorporated into the mitigated negative declaration for the project. The study included reviewing existing literature and geological mapping to provide a paleontological resources assessment and sensitivity analysis and provided measures to mitigate impacts to fossil resources. Caltrans District 8 – French Valley Parkway/I-15 Project, Riverside County, CA: As Paleontologist, Jennifer was one of two paleontologists responsible for surveying, planning, construction mitigation monitoring and writing the paleontological technical sections of the final survey and monitoring reports of results of excavations into the highly sensitive Pauba Formation in a complex area of the project requiring work on a busy freeway and city streets. Casitas Municipal Water District – Ventura-Santa Barbara Intertie Project, Ventura County, CA: As Senior/Project Manager, Jennifer was responsible for managing paleontological consulting, monitoring, and reporting for several ongoing projects related the Ventura-Santa Barbara Intertie Project. Jennifer supervised and coordinated paleontological field personnel and provides guidance related to handling of paleontological resource localities during excavations into multiple geologic units with a range of sensitivity. Santa Clarita Valley Water Agency, South Wells PFAS Groundwater Treatment Facility Project, Ventura County, CA: As Senior Paleontologist/Project Manager, Jennifer oversaw a paleontological initial study to be incorporated into the mitigated negative declaration for the project. The study included reviewing of existing literature and geological mapping to provide a paleontological resources assessment and sensitivity ratings and provided measures to mitigate impacts to fossil resources during construction of a proposed per- and polyfluoroalkyl substances treatment facility. Southern California Edison – Valley South Subtransmission Line Project, Riverside County, CA: As Senior Paleontologist, Jennifer was responsible for leading a crew of 8+ team members through 17 miles of a future linear transmission line. All survey work was incorporated into the Proponents Environmental Assessment (PEA) for Southern California Edison. This included proper BLM authorization and permitting to conduct surveying and a research design for field reconnaissance related to the PEA, EIS/EIR documentation for the transmission line. Greystar/City of San Diego – Sixth and Olive Project, San Diego County, CA: As Project Manager/Senior Paleontologist, Jennifer was responsible for recovering 70 fossil specimens from 9 localities. She drafted the budget, prepared the proposal, attended preconstruction meetings with City of San Diego, provided record search and literature review results, then applied cross trained archaeological and paleontological field and technical support during the project, provided project management/scheduling, salvaged fossil specimens, prepared fossil specimens in the laboratory, curated the fossil collection, and wrote the final paleontological monitoring report for a mass excavation 70+ feet into San Diego Formation near Balboa Park in eastern Downtown San Diego. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX xv RANDY ROMINGER, leed ap, assoc. dbia Principal-in-Charge Randy has over 38 years of experience in the construction industry involving the management of multi-million dollar projects for public and private sector clients. He has specialized in a variety of project types including parking structures, civic/ municipal, healthcare, corrections and education. Randy is an effective leader who believes trust, efficient conflict resolution, commitment, personal accountability and a goal-oriented approach are keys to a happy team and a successful project. EDUCATION BS, Construction Management, Colorado State University LICENSES & CERTIFICATIONS General Building Contractor B License #816632, CA LEED Accredited Professional; Assoc. Design-Build Prof. PROJECT EXPERIENCE California Polytechnic State University, San Luis Obispo, yak?it?ut?u Residential Community, San Luis Obispo, CA: A $204 million, 562,446 SF design-build project featuring eight structures with four and five levels above grade. The project featured single, double and quad units totaling 1,475 beds for first year students and an associated parking structure totaling 154,363 SF and over 480 stalls. Madera County Government Center, Madera, CA: A new $40 million, four-story, 131,000 SF administration building consisting of office space for county officials, customer service areas, board chambers as well as various conference and meeting rooms. The project also includes a new 400-car parking structure. San Luis Obispo Regional Transit Authority, Bus Maintenance Facility, San Luis Obispo, CA: A new $17.5 million (construction cost), 28,650 SF, single story bus maintenance facility with over 2,600 SF of mezzanine/ equipment platform located on a 6.44-acre site. The facility accommodates operations, administration and maintenance areas and includes detached enclosures on-site, including a trash enclosure and canopy over bus parking. Work also includes off-site improvements, specifically the T-intersection for future Elks Lane realignment. San Luis Obispo County, New Animal Shelter, San Luis Obispo, CA: A new $20.3 million, 16,000 SF design- build Animal Services Facility created to replace the existing animal services shelter constructed in 1975. The new facility improves public visitation and access, provides expanded services, security and incorporates larger kennel spaces with allowance for future expansion and overflow. San Luis Obispo County Community College District, Measure L Bond Program, San Luis Obispo, CA: A $275 million bond program which addresses crucial facility needs, including a new instructional building on the San Luis Obispo campus, a new campus center, a new career training facility and new early childhood center at the Paso Robles campus; the replacement of temporary classrooms, and repairs and upgrades to roofs, heating and air conditioning units, aquatic center and other infrastructure and utilities technology upgrades. MATT CHAPPELL, eit, cep Estimating Manager Matt has more than 26 years of experience in private and public construction and design. His experience includes project management, agency/contractor coordination, scheduling and project budgets, utility construction and estimating on multiple municipal and education projects. As a Certified Estimating Professional (CEP) by the Association for the Advancement of Cost Engineering (AACE), Matt exemplifies the well-rounded construction estimating professional. EDUCATION BS, Civil Engineering, University of Nebraska LICENSES & CERTIFICATIONS Engineer in Training #EI-7956, NB Certified Estimating Professional #130-10 PROJECT EXPERIENCE San Luis Obispo County, New Animal Shelter, San Luis Obispo, CA: A new $20.3 million, 16,000 SF design- build Animal Services Facility created to replace the existing animal services shelter constructed in 1975. The new facility improves public visitation and access, provides expanded services, security and incorporates larger kennel spaces with allowance for future expansion and overflow. County of San Luis Obispo, Probation Department Building, San Luis Obispo, CA: A new $16 million, 31,000 SF, two-story office building featuring office space for county probation staff, interview rooms, training, conference and evidence rooms, armory, secured sallyport, break rooms, locker and changing rooms, restrooms with showers, a public lobby, parking as well as an emergency generator. City of Chandler, Oregon Street Parking Structure, Chandler, AZ: A new $23 million, five-level, 293,000 SF, 932-space parking garage for the City of Chandler, which includes a road realignment along Oregon Street as well as intersection improvements at Arizona Avenue and Chicago Street. California Department of General Services, Richards Boulevard Office Complex, Sacramento, CA: A new $1 billion design-build office campus totaling approximately 1.25 million GSF consisting of four 7- to 11-story office buildings with two multi-floor podiums at the base for the towers. Site improvements include a seven-level parking garage with 1,294 spaces and an additional 318 surface parking spaces. Butte County Association of Governments, Butte Regional Transit Operations Center (BRTOC), Chico, CA: A new $38 million, 41,000 SF LEED Silver certified transit facility built to replace the outdated maintenance and operations facilities with a new bus maintenance building, operations building and an administrative office facility, along with associated on-site and off-site improvements, including an 8,000 SF tenant improvement. Work includes renovation of the existing building. The facility houses twelve additional executive offices and a new Board Room for Butte County Association of Governments official board meetings. AS-NEEDED IN-HOUSE SUPPORT SERVICES DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX xvi RICK STASSI Scheduling Manager Rick has over 45 years of technical and analytical industry scheduling experience, with a diverse career in the engineering and project management fields. His experience encompasses project controls, engineering support, customer service and information technology support as well as scheduling, with excellent interpersonal and team building skills. Rick is familiar with a wide range of systems and software including Procore, MS Project, Power BI, Primavera, Prolog and AutoCAD. His experience includes high volume projects across several industries including water/ wastewater, aviation, civic/municipal, commercial and transportation. EDUCATION Coursework, Engineering, Sacramento City College PROJECT EXPERIENCE California Polytechnic State University, San Luis Obispo, Vista Grande Dining Facility, San Luis Obispo, CA: A new $39.8 million, 35,000 SF, three-story dining complex facility which replaces a 43-year old facility. The new complex, which is double the size of the old facility, features six micro-restaurants with exhibition-style cooking as well as increased seating and lounge space encompassed in a modern LEED Gold certified building. San Luis Obispo County Community College District, Measure L Bond Program, San Luis Obispo, CA: A $275 million bond program which addresses crucial facility needs, including a new instructional building on the San Luis Obispo campus, a new campus center, a new career training facility and new early childhood center at the Paso Robles campus; the replacement of temporary classrooms, and repairs and upgrades to roofs, heating and air conditioning units, aquatic center and other infrastructure and utilities technology upgrades. California Department of General Services, Richards Boulevard Office Complex, Sacramento, CA: A new $1 billion design-build office campus totaling approximately 1.25 million GSF consisting of four 7- to 11-story office buildings with two multi-floor podiums at the base for the towers. Site improvements include a seven-level parking garage with 1,294 spaces and an additional 318 surface parking spaces. Sacramento Municipal Utility District, SMUD Headquarters Rehabilitation, Sacramento, CA: A $135 million complete renovation of the 120,000 SF office building and 45,000 SF parking garage. The north wing has a three level parking structure and a two-story office portion above the parking garage. This project is designed to achieve LEED Gold certification. Atascadero Unified School District, Measure I-10 & B-14 Bond Program, Atascadero, CA: A $126.2 million bond program providing expansion of vocational education programs and facilities, computer and technology upgrades and construction of a new science, technology, engineering and math facility at the high school as well as a new administration/classroom building at the middle school. HEATHER BROWN, pe, cpmp, leed ap Engineering & Architectural Services Director Heather brings more than 27 years of experience in the construction industry, where she has worked on a wide variety of public, higher education and commercial facilities. Her experience includes project management, mechanical and plumbing design, assessing and renovating both HVAC and plumbing systems, preparing calculations and AutoCAD drawings. Heather is responsible for the management of engineers and architects working with code, access compliance, design and constructability reviews, life cycle studies, value engineering sessions, energy studies, specifications development, needs assessments, master planning studies, facility assessments and construction inspections. EDUCATION MBA, Finance, California State University Sacramento BS, Mechanical Engineering, University of Portland, Oregon LICENSES & CERTIFICATIONS Mechanical Engineer #M31667, CA LEED Accredited Professional Commissioning Process Management Professional PROJECT EXPERIENCE San Luis Obispo Community College District, Photovoltaic Feasibility Study - Main and North Campus, San Luis Obispo, CA: Kitchell performed a study exploring the feasibility of installing on-site solar photovoltaic systems at Cuesta College’s Main and North Campus. The report investigated the electrical demand of the campuses over the pre-pandemic fully operating time frame of 2018-2020, the existing electrical site conditions, and civil infrastructure to determine the feasibility of installing an on-site solar photovoltaic system. Civic Park Condominiums, Cupertino, CA: Mechanical Engineer for this 132,000 SF, 4-story mixed development with 80 condominium units and 20,000 SF of retail and office space. The project also included a 120,000 SF, 3-level parking garage. Sacramento Municipal Utility District, SMUD Headquarters Rehabilitation, Sacramento, CA: A $135 million complete renovation of the 120,000 SF office building and 45,000 SF parking garage. The north wing has a three level parking structure and a two-story office portion above the parking garage. This project is designed to achieve LEED Gold certification. City of Chandler, Oregon Street Parking Structure, Chandler, AZ: A new $23 million, five-level, 293,000 SF, 932-space parking garage for the City of Chandler, which includes a road realignment along Oregon Street as well as intersection improvements at Arizona Avenue and Chicago Street. Butte County Association of Governments, Butte Regional Transit Operations Center (BRTOC), Chico, CA: A new $38 million, 41,000 SF LEED Silver certified transit facility built to replace the outdated maintenance and operations facilities with a new bus maintenance building, operations building and an administrative office facility, along with associated on-site and off-site improvements, including an 8,000 SF tenant improvement. Work includes renovation of the existing building. The facility houses twelve additional executive offices and a new Board Room for Butte County Association of Governments official board meetings. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 1540 Marsh Street, Suite 150 San Luis Obispo, CA 93401 www.kitchell.com DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 EXHIBIT C DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 1 Fee Proposal Within a separate sealed envelope, submit a complete fee proposal for the scope of services. Provide separate subtotals for Phase 1B and Phase 2 broken down by task and staff billing rates with estimated hours. Clearly identify fees for subconsultant services. Compensation for Services Kitchell’s philosophy for determining our compensation for services is driven by matching value to cost. In other words, we strive to provide the most appropriate complement of services and delivery methods to meet your objectives. Our primary goal is to align our understanding of the project success factors with your expectations. Our approach can be best described as “bottom-up-planning,” where we define the tasks to be performed, produce a detailed scope of services, identify staff that will implement the tasks, calculate the staff time requirement for each task and determine the resulting compensation. We believe this method provides you with the most cost- effective fee for the services provided. Typically, we prefer to be compensated on a lump sum fixed fee basis derived by using the approach just described. This arrangement eliminates the perception that the construction manager would benefit financially from construction cost overruns and change orders. We do not make it a practice to request changes to our contract for minor scope changes, or for major scope changes which can be managed within our established staffing plan and schedule. Billing amounts are determined using the method most appropriate to match the cost of carrying out our services. We are accustomed to billing using various compensation methods, which include: a fixed billing schedule, percentage of project/contract completion, and predetermined hourly rates, among other methods. Kitchell has worked under many different compensation methods and is flexible in meeting your preferences. Reimbursable Expenses Reimbursable expenses are those customary and reasonable costs associated with carrying out our Construction Management services and includes subconsultant invoices, Resident Engineer’s travel, printing, postage, and a copier/scanner for the job site office. We will charge only actual costs plus 10% to cover invoice processing and insurance. We understand the Phase 2 construction contract will include provisions for the contractor to provide an office space and a conference room for the construction management team including electricity, phone, internet, water, and sanitation services. Preconstruction services and Phase 1B construction services will be managed from our San Luis Obispo Office. Proposed Fees Phase 1B and Phase 2 fees are summarized below and broken down in detail by task and staff billing rates with estimated hours in the succeeding table. Subconsultant fees are identified within their respective tasks and include Kitchell’s mark-up on their fees. Our fee is based upon utilizing a full-time Project Inspector provided by Earth Systems. This position may not be redundant with City inspection, and if eliminated, would render $852,720 savings. Refer to the attached subconsultant fee proposal for further information regarding assumptions each firm used in deriving their fees. Rincon’s fees are for basic services. Their fee proposal also includes optional services the City may wish to consider. Our fees are based upon the scope of services described in Appendix A of the RFP and the following durations: Preconstruction services, 3-4 months from commencement of services to start of Phase 1B construction; Phase 1B, 6 months construction with post-construction concurrent with Phase 2 construction; Phase 2, 23 months construction in sequence with Phase 1B construction followed by 3 months for post-construction. Please see the following page for details. Task Phase 1B Phase B Task 1: Preconstruction Services $41,750 $22,500 Task 2: Construction Services $584,580 $2,788,440 Task 3: Geotechnical & Materials Testing & Specialty Inspection $111,553 $469,975 Task 4: Surveying $3,960 $19,800 Task 5: Construction Environmental Mitigation & Monitoring $29,638 $28,679 Task 6: Post-Construction Services $12,200 $126,500 Grand Totals:$783,681 $3,455,894 EXHIBIT C REVISED 11.9.2022 $3,436,094 $405,060 $600,201 DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 2 Description Rate/ Unit Price Phase 1B Phase 2 Hrs/Units Amount Hrs/Units Amount Task 1: Preconstruction Services Project Director $230 12 $2,760 2 $460 Resident Engineer $220 76 $16,720 40 $8,800 Assistant Resident Engineer/Sr. PM $205 76 $15,580 40 $8,200 Sr. Scheduler $180 20 $3,600 16 $2,880 Sr. Estimator $180 8 $1,440 12 $2,160 Reimbursable Expenses Allowance -$1,650 -$0 Task 2: Construction Services Project Director $230 48 $11,040 184 $42,320 Resident Engineer $220 96 $21,120 736 $161,920 Assistant Resident Engineer/Sr. PM $205 920 $186,600 3,680 $754,400 Quality Assurance Manager $170 960 $163,200 3,660 $622,200 Project Engineer ---3,600 $396,000 Project Inspector (By Earth Systems)$187 960 $179,520 3,600 $673,200 Sr. Scheduler $180 72 $12,960 300 $54,000 Sr. Estimator ---200 $36,000 Reimbursable Expenses Allowance -$8,140 -$48,400 Task 3: Geotechnical and Materials Testing and Specialty Inspection (Performed by Earth Systems) Earth Systems’ Fee with Kitchell Mark-up Quotation -$111,553 -$469,975 Task 4: Surveying (Performed by RRM) RRM’s Fee with Kitchell Mark-Up Quotation -$3,960 -$19,800 Task 5: Construction Environmental Mitigation and Monitoring (Performed by Rincon) Rincon’s Fee with Kitchell Mark-Up Quotation -$29,638 -$28,679 Task 6: Post-Construction Services Project Director ---24 $5,520 Resident Engineer ---24 $5,280 Assistant Resident Engineer/Sr. PM ---96 $19,680 Quality Assurance Manager $170 20 $3,400 240 $40,800 Project Engineer $110 80 $8,800 480 $52,800 Reimbursable Expenses Allowance -$0 -$2,420 DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 3 Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 2 Scope of Work Phase 1B Task 1 Project Initiation and Project Management This task includes project management, client coordination, quality assurance/quality control, and administration needed to prepare and execute the mitigation and monitoring plan for the project. The Rincon Principal and/or Project Manager will participate in one (1) project kickoff call with Kitchell and City staff. As part of this task, Rincon will undertake ongoing environmental compliance coordination with Kitchell and the City, review the overall project schedule, and establish a communication protocol to coordinate project changes or other issues that may arise throughout the duration of Phase 1B and Phase 2 construction activities. The project management task will also focus on maintenance of the project schedule. Rincon will manage the project team associated with environmental compliance activities including any optional tasks (if necessary), on-site monitoring, and reporting; coordinate the environmental review process schedule; and provide project updates for the environmental compliance. Rincon’s principal in charge and/or project manager will review and comment on the meeting minutes project status and budget updates. In addition to the kickoff meeting, Rincon proposes to attend up to six (6) coordination meetings with Kitchell and City staff, if applicable. Task 2 Nesting Bird Surveys and Reporting As outlined in the Plan, project activities that occur during the nesting bird season (February 1 through August 31) to be supported by a nesting bird survey conducted by a qualified biologist no more than three days prior to the initiation of ground disturbance and/or vegetation removal activities. A qualified Rincon biologist will conduct a nesting bird survey within three days prior to ground disturbing and/or vegetation removal activities for Phase 1B and Phase 2 as two separate surveys based on our understanding of the timing for each of these phases (see task 7). The nesting bird surveys will be conducted within the project boundary plus a 500-foot buffer for raptors and within the project area plus a 300-foot buffer for all other bird species where safely and legally accessible. The surveys will be conducted on foot within all accessible areas. Binoculars will be used for all inaccessible areas (e.g., private lands). This scope of work and associated cost assumes an individual nesting bird survey and report will be required for each of two phases: Phase 1B and Phase 2. Each nesting bird survey can be completed by one biologist in a single 4-hour day. If active an active nest(s) is found during a given survey, additional field time will be required to complete the survey (i.e., observation and documentation time necessary to assess nesting status such as clutch size and egg/fledging presence) and will be included as an amendment. If either of the project’s phases are to occur outside of the nesting bird season, a nesting bird survey and report will not be prepared for that phase. Upon completion of each nesting bird survey, Rincon will prepare a brief letter report that includes the purpose, methodology, and results. If active nests are found, a figure depicting the nest(s) location will be prepared. The reports will include a recommended avoidance buffer and monitoring period if an active nest is found within the survey area. Since the number of nests that may be identified is unknown, our cost does not include installing nest buffer(s), additional coordination, or monitoring the Rincon Consulting Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 3 active nest(s). If required, these monitoring tasks will be included as an additional scope of work to be authorized by the City prior to completion. The cost for this task assumes the draft letter reports will be submitted electronically for client review. Response to comments with up to two hours of staff time for each report is included. The final drafts will be compiled and submitted electronically. Task 3 Archaeological Construction Monitoring and Reporting for Phase 1B As discussed in the Plan, archaeological monitoring is required during initial ground disturbance. Rincon will conduct the required archaeological construction monitoring and reporting during Phase 1B activities. Additionally, a qualified principal investigator, defined as an archaeologist who meets the Secretary of the Interior’s Professional Qualifications Standard for archeology, shall be retained to oversee all mitigation measures related to archaeological resources, outlined in the following tasks. Task 3.1 Project Kickoff and WEAP Training Prior to the start of construction, Rincon will prepare a WEAP training program. The training will be presented to all on-site personnel and will include a briefing regarding the types of archaeological resources and/or fossils that could be found in the project area and the procedures to follow should archaeological or paleontological resources be encountered. The training will also include a discussion of applicable laws and penalties for removal or disturbance of archaeological or paleontological materials found on site. The training will provide instruction for workers with procedures to follow in the event of an archaeological resource or fossil discovery, including reporting procedures, and will provide contact information for the on-site monitor(s), Qualified Archaeologist, and Qualified Paleontologist. This training will be accomplished at the pre-construction kick-off meeting and will be conducted by the Qualified Archaeologist, Qualified Paleontologist, or their designated representative(s). Task 3.2 Archaeological Monitoring Rincon will provide a qualified archaeologist to observe all project-related ground-disturbing construction activities for Phase 1B of the project. The monitor shall be on-site on a full-time basis during initial earthmoving activities, including grading, trenching, vegetation removal, or other excavation activities. Under consultation between the qualified archaeologist and the City, monitoring may be reduced or eliminated based on observed conditions. The qualified archaeologist will observe soil disturbances, inspect exposed soils, and will re-direct equipment in the event potential resources are encountered. The monitor will conduct a cursory inspection of any discoveries; however, in the event resources potentially significant under CEQA are encountered, further investigation beyond the scope of work described may be required. The monitor will prepare daily monitoring logs that include a description of construction activities, soil descriptions (color, grain size, sediments, etc.), and cultural materials identified, if any. The monitoring logs will be reviewed as necessary by a Rincon senior archaeologist and filed at Rincon’s San Luis Obispo office. Rincon requires that construction staff provide 48-hour notice for mobilization of a monitor. Rincon will provide up to five (5), 8-hour days of archaeological monitoring at a day rate of $1500 per day. Should more than 5, 8 hour days for monitoring be required, Rincon can provide additional monitoring at the standard $1500 day rate Rincon will charge a half day rate of $800 for every day the monitor is on-site for less than 4 hours or if work is cancelled without 48 hours notification. Rincon assumes no cultural resources will be encountered during monitoring. A scope and budget augmentation will be requested to address finds encountered during monitoring. This scope and cost do DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 4 Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 4 not include analysis, laboratory preparation, or documentation of identified cultural resources discovered during monitoring. In the event cultural resources are encountered during the construction, all work shall be halted in the vicinity of the discovery until a qualified archaeologist can assess the significance of the resource. If the resources are found to be significant, they must be avoided or mitigated pursuant to the qualified archaeologist’s direction and mitigation measures outlined in the Plan. Mitigation may involve preservation in place or documentation and excavation of the resource. A report by the archaeologist evaluating the find and identifying mitigation actions taken shall be submitted to the Kitchell and the City. Task 4 Paleontological Construction Monitoring for Phase 1B Task 4.1 Paleontological Monitoring Rincon will provide a qualified paleontological monitor to be on site during initial project-related ground-disturbing activities of 10 feet or more in depth within previously undisturbed sediments. The monitor will inspect excavated or graded areas and trench sidewalls for evidence of paleontological resources. Monitoring procedures may also include onsite sample screening of sedimentary matrix for the presence of microfossils, at the discretion of the Qualified Paleontologist. Rincon will provide up to five (5), 8-hour days of paleontological monitoring. Rincon will charge a minimum 4 hours/day for every day the monitor is on-site for less than 4 hours or if work is cancelled without proper notification. An approximate daily monitoring rate for paleontological services would be $1,500 per day. If fossils are discovered, the monitor will temporarily divert construction to assess the find. If deemed scientifically significant or potentially significant, the monitor will collect the fossil specimen(s) and pertinent associated data in a manner that would minimize or avoid construction delays. All scientifically significant fossils recovered during monitoring will be prepared, identified, and curated permanently into a permanent repository. Optional Task 5 Historic American Building Survey Documentation Phase 1B and 2 are subject to the requirements of MMRP Measure CR-1 outlined in the Final EIR MMRP, which requires historic American building survey documentation prior to construction. If authorized, Rincon will prepare the required Historic American Building Survey (HABS)-level III documentation of two buildings, 610 and 614 Monterey Street prior to initiation of Phase 1B and Phase 2 construction activities. For this effort, Rincon’s project team will be led by Architectural History Project Manager JulieAnn Murphy with oversight provided by Architectural History Principal Shannon Carmack. Both Ms. Murphy and Ms. Carmack meet and exceed the Secretary of Interior’s Professional Qualification Standards (PQS) for History and Architectural History (36 CFR, Part 61). Additionally, they have prepared several HABS- like documentation packages for buildings and structures located throughout California. Photographs A Rincon Architectural Historian meeting the PQS Standards will conduct site visits to 610 Monterey Street and 614 Monterey Street. The purpose of the site visit will be to photograph the buildings. Photographs will be taken using a professional-quality single lens reflex digital camera. Large-format photographs and site drawings/plans will not be included as a component of the HABS package; either can be provided but would require a contract amendment. Images captured will include context views, elevations/exteriors, architectural details, overall interiors, and interior details (if warranted). A Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 5 maximum of 30 views of each building will be taken. The actual number of views obtained will depend upon site conditions, access, and safety considerations. Rincon assumes the City’s staff will facilitate access to the buildings, including the interiors and exteriors of the buildings. Given the close proximity of the buildings, Rincon further assumes one site visit will be sufficient to complete documentation. Following completion of the site visit, Rincon will upload photographs to an FTP site for review by the City to confirm that the photographs are adequate and will satisfy the HABS documentation requirements. Supplemental Research and Preparation of HABS Reports Rincon will prepare a HABS-level III report for the buildings in a format consistent with the Secretary of the Interior’s Standards and Guidelines for Architectural and Engineering Documentation: Historic American Building Survey. The report will include a physical description of the buildings and available information on their design and history. It will document the buildings’ construction history, architecture, and historical significance. Rincon will draw on existing documentation to the greatest extent feasible and will perform additional research as needed. The scope for this task does not include preparation of updated Department of Parks and Recreation (DPR) forms. Compilation of HABS Documentation Packages Upon completion the tasks described above, Rincon will assemble a HABS-level III documentation package for each building. The package will include photographs and the HABS-level III report. It will integrate any additional data collected. A map indicating the location from which each photograph was taken, and a photograph log, will be included for reference. A draft digital copy of each package will be submitted to the City for review and approval, following which point it will be finalized. Following finalization, Rincon will send original hard copies of the packages to San Luis Obispo Library and the History Center of San Luis Obispo County to satisfy the specific requirements of MMRP Measure CR-1. The photographs and the report will be printed on acid-free archival-bond paper and labeled and stored in archival sleeves and folders accordingly. The entire package will be housed in an acid-free storage container prior to delivery. Should additional hard or electronic copies of the documentation packages be requested, a change order will be necessary. Optional Task 6 Extended Phase 1 Testing Based on the findings of the Mitigation and Monitoring Plan prepared by Rincon in 2022, the anticipated method for investigating subsurface remains associated with CA-SLO-2431H is through an Extended Phase 1 (XPI) investigation consisting of mechanical backhoe trenching subsequent to demolition and pavement removal. Use of a backhoe will allow for an expedited review of the soil profiles and an assessment as to the potential to encounter buried archaeological deposits. The area of disturbance for demolition and pavement removal for Phase 1B and Phase 2 of the project is approximately 300 feet by 200 feet. Therefore, four backhoe trenches oriented from east to west and spaced approximately 20 meters (66 feet) apart will be necessary. Rincon assumes the XPI investigation will be negative for subsurface archaeological material that will require formal evaluation. In the event subsurface deposits that require such evaluation are identified during the XPI investigation, a budget amendment would be necessary to document and evaluate the finds. If the XPI investigation is positive, a Phase 2 significance evaluation may also be necessary to determine if the project will have a significant impact on the resource and to evaluate the deposit(s) for significance under CEQA. If an intact archaeological deposit is encountered during the Phase 2 that cannot be avoided by project design, a Phase 3 data recovery DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 5 Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 6 excavation of the deposit would likely be necessary to mitigate impacts. Phase 2 and Phase 3 testing would require a separate scope of work and cost. Optional Task 6.1 Extended Phase 1 Testing Plan Rincon will prepare an XPI work plan upon authorization. The work plan will include a discussion of the goals of the study, methods to be employed, and factors that determined the scope. Rincon assumes this plan will be submitted electronically and approved with a single combined round of comments from the City. Optional Task 6.2 Extended Phase 1 Fieldwork This work effort will be conducted under the direction of Rincon archaeologist Dustin Merrick, MA, RPA, who meets the Secretary of the Interior’s Professional Qualification Standard for prehistoric and historic archaeology. Under the direction of the Qualified Archaeologist, two Rincon archaeologists will direct the mechanical excavation of a series of up to four (4) trenches totaling approximately 800 linear feet to assess the presence or absence of subsurface archaeological deposits associated with CA-SLO-2341H within the project site. XPI fieldwork will require a two-person crew for no more than five (5), eight (8) hour days inclusive of travel time. Trenching will be performed by a qualified excavation contractor under the direction of the Rincon field director. This scope of work assumes costs for the excavation contractor will not exceed $1,200 per day. Rincon assumes that the presence of a Native American monitor will not be required for excavation activities, as no prehistoric resources are anticipated. For the purposes of this proposal, Rincon estimates that no more than four (4) trenches will be excavated. Excavation will be conducted using a standard backhoe fit with a flat blade. Excavation will be conducted in small lifts (10 to 20 cm) so that any archaeological materials, features or deposits can be identified immediately upon exposure. Stratigraphic soil profiles will be drawn of at least one side wall of a representative sample of the trenches. In lieu of hand excavation, Rincon will screen samples of excavated soils from the trenches to identify the amounts and types of artifacts and ecofacts that may be present in particular soil strata. Samples will be screened from different stratigraphic layers as identified in the field and at systematic intervals during trenching. The excavated soils will be dry screened through 1/8-inch (3-millimeter) mesh. Artifacts and ecofacts recovered during screening will be analyzed and documented in the field; no artifacts, samples, or specimens will be collected during the testing and no laboratory analysis is currently proposed. Artifacts recovered will be reburied within the trenches during backfilling. Excavation forms will be prepared providing all pertinent data (e.g., trench number, date, provenience, location justification, and termination justification). All excavation locations will be recorded using a sub- meter-accurate handheld GPS unit and documented both with notes and photographs. Should feature(s) be encountered that require hand excavation, Rincon will expose the feature so that it can be identified and its location recorded but will not complete full excavation of the feature. Complete recovery of the feature would be proposed for Phase 3 efforts, if needed. Should the feature consist of human remains, Rincon will cease work and notify the Kitchell, the City and the County Coroner. Rincon will submit a budget augmentation for the additional work related to the treatment of human remains that are Native American in origin. Optional Task 6.3 Extended Phase I Reporting Rincon will prepare a technical report to document the results of the investigation. The report will be prepared following the California Office of Historic Preservation’s Archaeological Resource Management Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 7 Reports (ARMR) Guidelines. The report will include a discussion of the findings of the study and all appropriate maps, figures, photographs, and tables. The report will also provide management recommendations for the project and outline procedures to be followed in the event of an unanticipated discovery during project construction. No more than one round of revisions to the XPI report will be necessary following review by Kitchell and the City. In addition to the XPI testing report, Rincon will prepare Department of Parks and Recreation 523 series forms to update the existing resource record (CA-SLO-2341H) that was identified within the current project boundaries. Phase 2 Task 7 Nesting Bird Surveys and Reporting As described under Task 2, project activities that occur during the nesting bird season (February 1 through August 31) to be supported by a nesting bird survey conducted by a qualified biologist no more than three days prior to the initiation of ground disturbance and/or vegetation removal activities. Upon completion of the nesting bird survey, Rincon will prepare a brief letter report that includes the purpose, methodology, and results as described in greater detail under Task 2. Task 8 Archaeological Construction Monitoring and Reporting for Phase 2 As discussed in the Plan, archaeological monitoring is required during initial ground disturbance. Rincon will conduct the required archaeological construction monitoring and reporting during Phase 2 activities. Additionally, a qualified principal investigator, defined as an archaeologist who meets the Secretary of the Interior’s Professional Qualifications Standard for archeology, shall be retained to oversee all mitigation measures related to archaeological resources, outlined in the following tasks. Task 8.1 Project Kickoff and WEAP Training Rincon will present the previously prepared WEAP for Phase 1B during the initiation of Phase 2 construction activities. The training will be presented to all on-site personnel and will include a briefing regarding the types of archaeological resources and/or fossils that could be found in the project area and the procedures to follow should archaeological or paleontological resources be encountered. The training will also include a discussion of applicable laws and penalties for removal or disturbance of archaeological or paleontological materials found on site. The training will provide instruction for workers with procedures to follow in the event of an archaeological resource or fossil discovery, including reporting procedures, and will provide contact information for the on-site monitor(s), Qualified Archaeologist, and Qualified Paleontologist. This training will be conducted on the first day of Phase 2 construction monitoring. Rincon assumes the Phase 1B WEAP will be sufficient and new WEAP or any preconstruction preparation will be required Task 8.2 Archaeological Monitoring Rincon will provide a qualified archaeologist to observe all project-related ground-disturbing construction activities for Phase 2 of the project. The monitor shall be on-site on a full-time basis during initial earthmoving activities, including grading, trenching, vegetation removal, or other excavation activities. Under consultation between the qualified archaeologist and the City, monitoring may be reduced or eliminated based on observed conditions. The qualified archaeologist will observe soil DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 6 Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 8 disturbances, inspect exposed soils, and will re-direct equipment in the event potential resources are encountered. The monitor will conduct a cursory inspection of any discoveries; however, in the event resources potentially significant under CEQA are encountered, further investigation beyond the scope of work described may be required. The monitor will prepare daily monitoring logs that include a description of construction activities, soil descriptions (color, grain size, sediments, etc.), and cultural materials identified, if any. The monitoring logs will be reviewed as necessary by a Rincon senior archaeologist and filed at Rincon’s San Luis Obispo office. Rincon requires that construction staff provide 48-hour notice for mobilization of a monitor. Rincon will provide up to five (5), 8-hour days of archaeological monitoring at a day rate of $1500 per day. Should more than 5, 8 hour days for monitoring be required, Rincon can provide additional monitoring at the standard $1500 day rate Rincon will charge a half day rate of $800 for every day the monitor is on-site for less than 4 hours or if work is cancelled without 48 hours notification. Rincon assumes no cultural resources will be encountered during monitoring. A scope and budget augmentation will be requested to address finds encountered during monitoring. This scope and cost do not include analysis, laboratory preparation, or documentation of identified cultural resources discovered during monitoring. In the event cultural resources are encountered during the construction, all work shall be halted in the vicinity of the discovery until a qualified archaeologist can assess the significance of the resource. If the resources are found to be significant, they must be avoided or mitigated pursuant to the qualified archaeologist’s direction and mitigation measures outlined in the Plan. Mitigation may involve preservation in place or documentation and excavation of the resource. A report by the archaeologist evaluating the find and identifying mitigation actions taken shall be submitted to the Kitchell and the City. Task 8.3 Archaeological Monitoring Letter Report Upon completion of the monitoring effort, Rincon will prepare a letter report that will describe the results, analysis, and conclusions of the archaeological monitoring effort. The letter report will be submitted to Kitchell and the City for review and approval within 30 days following the completion of monitoring. Rincon will respond to one (1) round of consolidated, minor comments on the draft letter report from Kitchell and the City staff. A copy of the final version of the letter report will be submitted to the City within 30 days of approval. All deliverables will be presented electronically. After the final copy is accepted by the City, the final report will be submitted to the Central Coast Information Center. Rincon assumes the archaeological monitoring letter report findings will be negative. Should a resource be discovered during archaeological monitoring, Rincon will request a scope and budget augmentation for the additional scope and cost. Rincon assumes that a single letter report for Phases 1B and 2 will suffice; therefore, we have budgeted a single letter report as a cost-saving measure. Task 9 Paleontological Construction Monitoring for Phase 2 Task 9.1 Paleontological Monitoring Rincon will provide a qualified paleontological monitor to be on site during initial project-related ground-disturbing activities of 10 feet or more in depth within previously undisturbed sediments. The monitor will inspect excavated or graded areas and trench sidewalls for evidence of paleontological resources. Monitoring procedures may also include onsite sample screening of sedimentary matrix for the presence of microfossils, at the discretion of the Qualified Paleontologist. Rincon will provide up to five (5), 8-hour days of paleontological monitoring. Rincon will charge a minimum 4 hours/day for every Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 9 day the monitor is on-site for less than 4 hours or if work is cancelled without proper notification. An approximate daily monitoring rate for paleontological services would be $1,500 per day. If fossils are discovered, the monitor will temporarily divert construction to assess the find. If deemed scientifically significant or potentially significant, the monitor will collect the fossil specimen(s) and pertinent associated data in a manner that would minimize or avoid construction delays. All scientifically significant fossils recovered during monitoring will be prepared, identified, and curated permanently into a permanent repository. Task 9.2 Paleontological Negative Findings Letter Report Rincon will prepare a final monitoring letter report that will outline the methodology of paleontological monitoring at the project site, describe the construction activity and duration, describe the lithology of the depositional units exposed during excavations, and present the results of the monitoring. The level of effort to complete a monitoring report is dependent on the number of resources recovered during monitoring activities. Rincon assumes that a single letter report for Phases 1B and 2 will suffice; therefore, we have budgeted a single letter report as a cost-saving measure. Assumptions Our scope of work and cost for this project has incorporated the following assumptions. ▪ This proposal assumes no cultural resources will be discovered during cultural resources monitoring and the current scope of work and cost estimate does not include analysis, collection, laboratory preparation, or documentation of identified cultural resources discovered during monitoring. A scope and budget augmentation will be requested to address finds encountered during monitoring. ▪ Access to the project boundary will be provided by Kitchell. The project boundary within private lands will be surveyed with the use of binoculars for the nesting bird survey. ▪ Rincon is not responsible for delays due to weather, site conditions (e.g., prohibited access, flooding, fire, safety) or other conditions out of Rincon’s control. ▪ One WEAP training by the archaeological and paleontological monitors on the first day of monitoring will be sufficient to train the entire construction crew and no additional WEAP training will be necessary. If additional training for new crew members is needed, Rincon can provide recorded presentations. ▪ Rincon assumes negative findings during paleontological monitoring, and the current cost estimate does not include expenses related to the treatment and curation of fossil specimens. Should fossils be recovered during monitoring, Rincon will immediately prepare an estimate for the anticipated costs associated with documentation and reporting requirements for the discovery. ▪ Kitchell will provide current project site plans for inclusion in the Archaeological Monitoring Technical Memorandum ▪ In light of the current COVID-19 pandemic, Rincon staff will conduct the nesting bird survey in accordance with the most current relevant, local COVID-19 safety protocols and social distancing guidance. ▪ Rincon is not responsible for damage to subsurface structures, utilities, pipelines, or other objects that are not marked or identified to us by client or Underground Service Alert utility notification service, provided that we have made appropriate inquiries to USA utility notification services. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 7 Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 10 ▪ Rincon assumes that the extended Phase I testing will not discover a resource that could be considered a historical resource under CEQA, and the current scope of work and cost estimate does not include analysis, collection, laboratory preparation, or documentation of identified cultural resources discovered during testing. If a cultural resource be discovered that has the potential to be a historic resource under CEQA, a scope and budget augmentation will be requested to address finds encountered during testing. ▪ Rincon is not responsible for delays due to weather, site conditions (e.g., prohibited access, flooding, fire, safety) or other conditions out of Rincon’s control. ▪ If additional effort is required beyond that identified in the work program outlined above, Rincon will perform the work on a time and materials basis with an amendment of the project cost and scope of work approved by Kitchell. These rates do not include overtime or penalties for missed meal periods. Should overtime be required, hours greater than eight (8) hours per day onsite or 40 hours per week onsite will be charged at a rate consistent with California state law (generally 1.5 times). As part of this work program, Rincon assumes a meal period will be allotted before the fifth hour of work. If a meal period is not allotted by the end of the fifth hour on any workday, an additional hour of labor will be charged. No additional services would be provided without receipt of prior written approval. Schedule Construction monitoring activities (Tasks 2, 3, 4, and optional Tasks 5 and 6) would proceed alongside the planned project construction schedule for Phase 1B. Similarly, construction monitoring activities (Tasks 7, 8, and 9) would proceed alongside the planned project construction schedule for Phase 2. Cost Rincon will complete the work scope for the tasks identified above to not exceed of $53,016 for Tasks 1 through 4 and $107,163 including all optional tasks. No other services will be provided without your express written authorization. Please see Table 1 below for a cost breakdown of each task. Table 1 Cost Summary Tasks Cost Phase 1B Task 1 Project Initiation and Project Management $4,165 Task 2 Nesting Bird Surveys and Reporting $3,265 Task 3 Archeological Construction Monitoring and Reporting for Phase 1B Task 3.1 Project Kickoff and WEAP Training $2,508 Task 3.2 Archaeological Monitoring $8,503 Task 4 Paleontological Construction for Phase 1B and Phase 2 Task 4.1 Paleontological Monitoring $8,503 Optional Task 5 Historic American Building Survey Documentation $19,609 Optional Task 6 Extended Phase 1 Testing Optional Task 6.1 Extended Phase I Testing Plan $4,744 Optional Task 6.2 Extended Phase I Fieldwork $23,204 Optional Task 6.3 Extended Phase 1 Reporting $6,590 Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 11 Phase 2 Task 7 Nesting Bird Surveys and Reporting $3,265 Task 8 Archaeological Construction Monitoring and Reporting for Phase 2 Task 8.1 Project Kickoff and WEAP Training – Task 8.2 Archaeological Monitoring $8,503 Task 8.3 Archaeological Monitoring Letter Report $3,739 Task 9 Paleontological Construction Monitoring for Phase 2 Task 9.1 Paleontological Monitoring $8,503 Task 9.2 Paleontological Negative Findings Letter Report $2,062 Total $107,163 All work will be performed on a time and materials basis in accordance with the work scope outlined above. Should the actual effort required to complete the tasks be less than anticipated, the amount billed will be less than the total cost outlined above. This cost estimate is in effect for a period of 30 days, during which time all of the elements of this proposal are fully negotiable to meet the needs of Kitchell. This work effort will be managed by Rincon Project Manager Dustin Merrick, M.A., Registered Professional Archaeologist (RPA), and Rincon Principal Christopher Duran, M.A., RPA. Both Mr. Merrick and Mr. Duran meet the Secretary of the Interior’s Professional Qualification Standards for prehistoric and historic archaeology (NPS 1983). Rincon is prepared to begin the work scope outlined above following receipt of a signed copy of this proposal as well as a retainer of $13,250 (approximately 25 percent of the proposed budget, not including optional tasks). Thank you for your consideration and for this opportunity to support your project. If you have any questions regarding this proposal, please contact Mr. Merrick at (805) 762-4064 or dmerrick@rinconconsultants.com, or Mr. Duran at (805) 644-4455, extension 22 or cduran@rinconconsultants.com. Sincerely, Rincon Consultants, Inc. Dustin Merrick, MA, RPA Project Manager/Archaeologist Christopher Duran, MA, RPA Principal/Senior Archaeologist Attachments Attachment 1 Reference List Attachment 2 Resumes of Key Personnel DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 8 RRM Design Group 1 SCOPE OF SERVICES TASK S.1: CONSTRUCTION STAKING This task will include the following: SUBTASK S.1A: PHASE 1B STAKING Rough Grade/Shoring Staking • One (1) set of rough grade and shoring offset stakes with grades to finish grade SUBTASK S.1B: PHASE 2 Sawcut • One (1) set of stakes will be provided for sawcut lines Sewer • One (1) set of offset stakes will be provided for sewer services with grades to flowline Water • One (1) set of offset stakes will be provided for water services with grades to finish the surface or top of curb Storm Drain • One (1) set of offset stakes at an interval of no greater than 50 feet, angle points and tees with grades to flowline. Double offsets will be provided for utility holes, drainage chambers and drain inlets with grades to flowline in/flowline out and rim/top of grate Building • One (1) set of offset stakes at grid lines 1 through 14, A, A.1, A.3, A.4, A.6, A.8, A.9, B, B.2, B.3, B.6, B.7, C, C.1, C.2, C.3, C.5, C.6, C.7, C.8, D, E for level one (1) with grades to finish surface Walls • One (1) set of offset stakes to centerline of wall with grades to top of footing or finish surface. • Street lights/transformers/vault • One (1) set of double offsets stakes to street lights transformers and vaults with grades top of curb or finish surface • Curb, flatwork • One (1) set of offset stakes to face of curb at an interval of no greater than 50 feet along straight sections and interval of no greater than 25 feet on curves sections, grade breaks, angle points and radius points with grades to top of curb or finish surface NOTE: Gas lines and conduits are not included in this proposal 2 MOVE-IN SCHEDULE: It will be the contractor’s responsibility to review the following move-in schedule with respect to possible phasing and overall project schedule. Any changes to this move-in schedule must be made prior to the award of contract. MOVE-IN SCHEDULE AND FEES Item No. Description No. of Move-ins 1 Rough Grade/Shoring 2 2 Sawcut 1 3, 4 Sewer/Water 1 5 Storm Drain 1 6 Building 1 7 Walls 1 8 Street Lights/Transformers/Vault 1 9 Curb, Flatwork 3 Total Moves to Site: 11 Deliverables: • Construction Stakes Fixed Fee: • Subtask S.1A: $3,600.00 (see footnote 1) This fee is based on prevailing wage • Subtask S.1B: $18,000.00 (see footnote 1) This fee is based on prevailing wage TASK S.2: RE-STAKING AND ADDITIONAL SERVICES All re-staking and services beyond the scope of work described herein will be performed on an hourly basis based on standard billing rates at the time the services are requested. Fee: Time and Materials • Hourly (see footnote 2) Fee Footnotes 1. Fixed fee tasks will be billed as the work progresses until the task is completed and the total amount stated in the contract for the task is invoiced. 2. Amounts billed for tasks shown as “Time and Materials” (T&M) will reflect actual hours worked. TOTAL RRM SERVICE FIX FEES: $21,600.00 Any work outside the scope of the original agreement between RRM Design Group and the Client and authorized by Client, is subject to the Terms and Conditions of the Prime Agreement. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 9 BILL RATE RANGES Subject to change effective March 1st each year  EXHIBIT A-1 SCHEDULE 1 Bill Rate Ranges Subject to change effective March 1st each year ARCHITECTURE INTERIOR DESIGN Architect 95$ -155$ Designer I 60$ -95$ Associate Manager of Architecture 140$ -200$ Designer II 70$ -120$ Design Director 145$ -240$ Interior Designer I 75$ -125$ Designer I 70$ -100$ Interior Designer II 90$ -150$ Designer II 80$ -125$ Intern 45$ -85$ Designer III 95$ -150$ Job Captain 105$ -165$ Intern 45$ -85$ Senior Interior Designer 110$ -195$ Job Captain 95$ -150$ Manager of Architecture 165$ -280$ LANDSCAPE ARCHITECTURE Principal 185$ -350$ Assistant Designer 70$ -110$ Project Architect 115$ -185$ Associate Designer 80$ -125$ Project Designer 115$ -185$ Designer 95$ -140$ Project Manager 115$ -185$ Design Director 135$ -235$ Senior Architect 135$ -235$ Intern 45$ -85$ Senior Designer 135$ -220$ Landscape Architect 95$ -145$ Senior Project Manager 135$ -240$ Manager of Landscape Architecture 150$ -245$ Principal 185$ -350$ ENGINEERING & SURVEYING Principal Landscape Architect 135$ -235$ Associate Engineer 115$ -170$ Senior Landscape Architect 115$ -175$ Construction Inspector 105$ -175$ Designer I 55$ -95$ PLANNING Designer II 75$ -125$ Assistant Planner 90$ -130$ Designer III (Structural only)90$ -135$ Associate Planner 105$ -170$ Engineer I 90$ -140$ Intern 45$ -85$ Engineer II 105$ -165$ GIS Specialist 80$ -150$ Land Surveyor 115$ -170$ Senior GIS Specialist 105$ -185$ Manager of Engineering Services 170$ -280$ Manager of Planning 175$ -265$ Manager of Surveying 155$ -235$ Principal 185$ -350$ Party Chief 90$ -150$ Principal Planner 165$ -250$ Principal 185$ -350$ Senior Planner 135$ -205$ Project Engineer 125$ -185$ Senior Urban Designer 135$ -210$ Project Manager 150$ -245$ Urban Designer 105$ -170$ Senior Associate Engineer 130$ -210$ Senior Designer 110$ -185$ CORPORATE SERVICES Senior Land Surveyor 135$ -210$ Administrative Assistant 60$ -95$ Senior Party Chief 115$ -185$ Administrative Coordinator 75$ -130$ Senior Project Engineer 140$ -230$ Assistant Office Manager 90$ -135$ Supervisor of Surveying 145$ -220$ Chief Executive Officer 195$ -500$ Survey Technician I 60$ -100$ File Clerk/Administrative Support 45$ -65$ Survey Technician II 75$ -115$ Marketing Assistant 45$ -85$ Survey Technician III 90$ -155$ Marketing Coordinator 65$ -115$ Surveying Crew Rates Marketing Manager 125$ -235$ REGULAR Marketing Specialist 90$ -155$ One person w/ GPS or Robotic Workstation 125$ -155$ Office Coordinator 75$ -130$ Two person 175$ -290$ Proposal Coordinator 80$ -140$ Three person 235$ -390$ Receptionist 45$ -80$ PREVAILING WAGE Senior Marketing Specialist 105$ -190$ One person w/ GPS or Robotic Workstation 150$ -180$ Two person 225$ -340$ Three person 325$ -490$      Rev 3/1/2022 3 CONSTRUCTION STAKING CONDITIONS: 1. It will be the contractor’s responsibility to inform RRM of changes in the Plans and Specifications that will affect the location of improvements. RRM will not be liable for misplaced improvements due to such changes that were not brought to our attention. Additional work caused by changes to the Plans and Specifications will be billed on an hourly basis. Also, any construction based on staking requested by the contractor based on unapproved plans and specifications will be done at the contractor’s sole risk. RRM will not be held liable for damages suffered by the contractor resulting from changes to the plans after RRM has set stakes. 2. To provide for reasonable preparation and organization, requests for staking should be made at least 48 hours in advance. Although RRM will make every effort to accommodate the unforeseen, no guarantee can be made without sufficient notice. 3. The contractor will be responsible for ensuring that the construction site is clear of debris and vehicles before ordering stakes. If staking is requested and site conditions do not allow the survey crew to work, you will be charged hourly for the time lost. This does not include poor site conditions caused by weather or other circumstances beyond the control of the contractor. 4. Any claim against RRM for losses or damages resulting from errors in staking (either horizontal or vertical) must be accompanied by proof of the actual location of the stake used and the information written on the lath (i.e., stakes must still be in place in the field when the claim is made). 5. The contractor will be responsible for discussing offsets for stakes prior to fieldwork. Otherwise, offsets will be chosen according to standard practice in this County, and any changes requested after the completion of staking will be billed to the contractor as an extra. 6. For your convenience, we will provide the job superintendent with a “construction staking request form” that must be signed before any extra work beyond the scope of the contract is done. Copies of this signed form will be sent with each monthly billing for your records. 7. Stakes shall be used only for their intended purpose. For example, rough grade stakes shall not be used for finish grading or building layout. 8. Three (3) consecutive points shown to be on the same slope rate must be used in common order that the contractor may detect any variation out of a perfect straight grade. In case any discrepancy is found, it shall be reported to the surveyor. Otherwise, the surveyor will not be responsible for any error in grade of the finished work. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 10 Earth Systems EARTH SYSTEMS | AUGUST 29, 2022 | CITY OF SAN LUIS OBISPO - CULTURAL ARTS DISTRICT PARKING STRUCTURE Earth Systems FEE BREAKDOWN Hours/Units Rate Total Earth Systems Fee Breakdown PROJECT: DATE: Hours/Units Rate Total PHASE IB - Cultural Arts District Parking Structure On-Site Improvements - 120 Work Day Duration Project Inspector 960 $170.00 $163,200.00 Subtotal Task 2 $163,200.00 Geotechnical Observation - Professional 40 $200.00 $8,000.00 Project Management/Quality Control 40 $225.00 $9,000.00 Grading Observation and Testing 320 $140.00 $44,800.00 Special Inspection - Shoring Wall 120 $145.00 $17,400.00 Reporting and Document Posting 40 $125.00 $5,000.00 Compaction Tests (per test)150 $10.00 $1,500.00 Mileage (per trip)170 $7.50 $1,275.00 Laboratory Testing - Per Fee Schedule (Allotment) $12,000.00 DIR/ECPR Posting 20 $90.00 $1,800.00 Subtotal Task 3 $100,775.00 Hours/Units Rate Total PHASE 2 - Project Inspector 3600 $170.00 $612,000.00 Subtotal Task 2 $612,000.00 Geotechnical Observation - Professional 40 $200.00 $8,000.00 Project Management/Quality Control 100 $225.00 $22,500.00 Grading Observation and Testing - 2023 280 $140.00 $39,200.00 Special Inspection - 2023 320 $145.00 $46,400.00 Grading Observation and Testing -2024 120 $140.00 $16,800.00 Special Inspection -2024 1600 $145.00 $232,000.00 Reporting and Document Posting 180 $125.00 $22,500.00 Compaction Tests (per test)150 $10.00 $1,500.00 Mileage (per trip)700 $7.50 $5,250.00 Laboratory Testing - Per Fee Schedule (Allotment) $25,000.00 DIR/ECPR Posting 90 $90.00 $8,100.00 Subtotal Task 3 $427,250.00 TOTAL TASK 2 $775,200.00 TOTAL TASK 3 $528,025.00 Task 2 - Construction Observations/Inspections Task 3 – Geotechnical and Materials Testing and Specialty Inspection City of San Luis Obispo - Cultural Arts District Parking Structure August 29, 2022 Cultural Arts District Parking Structure - 450 Work Day Duration Task 2 - Construction Observations/Inspections Task 3 – Geotechnical and Materials Testing and Specialty Inspection PHASE 1B - Cultural Arts District Parking Structure On-Site Improvements - 120 Work Day Duration Hours/Units Rate Total PHASE 2 - Cultural Arts District Parking Structure - 450 Work Day Duration DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 Certificate Of Completion Envelope Id: 39089CD97632471F8036895978DF81A8 Status: Completed Subject: Complete with DocuSign: Resident Engineer and Construction Management - Agreement.pdf Department: Supplier: Source Envelope: Document Pages: 93 Signatures: 4 Envelope Originator: Certificate Pages: 5 Initials: 0 Argelia Chang AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) 990 Palm Street San Luis Obispo, CA 93422 achang@slocity.org IP Address: 104.129.202.169 Record Tracking Status: Original 12/15/2022 11:55:07 AM Holder: Argelia Chang achang@slocity.org Location: DocuSign Signer Events Signature Timestamp Wendy Cohen wcohen@kitchell.com President Kitchell CEM, Inc. Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 104.220.121.60 Sent: 12/15/2022 11:58:04 AM Resent: 12/22/2022 4:26:12 PM Viewed: 12/23/2022 7:27:46 AM Signed: 12/23/2022 7:27:50 AM Electronic Record and Signature Disclosure: Accepted: 11/14/2022 12:37:10 PM ID: f59ea0e7-4d0e-4510-85e7-51548060a030 Randy Rominger rrominger@kitchell.com Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 174.87.132.185 Signed using mobile Sent: 12/23/2022 7:27:55 AM Viewed: 12/23/2022 2:07:31 PM Signed: 12/23/2022 2:08:04 PM Electronic Record and Signature Disclosure: Accepted: 12/23/2022 2:07:31 PM ID: ab204dce-8a22-46ed-ba83-0c357d81b18c Christine Dietrick cdietric@slocity.org Security Level: Email, Account Authentication (None) Signature Adoption: Drawn on Device Using IP Address: 104.129.202.90 Sent: 12/23/2022 2:08:09 PM Resent: 1/5/2023 8:01:21 AM Viewed: 1/5/2023 8:40:44 AM Signed: 1/5/2023 8:44:44 AM Electronic Record and Signature Disclosure: Accepted: 6/15/2020 2:16:11 PM ID: a47fa5a6-25c4-499a-ad2d-b3750c2fd621 Matt Horn mhorn@slocity.org Director of Public Works Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 47.32.158.228 Sent: 1/5/2023 8:44:50 AM Viewed: 1/5/2023 8:53:08 AM Signed: 1/5/2023 8:53:26 AM Electronic Record and Signature Disclosure: Signer Events Signature Timestamp Accepted: 11/7/2018 6:54:10 PM ID: abbb6413-5f03-483d-8739-5befeff5edf7 In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Argelia Chang achang@slocity.org Administrative Assistant III City of San Luis Obispo Security Level: Email, Account Authentication (None) Sent: 1/5/2023 8:53:30 AM Resent: 1/5/2023 8:53:38 AM Viewed: 1/5/2023 8:55:42 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Daniel Clancy dclancy@slocity.org Purchasing Analyst City of San Luis Obispo Security Level: Email, Account Authentication (None) Sent: 1/5/2023 8:53:32 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Manuel Guzman mguzman@slocity.org Security Level: Email, Account Authentication (None) Sent: 1/5/2023 8:53:33 AM Viewed: 1/5/2023 8:57:14 AM Electronic Record and Signature Disclosure: Accepted: 12/18/2020 9:05:30 AM ID: bda270ba-efa2-4807-a1cc-c5e70f600cee Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 12/15/2022 11:58:04 AM Certified Delivered Security Checked 1/5/2023 8:53:08 AM Signing Complete Security Checked 1/5/2023 8:53:26 AM Completed Security Checked 1/5/2023 8:53:33 AM Payment Events Status Timestamps Electronic Record and Signature Disclosure ELECTRONIC RECORD AND SIGNATURE DISCLOSURE From time to time, Carahsoft OBO City of San Luis Obispo (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through your DocuSign, Inc. (DocuSign) Express user account. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to these terms and conditions, please confirm your agreement by clicking the 'I agree' button at the bottom of this document. Getting paper copies At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. For such copies, as long as you are an authorized user of the DocuSign system you will have the ability to download and print any documents we send to you through your DocuSign user account for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. To indicate to us that you are changing your mind, you must withdraw your consent using the DocuSign 'Withdraw Consent' form on the signing page of your DocuSign account. This will indicate to us that you have withdrawn your consent to receive required notices and disclosures electronically from us and you will no longer be able to use your DocuSign Express user account to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through your DocuSign user account all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. Electronic Record and Signature Disclosure created on: 5/10/2017 10:25:58 AM Parties agreed to: Wendy Cohen, Randy Rominger, Christine Dietrick, Matt Horn, Manuel Guzman How to contact Carahsoft OBO City of San Luis Obispo: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: keriksso@slocity.org To advise Carahsoft OBO City of San Luis Obispo of your new e-mail address To let us know of a change in your e-mail address where we should send notices and disclosures electronically to you, you must send an email message to us at keriksso@slocity.org and in the body of such request you must state: your previous e-mail address, your new e-mail address. We do not require any other information from you to change your email address.. In addition, you must notify DocuSign, Inc to arrange for your new email address to be reflected in your DocuSign account by following the process for changing e-mail in DocuSign. To request paper copies from Carahsoft OBO City of San Luis Obispo To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an e-mail to keriksso@slocity.org and in the body of such request you must state your e-mail address, full name, US Postal address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with Carahsoft OBO City of San Luis Obispo To inform us that you no longer want to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your DocuSign account, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an e-mail to keriksso@slocity.org and in the body of such request you must state your e-mail, full name, IS Postal Address, telephone number, and account number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software Operating Systems: Windows2000? or WindowsXP? Browsers (for SENDERS): Internet Explorer 6.0? or above Browsers (for SIGNERS): Internet Explorer 6.0?, Mozilla FireFox 1.0, NetScape 7.2 (or above) Email: Access to a valid email account Screen Resolution: 800 x 600 minimum Enabled Security Settings: •Allow per session cookies •Users accessing the internet behind a Proxy Server must enable HTTP 1.1 settings via proxy connection ** These minimum requirements are subject to change. If these requirements change, we will provide you with an email message at the email address we have on file for you at that time providing you with the revised hardware and software requirements, at which time you will have the right to withdraw your consent. Acknowledging your access and consent to receive materials electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please verify that you were able to read this electronic disclosure and that you also were able to print on paper or electronically save this page for your future reference and access or that you were able to e-mail this disclosure and consent to an address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format on the terms and conditions described above, please let us know by clicking the 'I agree' button below. By checking the 'I Agree' box, I confirm that: • I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF ELECTRONIC RECORD AND SIGNATURE DISCLOSURES document; and • I can print on paper the disclosure or save or send the disclosure to a place where I can print it, for future reference and access; and • Until or unless I notify Carahsoft OBO City of San Luis Obispo as described above, I consent to receive from exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to me by Carahsoft OBO City of San Luis Obispo during the course of my relationship with you. 71 From:Kacsinta, Madeline Sent:Friday, October 27, 2023 10:48 AM To:Ryan Stefanek; Tally Richtsmeier; Tom Fee Subject:NEW PO - pending Attachments:RE and CM Services Cultural Arts District - Signed Agreement.pdf Hi Ryan, I just put through your new PO, and it is pending approval, but I wanted to give you a heads up. Below is a breakdown of the new PO. I am rolling in the Phase 2 scope as well. Attached is the original agreement that I am pulling from on the phase 2 scope. Original PO - Remining $239,859.03 Add Service 4 $237,600.00 Phase 2 Scope $3,436,094.00 TOTAL $ 3,913,553.03 I am hoping to get that PO number to you by end of today or Monday at the latest. Please let me know if you have any questions or concerns. Thank you, Madeline Kacsinta Engineer III Public Works 919 Palm, San Luis Obispo, CA 93401-3218 E MKacsint@slocity.org T 805.781.7094 slocity.org Stay connected with the City by signing up for e-notifications AGREEMENT THIS AGREEMENT is made and entered into in the City of San Luis Obispo on _________________ by and between the CITY OF SAN LUIS OBISPO, a municipal corporation, hereinafter referred to as City, and KITCHELL CEM, INC., hereinafter referred to as Consultant. W I T N E S S E T H WHEREAS, on July 28, 2022, requested proposals for Resident Engineer and Construction Management Services, Cultural Arts District Parking Structure, City Project Specification No. 90435-CM. WHEREAS, pursuant to said request, Consultant submitted a proposal that was accepted by City for said services. NOW THEREFORE, in consideration of their mutual promises, obligations and covenants hereinafter contained, the parties hereto agree as follows: 1. Contract Term. The term of this agreement shall be from the date this Agreement is made and entered, as first written above until all work has been completed. 2. Work Delays. Should the Consultant be obstructed or delayed in the work required to be done hereunder by changes in the work or by any default, act, or omission of the City, or by strikes, fire, earthquake, or any other Act of God, or by the inability to obtain materials, equipment, or labor due to federal government restrictions arising out of defense or war programs, then the time of completion may, at the City's sole option, be extended for such periods as may be agreed upon by the City and the Consultant. In the event that there is insufficient time to grant such extensions prior to the completion date of the contract, the City may, at the time of acceptance of the work, waive liquidated damages that may have accrued for failure to complete on time, due to any of the above, after hearing evidence as to the reasons for such delay, and making a finding as to the causes of same. 3. Termination for Cause. If, during the term of the contract, the City determines that the Consultant is not faithfully abiding by any term or condition contained herein, the City may notify the Consultant in writing of such defect or failure to perform. This notice must give the Consultant a 10 (ten) calendar day notice of time thereafter in which to perform said work or cure the deficiency. If the Consultant has not performed the work or cured the deficiency within the ten days specified in the notice, such shall constitute a breach of the contract and the City may terminate the contract immediately by written notice to the Consultant to said effect. Thereafter, neither party shall have any further duties, obligations, responsibilities, or rights under the contract except, however, any and all obligations of the Consultant's surety shall remain in full force and effect, and shall not be extinguished, reduced, or in any manner waived by the termination thereof. In said event, the Consultant shall be entitled to the reasonable value of its services performed from the beginning date in which the breach occurs up to the day it received DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 1/5/2023 | 8:53 AM PST the City's Notice of Termination, minus any offset from such payment representing the City's damages from such breach. "Reasonable value" includes fees or charges for goods or services as of the last milestone or task satisfactorily delivered or completed by the Consultant as may be set forth in the Agreement payment schedule; compensation for any other work, services or goods performed or provided by the Consultant shall be based solely on the City's assessment of the value of the work-in-progress in completing the overall workscope. The City reserves the right to delay any such payment until completion or confirmed abandonment of the project, as may be determined in the City's sole discretion, so as t o permit a full and complete accounting of costs. In no event, however, shall the Consultant be entitled to receive in excess of the compensation quoted in its proposal. 4. Termination for Convenience. The City also reserves the right to terminate the contract for convenience, providing a 30 (thirty) calendar day notice, at any time upon a determination by the Director that termination of the contract is in the best interest of the City. Upon termination notice from the City, Consultant must, unless otherwise directed, cease work and follow the City’s directions as to work in progress and finished goods. For termination of any services pursuant to this Agreement, the City’s liability will be the lesser of a reasonable price for the services rendered prior to termination. 5. Ability to Perform. The Consultant warrants that it possesses, or has arranged through subcontracts, all capital and other equipment, labor, materials, and licenses necessary to carry out and complete the work hereunder in compliance with any and all applicable federal, state, county, city, and special district laws, ordinances, and regulations. 6. Sub-contract Provisions. No portion of the work pertinent to this contract shall be subcontracted without written authorization by the City, except that which is expressly identified in the Consultant’s proposal. Any substitution of sub-consultants must be approved in writing by the City. For any sub-contract for services in excess of $25,000, the subcontract shall contain all provisions of this agreement. 7. Contract Assignment. The Consultant shall not assign, transfer, convey or otherwise dispose of the contract, or its right, title or interest, or its power to execute such a contract to any individual or business entity of any kind without the previous written consent of the City. 8. Inspection. The Consultant shall furnish City with every reasonable opportunity for City to ascertain that the services of the Consultant are being performed in accordance with the requirements and intentions of this contract. All work done and all materials furnished, if any, shall be subject to the City's inspection and approval. The inspection of such work shall not relieve Consultant of any of its obligations to fulfill its contract requirements. 9. Record Retention and Audit. For the purpose of determining compliance with various laws and regulations as well as performance of the contract, the Consultant and sub - consultants shall maintain all books, documents, papers, accounting records and other evidence pertaining to the performance of the contract, including but not limited to the cost of administering the contract. Materials shall be made available at their respective offices at all reasonable times during the contract period and for three years from the date of final DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 payment under the contract. Authorized representatives of the City shall have the option of inspecting and/or auditing all records. For Federally funded projects, access to records shall also include authorized representatives of the State and Federal government. Copies shall be furnished if requested. 10. Conflict of Interest. The Consultant shall disclose any financial, business, or other relationship with the City that may have an impact upon the outcome of this contract, or any ensuing City construction project. The Consultant shall also list current clients who may have a financial interest in the outcome of this contract, or any ensuing City construction project which will follow. The Consultant staff shall provide a Conflict of Interest Statement where determined necessary by the City. The Consultant covenants that it presently has no interest, and shall not acquire any interest—direct, indirect or otherwise—that would conflict in any manner or degree with the performance of the work hereunder. The Consultant further covenants that, in the performance of this work, no sub-consultant or person having such an interest shall be employed. The Consultant certifies that no one who has or will have any financial interest in performing this work is an officer or employee of the City. It is hereby expressly agreed that, in the performance of the work hereunder, the Consultant shall at all times be deemed an independent Consultant and not an agent or employee of the City. 11. Rebates, Kickbacks or Other Unlawful Consideration. The Consultant warrants that this contract was not obtained or secured through rebates, kickbacks or other unlawful consideration, either promised or paid to any City employee. For breach or violation of the warranty, the City shall have the right in its discretion; to terminate the contract without liability; to pay only for the value of the work actually performed; to deduct from the contract price; or otherwise recover the full amount of such rebate, kickback or other unlawful consideration. 12. Covenant Against Contingent Fees. The Consultant warrants by execution of this contract that no person or selling agency has been employed, or retained, to solicit or secure this contract upon an agreement or understanding, for a commission, percentage, brokerage, or contingent fee, excepting bona fide employees or bona fide established commercial or selling agencies maintained by the Consultant for the purpose of securing business. For breach or violation of this warranty, the City has the right to annul this contract without liability; pay only for the value of the work actually performed, or in its discretion, to deduct from the contract price or consideration, or otherwise recover the full amount of such commission, percentage, brokerage, or contingent fee. 13. Compliance with Laws and Wage Rates. The Consultant shall keep itself fully informed of and shall observe and comply with all applicable state and federal laws and county and City of San Luis Obispo ordinances, regulations and adopted codes during its performance of the work. This includes compliance with prevailing wage rates and their payment in accordance with California Labor Code. For purposed of this paragraph, “construction” includes work performed during the design and preconstruction phases of construction, including but not limited to, inspection and land surveying work. 14. Payment of Taxes. The contract prices shall include full compensation for all taxes that the Consultant is required to pay. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 15. Permits, Licenses and Filing Fees. The Consultant shall procure all permits and licenses, pay all charges and fees, and file all notices as they pertain to the completion of the Consultant’s work. The City will pay all application fees for permits required for the completion of the project including building and regulatory permit application fees. Consultant will provide a 10 day notice for the City to issue a check. 16. Safety Provisions. The Consultant shall conform to the rules and regulations pertaining to safety established by OSHA and the California Division of Industrial Safety. 17. Public and Employee Safety. Whenever the Consultant's operations create a condition hazardous to the public or City employees, it shall, at its expense and without cost to the City, furnish, erect and maintain such fences, temporary railings, barricades, lights, signs and other devices and take such other protective measures as are necessary to prevent accidents or damage or injury to the public and employees. 18. Preservation of City Property. The Consultant shall provide and install suitable safeguards, approved by the City, to protect City property from injury or damage. If City property is injured or damaged resulting from the Consultant's operations, it shall be replaced or restored at the Consultant's expense. The facilities shall be replaced or restored to a condition as good as when the Consultant began work. 19. Immigration Act of 1986. The Consultant warrants on behalf of itself and all sub- consultants engaged for the performance of this work that only persons authorized to work in the United States pursuant to the Immigration Reform and Control Act of 1986 and other applicable laws shall be employed in the performance of the work hereunder. 20. Consultant Non-Discrimination. In the award of subcontracts or in performance of this work, the Consultant agrees that it will not engage in, nor permit such sub-consultants as it may employ, to engage in discrimination in employment of persons on any basis prohibited by State or Federal law. 21. Accuracy of Specifications. The specifications for this project are believed by the City to be accurate and to contain no affirmative misrepresentation or any concealment of fact. Consultants are cautioned to undertake an independent analysis of any test results in the specifications, as City does not guaranty the accuracy of its interpretation of test results contained in the specifications package. In preparing its proposal, the Consultant and all sub-consultants named in its proposal shall bear sole responsibility for proposal preparation errors resulting from any misstatements or omissions in the specifications that could easily have been ascertained by examining either the project site or accurate test data in the City's possession. Although the effect of ambiguities or defects in the specifications will be as determined by law, any patent ambiguity or defect shall give rise to a duty of Consultant to inquire prior to proposal submittal. Failure to so inquire shall cause any such ambiguity or defect to be construed against the Consultant. An ambiguity or defect shall be considered patent if it is of such a nature that the Consultant, assuming reasonable skill, ability and diligence on its part, knew or should have known of the existence of the ambiguity or defect. Furthermore, failure of the Consultant or sub - consultants to notify City in writing of specification defects or ambiguities prior to proposal DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 submittal shall waive any right to assert said defects or ambiguities subsequent to submittal of the proposal. To the extent that these specifications constitute performance specifications, the City shall not be liable for costs incurred by the successful Consultant to achieve the project’s objective or standard beyond the amounts provided therefor in the proposal. In the event that, after awarding the contract, any dispute arises as a result of any actual or alleged ambiguity or defect in the specifications, or any other matter whatsoever, Consultant shall immediately notify the City in writing, and the Consultant and all sub- consultants shall continue to perform, irrespective of whether or not the ambiguity or defect is major, material, minor or trivial, and irrespective of whether or not a change order, time extension, or additional compensation has been granted by City. Failure to provide the hereinbefore described written notice within one (1) working day of Consultant's becoming aware of the facts giving rise to the dispute shall constitute a waiver of the right to assert the causative role of the defect or ambiguity in the plans or specifications concerning the dispute. 22. Hold Harmless and Indemnification. (a) Non-design, construction Professional Services: To the extent the Scope of Services involve a “construction contract” as that phrase is used in Civil Code Section 2783, this paragraph shall apply in place of paragraph A. To the fullest extent permitted by law (including, but not limited to California Civil Code Sections 2782 and 2782.8), Consultant shall indemnify, defend, and hold harmless the City, and its elected officials, officers, employees, volunteers, and agents (“City Indemnitees”), from and against any and all causes of action, claims, liabilities, obligations, judgments, or damages, including reasonable legal counsels’ fees and costs of litigation (“claims”), to the extent caused by the Consultant’s performance or Consultant’s failure to perform its obligations under this Agreement or out of the operations conducted by Consultant, except for such loss or damage arising from the active negligence, sole negligence or willful misconduct of the City. In the event the City Indemnitees are made a party to any action, lawsuit, or other adversarial proceeding arising from Consultant’s performance of this Agreement, the Consultant shall provide a defense to the City Indemnitees or at the City’s option, reimburse the City Indemnitees their costs of defense, including reasonable legal fees, incurred in defense of such claims. (b) The review, acceptance or approval of the Consultant’s work or work product by any indemnified party shall not affect, relieve or reduce the Consultant’s indemnification or defense obligations. This Section survives completion of the services or the termination of this contract. The provisions of this Section are not limited by and do not affect the provisions of this contract relating to insurance. 23. Non-Exclusive Contract. The City reserves the right to contract for the services listed in this proposal from other consultants during the contract term. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 24. Standards. Documents shall conform to City Standards and City furnished templates shall be used. 25. Consultant Endorsement. Technical reports, plans and specifications shall be stamped and signed by the Consultant where required. 26. Required Deliverable Products and Revisions. Deliverables include all items necessary to provide the work scope outlined in the Request for Proposal, incorporated herein by reference and attached hereto as Exhibit A. City staff will review any documents or materials provided by the Consultant and, where necessary, the Consultant will respond to staff comments and make such changes as deemed appropriate. 27. Ownership of Materials. Upon completion of all work under this contract, ownership and title to all reports, documents, plans, specifications, and estimates produced as part of this contract will automatically be vested in the city and no further agreement will be necessary to transfer ownership to the City. The Consultant shall furnish the City all necessary copies of data needed to complete the review and approval process. It is understood and agreed that all calculations, drawings and specifications, whether in hard copy or machine readable form, are intended for one-time use in the construction of the project for which this contract has been entered into. The Consultant is not liable for claims, liabilities, or losses arising out of, or connected with the modification, or misuse by the City of the machine-readable information and data provided by the Consultant under this agreement. Further, the Consultant is not liable for claims, liabilities, or losses arising out of, or connected with any use by City of the project documentation on other projects, except such use as may be authorized in writing by the Consultant. 28. Release of Reports and Information. Any reports, information, data, or other material given to, prepared by or assembled by the Consultant as part of the work or serv ices under these specifications shall be the property of City and shall not be made available to any individual or organization by the Consultant without the prior written approval of the City. The Consultant shall not issue any news release or public relations item of any nature, whatsoever, regarding work performed or to be performed under this contract without prior review of the contents thereof by the City and receipt of the City’s written permission. 29. Copies of Reports and Information. If the City requests additional copies of reports, drawings, specifications, or any other material in addition to what the Consultant is required to furnish in limited quantities as part of the work or services under these specifications, the Consultant shall provide such additional copies as are requested, and City shall compensate the Consultant for the costs of duplicating of such copies at the Consultant's direct expense. 30. Attendance at Meetings and Hearings. Consultant shall attend as many "working" meetings with staff as necessary in performing workscope tasks. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 31. Requests for Review. The Consultant shall respond to all requests for submittal review or contractor RFI’s within two weeks of receipt of the information from the City. 32. Project Proposal Submittal. Upon completion of the project scoping meeting, the Consultant shall submit a proposed workscope, compensation and schedule within 10 working days. The cost proposal shall include all costs including miscellaneous direct cost items. 33. Consultant Invoices. The Consultant shall deliver a monthly invoice to the City, itemized by project work phase or, in the case of on-call contracts, by project title. Invoice must include a breakdown of hours billed and miscellaneous charges and any sub-consultant invoices, similarly broken down, as supporting detail. 34. Payment. For providing services as specified in this Agreement, City will pay and Consultant shall receive therefore compensation in a total sum not to exceed the individual agreed upon project fee. Should the Consultant’s designs, drawings or specifications contain errors or deficiencies, the Consultant shall be required to correct them at no increase in cost to the City. For on-call services, the City will pay and the Consultant shall receive compensation as agreed to on a project by project basis. The Consultant shall be reimbursed for hours worked at the hourly rates attached to this agreement. Hourly rates include direct salary costs, employee benefits, overhead and fee. In addition, the Consultant shall be reimbursed for direct costs other than salary and vehicle cost that have been identified and are attached to this agreement. The Consultant’s personnel shall be reimbursed for per diem expenses at a rate not to exceed that currently authorized for State employees under State Department of Personnel Administration rules. 35. Payment Terms. The City's payment terms are 30 days from the receipt and approval by the City of an original invoice and acceptance by the City of the materials, supplies, equipment or services provided by the Consultant (Net 30). 36. Resolution of Disputes. Any dispute, other than audit, concerning a question of fact arising under this contract that is not disposed of by agreement shall be decided by a committee consisting of the City’s Project Manager and the City Director of Public Works, who may consider written or verbal information submitted by the Consultant. Not later than thirty days after completion of all deliverables necessary to complete the p lans, specifications and estimate, the Consultant may request review by the City Council of unresolved claims or disputes, other than audit, in accordance with Chapter 1.20 Appeals Procedure of the Municipal Code. Any dispute concerning a question of fact arising under an audit of this contract that is not disposed of by agreement, shall be reviewed by the City’s Chief Fiscal Officer. Not later than 30 days after issuance of the final audit report, the Consultant may request a review by the City’s Chief Fiscal Officer of unresolved audit issues. The request for review must be submitted in writing. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 Neither the pendency of a dispute, nor its consideration by the City will excuse the consultant from full and timely performance in accordance with the terms of this contract. 37. Disadvantaged Business Enterprise (DBE) Use for Federally Funded Projects. This agreement is subject to Title 49, Part 26 Code of Federal Regulations entitled “Participation by Disadvantaged Business Enterprises in Department of Transportation Financial Assistance Programs” when project work is for a federally funded project. In order to ensure the State Department of Transportation achieves its federally mandated statewide overall DBE goal, the City encourages the participation of DBEs as defined in 49 CFR 26 in the performance of this agreement. The City will make a determination on a project by project basis for reasonably expected DBE participation to compete for the sub-consulting opportunities in this agreement. The Consultant is responsible to be fully informed regarding the requirements of 49 CFR, Part 26. The Consultant shall notify the City of any changes to its anticipated DBE participation on federally funded projects, maintain records of DBE usage and complete and submit to the City the final report of DBE utilization prior to receiving final payment. Records shall show the name and business address of each DBE and the total dollar amount actually paid to each. The Consultant shall pay all sub-consultants within 10 calendar days from receipt of each payment made to the Consultant by the City. The Consultant shall carry out applicable requirements of Title 49 CFR 26 in the award and administration of US DOT assisted agreements. Failure by the Consultant to carry out these requirements is a material breach of this agreement, which may result in the termination of this agreement or such other remedy as the City deems appropriate. 38. Agreement Parties. City: Matt Horn Public Works Director City of San Luis Obispo 919 Palm Street San Luis Obispo, CA 93401 Consultant: Randy Rominger 1540 Marsh Street Stan Luis Obispo, CA 93401 All written notices to the parties hereto shall be sent by United States mail, postage prepaid by registered or certified mail addressed as shown above. 39. Incorporation by Reference. City Request for Proposals Specification No. 90435-CM dated July 28, 2022, Consultant's proposal dated September 1, 2022, and Consultant’s Revised Fee Proposal dated November 9, 2022, are hereby incorporated in and made a part of this Agreement and are attached hereto as Exhibits A, B, and C respectively. Should there be any conflict between terms set forth in the City Request for Proposals Specification No. 90435-CM and Consultant’s proposal dated September 1, 2022, or Revise Fee Proposal dated November 9, 2022, the terms in this agreement and City Request for Proposals Specification No. 90435-CM will govern. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 40. Amendments. Any amendment, modification or variation from the terms of this Agreement shall be in writing and shall be effective only upon approval by the City Engineer. 41. Working Out of Scope. If, at any time during the project, the consultant is directed to do work by persons other than the City Project Manager and the Consultant believes that the work is outside of the scope of the original contract, the Consultant shall inform the Project Manager immediately. If the Project Manager and Consultant both agree that the work is outside of the project scope and is necessary to the successful completion of the project, then a fee will be established for such work based on Consultant's hourly billing rates or a lump sum price agreed upon between the City and the Consultant. Any extra work performed by Consultant without prior written approval from the City Project Manager shall be at Consultant's own expense. 42. Complete Agreement. This written agreement, including all writings specifically incorporated herein by reference, shall constitute the complete agreement between the parties hereto. No oral agreement, understanding or representation not reduced to writing and specifically incorporated herein shall be of any force or effect, nor shall any such oral agreement, understanding or representation be binding upon the parties hereto. For and in consideration of the payments and agreements hereinbefore mentioned to be made and performed by City, Consultant agrees with City to do everything required by this Agreement, the said specification and incorporated documents. Authority to Execute Agreement. Both City and Consultant do covenant that each individual executing this agreement on behalf of each party is a person duly authorized and empowered to execute Agreements for such party. IN WITNESS WHEREOF, the parties hereto have caused this instrument to be executed the day and year first above written. CITY OF SAN LUIS OBISPO: CONSULTANT: ________________________________ Kitchell CEM, Inc. _______________________________ Matt Horn, Director of Public Works Wendy Cohen President APPROVED AS TO FORM: _______________________________ Christine Dietrick, City Attorney ________________________________ Randy Rominger Principal-in-Charge DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 EXHIBIT A DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 REQUEST FOR PROPOSALS RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES CULTURAL ARTS DISTRICT PARKING STRUCTURE CITY PROJECT NO. 90435-CM July 2022 The City of San Luis Obispo (City) is currently soliciting proposals for Resident Engineer and Construction Management Services for its Cultural Arts District Parking Structure Project. Each proposal must specify each and every item as set forth in the attached specifications. Any and all exceptions must be clearly stated in the proposal. Failure to set forth any item in the specifications without taking exception may be grounds for rejection. The City reserves the right to reject any and all proposals and to waive any irregularity or informality in any proposal or in the RFP process, as long as, in the judgment of the City, such action will not negate fair competition and will permit proper comparative evaluation of the proposals submitted. This RFP is posted on the City’s website at: https://www.slocity.org/doing-business/doing-business-with-the-city/bids-and-proposals Any changes, additions, or deletions to this RFP will be in the form of written addenda issued by the City. Any addenda will be posted on the website. Prospective proposers must check the website for addenda or other relevant new information during the response period. The City is not responsible for the failure of any prospective proposer to receive such addenda. All addenda so issued will become a part of this RFP. If your firm is interested and qualified, please submit the following in separately sealed envelopes plainly marked with the proposal title, specification number, Consultant name, and time and date of the proposal opening. All proposals must be submitted to the front counter at the Public Works Department, 919 Palm Street, by, 2:00 p.m. on September 1st, 2022. If you have any questions about the proposal process, please contact the Engineer directly. MANUEL GUZMAN Construction Engineering Manager mguzman@slocity.org EXHIBIT A DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 2  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT Table of Contents I. INTRODUCTION ..............................................................................................4   PURPOSE ............................................................................................................................................... 4   PROJECT LOCATION ........................................................................................................................... 4   BACKGROUND ...................................................................................................................................... 4   CONSTRUCTION CONTRACT DURATION .......................................................................................... 5  II. SCHEDULE AND SUBMITTAL ............................................................................6  A. RFP SCHEDULE .................................................................................................................................... 6  B. PROPOSAL SUBMITTAL ....................................................................................................................... 6  III. GENERAL INSTRUCTIONS ................................................................................7  A. CITY RIGHTS & OPTIONS ..................................................................................................................... 7  B. CHANGES TO THE RFP ........................................................................................................................ 8  C. COMMUNICATIONS ............................................................................................................................... 8  D. INSURANCE ........................................................................................................................................... 9  E. EXCEPTIONS & DEVIATIONS ............................................................................................................. 10  F. AWARD AND STANDARD AGREEMENT ........................................................................................... 10  G. PREVAILING WAGE............................................................................................................................. 10  H. FAIR EMPLOYMENT PRACTICE ........................................................................................................ 10  I. PROTEST OF AWARD ......................................................................................................................... 11  IV. PROPOSAL FORMAT ...................................................................................... 12   COVER LETTER ................................................................................................................................... 12   FIRM QUALIFICATIONS ...................................................................................................................... 12   ORGANIZATION AND APPROACH ..................................................................................................... 12   SCOPE OF WORK ............................................................................................................................... 13   CONTRACT AGREEMENT .................................................................................................................. 13   REFERENCES ...................................................................................................................................... 13   FEE PROPOSAL .................................................................................................................................. 13   OPTIONAL – ADDITIONAL SUPPORTING INFORMATION ............................................................... 14  V. CONSULTANT EVALUATION & CONTRACT AWARD ........................................ 15   PROPOSAL RESPONSIVENESS ........................................................................................................ 15   EVALUATION PROCEDURES ............................................................................................................. 15   CONTRACT AWARD ............................................................................................................................ 16  VII. APPENDICIES ................................................................................................. 17  APPENDIX A – SCOPE OF SERVICES ......................................................................... 17  DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 3  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT APPENDIX B – VICINITY MAP .................................................................................. 23  APPENDIX C – SAMPLE CONTRACT ......................................................................... 24  APPENDIX D – QUALITY ASSURANCE PROGRAM .................................................... 34  APPENDIX E – CONTRACT DOCUMENTS FOR PHASE 1B OF THE CULTURAL ARTS  DISTRICT PARKING STRUCTURE .............................................................................. 35  APPENDIX F – CONTRACT DOCUMENTS FOR PHASE 2 OF THE CULTURAL ARTS  DISTRICT PARKING STRUCTURE .............................................................................. 36  APPENDIX G1 –MITIGATION MONITORING AND REPORTING PROGRAM ............... 37  APPENDIX G2 – PHASE 1B AND 2 MITIGATION AND MONITORING PLAN ............... 37  APPENDIX H – CURRENT PROJECT  DELIVERY SCHEDULE ........................................ 38  DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 4  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT VI. INTRODUCTION PURPOSE The purpose of this Request for Proposal (RFP) is to provide interested parties with sufficient information regarding the resident engineer and construction management services the City of San Luis Obispo Department of Public Works (City) is seeking for its Cultural Arts District Parking Structure Project (Project). This information is intended to enable interested parties to prepare and submit proposals for a single construction management and resident engineer team to manage the construction for this Project. See Scope of Services attached as Appendix A. PROJECT LOCATION The Project is located on the corner of Palm Street and Nipomo Street. See Vicinity Map Attached as Appendix B. BACKGROUND The proposed scope is to provide construction management and resident engineer services to manage the Cultural Arts District Parking Structure Project. It is anticipated that a single team will work together to manage the demolition of an existing parking lot and buildings (the “Existing Site”) and construction of a new cast-in-place parking facility consisting of at least 399 parking spaces (the “Cultural Arts District Parking Structure”) in downtown San Luis Obispo (the “Project”). Two future buildings are planned immediately adjacent to the Cultural Arts District Parking Structure: a “liner building” along the Nipomo Street frontage and part of the Palm Street frontage; and a theater at the corner of Monterey and Nipomo Streets. Although neither of these buildings are part of this scope of work, they both have some shared access points and utilities that need to be coordinated as a part of this Project. The Project will be constructed in phases, under separate construction contracts, as follows: 1. Phase 1A: Dry Utility Undergrounding. This Project will underground PG&E and telecom facilities crossing the site. Note: This contract inspection and management will not be part of this work scope. 2. Phase 1B: Cultural Arts District Parking Structure On-Site Improvement Plans. Phase 1 includes site structure and parking lot demolition, grading, and permanent shoring work in preparation for garage construction in Phase 2. 3. Phase 2: Cultural Arts District Parking Structure. Phase 2 includes vertical construction of the parking structure, including frontage improvements and utility work. Phase 1B: On-Site Improvements, generally consists of: 1) Demolition and disposal of three residential lots and structures located at 633 Palm Street, 610 Monterey Street, and 614 Monterey Street 2) Demolition and site clearing of existing asphalt parking lot, including paving, landscaping, meters, and miscellaneous improvements. 3) Grading of pad area for Phase 2 4) Construction of permanent shoring along the north-east property line. 5) Existing tree protection. Phase 2: Cultural Arts District Parking Structure, generally consists of: 1) A new five-level cast-in-place parking structure with an approximately 32,000sf footprint (approximately 163,000sf gross), and approximately 399 total parking spaces. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 5  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT a. Level 1 (the ground floor) consists of standard parking, accessible parking, EV parking, and bicycle parking. b. Level 2 consists of standard parking, accessible parking, and EV parking. c. Level 3 and Level 4 consist of standard parking and accessible parking. d. Level 5 (the roof deck) consists of standard parking and accessible parking, with photovoltaic overhead panels. e. Two elevators. f. Automated revenue/payment system. 2) On-site and off-site improvements including: a. Off-site road improvements including new bulb-outs and decorative crosswalks and intersections. b. Construction of curb, gutter, driveway aprons, and sidewalk. c. Underground utilities and stormwater chambers. d. Pedestrian entry plazas (temporary where installed with future SLOREP Theatre Improvements). e. Planting and irrigation. Note that the Phase 2 contract will include provisions for the contractor to provide an office space and a conference room for the construction management team and provide electricity, phone, internet, water and sanitation services. CONSTRUCTION CONTRACT DURATION Phase 1B of the Project is planned to begin construction in Spring 2023 and last for approximately 6 months, not including contract close-out. Phase 2 of the Project is planned to begin construction in Fall 2023 and last for approximately 23 months, not including contract close-out. The above durations only reflect anticipated duration of the construction contract work and must be appropriately accounted for in the proposal. As part of the proposal, a general review of construction contract duration may be performed at the proposing firm’s option. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 6  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT VII. SCHEDULE AND SUBMITTAL A. RFP SCHEDULE The following represents the tentative schedule for this RFP. Any change in the scheduled dates for the Proposal Submission Deadline, or Interviews will be advertised in the form of an addendum to this RFP. The schedule for other milestones dates may be adjusted without notice. RFP Schedule Date Issued July 30, 2022 Proposal Submission Date September 1st, 2022, at 2:00 PM Evaluation of Proposals Previous + 4 Weeks Top 3 Ranked Consultants Interviewed Previous + 2 Weeks Finalize Staff Recommendation Previous + 1 Week Award by Public Works Director Previous + 1 Week Notice to Proceed 1 day from Award B. PROPOSAL SUBMITTAL If your firm is interested and qualified, please submit a proposal in a sealed envelope by 2:00 p.m. on September 1st, 2022. The proposal must be a maximum of 15 pages total, not including staff resumés and fee proposal (see Section IV.G for fee proposal requirements). DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 7  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT VIII. GENERAL INSTRUCTIONS A. CITY RIGHTS & OPTIONS 1. All proposals must be submitted to the City’s Public Works Department, 919 Palm Street, in sealed envelopes no later than 2:00 p.m. on September 1st, 2022. Late proposals will not be considered. 2. All costs incurred in the preparation and submission of proposals and related documentation will be borne solely by the proposer. 3. An impartial Selection Committee will develop a ranking of consultant proposals and recommend the most qualified consultant for tentative selection and contract negotiations. 4. The cost proposal of the top ranked consultant will be reviewed and may be negotiated with the consultant. Upon successful contract negotiations, staff will recommend a contract be awarded. 5. Consultant fees will be negotiated with the selected firm and finalized prior to the award of contract. 6. This RFP does not constitute an offer of employment or to contract for services. In addition, this RFP does not commit the City to negotiate a contract. The issuance of this RFP does not constitute an agreement by the City that any subsequent selection processes will occur, or that any contract will be entered into by the City. 7. The City has the right to use any or all ideas or concepts presented in any proposal or interview without restriction, without conversation to all applicants. 8. The City reserves the option to accept or reject any or all proposals, wholly or in part, received by reason of this request, and make more than one award, or no award, as the best interests of the City may appear. 9. All documents submitted to the City in response to this RFP will become the exclusive property of the City. 10. The City reserves the right to award the contract to the firm that presents the proposal which, in the judgment of the City, best accomplishes the desired results. 11. Any contract awarded pursuant to this Request for Proposal will incorporate the requirements and specifications contained in this Request for Proposal. All information presented in a proposer’s proposal will be considered binding upon selection of the successful proposer, unless otherwise modified and agreed to by the City during subsequent negotiations. 12. The City reserves the right to remedy technical errors, modify the published scope of services and approve or disapprove the use of all sub-consultants. 13. The contract will expire upon full completion of the scope of work. 14. Under the provisions of the California Public Records Act (the “Act”), Government Code section 6252 et seq., all “public records” (as defined in the Act) of a local agency, such as the City, must be available for inspection and copying upon the request of any person. Under the Act, the City may be obligated to provide a copy of any and all responses to this RFP, if such requests are made after the contract is awarded. One exception to this required disclosure is information which fits within the definition of a confidential trade secret [Government Code section 6254(k)] or contains other technical, financial or other data whose public disclosure could cause injury to the proposer’s competitive position. If DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 8  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT any proposer believes that information contained in its response to this RFP should be protected from disclosure, the proposer MUST specifically identify the pages of the response that contains the information by properly marking the applicable pages and inserting the following notice in the front of its response: NOTICE: The data on pages _ of this response identified by an asterisk (*) contain technical or financial information, which are trade secrets, or information for which disclosure would result in substantial injury to the proposer’s competitive position. Proposer requests that such data be used only for the evaluation of the response but understands that the disclosure will be limited to the extent the City considers proper under the law. If an agreement is entered into with the proposer, the City shall have the right to use or disclose the data as provided in the agreement, unless otherwise obligated by law. The City will not honor any attempt by proposer to designate its entire proposal as proprietary. If there is any dispute, lawsuit, claim or demand as to whether information within the response to the RFP is protected from disclosure under the Act, proposer shall indemnify, defend, and hold harmless, the City arising out of such dispute, lawsuit, claim or demand. 15. The proposing firm warrants that no official or employee of the City has an interest, has been employed or retained to solicit or aid in the procuring of a contract resulting from this RFP, if any, and further warrants that such person will not be employed in the performance of such contract without immediate written notice to the City. 16. Firms submitting a proposal shall warrant that their offer is made without any previous understanding, agreement, or connection with any person, firm, or corporation submitting a separate proposal for the same Project and is in all respects fair, without outside control, collusion, fraud, or otherwise illegal action. This condition will not apply to proposals which are submitted by firms who have partnered with others to submit a cooperative proposal that clearly identifies a primary contractor and the associated sub-contractors. 17. Unforeseen additional items and/or services may be required. The City therefore reserves the right to negotiate with the successful proposer for additional items and/or services beyond what is described in Appendix A to be added to the final contract. B. CHANGES TO THE RFP This RFP is posted on the City’s website at: https://www.slocity.org/doing-business/doing-business-with-the-city/bids-and-proposals Any changes, additions, or deletions to this RFP will be in the form of written addenda issued by the City. Any addenda will be posted on the website. Prospective proposers must check the website for addenda or other relevant new information during the response period. The City is not responsible for the failure of any prospective proposer to receive such addenda. All addenda so issued will become a part of this RFP. Any proposer who has already submitted their proposal and desires to make corrections, may remove and replace their proposal up to the date and time for which this RFP closes. C. COMMUNICATIONS All communications concerning this RFP must be directed to mguzman@slocity.org. All other communication is not binding and will in no way modify the RFP or the obligations of the City. All DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 9  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT questions will receive a response within five (5) business days. The proceedings of the Selection Committee are confidential, and members of the Selection Committee are not to be contacted by the proposers. After the solicitation has closed, proposers can request to view the RFP award information. Any questions and requests for information must be addressed to the Engineer. D. INSURANCE The Consultant shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Consultant, its agents, representatives, employees or subconsultants. Minimum Scope of Insurance. Coverage shall be at least as broad as: 1. Insurance Services Office Commercial General Liability coverage (occurrence form CG 20 10 Prior to 1993 or CG 20 10 07 04 with CG 20 37 10 01 or the exact equivalent as determined by the City). 2. Insurance Services Office form number CA 0001 (Ed. 1/87) covering Automobile Liability, code 1 (any auto). 3. Workers' Compensation insurance as required by the State of California and Employer's Liability Insurance. 4. Errors and Omissions Liability insurance as appropriate to the consultant's profession. Minimum Limits of Insurance. Consultant shall maintain limits no less than: 1. General Liability: $2,000,000 per occurrence for bodily injury, personal injury and property damage. If Commercial General Liability or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this Project /location or the general aggregate limit shall be twice the required occurrence limit. 2. Automobile Liability: $1,000,000 per accident for bodily injury and property damage. 3. Employer's Liability: $1,000,000 per accident for bodily injury or disease. 4. Professional / Errors and Omissions Liability: $2,000,000 per occurrence. Deductibles and Self-Insured Retentions. Any deductibles or self-insured retentions must be declared to and approved by the City. At the option of the City, either: the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the City, its officers, officials, employees and volunteers; or the Consultant shall procure a bond guaranteeing payment of losses and related investigations, claim administration and defense expenses. Other Insurance Provisions. The general liability and automobile liability policies are to contain, or be endorsed to contain, the following provisions: 1. The City, its officers, officials, employees, agents and volunteers are to be covered as insureds as respects: liability arising out of activities performed by or on behalf of the Consultant; products and completed operations of the Consultant; premises owned, occupied or used by the Consultant; or automobiles owned, leased, hired or borrowed by the Consultant. The coverage shall contain no special limitations on the scope of protection afforded to the City, its officers, official, employees, agents or volunteers. 2. For any claims related to this Project, the Consultant's insurance coverage shall be primary insurance as respects the City, its officers, officials, employees, agents and volunteers. Any insurance or self-insurance maintained by the City, its officers, officials, employees, agents or volunteers shall be excess of the Consultant's insurance and shall not contribute with it. 3. The Consultant's insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 10  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT 4. Each insurance policy required by this clause shall be end orsed to state that coverage shall not be suspended, voided, canceled by either party, reduced in coverage or in limits except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. The Consultant agrees to notify the City in the event that the policy is suspended, voided or reduced in coverage or limits. A minimum of 30 days prior written notice by certified mail, return receipt requested, will be provided. Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M. Best's rating of no less than A:VII. Verification of Coverage. Consultant shall furnish the City with a certificate of insurance showing maintenance of the required insurance coverage. Original endorsements effecting general liability and automobile liability coverage required by this clause must also be provided. The endorsements are to be signed by a person authorized by that insurer to bind coverage on its behalf. All endorsements are to be received and approved by the City before work commences. E. EXCEPTIONS & DEVIATIONS Any exceptions to or deviations from the requirements set forth in this RFP must be declared in the proposal submitted by the proposer. The City may waive any immaterial deviation or defect in a proposal. F. AWARD AND STANDARD AGREEMENT The City reserves the right to make awards within sixty (60) days after the date of the RFP closing. The successful proposer is expected to execute a contract reflecting the template in Appendix C. This sample contract is for reference to the anticipated terms and conditions governing the City and the successful proposer. The proposer must take exception in their proposal to any section of the attached contract they do not agree with. Failing to do so will be deemed as acceptance by the proposer to the terms spelled out in the sample contract. The City reserves the right, in its sole discretion, to add, delete, or modify, or negotiate additional terms and conditions to the attached contract. BEFORE BEGINNING ANY WORK OR SUBMITTING A PROPOSAL, IT IS ADVISED THAT PROPOSERS READ THE CITY INSURANCE AND INDEMNIFICATION REQUIREMENTS IN THE ATTACHED SAMPLE CONTRACT. G. PREVAILING WAGE A portion of this work is prevailing wage work. For any work proposed by the prime consultant or a subconsultant (any tier) under this contract, in accordance with Labor Code Section 1720 et seq., employees must be paid at least the prevailing rate wages for public works performed on the Project . Prime consultant and any applicable subconsultant (any tier) must register with the Department of Industrial Relations (DIR) prior to contract award, must remain registered for the entire term of the contract, and must submit certified payroll records to DIR at least monthly for such work. Firms can register at: http://www.dir.ca.gov/Public-Works/PublicWorks.html H. FAIR EMPLOYMENT PRACTICE The Consultant and all subconsultants must comply with all laws and regulations governing nondiscrimination in employment, including the Americans with Disabilities Act of 1990, the Fair Employment and Housing Act (California Government Code Section 129000 et seq.), and the applicable regulations promulgated thereunder Title 2, Division 4.1, Chapter 5 of the California Code of Regulations Section 11000 et seq. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 11  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT The Consultant, with regard to the work performed by them during the Contract, must not discriminate on the grounds of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or military and veteran status of any person in employment or the selection and retention of subcontractors, including procurement of materials and leases of equipment. I. PROTEST OF AWARD Any objection to the City’s final decision will be handled according to applicable state and local procurement laws. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 12  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT IX. PROPOSAL FORMAT A qualifying proposal must address all the following points and shall be in the format outlined in this section. The technical proposal will be a maximum of 15 pages total, not including staff resumés. COVER LETTER The cover letter will be addressed to: Manuel Guzman Construction Engineering Manager The letter must be on proposer’s letterhead and include the proposer’s contact name, mailing address, telephone number and email address. The letter will address the proposer’s understanding of the services being requested and any other pertinent information the proposer believes should be included. The name, address, telephone number, and email address of the person authorized to represent the firm with respect to all notices, negotiations, discussions, and other communications relating to this proposal, to any negotiation relating to the contract should be included in the letter. The letter must be signed by the individual authorized to bind the Consultant to the representations, commitments, and statements in the proposal. FIRM QUALIFICATIONS The City will only consider proposals that demonstrate firms have successfully completed comparable Project s. These Project s must illustrate the quality, type, and past performance of the Project team. Submittals must include a detailed description of a minimum of three (3) Project s within the past five (5) years which include the following information: 1. Contracting agency 2. Contracting agency Project Manager and contact information 3. Contract amount 4. Date of contract 5. Date of completion 6. Consultant Project Manager and contact information 7. Consultant Resident Engineer and contact information 8. Project Objective 9. Project Outcome: include original construction contract amount and final amount. ORGANIZATION AND APPROACH 1. Provide an organizational chart identifying the Project manager for the work and each key person who would be assigned to carry out the work and their respective roles in performing the work – specifically the Resident Engineer(s) and any Assistant Resident Engineers, inspectors, materials sampling and testing, other key support or contract administration staff. Provide a separate description of the experience and qualifications of the Project manager and each key person, including a summary of experience on similar Project s. Resumés should be included for all key individuals as an appendix to the submittal. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 13  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT 2. Describe your Project and management approach. Provide a detailed description of how the team and scope of work will be managed. 3. A list of no more than three references for the consultant and no more than three references for each subconsultants, including the names, addresses and telephone numbers of recent related clients/Project s, preferably other public agencies and a listing of the specific Project s and key individuals that have participated in them. Include the dollar amount related to the participation. Identify how much experience the firm and subconsultant has had with public agencies. 4. Describe your cost control and budgeting methodology for this Project. 5. Provide responses to the following: a. Describe critical construction related issues associated with the Project and how you will address these. b. Describe critical environmental issues and how you will address these. c. Describe how cost and schedule for the construction contract and your scope of work could be minimized. SCOPE OF WORK This section should establish that the proposer understands the City’s objectives and requirements, demonstrate the proposer’s ability to meet those requirements and outline clearly and concisely the plan for accomplishing the specified work in accordance with the time schedule as outlined in Appendix A, Scope of Services: 1. Include a detailed Scope of Work Statement describing all services to be provided. 2. Indication of information and participation the proposer will require from City staff. 3. Describe Project deliverables for each phase of your work. CONTRACT AGREEMENT Indicate any issues or proposed changes to the sample contract included as Appendix C. The Consultant must provide a brief statement affirming that the proposal terms will remain in effect for one hundred twenty (120) days following the date proposal submittals are due. A contract will not be awarded to a consultant without an adequate financial management and accounting system as required by 48 CFR Part 31 and 2 CFR Part 200. REFERENCES A list of no more than three references for the consultant and three references for each subconsultant, including the names, addresses and telephone numbers. These references may be the same as the references listed above in IV. Proposal Format, Section C. Organization and Approach. FEE PROPOSAL Within separate sealed envelope, submit a complete fee proposal for the scope of services. Provide separate subtotals for Phase 1B and Phase 2 broken down by task and staff billing rates with estimated hours. Clearly identify fees for subconsultant services. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 14  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT OPTIONAL – ADDITIONAL SUPPORTING INFORMATION Provide additional supporting information, not requested above, that you believe is pertinent to evaluating your firm’s ability to provide comparable program services. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 15  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT X. CONSULTANT EVALUATION & CONTRACT AWARD PROPOSAL RESPONSIVENESS Responses to this RFP must be complete. Responses that do not include the proposal content requirements identified within this RFP and subsequent addenda will be considered incomplete and will receive no further consideration. EVALUATION PROCEDURES Proposals will be evaluated according to each weighted Evaluation Criteria and scored on a zero to five-point rating scale shown in the table below. The scores for the Evaluation Criteria will then be multiplied according to their assigned weight to arrive at a weighted score for each firm. A firm’s proposal with a high weighted total will be deemed of higher quality than a proposal or interview with a lesser-weighted total. The top 3 ranked firms may be selected for an interview, which would be used to confirm ratings. Rating Scale 0 Not Acceptable Non-responsive, fails to meet RFP specifications. The approach has no probability of success in achieving Project objectives per the RFP. 1 Poor Below average, falls short of expectations, is substandard to that which is the average or expected norm, has a low probability of success in achieving Project objectives per the RFP. 2 Fair Has a reasonable probability of success, however, some objectives may not be met. 3 Average Acceptable, achieves all objectives in a reasonable fashion per the RFP. This will be the baseline score for each item with adjustments based on interpretation of the proposal by Selection Committee. 4 Above Average/Good Very good probability of success, better than that which is average or expected as the norm. Achieves all objectives per RFP requirements and expectations. 5 Excellent/ Exceptional Exceeds expectations, very innovative, clearly superior to that which is average or expected as the norm. Excellent probability of success and in achieving all objectives and meeting RFP requirements and expectations. The Proposal Evaluation Criteria and their respective weights are as follows: No. Criteria Weight 1 Understanding of Work Involved 5 2 Organization and Approach 5 3 Quality & Experience of Staff for Work 5 4 Firm Qualifications & References 5 TOTAL 20 DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 16  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT CONTRACT AWARD The final selection of the awarded consultant will be contingent upon successful contract negotiations and approval by the Public Works Director. The City Public Works Director will administer and enforce the provisions of the contract. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 17  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT XII. APPENDICIES APPENDIX A – SCOPE OF SERVICES Consultant shall provide an experienced registered Civil Engineer Construction Manager and support staff (as required) to manage the Project. Project Management services will include, but not be limited to, all items associated with construction management and inspection services necessary for Project completion and closeout. Typical Duties – The Work Tasks, defined in section below, generally include the following: 1. Maintain an awareness of safety and health requirements and enforce applicable contract provisions for the protection of the public and Project personnel. 2. Provide technical and administrative management services for the Project, coordination and oversight of all activities related to the construction of the Project and provide constant communication to the Project Manager of activities and concerns on the Project. Review all prepared documents with the Project Manager prior to submission to the Contractor. 3. Evaluate cost reduction incentive proposals and provide recommendations to Project Manager for acceptance or denial. 4. Perform the duties of Resident Engineer and Assistant Resident Engineer in accordance with Caltrans procedures including construction inspection, pay quantity calculations, materials sampling and testing, and compliance monitoring with Project plans, specifications, permits, environmental documents, and agreements. 5. Review and monitor the contractor’s schedule through weekly meetings, and maintain an as-built schedule. 6. Maintain binders of job records. 7. Prepare daily inspection and materials records and weekly status reports, and stormwater compliance documentation. 8. Prepare all correspondence related to Project activities and review with the Project Manager. 9. Identify actual and potential problems associated with the construction Project and consult with the design engineer and Project Manager to implement engineering solutions. 10. Coordinate submittal reviews and timely approvals with the design team and Project Manager. 11. Prepare and approve progress payments and supporting documentation. The City will provide signature authorization of monthly payments. 12. Pre-negotiate and prepare contract change orders. The City will provide signature authorization of contract change orders. 13. Perform labor and subcontracting compliance tasks including labor interviews and verifying certified payrolls and subcontractors utilization. 14. Complete record drawing markups daily, final Project certification, as outlined in Task 5, “Post-Construction Services.” 15. Recommend Project acceptance in accordance with City Standard Specifications and procedures. 16. Ensure full compliance to Americans with Disabilities Act (ADA). Work Tasks - A preliminary scope of services follows and includes identified work tasks. Task 1 – Pre-Construction Services DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 18  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT This task includes pre-construction services including, but not limited to the following:  Review and familiarization with contract plans, specifications, permits and agreements, including subsurface utility relocation work. If contract conflicts, errors, or omissions are discovered, convey to City and design engineer for correction if prior to Project advertisement  Assist the City in evaluation of bids received.  Review Resident Engineer files. Resident Engineer’s files consist of design engineer memos to Resident Engineers, and technical reports, environmental document, permits, and studies.  Prepare a Resident Engineer’s Project schedule which includes all pre-construction and utility relocations by others, and notification timelines noted on all permits, agreements, and contract documents. Upon receipt of Contractor’s schedule, evaluate and confer with the Contractor regarding workability of the schedule or suggest changes that may improve the schedule and update Resident Engineer’s schedule.  Prepare Project instructions and establish proposed contract administration and record keeping procedures to be used during construction for review and approval by Project Manager.  Attend meeting with City and Design Engineer to discuss design features. The intent of this meeting is to answer questions from the Resident Engineer, meet key staff, and review contract administration procedures.  Establish electronic records file structure and protocol for daily uploading to City network.  Prepare meeting agenda identifying attendees and conduct a pre-construction conference with the Contractor awarded the construction contract. Prepare and circulate meeting minutes.  Follow Caltrans Standard Specifications Section 5-1.43, Potential Claims and Dispute Resolution in establishing a Dispute Resolution Advisor (DRA) or Dispute Resolution Board (DRB) as mutually agreed to by the City and the Contractor. The agreed to process shall be reviewed and approved by Project Manager.  Establish correspondence protocols for contractor – construction management communications to allow for clear tracking of correspondence sequences and responses. Task 2 – Construction Services This task includes Project management, construction administration, scheduling, Project observation/inspection, and materials testing during construction. Consultant management services shall be in accordance with the Caltrans Local Assistance Program and Construction Manuals, including but not limited to the following: Project Coordination and Communication  Serve as the focal point for coordination among the contactor, surveyors, material testers, design team, the Project Manager, other agencies, utility companies, and other parties. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 19  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT  Maintain close contact with Project Manager and the design team and review all correspondence with the Project Manager prior to issuance. Maintain and track correspondence in an organized manner throughout the Project.  Receive all Contractor correspondence and prepare and transmit responses. Coordinate with applicable parties, as required, to develop responses.  Conduct weekly, or as necessary, construction contract coordination meetings with the Contractor. Take minutes and distribute to parties designated in the Project instructions. Schedules, Progress Meetings, and Reports  Review Contractor’s planned schedule for conformance with the specifications and for reasonableness of the sequence and duration of the activities. Provide acceptance or correction noticing to Contractor.  Review work progress as compared to the planned schedule and notify Contractor of schedule slippage. Analyze schedule to determine impact of weather and change orders. Obtain from Contactor updates of construction schedule incorporating actual progress, weather delays, and change order impacts. Negotiate time extensions due to change orders and other delays.  Prepare and submit a monthly progress report to Project Manager describing key issues, cost status, and schedule status.  Maintain as-built schedule Payment  Review Contractor’s initial schedule of values for reasonableness and ease of monitoring.  Prepare monthly quantity calculations to support progress payments.  Review and approve quantities submitted with monthly progress payment requests, negotiate differences over amount, and process payments through the Project Manager. Submittals and Requests for Information (RFI)  Receive, stamp, and log submittals, and review and approve, or distribute for review as necessary.  Monitor the review and return of submittals to Contactor. Provide reminders in advance of deadlines for submittal reviewers  Develop and maintain a submittal tracking list to identify parties responsible for review and acceptance, and received and response due dates.  Receive, process, and monitor Requests for Information (RFI) from Contactor.  Prepare responses to RFI related to construction issues in a timely manner.  Transmit design-related RFI to Design Engineer and copy the Project Manager.  Conduct meetings with Contractor and other parties, as needed, to discuss and resolve RFI. Change Orders  Evaluate potential change orders for compliance with permits, environmental documents and other on-site and construction constraints. Provide appropriate feedback for modifications or adjustments to change order proposals. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 20  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT  Prepare Cost Request Bulletins, perform quantity and cost analysis, as required, for negotiation of change orders, and negotiate payment for contract change orders.  Prepare change orders related to construction issues based on drawings, specifications, and other information from the City, design team, Project Manager, or Contractor.  Perform change order administration, including obtaining City approval of change order requests, issuing proposed change orders to Contractor, maintaining logs of proposed change orders, receiving change order quotations from Contractor, negotiating change order costs and time extension, processing final negotiated change orders, and incorporating approved change order into progress payment breakdown.  Prepare recommendations to accompany change order documents and forward to Project Manager for review and approval. Obtain Contractor signature and provide to the City for execution. Construction Observation/Inspection Services  Provide experienced and qualified inspectors who are acceptable to the City.  The inspectors will ensure compliance with all aspects of the construction contract by continuously monitoring, evaluating, approving or rejecting the Contractor’s work in accordance with the approved construction contract documents.  Review laboratory, shop and mill test reports of materials and equipment, and coordinate as required with the Design Engineers.  Review the safety programs developed by the Contractor as required by the contract documents and monitor the Contractor's compliance.  Determine that the Contractor’s work is being performed in accordance with City requirements and in accordance with the requirements of the contract documents. Endeavor to guard the City against defects and deficiencies in the work. As appropriate, require special inspection or testing, or make recommendations to the City regarding special inspection or testing of work not in accordance with the provisions of the contract documents, whether or not such work is fabricated, installed or completed. Subject to review by City, reject work, which does not conform to the requirements of the City or the contract documents.  Record the progress of the Project. Provide accurate and precise daily inspection reports. Submit written daily progress reports to the City, including information on Contractor and the entire Project, showing percentages of completion and the number and status of change orders.  Keep daily logs containing a record of weather, Contractor's work on the site, number of workers, work accomplished, problems encountered, and other relevant data. Make the log available to the City. Prepare and send a Weekly Statement of Working Days to the Contractor.  Check certified payrolls and monitor Contractor's compliance with labor code requirements.  Monitor all inspection activities, both City provided and any consulted out inspections.  Consolidate punch list items indicating work remaining for Project closeout. Claims  Receive and analyze Notices of Potential Claim and Claims submitted. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 21  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT  Review Notices and Claims with the Contract to verify understanding and determine if reasonable solution exists to address and eliminate the Claim. Review resolutions with the Project Manager and prepare appropriate response.  Perform claims administration, including coordinating and monitoring claims response preparation, logging claims, and tracking claims status, and response deadlines. Task 3 – Geotechnical and Materials Testing and Specialty Inspection Materials testing and specialty inspection services will be required for construction of the Project and provided by the Consultant or subconsultant, as directed by the Consultant. Consultant shall review and monitor testing for compliance with the Project requirements. The materials testing requirements include, but are not limited to, the following:  Select and retain the professional services of special consultants and certified testing laboratories. Monitor and coordinate their services.  Provide a quality control service including inspection and testing of all materials, such as but not limited to, steel strength, concrete strength, gravel gradations, soil compaction in accordance with the Project plans and specifications. Task 4 – Surveying Surveying is anticipated to be performed by Consultant’s Staff as directed by the Construction Manager. The Construction Manager shall review and monitor surveys to verify compliance with the Project requirements. The surveying requirements include, but are not limited to, the following:  Provide construction surveying services per the latest Caltrans “Survey Manual” and its revisions.  Surveys performed by the Engineer shall conform to the requirements of the Land Surveyor’s Act. Responsible Charge for the work shall reside with a January 1, 1982 Registered Civil Engineer or a licensed Land Surveyor in the State of California.  The minimum standard of survey quality shall be that of similar surveys performed by Caltrans.  The City will designate the existing horizontal and vertical control monuments that are to be the basis of all surveys. City will provide the California coordinate system values and elevations of these monuments. The Consultant shall adjust all Consultant performed surveys to the designated control monuments and their values.  Monuments established by the Consultant shall be marked by the Consultant with State furnished disks, plugs, or tags. In addition, the Consultant shall identify Consultant established monuments by tagging or stamping the monuments with the license or registration number of the Engineer’s surveyor who is in “responsible charge” of the work. Replacement of survey monuments shall be the responsibility of the Consultant. All new monuments shall be set in accordance with current City and Land Surveyors Act requirements. Task 5 – Construction Environmental Mitigation and Monitoring DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 22  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT The Environmental Monitor shall sign off and approve compliance with the approved MMRP and document implementation of all BMP and on and off-site mitigation measures included in the Project specifications. Work Tasks – Provide a scope of services and work tasks necessary for oversight and compliance with Phase 1B and Phase 2 Mitigation and Monitoring Plan prepared by Rincon (attachment G1 and G2). See appendix G1 and G2 for full listing of services require for inclusion in this task of the proposal. For example, the environmental monitoring requirements include, but are not limited to, the following:  Consultant shall provide qualified biologists to perform pre-construction surveys. The pre-construction surveys should also include a photograph record of the pre- construction condition of the site. Initial field inspections to establish no species are present (nesting surveys, etc.)  Training of the construction crews on what to look out for (including new crew orientation). Live training is required for when the job starts to include: foreman, supervisors, Project managers, and resident engineers. Once this initial training is completed then Project specific training videos shall be created for small crew changes.  Air Quality monitoring  Cultural/Archeological monitoring during all Project earthmoving activities  Verify placement of noise related signage  Paleontological monitoring for initial ground disturbance deeper than 10-feet Task 6 – Post-Construction Services The post-construction services task includes Project closeout after the work is complete. The post-construction services requirements include, but are not limited to, the following:  Compile record drawing information, and provide one copy of red-lined Project drawings to the City.  Compile any outstanding claims and documentation together in a coherent package.  The design consultant will provide Project changes to original design mylars to complete the record set.  Final payment will be recommended by Consultant to the City and all remaining Project files (organized in the manner specified in the Caltrans Construction Manual or otherwise specified in Project Plans & Specifications) will be transmitted to the City.  Project Certification and a Notice of Completion shall be provided in consultation with the City.  All claims shall be processed in accordance with Caltrans 2015 Standard Specifications Section 5-1.43, Potential Claims and Dispute Resolution. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 23  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT APPENDIX B – VICINITY MAP DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 24  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT APPENDIX C – SAMPLE CONTRACT AGREEMENT THIS AGREEMENT is made and entered into in the City of San Luis Obispo on _____________ by and between the CITY OF SAN LUIS OBISPO, a municipal corporation, hereinafter referred to as City, and [CONSULTANT’S NAME IN CAPITAL LETTERS], hereinafter referred to as Consultant. W I T N E S S E T H WHEREAS, on [DATE], requested proposals for Structural Engineering Design Services per Specification No. 90435-CM. WHEREAS, pursuant to said request, Consultant submitted a proposal that was accepted by City for said services. NOW THEREFORE, in consideration of their mutual promises, obligations and covenants hereinafter contained, the parties hereto agree as follows: 1. Contract Term. The term of this agreement shall be from the date this Agreement is made and entered, as first written above until all work has been completed. 2. Work Delays. Should the Consultant be obstructed or delayed in the work required to be done hereunder by changes in the work or by any default, act, or omission of the City, or by strikes, fire, earthquake, or any other Act of God, or by the inability to obtain materials, equipment, or labor due to federal government restrictions arising out of defense or war programs, then the time of completion may, at the City's sole option, be extended for such periods as may be agreed upon by the City and the Consultant. In the event that there is insufficient time to grant such extensions prior to the completion date of the contract, the City may, at the time of acceptance of the work, waive liquidated damages that may have accrued for failure to complete on time, due to any of the above, after hearing evidence as to the reasons for such delay, and making a finding as to the causes of same. 3. Termination for Cause. If, during the term of the contract, the City determines that the Consultant is not faithfully abiding by any term or condition contained herein, the City may notify the Consultant in writing of such defect or failure to perform. This notice must give the Consultant a 10 (ten) calendar day notice of time thereafter in which to perform said work or cure the deficiency. If the Consultant has not performed the work or cured the deficiency within the ten days specified in the notice, such shall constitute a breach of the contract and the City may terminate the contract immediately by written notice to the Consultant to said effect. Thereafter, neither party shall have any further duties, obligations, responsibilities, or rights under the contract except, however, any and all obligations of the Consultant's surety shall remain in full force and effect, and shall not be extinguished, reduced, or in any manner waived by the termination thereof. In said event, the Consultant shall be entitled to the reasonable value of its services performed from the beginning date in which the breach occurs up to the day it received the City's Notice DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 25  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT of Termination, minus any offset from such payment representing the City's damages from such breach. "Reasonable value" includes fees or charges for goods or services as of the last milestone or task satisfactorily delivered or completed by the Consultant as may be set forth in the Agreement payment schedule; compensation for any other work, services or goods performed or provided by the Consultant shall be based solely on the City's assessment of the value of the work-in-progress in completing the overall workscope. The City reserves the right to delay any such payment until completion or confirmed abandonment of the Project, as may be determined in the City's sole discretion, so as to permit a full and complete accounting of costs. In no event, however, shall the Consultant be entitled to receive in excess of the compensation quoted in its proposal. 4. Termination for Convenience. The City also reserves the right to terminate the contract for convenience, providing a 30 (thirty) calendar day notice, at any time upon a determination by the Director that termination of the contract is in the best interest of the City. Upon termination notice from the City, Consultant must, unless otherwise directed, cease work and follow the City’s directions as to work in progress and finished goods. For termination of any services pursuant to this Agreement, the City’s liability will be the lesser of a reasonable price for the services rendered prior to termination. 5. Ability to Perform. The Consultant warrants that it possesses, or has arranged through subcontracts, all capital and other equipment, labor, materials, and licenses necessary to carry out and complete the work hereunder in compliance with any and all applicable federal, state, county, city, and special district laws, ordinances, and regulations. 6. Sub-contract Provisions. No portion of the work pertinent to this contract shall be subcontracted without written authorization by the City, except that which is expressly identified in the Consultant’s proposal. Any substitution of sub-consultants must be approved in writing by the City. For any sub-contract for services in excess of $25,000, the subcontract shall contain all provisions of this agreement. 7. Contract Assignment. The Consultant shall not assign, transfer, convey or otherwise dispose of the contract, or its right, title or interest, or its power to execute such a contract to any individual or business entity of any kind without the previous written consent of the City. 8. Inspection. The Consultant shall furnish City with every reasonable opportunity for City to ascertain that the services of the Consultant are being performed in accordance with the requirements and intentions of this contract. All work done and all materials furnished, if any, shall be subject to the City's inspection and approval. The inspection of such work shall not relieve Consultant of any of its obligations to fulfill its contract requirements. 9. Record Retention and Audit. For the purpose of determining compliance with various laws and regulations as well as performance of the contract, the Consultant and sub-consultants shall maintain all books, documents, papers, accounting records and other evidence pertaining to the performance of the contract, including but not limited to the cost of administering the contract. Materials shall be made available at their respective offices at all reasonable times during the contract period and for three years from the date of final payment under the contract. Authorized representatives of the City shall have the option of inspecting and/or auditing all records. For Federally funded Project s, access to records shall also include authorized representatives of the State and Federal government. Copies shall be furnished if requested. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 26  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT 10. Conflict of Interest. The Consultant shall disclose any financial, business, or other relationship with the City that may have an impact upon the outcome of this contract, or any ensuing City construction Project. The Consultant shall also list current clients who may have a financial interest in the outcome of this contract, or any ensuing City construction Project which will follow. The Consultant staff shall provide a Conflict of Interest Statement where determined necessary by the City. The Consultant covenants that it presently has no interest, and shall not acquire any interest— direct, indirect or otherwise—that would conflict in any manner or degree with the performance of the work hereunder. The Consultant further covenants that, in the performance of this work, no sub-consultant or person having such an interest shall be employed. The Consultant certifies that no one who has or will have any financial interest in performing this work is an officer or employee of the City. It is hereby expressly agreed that, in the performance of the work hereunder, the Consultant shall at all times be deemed an independent Consultant and not an agent or employee of the City. 11. Rebates, Kickbacks or Other Unlawful Consideration. The Consultant warrants that this contract was not obtained or secured through rebates, kickbacks or other unlawful consideration, either promised or paid to any City employee. For breach or violation of the warranty, the City shall have the right in its discretion; to terminate the contract without liability; to pay only for the value of the work actually performed; to deduct from the contract price; or otherwise recover the full amount of such rebate, kickback or other unlawful consideration. 12. Covenant Against Contingent Fees. The Consultant warrants by execution of this contract that no person or selling agency has been employed, or retained, to solicit or secure this contract upon an agreement or understanding, for a commission, percentage, brokerage, or contingent fee, excepting bona fide employees or bona fide established commercial or selling agencies maintained by the Consultant for the purpose of securing business. For breach or violation of this warranty, the City has the right to annul this contract without liability; pay only for the value of the work actually performed, or in its discretion, to deduct from the contract price or consideration, or otherwise recover the full amount of such commission, percentage, brokerage, or contingent fee. 13. Compliance with Laws and Wage Rates. The Consultant shall keep itself fully informed of and shall observe and comply with all applicable state and federal laws and county and City of San Luis Obispo ordinances, regulations and adopted codes during its performance of the work. This includes compliance with prevailing wage rates and their payment in accordance with California Labor Code. For purposed of this paragraph, “construction” includes work performed during the design and preconstruction phases of construction, including but not limited to, inspection and land surveying work. 14. Payment of Taxes. The contract prices shall include full compensation for all taxes that the Consultant is required to pay. 15. Permits, Licenses and Filing Fees. The Consultant shall procure all permits and licenses, pay all charges and fees, and file all notices as they pertain to the completion of the Consultant’s work. The City will pay all application fees for permits required for the completion of the Project including building and regulatory permit application fees. Consultant will provide a 10 day notice for the City to issue a check. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 27  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT 16. Safety Provisions. The Consultant shall conform to the rules and regulations pertaining to safety established by OSHA and the California Division of Industrial Safety. 17. Public and Employee Safety. Whenever the Consultant's operations create a condition hazardous to the public or City employees, it shall, at its expense and without cost to the City, furnish, erect and maintain such fences, temporary railings, barricades, lights, signs and other devices and take such other protective measures as are necessary to prevent accidents or damage or injury to the public and employees. 18. Preservation of City Property. The Consultant shall provide and install suitable safeguards, approved by the City, to protect City property from injury or damage. If City property is injured or damaged resulting from the Consultant's operations, it shall be replaced or restored at the Consultant's expense. The facilities shall be replaced or restored to a condition as good as when the Consultant began work. 19. Immigration Act of 1986. The Consultant warrants on behalf of itself and all sub-consultants engaged for the performance of this work that only persons authorized to work in the United States pursuant to the Immigration Reform and Control Act of 1986 and other applicable laws shall be employed in the performance of the work hereunder. 20. Consultant Non-Discrimination. In the award of subcontracts or in performance of this work, the Consultant agrees that it will not engage in, nor permit such sub-consultants as it may employ, to engage in discrimination in employment of persons on any basis prohibited by State or Federal law. 21. Accuracy of Specifications. The specifications for this Project are believed by the City to be accurate and to contain no affirmative misrepresentation or any concealment of fact. Consultants are cautioned to undertake an independent analysis of any test results in the specifications, as City does not guaranty the accuracy of its interpretation of test results contained in the specifications package. In preparing its proposal, the Consultant and all sub- consultants named in its proposal shall bear sole responsibility for proposal preparation errors resulting from any misstatements or omissions in the specifications that could easily have been ascertained by examining either the Project site or accurate test data in the City's possession. Although the effect of ambiguities or defects in the specifications will be as determined by law, any patent ambiguity or defect shall give rise to a duty of Consultant to inquire prior to proposal submittal. Failure to so inquire shall cause any such ambiguity or defect to be construed against the Consultant. An ambiguity or defect shall be considered patent if it is of such a nature that the Consultant, assuming reasonable skill, ability and diligence on its part, knew or should have known of the existence of the ambiguity or defect. Furthermore, failure of the Consultant or sub-consultants to notify City in writing of specification defects or ambiguities prior to proposal submittal shall waive any right to assert said defects or ambiguities subsequent to submittal of the proposal. To the extent that these specifications constitute performance specifications, the City shall not be liable for costs incurred by the successful Consultant to achieve the Project ’s objective or standard beyond the amounts provided therefor in the proposal. In the event that, after awarding the contract, any dispute arises as a result of any actual or alleged ambiguity or defect in the specifications, or any other matter whatsoever, Consultant DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 28  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT shall immediately notify the City in writing, and the Consultant and all sub-consultants shall continue to perform, irrespective of whether or not the ambiguity or defect is major, material, minor or trivial, and irrespective of whether or not a change order, time extension, or additional compensation has been granted by City. Failure to provide the hereinbefore described written notice within one (1) working day of Consultant's becoming aware of the facts giving rise to the dispute shall constitute a waiver of the right to assert the causative role of the defect or ambiguity in the plans or specifications concerning the dispute. 22. Hold Harmless and Indemnification. (a) Non-design, non-construction Professional Services: To the fullest extent permitted by law (including, but not limited to California Civil Code Sections 2782 and 2782.8), Consultant shall indemnify, defend, and hold harmless the City, and its elected officials, officers, employees, volunteers, and agents (“City Indemnitees”), from and against any and all causes of action, claims, liabilities, obligations, judgments, or damages, including reasonable legal counsels’ fees and costs of litigation (“claims”), arising out of the Consultant’s performance or Consultant’s failure to perform its obligations under this Agreement or out of the operations conducted by Consultant, including the City’s active or passive negligence, except for such loss or damage arising from the sole or active negligence or willful misconduct of the City. In the event the City Indemnitees are made a party to any action, lawsuit, or other adversarial proceeding arising from Consultant’s performance of this Agreement, the Consultant shall provide a defense to the City Indemnitees or at the City’s option, reimburse the City Indemnitees their costs of defense, including reasonable legal fees, incurred in defense of such claims. (b) Non-design, construction Professional Services: To the extent the Scope of Services involve a “construction contract” as that phrase is used in Civil Code Section 2783, this paragraph shall apply in place of paragraph A. To the fullest extent permitted by law (including, but not limited to California Civil Code Sections 2782 and 2782.8), Consultant shall indemnify, defend, and hold harmless the City, and its elected officials, officers, employees, volunteers, and agents (“City Indemnitees”), from and against any and all causes of action, claims, liabilities, obligations, judgments, or damages, including reasonable legal counsels’ fees and costs of litigation (“claims”), arising out of the Consultant’s performance or Consultant’s failure to perform its obligations under this Agreement or out of the operations conducted by Consultant, except for such loss or damage arising from the active negligence, sole negligence or willful misconduct of the City. In the event the City Indemnitees are made a party to any action, lawsuit, or other adversarial proceeding arising from Consultant’s performance of this Agreement, the Consultant shall provide a defense to the City Indemnitees or at the City’s option, reimburse the City Indemnitees their costs of defense, including reasonable legal fees, incurred in defense of such claims. (c) Design Professional Services:   To the fullest extent permitted by law, Consultant shall indemnify, defend, and hold harmless City and any and all of its officials, employees and agents (“Indemnified Parties”) from and against any and all claims, losses, liabilities, damages, costs and expenses, including attorney’s fees and costs, to the extent they arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant. Consultant’s duty to defend shall consist of reimbursement of defense costs incurred DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 29  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT by City in direct proportion to the Consultant’s proportionate percentage of fault. Consultant’s percentage of fault shall be determined, as applicable, by a court of law, jury or arbitrator. In the event any loss, liability or damage is incurred by way of settlement or resolution without a court, jury or arbitrator having made a determination of the Consultant’s percentage of fault, the Parties agree to mediation with a neutral third-party to determine the Consultant’s proportionate percentage of fault for purposes of determining the amount of indemnity and defense cost reimbursement owed to the City. Notwithstanding the foregoing and without diminishing any rights of City in the preceding paragraph, for any liability, claim, demand, allegation against City arising out of, related to, or pertaining to any act or omission of Consultant, but which is not a design professional service, Consultant shall defend, indemnify, and hold harmless the Indemnified Parties from and against any and all damages, costs, expenses (including reasonable attorney fees and expert witness fees), judgments, settlements, and/or arbitration awards, whether for personal or bodily injury, property damage, or economic injury, and arising out of, related to, any concurrent or contributory negligence on the part of the City except for the sole or active negligence of, or willful misconduct of the City. (d) The review, acceptance or approval of the Consultant’s work or work product by any indemnified party shall not affect, relieve or reduce the Consultant’s indemnification or defense obligations. This Section survives completion of the services or the termination of this contract. The provisions of this Section are not limited by and do not affect the provisions of this contract relating to insurance. 23. Non-Exclusive Contract. The City reserves the right to contract for the services listed in this proposal from other consultants during the contract term. 24. Standards. Documents shall conform to City Standards and City furnished templates shall be used. 25. Consultant Endorsement. Technical reports, plans and specifications shall be stamped and signed by the Consultant where required. 26. Required Deliverable Products and Revisions. Deliverables include all items necessary to provide the work scope outlined in the Request for Proposal, incorporated herein by reference and attached hereto as Exhibit [X]. City staff will review any documents or materials provided by the Consultant and, where necessary, the Consultant will respond to staff comments and make such changes as deemed appropriate. 27. Ownership of Materials. Upon completion of all work under this contract, ownership and title to all reports, documents, plans, specifications, and estimates produced as part of this contract will automatically be vested in the city and no further agreement will be necessary to transfer ownership to the City. The Consultant shall furnish the City all necessary copies of data needed to complete the review and approval process. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 30  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT It is understood and agreed that all calculations, drawings and specifications, whether in hard copy or machine readable form, are intended for one-time use in the construction of the Project for which this contract has been entered into. The Consultant is not liable for claims, liabilities, or losses arising out of, or connected with the modification, or misuse by the City of the machine-readable information and data provided by the Consultant under this agreement. Further, the Consultant is not liable for claims, liabilities, or losses arising out of, or connected with any use by City of the Project documentation on other Project s, except such use as may be authorized in writing by the Consultant. 28. Release of Reports and Information. Any reports, information, data, or other material given to, prepared by or assembled by the Consultant as part of the work or services under these specifications shall be the property of City and shall not be made available to any individual or organization by the Consultant without the prior written approval of the City. The Consultant shall not issue any news release or public relations item of any nature, whatsoever, regarding work performed or to be performed under this contract without prior review of the contents thereof by the City and receipt of the City’s written permission. 29. Copies of Reports and Information. If the City requests additional copies of reports, drawings, specifications, or any other material in addition to what the Consultant is required to furnish in limited quantities as part of the work or services under these specifications, the Consultant shall provide such additional copies as are requested, and City shall compensate the Consultant for the costs of duplicating of such copies at the Consultant's direct expense. 30. Attendance at Meetings and Hearings. Consultant shall attend as many "working" meetings with staff as necessary in performing workscope tasks. 31. Requests for Review. The Consultant shall respond to all requests for submittal review or contractor RFI’s within two weeks of receipt of the information from the City. 32. Project Proposal Submittal. Upon completion of the Project scoping meeting, the Consultant shall submit a proposed workscope, compensation and schedule within 10 working days. The cost proposal shall include all costs including miscellaneous direct cost items. 33. Consultant Invoices. The Consultant shall deliver a monthly invoice to the City, itemized by Project work phase or, in the case of on-call contracts, by Project title. Invoice must include a breakdown of hours billed and miscellaneous charges and any sub-consultant invoices, similarly broken down, as supporting detail. 34. Payment. For providing services as specified in this Agreement, City will pay and Consultant shall receive therefore compensation in a total sum not to exceed the individual agreed upon Project fee. Should the Consultant’s designs, drawings or specifications contain errors or deficiencies, the Consultant shall be required to correct them at no increase in cost to the City. For on-call services, the City will pay and the Consultant shall receive compensation as agreed to on a Project by Project basis. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 31  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT The Consultant shall be reimbursed for hours worked at the hourly rates attached to this agreement. Hourly rates include direct salary costs, employee benefits, overhead and fee. In addition, the Consultant shall be reimbursed for direct costs other than salary and vehicle cost that have been identified and are attached to this agreement. The Consultant’s personnel shall be reimbursed for per diem expenses at a rate not to exceed that currently authorized for State employees under State Department of Personnel Administration rules. 35. Payment Terms. The City's payment terms are 30 days from the receipt and approval by the City of an original invoice and acceptance by the City of the materials, supplies, equipment or services provided by the Consultant (Net 30). 36. Resolution of Disputes. Any dispute, other than audit, concerning a question of fact arising under this contract that is not disposed of by agreement shall be decided by a committee consisting of the City’s Project Manager and the City Director of Public Works, who may consider written or verbal information submitted by the Consultant. Not later than thirty days after completion of all deliverables necessary to complete the plans, specifications and estimate, the Consultant may request review by the City Council of unresolved claims or disputes, other than audit, in accordance with Chapter 1.20 Appeals Procedure of the Municipal Code. Any dispute concerning a question of fact arising under an audit of this contract that is not disposed of by agreement, shall be reviewed by the City’s Chief Fiscal Officer. Not later than 30 days after issuance of the final audit report, the Consultant may request a review by the City’s Chief Fiscal Officer of unresolved audit issues. The request for review must be submitted in writing. Neither the pendency of a dispute, nor its consideration by the City will excuse the consultant from full and timely performance in accordance with the terms of this contract. 37. Disadvantaged Business Enterprise (DBE) Use for Federally Funded Project s. This agreement is subject to Title 49, Part 26 Code of Federal Regulations entitled “Participation by Disadvantaged Business Enterprises in Department of Transportation Financial Assistance Programs” when Project work is for a federally funded Project. In order to ensure the State Department of Transportation achieves its federally mandated statewide overall DBE goal, the City encourages the participation of DBEs as defined in 49 CFR 26 in the performance of this agreement. The City will make a determination on a Project by Project basis for reasonably expected DBE participation to compete for the sub-consulting opportunities in this agreement. The Consultant is responsible to be fully informed regarding the requirements of 49 CFR, Part 26. The Consultant shall notify the City of any changes to its anticipated DBE participation on federally funded Project s, maintain records of DBE usage and complete and submit to the City the final report of DBE utilization prior to receiving final payment. Records shall show the name and business address of each DBE and the total dollar amount actually paid to each. The Consultant shall pay all sub-consultants within 10 calendar days from receipt of each payment made to the Consultant by the City. The Consultant shall carry out applicable requirements of Title 49 CFR 26 in the award and administration of US DOT assisted agreements. Failure by the Consultant to carry out these DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 32  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT requirements is a material breach of this agreement, which may result in the termination of this agreement or such other remedy as the City deems appropriate. 38. Agreement Parties. City: Matt Horn Public Works Director City of San Luis Obispo 919 Palm Street San Luis Obispo, CA 93401 Consultant: All written notices to the parties hereto shall be sent by United States mail, postage prepaid by registered or certified mail addressed as shown above. 39. Incorporation by Reference. City Request for Proposals Specification No. 90435-CM and Consultant's proposal dated [DATE], are hereby incorporated in and made a part of this Agreement and are attached hereto as Exhibit [X]. Should there be any conflict between terms set forth in the City Request for Proposals Specification No. 90435-CM and Consultant’s proposal dated [DATE], the terms in this agreement and City Request for Qualifications Specification No. 90435-CM will govern. 40. Amendments. Any amendment, modification or variation from the terms of this Agreement shall be in writing and shall be effective only upon approval by the City Engineer. 41. Working Out of Scope. If, at any time during the Project, the consultant is directed to do work by persons other than the City Project Manager and the Consultant believes that the work is outside of the scope of the original contract, the Consultant shall inform the Project Manager immediately. If the Project Manager and Consultant both agree that the work is outside of the Project scope and is necessary to the successful completion of the Project, then a fee will be established for such work based on Consultant's hourly billing rates or a lump sum price agreed upon between the City and the Consultant. Any extra work performed by Consultant without prior written approval from the City Project Manager shall be at Consultant's own expense. 42. Complete Agreement. This written agreement, including all writings specifically incorporated herein by reference, shall constitute the complete agreement between the parties hereto. No oral agreement, understanding or representation not reduced to writing and specifically incorporated herein shall be of any force or effect, nor shall any such oral agreement, understanding or representation be binding upon the parties hereto. For and in consideration of the payments and agreements hereinbefore mentioned to be made and performed by City, Consultant agrees with City to do everything required by this Agreement, the said specification and incorporated documents. Authority to Execute Agreement. Both City and Consultant do covenant that each individual executing this agreement on behalf of each party is a person duly authorized and empowered to execute Agreements for such party. IN WITNESS WHEREOF, the parties hereto have caused this instrument to be executed the day and year first above written. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 33  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT CITY OF SAN LUIS OBISPO: CONSULTANT: ________________________________ Name of Company _______________________________ Matt Horn, Director of Public Works By: Name of CAO/President Its: CAO/President APPROVED AS TO FORM: _______________________________ Christine Dietrick, City Attorney (2nd signature required if Corporation): ________________________________ By: Name of Corporate Officer Its: ____________________ DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 34  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT APPENDIX D – QUALITY ASSURANCE PROGRAM (Attached as a separate document in BidSync) DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 35  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT APPENDIX E – CONTRACT DOCUMENTS FOR PHASE 1B OF THE CULTURAL ARTS DISTRICT PARKING STRUCTURE (Attached as a separate document in BidSync) DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 36  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT APPENDIX F – CONTRACT DOCUMENTS FOR PHASE 2 OF THE CULTURAL ARTS DISTRICT PARKING STRUCTURE (Attached as a separate document in BidSync) DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 37  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT APPENDIX G1 –MITIGATION MONITORING AND REPORTING PROGRAM APPENDIX G2 – PHASE 1B AND 2 MITIGATION AND MONITORING PLAN (Attached as a separate document in BidSync) DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 38  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT APPENDIX H – CURRENT PROJECT DELIVERY SCHEDULE (Attached as a separate document in BidSync) DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 EXHIBIT B DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 REQUEST FOR PROPOSALS // CITY PROJECT NO. 90435-CM RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES CULTURAL ARTS DISTRICT PARKING STRUCTURE September 1, 2022 EXHIBIT BDocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 1540 MARSH STREET, SUITE 150, SAN LUIS OBISPO, CA 93401 | TEL. 805.706.0276 | WWW.KITCHELL.COM September 1, 2022 Mr. Manuel Guzman, Construction Engineering Manager City of San Luis Obispo 919 Palm Street San Luis Obispo, CA 93401 Re: Proposal for Resident Engineer and Construction Management Services, Cultural Arts District Parking Structure, City Project No. 90435-CM Dear Mr. Guzman and Members of the Selection Committee: As an experienced construction manager with a solid foundation in general contracting, Kitchell is known for delivering quality projects and providing high value services to our clients. It is with great pleasure that we submit our proposal to perform resident engineer and construction management services for the New Cultural Arts District Parking Structure project. Our relational project management approach coupled with an extensive record of successful project delivery will fulfill your expectations and provide you satisfaction with the end result. Our commitment to these goals has resulted in more than eighty-five percent of our work derived from repeat business. We Have the Right Team With over 303 project and construction management professionals, we have the capacity, skill and enthusiasm to implement our time-tested project management tools and techniques to achieve project success. Project Director Tully Wyatt will work with you to ensure your complete satisfaction with our services and deliverables. Resident Engineer Andy Goh will fulfill the Resident Engineer duties and responsibilities as defined by Caltrans. Senior Project Manager/Assistant Resident Engineer Tom Fee will serve as our on-site representative to the City and will function as an extension of your staff, working integrally with City personnel, design professionals, the contractor, special consultants and stakeholders to deliver the project on time, under budget and with high quality. Our proposed project team members have demonstrated a long-term commitment to the pursuit of project excellence, are at the top of their respective professions, and will be dedicated to the task of serving the City through interactive collaboration, effective oversight of design professionals, contractors, outside agencies and effective management of the project as a whole. Local Commitment As a firm invested in the Central Coast for the long term through our established local San Luis Obispo office and widening project base, we understand the local construction market and will serve as a local resource in receiving responsive bids from qualified contractors. Our long-term commitment to local clients by staff members who understand the issues unique to the Central Coast, provides the City with assurance that we share your desire for success. Depth of In-house Resources Unlike most construction management firms, Kitchell has a full complement of in-house engineering and architectural support service professionals consisting of registered architects and licensed engineers in every discipline. In addition, Kitchell has in-house facilities management, commissioning, estimating and scheduling personnel each skilled and qualified in their respective disciplines. This team of dedicated professionals is equipped to resolve highly complex technical challenges on a moment’s notice. Kitchell would consider it an honor to serve the City of San Luis Obispo in carrying out resident engineer and construction management services for the New Cultural Arts District Parking Structure project as a collaborative member of the City’s team. We appreciate your consideration and look forward to the opportunity to personally demonstrate our qualifications as we progress in the selection process. Sincerely, Wendy Cohen, CCM Randy Rominger, LEED AP, Assoc. DBIA President Principal-in-Charge (Authorized to bind the firm) FIRM CONTACT/AUTHORIZED REPRESENTATIVE Name: Randy Rominger, Principal-in-Charge | Address: 1540 Marsh Street, Suite 150 | San Luis Obispo, CA 93401 tel. 805.706.0276 | email. rrominger@kitchell.com | Kitchell acknowledges and accepts receipt of Addendum #1 dated July 25, 2022. Randy is the authorized to represent the firm with respect to all notices, negotiations, discussions and other communications relating to this proposal. E. Cover Letter DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 2 F. Firm Qualifications Industry Leading Expertise Established in 1950, Kitchell is a 100% employee-owned company dedicated to providing construction management and general contracting services in the Western United States. Our firm’s innovations in management and reliability in delivering projects on time and within or under budget have earned us a reputation for superior performance. Since Kitchell’s inception, we have completed over $53 billion in public sector construction representing more 3,600 projects in parking structures, civic centers, education facilities, courthouses, municipal office buildings, detention and criminal justice centers, healthcare facilities, sports complexes, police/fire stations and performing/cultural arts centers. Having been in business for 72 years, Kitchell has proven its long-term stability and financial strength. As a construction management firm, Kitchell is consistently ranked amongst Engineering News Record’s top construction management firms. Focusing on the public sector has allowed us to develop management and project control techniques targeted to its specific needs. Our methods have been very successful—more than 85% of our work comes from repeat clients. We deliver our services using a variety of delivery strategies including agency and multiple prime CM, construction management at risk, lease-leaseback, design-build and the traditional design-bid-build. EXPERIENCE AT A GLANCE 14M SF OF PARKING PARKING STALLS 45,000 CENTRAL COAST CONSTRUCTION $1.7B CAL POLY SAN LUIS OBISPO, YAK?IT?UT?U RESIDENTIAL COMMUNITY SAN LUIS OBISPO, CA (COMPLETED 2020) Construction management services for a $204 million, 562,446 SF project featuring eight structures with four and five levels above grade. The project featured single, double and quad units totaling 1,475 beds for first year students and associated parking totaling 154,363 SF and over 450 stalls. 1. Contracting Agency:California Polytechnic State University, San Luis Obispo 2. Contracting Agency PM:Anthony Palazzo, Executive Director tel. 805.756.6538 | email. arpalazzo@calpoly.edu 3. Contract Amount:$3.9 million 4. Date of Contract:Jan 2013 5. Date of Completion:Jan 2020 6. Consultant PM:Tully Wyatt, Project Manager | tel. 805.440.2278 | email. twyatt@kitchell.com 7. Consultant RE:None 8. Project Objective:See description above. 9. Project Outcome:$165 million (Original Construction) | $172 million (Final Amount) PARKING STRUCTURE COMPLETED IN PAST 5 YEARS 5 yrs Randy Rominger PROJECT TEAM: Tully Wyatt DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 3 CITY OF CHANDLER, OREGON STREET PARKING STRUCTURE CHANDLER, AZ (COMPLETED 2019) Construction management services for a new $23 million, five-level, 293,000 SF, 932-space parking garage for the City of Chandler, which includes a road realignment along Oregon Street as well as intersection improvements at Arizona Avenue and Chicago Street. As Downtown Chandler’s largest garage, the project added much needed parking options for those accessing City Hall as well as restaurants and other venues in the bustling area. The structure is located to the west of City Hall across Arizona Avenue on the northwest corner of Chicago and Oregon streets. SAN LUIS OBISPO RTA, BUS MAINTENANCE FACILITY SAN LUIS OBISPO, CA (COMPLETED 2022) Construction management services for a new $17.5 million (construction cost), 28,650 SF, single story bus maintenance facility with over 2,600 SF of mezzanine/equipment platform located on a 6.44-acre site. The facility accommodates operations, administration and maintenance areas and includes detached enclosures on-site, including a trash enclosure and canopy over bus parking. Work also includes off-site improvements, specifically the T-intersection for future Elks Lane realignment. 1. Contracting Agency:City of Chandler 2. Contracting Agency PM:Paul Ahlas, Construction Project Manager - PW & U - Capital Projects tel. 480.782.3328 | email. paul.ahlas@chandleraz.gov 3. Contract Amount:$1.2 million 4. Date of Contract:June 2018 5. Date of Completion:December 2019 6. Consultant PM:Ralph Schulte tel. 515.822.8735 | email. rschulte@kitchell.com 7. Consultant RE:None 8. Project Objective:See description above. 9. Project Outcome:$19 million (Original Construction) | $20.8 million (Final Amount) 1. Contracting Agency:San Luis Obispo Regional Transit Authority 2. Contracting Agency PM:Geoff Straw, Executive Director tel. 805.781.4472 | email. gstraw@slorta.org 3. Contract Amount:$1.6 million 4. Date of Contract:June 2020 5. Date of Completion:February 2022 6. Consultant PM:Tully Wyatt, Project Manager tel. 805.440.2278 | email. twyatt@kitchell.com 7. Consultant RE:Troy Hart, Resident Engineer | tel. 805.448.8653 | email. thart@kitchell.com 8. Project Objective:See description above. 9. Project Outcome:$16.8 million (Original Construction) | $17.4 million (Final Amount) PARKING STRUCTURE COMPLETED IN PAST 5 YEARS COMPLETED IN PAST 5 YEARS 5 yrs 5 yrs Andy Goh Randy Rominger PROJECT TEAM:PROJECT TEAM: Heather Brown Tully Wyatt Ryan Stefanek DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 4 Additional Parking Structure Experience CITY OF SANTA MONICA, PARKING STRUCTURE 6, SANTA MONICA, CA A $44.6 million project consisting of demolition and rebuilding of a public parking structure located directly behind Santa Monica’s largest tourist attraction, the 3rd Street Promenade. The new structure is 11-stories (eight levels above grade and three levels subterranean) and contains approximately 750 total spaces. Other features include 30 electrical vehicle charging stations and infrastructure for future charging stations, a 90-bicycle bike rack and rooftop solar panels. The structure is LEED Gold Certified. SALINAS VALLEY MEMORIAL HEALTHCARE SYSTEM, PARKING GARAGE ANNEX, SALINAS, CA A new $36 million, 79,700 SF, four-level parking structure serving as an extension to the existing parking structure. The new garage provides a net increase of 166 parking stalls and includes a basement level with 20,000 SF of office and hospital support space. SMUD HEADQUARTERS REHABILITATION & PARKING STRUCTURE, SACRAMENTO, CA A $135 million complete renovation of the 120,000 SF office building and 45,000 SF parking garage. The building is divided into three sections: south wing, core and north wing. The south wing is four levels above grade with a full floor below grade; the core is five levels above grade and one floor below grade; and the north wing has three parking levels and a two-story office portion above the parking garage. UC SAN DIEGO, NORTH TORREY PINES LIVING AND LEARNING NEIGHBORHOOD, SAN DIEGO, CA A new $628 million project consisting of over 1.6 million GSF of student housing, parking, academic space and retail targeting LEED Platinum certification. The Living Learning Neighborhood provides approximately 2,000 new beds, resident facilities and support space for undergraduate students, new instruction and research space for departments and programs within the Divisions of Social Sciences and Arts and Humanities as well as general assignment classrooms. Buildings are varied heights with some individual buildings reaching up to 14 stories. The neighborhood also includes an underground parking structure with 1,200 spaces. G. Organization & Approach TULLY WYATT, dbia, leed ap Project Director CORE TEAM ANDY GOH, pe Resident Engineer TOM FEE Sr. Project Manager/Assist. Resident Engineer RYAN STEFANEK Quality Assurance Manager MATTHEW HARMS Project Engineer SUBCONSULTANTS CHARLES ZANOLI Testing & Inspections (Earth Systems) STEVE WEBSTER, ls BRIAN HELLWIG Surveying (RRM Design Group) COLBY BOGGS MICHAEL TOM, ms CASEY CLARK CHRISTOPHER DURAN, rpa DUSTIN MERRICK, rpa JENNIFER DICENZO Environmental Monitoring (Rincon Consulting) As-Needed In-House Support Services RANDY ROMINGER, leed ap, assoc. dbia Principal-in-Charge HEATHER BROWN, pe, leed ap, cpmp Engineering & Architectural Services Director MATT CHAPPELL, eit, cep Estimating Manager RICK STASSI Scheduling Manager 1. Provide an organizational chart identifying the Project manager for the work and each key person who would be assigned to carry out the work and their respective roles. Resumés should be included for all key individuals as an appendix. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 5 Roles & Responsibilities Our project team has been assembled based on their ability to deliver to the City of San Luis Obispo (SLO) the most efficient, cost effective and best-suited skills of our professional and support personnel. The ultimate success of the Cultural Arts District Parking Structure project is heavily dependent upon the experiences of the team. In developing our project team, staffing continuity is a key element in our approach to managing the project. The proposed team is proven in its capabilities and understands the complexities of parking structure construction. Kitchell’s project team is familiar with the local contracting community and has developed strong local contractor and subcontractor relationships. This maximizes the competitiveness translating to lower bid prices from the other important team members—the contractor and its subcontractors. Project Director Tully Wyatt will facilitate communication and decision making at all levels. He will ensure total team commitment of all resources to achieve the City’s objectives for the project, be present at key meetings and will be available continuously to the project team and City management staff. He will conduct risk assessments, participate in issue resolution and perform periodic site reviews to ensure the City’s objectives for schedule, budget and quality are being achieved. As a California Registered Civil Engineer, Andy Goh will fulfill the Resident Engineer duties and responsibilities as defined by Caltrans. He will study and become completely familiar with project plans, specifications, permits, environmental documents and agreements. He will work with our on- site team to organize and conduct construction inspections, materials testing and special inspections and environmental mitigation monitoring. He will review pay quantity calculations and ensure our team is monitoring the contractor’s compliance with the contract documents. Senior Project Manager/Assistant Resident Engineer Tom Fee will serve as Kitchell’s full-time on-site representative to the City of SLO and will function as an extension of your staff, working integrally with the project team. He will work in close coordination with Andy to fulfill the Resident Engineer responsibilities and will manage cost and time in accordance with the master project budget and schedule. He will drive the advancement of project efforts from preconstruction through completion. Tom will perform preconstruction services and deliverables and will be responsible for the timely completion of all construction phase deliverables. He will manage and administer contracts, report progress, interpret documents, conduct progress meetings, manage the progress payment process, facilitate resolution of field issues, and coordinate project punchlist, completion and turn over. Tom’s parking structure experience and his understanding of the local construction market will prove to be valuable assets to the City and the project team. Quality Assurance Manager Ryan Stefanek will serve on-site full-time during the construction phase and will develop and implement a project-specific quality assurance program. He will manage and coordinate submittal compliance, preinstallation meetings, mock-up reviews, inspections, testing, surveying, environmental mitigation monitoring and SWPPP compliance. Project Engineer Matthew Harms will serve on-site full-time during the construction phase. He will be responsible for the preparation and processing of project-related documentation including requests for information, submittals, design supplements, and project closeout documentation. He will maintain Kitchell’s project information system. As-Needed In-House Support Services Principal-in-Charge Randy Rominger will be responsible for ensuring client satisfaction with our team’s services, personnel, quality and contractual obligations. Estimating Manager Matt Chappel will lead our estimating team to validate project cost in accordance with the established project budget, lead estimating efforts that may be requested of Kitchell, participate in bid analysis and review contractor proposed change quotations. Engineering and Architectural Services Manager Heather Brown will lead our team’s registered architects and licensed engineers to provide engineering support services as needed throughout the course of the project. Scheduling Manager Rick Stassi will lead our scheduling team to provide scheduling support to the project team assisting in the development and maintenance of the Resident Engineer’s schedule. He will also assist the project team with in-depth review and analysis of contractor submitted schedules, monthly updates and delay fragnets. Subconsultants Charles Zanoli with Earth Systems will perform code compliance inspections as well as materials testing and special inspections as described in Task 3 of the RFP. Charles will also support applicable portions of Task 2. Steve Webster and Brian Hellwig with RRM Design Group will perform surveying as described in the RFP, Task 4. Colby Boggs, Michael Tom, Casey Clark, Christopher Duran, Dustin Merrick and Jennifer DiCenzo of Rincon Consulting will perform construction environmental mitigation and monitoring as described in the RFP, Task 5. Our proposed construction management team is 100% dedicated to your success from conception through completion. We will support the City of San Luis Obispo to ensure your Cultural Arts District Parking Structure project moves forward smoothly through closeout. Our team’s commitment goes beyond the job—they strive to see success in the community where they live and work. 100 % Dedicated to the success of your Cultural Arts District Parking Structure DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 6 Project & Management Approach Our approach to project management and the use of proper documentation from our project management information system, developed and proven over time, provides our team with the information necessary to keep the Phase 1B and Phase 2 projects within the established parameters for budget, schedule and quality. Kitchell will act as liaison with the City, design professionals and other consultants to facilitate and coordinate the execution of construction contracts, construction coordination and overall project management. We will act as the City’s representative, advising and consulting with the City and the design professional. We will monitor the work of contractors for deficiencies in the work and conduct a quality assurance program in cooperation with the design professionals and City quality assurance personnel. Earth Systems, our materials testing subconsultant will be carefully scheduled and monitored. We will notify the contractors and City Staff of deficiencies and follow through to ensure corrections are made in a timely manner. Informal ongoing punch lists will be generated to correct deficiencies as the projects proceed instead of waiting until the conclusion of the project to resolve quality issues in a timely manner. We will administer and coordinate the contracts, paying special attention to cost, contractor performance and quality. Through on-site coordination, regular progress meetings, thorough documentation and consistent schedule updates, we will ensure construction is completed on schedule, within budget and within the prescribed expectations of quality. Upon commencing services, our team develops several project management tools to facilitate complete and efficient delivery of services. These documents include a responsibility matrix, deliverables checklist, master schedule, cost control report, quality assurance (QA) plan and risk assessment. The responsibility matrix includes both external (among the entire project team) and internal (among the Kitchell team) responsibilities to bring clarity to assignments. Our Project Director Tully Wyatt attends progress meetings monthly (more often as the needs dictate) and conducts an on-site quality assurance assessment with the on-site team. The on-site team develops and implements a QA mitigation plan for the identified QA deficiencies. Tully conducts project health assessments with the on-site team on a quarterly basis. The project health assessment includes a risk assessment, review of the deliverables checklist, review of the project schedule, review of the cost control plan and review of the QA plan. The on-site team develops and implements a mitigation plan following each quarterly health assessment. 2. Describe your Project and management approach. Provide a detailed description of how the team and scope of work will be managed. 3. A list of no more than three references for the consultant and no more than three references for each subconsultants including a listing of the specific Projects and key individuals that have participated in them. Include the dollar amount related to the participation. Identify how much experience each firm has had with public agencies. Public Agency 1:San Luis Obispo Regional Transit Authority | Geoff Straw, Executive Director Address/tel.:253 Elks Lane | San Luis Obispo, CA 93401 | tel. 805.541.2228 ext. 4465 Project/Amount:Bus Maintenance Facility ($17.5 million) Staff:Randy Rominger, Tully Wyatt and Ryan Stefanek Public Agency 1:County of San Luis Obispo, Department of Airports | Craig Piper, Deputy Director Address/tel.:903 Airport Drive, Suite 5 | San Luis Obispo, CA 93401 | tel. 805.781.5205 Project/Amount:San Luis Obispo County Regional Airport Passenger Terminal ($39.5 million) Staff:Charles Zanoli Public Agency 2:Cal Poly San Luis Obispo | Anthony Palazzo, Executive Director Address/tel.:1 Grand Avenue | San Luis Obispo, CA 93407 | tel. 805.756.6538 Project/Amount:yak?it?ut?u Residential Community ($204 million) Staff:Randy Rominger and Tully Wyatt References Don’t take our word for it...Our clients are our strongest advocates! Our firm’s success is a reflection of the abilities of our staff and Kitchell as a whole. Below are references for which Kitchell has provided construction management services for their large public works capital improvement projects. In addition, we have included two references for each of our subconsultants. We encourage you to contact each of the references to the quality of our work and satisfaction with our services. Public Agency 2:Cal Poly San Luis Obispo | Howie Conroy, Construction Inspector Address/tel.:1 Grand Avenue | San Luis Obispo, CA 93407 | tel. 805.756.2173 Project/Amount:yak?it?ut?u Residential Community ($204 million) Staff:Charles Zanoli Public Agency 3:County of San Luis Obispo | Robert Ruiz, Program Manager Address/tel.:1087 Santa Rosa Street | San Luis Obispo, CA 93408 | tel. 805.788.2114 Project/Amount:New Animal Shelter ($20.3 million) | Probation Department Building ($16 million) Staff:New Animal Shelter: Randy Rominger and Tully Wyatt | Probation Dept. Bldg: Randy Rominger Kitchell Earth Systems DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 7 Public Agency 1:City of San Luis Obispo | Robert Hill, Sustainability & Natural Resources Official Address/tel.:919 Palm Street | San Luis Obispo, CA 93401 | tel. 805.781.7211 Project/Amount:Cerro San Luis Natural Reserve Initial Study/Negative Declaration (dollar amount N/A) Staff:Colby Boggs, Michael Tom, Casey Clark, Christopher Duran, Dustin Merrick & Jennifer DiCenzo Public Agency 1:City of San Luis Obispo | Hal Hannula, Supervising Civil Engineer Address/tel.:919 Palm Street | San Luis Obispo, CA 93401 | tel. 805.781.7201 Project/Amount:Police Station ($300,525), Public Safety Dispatch Center ($611,711), Jennifer Street Bridge ($38,600) Staff:Steve Webster and Brian Hellwig Public Agency 2:County of Santa Barbara | Travis Seawards, Deputy Director Address/tel.:123 East Anapamu Street | Santa Barbara, CA 93101 | tel. 805.568.2518 Project/Amount:Arctic Cold Project EIR Planning & Environmental Services ($280,220) Staff:Colby Boggs, Michael Tom, Casey Clark, Christopher Duran, Dustin Merrick & Jennifer DiCenzo Budgeting at California Polytechnic State University, San Luis Obispo, yak?it?ut?u Residential Community Kitchell was vested in maintaining the project budget at the yak?it?ut?u Residential Community. Aside from providing complete reviews of each contractor initiated change order request, we also tapped into our Estimating Department to review potential large scale changes to the project’s parking structure facility. In addition, we met bi-weekly with the Owner to review all approved, pending and potential changes to the project relative to the project contingency. These efforts at cost control and of continual budget review afforded the University the opportunities to provide additional facilities to the project (added a 2nd story to the administrative building), provide additional redundancies to vital systems like the lift station, emergency systems, and add critical infrastructure pieces to the campus electrical system (manholes, splice boxes). The combined team effort kept the project moving forward while managing these changes within the project budget. Public Agency 2:Lucia Mar Unified School District | Bryan Hagwood, Sr. Bond Project Manager Address/tel.:222 Stanley Avenue | Arroyo Grande, CA 93420 | tel. 805.474.3000 Project/Amount:Shell Beach ES Parking Lot ($225,270), Arroyo Grande HS Track ($7,000), Oceano ES ($91,280) Staff:Steve Webster and Brian Hellwig Public Agency Experience Kitchell brings more than 72 years of experience working with public agencies representing over $53 billion in construction encompassing over 3,600 projects. Focusing on the public sector has allowed us to develop management and project control techniques targeted to its specific needs. Earth Systems brings over 50 years of experience in the public sector. With an office in San Luis Obispo, Earth Systems brings extensive background in materials testing and special inspection, with a staff of over 20 highly qualified technicians and inspectors. They have worked with many jurisdictions throughout San Luis Obispo and Santa Barbara Counties including City of San Luis Obispo, City of Pismo Beach and City of Grover Beach to name a few. RRM Design Group brings more than 45 years of experience working with public agencies. Their work culture emphasizes collaboration, frequent communication and accessibility. Focusing on the public sector has allowed them to work with many clients in the Central Coast including the City and County of San Luis Obispo, City of Grover Beach, City of Paso Robles, City of San Mateo, City of Santa Barbara, City of Cloverdale and City of Ukiah to name a few. Rincon Consulting brings more than 26 years of experience working with public agencies including the City and County of San Luis Obispo, Santa Barbara County, City of Paso Robles and City of Santa Maria to name a few. 4. Describe your cost control and budgeting methodology for this Project. Budget Management One of our initial efforts will be to work with the City to understand/refine the budget, including identification of all cost components with reasonable budget assumptions to use until actual costs are accrued. We establish and maintain a cost control system in Procore to track all costs associated with the project against the established budget. As the project progresses, projected costs will be entered into the model, providing a real time assessment as to the status against budget. We often perform detailed estimates and reconcile to the design professional’s estimates, which provides an unbiased professional opinion of probable construction costs. Construction costs along with project soft costs are updated to reflect the latest information and tracked continuously against the established budget. We provide recommendations on construction feasibility, availability of materials and labor, time requirements for installation and construction, and factors related to cost including costs of alternative designs or materials, preliminary budgets and possible economies. If it appears the project construction budget will not be met, we offer alternatives and solutions to bring costs back in line. Rincon Consulting RRM Design Group DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 8 5. Provide responses to the following: We studied the documents published with the RFP and identified several potential critical construction and environmental issues, identified below with our proposed solutions for: Construction Related Issues Proposed Solution Local traffic surges every morning and afternoon (Mission Prep High and Old Mission Middle School) off Palm Street and adjacent streets, for student drop off and pick up. Establish access/egress restrictions, delivery moratoriums, work hours, etc. in the contract documents. Higuera Street and Marsh Street are natural traffic arteries for construction materials deliveries. During the deck pours, concrete trucks stack up to continuously pour concrete. Both streets contain critical commercial and retail outlets. Plan all deck pours and concrete truck staging either on-site (off streets) or remote with radio notification for minimal disruptions. If any businesses could be affected by steady traffic, discuss with City to review specific activities with affected business. Post-tensioned (PT) concrete placement quality control is exacting and unforgiving. Create stringent protocols for concrete placement, finishing, flatness, curing and sealants. Individuals (person) finishing concrete (swirl) may influence finish variation due to handling of trowel, pressure, etc. Ensure same finishing team is committed start to finish. Note that after placement, PT concrete cannot be readily repaired/ground for finish issues due to finish and cables, etc. Proper coordination for all PT slab systems including MEP, fire protection, ceiling inserts, bollard embeds, railings, bent U embeds, bolted wheel stops, etc. Perform thorough clash detection using Building Information Modeling (BIM) for all systems in or supported by PT decks to ensure there are no overhead clearance issues or in slab conflicts requiring retrofit. (No post install drilling allowed). Any structural changes requiring cutting or drilling into finished PT concrete. Resolve all identified constructability issues prior to bidding to mitigate cutting or drilling later. Any cutting or drilling PT concrete requires X-Ray cable locating and mapping, etc. This parking plan is essentially open building. Consider drainage and watertightness. When performing constructability reviews, check all decks for positive drainage including covered areas susceptible to wind driven water intrusion in all areas of the vehicle and pedestrian egress. Contractor use of tower crane for construction delivery. In bidding instruction include recommendations for tower crane placement (if used). Then have engineer revise structural plan to accommodate tower crane option. Parking structure fire separation/rating at the adjacent residential buildings. Review any portion of non-rated parking structure juxtaposed to the adjacent residential buildings for space separation and/ or rated wall conditions required. b) Describe critical environmental issues and how you will address these.a) Describe critical construction related issues associated with the Project and how you will address these. Environmental Issues Proposed Solution Storm water runoff in direct proximity to San Luis and Brizziolani creek beds Prioritize the SWPPP plan including ample retention basin/s. Monitor plan so it is constantly maintained. Provide effective track out plates to remove on-site soils and other contaminates from vehicles. This particular location is critical for all storm water to be properly contained and handled. Possible high ground water table/underground stream effect on over excavation, foundations, elevator pit, and shored wall on east side. Verify the geotech engineer has reviewed and coordinated with structural engineer. Also review seasonal water table heights with mitigation plans for these soil conditions, etc. Elevators: Plan elevator design, pits, etc. in relation to high water table and/or possible hydrostatic pressure seasonally. Plan any water stop rings, sump pit, and hydraulic cements, etc. to prevent ground water from penetrating the elevator pit from below. Potential tree drip and root damage at property line. Have arborist inspect trees at property line (on private property) for potential issues due to construction, that may require special protection, or removal and replacement. Potential for excessive noise levels due to construction activities. Check equipment noise dBs at adjacent buildings with mitigation options such as temporary sound walls, etc. Specify noise mitigation requirements in the contract documents DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 9 c) Describe how cost and schedule for the construction contract and your scope of work could be minimized. Cost & Schedule for the Construction Contract Construction cost and schedule can be minimized in a variety of ways. We analyzed the documents and have some suggestions, categorized as incentives, risk assignment and value analysis: Incentives: We assessed the Phase 1B and Phase 2 schedule durations and do not recommend they be reduced in the bid documents; however, schedule compression can be achieved through early delivery incentives and/or the use of bid alternates for reduced construction duration. Risk Assignment: As a rule, contractors don’t assume risk—they price it. Our risk assessment includes assignment of risk the contractor may consider to be onerous, or inappropriately assigned to them and thereby assign a premium to managing the risk item. An example is permanent shoring. Permanent shoring is shown on the east side property line on the Phase 1B Plan. The documents instruct the contractor to design all permanent shoring. There are two private structures on the zero-lot-line directly adjacent to the shoring. The contractor is to insure the permanent shoring design covers any additional foundation surcharge, etc. for zero deflection. Prospective bidders would likely consider this an onerous assignment of risk and charge a premium. We suggest the design professional design the permanent shoring or an allowance be established in the bid documents for permanent shoring design. Value Analysis: We identified a number of ideas the City may want to consider in realizing some time and/or cost savings. A few examples include: `Precast stair treads in lieu of poured in place. The cost of precast elements fluctuate; however, even if they’re higher in material cost, time and cost savings can be realized through faster installations and reduced labor. `The quantity of EV charging stations can be phased to meet the demand. We recommend installing the infrastructure for the charging stations but adding the equipment in phases to meet demand. This has the added benefit of taking advantage of future improvements in this emerging technology. `The copper dome details include specific details for copper dome construction, radius, materials, spire, waterproofing, roof gutter, etc. The City may want to consider a prefabricated unit. This could result in time and cost savings. Optimized Staffing Plan Our scope of work and resulting fees can be minimized through an optimized staffing plan, task assignment evaluation and reduced construction duration: Optimized Staffing Plan: We assembled our proposed staffing plan to deliver the highest qualified team at the best value. We accomplished this by assigning Resident Engineer Andy Goh on a part time basis working in close coordination with Assistant Resident Engineer Tom Fee. Through this strategy, the City receives the benefit of Andy’s expertise whenever needed without incurring the cost of a full- time team member. Task Assignment Evaluation: We assembled a team of in-house employees and subconsultants to perform all the tasks described in the RFP. We recommend primary responsibility for surveying be transferred to the contractor. This will appropriately place liability for survey errors on the contractor for remedy. We also recommend the City use in-house code compliance inspectors if this function can be performed by the City at lower cost. Reduced Construction Duration: Any schedule reductions achieved through the above measures could result in reduced duration of CM-RE services and result in fee savings as long as added staffing would not be required for added shifts or acceleration. During preconstruction, the Kitchell team assisted with re-scoping the project to bring the project in budget and developed a delivery plan including multiple bid packages and phasing to optimize the construction schedule. During construction, the Kitchell team provided day-to-day leadership throughout construction including cost, schedule and quality components of the project. The Kitchell team approached every day with the same enthusiasm, modifying plans as necessary to keep the project moving. They effectively communicated and coordinated with all involved in the project including the building department and other agencies having jurisdiction, the design team and contractors. We are grateful to have such capable staff on the project and would like to take this opportunity to recognize their dedication. -Andy Newman, Deputy Director, Butte County Association of Governments Butte Regional Transit Operations Center (BRTOC) Kitchell was a key partner in the successful delivery of the County of San Luis Obispo’s Animal Services Facility project. The first design-build project for the County. Kitchell provided preconstruction guidance on the $20.3M project and then was the day-to-day Construction Manager during construction. Kitchell’s staff was competent, professional and a pleasure to work with. - Robert Ruiz, Manager Project Delivery Division, County of San Luis Obispo ““ ““ Client Testimonials DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 10 H. Scope of Work This section should establish that the proposer understands the City’s objectives and requirements, demonstrate the proposer’s ability to meet those requirements and outline clearly and concisely the plan for accomplishing the specified work in accordance with the time schedule as outlined in Appendix A, Scope of Services: A Plan for Accomplishing the Specified Work We have thoroughly reviewed the Scope of Services contained in Appendix A of the RFP in conjunction with the contract documents, quality assurance plan, mitigation and monitoring plan, and project delivery schedule accompanying the RFP. Through this review and our periodic discussions with City personnel prior to issuance of the RFP, we have developed an understanding of the City’s objectives for the Cultural Arts District Parking Structure project. The succeeding paragraphs describe our plan for accomplishing the scope of work within the prescribed schedule. Scope of Services Statement We will perform the scope of services defined in Appendix A of the RFP, which includes: performing the duties of the Resident Engineer as defined by Caltrans, assist with bid evaluation, review available project documents, prepare and maintain the Resident Engineer’s project schedule, develop project procedures in collaboration with the City, establish and maintain the project management information/document control system, establish a dispute resolution process, provide project administration, coordination & communications, monitor/evaluate the contractor’s schedule, conduct progress meetings, issue progress reports, evaluate payment requests, manage the submittal and RFI processes, manage/mitigate change orders, conduct construction observations/inspections, evaluate & negotiate claims, perform materials testing & specialty inspections, perform surveying, perform construction environmental mitigation & monitoring, and manage project completion & closeout City Staff Participation We often use a responsibility matrix to clarify team participation requirements in granular detail. Our need for City staff participation generally boils down to providing project information and documentation, a designated representative who can render timely decisions, access to City personnel who have the authority to authorize contract modifications, and liaison with City departments and other local authorities involved in the project. Workplan Task 1: Preconstruction Services Upon commencing preconstruction phase services, Resident Engineer Andy Goh and Assistant Resident Engineer Tom Fee will perform an immersive study of all available project documents to become intimately familiar the available project information. They will use this base of information to build and implement a strategy to ensure successful delivery of the project, described in greater detail herein. Construction Management Plan Upon commencing services, we will work with the City to develop the construction management plan. This effort will serve as the project team’s primary point of reference and will establish the framework for project execution. The construction management plan will include the following: `Communications protocols, progress reporting requirements, roles and responsibilities, and project procedures to establish clarity on how the City, designer, contractor and Kitchell interact as a team and administer and coordinate the work of the project. `Master Budget and Master Schedule: Kitchell will evaluate the City’s current schedule, budget, and design to establish time and cost expectations. From this evaluation, Kitchell will develop a master budget and master schedule to track progress and develop strategies to remain on schedule and within budget. `Project Logistics Plan to identify and resolve project logistical challenges such as ensuring undisrupted activity to the surrounding community, access/egress issues, noise mitigation measures, staging operations, and many other logistical challenges. TASK TASK TASK TASK TASK TASK 1 2 3 4 5 6 Preconstruction Services Construction Services Geotech. & Materials Testing & Special Inspections Surveying Construction Environmental Mitigation & Monitoring Post Construction Deliverables DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 11 `General Conditions and Bid Forms/Procedures to convey clear scope of work and concise bidding/contract execution procedures to the bidding community and provide ample project administrative control. `Quality Assurance Plan to establish a clearly defined process for achieving the City’s quality objectives. The construction management plan is an evolving document and will be updated continually throughout the project. Many of these elements are explained in greater detail in relevant sections of our proposal. Resident Engineer’s Master Project Schedule We will develop and maintain the overall Critical Path Method (CPM) Resident Engineer’s master project schedule with milestones. Our project schedules provide information in a concise, clear, and effective format. The schedule will incorporate all remaining preconstruction and construction activities. In the process, we will evaluate and propose alternatives for project logistics, phasing and sequencing. We will advise the project team regarding factors including long-lead materials procurement, rapidly changing materials prices, weather, overall schedule requirements, favorable/unfavorable bidder climate and regulatory requirements. The project team will determine the pertinent factors. They will then be compiled, evaluated, and reduced to a set of recommendations for incorporation. Quality Assurance Plan Kitchell has a standard Quality Assurance (QA) program, which will serve as a vital tool in developing a project-specific QA plan and facilitating the contractor’s implementation of their Quality Control (QC) plan. We will take a proactive approach to quality assurance to see that project receives the best project quality for its investment. Primary aspects of Kitchell’s QA program include: `Conducting design and constructability reviews to improve buildability and help eliminate potential change orders `Establishing clear QA/QC processes and procedures including inspections, materials testing & special inspections; as well as delivered materials verification against approved submittals. `Participating in pre-installation meetings prior to each construction operation to ensure proper installations and applications without costly rework. `Requiring mock-ups of important building components and finishes to ensure that the specified quality expectations will be met. Bid Administration Successful administration of the bid phases will result in a project that meets the City’s goals for receiving responsive and responsible bid proposals from prospective qualified bidders. Kitchell performs a variety of services in administering and assisting in the contractor selection process. Our bid phase services often include: `Extensive bidder solicitation to generate a competitive bidding environment `Conducting pre-bid conferences to clarify bidding requirements and provide bidders with a venue to conduct their pre-bid investigations `Developing methods for tracking, responding to, and expediting questions received prior to receipt of bids `Reviewing addenda and advising the team of time, cost or constructability impacts `Assisting in assembling construction documents, bid documents, general conditions, addenda and distribution to all prospective bidders `Reviewing and analyzing bids and making recommendations to the owner for contract awards `Assist and coordinate the resolution of bid protests `Post-bid meetings and analysis of bid alternates `Assist with contract development, award, and formal issuance of Notice to Proceed Task 2: Construction Services Project Coordination & Communication Conveying clearly defined communications are paramount to project success. Kitchell will organize and establish effective communication among the project team members. We will ensure that responsibilities for completing tasks are assigned to appropriate team members, they are understood by all, and are tracked throughout the design and construction process. Written communications are date stamped, logged, and tracked for responses. Our project personnel are trained in Procore online data control system for generating and/or tracking communications, costs, requests for information, submittals, daily logs, drawings, and other project documents. We are also flexible in adapting to other project administration systems as dictated by City and project demands. Logs are distributed for all outstanding items. These logs are reviewed, prioritized, and correspondence is produced from Procore for all due and delinquent items. This enables the team to proactively address and resolve issues without experiencing the consequences of delayed response. Schedule Management Careful monitoring and regular reporting of activities against the contractor’s schedule will provide early information about overall progress. We will follow up on potential delay issues through active communication with City staff and the project team. We will continually review and monitor progress of the work against the scheduled milestones, and provide recommendations necessary to prevent, minimize, or recover from delays. The accepted critical path schedule will become the baseline upon which we measure progress, as well as record an accurate history of how the project is built through consistent schedule updates. We will use the weekly on-site project construction meetings as a forum to discuss the status of the schedule with the contractor. We will continuously monitor the schedule and enforce the provisions of the contract documents regarding scheduled progress. We will also enforce the provisions of the specifications regarding scheduled progress of the project. We have developed specific language used extensively in contract documents requiring the contractor to follow rigid specifications in the development and maintenance of a CPM schedule that is dollar and manpower loaded. In the event that a contractor submits a delay claim, the contractor must provide justification substantiating that an actual delay to the work occurred. Additionally, the contractor must provide a schedule analysis showing that the delay affected work activities critical to scheduled project completion. Finally, the contractor must substantiate the number of delay days claimed. The contractor’s documentation to substantiate the claim is then reviewed and analyzed, and entitlement, if any, is determined. PRECONSTRUCTION DELIVERABLES: –Resident Engineer’s master project schedule –Project Procedures –Quality Assurance plan DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 12 Progress Meetings We consider meetings an effective means of collaborating on ideas, resolving issues, building relationships, and reporting information in a relational environment. Subject matter for construction progress meetings will include the coordination and implementation of design elements, identification and resolution of issues, schedule coordination and compliance, tracking and management of RFIs, submittals, change orders, payment applications, and general coordination of testing and inspections. To memorialize important statements made and actions required, concise, accurate meeting minutes issued in a timely manner are just as important as the meetings themselves. We adhere to Kitchell’s 48-hour turnaround policy on issuing meeting minutes. Progress Reports Progress reports provide a snapshot of project status. We will generate reports electronically to summarize project activities, report schedule and budget status, address current project issues and forecast future activities. Photographs showing project progress are included along with applicable logs and other pertinent information. Payment Kitchell, in consultation with the design professional and the City, will implement a standard procedure for the review, processing, and payment of the contractor payment applications as well as invoices applicable to the project budget. This procedure will facilitate timely, accurate and appropriate payments, thereby limiting the City’s exposure to overpayments or interest fees. Submittals Kitchell’s submittal activities begin weeks before the contractor begins work. To ensure that the contractor fulfills the specified submittal requirements, we comb the specifications for any required submittals and enter them into our project administration software. This enables us to work from a submittal schedule tied to individualized submittal due dates. Once the contractor transmits submittals for approval, submittal status transitions from “scheduled” to “logged” by simply entering actual receipt dates to the pre-entered submittal information. We utilize our computerized submittal schedules and submittal logs to mitigate delays due to delinquent contractor submittals or consultant reviews. Requests for Information During construction, prompt resolution of the contractor’s requests for information (RFIs) will help mitigate change orders. For this reason, we have implemented an efficient RFI processing and monitoring system through our project administration software. We have also developed specification language to reduce erroneous RFIs. We will use the RFI Log to track requests for information including important receipt and response dates and ball-in-court status. Most importantly, the RFI Log prioritizes when a response is required to be submitted to the contractor. This will help mitigate delays due to delinquent RFI responses. The RFI Log is updated weekly and is distributed to all team members during the weekly meetings. Change Orders Our change order mitigation process will include a thorough evaluation of each change order request against the contract documents for validity. Valid change order requests will be systematically reviewed for onerous or excessive cost items. Kitchell, in conjunction with the City and the design professional, will develop and follow specific procedures for resolving change order disputes. The team will maintain emphasis on critical issues and ensure that all appropriate team members are informed of the proposed changes and the impact on cost and time immediately when the issues arise. Construction Observation/Inspection Our construction management personnel are well equipped to conduct field inspection support, oversight, and quality assurance. We have assisted in selecting, coordinating and administering over $300 million of special consultant contracts. This experience will be very useful in administering and coordinating the work of building inspectors, testing and inspection personnel, mitigation monitoring personnel and others as required by the City. We will conduct field observations and generate daily reports. Our project team will collect and report daily project information to develop a written history of the project. Information included in our daily reports includes activities performed, important events of the day, visitors, materials received, crew size, weather data, and issues to resolve. This collection of daily reports document daily construction events forming an as-built history of construction schedule implementation. Dispute Resolution/Claims We have found that unresolved disputes diminish in an environment of partnership. We recommend implementation of a dispute resolution ladder to enable issues to be escalated from the field to progressive levels of the project hierarchy enabling issues to be resolved without becoming stymied in conflict and indecision. SCHEDULE MANAGEMENT CITY OF SANTA MONICA, PARKING STRUCTURE 6 Kitchell was responsible for setting and maintaining the project schedule. Several factors had to be considered for establishing this schedule. First and foremost was how to facilitate a major construction project in a high-traffic downtown area. Second was the timing for delivery of materials – how it would affect neighboring businesses and residents, safety precautions to accommodate pedestrian traffic, etc. Kitchell met with the entire project team each week to monitor schedule issues, make adjustments as needed and report progress updates and changes to the client. With the demolition, however, there were a lot of unforeseen issues that affected the schedule early on. Once the existing structure was demolished and site excavation had begun, the general contractor discovered underground storage tanks and hazardous materials that required remediation. The additional work to remove the tanks and hazardous materials caused about a four-week delay. Despite these early challenges with unforeseen conditions during demolition and the need to bring in a new electrical connection, the project was delivered and operational on time. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 13 In the event parties disagree over design intent, unforeseen changes, utility conflicts, schedule delays and other issues, and agreement isn’t reached through dialogue, Kitchell will implement a dispute resolution process involving an objective analysis of merit and entitlement. Kitchell will meet with the City to recommend a solution then attempt settlement with the involved parties. If settlement negotiations are unsuccessful, Kitchell will recommend the matter be resolved through a formal dispute resolution process outlined in applicable contracts. Having a wide range of subject-matter experts, construction and engineering professionals, we will be able to review, assess and recommend action on additional cost matters, and scope entitlement or denials. Lastly, we can identify if contractor costs are appropriate based on our database of cost estimates developed for multiple projects in the region. TASK 3: GEOTECHNICAL & MATERIALS TESTING & SPECIALTY INSPECTION Earth Systems will perform the materials testing and specialty inspection scope of services described in the RFP. TASK 4: SURVEYING RRM will perform the survey scope of services as defined in the latest version of the Caltrans Survey Manual. TASK 5: CONSTRUCTION ENVIRONMENTAL MITIGATION & MONITORING Rincon will perform the environmental mitigation and monitoring scope as defined in the RFP including providing qualified biologist(s), air quality monitoring, cultural/archaeological monitoring, paleontological monitoring, and placing noise mitigation signage. TASK 6: POST-CONSTRUCTION SERVICES We will review the front-end documents to ensure they clearly reflect the City’s expectations for contract closeout and warranty issue response. We will also develop procedures that define each team member’s roles and responsibilities during the start-up, closeout and warranty phases. Kitchell will participate in walk-through inspections. From these inspections, a punch list of remaining items to be addressed will be generated. We will work with the City to verify that these items are corrected before moving on to final completion. Kitchell will assist in determining final completion and scheduling final inspection. We will manage submittal of required closeout documents including warranties, guarantees, affidavits, releases, bonds, and waivers, as well as coordinate delivery of all keys, manuals and maintenance stock. We will work with the City to secure as-built drawings, records, logs, photographs, change orders and shop drawings as required by the contract documents. CONSTRUCTION DELIVERABLES: –Project documentation via electronic uploads –Meeting minutes –Reports: Daily Observation, Inspection, Monthly Progress –Logs –Schedule reviews –Review/Recommendations: Changes, Claims, Payment Applications MATERIALS TESTING & SPECIALTY INSPECTION DELIVERABLES: –Materials testing and specialty inspection reports SURVEYING DELIVERABLES: –Survey records POST-CONSTRUCTION DELIVERABLES: –Red-lined project as-built drawings –Compilation of outstanding claims and other financial closeout documentation ENVIRONMENTAL MITIGATION & MONITORING DELIVERABLES: –Environmental mitigation and monitoring reports Three-Step Claim Analysis Process Merit Evaluation: Performed to determine the legal basis of the claim, if any. Settlement Negotiations: Conducted with the contractor. Entitlement Analysis: If the claim has merit, an entitlement analysis is performed to determine time and monetary entitlement. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 14 Contract Agreement Indicate any issues or proposed changes to the sample contract included as Appendix C. The Consultant must provide a brief statement affirming that the proposal terms will remain in effect for one hundred twenty (120) days following the date proposal submittals are due. Kitchell has reviewed the sample contract in Appendix C of the RFP, and has identified the following exceptions. We request the following redlined changes to the indemnity provisions: 22. Hold Harmless and Indemnification. `(a) Non-design, non-construction Professional Services: To the fullest extent permitted by law (including, but not limited to California Civil Code Sections 2782 and 2782.8), Consultant shall indemnify, defend, and hold harmless the City, and its elected officials, officers, employees, volunteers, and agents (“City Indemnitees”), from and against any and all causes of action, claims, liabilities, obligations, judgments, or damages, including reasonable legal counsels’ fees and costs of litigation (“claims”), arising out of to the extent caused by the Consultant’s negligent performance or Consultant’s negligent failure to perform its obligations under this Agreement or out of the operations conducted by Consultant, including the City’s active or passive negligence, except for such loss or damage arising from the sole or active negligence or willful misconduct of the City. In the event the City Indemnitees are made a party to any action, lawsuit, or other adversarial proceeding arising from Consultant’s performance of this Agreement, the Consultant shall provide a defense to the City Indemnitees or at the City’s option, reimburse the City Indemnitees and pay their costs of defense, including reasonable legal fees, incurred in defense of such claims. `(b) Non-design, construction Professional Services: To the extent the Scope of Services involve a “construction contract” as that phrase is used in Civil Code Section 2783, this paragraph shall apply in place of paragraph A. To the fullest extent permitted by law (including, but not limited to California Civil Code Sections 2782 and 2782.8), Consultant shall indemnify, defend, and hold harmless the City, and its elected officials, officers, employees, volunteers, and agents (“City Indemnitees”), from and against any and all causes of action, claims, liabilities, obligations, judgments, or damages, including reasonable legal counsels’ fees and costs of litigation (“claims”), arising out of to the extent caused by the Consultant’s negligent performance or Consultant’s negligent failure to perform its obligations under this Agreement or out of the operations conducted by Consultant, including the City’s active or passive negligence, except for such loss or damage arising from the sole or active negligence or willful misconduct of the City. In the event the City Indemnitees are made a party to any action, lawsuit, or other adversarial proceeding arising from Consultant’s performance of this Agreement, the Consultant shall provide a defense to the City Indemnitees or at the City’s option, reimburse the City Indemnitees and pay their costs of defense, including reasonable legal fees, incurred in defense of such claims. `(c) Design Professional Services: To the fullest extent permitted by law, Consultant shall indemnify, defend, and hold harmless City and any and all of its officials, employees and agents (“Indemnified Parties”) from and against any and all claims, losses, liabilities, damages, costs and expenses, including attorney’s fees and costs, to the extent they are caused by arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant. Consultant’s duty to defend shall consist of reimbursement of defense costs incurred by City in direct proportion to the Consultant’s proportionate percentage of fault. Consultant’s percentage of fault shall be determined, as applicable, by a court of law, jury or arbitrator. In the event any loss, liability or damage is incurred by way of settlement or resolution without a court, jury or arbitrator having made a determination of the Consultant’s percentage of fault, the Parties agree to mediation with a neutral third-party to determine the Consultant’s proportionate percentage of fault for purposes of determining the amount of indemnity and defense cost reimbursement owed to the City. Notwithstanding the foregoing and without diminishing any rights of City in the preceding paragraph, for any liability, claim, demand, allegation against City caused by a negligent arising out of, related to, or pertaining to any act or omission of Consultant, but which is not a design professional service, Consultant shall defend, indemnify, and hold harmless the Indemnified Parties from and against any and all damages, costs, expenses (including reasonable attorney fees and expert witness fees), judgments, settlements, and/or arbitration awards, whether for personal or bodily injury, property damage, or economic injury, and arising out of, related to, any concurrent or contributory negligence on the part of the City except for the sole or active negligence of, or willful misconduct of the City. In addition, we request the non-applicable indemnifications provisions be struck. We believe paragraphs (a) and (c) should be struck. In our opinion, the dispute resolution provisions in Article 36 are somewhat unusual and biased in favor of the Owner. We request the opportunity to meet with the City and explore mutually agreeable changes to the dispute resolution language. Statement of Affirmation Kitchell certifies that the proposal terms will remain in effect for one hundred twenty (120) days following the date proposal submittals due date, September 1, 2022. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 15 References Fee Proposal Optional- Additional Supporting Information A list of no more than three references for the consultant and three references for each subconsultant, including the names, addresses and telephone numbers. These references may be the same as the references listed above in IV. Proposal Format, Section C. Organization and Approach. Within a separate sealed envelope, submit a complete fee proposal for the scope of services. Provide separate subtotals for Phase 1B and Phase 2 broken down by task and staff billing rates with estimated hours. Clearly identify fees for subconsultant services. Please see pages 6 and 7 for details on no more than three references for Kitchell and each of our subconsultants. Please see the separately sealed envelope for details on our complete fee proposal for the scope of services. We have provided separate subtotals for Phase 1B and Phase 2 broken down by task and staff billing rates with estimated hours, as well as clearly identified fees for subconsultant services. None. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX i EDUCATION MBA, Florida Institute of Technology BS, Architecture Engineering, California Polytechnic State University, San Luis Obispo INDUSTRY CERTIFICATIONS Designated Design-Build Professional LEED Accredited Professional OSHA 30 Hour Certification TULLY WYATT, dbia, leed ap PROJECT DIRECTOR As local San Luis Obispo resident, Tully brings over 19 years of industry experience as a dedicated, organized and detail oriented construction professional. He is a skilled leader who believes in transparent, ongoing communication and maximizing technology to expedite information, guaranteeing that all team members, including subcontractors, are constantly informed of decisions or changes in real time. Tully has a wide range of experience in alternate delivery methods, including CMAR and design-build, as well as extensive project experience, including his most recent work at San Luis Obispo Regional Transit Authority Bus Maintenance Facility where he is serving as a Senior Project Manager. As a local resident for many years, Tully is committed to his local community and clients. His commitment to local clients ensures Tully understands the issues unique to San Luis Obispo, providing the City with assurance that he shares your desire for success. PROJECT EXPERIENCE California Polytechnic State University, San Luis Obispo, yak?it?ut?u Residential Community, San Luis Obispo, CA: A $204 million, 562,446 SF design-build project featuring eight structures with four and five levels above grade. The project featured single, double and quad units totaling 1,475 beds for first year students and an associated parking structure totaling 154,363 SF and over 480 stalls. Situated adjacent to the Grand Avenue entrance of the campus, the community is richly programmed with study areas, large scale living rooms for 50 students or more, outdoor courtyards and circulation routes, a mailroom, recreation center, offices and admissions welcome center. Outdoor spaces include a large lawn with an amphitheater and a courtyard with volleyball and basketball courts, natural features, gardens, contemplative spaces, and bike paths – all designed to support new students’ engagement in the Cal Poly experience. This project is LEED Platinum certified. San Luis Obispo Regional Transit Authority, Bus Maintenance Facility, San Luis Obispo, CA: A new $17.5 million (construction cost), 28,650 SF, single story bus maintenance facility with over 2,600 SF of mezzanine/equipment platform located on a 6.44-acre site. The facility accommodates operations, administration and maintenance areas and includes detached enclosures on-site, including a trash enclosure and canopy over bus parking. Work also includes off-site improvements, specifically the T-intersection for future Elks Lane realignment. California Polytechnic State University, San Luis Obispo, Recreation Center, San Luis Obispo, CA: A $57.5 million, LEED Gold certified recreation expansion that added 85,000 SF to the facility and renovated another 90,000 SF. Additions included a lobby/lounge, three fitness rooms, a two-court gym, a multi-activity center, tripled exercise space, a wellness center, an indoor jogging track, restrooms, leisure pool and deck, an additional sand volleyball court, and six racquetball courts rebuilt with Squash and Wallyball configurations. Renovations included men’s and women’s locker rooms. The recreation center remained operational during the construction period. San Luis Obispo County Community College District, Measure L Bond Program, San Luis Obispo, CA: A $275 million bond program which addresses crucial facility needs, including a new instructional building on the San Luis Obispo campus, a new campus center, a new career training facility and new early childhood center at the Paso Robles campus; the replacement of temporary classrooms, and repairs and upgrades to roofs, heating and air conditioning units, aquatic center and other infrastructure and utilities technology upgrades. County of San Luis Obispo, Probation Department Building, San Luis Obispo, CA: A new $16 million, 31,000 SF, two-story office building featuring office space for county probation staff, interview rooms, training, conference and evidence rooms, armory, secured sallyport, break rooms, locker and changing rooms, restrooms with showers, a public lobby, secured parking for employee vehicles and department vehicles as well as an emergency generator. Santa Barbara County, Staff Augmentation Services, Santa Barbara, CA: Tully alongside Kitchell is currently providing staff augmentation services to Santa Barbara County for over 27 projects totaling more than $73.1 million. Our services include project and construction management for capital and facilities/maintenance projects, project development, programming, scope of work development, RFP/bidding document production, overseeing bidding process and closeout. City of Santa Maria, Historic Smith-Enos House Structural Improvements, Santa Maria, CA: A $180,000 project providing structural improvements to the historic Smith-Enos House in Santa Maria. The modernization and revitalization of the structure is phase one of a multi-phase approach to the renovation of the house, which aims to rehabilitate the interior and exterior of the historic residence to recreate a new indoor public recreation venue featuring cultural and historic exhibits. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX ii EDUCATION MBA, Business Administration, Arizona State University MS, Civil Engineering, Arizona State University BS, Civil Engineering, Arizona State University INDUSTRY CERTIFICATIONS Professional Engineer #C 45731, CA Professional Engineer #24771, AZ Professional Engineer #125612, TX ANDY GOH, pe RESIDENT ENGINEER With more than 34 years of strong, relevant management experience in a wide variety of public works service areas and operations, Andy has led teams to the successful completion of hundreds of infrastructure projects, many of which are fast-track, high profile or federally funded. He is well-versed in complex public policy issues and applicable laws governing municipal operations and project delivery. Under his leadership over the years, his teams have provided customer service-first public service with strategic forward-thinking and incorporated best management practices and use of technology to improve and enhance service delivery. Andy has successfully led his teams in completing many major and complex capital improvement projects in various markets including street transportation, public transit, water and wastewater, public safety and aviation. Proactive in establishing constructive and collaborative partnerships, he prides himself on his ability to build solid and lasting relationships. Andy is results-driven and decisive, while remaining an approachable and progressive leader with a strong commitment to the client’s strategic vision.  PROJECT EXPERIENCE City of Chandler, Oregon Street Parking Structure, Chandler, AZ: A new $23 million, five-level, 293,000 SF, 932-space parking garage for the City of Chandler, which includes a road realignment along Oregon Street as well as intersection improvements at Arizona Avenue and Chicago Street. As Downtown Chandler’s largest garage, the project added much needed parking options for those accessing City Hall as well as restaurants and other venues in the bustling area. The structure is located to the west of City Hall across Arizona Avenue on the northwest corner of Chicago and Oregon streets. City of Tempe, Tempe City Hall Parking Structure, Tempe, AZ: A $16 million (construction cost), five-level, 175,000 SF, 440 stalls parking structure. The five-story mixed- use facility includes parking on all five levels with retail and office space in portions of the first two levels. The exterior cladding of the building consists of light gauge metal stud walls with an adhered stone finish. Tempe East Valley Bus Operation & Maintenance Facility, Tempe, AZ: A $39 million, 103,890 SF, 250-bus LEED Gold certified facility featuring administrative offices, operations/ driver facilities for over 500 operators, a bus maintenance building, bus canopies, and a full liquid natural gas and compressed natural gas (LNG/CNG) fueling center with fare retrieval and bus wash on a 25-acre site. City of Tempe, Center for the Arts, Tempe, AZ: A new $68 million, 88,000 SF performing and visual arts center consisting of two theaters, multi-use areas, gallery and administrative space as well as 20 acres of site development. The facility includes a 600-seat main theater, 200-seat black box theater, public space, stage support, a 3,000 SF multi-use space for rehearsals and events, a 3,500 SF visual arts gallery, administration, gift shop, catering kitchen and donor room. Special features include a 20,000 SF underfloor air distribution (UFAD) system, high-end architectural concrete components such as scalloped walls, battered/radius walls and a cast-in-place dome in the main theater. Site development features include a reflecting pool, pedestrian paths and a park located next to a riparian area on the southwest shore of the Tempe Town Lake, adjacent to a downstream dam. City of Tempe, Curry Road Pedestrian Improvements, Tempe, AZ: A $600,000 road improvement project consisting of the removal and replacement of curbs, gutters, sidewalks, roadway medians, landscaping and a 48” concrete irrigation pipe. This project was funded by the ARRA. City of Tempe, Tempe Town Lake Pedestrian Bridge, Tempe, AZ: A new $5.5 million CMAR suspension bridge totaling 1,000 LF pedestrian and bicyclist bridge connecting the north and south shores of Tempe Town Lake. The bridge, which is lit with vibrant blue hues after dark, consists of four spans of 228 feet each and weighs about 165,000 pounds in total. The bridge is 12 feet wide and 34 feet tall, with arches suspended by 32 metal cables. The bridge has a total of 128 steel cables which criss-cross each other and add to the bridge’s distinctive shape. City of Chandler, Chandler Public Safety Training Center, Chandler, AZ: A new $27 million, 58,090 SF shared resource facility for the Chandler Police Department and Chandler Fire Department. It was built in multiple phases with Phase 1 providing an administrative, educational and tactical training building. Phase 2 provides a separate, state-of-the-art indoor police firing range complex. The finished facility includes an auditorium, offices, tactical training, fitness, firearms simulation system, breakroom, secure parking and exterior secure break areas. This new training complex is the hub for integrated police and fire training and the combined public safety training center. City of Tempe, Apache Boulevard Police Substation, 911 Call Center, and Property & Evidence Facility, Tempe, AZ: An 82,800 SF facility prominently located on Apache Boulevard housing various police functions including patrol, SWAT team, a 911 Call Center and a Property & Evidence Facility. The second floor of the Apache Substation includes a 911 Call Center and Dispatch Center with space allowing users to collaborate, flexible access to the console areas and a separate training area. The entire facility includes complete redundant power and cooling systems. Adjacent to the Substation and Call Center is a 28,800SF property and evidence storage facility. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX iii EDUCATION Coursework, Art, Saddleback College AFFILIATIONS Construction Management Association of America (CMAA) TOM FEE SR. PROJECT MANAGER/ASSISTANT RESIDENT ENGINEER Tom has more than 30 years of experience successfully leading teams managing program development and construction for both public and private clients. As a construction expert, he specializes in all processes from predevelopment through construction delivery, authoring construction management guidelines and redevelopment use plans. Tom’s experience encompasses commercial, industrial, civic/municipal, public private partnership, planning, commercial mixed use, telecommunications, criminal justice, healthcare, hospitality and residential, providing services including program development, plan and specification constructability review, bidding and buyout, estimates, change order review, baseline scheduling and dispute resolution. He believes in a proactive project management approach, increasing productivity and providing exemplary results for his clients. PROJECT EXPERIENCE City of Los Angeles, Metropolis LA R2, Los Angeles, CA: Tom managed on-site construction for the R2 portion of the downtown Los Angeles Metropolis LA. R2 is a type I concrete condominium single structure with 40 levels above grade and two levels below grade. A total of 514 luxury condominiums with a connected (post tensioned) 11-story parking structure totaling 658,495 SF and 1,821 stalls. The roof of the parking structure is a landscaped deck featuring a swimming pool, spa, fire features, volleyball, sporting area, a dog park and a play space. The overall project is located within the 6.3 acre, $1 billion Metropolis development. R2 also includes 36,482 SF of retail located at the ground floor and an amenity level. City of Beverly Hills, La Cienega Tennis Center, Beverly Hills, CA: As construction manager for the City of Beverly Hills, Tom managed overall construction of the La Cienega Park and Tennis Center. The project included a 138,000 SF, post tensioned parking garage with City tennis courts located on the parking structure roof. The project also included a park, two baseball fields, soccer field and the Margaret Herrick Museum and Library. Los Angeles Unified School District, Central Los Angeles Region High School #12, Los Angeles, CA: A new $20.2 million concrete podium style construction with below grade parking and steel frame parking structure for upper floors. Tom served as the Cost Estimator responsible for reviewing the contractor’s baseline schedule, monthly pay application and time impact analysis by general contractor, preparation of independent cost estimates for change orders, evaluation of general contractor cost estimates and negotiation of final change order amounts. University of California, Santa Barbara, San Nicolas and San Rafael Residence Halls, Santa Barbara, CA: Two fast-tracked complete interior replacement projects totaling approximately $3 million located on the UCSB campus, San Nicolas Hall, a seven- story building with 265 rooms and San Rafael Hall, which consists of housing clusters accommodating approximately 500 students. Construction volume required CPM schedules to be updated twice per day, working closely with the university and subcontractors to guarantee delivery. Projects were completed sequentially on-time and within budget. University of California, Santa Barbara, Biotech Seawater Laboratory, Santa Barbara, CA: A $7 million biotech seawater lab/marine studies facility which can replicate any global ocean condition. Tom served as the Superintendent responsible for managing site construction to completion and certification for a project with extremely complicated logistics for structural concrete involving corrosion resistance, direct seawater filtering, piping and storage tanks. Due to the complexity of the project, constant interface with staff and facilities management during construction was required. Department of General Services, Caltrans District 11 Headquarters, San Diego, CA: Senior Project Manager responsible for managing program, infrastructure planning, constructability review, master schedule, project budget, public bidding, award and physical delivery of the 12-acre, 320,000 SF, five building campus. Project was completed under project and ahead of schedule. Dynegy, The Plant University, Morro Bay, CA: Programming for a redevelopment of a 12 million cu. ft. waterfront power plant while still in operation. The site consists of 50 acres of oil storage, brownfield certification, city lease arrangements, etc. The final program and site use plan was projected at $175 million and included a post graduate university for sustainable power engineering and water studies, classrooms, labs, housing, commercial mixed-use space and convention center. Kern County, Park Wi-Fi, Kern County, CA: Kitchell is providing project management services for the County’s park Wi-Fi project. The American Rescue Plan Act (ARPA) provided the County with funds thereby allowing them to provide public access internet Wi-Fi coverage to the 43 County-owned parks scattered among the 8,163 square miles that encompass Kern County – roughly the same size as the State of New Jersey. Our services include planning, scope development, consultant/contractor procurement, estimating, commissioning, and project management from concept through completion for each of the park sites. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX iv EDUCATION MBA, Business Analytics, Cal Poly San Luis Obispo BA, Politics, University of California, Santa Cruz Certificate, Business Analytics INDUSTRY CERTIFICATIONS OSHA 30-Hour Certified Construction Manager-in-Training (In Progress) RYAN STEFANEK QUALITY ASSURANCE MANAGER Ryan brings eight years of experience in the construction industry. He started his career as a field laborer with a general contractor performing carpenter duties while pursuing a master’s degree in business analytics at California Polytechnic State University in San Luis Obispo. Over the years, Ryan transitioned to construction management as a project intern and worked his way up to project engineer. He is passionate about construction and feels that working in the industry is a mixture of marathons and sprints. Ryan excels at planning and responding quickly to project demands. Ryan brings a proven ability to lead cross-functional teams through routine and complex processes. Skilled in guiding team building exercises that focus on morale and personal and professional growth. He takes a responsive leadership approach and uses critical thinking skills to solve issues during the initial stages. Equipped with a Master’s Degree in Business Administration and a Certification in Business Analytics Ryan has a solid ability to research and analyze data with strong attention to detail and an eye for spotting inaccuracies. In addition, Ryan has proven expertise in project planning, scheduling and implementation. As a highly skilled professional, Ryan is well versed in the process of providing QA/AC oversight as a component of Kitchell’s services. He provides an informed high-altitude view of the projects issues with quality delivery. Ryan’s recent experience includes serving as Project Engineer III for a four-story cast in place concrete structure in the City of San Luis Obispo. He also brings recent experience from the San Luis Obispo Regional Transit Authority Bus Maintenance Facility project. PROJECT EXPERIENCE California Polytechnic State University, Multi-Use Facility, San Luis Obispo, CA: Construction of a $100 million four-story cast in place concrete structure that housed multiple facilities for the University including a commercial kitchen, videography studio and multiple laboratory spaces. Ryan’s responsibilities included managing multiple disciples of subcontractors including MEPs and finish trades and ensured coordination and compliance with the contract documents. He also led the weekly owner and architect walks and verified quality concerns were communicated and corrected with subcontractors. San Luis Obispo Regional Transit Authority, Bus Maintenance Facility, San Luis Obispo, CA: A new $17.5 million (construction cost), 28,650 SF, single story bus maintenance facility with over 2,600 SF of mezzanine/equipment platform located on a 6.44-acre site. The facility accommodates operations, administration and maintenance areas and includes detached enclosures on-site, including a trash enclosure and canopy over bus parking. Work also includes off-site improvements, specifically the T-intersection for future Elks Lane realignment. San Luis Obispo County Community College District, Measure L Bond Program, San Luis Obispo, CA: A $275 million bond program which addresses crucial facility needs, including a new instructional building on the San Luis Obispo campus, a new campus center, a new career training facility and new early childhood center at the Paso Robles campus; the replacement of temporary classrooms, and repairs and upgrades to roofs, heating and air conditioning units, aquatic center and other infrastructure and utilities technology upgrades. Projects within this program are being delivered via multi-prime delivery method. California Polytechnic State University, San Luis Obispo, Neighborhood UU - Building 65, Building 19 and Plaza Improvements, San Luis Obispo, CA: Preconstruction services for a $30 million, 59,100 SF project consisting of renovation of 34,600 SF of space in Building 19 including complete renovation of the entire top floor, renovation of electrical and plumbing systems (as related to the top floor scope of work) in the bottom floor of Building 19 and the surrounding plaza area to the north of the building as well as new landscaping and site improvements to the plaza. Work in Building 65 consists of 24,500 SF of renovations including the Chumash Auditorium, lobby area and public areas on that floor as well as exterior improvements at the upper level and interior circulation spine at the lower level of the building to increase and improve student seating and study areas. Custom Homes, San Luis Obispo County: Carpenter and supervisor for $3 million of custom home construction encompassing more than 25 projects. Self-preformed work includes demolition, electrical, carpentry, finish carpentry and concrete. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX v EDUCATION BS, Civil Engineering, California Polytechnic State University, San Luis Obispo, CA MATT HARMS PROJECT ENGINEER Matt is a highly skilled professional supporting project managers with one year of industry experience. He has a passion for the construction management industry and finds working in CM strengthens his strategic and analytical skill sets. He is well-versed in the process of reviewing, issuing and processing RFIs and submittals, updating drawings and meeting minutes and negotiating change orders with team members on all sides of the table. Matt is familiar with a variety of software including Bluebeam, Procore, BIM 360, Assemble, Revit and AutoCAD. His recent experience includes serving as a field engineer for a $90.2 million ocean outfall booster pump rehabilitation and $6 million piping replacement. PROJECT EXPERIENCE Orange County Sanitation District, Ocean Outfall Booster Pump Rehabilitation, Huntington Beach, CA: A $90.2 million, 40,000 SF ocean outfall booster pump rehabilitation delivered via design-bid-build. The project encompassed the construction of a new low flow outfall pump station, rehabilitation of the existing central power generation building, rehabilitation of an effluent pump station annex and rehabilitation of the existing electrical distribution system. Matt’s responsibilities included acquiring daily permits for labor, analyzing budget for labor distribution reports, quality control for concrete pours, creating purchase orders, creating and evaluating change orders, safety meeting, safety walks, safety orientation for new employees and subcontractors, schedule meetings and submittals. Orange County Sanitation District, P2-123 Return Activated Sludge Piping Replacement, Huntington Beach, CA: A $6 million, 1,400 LF project encompassing the removal and replacement of a deteriorating return activation sludge piping, valves, valve actuators and wiring, flexible couplings and pipe supports. In addition, the project also included the installation of 12 new 14” isolation valves and installing new sluice gates. Matt’s responsibilities included acquiring daily permits for labor, analyzing budget for labor distribution reports, quality control for concrete pours, creating purchase orders, creating and evaluating change orders, safety meeting, safety walks, safety orientation for new employees and subcontractors, schedule meetings and submittals. California Polytechnic State University San Luis Obispo, Highway Realignment, San Luis Obispo, CA: Design services for highway improvements along the 101 in the Central Coast starting south of El Campo Road near Arroyo Grande to North of Hemi Road near Nipomo. Main goals of the project included improving safety, maintaining overall circulation and operations of US 101, as well as emphasize sustainability. Matt’s responsibilities included performing initial site studies, such as geotechnical site investigation, a water runoff analysis and traffic impact study to name a few. In addition, Matt also assisted in technical write-ups and assisted with corridor modeling design. California Polytechnic State University San Luis Obispo, Higuera and Chorro Street Intersection Improvement Proposal (Cal Poly Project), San Luis Obispo, CA: For this project, Matt determined the level of service for Higuera Street and designed an improved system layout for the intersection. The project goal was to increase safety in all aspects, such as pedestrian and vehicular safety while decreasing congestion. Matt’s responsibilities included analysis of Higuera and Chorro intersection in downtown San Luis Obispo. He recorded pedestrian and vehicle volumes, crash data and traffic signal parameters. Matt’s studies also included a traffic warrant study, traffic signal analysis, synchro analysis, safety analysis, critical lane volume studies and intersection sight distance analysis. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX vi EDUCATION BS, Natural Resources Management, Cal Poly State University, San Luis Obispo AA, Engineering Technology, Cuesta Community College INDUSTRY CERTIFICATIONS ICC Certified Special Inspector: Reinforced Concrete (#1025543-49) ICC Certified Special Inspector: Structural Masonry (#1025543-84) ICC Certified Special Inspector: Prestressed Concrete (#1025543-92) ICC Certified Special Inspector: Structural Steel, Bolting and Welding (#1025543-S1, S2 & W) ICC Certified Master of Special Inspection (#1025543-MI) ICC Certified Special Inspector: Spray Applied Fireproofing (#1025543-86) NICET Level III, Transportation Engineering Technology (#86954) AWS-CWI QCI-88 & 96, Certified Welding Inspector (#95011151) DSA Masonry Inspector (#5852 CHARLES ZANOLI TESTING & INSPECTION With over 30 years in the construction industry, Charles is a highly qualified inspector with a wealth of experience in materials testing and special inspection. Certified by numerous regulatory agencies, he specializes in testing and inspection of reinforced concrete, pre-stressed concrete, structural masonry, asphalt concrete, bolts, spray-approved fire-proofing and soils. He has a broad base of project experience, including numerous structures at California Polytechnic State University at San Luis Obispo, K-12 school projects throughout San Luis Obispo and Santa Barbara counties, and public works facilities and infrastructure. Charles is certified by APWA as a public works inspector and is a ICC- certified Master Inspector, certified by ICC for inspection of reinforced concrete, pre-stressed concrete, structural masonry, structural steel and welding, and spray-applied fire-proofing to name a few. Charles studied engineering technology and obtained a bachelor’s degree in Natural Resource Management from California Polytechnic State University. PROJECT EXPERIENCE California Polytechnic State University, San Luis Obispo, yak?it?ut?u Residential Community, San Luis Obispo, CA: A $204 million, 562,446 SF design-build project featuring eight structures with four and five levels above grade. The project featured single, double and quad units totaling 1,475 beds for first year students and an associated parking structure totaling 154,363 SF and over 480 stalls. Situated adjacent to the Grand Avenue entrance of the campus, the community is richly programmed with study areas, large scale living rooms for 50 students or more, outdoor courtyards and circulation routes, a mailroom, recreation center, offices and admissions welcome center. Outdoor spaces include a large lawn with an amphitheater and a courtyard with volleyball and basketball courts, natural features, gardens, contemplative spaces, and bike paths – all designed to support new students’ engagement in the Cal Poly experience. This project is LEED Platinum certified. Hotel San Luis Obispo (Hotel SLO), Multi-Story Hotel and Parking Structure, San Luis Obispo, CA: Hotel San Luis Obispo is located at 955 Morro Street in downtown San Luis Obispo. The approximately 110,000 SF structure was constructed as part of a mixed-use project in the Chinatown District of the city. The hotel encompasses 78 rooms and suites, two on-site restaurants, a spa, garden courtyard, pool, gym and social event/meeting spaces for up to 350 guests. The multi-story building has a subterranean parking level, accessed via a ramp from Morro Street, that entailed cuts of up to 17 feet. It utilized a conventional reinforced concrete slab with poured-in-place retaining and shear walls and concrete columns. The first floor was constructed utilizing a conventionally reinforced concrete slab, while the upper floors were supported by post-tensioned concrete slabs with wood-framed construction. Vespera on Ocean, Pismo Beach, CA: Vespera on Ocean is a 124-room Marriott Autograph hotel located at 147 Stimson Avenue in Pismo Beach. Earth Systems conducted a geotechnical engineering investigation for the project, which comprises an underground parking level, a street level concrete podium deck and three stories of stud-framed hotel rooms, and exterior pool and recreation areas. Challenges at the beach-front site included the potential for liquefaction and dynamic settlement, subsurface water, and shoring of excavations adjacent to adjacent buildings and infrastructure. Development of the site involved cuts of up to 16 feet to accommodate the subterranean parking level. San Luis Obispo County Regional Airport Passenger Terminal, San Luis Obispo, CA: Earth Systems provided a geotechnical engineering report, materials testing and special inspection for the recently completed San Luis Obispo County Regional Airport passenger terminal. At approximately 56,000 SF, the new terminal is about 45,000 SF larger than the previous facility. The $39.5 building includes a main entry, lobby, ticketing, baggage retrieval, rental car and security screening areas, airport administration offices, a public parking lot and main aircraft parking lot. It is of structural steel and masonry construction with a masonry veneer. The building is supported by conventional continuous footing foundations and concrete slabs-on grade. Hotel Cerro, San Luis Obispo, CA: Earth Systems prepared reports to provide geotechnical engineering criteria for the construction of the Hotel Cerro in downtown San Luis Obispo, California. The 65-room structure includes 65 guest rooms, restaurant space, a conference center, a spa and a rooftop pool deck. The structure consisted of wood and steel frame and concrete cast-in-place construction. William and Linda Frost Center for Research and Innovation, California Polytechnic State University at San Luis Obispo, CA: The $125 million William and Linda Frost Center for Research and Innovation will be an interdisciplinary building that will house three colleges – the College of Science and Mathematics, the College of Agriculture Food and Environmental Sciences, and the College of Liberal Arts. Currently under construction, the 102,000 SF structure will have four levels and will include a total of 20 laboratories, a technology center, studio space, classrooms, faculty offices, and conference rooms. A new plant conservatory is planned for the hillside overlooking the Poly Canyon Village student housing complex. ADDITIONAL INDUSTRY CERTIFICATIONS DSA Pneumatically Pl. Concrete (#5954) ACI Concrete Field Testing Technician, Grade 1 (No. 00931544) Certified Nuclear Gauge Operator Hazardous Waste Operations and Emergency Response, 40-hour and 8-hour refresher courses (OSHA 29 CFR 1910.120 and Title 8, CCR 5192) DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX vii EDUCATION BS, Agricultural Engineering, California Polytechnic State University, San Luis Obispo, CA LICENSES Professional Land Surveyor #LS7561, CA STEVE WEBSTER, ls SUPERVISOR OF SURVEYING Steve has over 38 years of surveying experience in the office and the field. As a project manager, his primary responsibility is the management of construction projects. While at RRM Design Group, he has performed surveying services, such as construction staking and boundary and topographic surveying, for both public and private sector clients. Along with field surveying duties, Steve prepares construction stake calculations, conducts research and analysis of boundaries, and creates boundary, topographic, and ALTA maps. He has experience with surveying equipment such as total and robotic stations and GPS. PROJECT EXPERIENCE Lucia Mar Unified School District, Arroyo Grande High School Parking, Arroyo Grande, CA: RRM provided numerous layout concepts to maximize the existing parking layout to accommodate a bus drop-off site and separate parking for the newly constructed Performing Arts Center. RRM reviewed existing pavement conditions (to determine areas that needed to be overlaid versus reconstructed) and prepared final construction documents showing re-stripping of the area, relocation of parking lot lighting, and pavement reconditioning. The total parking lot spaces provided were 367. California Polytechnic State University, San Luis Obispo, Parking Structure, San Luis Obispo, CA: RRM Design Group worked with Watry Design Group to design a new 1,300 car parking structure and multi-modal facility which will serve as the first of three planned centers of public transportation on the Cal Poly San Luis Obispo campus. Inn at The Pier Engineering, Pismo Beach, CA: RRM was hired for engineering and surveying services for The Inn at The Pier hotel with 104 guest rooms in Pismo Beach. The hotel has 132 parking spaces, including 127 underground spaces. RRM licensed land surveyors prepared and submitted the application to facilitate the lot merger for 6 lots through the City of Pismo Beach approval process. Arroyo Grande Hospital, Parking Lot, Arroyo Grande, CA: RRM prepared studies to review how the parking at Arroyo Grande Community Hospital could be increased to allow for more parking on the site. After the plan was approved, RRM prepared the construction documents to extend the current parking areas. The construction documents consisted of grading, layout, electrical and landscape plans. Lucia Mar Unified School District, Shell Beach Elementary School Parking Lot, Pismo Beach, CA: Lucia Mar Unified School District hired RRM to make several campus upgrades at Shell Beach Elementary School. This past spring, RRM completed updates to reconfigure the student drop-off areas and school parking lot to improve the flow of traffic. Sierra Vista Medical Center Parking Structure Construction Staking, San Luis Obispo, CA: RRM implemented the design and provided construction for phasing, staging, grading, drainage, hydrology, parking, circulation, accessibility, off-site road design, and upgrades to existing and new utility infrastructure. Following a two-year comprehensive planning and design study led by RRM Design Group, the San Luis Obispo City Council approved the Medical Center Master Plan for Tenet Health Care’s Sierra Vista Hospital facilities. The Plan calls for adding a new, 4-story, 85,000 SF tower to accommodate increased healthcare demands, replace existing aging facilities, and add a new 45,000 SF medical office building to serve the increasing demand for medical offices in San Luis Obispo. The Plan also includes a new five-story, 400-space parking structure and a comprehensive reorganization of the vehicle circulation. The Pismo Hotel Land Surveying Services, Pismo Beach, CA: RRM was retained for surveying services for the Pismo Hotel in Pismo Beach. RRM provided site survey control, monitoring of adjacent structures, construction staking of on-site and off-site utilities and improvements, building grid lines, verified placement of all anchor bolts for buildings, benchmarks for finish floor elevations, and framing and hold-down placements. RRM also provided calculations and staking of 965 feet of sheet piles and a post-construction ALTA/ ACSM Land Title Survey (As-Built). DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX viii EDUCATION AS, Surveying and Forest Practices, Kings River Community College, Reedley, CA BRIAN HELLWIG SUPERVISOR OF SURVEYING With a beginning in forestry and two decades of surveying experience, Brian is an expert surveyor. Brian offers experience in boundary surveying and construction staking of various projects such as commercial, residential, and mixed-use developments. He has experience with surveying equipment such as total and robotic stations, high-definition three-dimensional terrestrial laser scanning, GPS, and various surveying software. Brian’s previous work ranges from the expansive Hearst Boundary survey to the beautiful downtown Big Bear Streetscape. His open communication style ensures that all parties involved in a project are updated with up-to-date and relevant information at every intersection. PROJECT EXPERIENCE Inn at The Pier Engineering, Pismo Beach, CA: RRM was hired for engineering and surveying services for The Inn at The Pier hotel with 104 guest rooms in Pismo Beach. The hotel has 132 parking spaces, including 127 underground spaces. RRM licensed land surveyors prepared and submitted the application to facilitate the lot merger for 6 lots through the City of Pismo Beach approval process. The Pismo Hotel Land Surveying Services, Pismo Beach, CA: RRM was retained for surveying services for The Pismo Hotel in Pismo Beach. RRM provided site survey control, monitoring of adjacent structures, construction staking of on-site and off-site utilities and improvements, building grid lines, verified placement of all anchor bolts for buildings, benchmarks for finish floor elevations, and framing and hold-down placements. RRM also provided calculations and staking of 965 feet of sheet piles and a post-construction ALTA/ ACSM Land Title Survey (As-Built). City of Pismo Beach, Pismo Beach Pier Plaza and Parking Lot Upgrade, Pismo Beach, CA: The City of Pismo Beach hired RRM to repurpose a portion of the existing parking lot and expanded an existing small plaza at the base of the Pismo Pier. The plaza is connected to two separate promenade boardwalks that run parallel to the beach. The highlight of the plaza is two concrete slides that whisk giddy beachgoers of all ages from the plaza onto the sand 16 feet below. Improvements include accessible access to the beach, stepped seating, reconfigured parking lot, and a newly constructed restroom building. Lucia Mar Unified School District, Shell Beach Elementary School Parking Lot, Pismo Beach, CA: Lucia Mar Unified School District hired RRM to make several campus upgrades at Shell Beach Elementary School. This past spring, RRM completed updates to reconfigure the student drop-off areas and school parking lot to improve the flow of traffic. Lucia Mar Unified School District, Shell Beach Elementary School Parking Lot, Pismo Beach, CA: Lucia Mar Unified School District hired RRM to make several campus upgrades at Shell Beach Elementary School. This past spring, RRM completed updates to reconfigure the student drop-off areas and school parking lot to improve the flow of traffic. Sierra Vista Medical Center, Parking Structure Construction Staking, San Luis Obispo, CA: RRM implemented the design and provided construction for phasing, staging, grading, drainage, hydrology, parking, circulation, accessibility, off-site road design, and upgrades to existing and new utility infrastructure. Following a two-year comprehensive planning and design study led by RRM Design Group, the San Luis Obispo City Council approved the Medical Center Master Plan for Tenet Health Care’s Sierra Vista Hospital facilities. The Plan calls for adding a new, 4-story, 85,000 SF tower to accommodate increased healthcare demands, replace existing aging facilities, and add a new 45,000 SF medical office building to serve the increasing demand for medical offices in San Luis Obispo. The Plan also includes a new five-story, 400-space parking structure and a comprehensive reorganization of the vehicle circulation. Edward C. Little Water Recycling Facility, Visitor Center Renovation, El Segundo, CA: A $9.6 million renovation of the visitor center resulting in a multipurpose visitor center that will better enable West Basin to educate guests about the District’s mission, various water recycling treatment processes, as well as water-related issues in the region. ADDITIONAL EXPERIENCE `Lucia Mar Unified School District, Oceano Elementary School Infrastructure Rehabilitation, Oceano, CA `City of San Luis Obispo, Police Station, San Luis Obispo, CA `City of San Luis Obispo, Public Safety Dispatch Center, San Luis Obispo, CA `Sierra Vista Hospital Heliport, San Luis Obispo, CA DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX ix EDUCATION MS, Botany, California State University, Chico BS, Ecology and Evolution, University of California, Santa Barbara CERTIFICATIONS/ REGISTRATIONS Certified Ecologist, Ecological Society of America California Rapid Assessment Method, CRAM.org Wetland Delineation Training, Richard Chinn Environmental PERMITS Rare, Threatened, and Endangered Plant Voucher Collecting Permit No. 2081(a)- 16-022-V – CDFW, 2018 COLBY BOGGS SENIOR ECOLOGIST Colby is a Principal and Senior Ecologist with Rincon Consultants. He brings over 23 years of professional experience as a botanist, ecologist, wetlands specialist, and biological sciences educator and researcher. His duties at Rincon include biological field surveys for special status species, habitat and plant community mapping, wetlands assessments, biological resources analyses, construction and mitigation monitoring, conservation planning, regulatory compliance, and the preparation of biological reports, environmental documents and permit applications in support of CEQA, NEPA, Porter-Cologne Water Quality Control Act, California Fish and Game Code, California Coastal Act, Clean Water Act, Rivers and Harbors Act of 1899, and State and federal Endangered Species Acts. PROJECT EXPERIENCE County of San Luis Obispo, QA/QC Biological Resources, On-call and Planning Consultant Services for General Cannabis Case Processing, San Luis Obispo County, CA: Colby worked with County staff, applicants and agents to process applications for proposed cannabis operations which included indoor and outdoor cultivation and ancillary uses such as distribution, processing, nursery, and small-scale non-volatile manufacturing. He reviewed submitted application materials specific to biological resources, determined application completeness in concurrence with County staff and prepared documentation of CEQA analysis (IS-MNDs). Recently processed cases included production of the IS-MNDs for DRC2018-00010 Greenview, LLC and DRC2019-00110 Synergy Farms – Cano. City of Paso Robles, QA/QC Biological Resources, Olsen-South Chandler Ranch, Paso Robles, CA: Colby provided QA/QC for the Biological Resources section of the Paso Robles Olsen/South Chandler Ranch Specific Plan Project. The 358-acre Specific Plan area represented a key development area for the City, identified in the General Plan Land Use Element. The project included a specific plan, general plan amendment, zone change, multiple tentative tract maps, an oak tree removal permit, roadway abandonments and multiple development agreements. The EIR analysis required a hybrid of programmatic and project-specific elements to address the long-term impacts of buildout within the specific plan area as well as specific impacts of the proposed residential, commercial and recreational uses in the specific plan area. City of San Luis Obispo, QA/QC Biological Resources, San Luis Ranch Specific Plan Project EIR, San Luis Obispo County, CA: Colby provided QA/QC for the Biological Resources section of the San Luis Ranch Project on behalf of the City of San Luis Obispo. The 131-acre project site represented a key development area for the City, identified in the land use and circulation element update. The proposed project included a specific plan, general plan amendment and development plan for a 131-acre project site, including annexation of the site into the City of San Luis Obispo. This specific plan included a mixture of residential, commercial, office and hotel uses, with a portion of the site preserved for agriculture and open space uses. Our EIR approach on this project was a unique hybrid of programmatic and project-specific elements developed in close coordination with City staff to address both the specific impacts of the proposed development and the long-term impacts of buildout within the specific plan area. South San Luis Obispo County Sanitation District, QA/QC Biological Resources, Wastewater Treatment Plan Redundancy Project CEQA Technical Studies, Oceano, San Luis Obispo County, CA: Colby served as Biological Resources Technical Advisor for this project. The South San Luis Obispo County Sanitation District Redundancy project involves the construction and operation of backup infrastructure at the District’s wastewater treatment facility in Oceano. In support of Clean Water State Revolving Fund and United States Department of Agriculture funding pursuits for the project, Rincon prepared technical studies compliant with CEQAPlus and NEPA requirements. Technical studies include an Environmental Report for Categorical Exclusion, a Federal Clean Air Act Conformity Analysis, a Cultural Resources Assessment, and a Biological Evaluation. Rincon is also coordinating with U.S. Department of Agriculture staff to facilitate the environmental review process and receive a Biological Opinion from United States Fish and Wildlife Service for impacts to California red- legged frog. County of Santa Barbara, QA/QC Biological Resources, Arctic Cold Agricultural Refrigeration Facility EIR, Santa Barbara County, CA: Colby is currently providing QA/QC for the Biological Resources section of an EIR for the proposed Arctic Cold Agricultural Refrigeration Facility in northern Santa Barbara County. The proposed project includes a Conditional Use Permit and Development Plan for a freezer/processor facility on a 109-acre property east of Santa Maria. Because the property is currently used for active agricultural production with a mix of row crops, livestock grazing, and a vegetable cooling plant that is not a part of the proposed project, and includes abandoned petroleum wells, the environmental evaluation focuses on agricultural resources, air quality and greenhouse gas emissions, biological resources, hazards and hazardous materials, transportation, and utilities and service systems. City of Santa Maria, QA/QC Biological Resources, Area 9 Specific Plan EIR, Santa Maria, CA: Colby provided QA/QC for the Biological Resources section of the EIR for the Area 9 Specific Plan. This project incorporated a range of land use components in a 900-acre Specific Plan area, including agricultural manufacturing, commercial manufacturing, industrial, commercial office, community commercial, open space, and mixed-use residential. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX x EDUCATION MS, Biological Sciences, California Polytechnic State University, San Luis Obispo BS, Ecology and Systematic Biology, Concentration in Wildlife Biology; California Polytechnic State University, San Luis Obispo MICHAEL TOM, ms SENIOR BIOLOGIST Michael has experience conducting general and focused surveys for a variety of plant and animal species. He is proficient in maintaining herpetology collections and providing assistance with a number of vertebrate and invertebrate species. Michael has working knowledge and training with the fauna and flora of the Central Coast, San Joaquin Valley, and desert regions of California. He has also received specific training in survey protocols, habitat requirements and natural histories of the California Redlegged Frog (CRLF) and desert tortoise. Michael has assisted in special status species, general wildlife and preconstruction surveys. He has performed protocol level surveys as well as preconstruction clearance and monitoring for San Joaquin Kit fox. He has also performed protocol level surveys for desert tortoise, blunt nosed leopard lizard and California red-legged frog and has performed preconstruction surveys for giant garter snake, western pond turtles, coast horned lizards, western spade foot toads, and nesting birds. He has been authorized by the U.S. Fish and Wildlife Service under Biological Opinions for projects to handle CRLF and has handled the species on those projects where they were encountered. PROJECT EXPERIENCE SLO Creek California Red-legged Frog Habitat Assessment, San Luis Obispo County. San Luis Obispo County, Supply line 36-9-09 emergency repair, Los Berros Creek, CA: Conducted preconstruction surveys and monitoring for California red-legged frog. Captured and relocated one California red-legged frog. Santa Barbara County, Jail Northern Branch Facility, Santa Barbara, CA: California red-legged frog habitat assessment in Santa Barbara County. San Luis Obispo County, Arroyo Grande Creek at Rodriguez Road Grade Stabilization Project: Conducted preconstruction surveys and monitoring for California red-legged frog. Santa Rosa Creek Road 7.0 Emergency Culvert Repair Project Monitoring, San Luis Obispo County, CA: Michael conducted preconstruction surveys and monitoring for California red-legged frog. San Luis Obispo County, California red-legged frog focused biological monitoring for the Arroyo Grande Creek Levee Maintenance Project, San Luis Obispo County, CA: Biological monitoring for the Old Los Berros Culvert Repair and Duckbill Valve Replacement project. San Luis Obispo County, City of Arroyo Grande, CA: California red-legged frog, western pond turtle and nesting bird preconstruction surveys for the City of Arroyo Grande. California red-legged frog and California tiger salamander focused construction monitoring/relocation for the Salinas Road Interchange project, Salinas, CA: Captured and handled four California red-legged frogs under the supervision of the authorized biologist. San Benito County, Vallecitos Oil Field and Gas Wells, Four Focused Project Locations: California Tiger Salamander and California Redlegged Frog Habitat Assessment. California Academy of Sciences and California Polytechnic State University Biological Sciences Department: Four years of reptile and amphibian husbandry experience (including handling of snakes, frogs, turtles, salamanders and lizards) combined from the California Academy of Sciences and California Polytechnic State University Biological Sciences Department. PROJECT AUTHORIZATIONS `California red-legged frog handling and relocation authorization, Los Osos Valley Road Interchange Project, BO (1- 8-08-F-27) `California red-legged frog handling and relocation authorization, Supply line 36-9-09 emergency repair, Los Berros Creek. Authorization under RGP 63 through Emergency Section 7 Consultation with the USFWS. `USFWS California red-legged frog handling authorization (Under supervision), Rodriguez Waterline Stabilization Project. BO 8-8-12-F-17 `NMFS steelhead monitoring authorization under the supervision of lead fisheries biologist Don Alley, Heritage Ranch Community Services District Gallery Well Repair Project. BO 151422SWR03SR8572 `USFWS California red-legged frog, San Joaquin kit fox and California condor monitoring authorization, Heritage Ranch Community Services District Gallery Well Repair Project. `USFWS California red-legged frog handling authorization (Under supervision), Salinas Road Interchange Project. BO 8-8-09-F-65R DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX xi EDUCATION BS, Forestry and Natural Resources, Concentration in Wildlife Biology, California Polytechnic State University, San Luis Obispo CERTIFICATIONS/ REGISTRATIONS International Society of Arboriculture Certified Arborist WE-12031A USFS and CPUC approved Botanist, Avian Biologist, and Bat Biologist Department of Pesticide Regulation Qualified Applicators License Category E (Forest and Right-of-Way) License #151384 Certified Recycled Water Site Supervisor #5770 Professional Association of Diving Instructors Certified Open Water Diver CPR/First Aid Certified CASEY CLARK BIOLOGIST/ARBORIST/PROJECT MANAGER Casey serves as a biologist, arborist and project manager under Rincon’s Natural Resources group. He is a personable, creative, and multifaceted California based biologist with an expertise in botany and plant ecology. His responsibilities include leading and managing a variety of natural resources projects involving habitat suitability assessments, special-status species surveys, habitat restoration success criteria monitoring, vegetation community classification and mapping, noxious weed surveys and risk assessments, jurisdictional delineations, resource constraints analyses and arboricultural assessments. Mr. Clark has prepared extensive biological resources technical reports in support of the California Environmental Quality Act and the National Environmental Policy Act. He has six years of experience in the environmental consulting industry and graduated cum laude from Cal Poly San Luis Obispo with a Bachelor of Science in Forestry and Natural Resources where the focus of his coursework was in botany, wildlife biology, ecology, and resource conservation. PROJECT EXPERIENCE East Bay Municipal Utilities District, Quarry Site Restoration Project, Oakland, CA: As Lead Biologist and Project Manager Casey prepared a competitive proposal that secured a contract that contained rare plant surveys, a wetland delineation survey, and an arborist survey for a potential East Bay Municipal Utilities District restoration project within an abandoned 60- acre quarry site outside of San Leandro, California. Casey lead the arborist surveys and prepared a comprehensive Arborist Condition Report. He performed background research for potential rare plants within the quarry site and managed the successful execution and delivery of the Wetland Delineation Report. He served as the primary client-facing biologist managing all aspects of the project, including budget, deliverable preparation and staff. The project was successfully completed within budget. Liberty Utilities, 650 Line Rebuild Project, Truckee, CA: Casey served as lead biologist managing all project-related botanical tasks. He led full floristic field surveys, including assessments for noxious weeds and rare plants and performed restoration success criteria monitoring for the rebuild of approximately nine miles of power line reconstruction within the Tahoe National Forest between the north shore of Lake Tahoe and Truckee, California. He also prepared a comprehensive Botanical Resources Technical Report, Rare Plant Survey report, and Invasive Plant Risk Assessment Report in cooperation with project mitigation measures. Casey also utilized the data collected from bat roost habitat assessments and emergence reports to prepare a Bat Emergence Survey Report. San Diego Gas & Electric Company, Del Mar Reconfiguration Project, San Diego County, CA: Lead project biologist managing all botanical tasks for the reconfiguration of an existing 69 kilovolt power line, removal of an existing 69 kilovolt power line and conversion of portions of existing 12 kilovolt distribution lines from an overhead to underground configuration in San Diego County. Lead rare plant surveys and prepared a report documenting over 25 species of special-status plants. Casey conducted and prepared preconstruction surveys and reports, baseline restoration monitoring surveys and reports, monarch butterfly monitoring, focused coastal California gnatcatcher surveys, nesting bird surveys and reports, and conducted habitat assessments and emergence surveys for potential bat roosts. Southern California Gas Company, Confidential Project, Various Counties/Cities, Southern California: Lead surveys and prepared a Biological Resources Technical Report in compliance with CEQA that identified existing or potential sensitive natural vegetation communities, potentially jurisdictional aquatic features, and special-status plant and animal species and their associated habitat for the installation of a proposed 30-inch diameter natural gas pipeline beneath the Colorado River and the removal of the existing 30-inch-diameter natural gas pipeline and it’s supporting suspension bridge over the river, extending southeast from the community of Ehrenberg in Arizona into the City of Blythe in California. Assisted a permitted biologist in focused western yellow-billed cuckoo and southwestern willow surveys and report creation for client and agency submittal. Southwest Gas Company, Helendale Hawes Line High-Pressure Main Replacement Project, Various Counties/Cities Southern California: Casey lead surveys and prepared a Biological Resources Technical Report in compliance with CEQA that identified existing or potential sensitive natural vegetation communities, potentially jurisdictional aquatic features, and special-status plant and animal species and their associated habitat. The project involved the replacement of approximately 12 miles of 30-inch diameter natural gas pipeline traveling immediately adjacent to the Mojave River in Helendale, California. East Bay Municipal Utilities District, Walnut Creek Water Treatment Plant Pretreatment Upgrades Project, Walnut Creek, CA: As Arborist and Project Manager, Casey prepared a competitive proposal successfully securing a contract containing an arborist survey for the 13.5 acre Walnut Creek Water Treatment Plant Upgrade Project in Walnut Creek, California. Lead the arborist surveys and prepared a comprehensive Arborist Condition Report, which made tree protection and removal recommendations based off protected tree classifications, health condition and potential construction impact designations. As the primary client facing biologist managing all aspects of the project, including budget, deliverable preparation, and staff. Successful executive of the project granted additional arborist work at the Lafayette Water Treatment facility in Lafayette, California. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX xii EDUCATION MA, Anthropology, Northern Arizona University BS, Anthropology-Cultural Resources Management California State Polytechnic University, Pomona CERTIFICATIONS/ REGISTRATIONS Registered Professional Archaeologist #415730, CA AFFILIATIONS Section 106 Compliance Advanced Section 106 Society for American Archaeology Society for CA Archeology CHRISTOPHER DURAN, rpa SENIOR ARCHAEOLOGIST Christopher Duran is a Principal and Senior Archaeologist at Rincon Consultants, Inc. He brings more than a decade of professional experience in cultural resources management and exceeds the SOI’s Professional Qualification Standards. In addition, he has worked throughout California for various federal, state, and local agencies and has worked on several projects for private sector clients including developers and utility companies. Christopher has worked on hundreds of projects managing several millions of dollars in cultural resources investigations. He is an expert in cultural resources management and has worked on projects in compliance Sections 106 and 110 of the National Historic Preservation Act (NHPA), the National Environmental Policy Act (NEPA), and the California Environmental Quality Act (CEQA) as they pertain to cultural resources. PROJECT EXPERIENCE Watt Communities, LLC., Braverman Drive Tentative Map Project Phase II and III Cultural Resources Investigations, City of Santee, CA: As Project Manager/Principal Investigator, Christopher managed Phase II test investigations and managed field personnel and reporting during the site evaluation phase of a residential development project in Santee that includes one significant prehistoric site, CA-SDI-5669. Evaluation determined that CA- SDI-5669 is eligible for listing in the California Register of Historical Resources and required mitigation prior to ground disturbance related to construction of the development. Christopher prepared and executed a Data Recovery Plan and Research Design to mitigate the site. Santa Barbara County, Hollister Avenue Road Widening Project Cultural Resources Investigation, Cities of Goleta and Santa Barbara, CA: The project included the survey and documentation of a roadway interchange. Christopher led the field survey effort, document production and recommendations for the project. Southern California Gas Company, On-Call Cultural Resource Studies for Southern California Gas Company, Southern California: As Principal Investigator/Project Manager, Christopher prepared scopes of work, cost estimates and requests for service for archaeological studies throughout Southern California Gas Company’s (SoCalGas) jurisdiction. To date, studies managed for SoCalGas include emergency monitoring projects on Bureau of Land Management (BLM) lands during evaluation of the integrity of Lines 2000 and 3000 that required coordination between SoCalGas, BLM and a qualified subcontractor that performed the work. Additional undertakings performed under this contract include monitoring at Mission Santa Barbara, survey of two deep well anodes in the Mojave Desert, archaeological monitoring during wetland delineation on Burton Mesa (Santa Barbara County), and monitoring during pipeline installation for the Goleta Storage Project. Christopher also managed subcontractor performance, tracked and managed invoicing, reviewed project deliverables and scheduled qualified staff to perform the work. Naval Facilities Engineering Command, Stuart Mesa West Phase II Archaeological Investigation, Camp Pendleton, San Diego County, CA: As Field Director, Christopher managed field crews, conducting test excavations, reporting and collections management. Narven Enterprises, Archaeological Testing at 1441-1447 Sixth Avenue, San Diego, CA: As Principal Investigator/Project Manager, Christopher coordinated the reparation and implementation of an archaeological testing plan (ATP) for potential subsurface deposits on a proposed redevelopment site in downtown San Diego. He reviewed and approved ATP prior to submission to the client. The ATP was based upon the results of reviewing Sanborn Fire Insurance maps dating to the turn of the nineteenth century that documented previous development on the property. Christopher served as on-call Principal Investigator during mechanical excavations on the property, the results of which were negative. Bureau of Indian Affairs, Ewiiaapaayp Reservation Road Construction Cultural Resources Inventory, Ewiiaapaayp Indian Reservation, San Diego County, CA: As Project Manager/Principal Investigator, Christopher managed field crews, budgeting, and maintained contact and coordination with the primary contractor, Bureau of Indian Affairs and Tribal Government. Bureau of Indian Affairs, La Posta Reservation Road Construction Cultural Resources Inventory, La Posta Indian Reservation, San Diego County, CA: As Project Manager/ Principal Investigator, Christopher managed field crews, budgeting, and maintaining contact and coordination with primary contractor, Bureau of Indian Affairs and Tribal Government. Bureau of Indian Affairs, Santa Ysabel Reservation Road Reconstruction Cultural Resources Inventory, Santa Ysabel Reservation, San Diego County, CA: As Project Manager/Principal Investigator, Christopher prepared technical documents and provided agency consultation. Bureau of Land Management, Palm Springs South Coast Field Office, Canyon Lake Fuels Reduction Cultural Resources Inventory Project, Riverside County, CA: As Project Manager/Principal Investigator, Christopher managed fieldwork, field crew, scheduling, budgeting, preparing the technical report and maintained client contact. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX xiii EDUCATION MA, Public Archaeology, California State University Northridge BS, Anthropology – Emphasis in Physical Anthropology, University of California, Santa Barbara AFFILIATIONS Register of Professional Archaeologists Member Society for California Archaeology Member Society for American Archaeology Member DUSTIN MERRICK, rpa ARCHAEOLOGIST/PROJECT MANAGER Dustin is an Archaeologist with Rincon Consultants, Inc. He has extensive experience with pedestrian survey, archaeological excavations, monitoring, site mapping, and site recordation. Dustin also has experience managing projects throughout the Central Coast. He has worked with both prehistoric and historic archaeology throughout the Central Coast and Mojave Desert areas as well as the Channel Islands. He is experienced in protecting and managing cultural resources and specializes in osteological, faunal, and paleoethnobotanical analyses, specializing in prehistoric coastal and near-shore island environments. PROJECT EXPERIENCE Water Resource Recovery Facility Project, San Luis Obispo, CA: Dustin managed archaeological and paleontological resource monitoring and directed all fieldwork associated with the project. In addition, he worked directly with the City of San Luis Obispo and Native American monitor for the reinternment of cultural materials. Pacific Gas and Electric Cambria Access Road Maintenance Project, San Luis Obispo County, CA: Dustin was field lead for the survey within United States Forest Service lands and was the primary author of the technical cultural resource constraints report. Pacific Gas and Electric Tassajara Road Maintenance Project, San Luis Obispo County, CA: Dustin was field lead for the survey within United States Forest Service lands, coordinated with the Native American Heritage Commission and local tribe members and was the primary author of the technical cultural resource constraints report. Central Coast Blue Test Injection Well Extended Phase I Study, City of Pismo Beach, CA: Dustin managed all cultural resources components including survey, testing and monitoring and was the lead author on the cultural resources study. Cathodic Anode Well Project, Santa Barbara County, CA: Dustin was the field lead for the survey within Bureau of Land Management lands, coordinated with the Native American Heritage Commission and local tribe members and was the primary author of the technical report. Organic Liberty Cultivation Project, Santa Barbara County, CA: Dustin was field lead for the survey, coordinated with the Native American Heritage Commission and local tribe members and was the primary author of the technical report. In addition, he was the lead for the cultural resources and tribal cultural resources section in the environmental impact report. Pacific Gas and Electric Vandenberg-Divide Project, Santa Barbara County, CA: Dustin was field lead for the survey within Vandenberg Airforce Base lands and was the primary author of the technical cultural resource constraints report. Pacific Gas and Electric Gates Tulare Project, Tulare County, CA: Dustin was field lead for the survey within Bureau of Land Management lands, coordinated with the Native American Heritage Commission and local tribe members and was the primary author of the technical cultural resource constraints report. California High Speed Rail, Madera County, CA: Dustin was field lead for multiple monitoring and survey efforts, coordinated with the local tribe members and was the primary author of multiple technical cultural resource reports. Rexford Solar project, Tulare County, CA: Dustin coordinated with the Native American Heritage Commission and local tribe members and was the primary author of the technical cultural resource report. In addition, he was the project manager for the project and assisted the survey effort. Bellefield Solar, Mojave, CA: Dustin led the survey and is the project manager for the Phase II testing. In Addition, Mr. Merrick coordinated with the Native American Heritage Commission and local tribe members and was the primary author of the technical cultural resource report. Aratina Solar Project, Mojave, CA: Dustin participated in the survey, coordinated with the Native American Heritage Commission and local tribe members and was the primary author of the technical report. APN 038-260-049 Phase I Cultural Resources Study Project, Kings County, CA: Dustin conducted a pedestrian survey of the property directly west and south of the Avenal Animal Shelter, conducted Native American outreach and co-authored the technical report. Solar Cultural Resources Investigation, Kern County, CA: Dustin served as a crew member for the pedestrian survey and recorded prehistoric and historic sites using ArcPad GIS software. Cave Valley School Extended Phase I Study, Cool, CA: Dustin led the extended Phase I excavation and was the lead author on the cultural resources study. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX xiv EDUCATION BA, Anthropology, San Diego State University, San Diego, California Minor, Geology, San Diego State University, San Diego, California JENNIFER DICENZO PALEONTOLOGICAL PROGRAM MANAGER Jennifer has over 10 years of fieldwork and consulting experience in California paleontology and archaeology. She received her BA degree in anthropology with a focus in archaeology and a minor in geology with a focus on paleontology, at San Diego State University in 2012. She has made substantial contributions supervising field staff, surveying, construction mitigation monitoring, data recovery, fossil salvage, laboratory fossil preparation, writing technical assessments, developing, and administering monitoring and mitigation plans, report writing, managing projects, business development and graphic design. Jennifer has coordinated compliance monitoring on a range of projects including renewable energy, transmission lines, housing and commercial developments, transportation and utility. She has written and supervised the preparation of numerous technical documents including paleontological resources assessments and technical reports, impact analyses, paleontological mitigation and monitoring plans, paleontological section of if environmental impact reports, environmental assessment reports, initial studies for mitigated negative declarations, paleontological monitoring reports and paleontological survey reports. PROJECT EXPERIENCE County of San Luis Obispo, San Luis Obispo County Paso Basin Land Use Management Area Planting Ordinance Program Environmental Impact Report, San Luis Obispo County, CA: As Senior Paleontologist/Project Manager, Jennifer was responsible for overseeing the paleontological study for incorporation into the Program Environmental Impact Report. The study included reviewing existing literature and geological mapping to provide a paleontological resources assessment and sensitivity analysis and provided measures to mitigate impacts to fossil resources. City of San Luis Obispo, Utilities Department –Water Resource Recovery Facility Project, San Luis Obispo County, CA: As Senior Paleontologist, Jennifer was responsible for providing oversight and coordination of paleontological fieldwork for this ongoing mass excavation into Quaternary older alluvial deposits. Southern California Edison – Valle Substation Project, Ventura County, CA: As Senior Paleontologist/Project Manager, Jennifer was responsible for providing oversight and coordination of all fieldwork and prepared a summary of findings for a paleontological survey of a proposed utility improvements project. City of Port Hueneme –Bubbling Springs Routine Maintenance Agreement Project, Ventura County, CA: As Senior Paleontologist/Project Manager, Jennifer oversaw a paleontological initial study to be incorporated into the mitigated negative declaration for the project. The study included reviewing existing literature and geological mapping to provide a paleontological resources assessment and sensitivity analysis and provided measures to mitigate impacts to fossil resources. Caltrans District 8 – French Valley Parkway/I-15 Project, Riverside County, CA: As Paleontologist, Jennifer was one of two paleontologists responsible for surveying, planning, construction mitigation monitoring and writing the paleontological technical sections of the final survey and monitoring reports of results of excavations into the highly sensitive Pauba Formation in a complex area of the project requiring work on a busy freeway and city streets. Casitas Municipal Water District – Ventura-Santa Barbara Intertie Project, Ventura County, CA: As Senior/Project Manager, Jennifer was responsible for managing paleontological consulting, monitoring, and reporting for several ongoing projects related the Ventura-Santa Barbara Intertie Project. Jennifer supervised and coordinated paleontological field personnel and provides guidance related to handling of paleontological resource localities during excavations into multiple geologic units with a range of sensitivity. Santa Clarita Valley Water Agency, South Wells PFAS Groundwater Treatment Facility Project, Ventura County, CA: As Senior Paleontologist/Project Manager, Jennifer oversaw a paleontological initial study to be incorporated into the mitigated negative declaration for the project. The study included reviewing of existing literature and geological mapping to provide a paleontological resources assessment and sensitivity ratings and provided measures to mitigate impacts to fossil resources during construction of a proposed per- and polyfluoroalkyl substances treatment facility. Southern California Edison – Valley South Subtransmission Line Project, Riverside County, CA: As Senior Paleontologist, Jennifer was responsible for leading a crew of 8+ team members through 17 miles of a future linear transmission line. All survey work was incorporated into the Proponents Environmental Assessment (PEA) for Southern California Edison. This included proper BLM authorization and permitting to conduct surveying and a research design for field reconnaissance related to the PEA, EIS/EIR documentation for the transmission line. Greystar/City of San Diego – Sixth and Olive Project, San Diego County, CA: As Project Manager/Senior Paleontologist, Jennifer was responsible for recovering 70 fossil specimens from 9 localities. She drafted the budget, prepared the proposal, attended preconstruction meetings with City of San Diego, provided record search and literature review results, then applied cross trained archaeological and paleontological field and technical support during the project, provided project management/scheduling, salvaged fossil specimens, prepared fossil specimens in the laboratory, curated the fossil collection, and wrote the final paleontological monitoring report for a mass excavation 70+ feet into San Diego Formation near Balboa Park in eastern Downtown San Diego. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX xv RANDY ROMINGER, leed ap, assoc. dbia Principal-in-Charge Randy has over 38 years of experience in the construction industry involving the management of multi-million dollar projects for public and private sector clients. He has specialized in a variety of project types including parking structures, civic/ municipal, healthcare, corrections and education. Randy is an effective leader who believes trust, efficient conflict resolution, commitment, personal accountability and a goal-oriented approach are keys to a happy team and a successful project. EDUCATION BS, Construction Management, Colorado State University LICENSES & CERTIFICATIONS General Building Contractor B License #816632, CA LEED Accredited Professional; Assoc. Design-Build Prof. PROJECT EXPERIENCE California Polytechnic State University, San Luis Obispo, yak?it?ut?u Residential Community, San Luis Obispo, CA: A $204 million, 562,446 SF design-build project featuring eight structures with four and five levels above grade. The project featured single, double and quad units totaling 1,475 beds for first year students and an associated parking structure totaling 154,363 SF and over 480 stalls. Madera County Government Center, Madera, CA: A new $40 million, four-story, 131,000 SF administration building consisting of office space for county officials, customer service areas, board chambers as well as various conference and meeting rooms. The project also includes a new 400-car parking structure. San Luis Obispo Regional Transit Authority, Bus Maintenance Facility, San Luis Obispo, CA: A new $17.5 million (construction cost), 28,650 SF, single story bus maintenance facility with over 2,600 SF of mezzanine/ equipment platform located on a 6.44-acre site. The facility accommodates operations, administration and maintenance areas and includes detached enclosures on-site, including a trash enclosure and canopy over bus parking. Work also includes off-site improvements, specifically the T-intersection for future Elks Lane realignment. San Luis Obispo County, New Animal Shelter, San Luis Obispo, CA: A new $20.3 million, 16,000 SF design- build Animal Services Facility created to replace the existing animal services shelter constructed in 1975. The new facility improves public visitation and access, provides expanded services, security and incorporates larger kennel spaces with allowance for future expansion and overflow. San Luis Obispo County Community College District, Measure L Bond Program, San Luis Obispo, CA: A $275 million bond program which addresses crucial facility needs, including a new instructional building on the San Luis Obispo campus, a new campus center, a new career training facility and new early childhood center at the Paso Robles campus; the replacement of temporary classrooms, and repairs and upgrades to roofs, heating and air conditioning units, aquatic center and other infrastructure and utilities technology upgrades. MATT CHAPPELL, eit, cep Estimating Manager Matt has more than 26 years of experience in private and public construction and design. His experience includes project management, agency/contractor coordination, scheduling and project budgets, utility construction and estimating on multiple municipal and education projects. As a Certified Estimating Professional (CEP) by the Association for the Advancement of Cost Engineering (AACE), Matt exemplifies the well-rounded construction estimating professional. EDUCATION BS, Civil Engineering, University of Nebraska LICENSES & CERTIFICATIONS Engineer in Training #EI-7956, NB Certified Estimating Professional #130-10 PROJECT EXPERIENCE San Luis Obispo County, New Animal Shelter, San Luis Obispo, CA: A new $20.3 million, 16,000 SF design- build Animal Services Facility created to replace the existing animal services shelter constructed in 1975. The new facility improves public visitation and access, provides expanded services, security and incorporates larger kennel spaces with allowance for future expansion and overflow. County of San Luis Obispo, Probation Department Building, San Luis Obispo, CA: A new $16 million, 31,000 SF, two-story office building featuring office space for county probation staff, interview rooms, training, conference and evidence rooms, armory, secured sallyport, break rooms, locker and changing rooms, restrooms with showers, a public lobby, parking as well as an emergency generator. City of Chandler, Oregon Street Parking Structure, Chandler, AZ: A new $23 million, five-level, 293,000 SF, 932-space parking garage for the City of Chandler, which includes a road realignment along Oregon Street as well as intersection improvements at Arizona Avenue and Chicago Street. California Department of General Services, Richards Boulevard Office Complex, Sacramento, CA: A new $1 billion design-build office campus totaling approximately 1.25 million GSF consisting of four 7- to 11-story office buildings with two multi-floor podiums at the base for the towers. Site improvements include a seven-level parking garage with 1,294 spaces and an additional 318 surface parking spaces. Butte County Association of Governments, Butte Regional Transit Operations Center (BRTOC), Chico, CA: A new $38 million, 41,000 SF LEED Silver certified transit facility built to replace the outdated maintenance and operations facilities with a new bus maintenance building, operations building and an administrative office facility, along with associated on-site and off-site improvements, including an 8,000 SF tenant improvement. Work includes renovation of the existing building. The facility houses twelve additional executive offices and a new Board Room for Butte County Association of Governments official board meetings. AS-NEEDED IN-HOUSE SUPPORT SERVICES DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX xvi RICK STASSI Scheduling Manager Rick has over 45 years of technical and analytical industry scheduling experience, with a diverse career in the engineering and project management fields. His experience encompasses project controls, engineering support, customer service and information technology support as well as scheduling, with excellent interpersonal and team building skills. Rick is familiar with a wide range of systems and software including Procore, MS Project, Power BI, Primavera, Prolog and AutoCAD. His experience includes high volume projects across several industries including water/ wastewater, aviation, civic/municipal, commercial and transportation. EDUCATION Coursework, Engineering, Sacramento City College PROJECT EXPERIENCE California Polytechnic State University, San Luis Obispo, Vista Grande Dining Facility, San Luis Obispo, CA: A new $39.8 million, 35,000 SF, three-story dining complex facility which replaces a 43-year old facility. The new complex, which is double the size of the old facility, features six micro-restaurants with exhibition-style cooking as well as increased seating and lounge space encompassed in a modern LEED Gold certified building. San Luis Obispo County Community College District, Measure L Bond Program, San Luis Obispo, CA: A $275 million bond program which addresses crucial facility needs, including a new instructional building on the San Luis Obispo campus, a new campus center, a new career training facility and new early childhood center at the Paso Robles campus; the replacement of temporary classrooms, and repairs and upgrades to roofs, heating and air conditioning units, aquatic center and other infrastructure and utilities technology upgrades. California Department of General Services, Richards Boulevard Office Complex, Sacramento, CA: A new $1 billion design-build office campus totaling approximately 1.25 million GSF consisting of four 7- to 11-story office buildings with two multi-floor podiums at the base for the towers. Site improvements include a seven-level parking garage with 1,294 spaces and an additional 318 surface parking spaces. Sacramento Municipal Utility District, SMUD Headquarters Rehabilitation, Sacramento, CA: A $135 million complete renovation of the 120,000 SF office building and 45,000 SF parking garage. The north wing has a three level parking structure and a two-story office portion above the parking garage. This project is designed to achieve LEED Gold certification. Atascadero Unified School District, Measure I-10 & B-14 Bond Program, Atascadero, CA: A $126.2 million bond program providing expansion of vocational education programs and facilities, computer and technology upgrades and construction of a new science, technology, engineering and math facility at the high school as well as a new administration/classroom building at the middle school. HEATHER BROWN, pe, cpmp, leed ap Engineering & Architectural Services Director Heather brings more than 27 years of experience in the construction industry, where she has worked on a wide variety of public, higher education and commercial facilities. Her experience includes project management, mechanical and plumbing design, assessing and renovating both HVAC and plumbing systems, preparing calculations and AutoCAD drawings. Heather is responsible for the management of engineers and architects working with code, access compliance, design and constructability reviews, life cycle studies, value engineering sessions, energy studies, specifications development, needs assessments, master planning studies, facility assessments and construction inspections. EDUCATION MBA, Finance, California State University Sacramento BS, Mechanical Engineering, University of Portland, Oregon LICENSES & CERTIFICATIONS Mechanical Engineer #M31667, CA LEED Accredited Professional Commissioning Process Management Professional PROJECT EXPERIENCE San Luis Obispo Community College District, Photovoltaic Feasibility Study - Main and North Campus, San Luis Obispo, CA: Kitchell performed a study exploring the feasibility of installing on-site solar photovoltaic systems at Cuesta College’s Main and North Campus. The report investigated the electrical demand of the campuses over the pre-pandemic fully operating time frame of 2018-2020, the existing electrical site conditions, and civil infrastructure to determine the feasibility of installing an on-site solar photovoltaic system. Civic Park Condominiums, Cupertino, CA: Mechanical Engineer for this 132,000 SF, 4-story mixed development with 80 condominium units and 20,000 SF of retail and office space. The project also included a 120,000 SF, 3-level parking garage. Sacramento Municipal Utility District, SMUD Headquarters Rehabilitation, Sacramento, CA: A $135 million complete renovation of the 120,000 SF office building and 45,000 SF parking garage. The north wing has a three level parking structure and a two-story office portion above the parking garage. This project is designed to achieve LEED Gold certification. City of Chandler, Oregon Street Parking Structure, Chandler, AZ: A new $23 million, five-level, 293,000 SF, 932-space parking garage for the City of Chandler, which includes a road realignment along Oregon Street as well as intersection improvements at Arizona Avenue and Chicago Street. Butte County Association of Governments, Butte Regional Transit Operations Center (BRTOC), Chico, CA: A new $38 million, 41,000 SF LEED Silver certified transit facility built to replace the outdated maintenance and operations facilities with a new bus maintenance building, operations building and an administrative office facility, along with associated on-site and off-site improvements, including an 8,000 SF tenant improvement. Work includes renovation of the existing building. The facility houses twelve additional executive offices and a new Board Room for Butte County Association of Governments official board meetings. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 1540 Marsh Street, Suite 150 San Luis Obispo, CA 93401 www.kitchell.com DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 EXHIBIT C DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 1 Fee Proposal Within a separate sealed envelope, submit a complete fee proposal for the scope of services. Provide separate subtotals for Phase 1B and Phase 2 broken down by task and staff billing rates with estimated hours. Clearly identify fees for subconsultant services. Compensation for Services Kitchell’s philosophy for determining our compensation for services is driven by matching value to cost. In other words, we strive to provide the most appropriate complement of services and delivery methods to meet your objectives. Our primary goal is to align our understanding of the project success factors with your expectations. Our approach can be best described as “bottom-up-planning,” where we define the tasks to be performed, produce a detailed scope of services, identify staff that will implement the tasks, calculate the staff time requirement for each task and determine the resulting compensation. We believe this method provides you with the most cost- effective fee for the services provided. Typically, we prefer to be compensated on a lump sum fixed fee basis derived by using the approach just described. This arrangement eliminates the perception that the construction manager would benefit financially from construction cost overruns and change orders. We do not make it a practice to request changes to our contract for minor scope changes, or for major scope changes which can be managed within our established staffing plan and schedule. Billing amounts are determined using the method most appropriate to match the cost of carrying out our services. We are accustomed to billing using various compensation methods, which include: a fixed billing schedule, percentage of project/contract completion, and predetermined hourly rates, among other methods. Kitchell has worked under many different compensation methods and is flexible in meeting your preferences. Reimbursable Expenses Reimbursable expenses are those customary and reasonable costs associated with carrying out our Construction Management services and includes subconsultant invoices, Resident Engineer’s travel, printing, postage, and a copier/scanner for the job site office. We will charge only actual costs plus 10% to cover invoice processing and insurance. We understand the Phase 2 construction contract will include provisions for the contractor to provide an office space and a conference room for the construction management team including electricity, phone, internet, water, and sanitation services. Preconstruction services and Phase 1B construction services will be managed from our San Luis Obispo Office. Proposed Fees Phase 1B and Phase 2 fees are summarized below and broken down in detail by task and staff billing rates with estimated hours in the succeeding table. Subconsultant fees are identified within their respective tasks and include Kitchell’s mark-up on their fees. Our fee is based upon utilizing a full-time Project Inspector provided by Earth Systems. This position may not be redundant with City inspection, and if eliminated, would render $852,720 savings. Refer to the attached subconsultant fee proposal for further information regarding assumptions each firm used in deriving their fees. Rincon’s fees are for basic services. Their fee proposal also includes optional services the City may wish to consider. Our fees are based upon the scope of services described in Appendix A of the RFP and the following durations: Preconstruction services, 3-4 months from commencement of services to start of Phase 1B construction; Phase 1B, 6 months construction with post-construction concurrent with Phase 2 construction; Phase 2, 23 months construction in sequence with Phase 1B construction followed by 3 months for post-construction. Please see the following page for details. Task Phase 1B Phase B Task 1: Preconstruction Services $41,750 $22,500 Task 2: Construction Services $584,580 $2,788,440 Task 3: Geotechnical & Materials Testing & Specialty Inspection $111,553 $469,975 Task 4: Surveying $3,960 $19,800 Task 5: Construction Environmental Mitigation & Monitoring $29,638 $28,679 Task 6: Post-Construction Services $12,200 $126,500 Grand Totals:$783,681 $3,455,894 EXHIBIT C REVISED 11.9.2022 $3,436,094 $405,060 $600,201 DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 2 Description Rate/ Unit Price Phase 1B Phase 2 Hrs/Units Amount Hrs/Units Amount Task 1: Preconstruction Services Project Director $230 12 $2,760 2 $460 Resident Engineer $220 76 $16,720 40 $8,800 Assistant Resident Engineer/Sr. PM $205 76 $15,580 40 $8,200 Sr. Scheduler $180 20 $3,600 16 $2,880 Sr. Estimator $180 8 $1,440 12 $2,160 Reimbursable Expenses Allowance -$1,650 -$0 Task 2: Construction Services Project Director $230 48 $11,040 184 $42,320 Resident Engineer $220 96 $21,120 736 $161,920 Assistant Resident Engineer/Sr. PM $205 920 $186,600 3,680 $754,400 Quality Assurance Manager $170 960 $163,200 3,660 $622,200 Project Engineer ---3,600 $396,000 Project Inspector (By Earth Systems)$187 960 $179,520 3,600 $673,200 Sr. Scheduler $180 72 $12,960 300 $54,000 Sr. Estimator ---200 $36,000 Reimbursable Expenses Allowance -$8,140 -$48,400 Task 3: Geotechnical and Materials Testing and Specialty Inspection (Performed by Earth Systems) Earth Systems’ Fee with Kitchell Mark-up Quotation -$111,553 -$469,975 Task 4: Surveying (Performed by RRM) RRM’s Fee with Kitchell Mark-Up Quotation -$3,960 -$19,800 Task 5: Construction Environmental Mitigation and Monitoring (Performed by Rincon) Rincon’s Fee with Kitchell Mark-Up Quotation -$29,638 -$28,679 Task 6: Post-Construction Services Project Director ---24 $5,520 Resident Engineer ---24 $5,280 Assistant Resident Engineer/Sr. PM ---96 $19,680 Quality Assurance Manager $170 20 $3,400 240 $40,800 Project Engineer $110 80 $8,800 480 $52,800 Reimbursable Expenses Allowance -$0 -$2,420 DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 3 Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 2 Scope of Work Phase 1B Task 1 Project Initiation and Project Management This task includes project management, client coordination, quality assurance/quality control, and administration needed to prepare and execute the mitigation and monitoring plan for the project. The Rincon Principal and/or Project Manager will participate in one (1) project kickoff call with Kitchell and City staff. As part of this task, Rincon will undertake ongoing environmental compliance coordination with Kitchell and the City, review the overall project schedule, and establish a communication protocol to coordinate project changes or other issues that may arise throughout the duration of Phase 1B and Phase 2 construction activities. The project management task will also focus on maintenance of the project schedule. Rincon will manage the project team associated with environmental compliance activities including any optional tasks (if necessary), on-site monitoring, and reporting; coordinate the environmental review process schedule; and provide project updates for the environmental compliance. Rincon’s principal in charge and/or project manager will review and comment on the meeting minutes project status and budget updates. In addition to the kickoff meeting, Rincon proposes to attend up to six (6) coordination meetings with Kitchell and City staff, if applicable. Task 2 Nesting Bird Surveys and Reporting As outlined in the Plan, project activities that occur during the nesting bird season (February 1 through August 31) to be supported by a nesting bird survey conducted by a qualified biologist no more than three days prior to the initiation of ground disturbance and/or vegetation removal activities. A qualified Rincon biologist will conduct a nesting bird survey within three days prior to ground disturbing and/or vegetation removal activities for Phase 1B and Phase 2 as two separate surveys based on our understanding of the timing for each of these phases (see task 7). The nesting bird surveys will be conducted within the project boundary plus a 500-foot buffer for raptors and within the project area plus a 300-foot buffer for all other bird species where safely and legally accessible. The surveys will be conducted on foot within all accessible areas. Binoculars will be used for all inaccessible areas (e.g., private lands). This scope of work and associated cost assumes an individual nesting bird survey and report will be required for each of two phases: Phase 1B and Phase 2. Each nesting bird survey can be completed by one biologist in a single 4-hour day. If active an active nest(s) is found during a given survey, additional field time will be required to complete the survey (i.e., observation and documentation time necessary to assess nesting status such as clutch size and egg/fledging presence) and will be included as an amendment. If either of the project’s phases are to occur outside of the nesting bird season, a nesting bird survey and report will not be prepared for that phase. Upon completion of each nesting bird survey, Rincon will prepare a brief letter report that includes the purpose, methodology, and results. If active nests are found, a figure depicting the nest(s) location will be prepared. The reports will include a recommended avoidance buffer and monitoring period if an active nest is found within the survey area. Since the number of nests that may be identified is unknown, our cost does not include installing nest buffer(s), additional coordination, or monitoring the Rincon Consulting Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 3 active nest(s). If required, these monitoring tasks will be included as an additional scope of work to be authorized by the City prior to completion. The cost for this task assumes the draft letter reports will be submitted electronically for client review. Response to comments with up to two hours of staff time for each report is included. The final drafts will be compiled and submitted electronically. Task 3 Archaeological Construction Monitoring and Reporting for Phase 1B As discussed in the Plan, archaeological monitoring is required during initial ground disturbance. Rincon will conduct the required archaeological construction monitoring and reporting during Phase 1B activities. Additionally, a qualified principal investigator, defined as an archaeologist who meets the Secretary of the Interior’s Professional Qualifications Standard for archeology, shall be retained to oversee all mitigation measures related to archaeological resources, outlined in the following tasks. Task 3.1 Project Kickoff and WEAP Training Prior to the start of construction, Rincon will prepare a WEAP training program. The training will be presented to all on-site personnel and will include a briefing regarding the types of archaeological resources and/or fossils that could be found in the project area and the procedures to follow should archaeological or paleontological resources be encountered. The training will also include a discussion of applicable laws and penalties for removal or disturbance of archaeological or paleontological materials found on site. The training will provide instruction for workers with procedures to follow in the event of an archaeological resource or fossil discovery, including reporting procedures, and will provide contact information for the on-site monitor(s), Qualified Archaeologist, and Qualified Paleontologist. This training will be accomplished at the pre-construction kick-off meeting and will be conducted by the Qualified Archaeologist, Qualified Paleontologist, or their designated representative(s). Task 3.2 Archaeological Monitoring Rincon will provide a qualified archaeologist to observe all project-related ground-disturbing construction activities for Phase 1B of the project. The monitor shall be on-site on a full-time basis during initial earthmoving activities, including grading, trenching, vegetation removal, or other excavation activities. Under consultation between the qualified archaeologist and the City, monitoring may be reduced or eliminated based on observed conditions. The qualified archaeologist will observe soil disturbances, inspect exposed soils, and will re-direct equipment in the event potential resources are encountered. The monitor will conduct a cursory inspection of any discoveries; however, in the event resources potentially significant under CEQA are encountered, further investigation beyond the scope of work described may be required. The monitor will prepare daily monitoring logs that include a description of construction activities, soil descriptions (color, grain size, sediments, etc.), and cultural materials identified, if any. The monitoring logs will be reviewed as necessary by a Rincon senior archaeologist and filed at Rincon’s San Luis Obispo office. Rincon requires that construction staff provide 48-hour notice for mobilization of a monitor. Rincon will provide up to five (5), 8-hour days of archaeological monitoring at a day rate of $1500 per day. Should more than 5, 8 hour days for monitoring be required, Rincon can provide additional monitoring at the standard $1500 day rate Rincon will charge a half day rate of $800 for every day the monitor is on-site for less than 4 hours or if work is cancelled without 48 hours notification. Rincon assumes no cultural resources will be encountered during monitoring. A scope and budget augmentation will be requested to address finds encountered during monitoring. This scope and cost do DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 4 Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 4 not include analysis, laboratory preparation, or documentation of identified cultural resources discovered during monitoring. In the event cultural resources are encountered during the construction, all work shall be halted in the vicinity of the discovery until a qualified archaeologist can assess the significance of the resource. If the resources are found to be significant, they must be avoided or mitigated pursuant to the qualified archaeologist’s direction and mitigation measures outlined in the Plan. Mitigation may involve preservation in place or documentation and excavation of the resource. A report by the archaeologist evaluating the find and identifying mitigation actions taken shall be submitted to the Kitchell and the City. Task 4 Paleontological Construction Monitoring for Phase 1B Task 4.1 Paleontological Monitoring Rincon will provide a qualified paleontological monitor to be on site during initial project-related ground-disturbing activities of 10 feet or more in depth within previously undisturbed sediments. The monitor will inspect excavated or graded areas and trench sidewalls for evidence of paleontological resources. Monitoring procedures may also include onsite sample screening of sedimentary matrix for the presence of microfossils, at the discretion of the Qualified Paleontologist. Rincon will provide up to five (5), 8-hour days of paleontological monitoring. Rincon will charge a minimum 4 hours/day for every day the monitor is on-site for less than 4 hours or if work is cancelled without proper notification. An approximate daily monitoring rate for paleontological services would be $1,500 per day. If fossils are discovered, the monitor will temporarily divert construction to assess the find. If deemed scientifically significant or potentially significant, the monitor will collect the fossil specimen(s) and pertinent associated data in a manner that would minimize or avoid construction delays. All scientifically significant fossils recovered during monitoring will be prepared, identified, and curated permanently into a permanent repository. Optional Task 5 Historic American Building Survey Documentation Phase 1B and 2 are subject to the requirements of MMRP Measure CR-1 outlined in the Final EIR MMRP, which requires historic American building survey documentation prior to construction. If authorized, Rincon will prepare the required Historic American Building Survey (HABS)-level III documentation of two buildings, 610 and 614 Monterey Street prior to initiation of Phase 1B and Phase 2 construction activities. For this effort, Rincon’s project team will be led by Architectural History Project Manager JulieAnn Murphy with oversight provided by Architectural History Principal Shannon Carmack. Both Ms. Murphy and Ms. Carmack meet and exceed the Secretary of Interior’s Professional Qualification Standards (PQS) for History and Architectural History (36 CFR, Part 61). Additionally, they have prepared several HABS- like documentation packages for buildings and structures located throughout California. Photographs A Rincon Architectural Historian meeting the PQS Standards will conduct site visits to 610 Monterey Street and 614 Monterey Street. The purpose of the site visit will be to photograph the buildings. Photographs will be taken using a professional-quality single lens reflex digital camera. Large-format photographs and site drawings/plans will not be included as a component of the HABS package; either can be provided but would require a contract amendment. Images captured will include context views, elevations/exteriors, architectural details, overall interiors, and interior details (if warranted). A Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 5 maximum of 30 views of each building will be taken. The actual number of views obtained will depend upon site conditions, access, and safety considerations. Rincon assumes the City’s staff will facilitate access to the buildings, including the interiors and exteriors of the buildings. Given the close proximity of the buildings, Rincon further assumes one site visit will be sufficient to complete documentation. Following completion of the site visit, Rincon will upload photographs to an FTP site for review by the City to confirm that the photographs are adequate and will satisfy the HABS documentation requirements. Supplemental Research and Preparation of HABS Reports Rincon will prepare a HABS-level III report for the buildings in a format consistent with the Secretary of the Interior’s Standards and Guidelines for Architectural and Engineering Documentation: Historic American Building Survey. The report will include a physical description of the buildings and available information on their design and history. It will document the buildings’ construction history, architecture, and historical significance. Rincon will draw on existing documentation to the greatest extent feasible and will perform additional research as needed. The scope for this task does not include preparation of updated Department of Parks and Recreation (DPR) forms. Compilation of HABS Documentation Packages Upon completion the tasks described above, Rincon will assemble a HABS-level III documentation package for each building. The package will include photographs and the HABS-level III report. It will integrate any additional data collected. A map indicating the location from which each photograph was taken, and a photograph log, will be included for reference. A draft digital copy of each package will be submitted to the City for review and approval, following which point it will be finalized. Following finalization, Rincon will send original hard copies of the packages to San Luis Obispo Library and the History Center of San Luis Obispo County to satisfy the specific requirements of MMRP Measure CR-1. The photographs and the report will be printed on acid-free archival-bond paper and labeled and stored in archival sleeves and folders accordingly. The entire package will be housed in an acid-free storage container prior to delivery. Should additional hard or electronic copies of the documentation packages be requested, a change order will be necessary. Optional Task 6 Extended Phase 1 Testing Based on the findings of the Mitigation and Monitoring Plan prepared by Rincon in 2022, the anticipated method for investigating subsurface remains associated with CA-SLO-2431H is through an Extended Phase 1 (XPI) investigation consisting of mechanical backhoe trenching subsequent to demolition and pavement removal. Use of a backhoe will allow for an expedited review of the soil profiles and an assessment as to the potential to encounter buried archaeological deposits. The area of disturbance for demolition and pavement removal for Phase 1B and Phase 2 of the project is approximately 300 feet by 200 feet. Therefore, four backhoe trenches oriented from east to west and spaced approximately 20 meters (66 feet) apart will be necessary. Rincon assumes the XPI investigation will be negative for subsurface archaeological material that will require formal evaluation. In the event subsurface deposits that require such evaluation are identified during the XPI investigation, a budget amendment would be necessary to document and evaluate the finds. If the XPI investigation is positive, a Phase 2 significance evaluation may also be necessary to determine if the project will have a significant impact on the resource and to evaluate the deposit(s) for significance under CEQA. If an intact archaeological deposit is encountered during the Phase 2 that cannot be avoided by project design, a Phase 3 data recovery DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 5 Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 6 excavation of the deposit would likely be necessary to mitigate impacts. Phase 2 and Phase 3 testing would require a separate scope of work and cost. Optional Task 6.1 Extended Phase 1 Testing Plan Rincon will prepare an XPI work plan upon authorization. The work plan will include a discussion of the goals of the study, methods to be employed, and factors that determined the scope. Rincon assumes this plan will be submitted electronically and approved with a single combined round of comments from the City. Optional Task 6.2 Extended Phase 1 Fieldwork This work effort will be conducted under the direction of Rincon archaeologist Dustin Merrick, MA, RPA, who meets the Secretary of the Interior’s Professional Qualification Standard for prehistoric and historic archaeology. Under the direction of the Qualified Archaeologist, two Rincon archaeologists will direct the mechanical excavation of a series of up to four (4) trenches totaling approximately 800 linear feet to assess the presence or absence of subsurface archaeological deposits associated with CA-SLO-2341H within the project site. XPI fieldwork will require a two-person crew for no more than five (5), eight (8) hour days inclusive of travel time. Trenching will be performed by a qualified excavation contractor under the direction of the Rincon field director. This scope of work assumes costs for the excavation contractor will not exceed $1,200 per day. Rincon assumes that the presence of a Native American monitor will not be required for excavation activities, as no prehistoric resources are anticipated. For the purposes of this proposal, Rincon estimates that no more than four (4) trenches will be excavated. Excavation will be conducted using a standard backhoe fit with a flat blade. Excavation will be conducted in small lifts (10 to 20 cm) so that any archaeological materials, features or deposits can be identified immediately upon exposure. Stratigraphic soil profiles will be drawn of at least one side wall of a representative sample of the trenches. In lieu of hand excavation, Rincon will screen samples of excavated soils from the trenches to identify the amounts and types of artifacts and ecofacts that may be present in particular soil strata. Samples will be screened from different stratigraphic layers as identified in the field and at systematic intervals during trenching. The excavated soils will be dry screened through 1/8-inch (3-millimeter) mesh. Artifacts and ecofacts recovered during screening will be analyzed and documented in the field; no artifacts, samples, or specimens will be collected during the testing and no laboratory analysis is currently proposed. Artifacts recovered will be reburied within the trenches during backfilling. Excavation forms will be prepared providing all pertinent data (e.g., trench number, date, provenience, location justification, and termination justification). All excavation locations will be recorded using a sub- meter-accurate handheld GPS unit and documented both with notes and photographs. Should feature(s) be encountered that require hand excavation, Rincon will expose the feature so that it can be identified and its location recorded but will not complete full excavation of the feature. Complete recovery of the feature would be proposed for Phase 3 efforts, if needed. Should the feature consist of human remains, Rincon will cease work and notify the Kitchell, the City and the County Coroner. Rincon will submit a budget augmentation for the additional work related to the treatment of human remains that are Native American in origin. Optional Task 6.3 Extended Phase I Reporting Rincon will prepare a technical report to document the results of the investigation. The report will be prepared following the California Office of Historic Preservation’s Archaeological Resource Management Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 7 Reports (ARMR) Guidelines. The report will include a discussion of the findings of the study and all appropriate maps, figures, photographs, and tables. The report will also provide management recommendations for the project and outline procedures to be followed in the event of an unanticipated discovery during project construction. No more than one round of revisions to the XPI report will be necessary following review by Kitchell and the City. In addition to the XPI testing report, Rincon will prepare Department of Parks and Recreation 523 series forms to update the existing resource record (CA-SLO-2341H) that was identified within the current project boundaries. Phase 2 Task 7 Nesting Bird Surveys and Reporting As described under Task 2, project activities that occur during the nesting bird season (February 1 through August 31) to be supported by a nesting bird survey conducted by a qualified biologist no more than three days prior to the initiation of ground disturbance and/or vegetation removal activities. Upon completion of the nesting bird survey, Rincon will prepare a brief letter report that includes the purpose, methodology, and results as described in greater detail under Task 2. Task 8 Archaeological Construction Monitoring and Reporting for Phase 2 As discussed in the Plan, archaeological monitoring is required during initial ground disturbance. Rincon will conduct the required archaeological construction monitoring and reporting during Phase 2 activities. Additionally, a qualified principal investigator, defined as an archaeologist who meets the Secretary of the Interior’s Professional Qualifications Standard for archeology, shall be retained to oversee all mitigation measures related to archaeological resources, outlined in the following tasks. Task 8.1 Project Kickoff and WEAP Training Rincon will present the previously prepared WEAP for Phase 1B during the initiation of Phase 2 construction activities. The training will be presented to all on-site personnel and will include a briefing regarding the types of archaeological resources and/or fossils that could be found in the project area and the procedures to follow should archaeological or paleontological resources be encountered. The training will also include a discussion of applicable laws and penalties for removal or disturbance of archaeological or paleontological materials found on site. The training will provide instruction for workers with procedures to follow in the event of an archaeological resource or fossil discovery, including reporting procedures, and will provide contact information for the on-site monitor(s), Qualified Archaeologist, and Qualified Paleontologist. This training will be conducted on the first day of Phase 2 construction monitoring. Rincon assumes the Phase 1B WEAP will be sufficient and new WEAP or any preconstruction preparation will be required Task 8.2 Archaeological Monitoring Rincon will provide a qualified archaeologist to observe all project-related ground-disturbing construction activities for Phase 2 of the project. The monitor shall be on-site on a full-time basis during initial earthmoving activities, including grading, trenching, vegetation removal, or other excavation activities. Under consultation between the qualified archaeologist and the City, monitoring may be reduced or eliminated based on observed conditions. The qualified archaeologist will observe soil DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 6 Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 8 disturbances, inspect exposed soils, and will re-direct equipment in the event potential resources are encountered. The monitor will conduct a cursory inspection of any discoveries; however, in the event resources potentially significant under CEQA are encountered, further investigation beyond the scope of work described may be required. The monitor will prepare daily monitoring logs that include a description of construction activities, soil descriptions (color, grain size, sediments, etc.), and cultural materials identified, if any. The monitoring logs will be reviewed as necessary by a Rincon senior archaeologist and filed at Rincon’s San Luis Obispo office. Rincon requires that construction staff provide 48-hour notice for mobilization of a monitor. Rincon will provide up to five (5), 8-hour days of archaeological monitoring at a day rate of $1500 per day. Should more than 5, 8 hour days for monitoring be required, Rincon can provide additional monitoring at the standard $1500 day rate Rincon will charge a half day rate of $800 for every day the monitor is on-site for less than 4 hours or if work is cancelled without 48 hours notification. Rincon assumes no cultural resources will be encountered during monitoring. A scope and budget augmentation will be requested to address finds encountered during monitoring. This scope and cost do not include analysis, laboratory preparation, or documentation of identified cultural resources discovered during monitoring. In the event cultural resources are encountered during the construction, all work shall be halted in the vicinity of the discovery until a qualified archaeologist can assess the significance of the resource. If the resources are found to be significant, they must be avoided or mitigated pursuant to the qualified archaeologist’s direction and mitigation measures outlined in the Plan. Mitigation may involve preservation in place or documentation and excavation of the resource. A report by the archaeologist evaluating the find and identifying mitigation actions taken shall be submitted to the Kitchell and the City. Task 8.3 Archaeological Monitoring Letter Report Upon completion of the monitoring effort, Rincon will prepare a letter report that will describe the results, analysis, and conclusions of the archaeological monitoring effort. The letter report will be submitted to Kitchell and the City for review and approval within 30 days following the completion of monitoring. Rincon will respond to one (1) round of consolidated, minor comments on the draft letter report from Kitchell and the City staff. A copy of the final version of the letter report will be submitted to the City within 30 days of approval. All deliverables will be presented electronically. After the final copy is accepted by the City, the final report will be submitted to the Central Coast Information Center. Rincon assumes the archaeological monitoring letter report findings will be negative. Should a resource be discovered during archaeological monitoring, Rincon will request a scope and budget augmentation for the additional scope and cost. Rincon assumes that a single letter report for Phases 1B and 2 will suffice; therefore, we have budgeted a single letter report as a cost-saving measure. Task 9 Paleontological Construction Monitoring for Phase 2 Task 9.1 Paleontological Monitoring Rincon will provide a qualified paleontological monitor to be on site during initial project-related ground-disturbing activities of 10 feet or more in depth within previously undisturbed sediments. The monitor will inspect excavated or graded areas and trench sidewalls for evidence of paleontological resources. Monitoring procedures may also include onsite sample screening of sedimentary matrix for the presence of microfossils, at the discretion of the Qualified Paleontologist. Rincon will provide up to five (5), 8-hour days of paleontological monitoring. Rincon will charge a minimum 4 hours/day for every Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 9 day the monitor is on-site for less than 4 hours or if work is cancelled without proper notification. An approximate daily monitoring rate for paleontological services would be $1,500 per day. If fossils are discovered, the monitor will temporarily divert construction to assess the find. If deemed scientifically significant or potentially significant, the monitor will collect the fossil specimen(s) and pertinent associated data in a manner that would minimize or avoid construction delays. All scientifically significant fossils recovered during monitoring will be prepared, identified, and curated permanently into a permanent repository. Task 9.2 Paleontological Negative Findings Letter Report Rincon will prepare a final monitoring letter report that will outline the methodology of paleontological monitoring at the project site, describe the construction activity and duration, describe the lithology of the depositional units exposed during excavations, and present the results of the monitoring. The level of effort to complete a monitoring report is dependent on the number of resources recovered during monitoring activities. Rincon assumes that a single letter report for Phases 1B and 2 will suffice; therefore, we have budgeted a single letter report as a cost-saving measure. Assumptions Our scope of work and cost for this project has incorporated the following assumptions. ▪ This proposal assumes no cultural resources will be discovered during cultural resources monitoring and the current scope of work and cost estimate does not include analysis, collection, laboratory preparation, or documentation of identified cultural resources discovered during monitoring. A scope and budget augmentation will be requested to address finds encountered during monitoring. ▪ Access to the project boundary will be provided by Kitchell. The project boundary within private lands will be surveyed with the use of binoculars for the nesting bird survey. ▪ Rincon is not responsible for delays due to weather, site conditions (e.g., prohibited access, flooding, fire, safety) or other conditions out of Rincon’s control. ▪ One WEAP training by the archaeological and paleontological monitors on the first day of monitoring will be sufficient to train the entire construction crew and no additional WEAP training will be necessary. If additional training for new crew members is needed, Rincon can provide recorded presentations. ▪ Rincon assumes negative findings during paleontological monitoring, and the current cost estimate does not include expenses related to the treatment and curation of fossil specimens. Should fossils be recovered during monitoring, Rincon will immediately prepare an estimate for the anticipated costs associated with documentation and reporting requirements for the discovery. ▪ Kitchell will provide current project site plans for inclusion in the Archaeological Monitoring Technical Memorandum ▪ In light of the current COVID-19 pandemic, Rincon staff will conduct the nesting bird survey in accordance with the most current relevant, local COVID-19 safety protocols and social distancing guidance. ▪ Rincon is not responsible for damage to subsurface structures, utilities, pipelines, or other objects that are not marked or identified to us by client or Underground Service Alert utility notification service, provided that we have made appropriate inquiries to USA utility notification services. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 7 Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 10 ▪ Rincon assumes that the extended Phase I testing will not discover a resource that could be considered a historical resource under CEQA, and the current scope of work and cost estimate does not include analysis, collection, laboratory preparation, or documentation of identified cultural resources discovered during testing. If a cultural resource be discovered that has the potential to be a historic resource under CEQA, a scope and budget augmentation will be requested to address finds encountered during testing. ▪ Rincon is not responsible for delays due to weather, site conditions (e.g., prohibited access, flooding, fire, safety) or other conditions out of Rincon’s control. ▪ If additional effort is required beyond that identified in the work program outlined above, Rincon will perform the work on a time and materials basis with an amendment of the project cost and scope of work approved by Kitchell. These rates do not include overtime or penalties for missed meal periods. Should overtime be required, hours greater than eight (8) hours per day onsite or 40 hours per week onsite will be charged at a rate consistent with California state law (generally 1.5 times). As part of this work program, Rincon assumes a meal period will be allotted before the fifth hour of work. If a meal period is not allotted by the end of the fifth hour on any workday, an additional hour of labor will be charged. No additional services would be provided without receipt of prior written approval. Schedule Construction monitoring activities (Tasks 2, 3, 4, and optional Tasks 5 and 6) would proceed alongside the planned project construction schedule for Phase 1B. Similarly, construction monitoring activities (Tasks 7, 8, and 9) would proceed alongside the planned project construction schedule for Phase 2. Cost Rincon will complete the work scope for the tasks identified above to not exceed of $53,016 for Tasks 1 through 4 and $107,163 including all optional tasks. No other services will be provided without your express written authorization. Please see Table 1 below for a cost breakdown of each task. Table 1 Cost Summary Tasks Cost Phase 1B Task 1 Project Initiation and Project Management $4,165 Task 2 Nesting Bird Surveys and Reporting $3,265 Task 3 Archeological Construction Monitoring and Reporting for Phase 1B Task 3.1 Project Kickoff and WEAP Training $2,508 Task 3.2 Archaeological Monitoring $8,503 Task 4 Paleontological Construction for Phase 1B and Phase 2 Task 4.1 Paleontological Monitoring $8,503 Optional Task 5 Historic American Building Survey Documentation $19,609 Optional Task 6 Extended Phase 1 Testing Optional Task 6.1 Extended Phase I Testing Plan $4,744 Optional Task 6.2 Extended Phase I Fieldwork $23,204 Optional Task 6.3 Extended Phase 1 Reporting $6,590 Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 11 Phase 2 Task 7 Nesting Bird Surveys and Reporting $3,265 Task 8 Archaeological Construction Monitoring and Reporting for Phase 2 Task 8.1 Project Kickoff and WEAP Training – Task 8.2 Archaeological Monitoring $8,503 Task 8.3 Archaeological Monitoring Letter Report $3,739 Task 9 Paleontological Construction Monitoring for Phase 2 Task 9.1 Paleontological Monitoring $8,503 Task 9.2 Paleontological Negative Findings Letter Report $2,062 Total $107,163 All work will be performed on a time and materials basis in accordance with the work scope outlined above. Should the actual effort required to complete the tasks be less than anticipated, the amount billed will be less than the total cost outlined above. This cost estimate is in effect for a period of 30 days, during which time all of the elements of this proposal are fully negotiable to meet the needs of Kitchell. This work effort will be managed by Rincon Project Manager Dustin Merrick, M.A., Registered Professional Archaeologist (RPA), and Rincon Principal Christopher Duran, M.A., RPA. Both Mr. Merrick and Mr. Duran meet the Secretary of the Interior’s Professional Qualification Standards for prehistoric and historic archaeology (NPS 1983). Rincon is prepared to begin the work scope outlined above following receipt of a signed copy of this proposal as well as a retainer of $13,250 (approximately 25 percent of the proposed budget, not including optional tasks). Thank you for your consideration and for this opportunity to support your project. If you have any questions regarding this proposal, please contact Mr. Merrick at (805) 762-4064 or dmerrick@rinconconsultants.com, or Mr. Duran at (805) 644-4455, extension 22 or cduran@rinconconsultants.com. Sincerely, Rincon Consultants, Inc. Dustin Merrick, MA, RPA Project Manager/Archaeologist Christopher Duran, MA, RPA Principal/Senior Archaeologist Attachments Attachment 1 Reference List Attachment 2 Resumes of Key Personnel DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 8 RRM Design Group 1 SCOPE OF SERVICES TASK S.1: CONSTRUCTION STAKING This task will include the following: SUBTASK S.1A: PHASE 1B STAKING Rough Grade/Shoring Staking • One (1) set of rough grade and shoring offset stakes with grades to finish grade SUBTASK S.1B: PHASE 2 Sawcut • One (1) set of stakes will be provided for sawcut lines Sewer • One (1) set of offset stakes will be provided for sewer services with grades to flowline Water • One (1) set of offset stakes will be provided for water services with grades to finish the surface or top of curb Storm Drain • One (1) set of offset stakes at an interval of no greater than 50 feet, angle points and tees with grades to flowline. Double offsets will be provided for utility holes, drainage chambers and drain inlets with grades to flowline in/flowline out and rim/top of grate Building • One (1) set of offset stakes at grid lines 1 through 14, A, A.1, A.3, A.4, A.6, A.8, A.9, B, B.2, B.3, B.6, B.7, C, C.1, C.2, C.3, C.5, C.6, C.7, C.8, D, E for level one (1) with grades to finish surface Walls • One (1) set of offset stakes to centerline of wall with grades to top of footing or finish surface. • Street lights/transformers/vault • One (1) set of double offsets stakes to street lights transformers and vaults with grades top of curb or finish surface • Curb, flatwork • One (1) set of offset stakes to face of curb at an interval of no greater than 50 feet along straight sections and interval of no greater than 25 feet on curves sections, grade breaks, angle points and radius points with grades to top of curb or finish surface NOTE: Gas lines and conduits are not included in this proposal 2 MOVE-IN SCHEDULE: It will be the contractor’s responsibility to review the following move-in schedule with respect to possible phasing and overall project schedule. Any changes to this move-in schedule must be made prior to the award of contract. MOVE-IN SCHEDULE AND FEES Item No. Description No. of Move-ins 1 Rough Grade/Shoring 2 2 Sawcut 1 3, 4 Sewer/Water 1 5 Storm Drain 1 6 Building 1 7 Walls 1 8 Street Lights/Transformers/Vault 1 9 Curb, Flatwork 3 Total Moves to Site: 11 Deliverables: • Construction Stakes Fixed Fee: • Subtask S.1A: $3,600.00 (see footnote 1) This fee is based on prevailing wage • Subtask S.1B: $18,000.00 (see footnote 1) This fee is based on prevailing wage TASK S.2: RE-STAKING AND ADDITIONAL SERVICES All re-staking and services beyond the scope of work described herein will be performed on an hourly basis based on standard billing rates at the time the services are requested. Fee: Time and Materials • Hourly (see footnote 2) Fee Footnotes 1. Fixed fee tasks will be billed as the work progresses until the task is completed and the total amount stated in the contract for the task is invoiced. 2. Amounts billed for tasks shown as “Time and Materials” (T&M) will reflect actual hours worked. TOTAL RRM SERVICE FIX FEES: $21,600.00 Any work outside the scope of the original agreement between RRM Design Group and the Client and authorized by Client, is subject to the Terms and Conditions of the Prime Agreement. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 9 BILL RATE RANGES Subject to change effective March 1st each year  EXHIBIT A-1 SCHEDULE 1 Bill Rate Ranges Subject to change effective March 1st each year ARCHITECTURE INTERIOR DESIGN Architect 95$ -155$ Designer I 60$ -95$ Associate Manager of Architecture 140$ -200$ Designer II 70$ -120$ Design Director 145$ -240$ Interior Designer I 75$ -125$ Designer I 70$ -100$ Interior Designer II 90$ -150$ Designer II 80$ -125$ Intern 45$ -85$ Designer III 95$ -150$ Job Captain 105$ -165$ Intern 45$ -85$ Senior Interior Designer 110$ -195$ Job Captain 95$ -150$ Manager of Architecture 165$ -280$ LANDSCAPE ARCHITECTURE Principal 185$ -350$ Assistant Designer 70$ -110$ Project Architect 115$ -185$ Associate Designer 80$ -125$ Project Designer 115$ -185$ Designer 95$ -140$ Project Manager 115$ -185$ Design Director 135$ -235$ Senior Architect 135$ -235$ Intern 45$ -85$ Senior Designer 135$ -220$ Landscape Architect 95$ -145$ Senior Project Manager 135$ -240$ Manager of Landscape Architecture 150$ -245$ Principal 185$ -350$ ENGINEERING & SURVEYING Principal Landscape Architect 135$ -235$ Associate Engineer 115$ -170$ Senior Landscape Architect 115$ -175$ Construction Inspector 105$ -175$ Designer I 55$ -95$ PLANNING Designer II 75$ -125$ Assistant Planner 90$ -130$ Designer III (Structural only)90$ -135$ Associate Planner 105$ -170$ Engineer I 90$ -140$ Intern 45$ -85$ Engineer II 105$ -165$ GIS Specialist 80$ -150$ Land Surveyor 115$ -170$ Senior GIS Specialist 105$ -185$ Manager of Engineering Services 170$ -280$ Manager of Planning 175$ -265$ Manager of Surveying 155$ -235$ Principal 185$ -350$ Party Chief 90$ -150$ Principal Planner 165$ -250$ Principal 185$ -350$ Senior Planner 135$ -205$ Project Engineer 125$ -185$ Senior Urban Designer 135$ -210$ Project Manager 150$ -245$ Urban Designer 105$ -170$ Senior Associate Engineer 130$ -210$ Senior Designer 110$ -185$ CORPORATE SERVICES Senior Land Surveyor 135$ -210$ Administrative Assistant 60$ -95$ Senior Party Chief 115$ -185$ Administrative Coordinator 75$ -130$ Senior Project Engineer 140$ -230$ Assistant Office Manager 90$ -135$ Supervisor of Surveying 145$ -220$ Chief Executive Officer 195$ -500$ Survey Technician I 60$ -100$ File Clerk/Administrative Support 45$ -65$ Survey Technician II 75$ -115$ Marketing Assistant 45$ -85$ Survey Technician III 90$ -155$ Marketing Coordinator 65$ -115$ Surveying Crew Rates Marketing Manager 125$ -235$ REGULAR Marketing Specialist 90$ -155$ One person w/ GPS or Robotic Workstation 125$ -155$ Office Coordinator 75$ -130$ Two person 175$ -290$ Proposal Coordinator 80$ -140$ Three person 235$ -390$ Receptionist 45$ -80$ PREVAILING WAGE Senior Marketing Specialist 105$ -190$ One person w/ GPS or Robotic Workstation 150$ -180$ Two person 225$ -340$ Three person 325$ -490$      Rev 3/1/2022 3 CONSTRUCTION STAKING CONDITIONS: 1. It will be the contractor’s responsibility to inform RRM of changes in the Plans and Specifications that will affect the location of improvements. RRM will not be liable for misplaced improvements due to such changes that were not brought to our attention. Additional work caused by changes to the Plans and Specifications will be billed on an hourly basis. Also, any construction based on staking requested by the contractor based on unapproved plans and specifications will be done at the contractor’s sole risk. RRM will not be held liable for damages suffered by the contractor resulting from changes to the plans after RRM has set stakes. 2. To provide for reasonable preparation and organization, requests for staking should be made at least 48 hours in advance. Although RRM will make every effort to accommodate the unforeseen, no guarantee can be made without sufficient notice. 3. The contractor will be responsible for ensuring that the construction site is clear of debris and vehicles before ordering stakes. If staking is requested and site conditions do not allow the survey crew to work, you will be charged hourly for the time lost. This does not include poor site conditions caused by weather or other circumstances beyond the control of the contractor. 4. Any claim against RRM for losses or damages resulting from errors in staking (either horizontal or vertical) must be accompanied by proof of the actual location of the stake used and the information written on the lath (i.e., stakes must still be in place in the field when the claim is made). 5. The contractor will be responsible for discussing offsets for stakes prior to fieldwork. Otherwise, offsets will be chosen according to standard practice in this County, and any changes requested after the completion of staking will be billed to the contractor as an extra. 6. For your convenience, we will provide the job superintendent with a “construction staking request form” that must be signed before any extra work beyond the scope of the contract is done. Copies of this signed form will be sent with each monthly billing for your records. 7. Stakes shall be used only for their intended purpose. For example, rough grade stakes shall not be used for finish grading or building layout. 8. Three (3) consecutive points shown to be on the same slope rate must be used in common order that the contractor may detect any variation out of a perfect straight grade. In case any discrepancy is found, it shall be reported to the surveyor. Otherwise, the surveyor will not be responsible for any error in grade of the finished work. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 10 Earth Systems EARTH SYSTEMS | AUGUST 29, 2022 | CITY OF SAN LUIS OBISPO - CULTURAL ARTS DISTRICT PARKING STRUCTURE Earth Systems FEE BREAKDOWN Hours/Units Rate Total Earth Systems Fee Breakdown PROJECT: DATE: Hours/Units Rate Total PHASE IB - Cultural Arts District Parking Structure On-Site Improvements - 120 Work Day Duration Project Inspector 960 $170.00 $163,200.00 Subtotal Task 2 $163,200.00 Geotechnical Observation - Professional 40 $200.00 $8,000.00 Project Management/Quality Control 40 $225.00 $9,000.00 Grading Observation and Testing 320 $140.00 $44,800.00 Special Inspection - Shoring Wall 120 $145.00 $17,400.00 Reporting and Document Posting 40 $125.00 $5,000.00 Compaction Tests (per test)150 $10.00 $1,500.00 Mileage (per trip)170 $7.50 $1,275.00 Laboratory Testing - Per Fee Schedule (Allotment) $12,000.00 DIR/ECPR Posting 20 $90.00 $1,800.00 Subtotal Task 3 $100,775.00 Hours/Units Rate Total PHASE 2 - Project Inspector 3600 $170.00 $612,000.00 Subtotal Task 2 $612,000.00 Geotechnical Observation - Professional 40 $200.00 $8,000.00 Project Management/Quality Control 100 $225.00 $22,500.00 Grading Observation and Testing - 2023 280 $140.00 $39,200.00 Special Inspection - 2023 320 $145.00 $46,400.00 Grading Observation and Testing -2024 120 $140.00 $16,800.00 Special Inspection -2024 1600 $145.00 $232,000.00 Reporting and Document Posting 180 $125.00 $22,500.00 Compaction Tests (per test)150 $10.00 $1,500.00 Mileage (per trip)700 $7.50 $5,250.00 Laboratory Testing - Per Fee Schedule (Allotment) $25,000.00 DIR/ECPR Posting 90 $90.00 $8,100.00 Subtotal Task 3 $427,250.00 TOTAL TASK 2 $775,200.00 TOTAL TASK 3 $528,025.00 Task 2 - Construction Observations/Inspections Task 3 – Geotechnical and Materials Testing and Specialty Inspection City of San Luis Obispo - Cultural Arts District Parking Structure August 29, 2022 Cultural Arts District Parking Structure - 450 Work Day Duration Task 2 - Construction Observations/Inspections Task 3 – Geotechnical and Materials Testing and Specialty Inspection PHASE 1B - Cultural Arts District Parking Structure On-Site Improvements - 120 Work Day Duration Hours/Units Rate Total PHASE 2 - Cultural Arts District Parking Structure - 450 Work Day Duration DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 Certificate Of Completion Envelope Id: 39089CD97632471F8036895978DF81A8 Status: Completed Subject: Complete with DocuSign: Resident Engineer and Construction Management - Agreement.pdf Department: Supplier: Source Envelope: Document Pages: 93 Signatures: 4 Envelope Originator: Certificate Pages: 5 Initials: 0 Argelia Chang AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) 990 Palm Street San Luis Obispo, CA 93422 achang@slocity.org IP Address: 104.129.202.169 Record Tracking Status: Original 12/15/2022 11:55:07 AM Holder: Argelia Chang achang@slocity.org Location: DocuSign Signer Events Signature Timestamp Wendy Cohen wcohen@kitchell.com President Kitchell CEM, Inc. Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 104.220.121.60 Sent: 12/15/2022 11:58:04 AM Resent: 12/22/2022 4:26:12 PM Viewed: 12/23/2022 7:27:46 AM Signed: 12/23/2022 7:27:50 AM Electronic Record and Signature Disclosure: Accepted: 11/14/2022 12:37:10 PM ID: f59ea0e7-4d0e-4510-85e7-51548060a030 Randy Rominger rrominger@kitchell.com Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 174.87.132.185 Signed using mobile Sent: 12/23/2022 7:27:55 AM Viewed: 12/23/2022 2:07:31 PM Signed: 12/23/2022 2:08:04 PM Electronic Record and Signature Disclosure: Accepted: 12/23/2022 2:07:31 PM ID: ab204dce-8a22-46ed-ba83-0c357d81b18c Christine Dietrick cdietric@slocity.org Security Level: Email, Account Authentication (None) Signature Adoption: Drawn on Device Using IP Address: 104.129.202.90 Sent: 12/23/2022 2:08:09 PM Resent: 1/5/2023 8:01:21 AM Viewed: 1/5/2023 8:40:44 AM Signed: 1/5/2023 8:44:44 AM Electronic Record and Signature Disclosure: Accepted: 6/15/2020 2:16:11 PM ID: a47fa5a6-25c4-499a-ad2d-b3750c2fd621 Matt Horn mhorn@slocity.org Director of Public Works Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 47.32.158.228 Sent: 1/5/2023 8:44:50 AM Viewed: 1/5/2023 8:53:08 AM Signed: 1/5/2023 8:53:26 AM Electronic Record and Signature Disclosure: Signer Events Signature Timestamp Accepted: 11/7/2018 6:54:10 PM ID: abbb6413-5f03-483d-8739-5befeff5edf7 In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Argelia Chang achang@slocity.org Administrative Assistant III City of San Luis Obispo Security Level: Email, Account Authentication (None) Sent: 1/5/2023 8:53:30 AM Resent: 1/5/2023 8:53:38 AM Viewed: 1/5/2023 8:55:42 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Daniel Clancy dclancy@slocity.org Purchasing Analyst City of San Luis Obispo Security Level: Email, Account Authentication (None) Sent: 1/5/2023 8:53:32 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Manuel Guzman mguzman@slocity.org Security Level: Email, Account Authentication (None) Sent: 1/5/2023 8:53:33 AM Electronic Record and Signature Disclosure: Accepted: 12/18/2020 9:05:30 AM ID: bda270ba-efa2-4807-a1cc-c5e70f600cee Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 12/15/2022 11:58:04 AM Certified Delivered Security Checked 1/5/2023 8:53:08 AM Signing Complete Security Checked 1/5/2023 8:53:26 AM Completed Security Checked 1/5/2023 8:53:33 AM Payment Events Status Timestamps Electronic Record and Signature Disclosure ELECTRONIC RECORD AND SIGNATURE DISCLOSURE From time to time, Carahsoft OBO City of San Luis Obispo (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through your DocuSign, Inc. (DocuSign) Express user account. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to these terms and conditions, please confirm your agreement by clicking the 'I agree' button at the bottom of this document. Getting paper copies At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. For such copies, as long as you are an authorized user of the DocuSign system you will have the ability to download and print any documents we send to you through your DocuSign user account for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. To indicate to us that you are changing your mind, you must withdraw your consent using the DocuSign 'Withdraw Consent' form on the signing page of your DocuSign account. This will indicate to us that you have withdrawn your consent to receive required notices and disclosures electronically from us and you will no longer be able to use your DocuSign Express user account to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through your DocuSign user account all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. Electronic Record and Signature Disclosure created on: 5/10/2017 10:25:58 AM Parties agreed to: Wendy Cohen, Randy Rominger, Christine Dietrick, Matt Horn, Manuel Guzman How to contact Carahsoft OBO City of San Luis Obispo: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: keriksso@slocity.org To advise Carahsoft OBO City of San Luis Obispo of your new e-mail address To let us know of a change in your e-mail address where we should send notices and disclosures electronically to you, you must send an email message to us at keriksso@slocity.org and in the body of such request you must state: your previous e-mail address, your new e-mail address. We do not require any other information from you to change your email address.. In addition, you must notify DocuSign, Inc to arrange for your new email address to be reflected in your DocuSign account by following the process for changing e-mail in DocuSign. To request paper copies from Carahsoft OBO City of San Luis Obispo To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an e-mail to keriksso@slocity.org and in the body of such request you must state your e-mail address, full name, US Postal address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with Carahsoft OBO City of San Luis Obispo To inform us that you no longer want to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your DocuSign account, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an e-mail to keriksso@slocity.org and in the body of such request you must state your e-mail, full name, IS Postal Address, telephone number, and account number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software Operating Systems: Windows2000? or WindowsXP? Browsers (for SENDERS): Internet Explorer 6.0? or above Browsers (for SIGNERS): Internet Explorer 6.0?, Mozilla FireFox 1.0, NetScape 7.2 (or above) Email: Access to a valid email account Screen Resolution: 800 x 600 minimum Enabled Security Settings: •Allow per session cookies •Users accessing the internet behind a Proxy Server must enable HTTP 1.1 settings via proxy connection ** These minimum requirements are subject to change. If these requirements change, we will provide you with an email message at the email address we have on file for you at that time providing you with the revised hardware and software requirements, at which time you will have the right to withdraw your consent. Acknowledging your access and consent to receive materials electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please verify that you were able to read this electronic disclosure and that you also were able to print on paper or electronically save this page for your future reference and access or that you were able to e-mail this disclosure and consent to an address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format on the terms and conditions described above, please let us know by clicking the 'I agree' button below. By checking the 'I Agree' box, I confirm that: • I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF ELECTRONIC RECORD AND SIGNATURE DISCLOSURES document; and • I can print on paper the disclosure or save or send the disclosure to a place where I can print it, for future reference and access; and • Until or unless I notify Carahsoft OBO City of San Luis Obispo as described above, I consent to receive from exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to me by Carahsoft OBO City of San Luis Obispo during the course of my relationship with you. 72 From:Kacsinta, Madeline Sent:Friday, October 27, 2023 10:32 AM To:Clancy, Daniel Subject:PO 615119 Attachments:RE and CM Services Cultural Arts District - Signed Agreement.pdf Follow Up Flag:Follow up Flag Status:Completed Good Morning Daniel! I hope your Friday is going well. I am going to close Kitchell’s current PO, and open a new one with the existing balance of $239,859.03, an add service of $237,600.00, and their new service agreement for phase 2 of $3,436,094. I have attached Kitchell’s original signed agreement, and will also attach it to the new PO, but wanted to give you a heads up, since it is a large dollar amount. You can find the dollar amount for the proposal on the agreement on page 84. Please let me know if you have any questions or concerns. Thank you, Madeline Kacsinta Engineer III Public Works 919 Palm, San Luis Obispo, CA 93401-3218 E MKacsint@slocity.org T 805.781.7094 slocity.org Stay connected with the City by signing up for e-notifications AGREEMENT THIS AGREEMENT is made and entered into in the City of San Luis Obispo on _________________ by and between the CITY OF SAN LUIS OBISPO, a municipal corporation, hereinafter referred to as City, and KITCHELL CEM, INC., hereinafter referred to as Consultant. W I T N E S S E T H WHEREAS, on July 28, 2022, requested proposals for Resident Engineer and Construction Management Services, Cultural Arts District Parking Structure, City Project Specification No. 90435-CM. WHEREAS, pursuant to said request, Consultant submitted a proposal that was accepted by City for said services. NOW THEREFORE, in consideration of their mutual promises, obligations and covenants hereinafter contained, the parties hereto agree as follows: 1. Contract Term. The term of this agreement shall be from the date this Agreement is made and entered, as first written above until all work has been completed. 2. Work Delays. Should the Consultant be obstructed or delayed in the work required to be done hereunder by changes in the work or by any default, act, or omission of the City, or by strikes, fire, earthquake, or any other Act of God, or by the inability to obtain materials, equipment, or labor due to federal government restrictions arising out of defense or war programs, then the time of completion may, at the City's sole option, be extended for such periods as may be agreed upon by the City and the Consultant. In the event that there is insufficient time to grant such extensions prior to the completion date of the contract, the City may, at the time of acceptance of the work, waive liquidated damages that may have accrued for failure to complete on time, due to any of the above, after hearing evidence as to the reasons for such delay, and making a finding as to the causes of same. 3. Termination for Cause. If, during the term of the contract, the City determines that the Consultant is not faithfully abiding by any term or condition contained herein, the City may notify the Consultant in writing of such defect or failure to perform. This notice must give the Consultant a 10 (ten) calendar day notice of time thereafter in which to perform said work or cure the deficiency. If the Consultant has not performed the work or cured the deficiency within the ten days specified in the notice, such shall constitute a breach of the contract and the City may terminate the contract immediately by written notice to the Consultant to said effect. Thereafter, neither party shall have any further duties, obligations, responsibilities, or rights under the contract except, however, any and all obligations of the Consultant's surety shall remain in full force and effect, and shall not be extinguished, reduced, or in any manner waived by the termination thereof. In said event, the Consultant shall be entitled to the reasonable value of its services performed from the beginning date in which the breach occurs up to the day it received DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 1/5/2023 | 8:53 AM PST the City's Notice of Termination, minus any offset from such payment representing the City's damages from such breach. "Reasonable value" includes fees or charges for goods or services as of the last milestone or task satisfactorily delivered or completed by the Consultant as may be set forth in the Agreement payment schedule; compensation for any other work, services or goods performed or provided by the Consultant shall be based solely on the City's assessment of the value of the work-in-progress in completing the overall workscope. The City reserves the right to delay any such payment until completion or confirmed abandonment of the project, as may be determined in the City's sole discretion, so as t o permit a full and complete accounting of costs. In no event, however, shall the Consultant be entitled to receive in excess of the compensation quoted in its proposal. 4. Termination for Convenience. The City also reserves the right to terminate the contract for convenience, providing a 30 (thirty) calendar day notice, at any time upon a determination by the Director that termination of the contract is in the best interest of the City. Upon termination notice from the City, Consultant must, unless otherwise directed, cease work and follow the City’s directions as to work in progress and finished goods. For termination of any services pursuant to this Agreement, the City’s liability will be the lesser of a reasonable price for the services rendered prior to termination. 5. Ability to Perform. The Consultant warrants that it possesses, or has arranged through subcontracts, all capital and other equipment, labor, materials, and licenses necessary to carry out and complete the work hereunder in compliance with any and all applicable federal, state, county, city, and special district laws, ordinances, and regulations. 6. Sub-contract Provisions. No portion of the work pertinent to this contract shall be subcontracted without written authorization by the City, except that which is expressly identified in the Consultant’s proposal. Any substitution of sub-consultants must be approved in writing by the City. For any sub-contract for services in excess of $25,000, the subcontract shall contain all provisions of this agreement. 7. Contract Assignment. The Consultant shall not assign, transfer, convey or otherwise dispose of the contract, or its right, title or interest, or its power to execute such a contract to any individual or business entity of any kind without the previous written consent of the City. 8. Inspection. The Consultant shall furnish City with every reasonable opportunity for City to ascertain that the services of the Consultant are being performed in accordance with the requirements and intentions of this contract. All work done and all materials furnished, if any, shall be subject to the City's inspection and approval. The inspection of such work shall not relieve Consultant of any of its obligations to fulfill its contract requirements. 9. Record Retention and Audit. For the purpose of determining compliance with various laws and regulations as well as performance of the contract, the Consultant and sub - consultants shall maintain all books, documents, papers, accounting records and other evidence pertaining to the performance of the contract, including but not limited to the cost of administering the contract. Materials shall be made available at their respective offices at all reasonable times during the contract period and for three years from the date of final DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 payment under the contract. Authorized representatives of the City shall have the option of inspecting and/or auditing all records. For Federally funded projects, access to records shall also include authorized representatives of the State and Federal government. Copies shall be furnished if requested. 10. Conflict of Interest. The Consultant shall disclose any financial, business, or other relationship with the City that may have an impact upon the outcome of this contract, or any ensuing City construction project. The Consultant shall also list current clients who may have a financial interest in the outcome of this contract, or any ensuing City construction project which will follow. The Consultant staff shall provide a Conflict of Interest Statement where determined necessary by the City. The Consultant covenants that it presently has no interest, and shall not acquire any interest—direct, indirect or otherwise—that would conflict in any manner or degree with the performance of the work hereunder. The Consultant further covenants that, in the performance of this work, no sub-consultant or person having such an interest shall be employed. The Consultant certifies that no one who has or will have any financial interest in performing this work is an officer or employee of the City. It is hereby expressly agreed that, in the performance of the work hereunder, the Consultant shall at all times be deemed an independent Consultant and not an agent or employee of the City. 11. Rebates, Kickbacks or Other Unlawful Consideration. The Consultant warrants that this contract was not obtained or secured through rebates, kickbacks or other unlawful consideration, either promised or paid to any City employee. For breach or violation of the warranty, the City shall have the right in its discretion; to terminate the contract without liability; to pay only for the value of the work actually performed; to deduct from the contract price; or otherwise recover the full amount of such rebate, kickback or other unlawful consideration. 12. Covenant Against Contingent Fees. The Consultant warrants by execution of this contract that no person or selling agency has been employed, or retained, to solicit or secure this contract upon an agreement or understanding, for a commission, percentage, brokerage, or contingent fee, excepting bona fide employees or bona fide established commercial or selling agencies maintained by the Consultant for the purpose of securing business. For breach or violation of this warranty, the City has the right to annul this contract without liability; pay only for the value of the work actually performed, or in its discretion, to deduct from the contract price or consideration, or otherwise recover the full amount of such commission, percentage, brokerage, or contingent fee. 13. Compliance with Laws and Wage Rates. The Consultant shall keep itself fully informed of and shall observe and comply with all applicable state and federal laws and county and City of San Luis Obispo ordinances, regulations and adopted codes during its performance of the work. This includes compliance with prevailing wage rates and their payment in accordance with California Labor Code. For purposed of this paragraph, “construction” includes work performed during the design and preconstruction phases of construction, including but not limited to, inspection and land surveying work. 14. Payment of Taxes. The contract prices shall include full compensation for all taxes that the Consultant is required to pay. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 15. Permits, Licenses and Filing Fees. The Consultant shall procure all permits and licenses, pay all charges and fees, and file all notices as they pertain to the completion of the Consultant’s work. The City will pay all application fees for permits required for the completion of the project including building and regulatory permit application fees. Consultant will provide a 10 day notice for the City to issue a check. 16. Safety Provisions. The Consultant shall conform to the rules and regulations pertaining to safety established by OSHA and the California Division of Industrial Safety. 17. Public and Employee Safety. Whenever the Consultant's operations create a condition hazardous to the public or City employees, it shall, at its expense and without cost to the City, furnish, erect and maintain such fences, temporary railings, barricades, lights, signs and other devices and take such other protective measures as are necessary to prevent accidents or damage or injury to the public and employees. 18. Preservation of City Property. The Consultant shall provide and install suitable safeguards, approved by the City, to protect City property from injury or damage. If City property is injured or damaged resulting from the Consultant's operations, it shall be replaced or restored at the Consultant's expense. The facilities shall be replaced or restored to a condition as good as when the Consultant began work. 19. Immigration Act of 1986. The Consultant warrants on behalf of itself and all sub- consultants engaged for the performance of this work that only persons authorized to work in the United States pursuant to the Immigration Reform and Control Act of 1986 and other applicable laws shall be employed in the performance of the work hereunder. 20. Consultant Non-Discrimination. In the award of subcontracts or in performance of this work, the Consultant agrees that it will not engage in, nor permit such sub-consultants as it may employ, to engage in discrimination in employment of persons on any basis prohibited by State or Federal law. 21. Accuracy of Specifications. The specifications for this project are believed by the City to be accurate and to contain no affirmative misrepresentation or any concealment of fact. Consultants are cautioned to undertake an independent analysis of any test results in the specifications, as City does not guaranty the accuracy of its interpretation of test results contained in the specifications package. In preparing its proposal, the Consultant and all sub-consultants named in its proposal shall bear sole responsibility for proposal preparation errors resulting from any misstatements or omissions in the specifications that could easily have been ascertained by examining either the project site or accurate test data in the City's possession. Although the effect of ambiguities or defects in the specifications will be as determined by law, any patent ambiguity or defect shall give rise to a duty of Consultant to inquire prior to proposal submittal. Failure to so inquire shall cause any such ambiguity or defect to be construed against the Consultant. An ambiguity or defect shall be considered patent if it is of such a nature that the Consultant, assuming reasonable skill, ability and diligence on its part, knew or should have known of the existence of the ambiguity or defect. Furthermore, failure of the Consultant or sub - consultants to notify City in writing of specification defects or ambiguities prior to proposal DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 submittal shall waive any right to assert said defects or ambiguities subsequent to submittal of the proposal. To the extent that these specifications constitute performance specifications, the City shall not be liable for costs incurred by the successful Consultant to achieve the project’s objective or standard beyond the amounts provided therefor in the proposal. In the event that, after awarding the contract, any dispute arises as a result of any actual or alleged ambiguity or defect in the specifications, or any other matter whatsoever, Consultant shall immediately notify the City in writing, and the Consultant and all sub- consultants shall continue to perform, irrespective of whether or not the ambiguity or defect is major, material, minor or trivial, and irrespective of whether or not a change order, time extension, or additional compensation has been granted by City. Failure to provide the hereinbefore described written notice within one (1) working day of Consultant's becoming aware of the facts giving rise to the dispute shall constitute a waiver of the right to assert the causative role of the defect or ambiguity in the plans or specifications concerning the dispute. 22. Hold Harmless and Indemnification. (a) Non-design, construction Professional Services: To the extent the Scope of Services involve a “construction contract” as that phrase is used in Civil Code Section 2783, this paragraph shall apply in place of paragraph A. To the fullest extent permitted by law (including, but not limited to California Civil Code Sections 2782 and 2782.8), Consultant shall indemnify, defend, and hold harmless the City, and its elected officials, officers, employees, volunteers, and agents (“City Indemnitees”), from and against any and all causes of action, claims, liabilities, obligations, judgments, or damages, including reasonable legal counsels’ fees and costs of litigation (“claims”), to the extent caused by the Consultant’s performance or Consultant’s failure to perform its obligations under this Agreement or out of the operations conducted by Consultant, except for such loss or damage arising from the active negligence, sole negligence or willful misconduct of the City. In the event the City Indemnitees are made a party to any action, lawsuit, or other adversarial proceeding arising from Consultant’s performance of this Agreement, the Consultant shall provide a defense to the City Indemnitees or at the City’s option, reimburse the City Indemnitees their costs of defense, including reasonable legal fees, incurred in defense of such claims. (b) The review, acceptance or approval of the Consultant’s work or work product by any indemnified party shall not affect, relieve or reduce the Consultant’s indemnification or defense obligations. This Section survives completion of the services or the termination of this contract. The provisions of this Section are not limited by and do not affect the provisions of this contract relating to insurance. 23. Non-Exclusive Contract. The City reserves the right to contract for the services listed in this proposal from other consultants during the contract term. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 24. Standards. Documents shall conform to City Standards and City furnished templates shall be used. 25. Consultant Endorsement. Technical reports, plans and specifications shall be stamped and signed by the Consultant where required. 26. Required Deliverable Products and Revisions. Deliverables include all items necessary to provide the work scope outlined in the Request for Proposal, incorporated herein by reference and attached hereto as Exhibit A. City staff will review any documents or materials provided by the Consultant and, where necessary, the Consultant will respond to staff comments and make such changes as deemed appropriate. 27. Ownership of Materials. Upon completion of all work under this contract, ownership and title to all reports, documents, plans, specifications, and estimates produced as part of this contract will automatically be vested in the city and no further agreement will be necessary to transfer ownership to the City. The Consultant shall furnish the City all necessary copies of data needed to complete the review and approval process. It is understood and agreed that all calculations, drawings and specifications, whether in hard copy or machine readable form, are intended for one-time use in the construction of the project for which this contract has been entered into. The Consultant is not liable for claims, liabilities, or losses arising out of, or connected with the modification, or misuse by the City of the machine-readable information and data provided by the Consultant under this agreement. Further, the Consultant is not liable for claims, liabilities, or losses arising out of, or connected with any use by City of the project documentation on other projects, except such use as may be authorized in writing by the Consultant. 28. Release of Reports and Information. Any reports, information, data, or other material given to, prepared by or assembled by the Consultant as part of the work or serv ices under these specifications shall be the property of City and shall not be made available to any individual or organization by the Consultant without the prior written approval of the City. The Consultant shall not issue any news release or public relations item of any nature, whatsoever, regarding work performed or to be performed under this contract without prior review of the contents thereof by the City and receipt of the City’s written permission. 29. Copies of Reports and Information. If the City requests additional copies of reports, drawings, specifications, or any other material in addition to what the Consultant is required to furnish in limited quantities as part of the work or services under these specifications, the Consultant shall provide such additional copies as are requested, and City shall compensate the Consultant for the costs of duplicating of such copies at the Consultant's direct expense. 30. Attendance at Meetings and Hearings. Consultant shall attend as many "working" meetings with staff as necessary in performing workscope tasks. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 31. Requests for Review. The Consultant shall respond to all requests for submittal review or contractor RFI’s within two weeks of receipt of the information from the City. 32. Project Proposal Submittal. Upon completion of the project scoping meeting, the Consultant shall submit a proposed workscope, compensation and schedule within 10 working days. The cost proposal shall include all costs including miscellaneous direct cost items. 33. Consultant Invoices. The Consultant shall deliver a monthly invoice to the City, itemized by project work phase or, in the case of on-call contracts, by project title. Invoice must include a breakdown of hours billed and miscellaneous charges and any sub-consultant invoices, similarly broken down, as supporting detail. 34. Payment. For providing services as specified in this Agreement, City will pay and Consultant shall receive therefore compensation in a total sum not to exceed the individual agreed upon project fee. Should the Consultant’s designs, drawings or specifications contain errors or deficiencies, the Consultant shall be required to correct them at no increase in cost to the City. For on-call services, the City will pay and the Consultant shall receive compensation as agreed to on a project by project basis. The Consultant shall be reimbursed for hours worked at the hourly rates attached to this agreement. Hourly rates include direct salary costs, employee benefits, overhead and fee. In addition, the Consultant shall be reimbursed for direct costs other than salary and vehicle cost that have been identified and are attached to this agreement. The Consultant’s personnel shall be reimbursed for per diem expenses at a rate not to exceed that currently authorized for State employees under State Department of Personnel Administration rules. 35. Payment Terms. The City's payment terms are 30 days from the receipt and approval by the City of an original invoice and acceptance by the City of the materials, supplies, equipment or services provided by the Consultant (Net 30). 36. Resolution of Disputes. Any dispute, other than audit, concerning a question of fact arising under this contract that is not disposed of by agreement shall be decided by a committee consisting of the City’s Project Manager and the City Director of Public Works, who may consider written or verbal information submitted by the Consultant. Not later than thirty days after completion of all deliverables necessary to complete the p lans, specifications and estimate, the Consultant may request review by the City Council of unresolved claims or disputes, other than audit, in accordance with Chapter 1.20 Appeals Procedure of the Municipal Code. Any dispute concerning a question of fact arising under an audit of this contract that is not disposed of by agreement, shall be reviewed by the City’s Chief Fiscal Officer. Not later than 30 days after issuance of the final audit report, the Consultant may request a review by the City’s Chief Fiscal Officer of unresolved audit issues. The request for review must be submitted in writing. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 Neither the pendency of a dispute, nor its consideration by the City will excuse the consultant from full and timely performance in accordance with the terms of this contract. 37. Disadvantaged Business Enterprise (DBE) Use for Federally Funded Projects. This agreement is subject to Title 49, Part 26 Code of Federal Regulations entitled “Participation by Disadvantaged Business Enterprises in Department of Transportation Financial Assistance Programs” when project work is for a federally funded project. In order to ensure the State Department of Transportation achieves its federally mandated statewide overall DBE goal, the City encourages the participation of DBEs as defined in 49 CFR 26 in the performance of this agreement. The City will make a determination on a project by project basis for reasonably expected DBE participation to compete for the sub-consulting opportunities in this agreement. The Consultant is responsible to be fully informed regarding the requirements of 49 CFR, Part 26. The Consultant shall notify the City of any changes to its anticipated DBE participation on federally funded projects, maintain records of DBE usage and complete and submit to the City the final report of DBE utilization prior to receiving final payment. Records shall show the name and business address of each DBE and the total dollar amount actually paid to each. The Consultant shall pay all sub-consultants within 10 calendar days from receipt of each payment made to the Consultant by the City. The Consultant shall carry out applicable requirements of Title 49 CFR 26 in the award and administration of US DOT assisted agreements. Failure by the Consultant to carry out these requirements is a material breach of this agreement, which may result in the termination of this agreement or such other remedy as the City deems appropriate. 38. Agreement Parties. City: Matt Horn Public Works Director City of San Luis Obispo 919 Palm Street San Luis Obispo, CA 93401 Consultant: Randy Rominger 1540 Marsh Street Stan Luis Obispo, CA 93401 All written notices to the parties hereto shall be sent by United States mail, postage prepaid by registered or certified mail addressed as shown above. 39. Incorporation by Reference. City Request for Proposals Specification No. 90435-CM dated July 28, 2022, Consultant's proposal dated September 1, 2022, and Consultant’s Revised Fee Proposal dated November 9, 2022, are hereby incorporated in and made a part of this Agreement and are attached hereto as Exhibits A, B, and C respectively. Should there be any conflict between terms set forth in the City Request for Proposals Specification No. 90435-CM and Consultant’s proposal dated September 1, 2022, or Revise Fee Proposal dated November 9, 2022, the terms in this agreement and City Request for Proposals Specification No. 90435-CM will govern. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 40. Amendments. Any amendment, modification or variation from the terms of this Agreement shall be in writing and shall be effective only upon approval by the City Engineer. 41. Working Out of Scope. If, at any time during the project, the consultant is directed to do work by persons other than the City Project Manager and the Consultant believes that the work is outside of the scope of the original contract, the Consultant shall inform the Project Manager immediately. If the Project Manager and Consultant both agree that the work is outside of the project scope and is necessary to the successful completion of the project, then a fee will be established for such work based on Consultant's hourly billing rates or a lump sum price agreed upon between the City and the Consultant. Any extra work performed by Consultant without prior written approval from the City Project Manager shall be at Consultant's own expense. 42. Complete Agreement. This written agreement, including all writings specifically incorporated herein by reference, shall constitute the complete agreement between the parties hereto. No oral agreement, understanding or representation not reduced to writing and specifically incorporated herein shall be of any force or effect, nor shall any such oral agreement, understanding or representation be binding upon the parties hereto. For and in consideration of the payments and agreements hereinbefore mentioned to be made and performed by City, Consultant agrees with City to do everything required by this Agreement, the said specification and incorporated documents. Authority to Execute Agreement. Both City and Consultant do covenant that each individual executing this agreement on behalf of each party is a person duly authorized and empowered to execute Agreements for such party. IN WITNESS WHEREOF, the parties hereto have caused this instrument to be executed the day and year first above written. CITY OF SAN LUIS OBISPO: CONSULTANT: ________________________________ Kitchell CEM, Inc. _______________________________ Matt Horn, Director of Public Works Wendy Cohen President APPROVED AS TO FORM: _______________________________ Christine Dietrick, City Attorney ________________________________ Randy Rominger Principal-in-Charge DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 EXHIBIT A DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 REQUEST FOR PROPOSALS RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES CULTURAL ARTS DISTRICT PARKING STRUCTURE CITY PROJECT NO. 90435-CM July 2022 The City of San Luis Obispo (City) is currently soliciting proposals for Resident Engineer and Construction Management Services for its Cultural Arts District Parking Structure Project. Each proposal must specify each and every item as set forth in the attached specifications. Any and all exceptions must be clearly stated in the proposal. Failure to set forth any item in the specifications without taking exception may be grounds for rejection. The City reserves the right to reject any and all proposals and to waive any irregularity or informality in any proposal or in the RFP process, as long as, in the judgment of the City, such action will not negate fair competition and will permit proper comparative evaluation of the proposals submitted. This RFP is posted on the City’s website at: https://www.slocity.org/doing-business/doing-business-with-the-city/bids-and-proposals Any changes, additions, or deletions to this RFP will be in the form of written addenda issued by the City. Any addenda will be posted on the website. Prospective proposers must check the website for addenda or other relevant new information during the response period. The City is not responsible for the failure of any prospective proposer to receive such addenda. All addenda so issued will become a part of this RFP. If your firm is interested and qualified, please submit the following in separately sealed envelopes plainly marked with the proposal title, specification number, Consultant name, and time and date of the proposal opening. All proposals must be submitted to the front counter at the Public Works Department, 919 Palm Street, by, 2:00 p.m. on September 1st, 2022. If you have any questions about the proposal process, please contact the Engineer directly. MANUEL GUZMAN Construction Engineering Manager mguzman@slocity.org EXHIBIT A DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 2  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT Table of Contents I. INTRODUCTION ..............................................................................................4   PURPOSE ............................................................................................................................................... 4   PROJECT LOCATION ........................................................................................................................... 4   BACKGROUND ...................................................................................................................................... 4   CONSTRUCTION CONTRACT DURATION .......................................................................................... 5  II. SCHEDULE AND SUBMITTAL ............................................................................6  A. RFP SCHEDULE .................................................................................................................................... 6  B. PROPOSAL SUBMITTAL ....................................................................................................................... 6  III. GENERAL INSTRUCTIONS ................................................................................7  A. CITY RIGHTS & OPTIONS ..................................................................................................................... 7  B. CHANGES TO THE RFP ........................................................................................................................ 8  C. COMMUNICATIONS ............................................................................................................................... 8  D. INSURANCE ........................................................................................................................................... 9  E. EXCEPTIONS & DEVIATIONS ............................................................................................................. 10  F. AWARD AND STANDARD AGREEMENT ........................................................................................... 10  G. PREVAILING WAGE............................................................................................................................. 10  H. FAIR EMPLOYMENT PRACTICE ........................................................................................................ 10  I. PROTEST OF AWARD ......................................................................................................................... 11  IV. PROPOSAL FORMAT ...................................................................................... 12   COVER LETTER ................................................................................................................................... 12   FIRM QUALIFICATIONS ...................................................................................................................... 12   ORGANIZATION AND APPROACH ..................................................................................................... 12   SCOPE OF WORK ............................................................................................................................... 13   CONTRACT AGREEMENT .................................................................................................................. 13   REFERENCES ...................................................................................................................................... 13   FEE PROPOSAL .................................................................................................................................. 13   OPTIONAL – ADDITIONAL SUPPORTING INFORMATION ............................................................... 14  V. CONSULTANT EVALUATION & CONTRACT AWARD ........................................ 15   PROPOSAL RESPONSIVENESS ........................................................................................................ 15   EVALUATION PROCEDURES ............................................................................................................. 15   CONTRACT AWARD ............................................................................................................................ 16  VII. APPENDICIES ................................................................................................. 17  APPENDIX A – SCOPE OF SERVICES ......................................................................... 17  DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 3  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT APPENDIX B – VICINITY MAP .................................................................................. 23  APPENDIX C – SAMPLE CONTRACT ......................................................................... 24  APPENDIX D – QUALITY ASSURANCE PROGRAM .................................................... 34  APPENDIX E – CONTRACT DOCUMENTS FOR PHASE 1B OF THE CULTURAL ARTS  DISTRICT PARKING STRUCTURE .............................................................................. 35  APPENDIX F – CONTRACT DOCUMENTS FOR PHASE 2 OF THE CULTURAL ARTS  DISTRICT PARKING STRUCTURE .............................................................................. 36  APPENDIX G1 –MITIGATION MONITORING AND REPORTING PROGRAM ............... 37  APPENDIX G2 – PHASE 1B AND 2 MITIGATION AND MONITORING PLAN ............... 37  APPENDIX H – CURRENT PROJECT  DELIVERY SCHEDULE ........................................ 38  DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 4  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT VI. INTRODUCTION PURPOSE The purpose of this Request for Proposal (RFP) is to provide interested parties with sufficient information regarding the resident engineer and construction management services the City of San Luis Obispo Department of Public Works (City) is seeking for its Cultural Arts District Parking Structure Project (Project). This information is intended to enable interested parties to prepare and submit proposals for a single construction management and resident engineer team to manage the construction for this Project. See Scope of Services attached as Appendix A. PROJECT LOCATION The Project is located on the corner of Palm Street and Nipomo Street. See Vicinity Map Attached as Appendix B. BACKGROUND The proposed scope is to provide construction management and resident engineer services to manage the Cultural Arts District Parking Structure Project. It is anticipated that a single team will work together to manage the demolition of an existing parking lot and buildings (the “Existing Site”) and construction of a new cast-in-place parking facility consisting of at least 399 parking spaces (the “Cultural Arts District Parking Structure”) in downtown San Luis Obispo (the “Project”). Two future buildings are planned immediately adjacent to the Cultural Arts District Parking Structure: a “liner building” along the Nipomo Street frontage and part of the Palm Street frontage; and a theater at the corner of Monterey and Nipomo Streets. Although neither of these buildings are part of this scope of work, they both have some shared access points and utilities that need to be coordinated as a part of this Project. The Project will be constructed in phases, under separate construction contracts, as follows: 1. Phase 1A: Dry Utility Undergrounding. This Project will underground PG&E and telecom facilities crossing the site. Note: This contract inspection and management will not be part of this work scope. 2. Phase 1B: Cultural Arts District Parking Structure On-Site Improvement Plans. Phase 1 includes site structure and parking lot demolition, grading, and permanent shoring work in preparation for garage construction in Phase 2. 3. Phase 2: Cultural Arts District Parking Structure. Phase 2 includes vertical construction of the parking structure, including frontage improvements and utility work. Phase 1B: On-Site Improvements, generally consists of: 1) Demolition and disposal of three residential lots and structures located at 633 Palm Street, 610 Monterey Street, and 614 Monterey Street 2) Demolition and site clearing of existing asphalt parking lot, including paving, landscaping, meters, and miscellaneous improvements. 3) Grading of pad area for Phase 2 4) Construction of permanent shoring along the north-east property line. 5) Existing tree protection. Phase 2: Cultural Arts District Parking Structure, generally consists of: 1) A new five-level cast-in-place parking structure with an approximately 32,000sf footprint (approximately 163,000sf gross), and approximately 399 total parking spaces. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 5  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT a. Level 1 (the ground floor) consists of standard parking, accessible parking, EV parking, and bicycle parking. b. Level 2 consists of standard parking, accessible parking, and EV parking. c. Level 3 and Level 4 consist of standard parking and accessible parking. d. Level 5 (the roof deck) consists of standard parking and accessible parking, with photovoltaic overhead panels. e. Two elevators. f. Automated revenue/payment system. 2) On-site and off-site improvements including: a. Off-site road improvements including new bulb-outs and decorative crosswalks and intersections. b. Construction of curb, gutter, driveway aprons, and sidewalk. c. Underground utilities and stormwater chambers. d. Pedestrian entry plazas (temporary where installed with future SLOREP Theatre Improvements). e. Planting and irrigation. Note that the Phase 2 contract will include provisions for the contractor to provide an office space and a conference room for the construction management team and provide electricity, phone, internet, water and sanitation services. CONSTRUCTION CONTRACT DURATION Phase 1B of the Project is planned to begin construction in Spring 2023 and last for approximately 6 months, not including contract close-out. Phase 2 of the Project is planned to begin construction in Fall 2023 and last for approximately 23 months, not including contract close-out. The above durations only reflect anticipated duration of the construction contract work and must be appropriately accounted for in the proposal. As part of the proposal, a general review of construction contract duration may be performed at the proposing firm’s option. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 6  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT VII. SCHEDULE AND SUBMITTAL A. RFP SCHEDULE The following represents the tentative schedule for this RFP. Any change in the scheduled dates for the Proposal Submission Deadline, or Interviews will be advertised in the form of an addendum to this RFP. The schedule for other milestones dates may be adjusted without notice. RFP Schedule Date Issued July 30, 2022 Proposal Submission Date September 1st, 2022, at 2:00 PM Evaluation of Proposals Previous + 4 Weeks Top 3 Ranked Consultants Interviewed Previous + 2 Weeks Finalize Staff Recommendation Previous + 1 Week Award by Public Works Director Previous + 1 Week Notice to Proceed 1 day from Award B. PROPOSAL SUBMITTAL If your firm is interested and qualified, please submit a proposal in a sealed envelope by 2:00 p.m. on September 1st, 2022. The proposal must be a maximum of 15 pages total, not including staff resumés and fee proposal (see Section IV.G for fee proposal requirements). DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 7  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT VIII. GENERAL INSTRUCTIONS A. CITY RIGHTS & OPTIONS 1. All proposals must be submitted to the City’s Public Works Department, 919 Palm Street, in sealed envelopes no later than 2:00 p.m. on September 1st, 2022. Late proposals will not be considered. 2. All costs incurred in the preparation and submission of proposals and related documentation will be borne solely by the proposer. 3. An impartial Selection Committee will develop a ranking of consultant proposals and recommend the most qualified consultant for tentative selection and contract negotiations. 4. The cost proposal of the top ranked consultant will be reviewed and may be negotiated with the consultant. Upon successful contract negotiations, staff will recommend a contract be awarded. 5. Consultant fees will be negotiated with the selected firm and finalized prior to the award of contract. 6. This RFP does not constitute an offer of employment or to contract for services. In addition, this RFP does not commit the City to negotiate a contract. The issuance of this RFP does not constitute an agreement by the City that any subsequent selection processes will occur, or that any contract will be entered into by the City. 7. The City has the right to use any or all ideas or concepts presented in any proposal or interview without restriction, without conversation to all applicants. 8. The City reserves the option to accept or reject any or all proposals, wholly or in part, received by reason of this request, and make more than one award, or no award, as the best interests of the City may appear. 9. All documents submitted to the City in response to this RFP will become the exclusive property of the City. 10. The City reserves the right to award the contract to the firm that presents the proposal which, in the judgment of the City, best accomplishes the desired results. 11. Any contract awarded pursuant to this Request for Proposal will incorporate the requirements and specifications contained in this Request for Proposal. All information presented in a proposer’s proposal will be considered binding upon selection of the successful proposer, unless otherwise modified and agreed to by the City during subsequent negotiations. 12. The City reserves the right to remedy technical errors, modify the published scope of services and approve or disapprove the use of all sub-consultants. 13. The contract will expire upon full completion of the scope of work. 14. Under the provisions of the California Public Records Act (the “Act”), Government Code section 6252 et seq., all “public records” (as defined in the Act) of a local agency, such as the City, must be available for inspection and copying upon the request of any person. Under the Act, the City may be obligated to provide a copy of any and all responses to this RFP, if such requests are made after the contract is awarded. One exception to this required disclosure is information which fits within the definition of a confidential trade secret [Government Code section 6254(k)] or contains other technical, financial or other data whose public disclosure could cause injury to the proposer’s competitive position. If DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 8  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT any proposer believes that information contained in its response to this RFP should be protected from disclosure, the proposer MUST specifically identify the pages of the response that contains the information by properly marking the applicable pages and inserting the following notice in the front of its response: NOTICE: The data on pages _ of this response identified by an asterisk (*) contain technical or financial information, which are trade secrets, or information for which disclosure would result in substantial injury to the proposer’s competitive position. Proposer requests that such data be used only for the evaluation of the response but understands that the disclosure will be limited to the extent the City considers proper under the law. If an agreement is entered into with the proposer, the City shall have the right to use or disclose the data as provided in the agreement, unless otherwise obligated by law. The City will not honor any attempt by proposer to designate its entire proposal as proprietary. If there is any dispute, lawsuit, claim or demand as to whether information within the response to the RFP is protected from disclosure under the Act, proposer shall indemnify, defend, and hold harmless, the City arising out of such dispute, lawsuit, claim or demand. 15. The proposing firm warrants that no official or employee of the City has an interest, has been employed or retained to solicit or aid in the procuring of a contract resulting from this RFP, if any, and further warrants that such person will not be employed in the performance of such contract without immediate written notice to the City. 16. Firms submitting a proposal shall warrant that their offer is made without any previous understanding, agreement, or connection with any person, firm, or corporation submitting a separate proposal for the same Project and is in all respects fair, without outside control, collusion, fraud, or otherwise illegal action. This condition will not apply to proposals which are submitted by firms who have partnered with others to submit a cooperative proposal that clearly identifies a primary contractor and the associated sub-contractors. 17. Unforeseen additional items and/or services may be required. The City therefore reserves the right to negotiate with the successful proposer for additional items and/or services beyond what is described in Appendix A to be added to the final contract. B. CHANGES TO THE RFP This RFP is posted on the City’s website at: https://www.slocity.org/doing-business/doing-business-with-the-city/bids-and-proposals Any changes, additions, or deletions to this RFP will be in the form of written addenda issued by the City. Any addenda will be posted on the website. Prospective proposers must check the website for addenda or other relevant new information during the response period. The City is not responsible for the failure of any prospective proposer to receive such addenda. All addenda so issued will become a part of this RFP. Any proposer who has already submitted their proposal and desires to make corrections, may remove and replace their proposal up to the date and time for which this RFP closes. C. COMMUNICATIONS All communications concerning this RFP must be directed to mguzman@slocity.org. All other communication is not binding and will in no way modify the RFP or the obligations of the City. All DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 9  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT questions will receive a response within five (5) business days. The proceedings of the Selection Committee are confidential, and members of the Selection Committee are not to be contacted by the proposers. After the solicitation has closed, proposers can request to view the RFP award information. Any questions and requests for information must be addressed to the Engineer. D. INSURANCE The Consultant shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Consultant, its agents, representatives, employees or subconsultants. Minimum Scope of Insurance. Coverage shall be at least as broad as: 1. Insurance Services Office Commercial General Liability coverage (occurrence form CG 20 10 Prior to 1993 or CG 20 10 07 04 with CG 20 37 10 01 or the exact equivalent as determined by the City). 2. Insurance Services Office form number CA 0001 (Ed. 1/87) covering Automobile Liability, code 1 (any auto). 3. Workers' Compensation insurance as required by the State of California and Employer's Liability Insurance. 4. Errors and Omissions Liability insurance as appropriate to the consultant's profession. Minimum Limits of Insurance. Consultant shall maintain limits no less than: 1. General Liability: $2,000,000 per occurrence for bodily injury, personal injury and property damage. If Commercial General Liability or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this Project /location or the general aggregate limit shall be twice the required occurrence limit. 2. Automobile Liability: $1,000,000 per accident for bodily injury and property damage. 3. Employer's Liability: $1,000,000 per accident for bodily injury or disease. 4. Professional / Errors and Omissions Liability: $2,000,000 per occurrence. Deductibles and Self-Insured Retentions. Any deductibles or self-insured retentions must be declared to and approved by the City. At the option of the City, either: the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the City, its officers, officials, employees and volunteers; or the Consultant shall procure a bond guaranteeing payment of losses and related investigations, claim administration and defense expenses. Other Insurance Provisions. The general liability and automobile liability policies are to contain, or be endorsed to contain, the following provisions: 1. The City, its officers, officials, employees, agents and volunteers are to be covered as insureds as respects: liability arising out of activities performed by or on behalf of the Consultant; products and completed operations of the Consultant; premises owned, occupied or used by the Consultant; or automobiles owned, leased, hired or borrowed by the Consultant. The coverage shall contain no special limitations on the scope of protection afforded to the City, its officers, official, employees, agents or volunteers. 2. For any claims related to this Project, the Consultant's insurance coverage shall be primary insurance as respects the City, its officers, officials, employees, agents and volunteers. Any insurance or self-insurance maintained by the City, its officers, officials, employees, agents or volunteers shall be excess of the Consultant's insurance and shall not contribute with it. 3. The Consultant's insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 10  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT 4. Each insurance policy required by this clause shall be end orsed to state that coverage shall not be suspended, voided, canceled by either party, reduced in coverage or in limits except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. The Consultant agrees to notify the City in the event that the policy is suspended, voided or reduced in coverage or limits. A minimum of 30 days prior written notice by certified mail, return receipt requested, will be provided. Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M. Best's rating of no less than A:VII. Verification of Coverage. Consultant shall furnish the City with a certificate of insurance showing maintenance of the required insurance coverage. Original endorsements effecting general liability and automobile liability coverage required by this clause must also be provided. The endorsements are to be signed by a person authorized by that insurer to bind coverage on its behalf. All endorsements are to be received and approved by the City before work commences. E. EXCEPTIONS & DEVIATIONS Any exceptions to or deviations from the requirements set forth in this RFP must be declared in the proposal submitted by the proposer. The City may waive any immaterial deviation or defect in a proposal. F. AWARD AND STANDARD AGREEMENT The City reserves the right to make awards within sixty (60) days after the date of the RFP closing. The successful proposer is expected to execute a contract reflecting the template in Appendix C. This sample contract is for reference to the anticipated terms and conditions governing the City and the successful proposer. The proposer must take exception in their proposal to any section of the attached contract they do not agree with. Failing to do so will be deemed as acceptance by the proposer to the terms spelled out in the sample contract. The City reserves the right, in its sole discretion, to add, delete, or modify, or negotiate additional terms and conditions to the attached contract. BEFORE BEGINNING ANY WORK OR SUBMITTING A PROPOSAL, IT IS ADVISED THAT PROPOSERS READ THE CITY INSURANCE AND INDEMNIFICATION REQUIREMENTS IN THE ATTACHED SAMPLE CONTRACT. G. PREVAILING WAGE A portion of this work is prevailing wage work. For any work proposed by the prime consultant or a subconsultant (any tier) under this contract, in accordance with Labor Code Section 1720 et seq., employees must be paid at least the prevailing rate wages for public works performed on the Project . Prime consultant and any applicable subconsultant (any tier) must register with the Department of Industrial Relations (DIR) prior to contract award, must remain registered for the entire term of the contract, and must submit certified payroll records to DIR at least monthly for such work. Firms can register at: http://www.dir.ca.gov/Public-Works/PublicWorks.html H. FAIR EMPLOYMENT PRACTICE The Consultant and all subconsultants must comply with all laws and regulations governing nondiscrimination in employment, including the Americans with Disabilities Act of 1990, the Fair Employment and Housing Act (California Government Code Section 129000 et seq.), and the applicable regulations promulgated thereunder Title 2, Division 4.1, Chapter 5 of the California Code of Regulations Section 11000 et seq. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 11  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT The Consultant, with regard to the work performed by them during the Contract, must not discriminate on the grounds of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or military and veteran status of any person in employment or the selection and retention of subcontractors, including procurement of materials and leases of equipment. I. PROTEST OF AWARD Any objection to the City’s final decision will be handled according to applicable state and local procurement laws. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 12  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT IX. PROPOSAL FORMAT A qualifying proposal must address all the following points and shall be in the format outlined in this section. The technical proposal will be a maximum of 15 pages total, not including staff resumés. COVER LETTER The cover letter will be addressed to: Manuel Guzman Construction Engineering Manager The letter must be on proposer’s letterhead and include the proposer’s contact name, mailing address, telephone number and email address. The letter will address the proposer’s understanding of the services being requested and any other pertinent information the proposer believes should be included. The name, address, telephone number, and email address of the person authorized to represent the firm with respect to all notices, negotiations, discussions, and other communications relating to this proposal, to any negotiation relating to the contract should be included in the letter. The letter must be signed by the individual authorized to bind the Consultant to the representations, commitments, and statements in the proposal. FIRM QUALIFICATIONS The City will only consider proposals that demonstrate firms have successfully completed comparable Project s. These Project s must illustrate the quality, type, and past performance of the Project team. Submittals must include a detailed description of a minimum of three (3) Project s within the past five (5) years which include the following information: 1. Contracting agency 2. Contracting agency Project Manager and contact information 3. Contract amount 4. Date of contract 5. Date of completion 6. Consultant Project Manager and contact information 7. Consultant Resident Engineer and contact information 8. Project Objective 9. Project Outcome: include original construction contract amount and final amount. ORGANIZATION AND APPROACH 1. Provide an organizational chart identifying the Project manager for the work and each key person who would be assigned to carry out the work and their respective roles in performing the work – specifically the Resident Engineer(s) and any Assistant Resident Engineers, inspectors, materials sampling and testing, other key support or contract administration staff. Provide a separate description of the experience and qualifications of the Project manager and each key person, including a summary of experience on similar Project s. Resumés should be included for all key individuals as an appendix to the submittal. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 13  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT 2. Describe your Project and management approach. Provide a detailed description of how the team and scope of work will be managed. 3. A list of no more than three references for the consultant and no more than three references for each subconsultants, including the names, addresses and telephone numbers of recent related clients/Project s, preferably other public agencies and a listing of the specific Project s and key individuals that have participated in them. Include the dollar amount related to the participation. Identify how much experience the firm and subconsultant has had with public agencies. 4. Describe your cost control and budgeting methodology for this Project. 5. Provide responses to the following: a. Describe critical construction related issues associated with the Project and how you will address these. b. Describe critical environmental issues and how you will address these. c. Describe how cost and schedule for the construction contract and your scope of work could be minimized. SCOPE OF WORK This section should establish that the proposer understands the City’s objectives and requirements, demonstrate the proposer’s ability to meet those requirements and outline clearly and concisely the plan for accomplishing the specified work in accordance with the time schedule as outlined in Appendix A, Scope of Services: 1. Include a detailed Scope of Work Statement describing all services to be provided. 2. Indication of information and participation the proposer will require from City staff. 3. Describe Project deliverables for each phase of your work. CONTRACT AGREEMENT Indicate any issues or proposed changes to the sample contract included as Appendix C. The Consultant must provide a brief statement affirming that the proposal terms will remain in effect for one hundred twenty (120) days following the date proposal submittals are due. A contract will not be awarded to a consultant without an adequate financial management and accounting system as required by 48 CFR Part 31 and 2 CFR Part 200. REFERENCES A list of no more than three references for the consultant and three references for each subconsultant, including the names, addresses and telephone numbers. These references may be the same as the references listed above in IV. Proposal Format, Section C. Organization and Approach. FEE PROPOSAL Within separate sealed envelope, submit a complete fee proposal for the scope of services. Provide separate subtotals for Phase 1B and Phase 2 broken down by task and staff billing rates with estimated hours. Clearly identify fees for subconsultant services. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 14  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT OPTIONAL – ADDITIONAL SUPPORTING INFORMATION Provide additional supporting information, not requested above, that you believe is pertinent to evaluating your firm’s ability to provide comparable program services. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 15  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT X. CONSULTANT EVALUATION & CONTRACT AWARD PROPOSAL RESPONSIVENESS Responses to this RFP must be complete. Responses that do not include the proposal content requirements identified within this RFP and subsequent addenda will be considered incomplete and will receive no further consideration. EVALUATION PROCEDURES Proposals will be evaluated according to each weighted Evaluation Criteria and scored on a zero to five-point rating scale shown in the table below. The scores for the Evaluation Criteria will then be multiplied according to their assigned weight to arrive at a weighted score for each firm. A firm’s proposal with a high weighted total will be deemed of higher quality than a proposal or interview with a lesser-weighted total. The top 3 ranked firms may be selected for an interview, which would be used to confirm ratings. Rating Scale 0 Not Acceptable Non-responsive, fails to meet RFP specifications. The approach has no probability of success in achieving Project objectives per the RFP. 1 Poor Below average, falls short of expectations, is substandard to that which is the average or expected norm, has a low probability of success in achieving Project objectives per the RFP. 2 Fair Has a reasonable probability of success, however, some objectives may not be met. 3 Average Acceptable, achieves all objectives in a reasonable fashion per the RFP. This will be the baseline score for each item with adjustments based on interpretation of the proposal by Selection Committee. 4 Above Average/Good Very good probability of success, better than that which is average or expected as the norm. Achieves all objectives per RFP requirements and expectations. 5 Excellent/ Exceptional Exceeds expectations, very innovative, clearly superior to that which is average or expected as the norm. Excellent probability of success and in achieving all objectives and meeting RFP requirements and expectations. The Proposal Evaluation Criteria and their respective weights are as follows: No. Criteria Weight 1 Understanding of Work Involved 5 2 Organization and Approach 5 3 Quality & Experience of Staff for Work 5 4 Firm Qualifications & References 5 TOTAL 20 DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 16  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT CONTRACT AWARD The final selection of the awarded consultant will be contingent upon successful contract negotiations and approval by the Public Works Director. The City Public Works Director will administer and enforce the provisions of the contract. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 17  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT XII. APPENDICIES APPENDIX A – SCOPE OF SERVICES Consultant shall provide an experienced registered Civil Engineer Construction Manager and support staff (as required) to manage the Project. Project Management services will include, but not be limited to, all items associated with construction management and inspection services necessary for Project completion and closeout. Typical Duties – The Work Tasks, defined in section below, generally include the following: 1. Maintain an awareness of safety and health requirements and enforce applicable contract provisions for the protection of the public and Project personnel. 2. Provide technical and administrative management services for the Project, coordination and oversight of all activities related to the construction of the Project and provide constant communication to the Project Manager of activities and concerns on the Project. Review all prepared documents with the Project Manager prior to submission to the Contractor. 3. Evaluate cost reduction incentive proposals and provide recommendations to Project Manager for acceptance or denial. 4. Perform the duties of Resident Engineer and Assistant Resident Engineer in accordance with Caltrans procedures including construction inspection, pay quantity calculations, materials sampling and testing, and compliance monitoring with Project plans, specifications, permits, environmental documents, and agreements. 5. Review and monitor the contractor’s schedule through weekly meetings, and maintain an as-built schedule. 6. Maintain binders of job records. 7. Prepare daily inspection and materials records and weekly status reports, and stormwater compliance documentation. 8. Prepare all correspondence related to Project activities and review with the Project Manager. 9. Identify actual and potential problems associated with the construction Project and consult with the design engineer and Project Manager to implement engineering solutions. 10. Coordinate submittal reviews and timely approvals with the design team and Project Manager. 11. Prepare and approve progress payments and supporting documentation. The City will provide signature authorization of monthly payments. 12. Pre-negotiate and prepare contract change orders. The City will provide signature authorization of contract change orders. 13. Perform labor and subcontracting compliance tasks including labor interviews and verifying certified payrolls and subcontractors utilization. 14. Complete record drawing markups daily, final Project certification, as outlined in Task 5, “Post-Construction Services.” 15. Recommend Project acceptance in accordance with City Standard Specifications and procedures. 16. Ensure full compliance to Americans with Disabilities Act (ADA). Work Tasks - A preliminary scope of services follows and includes identified work tasks. Task 1 – Pre-Construction Services DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 18  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT This task includes pre-construction services including, but not limited to the following:  Review and familiarization with contract plans, specifications, permits and agreements, including subsurface utility relocation work. If contract conflicts, errors, or omissions are discovered, convey to City and design engineer for correction if prior to Project advertisement  Assist the City in evaluation of bids received.  Review Resident Engineer files. Resident Engineer’s files consist of design engineer memos to Resident Engineers, and technical reports, environmental document, permits, and studies.  Prepare a Resident Engineer’s Project schedule which includes all pre-construction and utility relocations by others, and notification timelines noted on all permits, agreements, and contract documents. Upon receipt of Contractor’s schedule, evaluate and confer with the Contractor regarding workability of the schedule or suggest changes that may improve the schedule and update Resident Engineer’s schedule.  Prepare Project instructions and establish proposed contract administration and record keeping procedures to be used during construction for review and approval by Project Manager.  Attend meeting with City and Design Engineer to discuss design features. The intent of this meeting is to answer questions from the Resident Engineer, meet key staff, and review contract administration procedures.  Establish electronic records file structure and protocol for daily uploading to City network.  Prepare meeting agenda identifying attendees and conduct a pre-construction conference with the Contractor awarded the construction contract. Prepare and circulate meeting minutes.  Follow Caltrans Standard Specifications Section 5-1.43, Potential Claims and Dispute Resolution in establishing a Dispute Resolution Advisor (DRA) or Dispute Resolution Board (DRB) as mutually agreed to by the City and the Contractor. The agreed to process shall be reviewed and approved by Project Manager.  Establish correspondence protocols for contractor – construction management communications to allow for clear tracking of correspondence sequences and responses. Task 2 – Construction Services This task includes Project management, construction administration, scheduling, Project observation/inspection, and materials testing during construction. Consultant management services shall be in accordance with the Caltrans Local Assistance Program and Construction Manuals, including but not limited to the following: Project Coordination and Communication  Serve as the focal point for coordination among the contactor, surveyors, material testers, design team, the Project Manager, other agencies, utility companies, and other parties. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 19  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT  Maintain close contact with Project Manager and the design team and review all correspondence with the Project Manager prior to issuance. Maintain and track correspondence in an organized manner throughout the Project.  Receive all Contractor correspondence and prepare and transmit responses. Coordinate with applicable parties, as required, to develop responses.  Conduct weekly, or as necessary, construction contract coordination meetings with the Contractor. Take minutes and distribute to parties designated in the Project instructions. Schedules, Progress Meetings, and Reports  Review Contractor’s planned schedule for conformance with the specifications and for reasonableness of the sequence and duration of the activities. Provide acceptance or correction noticing to Contractor.  Review work progress as compared to the planned schedule and notify Contractor of schedule slippage. Analyze schedule to determine impact of weather and change orders. Obtain from Contactor updates of construction schedule incorporating actual progress, weather delays, and change order impacts. Negotiate time extensions due to change orders and other delays.  Prepare and submit a monthly progress report to Project Manager describing key issues, cost status, and schedule status.  Maintain as-built schedule Payment  Review Contractor’s initial schedule of values for reasonableness and ease of monitoring.  Prepare monthly quantity calculations to support progress payments.  Review and approve quantities submitted with monthly progress payment requests, negotiate differences over amount, and process payments through the Project Manager. Submittals and Requests for Information (RFI)  Receive, stamp, and log submittals, and review and approve, or distribute for review as necessary.  Monitor the review and return of submittals to Contactor. Provide reminders in advance of deadlines for submittal reviewers  Develop and maintain a submittal tracking list to identify parties responsible for review and acceptance, and received and response due dates.  Receive, process, and monitor Requests for Information (RFI) from Contactor.  Prepare responses to RFI related to construction issues in a timely manner.  Transmit design-related RFI to Design Engineer and copy the Project Manager.  Conduct meetings with Contractor and other parties, as needed, to discuss and resolve RFI. Change Orders  Evaluate potential change orders for compliance with permits, environmental documents and other on-site and construction constraints. Provide appropriate feedback for modifications or adjustments to change order proposals. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 20  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT  Prepare Cost Request Bulletins, perform quantity and cost analysis, as required, for negotiation of change orders, and negotiate payment for contract change orders.  Prepare change orders related to construction issues based on drawings, specifications, and other information from the City, design team, Project Manager, or Contractor.  Perform change order administration, including obtaining City approval of change order requests, issuing proposed change orders to Contractor, maintaining logs of proposed change orders, receiving change order quotations from Contractor, negotiating change order costs and time extension, processing final negotiated change orders, and incorporating approved change order into progress payment breakdown.  Prepare recommendations to accompany change order documents and forward to Project Manager for review and approval. Obtain Contractor signature and provide to the City for execution. Construction Observation/Inspection Services  Provide experienced and qualified inspectors who are acceptable to the City.  The inspectors will ensure compliance with all aspects of the construction contract by continuously monitoring, evaluating, approving or rejecting the Contractor’s work in accordance with the approved construction contract documents.  Review laboratory, shop and mill test reports of materials and equipment, and coordinate as required with the Design Engineers.  Review the safety programs developed by the Contractor as required by the contract documents and monitor the Contractor's compliance.  Determine that the Contractor’s work is being performed in accordance with City requirements and in accordance with the requirements of the contract documents. Endeavor to guard the City against defects and deficiencies in the work. As appropriate, require special inspection or testing, or make recommendations to the City regarding special inspection or testing of work not in accordance with the provisions of the contract documents, whether or not such work is fabricated, installed or completed. Subject to review by City, reject work, which does not conform to the requirements of the City or the contract documents.  Record the progress of the Project. Provide accurate and precise daily inspection reports. Submit written daily progress reports to the City, including information on Contractor and the entire Project, showing percentages of completion and the number and status of change orders.  Keep daily logs containing a record of weather, Contractor's work on the site, number of workers, work accomplished, problems encountered, and other relevant data. Make the log available to the City. Prepare and send a Weekly Statement of Working Days to the Contractor.  Check certified payrolls and monitor Contractor's compliance with labor code requirements.  Monitor all inspection activities, both City provided and any consulted out inspections.  Consolidate punch list items indicating work remaining for Project closeout. Claims  Receive and analyze Notices of Potential Claim and Claims submitted. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 21  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT  Review Notices and Claims with the Contract to verify understanding and determine if reasonable solution exists to address and eliminate the Claim. Review resolutions with the Project Manager and prepare appropriate response.  Perform claims administration, including coordinating and monitoring claims response preparation, logging claims, and tracking claims status, and response deadlines. Task 3 – Geotechnical and Materials Testing and Specialty Inspection Materials testing and specialty inspection services will be required for construction of the Project and provided by the Consultant or subconsultant, as directed by the Consultant. Consultant shall review and monitor testing for compliance with the Project requirements. The materials testing requirements include, but are not limited to, the following:  Select and retain the professional services of special consultants and certified testing laboratories. Monitor and coordinate their services.  Provide a quality control service including inspection and testing of all materials, such as but not limited to, steel strength, concrete strength, gravel gradations, soil compaction in accordance with the Project plans and specifications. Task 4 – Surveying Surveying is anticipated to be performed by Consultant’s Staff as directed by the Construction Manager. The Construction Manager shall review and monitor surveys to verify compliance with the Project requirements. The surveying requirements include, but are not limited to, the following:  Provide construction surveying services per the latest Caltrans “Survey Manual” and its revisions.  Surveys performed by the Engineer shall conform to the requirements of the Land Surveyor’s Act. Responsible Charge for the work shall reside with a January 1, 1982 Registered Civil Engineer or a licensed Land Surveyor in the State of California.  The minimum standard of survey quality shall be that of similar surveys performed by Caltrans.  The City will designate the existing horizontal and vertical control monuments that are to be the basis of all surveys. City will provide the California coordinate system values and elevations of these monuments. The Consultant shall adjust all Consultant performed surveys to the designated control monuments and their values.  Monuments established by the Consultant shall be marked by the Consultant with State furnished disks, plugs, or tags. In addition, the Consultant shall identify Consultant established monuments by tagging or stamping the monuments with the license or registration number of the Engineer’s surveyor who is in “responsible charge” of the work. Replacement of survey monuments shall be the responsibility of the Consultant. All new monuments shall be set in accordance with current City and Land Surveyors Act requirements. Task 5 – Construction Environmental Mitigation and Monitoring DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 22  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT The Environmental Monitor shall sign off and approve compliance with the approved MMRP and document implementation of all BMP and on and off-site mitigation measures included in the Project specifications. Work Tasks – Provide a scope of services and work tasks necessary for oversight and compliance with Phase 1B and Phase 2 Mitigation and Monitoring Plan prepared by Rincon (attachment G1 and G2). See appendix G1 and G2 for full listing of services require for inclusion in this task of the proposal. For example, the environmental monitoring requirements include, but are not limited to, the following:  Consultant shall provide qualified biologists to perform pre-construction surveys. The pre-construction surveys should also include a photograph record of the pre- construction condition of the site. Initial field inspections to establish no species are present (nesting surveys, etc.)  Training of the construction crews on what to look out for (including new crew orientation). Live training is required for when the job starts to include: foreman, supervisors, Project managers, and resident engineers. Once this initial training is completed then Project specific training videos shall be created for small crew changes.  Air Quality monitoring  Cultural/Archeological monitoring during all Project earthmoving activities  Verify placement of noise related signage  Paleontological monitoring for initial ground disturbance deeper than 10-feet Task 6 – Post-Construction Services The post-construction services task includes Project closeout after the work is complete. The post-construction services requirements include, but are not limited to, the following:  Compile record drawing information, and provide one copy of red-lined Project drawings to the City.  Compile any outstanding claims and documentation together in a coherent package.  The design consultant will provide Project changes to original design mylars to complete the record set.  Final payment will be recommended by Consultant to the City and all remaining Project files (organized in the manner specified in the Caltrans Construction Manual or otherwise specified in Project Plans & Specifications) will be transmitted to the City.  Project Certification and a Notice of Completion shall be provided in consultation with the City.  All claims shall be processed in accordance with Caltrans 2015 Standard Specifications Section 5-1.43, Potential Claims and Dispute Resolution. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 23  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT APPENDIX B – VICINITY MAP DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 24  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT APPENDIX C – SAMPLE CONTRACT AGREEMENT THIS AGREEMENT is made and entered into in the City of San Luis Obispo on _____________ by and between the CITY OF SAN LUIS OBISPO, a municipal corporation, hereinafter referred to as City, and [CONSULTANT’S NAME IN CAPITAL LETTERS], hereinafter referred to as Consultant. W I T N E S S E T H WHEREAS, on [DATE], requested proposals for Structural Engineering Design Services per Specification No. 90435-CM. WHEREAS, pursuant to said request, Consultant submitted a proposal that was accepted by City for said services. NOW THEREFORE, in consideration of their mutual promises, obligations and covenants hereinafter contained, the parties hereto agree as follows: 1. Contract Term. The term of this agreement shall be from the date this Agreement is made and entered, as first written above until all work has been completed. 2. Work Delays. Should the Consultant be obstructed or delayed in the work required to be done hereunder by changes in the work or by any default, act, or omission of the City, or by strikes, fire, earthquake, or any other Act of God, or by the inability to obtain materials, equipment, or labor due to federal government restrictions arising out of defense or war programs, then the time of completion may, at the City's sole option, be extended for such periods as may be agreed upon by the City and the Consultant. In the event that there is insufficient time to grant such extensions prior to the completion date of the contract, the City may, at the time of acceptance of the work, waive liquidated damages that may have accrued for failure to complete on time, due to any of the above, after hearing evidence as to the reasons for such delay, and making a finding as to the causes of same. 3. Termination for Cause. If, during the term of the contract, the City determines that the Consultant is not faithfully abiding by any term or condition contained herein, the City may notify the Consultant in writing of such defect or failure to perform. This notice must give the Consultant a 10 (ten) calendar day notice of time thereafter in which to perform said work or cure the deficiency. If the Consultant has not performed the work or cured the deficiency within the ten days specified in the notice, such shall constitute a breach of the contract and the City may terminate the contract immediately by written notice to the Consultant to said effect. Thereafter, neither party shall have any further duties, obligations, responsibilities, or rights under the contract except, however, any and all obligations of the Consultant's surety shall remain in full force and effect, and shall not be extinguished, reduced, or in any manner waived by the termination thereof. In said event, the Consultant shall be entitled to the reasonable value of its services performed from the beginning date in which the breach occurs up to the day it received the City's Notice DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 25  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT of Termination, minus any offset from such payment representing the City's damages from such breach. "Reasonable value" includes fees or charges for goods or services as of the last milestone or task satisfactorily delivered or completed by the Consultant as may be set forth in the Agreement payment schedule; compensation for any other work, services or goods performed or provided by the Consultant shall be based solely on the City's assessment of the value of the work-in-progress in completing the overall workscope. The City reserves the right to delay any such payment until completion or confirmed abandonment of the Project, as may be determined in the City's sole discretion, so as to permit a full and complete accounting of costs. In no event, however, shall the Consultant be entitled to receive in excess of the compensation quoted in its proposal. 4. Termination for Convenience. The City also reserves the right to terminate the contract for convenience, providing a 30 (thirty) calendar day notice, at any time upon a determination by the Director that termination of the contract is in the best interest of the City. Upon termination notice from the City, Consultant must, unless otherwise directed, cease work and follow the City’s directions as to work in progress and finished goods. For termination of any services pursuant to this Agreement, the City’s liability will be the lesser of a reasonable price for the services rendered prior to termination. 5. Ability to Perform. The Consultant warrants that it possesses, or has arranged through subcontracts, all capital and other equipment, labor, materials, and licenses necessary to carry out and complete the work hereunder in compliance with any and all applicable federal, state, county, city, and special district laws, ordinances, and regulations. 6. Sub-contract Provisions. No portion of the work pertinent to this contract shall be subcontracted without written authorization by the City, except that which is expressly identified in the Consultant’s proposal. Any substitution of sub-consultants must be approved in writing by the City. For any sub-contract for services in excess of $25,000, the subcontract shall contain all provisions of this agreement. 7. Contract Assignment. The Consultant shall not assign, transfer, convey or otherwise dispose of the contract, or its right, title or interest, or its power to execute such a contract to any individual or business entity of any kind without the previous written consent of the City. 8. Inspection. The Consultant shall furnish City with every reasonable opportunity for City to ascertain that the services of the Consultant are being performed in accordance with the requirements and intentions of this contract. All work done and all materials furnished, if any, shall be subject to the City's inspection and approval. The inspection of such work shall not relieve Consultant of any of its obligations to fulfill its contract requirements. 9. Record Retention and Audit. For the purpose of determining compliance with various laws and regulations as well as performance of the contract, the Consultant and sub-consultants shall maintain all books, documents, papers, accounting records and other evidence pertaining to the performance of the contract, including but not limited to the cost of administering the contract. Materials shall be made available at their respective offices at all reasonable times during the contract period and for three years from the date of final payment under the contract. Authorized representatives of the City shall have the option of inspecting and/or auditing all records. For Federally funded Project s, access to records shall also include authorized representatives of the State and Federal government. Copies shall be furnished if requested. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 26  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT 10. Conflict of Interest. The Consultant shall disclose any financial, business, or other relationship with the City that may have an impact upon the outcome of this contract, or any ensuing City construction Project. The Consultant shall also list current clients who may have a financial interest in the outcome of this contract, or any ensuing City construction Project which will follow. The Consultant staff shall provide a Conflict of Interest Statement where determined necessary by the City. The Consultant covenants that it presently has no interest, and shall not acquire any interest— direct, indirect or otherwise—that would conflict in any manner or degree with the performance of the work hereunder. The Consultant further covenants that, in the performance of this work, no sub-consultant or person having such an interest shall be employed. The Consultant certifies that no one who has or will have any financial interest in performing this work is an officer or employee of the City. It is hereby expressly agreed that, in the performance of the work hereunder, the Consultant shall at all times be deemed an independent Consultant and not an agent or employee of the City. 11. Rebates, Kickbacks or Other Unlawful Consideration. The Consultant warrants that this contract was not obtained or secured through rebates, kickbacks or other unlawful consideration, either promised or paid to any City employee. For breach or violation of the warranty, the City shall have the right in its discretion; to terminate the contract without liability; to pay only for the value of the work actually performed; to deduct from the contract price; or otherwise recover the full amount of such rebate, kickback or other unlawful consideration. 12. Covenant Against Contingent Fees. The Consultant warrants by execution of this contract that no person or selling agency has been employed, or retained, to solicit or secure this contract upon an agreement or understanding, for a commission, percentage, brokerage, or contingent fee, excepting bona fide employees or bona fide established commercial or selling agencies maintained by the Consultant for the purpose of securing business. For breach or violation of this warranty, the City has the right to annul this contract without liability; pay only for the value of the work actually performed, or in its discretion, to deduct from the contract price or consideration, or otherwise recover the full amount of such commission, percentage, brokerage, or contingent fee. 13. Compliance with Laws and Wage Rates. The Consultant shall keep itself fully informed of and shall observe and comply with all applicable state and federal laws and county and City of San Luis Obispo ordinances, regulations and adopted codes during its performance of the work. This includes compliance with prevailing wage rates and their payment in accordance with California Labor Code. For purposed of this paragraph, “construction” includes work performed during the design and preconstruction phases of construction, including but not limited to, inspection and land surveying work. 14. Payment of Taxes. The contract prices shall include full compensation for all taxes that the Consultant is required to pay. 15. Permits, Licenses and Filing Fees. The Consultant shall procure all permits and licenses, pay all charges and fees, and file all notices as they pertain to the completion of the Consultant’s work. The City will pay all application fees for permits required for the completion of the Project including building and regulatory permit application fees. Consultant will provide a 10 day notice for the City to issue a check. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 27  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT 16. Safety Provisions. The Consultant shall conform to the rules and regulations pertaining to safety established by OSHA and the California Division of Industrial Safety. 17. Public and Employee Safety. Whenever the Consultant's operations create a condition hazardous to the public or City employees, it shall, at its expense and without cost to the City, furnish, erect and maintain such fences, temporary railings, barricades, lights, signs and other devices and take such other protective measures as are necessary to prevent accidents or damage or injury to the public and employees. 18. Preservation of City Property. The Consultant shall provide and install suitable safeguards, approved by the City, to protect City property from injury or damage. If City property is injured or damaged resulting from the Consultant's operations, it shall be replaced or restored at the Consultant's expense. The facilities shall be replaced or restored to a condition as good as when the Consultant began work. 19. Immigration Act of 1986. The Consultant warrants on behalf of itself and all sub-consultants engaged for the performance of this work that only persons authorized to work in the United States pursuant to the Immigration Reform and Control Act of 1986 and other applicable laws shall be employed in the performance of the work hereunder. 20. Consultant Non-Discrimination. In the award of subcontracts or in performance of this work, the Consultant agrees that it will not engage in, nor permit such sub-consultants as it may employ, to engage in discrimination in employment of persons on any basis prohibited by State or Federal law. 21. Accuracy of Specifications. The specifications for this Project are believed by the City to be accurate and to contain no affirmative misrepresentation or any concealment of fact. Consultants are cautioned to undertake an independent analysis of any test results in the specifications, as City does not guaranty the accuracy of its interpretation of test results contained in the specifications package. In preparing its proposal, the Consultant and all sub- consultants named in its proposal shall bear sole responsibility for proposal preparation errors resulting from any misstatements or omissions in the specifications that could easily have been ascertained by examining either the Project site or accurate test data in the City's possession. Although the effect of ambiguities or defects in the specifications will be as determined by law, any patent ambiguity or defect shall give rise to a duty of Consultant to inquire prior to proposal submittal. Failure to so inquire shall cause any such ambiguity or defect to be construed against the Consultant. An ambiguity or defect shall be considered patent if it is of such a nature that the Consultant, assuming reasonable skill, ability and diligence on its part, knew or should have known of the existence of the ambiguity or defect. Furthermore, failure of the Consultant or sub-consultants to notify City in writing of specification defects or ambiguities prior to proposal submittal shall waive any right to assert said defects or ambiguities subsequent to submittal of the proposal. To the extent that these specifications constitute performance specifications, the City shall not be liable for costs incurred by the successful Consultant to achieve the Project ’s objective or standard beyond the amounts provided therefor in the proposal. In the event that, after awarding the contract, any dispute arises as a result of any actual or alleged ambiguity or defect in the specifications, or any other matter whatsoever, Consultant DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 28  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT shall immediately notify the City in writing, and the Consultant and all sub-consultants shall continue to perform, irrespective of whether or not the ambiguity or defect is major, material, minor or trivial, and irrespective of whether or not a change order, time extension, or additional compensation has been granted by City. Failure to provide the hereinbefore described written notice within one (1) working day of Consultant's becoming aware of the facts giving rise to the dispute shall constitute a waiver of the right to assert the causative role of the defect or ambiguity in the plans or specifications concerning the dispute. 22. Hold Harmless and Indemnification. (a) Non-design, non-construction Professional Services: To the fullest extent permitted by law (including, but not limited to California Civil Code Sections 2782 and 2782.8), Consultant shall indemnify, defend, and hold harmless the City, and its elected officials, officers, employees, volunteers, and agents (“City Indemnitees”), from and against any and all causes of action, claims, liabilities, obligations, judgments, or damages, including reasonable legal counsels’ fees and costs of litigation (“claims”), arising out of the Consultant’s performance or Consultant’s failure to perform its obligations under this Agreement or out of the operations conducted by Consultant, including the City’s active or passive negligence, except for such loss or damage arising from the sole or active negligence or willful misconduct of the City. In the event the City Indemnitees are made a party to any action, lawsuit, or other adversarial proceeding arising from Consultant’s performance of this Agreement, the Consultant shall provide a defense to the City Indemnitees or at the City’s option, reimburse the City Indemnitees their costs of defense, including reasonable legal fees, incurred in defense of such claims. (b) Non-design, construction Professional Services: To the extent the Scope of Services involve a “construction contract” as that phrase is used in Civil Code Section 2783, this paragraph shall apply in place of paragraph A. To the fullest extent permitted by law (including, but not limited to California Civil Code Sections 2782 and 2782.8), Consultant shall indemnify, defend, and hold harmless the City, and its elected officials, officers, employees, volunteers, and agents (“City Indemnitees”), from and against any and all causes of action, claims, liabilities, obligations, judgments, or damages, including reasonable legal counsels’ fees and costs of litigation (“claims”), arising out of the Consultant’s performance or Consultant’s failure to perform its obligations under this Agreement or out of the operations conducted by Consultant, except for such loss or damage arising from the active negligence, sole negligence or willful misconduct of the City. In the event the City Indemnitees are made a party to any action, lawsuit, or other adversarial proceeding arising from Consultant’s performance of this Agreement, the Consultant shall provide a defense to the City Indemnitees or at the City’s option, reimburse the City Indemnitees their costs of defense, including reasonable legal fees, incurred in defense of such claims. (c) Design Professional Services:   To the fullest extent permitted by law, Consultant shall indemnify, defend, and hold harmless City and any and all of its officials, employees and agents (“Indemnified Parties”) from and against any and all claims, losses, liabilities, damages, costs and expenses, including attorney’s fees and costs, to the extent they arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant. Consultant’s duty to defend shall consist of reimbursement of defense costs incurred DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 29  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT by City in direct proportion to the Consultant’s proportionate percentage of fault. Consultant’s percentage of fault shall be determined, as applicable, by a court of law, jury or arbitrator. In the event any loss, liability or damage is incurred by way of settlement or resolution without a court, jury or arbitrator having made a determination of the Consultant’s percentage of fault, the Parties agree to mediation with a neutral third-party to determine the Consultant’s proportionate percentage of fault for purposes of determining the amount of indemnity and defense cost reimbursement owed to the City. Notwithstanding the foregoing and without diminishing any rights of City in the preceding paragraph, for any liability, claim, demand, allegation against City arising out of, related to, or pertaining to any act or omission of Consultant, but which is not a design professional service, Consultant shall defend, indemnify, and hold harmless the Indemnified Parties from and against any and all damages, costs, expenses (including reasonable attorney fees and expert witness fees), judgments, settlements, and/or arbitration awards, whether for personal or bodily injury, property damage, or economic injury, and arising out of, related to, any concurrent or contributory negligence on the part of the City except for the sole or active negligence of, or willful misconduct of the City. (d) The review, acceptance or approval of the Consultant’s work or work product by any indemnified party shall not affect, relieve or reduce the Consultant’s indemnification or defense obligations. This Section survives completion of the services or the termination of this contract. The provisions of this Section are not limited by and do not affect the provisions of this contract relating to insurance. 23. Non-Exclusive Contract. The City reserves the right to contract for the services listed in this proposal from other consultants during the contract term. 24. Standards. Documents shall conform to City Standards and City furnished templates shall be used. 25. Consultant Endorsement. Technical reports, plans and specifications shall be stamped and signed by the Consultant where required. 26. Required Deliverable Products and Revisions. Deliverables include all items necessary to provide the work scope outlined in the Request for Proposal, incorporated herein by reference and attached hereto as Exhibit [X]. City staff will review any documents or materials provided by the Consultant and, where necessary, the Consultant will respond to staff comments and make such changes as deemed appropriate. 27. Ownership of Materials. Upon completion of all work under this contract, ownership and title to all reports, documents, plans, specifications, and estimates produced as part of this contract will automatically be vested in the city and no further agreement will be necessary to transfer ownership to the City. The Consultant shall furnish the City all necessary copies of data needed to complete the review and approval process. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 30  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT It is understood and agreed that all calculations, drawings and specifications, whether in hard copy or machine readable form, are intended for one-time use in the construction of the Project for which this contract has been entered into. The Consultant is not liable for claims, liabilities, or losses arising out of, or connected with the modification, or misuse by the City of the machine-readable information and data provided by the Consultant under this agreement. Further, the Consultant is not liable for claims, liabilities, or losses arising out of, or connected with any use by City of the Project documentation on other Project s, except such use as may be authorized in writing by the Consultant. 28. Release of Reports and Information. Any reports, information, data, or other material given to, prepared by or assembled by the Consultant as part of the work or services under these specifications shall be the property of City and shall not be made available to any individual or organization by the Consultant without the prior written approval of the City. The Consultant shall not issue any news release or public relations item of any nature, whatsoever, regarding work performed or to be performed under this contract without prior review of the contents thereof by the City and receipt of the City’s written permission. 29. Copies of Reports and Information. If the City requests additional copies of reports, drawings, specifications, or any other material in addition to what the Consultant is required to furnish in limited quantities as part of the work or services under these specifications, the Consultant shall provide such additional copies as are requested, and City shall compensate the Consultant for the costs of duplicating of such copies at the Consultant's direct expense. 30. Attendance at Meetings and Hearings. Consultant shall attend as many "working" meetings with staff as necessary in performing workscope tasks. 31. Requests for Review. The Consultant shall respond to all requests for submittal review or contractor RFI’s within two weeks of receipt of the information from the City. 32. Project Proposal Submittal. Upon completion of the Project scoping meeting, the Consultant shall submit a proposed workscope, compensation and schedule within 10 working days. The cost proposal shall include all costs including miscellaneous direct cost items. 33. Consultant Invoices. The Consultant shall deliver a monthly invoice to the City, itemized by Project work phase or, in the case of on-call contracts, by Project title. Invoice must include a breakdown of hours billed and miscellaneous charges and any sub-consultant invoices, similarly broken down, as supporting detail. 34. Payment. For providing services as specified in this Agreement, City will pay and Consultant shall receive therefore compensation in a total sum not to exceed the individual agreed upon Project fee. Should the Consultant’s designs, drawings or specifications contain errors or deficiencies, the Consultant shall be required to correct them at no increase in cost to the City. For on-call services, the City will pay and the Consultant shall receive compensation as agreed to on a Project by Project basis. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 31  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT The Consultant shall be reimbursed for hours worked at the hourly rates attached to this agreement. Hourly rates include direct salary costs, employee benefits, overhead and fee. In addition, the Consultant shall be reimbursed for direct costs other than salary and vehicle cost that have been identified and are attached to this agreement. The Consultant’s personnel shall be reimbursed for per diem expenses at a rate not to exceed that currently authorized for State employees under State Department of Personnel Administration rules. 35. Payment Terms. The City's payment terms are 30 days from the receipt and approval by the City of an original invoice and acceptance by the City of the materials, supplies, equipment or services provided by the Consultant (Net 30). 36. Resolution of Disputes. Any dispute, other than audit, concerning a question of fact arising under this contract that is not disposed of by agreement shall be decided by a committee consisting of the City’s Project Manager and the City Director of Public Works, who may consider written or verbal information submitted by the Consultant. Not later than thirty days after completion of all deliverables necessary to complete the plans, specifications and estimate, the Consultant may request review by the City Council of unresolved claims or disputes, other than audit, in accordance with Chapter 1.20 Appeals Procedure of the Municipal Code. Any dispute concerning a question of fact arising under an audit of this contract that is not disposed of by agreement, shall be reviewed by the City’s Chief Fiscal Officer. Not later than 30 days after issuance of the final audit report, the Consultant may request a review by the City’s Chief Fiscal Officer of unresolved audit issues. The request for review must be submitted in writing. Neither the pendency of a dispute, nor its consideration by the City will excuse the consultant from full and timely performance in accordance with the terms of this contract. 37. Disadvantaged Business Enterprise (DBE) Use for Federally Funded Project s. This agreement is subject to Title 49, Part 26 Code of Federal Regulations entitled “Participation by Disadvantaged Business Enterprises in Department of Transportation Financial Assistance Programs” when Project work is for a federally funded Project. In order to ensure the State Department of Transportation achieves its federally mandated statewide overall DBE goal, the City encourages the participation of DBEs as defined in 49 CFR 26 in the performance of this agreement. The City will make a determination on a Project by Project basis for reasonably expected DBE participation to compete for the sub-consulting opportunities in this agreement. The Consultant is responsible to be fully informed regarding the requirements of 49 CFR, Part 26. The Consultant shall notify the City of any changes to its anticipated DBE participation on federally funded Project s, maintain records of DBE usage and complete and submit to the City the final report of DBE utilization prior to receiving final payment. Records shall show the name and business address of each DBE and the total dollar amount actually paid to each. The Consultant shall pay all sub-consultants within 10 calendar days from receipt of each payment made to the Consultant by the City. The Consultant shall carry out applicable requirements of Title 49 CFR 26 in the award and administration of US DOT assisted agreements. Failure by the Consultant to carry out these DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 32  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT requirements is a material breach of this agreement, which may result in the termination of this agreement or such other remedy as the City deems appropriate. 38. Agreement Parties. City: Matt Horn Public Works Director City of San Luis Obispo 919 Palm Street San Luis Obispo, CA 93401 Consultant: All written notices to the parties hereto shall be sent by United States mail, postage prepaid by registered or certified mail addressed as shown above. 39. Incorporation by Reference. City Request for Proposals Specification No. 90435-CM and Consultant's proposal dated [DATE], are hereby incorporated in and made a part of this Agreement and are attached hereto as Exhibit [X]. Should there be any conflict between terms set forth in the City Request for Proposals Specification No. 90435-CM and Consultant’s proposal dated [DATE], the terms in this agreement and City Request for Qualifications Specification No. 90435-CM will govern. 40. Amendments. Any amendment, modification or variation from the terms of this Agreement shall be in writing and shall be effective only upon approval by the City Engineer. 41. Working Out of Scope. If, at any time during the Project, the consultant is directed to do work by persons other than the City Project Manager and the Consultant believes that the work is outside of the scope of the original contract, the Consultant shall inform the Project Manager immediately. If the Project Manager and Consultant both agree that the work is outside of the Project scope and is necessary to the successful completion of the Project, then a fee will be established for such work based on Consultant's hourly billing rates or a lump sum price agreed upon between the City and the Consultant. Any extra work performed by Consultant without prior written approval from the City Project Manager shall be at Consultant's own expense. 42. Complete Agreement. This written agreement, including all writings specifically incorporated herein by reference, shall constitute the complete agreement between the parties hereto. No oral agreement, understanding or representation not reduced to writing and specifically incorporated herein shall be of any force or effect, nor shall any such oral agreement, understanding or representation be binding upon the parties hereto. For and in consideration of the payments and agreements hereinbefore mentioned to be made and performed by City, Consultant agrees with City to do everything required by this Agreement, the said specification and incorporated documents. Authority to Execute Agreement. Both City and Consultant do covenant that each individual executing this agreement on behalf of each party is a person duly authorized and empowered to execute Agreements for such party. IN WITNESS WHEREOF, the parties hereto have caused this instrument to be executed the day and year first above written. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 33  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT CITY OF SAN LUIS OBISPO: CONSULTANT: ________________________________ Name of Company _______________________________ Matt Horn, Director of Public Works By: Name of CAO/President Its: CAO/President APPROVED AS TO FORM: _______________________________ Christine Dietrick, City Attorney (2nd signature required if Corporation): ________________________________ By: Name of Corporate Officer Its: ____________________ DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 34  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT APPENDIX D – QUALITY ASSURANCE PROGRAM (Attached as a separate document in BidSync) DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 35  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT APPENDIX E – CONTRACT DOCUMENTS FOR PHASE 1B OF THE CULTURAL ARTS DISTRICT PARKING STRUCTURE (Attached as a separate document in BidSync) DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 36  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT APPENDIX F – CONTRACT DOCUMENTS FOR PHASE 2 OF THE CULTURAL ARTS DISTRICT PARKING STRUCTURE (Attached as a separate document in BidSync) DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 37  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT APPENDIX G1 –MITIGATION MONITORING AND REPORTING PROGRAM APPENDIX G2 – PHASE 1B AND 2 MITIGATION AND MONITORING PLAN (Attached as a separate document in BidSync) DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 38  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT APPENDIX H – CURRENT PROJECT DELIVERY SCHEDULE (Attached as a separate document in BidSync) DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 EXHIBIT B DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 REQUEST FOR PROPOSALS // CITY PROJECT NO. 90435-CM RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES CULTURAL ARTS DISTRICT PARKING STRUCTURE September 1, 2022 EXHIBIT BDocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 1540 MARSH STREET, SUITE 150, SAN LUIS OBISPO, CA 93401 | TEL. 805.706.0276 | WWW.KITCHELL.COM September 1, 2022 Mr. Manuel Guzman, Construction Engineering Manager City of San Luis Obispo 919 Palm Street San Luis Obispo, CA 93401 Re: Proposal for Resident Engineer and Construction Management Services, Cultural Arts District Parking Structure, City Project No. 90435-CM Dear Mr. Guzman and Members of the Selection Committee: As an experienced construction manager with a solid foundation in general contracting, Kitchell is known for delivering quality projects and providing high value services to our clients. It is with great pleasure that we submit our proposal to perform resident engineer and construction management services for the New Cultural Arts District Parking Structure project. Our relational project management approach coupled with an extensive record of successful project delivery will fulfill your expectations and provide you satisfaction with the end result. Our commitment to these goals has resulted in more than eighty-five percent of our work derived from repeat business. We Have the Right Team With over 303 project and construction management professionals, we have the capacity, skill and enthusiasm to implement our time-tested project management tools and techniques to achieve project success. Project Director Tully Wyatt will work with you to ensure your complete satisfaction with our services and deliverables. Resident Engineer Andy Goh will fulfill the Resident Engineer duties and responsibilities as defined by Caltrans. Senior Project Manager/Assistant Resident Engineer Tom Fee will serve as our on-site representative to the City and will function as an extension of your staff, working integrally with City personnel, design professionals, the contractor, special consultants and stakeholders to deliver the project on time, under budget and with high quality. Our proposed project team members have demonstrated a long-term commitment to the pursuit of project excellence, are at the top of their respective professions, and will be dedicated to the task of serving the City through interactive collaboration, effective oversight of design professionals, contractors, outside agencies and effective management of the project as a whole. Local Commitment As a firm invested in the Central Coast for the long term through our established local San Luis Obispo office and widening project base, we understand the local construction market and will serve as a local resource in receiving responsive bids from qualified contractors. Our long-term commitment to local clients by staff members who understand the issues unique to the Central Coast, provides the City with assurance that we share your desire for success. Depth of In-house Resources Unlike most construction management firms, Kitchell has a full complement of in-house engineering and architectural support service professionals consisting of registered architects and licensed engineers in every discipline. In addition, Kitchell has in-house facilities management, commissioning, estimating and scheduling personnel each skilled and qualified in their respective disciplines. This team of dedicated professionals is equipped to resolve highly complex technical challenges on a moment’s notice. Kitchell would consider it an honor to serve the City of San Luis Obispo in carrying out resident engineer and construction management services for the New Cultural Arts District Parking Structure project as a collaborative member of the City’s team. We appreciate your consideration and look forward to the opportunity to personally demonstrate our qualifications as we progress in the selection process. Sincerely, Wendy Cohen, CCM Randy Rominger, LEED AP, Assoc. DBIA President Principal-in-Charge (Authorized to bind the firm) FIRM CONTACT/AUTHORIZED REPRESENTATIVE Name: Randy Rominger, Principal-in-Charge | Address: 1540 Marsh Street, Suite 150 | San Luis Obispo, CA 93401 tel. 805.706.0276 | email. rrominger@kitchell.com | Kitchell acknowledges and accepts receipt of Addendum #1 dated July 25, 2022. Randy is the authorized to represent the firm with respect to all notices, negotiations, discussions and other communications relating to this proposal. E. Cover Letter DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 2 F. Firm Qualifications Industry Leading Expertise Established in 1950, Kitchell is a 100% employee-owned company dedicated to providing construction management and general contracting services in the Western United States. Our firm’s innovations in management and reliability in delivering projects on time and within or under budget have earned us a reputation for superior performance. Since Kitchell’s inception, we have completed over $53 billion in public sector construction representing more 3,600 projects in parking structures, civic centers, education facilities, courthouses, municipal office buildings, detention and criminal justice centers, healthcare facilities, sports complexes, police/fire stations and performing/cultural arts centers. Having been in business for 72 years, Kitchell has proven its long-term stability and financial strength. As a construction management firm, Kitchell is consistently ranked amongst Engineering News Record’s top construction management firms. Focusing on the public sector has allowed us to develop management and project control techniques targeted to its specific needs. Our methods have been very successful—more than 85% of our work comes from repeat clients. We deliver our services using a variety of delivery strategies including agency and multiple prime CM, construction management at risk, lease-leaseback, design-build and the traditional design-bid-build. EXPERIENCE AT A GLANCE 14M SF OF PARKING PARKING STALLS 45,000 CENTRAL COAST CONSTRUCTION $1.7B CAL POLY SAN LUIS OBISPO, YAK?IT?UT?U RESIDENTIAL COMMUNITY SAN LUIS OBISPO, CA (COMPLETED 2020) Construction management services for a $204 million, 562,446 SF project featuring eight structures with four and five levels above grade. The project featured single, double and quad units totaling 1,475 beds for first year students and associated parking totaling 154,363 SF and over 450 stalls. 1. Contracting Agency:California Polytechnic State University, San Luis Obispo 2. Contracting Agency PM:Anthony Palazzo, Executive Director tel. 805.756.6538 | email. arpalazzo@calpoly.edu 3. Contract Amount:$3.9 million 4. Date of Contract:Jan 2013 5. Date of Completion:Jan 2020 6. Consultant PM:Tully Wyatt, Project Manager | tel. 805.440.2278 | email. twyatt@kitchell.com 7. Consultant RE:None 8. Project Objective:See description above. 9. Project Outcome:$165 million (Original Construction) | $172 million (Final Amount) PARKING STRUCTURE COMPLETED IN PAST 5 YEARS 5 yrs Randy Rominger PROJECT TEAM: Tully Wyatt DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 3 CITY OF CHANDLER, OREGON STREET PARKING STRUCTURE CHANDLER, AZ (COMPLETED 2019) Construction management services for a new $23 million, five-level, 293,000 SF, 932-space parking garage for the City of Chandler, which includes a road realignment along Oregon Street as well as intersection improvements at Arizona Avenue and Chicago Street. As Downtown Chandler’s largest garage, the project added much needed parking options for those accessing City Hall as well as restaurants and other venues in the bustling area. The structure is located to the west of City Hall across Arizona Avenue on the northwest corner of Chicago and Oregon streets. SAN LUIS OBISPO RTA, BUS MAINTENANCE FACILITY SAN LUIS OBISPO, CA (COMPLETED 2022) Construction management services for a new $17.5 million (construction cost), 28,650 SF, single story bus maintenance facility with over 2,600 SF of mezzanine/equipment platform located on a 6.44-acre site. The facility accommodates operations, administration and maintenance areas and includes detached enclosures on-site, including a trash enclosure and canopy over bus parking. Work also includes off-site improvements, specifically the T-intersection for future Elks Lane realignment. 1. Contracting Agency:City of Chandler 2. Contracting Agency PM:Paul Ahlas, Construction Project Manager - PW & U - Capital Projects tel. 480.782.3328 | email. paul.ahlas@chandleraz.gov 3. Contract Amount:$1.2 million 4. Date of Contract:June 2018 5. Date of Completion:December 2019 6. Consultant PM:Ralph Schulte tel. 515.822.8735 | email. rschulte@kitchell.com 7. Consultant RE:None 8. Project Objective:See description above. 9. Project Outcome:$19 million (Original Construction) | $20.8 million (Final Amount) 1. Contracting Agency:San Luis Obispo Regional Transit Authority 2. Contracting Agency PM:Geoff Straw, Executive Director tel. 805.781.4472 | email. gstraw@slorta.org 3. Contract Amount:$1.6 million 4. Date of Contract:June 2020 5. Date of Completion:February 2022 6. Consultant PM:Tully Wyatt, Project Manager tel. 805.440.2278 | email. twyatt@kitchell.com 7. Consultant RE:Troy Hart, Resident Engineer | tel. 805.448.8653 | email. thart@kitchell.com 8. Project Objective:See description above. 9. Project Outcome:$16.8 million (Original Construction) | $17.4 million (Final Amount) PARKING STRUCTURE COMPLETED IN PAST 5 YEARS COMPLETED IN PAST 5 YEARS 5 yrs 5 yrs Andy Goh Randy Rominger PROJECT TEAM:PROJECT TEAM: Heather Brown Tully Wyatt Ryan Stefanek DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 4 Additional Parking Structure Experience CITY OF SANTA MONICA, PARKING STRUCTURE 6, SANTA MONICA, CA A $44.6 million project consisting of demolition and rebuilding of a public parking structure located directly behind Santa Monica’s largest tourist attraction, the 3rd Street Promenade. The new structure is 11-stories (eight levels above grade and three levels subterranean) and contains approximately 750 total spaces. Other features include 30 electrical vehicle charging stations and infrastructure for future charging stations, a 90-bicycle bike rack and rooftop solar panels. The structure is LEED Gold Certified. SALINAS VALLEY MEMORIAL HEALTHCARE SYSTEM, PARKING GARAGE ANNEX, SALINAS, CA A new $36 million, 79,700 SF, four-level parking structure serving as an extension to the existing parking structure. The new garage provides a net increase of 166 parking stalls and includes a basement level with 20,000 SF of office and hospital support space. SMUD HEADQUARTERS REHABILITATION & PARKING STRUCTURE, SACRAMENTO, CA A $135 million complete renovation of the 120,000 SF office building and 45,000 SF parking garage. The building is divided into three sections: south wing, core and north wing. The south wing is four levels above grade with a full floor below grade; the core is five levels above grade and one floor below grade; and the north wing has three parking levels and a two-story office portion above the parking garage. UC SAN DIEGO, NORTH TORREY PINES LIVING AND LEARNING NEIGHBORHOOD, SAN DIEGO, CA A new $628 million project consisting of over 1.6 million GSF of student housing, parking, academic space and retail targeting LEED Platinum certification. The Living Learning Neighborhood provides approximately 2,000 new beds, resident facilities and support space for undergraduate students, new instruction and research space for departments and programs within the Divisions of Social Sciences and Arts and Humanities as well as general assignment classrooms. Buildings are varied heights with some individual buildings reaching up to 14 stories. The neighborhood also includes an underground parking structure with 1,200 spaces. G. Organization & Approach TULLY WYATT, dbia, leed ap Project Director CORE TEAM ANDY GOH, pe Resident Engineer TOM FEE Sr. Project Manager/Assist. Resident Engineer RYAN STEFANEK Quality Assurance Manager MATTHEW HARMS Project Engineer SUBCONSULTANTS CHARLES ZANOLI Testing & Inspections (Earth Systems) STEVE WEBSTER, ls BRIAN HELLWIG Surveying (RRM Design Group) COLBY BOGGS MICHAEL TOM, ms CASEY CLARK CHRISTOPHER DURAN, rpa DUSTIN MERRICK, rpa JENNIFER DICENZO Environmental Monitoring (Rincon Consulting) As-Needed In-House Support Services RANDY ROMINGER, leed ap, assoc. dbia Principal-in-Charge HEATHER BROWN, pe, leed ap, cpmp Engineering & Architectural Services Director MATT CHAPPELL, eit, cep Estimating Manager RICK STASSI Scheduling Manager 1. Provide an organizational chart identifying the Project manager for the work and each key person who would be assigned to carry out the work and their respective roles. Resumés should be included for all key individuals as an appendix. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 5 Roles & Responsibilities Our project team has been assembled based on their ability to deliver to the City of San Luis Obispo (SLO) the most efficient, cost effective and best-suited skills of our professional and support personnel. The ultimate success of the Cultural Arts District Parking Structure project is heavily dependent upon the experiences of the team. In developing our project team, staffing continuity is a key element in our approach to managing the project. The proposed team is proven in its capabilities and understands the complexities of parking structure construction. Kitchell’s project team is familiar with the local contracting community and has developed strong local contractor and subcontractor relationships. This maximizes the competitiveness translating to lower bid prices from the other important team members—the contractor and its subcontractors. Project Director Tully Wyatt will facilitate communication and decision making at all levels. He will ensure total team commitment of all resources to achieve the City’s objectives for the project, be present at key meetings and will be available continuously to the project team and City management staff. He will conduct risk assessments, participate in issue resolution and perform periodic site reviews to ensure the City’s objectives for schedule, budget and quality are being achieved. As a California Registered Civil Engineer, Andy Goh will fulfill the Resident Engineer duties and responsibilities as defined by Caltrans. He will study and become completely familiar with project plans, specifications, permits, environmental documents and agreements. He will work with our on- site team to organize and conduct construction inspections, materials testing and special inspections and environmental mitigation monitoring. He will review pay quantity calculations and ensure our team is monitoring the contractor’s compliance with the contract documents. Senior Project Manager/Assistant Resident Engineer Tom Fee will serve as Kitchell’s full-time on-site representative to the City of SLO and will function as an extension of your staff, working integrally with the project team. He will work in close coordination with Andy to fulfill the Resident Engineer responsibilities and will manage cost and time in accordance with the master project budget and schedule. He will drive the advancement of project efforts from preconstruction through completion. Tom will perform preconstruction services and deliverables and will be responsible for the timely completion of all construction phase deliverables. He will manage and administer contracts, report progress, interpret documents, conduct progress meetings, manage the progress payment process, facilitate resolution of field issues, and coordinate project punchlist, completion and turn over. Tom’s parking structure experience and his understanding of the local construction market will prove to be valuable assets to the City and the project team. Quality Assurance Manager Ryan Stefanek will serve on-site full-time during the construction phase and will develop and implement a project-specific quality assurance program. He will manage and coordinate submittal compliance, preinstallation meetings, mock-up reviews, inspections, testing, surveying, environmental mitigation monitoring and SWPPP compliance. Project Engineer Matthew Harms will serve on-site full-time during the construction phase. He will be responsible for the preparation and processing of project-related documentation including requests for information, submittals, design supplements, and project closeout documentation. He will maintain Kitchell’s project information system. As-Needed In-House Support Services Principal-in-Charge Randy Rominger will be responsible for ensuring client satisfaction with our team’s services, personnel, quality and contractual obligations. Estimating Manager Matt Chappel will lead our estimating team to validate project cost in accordance with the established project budget, lead estimating efforts that may be requested of Kitchell, participate in bid analysis and review contractor proposed change quotations. Engineering and Architectural Services Manager Heather Brown will lead our team’s registered architects and licensed engineers to provide engineering support services as needed throughout the course of the project. Scheduling Manager Rick Stassi will lead our scheduling team to provide scheduling support to the project team assisting in the development and maintenance of the Resident Engineer’s schedule. He will also assist the project team with in-depth review and analysis of contractor submitted schedules, monthly updates and delay fragnets. Subconsultants Charles Zanoli with Earth Systems will perform code compliance inspections as well as materials testing and special inspections as described in Task 3 of the RFP. Charles will also support applicable portions of Task 2. Steve Webster and Brian Hellwig with RRM Design Group will perform surveying as described in the RFP, Task 4. Colby Boggs, Michael Tom, Casey Clark, Christopher Duran, Dustin Merrick and Jennifer DiCenzo of Rincon Consulting will perform construction environmental mitigation and monitoring as described in the RFP, Task 5. Our proposed construction management team is 100% dedicated to your success from conception through completion. We will support the City of San Luis Obispo to ensure your Cultural Arts District Parking Structure project moves forward smoothly through closeout. Our team’s commitment goes beyond the job—they strive to see success in the community where they live and work. 100 % Dedicated to the success of your Cultural Arts District Parking Structure DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 6 Project & Management Approach Our approach to project management and the use of proper documentation from our project management information system, developed and proven over time, provides our team with the information necessary to keep the Phase 1B and Phase 2 projects within the established parameters for budget, schedule and quality. Kitchell will act as liaison with the City, design professionals and other consultants to facilitate and coordinate the execution of construction contracts, construction coordination and overall project management. We will act as the City’s representative, advising and consulting with the City and the design professional. We will monitor the work of contractors for deficiencies in the work and conduct a quality assurance program in cooperation with the design professionals and City quality assurance personnel. Earth Systems, our materials testing subconsultant will be carefully scheduled and monitored. We will notify the contractors and City Staff of deficiencies and follow through to ensure corrections are made in a timely manner. Informal ongoing punch lists will be generated to correct deficiencies as the projects proceed instead of waiting until the conclusion of the project to resolve quality issues in a timely manner. We will administer and coordinate the contracts, paying special attention to cost, contractor performance and quality. Through on-site coordination, regular progress meetings, thorough documentation and consistent schedule updates, we will ensure construction is completed on schedule, within budget and within the prescribed expectations of quality. Upon commencing services, our team develops several project management tools to facilitate complete and efficient delivery of services. These documents include a responsibility matrix, deliverables checklist, master schedule, cost control report, quality assurance (QA) plan and risk assessment. The responsibility matrix includes both external (among the entire project team) and internal (among the Kitchell team) responsibilities to bring clarity to assignments. Our Project Director Tully Wyatt attends progress meetings monthly (more often as the needs dictate) and conducts an on-site quality assurance assessment with the on-site team. The on-site team develops and implements a QA mitigation plan for the identified QA deficiencies. Tully conducts project health assessments with the on-site team on a quarterly basis. The project health assessment includes a risk assessment, review of the deliverables checklist, review of the project schedule, review of the cost control plan and review of the QA plan. The on-site team develops and implements a mitigation plan following each quarterly health assessment. 2. Describe your Project and management approach. Provide a detailed description of how the team and scope of work will be managed. 3. A list of no more than three references for the consultant and no more than three references for each subconsultants including a listing of the specific Projects and key individuals that have participated in them. Include the dollar amount related to the participation. Identify how much experience each firm has had with public agencies. Public Agency 1:San Luis Obispo Regional Transit Authority | Geoff Straw, Executive Director Address/tel.:253 Elks Lane | San Luis Obispo, CA 93401 | tel. 805.541.2228 ext. 4465 Project/Amount:Bus Maintenance Facility ($17.5 million) Staff:Randy Rominger, Tully Wyatt and Ryan Stefanek Public Agency 1:County of San Luis Obispo, Department of Airports | Craig Piper, Deputy Director Address/tel.:903 Airport Drive, Suite 5 | San Luis Obispo, CA 93401 | tel. 805.781.5205 Project/Amount:San Luis Obispo County Regional Airport Passenger Terminal ($39.5 million) Staff:Charles Zanoli Public Agency 2:Cal Poly San Luis Obispo | Anthony Palazzo, Executive Director Address/tel.:1 Grand Avenue | San Luis Obispo, CA 93407 | tel. 805.756.6538 Project/Amount:yak?it?ut?u Residential Community ($204 million) Staff:Randy Rominger and Tully Wyatt References Don’t take our word for it...Our clients are our strongest advocates! Our firm’s success is a reflection of the abilities of our staff and Kitchell as a whole. Below are references for which Kitchell has provided construction management services for their large public works capital improvement projects. In addition, we have included two references for each of our subconsultants. We encourage you to contact each of the references to the quality of our work and satisfaction with our services. Public Agency 2:Cal Poly San Luis Obispo | Howie Conroy, Construction Inspector Address/tel.:1 Grand Avenue | San Luis Obispo, CA 93407 | tel. 805.756.2173 Project/Amount:yak?it?ut?u Residential Community ($204 million) Staff:Charles Zanoli Public Agency 3:County of San Luis Obispo | Robert Ruiz, Program Manager Address/tel.:1087 Santa Rosa Street | San Luis Obispo, CA 93408 | tel. 805.788.2114 Project/Amount:New Animal Shelter ($20.3 million) | Probation Department Building ($16 million) Staff:New Animal Shelter: Randy Rominger and Tully Wyatt | Probation Dept. Bldg: Randy Rominger Kitchell Earth Systems DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 7 Public Agency 1:City of San Luis Obispo | Robert Hill, Sustainability & Natural Resources Official Address/tel.:919 Palm Street | San Luis Obispo, CA 93401 | tel. 805.781.7211 Project/Amount:Cerro San Luis Natural Reserve Initial Study/Negative Declaration (dollar amount N/A) Staff:Colby Boggs, Michael Tom, Casey Clark, Christopher Duran, Dustin Merrick & Jennifer DiCenzo Public Agency 1:City of San Luis Obispo | Hal Hannula, Supervising Civil Engineer Address/tel.:919 Palm Street | San Luis Obispo, CA 93401 | tel. 805.781.7201 Project/Amount:Police Station ($300,525), Public Safety Dispatch Center ($611,711), Jennifer Street Bridge ($38,600) Staff:Steve Webster and Brian Hellwig Public Agency 2:County of Santa Barbara | Travis Seawards, Deputy Director Address/tel.:123 East Anapamu Street | Santa Barbara, CA 93101 | tel. 805.568.2518 Project/Amount:Arctic Cold Project EIR Planning & Environmental Services ($280,220) Staff:Colby Boggs, Michael Tom, Casey Clark, Christopher Duran, Dustin Merrick & Jennifer DiCenzo Budgeting at California Polytechnic State University, San Luis Obispo, yak?it?ut?u Residential Community Kitchell was vested in maintaining the project budget at the yak?it?ut?u Residential Community. Aside from providing complete reviews of each contractor initiated change order request, we also tapped into our Estimating Department to review potential large scale changes to the project’s parking structure facility. In addition, we met bi-weekly with the Owner to review all approved, pending and potential changes to the project relative to the project contingency. These efforts at cost control and of continual budget review afforded the University the opportunities to provide additional facilities to the project (added a 2nd story to the administrative building), provide additional redundancies to vital systems like the lift station, emergency systems, and add critical infrastructure pieces to the campus electrical system (manholes, splice boxes). The combined team effort kept the project moving forward while managing these changes within the project budget. Public Agency 2:Lucia Mar Unified School District | Bryan Hagwood, Sr. Bond Project Manager Address/tel.:222 Stanley Avenue | Arroyo Grande, CA 93420 | tel. 805.474.3000 Project/Amount:Shell Beach ES Parking Lot ($225,270), Arroyo Grande HS Track ($7,000), Oceano ES ($91,280) Staff:Steve Webster and Brian Hellwig Public Agency Experience Kitchell brings more than 72 years of experience working with public agencies representing over $53 billion in construction encompassing over 3,600 projects. Focusing on the public sector has allowed us to develop management and project control techniques targeted to its specific needs. Earth Systems brings over 50 years of experience in the public sector. With an office in San Luis Obispo, Earth Systems brings extensive background in materials testing and special inspection, with a staff of over 20 highly qualified technicians and inspectors. They have worked with many jurisdictions throughout San Luis Obispo and Santa Barbara Counties including City of San Luis Obispo, City of Pismo Beach and City of Grover Beach to name a few. RRM Design Group brings more than 45 years of experience working with public agencies. Their work culture emphasizes collaboration, frequent communication and accessibility. Focusing on the public sector has allowed them to work with many clients in the Central Coast including the City and County of San Luis Obispo, City of Grover Beach, City of Paso Robles, City of San Mateo, City of Santa Barbara, City of Cloverdale and City of Ukiah to name a few. Rincon Consulting brings more than 26 years of experience working with public agencies including the City and County of San Luis Obispo, Santa Barbara County, City of Paso Robles and City of Santa Maria to name a few. 4. Describe your cost control and budgeting methodology for this Project. Budget Management One of our initial efforts will be to work with the City to understand/refine the budget, including identification of all cost components with reasonable budget assumptions to use until actual costs are accrued. We establish and maintain a cost control system in Procore to track all costs associated with the project against the established budget. As the project progresses, projected costs will be entered into the model, providing a real time assessment as to the status against budget. We often perform detailed estimates and reconcile to the design professional’s estimates, which provides an unbiased professional opinion of probable construction costs. Construction costs along with project soft costs are updated to reflect the latest information and tracked continuously against the established budget. We provide recommendations on construction feasibility, availability of materials and labor, time requirements for installation and construction, and factors related to cost including costs of alternative designs or materials, preliminary budgets and possible economies. If it appears the project construction budget will not be met, we offer alternatives and solutions to bring costs back in line. Rincon Consulting RRM Design Group DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 8 5. Provide responses to the following: We studied the documents published with the RFP and identified several potential critical construction and environmental issues, identified below with our proposed solutions for: Construction Related Issues Proposed Solution Local traffic surges every morning and afternoon (Mission Prep High and Old Mission Middle School) off Palm Street and adjacent streets, for student drop off and pick up. Establish access/egress restrictions, delivery moratoriums, work hours, etc. in the contract documents. Higuera Street and Marsh Street are natural traffic arteries for construction materials deliveries. During the deck pours, concrete trucks stack up to continuously pour concrete. Both streets contain critical commercial and retail outlets. Plan all deck pours and concrete truck staging either on-site (off streets) or remote with radio notification for minimal disruptions. If any businesses could be affected by steady traffic, discuss with City to review specific activities with affected business. Post-tensioned (PT) concrete placement quality control is exacting and unforgiving. Create stringent protocols for concrete placement, finishing, flatness, curing and sealants. Individuals (person) finishing concrete (swirl) may influence finish variation due to handling of trowel, pressure, etc. Ensure same finishing team is committed start to finish. Note that after placement, PT concrete cannot be readily repaired/ground for finish issues due to finish and cables, etc. Proper coordination for all PT slab systems including MEP, fire protection, ceiling inserts, bollard embeds, railings, bent U embeds, bolted wheel stops, etc. Perform thorough clash detection using Building Information Modeling (BIM) for all systems in or supported by PT decks to ensure there are no overhead clearance issues or in slab conflicts requiring retrofit. (No post install drilling allowed). Any structural changes requiring cutting or drilling into finished PT concrete. Resolve all identified constructability issues prior to bidding to mitigate cutting or drilling later. Any cutting or drilling PT concrete requires X-Ray cable locating and mapping, etc. This parking plan is essentially open building. Consider drainage and watertightness. When performing constructability reviews, check all decks for positive drainage including covered areas susceptible to wind driven water intrusion in all areas of the vehicle and pedestrian egress. Contractor use of tower crane for construction delivery. In bidding instruction include recommendations for tower crane placement (if used). Then have engineer revise structural plan to accommodate tower crane option. Parking structure fire separation/rating at the adjacent residential buildings. Review any portion of non-rated parking structure juxtaposed to the adjacent residential buildings for space separation and/ or rated wall conditions required. b) Describe critical environmental issues and how you will address these.a) Describe critical construction related issues associated with the Project and how you will address these. Environmental Issues Proposed Solution Storm water runoff in direct proximity to San Luis and Brizziolani creek beds Prioritize the SWPPP plan including ample retention basin/s. Monitor plan so it is constantly maintained. Provide effective track out plates to remove on-site soils and other contaminates from vehicles. This particular location is critical for all storm water to be properly contained and handled. Possible high ground water table/underground stream effect on over excavation, foundations, elevator pit, and shored wall on east side. Verify the geotech engineer has reviewed and coordinated with structural engineer. Also review seasonal water table heights with mitigation plans for these soil conditions, etc. Elevators: Plan elevator design, pits, etc. in relation to high water table and/or possible hydrostatic pressure seasonally. Plan any water stop rings, sump pit, and hydraulic cements, etc. to prevent ground water from penetrating the elevator pit from below. Potential tree drip and root damage at property line. Have arborist inspect trees at property line (on private property) for potential issues due to construction, that may require special protection, or removal and replacement. Potential for excessive noise levels due to construction activities. Check equipment noise dBs at adjacent buildings with mitigation options such as temporary sound walls, etc. Specify noise mitigation requirements in the contract documents DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 9 c) Describe how cost and schedule for the construction contract and your scope of work could be minimized. Cost & Schedule for the Construction Contract Construction cost and schedule can be minimized in a variety of ways. We analyzed the documents and have some suggestions, categorized as incentives, risk assignment and value analysis: Incentives: We assessed the Phase 1B and Phase 2 schedule durations and do not recommend they be reduced in the bid documents; however, schedule compression can be achieved through early delivery incentives and/or the use of bid alternates for reduced construction duration. Risk Assignment: As a rule, contractors don’t assume risk—they price it. Our risk assessment includes assignment of risk the contractor may consider to be onerous, or inappropriately assigned to them and thereby assign a premium to managing the risk item. An example is permanent shoring. Permanent shoring is shown on the east side property line on the Phase 1B Plan. The documents instruct the contractor to design all permanent shoring. There are two private structures on the zero-lot-line directly adjacent to the shoring. The contractor is to insure the permanent shoring design covers any additional foundation surcharge, etc. for zero deflection. Prospective bidders would likely consider this an onerous assignment of risk and charge a premium. We suggest the design professional design the permanent shoring or an allowance be established in the bid documents for permanent shoring design. Value Analysis: We identified a number of ideas the City may want to consider in realizing some time and/or cost savings. A few examples include: `Precast stair treads in lieu of poured in place. The cost of precast elements fluctuate; however, even if they’re higher in material cost, time and cost savings can be realized through faster installations and reduced labor. `The quantity of EV charging stations can be phased to meet the demand. We recommend installing the infrastructure for the charging stations but adding the equipment in phases to meet demand. This has the added benefit of taking advantage of future improvements in this emerging technology. `The copper dome details include specific details for copper dome construction, radius, materials, spire, waterproofing, roof gutter, etc. The City may want to consider a prefabricated unit. This could result in time and cost savings. Optimized Staffing Plan Our scope of work and resulting fees can be minimized through an optimized staffing plan, task assignment evaluation and reduced construction duration: Optimized Staffing Plan: We assembled our proposed staffing plan to deliver the highest qualified team at the best value. We accomplished this by assigning Resident Engineer Andy Goh on a part time basis working in close coordination with Assistant Resident Engineer Tom Fee. Through this strategy, the City receives the benefit of Andy’s expertise whenever needed without incurring the cost of a full- time team member. Task Assignment Evaluation: We assembled a team of in-house employees and subconsultants to perform all the tasks described in the RFP. We recommend primary responsibility for surveying be transferred to the contractor. This will appropriately place liability for survey errors on the contractor for remedy. We also recommend the City use in-house code compliance inspectors if this function can be performed by the City at lower cost. Reduced Construction Duration: Any schedule reductions achieved through the above measures could result in reduced duration of CM-RE services and result in fee savings as long as added staffing would not be required for added shifts or acceleration. During preconstruction, the Kitchell team assisted with re-scoping the project to bring the project in budget and developed a delivery plan including multiple bid packages and phasing to optimize the construction schedule. During construction, the Kitchell team provided day-to-day leadership throughout construction including cost, schedule and quality components of the project. The Kitchell team approached every day with the same enthusiasm, modifying plans as necessary to keep the project moving. They effectively communicated and coordinated with all involved in the project including the building department and other agencies having jurisdiction, the design team and contractors. We are grateful to have such capable staff on the project and would like to take this opportunity to recognize their dedication. -Andy Newman, Deputy Director, Butte County Association of Governments Butte Regional Transit Operations Center (BRTOC) Kitchell was a key partner in the successful delivery of the County of San Luis Obispo’s Animal Services Facility project. The first design-build project for the County. Kitchell provided preconstruction guidance on the $20.3M project and then was the day-to-day Construction Manager during construction. Kitchell’s staff was competent, professional and a pleasure to work with. - Robert Ruiz, Manager Project Delivery Division, County of San Luis Obispo ““ ““ Client Testimonials DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 10 H. Scope of Work This section should establish that the proposer understands the City’s objectives and requirements, demonstrate the proposer’s ability to meet those requirements and outline clearly and concisely the plan for accomplishing the specified work in accordance with the time schedule as outlined in Appendix A, Scope of Services: A Plan for Accomplishing the Specified Work We have thoroughly reviewed the Scope of Services contained in Appendix A of the RFP in conjunction with the contract documents, quality assurance plan, mitigation and monitoring plan, and project delivery schedule accompanying the RFP. Through this review and our periodic discussions with City personnel prior to issuance of the RFP, we have developed an understanding of the City’s objectives for the Cultural Arts District Parking Structure project. The succeeding paragraphs describe our plan for accomplishing the scope of work within the prescribed schedule. Scope of Services Statement We will perform the scope of services defined in Appendix A of the RFP, which includes: performing the duties of the Resident Engineer as defined by Caltrans, assist with bid evaluation, review available project documents, prepare and maintain the Resident Engineer’s project schedule, develop project procedures in collaboration with the City, establish and maintain the project management information/document control system, establish a dispute resolution process, provide project administration, coordination & communications, monitor/evaluate the contractor’s schedule, conduct progress meetings, issue progress reports, evaluate payment requests, manage the submittal and RFI processes, manage/mitigate change orders, conduct construction observations/inspections, evaluate & negotiate claims, perform materials testing & specialty inspections, perform surveying, perform construction environmental mitigation & monitoring, and manage project completion & closeout City Staff Participation We often use a responsibility matrix to clarify team participation requirements in granular detail. Our need for City staff participation generally boils down to providing project information and documentation, a designated representative who can render timely decisions, access to City personnel who have the authority to authorize contract modifications, and liaison with City departments and other local authorities involved in the project. Workplan Task 1: Preconstruction Services Upon commencing preconstruction phase services, Resident Engineer Andy Goh and Assistant Resident Engineer Tom Fee will perform an immersive study of all available project documents to become intimately familiar the available project information. They will use this base of information to build and implement a strategy to ensure successful delivery of the project, described in greater detail herein. Construction Management Plan Upon commencing services, we will work with the City to develop the construction management plan. This effort will serve as the project team’s primary point of reference and will establish the framework for project execution. The construction management plan will include the following: `Communications protocols, progress reporting requirements, roles and responsibilities, and project procedures to establish clarity on how the City, designer, contractor and Kitchell interact as a team and administer and coordinate the work of the project. `Master Budget and Master Schedule: Kitchell will evaluate the City’s current schedule, budget, and design to establish time and cost expectations. From this evaluation, Kitchell will develop a master budget and master schedule to track progress and develop strategies to remain on schedule and within budget. `Project Logistics Plan to identify and resolve project logistical challenges such as ensuring undisrupted activity to the surrounding community, access/egress issues, noise mitigation measures, staging operations, and many other logistical challenges. TASK TASK TASK TASK TASK TASK 1 2 3 4 5 6 Preconstruction Services Construction Services Geotech. & Materials Testing & Special Inspections Surveying Construction Environmental Mitigation & Monitoring Post Construction Deliverables DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 11 `General Conditions and Bid Forms/Procedures to convey clear scope of work and concise bidding/contract execution procedures to the bidding community and provide ample project administrative control. `Quality Assurance Plan to establish a clearly defined process for achieving the City’s quality objectives. The construction management plan is an evolving document and will be updated continually throughout the project. Many of these elements are explained in greater detail in relevant sections of our proposal. Resident Engineer’s Master Project Schedule We will develop and maintain the overall Critical Path Method (CPM) Resident Engineer’s master project schedule with milestones. Our project schedules provide information in a concise, clear, and effective format. The schedule will incorporate all remaining preconstruction and construction activities. In the process, we will evaluate and propose alternatives for project logistics, phasing and sequencing. We will advise the project team regarding factors including long-lead materials procurement, rapidly changing materials prices, weather, overall schedule requirements, favorable/unfavorable bidder climate and regulatory requirements. The project team will determine the pertinent factors. They will then be compiled, evaluated, and reduced to a set of recommendations for incorporation. Quality Assurance Plan Kitchell has a standard Quality Assurance (QA) program, which will serve as a vital tool in developing a project-specific QA plan and facilitating the contractor’s implementation of their Quality Control (QC) plan. We will take a proactive approach to quality assurance to see that project receives the best project quality for its investment. Primary aspects of Kitchell’s QA program include: `Conducting design and constructability reviews to improve buildability and help eliminate potential change orders `Establishing clear QA/QC processes and procedures including inspections, materials testing & special inspections; as well as delivered materials verification against approved submittals. `Participating in pre-installation meetings prior to each construction operation to ensure proper installations and applications without costly rework. `Requiring mock-ups of important building components and finishes to ensure that the specified quality expectations will be met. Bid Administration Successful administration of the bid phases will result in a project that meets the City’s goals for receiving responsive and responsible bid proposals from prospective qualified bidders. Kitchell performs a variety of services in administering and assisting in the contractor selection process. Our bid phase services often include: `Extensive bidder solicitation to generate a competitive bidding environment `Conducting pre-bid conferences to clarify bidding requirements and provide bidders with a venue to conduct their pre-bid investigations `Developing methods for tracking, responding to, and expediting questions received prior to receipt of bids `Reviewing addenda and advising the team of time, cost or constructability impacts `Assisting in assembling construction documents, bid documents, general conditions, addenda and distribution to all prospective bidders `Reviewing and analyzing bids and making recommendations to the owner for contract awards `Assist and coordinate the resolution of bid protests `Post-bid meetings and analysis of bid alternates `Assist with contract development, award, and formal issuance of Notice to Proceed Task 2: Construction Services Project Coordination & Communication Conveying clearly defined communications are paramount to project success. Kitchell will organize and establish effective communication among the project team members. We will ensure that responsibilities for completing tasks are assigned to appropriate team members, they are understood by all, and are tracked throughout the design and construction process. Written communications are date stamped, logged, and tracked for responses. Our project personnel are trained in Procore online data control system for generating and/or tracking communications, costs, requests for information, submittals, daily logs, drawings, and other project documents. We are also flexible in adapting to other project administration systems as dictated by City and project demands. Logs are distributed for all outstanding items. These logs are reviewed, prioritized, and correspondence is produced from Procore for all due and delinquent items. This enables the team to proactively address and resolve issues without experiencing the consequences of delayed response. Schedule Management Careful monitoring and regular reporting of activities against the contractor’s schedule will provide early information about overall progress. We will follow up on potential delay issues through active communication with City staff and the project team. We will continually review and monitor progress of the work against the scheduled milestones, and provide recommendations necessary to prevent, minimize, or recover from delays. The accepted critical path schedule will become the baseline upon which we measure progress, as well as record an accurate history of how the project is built through consistent schedule updates. We will use the weekly on-site project construction meetings as a forum to discuss the status of the schedule with the contractor. We will continuously monitor the schedule and enforce the provisions of the contract documents regarding scheduled progress. We will also enforce the provisions of the specifications regarding scheduled progress of the project. We have developed specific language used extensively in contract documents requiring the contractor to follow rigid specifications in the development and maintenance of a CPM schedule that is dollar and manpower loaded. In the event that a contractor submits a delay claim, the contractor must provide justification substantiating that an actual delay to the work occurred. Additionally, the contractor must provide a schedule analysis showing that the delay affected work activities critical to scheduled project completion. Finally, the contractor must substantiate the number of delay days claimed. The contractor’s documentation to substantiate the claim is then reviewed and analyzed, and entitlement, if any, is determined. PRECONSTRUCTION DELIVERABLES: –Resident Engineer’s master project schedule –Project Procedures –Quality Assurance plan DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 12 Progress Meetings We consider meetings an effective means of collaborating on ideas, resolving issues, building relationships, and reporting information in a relational environment. Subject matter for construction progress meetings will include the coordination and implementation of design elements, identification and resolution of issues, schedule coordination and compliance, tracking and management of RFIs, submittals, change orders, payment applications, and general coordination of testing and inspections. To memorialize important statements made and actions required, concise, accurate meeting minutes issued in a timely manner are just as important as the meetings themselves. We adhere to Kitchell’s 48-hour turnaround policy on issuing meeting minutes. Progress Reports Progress reports provide a snapshot of project status. We will generate reports electronically to summarize project activities, report schedule and budget status, address current project issues and forecast future activities. Photographs showing project progress are included along with applicable logs and other pertinent information. Payment Kitchell, in consultation with the design professional and the City, will implement a standard procedure for the review, processing, and payment of the contractor payment applications as well as invoices applicable to the project budget. This procedure will facilitate timely, accurate and appropriate payments, thereby limiting the City’s exposure to overpayments or interest fees. Submittals Kitchell’s submittal activities begin weeks before the contractor begins work. To ensure that the contractor fulfills the specified submittal requirements, we comb the specifications for any required submittals and enter them into our project administration software. This enables us to work from a submittal schedule tied to individualized submittal due dates. Once the contractor transmits submittals for approval, submittal status transitions from “scheduled” to “logged” by simply entering actual receipt dates to the pre-entered submittal information. We utilize our computerized submittal schedules and submittal logs to mitigate delays due to delinquent contractor submittals or consultant reviews. Requests for Information During construction, prompt resolution of the contractor’s requests for information (RFIs) will help mitigate change orders. For this reason, we have implemented an efficient RFI processing and monitoring system through our project administration software. We have also developed specification language to reduce erroneous RFIs. We will use the RFI Log to track requests for information including important receipt and response dates and ball-in-court status. Most importantly, the RFI Log prioritizes when a response is required to be submitted to the contractor. This will help mitigate delays due to delinquent RFI responses. The RFI Log is updated weekly and is distributed to all team members during the weekly meetings. Change Orders Our change order mitigation process will include a thorough evaluation of each change order request against the contract documents for validity. Valid change order requests will be systematically reviewed for onerous or excessive cost items. Kitchell, in conjunction with the City and the design professional, will develop and follow specific procedures for resolving change order disputes. The team will maintain emphasis on critical issues and ensure that all appropriate team members are informed of the proposed changes and the impact on cost and time immediately when the issues arise. Construction Observation/Inspection Our construction management personnel are well equipped to conduct field inspection support, oversight, and quality assurance. We have assisted in selecting, coordinating and administering over $300 million of special consultant contracts. This experience will be very useful in administering and coordinating the work of building inspectors, testing and inspection personnel, mitigation monitoring personnel and others as required by the City. We will conduct field observations and generate daily reports. Our project team will collect and report daily project information to develop a written history of the project. Information included in our daily reports includes activities performed, important events of the day, visitors, materials received, crew size, weather data, and issues to resolve. This collection of daily reports document daily construction events forming an as-built history of construction schedule implementation. Dispute Resolution/Claims We have found that unresolved disputes diminish in an environment of partnership. We recommend implementation of a dispute resolution ladder to enable issues to be escalated from the field to progressive levels of the project hierarchy enabling issues to be resolved without becoming stymied in conflict and indecision. SCHEDULE MANAGEMENT CITY OF SANTA MONICA, PARKING STRUCTURE 6 Kitchell was responsible for setting and maintaining the project schedule. Several factors had to be considered for establishing this schedule. First and foremost was how to facilitate a major construction project in a high-traffic downtown area. Second was the timing for delivery of materials – how it would affect neighboring businesses and residents, safety precautions to accommodate pedestrian traffic, etc. Kitchell met with the entire project team each week to monitor schedule issues, make adjustments as needed and report progress updates and changes to the client. With the demolition, however, there were a lot of unforeseen issues that affected the schedule early on. Once the existing structure was demolished and site excavation had begun, the general contractor discovered underground storage tanks and hazardous materials that required remediation. The additional work to remove the tanks and hazardous materials caused about a four-week delay. Despite these early challenges with unforeseen conditions during demolition and the need to bring in a new electrical connection, the project was delivered and operational on time. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 13 In the event parties disagree over design intent, unforeseen changes, utility conflicts, schedule delays and other issues, and agreement isn’t reached through dialogue, Kitchell will implement a dispute resolution process involving an objective analysis of merit and entitlement. Kitchell will meet with the City to recommend a solution then attempt settlement with the involved parties. If settlement negotiations are unsuccessful, Kitchell will recommend the matter be resolved through a formal dispute resolution process outlined in applicable contracts. Having a wide range of subject-matter experts, construction and engineering professionals, we will be able to review, assess and recommend action on additional cost matters, and scope entitlement or denials. Lastly, we can identify if contractor costs are appropriate based on our database of cost estimates developed for multiple projects in the region. TASK 3: GEOTECHNICAL & MATERIALS TESTING & SPECIALTY INSPECTION Earth Systems will perform the materials testing and specialty inspection scope of services described in the RFP. TASK 4: SURVEYING RRM will perform the survey scope of services as defined in the latest version of the Caltrans Survey Manual. TASK 5: CONSTRUCTION ENVIRONMENTAL MITIGATION & MONITORING Rincon will perform the environmental mitigation and monitoring scope as defined in the RFP including providing qualified biologist(s), air quality monitoring, cultural/archaeological monitoring, paleontological monitoring, and placing noise mitigation signage. TASK 6: POST-CONSTRUCTION SERVICES We will review the front-end documents to ensure they clearly reflect the City’s expectations for contract closeout and warranty issue response. We will also develop procedures that define each team member’s roles and responsibilities during the start-up, closeout and warranty phases. Kitchell will participate in walk-through inspections. From these inspections, a punch list of remaining items to be addressed will be generated. We will work with the City to verify that these items are corrected before moving on to final completion. Kitchell will assist in determining final completion and scheduling final inspection. We will manage submittal of required closeout documents including warranties, guarantees, affidavits, releases, bonds, and waivers, as well as coordinate delivery of all keys, manuals and maintenance stock. We will work with the City to secure as-built drawings, records, logs, photographs, change orders and shop drawings as required by the contract documents. CONSTRUCTION DELIVERABLES: –Project documentation via electronic uploads –Meeting minutes –Reports: Daily Observation, Inspection, Monthly Progress –Logs –Schedule reviews –Review/Recommendations: Changes, Claims, Payment Applications MATERIALS TESTING & SPECIALTY INSPECTION DELIVERABLES: –Materials testing and specialty inspection reports SURVEYING DELIVERABLES: –Survey records POST-CONSTRUCTION DELIVERABLES: –Red-lined project as-built drawings –Compilation of outstanding claims and other financial closeout documentation ENVIRONMENTAL MITIGATION & MONITORING DELIVERABLES: –Environmental mitigation and monitoring reports Three-Step Claim Analysis Process Merit Evaluation: Performed to determine the legal basis of the claim, if any. Settlement Negotiations: Conducted with the contractor. Entitlement Analysis: If the claim has merit, an entitlement analysis is performed to determine time and monetary entitlement. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 14 Contract Agreement Indicate any issues or proposed changes to the sample contract included as Appendix C. The Consultant must provide a brief statement affirming that the proposal terms will remain in effect for one hundred twenty (120) days following the date proposal submittals are due. Kitchell has reviewed the sample contract in Appendix C of the RFP, and has identified the following exceptions. We request the following redlined changes to the indemnity provisions: 22. Hold Harmless and Indemnification. `(a) Non-design, non-construction Professional Services: To the fullest extent permitted by law (including, but not limited to California Civil Code Sections 2782 and 2782.8), Consultant shall indemnify, defend, and hold harmless the City, and its elected officials, officers, employees, volunteers, and agents (“City Indemnitees”), from and against any and all causes of action, claims, liabilities, obligations, judgments, or damages, including reasonable legal counsels’ fees and costs of litigation (“claims”), arising out of to the extent caused by the Consultant’s negligent performance or Consultant’s negligent failure to perform its obligations under this Agreement or out of the operations conducted by Consultant, including the City’s active or passive negligence, except for such loss or damage arising from the sole or active negligence or willful misconduct of the City. In the event the City Indemnitees are made a party to any action, lawsuit, or other adversarial proceeding arising from Consultant’s performance of this Agreement, the Consultant shall provide a defense to the City Indemnitees or at the City’s option, reimburse the City Indemnitees and pay their costs of defense, including reasonable legal fees, incurred in defense of such claims. `(b) Non-design, construction Professional Services: To the extent the Scope of Services involve a “construction contract” as that phrase is used in Civil Code Section 2783, this paragraph shall apply in place of paragraph A. To the fullest extent permitted by law (including, but not limited to California Civil Code Sections 2782 and 2782.8), Consultant shall indemnify, defend, and hold harmless the City, and its elected officials, officers, employees, volunteers, and agents (“City Indemnitees”), from and against any and all causes of action, claims, liabilities, obligations, judgments, or damages, including reasonable legal counsels’ fees and costs of litigation (“claims”), arising out of to the extent caused by the Consultant’s negligent performance or Consultant’s negligent failure to perform its obligations under this Agreement or out of the operations conducted by Consultant, including the City’s active or passive negligence, except for such loss or damage arising from the sole or active negligence or willful misconduct of the City. In the event the City Indemnitees are made a party to any action, lawsuit, or other adversarial proceeding arising from Consultant’s performance of this Agreement, the Consultant shall provide a defense to the City Indemnitees or at the City’s option, reimburse the City Indemnitees and pay their costs of defense, including reasonable legal fees, incurred in defense of such claims. `(c) Design Professional Services: To the fullest extent permitted by law, Consultant shall indemnify, defend, and hold harmless City and any and all of its officials, employees and agents (“Indemnified Parties”) from and against any and all claims, losses, liabilities, damages, costs and expenses, including attorney’s fees and costs, to the extent they are caused by arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant. Consultant’s duty to defend shall consist of reimbursement of defense costs incurred by City in direct proportion to the Consultant’s proportionate percentage of fault. Consultant’s percentage of fault shall be determined, as applicable, by a court of law, jury or arbitrator. In the event any loss, liability or damage is incurred by way of settlement or resolution without a court, jury or arbitrator having made a determination of the Consultant’s percentage of fault, the Parties agree to mediation with a neutral third-party to determine the Consultant’s proportionate percentage of fault for purposes of determining the amount of indemnity and defense cost reimbursement owed to the City. Notwithstanding the foregoing and without diminishing any rights of City in the preceding paragraph, for any liability, claim, demand, allegation against City caused by a negligent arising out of, related to, or pertaining to any act or omission of Consultant, but which is not a design professional service, Consultant shall defend, indemnify, and hold harmless the Indemnified Parties from and against any and all damages, costs, expenses (including reasonable attorney fees and expert witness fees), judgments, settlements, and/or arbitration awards, whether for personal or bodily injury, property damage, or economic injury, and arising out of, related to, any concurrent or contributory negligence on the part of the City except for the sole or active negligence of, or willful misconduct of the City. In addition, we request the non-applicable indemnifications provisions be struck. We believe paragraphs (a) and (c) should be struck. In our opinion, the dispute resolution provisions in Article 36 are somewhat unusual and biased in favor of the Owner. We request the opportunity to meet with the City and explore mutually agreeable changes to the dispute resolution language. Statement of Affirmation Kitchell certifies that the proposal terms will remain in effect for one hundred twenty (120) days following the date proposal submittals due date, September 1, 2022. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 15 References Fee Proposal Optional- Additional Supporting Information A list of no more than three references for the consultant and three references for each subconsultant, including the names, addresses and telephone numbers. These references may be the same as the references listed above in IV. Proposal Format, Section C. Organization and Approach. Within a separate sealed envelope, submit a complete fee proposal for the scope of services. Provide separate subtotals for Phase 1B and Phase 2 broken down by task and staff billing rates with estimated hours. Clearly identify fees for subconsultant services. Please see pages 6 and 7 for details on no more than three references for Kitchell and each of our subconsultants. Please see the separately sealed envelope for details on our complete fee proposal for the scope of services. We have provided separate subtotals for Phase 1B and Phase 2 broken down by task and staff billing rates with estimated hours, as well as clearly identified fees for subconsultant services. None. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX i EDUCATION MBA, Florida Institute of Technology BS, Architecture Engineering, California Polytechnic State University, San Luis Obispo INDUSTRY CERTIFICATIONS Designated Design-Build Professional LEED Accredited Professional OSHA 30 Hour Certification TULLY WYATT, dbia, leed ap PROJECT DIRECTOR As local San Luis Obispo resident, Tully brings over 19 years of industry experience as a dedicated, organized and detail oriented construction professional. He is a skilled leader who believes in transparent, ongoing communication and maximizing technology to expedite information, guaranteeing that all team members, including subcontractors, are constantly informed of decisions or changes in real time. Tully has a wide range of experience in alternate delivery methods, including CMAR and design-build, as well as extensive project experience, including his most recent work at San Luis Obispo Regional Transit Authority Bus Maintenance Facility where he is serving as a Senior Project Manager. As a local resident for many years, Tully is committed to his local community and clients. His commitment to local clients ensures Tully understands the issues unique to San Luis Obispo, providing the City with assurance that he shares your desire for success. PROJECT EXPERIENCE California Polytechnic State University, San Luis Obispo, yak?it?ut?u Residential Community, San Luis Obispo, CA: A $204 million, 562,446 SF design-build project featuring eight structures with four and five levels above grade. The project featured single, double and quad units totaling 1,475 beds for first year students and an associated parking structure totaling 154,363 SF and over 480 stalls. Situated adjacent to the Grand Avenue entrance of the campus, the community is richly programmed with study areas, large scale living rooms for 50 students or more, outdoor courtyards and circulation routes, a mailroom, recreation center, offices and admissions welcome center. Outdoor spaces include a large lawn with an amphitheater and a courtyard with volleyball and basketball courts, natural features, gardens, contemplative spaces, and bike paths – all designed to support new students’ engagement in the Cal Poly experience. This project is LEED Platinum certified. San Luis Obispo Regional Transit Authority, Bus Maintenance Facility, San Luis Obispo, CA: A new $17.5 million (construction cost), 28,650 SF, single story bus maintenance facility with over 2,600 SF of mezzanine/equipment platform located on a 6.44-acre site. The facility accommodates operations, administration and maintenance areas and includes detached enclosures on-site, including a trash enclosure and canopy over bus parking. Work also includes off-site improvements, specifically the T-intersection for future Elks Lane realignment. California Polytechnic State University, San Luis Obispo, Recreation Center, San Luis Obispo, CA: A $57.5 million, LEED Gold certified recreation expansion that added 85,000 SF to the facility and renovated another 90,000 SF. Additions included a lobby/lounge, three fitness rooms, a two-court gym, a multi-activity center, tripled exercise space, a wellness center, an indoor jogging track, restrooms, leisure pool and deck, an additional sand volleyball court, and six racquetball courts rebuilt with Squash and Wallyball configurations. Renovations included men’s and women’s locker rooms. The recreation center remained operational during the construction period. San Luis Obispo County Community College District, Measure L Bond Program, San Luis Obispo, CA: A $275 million bond program which addresses crucial facility needs, including a new instructional building on the San Luis Obispo campus, a new campus center, a new career training facility and new early childhood center at the Paso Robles campus; the replacement of temporary classrooms, and repairs and upgrades to roofs, heating and air conditioning units, aquatic center and other infrastructure and utilities technology upgrades. County of San Luis Obispo, Probation Department Building, San Luis Obispo, CA: A new $16 million, 31,000 SF, two-story office building featuring office space for county probation staff, interview rooms, training, conference and evidence rooms, armory, secured sallyport, break rooms, locker and changing rooms, restrooms with showers, a public lobby, secured parking for employee vehicles and department vehicles as well as an emergency generator. Santa Barbara County, Staff Augmentation Services, Santa Barbara, CA: Tully alongside Kitchell is currently providing staff augmentation services to Santa Barbara County for over 27 projects totaling more than $73.1 million. Our services include project and construction management for capital and facilities/maintenance projects, project development, programming, scope of work development, RFP/bidding document production, overseeing bidding process and closeout. City of Santa Maria, Historic Smith-Enos House Structural Improvements, Santa Maria, CA: A $180,000 project providing structural improvements to the historic Smith-Enos House in Santa Maria. The modernization and revitalization of the structure is phase one of a multi-phase approach to the renovation of the house, which aims to rehabilitate the interior and exterior of the historic residence to recreate a new indoor public recreation venue featuring cultural and historic exhibits. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX ii EDUCATION MBA, Business Administration, Arizona State University MS, Civil Engineering, Arizona State University BS, Civil Engineering, Arizona State University INDUSTRY CERTIFICATIONS Professional Engineer #C 45731, CA Professional Engineer #24771, AZ Professional Engineer #125612, TX ANDY GOH, pe RESIDENT ENGINEER With more than 34 years of strong, relevant management experience in a wide variety of public works service areas and operations, Andy has led teams to the successful completion of hundreds of infrastructure projects, many of which are fast-track, high profile or federally funded. He is well-versed in complex public policy issues and applicable laws governing municipal operations and project delivery. Under his leadership over the years, his teams have provided customer service-first public service with strategic forward-thinking and incorporated best management practices and use of technology to improve and enhance service delivery. Andy has successfully led his teams in completing many major and complex capital improvement projects in various markets including street transportation, public transit, water and wastewater, public safety and aviation. Proactive in establishing constructive and collaborative partnerships, he prides himself on his ability to build solid and lasting relationships. Andy is results-driven and decisive, while remaining an approachable and progressive leader with a strong commitment to the client’s strategic vision.  PROJECT EXPERIENCE City of Chandler, Oregon Street Parking Structure, Chandler, AZ: A new $23 million, five-level, 293,000 SF, 932-space parking garage for the City of Chandler, which includes a road realignment along Oregon Street as well as intersection improvements at Arizona Avenue and Chicago Street. As Downtown Chandler’s largest garage, the project added much needed parking options for those accessing City Hall as well as restaurants and other venues in the bustling area. The structure is located to the west of City Hall across Arizona Avenue on the northwest corner of Chicago and Oregon streets. City of Tempe, Tempe City Hall Parking Structure, Tempe, AZ: A $16 million (construction cost), five-level, 175,000 SF, 440 stalls parking structure. The five-story mixed- use facility includes parking on all five levels with retail and office space in portions of the first two levels. The exterior cladding of the building consists of light gauge metal stud walls with an adhered stone finish. Tempe East Valley Bus Operation & Maintenance Facility, Tempe, AZ: A $39 million, 103,890 SF, 250-bus LEED Gold certified facility featuring administrative offices, operations/ driver facilities for over 500 operators, a bus maintenance building, bus canopies, and a full liquid natural gas and compressed natural gas (LNG/CNG) fueling center with fare retrieval and bus wash on a 25-acre site. City of Tempe, Center for the Arts, Tempe, AZ: A new $68 million, 88,000 SF performing and visual arts center consisting of two theaters, multi-use areas, gallery and administrative space as well as 20 acres of site development. The facility includes a 600-seat main theater, 200-seat black box theater, public space, stage support, a 3,000 SF multi-use space for rehearsals and events, a 3,500 SF visual arts gallery, administration, gift shop, catering kitchen and donor room. Special features include a 20,000 SF underfloor air distribution (UFAD) system, high-end architectural concrete components such as scalloped walls, battered/radius walls and a cast-in-place dome in the main theater. Site development features include a reflecting pool, pedestrian paths and a park located next to a riparian area on the southwest shore of the Tempe Town Lake, adjacent to a downstream dam. City of Tempe, Curry Road Pedestrian Improvements, Tempe, AZ: A $600,000 road improvement project consisting of the removal and replacement of curbs, gutters, sidewalks, roadway medians, landscaping and a 48” concrete irrigation pipe. This project was funded by the ARRA. City of Tempe, Tempe Town Lake Pedestrian Bridge, Tempe, AZ: A new $5.5 million CMAR suspension bridge totaling 1,000 LF pedestrian and bicyclist bridge connecting the north and south shores of Tempe Town Lake. The bridge, which is lit with vibrant blue hues after dark, consists of four spans of 228 feet each and weighs about 165,000 pounds in total. The bridge is 12 feet wide and 34 feet tall, with arches suspended by 32 metal cables. The bridge has a total of 128 steel cables which criss-cross each other and add to the bridge’s distinctive shape. City of Chandler, Chandler Public Safety Training Center, Chandler, AZ: A new $27 million, 58,090 SF shared resource facility for the Chandler Police Department and Chandler Fire Department. It was built in multiple phases with Phase 1 providing an administrative, educational and tactical training building. Phase 2 provides a separate, state-of-the-art indoor police firing range complex. The finished facility includes an auditorium, offices, tactical training, fitness, firearms simulation system, breakroom, secure parking and exterior secure break areas. This new training complex is the hub for integrated police and fire training and the combined public safety training center. City of Tempe, Apache Boulevard Police Substation, 911 Call Center, and Property & Evidence Facility, Tempe, AZ: An 82,800 SF facility prominently located on Apache Boulevard housing various police functions including patrol, SWAT team, a 911 Call Center and a Property & Evidence Facility. The second floor of the Apache Substation includes a 911 Call Center and Dispatch Center with space allowing users to collaborate, flexible access to the console areas and a separate training area. The entire facility includes complete redundant power and cooling systems. Adjacent to the Substation and Call Center is a 28,800SF property and evidence storage facility. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX iii EDUCATION Coursework, Art, Saddleback College AFFILIATIONS Construction Management Association of America (CMAA) TOM FEE SR. PROJECT MANAGER/ASSISTANT RESIDENT ENGINEER Tom has more than 30 years of experience successfully leading teams managing program development and construction for both public and private clients. As a construction expert, he specializes in all processes from predevelopment through construction delivery, authoring construction management guidelines and redevelopment use plans. Tom’s experience encompasses commercial, industrial, civic/municipal, public private partnership, planning, commercial mixed use, telecommunications, criminal justice, healthcare, hospitality and residential, providing services including program development, plan and specification constructability review, bidding and buyout, estimates, change order review, baseline scheduling and dispute resolution. He believes in a proactive project management approach, increasing productivity and providing exemplary results for his clients. PROJECT EXPERIENCE City of Los Angeles, Metropolis LA R2, Los Angeles, CA: Tom managed on-site construction for the R2 portion of the downtown Los Angeles Metropolis LA. R2 is a type I concrete condominium single structure with 40 levels above grade and two levels below grade. A total of 514 luxury condominiums with a connected (post tensioned) 11-story parking structure totaling 658,495 SF and 1,821 stalls. The roof of the parking structure is a landscaped deck featuring a swimming pool, spa, fire features, volleyball, sporting area, a dog park and a play space. The overall project is located within the 6.3 acre, $1 billion Metropolis development. R2 also includes 36,482 SF of retail located at the ground floor and an amenity level. City of Beverly Hills, La Cienega Tennis Center, Beverly Hills, CA: As construction manager for the City of Beverly Hills, Tom managed overall construction of the La Cienega Park and Tennis Center. The project included a 138,000 SF, post tensioned parking garage with City tennis courts located on the parking structure roof. The project also included a park, two baseball fields, soccer field and the Margaret Herrick Museum and Library. Los Angeles Unified School District, Central Los Angeles Region High School #12, Los Angeles, CA: A new $20.2 million concrete podium style construction with below grade parking and steel frame parking structure for upper floors. Tom served as the Cost Estimator responsible for reviewing the contractor’s baseline schedule, monthly pay application and time impact analysis by general contractor, preparation of independent cost estimates for change orders, evaluation of general contractor cost estimates and negotiation of final change order amounts. University of California, Santa Barbara, San Nicolas and San Rafael Residence Halls, Santa Barbara, CA: Two fast-tracked complete interior replacement projects totaling approximately $3 million located on the UCSB campus, San Nicolas Hall, a seven- story building with 265 rooms and San Rafael Hall, which consists of housing clusters accommodating approximately 500 students. Construction volume required CPM schedules to be updated twice per day, working closely with the university and subcontractors to guarantee delivery. Projects were completed sequentially on-time and within budget. University of California, Santa Barbara, Biotech Seawater Laboratory, Santa Barbara, CA: A $7 million biotech seawater lab/marine studies facility which can replicate any global ocean condition. Tom served as the Superintendent responsible for managing site construction to completion and certification for a project with extremely complicated logistics for structural concrete involving corrosion resistance, direct seawater filtering, piping and storage tanks. Due to the complexity of the project, constant interface with staff and facilities management during construction was required. Department of General Services, Caltrans District 11 Headquarters, San Diego, CA: Senior Project Manager responsible for managing program, infrastructure planning, constructability review, master schedule, project budget, public bidding, award and physical delivery of the 12-acre, 320,000 SF, five building campus. Project was completed under project and ahead of schedule. Dynegy, The Plant University, Morro Bay, CA: Programming for a redevelopment of a 12 million cu. ft. waterfront power plant while still in operation. The site consists of 50 acres of oil storage, brownfield certification, city lease arrangements, etc. The final program and site use plan was projected at $175 million and included a post graduate university for sustainable power engineering and water studies, classrooms, labs, housing, commercial mixed-use space and convention center. Kern County, Park Wi-Fi, Kern County, CA: Kitchell is providing project management services for the County’s park Wi-Fi project. The American Rescue Plan Act (ARPA) provided the County with funds thereby allowing them to provide public access internet Wi-Fi coverage to the 43 County-owned parks scattered among the 8,163 square miles that encompass Kern County – roughly the same size as the State of New Jersey. Our services include planning, scope development, consultant/contractor procurement, estimating, commissioning, and project management from concept through completion for each of the park sites. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX iv EDUCATION MBA, Business Analytics, Cal Poly San Luis Obispo BA, Politics, University of California, Santa Cruz Certificate, Business Analytics INDUSTRY CERTIFICATIONS OSHA 30-Hour Certified Construction Manager-in-Training (In Progress) RYAN STEFANEK QUALITY ASSURANCE MANAGER Ryan brings eight years of experience in the construction industry. He started his career as a field laborer with a general contractor performing carpenter duties while pursuing a master’s degree in business analytics at California Polytechnic State University in San Luis Obispo. Over the years, Ryan transitioned to construction management as a project intern and worked his way up to project engineer. He is passionate about construction and feels that working in the industry is a mixture of marathons and sprints. Ryan excels at planning and responding quickly to project demands. Ryan brings a proven ability to lead cross-functional teams through routine and complex processes. Skilled in guiding team building exercises that focus on morale and personal and professional growth. He takes a responsive leadership approach and uses critical thinking skills to solve issues during the initial stages. Equipped with a Master’s Degree in Business Administration and a Certification in Business Analytics Ryan has a solid ability to research and analyze data with strong attention to detail and an eye for spotting inaccuracies. In addition, Ryan has proven expertise in project planning, scheduling and implementation. As a highly skilled professional, Ryan is well versed in the process of providing QA/AC oversight as a component of Kitchell’s services. He provides an informed high-altitude view of the projects issues with quality delivery. Ryan’s recent experience includes serving as Project Engineer III for a four-story cast in place concrete structure in the City of San Luis Obispo. He also brings recent experience from the San Luis Obispo Regional Transit Authority Bus Maintenance Facility project. PROJECT EXPERIENCE California Polytechnic State University, Multi-Use Facility, San Luis Obispo, CA: Construction of a $100 million four-story cast in place concrete structure that housed multiple facilities for the University including a commercial kitchen, videography studio and multiple laboratory spaces. Ryan’s responsibilities included managing multiple disciples of subcontractors including MEPs and finish trades and ensured coordination and compliance with the contract documents. He also led the weekly owner and architect walks and verified quality concerns were communicated and corrected with subcontractors. San Luis Obispo Regional Transit Authority, Bus Maintenance Facility, San Luis Obispo, CA: A new $17.5 million (construction cost), 28,650 SF, single story bus maintenance facility with over 2,600 SF of mezzanine/equipment platform located on a 6.44-acre site. The facility accommodates operations, administration and maintenance areas and includes detached enclosures on-site, including a trash enclosure and canopy over bus parking. Work also includes off-site improvements, specifically the T-intersection for future Elks Lane realignment. San Luis Obispo County Community College District, Measure L Bond Program, San Luis Obispo, CA: A $275 million bond program which addresses crucial facility needs, including a new instructional building on the San Luis Obispo campus, a new campus center, a new career training facility and new early childhood center at the Paso Robles campus; the replacement of temporary classrooms, and repairs and upgrades to roofs, heating and air conditioning units, aquatic center and other infrastructure and utilities technology upgrades. Projects within this program are being delivered via multi-prime delivery method. California Polytechnic State University, San Luis Obispo, Neighborhood UU - Building 65, Building 19 and Plaza Improvements, San Luis Obispo, CA: Preconstruction services for a $30 million, 59,100 SF project consisting of renovation of 34,600 SF of space in Building 19 including complete renovation of the entire top floor, renovation of electrical and plumbing systems (as related to the top floor scope of work) in the bottom floor of Building 19 and the surrounding plaza area to the north of the building as well as new landscaping and site improvements to the plaza. Work in Building 65 consists of 24,500 SF of renovations including the Chumash Auditorium, lobby area and public areas on that floor as well as exterior improvements at the upper level and interior circulation spine at the lower level of the building to increase and improve student seating and study areas. Custom Homes, San Luis Obispo County: Carpenter and supervisor for $3 million of custom home construction encompassing more than 25 projects. Self-preformed work includes demolition, electrical, carpentry, finish carpentry and concrete. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX v EDUCATION BS, Civil Engineering, California Polytechnic State University, San Luis Obispo, CA MATT HARMS PROJECT ENGINEER Matt is a highly skilled professional supporting project managers with one year of industry experience. He has a passion for the construction management industry and finds working in CM strengthens his strategic and analytical skill sets. He is well-versed in the process of reviewing, issuing and processing RFIs and submittals, updating drawings and meeting minutes and negotiating change orders with team members on all sides of the table. Matt is familiar with a variety of software including Bluebeam, Procore, BIM 360, Assemble, Revit and AutoCAD. His recent experience includes serving as a field engineer for a $90.2 million ocean outfall booster pump rehabilitation and $6 million piping replacement. PROJECT EXPERIENCE Orange County Sanitation District, Ocean Outfall Booster Pump Rehabilitation, Huntington Beach, CA: A $90.2 million, 40,000 SF ocean outfall booster pump rehabilitation delivered via design-bid-build. The project encompassed the construction of a new low flow outfall pump station, rehabilitation of the existing central power generation building, rehabilitation of an effluent pump station annex and rehabilitation of the existing electrical distribution system. Matt’s responsibilities included acquiring daily permits for labor, analyzing budget for labor distribution reports, quality control for concrete pours, creating purchase orders, creating and evaluating change orders, safety meeting, safety walks, safety orientation for new employees and subcontractors, schedule meetings and submittals. Orange County Sanitation District, P2-123 Return Activated Sludge Piping Replacement, Huntington Beach, CA: A $6 million, 1,400 LF project encompassing the removal and replacement of a deteriorating return activation sludge piping, valves, valve actuators and wiring, flexible couplings and pipe supports. In addition, the project also included the installation of 12 new 14” isolation valves and installing new sluice gates. Matt’s responsibilities included acquiring daily permits for labor, analyzing budget for labor distribution reports, quality control for concrete pours, creating purchase orders, creating and evaluating change orders, safety meeting, safety walks, safety orientation for new employees and subcontractors, schedule meetings and submittals. California Polytechnic State University San Luis Obispo, Highway Realignment, San Luis Obispo, CA: Design services for highway improvements along the 101 in the Central Coast starting south of El Campo Road near Arroyo Grande to North of Hemi Road near Nipomo. Main goals of the project included improving safety, maintaining overall circulation and operations of US 101, as well as emphasize sustainability. Matt’s responsibilities included performing initial site studies, such as geotechnical site investigation, a water runoff analysis and traffic impact study to name a few. In addition, Matt also assisted in technical write-ups and assisted with corridor modeling design. California Polytechnic State University San Luis Obispo, Higuera and Chorro Street Intersection Improvement Proposal (Cal Poly Project), San Luis Obispo, CA: For this project, Matt determined the level of service for Higuera Street and designed an improved system layout for the intersection. The project goal was to increase safety in all aspects, such as pedestrian and vehicular safety while decreasing congestion. Matt’s responsibilities included analysis of Higuera and Chorro intersection in downtown San Luis Obispo. He recorded pedestrian and vehicle volumes, crash data and traffic signal parameters. Matt’s studies also included a traffic warrant study, traffic signal analysis, synchro analysis, safety analysis, critical lane volume studies and intersection sight distance analysis. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX vi EDUCATION BS, Natural Resources Management, Cal Poly State University, San Luis Obispo AA, Engineering Technology, Cuesta Community College INDUSTRY CERTIFICATIONS ICC Certified Special Inspector: Reinforced Concrete (#1025543-49) ICC Certified Special Inspector: Structural Masonry (#1025543-84) ICC Certified Special Inspector: Prestressed Concrete (#1025543-92) ICC Certified Special Inspector: Structural Steel, Bolting and Welding (#1025543-S1, S2 & W) ICC Certified Master of Special Inspection (#1025543-MI) ICC Certified Special Inspector: Spray Applied Fireproofing (#1025543-86) NICET Level III, Transportation Engineering Technology (#86954) AWS-CWI QCI-88 & 96, Certified Welding Inspector (#95011151) DSA Masonry Inspector (#5852 CHARLES ZANOLI TESTING & INSPECTION With over 30 years in the construction industry, Charles is a highly qualified inspector with a wealth of experience in materials testing and special inspection. Certified by numerous regulatory agencies, he specializes in testing and inspection of reinforced concrete, pre-stressed concrete, structural masonry, asphalt concrete, bolts, spray-approved fire-proofing and soils. He has a broad base of project experience, including numerous structures at California Polytechnic State University at San Luis Obispo, K-12 school projects throughout San Luis Obispo and Santa Barbara counties, and public works facilities and infrastructure. Charles is certified by APWA as a public works inspector and is a ICC- certified Master Inspector, certified by ICC for inspection of reinforced concrete, pre-stressed concrete, structural masonry, structural steel and welding, and spray-applied fire-proofing to name a few. Charles studied engineering technology and obtained a bachelor’s degree in Natural Resource Management from California Polytechnic State University. PROJECT EXPERIENCE California Polytechnic State University, San Luis Obispo, yak?it?ut?u Residential Community, San Luis Obispo, CA: A $204 million, 562,446 SF design-build project featuring eight structures with four and five levels above grade. The project featured single, double and quad units totaling 1,475 beds for first year students and an associated parking structure totaling 154,363 SF and over 480 stalls. Situated adjacent to the Grand Avenue entrance of the campus, the community is richly programmed with study areas, large scale living rooms for 50 students or more, outdoor courtyards and circulation routes, a mailroom, recreation center, offices and admissions welcome center. Outdoor spaces include a large lawn with an amphitheater and a courtyard with volleyball and basketball courts, natural features, gardens, contemplative spaces, and bike paths – all designed to support new students’ engagement in the Cal Poly experience. This project is LEED Platinum certified. Hotel San Luis Obispo (Hotel SLO), Multi-Story Hotel and Parking Structure, San Luis Obispo, CA: Hotel San Luis Obispo is located at 955 Morro Street in downtown San Luis Obispo. The approximately 110,000 SF structure was constructed as part of a mixed-use project in the Chinatown District of the city. The hotel encompasses 78 rooms and suites, two on-site restaurants, a spa, garden courtyard, pool, gym and social event/meeting spaces for up to 350 guests. The multi-story building has a subterranean parking level, accessed via a ramp from Morro Street, that entailed cuts of up to 17 feet. It utilized a conventional reinforced concrete slab with poured-in-place retaining and shear walls and concrete columns. The first floor was constructed utilizing a conventionally reinforced concrete slab, while the upper floors were supported by post-tensioned concrete slabs with wood-framed construction. Vespera on Ocean, Pismo Beach, CA: Vespera on Ocean is a 124-room Marriott Autograph hotel located at 147 Stimson Avenue in Pismo Beach. Earth Systems conducted a geotechnical engineering investigation for the project, which comprises an underground parking level, a street level concrete podium deck and three stories of stud-framed hotel rooms, and exterior pool and recreation areas. Challenges at the beach-front site included the potential for liquefaction and dynamic settlement, subsurface water, and shoring of excavations adjacent to adjacent buildings and infrastructure. Development of the site involved cuts of up to 16 feet to accommodate the subterranean parking level. San Luis Obispo County Regional Airport Passenger Terminal, San Luis Obispo, CA: Earth Systems provided a geotechnical engineering report, materials testing and special inspection for the recently completed San Luis Obispo County Regional Airport passenger terminal. At approximately 56,000 SF, the new terminal is about 45,000 SF larger than the previous facility. The $39.5 building includes a main entry, lobby, ticketing, baggage retrieval, rental car and security screening areas, airport administration offices, a public parking lot and main aircraft parking lot. It is of structural steel and masonry construction with a masonry veneer. The building is supported by conventional continuous footing foundations and concrete slabs-on grade. Hotel Cerro, San Luis Obispo, CA: Earth Systems prepared reports to provide geotechnical engineering criteria for the construction of the Hotel Cerro in downtown San Luis Obispo, California. The 65-room structure includes 65 guest rooms, restaurant space, a conference center, a spa and a rooftop pool deck. The structure consisted of wood and steel frame and concrete cast-in-place construction. William and Linda Frost Center for Research and Innovation, California Polytechnic State University at San Luis Obispo, CA: The $125 million William and Linda Frost Center for Research and Innovation will be an interdisciplinary building that will house three colleges – the College of Science and Mathematics, the College of Agriculture Food and Environmental Sciences, and the College of Liberal Arts. Currently under construction, the 102,000 SF structure will have four levels and will include a total of 20 laboratories, a technology center, studio space, classrooms, faculty offices, and conference rooms. A new plant conservatory is planned for the hillside overlooking the Poly Canyon Village student housing complex. ADDITIONAL INDUSTRY CERTIFICATIONS DSA Pneumatically Pl. Concrete (#5954) ACI Concrete Field Testing Technician, Grade 1 (No. 00931544) Certified Nuclear Gauge Operator Hazardous Waste Operations and Emergency Response, 40-hour and 8-hour refresher courses (OSHA 29 CFR 1910.120 and Title 8, CCR 5192) DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX vii EDUCATION BS, Agricultural Engineering, California Polytechnic State University, San Luis Obispo, CA LICENSES Professional Land Surveyor #LS7561, CA STEVE WEBSTER, ls SUPERVISOR OF SURVEYING Steve has over 38 years of surveying experience in the office and the field. As a project manager, his primary responsibility is the management of construction projects. While at RRM Design Group, he has performed surveying services, such as construction staking and boundary and topographic surveying, for both public and private sector clients. Along with field surveying duties, Steve prepares construction stake calculations, conducts research and analysis of boundaries, and creates boundary, topographic, and ALTA maps. He has experience with surveying equipment such as total and robotic stations and GPS. PROJECT EXPERIENCE Lucia Mar Unified School District, Arroyo Grande High School Parking, Arroyo Grande, CA: RRM provided numerous layout concepts to maximize the existing parking layout to accommodate a bus drop-off site and separate parking for the newly constructed Performing Arts Center. RRM reviewed existing pavement conditions (to determine areas that needed to be overlaid versus reconstructed) and prepared final construction documents showing re-stripping of the area, relocation of parking lot lighting, and pavement reconditioning. The total parking lot spaces provided were 367. California Polytechnic State University, San Luis Obispo, Parking Structure, San Luis Obispo, CA: RRM Design Group worked with Watry Design Group to design a new 1,300 car parking structure and multi-modal facility which will serve as the first of three planned centers of public transportation on the Cal Poly San Luis Obispo campus. Inn at The Pier Engineering, Pismo Beach, CA: RRM was hired for engineering and surveying services for The Inn at The Pier hotel with 104 guest rooms in Pismo Beach. The hotel has 132 parking spaces, including 127 underground spaces. RRM licensed land surveyors prepared and submitted the application to facilitate the lot merger for 6 lots through the City of Pismo Beach approval process. Arroyo Grande Hospital, Parking Lot, Arroyo Grande, CA: RRM prepared studies to review how the parking at Arroyo Grande Community Hospital could be increased to allow for more parking on the site. After the plan was approved, RRM prepared the construction documents to extend the current parking areas. The construction documents consisted of grading, layout, electrical and landscape plans. Lucia Mar Unified School District, Shell Beach Elementary School Parking Lot, Pismo Beach, CA: Lucia Mar Unified School District hired RRM to make several campus upgrades at Shell Beach Elementary School. This past spring, RRM completed updates to reconfigure the student drop-off areas and school parking lot to improve the flow of traffic. Sierra Vista Medical Center Parking Structure Construction Staking, San Luis Obispo, CA: RRM implemented the design and provided construction for phasing, staging, grading, drainage, hydrology, parking, circulation, accessibility, off-site road design, and upgrades to existing and new utility infrastructure. Following a two-year comprehensive planning and design study led by RRM Design Group, the San Luis Obispo City Council approved the Medical Center Master Plan for Tenet Health Care’s Sierra Vista Hospital facilities. The Plan calls for adding a new, 4-story, 85,000 SF tower to accommodate increased healthcare demands, replace existing aging facilities, and add a new 45,000 SF medical office building to serve the increasing demand for medical offices in San Luis Obispo. The Plan also includes a new five-story, 400-space parking structure and a comprehensive reorganization of the vehicle circulation. The Pismo Hotel Land Surveying Services, Pismo Beach, CA: RRM was retained for surveying services for the Pismo Hotel in Pismo Beach. RRM provided site survey control, monitoring of adjacent structures, construction staking of on-site and off-site utilities and improvements, building grid lines, verified placement of all anchor bolts for buildings, benchmarks for finish floor elevations, and framing and hold-down placements. RRM also provided calculations and staking of 965 feet of sheet piles and a post-construction ALTA/ ACSM Land Title Survey (As-Built). DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX viii EDUCATION AS, Surveying and Forest Practices, Kings River Community College, Reedley, CA BRIAN HELLWIG SUPERVISOR OF SURVEYING With a beginning in forestry and two decades of surveying experience, Brian is an expert surveyor. Brian offers experience in boundary surveying and construction staking of various projects such as commercial, residential, and mixed-use developments. He has experience with surveying equipment such as total and robotic stations, high-definition three-dimensional terrestrial laser scanning, GPS, and various surveying software. Brian’s previous work ranges from the expansive Hearst Boundary survey to the beautiful downtown Big Bear Streetscape. His open communication style ensures that all parties involved in a project are updated with up-to-date and relevant information at every intersection. PROJECT EXPERIENCE Inn at The Pier Engineering, Pismo Beach, CA: RRM was hired for engineering and surveying services for The Inn at The Pier hotel with 104 guest rooms in Pismo Beach. The hotel has 132 parking spaces, including 127 underground spaces. RRM licensed land surveyors prepared and submitted the application to facilitate the lot merger for 6 lots through the City of Pismo Beach approval process. The Pismo Hotel Land Surveying Services, Pismo Beach, CA: RRM was retained for surveying services for The Pismo Hotel in Pismo Beach. RRM provided site survey control, monitoring of adjacent structures, construction staking of on-site and off-site utilities and improvements, building grid lines, verified placement of all anchor bolts for buildings, benchmarks for finish floor elevations, and framing and hold-down placements. RRM also provided calculations and staking of 965 feet of sheet piles and a post-construction ALTA/ ACSM Land Title Survey (As-Built). City of Pismo Beach, Pismo Beach Pier Plaza and Parking Lot Upgrade, Pismo Beach, CA: The City of Pismo Beach hired RRM to repurpose a portion of the existing parking lot and expanded an existing small plaza at the base of the Pismo Pier. The plaza is connected to two separate promenade boardwalks that run parallel to the beach. The highlight of the plaza is two concrete slides that whisk giddy beachgoers of all ages from the plaza onto the sand 16 feet below. Improvements include accessible access to the beach, stepped seating, reconfigured parking lot, and a newly constructed restroom building. Lucia Mar Unified School District, Shell Beach Elementary School Parking Lot, Pismo Beach, CA: Lucia Mar Unified School District hired RRM to make several campus upgrades at Shell Beach Elementary School. This past spring, RRM completed updates to reconfigure the student drop-off areas and school parking lot to improve the flow of traffic. Lucia Mar Unified School District, Shell Beach Elementary School Parking Lot, Pismo Beach, CA: Lucia Mar Unified School District hired RRM to make several campus upgrades at Shell Beach Elementary School. This past spring, RRM completed updates to reconfigure the student drop-off areas and school parking lot to improve the flow of traffic. Sierra Vista Medical Center, Parking Structure Construction Staking, San Luis Obispo, CA: RRM implemented the design and provided construction for phasing, staging, grading, drainage, hydrology, parking, circulation, accessibility, off-site road design, and upgrades to existing and new utility infrastructure. Following a two-year comprehensive planning and design study led by RRM Design Group, the San Luis Obispo City Council approved the Medical Center Master Plan for Tenet Health Care’s Sierra Vista Hospital facilities. The Plan calls for adding a new, 4-story, 85,000 SF tower to accommodate increased healthcare demands, replace existing aging facilities, and add a new 45,000 SF medical office building to serve the increasing demand for medical offices in San Luis Obispo. The Plan also includes a new five-story, 400-space parking structure and a comprehensive reorganization of the vehicle circulation. Edward C. Little Water Recycling Facility, Visitor Center Renovation, El Segundo, CA: A $9.6 million renovation of the visitor center resulting in a multipurpose visitor center that will better enable West Basin to educate guests about the District’s mission, various water recycling treatment processes, as well as water-related issues in the region. ADDITIONAL EXPERIENCE `Lucia Mar Unified School District, Oceano Elementary School Infrastructure Rehabilitation, Oceano, CA `City of San Luis Obispo, Police Station, San Luis Obispo, CA `City of San Luis Obispo, Public Safety Dispatch Center, San Luis Obispo, CA `Sierra Vista Hospital Heliport, San Luis Obispo, CA DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX ix EDUCATION MS, Botany, California State University, Chico BS, Ecology and Evolution, University of California, Santa Barbara CERTIFICATIONS/ REGISTRATIONS Certified Ecologist, Ecological Society of America California Rapid Assessment Method, CRAM.org Wetland Delineation Training, Richard Chinn Environmental PERMITS Rare, Threatened, and Endangered Plant Voucher Collecting Permit No. 2081(a)- 16-022-V – CDFW, 2018 COLBY BOGGS SENIOR ECOLOGIST Colby is a Principal and Senior Ecologist with Rincon Consultants. He brings over 23 years of professional experience as a botanist, ecologist, wetlands specialist, and biological sciences educator and researcher. His duties at Rincon include biological field surveys for special status species, habitat and plant community mapping, wetlands assessments, biological resources analyses, construction and mitigation monitoring, conservation planning, regulatory compliance, and the preparation of biological reports, environmental documents and permit applications in support of CEQA, NEPA, Porter-Cologne Water Quality Control Act, California Fish and Game Code, California Coastal Act, Clean Water Act, Rivers and Harbors Act of 1899, and State and federal Endangered Species Acts. PROJECT EXPERIENCE County of San Luis Obispo, QA/QC Biological Resources, On-call and Planning Consultant Services for General Cannabis Case Processing, San Luis Obispo County, CA: Colby worked with County staff, applicants and agents to process applications for proposed cannabis operations which included indoor and outdoor cultivation and ancillary uses such as distribution, processing, nursery, and small-scale non-volatile manufacturing. He reviewed submitted application materials specific to biological resources, determined application completeness in concurrence with County staff and prepared documentation of CEQA analysis (IS-MNDs). Recently processed cases included production of the IS-MNDs for DRC2018-00010 Greenview, LLC and DRC2019-00110 Synergy Farms – Cano. City of Paso Robles, QA/QC Biological Resources, Olsen-South Chandler Ranch, Paso Robles, CA: Colby provided QA/QC for the Biological Resources section of the Paso Robles Olsen/South Chandler Ranch Specific Plan Project. The 358-acre Specific Plan area represented a key development area for the City, identified in the General Plan Land Use Element. The project included a specific plan, general plan amendment, zone change, multiple tentative tract maps, an oak tree removal permit, roadway abandonments and multiple development agreements. The EIR analysis required a hybrid of programmatic and project-specific elements to address the long-term impacts of buildout within the specific plan area as well as specific impacts of the proposed residential, commercial and recreational uses in the specific plan area. City of San Luis Obispo, QA/QC Biological Resources, San Luis Ranch Specific Plan Project EIR, San Luis Obispo County, CA: Colby provided QA/QC for the Biological Resources section of the San Luis Ranch Project on behalf of the City of San Luis Obispo. The 131-acre project site represented a key development area for the City, identified in the land use and circulation element update. The proposed project included a specific plan, general plan amendment and development plan for a 131-acre project site, including annexation of the site into the City of San Luis Obispo. This specific plan included a mixture of residential, commercial, office and hotel uses, with a portion of the site preserved for agriculture and open space uses. Our EIR approach on this project was a unique hybrid of programmatic and project-specific elements developed in close coordination with City staff to address both the specific impacts of the proposed development and the long-term impacts of buildout within the specific plan area. South San Luis Obispo County Sanitation District, QA/QC Biological Resources, Wastewater Treatment Plan Redundancy Project CEQA Technical Studies, Oceano, San Luis Obispo County, CA: Colby served as Biological Resources Technical Advisor for this project. The South San Luis Obispo County Sanitation District Redundancy project involves the construction and operation of backup infrastructure at the District’s wastewater treatment facility in Oceano. In support of Clean Water State Revolving Fund and United States Department of Agriculture funding pursuits for the project, Rincon prepared technical studies compliant with CEQAPlus and NEPA requirements. Technical studies include an Environmental Report for Categorical Exclusion, a Federal Clean Air Act Conformity Analysis, a Cultural Resources Assessment, and a Biological Evaluation. Rincon is also coordinating with U.S. Department of Agriculture staff to facilitate the environmental review process and receive a Biological Opinion from United States Fish and Wildlife Service for impacts to California red- legged frog. County of Santa Barbara, QA/QC Biological Resources, Arctic Cold Agricultural Refrigeration Facility EIR, Santa Barbara County, CA: Colby is currently providing QA/QC for the Biological Resources section of an EIR for the proposed Arctic Cold Agricultural Refrigeration Facility in northern Santa Barbara County. The proposed project includes a Conditional Use Permit and Development Plan for a freezer/processor facility on a 109-acre property east of Santa Maria. Because the property is currently used for active agricultural production with a mix of row crops, livestock grazing, and a vegetable cooling plant that is not a part of the proposed project, and includes abandoned petroleum wells, the environmental evaluation focuses on agricultural resources, air quality and greenhouse gas emissions, biological resources, hazards and hazardous materials, transportation, and utilities and service systems. City of Santa Maria, QA/QC Biological Resources, Area 9 Specific Plan EIR, Santa Maria, CA: Colby provided QA/QC for the Biological Resources section of the EIR for the Area 9 Specific Plan. This project incorporated a range of land use components in a 900-acre Specific Plan area, including agricultural manufacturing, commercial manufacturing, industrial, commercial office, community commercial, open space, and mixed-use residential. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX x EDUCATION MS, Biological Sciences, California Polytechnic State University, San Luis Obispo BS, Ecology and Systematic Biology, Concentration in Wildlife Biology; California Polytechnic State University, San Luis Obispo MICHAEL TOM, ms SENIOR BIOLOGIST Michael has experience conducting general and focused surveys for a variety of plant and animal species. He is proficient in maintaining herpetology collections and providing assistance with a number of vertebrate and invertebrate species. Michael has working knowledge and training with the fauna and flora of the Central Coast, San Joaquin Valley, and desert regions of California. He has also received specific training in survey protocols, habitat requirements and natural histories of the California Redlegged Frog (CRLF) and desert tortoise. Michael has assisted in special status species, general wildlife and preconstruction surveys. He has performed protocol level surveys as well as preconstruction clearance and monitoring for San Joaquin Kit fox. He has also performed protocol level surveys for desert tortoise, blunt nosed leopard lizard and California red-legged frog and has performed preconstruction surveys for giant garter snake, western pond turtles, coast horned lizards, western spade foot toads, and nesting birds. He has been authorized by the U.S. Fish and Wildlife Service under Biological Opinions for projects to handle CRLF and has handled the species on those projects where they were encountered. PROJECT EXPERIENCE SLO Creek California Red-legged Frog Habitat Assessment, San Luis Obispo County. San Luis Obispo County, Supply line 36-9-09 emergency repair, Los Berros Creek, CA: Conducted preconstruction surveys and monitoring for California red-legged frog. Captured and relocated one California red-legged frog. Santa Barbara County, Jail Northern Branch Facility, Santa Barbara, CA: California red-legged frog habitat assessment in Santa Barbara County. San Luis Obispo County, Arroyo Grande Creek at Rodriguez Road Grade Stabilization Project: Conducted preconstruction surveys and monitoring for California red-legged frog. Santa Rosa Creek Road 7.0 Emergency Culvert Repair Project Monitoring, San Luis Obispo County, CA: Michael conducted preconstruction surveys and monitoring for California red-legged frog. San Luis Obispo County, California red-legged frog focused biological monitoring for the Arroyo Grande Creek Levee Maintenance Project, San Luis Obispo County, CA: Biological monitoring for the Old Los Berros Culvert Repair and Duckbill Valve Replacement project. San Luis Obispo County, City of Arroyo Grande, CA: California red-legged frog, western pond turtle and nesting bird preconstruction surveys for the City of Arroyo Grande. California red-legged frog and California tiger salamander focused construction monitoring/relocation for the Salinas Road Interchange project, Salinas, CA: Captured and handled four California red-legged frogs under the supervision of the authorized biologist. San Benito County, Vallecitos Oil Field and Gas Wells, Four Focused Project Locations: California Tiger Salamander and California Redlegged Frog Habitat Assessment. California Academy of Sciences and California Polytechnic State University Biological Sciences Department: Four years of reptile and amphibian husbandry experience (including handling of snakes, frogs, turtles, salamanders and lizards) combined from the California Academy of Sciences and California Polytechnic State University Biological Sciences Department. PROJECT AUTHORIZATIONS `California red-legged frog handling and relocation authorization, Los Osos Valley Road Interchange Project, BO (1- 8-08-F-27) `California red-legged frog handling and relocation authorization, Supply line 36-9-09 emergency repair, Los Berros Creek. Authorization under RGP 63 through Emergency Section 7 Consultation with the USFWS. `USFWS California red-legged frog handling authorization (Under supervision), Rodriguez Waterline Stabilization Project. BO 8-8-12-F-17 `NMFS steelhead monitoring authorization under the supervision of lead fisheries biologist Don Alley, Heritage Ranch Community Services District Gallery Well Repair Project. BO 151422SWR03SR8572 `USFWS California red-legged frog, San Joaquin kit fox and California condor monitoring authorization, Heritage Ranch Community Services District Gallery Well Repair Project. `USFWS California red-legged frog handling authorization (Under supervision), Salinas Road Interchange Project. BO 8-8-09-F-65R DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX xi EDUCATION BS, Forestry and Natural Resources, Concentration in Wildlife Biology, California Polytechnic State University, San Luis Obispo CERTIFICATIONS/ REGISTRATIONS International Society of Arboriculture Certified Arborist WE-12031A USFS and CPUC approved Botanist, Avian Biologist, and Bat Biologist Department of Pesticide Regulation Qualified Applicators License Category E (Forest and Right-of-Way) License #151384 Certified Recycled Water Site Supervisor #5770 Professional Association of Diving Instructors Certified Open Water Diver CPR/First Aid Certified CASEY CLARK BIOLOGIST/ARBORIST/PROJECT MANAGER Casey serves as a biologist, arborist and project manager under Rincon’s Natural Resources group. He is a personable, creative, and multifaceted California based biologist with an expertise in botany and plant ecology. His responsibilities include leading and managing a variety of natural resources projects involving habitat suitability assessments, special-status species surveys, habitat restoration success criteria monitoring, vegetation community classification and mapping, noxious weed surveys and risk assessments, jurisdictional delineations, resource constraints analyses and arboricultural assessments. Mr. Clark has prepared extensive biological resources technical reports in support of the California Environmental Quality Act and the National Environmental Policy Act. He has six years of experience in the environmental consulting industry and graduated cum laude from Cal Poly San Luis Obispo with a Bachelor of Science in Forestry and Natural Resources where the focus of his coursework was in botany, wildlife biology, ecology, and resource conservation. PROJECT EXPERIENCE East Bay Municipal Utilities District, Quarry Site Restoration Project, Oakland, CA: As Lead Biologist and Project Manager Casey prepared a competitive proposal that secured a contract that contained rare plant surveys, a wetland delineation survey, and an arborist survey for a potential East Bay Municipal Utilities District restoration project within an abandoned 60- acre quarry site outside of San Leandro, California. Casey lead the arborist surveys and prepared a comprehensive Arborist Condition Report. He performed background research for potential rare plants within the quarry site and managed the successful execution and delivery of the Wetland Delineation Report. He served as the primary client-facing biologist managing all aspects of the project, including budget, deliverable preparation and staff. The project was successfully completed within budget. Liberty Utilities, 650 Line Rebuild Project, Truckee, CA: Casey served as lead biologist managing all project-related botanical tasks. He led full floristic field surveys, including assessments for noxious weeds and rare plants and performed restoration success criteria monitoring for the rebuild of approximately nine miles of power line reconstruction within the Tahoe National Forest between the north shore of Lake Tahoe and Truckee, California. He also prepared a comprehensive Botanical Resources Technical Report, Rare Plant Survey report, and Invasive Plant Risk Assessment Report in cooperation with project mitigation measures. Casey also utilized the data collected from bat roost habitat assessments and emergence reports to prepare a Bat Emergence Survey Report. San Diego Gas & Electric Company, Del Mar Reconfiguration Project, San Diego County, CA: Lead project biologist managing all botanical tasks for the reconfiguration of an existing 69 kilovolt power line, removal of an existing 69 kilovolt power line and conversion of portions of existing 12 kilovolt distribution lines from an overhead to underground configuration in San Diego County. Lead rare plant surveys and prepared a report documenting over 25 species of special-status plants. Casey conducted and prepared preconstruction surveys and reports, baseline restoration monitoring surveys and reports, monarch butterfly monitoring, focused coastal California gnatcatcher surveys, nesting bird surveys and reports, and conducted habitat assessments and emergence surveys for potential bat roosts. Southern California Gas Company, Confidential Project, Various Counties/Cities, Southern California: Lead surveys and prepared a Biological Resources Technical Report in compliance with CEQA that identified existing or potential sensitive natural vegetation communities, potentially jurisdictional aquatic features, and special-status plant and animal species and their associated habitat for the installation of a proposed 30-inch diameter natural gas pipeline beneath the Colorado River and the removal of the existing 30-inch-diameter natural gas pipeline and it’s supporting suspension bridge over the river, extending southeast from the community of Ehrenberg in Arizona into the City of Blythe in California. Assisted a permitted biologist in focused western yellow-billed cuckoo and southwestern willow surveys and report creation for client and agency submittal. Southwest Gas Company, Helendale Hawes Line High-Pressure Main Replacement Project, Various Counties/Cities Southern California: Casey lead surveys and prepared a Biological Resources Technical Report in compliance with CEQA that identified existing or potential sensitive natural vegetation communities, potentially jurisdictional aquatic features, and special-status plant and animal species and their associated habitat. The project involved the replacement of approximately 12 miles of 30-inch diameter natural gas pipeline traveling immediately adjacent to the Mojave River in Helendale, California. East Bay Municipal Utilities District, Walnut Creek Water Treatment Plant Pretreatment Upgrades Project, Walnut Creek, CA: As Arborist and Project Manager, Casey prepared a competitive proposal successfully securing a contract containing an arborist survey for the 13.5 acre Walnut Creek Water Treatment Plant Upgrade Project in Walnut Creek, California. Lead the arborist surveys and prepared a comprehensive Arborist Condition Report, which made tree protection and removal recommendations based off protected tree classifications, health condition and potential construction impact designations. As the primary client facing biologist managing all aspects of the project, including budget, deliverable preparation, and staff. Successful executive of the project granted additional arborist work at the Lafayette Water Treatment facility in Lafayette, California. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX xii EDUCATION MA, Anthropology, Northern Arizona University BS, Anthropology-Cultural Resources Management California State Polytechnic University, Pomona CERTIFICATIONS/ REGISTRATIONS Registered Professional Archaeologist #415730, CA AFFILIATIONS Section 106 Compliance Advanced Section 106 Society for American Archaeology Society for CA Archeology CHRISTOPHER DURAN, rpa SENIOR ARCHAEOLOGIST Christopher Duran is a Principal and Senior Archaeologist at Rincon Consultants, Inc. He brings more than a decade of professional experience in cultural resources management and exceeds the SOI’s Professional Qualification Standards. In addition, he has worked throughout California for various federal, state, and local agencies and has worked on several projects for private sector clients including developers and utility companies. Christopher has worked on hundreds of projects managing several millions of dollars in cultural resources investigations. He is an expert in cultural resources management and has worked on projects in compliance Sections 106 and 110 of the National Historic Preservation Act (NHPA), the National Environmental Policy Act (NEPA), and the California Environmental Quality Act (CEQA) as they pertain to cultural resources. PROJECT EXPERIENCE Watt Communities, LLC., Braverman Drive Tentative Map Project Phase II and III Cultural Resources Investigations, City of Santee, CA: As Project Manager/Principal Investigator, Christopher managed Phase II test investigations and managed field personnel and reporting during the site evaluation phase of a residential development project in Santee that includes one significant prehistoric site, CA-SDI-5669. Evaluation determined that CA- SDI-5669 is eligible for listing in the California Register of Historical Resources and required mitigation prior to ground disturbance related to construction of the development. Christopher prepared and executed a Data Recovery Plan and Research Design to mitigate the site. Santa Barbara County, Hollister Avenue Road Widening Project Cultural Resources Investigation, Cities of Goleta and Santa Barbara, CA: The project included the survey and documentation of a roadway interchange. Christopher led the field survey effort, document production and recommendations for the project. Southern California Gas Company, On-Call Cultural Resource Studies for Southern California Gas Company, Southern California: As Principal Investigator/Project Manager, Christopher prepared scopes of work, cost estimates and requests for service for archaeological studies throughout Southern California Gas Company’s (SoCalGas) jurisdiction. To date, studies managed for SoCalGas include emergency monitoring projects on Bureau of Land Management (BLM) lands during evaluation of the integrity of Lines 2000 and 3000 that required coordination between SoCalGas, BLM and a qualified subcontractor that performed the work. Additional undertakings performed under this contract include monitoring at Mission Santa Barbara, survey of two deep well anodes in the Mojave Desert, archaeological monitoring during wetland delineation on Burton Mesa (Santa Barbara County), and monitoring during pipeline installation for the Goleta Storage Project. Christopher also managed subcontractor performance, tracked and managed invoicing, reviewed project deliverables and scheduled qualified staff to perform the work. Naval Facilities Engineering Command, Stuart Mesa West Phase II Archaeological Investigation, Camp Pendleton, San Diego County, CA: As Field Director, Christopher managed field crews, conducting test excavations, reporting and collections management. Narven Enterprises, Archaeological Testing at 1441-1447 Sixth Avenue, San Diego, CA: As Principal Investigator/Project Manager, Christopher coordinated the reparation and implementation of an archaeological testing plan (ATP) for potential subsurface deposits on a proposed redevelopment site in downtown San Diego. He reviewed and approved ATP prior to submission to the client. The ATP was based upon the results of reviewing Sanborn Fire Insurance maps dating to the turn of the nineteenth century that documented previous development on the property. Christopher served as on-call Principal Investigator during mechanical excavations on the property, the results of which were negative. Bureau of Indian Affairs, Ewiiaapaayp Reservation Road Construction Cultural Resources Inventory, Ewiiaapaayp Indian Reservation, San Diego County, CA: As Project Manager/Principal Investigator, Christopher managed field crews, budgeting, and maintained contact and coordination with the primary contractor, Bureau of Indian Affairs and Tribal Government. Bureau of Indian Affairs, La Posta Reservation Road Construction Cultural Resources Inventory, La Posta Indian Reservation, San Diego County, CA: As Project Manager/ Principal Investigator, Christopher managed field crews, budgeting, and maintaining contact and coordination with primary contractor, Bureau of Indian Affairs and Tribal Government. Bureau of Indian Affairs, Santa Ysabel Reservation Road Reconstruction Cultural Resources Inventory, Santa Ysabel Reservation, San Diego County, CA: As Project Manager/Principal Investigator, Christopher prepared technical documents and provided agency consultation. Bureau of Land Management, Palm Springs South Coast Field Office, Canyon Lake Fuels Reduction Cultural Resources Inventory Project, Riverside County, CA: As Project Manager/Principal Investigator, Christopher managed fieldwork, field crew, scheduling, budgeting, preparing the technical report and maintained client contact. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX xiii EDUCATION MA, Public Archaeology, California State University Northridge BS, Anthropology – Emphasis in Physical Anthropology, University of California, Santa Barbara AFFILIATIONS Register of Professional Archaeologists Member Society for California Archaeology Member Society for American Archaeology Member DUSTIN MERRICK, rpa ARCHAEOLOGIST/PROJECT MANAGER Dustin is an Archaeologist with Rincon Consultants, Inc. He has extensive experience with pedestrian survey, archaeological excavations, monitoring, site mapping, and site recordation. Dustin also has experience managing projects throughout the Central Coast. He has worked with both prehistoric and historic archaeology throughout the Central Coast and Mojave Desert areas as well as the Channel Islands. He is experienced in protecting and managing cultural resources and specializes in osteological, faunal, and paleoethnobotanical analyses, specializing in prehistoric coastal and near-shore island environments. PROJECT EXPERIENCE Water Resource Recovery Facility Project, San Luis Obispo, CA: Dustin managed archaeological and paleontological resource monitoring and directed all fieldwork associated with the project. In addition, he worked directly with the City of San Luis Obispo and Native American monitor for the reinternment of cultural materials. Pacific Gas and Electric Cambria Access Road Maintenance Project, San Luis Obispo County, CA: Dustin was field lead for the survey within United States Forest Service lands and was the primary author of the technical cultural resource constraints report. Pacific Gas and Electric Tassajara Road Maintenance Project, San Luis Obispo County, CA: Dustin was field lead for the survey within United States Forest Service lands, coordinated with the Native American Heritage Commission and local tribe members and was the primary author of the technical cultural resource constraints report. Central Coast Blue Test Injection Well Extended Phase I Study, City of Pismo Beach, CA: Dustin managed all cultural resources components including survey, testing and monitoring and was the lead author on the cultural resources study. Cathodic Anode Well Project, Santa Barbara County, CA: Dustin was the field lead for the survey within Bureau of Land Management lands, coordinated with the Native American Heritage Commission and local tribe members and was the primary author of the technical report. Organic Liberty Cultivation Project, Santa Barbara County, CA: Dustin was field lead for the survey, coordinated with the Native American Heritage Commission and local tribe members and was the primary author of the technical report. In addition, he was the lead for the cultural resources and tribal cultural resources section in the environmental impact report. Pacific Gas and Electric Vandenberg-Divide Project, Santa Barbara County, CA: Dustin was field lead for the survey within Vandenberg Airforce Base lands and was the primary author of the technical cultural resource constraints report. Pacific Gas and Electric Gates Tulare Project, Tulare County, CA: Dustin was field lead for the survey within Bureau of Land Management lands, coordinated with the Native American Heritage Commission and local tribe members and was the primary author of the technical cultural resource constraints report. California High Speed Rail, Madera County, CA: Dustin was field lead for multiple monitoring and survey efforts, coordinated with the local tribe members and was the primary author of multiple technical cultural resource reports. Rexford Solar project, Tulare County, CA: Dustin coordinated with the Native American Heritage Commission and local tribe members and was the primary author of the technical cultural resource report. In addition, he was the project manager for the project and assisted the survey effort. Bellefield Solar, Mojave, CA: Dustin led the survey and is the project manager for the Phase II testing. In Addition, Mr. Merrick coordinated with the Native American Heritage Commission and local tribe members and was the primary author of the technical cultural resource report. Aratina Solar Project, Mojave, CA: Dustin participated in the survey, coordinated with the Native American Heritage Commission and local tribe members and was the primary author of the technical report. APN 038-260-049 Phase I Cultural Resources Study Project, Kings County, CA: Dustin conducted a pedestrian survey of the property directly west and south of the Avenal Animal Shelter, conducted Native American outreach and co-authored the technical report. Solar Cultural Resources Investigation, Kern County, CA: Dustin served as a crew member for the pedestrian survey and recorded prehistoric and historic sites using ArcPad GIS software. Cave Valley School Extended Phase I Study, Cool, CA: Dustin led the extended Phase I excavation and was the lead author on the cultural resources study. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX xiv EDUCATION BA, Anthropology, San Diego State University, San Diego, California Minor, Geology, San Diego State University, San Diego, California JENNIFER DICENZO PALEONTOLOGICAL PROGRAM MANAGER Jennifer has over 10 years of fieldwork and consulting experience in California paleontology and archaeology. She received her BA degree in anthropology with a focus in archaeology and a minor in geology with a focus on paleontology, at San Diego State University in 2012. She has made substantial contributions supervising field staff, surveying, construction mitigation monitoring, data recovery, fossil salvage, laboratory fossil preparation, writing technical assessments, developing, and administering monitoring and mitigation plans, report writing, managing projects, business development and graphic design. Jennifer has coordinated compliance monitoring on a range of projects including renewable energy, transmission lines, housing and commercial developments, transportation and utility. She has written and supervised the preparation of numerous technical documents including paleontological resources assessments and technical reports, impact analyses, paleontological mitigation and monitoring plans, paleontological section of if environmental impact reports, environmental assessment reports, initial studies for mitigated negative declarations, paleontological monitoring reports and paleontological survey reports. PROJECT EXPERIENCE County of San Luis Obispo, San Luis Obispo County Paso Basin Land Use Management Area Planting Ordinance Program Environmental Impact Report, San Luis Obispo County, CA: As Senior Paleontologist/Project Manager, Jennifer was responsible for overseeing the paleontological study for incorporation into the Program Environmental Impact Report. The study included reviewing existing literature and geological mapping to provide a paleontological resources assessment and sensitivity analysis and provided measures to mitigate impacts to fossil resources. City of San Luis Obispo, Utilities Department –Water Resource Recovery Facility Project, San Luis Obispo County, CA: As Senior Paleontologist, Jennifer was responsible for providing oversight and coordination of paleontological fieldwork for this ongoing mass excavation into Quaternary older alluvial deposits. Southern California Edison – Valle Substation Project, Ventura County, CA: As Senior Paleontologist/Project Manager, Jennifer was responsible for providing oversight and coordination of all fieldwork and prepared a summary of findings for a paleontological survey of a proposed utility improvements project. City of Port Hueneme –Bubbling Springs Routine Maintenance Agreement Project, Ventura County, CA: As Senior Paleontologist/Project Manager, Jennifer oversaw a paleontological initial study to be incorporated into the mitigated negative declaration for the project. The study included reviewing existing literature and geological mapping to provide a paleontological resources assessment and sensitivity analysis and provided measures to mitigate impacts to fossil resources. Caltrans District 8 – French Valley Parkway/I-15 Project, Riverside County, CA: As Paleontologist, Jennifer was one of two paleontologists responsible for surveying, planning, construction mitigation monitoring and writing the paleontological technical sections of the final survey and monitoring reports of results of excavations into the highly sensitive Pauba Formation in a complex area of the project requiring work on a busy freeway and city streets. Casitas Municipal Water District – Ventura-Santa Barbara Intertie Project, Ventura County, CA: As Senior/Project Manager, Jennifer was responsible for managing paleontological consulting, monitoring, and reporting for several ongoing projects related the Ventura-Santa Barbara Intertie Project. Jennifer supervised and coordinated paleontological field personnel and provides guidance related to handling of paleontological resource localities during excavations into multiple geologic units with a range of sensitivity. Santa Clarita Valley Water Agency, South Wells PFAS Groundwater Treatment Facility Project, Ventura County, CA: As Senior Paleontologist/Project Manager, Jennifer oversaw a paleontological initial study to be incorporated into the mitigated negative declaration for the project. The study included reviewing of existing literature and geological mapping to provide a paleontological resources assessment and sensitivity ratings and provided measures to mitigate impacts to fossil resources during construction of a proposed per- and polyfluoroalkyl substances treatment facility. Southern California Edison – Valley South Subtransmission Line Project, Riverside County, CA: As Senior Paleontologist, Jennifer was responsible for leading a crew of 8+ team members through 17 miles of a future linear transmission line. All survey work was incorporated into the Proponents Environmental Assessment (PEA) for Southern California Edison. This included proper BLM authorization and permitting to conduct surveying and a research design for field reconnaissance related to the PEA, EIS/EIR documentation for the transmission line. Greystar/City of San Diego – Sixth and Olive Project, San Diego County, CA: As Project Manager/Senior Paleontologist, Jennifer was responsible for recovering 70 fossil specimens from 9 localities. She drafted the budget, prepared the proposal, attended preconstruction meetings with City of San Diego, provided record search and literature review results, then applied cross trained archaeological and paleontological field and technical support during the project, provided project management/scheduling, salvaged fossil specimens, prepared fossil specimens in the laboratory, curated the fossil collection, and wrote the final paleontological monitoring report for a mass excavation 70+ feet into San Diego Formation near Balboa Park in eastern Downtown San Diego. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX xv RANDY ROMINGER, leed ap, assoc. dbia Principal-in-Charge Randy has over 38 years of experience in the construction industry involving the management of multi-million dollar projects for public and private sector clients. He has specialized in a variety of project types including parking structures, civic/ municipal, healthcare, corrections and education. Randy is an effective leader who believes trust, efficient conflict resolution, commitment, personal accountability and a goal-oriented approach are keys to a happy team and a successful project. EDUCATION BS, Construction Management, Colorado State University LICENSES & CERTIFICATIONS General Building Contractor B License #816632, CA LEED Accredited Professional; Assoc. Design-Build Prof. PROJECT EXPERIENCE California Polytechnic State University, San Luis Obispo, yak?it?ut?u Residential Community, San Luis Obispo, CA: A $204 million, 562,446 SF design-build project featuring eight structures with four and five levels above grade. The project featured single, double and quad units totaling 1,475 beds for first year students and an associated parking structure totaling 154,363 SF and over 480 stalls. Madera County Government Center, Madera, CA: A new $40 million, four-story, 131,000 SF administration building consisting of office space for county officials, customer service areas, board chambers as well as various conference and meeting rooms. The project also includes a new 400-car parking structure. San Luis Obispo Regional Transit Authority, Bus Maintenance Facility, San Luis Obispo, CA: A new $17.5 million (construction cost), 28,650 SF, single story bus maintenance facility with over 2,600 SF of mezzanine/ equipment platform located on a 6.44-acre site. The facility accommodates operations, administration and maintenance areas and includes detached enclosures on-site, including a trash enclosure and canopy over bus parking. Work also includes off-site improvements, specifically the T-intersection for future Elks Lane realignment. San Luis Obispo County, New Animal Shelter, San Luis Obispo, CA: A new $20.3 million, 16,000 SF design- build Animal Services Facility created to replace the existing animal services shelter constructed in 1975. The new facility improves public visitation and access, provides expanded services, security and incorporates larger kennel spaces with allowance for future expansion and overflow. San Luis Obispo County Community College District, Measure L Bond Program, San Luis Obispo, CA: A $275 million bond program which addresses crucial facility needs, including a new instructional building on the San Luis Obispo campus, a new campus center, a new career training facility and new early childhood center at the Paso Robles campus; the replacement of temporary classrooms, and repairs and upgrades to roofs, heating and air conditioning units, aquatic center and other infrastructure and utilities technology upgrades. MATT CHAPPELL, eit, cep Estimating Manager Matt has more than 26 years of experience in private and public construction and design. His experience includes project management, agency/contractor coordination, scheduling and project budgets, utility construction and estimating on multiple municipal and education projects. As a Certified Estimating Professional (CEP) by the Association for the Advancement of Cost Engineering (AACE), Matt exemplifies the well-rounded construction estimating professional. EDUCATION BS, Civil Engineering, University of Nebraska LICENSES & CERTIFICATIONS Engineer in Training #EI-7956, NB Certified Estimating Professional #130-10 PROJECT EXPERIENCE San Luis Obispo County, New Animal Shelter, San Luis Obispo, CA: A new $20.3 million, 16,000 SF design- build Animal Services Facility created to replace the existing animal services shelter constructed in 1975. The new facility improves public visitation and access, provides expanded services, security and incorporates larger kennel spaces with allowance for future expansion and overflow. County of San Luis Obispo, Probation Department Building, San Luis Obispo, CA: A new $16 million, 31,000 SF, two-story office building featuring office space for county probation staff, interview rooms, training, conference and evidence rooms, armory, secured sallyport, break rooms, locker and changing rooms, restrooms with showers, a public lobby, parking as well as an emergency generator. City of Chandler, Oregon Street Parking Structure, Chandler, AZ: A new $23 million, five-level, 293,000 SF, 932-space parking garage for the City of Chandler, which includes a road realignment along Oregon Street as well as intersection improvements at Arizona Avenue and Chicago Street. California Department of General Services, Richards Boulevard Office Complex, Sacramento, CA: A new $1 billion design-build office campus totaling approximately 1.25 million GSF consisting of four 7- to 11-story office buildings with two multi-floor podiums at the base for the towers. Site improvements include a seven-level parking garage with 1,294 spaces and an additional 318 surface parking spaces. Butte County Association of Governments, Butte Regional Transit Operations Center (BRTOC), Chico, CA: A new $38 million, 41,000 SF LEED Silver certified transit facility built to replace the outdated maintenance and operations facilities with a new bus maintenance building, operations building and an administrative office facility, along with associated on-site and off-site improvements, including an 8,000 SF tenant improvement. Work includes renovation of the existing building. The facility houses twelve additional executive offices and a new Board Room for Butte County Association of Governments official board meetings. AS-NEEDED IN-HOUSE SUPPORT SERVICES DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX xvi RICK STASSI Scheduling Manager Rick has over 45 years of technical and analytical industry scheduling experience, with a diverse career in the engineering and project management fields. His experience encompasses project controls, engineering support, customer service and information technology support as well as scheduling, with excellent interpersonal and team building skills. Rick is familiar with a wide range of systems and software including Procore, MS Project, Power BI, Primavera, Prolog and AutoCAD. His experience includes high volume projects across several industries including water/ wastewater, aviation, civic/municipal, commercial and transportation. EDUCATION Coursework, Engineering, Sacramento City College PROJECT EXPERIENCE California Polytechnic State University, San Luis Obispo, Vista Grande Dining Facility, San Luis Obispo, CA: A new $39.8 million, 35,000 SF, three-story dining complex facility which replaces a 43-year old facility. The new complex, which is double the size of the old facility, features six micro-restaurants with exhibition-style cooking as well as increased seating and lounge space encompassed in a modern LEED Gold certified building. San Luis Obispo County Community College District, Measure L Bond Program, San Luis Obispo, CA: A $275 million bond program which addresses crucial facility needs, including a new instructional building on the San Luis Obispo campus, a new campus center, a new career training facility and new early childhood center at the Paso Robles campus; the replacement of temporary classrooms, and repairs and upgrades to roofs, heating and air conditioning units, aquatic center and other infrastructure and utilities technology upgrades. California Department of General Services, Richards Boulevard Office Complex, Sacramento, CA: A new $1 billion design-build office campus totaling approximately 1.25 million GSF consisting of four 7- to 11-story office buildings with two multi-floor podiums at the base for the towers. Site improvements include a seven-level parking garage with 1,294 spaces and an additional 318 surface parking spaces. Sacramento Municipal Utility District, SMUD Headquarters Rehabilitation, Sacramento, CA: A $135 million complete renovation of the 120,000 SF office building and 45,000 SF parking garage. The north wing has a three level parking structure and a two-story office portion above the parking garage. This project is designed to achieve LEED Gold certification. Atascadero Unified School District, Measure I-10 & B-14 Bond Program, Atascadero, CA: A $126.2 million bond program providing expansion of vocational education programs and facilities, computer and technology upgrades and construction of a new science, technology, engineering and math facility at the high school as well as a new administration/classroom building at the middle school. HEATHER BROWN, pe, cpmp, leed ap Engineering & Architectural Services Director Heather brings more than 27 years of experience in the construction industry, where she has worked on a wide variety of public, higher education and commercial facilities. Her experience includes project management, mechanical and plumbing design, assessing and renovating both HVAC and plumbing systems, preparing calculations and AutoCAD drawings. Heather is responsible for the management of engineers and architects working with code, access compliance, design and constructability reviews, life cycle studies, value engineering sessions, energy studies, specifications development, needs assessments, master planning studies, facility assessments and construction inspections. EDUCATION MBA, Finance, California State University Sacramento BS, Mechanical Engineering, University of Portland, Oregon LICENSES & CERTIFICATIONS Mechanical Engineer #M31667, CA LEED Accredited Professional Commissioning Process Management Professional PROJECT EXPERIENCE San Luis Obispo Community College District, Photovoltaic Feasibility Study - Main and North Campus, San Luis Obispo, CA: Kitchell performed a study exploring the feasibility of installing on-site solar photovoltaic systems at Cuesta College’s Main and North Campus. The report investigated the electrical demand of the campuses over the pre-pandemic fully operating time frame of 2018-2020, the existing electrical site conditions, and civil infrastructure to determine the feasibility of installing an on-site solar photovoltaic system. Civic Park Condominiums, Cupertino, CA: Mechanical Engineer for this 132,000 SF, 4-story mixed development with 80 condominium units and 20,000 SF of retail and office space. The project also included a 120,000 SF, 3-level parking garage. Sacramento Municipal Utility District, SMUD Headquarters Rehabilitation, Sacramento, CA: A $135 million complete renovation of the 120,000 SF office building and 45,000 SF parking garage. The north wing has a three level parking structure and a two-story office portion above the parking garage. This project is designed to achieve LEED Gold certification. City of Chandler, Oregon Street Parking Structure, Chandler, AZ: A new $23 million, five-level, 293,000 SF, 932-space parking garage for the City of Chandler, which includes a road realignment along Oregon Street as well as intersection improvements at Arizona Avenue and Chicago Street. Butte County Association of Governments, Butte Regional Transit Operations Center (BRTOC), Chico, CA: A new $38 million, 41,000 SF LEED Silver certified transit facility built to replace the outdated maintenance and operations facilities with a new bus maintenance building, operations building and an administrative office facility, along with associated on-site and off-site improvements, including an 8,000 SF tenant improvement. Work includes renovation of the existing building. The facility houses twelve additional executive offices and a new Board Room for Butte County Association of Governments official board meetings. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 1540 Marsh Street, Suite 150 San Luis Obispo, CA 93401 www.kitchell.com DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 EXHIBIT C DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 1 Fee Proposal Within a separate sealed envelope, submit a complete fee proposal for the scope of services. Provide separate subtotals for Phase 1B and Phase 2 broken down by task and staff billing rates with estimated hours. Clearly identify fees for subconsultant services. Compensation for Services Kitchell’s philosophy for determining our compensation for services is driven by matching value to cost. In other words, we strive to provide the most appropriate complement of services and delivery methods to meet your objectives. Our primary goal is to align our understanding of the project success factors with your expectations. Our approach can be best described as “bottom-up-planning,” where we define the tasks to be performed, produce a detailed scope of services, identify staff that will implement the tasks, calculate the staff time requirement for each task and determine the resulting compensation. We believe this method provides you with the most cost- effective fee for the services provided. Typically, we prefer to be compensated on a lump sum fixed fee basis derived by using the approach just described. This arrangement eliminates the perception that the construction manager would benefit financially from construction cost overruns and change orders. We do not make it a practice to request changes to our contract for minor scope changes, or for major scope changes which can be managed within our established staffing plan and schedule. Billing amounts are determined using the method most appropriate to match the cost of carrying out our services. We are accustomed to billing using various compensation methods, which include: a fixed billing schedule, percentage of project/contract completion, and predetermined hourly rates, among other methods. Kitchell has worked under many different compensation methods and is flexible in meeting your preferences. Reimbursable Expenses Reimbursable expenses are those customary and reasonable costs associated with carrying out our Construction Management services and includes subconsultant invoices, Resident Engineer’s travel, printing, postage, and a copier/scanner for the job site office. We will charge only actual costs plus 10% to cover invoice processing and insurance. We understand the Phase 2 construction contract will include provisions for the contractor to provide an office space and a conference room for the construction management team including electricity, phone, internet, water, and sanitation services. Preconstruction services and Phase 1B construction services will be managed from our San Luis Obispo Office. Proposed Fees Phase 1B and Phase 2 fees are summarized below and broken down in detail by task and staff billing rates with estimated hours in the succeeding table. Subconsultant fees are identified within their respective tasks and include Kitchell’s mark-up on their fees. Our fee is based upon utilizing a full-time Project Inspector provided by Earth Systems. This position may not be redundant with City inspection, and if eliminated, would render $852,720 savings. Refer to the attached subconsultant fee proposal for further information regarding assumptions each firm used in deriving their fees. Rincon’s fees are for basic services. Their fee proposal also includes optional services the City may wish to consider. Our fees are based upon the scope of services described in Appendix A of the RFP and the following durations: Preconstruction services, 3-4 months from commencement of services to start of Phase 1B construction; Phase 1B, 6 months construction with post-construction concurrent with Phase 2 construction; Phase 2, 23 months construction in sequence with Phase 1B construction followed by 3 months for post-construction. Please see the following page for details. Task Phase 1B Phase B Task 1: Preconstruction Services $41,750 $22,500 Task 2: Construction Services $584,580 $2,788,440 Task 3: Geotechnical & Materials Testing & Specialty Inspection $111,553 $469,975 Task 4: Surveying $3,960 $19,800 Task 5: Construction Environmental Mitigation & Monitoring $29,638 $28,679 Task 6: Post-Construction Services $12,200 $126,500 Grand Totals:$783,681 $3,455,894 EXHIBIT C REVISED 11.9.2022 $3,436,094 $405,060 $600,201 DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 2 Description Rate/ Unit Price Phase 1B Phase 2 Hrs/Units Amount Hrs/Units Amount Task 1: Preconstruction Services Project Director $230 12 $2,760 2 $460 Resident Engineer $220 76 $16,720 40 $8,800 Assistant Resident Engineer/Sr. PM $205 76 $15,580 40 $8,200 Sr. Scheduler $180 20 $3,600 16 $2,880 Sr. Estimator $180 8 $1,440 12 $2,160 Reimbursable Expenses Allowance -$1,650 -$0 Task 2: Construction Services Project Director $230 48 $11,040 184 $42,320 Resident Engineer $220 96 $21,120 736 $161,920 Assistant Resident Engineer/Sr. PM $205 920 $186,600 3,680 $754,400 Quality Assurance Manager $170 960 $163,200 3,660 $622,200 Project Engineer ---3,600 $396,000 Project Inspector (By Earth Systems)$187 960 $179,520 3,600 $673,200 Sr. Scheduler $180 72 $12,960 300 $54,000 Sr. Estimator ---200 $36,000 Reimbursable Expenses Allowance -$8,140 -$48,400 Task 3: Geotechnical and Materials Testing and Specialty Inspection (Performed by Earth Systems) Earth Systems’ Fee with Kitchell Mark-up Quotation -$111,553 -$469,975 Task 4: Surveying (Performed by RRM) RRM’s Fee with Kitchell Mark-Up Quotation -$3,960 -$19,800 Task 5: Construction Environmental Mitigation and Monitoring (Performed by Rincon) Rincon’s Fee with Kitchell Mark-Up Quotation -$29,638 -$28,679 Task 6: Post-Construction Services Project Director ---24 $5,520 Resident Engineer ---24 $5,280 Assistant Resident Engineer/Sr. PM ---96 $19,680 Quality Assurance Manager $170 20 $3,400 240 $40,800 Project Engineer $110 80 $8,800 480 $52,800 Reimbursable Expenses Allowance -$0 -$2,420 DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 3 Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 2 Scope of Work Phase 1B Task 1 Project Initiation and Project Management This task includes project management, client coordination, quality assurance/quality control, and administration needed to prepare and execute the mitigation and monitoring plan for the project. The Rincon Principal and/or Project Manager will participate in one (1) project kickoff call with Kitchell and City staff. As part of this task, Rincon will undertake ongoing environmental compliance coordination with Kitchell and the City, review the overall project schedule, and establish a communication protocol to coordinate project changes or other issues that may arise throughout the duration of Phase 1B and Phase 2 construction activities. The project management task will also focus on maintenance of the project schedule. Rincon will manage the project team associated with environmental compliance activities including any optional tasks (if necessary), on-site monitoring, and reporting; coordinate the environmental review process schedule; and provide project updates for the environmental compliance. Rincon’s principal in charge and/or project manager will review and comment on the meeting minutes project status and budget updates. In addition to the kickoff meeting, Rincon proposes to attend up to six (6) coordination meetings with Kitchell and City staff, if applicable. Task 2 Nesting Bird Surveys and Reporting As outlined in the Plan, project activities that occur during the nesting bird season (February 1 through August 31) to be supported by a nesting bird survey conducted by a qualified biologist no more than three days prior to the initiation of ground disturbance and/or vegetation removal activities. A qualified Rincon biologist will conduct a nesting bird survey within three days prior to ground disturbing and/or vegetation removal activities for Phase 1B and Phase 2 as two separate surveys based on our understanding of the timing for each of these phases (see task 7). The nesting bird surveys will be conducted within the project boundary plus a 500-foot buffer for raptors and within the project area plus a 300-foot buffer for all other bird species where safely and legally accessible. The surveys will be conducted on foot within all accessible areas. Binoculars will be used for all inaccessible areas (e.g., private lands). This scope of work and associated cost assumes an individual nesting bird survey and report will be required for each of two phases: Phase 1B and Phase 2. Each nesting bird survey can be completed by one biologist in a single 4-hour day. If active an active nest(s) is found during a given survey, additional field time will be required to complete the survey (i.e., observation and documentation time necessary to assess nesting status such as clutch size and egg/fledging presence) and will be included as an amendment. If either of the project’s phases are to occur outside of the nesting bird season, a nesting bird survey and report will not be prepared for that phase. Upon completion of each nesting bird survey, Rincon will prepare a brief letter report that includes the purpose, methodology, and results. If active nests are found, a figure depicting the nest(s) location will be prepared. The reports will include a recommended avoidance buffer and monitoring period if an active nest is found within the survey area. Since the number of nests that may be identified is unknown, our cost does not include installing nest buffer(s), additional coordination, or monitoring the Rincon Consulting Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 3 active nest(s). If required, these monitoring tasks will be included as an additional scope of work to be authorized by the City prior to completion. The cost for this task assumes the draft letter reports will be submitted electronically for client review. Response to comments with up to two hours of staff time for each report is included. The final drafts will be compiled and submitted electronically. Task 3 Archaeological Construction Monitoring and Reporting for Phase 1B As discussed in the Plan, archaeological monitoring is required during initial ground disturbance. Rincon will conduct the required archaeological construction monitoring and reporting during Phase 1B activities. Additionally, a qualified principal investigator, defined as an archaeologist who meets the Secretary of the Interior’s Professional Qualifications Standard for archeology, shall be retained to oversee all mitigation measures related to archaeological resources, outlined in the following tasks. Task 3.1 Project Kickoff and WEAP Training Prior to the start of construction, Rincon will prepare a WEAP training program. The training will be presented to all on-site personnel and will include a briefing regarding the types of archaeological resources and/or fossils that could be found in the project area and the procedures to follow should archaeological or paleontological resources be encountered. The training will also include a discussion of applicable laws and penalties for removal or disturbance of archaeological or paleontological materials found on site. The training will provide instruction for workers with procedures to follow in the event of an archaeological resource or fossil discovery, including reporting procedures, and will provide contact information for the on-site monitor(s), Qualified Archaeologist, and Qualified Paleontologist. This training will be accomplished at the pre-construction kick-off meeting and will be conducted by the Qualified Archaeologist, Qualified Paleontologist, or their designated representative(s). Task 3.2 Archaeological Monitoring Rincon will provide a qualified archaeologist to observe all project-related ground-disturbing construction activities for Phase 1B of the project. The monitor shall be on-site on a full-time basis during initial earthmoving activities, including grading, trenching, vegetation removal, or other excavation activities. Under consultation between the qualified archaeologist and the City, monitoring may be reduced or eliminated based on observed conditions. The qualified archaeologist will observe soil disturbances, inspect exposed soils, and will re-direct equipment in the event potential resources are encountered. The monitor will conduct a cursory inspection of any discoveries; however, in the event resources potentially significant under CEQA are encountered, further investigation beyond the scope of work described may be required. The monitor will prepare daily monitoring logs that include a description of construction activities, soil descriptions (color, grain size, sediments, etc.), and cultural materials identified, if any. The monitoring logs will be reviewed as necessary by a Rincon senior archaeologist and filed at Rincon’s San Luis Obispo office. Rincon requires that construction staff provide 48-hour notice for mobilization of a monitor. Rincon will provide up to five (5), 8-hour days of archaeological monitoring at a day rate of $1500 per day. Should more than 5, 8 hour days for monitoring be required, Rincon can provide additional monitoring at the standard $1500 day rate Rincon will charge a half day rate of $800 for every day the monitor is on-site for less than 4 hours or if work is cancelled without 48 hours notification. Rincon assumes no cultural resources will be encountered during monitoring. A scope and budget augmentation will be requested to address finds encountered during monitoring. This scope and cost do DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 4 Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 4 not include analysis, laboratory preparation, or documentation of identified cultural resources discovered during monitoring. In the event cultural resources are encountered during the construction, all work shall be halted in the vicinity of the discovery until a qualified archaeologist can assess the significance of the resource. If the resources are found to be significant, they must be avoided or mitigated pursuant to the qualified archaeologist’s direction and mitigation measures outlined in the Plan. Mitigation may involve preservation in place or documentation and excavation of the resource. A report by the archaeologist evaluating the find and identifying mitigation actions taken shall be submitted to the Kitchell and the City. Task 4 Paleontological Construction Monitoring for Phase 1B Task 4.1 Paleontological Monitoring Rincon will provide a qualified paleontological monitor to be on site during initial project-related ground-disturbing activities of 10 feet or more in depth within previously undisturbed sediments. The monitor will inspect excavated or graded areas and trench sidewalls for evidence of paleontological resources. Monitoring procedures may also include onsite sample screening of sedimentary matrix for the presence of microfossils, at the discretion of the Qualified Paleontologist. Rincon will provide up to five (5), 8-hour days of paleontological monitoring. Rincon will charge a minimum 4 hours/day for every day the monitor is on-site for less than 4 hours or if work is cancelled without proper notification. An approximate daily monitoring rate for paleontological services would be $1,500 per day. If fossils are discovered, the monitor will temporarily divert construction to assess the find. If deemed scientifically significant or potentially significant, the monitor will collect the fossil specimen(s) and pertinent associated data in a manner that would minimize or avoid construction delays. All scientifically significant fossils recovered during monitoring will be prepared, identified, and curated permanently into a permanent repository. Optional Task 5 Historic American Building Survey Documentation Phase 1B and 2 are subject to the requirements of MMRP Measure CR-1 outlined in the Final EIR MMRP, which requires historic American building survey documentation prior to construction. If authorized, Rincon will prepare the required Historic American Building Survey (HABS)-level III documentation of two buildings, 610 and 614 Monterey Street prior to initiation of Phase 1B and Phase 2 construction activities. For this effort, Rincon’s project team will be led by Architectural History Project Manager JulieAnn Murphy with oversight provided by Architectural History Principal Shannon Carmack. Both Ms. Murphy and Ms. Carmack meet and exceed the Secretary of Interior’s Professional Qualification Standards (PQS) for History and Architectural History (36 CFR, Part 61). Additionally, they have prepared several HABS- like documentation packages for buildings and structures located throughout California. Photographs A Rincon Architectural Historian meeting the PQS Standards will conduct site visits to 610 Monterey Street and 614 Monterey Street. The purpose of the site visit will be to photograph the buildings. Photographs will be taken using a professional-quality single lens reflex digital camera. Large-format photographs and site drawings/plans will not be included as a component of the HABS package; either can be provided but would require a contract amendment. Images captured will include context views, elevations/exteriors, architectural details, overall interiors, and interior details (if warranted). A Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 5 maximum of 30 views of each building will be taken. The actual number of views obtained will depend upon site conditions, access, and safety considerations. Rincon assumes the City’s staff will facilitate access to the buildings, including the interiors and exteriors of the buildings. Given the close proximity of the buildings, Rincon further assumes one site visit will be sufficient to complete documentation. Following completion of the site visit, Rincon will upload photographs to an FTP site for review by the City to confirm that the photographs are adequate and will satisfy the HABS documentation requirements. Supplemental Research and Preparation of HABS Reports Rincon will prepare a HABS-level III report for the buildings in a format consistent with the Secretary of the Interior’s Standards and Guidelines for Architectural and Engineering Documentation: Historic American Building Survey. The report will include a physical description of the buildings and available information on their design and history. It will document the buildings’ construction history, architecture, and historical significance. Rincon will draw on existing documentation to the greatest extent feasible and will perform additional research as needed. The scope for this task does not include preparation of updated Department of Parks and Recreation (DPR) forms. Compilation of HABS Documentation Packages Upon completion the tasks described above, Rincon will assemble a HABS-level III documentation package for each building. The package will include photographs and the HABS-level III report. It will integrate any additional data collected. A map indicating the location from which each photograph was taken, and a photograph log, will be included for reference. A draft digital copy of each package will be submitted to the City for review and approval, following which point it will be finalized. Following finalization, Rincon will send original hard copies of the packages to San Luis Obispo Library and the History Center of San Luis Obispo County to satisfy the specific requirements of MMRP Measure CR-1. The photographs and the report will be printed on acid-free archival-bond paper and labeled and stored in archival sleeves and folders accordingly. The entire package will be housed in an acid-free storage container prior to delivery. Should additional hard or electronic copies of the documentation packages be requested, a change order will be necessary. Optional Task 6 Extended Phase 1 Testing Based on the findings of the Mitigation and Monitoring Plan prepared by Rincon in 2022, the anticipated method for investigating subsurface remains associated with CA-SLO-2431H is through an Extended Phase 1 (XPI) investigation consisting of mechanical backhoe trenching subsequent to demolition and pavement removal. Use of a backhoe will allow for an expedited review of the soil profiles and an assessment as to the potential to encounter buried archaeological deposits. The area of disturbance for demolition and pavement removal for Phase 1B and Phase 2 of the project is approximately 300 feet by 200 feet. Therefore, four backhoe trenches oriented from east to west and spaced approximately 20 meters (66 feet) apart will be necessary. Rincon assumes the XPI investigation will be negative for subsurface archaeological material that will require formal evaluation. In the event subsurface deposits that require such evaluation are identified during the XPI investigation, a budget amendment would be necessary to document and evaluate the finds. If the XPI investigation is positive, a Phase 2 significance evaluation may also be necessary to determine if the project will have a significant impact on the resource and to evaluate the deposit(s) for significance under CEQA. If an intact archaeological deposit is encountered during the Phase 2 that cannot be avoided by project design, a Phase 3 data recovery DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 5 Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 6 excavation of the deposit would likely be necessary to mitigate impacts. Phase 2 and Phase 3 testing would require a separate scope of work and cost. Optional Task 6.1 Extended Phase 1 Testing Plan Rincon will prepare an XPI work plan upon authorization. The work plan will include a discussion of the goals of the study, methods to be employed, and factors that determined the scope. Rincon assumes this plan will be submitted electronically and approved with a single combined round of comments from the City. Optional Task 6.2 Extended Phase 1 Fieldwork This work effort will be conducted under the direction of Rincon archaeologist Dustin Merrick, MA, RPA, who meets the Secretary of the Interior’s Professional Qualification Standard for prehistoric and historic archaeology. Under the direction of the Qualified Archaeologist, two Rincon archaeologists will direct the mechanical excavation of a series of up to four (4) trenches totaling approximately 800 linear feet to assess the presence or absence of subsurface archaeological deposits associated with CA-SLO-2341H within the project site. XPI fieldwork will require a two-person crew for no more than five (5), eight (8) hour days inclusive of travel time. Trenching will be performed by a qualified excavation contractor under the direction of the Rincon field director. This scope of work assumes costs for the excavation contractor will not exceed $1,200 per day. Rincon assumes that the presence of a Native American monitor will not be required for excavation activities, as no prehistoric resources are anticipated. For the purposes of this proposal, Rincon estimates that no more than four (4) trenches will be excavated. Excavation will be conducted using a standard backhoe fit with a flat blade. Excavation will be conducted in small lifts (10 to 20 cm) so that any archaeological materials, features or deposits can be identified immediately upon exposure. Stratigraphic soil profiles will be drawn of at least one side wall of a representative sample of the trenches. In lieu of hand excavation, Rincon will screen samples of excavated soils from the trenches to identify the amounts and types of artifacts and ecofacts that may be present in particular soil strata. Samples will be screened from different stratigraphic layers as identified in the field and at systematic intervals during trenching. The excavated soils will be dry screened through 1/8-inch (3-millimeter) mesh. Artifacts and ecofacts recovered during screening will be analyzed and documented in the field; no artifacts, samples, or specimens will be collected during the testing and no laboratory analysis is currently proposed. Artifacts recovered will be reburied within the trenches during backfilling. Excavation forms will be prepared providing all pertinent data (e.g., trench number, date, provenience, location justification, and termination justification). All excavation locations will be recorded using a sub- meter-accurate handheld GPS unit and documented both with notes and photographs. Should feature(s) be encountered that require hand excavation, Rincon will expose the feature so that it can be identified and its location recorded but will not complete full excavation of the feature. Complete recovery of the feature would be proposed for Phase 3 efforts, if needed. Should the feature consist of human remains, Rincon will cease work and notify the Kitchell, the City and the County Coroner. Rincon will submit a budget augmentation for the additional work related to the treatment of human remains that are Native American in origin. Optional Task 6.3 Extended Phase I Reporting Rincon will prepare a technical report to document the results of the investigation. The report will be prepared following the California Office of Historic Preservation’s Archaeological Resource Management Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 7 Reports (ARMR) Guidelines. The report will include a discussion of the findings of the study and all appropriate maps, figures, photographs, and tables. The report will also provide management recommendations for the project and outline procedures to be followed in the event of an unanticipated discovery during project construction. No more than one round of revisions to the XPI report will be necessary following review by Kitchell and the City. In addition to the XPI testing report, Rincon will prepare Department of Parks and Recreation 523 series forms to update the existing resource record (CA-SLO-2341H) that was identified within the current project boundaries. Phase 2 Task 7 Nesting Bird Surveys and Reporting As described under Task 2, project activities that occur during the nesting bird season (February 1 through August 31) to be supported by a nesting bird survey conducted by a qualified biologist no more than three days prior to the initiation of ground disturbance and/or vegetation removal activities. Upon completion of the nesting bird survey, Rincon will prepare a brief letter report that includes the purpose, methodology, and results as described in greater detail under Task 2. Task 8 Archaeological Construction Monitoring and Reporting for Phase 2 As discussed in the Plan, archaeological monitoring is required during initial ground disturbance. Rincon will conduct the required archaeological construction monitoring and reporting during Phase 2 activities. Additionally, a qualified principal investigator, defined as an archaeologist who meets the Secretary of the Interior’s Professional Qualifications Standard for archeology, shall be retained to oversee all mitigation measures related to archaeological resources, outlined in the following tasks. Task 8.1 Project Kickoff and WEAP Training Rincon will present the previously prepared WEAP for Phase 1B during the initiation of Phase 2 construction activities. The training will be presented to all on-site personnel and will include a briefing regarding the types of archaeological resources and/or fossils that could be found in the project area and the procedures to follow should archaeological or paleontological resources be encountered. The training will also include a discussion of applicable laws and penalties for removal or disturbance of archaeological or paleontological materials found on site. The training will provide instruction for workers with procedures to follow in the event of an archaeological resource or fossil discovery, including reporting procedures, and will provide contact information for the on-site monitor(s), Qualified Archaeologist, and Qualified Paleontologist. This training will be conducted on the first day of Phase 2 construction monitoring. Rincon assumes the Phase 1B WEAP will be sufficient and new WEAP or any preconstruction preparation will be required Task 8.2 Archaeological Monitoring Rincon will provide a qualified archaeologist to observe all project-related ground-disturbing construction activities for Phase 2 of the project. The monitor shall be on-site on a full-time basis during initial earthmoving activities, including grading, trenching, vegetation removal, or other excavation activities. Under consultation between the qualified archaeologist and the City, monitoring may be reduced or eliminated based on observed conditions. The qualified archaeologist will observe soil DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 6 Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 8 disturbances, inspect exposed soils, and will re-direct equipment in the event potential resources are encountered. The monitor will conduct a cursory inspection of any discoveries; however, in the event resources potentially significant under CEQA are encountered, further investigation beyond the scope of work described may be required. The monitor will prepare daily monitoring logs that include a description of construction activities, soil descriptions (color, grain size, sediments, etc.), and cultural materials identified, if any. The monitoring logs will be reviewed as necessary by a Rincon senior archaeologist and filed at Rincon’s San Luis Obispo office. Rincon requires that construction staff provide 48-hour notice for mobilization of a monitor. Rincon will provide up to five (5), 8-hour days of archaeological monitoring at a day rate of $1500 per day. Should more than 5, 8 hour days for monitoring be required, Rincon can provide additional monitoring at the standard $1500 day rate Rincon will charge a half day rate of $800 for every day the monitor is on-site for less than 4 hours or if work is cancelled without 48 hours notification. Rincon assumes no cultural resources will be encountered during monitoring. A scope and budget augmentation will be requested to address finds encountered during monitoring. This scope and cost do not include analysis, laboratory preparation, or documentation of identified cultural resources discovered during monitoring. In the event cultural resources are encountered during the construction, all work shall be halted in the vicinity of the discovery until a qualified archaeologist can assess the significance of the resource. If the resources are found to be significant, they must be avoided or mitigated pursuant to the qualified archaeologist’s direction and mitigation measures outlined in the Plan. Mitigation may involve preservation in place or documentation and excavation of the resource. A report by the archaeologist evaluating the find and identifying mitigation actions taken shall be submitted to the Kitchell and the City. Task 8.3 Archaeological Monitoring Letter Report Upon completion of the monitoring effort, Rincon will prepare a letter report that will describe the results, analysis, and conclusions of the archaeological monitoring effort. The letter report will be submitted to Kitchell and the City for review and approval within 30 days following the completion of monitoring. Rincon will respond to one (1) round of consolidated, minor comments on the draft letter report from Kitchell and the City staff. A copy of the final version of the letter report will be submitted to the City within 30 days of approval. All deliverables will be presented electronically. After the final copy is accepted by the City, the final report will be submitted to the Central Coast Information Center. Rincon assumes the archaeological monitoring letter report findings will be negative. Should a resource be discovered during archaeological monitoring, Rincon will request a scope and budget augmentation for the additional scope and cost. Rincon assumes that a single letter report for Phases 1B and 2 will suffice; therefore, we have budgeted a single letter report as a cost-saving measure. Task 9 Paleontological Construction Monitoring for Phase 2 Task 9.1 Paleontological Monitoring Rincon will provide a qualified paleontological monitor to be on site during initial project-related ground-disturbing activities of 10 feet or more in depth within previously undisturbed sediments. The monitor will inspect excavated or graded areas and trench sidewalls for evidence of paleontological resources. Monitoring procedures may also include onsite sample screening of sedimentary matrix for the presence of microfossils, at the discretion of the Qualified Paleontologist. Rincon will provide up to five (5), 8-hour days of paleontological monitoring. Rincon will charge a minimum 4 hours/day for every Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 9 day the monitor is on-site for less than 4 hours or if work is cancelled without proper notification. An approximate daily monitoring rate for paleontological services would be $1,500 per day. If fossils are discovered, the monitor will temporarily divert construction to assess the find. If deemed scientifically significant or potentially significant, the monitor will collect the fossil specimen(s) and pertinent associated data in a manner that would minimize or avoid construction delays. All scientifically significant fossils recovered during monitoring will be prepared, identified, and curated permanently into a permanent repository. Task 9.2 Paleontological Negative Findings Letter Report Rincon will prepare a final monitoring letter report that will outline the methodology of paleontological monitoring at the project site, describe the construction activity and duration, describe the lithology of the depositional units exposed during excavations, and present the results of the monitoring. The level of effort to complete a monitoring report is dependent on the number of resources recovered during monitoring activities. Rincon assumes that a single letter report for Phases 1B and 2 will suffice; therefore, we have budgeted a single letter report as a cost-saving measure. Assumptions Our scope of work and cost for this project has incorporated the following assumptions. ▪ This proposal assumes no cultural resources will be discovered during cultural resources monitoring and the current scope of work and cost estimate does not include analysis, collection, laboratory preparation, or documentation of identified cultural resources discovered during monitoring. A scope and budget augmentation will be requested to address finds encountered during monitoring. ▪ Access to the project boundary will be provided by Kitchell. The project boundary within private lands will be surveyed with the use of binoculars for the nesting bird survey. ▪ Rincon is not responsible for delays due to weather, site conditions (e.g., prohibited access, flooding, fire, safety) or other conditions out of Rincon’s control. ▪ One WEAP training by the archaeological and paleontological monitors on the first day of monitoring will be sufficient to train the entire construction crew and no additional WEAP training will be necessary. If additional training for new crew members is needed, Rincon can provide recorded presentations. ▪ Rincon assumes negative findings during paleontological monitoring, and the current cost estimate does not include expenses related to the treatment and curation of fossil specimens. Should fossils be recovered during monitoring, Rincon will immediately prepare an estimate for the anticipated costs associated with documentation and reporting requirements for the discovery. ▪ Kitchell will provide current project site plans for inclusion in the Archaeological Monitoring Technical Memorandum ▪ In light of the current COVID-19 pandemic, Rincon staff will conduct the nesting bird survey in accordance with the most current relevant, local COVID-19 safety protocols and social distancing guidance. ▪ Rincon is not responsible for damage to subsurface structures, utilities, pipelines, or other objects that are not marked or identified to us by client or Underground Service Alert utility notification service, provided that we have made appropriate inquiries to USA utility notification services. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 7 Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 10 ▪ Rincon assumes that the extended Phase I testing will not discover a resource that could be considered a historical resource under CEQA, and the current scope of work and cost estimate does not include analysis, collection, laboratory preparation, or documentation of identified cultural resources discovered during testing. If a cultural resource be discovered that has the potential to be a historic resource under CEQA, a scope and budget augmentation will be requested to address finds encountered during testing. ▪ Rincon is not responsible for delays due to weather, site conditions (e.g., prohibited access, flooding, fire, safety) or other conditions out of Rincon’s control. ▪ If additional effort is required beyond that identified in the work program outlined above, Rincon will perform the work on a time and materials basis with an amendment of the project cost and scope of work approved by Kitchell. These rates do not include overtime or penalties for missed meal periods. Should overtime be required, hours greater than eight (8) hours per day onsite or 40 hours per week onsite will be charged at a rate consistent with California state law (generally 1.5 times). As part of this work program, Rincon assumes a meal period will be allotted before the fifth hour of work. If a meal period is not allotted by the end of the fifth hour on any workday, an additional hour of labor will be charged. No additional services would be provided without receipt of prior written approval. Schedule Construction monitoring activities (Tasks 2, 3, 4, and optional Tasks 5 and 6) would proceed alongside the planned project construction schedule for Phase 1B. Similarly, construction monitoring activities (Tasks 7, 8, and 9) would proceed alongside the planned project construction schedule for Phase 2. Cost Rincon will complete the work scope for the tasks identified above to not exceed of $53,016 for Tasks 1 through 4 and $107,163 including all optional tasks. No other services will be provided without your express written authorization. Please see Table 1 below for a cost breakdown of each task. Table 1 Cost Summary Tasks Cost Phase 1B Task 1 Project Initiation and Project Management $4,165 Task 2 Nesting Bird Surveys and Reporting $3,265 Task 3 Archeological Construction Monitoring and Reporting for Phase 1B Task 3.1 Project Kickoff and WEAP Training $2,508 Task 3.2 Archaeological Monitoring $8,503 Task 4 Paleontological Construction for Phase 1B and Phase 2 Task 4.1 Paleontological Monitoring $8,503 Optional Task 5 Historic American Building Survey Documentation $19,609 Optional Task 6 Extended Phase 1 Testing Optional Task 6.1 Extended Phase I Testing Plan $4,744 Optional Task 6.2 Extended Phase I Fieldwork $23,204 Optional Task 6.3 Extended Phase 1 Reporting $6,590 Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 11 Phase 2 Task 7 Nesting Bird Surveys and Reporting $3,265 Task 8 Archaeological Construction Monitoring and Reporting for Phase 2 Task 8.1 Project Kickoff and WEAP Training – Task 8.2 Archaeological Monitoring $8,503 Task 8.3 Archaeological Monitoring Letter Report $3,739 Task 9 Paleontological Construction Monitoring for Phase 2 Task 9.1 Paleontological Monitoring $8,503 Task 9.2 Paleontological Negative Findings Letter Report $2,062 Total $107,163 All work will be performed on a time and materials basis in accordance with the work scope outlined above. Should the actual effort required to complete the tasks be less than anticipated, the amount billed will be less than the total cost outlined above. This cost estimate is in effect for a period of 30 days, during which time all of the elements of this proposal are fully negotiable to meet the needs of Kitchell. This work effort will be managed by Rincon Project Manager Dustin Merrick, M.A., Registered Professional Archaeologist (RPA), and Rincon Principal Christopher Duran, M.A., RPA. Both Mr. Merrick and Mr. Duran meet the Secretary of the Interior’s Professional Qualification Standards for prehistoric and historic archaeology (NPS 1983). Rincon is prepared to begin the work scope outlined above following receipt of a signed copy of this proposal as well as a retainer of $13,250 (approximately 25 percent of the proposed budget, not including optional tasks). Thank you for your consideration and for this opportunity to support your project. If you have any questions regarding this proposal, please contact Mr. Merrick at (805) 762-4064 or dmerrick@rinconconsultants.com, or Mr. Duran at (805) 644-4455, extension 22 or cduran@rinconconsultants.com. Sincerely, Rincon Consultants, Inc. Dustin Merrick, MA, RPA Project Manager/Archaeologist Christopher Duran, MA, RPA Principal/Senior Archaeologist Attachments Attachment 1 Reference List Attachment 2 Resumes of Key Personnel DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 8 RRM Design Group 1 SCOPE OF SERVICES TASK S.1: CONSTRUCTION STAKING This task will include the following: SUBTASK S.1A: PHASE 1B STAKING Rough Grade/Shoring Staking • One (1) set of rough grade and shoring offset stakes with grades to finish grade SUBTASK S.1B: PHASE 2 Sawcut • One (1) set of stakes will be provided for sawcut lines Sewer • One (1) set of offset stakes will be provided for sewer services with grades to flowline Water • One (1) set of offset stakes will be provided for water services with grades to finish the surface or top of curb Storm Drain • One (1) set of offset stakes at an interval of no greater than 50 feet, angle points and tees with grades to flowline. Double offsets will be provided for utility holes, drainage chambers and drain inlets with grades to flowline in/flowline out and rim/top of grate Building • One (1) set of offset stakes at grid lines 1 through 14, A, A.1, A.3, A.4, A.6, A.8, A.9, B, B.2, B.3, B.6, B.7, C, C.1, C.2, C.3, C.5, C.6, C.7, C.8, D, E for level one (1) with grades to finish surface Walls • One (1) set of offset stakes to centerline of wall with grades to top of footing or finish surface. • Street lights/transformers/vault • One (1) set of double offsets stakes to street lights transformers and vaults with grades top of curb or finish surface • Curb, flatwork • One (1) set of offset stakes to face of curb at an interval of no greater than 50 feet along straight sections and interval of no greater than 25 feet on curves sections, grade breaks, angle points and radius points with grades to top of curb or finish surface NOTE: Gas lines and conduits are not included in this proposal 2 MOVE-IN SCHEDULE: It will be the contractor’s responsibility to review the following move-in schedule with respect to possible phasing and overall project schedule. Any changes to this move-in schedule must be made prior to the award of contract. MOVE-IN SCHEDULE AND FEES Item No. Description No. of Move-ins 1 Rough Grade/Shoring 2 2 Sawcut 1 3, 4 Sewer/Water 1 5 Storm Drain 1 6 Building 1 7 Walls 1 8 Street Lights/Transformers/Vault 1 9 Curb, Flatwork 3 Total Moves to Site: 11 Deliverables: • Construction Stakes Fixed Fee: • Subtask S.1A: $3,600.00 (see footnote 1) This fee is based on prevailing wage • Subtask S.1B: $18,000.00 (see footnote 1) This fee is based on prevailing wage TASK S.2: RE-STAKING AND ADDITIONAL SERVICES All re-staking and services beyond the scope of work described herein will be performed on an hourly basis based on standard billing rates at the time the services are requested. Fee: Time and Materials • Hourly (see footnote 2) Fee Footnotes 1. Fixed fee tasks will be billed as the work progresses until the task is completed and the total amount stated in the contract for the task is invoiced. 2. Amounts billed for tasks shown as “Time and Materials” (T&M) will reflect actual hours worked. TOTAL RRM SERVICE FIX FEES: $21,600.00 Any work outside the scope of the original agreement between RRM Design Group and the Client and authorized by Client, is subject to the Terms and Conditions of the Prime Agreement. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 9 BILL RATE RANGES Subject to change effective March 1st each year  EXHIBIT A-1 SCHEDULE 1 Bill Rate Ranges Subject to change effective March 1st each year ARCHITECTURE INTERIOR DESIGN Architect 95$ -155$ Designer I 60$ -95$ Associate Manager of Architecture 140$ -200$ Designer II 70$ -120$ Design Director 145$ -240$ Interior Designer I 75$ -125$ Designer I 70$ -100$ Interior Designer II 90$ -150$ Designer II 80$ -125$ Intern 45$ -85$ Designer III 95$ -150$ Job Captain 105$ -165$ Intern 45$ -85$ Senior Interior Designer 110$ -195$ Job Captain 95$ -150$ Manager of Architecture 165$ -280$ LANDSCAPE ARCHITECTURE Principal 185$ -350$ Assistant Designer 70$ -110$ Project Architect 115$ -185$ Associate Designer 80$ -125$ Project Designer 115$ -185$ Designer 95$ -140$ Project Manager 115$ -185$ Design Director 135$ -235$ Senior Architect 135$ -235$ Intern 45$ -85$ Senior Designer 135$ -220$ Landscape Architect 95$ -145$ Senior Project Manager 135$ -240$ Manager of Landscape Architecture 150$ -245$ Principal 185$ -350$ ENGINEERING & SURVEYING Principal Landscape Architect 135$ -235$ Associate Engineer 115$ -170$ Senior Landscape Architect 115$ -175$ Construction Inspector 105$ -175$ Designer I 55$ -95$ PLANNING Designer II 75$ -125$ Assistant Planner 90$ -130$ Designer III (Structural only)90$ -135$ Associate Planner 105$ -170$ Engineer I 90$ -140$ Intern 45$ -85$ Engineer II 105$ -165$ GIS Specialist 80$ -150$ Land Surveyor 115$ -170$ Senior GIS Specialist 105$ -185$ Manager of Engineering Services 170$ -280$ Manager of Planning 175$ -265$ Manager of Surveying 155$ -235$ Principal 185$ -350$ Party Chief 90$ -150$ Principal Planner 165$ -250$ Principal 185$ -350$ Senior Planner 135$ -205$ Project Engineer 125$ -185$ Senior Urban Designer 135$ -210$ Project Manager 150$ -245$ Urban Designer 105$ -170$ Senior Associate Engineer 130$ -210$ Senior Designer 110$ -185$ CORPORATE SERVICES Senior Land Surveyor 135$ -210$ Administrative Assistant 60$ -95$ Senior Party Chief 115$ -185$ Administrative Coordinator 75$ -130$ Senior Project Engineer 140$ -230$ Assistant Office Manager 90$ -135$ Supervisor of Surveying 145$ -220$ Chief Executive Officer 195$ -500$ Survey Technician I 60$ -100$ File Clerk/Administrative Support 45$ -65$ Survey Technician II 75$ -115$ Marketing Assistant 45$ -85$ Survey Technician III 90$ -155$ Marketing Coordinator 65$ -115$ Surveying Crew Rates Marketing Manager 125$ -235$ REGULAR Marketing Specialist 90$ -155$ One person w/ GPS or Robotic Workstation 125$ -155$ Office Coordinator 75$ -130$ Two person 175$ -290$ Proposal Coordinator 80$ -140$ Three person 235$ -390$ Receptionist 45$ -80$ PREVAILING WAGE Senior Marketing Specialist 105$ -190$ One person w/ GPS or Robotic Workstation 150$ -180$ Two person 225$ -340$ Three person 325$ -490$      Rev 3/1/2022 3 CONSTRUCTION STAKING CONDITIONS: 1. It will be the contractor’s responsibility to inform RRM of changes in the Plans and Specifications that will affect the location of improvements. RRM will not be liable for misplaced improvements due to such changes that were not brought to our attention. Additional work caused by changes to the Plans and Specifications will be billed on an hourly basis. Also, any construction based on staking requested by the contractor based on unapproved plans and specifications will be done at the contractor’s sole risk. RRM will not be held liable for damages suffered by the contractor resulting from changes to the plans after RRM has set stakes. 2. To provide for reasonable preparation and organization, requests for staking should be made at least 48 hours in advance. Although RRM will make every effort to accommodate the unforeseen, no guarantee can be made without sufficient notice. 3. The contractor will be responsible for ensuring that the construction site is clear of debris and vehicles before ordering stakes. If staking is requested and site conditions do not allow the survey crew to work, you will be charged hourly for the time lost. This does not include poor site conditions caused by weather or other circumstances beyond the control of the contractor. 4. Any claim against RRM for losses or damages resulting from errors in staking (either horizontal or vertical) must be accompanied by proof of the actual location of the stake used and the information written on the lath (i.e., stakes must still be in place in the field when the claim is made). 5. The contractor will be responsible for discussing offsets for stakes prior to fieldwork. Otherwise, offsets will be chosen according to standard practice in this County, and any changes requested after the completion of staking will be billed to the contractor as an extra. 6. For your convenience, we will provide the job superintendent with a “construction staking request form” that must be signed before any extra work beyond the scope of the contract is done. Copies of this signed form will be sent with each monthly billing for your records. 7. Stakes shall be used only for their intended purpose. For example, rough grade stakes shall not be used for finish grading or building layout. 8. Three (3) consecutive points shown to be on the same slope rate must be used in common order that the contractor may detect any variation out of a perfect straight grade. In case any discrepancy is found, it shall be reported to the surveyor. Otherwise, the surveyor will not be responsible for any error in grade of the finished work. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 10 Earth Systems EARTH SYSTEMS | AUGUST 29, 2022 | CITY OF SAN LUIS OBISPO - CULTURAL ARTS DISTRICT PARKING STRUCTURE Earth Systems FEE BREAKDOWN Hours/Units Rate Total Earth Systems Fee Breakdown PROJECT: DATE: Hours/Units Rate Total PHASE IB - Cultural Arts District Parking Structure On-Site Improvements - 120 Work Day Duration Project Inspector 960 $170.00 $163,200.00 Subtotal Task 2 $163,200.00 Geotechnical Observation - Professional 40 $200.00 $8,000.00 Project Management/Quality Control 40 $225.00 $9,000.00 Grading Observation and Testing 320 $140.00 $44,800.00 Special Inspection - Shoring Wall 120 $145.00 $17,400.00 Reporting and Document Posting 40 $125.00 $5,000.00 Compaction Tests (per test)150 $10.00 $1,500.00 Mileage (per trip)170 $7.50 $1,275.00 Laboratory Testing - Per Fee Schedule (Allotment) $12,000.00 DIR/ECPR Posting 20 $90.00 $1,800.00 Subtotal Task 3 $100,775.00 Hours/Units Rate Total PHASE 2 - Project Inspector 3600 $170.00 $612,000.00 Subtotal Task 2 $612,000.00 Geotechnical Observation - Professional 40 $200.00 $8,000.00 Project Management/Quality Control 100 $225.00 $22,500.00 Grading Observation and Testing - 2023 280 $140.00 $39,200.00 Special Inspection - 2023 320 $145.00 $46,400.00 Grading Observation and Testing -2024 120 $140.00 $16,800.00 Special Inspection -2024 1600 $145.00 $232,000.00 Reporting and Document Posting 180 $125.00 $22,500.00 Compaction Tests (per test)150 $10.00 $1,500.00 Mileage (per trip)700 $7.50 $5,250.00 Laboratory Testing - Per Fee Schedule (Allotment) $25,000.00 DIR/ECPR Posting 90 $90.00 $8,100.00 Subtotal Task 3 $427,250.00 TOTAL TASK 2 $775,200.00 TOTAL TASK 3 $528,025.00 Task 2 - Construction Observations/Inspections Task 3 – Geotechnical and Materials Testing and Specialty Inspection City of San Luis Obispo - Cultural Arts District Parking Structure August 29, 2022 Cultural Arts District Parking Structure - 450 Work Day Duration Task 2 - Construction Observations/Inspections Task 3 – Geotechnical and Materials Testing and Specialty Inspection PHASE 1B - Cultural Arts District Parking Structure On-Site Improvements - 120 Work Day Duration Hours/Units Rate Total PHASE 2 - Cultural Arts District Parking Structure - 450 Work Day Duration DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 Certificate Of Completion Envelope Id: 39089CD97632471F8036895978DF81A8 Status: Completed Subject: Complete with DocuSign: Resident Engineer and Construction Management - Agreement.pdf Department: Supplier: Source Envelope: Document Pages: 93 Signatures: 4 Envelope Originator: Certificate Pages: 5 Initials: 0 Argelia Chang AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) 990 Palm Street San Luis Obispo, CA 93422 achang@slocity.org IP Address: 104.129.202.169 Record Tracking Status: Original 12/15/2022 11:55:07 AM Holder: Argelia Chang achang@slocity.org Location: DocuSign Signer Events Signature Timestamp Wendy Cohen wcohen@kitchell.com President Kitchell CEM, Inc. Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 104.220.121.60 Sent: 12/15/2022 11:58:04 AM Resent: 12/22/2022 4:26:12 PM Viewed: 12/23/2022 7:27:46 AM Signed: 12/23/2022 7:27:50 AM Electronic Record and Signature Disclosure: Accepted: 11/14/2022 12:37:10 PM ID: f59ea0e7-4d0e-4510-85e7-51548060a030 Randy Rominger rrominger@kitchell.com Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 174.87.132.185 Signed using mobile Sent: 12/23/2022 7:27:55 AM Viewed: 12/23/2022 2:07:31 PM Signed: 12/23/2022 2:08:04 PM Electronic Record and Signature Disclosure: Accepted: 12/23/2022 2:07:31 PM ID: ab204dce-8a22-46ed-ba83-0c357d81b18c Christine Dietrick cdietric@slocity.org Security Level: Email, Account Authentication (None) Signature Adoption: Drawn on Device Using IP Address: 104.129.202.90 Sent: 12/23/2022 2:08:09 PM Resent: 1/5/2023 8:01:21 AM Viewed: 1/5/2023 8:40:44 AM Signed: 1/5/2023 8:44:44 AM Electronic Record and Signature Disclosure: Accepted: 6/15/2020 2:16:11 PM ID: a47fa5a6-25c4-499a-ad2d-b3750c2fd621 Matt Horn mhorn@slocity.org Director of Public Works Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 47.32.158.228 Sent: 1/5/2023 8:44:50 AM Viewed: 1/5/2023 8:53:08 AM Signed: 1/5/2023 8:53:26 AM Electronic Record and Signature Disclosure: Signer Events Signature Timestamp Accepted: 11/7/2018 6:54:10 PM ID: abbb6413-5f03-483d-8739-5befeff5edf7 In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Argelia Chang achang@slocity.org Administrative Assistant III City of San Luis Obispo Security Level: Email, Account Authentication (None) Sent: 1/5/2023 8:53:30 AM Resent: 1/5/2023 8:53:38 AM Viewed: 1/5/2023 8:55:42 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Daniel Clancy dclancy@slocity.org Purchasing Analyst City of San Luis Obispo Security Level: Email, Account Authentication (None) Sent: 1/5/2023 8:53:32 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Manuel Guzman mguzman@slocity.org Security Level: Email, Account Authentication (None) Sent: 1/5/2023 8:53:33 AM Electronic Record and Signature Disclosure: Accepted: 12/18/2020 9:05:30 AM ID: bda270ba-efa2-4807-a1cc-c5e70f600cee Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 12/15/2022 11:58:04 AM Certified Delivered Security Checked 1/5/2023 8:53:08 AM Signing Complete Security Checked 1/5/2023 8:53:26 AM Completed Security Checked 1/5/2023 8:53:33 AM Payment Events Status Timestamps Electronic Record and Signature Disclosure ELECTRONIC RECORD AND SIGNATURE DISCLOSURE From time to time, Carahsoft OBO City of San Luis Obispo (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through your DocuSign, Inc. (DocuSign) Express user account. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to these terms and conditions, please confirm your agreement by clicking the 'I agree' button at the bottom of this document. Getting paper copies At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. For such copies, as long as you are an authorized user of the DocuSign system you will have the ability to download and print any documents we send to you through your DocuSign user account for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. To indicate to us that you are changing your mind, you must withdraw your consent using the DocuSign 'Withdraw Consent' form on the signing page of your DocuSign account. This will indicate to us that you have withdrawn your consent to receive required notices and disclosures electronically from us and you will no longer be able to use your DocuSign Express user account to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through your DocuSign user account all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. Electronic Record and Signature Disclosure created on: 5/10/2017 10:25:58 AM Parties agreed to: Wendy Cohen, Randy Rominger, Christine Dietrick, Matt Horn, Manuel Guzman How to contact Carahsoft OBO City of San Luis Obispo: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: keriksso@slocity.org To advise Carahsoft OBO City of San Luis Obispo of your new e-mail address To let us know of a change in your e-mail address where we should send notices and disclosures electronically to you, you must send an email message to us at keriksso@slocity.org and in the body of such request you must state: your previous e-mail address, your new e-mail address. We do not require any other information from you to change your email address.. In addition, you must notify DocuSign, Inc to arrange for your new email address to be reflected in your DocuSign account by following the process for changing e-mail in DocuSign. To request paper copies from Carahsoft OBO City of San Luis Obispo To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an e-mail to keriksso@slocity.org and in the body of such request you must state your e-mail address, full name, US Postal address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with Carahsoft OBO City of San Luis Obispo To inform us that you no longer want to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your DocuSign account, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an e-mail to keriksso@slocity.org and in the body of such request you must state your e-mail, full name, IS Postal Address, telephone number, and account number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software Operating Systems: Windows2000? or WindowsXP? Browsers (for SENDERS): Internet Explorer 6.0? or above Browsers (for SIGNERS): Internet Explorer 6.0?, Mozilla FireFox 1.0, NetScape 7.2 (or above) Email: Access to a valid email account Screen Resolution: 800 x 600 minimum Enabled Security Settings: •Allow per session cookies •Users accessing the internet behind a Proxy Server must enable HTTP 1.1 settings via proxy connection ** These minimum requirements are subject to change. If these requirements change, we will provide you with an email message at the email address we have on file for you at that time providing you with the revised hardware and software requirements, at which time you will have the right to withdraw your consent. Acknowledging your access and consent to receive materials electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please verify that you were able to read this electronic disclosure and that you also were able to print on paper or electronically save this page for your future reference and access or that you were able to e-mail this disclosure and consent to an address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format on the terms and conditions described above, please let us know by clicking the 'I agree' button below. By checking the 'I Agree' box, I confirm that: • I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF ELECTRONIC RECORD AND SIGNATURE DISCLOSURES document; and • I can print on paper the disclosure or save or send the disclosure to a place where I can print it, for future reference and access; and • Until or unless I notify Carahsoft OBO City of San Luis Obispo as described above, I consent to receive from exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to me by Carahsoft OBO City of San Luis Obispo during the course of my relationship with you. 109 From:Dan Parker-King <dan@hiveengineering.us> Sent:Thursday, August 31, 2023 1:54 PM To:Nelson, Brian; Kacsinta, Madeline; Ryan Stefanek; Tally Richtsmeier; Tyler Benson Subject:22-143 SLO Phase 1B Downtown CADPS Site Prep - SWPPP Plan Attachments:SWPPP -SLO DOWNTOWN PARKING SWPPP_v2.pdf; 565511_ConstructionNOI.pdf This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Brian, I've updated the information for this project into the SMARTs system. It should have sent you a notification. I believe it is ready for you to finalize it. Please let me know if you have any questions or need anything modified. I did notice that I haven't gotten your signature on the SWPPP (Page 5) as the LRP. If you could sign that and send it back to me at your earliest convenience. I believe we are planning to start demolition next Tuesday, so it would be appreciated if you could expedite this. Thanks in advance, Dan Parker-King, PE Principal Engineer Tel (805)-550-8546 www.hiveengineering.us HIVE ENGINEERING 705 Fiero Ln Suite 10 | San Luis Obispo | CA 93401 State Water Resources Control Board NOTICE OF INTENT GENERAL PERMIT TO DISCHARGE STORM WATER ASSOCIATED WITH CONSTRUCTION ACTIVITY (WQ ORDER No. 2009-0009-DWQ) 0.24 City of San Luis Obispo bnelson@slocity.org Brian Nelson 1.25 1.2 Acres 609 Palm Street 805-549-3147 City Engineer City Engineer San Luis Obispo CA 93401 Daniel ParkerKing Brian Nelson C74672 -120.66668 San Luis Obispo CA 93401 SLO Phase 1B Downtown Parking Structure Site Prep Yes San Luis Obispo CA 93401 805-781-7113 bnelson@slocity.org Region 3 - Central Coast bnelson@slocity.org 990 Palm Street 35.27969 San Luis Obispo September 04, 2023 September 29, 2023 Brian Nelson *Other: City Parking Structure Level2 City of San Luis Obispo 805-781-7113 805-781-7113 r3_stormwater@waterboards.ca.gov 3.3 September 29, 20231.2 Acres 990 Palm Street WDID: Post Construction Information State Water Resources Control Board NOTICE OF INTENT GENERAL PERMIT TO DISCHARGE STORM WATER ASSOCIATED WITH CONSTRUCTION ACTIVITY (WQ ORDER No. 2009-0009-DWQ) STORM WATER POLLUTION PREVENTION PLAN Project Name: SLO Phase 1B Downtown Parking Structure Site Prep Legally Responsible Person (LRP) Brian Nelson Deputy Director of Public Works / City Engineer City of San Luis Obispo 919 Palm Street San Luis Obispo, CA 93401 Prepared For: The City of San Luis Obispo 919 Palm Street San Luis Obispo, CA Risk Level: 2 Site Addresses: Cultural Arts District 609 Palm Street San Luis Obispo, CA 93401 Estimated Project Construction Dates: September 1, 2023 – November 1, 2023 SWPPP Prepared by: Hive Engineering 705 Fiero Lane, Suite 10 San Luis Obispo, CA 93401 (805) 550-8546 phone QSP Daniel Parker-King, RCE, QSD/P Permit Registration Submittal Date:8/31/23 WDID No: - 565511 Date: 8/31/23 SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 2 TABLE OF CONTENTS Acronyms .............................................................................................................................................................. 4 Legally Responsible Person ................................................................................................................................... 5 Qualified SWPPP Developer .................................................................................................................................. 6 Storm Water Multi-Application and Report Tracking System ............................................................................................ 6 1.0 SWPPP Requirements............................................................................................................................... 7 1.1 Introduction ......................................................................................................................................................... 7 1.2 Permit Registration Documents ........................................................................................................................... 7 1.3 Swppp availability and implementation .............................................................................................................. 8 1.4 Pollution Prevention Team .................................................................................................................................. 8 1.5 Duly Authorized Representatives ........................................................................................................................ 8 1.6 Permits and Governing Documents ..................................................................................................................... 8 1.7 SWPPP Amendments ........................................................................................................................................... 9 1.8 Retention of Records ........................................................................................................................................... 9 1.9 Exceedance Response Actions (ERA’s) ............................................................................................................... 10 1.10 Annual Comprehensive Facility Compliance Evaluation .................................................................................... 10 1.11 Annual Report .................................................................................................................................................... 11 1.12 Termination and Changes to General Permit Coverage ..................................................................................... 11 2.0 Facility Information ................................................................................................................................ 11 2.1 Facility Description ............................................................................................................................................. 11 2.1.1 Facility Location ............................................................................................................................................ 11 2.1.2 Existing Conditions ........................................................................................................................................ 12 2.1.3 Description of Drainage Areas and Existing Drainage ................................................................................... 13 2.1.4 Developed Condition .................................................................................................................................... 14 2.2 Project Risk Level ............................................................................................................................................... 14 2.2.1 Project Sediment Risk: .................................................................................................................................. 15 2.2.2 Receiving Water Risk: .................................................................................................................................... 17 2.2.3 Combined Risk: ............................................................................................................................................. 17 2.3 Construction Site Estimates ............................................................................................................................... 18 2.4 Construction Schedule ....................................................................................................................................... 18 2.5 Identification of Potential Pollutant Source ....................................................................................................... 18 3.0 Best Management Practices .................................................................................................................. 19 3.1 Contractor Information ...................................................................................................................................... 19 3.2 BMP Installation Schedule ................................................................................................................................. 19 3.3 Erosion & Sediment Control Best Management Practices ................................................................................. 21 3.4 Non-Storm Water and Material Management Best Management Practices ..................................................... 21 3.5 Post-Construction Best Management Practices ................................................................................................. 22 3.6 Housekeeping Requirements ............................................................................................................................. 22 3.7 Non-Storm Water Management ........................................................................................................................ 24 3.8 Erosion Control .................................................................................................................................................. 24 3.9 Sediment Control ............................................................................................................................................... 24 3.10 Inspection, Maintenance & Repair .................................................................................................................... 24 3.11 Training .............................................................................................................................................................. 25 3.12 Inspection and Entry .......................................................................................................................................... 25 4.0 Construction Site Monitoring Program .................................................................................................. 26 4.1 Construction Site Monitoring Program (CSMP) ................................................................................................. 26 4.2 Visual Monitoring & Inspection ......................................................................................................................... 27 4.3 Non-Storm Water Discharge Monitoring ........................................................................................................... 28 4.4 Water Quality Sampling and Analysis ................................................................................................................ 28 SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 3 4.5 Construction Activity ......................................................................................................................................... 28 4.6 Quality Assurance and Quality Control .............................................................................................................. 29 4.7 Reporting Requirements and Records Retention .............................................................................................. 31 5.0 General Procedures and Requirements .................................................................................................. 31 5.1 SWPPP Availability and Implementation ........................................................................................................... 31 5.2 SWPPP Amendments ......................................................................................................................................... 32 5.1 Retention of Records ......................................................................................................................................... 32 5.2 Reporting Requirements .................................................................................................................................... 32 5.3 Required Non-Compliance Reporting ................................................................................................................ 33 5.4 Annual Report .................................................................................................................................................... 33 5.5 Changes to Permit Coverage .............................................................................................................................. 33 5.6 Notice of Termination ........................................................................................................................................ 33 APPENDIX A NPDES CONSTRUCTION GENERAL PERMIT ............................................................................. 35 APPENDIX B BMPS FROM THE 2009 CALIFORNIA CONSTRUCTION BMP HANDBOOK ......................... 36 APPENDIX C LIST OF POTENTIAL NON-VISIBLE POLLUTANTS ................................................................... 37 APPENDIX D SWPPP CONTRACTOR/SUBCONTRACTOR AGREEMENTS ................................................... 39 APPENDIX E CONTRACTOR/SUBCONTRACTOR INFORMATION .................................................................. 40 APPENDIX F SWPPP TRAINING LOG ................................................................................................................... 41 APPENDIX G SITE MAP EROSION CONTROL PLAN ......................................................................................... 43 APPENDIX H RISK LEVEL CALCULATIONS ....................................................................................................... 44 APPENDIX I CHAIN-OF-CUSTODY (COC) FORM ............................................................................................... 47 APPENDIX J SWPPP AMENDMENT(S) & LOG ............................................................................................................ 49 APPENDIX K CORRECTIVE ACTION LOG .................................................................................................................... 51 APPENDIX L SAMPLING LOG ................................................................................................................................ 58 APPENDIX M ANNUAL FEE STATEMENT AND RECIEPTS .............................................................................. 63 APPENDIX N CONSTRUCTION SITE MONITORING INSPECTION FORM ...................................................... 67 APPENDIX O RAIN EVENT ACTION PLAN .......................................................................................................... 74 SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 4 ACRONYMS ASTM American Society of Testing and Materials BAT Best Available Technology BCT Best Conventional Pollutant Control Technology BMP Best Management Practice BPT Best Practicable Control Technology Currently Available CFR Code of Federal Regulations CGP Construction General Permit – NPDES Construction General Permit for Storm Water Discharges associated with Construction Activities COC Chain of custody COT City of Tehachapi CSMP Construction Site Monitoring Program CWA Clean Water Act of 1987 EPA Environment Protection Agency LRP Legally Responsible Person MS4 Municipal Storm Sewer System NAL Numeric Action Levels NEL Numeric Effluent Limitations NOAA National Oceanic and Atmospheric Administration (www.noaa.gov) NOI Notice of Intent NOT Notice of Termination NPDES National Pollution Discharge Elimination System POC Pollutants of Concern PoP Probability of Precipitation PRD Permit Registration Documents QSD Qualified SWPPP Developer QSP Qualified SWPPP Practitioner REAP Rain Event Action Plan RUSLE Revised Universal Soil Loss Equation RWQCB Regional Water Quality Control Board SAP Sampling and Analysis Plan SMARTS Storm water Multi- Application Report Tracking System SWAMP Surface Water Ambient Monitoring Program SWPPP Storm Water Pollution Prevention Plan SWPPM Storm Water Pollution Prevention Manager SWRCB State of California Water Resources Control Board SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 5 LEGALLY RESPONSIBLE PERSON Approval and Certification of the Stormwater Pollution Prevention Plan Facility Name SLO Phase 1B Downtown Parking Structure Site Prep Waste Discharge Identification (WDID): 565511 “I certify under penalty of law that this document and all Attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, to the best of my knowledge and belief, the information submitted is, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." _______________________________________ Legally Responsible Person/Ogranization Date _______________________________________ Legally Responsible Person Date ____Brian Nelson________________________ 805-781-7113 Printed Name Phone SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 6 QUALIFIED SWPPP DEVELOPER This SWPPP was prepared under the direction of Daniel Parker-King, a Qualified SWPPP Developer (QSD). ___________________________________________ 8/23/23 Daniel Parker-King, RCE, QSD/P Date Mr. Parker-King possesses the following QSD qualifications per Section VII of the Construction General Permit: California Registered Civil Engineer, C74672, Expiration 12.31.23 QSD Certification Number C74672 Contact Information for questions or concerns: Hive Engineering 705 Fiero Lane, Suite 10 San Luis Obispo, CA 93401 (805) 550-8546 This SWPPP conforms to the required elements of the Construction General Permit Order No. 2009-0009-DWQ and amendments Order No. 2010-0014-DWQ and Order No. 2012-0006-DWQ issued by the State of California, State Water Resource Control Board. A QSD is required to prepare any necessary SWPPP amendments or annual reports. This SWPPP (including all inspections, amendments and reports) and the Construction General Permit shall be maintained for three years from the date submitted. These records shall be available at the construction site until construction is complete. When the original SWPPP is retained by a crewmember in a construction vehicle and it is not currently at the construction site, current copies of the BMPs and map/drawing will be left with the field crew and the original SWPPP shall be made available via a request by radio/telephone.) STORM WATER MULTI-APPLICATION AND REPORT TRACKING SYSTEM The Construction General Permit requires all dischargers to electronically file all Permit Registration Documents (PRDs), Notices of Termination (NOT), changes of information (COI’s), annual reporting, and other compliance documents required by the Construction General Permit through the State Water Board’s Storm water Multi-Application and Report Tracking System (SMARTS) website. SMARTS can be found at https://smarts.waterboards.ca.gov/smarts/faces/SwSmartsLogin.jsp SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 7 1.0 SWPPP REQUIREMENTS 1.1 INTRODUCTION The Cultural Arts District Parking Structure site comprises approximately 1.2 acres and spans several addresses including, 609 Palm Street, 972 Nipomo Street, 633 Palm Street, 630 Monterey Street, 970 Nipomo Street, 610 Monterey Street, 614 Monterey Street, in San Luis Obispo, California. The property is owned by The City of San Luis Obispo. This Stormwater Pollution Prevention Plan (SWPPP) is designed to comply with California’s General Permit for Stormwater Discharges Associated with Industrial Activities (General Permit) Order No. 2014-0057-DWQ (NPDES No. CAS000001) issued by the State Water Resources Control Board (State Water Board). This SWPPP has been prepared following the SWPPP Template provided on the California Stormwater Quality Association Stormwater Best Management Practice Handbook Portal: Industrial and Commercial (CASQA 2014). In accordance with the General Permit, Section X.A, this SWPPP contains the following required elements: · Facility Name and Contact Information · Site Map · Storm Water Pollution Prevention Plan · Signed Certification Statement · Annual Fee (Appendix M) 1.2 PERMIT REGISTRATION DOCUMENTS Required Permit Registration Documents (PRDs) were submitted to the State Water Board via the Stormwater Multi Application and Report Tracking System (SMARTS) by the Legally Responsible Person (LRP), or authorized personnel (i.e., Approved Signatory) under the direction of the LRP. To obtain coverage, the Edwards Construction Group must electronically file Permit Registration Documents (PRDs) prior to the commencement of construction activity. Failure to obtain coverage under the Construction General Permit for storm water discharges to waters of the United States is a violation of the CWA and the California Water Code. The project-specific PRDs include:  Notice of Intent (NOI)  Risk Assessment (Appendix H)  Site Map (Appendix G)  Storm Water Pollution Prevention Plan  Signed Certification Statement  Annual Fee (Appendix M) The annual fee is required no later than seven days prior to the commencement of construction activities. Permit coverage shall not commence until the annual fee and PRDs are received by the State Water Board, and a Waste Discharger Identification (WDID) number is assigned and sent by State Water Board Storm water Multi-Application and Report Tracking System (SMARTS). SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 8 1.3 SWPPP AVAILABILITY AND IMPLEMENTATION The SWPPP is available on-site to all employees during all hours of operation (see Section 2.5 for the Operations Schedule), and will be made available upon request by a State or Municipal inspector. The SWPPP will be implemented by August 1, 2023. 1.4 POLLUTION PREVENTION TEAM Facility staff that have been designated as Pollution Prevention Team members are listed below in Table 1.1., along with their responsibilities and duties. A list of alternate team members is also provided, and these personnel will perform SWPPP activities when regular members of the Pollution Prevention Team are absent or unavailable. This table will be updated as needed when there are changes to staff and staff responsibilities. All team members will be trained to perform the duties assigned to them. Employee training logs are provided in Appendix C. Table 1.1 Pollution Prevention Team Name Title Phone Number Responsibilities and Duties 1.5 DULY AUTHORIZED REPRESENTATIVES Duly Authorized Representative(s) who are responsible for SWPPP implementation and have authority to sign PRDs [is/are] listed below in Table 1.2. Written authorizations from the LRP for these individuals are provided in Appendix D. Table 1.2 Duly Authorized Representatives Name Title Phone Number 1.6 PERMITS AND GOVERNING DOCUMENTS In addition to the General Permit, the following documents have been taken into account while preparing this SWPPP: · Regional Water Board requirements; SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 9 · Basin Plan requirements; · TMDL Requirements; · Spill Prevention Control and Countermeasures Plan; · Hazardous Material Business Plan; · Hazardous Waste Regulations and Permits; · Air Quality Regulations and Permits ; and · Clean Water Act Section 401 Water Quality Certifications and 404 Permits. 1.7 SWPPP AMENDMENTS This SWPPP will be amended or revised as needed. A list of amendments (Amendment Log) is included in the front of this SWPPP (page 7), and amendment certifications are included in Appendix E. The Amendment Log will include the date of initial preparation and the date of each amendment. The SWPPP should be revised when: · There is a General Permit violation; · There is a reduction or increase in the total industrial area exposed to stormwater; · BMPs do not meet the objectives of reducing or eliminating pollutants in stormwater discharges; · There is a change in industrial operations which may affect the discharge of pollutants to surface waters, groundwater(s), or a municipal separate storm sewer system (MS4); · There is a change to the parties responsible for implementing the SWPPP; or · Otherwise deemed necessary by the QISP. The following items will be included in each amendment: · Who requested the amendment; · The location of proposed change; · The reason for change; · The original BMP(s) proposed, if any; and · The new BMP(s) proposed. · Amendments will be logged at the front of the SWPPP and certification kept in Appendix E. The SWPPP text will be revised replaced, and/or hand annotated as necessary to properly convey the amendment. SWPPP amendments must be certified and submitted by the LRP or their designated Duly Authorized Representative via SMARTS within 30 days whenever the SWPPP contains significant revisions. With the exception of significant revisions, SWPPP changes will be certified and uploaded to SMARTS once every three (3) months in the reporting year. 1.8 RETENTION OF RECORDS Paper or electronic records of documents required by this SWPPP will be retained for a minimum of five (5) years from the date generated or date submitted, whichever is later, for the following items: · Employee Training Records; SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 10 · BMP Implementation Records; · Spill and Clean-up Related Records; · Records of Sampling and Analysis Information • The date, exact location, and time of sampling or measurement; • The date(s) analyses were performed; • The individual(s) that performed the analyses; • The analytical techniques or methods used; and • The results of such analyses; · Records of Visual Observations • The date • The industrial areas/drainage areas of the facility observed during the inspection (Location); • The approximate time of the observation; • Presence and probable source of observed pollutants; and • Name of the individual(s) that conducted the observations; • Response to the observations including identification of SWPPP revisions if needed. • Level 1 ERA Reports; • Level 2 ERA Action Plan; • Level 2 ERA Technical Report; and • Annual Reports from SMARTS (checklist and any explanations). 1.9 EXCEEDANCE RESPONSE ACTIONS (ERA’S) If a General Permit NAL exceedance occurs in a given reporting year, a Level 1 ERA Evaluation and a Level 1 ERA Report will be required in the following year, or, if in a subsequent year, a Level 2 ERA Action Plan and a Level 2 ERA Report will be required in accordance with the General Permit. The results of either of the ERA reports may require that the SWPPP be amended. 1.10 ANNUAL COMPREHENSIVE FACILITY COMPLIANCE EVALUATION The General Permit (Section XV) requires the Discharger to conduct one Annual Comprehensive Facility Compliance Evaluation (Annual Evaluation) for each reporting year (July 1 to June 30). Annual Evaluations will be conducted at least eight (8) months and not more than sixteen (16) months after the previous Annual Evaluation. The planned window for conducting the Annual Evaluation is between April and June of each year. The SWPPP will be revised, as appropriate based on the results of the Annual Evaluation, and the revisions will be implemented within 90 days of the Annual Evaluation. At a minimum, Annual Evaluations will consist of: · A review of all sampling, visual observation, and inspection and monitoring records and sampling and analysis results conducted during the previous reporting year; · A visual inspection of all areas of industrial activity and associated potential pollutant sources for evidence of, or the potential for, pollutants entering the stormwater conveyance system; SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 11 · A visual inspection of all drainage areas previously identified as having no exposure to industrial activities and materials in accordance with the definitions in Section XVII; · A visual inspection of equipment needed to implement the BMPs; · A visual inspection of any BMPs; · A review and effectiveness assessment of all BMPs for each area of industrial activity and associated potential pollutant sources to determine if the BMPs are properly designed, implemented, and are effective in reducing and preventing pollutants in industrial stormwater discharges and authorized NSWDs; and · An assessment of any other factors needed to comply with the Annual Reporting requirements in General Permit Section XVI.B. 1.11 ANNUAL REPORT The Annual Report will be prepared, certified, and electronically submitted no later than July 15th following each reporting year using the standardized format and checklists in SMARTS based on the reporting requirements identified in Section XVI of the General Permit. Annual reports will be submitted in SMARTS and in accordance with information required by the on- line forms. 1.12 TERMINATION AND CHANGES TO GENERAL PERMIT COVERAGE When any of the following conditions occur, termination of coverage under the General Permit will be requested by certifying and submitting a Notice of Termination (NOT) via SMARTS: · Operation of the facility has been transferred to another entity; · The facility has ceased operations, completed closure activities, and removed all industrial related pollutant generating sources; · The facility’s operations have changed and are no longer subject to the General Permit. The SWPPP and all of the provisions of the General Permit will be complied with until a valid NOT is received and accepted by the Board. If ownership changes, the new owner of the facility will be notified of the General Permit and regulatory requirements for permit coverage. 2.0 FACILITY INFORMATION 2.1 FACILITY DESCRIPTION 2.1.1 Facility Location The Cultural Arts District Parking Structure site comprises approximately 1.2 acres and spans several addresses including, 609 Palm Street, 972 Nipomo Street, 633 Palm Street, 630 Monterey Street, 970 Nipomo Street, 610 Monterey Street, 614 Monterey Street, in San Luis Obispo, California. The property is owned by The City of San Luis Obispo, and is located within Section 26, Township 30S, Range 12E. These phase 1b site preparation plans consist of tree protection, demolition and clearing. Phase 2 (under separate cover) includes on-site rough grading, temporary and permanent shoring, improvements, buildings, precise grading, landscape, and associated frontage improvements. SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 12 The general construction activities to be performed at the Project Site may include, but are not limited to the following: · Demolition of existing structure · Demolition of existing underground utilities (Sewer, Water, Electric, etc…) · Tree removal · Site grading · Washout Areas · Construction entrance/exit Figure 2.1: Vicinity Map Figure 2.2: Site Map 2.1.2 Existing Conditions The existing site consists of four structures, a garage, a parking lot, trees, minor landscaping and associated utilities. Most of the site slopes gently to the west towards the corner of Pismo and Nipomo St. The southwest corner of the property slopes towards the corner of Monterey and Nipomo. There are two structures on the northern corner of the site and three structures on SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 13 the southern corner. The rest of the site is paved with parking areas broken up by small landscaped planters. Existing sources of contamination at the site include: · Contaminated Soil · Erosion and Sediment from stormwater runoff · Hydrocarbons from vehicular parking · Existing utilities (sewer) Figure 2.3: Existing Conditions 2.1.3 Description of Drainage Areas and Existing Drainage The site is divided into two drainage areas ranging from 5%-10%. Drainage area A1 (44,900 SF) flows to the northwest, while drainage area B1 (13,700 SF) flows to the south and southwest. Offsite drainage is received from area A2 (13,692 SF), flowing into area A1. Area A2 previously contained an apartment and home but they have been removed. The elevations of the project ranges from 188 to 205 above mean sea level (msl). Stormwater is conveyed through surface runoff, and flows off site into the city’s municipal stormwater system. SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 14 Demolition to occur as a part of this project will keep the drainage patterns relatively the same, creating pervious area. The construction of a parking structure during the second phase will add impervious areas. Drainage areas and their directions can be seen in Figure 4. Figure 2.4: Drainage Areas The site is located within the Stenner Lake Watershed.. 2.1.4 Developed Condition Post demolition surface drainage will generally be directed as it has historically. Storm water will flow offsite to the City of San Luis Obispo storm drain system, and ultimately to Brizziolari Creek. Post construction drainage patterns and conveyance systems are presented on the Improvement Plans. 2.2 PROJECT RISK LEVEL This SWPPP utilized a Risk-Based Permitting Approach under the Construction General Permit (SWRCB Order No. 2009-0009 DWQ), as set forth by the SWRCB and RWQCB. There are two major steps to site planning and risk determination. The project’s overall risk is broken up into two elements – (1) project sediment risk (the relative amount of sediment that can be discharged, given the project and location details) and (2) receiving water risk (the risk sediment discharges pose to the receiving waters) SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 15 2.2.1 Project Sediment Risk: Project Sediment Risk can be determined using two separate methods. Method 1 establishes sediment risk based on the following Soil Loss Equation (RUSLE) to obtain an estimate of project-related bare ground soil loss expressed in tons/acre. The RUSLE equation is as follows: A = (R)(K)(LS)(C)(P) Where: A = the rate of sheet and rill erosion R = rainfall-runoff erosivity factor K = soil erodibility factor LS = length-slope factor C = cover factor (erosion controls) (taken as 1.0 to simulate bare ground) P = management operations and support practices (sediment controls) (taken as 1.0 to simulate bare ground) Method 2 (also known as the “map option”) utilizes GIS maps where the product of K and LS are predetermined (located below in Figure 2 and 3) and an online calculator for determining R factor for determining soil loss. For this option, the R factor for the project is calculated using the online calculator at https://www.epa.gov/npdes/rainfall-erosivity-factor-calculator-small-construction-sites. To determine soil loss in tons per acre, the discharger multiplies the R factor times the value for K times LS from the map. Figure 2.5. K Factor SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 16 Figure 2.6. LS Factor Calculated Using Google Earth KML Figure 2.7. R Value from EPA Website Method 2 was utilized in this SWPPP. Using the SWRCB “Risk Assessment R-Factor Calculation Notification” for the R factor with construction start dates of 08/1/23 and an end construction date of 11/1/2023, the R factor was determined to be 3.3. The K factor and LS factor were determined to be 0.24 and 1.25 respectively. Multiplying the above numbers together yields a Project Sediment Risk Factor of 0.99 tons/acre. Since 0.99 tons/acre is less than 15 tons/acre, the site can be classified as to having a Low Sediment Risk. SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 17 2.2.2 Receiving Water Risk: The project area can neither discharge (either directly or indirectly) to a 303(d)-listed waterbody impaired by sediment nor to a waterbody with designated beneficial use. This project site has been classified as a High Receiving Water Risk. 2.2.3 Combined Risk: The Combined Risk Level Matrix table in the Construction General Permit Order No. 2009-0009-DWQ (Appendix A) was utilized to determine the combined risk. Using this table, it was determined that the Project Site is a Risk Level 2. Table 1. Combined Risk Level Matrix Receiving Water Risk Sediment Risk Low Medium High Low Level 1 Level 2 High Level 2 Level 3 SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 18 2.3 CONSTRUCTION SITE ESTIMATES “Construction activities” refers to actions that result in a disturbance of the land, including demolition, clearing, grading, excavating, vertical construction, landscaping and other similar activities. It also includes “construction-related activities,” areas that support the construction project such as stockpiles, borrow areas, concrete truck washouts, fueling areas, material storage areas and equipment storage areas. The following estimates are from the planned construction-related activities in the staging yard. More specific information pertaining to the other proposed well pads can be found in their respective site map/ erosion control plans within Appendix G. · Total project area: 1.2 acres · Site area to be disturbed: 1.2 acres • Percentage impervious area before and after demolition: 67% and 0% • Runoff coefficient before and after construction: NIC 2.4 CONSTRUCTION SCHEDULE • Demolition 9/01/2023 to 11/30/2023 • Grading Utilities & Vertical Construction 10/1/2023 to 10/1/2025 (NIC) 2.5 IDENTIFICATION OF POTENTIAL POLLUTANT SOURCE The pollutant of greatest concern on most construction sites is sediment which may become detached during construction related activities. Non-visible pollutants may be attached to the soils and run-off the site, potentially polluting the receiving body of water. Pollutant sources include, but are not limited to the following: a. Disturbances caused by demolition, clearing, grading and excavation activities related to site preparation. b. Storm-related precipitation c. Dust control through water spraying d. Leaks from equipment and/or portable toilets e. Wash out and maintenance areas f. Transporting of concrete and/ or asphalt materials g. Transporting of construction materials and fuels h. Flushing of water lines i. Vehicle fluids j. Cement materials k. Raw landscape materials l. General litter m. PVC pipe n. RCP pipe For a list of potential non-visible pollutants, refer to Appendix C: List of Potential Non-visible Pollutants & Pollutant Testing Guidance Table. SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 19 3.0 BEST MANAGEMENT PRACTICES 3.1 CONTRACTOR INFORMATION Appendix E includes the names and contact information of the Storm Water Pollution Prevention Plan Manager (SWPPPM) and a list of names of all contractors, subcontractors, and individuals who will be directed by the SWPPPM. This list shall include telephone numbers and work addresses. Specific areas of responsibility of each subcontractor and emergency contact numbers shall also be included. The discharger shall ensure that all BMPs required by the Construction General Permit are implemented by a Qualified SWPPPM. The SWPPPM shall be a person responsible for non-storm water and storm water visual observations, sampling and analysis and shall have primary responsibility and significant authority for the implementation, maintenance, inspection of the site to ensure full compliance with the SWPPP and the Permit. Best Management Practices (BMPs) were chosen for this project to reduce or eliminate pollutants in storm water discharge, and to comply with the Provisions of Attachment D of the General Order (Risk Level 2 Requirements) as well as those in the Construction General Permit Order. BMPs are shown in the erosion and sediment control plan provided in Appendix B. The Construction General Permit Order requires: Dischargers minimize or prevent pollutants in storm water discharges and authorized non-storm water discharges through the use of controls, structures, and management practices that achieve Best Available Technology Economically Achievable (BAT) for toxic and non-conventional pollutants and Best Conventional Pollutant Control Technology (BCT) for conventional pollutants. Storm water discharges and authorized non-storm water discharges regulated by the Construction General Permit not contain a hazardous substance equal to or in excess of reportable quantities established in 40 C.F.R. §§ 117.3 and 302.4, unless a separate NPDES Permit has been issued to regulate those discharges. As a Risk Level 2 discharger this project is subject to Numeric Action Levels (NALs) for pH and turbidity as described in Section 4.5. 3.2 BMP INSTALLATION SCHEDULE The Contractor is responsible for ensuring that appropriate BMPs are in place during the operations requiring the BMPs. Below is a schedule intended to provide the minimum BMPs necessary during each phase of the contractor’s operation. Additional BMPs may be necessary. Some BMPs installed early in the project shall remain in place upon completion of the project, while others must be removed prior to the completion of the project. Appendix B provides BMP Fact Sheets on design and implementation guidelines for each BMP. Those identified by “*” should only be implemented when applicable. The following BMPs shall be installed / utilized prior to clearing and grubbing operations: EC-1 Scheduling EC-2 Preservation of Existing Vegetation SE-7 Street Sweeping and Vacuuming SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 20 NS-9 Vehicle and Equipment Fueling NS-10 Vehicle & Equipment Maintenance WM-1 Material Delivery and Storage WM-2 Material Use WM-3 Stockpile Management WM-4 Spill Prevention and Control WM-5 Solid Waste Management WM-6 Hazardous Waste Management WM-9 Sanitary/Septic Waste Management The following BMPs shall be installed / utilized during grading/mobilization operations: WE-1 Wind Erosion Control TC-1 Stabilized Construction Entrance/Exit NS-1 Water Conservation Practices SE-1 Silt Fences SE-5 Fiber Rolls The following BMPs shall be installed / utilized upon completion of drainage work: (NOT IN CONTRACT) EC-9 Drainage Swales The following BMPs shall be installed / utilized during vertical construction: (NOT IN CONTRACT) EC-1 Scheduling EC-2 Preservation of Existing Vegetation WM-1 Material Delivery and Storage WM-2 Material Use WM-3 Stockpile Management WM-4 Spill Prevention and Control WM-5 Solid Waste Management WM-8 Concrete Waste Management* WM-9 Sanitary/Septic Waste Management The following BMPs may be utilized during utility operations: (NOT IN CONTRACT) WM-1 Material Delivery and Storage WM-2 Material Use WM-3 Stockpile Management WM-4 Spill Prevention and Control WM-5 Solid Waste Management WM-8 Concrete Waste Management* WM-9 Sanitary/Septic Waste Management All BMPs, except those designated as post-construction BMPs in Section 3.5, are to be removed prior to contract acceptance. It is not anticipated that this project will necessitate the stockpiling of materials. However, if materials are stockpile on-site and the stockpiles are inactive (not scheduled to be re-disturbed for at least 14 days), then the stockpiled areas shall be covered and a berm placed around the materials in accordance with WM-3 “Stockpile Management.” SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 21 3.3 EROSION & SEDIMENT CONTROL BEST MANAGEMENT PRACTICES Appendix B provides BMP Fact Sheets on design and implementation guidelines for each BMP to reduce or eliminate pollutants in storm water discharges. All BMPs are required to be implemented. The following BMPs are to be incorporated into this SWPPP: EC-1 Scheduling EC-2 Preservation of Existing Vegetation EC-8 Wood Mulching EC-16 Non-Vegetative Stabilization SE-1 Silt Fences SE-5 Fiber Rolls SE-7 Street Sweeping and Vacuuming SE-10 Storm Drain Inlet Protection TC-1 Stabilized Construction Entrance/Exit TC-3 Entrance/Outlet Tire Wash WE-1 Wind Erosion Control WM-9 Sanitary/Septic Waste Management 3.4 NON-STORM WATER AND MATERIAL MANAGEMENT BEST MANAGEMENT PRACTICES Non-storm water discharges may contribute significant pollutant loads to receiving waters. Measures to control spills, leakage, and dumping, and to prevent illicit connections during construction must be addressed through structural as well as non-structural Best Management Practices (BMPs). BMPs are designated in this SWPPP to prevent non-storm water discharges. All BMPs are required to be implemented. Those identified by “*” should only be implemented when applicable. NS-1 Water Conservation Practices NS-2 Dewatering Operations NS-3 Paving and Grinding Operations NS-7 Potable Water/Irrigation NS-8 Vehicle and Equipment Cleaning NS-9 Vehicle and Equipment Fueling WM-1 Material Delivery/Storage WM-2 Material Use WM-3 Stockpile Management WM-4 Spill Prevention and Control WM-5 Solid Waste Management WM-6 Hazardous Waste Management WM-7 Contaminated Soil Management WM-8 Concrete Waste Management WM-10 Liquid Waste Management SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 22 Vehicle and Equipment Cleaning is prohibited from occurring on-site. Fueling and maintenance of equipment and vehicles shall take place in designated areas only. Materials storage on–site will be minimized. 3.5 POST-CONSTRUCTION BEST MANAGEMENT PRACTICES This SWPPP contains Post-Construction BMPs, which are designated to reduce or eliminate pollutants after construction is completed. BMPs serving dual purpose roles (construction and post-construction protection) include: EC-6 Straw Mulch/Hydroseed/Tackifier/Soil Amendment EC-7 Geotextiles & Mats EC-9 Drainage Swales EC-10 Velocity Dissipation Devices 3.6 HOUSEKEEPING REQUIREMENTS All Risk Level 2 dischargers are required to adhere to the minimum housekeeping requirements as specified in Attachment C of the Construction General Permit. They include, but are not limited to: Construction Materials: Risk Level 2 dischargers shall implement good site management measures for construction materials that could potentially be a threat to the water quality if discharged. They include: · Conduct an inventory of products to be used. · Cover and berm loose stockpiled construction material that are not actively being used. · Store Chemicals in watertight containers (with appropriate secondary containment to prevent any spillage or leakage) or in a storage shed. · Minimize exposure of construction materials to precipitation. · Implement BMPs to prevent the off-site tracking of loose construction and landscape materials. Waste Management: Risk Level 2 dischargers shall implement good housekeeping for waste management. They include, but are not limited to: · Prevent disposal of any rinse or wash waters or materials on impervious or pervious site surfaces or into the storm drain system. · Ensure containment of sanitation facilities. · Clean or replace sanitation facilities and inspect them for leaks regularly. · Cover waste disposal containers at the end of every business day and during rain events. · Prevent discharges from disposal containers to the drainage system or receiving water. · Contain and protect stockpile waste from wind or rain, unless actively being used. · Implement procedures that effectively address hazardous and non-hazardous spills. SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 23 · Develop a spill response plan. · Ensure containment of concrete washout areas and other washout areas that may contain pollutants. There shall be no discharge to the underlying soil. Vehicle Storage and Maintenance: Risk Level 2 dischargers shall implement good housekeeping for vehicle storage and maintenance. They include, but are not limited to: · Prevent oil, grease or fuel to leak in to the ground, storm drains or surface waters. · Place all equipment or vehicles, which are to be fueled, maintained and stored in a designated area fitted with appropriate BMPs. · Clean leaks immediately, and dispose of material properly. Landscape Materials: Risk Level 2 dischargers shall implement good housekeeping for landscape materials. They include, but are not limited to: · Contain stockpiled materials when they are not actively being used. · Contain fertilizers when they are not actively being used. · Discontinue the application of erodible landscape materials within 2 days before a forecast rain event or during periods of precipitation. · Apply erodible landscape materials according to the manufacture recommendations. · Stack erodible landscaped materials on pallets and covering or storing such materials when not being used or applied. Potential Pollutant Sources: Risk Level 2 dischargers shall conduct an assessment and create a list of potential pollutant sources (see Appendix C) and identify any areas of the site where additional BMPs are necessary to reduce or prevent pollutants in storm water discharges and authorized non-storm water discharges. When developing BMPs, Risk Level 2 dischargers shall do the following: · Consider the quantity, physical characteristics (e.g., liquid, powder, solid), and locations of each potential pollutant source handled, produced, stored recycled, or disposed of at the site. · Consider the degree to which pollutants associated with those materials may be exposed to and mobilized by contact with storm water · Consider the direct and indirect pathways that pollutants may be exposed to storm water or authorized non-storm water discharges. This shall include an assessment of past spills or leaks, non-storm water discharges, and discharges form adjoining areas. · Ensure retention of sampling, visual observations, and inspection records. · Ensure effectiveness of existing BMPs to reduce or prevent pollutants in storm water discharges and authorized non-storm water discharges. SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 24 3.7 NON-STORM WATER MANAGEMENT Risk Level 2 dischargers shall implement measure to control all non-storm water discharges during construction. Non-storm water discharges are any discharges not directly associated with a rain even. Non- storm water discharges can include but are not limited to leaks from equipment or vehicles, flushing of water lines or washing of equipment. Risk Level 2 requirements include: · Dischargers shall implement measures to control all non-storm water discharges during construction. · Dischargers shall wash vehicles in such a manner as to prevent pollutants from entering surface waters. · Streets shall be cleaned in such a manner as to prevent unauthorized non-storm water discharges from reaching surface waters or the storm drain system. 3.8 EROSION CONTROL The primary pollutant identified during construction is sediment. Erosion and sedimentation controls will be implemented as necessary along the boundaries of the construction areas within the Project Site to minimize, as necessary, the amount of sediment transported off-site by storm water runoff. These control measures will be put in place as needed at the onset of construction activities and will remain in place (as needed) during construction and through periods of inactivity. Dischargers shall provide effective soil cover for inactive areas. Descriptions and diagrams of the BMPs are included in Appendix B. All disturbed areas shall provide effective soil cover for inactive areas and all finished slopes, open space, utility backfill and completed lots. All disturbed areas of the construction Project Site will be stabilized in a manner similar to its original condition. Both temporary (water trucks) and permanent measures will also be applied to control dust generation. Final stabilization will need to be completed prior to submitting a Notice of Termination (NOT). 3.9 SEDIMENT CONTROL Dischargers shall establish and maintain effective perimeter controls. Silt barriers consisting of silt fences, fiber rolls, sandbags, hay bales, and/or berms will be set up around the construction site as necessary so that sediment will not be discharged off-site. Sedimentation control will be in place and maintained on all disturbed areas during the rainy season. Sediment control BMPs will be implemented as needed. Construction sites that require silt barriers around them are sites where the ground surface has been disturbed by construction activities such as grading and /or excavation. Sediment buildup along silt barriers will be monitored and removed as necessary. Removed sediment will be deposited in an area that will not allow sediment to be discharged off-site. All loose soil and debris, which may create a potential hazard, will be hauled offsite and disposed of at an approved location. All construction entrances and exits shall be stabilized to sufficiently control sediment discharge from the site. 3.10 INSPECTION, MAINTENANCE & REPAIR All storm water control measures shall be properly maintained at regular intervals by trained personnel consistent with Project Site operational maintenance schedules. Inspections will be performed by a QSP or someone under his direction weekly, before, during, after qualifying storm events (0.5 inches per storm SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 25 event), and once each 24-hour period during extended storm events during business. These inspections will be conducted to identify BMP effectiveness. If any structural defects are observed interfering with design performance of BMPs, repairs or design changes will be implemented by the SWPPM within 72 hours. 3.11 TRAINING The SWPPM is responsible for training project personnel on the following topics: · Erosion Control BMPs · Sediment Control BMPs · Non-Storm Water BMPs · Waste Management and Materials Pollution Control BMPs · Emergency Procedures specific to the construction site storm water management Inspections will be conducted by a QSP. A QSP may train individuals to conduct the inspections, and collect storm water samples for non-visible pollutants. Trained individuals will also have received training and have experience with respect to erosion control methods, either through scholastic institutions, previous job experiences, or through workshops conducted by recognized regulatory agencies or professional organizations. Training records (Appendix F) will document attendees, the subjects covered and the date of training. Training logs/records are to be recorded and stored with the rest of the record materials · To ensure that the preparation, implementation, and oversight of the SWPPP is sufficient for effective pollution prevention, Section II, Part H of the Construction General Permit specifies that the Qualified SWPPP Developer and Qualified SWPPP Practitioners responsible for creating, revising, overseeing, and implementing the SWPPP must attend a State Water Board sponsored or approved QSD and QSP training course. · 3.12 INSPECTION AND ENTRY The discharger shall allow the Regional Water Board, State Water Board, U.S. EPA, and/or, in the case of construction sites which discharge through a municipal separate storm sewer, an authorized representative of the municipal operator of the separate storm sewer system receiving the discharge, upon the presentation of credentials and other documents as may be required by law, to: · Enter upon the discharger’s premises at reasonable times where a regulated construction activity is being conducted or where records must be kept under the conditions of the Construction General Permit; · Access and copy at reasonable times any records that must be kept under the conditions of the Construction General Permit; · Inspect at reasonable times the complete construction site, including any off-site staging areas or material storage areas, and the erosion/sediment controls; and · Sample or monitor at reasonable times for the purpose of ensuring Construction General Permit compliance. SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 26 4.0 CONSTRUCTION SITE MONITORING PROGRAM 4.1 CONSTRUCTION SITE MONITORING PROGRAM (CSMP) The Construction General Permit requires the following types of monitoring for Risk Level 2 projects: · Visual inspections of Best Management Practices (BMPs); · Visual monitoring of the site related to qualifying storm events; · Visual monitoring of the site for non-storm water discharges; · Sampling and analysis of construction site runoff; · Sampling and analysis of non-storm water discharges; Storm event monitoring should be conducted during business hours; and when the National Oceanographic and Atmospheric Administration (NOAA) (http://www.srh.noaa.gov/forecast) forecasts a rain event with a 50% or greater probability of producing a ½ inch or more of rain. Table 4.1: Summary of Risk Level 2 Monitoring Type of Monitoring What When Location Visual Inspection BMP Presence and effectiveness of all BMPs Weekly and Every 24 hours during an extended storm event. Overall site Stormwater Pre-storm All drainage areas and BMPs. Within 2 business days before each qualifying storm event. Overall site Post-storm All drainage areas and BMPs. Within 2 business days after each qualifying storm event. Overall site Non-storm water Operations and BMPs identified in Section 3.4 Quarterly Staging areas Sampling & Analysis Storm water runoff (effluent) pH and turbidity of storm water runoff representative of site. Within 2 business days of each qualifying storm event, and at a minimum 3 samples per day. Perimeter of site BMP failure/spill (non-visible) Runoff affected and not affected by the discharge/spill. Use Appendix C as a guide. Within first 2 hours of discharge from site. Perimeter of site Non-storm water Operations and BMPs identified in Section 3.4 If non-storm water is discharged off site. Perimeter of site Rain events and resulting monitoring periods should be separated into qualifying rain events. A qualifying rain event is defined as any event producing precipitation of ½ inch or more within a 48 hour or greater period. Monitoring locations provide clear views of BMPs, disturbed areas and extend through the entire site. Dischargers must maintain on-site records of all visual observations, personnel performing the observations, observation dates, weather conditions, locations observed, and corrective actions taken in response to the observations. The Construction Site Monitoring Inspection Form (Appendix N) should be used to track all monitoring activities. SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 27 Figure 4.1 Overview of Monitoring Locations 4.2 VISUAL MONITORING & INSPECTION All storm water monitoring must be completed within two (2) business days of each qualifying rain event at identified locations. Appendix G shows the monitoring locations. BMP Inspection The purpose of these inspections is to identify BMPs that: · Need maintenance to operate effectively; · Failed; or · Could fail to operate as intended. If deficiencies are identified during BMP inspections, repairs or design changes to BMPs must be initiated within 72 hours of identification and need to be completed as soon as possible. All BMP inspections must be documented on a Construction Site Monitoring Inspection Form (Appendix N). Storm Water Inspection Dischargers must conduct a pre-storm event inspection of: · All storm water drainage areas to identify and resolve prior to the storm event, any spills, leaks, or uncontrolled pollutant sources · All BMPs to identify proper implementation · Any storm water storage and containment areas to detect and remedy leaks if found SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 28 Dischargers must conduct a post-storm event inspection within two business days (48 hours) to identify whether: · BMPs were adequately designed, implemented, and effective, and · If any additional BMPs necessary (and amend the SWPPP accordingly). 4.3 NON-STORM WATER DISCHARGE MONITORING Quarterly non-storm water discharge monitoring will include the visual inspection of each drainage area during daylight hours for the presence of non-storm water discharges and their sources in July – September, October – December, January – March, and April – June quarters. If non-storm water is discharged off site, the effluent must be sampled. Quarterly monitoring should be recorded on Construction Site Monitoring Inspection Form in Appendix N. Potential non-storm water discharges within this project include: · Grading and Land Development · Site Stabilization · Vehicle and equipment cleaning, fueling and maintenance · Sanitary/Septic waste facilities · Concrete wash out areas · Contaminated Soils Quarterly inspections need to include each drainage area of the project and document: · Presence or indications of unauthorized and authorized non-storm water discharges and their sources · Pollutant characteristics of the non-storm water discharge (floating and suspended material sheen, discoloration, turbidity, odor, etc.) · Personnel performing the observations · Dates and approximate time each drainage area and non-storm water discharge was observed · Response taken to observations 4.4 WATER QUALITY SAMPLING AND ANALYSIS The project is required to collect samples of: · runoff for non-visible pollutants in the event of a BMP failure, breach or spill · non-storm water discharge Sampling personnel will collect storm water grab samples at discharge locations according to procedures outlined in Section 4.6 Quality Assurance and Quality Control. Appendix G shows the monitoring locations for all monitoring. Appendix L contains the Sampling Activity Log. Sampling is not required outside of scheduled business hours or under dangerous conditions. An explanation of why samples were not taken will be included with on-site inspection documents. 4.5 CONSTRUCTION ACTIVITY Non-Visible Pollutant Sampling SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 29 If there is a breach, spill or BMP failure, runoff affected by the non-visible pollutants will be sampled within the first two hours of discharge. It is important to note that covered construction materials or those that are in their final constructed form, do not need to be monitored. Materials that are stored exposed to precipitation and may generate runoff need to be considered for non-visible pollutant monitoring. Appendix C provides further guidance. Non-Stormwater Sampling If non-storm water is discharged off site, the effluent must be sampled. All non-storm water sample analyses should be conducted by a state certified laboratory. 4.6 QUALITY ASSURANCE AND QUALITY CONTROL The QSP is responsible for non-storm water and storm water visual observations, sampling and analysis, and for ensuring full compliance with the permit and implementation of all elements of the SWPPP. Prior to the rainy season, all sampling personnel and alternates will review the Monitoring Plan. Qualifications of designated personnel describing environmental sampling training and experience are provided in Appendix F. Sampling personnel will be designated and trained to collect, maintain and ship samples in accordance with the Surface Water Ambient Monitoring Program’s (SWAMP) 2008 Quality Assurance Program Plan (QAPP) (http://www.swrcb.ca.gov/water_issues/programs/swamp/tools.shtml#qa). Supplies and Storage An adequate stock of supplies and equipment for non-visible pollutants will be available on the project site or provided by the approved laboratory (Appendix I) prior to a sampling event. Monitoring supplies and equipment will be stored in a cool-temperature environment that will not come into contact with rain or direct sunlight. Sampling personnel will be available to collect samples in accordance with the sampling schedule. Supplies maintained at the project site will include, but will not be limited to, surgical gloves, sample collection equipment, coolers, appropriate number and volume of sample bottles, identification labels, re- sealable storage bags, paper towels, personal rain gear, ice, Sampling Activity Log forms (Appendix L), and Chain of Custody (COC) forms (Appendix I). Sample Collection and Handling Procedures All sampling and sample preservation must be in accordance with the current edition of Standard Methods for the Examination of Water and Wastewater (American Public Health Association). To maintain sample integrity and prevent cross-contamination, sampling collection personnel will: · Wear a clean pair of surgical gloves prior to the collection and handling of each sample at each location. · Not contaminate the inside of the sample bottle by not allowing it to come into contact with any material other than the water sample. · Discard sample bottles or sample lids that have been dropped onto the ground prior to sample collection. · Not leave the cooler lid open for an extended period of time once samples are placed inside. · Not touch the exposed end of a sampling tube, if applicable. · Avoid allowing rainwater to drip from rain gear or other surfaces into sample bottles. SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 30 · Not eat, smoke, or drink during sample collection. · Not sneeze or cough in the direction of an open sample bottle. · Minimize the exposure of the samples to direct sunlight, as sunlight may cause biochemical transformation of the sample to take place. · Decontaminate sampling equipment prior to sample collection using a TSP-soapy water wash, distilled water rinse, and final rinse with distilled water. · Dispose of decontamination water/soaps appropriately; i.e., not discharge to the storm drain system or receiving water. Any samples provided to a lab will be provided within 48 hours and use only the sample bottle provided by the lab (Appendix I). For an initial verification of laboratory or field analysis, duplicate samples will be collected at a rate of 10 percent or 1 duplicate per sampling event. The duplicate sample will be collected, handled, and analyzed using the same protocols as primary samples, and will be collected where contaminants are likely, and not on the upstream sample. A duplicate sample will be collected immediately after the primary sample has been collected. Duplicate samples will not influence any evaluations or conclusions; however, they will be used as a check on laboratory quality assurance. Non-Visible Pollutants The Contractor shall notify the QSP if non-visible pollutants are expected. Sample Documentation Procedures All original data documented on sample bottle identification labels, Chain of Custody forms (Appendix I), Sampling Activity Logs (Appendix L), and Construction Site Monitoring Inspection Form (Appendix N) will be recorded using waterproof ink. These will be considered accountable documents. If an error is made on an accountable document, the individual will make corrections by lining through the error and entering the correct information. The erroneous information will not be obliterated. All corrections will be initialed and dated. Copies of the Construction Site Monitoring Inspection Form are provided in Appendix N. Sampling and field analysis activities will be documented using the following: • Sample Bottle Identification Labels: Sampling personnel will attach an identification label to each sample bottle. At a minimum, the following information will be recorded on the label, as appropriate… · Project name • Project number • Unique sample identification number and location. [Project Number]-[Six digit sample collection date]-[Location] (Example: 0G5304-081801-Upstream). Quality assurance/quality control (QA/QC) samples shall be identified similarly using a unique sample number or designation (Example: 0G5304-081801-DUP1) · Collection date/time (No time applied to QA/QC samples) · Analysis constituent • Sampling Activity Logs: A log of sampling events will identify… SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 31 o Sampling date · Separate times for sample collection of upstream, downstream, run-on, and QA/QC samples recorded to the nearest minute · Unique sample identification number and location · Analysis constituent · Names of sampling personnel · Weather conditions (including precipitation amount) · Field analysis results · Other pertinent data · Chain of Custody (COC) forms (Appendix I): All samples to be analyzed by a laboratory will be accompanied by a COC form provided by the laboratory. Only the sample collectors will sign the COC form over to the lab. COC procedures will be strictly adhered to for QA/QC purposes. · Storm Water Quality Sampling Log (Appendix L): When applicable, the Contractor’s storm water inspector will document in the log that samples for sedimentation/siltation and/or turbidity were taken during a rain event. 4.7 REPORTING REQUIREMENTS AND RECORDS RETENTION Records of all monitoring inspections are required to remain onsite during the construction period and for a minimum of three years. Records shall include the following items: · The date, place, and time of facility inspections, sampling, visual observations (inspections), and/or measurements, including precipitation; · The individual(s) who performed the facility inspections, sampling, visual observation (inspections), and/or measurements; · The date and approximate time of analyses; · The individual(s) who performed the analyses; · A summary of all analytical results from the last three years, the method detection limits and reporting limits, and the analytical techniques or methods used; · Rain gauge readings from site inspections; · QA/QC records and results; · Non-storm water discharge inspections and visual observations (inspections) and storm water discharge visual observation records; · Visual observation and sample collection exemption records (Appendix O); and · The records of any corrective actions and follow-up activities that resulted from analytical results, visual observations (inspections), or inspections (Appendix K). Most reporting will occur in the Annual Report (Appendix P). 5.0 GENERAL PROCEDURES AND REQUIREMENTS 5.1 SWPPP AVAILABILITY AND IMPLEMENTATION The General Construction Permit Section XIV.C requires the SWPPP be available at the construction site during working hours while construction is occurring and shall be made available upon request by a State or Municipal inspector. When the original SWPPP is retained by a crewmember in a construction vehicle SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 32 and is not currently at the construction site, current copies of the BMPs and map/drawing will be left with the field crew and the original SWPPP shall be made available via a request by radio/telephone. 5.2 SWPPP AMENDMENTS The General Construction Permit Section XIV.A requires that SWPPP be amended or revised by a QSD and that the SWPPP include a listing of the date of initial preparation and the date of each amendment. Amendments must be signed by a QSD. All amendments are to be dated, attached to the SWPPP and logged in Appendix J. This SWPPP should be amended if any BMP is not installed according to the site map or if a BMP is changed due to ineffectiveness. The following items shall be in each amendment: 1.0 Who requested the amendment 2.0 The location of the proposed change 3.0 The reason for the change 4.0 The original BMP proposed, if any 5.0 The new BMP The amendments for this SWPPP, along with the required approval can be found in the SWPPP Amendment Log located in Appendix J. Any amendment to the SWPPP must be approved by the QSD. 5.1 RETENTION OF RECORDS The Construction General Permit Section I.J.69 and IV.G requires that all dischargers maintain a paper or electronic copy of all required records for three years from the date generated or date submitted, whichever is last. The records must be available at the construction site until construction is completed. The discharger shall furnish the RWQCB, SWRCB, OR USEPA, within a reasonable time, any requested information to determine compliance with the Construction General Permit. The final SWPPP shall be maintained for the time period indicated. 5.2 REPORTING REQUIREMENTS As per the Construction General Permit, a Legally Responsible Person must submit electronically all project/permit related documents (also known as Permit Registration Documents, or PRDs) for new projects commencing on or after July 1, 2010 prior to commencement of construction activities through the Storm water Multi- Application Report Tracking System (SMARTS). SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 33 5.3 REQUIRED NON-COMPLIANCE REPORTING Dan Parker-King shall give advanced notice to the RWQCB of any changes in the construction-related activity which may result in a non-compliance with the storm water requirement of the Construction General Permit. Examples of non-compliance include, but are not limited to: · Self-reporting of any discharge violations; · Discharges which contain a hazardous substance. 5.4 ANNUAL REPORT Hive Engineering. shall prepare and electronically submit an Annual Report via SMARTS no later than September 1 of each year. Reporting requirements include: · Sampling and analysis results including laboratory reports, analytical methods and reporting limits and change of custody forms · Corrective actions and compliance activities · Violations of the Construction General Permit · Date, time, place and name(s) of the inspector(s) for all sampling, inspections and field measurements · Visual observation and sample collections records · Training Documentations 5.5 CHANGES TO PERMIT COVERAGE The General Construction Permit Section II. C allows a permittee to reduce or increase the total acreage covered under the Construction General Permit when: · A portion of the project is complete · When conditions for termination of coverage have been met · When ownership of a portion of the project is sold to a different entity · When new acreage is added to the project 5.6 NOTICE OF TERMINATION The General Construction Permit Section II. D requires that within 90 days of when construction is complete or ownership has been transferred, the discharger shall electronically file a Notice of Termination (NOT), a final site map, and photos through the State Water Boards SMARTS system. Filing a NOT certifies that all Construction General Permit requirements have been met. The NOT is submitted when the construction project is complete and all Construction General Permit requirements for termination and final stabilization have been met. These requirements include: · The site will not pose any additional sediment discharge risk than it did prior to construction activity. SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 34 · All construction related equipment, materials and any temporary BMPs no longer needed are removed from the site. · Post-Construction storm water management measures are installed and a long-term maintenance plan that is designed for a minimum of 5-years has been developed. The NOT must demonstrate through photos, RUSLE results, or results of testing and analysis that the project meets all of the requirements of Section II.D.1 of the Construction General Permit by one of the following methods: · 70% final cover method (no computational proof required). · RUSLE/RUSLE2 method (computational proof required). · Custom Method SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 35 APPENDIX A NPDES CONSTRUCTION GENERAL PERMIT For the complete construction general permit, see separate binder onsite. SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 36 APPENDIX B BMPS FROM THE 2009 CALIFORNIA CONSTRUCTION BMP HANDBOOK SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 37 APPENDIX C LIST OF POTENTIAL NON-VISIBLE POLLUTANTS SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 38 Construction Activities and Associated Pollutants Phase Activity Associated Materials or Pollutants Pollutant Category(1) Grading and Land Development Vehicle and equipment use · Equipment operation · Equipment maintenance · Equipment washing · Equipment fueling Oil and Grease Soil preparation/amendments · Use of soil additives/amendments Nutrients Demolition Phase Removal of existing structures · Demolition of asphalt, concrete, masonry, framing, roofing, metal structures. Metals, Oil and Grease, Synthetic Organics Solid waste · Litter, trash and debris · Vegetation Gross Pollutants Landscaping and Site Stabilization Phase Planting / Vegetation Management · Vegetation control (pesticides/herbicides) · Planting · Plant maintenance · Vegetation removal Nutrients, Metals, Synthetic Organics (1) Categories per CASQA BMP Handbook (i.e., Sediment, Nutrients, Bacteria and Viruses, Oil and Grease, Metals, Synthetic Organics, Pesticides, Gross Pollutants, and Vector Production) SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 39 APPENDIX D SWPPP CONTRACTOR/SUBCONTRACTOR AGREEMENTS Agreements will be provided at a later date. SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 40 APPENDIX E CONTRACTOR/SUBCONTRACTOR INFORMATION Contractor(s) and subcontractor(s) will be named later. SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 41 APPENDIX F SWPPP TRAINING LOG SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 42 Trained Contractor Personnel Log Stormwater Management Training Log and Documentation Project Name: WDID #: 3 40C399332 Stormwater Management Topic: (check as appropriate)  Erosion Control  Wind Erosion Control  Non-Stormwater Management Stormwater Sampling  Sediment Control Tracking Control  Waste Management and Materials Pollution Control Objective: Location: Date: Instructor: Telephone Course Length Attendee Roster (Attach additional forms if necessary) Name Company Phone As needed, add proof of external training (e.g., course completion certificates, credentials for QSP, QSD). SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 43 APPENDIX G SITE MAP EROSION CONTROL PLAN SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 44 APPENDIX H RISK LEVEL CALCULATIONS SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 45 A B C 1 Sediment Risk Factor Worksheet Entry 2 A) R Factor 3 Analyses of data indicated that when factors other than rainfall are held constant, soil loss is directly proportional to a rainfall factor composed of total storm kinetic energy (E) times the maximum 30-min intensity (I30) (Wischmeier and Smith, 1958). The numerical value of R is the average annual sum of EI30 for storm events during a rainfall record of at least 22 years. "Isoerodent" maps were developed based on R values calculated for more than 1000 locations in the Western U.S. Refer to the link below to determine the R factor for the project site. 4 http://cfpub.epa.gov/npdes/stormwater/LEW/lewCalculator.cfm 5 R Factor Value 3.3 6 B) K Factor (weighted average, by area, for all site soils) 7 The soil-erodibility factor K represents: (1) susceptibility of soil or surface material to erosion, (2) transportability of the sediment, and (3) the amount and rate of runoff given a particular rainfall input, as measured under a standard condition. Fine- textured soils that are high in clay have low K values (about 0.05 to 0.15) because the particles are resistant to detachment. Coarse-textured soils, such as sandy soils, also have low K values (about 0.05 to 0.2) because of high infiltration resulting in low runoff even though these particles are easily detached. Medium-textured soils, such as a silt loam, have moderate K values (about 0.25 to 0.45) because they are moderately susceptible to particle detachment and they produce runoff at moderate rates. Soils having a high silt content are especially susceptible to erosion and have high K values, which can exceed 0.45 and can be as large as 0.65. Silt-size particles are easily detached and tend to crust, producing high rates and large volumes of runoff. Use Site- specific data must be submitted. 8 Site-specific K factor guidance 9 K Factor Value 0.24 10 C) LS Factor (weighted average, by area, for all slopes) 11 The effect of topography on erosion is accounted for by the LS factor, which combines the effects of a hillslope-length factor, L, and a hillslope-gradient factor, S. Generally speaking, as hillslope length and/or hillslope gradient increase, soil loss increases. As hillslope length increases, total soil loss and soil loss per unit area increase due to the progressive accumulation of runoff in the downslope direction. As the hillslope gradient increases, the velocity and erosivity of runoff increases. Use the LS table located in separate tab of this spreadsheet to determine LS factors. Estimate the weighted LS for the site prior to construction. 12 LS Table 13 LS Factor Value 1.25 14 15 Watershed Erosion Estimate (=RxKxLS) in tons/acre 0.99 16 Site Sediment Risk Factor LOW 17 Low Sediment Risk: < 15 tons/acre 18 Medium Sediment Risk: >=15 and <75 tons/acre 19 High Sediment Risk: >= 75 tons/acre 20 SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 46 Receiving Water (RW) Risk Factor Worksheet Entry Score A. Watershed Characteristics yes/no A.1. Does the disturbed area discharge (either directly or indirectly) to a 303(d)-listed waterbody impaired by sediment (For help with impaired waterbodies please visit the link below) or has a USEPA approved TMDL implementation plan for sediment?: YES HIGH http://www.waterboards.ca.gov/water_issues/programs/tmdl/integrated2010.shtml OR A.2. Does the disturbed area discharge to a waterbody with designated beneficial uses of SPAWN & COLD & MIGRATORY? (For help please review the appropriate Regional Board Basin Plan) http://www.waterboards.ca.gov/waterboards_map.shtml Region 1 Basin Plan Region 2 Basin Plan Region 3 Basin Plan Region 4 Basin Plan Region 5 Basin Plan Region 6 Basin Plan Region 7 Basin Plan Region 8 Basin Plan Region 9 Basin Plan Receiving Water Risk Sediment Risk Low Medium High Low Level 1 Level 2 High Level 2 Level 3 SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 47 APPENDIX I CHAIN-OF-CUSTODY (COC) FORM SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering DESTINATION LAB: ATTN: ADDRESS: Office Phone: Cell Phone: REQUESTED ANALYSIS Notes: SAMPLED BY: Contact: Facility Name Client Sample ID Sample Date Sample Time Sample Matrix Container # Type Pres. SENDER COMMENTS: RELINQUISHED BY Signature: Print: Company: Date: TIME: LABORATORY COMMENTS: RECEIVED BY Signature: Print: Company: Date: TIME: SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering APPENDIX J SWPPP AMENDMENT(S) & LOG SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering Amendment Log Facility Name: Cultural Arts district Parking Structure Waste Discharge Identification (WDID): 565511 Amendment No. Date Page and Section No. Requested By Brief Description of Amendment; include reason for change, site location, and BMP modifications. Prepared and Approved By 1 8/31/23 2.1 C.1.0 DPK Update risk level based on proximity to waterbody. Updated detail for inlet protection based on phasing DPK SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering APPENDIX K CORRECTIVE ACTION LOG SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering EXAMPLE Corrective Action Log Project Name: ______________________________________________ NPDES ID Number: __________________________________________ Section A – Individual Completing this Log Name: Title: Company Name: Email: Address: Phone Number: Section B – Details of the Problem (CGP Part 5.4.1.a) Complete this section within 24 hours of discovering the condition that triggered corrective action. Date problem was first identified: Time problem was first identified: What site conditions triggered this corrective action? (Check the box that applies. See instructions for a description of each triggering condition (1 thru 6).)  ☐ 1 ☐ 2 ☐ 3 ☐ 4 ☐ 5a ☐ 5b ☐ 6 Specific location where problem identified: Provide a description of the specific condition that triggered the need for corrective action and the cause (if identifiable): Section C – Corrective Action Completion (CGP Part 5.4.1.b) Complete this section within 24 hours after completing the corrective action. For site condition # 1, 2, 3, 4, or 6 (those not related to a dewatering discharge) confirm that you met the following deadlines (CGP Part 5.2.1): ☐ Immediately took all reasonable steps to address the condition, including cleaning up any contaminated surfaces so the material will not discharge in subsequent storm events. AND ☐ Completed corrective action by the close of the next business day, unless a new or replacement control, or significant repair, was required. OR ☐ Completed corrective action within seven (7) calendar days from the time of discovery because a new or replacement control, or significant repair, was necessary to complete the installation of the new or modified control or complete the repair. OR ☐ It was infeasible to complete the installation or repair within 7 calendar days from the time of discovery. Provide the following additional information: Explain why 7 calendar days was infeasible to complete the installation or repair: SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering Provide your schedule for installing the stormwater control and making it operational as soon as feasible after the 7 calendar days: For site condition # 5a, 5b, or 6 (those related to a dewatering discharge), confirm that you met the following deadlines: ☐ Immediately took all reasonable steps to minimize or prevent the discharge of pollutants until a solution could be implemented, including shutting off the dewatering discharge as soon as possible depending on the severity of the condition taking safety considerations into account. ☐ Determined whether the dewatering controls were operating effectively and whether they were causing the conditions. ☐ Made any necessary adjustments, repairs, or replacements to the dewatering controls to lower the turbidity levels below the benchmark or remove the visible plume or sheen. Describe any modification(s) made as part of corrective action: (Insert additional rows below if applicable) Date of completion: SWPPP update necessary? If yes, date SWPPP was updated: 1. ☐ Yes ☐ No 2. ☐ Yes ☐ No Section D - Signature and Certification (CGP Part 5.4.2) “I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information contained therein. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information contained is, to the best of my knowledge and belief, true, accurate, and complete. I have no personal knowledge that the information submitted is other than true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.” MANDATORY: Signature of Operator or “Duly Authorized Representative:” Signature: Date: Printed Name: Affiliation: OPTIONAL: Signature of Contractor or Subcontractor Signature: Date: Printed Name: Affiliation: SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering General Instructions This Corrective Action Log Template is provided to assist you creating a corrective action log that complies with the minimum reporting requirements of Part 5.4 of the EPA’s Construction General Permit (CGP). For each triggering condition on your site, you will need to fill out a separate corrective action log. The entire form must be completed to be compliant with the requirements of the permit. (Note: In Section C, if you do not need the number of rows provided in the corrective action log, you may delete these or cross them off. Alternatively, if you need more space to describe any modifications, you may insert additional rows in the electronic version of this form or use the bottom of the page in the field version of this form.) If you are covered under a State CGP, this template may be helpful in developing a log that can be used for that permit; however, you will likely need to modify this form to meet the specific requirements of any State-issued permit. If your permitting authority requires you to use a specific corrective action log, you should not use this template. Instructions for Section A Individual completing this form Enter the name of the person completing this log. Include the person’s contact information (title, affiliated company name, address, email, and phone number). Instructions for Section B You must complete Section B within 24 hours of discovering the condition that triggered corrective action. (CGP Part 5.4) When was the problem first discovered? Specify the date and time when the triggering condition was first discovered. What site conditions triggered this corrective action? (CGP Parts 5.1 and 5.3) Check the box corresponding to the numbered triggering condition below that applies to your site. 1. A stormwater control needs a significant repair or a new or replacement control is needed, or, in accordance with Part Error! Reference source not found., you find it necessary to repeatedly (i.e., 3 or more times) conduct the same routine maintenance fix to the same control at the same location (unless you document in your inspection report under Part Error! Reference source not found. that the specific reoccurrence of this same problem should still be addressed as a routine maintenance fix under Part Error! Reference source not found.); 2. A stormwater control necessary to comply with the requirements of this permit was never installed, or was installed incorrectly; 3. Your discharges are not meeting applicable water quality standards; 4. A prohibited discharge has occurred (see Part 1.3); 5. During discharge from site dewatering activities: a. The weekly average of your turbidity monitoring results exceeds the 50 NTU benchmark (or alternate benchmark if approved by EPA pursuant to Part Error! Reference source not found.); or b. You observe or you are informed by EPA, State, or local authorities of the presence of any of the following at the point of discharge to a receiving water flowing through or immediately adjacent to your site and/or to constructed or natural site drainage features or storm drain inlets: · sediment plume · suspended solids · unusual color · presence of odor SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering · decreased clarity · presence of foam · visible sheen on the water surface or visible oily deposits on the bottom or shoreline of the receiving water 6. EPA requires corrective action as a result of permit violations found during an inspection carried out under Part 4.8. Provide a description of the problem (CGP Part 5.4.1.a) Provide a summary description of the condition you found that triggered corrective action, the cause of the problem (if identifiable), and the specific location where it was found. Be as specific as possible about the location; it is recommended that you refer to a precise point on your site map. Instructions for Section C You must complete Section C within 24 hours after completing the correction action. (CGP Part 5.4) Deadlines for completing corrective action for condition # 1, 2, 3, 4, or 6 (if not relating to a dewatering discharge) (CGP Part 5.2.1) Check the box to confirm that you met the deadlines that apply to each triggering condition. You are always required to check the first box (i.e., Immediately took all reasonable steps to address the condition, including cleaning up any contaminated surfaces so the material will not discharge in subsequent storm events.). Only one of the next three boxes should be checked depending on the situation that applies to this corrective action. Check the second box if the corrective action for this particular triggering condition does not require a new or replacement control, or a significant repair. These actions must be completed by the close of the next business day from the time of discovery of the condition. Check the third box if the corrective action for this particular triggering condition requires a new or replacement control, or a significant repair. These actions must be completed by no later than seven calendar days from the time of discover of the condition. Check the fourth box if the corrective action for this particular triggering condition requires a new or replacement control, or a significant repair, and if it is infeasible to complete the work within seven calendar days. Additionally, you will need to fill out the table below the checkbox that requires: 1. An explanation as to why it was infeasible to complete the installation or repair within seven calendar days of discovering the condition. 2. Provide the schedule you will adhere to for installing the stormwater control and making it operational as soon as feasible after the seventh day following discovery. Note: Per Part 5.2.1.c, where these actions result in changes to any of the stormwater controls or procedures documented in your SWPPP, you must modify your SWPPP accordingly within seven calendar days of completing this work. Deadlines for completing corrective action for condition # 5a, 5b, or 6 related to a dewatering discharge (CGP Part 5.2.2) These deadlines apply to conditions relating to construction dewatering activities. Check the box to confirm that you met the deadlines that apply to each triggering condition. You are required to check all of the boxes in this section to indicate your compliance with the corrective action deadlines. List of modification(s) to correct problem Provide a list of modifications you completed to correct the problem. Date of completion Enter the date you completed the modification. The work must be completed by the deadline you indicated above. SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering SWPPP update necessary? Check “Yes” or “No” to indicate if a SWPPP update is necessary consistent with Part 7.4.1.a in order to reflect changes implemented at your site. If “Yes,” then enter the date you updated your SWPPP. The SWPPP updates must be made within seven calendar days of completing a corrective action. (CGP Part 5.2.1.c) Instructions for Section D Each corrective action log entry must be signed and certified following completion of Section D to be considered complete. (CGP Part 5.4.2) Operator or “Duly Authorized Representative” – MANDATORY (CGP Appendix G Part G.11.2 and CGP Appendix H Section X) At a minimum, the corrective action log must be signed by either (1) the person who signed the NOI, or (2) a duly authorized representative of that person. The following requirements apply: If the signatory will be the person who signed the NOI for permit coverage, as a reminder, that person must be one of the following types of individuals: · For a corporation: By a responsible corporate officer. For the purpose of this subsection, a responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy- or decision-making functions for the corporation, or (ii) the manager of one or more manufacturing, production, or operating facilities, provided, the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long term environmental compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. · For a partnership or sole proprietorship: By a general partner or the proprietor, respectively. · For a municipality, State, Federal, or other public agency: By either a principal executive officer or ranking elected official. For purposes of this subsection, a principal executive officer of a Federal agency includes (i) the chief executive officer of the agency, or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency (e.g., Regional Administrator of EPA). If the signatory will be a duly authorized representative, the following requirements must be met: · The authorization is made in writing by the person who signed the NOI (see above); · The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity such as the position of plant manager, operator of a well or a well field, superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative may thus be either a named individual or any individual occupying a named position); and · The signed and dated written authorization is included in the SWPPP. A copy must be submitted to EPA, if requested. Sign, date and print your name and affiliation. SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering Contractor or Subcontractor - OPTIONAL Where you rely on a contractor or subcontractor to complete this log and the associated corrective action, you should consider requiring the individual(s) to sign and certify each log entry. Note that this does not relieve you, the permitted operator, of the requirement to sign and certify the log as well. If applicable, sign, date, and print your name and affiliation. Recordkeeping Logs must be retained for at least 3 years from the date your permit coverage expires or is terminated. (CGP Part 5.4.4) Keep copies of your signed corrective action log entries at the site or at an easily accessible location so that it can be made immediately available at the time of an on-site inspection or upon request by EPA. (CGP Part 5.4.3) Include a copy of the corrective action log in your SWPPP. (CGP Part 7.2.7.e) Note While EPA has made every effort to ensure the accuracy of all instructions contained in this template, it is the permit, not this template, that determines the actual obligations of regulated construction stormwater discharges. In the event of a conflict between this template and any corresponding provision of the CGP, you must abide by the requirements in the permit. EPA welcomes comments on this Corrective Action Log Template at any time and will consider those comments in any future revision. You may contact EPA for CGP-related inquiries at cgp@epa.gov SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering APPENDIX L SAMPLING LOG SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering Visual Observation Log - Monthly Date and Time of Inspection: Report Date: Facility Name: Weather Antecedent Conditions (last 48 hours): Current Weather: NSWD Observations Were any authorized non-stormwater discharges observed? Yes □ No □ Were any unauthorized non-stormwater discharges observed? Yes □ No □ If yes to either, identify source: Outdoor Industrial Equipment and Storage Area Observations Complete Monthly BMP Inspection Report Yes □ No □ Drainage Area 1: Were any deficiencies or any other potential source of industrial pollutants observed? Yes □ No □ Drainage Area 2: Were any deficiencies or any other potential source of industrial pollutants observed? Yes □ No □ Drainage Area 3: Were any deficiencies or any other potential source of industrial pollutants observed? Yes □ No □ If yes to any, describe: Exception Documentation (explanation required if inspection could not be conducted). Inspector Information Inspector Name: Inspector Title: Signature: Date: SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering Visual Observation Log – Sampling Events Date and Time of Inspection: Report Date: Facility Name: Weather Antecedent Conditions (last 48 hours): Weather: Precipitation Total: Predicted % chance of rain: Estimate storm beginning: (date and time) Estimate storm duration: (hours) Estimate time since last storm: (days or hours) Rain gauge reading: (inches) Sampling Event Observations Observations: If yes identify location and observe drainage area to identify probable cause Odors Yes □ No □ Floating material Yes □ No □ Suspended Material Yes □ No □ Sheen Yes □ No □ Discolorations Yes □ No □ Turbidity Yes □ No □ NSWD Observations Were any authorized non-stormwater discharges observed? Yes □ No □ Were any unauthorized non-stormwater discharges observed? Yes □ No □ If yes to either, identify source Drainage Area Observations Drainage Area Deficiencies Noted SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering Exception Documentation (explanation required if inspection could not be conducted). Inspector Information Inspector Name: Inspector Title: Signature: Date: SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering Sampling Log Facility Name: Date: Time Start: Sampler Name: Field Meter Calibration pH Meter ID No./Description: Calibration Date/Time: Field pH Measurements Discharge Location Identifier pH Time Samples Collected Discharge Location Identifier Constituent Time Oil and Grease Total Suspended Solids Additional Sampling Notes: Time End: SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering APPENDIX M ANNUAL FEE STATEMENT AND RECIEPTS SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering FOR INFORMATION ONLY. SEE THE WATERBOARDS.CA.GOV WEBSITE FOR FEES AND STIPULATONS. CALIFORNIA CODE OF REGULATIONS TITLE 23. Division 3. Chapter 9. Waste Discharge Reports and Requirements Article 1. Fees Section 2200. Annual Fee Schedules. Each person for whom waste discharge requirements have been prescribed pursuant to Section 13263 of the Water Code shall submit, to the state board, an annual fee in accordance with the following schedules. The fee shall be submitted for each waste discharge requirement order issued to that person.1 (a) The annual fees for persons issued waste discharge requirements (WDRs), except as provided in subdivisions (a)(3), (a)(4), (b), and (c), shall be based on the discharge’s threat to water quality (TTWQ) and complexity (CPLX) rating according to the following fee schedule, plus applicable surcharge(s). SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering Oil and gas produced water storage and disposal facilities regulated by waste discharge requirements are subject to a surcharge per barrels of waste water discharged in the prior 12 months according to the following schedule: TTWQ & CPLX Rating No Barrels 1 to 999,999 Barrels 1,000 SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering APPENDIX N CONSTRUCTION SITE MONITORING INSPECTION FORM SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering BMP INSPECTION REPORT Date and Time of Inspection: Date Report Written: Inspection Type: (Circle one) Weekly Complete Parts I,II,III and VII Pre-Storm Complete Parts I,II,III,IV and VII During Rain Event Complete Parts I, II, III, V, and VII Post-Storm Complete Parts I,II,III,VI and VII Part I. General Information Site Information Construction Site Name: Construction stage and completed activities: Approximate area of site that is exposed: Photos Taken: (Circle one) Yes No Photo Reference IDs: Weather Estimate storm beginning: (date and time) Estimate storm duration: (hours) Estimate time since last storm: (days or hours) Rain gauge reading and location: (in) Is a “Qualifying Event” predicted or did one occur (i.e., 0.5” rain with 48-hrs or greater between events)? (Y/N) If yes, summarize forecast: Exemption Documentation (explanation required if inspection could not be conducted). Visual inspections are not required outside of business hours or during dangerous weather conditions such as flooding or electrical storms. Inspector Information Inspector Name: Inspector Title: Signature: Date: SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering Part II. BMP Observations. Describe deficiencies in Part III. Minimum BMPs for Risk Level 2 Sites Failures or other short comings (yes, no, N/A) Action Required (yes/no) Action Implemented (Date) Good Housekeeping for Construction Materials Inventory of products (excluding materials designed to be outdoors) Stockpiled construction materials not actively in use are covered and bermed All chemicals are stored in watertight containers with appropriate secondary containment, or in a completely enclosed storage shed Construction materials are minimally exposed to precipitation BMPs preventing the off-site tracking of materials are implemented and properly effective Good Housekeeping for Waste Management Wash/rinse water and materials are prevented from being disposed into the storm drain system Portable toilets are contained to prevent discharges of waste Sanitation facilities are clean and with no apparent for leaks and spills Equipment is in place to cover waste disposal containers at the end of business day and during rain events Discharges from waste disposal containers are prevented from discharging to the storm drain system / receiving water Stockpiled waste material is securely protected from wind and rain if not actively in use Procedures are in place for addressing hazardous and non- hazardous spills Appropriate spill response personnel are assigned and trained Equipment and materials for cleanup of spills is available onsite Washout areas (e.g., concrete) are contained appropriately to prevent discharge or infiltration into the underlying soil Good Housekeeping for Vehicle Storage and Maintenance Measures are in place to prevent oil, grease, or fuel from leaking into the ground, storm drains, or surface waters All equipment or vehicles are fueled, maintained, and stored in a designated area with appropriate BMPs Vehicle and equipment leaks are cleaned immediately and disposed of properly SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering Part II. BMP Observations Continued. Describe deficiencies in Part III. Minimum BMPs for Risk Level 2 Sites Adequately designed, implemented and effective (yes, no, N/A) Action Required (yes/no) Action Implemented (Date) Good Housekeeping for Landscape Materials Stockpiled landscape materials such as mulches and topsoil are contained and covered when not actively in use Erodible landscape material has not been applied 2 days before a forecasted rain event or during an event Erodible landscape materials are applied at quantities and rates in accordance with manufacturer recommendations Bagged erodible landscape materials are stored on pallets and covered Good Housekeeping for Air Deposition of Site Materials Good housekeeping measures are implemented onsite to control the air deposition of site materials and from site operations Non-Stormwater Management Non-Stormwater discharges are properly controlled Vehicles are washed in a manner to prevent non-stormwater discharges to surface waters or drainage systems Streets are cleaned in a manner to prevent unauthorized non- stormwater discharges to surface waters or drainage systems. Erosion Controls Wind erosion controls are effectively implemented Effective soil cover is provided for disturbed areas inactive (i.e., not scheduled to be disturbed for 14 days) as well as finished slopes, open space, utility backfill, and completed lots The use of plastic materials is limited in cases when a more sustainable, environmentally friendly alternative exists. Sediment Controls Perimeter controls are established and effective at controlling erosion and sediment discharges from the site Entrances and exits are stabilized to control erosion and sediment discharges from the site Sediment basins are properly maintained Linear sediment control along toe of slope, face of slope an at grade breaks (Risk Level 2 & 3 Only) Limit construction activity to and from site to entrances and exits that employ effective controls to prevent offsite tracking (Risk Level 2 & 3 Only) SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering Ensure all storm, drain inlets and perimeter controls, runoff control BMPs and pollutants controls at entrances and exits are maintained and protected from activities the reduce their effectiveness (Risk Level 2 & 3 Only) Inspect all immediate access roads daily (Risk Level 2 & 3 Only) Run-On and Run-Off Controls Run-on to the site is effectively managed and directed away from all disturbed areas. Other Are the project SWPPP and BMP plan up to date, available on-site and being properly implemented? Part III. Descriptions of BMP Deficiencies Deficiency Repairs Implemented: Note - Repairs must begin within 72 hours of identification and, complete repairs as soon as possible. Start Date Action 1. 2. 3. 4. Part IV. Additional Pre-Storm Observations. Note the presence or absence of floating and suspended materials, sheen, discoloration, turbidity, odors, and source(s) of pollutants(s). Yes, No, N/A Do stormwater storage and containment areas have adequate freeboard? If no, complete Part III. Are drainage areas free of spills, leaks, or uncontrolled pollutant sources? If no, complete Part VII and describe below. Notes: Are stormwater storage and containment areas free of leaks? If no, complete Parts III and/or VII and describe below. SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering Part V. Additional During Storm Observations. If BMPs cannot be inspected during inclement weather, list the results of visual inspections at all relevant outfalls, discharge points, and downstream locations. Note odors or visible sheen on the surface of discharges. Complete Part VII (Corrective Actions) as needed. Outfall, Discharge Point, or Other Downstream Location Location Description Location Description Location Description Location Description Location Description Location Description Location Description Location Description Part VI. Additional Post-Storm Observations. Visually observe (inspect) stormwater discharges at all discharge locations within two business days (48 hours) after each qualifying rain event, and observe (inspect) the discharge of stored or contained stormwater that is derived from and discharged subsequent to a qualifying rain event producing precipitation of ½ inch or more at the time of discharge. Complete Part VII (Corrective Actions) as needed. Discharge Location, Storage or Containment Area Visual Observation Notes: SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering Part VII. Additional Corrective Actions Required. Identify additional corrective actions not included with BMP Deficiencies (Part III) above. Note if SWPPP change is required. Required Actions Implementation Date SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering APPENDIX O RAIN EVENT ACTION PLAN SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering Rain Event Action Plan (REAP) Date of REAP WB DID Number: Date Rain Predicted to Occur: Predicted % chance of rain: Predicted Rain Event Triggered Actions Below is a list of suggested actions and items to review for this project. Each active Trade should check all material storage areas, stockpiles, waste management areas, vehicle and equipment storage and maintenance, areas of active soil disturbance, and areas of active work to ensure the proper implementation of BMPs. Project-wide BMPs should be checked and cross- referenced to the BMP progress map. Trade or Activity Suggested action(s) to perform / item(s) to review prior to rain event  Information & Scheduling  Inform trade supervisors of predicted rain  Check scheduled activities and reschedule as needed  Alert erosion/sediment control provider  Alert sample collection contractor (if applicable)  Schedule staff for extended rain inspections  Check Erosion and Sediment Control (ESC) material stock  Review BMP progress map  Other:    Material storage areas  Material under cover or in sheds (ex: treated woods and metals)  Perimeter control around stockpiles  Other:    Waste management areas  Dumpsters closed  Drain holes plugged  Recycling bins covered  Sanitary stations bermed and protected from tipping  Other:    Trade operations  Exterior operations shut down for event (e.g., no concrete pours or paving)  Soil treatments (e.g., fertilizer) ceased within 24 hours of event  Materials and equipment (e.g., tools) properly stored and covered  Waste and debris disposed in covered dumpsters or removed from site  Trenches and excavations protected  Perimeter controls around disturbed areas  Fueling and repair areas covered and bermed  Other:    Site ESC BMPs  Adequate capacity in sediment basins and traps  Site perimeter controls in place  Catch basin and drop inlet protection in place and cleaned  Temporary erosion controls deployed  Temporary perimeter controls deployed around disturbed areas and stockpiles  Roads swept; site ingress and egress points stabilized  Other:    Concrete rinse out area  Adequate capacity for rain  Wash-out bins covered  Other:    Spill and drips  All incident spills and drips, including paint, stucco, fuel, and oil cleaned  Drip pans emptied  Other:  SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering  Other / Discussion / Diagrams              Attach a printout of the weather forecast from the NOAA website to the REAP. I certify under penalty of law that this Rain Event Action Plan (REAP) will be performed in accordance with the General Permit by me or under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Date: Qualified SWPPP Practitioner (Use ink please) 132 From:Dustin Merrick <dmerrick@rinconconsultants.com> Sent:Tuesday, August 22, 2023 4:56 PM To:Kelsey Shaffer; rstefanek@kitchell.com; Kacsinta, Madeline; Hannah Haas Cc:Lorie Laguna; Lisa Lathrop; Haylee Bautista; Mona Tucker Subject:RE: [EXT] City of SLO Parking Structure Attachments:PalmNipomo_FEIR_CR and TCR.pdf; Phase 1B-2 Mitigation and Monitoring Plan.pdf; Cultural Resources Inventory Report 2011.pdf; Cultural Arts XPI Report.pdf This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Hi Kelsey, I believe Madeline followed up with you, but I wanted to provide you with the documents you requested. Attached are the Phase I and extended Phase I cultural resources reports. I’m also attaching the relevant Environmental Impact Report and monitoring plan for the current phase of the project. We did indeed monitor the previous utilities undergrounding phase, which part of a different CEQA document relating to utility improvements throughout the City. We did observe some materials related to a late 18 th century house. The features included refuse deposit, two brick foundations, and a red-brick-walled fireplace. Based on archival research, we believe that these features are related to a house built by Dr. Thomas Norton and was catastrophically burned and demolished in the 1950s. Feel free to let me know if you have any questions or there’s anything else I can assist with. Dustin Merrick, MA, RPA, Archaeologist/Project Manager Rincon Consultants, Inc. 805-762-4064 Direct 805-644-4455 Main dmerrick@rinconconsultants.com From: Kelsey Shaffer < Sent: Friday, August 11, 2023 2:00 PM To: Dustin Merrick <dmerrick@rinconconsultants.com>; rstefanek@kitchell.com; MKacsint@slocity.org; Hannah Haas <hhaas@rinconconsultants.com> Cc: ; Lisa Lathrop < ; Haylee Bautista < ; Mona Tucker < Subject: Re: [EXT] City of SLO Parking Structure 133 CAUTION: This email originated from outside of Rincon Consultants. Be cautious before clicking on any links, or opening any attachments, until you are confident that the content is safe . Hi Dustin, I hope you are doing well and enjoying your Friday! Our tribe wanted to follow up on the new SLO Parking Structure. Is it possible to send the monitoring plan and arch reports for this project? In the past we had mentioned that this was a sensitive area of interest to the tribe, and having worked in the area before fi nding both cultural and historic deposits we would like to have ytt monitoring for the ground disturbance. We understand that phase one included trenching for underground utilities and was already started and possibly completed? Can you give us a summary of any findings during that work? Thank you very much, we look forward to hearing from you! Have a good weekend. au’au’ Kelsey Shaffer Sent from my iPhone On Aug 11, 2023, at 1:38 PM, Mona Tucker < wrote: FYI ---------- Forwarded message --------- From: Dustin Merrick <dmerrick@rinconconsultants.com> Date: Thu, May 4, 2023 at 2:47 PM Subject: RE: [EXT] City of SLO Parking Structure To: Mona Tucker < Cc: Ryan Stefanek <rstefanek@kitchell.com>, Kacsinta, Madeline <MKacsint@slocity.org>, Hannah Haas <hhaas@rinconconsultants.com> Hi Mona, Sure thing! I’ll get you everything I can before the end of day tomorrow. 134 Best, Dustin Merrick, MA, RPA, Archaeologist/Project Manager Rincon Consultants, Inc. 805-762-4064 Direct 805-644-4455 Main dmerrick@rinconconsultants.com From: Mona Tucker < Sent: Thursday, May 4, 2023 12:22 PM To: Dustin Merrick <dmerrick@rinconconsultants.com> Subject: [EXT] City of SLO Parking Structure CAUTION: This email originated from outside of Rincon Consultants. Be cautious before clicking on any links, or opening any attachments, until you are confident that the content is safe . Hello Dustin: I would like to see the monitoring plan and to be in place to fulfill monitoring needs. I would also like to see the arch reports for the location and the City of SLO should be sending that request to you soon. 135 Thank you, Mona Mona Tucker -- Mona Olivas Tucker, Chair yak tityu tityu yak tiłhini Northern Chumash Tribe San Luis Obispo County and Region yttnorthernchumashtribe.com/ Dustin Merrick, MA, RPA, Archaeologist/Project Manager Rincon Consultants, Inc. 805-762-4064 Direct 805-644-4455 Main dmerrick@rinconconsultants.com Palm Nipomo Parking Structure Project Final Environmental Impact Report SCH#2017051011 prepared by City of San Luis Obispo Public Works Department 919 Palm Street San Luis Obispo, California 93401 Contact: Scott Lee, Parking Manager prepared with the assistance of Rincon Consultants, Inc. 1530 Monterey Street, Suite D San Luis Obispo, California 93401 July 2018 Volume I Palm Nipomo Parking Structure Project Final Environmental Impact Report SCH#2017051011 prepared by City of San Luis Obispo Public Works Department 919 Palm Street San Luis Obispo, California 93401 Contact: Scott Lee, Parking Manager prepared with the assistance of Rincon Consultants, Inc. 1530 Monterey Street, Suite D San Luis Obispo, California 93401 July 2018 Volume I This report prepared on 50% recycled paper with 50% post-consumer content. Table of Contents Final Environmental Impact Report i Table of Contents Executive Summary ................................................................................................................................ 1 Project Synopsis .................................................................................................................. 1 Project Alternativ ................................................................................................................ 3 Significant and Unavoidable Impacts .................................................................................. 5 1 Introduction ..................................................................................................................................19 1.1 Environmental Impact Report Background.......................................................................19 1.2 Purpose and Legal Authority .............................................................................................19 1.3 Scope and Content ............................................................................................................20 1.4 Lead, Responsible, and Trustee Agencies .........................................................................21 1.5 Environmental Review Process .........................................................................................21 2 Project Description .......................................................................................................................25 2.1 Project Applicant ...............................................................................................................25 2.2 Lead Agency Contact Person .............................................................................................25 2.3 Project Location ................................................................................................................25 2.4 Existing Site Characteristics ..............................................................................................25 Setting ...............................................................................................................29 2.4.1 Current Land Use Designation and Zoning .......................................................29 2.4.2 Surrounding Land Uses .....................................................................................29 2.4.3 2.5 Project Characteristics ......................................................................................................30 Project Objectives .............................................................................................37 2.5.1 Required Approvals ..........................................................................................37 2.5.2 3 Environmental Setting ..................................................................................................................39 3.1 Regional Setting ................................................................................................................39 3.2 Project Site Setting ............................................................................................................39 3.3 Cumulative Development .................................................................................................40 4 Environmental Impact Analysis ....................................................................................................41 4.1 Aesthetics ..........................................................................................................................43 Setting ...............................................................................................................43 4.1.1 4.1.2 Impact Analysis .................................................................................................53 4.2 Cultural and Tribal Cultural Resources..............................................................................59 Setting ...............................................................................................................59 4.2.1 Impact Analysis .................................................................................................69 4.2.2 4.3 Noise .................................................................................................................................81 Setting ...............................................................................................................81 4.3.1 Impact Analysis .................................................................................................87 4.3.2 4.4 Transportation ................................................................................................................101 4.4.1 Setting .............................................................................................................101 4.4.2 Impact Analysis ...............................................................................................112 City of San Luis Obispo Palm Nipomo Parking Structure Project ii 5 Issues Addressed in the Initial Study ..........................................................................................127 5.1 Impacts Less than Significant with Mitigation ................................................................127 5.2 Issues with Less than Significant Impact or No Impact ...................................................133 6 Other CEQA Required Discussions ..............................................................................................145 6.1 Growth Inducing Effects ..................................................................................................145 Population Growth .........................................................................................145 6.1.1 Economic Growth ...........................................................................................145 6.1.2 Precedent Setting Action ................................................................................146 6.1.3 Development of Isolated or Adjacent Area of Open Space ............................146 6.1.4 6.1.5 Removal of an Impediment to Growth ...........................................................146 6.2 Energy Use and Conservation .........................................................................................146 Existing Conditions ..........................................................................................147 6.2.1 Analysis of Project Impacts and Determination of Significance .....................151 6.2.2 6.3 Significant Unavoidable Effects .......................................................................................154 6.4 Significant Irreversible Environmental Effects ................................................................154 7 Alternatives .................................................................................................................................155 7.1 Alternatives Considered but Eliminated from Further Discussion .................................155 7.2 Alternative 1: No Project/No Development....................................................................156 7.2.1 Alternative Description ...................................................................................156 7.2.2 Impact Analysis ...............................................................................................156 7.3 Alternative 2: Project Plus Live/Work Units ....................................................................156 7.3.1 Alternative Description ...................................................................................156 7.3.2 Impact Analysis ...............................................................................................157 7.4 Alternative 3: Parking Structure, Commercial and Residential ......................................158 7.4.1 Alternative Description ...................................................................................158 7.4.2 Impact Analysis ...............................................................................................158 7.5 Alternative 4: Historic Resource Preservation ................................................................160 7.5.1 Alternative Description ...................................................................................160 7.5.2 Impact Analysis ...............................................................................................160 7.6 Environmentally Superior Alternative ............................................................................161 8 References ..................................................................................................................................163 8.1 Bibliography ....................................................................................................................163 8.2 List of Preparers ..............................................................................................................166 9 Response to Comments on the Draft EIR ...................................................................................167 9.1 Responses to Public Testimony on the Draft EIR ............................................................167 9.2 Responses to Written Comments on the Draft EIR ........................................................175 Tables Table 1 Project Characteristics ........................................................................................................ 2 Table 2 Class I, Significant and Unavoidable Environmental Impacts ............................................. 6 Table 3 Class II, Significant but Mitigable Environmental Impacts .................................................. 9 Table 4 Class III, Less than Significant Environmental Impacts .....................................................18 Table 5 Designated Historic Buildings Within and Adjacent to the Project Site ...........................62 Table of Contents Final Environmental Impact Report iii Table 6 Impacts to Historical Resources ........................................................................................72 Table 7 Noise Measurement Results .............................................................................................83 Table 8 Maximum Noise Exposure for Noise-Sensitive Uses Due To Transportation Noise Sources ..........................................................................................................................................85 Table 9 Maximum Noise Levels for Nonscheduled, Intermittent, Short-Term Operation (Less than 10 Days) of Mobile Equipment .............................................................................................86 Table 10 Maximum Noise Levels for Repetitively Scheduled, Relatively Long-Term Operation (10 Days or More) of Stationary Equipment .......................................................................................86 Table 11 Exterior Noise Limits (Not to be Exceeded More than 30 Minutes in Any Hour) .............87 Table 12 Maximum Periods for Increased Noise Levels ..................................................................87 Table 13 California Department of Transportation Vibration Annoyance Potential Criteria ..........90 Table 14 Significance of Changes in Operational Roadway Noise Exposures .................................91 Table 15 Construction Noise Levels by Phase..................................................................................92 Table 16 Vibration Source Levels for Construction Equipment .......................................................96 Table 17 Existing and Existing Plus Project Noise Levels on Studied Roadway Segments ..............98 Table 18 Cumulative and Cumulative Plus Project Noise Levels on Roadway Segments..............100 Table 19 Study Intersections and Segments ..................................................................................101 Table 20 Level of Service Criteria ...................................................................................................104 Table 21 Existing Average Daily Trips ............................................................................................105 Table 22 Existing Intersection LOS for Vehicles (PM Peak Hour) ..................................................105 Table 23 Existing Roadway Segment LOS for Vehicles (PM Peak Hour) ........................................107 Table 24 Existing Intersection LOS for Pedestrians (PM Peak Hour) .............................................107 Table 25 Existing Roadway Segment LOS for Pedestrians (PM Peak Hour) ..................................107 Table 26 Existing Roadway Segment LOS for Bicycles (PM Peak Hour).........................................108 Table 27 Existing Roadway Segment LOS for Public Transit (PM Peak Hour) ...............................109 Table 28 Weekday Vehicle Trip Generation (PM Peak Hour) ........................................................112 Table 29 Existing and Existing Plus Project Intersection LOS for Vehicles (PM Peak Hour) ..........115 Table 30 Existing and Existing Plus Project Segment LOS for Vehicles (PM Peak Hour) ...............116 Table 31 Existing and Existing Plus Project Intersection LOS for Pedestrians (PM Peak Hour) .....118 Table 32 Existing and Existing Plus Project Segment LOS for Pedestrians (PM Peak Hour) ..........118 Table 33 Existing and Existing Plus Project Segment LOS for Bicycles (PM Peak Hour) ................119 Table 34 Existing and Existing Plus Project Segment LOS for Transit (PM Peak Hour) ..................119 Table 35 Cumulative and Cumulative Plus Project Intersection LOS for Vehicles (PM Peak Hour)122 Table 36 Cumulative and Cumulative Plus Project Segment LOS for Vehicles (PM Peak Hour) ...122 City of San Luis Obispo Palm Nipomo Parking Structure Project iv Table 37 Cumulative and Cumulative Plus Project Segment LOS for Bicycles (PM Peak Hour) ....124 Table 38 Cumulative and Cumulative Plus Project Segment LOS for Transit (PM Peak Hour) ......124 Table 39 Cumulative and Cumulative Plus Project Intersection LOS for Pedestrians (PM Peak Hour) ........................................................................................................................................125 Table 40 Cumulative and Cumulative Plus Project Roadway Segment LOS for Pedestrians (PM Peak Hour) ..................................................................................................................................125 Table 41 Project Energy Use Relative to Statewide Energy Use ....................................................152 Table 42 Project Operational Vehicle Fuel Consumption ..............................................................152 Table 43 Alternatives and Impact Comparisons ............................................................................162 Table 44 Public Hearing Comment Summary ................................................................................168 Table 45 Comments Received on the Draft EIR .............................................................................176 Figures Figure 1 Environmental Review Process .........................................................................................23 Figure 2 Regional Location ..............................................................................................................26 Figure 3 Project Planning Area ........................................................................................................27 Figure 4 Project Site Location and Surrounding Uses .....................................................................28 Figure 5 Site Plan.............................................................................................................................31 Figure 6 Nipomo Street Elevation ...................................................................................................32 Figure 7 Conceptual Project Renderings (View of Parking Structure and Commercial Space from Corner of Palm and Nipomo Streets) ............................................................................................35 Figure 8 Conceptual Project Renderings (View of Commercial Space and Parking Structure from Nipomo Streets) ............................................................................................................................36 Figure 9 Site Photographs ...............................................................................................................45 Figure 10 Noise Measurement Locations .........................................................................................84 Figure 11 Study Intersections and Road Segments ........................................................................102 Figure 12 Existing Weekday PM Peak Hour Traffic Volumes ..........................................................106 Figure 13 Existing Plus Project Weekday PM Peak Hour Traffic Volumes ......................................117 Figure 14 Cumulative and Cumulative Plus Project Traffic Volumes ..............................................123 Appendices Appendix A Notice of Preparation and Initial Study Appendix B Cultural Resources Inventory Report and Native American Correspondence Appendix C Noise Modeling Worksheets Appendix D Transportation Impact Study Executive Summary Final Environmental Impact Report 1 Executive Summary This section summarizes the characteristics of the proposed Palm Nipomo Parking Structure Project, alternatives to the project, and the environmental impacts, mitigation measures, and residual impacts associated with the project. City staff prepared an Initial Study and circulated a Notice of Preparation (NOP) for the project on May 1, 2017. The Initial Study identified potentially significant impacts with respect to aesthetics, cultural resources, noise, and transportation and traffic, and this document is an environmental impact report (EIR) that further analyzes those impacts. All other CEQA issue areas were addressed in the Initial Study (Appendix A) and are summarized in Section 5.0, Issues Addressed in the Initial Study. Project Synopsis Project Applicant City of San Luis Obispo Public Works Department 919 Palm Street San Luis Obispo, California 93401 (805) 781-7203 Lead Agency Contact Person City of San Luis Obispo Public Works Department 919 Palm Street San Luis Obispo, California 93401 (805) 781-7203 Contact: Scott Lee, Parking Manager Project Description This EIR has been prepared to examine the potential environmental effects of the Palm Nipomo Parking Structure Project. The following is a summary of the full project description, which is located in Section 2.0, Project Description. The project would involve the removal of an existing 77-space surface parking lot and five residential structures (including detached garage) and construction of an above-ground, five-level parking structure, non-profit theater, and commercial space on a 1.38-acre site located in the city of San Luis Obispo. The parking structure would provide up to 445 parking spaces.1 Main vehicular access to the structure would be provided from Palm Street, with secondary access from Nipomo Street. The theater would entail a three-story structure with a gross floor area of 23,841 square feet 1 The parking structure is undergoing design refinement with respect to the ultimate number of parking spaces. Based on the current design, the structure would provide 410 parking spaces; however, the analysis conservatively assumes a maximum of up to 445 parking spaces would be provided. City of San Luis Obispo Palm Nipomo Parking Structure Project 2 and up to 255290 theater seats fronting Monterey Street. The project would also include 5,000 square feet of commercial space on two levels fronting Nipomo Street. The project would require a General Plan Amendment, Zone Change, Planning Commission Use Permit, and Architectural Review. Table 1 summarizes the characteristics of the proposed project. Table 1 Project Characteristics Address 609, 610, 614, 630, 633 Palm Street and 970, 972 Nipomo Street APN 002-412-001, 002-412-002, 002-412-003, 002-412-004, 002-412- 011, and 002-412-012 Maximum Building Height Parking Structure 50 feet structure + 14 feet for elevator tower Commercial 41 feet Theater 43 feet Lot Area Approx. 60,329 square feet (sf) (1.38 acres) Building Footprint1 Approx. 44,487 sf Building Gross Floor Area2 191,591 sf Parking Structure Gross Floor Area 162,750 sf Ground Floor 32,500 sf Parking Level 2 32,750 sf Parking Level 3 32,750 sf Parking Level 4 32,750 sf Parking Level 5 32,000 sf Commercial Gross Floor Area 5,000 sf 1st Floor 2,500 sf 2nd Floor 2,500 sf Theater Gross Floor Area 23,841 sf 1st Floor (Basement) 6,357 sf 2nd Floor (Main) 9,487 sf 3rd Floor 5,744 sf Roof Balcony & Exit Stairs 2,253 sf Total Parking Spaces3 445 Net New Parking Spaces 368 1 Building footprint is sum of ground or main levels of each use. 2 The gross floor area is the sum of all floors or levels for all uses. 3 The parking structure is undergoing design refinement with respect to the ultimate number of parking spaces. Based on the current design, the structure would provide 410 parking spaces; however, the analysis conservatively assumes a maximum of up to 445 parking spaces would be provided. sf = square feet Executive Summary Final Environmental Impact Report 3 Project Objectives Objectives for this project include the following:  Provide a minimum of 400 parking spaces  Accommodate cultural uses on Monterey Street in front of the structure  Include a pedestrian-level public use plaza area at the corner of Nipomo and Monterey Streets  Provide a direct pedestrian connection from the structure to Monterey Street  Preserve the large oak tree on site  Consider contextual sensitivity of surrounding properties (e.g., Lattimer-Hayes adobe) Project Alternatives As required by Section 15126(d) of the State CEQA Guidelines, this EIR examines a range of reasonable alternatives to the project that could feasibly achieve similar objectives. This includes the following five alternatives:  Alternative 1. No Project /No Development assumes the project is not approved, that none of the proposed entitlements are implemented, and that no further development would occur on the project site.  Alternative 2. Project Plus Live/Work Units would be the same as the proposed project described above, except the 5,000 square feet of commercial space would be reduced to 2,500 square feet of commercial space and four residential units would be included.  Alternative 3. Parking Structure, Commercial, and Residential would be the same as the preferred project described above, except the theater would be replaced with 22 two-bedroom residential units.  Alternative 4. Historic Resource Preservation would include the parking structure and 5,000 square feet of commercial space, but retain the two houses at 610 and 614 Monterey Street. The theater would not be included as part of this alternative. Alternative 4. The Historic Resource Preservation Alternative would be the environmentally superior alternative, as it would avoid direct impacts to historical resources because the two contributing structures to the Downtown Historic District and the linkage between properties in the district they provide would remain in place. However, aesthetic and noise impacts would remain significant and unavoidable. Alternative 1. No Project/No Development could also be considered environmentally superior to the proposed project because the site would remain as is and it would not result in any significant environmental impacts; however, it would not meet the project objectives. Alternative 2. Project Plus Live/Work Units would result in a similar magnitude of environmental impacts as the proposed project, as buildout would be almost identical. This alternative would not reduce any of the significant and unavoidable impacts. Alternative 3. Parking Structure, Commercial, and Residential would result in a similar magnitude of environmental impacts as the proposed project. The addition of 22 residential units in place of the theater would not result in inferior or superior environmental conditions relative to the proposed project and would not eliminate the significant impacts to historical resources, visual City of San Luis Obispo Palm Nipomo Parking Structure Project 4 character, or from construction noise. Most of the issues addressed in the Initial Study would be the same as the proposed project, with an incremental increase in public services demanded and water/wastewater generated. The complete alternatives analysis is included in Section 7.0, Alternatives. Areas of Concern Pursuant to State CEQA Guidelines § 15123(b)(2), this EIR acknowledges the areas of controversy and issues to be resolved which are known to the City of San Luis Obispo or were raised during the scoping process. An Initial Study and Notice of Preparation (NOP) of an EIR was prepared and circulated for a 30-day agency- and public-review period beginning on May 1, 2017. Several comment letters from members of the public were received in response to the NOP. In addition, an EIR Scoping Meeting was also held at the Planning Commission Meeting on May 10, 2017, and comments on the scope of the EIR were received from members of the public and the City Planning Commissioners. The NOP and Initial Study, and NOP comment letters are included in Appendix A of this EIR. Key issues of concern that were identified in the NOP responses and voiced at the EIR scoping meeting included the following: Comment/Area of Concern EIR Section Where Addressed Impacts on views of Cerro San Luis Obispo 4.1 Aesthetics Size and scale of the project and its aesthetic compatibility with the historical character or surrounding development 4.1 Aesthetics Impacts to historical resources, including adobe on the project site 4.2 Cultural and Tribal Cultural Resources Impacts to tribal cultural resources 4.2 Cultural and Tribal Cultural Resources Increase in operational noise and its impact on sensitive receptors 4.3 Noise Vehicle trips generated by project 4.4 Transportation Pedestrian-vehicle conflicts; pedestrian safety crossing Nipomo Street 4.4 Transportation Induced travel 4.4 Transportation Calculation methodology for greenhouse gas emissions 5.0 Issues Addressed in Initial Study Alternatives to the project 7.0 Alternatives Revisions to the Draft EIR Under the provisions CEQA Section 15088, a 45-day public review period of the Draft EIR is required. The Draft EIR was circulated from December 14, 2017 until March 1, 2018. Each written and verbal comment that the City received is included in Section 9.0, Responses to Comments. Responses to these comments have been prepared to address the environmental concerns raised by the commenters and to indicate where and how the Draft EIR addresses pertinent environmental issues. The Draft EIR and responses to comments collectively comprise the Final EIR for the project. The responses to comments summarize the comment and direct the commenter to the section of the Draft EIR that addresses their comment. In some cases, revisions have been made to the Draft EIR to clarify information, data, or intent, or to make minor typographical corrections or minor working changes. Any changes made to the text of the Draft EIR are noted in the Final EIR as changes from the Draft EIR. Where a comment results in a change to the Draft EIR text, a notation is made in the response indicating that the text is revised. Changes in the Draft EIR text are signified by strikeouts where text is removed and by underline font where text is added. If text is added where Executive Summary Final Environmental Impact Report 5 the font is already bold or underlined, additions are noted using underlined bold font. Revisions were made to the proposed number of theater seats. These changes are shown on page 2 of the Executive Summary and Section 2.5, Project Characteristics. Although the total number of seats increased from 155 to 191, this did not change any of the impacts as project effects were calculated based on building square footage and/or number of employees, which did not change. In addition, a revision was made to the theater footprint shown on Figure 5, Site Plan, based on refinements to the project design. As previously noted, the building square footage did not change and this revision did not change any of the impacts. Summary of Impacts and Mitigation Measures Table 2 through Table 4 provide a summary of the potential environmental impacts of the project. The mitigation measures associated with each impact, which are to be implemented in order to reduce the environmental impacts to the maximum extent feasible, are also summarized therein. In accordance with the State CEQA Guidelines, the tables identify the following types of potential impacts associated with the project:  Class I, Significant and Unavoidable. An impact that cannot be reduced to below the threshold level given reasonably available and feasible mitigation measures. Such an impact requires a ‘Statement of Overriding Considerations’ to be issued if the project is approved per §15093 of the State CEQA Guidelines.  Class II, Significant but Mitigable. An impact that can be reduced to below the threshold level given reasonably available and feasible mitigation measures. Such an impact requires ‘Findings’ to be made under §15091 of the State CEQA Guidelines.  Class III, Less than Significant. An impact that may be adverse, but does not exceed the threshold levels and does not require mitigation measures. However, mitigation measures that could further lessen the environmental effect may be suggested if readily available and easily achievable.  Class IV, Beneficial. An effect that would reduce existing environmental problems or hazards. Significant and Unavoidable Impacts The project would result in five significant and unavoidable (Class I) impacts. Issue areas with Class I impacts include aesthetics (visual character and cumulative visual character), cultural resources (historic resources and cumulative historic resources), and noise (construction noise) as summarized in Table 2. City of San Luis Obispo Palm Nipomo Parking Structure Project 6 Table 2 Class I, Significant and Unavoidable Environmental Impacts Impact Mitigation Measures Residual Impact Aesthetics Impact AES-2. The project would permanently alter the existing visual character of the site because it would introduce new structures that are substantially different in terms of size, scale, and massing. This impact is Class I, significant and unavoidable. As discussed in the impact analysis and described in the project description, the project includes various features that are intended to mitigate visual impacts. No additional mitigation measures are feasible. The project design features would reduce visual impacts to the extent feasible; however, due to the size, scale, and massing of the project, impacts related to a change in visual character would remain significant and unavoidable. Cumulative Aesthetics Impact. The project would result in a significant and unavoidable impact associated with change in visual character due to the increase in size, scale, and massing of the project. This combined with other cumulative development in the area would increase the intensity of development in the area and permanently alter the visual character. Therefore, the project would result in a Class I, significant and unavoidable, cumulative impact. As discussed in the impact analysis and described in the project description, the project includes various features that are intended to mitigate visual impacts. No additional mitigation measures are feasible to address cumulative impacts. The project features would reduce the project’s visual impacts to the extent feasible; however, impacts to change in visual character would be cumulatively considerable. Cultural and Tribal Cultural Resources Impact CR-1. Construction of the project would result in demolition of two structures on the project site that are historic resources, and adversely affect the Downtown Historic District. This would cause a substantial adverse change in the significance of historic resources as defined in CEQA Guidelines §15064.5. This impact is Class I, significant and unavoidable. CR-1 Historical Building Documentation Packages. Impacts to historical resources shall be minimized through the preparation of archival historic building documentation packages for both 610 and 614 Monterey Street. Prior to issuance of demolition permits, the City of San Luis Obispo shall ensure that documentation of both properties is completed in the form of a Historic American Building Survey (HABS)-Like documentation that shall comply with the Secretary of the Interior’s Standards for Architectural and Engineering Documentation (NPS 1990). The documentation shall generally follow the HABS Level III requirements and include high-quality digital photographic recordation of the buildings and their overall setting, detailed historic narrative report, and compilation of historic research. The documentation shall be completed by a qualified architectural historian or historian who meets the Secretary of the Interior’s Professional Qualification Standards for History and/or Architectural History (NPS 1983). Individual archival documentation packages shall be completed both properties and offered as donated material to the San Luis Obispo Library and the History Center of San Luis Obispo County, where it would be available to local researchers. Completion of this mitigation measure shall be monitored and enforced by the lead agency. Implementation of Mitigation Measure CR-1 would reduce impacts to historical resources to the greatest extent possible; however, this measure would not eliminate the permanent impacts to the identified historic resources, and no other feasible mitigation measures are available. Therefore, the project would result in a significant and unavoidable impact to historic resources. Executive Summary Final Environmental Impact Report 7 Impact Mitigation Measures Residual Impact Cumulative Cultural Resources Impact. The project would result in a significant and unavoidable impact associated with the removal of historic structures that contribute to the Downtown Historic District. As such, the project would contribute to the cumulative loss of historic resources in the City. This would be a Class I, significant and unavoidable, cumulative impact to historical resources. No additional mitigation is available to address cumulative cultural resources impacts. Implementation of Mitigation Measure CR-1 would reduce this impact to the greatest extent possible; however, cumulative cultural resources impacts would remain significant and unavoidable. Noise Impact N-1. Short-term construction activity would temporarily generate noise that would exceed City noise thresholds. Mitigation is available to reduce temporary construction noise, but would not be sufficient to reduce impacts to less than the applicable thresholds. This impact is Class I, significant and unavoidable. N-1(a) Construction Vehicle Travel Route. Construction vehicles and haul trucks shall utilize roadways which avoid residential neighborhoods and sensitive receptors where possible. The applicant shall submit a proposed construction vehicle and hauling route for City review and approval prior to grading/building permit issuance. The approved construction vehicle and hauling route shall be used for all construction vehicles and hauling trips during the duration of construction. N-1(b) Construction Activity Timing. Except for emergency repair of public service utilities or where an exception is issued by the Community Development Department, no operation of tools or equipment used in construction, drilling, repair, alteration, or demolition work shall occur daily between the hours of 7:00 PM and 7:00 AM, or anytime on Sundays, holidays, or after sunset, where that operation creates a noise disturbance that exceeds 75 dBA for single family residential, 80 dBA for multi-family residential, and 85 dBA for mixed residential/commercial land uses across a residential or commercial property line for a maximum of 10 days. For construction activities lasting more than 10 days, noise from construction equipment shall not exceed 60 dBA for single family residential, 65 dBA for multi-family residential, and 70 dBA for mixed residential/commercial land uses across a residential or commercial property line. Mitigation Measures N-1(a) through N-1(d) would require implementation of noise reduction devices and techniques during construction, and would reduce noise associated with on- and offsite construction activity to the maximum extent feasible. However, temporary noise impacts associated with onsite and offsite construction activity would be significant and unavoidable. N-1(c) Construction Equipment Best Management Practices (BMPs). For all construction activity at the project site, noise attenuation techniques shall be employed to reduce noise levels to extent feasible in accordance with the City of San Luis Obispo Municipal Code, Title 9, Chapter 9.12 (Noise Control). Such techniques shall include:  Sound blankets on noise-generating equipment  Stationary construction equipment that generates noise levels above 60 dBA at the project boundaries shall be shielded with barriers that meet a sound transmission class (a rating of how well noise barriers attenuate sound) of 25 City of San Luis Obispo Palm Nipomo Parking Structure Project 8 Impact Mitigation Measures Residual Impact  All diesel equipment shall be operated with closed engine doors and shall be equipped with factory- recommended mufflers  For stationary equipment, the applicant shall designate equipment areas with appropriate acoustic shielding on building and grading plans. Equipment and shielding shall be installed prior to construction and remain in the designated location throughout construction activities  Electrical power shall be used to power air compressors and similar power tools  The movement of construction-related vehicles, with the exception of passenger vehicles, along roadways adjacent to sensitive receptors shall be limited to the hours between 7:00 AM and 7:00 PM, Monday through Saturday and no movement of heavy equipment shall occur on Sundays or official holidays (e.g., Thanksgiving, Labor Day)  Temporary sound barriers shall be constructed between construction sites and affected uses N-1(d) Neighborhood Property Owner Notification and Construction Noise Complaints. The contractor shall inform residents and business operators at properties within 300 feet of the project site of proposed construction timelines and noise complaint procedures to minimize potential annoyance related to construction noise. Proof of mailing the notices shall be provided to the Community Development Department before the City issues a zoning clearance. Signs shall be in place before beginning of and throughout grading and construction activities. Noise- related complaints shall be directed to the City’s Community Development Department. Executive Summary Final Environmental Impact Report 9 Table 3 Class II, Significant but Mitigable Environmental Impacts Impact Mitigation Measures Residual Impact Aesthetics Impact AES-3. Implementation of the project would result in an increase in nighttime lighting and daytime glare at the project site; however, with mitigation, this increase would not adversely affect day or nighttime views in the area. This impact would be Class II, significant but mitigable. AES-3(a) Lighting Plan. Prior to issuance of building permits, the applicant shall prepare and submit a comprehensive lighting plan for Architectural Review Committee review and approval. The lighting plan shall be consistent with the Municipal Code Night Sky Ordinance, and prepared using guidance and best practices endorsed by the International Dark Sky Association. The lighting plan shall address all aspects of the lighting, including but not limited to all buildings, infrastructure, driveways, paths, plazas, safety, and signage. The lighting plan must include identification of all types, sizes, and intensities of wall mounted building lights and landscape accent lighting, and a photometric map must be provided. The lighting plan shall include the following: a. The point source of all exterior lighting shall be shielded from offsite views b. Light trespass from exterior lights shall be minimized by directing light downward and utilizing cut-off fixtures or shields c. Lumination from exterior lights shall be the lowest level allowed by public safety standards d. Exterior lighting shall be designed to not focus illumination onto exterior walls e. Any signage visible from offsite shall not be internally laminated AES-3(b) Glare Reduction. To minimize impacts on residential development in proximity to the project site, roof and building materials shall be non-reflective, and shall be muted in hues consistent with standards in the Community Design Guidelines, Section 6.1-C. Implementation of Mitigation Measures AES-3(a) and AES-3(b) would reduce impacts associated with light and glare to a less than significant level. Cultural and Tribal Cultural Resources Impact CR-2. Construction of the project would result in ground disturbance that could cause a substantial adverse change in the significance of an archaeological resource as defined in CEQA Guidelines 15064. This impact would be Class II, significant but mitigable. CR-2(a) Retain a Qualified Principal Investigator. A qualified principal investigator, defined as an archaeologist who meets the Secretary of the Interior’s Standards for professional archaeology (hereafter qualified archaeologist), shall be retained to carry out all mitigation measures related to archaeological resources. CR-2(b) City of San Luis Obispo Consolidated Approach for Archaeological Investigations. Mitigation of archaeological resources within the project area shall follow the Consolidated Approach as outlined in the City of San Luis Obispo Archaeological Resource Preservation Program Guidelines. The Consolidated Approach shall include (1) the preparation of a Research Design and Mitigation Plan prepared by the qualified archaeologist and submitted for written approval to the City’s Community Development Director (Director), which shall include but not be limited to the research design, laboratory and field methods, public interpretation, and location of curation; (2) monitoring of demolition and Implementation of Mitigation Measures CR-2(a) through CR-2(d) would reduce impacts to archaeological resources to a less than significant level. City of San Luis Obispo Palm Nipomo Parking Structure Project 10 Impact Mitigation Measures Residual Impact clearing of pavement within the project area; (3) fieldwork after the removal of pavement consisting of a Phase I inventory, Phase 2 Testing and Evaluation, and Phase 3 Data Recovery aimed at locating archaeological remains, evaluating their significance and integrity, and mitigating impacts through data recovery excavation; (4) the completion of special studies, such as faunal analysis, if appropriate, and the curation of recovered artifacts; and (5) the completion of a technical report documenting the results of the consolidated approach prepared in accordance with current professional standards and submitted to the Director. CR-2(c) Archaeological Monitoring. An archaeological monitor shall be present for all project-related ground- disturbing construction activities. The monitor(s) shall be onsite on a full-time basis during earthmoving activities, including grading, trenching, vegetation removal, or other excavation activities. Under consultation between the qualified archaeologist and the City, monitoring may be reduced or eliminated based on observed conditions. CR-2(d) Unanticipated Discovery of Archaeological Resources. In the event that cultural resources are encountered during the implementation of mitigation measures CR-2b or CR-2c, all work shall be halted in the vicinity of the discovery until a qualified archaeologist can assess the significance of the resource. If the resources are found to be significant, they must be avoided or mitigated pursuant to the qualified archaeologist’s direction and the testing plan outlined under MM CR-2b. Mitigation may involve preservation in place or documentation and excavation of the resource. A report by the archaeologist evaluating the find and identifying mitigation actions taken shall be submitted to the City. Impact CR-3. Construction of the project would result in ground disturbance that could indirectly or directly destroy a unique paleontological resource. This impact would be Class II, significant but mitigable. CR-3(a) Qualified Project Paleontologist. A qualified project paleontologist, defined as a paleontologist who meets the standards of the SVP (2010), shall be retained to carry out all mitigation measures related to paleontological resources. CR-3(b) Worker Environmental Awareness Program (WEAP). Prior to the start of construction, the project paleontologist or his or her designee shall conduct training for construction personnel regarding the appearance of fossils and the procedures for notifying paleontological staff should fossils be discovered by construction staff. The WEAP shall be fulfilled at the time of a preconstruction meeting at which a qualified paleontologist shall attend. CR-3(c) Paleontological Monitoring. Ground-disturbing construction activities (including grading, trenching, foundation work, and other excavations) in previously undisturbed sediments that exceed 10 feet in depth shall be monitored on a full-time basis during initial ground disturbance. Monitoring shall be conducted by a qualified paleontological monitor, who is defined as an individual who has experience with collection and salvage of paleontological resources and meets the minimum Implementation of Mitigation Measures CR-3(a) through CR-3(d) would reduce impacts to paleontological resources to a less than significant level. Executive Summary Final Environmental Impact Report 11 Impact Mitigation Measures Residual Impact standards of the SVP (2010). The duration and timing of the monitoring will be determined by the project paleontologist and the location and extent of proposed ground disturbance. If the project paleontologist determines that full-time monitoring is no longer warranted, based on the specific geologic conditions at the surface or at depth, the project paleontologist may recommend that monitoring be reduced to periodic spot- checking or cease entirely. Monitoring is not necessary in artificial fill or for activities that do not reach 10 feet in depth. CR-3(d) Fossil Discoveries. In the event of a fossil discovery by the paleontological monitor or construction personnel, all work in the immediate vicinity of the find shall cease. The project paleontologist shall evaluate the find before restarting construction activity in the area. If it is determined that the fossil(s) is (are) scientifically significant, the project paleontologist shall complete the following conditions to mitigate impacts to significant fossil resources: 1) Salvage of Fossils. The project paleontologist (or paleontological monitor) shall recover significant fossils following standard field procedures for collecting paleontological resources, as described by the SVP (2010). Typically, fossils can be safely salvaged quickly by a single paleontologist and not disrupt construction activity. In some cases, larger fossils (such as complete skeletons or large mammal fossils) require more extensive excavation and longer salvage periods. In this case the paleontologist shall have the authority to temporarily direct, divert or halt construction activity to ensure that the fossil(s) can be removed in a safe and timely manner. 2) Preparation and Curation of Recovered Fossils. Once salvaged, significant fossils shall be identified to the lowest possible taxonomic level, prepared to a curation- ready condition, and curated in a scientific institution with a permanent paleontological collection (such as the University of California Museum of Paleontology), along with all pertinent field notes, photos, data, and maps. Fossils of undetermined significance at the time of collection may also warrant curation at the discretion of the project paleontologist. Impact CR-5. Ground-disturbing activities associated with construction of the project have the potential to disturb unidentified human remains. This impact would be Class II, significant but mitigable. Compliance with existing regulations and Mitigation Measure CR-2(d) would ensure that impacts to human remains and burial grounds would remain less than significant. Implementation of Mitigation Measure CR- 2(d) would reduce this impact to a less than significant level. Cumulative Noise Impact. Construction of the proposed project could overlap with the construction of other projects in the vicinity (Monterey Place and the Vesper Hotel at the N-4 Coordination of Construction Timing. Prior to the issuance of grading permits, the City of San Luis Obispo shall review and coordinate the construction schedules of any other projects within 300 feet of the project to ensure that construction schedules do not overlap. Implementation of Mitigation Measure N-4 would avoid additional cumulative construction noise impacts and reduce City of San Luis Obispo Palm Nipomo Parking Structure Project 12 Impact Mitigation Measures Residual Impact Creamery) which would result in a significant cumulative impact. The project’s incremental contribution would be cumulatively considerable. cumulative impacts to a less than significant level. Transportation Impact T-3. Implementation of the project would result in pedestrian access impacts due to the difficulty of crossing Nipomo Street at an uncontrolled location. This impact would be Class II, significant but mitigable. T-3 Pedestrian Access. Subject to approval of the Public Works Director, the City shall incorporate improvements to the intersections of Dana Street/Nipomo Street and Monterey Street/Nipomo Street to enhance pedestrian safety and accessibility. The improvements shall be consistent with the City’s Circulation Element and Downtown Physical Concept Plan (2017) and shall balance the needs of each mode of use. At a minimum the project should consider:  High visibility crosswalk, or other intersection enhancements, with directional curb ramps across Nipomo Street from the northwest corner of Dana Street/Nipomo Street to the southwest corner of the parking structure.  High visibility crosswalk, or other intersection enhancements, with directional curb ramps from the southeast corner of Monterey Street/Nipomo Street across Nipomo Street.  Standard crosswalks, or other intersection enhancements, with directional curb ramps across Monterey Street and Dana Street where they intersect with Nipomo Street.  Reduce the curb radii on the southwest corner of Dana Street/Nipomo Street and the northeast corner of Monterey Street/Nipomo Street. Implementation of Mitigation Measure T-3 would reduce this impact to a less than significant level. Cumulative Traffic Impact. Under Cumulative plus Project conditions, one study intersection (the project driveway at Nipomo Street) would operate at an unacceptable level of service for pedestrians during the evening peak hour. This impact would be Class II, significant but mitigable. Mitigation Measure T-3 would be required. Implementation of Mitigation Measure T-3 would reduce impacts to a less than significant level. Air Quality (from Initial Study) Construction of the project would generate temporary increases in localized air pollutant emissions (fugitive dust, ozone precursors, and diesel particulate matter emissions) within 1,000 of sensitive receptors. In addition the South Coast Air Basin is in non-attainment for SCCAB is in non-attainment for PM10. This impact would be Class II, significant but mitigable. AQ-1 Fugitive Dust Control Measures. Construction projects shall implement the following dust control measures so as to reduce PM10 emissions in accordance with San Luis Obispo Air Pollution Control District (SLOAPCD) requirements.  Reduce the amount of the disturbed area where possible  Water trucks or sprinkler systems shall be used during construction in sufficient quantities to prevent airborne dust from leaving the site. Increased watering frequency shall be required whenever wind speeds exceed 15 mph. Reclaimed (non-potable) water shall Implementation of Mitigation Measures AQ-1 and AQ-2(a) through AQ-2(c) would reduce impacts to a less than significant level. Executive Summary Final Environmental Impact Report 13 Impact Mitigation Measures Residual Impact be used whenever possible  All dirt stock pile areas shall be sprayed daily as needed  Permanent dust control measures identified in the approved project revegetation and landscape plans shall be implemented as soon as possible following completion of any soil disturbing activities  Exposed ground areas that are planned to be reworked at dates greater than one month after initial grading shall be sown with a fast germinating, non- invasive grass seed and watered until vegetation is established  All disturbed soil areas not subject to revegetation shall be stabilized using approved chemical soil binders, jute netting, or other methods approved in advance by the SLOAPCD  All roadways, driveways, sidewalks, etc. to be paved shall be completed as soon as possible after grading unless seeding or soil binders are used  Vehicle speed for all construction vehicles shall not exceed 15 miles per hour (mph) on any unpaved surface at the construction site  All trucks hauling dirt, sand, soil, or other loose materials are to be covered or shall maintain at least two feet of freeboard (minimum vertical distance between top of load and top of trailer) in accordance with California Vehicle Code Section 23114  Install wheel washers where vehicles enter and exit unpaved roads onto streets, or wash off trucks and equipment leaving the site  Sweep streets at the end of each day if visible soil material is carried onto adjacent paved roads. Water sweepers with reclaimed water shall be used where feasible  All of these fugitive dust mitigation measures shall be shown on grading and building plans  The contractor or builder shall designate a person or persons to monitor the fugitive dust emissions and enhance the implementation of the measures as necessary to minimize dust complaints, reduce visible emissions below 20 percent opacity, and to prevent transport of dust offsite. Their duties shall include holidays and weekend periods when work may not be in progress. The name and telephone number of such persons shall be provided to the SLOAPCD Compliance Division prior to the start of any grading, earthwork, or demolition. AQ-2(a) Standard Control Measures for Construction Equipment. The following standard air quality mitigation measures shall be implemented during construction activities at the project site:  Maintain all construction equipment in proper tune according to manufacturer’s specifications  Fuel all off-road and portable diesel powered equipment with ARB certified motor vehicle diesel fuel City of San Luis Obispo Palm Nipomo Parking Structure Project 14 Impact Mitigation Measures Residual Impact (non-taxed version suitable for sue off-road)  Use diesel construction equipment meeting ARB’s Tier 2 certified engines or cleaner off-road heavy-duty diesel engines, and comply with the State Off-Road Regulation  Use on-road heavy-duty trucks that meet the ARB’s 2007 or cleaner certification standard for on-road heavy-duty diesel engines, and comply with the State On-Road Regulation  Construction or trucking companies with fleets that do not have engines in their fleet that meet the engine standards identified in the above two measures (e.g., captive or NOX exempt area fleets) may be eligible by proving alternative compliance  All on- and off-road diesel equipment shall not idle for more than 5 minutes. Signs shall be posted in the designated queuing areas and or job sites to remind drivers and operators of the 5 minute idling limit  Diesel idling within 1,000 feet of sensitive receptors is not permitted  Staging and queuing areas shall not be located within 1,000 feet of sensitive receptors  Electrify equipment when feasible  Substitute gasoline-powered in place of diesel- powered equipment, where feasible  Use alternatively fueled construction equipment onsite where feasible, such as compressed natural gas, liquefied natural gas, propane or biodiesel AQ-2(b) Best Available Control Technology (BACT) for Construction Equipment. The following BACT for diesel- fueled construction equipment shall be implemented during construction activities at the project site, where feasible:  Further reduce emissions by expanding use of Tier 3 and Tier 4 off-road and 2010 on-road compliant engines where feasible  Repower equipment with the cleanest engines available  Install California Verified Diesel Emission Control Strategies, such as level 2 diesel particulate filters (these strategies are listed at: www.arb.ca.gov/diesel/verdev/vt/cvt.htm) AQ-2(c) Architectural Coating. To reduce ROG and NOX levels during the architectural coating phase, low or no VOC-emission paint shall be used with levels of 50 g/L or less. Biological Resources (from Initial Study) Construction of the project would involve general construction activity and tree removal that may affect protected nesting birds. Impacts to migratory bird species would be potentially significant unless mitigation is BIO-1 Nesting Bird Protection. To avoid disturbance of nesting and special-status birds, activities related to the project, including, but not limited to, vegetation removal, ground disturbance, and construction and demolition shall occur outside of the bird breeding season (typically February through August in the project region). If construction must begin within the breeding season, then Implementation of Mitigation Measure BIO-1 would reduce impacts to a less than significant level. Executive Summary Final Environmental Impact Report 15 Impact Mitigation Measures Residual Impact incorporated. a pre-construction nesting bird survey shall be conducted no more than 3 days prior to initiation of ground disturbance and vegetation removal activities. The nesting bird pre-construction survey shall be conducted within the Project Boundary, including a 300-foot buffer (500-foot for raptors), on foot, and within inaccessible areas (i.e., private lands) afar using binoculars to the extent practical. The survey shall be conducted by a biologist familiar with the identification of avian species known to occur in the area. If nests are found, an avoidance buffer (which is dependent upon the species, the proposed work activity, and existing disturbances associated with land uses outside of the site) shall be determined and demarcated by the biologist with bright orange construction fencing, flagging, construction lathe, or other means to mark the boundary. All construction personnel shall be notified as to the existence of the buffer zone and to avoid entering the buffer zone during the nesting season. No ground- disturbing activities shall occur within this buffer until the avian biologist has confirmed that breeding/nesting is completed and the young have fledged the nest. Encroachment into the buffer shall occur only at the discretion of the qualified biologist. Geology and Soils (from Initial Study) Implementation of the project would occur on soils that have moderate to high expansion potential. This impact would be potentially significant unless mitigation is incorporated. GEO-1 Minimization of Expansive Soil Hazards. Once the final maximum loads of the project have been determined, a design-level geotechnical report shall be prepared that identifies the most appropriate geotechnical improvements to onsite soils, the foundation, and parking structure to minimize expansive soil hazards. Recommendations could include, but are not limited to the following:  Use imported non-expansive materials combined with pre-moistening of the soils to provide protection for slabs and flatwork  Provide a layer of non-expansive material 18 to 24 inches thick  Use post-tensioned slabs-on-grade  Implement shoring methods, such as shotcrete-faced soil nail walls, tangent drilled caissons, whaler-braced retaining walls, and steel I-beam and lagging walls  Use over-excavation and recompaction  Utilize a deep foundation system, such as caissons or rammed aggregate piers A certified soils engineer shall be retained for monitoring during construction of the project. The certified soils engineer shall also provide any necessary soil testing during construction, to ensure compliance with the design-level geotechnical report, and to provide site- specific guidance as subsurface materials are encountered. Implementation of Mitigation Measure GEO-1 would reduce impacts to a less than significant level. City of San Luis Obispo Palm Nipomo Parking Structure Project 16 Impact Mitigation Measures Residual Impact Hazardous Materials (from Initial Study) Construction of the project would require excavation and removal of existing fill, which has the potential to be contaminated. Therefore, construction activities could expose workers to contaminated soil onsite. This impact would be potentially significant unless mitigation is incorporated. HAZ-1 Hazardous Materials Soil Sampling and Remediation. Prior to issuance of grading permits, additional soil samples testing for total petroleum hydrocarbons shall be performed. A work plan shall be completed to address the sampling protocols to be followed, as well as the number of samples to be taken and the chemical analysis required. Upon City of San Luis Obispo approval, the work plan shall be implemented and the results of the soil sampling shall be forwarded to the City of San Luis Obispo. The City shall review the data to determine if any additional investigation or remedial activities are deemed necessary. No work shall resume in that area until the lead local regulatory agency has provided written authorization that the area does not warrant any additional action. If concentrations of contaminants warrant remediation, contaminated materials shall be remediated either prior to or concurrent with construction. Remediation shall generally include a management plan which establishes design and implementation of remediation. Cleanup may include excavation, disposal, bio-remediation, or any other treatment of conditions subject to regulatory action. All necessary reports, regulations and permits shall be followed to achieve cleanup of the site. The contaminated materials shall be remediated under the supervision of an environmental consultant licensed to oversee such remediation and under the direction of the lead oversight agency. The remediation program shall also be approved by the San Luis Obispo Fire Department. All proper waste handling and disposal procedures shall be followed. Upon completion of the remediation, the environmental consultant shall prepare a report summarizing the project, the remediation approach implemented, and the analytical results after completion of the remediation, including all waste disposal or treatment manifests. Implementation of Mitigation Measure HAZ-1 would reduce impacts to a less than significant level Transportation (from Initial Study) Construction of the project would result in short term construction traffic, construction parking, and modifications to existing pedestrian, bicycle, and transit circulation during the construction period. This impact would be potentially significant unless mitigation is incorporated. T-1 Construction Management Plan. Prior to the issuance of each building permit, the construction contractor shall meet with the Public Works department to determine traffic management strategies to reduce, to the maximum extent feasible, traffic congestion and the effects of parking demand by construction workers during construction of this project. The construction contractor will develop a construction management plan for review and approval by the Public Works department. The plan shall include at least the following items and requirements:  A set of comprehensive traffic control measures, including scheduling of major truck trips and deliveries to avoid peak traffic and pedestrian hours, detour signs if required, lane closure procedures, sidewalk closure procedures, signs, cones for drivers, and designated construction access routes.  Notification procedures for adjacent property owners and public safety personnel regarding when major Implementation of Mitigation Measure T-1 would reduce impacts to a less than significant level. Executive Summary Final Environmental Impact Report 17 Impact Mitigation Measures Residual Impact deliveries, detours, and lane closures will occur.  Location of construction staging areas for materials, equipment, and vehicles (must be located on the project site).  Identification of haul routes for movement of construction vehicles that would minimize impacts on vehicular and pedestrian traffic, circulation and safety; and provision for monitoring surface streets used for haul routes so that any damage and debris attributable to the haul trucks can be identified and corrected by the project applicant.  Temporary construction fences to contain debris and material and to secure the site.  Provisions for removal of trash generated by project construction activity.  A process for responding to and tracking complaints pertaining to construction activity.  Provisions for monitoring surface streets used for truck routes so that any damage and debris attributable to the trucks can be identified and corrected.  It is anticipated that this Construction Traffic Management Plan would be developed in the context of a larger Construction Management Plan, which would address other issues such as hours of construction onsite, limitations on noise and dust emissions, and other applicable items. City of San Luis Obispo Palm Nipomo Parking Structure Project 18 Table 4 Class III, Less than Significant Environmental Impacts Impact Mitigation Measures Residual Impact Aesthetics Impact AES-1. The project would not have a substantial adverse impact on a scenic vista because it is not located in a city-designated scenic vista. This impact would be Class III, less than significant. No mitigation measures are required. Less than Significant Cultural and Tribal Cultural Resources Impact CR-4. No Tribal Cultural Resources were identified within the project site, but area is generally considered sensitive for cultural resources. This impact would be Class III, less than significant. No mitigation measures are required. Less than Significant Noise Impact N-2. Short term construction activities would generate intermittent levels of groundborne vibration that would be perceptible, but would not exceed applicable thresholds. This impact would be Class III, less than significant. No mitigation measures are required. Less than Significant Impact N-3. The project would generate operational noise from project-generated traffic and new commercial and parking uses. Noise from the project would not exceed acceptable noise levels at existing off -site sensitive receptors. This impact would be Class III, less than significant. No mitigation measures are required. Less than Significant Cumulative Noise Impact. Under Cumulative Plus Project Conditions, noise levels would not exceed thresholds. Impacts would not be significant or cumulatively considerable. No mitigation measures are required. Less than Significant Transportation Impact T-1. Under Existing Plus Project conditions, all intersections and segments would operate at acceptable levels of service for vehicles, pedestrians, bicycles, and transit. These impacts would be Class III, less than significant. No mitigation measures are required. Less than Significant Impact T-2. The project would not add roadway capacity that would induce travel and would not generate new travel demand as a land use. In addition, the City actively manages parking demand and encourages non-auto modes of travel. Therefore, the project would have a negligible impact on vehicle miles traveled (VMT). This impact would be Class III, less than significant. No mitigation measures are required. Less than Significant Cumulative Traffic Impact. Under Cumulative plus Project conditions, all study intersections and segments would operate at acceptable levels of service for vehicles, and all segments would operate at acceptable levels of service for bicycles and transit. These impacts would be Class III, less than significant. No mitigation measures are required. Less than Significant Introduction Final Environmental Impact Report 19 1 Introduction This document is an Environmental Impact Report (EIR) that examines the potential effects of constructing the Palm-Nipomo Project on a 1.38-acre site in the City of San Luis Obispo, California. The project is described in detail in Section 2.0, Project Description. This chapter describes: (1) the background of the EIR; (2) the purpose of and legal authority for the EIR; (3) the scope and content of the EIR; (4) lead, responsible and trustee agencies; and (5) the environmental review process required under the California Environmental Quality Act (CEQA). 1.1 Environmental Impact Report Background The City of San Luis Obispo prepared an Initial Study and circulated a Notice of Preparation (NOP) of this EIR for a 30-day agency and public review period starting on May 1, 2017. The Initial Study serves as the scoping document for this EIR. The Initial Study determined that the proposed project required the preparation of an EIR to further evaluate potential impacts related to the following environmental issue areas: aesthetics, cultural resources, noise, and transportation. The City received two letters in response to the NOP. The Initial Study, NOP, and NOP comment letters are presented in Appendix A to this EIR. An EIR scoping meeting was also held on May 10, 2017, in the City Council Chamber, and comments on the scope of the EIR were received from private citizens and the Planning Commissioners. Key issues of concern that were noted in the NOP responses and voiced at the EIR scoping meeting included the following:  Impacts on views of Cerro San Luis Obispo  Size and scale of the project and its aesthetic compatibility with the historical character or surrounding development  Impacts to historical resources, including the adobe on the project site  Impacts to tribal cultural resources  Increase in operational noise and its impact on sensitive receptors  Vehicle trips generated by project  Pedestrian-vehicle conflicts; pedestrian safety crossing Nipomo Street  Induced travel  Sources of greenhouse gas emissions  Alternatives to the project 1.2 Purpose and Legal Authority This EIR has been prepared in accordance with CEQA and the CEQA Guidelines. In accordance with Section 15121(a) of the CEQA Guidelines, the purpose of this EIR is to serve as an informational document that: City of San Luis Obispo Palm Nipomo Parking Structure Project 20 “will inform public agency decision-makers and the public generally of the significant environmental effects of a project, identify possible ways to minimize the significant effects, and describe reasonable alternatives to the project” This report serves as an informational document for the public and the City of San Luis Obispo decision-makers. The proposed project requires discretionary approval from the City and, therefore, is subject to CEQA’s environmental review requirements. The process will culminate with Planning Commission and City Council hearings to consider certification of a Final EIR and make a decision whether to approve the proposed project, possibly with conditions of approval, or with modifications to the project. 1.3 Scope and Content This EIR addresses the issues determined to be potentially significant in the Initial Study, and based on responses to the NOP and scoping discussions among the public, consulting staff, and the City. The environmental issues addressed in impact sections in this EIR include:  Aesthetics  Cultural Resources  Noise  Transportation All other impacts were addressed in the Initial Study and the associated technical studies prepared as part of the project application and are summarized in Section 5.0, Issues Addressed in the Initial Study. The impact analysis contained in Section 4.0 includes a description of the physical and regulatory setting, followed by an analysis of the proposed project’s impacts in that area. Each potential impact is numbered separately, followed by an explanation of how the level of impact was determined. When appropriate, the EIR identifies feasible mitigation measures. Following the mitigation measures are a discussion of any residual impacts or secondary impacts. The alternatives section of the EIR (Section 7.0) was prepared in accordance with Section 15126.6 of the CEQA Guidelines that requires an EIR to examine a reasonable range of alternatives capable of avoiding or minimizing a project’s significant effects while achieving most of the basic project objectives. The alternatives discussion evaluates the CEQA-required “no project” alternative and three alternative development scenarios for the site. It also identifies the environmentally superior alternative among the alternatives assessed. In preparing the EIR, use was made of pertinent City policies and guidelines, existing EIRs and background documents prepared by the City, and documents that guide land use in the city. A full reference list is contained in Section 8.0, References, of this EIR. The level of detail contained throughout this EIR is consistent with the requirements of CEQA and applicable court decisions. The State CEQA Guidelines provide the standard of adequacy on which this document is based. The Guidelines state: “An EIR should be prepared with a sufficient degree of analysis to provide decision-makers with information which enables them to make a decision which intelligently takes account of environmental consequences. An evaluation of the environmental effects of the proposed project need not be exhaustive, but the sufficiency of an EIR is to be reviewed in light of what is reasonably feasible. Disagreement among experts does not make an EIR inadequate, but the EIR Introduction Final Environmental Impact Report 21 should summarize the main points of disagreement among the experts. The courts have looked not for perfection, but for adequacy, completeness, and a good faith effort at full disclosure (Section 15151).” 1.4 Lead, Responsible, and Trustee Agencies The State CEQA Guidelines define “lead,” “responsible” and “trustee” agencies. The City of San Luis Obispo is the lead agency for the project because it has the principal responsibility for approving the project. A “responsible agency” refers to a public agency other than the lead agency that has discretionary approval over the project. The Regional Water Quality Control Board is a Responsible Agency because the proposed project would require a National Pollutant Discharge Elimination System Permit. A “trustee agency” refers to a state agency having jurisdiction by law over natural resources affected by a project. There are no trustee agencies with jurisdiction on the site. 1.5 Environmental Review Process The environmental review process required under CEQA is summarized below and shown in Figure 1. The steps appear in sequential order. 1. Notice of Preparation (NOP) Distributed. Immediately after deciding that an EIR is required, the lead agency must file a NOP soliciting input on the EIR scope to "responsible," "trustee," and involved federal agencies; to the State Clearinghouse, if one or more state agencies is a responsible or trustee agency; and to parties previously requesting notice in writing. The NOP must be posted in the County Clerk's office for 30 days. A scoping meeting to solicit public input on the issues to be assessed in the EIR is not required, but may be conducted by the lead agency. 2. Draft EIR Prepared. The Draft EIR must contain: a) table of contents or index; b) summary; c) project description; d) environmental setting; e) significant impacts (direct, indirect, cumulative, growth-inducing and unavoidable impacts); f) alternatives; g) mitigation measures; and h) irreversible changes. 3. Public Notice and Review. A lead agency must prepare a Public Notice of Availability of an EIR. The Notice must be placed in the County Clerk's office for 30 days (Public Resources Code Section 21092) and sent to anyone requesting it. Additionally, public notice of Draft EIR availability must be given through at least one of the following procedures: a) publication in a newspaper of general circulation; b) posting on and off the project site; and c) direct mailing to owners and occupants of contiguous properties. The lead agency must consult with and request comments on the Draft EIR from responsible and trustee agencies, and adjacent cities and counties. The minimum public review period for a Draft EIR is 30 days. When a Draft EIR is sent to the State Clearinghouse for review, the public review period must be 45 days, unless a shorter period is approved by the Clearinghouse (Public Resources Code 21091). Distribution of the Draft EIR may be required through the State Clearinghouse. 4. Notice of Completion. A lead agency must file a Notice of Completion with the State Clearinghouse as soon as it completes a Draft EIR. City of San Luis Obispo Palm Nipomo Parking Structure Project 22 5. Final EIR. A Final EIR must include a) the Draft EIR; b) copies of comments received during public review; c) list of persons and entities commenting; and d) responses to comments. 6. Certification of Final EIR. The lead agency shall certify: a) the Final EIR has been completed in compliance with CEQA; b) the Final EIR was presented to the decision-making body of the lead agency; and c) the decision-making body reviewed and considered the information in the Final EIR prior to approving a project. 7. Lead Agency Project Decision. A lead agency may: a) disapprove a project because of its significant environmental effects; b) require changes to a project to reduce or avoid significant environmental effects; or c) approve a project despite its significant environmental effects, if the proper findings and statement of overriding considerations are adopted. 8. Findings/Statement of Overriding Considerations. For each significant impact of the project identified in the EIR, the lead or responsible agency must find, based on substantial evidence, that either: a) the project has been changed to avoid or substantially reduce the magnitude of the impact; b) changes to the project are within another agency's jurisdiction and such changes have or should be adopted; or c) specific economic, social, or other considerations make the mitigation measures or project alternatives infeasible. If an agency approves a project with unavoidable significant environmental effects, it must prepare a written Statement of Overriding Considerations that set forth the specific social, economic or other reasons supporting the agency's decision. 9. Mitigation Monitoring/Reporting Program. When an agency makes findings on significant effects identified in the EIR, it must adopt a reporting or monitoring program for mitigation measures that were adopted or made conditions of project approval to mitigate significant effects. 10. Notice of Determination. An agency must file a Notice of Determination after deciding to approve a project for which an EIR is prepared. A local agency must file the Notice with the County Clerk. The Notice must be posted for 30 days and sent to anyone previously requesting notice. Posting of the Notice starts a 30-day statute of limitations on CEQA challenges. Introduction Final Environmental Impact Report 23 Figure 1 Environmental Review Process City of San Luis Obispo Palm Nipomo Parking Structure Project 24 This page left intentionally blank. Project Description Final Environmental Impact Report 25 2 Project Description This section describes the proposed project, including the project applicant, the project site and surrounding land uses, major project characteristics, project objectives, and discretionary actions needed for approval. 2.1 Project Applicant City of San Luis Obispo 919 Palm Street San Luis Obispo, California 93401 (805) 781-7203 2.2 Lead Agency Contact Person City of San Luis Obispo Public Works Department 919 Palm Street San Luis Obispo, California 93401 (805) 781-7203 Contact: Scott Lee, Parking Manager 2.3 Project Location The project site is a 1.38-acre property located in San Luis Obispo, California. Figure 2 shows the regional location of the project. The site lies in the City’s Downtown Planning Area, adjacent to the Downtown Core. The majority of the site (except for APN 002-412-003) is also located in the City’s Downtown Historic District. Figure 3 shows the location of the project in the context of these planning areas. The project site located at the intersections of Palm and Nipomo streets and Nipomo and Monterey streets (609, 610, 614, 630, 633 Palm Street and 970, 972 Nipomo Street). The property consists of six parcels, including Assessor’s Parcel Numbers (APN) 002-412-001, 002- 412-002, 002-412-003, 002-412-004, 002-412-011, and 002-412-012 (Figure 4). 2.4 Existing Site Characteristics This section describes the current characteristics of the project site. Additional details of the current setting at the site and surrounding locations can be found in Section 3.0, Environmental Setting, as well as in the individual issue area discussions in Section 4.0, Environmental Impact Analysis. City of San Luis Obispo Palm Nipomo Parking Structure Project 26 Figure 2 Regional Location Project Description Final Environmental Impact Report 27 Figure 3 Project Planning Area City of San Luis Obispo Palm Nipomo Parking Structure Project 28 Figure 4 Project Site Location and Surrounding Uses Project Description Final Environmental Impact Report 29 Setting 2.4.1 As shown in Figure 3, the project site is located within the City’s Downtown Planning Area, adjacent to the City’s Downtown Core. The majority of the site (except for APN 002-412-003) is also located in the City’s Downtown Historic District. As such, the existing setting is urban and characterized by a wide variety of uses. The project site has been previously graded and developed and is surrounded by roads and urban structures. A 77-space surface parking lot, one detached garage, and four residential structures with five residences (three single-family residences and one secondary unit adjacent to Palm Street with two apartments) currently occupy the site. Two of the residential units, 610 and 614 Monterey Street, are on the City’s List of Contributing Historic Resources, which identifies structures that contribute to the significance of designated historic districts. The existing parking lot provides public parking in metered stalls owned and operated by the City of San Luis Obispo. Ingress and egress to the lot is available from an at-grade driveway on Palm Street. Elevations onsite range from 190 and 206 feet above mean sea level, and slopes are generally toward the northwest. Mature trees are scattered throughout the site and located on surrounding public sidewalks on Nipomo and Palm Streets. One of the trees on the site is a large oak tree along Monterey Street, which has the potential to be recognized as a “significant tree” by the City Council Tree Committee. The project site also includes several landscaped planting medians and areas. Partial views of Cerro San Luis are available from the central portion of the site. Current Land Use Designation and Zoning 2.4.2 The project site is composed of six parcels. Five of the parcels are currently zoned Office with a Historic Overlay (O-H), as defined by the City’s Zoning Ordinance, and have Office General Plan land use designations (APN 002-412-001, 002-412-002, 002-412-004, 002-412-011, and 002-412-012). These five parcels are located in the City’s Downtown Historic District. One parcel is zoned Medium- High Density Residential (R-3) and has a Medium-High Density Residential General Plan land use designation (APN 002-412-003). Surrounding Land Uses 2.4.3 The area surrounding the site is urbanized. The existing uses surrounding the site are shown in Figure 4, and include the following:  West. Existing development across Nipomo Street includes the Reis Family Mortuary & Crematory with surface parking lot and a residential complex comprised of multiple buildings. The area comprising the mortuary has a land use designation of Office and is zoned Office with a Historic Overlay (O-H), while the residential complex has a land use designation of Medium-High Density Residential and is zoned Medium-High Density Residential (R-3).  South. South of the site is the San Luis Obispo Children’s Museum and two residences designated as City contributing historic resources along Monterey Street. The parcel that houses the museum has a land use designation of Public and is zoned Public Facility with a Historic Overlay (PF-H), while the parcels containing the residential units have land use designation of General Retail and are zoned Downtown Commercial with a Special Consideration and Historic Overlay (C-D-S-H). Along Nipomo to the southwest is the Soda Works mixed commercial and residential complex with a land use designation of General Retail and zoned Downtown Commercial with a Planned Development and Historic Overlay (C-D-H-PD). City of San Luis Obispo Palm Nipomo Parking Structure Project 30  East. Adjacent to the project site is a two-story multi-family residential complex with surface parking fronting Palm Street and a single-family residence with detached garage, identified as the Hays-Lattimer Adobe historic resource, fronting Monterey Street. The multi-family residential building has a land use designation of Medium-High Density Residential and is zoned Medium-High Density Residential (R-3), while the single family residence has a land use designation of Office and is zoned Office with Historic Overlay (O-H).  North. The Mission College Preparatory School athletic field is located north of the project site across Palm Street. The school is located just west of the athletic field along Palm Street. The area has a land use designation of Medium-High Density Residential. The athletic field is zoned Medium-High Density Residential (R-3), while the school is zoned Medium-High Density Residential with a Historic Overlay (R-3-H). 2.5 Project Characteristics The project would involve the removal of an existing 77-space surface parking lot and five residential structures (including detached garage) and construction of an above-ground five-level parking structure, non-profit theater, and commercial space. Figure 5 shows the proposed site plan. The parking structure would provide up to 445 parking spaces.2 Main vehicular access to the structure would be from Palm Street, with secondary access from Nipomo Street. Vehicle access would not be provided from Monterey Street; however, a direct pedestrian connection would be provided from the structure to Monterey Street. Pedestrian access would also be provided to public sidewalks from each corner of the structure and bicycle access would be provided from Nipomo Street. The parking structure’s maximum height, excluding elevator towers, would be 50 feet (Figure 6). The maximum height of the elevator towers would be 64 feet above grade. The top deck of the parking structure would include a public use space in the northwest corner nearest to Palm and Nipomo Streets. The project would also include 5,000 square feet of commercial space on two levels fronting Nipomo Street. The maximum height of the commercial space would be 41 feet above existing grade. In addition, the project would include a new structure for the San Luis Obispo Little Theatre (now the San Luis Obispo Repertory Theatre or SLO REP) that would front Monterey Street. The theater would be a three-story structure with a gross floor area of roughly 23,841 square feet. The base level would house a rehearsal area, workshop, storage and other amenities. The main level would be comprised of a main theater with 155191 seats, and a smaller theatre with 10099 reconfigurable seats, generating a total of 255290 seats. The third floor would include offices and a conference room. Entry to the theater would be provided at the street level through a public plaza along Monterey Street. The street level plaza would include a public seating area and incorporate public art. The maximum height of the theater would be approximately 43 feet above existing grade. 2 The parking structure is undergoing design refinement with respect to the ultimate number of parking spaces. Based on the current design, the structure would provide 410 parking spaces; however, the analysis conservatively assumes a maximum of up to 445 parking spaces would be provided. Motorcycle parking would be provided in accordance with the ratios required in the City’s Zoning Regulations (§17.16.060). Project Description Final Environmental Impact Report 31 Figure 5 Site Plan City of San Luis Obispo Palm Nipomo Parking Structure Project 32 Figure 6 Nipomo Street Elevation Project Description Final Environmental Impact Report 33 Construction and Demolition Project construction would last approximately 12 months and is anticipated to start in 2019. Project construction would include site preparation, demolition, grading, building construction, architectural coating, and paving. The project would involve the removal of almost all existing public and private improvements and existing trees and vegetation on the site, with the exception of the large oak tree along Monterey Street and the two trees at the corner of Nipomo and Monterey Streets. Demolition activities would involve removal of the existing surface parking lot, four residential structures3, and detached garage. The project would excavate to a depth of approximately 14 feet at the highest point of the site, along the southern and eastern boundaries of the parking structure. In total, earthwork for buildout of the project is estimated to require 6,400 cubic yards of cut, and 700 cubic yards of fill, resulting in a need for approximately 5,700 cubic yards of soil export. The parking structure would be constructed using drilled caissons or rammed aggregate piers to support the structure. The project would not utilize the method of driven piles. Site Access and Circulation Vehicle As mentioned above, vehicle access into and out of the parking structure would be provided via driveways on Palm Street and Nipomo Street, with one lane for ingress and one lane for egress at each driveway. Each driveway entrance would have storage to accommodate two inbound vehicles. The parking structure exits would be designed so that exiting vehicles would have at least 10 feet of a clear sight triangle to the sidewalk on both sides of the exit, unobstructed by building corners, columns, or any other visual impediments. This distance is measured from eight feet behind the stop bar and two feet to the right of the centerline where a driver would be located in a stopped vehicle. Motorcycle parking would be provided in accordance with the ratios required in the City’s Zoning Regulations. Pedestrian Sidewalks on Nipomo Street would be widened to approximately 12 to 18.5 feet. The sidewalks on Palm Street and Monterey Street would be reconstructed, but remain at their current widths. As shown on Figure 5, a pedestrian crosswalk would be installed across Monterey Street, as well as a “bump out” of the sidewalk that extends into the street to increase pedestrian visibility at the crosswalk. Bicycle Bicycle parking would be provided near the parking structure’s Nipomo Street entrance. Access would be shared with the pedestrian entrance, but the width would be 10 feet wide to accommodate both. Short- and long-term bicycle parking would be provided in accordance with the ratios required in the City’s Zoning Regulations. 3 As noted in Section 2.4.1 Setting, there are four residential structures containing five residences (three single-family residences and one secondary unit containing two separate apartments). City of San Luis Obispo Palm Nipomo Parking Structure Project 34 Conceptual Design The following characteristics are proposed design features of the project.  The parking structure would be set back ten feet from the eastern boundary. The theater would be set back from Monterey Street with a public plaza area in front.  The façade of parking structure and commercial space would be designed to resemble a neighborhood building instead of a typical parking structure and with an architectural style similar to the surrounding Spanish Colonial architecture. Architectural design elements would include arches, stucco, tile roof, rusticated base, and multi-paned mullion pattern (Figure 76).  The openings on the parking structure would be articulated with mullions and sized to reflect traditional window openings in a building. Openings on the east side would have solid rails approximately 3.5 feet high.  The Nipomo Street facade reflects and would complement the downtown architecture and steps down the building form to a two-story structure along Nipomo Street (Figure 87).  The theater would have a contemporary design with the primary exterior finish materials being a multi-colored terra cotta, rain-screen panel system eliciting a color scheme complimenting that of the nearby historic Mission San Luis Obispo de Tolosa-namely white, dun, and varying shades of terra cotta clay. Accent and secondary materials would be smooth troweled stucco in a dun tone, and split face and split fluted concrete masonry unit blocks in a terra cotta tone. In addition, there would be two prominent, curved glass curtain walls with brushed aluminum muntins that face Monterey Street. Conceptual Lighting Outdoor lighting would be fully shielded or recessed and downcast, consistent with the City’s Municipal Code. Proposed exterior lighting would consist of dimmable white light-emitting diodes (LED) mounted to the buildings. Lighting inside the parking structure would consist of LED downlights with shielding elements. When viewed from outside of the parking structure, these shielding elements would eliminate any direct views of the light source. Lighting on the rooftop parking level would be provided by pole-mounted LED luminaires compliant with the City of San Luis Obispo Municipal Code, which requires rooftop lights to minimize spill and include full-cutoffs that reduce light pollution at night. To comply with the Title 24 energy codes, the parking structure would be controlled with photocells to conserve energy during daytime operational hours. The parking structure would also utilize occupancy sensors which would turn the lights off when no activity is detected in the structure. The lighting concept for the plaza area is to provide low-level pedestrian lights (recessed wall lights and/or bollard lights) that give a safe light level for night use. Additionally, there would be accent lighting in the planters to illuminate the courtyard trees. Non-emergency lighting would be on automatic shut-off timers and lighting would be on motion-activated sensors where appropriate. Streetlights would be installed per City Engineering Standards, and the approved conceptual Downtown Lighting Plan (for streetlights along Monterey Street). Project Description Final Environmental Impact Report 35 Figure 76 Conceptual Project Renderings (View of Parking Structure and Commercial Space from Corner of Palm and Nipomo Streets) Source: RRM Design Group, 2016 City of San Luis Obispo Palm Nipomo Parking Structure Project 36 Figure 87 Conceptual Project Renderings (View of Commercial Space and Parking Structure from Nipomo Streets) Source: RRM Design Group, 2016 Project Description Final Environmental Impact Report 37 Landscaping and Trees Landscaping would consist of new street trees in accordance with the City of San Luis Obispo’s street tree list (e.g., Brisbane Box, Carrotwood, Ficus, Queen Palms) along Palm, Nipomo, and Monterey streets, ranging from 8 to 12 feet high. After five years, the trees would be expected to achieve heights in the range of 16 to 30 feet tall. Existing trees, including the fern pine and oak on the corner of Monterey and Nipomo streets and the large oak tree on Monterey Street would remain. In addition, landscaping would include drought-tolerant shrub planters along the pedestrian plaza/walkways. Landscape irrigation would be designed to minimize the use of water and meet all water conservation practices required by the City’s Municipal Code. Utilities Water, firewater, and wastewater service for the project would be provided by the City via adjacent main lines that surround the project site. No utility extensions would be required. Project Objectives 2.5.1 Objectives for this project include the following:  Provide a minimum of 400 parking spaces  Accommodate cultural uses on Monterey Street in front of the structure  Include a pedestrian-level public use plaza area at the corner of Nipomo and Monterey Streets  Provide a direct pedestrian connection from the structure to Monterey Street  Preserve the large oak tree on site  Consider contextual sensitivity of surrounding properties (e.g., Lattimer-Hayes adobe) Required Approvals 2.5.2 The following approvals would be required for the project:  General Plan Amendment. Amend General Plan Land Use Map from Office and Medium-High Density Residential to Public  Zone Change. Amend Zoning Map from Office with Historic Overlay (O-H) and Medium-High Density Residential to Public Facility with a Historic Overlay (PF-H)  Planning Commission Use Permit. To allow the multi-level parking structure and non-profit theater with deviations to the setback requirements and building height limits4, and to request a variances forto the floor to area ratio to exceed 1.0 and to the maximum lot coverage to exceed the 60 percent maximum lot coverage 4  Architectural Review. Including both Cultural Heritage Committee and Architectural Review Commission review In addition, the following approval would be required:  Regional Water Quality Control Board – National Pollutant Discharge Elimination System Permit 4 Zoning Regulations Table 9: Subsection 6. Parking as a principal use. Use Permit approval may include deviations to otherwise applicable setback requirements and building height limits. A multi-level parking facility shall require the approval of a Use Permit by the Planning Commission. Environmental Impact Analysis Cultural and Tribal Cultural Resources Final Environmental Impact Report 59 4.2 Cultural and Tribal Cultural Resources This section analyzes potential impacts to cultural and tribal resources as a result of the proposed project. The analysis is based on the 2011 Cultural Resources Study prepared by Applied Earthworks (Appendix C). Setting 4.2.1 a. Environmental Setting Prehistoric Setting The project site is located in what is described generally as the Central Coast archaeological region, one of eight organizational divisions of California (Jones and Klar 2007, Moratto 1984). The Central Coast archaeological region extends from Monterey Bay to Morro Bay, and includes the County of San Luis Obispo. The prehistoric cultural chronology for the Central Coast is generally divided into six periods: Paleoindian (ca. 10,000–6,000 B.C.), Millingstone (6,000–3,000 B.C.), Early and Early-Middle Transition (3,000–600 B.C.), Middle (600 B.C. - A.D. 1000), Middle-Late Transition (A.D. 1000–A.D. 1250), and Late (A.D. 1250–historic contact [ca. A.D. 1769]) (Jones and Klar 2007). Several chronological sequences have been devised to understand cultural changes along the Central Coast from the Millingstone Period to contact. Jones (1993) and Jones and Waugh (1995) presented a Central Coast sequence that integrates data from archaeological studies conducted since the 1980s. Three periods, including the Early, Middle, and Late periods, are presented in their prehistoric sequence subsequent to the Millingstone Period. More recently, Jones and Ferneau (2002) updated the sequence following the Millingstone Period as follows: Early, Early-Middle Transition, Middle, Middle-Late Transition, and Late periods. The archaeology of the Central Coast subsequent to the Millingstone Period is distinct from that of the Bay Area to the north and Central Valley to the east. The region has more in common with the Santa Barbara Channel area during the Middle and Middle-Late Transition periods, but few similarities during the Late period (Jones and Ferneau 2002). Historic Setting Post-European contact history for California is divided generally into three periods: the Spanish Period (1769–1822), the Mexican Period (1822–1848), and the American Period (1848–present). The Spanish Period brought the establishment of the California mission system, while the Mexican Period is largely known for the division of the land of California into private land holdings. Following the Mexican-American war, the United States purchased California from Mexico; population of the state subsequently increased, particularly during the Gold Rush. Following the arrival of the first Europeans, Padre Junipero Serra founded Mission San Luis Obispo de Tolosa in 1772. The population of native people at the mission declined rapidly. In 1803, there was a peak of 919 Native Americans residing at the mission, but by 1838 the population had declined to 170. In 1822, California became a Mexican Territory, and the mission lands gradually became private ranchos through Mexican land grants. In 1846, the Bear Flag Rebellion resulted in California’s independence from Mexico, and control of the territory soon fell into the hands of the United States. City of San Luis Obispo Palm Nipomo Parking Structure Project 60 The City of San Luis Obispo was incorporated in 1876 (Angel 1883). The city’s early development is closely associated with Mission San Luis Obispo de Tolosa, the Coast Line Stage which carried U.S. mail for Wells Fargo and Company through San Luis Obispo to points north and south of the City, and the pacific railway which made San Luis Obispo the commercial center of the region and provided access for passenger steamer service (Kocher 1972; Tognazzini 1993; Cooper 1875; Angel 1883). The completion of the mainline Southern Pacific rail line allowed travel and shipment of goods with greater opportunities for selling and buying commodities. The establishment of California Polytechnic State University in 1903 as a vocational school on 281 acres was also a significant draw for the city. Later development was driven by the completion of U.S. Highway 101 as San Luis Obispo was a prime location for travelers to rest on the long trip from San Francisco to Los Angeles and the establishment of the nearby military base at Camp San Luis Obispo (City of San Luis Obispo 1983; Krieger 1988; Palmer et al. 2001). Beginning in 1945, following the end of World War II, San Luis Obispo experienced a period of modernization in the second half of the twentieth century, mainly due to returning soldiers. The influx of new commerce required new development, with older buildings demolished to make way for more modern structures and parking lots. Many of the older buildings demolished were residential homes. City landmarks and many remaining adobes were lost during this period. Growth required an influx of parking to accommodate downtown customers. Many city surface parking lots were established in the downtown, including the one on the current project. Project Site Historic Context Properties lining Monterey and Higuera streets between Nipomo and Santa Rosa streets were rapidly developed in the 1860s for both commercial and residential purposes. The Harris and Ward Map established Block 9, bounded by Palm, Broad, Monterey, and Nipomo streets, divided into six lots. The project site encompasses Lots 1 and 2 whose owners were identified as: Lot 1, illegible and Lot 2, Roberto Villa. Roberto Villa presented a Petition for Grant for Lot 2 in 1870. He had settled on the land in 1855 and his property and a solitary structure appear on an 1859 petition for land that also depicts a fence on Lot 1 (at the corner of Palm and Nipomo Streets). By 1874, the project site had been divided into three lots (Applied EarthWorks 2011). During the last quarter of the nineteenth century, the project area experienced little change while Monterey Street, to the east, continued to develop with commercial and residential infill. Within the project area, dwellings at 610, 614, and 630 Monterey Street exhibited small additions to the rears of the buildings. The 1886, 1888, and 1891 Sanborn Maps show three residences within the project area, including an outhouse at the rear of the adobe on Lot 3. James Moore operated a dyeing and cleaning business in a shed at 614 Monterey Street. Three small ancillary buildings and one a shed were present at 610 Monterey Street. All of the buildings are no longer present on the project site. Shortly after the turn of the twentieth century, the city began improving streets by grading roads and filling in low places with gravel, and new development followed these improvements. Within the project area, a house was constructed in Lot 1 along with an outhouse or shed. During this same time, James Moore moved his dyeing and cleaning business from 614 Monterey Street to 610 Monterey Street. By the 1930s, the structures at 610 and 614 Monterey Street were demolished and new residences were constructed in their place in 1937 and 1933, respectively. By 1957, the house on Lot 1 was moved to the south of the lot and a welding shop was constructed in its place. New surface parking lots established in the 1960s and 1970s frequently replaced older buildings and historic uses of the properties. Within the project site, two dwellings and the welding shop were demolished to make room for the parking lot that exists today. Environmental Impact Analysis Cultural and Tribal Cultural Resources Final Environmental Impact Report 61 Documented Cultural Resources This section is based on the results of the 2011 Cultural Resources Study (Appendix C) and 2017 updated records search, of which the methods are further described in section 4.2.2(a) below. Archaeological Resources The results of the records searches identify the presence of one archaeological site within the project site (CA-SLO-2341H) and two archaeological sites adjacent to the project site (CA-SLO- 1890/H and CA-SLO-2206H). Resource CA-SLO-2341H was identified in 2003 during a citywide water line installation project and consists of a series of historic archaeological features. The nearest component of CA-SLO-2341H to the current project site was a black powder flask (1790-1860) located at the intersection of Palm and Nipomo streets adjacent to the current project site. Resources CA-SLO-1890/H and CA-SLO-2206H both consist of historic refuse deposits. Resource CA- SLO-1890/H also includes a historic house and the remnants of an adobe structure. The site record also suggests that the archaeological site contains a prehistoric component, but no discussion is given for such remains and the site is described as containing “virtually no pre-1880 refuse.” The results of the records search further identified studies conducted by Bertrando and Bertrando within the project area that consisted of archaeological testing within the project area in 1997 and in 1999. The testing conducted in 1997 identified historical material in the upper 12 inches of soil. The testing conducted in 1999 identified the remains of the rock foundation of a house constructed circa 1905 and additional historic artifacts including glass, ceramics, nails, shell, and ceramic roof tiles all thought to be associated with the house and with a welding shop (1926–1996) that was located on the property. As part of the 2011 Cultural Resources Study, Applied Earthworks staff also conducted a pedestrian survey of the project site for archaeological and architectural resources. The project area has very little exposed ground surface, though narrow strips of exposed soil are present along the Monterey Street boundary of the project site which contained historic-period debris, including glass, ceramic fragments, ferrous metal items, and shell. The study concluded that it is likely that subsurface cultural remains are intact. Built Environment Resources The project site is partially located within the Downtown Historic District, which was locally designated in 1987, and is therefore considered a historical resource under CEQA. Figure 3 shows the boundaries of the Downtown Historic District relative to the project site. The Downtown Historic District extends east from U.S. Highway 101 and Dana Street to just beyond Osos Street, and runs north from Marsh Street to Palm Street. It contains many of the city’s most important historic buildings, and while they are primarily commercial, there is also a small subsection of residential properties largely concentrated west of Broad Street, in the project area. The buildings on the north side of Monterey Street create a historic streetscape that connects the area west of Mission Plaza to the westernmost section of the Downtown Historic District on Dana Street. In this area, the historic district transitions from commercial to residential, which is a physical characteristic of the district that helps conveys the reasons for its significance. The City maintains a Master List of Historic Resources, which identifies buildings that are considered historically significant on their own merits, and a List of Contributing Historic Resources, which identifies structures that contribute to the significance of designated historic districts, although they City of San Luis Obispo Palm Nipomo Parking Structure Project 62 may not be individually significant. In general, buildings within the district display a variety of architectural styles but are primarily one to two stories in height and 50 to 75 feet in width. Two Master List properties and two contributing properties lie within or adjacent to the current project area (Table 5). The single-story vernacular residence with a detached garage at 610 Monterey Street, located on the project site, is a contributing property built in 1937 by Klien Williams. Although the 2011 Cultural Resources Study recommended it as ineligible for the CRHR and local listing, it is currently listed as a contributor to the Downtown Historic District and is thus considered a historical resource for the purposes of CEQA. The single-story, mission-influenced vernacular residence at 614 Monterey Street, located on the project site, was built by Louis R. Heyd in 1935 and is also is a contributing property to the Downtown Historic District. The 2011 Cultural Resources Study identified this property as being eligible for local listing on the City’s Master List because of its rarity and its representation of the vernacular renewal of adobe architecture prior to World War II. The property is therefore considered a historical resource for the purposes of CEQA. The Hays-Lattimer adobe is a Master List property located immediately adjacent to the east of the project site at 638-642 Monterey Street. Constructed in 1860, the property contains a weather- boarded single-story adobe residence. The two-story Harmony Creamery at 991 Nipomo Street, also located adjacent to the project site, is another Master List property. Built in 1930 by the Harmony Valley Creamer Association, it is Spanish Colonial Revival in style. The residential buildings on the project site located at 633 and 633 ½ Palm Street are located just outside the City’s Downtown Historic District. They were each recommended ineligible for listing on the CRHR and local listing, and were not found to qualify as contributing resources to the Downtown Historic District; neither is considered a historical resource under CEQA as a result. Table 5 Designated Historic Buildings Within and Adjacent to the Project Site Address Local Designation Location Relative to Project Site 610 Monterey Street Contributing property to Downtown Historic District Within 614 Monterey Street Contributing property to Downtown Historic District Within 638-342 Monterey Street (Hays-Lattimer Adobe) On Master List of Historic Resources, Downtown Historic District Adjacent 991 Nipomo Street (Harmony Creamery) On Master List of Historic Resources, Downtown Historic District Adjacent Paleontological Setting The project site lies between the San Lucia Mountains and the San Luis Mountains in the Coast Ranges geomorphic province. The Coast Ranges are northwest-trending mountain ranges and valleys that run along the Pacific coast from Santa Barbara to the Oregon border (Norris and Webb, 1990). The Coast Ranges record a thick sequence of sedimentary strata dating back to the Mesozoic Franciscan Melange (~251 million years ago), with granitic and metamorphic rocks of the Salinian block present in the southern Coast Ranges, where the project is located (Norris and Webb 1990). Environmental Impact Analysis Cultural and Tribal Cultural Resources Final Environmental Impact Report 63 The Franciscan Melange records deposition of volcanic and clastic sediments into a subduction zone during the Mesozoic era, followed by subsequent metamorphism (Wakabayashi 1992). The Franciscan Melange is known to contain a wide range of fossils, including radiolarians, mollusks, diatoms, foraminifers, and marine vertebrates (Schlocker 1974; Elder 2015; Hilton 2003). A search of the University of California Museum of Paleontology (UCMP) online collection records shows that fossils of all of these organisms have been recovered from Franciscan rocks in and around San Luis Obispo County (UCMP 2017). The most impressive of these fossils is a large marine reptile, Plesiosaur hesternus, recovered from Oakley Ranch (Hilton 2003). More recently, the Pleistocene history of the region (2.6 million–10,000 years ago) is marked by glacially controlled sea level fluctuations and tectonic uplift during which the shoreline advanced and retreated as much as 30 miles across the continental shelf (Hall 2007). Sea level advance cut a system of marine terraces, 12 of which are exposed in the Point San Luis area eight to nine miles southwest of the city. These terraces range in age from 83,000 to 49,000 years, and reach elevations of 79 feet above modern sea level. The formations that compose these terraces are the most paleontologically productive in the region (City of San Luis Obispo 2014). Jefferson et al. (1992) reported three vertebrate localities along the coast within nine miles of San Luis Obispo. These localities occur in Pleistocene fluvial deposits overlying marine terraces, and include assemblages of the Rancholabrean mammals Equus sp. and E. occidentalis (horse); Camelops sp. and C. hesternus (camel); Bison antiquus and B. latifrons (bison), and Mammut americanum (mammoth). Other localities in San Luis Obispo County are noted as well (UCMP 2017). b. Regulatory Setting The primary applicable federal and state laws and regulations protecting cultural resources are the National Historic Preservation Act, as amended, CEQA, and California Public Resources Code (Cal. Public Res. Code) §§5024.1 and 21084.1. These and other federal, state, and local laws and regulations and ordinances that pertain to cultural resources are described below. Federal The project does not involve federal funding or permitting, and as a result, does not have a federal nexus. Therefore, compliance with reference to the National Historic Preservation Act (NHPA) of 1966 and other federal laws is provided here for informational purposes only. National Historic Preservation Act [16 United States Code (U.S.C.) Section 470 et seq.] The NHPA establishes the federal government policy on historic preservation and the programs, including the National Register of Historic Places (NRHP), through which this policy is implemented. Under the NHPA, significant cultural resources, referred to as “historic properties,” include any prehistoric or historic district, site, building, structure, or object included in, or determined eligible for inclusion in, the NRHP. Historic properties also include resources determined to be National Historic Landmarks. National Historic Landmarks are nationally significant historic places designated by the Secretary of the Interior because they possess exceptional value or quality in illustrating or interpreting United States heritage. A property is considered historically significant if it meets one of the NRHP criteria and retains sufficient historic integrity to convey its significance. This act also established the Advisory Council on Historic Preservation, an independent federal agency that administers Section 106 of the NHPA by developing procedures to protect cultural resources City of San Luis Obispo Palm Nipomo Parking Structure Project 64 included in, or eligible for inclusion in, the NRHP. Regulations are published in 36 Code of Federal Regulations (C.F.R.) Parts 60, 63, and 800. Archaeological Resources Protection Act (ARPA) [16 U.S.C. 470] This statute was enacted to secure, for the present and future benefit of the American people, the protection of archaeological resources and sites which are on public lands and Indian lands. It was also enacted to foster increased cooperation and exchange of information between governmental authorities, the professional archaeological community, and private individuals (Sec. 2(4)(b)). State California Environmental Quality Act, Public Resources Code §21083.2 and California Code of Regulations (CCR), Title 14, §15064.5 CEQA requires a lead agency to consider the effects of a project on historical resources (Cal. Public Res. Code §21084.1). The CEQA Guidelines §15064.5(b) provides specific guidance for determining the significance of impacts on historical resources and unique archaeological resources (CEQA Guidelines §15064.5(b) and Cal. Public Res. Code §21083.2). Under CEQA, these resources are called “historical resources” whether they are of historic or prehistoric age. Public Resources Code §21084.1 defines historical resources as those listed, or eligible for listing, in the California Register of Historical Resources (CRHR), or those listed in the historical register of a local jurisdiction (county or city) unless the preponderance of the evidence demonstrates that the resource is not historically or culturally significant. NRHP-listed “historic properties” located in California are considered historical resources for the purposes of CEQA and are also listed in the CRHR. The CRHR criteria for listing such resources are based on, and are very similar to, the NRHP criteria. Cal. Public Res. Code §21083.2 and CEQA Guidelines §15064.5(c) provide further definitions and guidance for archaeological sites and their treatment. Different legal rules apply to the two different categories of cultural resources, though the two categories sometimes overlap where a “unique archaeological resource” also qualifies as a “historical resource.” In such an instance, the more stringent rules for the protection of archaeological resources that are historical resources apply. CEQA Guidelines §15064.5 also prescribes a process and procedures for addressing the existence of, or probable likelihood, of Native American human remains, as well as the unexpected discovery of any human remains during implementation of a project. This includes consultations with appropriate Native American tribes. The CEQA Guidelines define procedures, types of activities, persons, and public agencies required to comply with CEQA. CEQA Guidelines §15064.5(b) prescribes that project effects that would “cause a substantial adverse change in the significance of an historical resource” are significant effects on the environment. Substantial adverse changes include physical changes to both the historical resource and its immediate surroundings. Section 15126.4(a)(1) states that an EIR shall describe feasible measures which could minimize significant adverse impacts. Section 15126.5(b) describes mitigation measures related to impacts on historical resources. CEQA also requires that public agencies and private interests identify the potential environmental consequences of their proposed projects on any object or site considered to be a historical resource Environmental Impact Analysis Cultural and Tribal Cultural Resources Final Environmental Impact Report 65 of California, including paleontological resources (Cal. Public Res. Code §21084.1, CCR Title 14, §15064.5). California Register of Historical Resources (Cal. Public Res. Code §5024.1 and 14 CCR §4850) Cal. Public Res. Code §5024.1 establishes the CRHR, which lists all California properties considered to be significant historical resources. The CRHR also includes all properties listed or determined eligible for listing in the NRHP, including properties evaluated and determined eligible under §106. The criteria for listing on the CRHR, criteria 1–4, are similar to those of the NRHP: [Resources that are] associated with events that have made a significant contribution to the 1. broad patterns of California’s history and cultural heritage [Resources that are] associated with the lives of persons important in our past 2. [Resources that] embody the distinctive characteristics of a type, period, region, or method of 3. construction, or represents the work of an important creative individual, or possesses high artistic value [Resources that have] yielded, or may be likely to yield, information important in prehistory or 4. history The CRHR regulations govern the nomination of resources to the CRHR (14 CCR §4850). The regulations set forth the criteria for eligibility as well as guidelines for assessing historical integrity and resources that have special considerations. California Public Resources Code Cal. Public Res. Code also protects paleontological resources in specific contexts. In particular, Cal. Public Res. Code §5097.5 prohibits “knowing and willful” excavation, removal, destruction, injury, and defacement of any paleontological feature on public lands without express authorization from the agency with jurisdiction. Violation of this prohibition is a misdemeanor and is subject to fine and/or imprisonment (Cal. Public Res. Code § 5097.5(c)), and persons convicted of such a violation may also be required to provide restitution (Cal. Public Res. Code § 5097.5(d)(1)). Additionally, Cal. Public Res. Code §30244 requires “reasonable mitigation measures” to address impacts on paleontological resources identified by the State Historic Preservation Officer. Section 5097.5 of the Cal. Public Res. Code states: “No person shall knowingly and willfully excavate upon, or remove, destroy, injure or deface any historic or prehistoric ruins, burial grounds, archaeological or vertebrate paleontological site, including fossilized footprints, inscriptions made by human agency, or any other archaeological, paleontological or historical feature, situated on public lands, except with the express permission of the public agency having jurisdiction over such lands. Violation of this section is a misdemeanor.” As used in this Cal. Public Res. Code section, “public lands” means lands owned by, or under the jurisdiction of, the state or any city, county, district, authority, or public corporation, or any agency thereof. Consequently, local agencies are required to comply with Cal. Public Res. Code §5097.5 for their own activities, including construction and maintenance, as well as for permit actions (e.g., encroachment permits) undertaken by others. City of San Luis Obispo Palm Nipomo Parking Structure Project 66 Codes Governing Human Remains Section 15064.5 of the CEQA Guidelines also assigns special importance to human remains and specifies procedures to be used when Native American remains are discovered. The disposition of human remains is governed by Health and Safety Code §7050.5 and Cal. Public Res. Code §§5097.94 and 5097.98, and falls within the jurisdiction of the NAHC. If human remains are discovered, the County Coroner must be notified within 48 hours and there should be no further disturbance to the site where the remains were found. If the remains are determined by the coroner to be Native American, the coroner is responsible for contacting the NAHC within 24 hours. The NAHC, pursuant to Cal. Public Res. Code §5097.98, will immediately notify those persons it believes to be most likely descended from the deceased Native Americans so they can inspect the burial site and make recommendations for treatment or disposal. California Tribal Cultural Resources and Consultation (Assembly Bill 52, Chapter 532) Assembly Bill (AB) 52 became law on January 1, 2015. It establishes a formal consultation process for California Indian tribes as part of CEQA and equates significant impacts on tribal cultural resources with significant environmental impacts. Several new Public Resources Codes have been written to codify the law’s requirements. Cal. Public Res. Code §21074 defines a California Native American Tribe as a tribe located in California that is on the contact list maintained by the Native American Heritage Commission. It also defines what types of resources are to be considered tribal cultural resources. Cal. Public Res. Code §21080.3.1 describes formal tribal consultation requirements; Cal. Public Res. Code §21080.3.2 provides that if the California tribe requests consultation to include project alternatives and mitigation measures, such consultation would be required; Cal. Public Res. Code §21082.3 provides that any mitigation measures agreed upon during consultation shall be recommended for inclusion in the environmental document and affirms the lead agency’s obligation to keep confidential any information obtained from a Native American tribe during the consultation process; and Cal. Public Res. Code §21083.4 provides examples of mitigation for impacts to Tribal Cultural Resources. Senate Bill 18 (Chapter 905, Statutes of 2004) Senate Bill (SB) 18 requires cities and counties to consult with Native American tribes to help protect traditional tribal cultural places through the land use planning process for general plan adoption or amendments and to specific plan adoption or amendments. Local San Luis Obispo Zoning Regulations, Chapter 17.54 Establishes the Historical Preservation Overlay Zone (H) and describes its purposes and application, allowed uses and property development standards. Historic Preservation Ordinance, San Luis Obispo Municipal Code 14.1 The City Municipal Code contains specific requirements for the demolition and relocation of structures listed in the inventory of historic resources. These requirements are stated in Municipal Code §§14.01.100 and 14.01.110. Environmental Impact Analysis Cultural and Tribal Cultural Resources Final Environmental Impact Report 67 The City Municipal Code states that the Cultural Heritage Committee (CHC) shall review and make recommendations to the City Council regarding demolition applications for structures listed in the inventory of historic resources. An application for demolition of a listed historic resource shall be approved only if the proposed demolition is found consistent with the general plan, and 1) the historic resource is a hazard to public health of safety, and repair or stabilization is not structurally feasible; or 2) denial of the application will constitute an economic hardship as described in §14.01.100(J)(1-3) of the municipal code. Additional procedures regarding the timing of the demolition, documentation and acknowledgment of the historic resource are also delineated. Likewise, the relocation of a structure listed on the inventory of historical resources is subject to review by the CHC and Architectural Review Commission (ARC). Relocation shall be permitted only when relocation is consistent with the goals and policies of the general plan, any applicable area or specific plans, and the Historic Preservation Program Guidelines, as well as additional criteria defined in Municipal Code §14.01.110(B)(1-6). The timing, plan, procedures, and documentation are also delineated. City of San Luis Obispo Municipal Code Demolition and Moving of Buildings Appendix Chapter 2, Chapter 201, of the San Luis Obispo Municipal Code, establishes procedures and requirements for the relocation or demolition of historic buildings. City of San Luis Obispo Historic Preservation Program Guidelines The guidelines establish procedures for the treatment of historic resources, including construction in historic districts and on properties with historic resources. They also include a discussion of the city’s existing historic districts and provide a summary of their significance and character-defining features. City of San Luis Obispo Archaeological Resource Preservation Program Guidelines The guidelines establish procedures to be used for the identification, evaluation, and preservation of archaeological and other cultural resources. Cultural resources refer to the artifacts, human remains, and sites containing evidence of past human activities, including prehistoric Native American archaeological sites, historic archaeological sites, sites or natural landscapes associated with important human events, and Native American sacred places and cultural landscapes. City of San Luis Obispo Community Design Guidelines The guidelines establish site and architectural design standards for development projects, including projects involving historic resources and historic districts, and demolitions. City of San Luis Obispo General Plan Conservation and Open Space Element. The Conservation and Open Space Element of the General Plan establishes citywide policies and programs regarding identification and treatment of cultural resources. The following policies apply to this project:  Policy 3.3.1 Historic Preservation. Significant historic and architectural resources should be identified, preserved, and rehabilitated.  Policy 3.3.2 Demolitions. Historically or architecturally significant buildings shall not be demolished or substantially changed in outward appearance, unless doing so is necessary to City of San Luis Obispo Palm Nipomo Parking Structure Project 68 remove a threat to health and safety and other means to eliminate or reduce the threat to acceptable levels are infeasible.  Policy 3.3.3 Historical Documentation. Buildings and other cultural features that are not historically significant but which have historical or architectural value should be preserved or relocated where feasible. Where preservation or relocation is not feasible, the resources shall be documented and the information retained in a secure but publicly accessible location. An acknowledgement of the resources should be incorporated within the site through historic signage and the reuse or display of historic material and artifacts.  Policy 3.5.1. Archaeological Resource Protection. The City shall provide for the protection of both known and potential archaeological resources. To avoid significant damage to important archaeological sites, all available measures, including purchase of the property in fee or easement, shall be explored at the time of a development proposal. Where such measures are not feasible and development would adversely affect identified archaeological or paleontological resources, mitigation shall be required pursuant to the Archaeological Resource Preservation Program Guidelines.  Policy 3.5.2. Native American Sites. All Native American cultural and archaeological sites shall be protected as open space wherever possible.  Policy 3.5.4 Archaeological Sensitive Areas. Development within an archaeologically sensitive area shall require a preliminary site survey by a qualified archaeologist knowledgeable in Native American cultures, prior to a determination of the potential environmental impacts of the project.  Policy 3.5.5 Archaeological Resources Present. Where a preliminary site survey finds substantial archaeological resources, before permitting construction, the City shall require a mitigation plan to protect the resources. Possible mitigation measures include: presence of a qualified professional during initial grading or trenching; project redesign; covering with a layer of fill; excavation removal and curation in an appropriate facility under the direction of a qualified professional.  Policy 3.5.6 Qualified Archaeologist Present. Where substantial archaeological resources are discovered during construction or grading activities, all such activities in the immediate area of the find shall cease until a qualified archaeologist knowledgeable in Native American cultures can determine the significance of the resource and recommend alternative mitigation measures.  Policy 3.5.7 Native American Participation. Native American participation shall be included in the City’s Guidelines for resource assessment and impact mitigation. Native American representatives should be present during archaeological excavation and during construction in an area likely to contain cultural resources. The Native American community shall be consulted as knowledge of cultural resources expands and as the City considered updates or significant changes to its General Plan.  Policy 3.6.3 Construction within Historic Districts. The Cultural Heritage Committee and Architectural Review Commission will provide specific guidance on the construction of new buildings within historic districts. Environmental Impact Analysis Cultural and Tribal Cultural Resources Final Environmental Impact Report 69 Impact Analysis 4.2.2 a. Methodology and Significance Thresholds Methodology Cultural Resources Methodology Direct impacts are assessed by identifying known cultural resources in the project study area, determining if any archaeological sites or historic structures are located within the project area, assessing the significance of the resources that may be affected, and determining the appropriate mitigation. Removal, demolition, or alteration of historical resources can permanently impact the historic fabric of an archaeological site, structure, or historic district. As previously mentioned, in 2011 Applied Earthworks prepared a Cultural Resources Study of the project site and vicinity (Appendix C). The study involved a records search at the Central Coast Information Center of the California Historical Resources Information System at the University of California Santa Barbara, archival and historical research, field survey of the property, predictive modeling of archaeological resources, evaluation of any potentially significant historic structures on the property, and assessment of potential impacts to the surrounding Downtown Historic District. The records search was conducted to identify previous cultural resources evaluations and previously recorded cultural resources on the project site as well as within a 200-foot radius of the project site. The archival research focused on the review of primary and secondary source materials related to the history and development of the project site and vicinity. Sources examined during the records and archival search included maps pinpointing cultural resources locations, survey coverage maps, site record and report files, city directories, Great Registers, historical maps, and newspapers. The State Historic Property Data Files, National Register of Historic Places, National Register of Determined Eligible Properties, California Points of Historic Interest, California Office of Historic Preservation Archaeological Determinations of Eligibility, and the California Department of Transportation State and Local Bridge Surveys were also analyzed. The results of the records search further identified studies conducted by Bertrando and Bertrando within the project site that consisted of archaeological testing in 1997 and 1999. In 2017, Rincon Consultants conducted an updated records search to expand the radius to 0.25-mile and to identify any cultural resources recorded since 2011. Archaeological sites and historic structures located within the project area are described in Section 4.2.1, Setting. Native American Consultation The City conducted Native American consultation consistent with Senate Bill 18 and Assembly Bill 52 for the project to identify potential concerns or issues associated with Native American cultural resources near the project. Rincon contacted the NAHC to determine if any sites recorded in the NAHC’s Sacred Lands File occur in or near the project site. The NAHC responded on May 1, 2017 that the search of the sacred land files for the USGS quadrangle in which the project is located “provided negative results” (citation). The NAHC did provide a list of Native American tribes with traditional lands or cultural places in the project area that may have knowledge of cultural resources at the project site. The Native American scoping did not identify any specific resources important to the consulted groups in or near the project site. However, Patti Dunton of the Salinan Tribe of Monterey City of San Luis Obispo Palm Nipomo Parking Structure Project 70 and San Luis Obispo Counties noted that the project site is sensitive for cultural resources and requested an archaeological survey of the project area before and after the asphalt is removed. She asked that if resources are identified that all further ground-disturbing areas be monitored by a cultural resources specialist from the Salinan Tribe. Native American correspondence can be found in Appendix C. Paleontological Resources Methodology Rincon Consultants paleontologists evaluated the paleontological sensitivity of the geologic units present on the project site based on a review of existing information in the primary literature on known fossils within those geologic units, review of previous geotechnical studies of the project site, and consultation of the online database maintained by the University of California Museum of Paleontology (UCMP) for fossil localities in San Luis Obispo County recorded from geologic units present in the project site. Rincon Consultants’ paleontologists assigned paleontological sensitivity to each geologic unit within the project site. The potential for impacts to significant paleontological resources is based on the potential for ground disturbance to directly impact paleontologically sensitive geologic units. Paleontological sensitivity is defined by the Society of Vertebrate Paleontology (SVP). The SVP broadly defines significant paleontological resources as follows (SVP 2010:11): “Fossils and fossiliferous deposits consisting of identifiable vertebrate fossils, large or small, uncommon invertebrate, plant, and trace fossils, and other data that provide taphonomic, taxonomic, phylogenetic, paleoecologic, stratigraphic, and/or biochronologic information. Paleontological resources are considered to be older than recorded human history and/or older than middle Holocene (i.e., older than about 5,000 radiocarbon years).” Significant paleontological resources are determined to be fossils or assemblages of fossils that are unique, unusual, rare, diagnostically important, or are common but have the potential to provide valuable scientific information for evaluating evolutionary patterns and processes, or which could improve our understanding of paleochronology, paleoecology, paleophylogeography, or depositional histories. New or unique specimens can provide new insights into evolutionary history; however, additional specimens of even well represented lineages can be equally important for studying evolutionary pattern and process, evolutionary rates, and paleophylogeography. Even unidentifiable material can provide useful data for dating geologic units if radiocarbon dating is possible. As such, common fossils (especially vertebrates) may be scientifically important, and therefore considered highly significant. The SVP (2010) describes sedimentary rock units as having high, low, undetermined, or no potential for containing significant nonrenewable paleontological resources. This criterion is based on rock units within which vertebrate or significant invertebrate fossils have been determined by previous studies to be present or likely to be present. While these standards were specifically written to protect vertebrate paleontological resources, all fields of paleontology have adopted these guidelines: I. HIGH POTENTIAL (SENSITIVITY) Rock units from which significant vertebrate or significant invertebrate fossils or significant suites of plant fossils have been recovered are considered to have a high potential for containing significant non-renewable fossiliferous resources. These units include but are not limited to, sedimentary formations and some volcanic formations which contain significant nonrenewable paleontological Environmental Impact Analysis Cultural and Tribal Cultural Resources Final Environmental Impact Report 71 resources anywhere within their geographical extent, and sedimentary rock units temporally or lithologically suitable for the preservation of fossils. Sensitivity comprises both (a) the potential for yielding abundant or significant vertebrate fossils or for yielding a few significant fossils, large or small, vertebrate, invertebrate, or botanical and (b) the importance of recovered evidence for new and significant taxonomic, phylogenetic, ecologic, or stratigraphic data. Areas which contain potentially datable organic remains older than Recent, including deposits associated with nests or middens, and areas which may contain new vertebrate deposits, traces, or trackways are also classified as significant. II. LOW POTENTIAL (SENSITIVITY) Sedimentary rock units that are potentially fossiliferous, but have not yielded fossils in the past or contain common and/or widespread invertebrate fossils of well documented and understood taphonomic, phylogenetic species and habitat ecology. Reports in the paleontological literature or field surveys by a qualified vertebrate paleontologist may allow determination that some areas or units have low potentials for yielding significant fossils prior to the start of construction. Generally, these units will be poorly represented by specimens in institutional collections and will not require protection or salvage operations. However, as excavation for construction gets underway it is possible that significant and unanticipated paleontological resources might be encountered and require a change of classification from Low to High Potential and, thus, require monitoring and mitigation if the resources are found to be significant. III. UNDETERMINED POTENTIAL (SENSITIVITY) Specific areas underlain by sedimentary rock units for which little information is available are considered to have undetermined fossiliferous potentials. Field surveys by a qualified vertebrate paleontologist to specifically determine the potentials of the rock units are required before programs of impact mitigation for such areas may be developed. IV. NO POTENTIAL Rock units of metamorphic or igneous origin are commonly classified as having no potential for containing significant paleontological resources. The loss of significant paleontological resources that meet the criteria outlined above would be considered a significant impact under CEQA, and the CEQA lead agency is responsible for ensuring that paleontological resources are protected in compliance with CEQA and other applicable statutes. Significance Thresholds If a project may cause a substantial adverse change in the characteristics of a resource that convey its significance or justify its eligibility for inclusion in the CRHR or a local register, either through demolition, destruction, relocation, alteration, or other means, then the project is judged to have a significant effect on the environment (CEQA Guidelines, §15064.5[b]). The following thresholds are based on Appendix G of the CEQA Guidelines. Impacts would be significant if the project would: Cause a substantial adverse change in the significance of a historical resource 1. Cause a substantial adverse change in the significance of an archaeological resource 2. Directly or indirectly destroy a unique paleontological resource or site or unique geologic 3. feature Disturb any human remains, including those interred outside of formal cemeteries 4. City of San Luis Obispo Palm Nipomo Parking Structure Project 72 Cause a substantial adverse change in the significance of a tribal cultural resource, defined in 5. Public Resources Code §21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is: A. Listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code §5020.1(k) B. A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code §5024.1. In applying the criteria set forth in subdivision (c) of Public Resource Code §5024.1, the lead agency shall consider the significance of the resource to a California Native American tribe b. Project Impacts Impact CR-1N-4 CONSTRUCTION OF THE PROJECT WOULD RESULT IN THE DEMOLITION OF TWO STRUCTURES ON THE PROJECT SITE THAT ARE HISTORIC RESOURCES, AND ADVERSELY AFFECT THE DOWNTOWN HISTORIC DISTRICT. THIS WOULD CAUSE A SUBSTANTIAL ADVERSE CHANGE IN THE SIGNIFICANCE OF HISTORICAL RESOURCES AS DEFINED IN CEQA GUIDELINES §15064.5. THIS IMPACT WOULD BE CLASS I, SIGNIFICANT AND UNAVOIDABLE. The CEQA guidelines define direct impacts as direct or primary effects caused by a project at the same place, and indirect impacts as affects caused by a project but occur at a different place. The project proposes a number of actions, each of which will result in impacts to historical resources. Table 6 summarizes each of the proposed project actions and the resulting type and level of impact that would result to historical resources. Table 6 Impacts to Historical Resources Project Action Type of Impact Level of Impact Demolition of 633 and 633½ Palm Street1 Direct Less than significant Demolition of 610 Monterey Street Direct Significant Demolition of 614 Monterey Street Direct Significant New Construction Indirect/Direct Significant/Less than significant 1 As discussed above, based on the 2011 Cultural Resources Study, these structures were found to not meet the definition of historical resources under CEQA. Demolition of 633 and 633 ½ Palm Street The project would result in the demolition of the buildings at 633 and 633 ½ Palm Street. Although demolition of these buildings would be a direct impact, as discussed above, neither is considered a historical resource as defined by CEQA. Both buildings were evaluated in 2011 and found to not meet the definition of historical resources under CEQA and they are located outside the boundaries of the Downtown Historic District. Thus, their demolition would not diminish the integrity of the Downtown Historic District and would not constitute a significant impact on historical resources. Demolition of 610 Monterey Street The project would result in the demolition of the structure at 610 Monterey Street. As a contributing resource to the Downtown Historic District, this property is a historical resource as defined by CEQA. Demolition of this property is potentially inconsistent with Policies 3.3.1 and 3.3.2 Environmental Impact Analysis Cultural and Tribal Cultural Resources Final Environmental Impact Report 73 of the City’s Conservation and Open Space Element of the General Plan, and would be considered a significant adverse impact under CEQA. Demolition of 614 Monterey Street The project would result in the demolition of the structure at 614 Monterey Street. As both a contributing resource to the Downtown Historic District and a property that was found individually eligible for local designation in 2011, this property is a historical resource as defined by CEQA. Demolition of this property is potentially inconsistent with Policies 3.3.1 and 3.3.2 of the City’s Conservation and Open Space Element of the General Plan, and would be considered a significant adverse impact under CEQA. New Construction The project has the potential to result in direct and indirect impacts to historical resources, specifically the Downtown Historic District, the adjacent locally-designated Hays-Lattimer Adobe located at 638-642 Monterey Street, and the locally-designated Harmony Creamery at 991 Nipomo Street. In consideration of these potential impacts this analysis follows the guidance of the City of San Luis Obispo’s Historic Preservation Program Guidelines, which states “construction in historic districts and on properties that contain listed historic resources shall conform with the goals and policies of the General Plan, the Historic Preservation Ordinance, these Guidelines, the Community Design Guidelines, any applicable specific or area plan, and the Secretary of the Interior’s Standards for the Treatment of Historic Properties (City of San Luis Obispo 2010:6). The City of San Luis Obispo’s Historic Preservation Program Guidelines state “new structures in historic districts shall be designed to be architecturally compatible with the district’s prevailing historic character as measured by their consistency with the scale, massing, rhythm, signature architectural elements, exterior materials, siting, and street yard setbacks of the districts historic structures” (City of San Luis Obispo 2010:7). Further guidance is provided in the Secretary of the Interior’s Standards for the Treatment of Historic Properties, which is recognized by CEQA as mitigating potential adverse impacts caused by a project to below the level of significance. According to the Secretary of the Interior’s Standards, new construction in or near historic properties, including districts, should be differentiated but compatible; attention should be devoted to ensuring that the new construction is complementary to the historic property but does not create a false sense of history by imitating or replicating a historic building or property. The Secretary of the Interior’s Standards include setting, in terms of the character of the surrounding environment, as a character-defining feature that weighs in the analysis of a resource’s retention of historic integrity. The proposed project would adversely affect the Downtown Historic District by inserting a new visual feature that is inconsistent with the height, scale, and massing of the resources that characterize the historic district. As described in the setting above, these resources within the district are primarily one to two stories in height and 50 to 75 feet in width. Although the commercial space and non-profit theater would be 41 to 43 feet high, the maximum height of the project would be 50 feet. The project would also have an approximately 200 x 200 square foot floor area. This is substantially taller and wider than the other adjacent historic resources, and would interrupt the rhythm and overall setting of the district. The parking structure and commercial space would be designed in a Spanish Colonial architectural style that is compatible with the surrounding historic properties; however, the theater would be Modernistic in style. The project would be visible from the contributing properties along Dana Street, adjacent Hays-Lattimer adobe, and Harmony City of San Luis Obispo Palm Nipomo Parking Structure Project 74 Creamery, and the visual impacts of the project may reach as far as the Dr. George B. Nichols House at 664 Monterey Street, the Carnegie Library at 696 Monterey Street, and the San Luis Obispo de Tolosa Mission, all Master List Properties. Since the designation of the Downtown Historic District in 1987, Nipomo Street between Higuera and Palm streets has sustained several other changes to historic character. Three buildings were removed (one relocated outside of the district) for the creation of the existing parking area at Palm and Nipomo street in 1997. The new Children’s Museum at the corner of Nipomo and Monterey streets is modern in appearance and inconsistent with the architecture of the surrounding properties. The new Soda Water Works building was also constructed with a modern appearance. Both of these properties are inside the Downtown Historic District boundaries but are no longer contributing resources. The project would further result in direct impacts to the Downtown Historic District by removing two contributing structures and introducing new, nonconforming structures. This would physically and visually disconnect the contributing historic resources on Dana Street5 from the remainder of the district to the east, resulting in a loss of integrity of the historic district. The proposed project would also interrupt the transition from commercial to residential that occurs in this area of the historic district, which is a physical characteristic of the district that helps conveys the reasons for its significance. As a result, the proposed project would result in a significant adverse impact to the Downtown Historic District. As described above, the Hays-Lattimer adobe is located immediately adjacent to the east of the project site and is a historical resource for the purposes of CEQA. Project construction activities would generate groundborne vibration that has the potential to result in damage to the historic adobe building. The Federal Transit Administration (FTA) thresholds for damage to fragile historic buildings, state that vibration impacts would be significant if vibration exceeds 88 VdB. As discussed in Section 4.3, Noise, the project would not generate vibration levels higher than 87 VdB at a distance of 25 feet. The adobe structure is approximately 60 feet from where construction of the nearest structure would occur. Direct impacts to the Hays-Lattimer adobe from groundborne vibration would therefore be less than significant. As noted above, the Secretary of the Interior’s Standards include setting, in terms of the character of the surrounding environment, as a character-defining feature that weighs in the analysis of a resource’s retention of historic integrity. The setting of the Hays-Lattimer and Harmony Creamery is consistent with the larger Downtown Historic District and is characterized by one to two-story buildings that are approximately 50 to 75 feet wide. Although the commercial building along Nipomo Street and the theater along Monterey Street would be lower (approximately 41 to 43 feet tall) than the parking structure, the proposed project as a whole is substantially larger in its scale, massing, and height and would alter the surrounding setting of both historical resources. Although this change would negatively affect their historic integrity, both would continue to convey the reasons for their significance. Indirect impacts to the Hays-Lattimer adobe and Harmony Creamery would therefore be less than significant. Mitigation Measures The following mitigation measure is required. 5 The Dana Street group is a small subsection of residential properties within the otherwise commercial Downtown Historic Distr ict, which is representative of the early residential settlement of downtown San Luis Obispo and contributes to the significance of the district. Environmental Impact Analysis Cultural and Tribal Cultural Resources Final Environmental Impact Report 75 CR-1 Historic Building Documentation Packages Impacts to historical resources shall be minimized through the preparation of archival historic building documentation packages for both 610 and 614 Monterey Street. Prior to issuance of demolition permits, the City of San Luis Obispo shall ensure that documentation of both properties is completed in the form of a Historic American Building Survey (HABS)-Like documentation that shall comply with the Secretary of the Interior’s Standards for Architectural and Engineering Documentation (NPS 1990). The documentation shall generally follow the HABS Level III requirements and include high-quality digital photographic recordation of the buildings and their overall setting, detailed historic narrative report, and compilation of historic research. The documentation shall be completed by a qualified architectural historian or historian who meets the Secretary of the Interior’s Professional Qualification Standards for History and/or Architectural History (NPS 1983). Individual archival documentation packages shall be completed for both properties and offered as donated material to the San Luis Obispo Library and the History Center of San Luis Obispo County, where it would be available to local researchers. PLAN REQUIREMENTS AND TIMING The City shall complete archival documentation of the 610 and 614 Monterey Street properties to the issuance of project grading permits. MONITORING The Community Development Director shall confirm completion of and approve the archival documentation. The City shall confirm submittal of the documentation to the History Center of San Luis Obispo County and the San Luis Obispo County Library. Significance After Mitigation Mitigation Measure CR-1 would reduce impacts to historical resources to the greatest extent possible; however, this measure would not eliminate the permanent impacts to the identified historic resources, and no other feasible mitigation measures are available. Therefore, the project would result in a significant and unavoidable impact to historic resources. Impact CR-2N-5 CONSTRUCTION OF THE PROJECT WOULD RESULT IN GROUND DISTURBANCE THAT COULD CAUSE A SUBSTANTIAL ADVERSE CHANGE IN THE SIGNIFICANCE OF AN ARCHAEOLOGICAL RESOURCE AS DEFINED IN CEQA GUIDELINES 15064. THIS IMPACT WOULD BE CLASS II, SIGNIFICANT BUT MITIGATABLE. The project site is currently developed with an asphalt parking lot and residential structures. During archaeological testing conducted in 1996 and 1999, subsurface historical archaeological materials were identified in the 0.5-acre surface parking lot at the corner of Palm and Nipomo streets within the project site. During the survey conducted for the project in 2011, historic-period debris was observed in the small amount of exposed native soils along Monterey Street. Additionally, similar work in the project vicinity has shown that subsurface archaeological deposits exist throughout the city. Approximately 0.125 mile (660 feet) from the project site, trenches uncovered a mission-era midden containing a significant Native American deposit and it is unclear whether that deposit extends to the project site. Based on the results of work within the project site and the vicinity, it is likely that additional remains related to the mission and post-mission occupation of the area are present. Additional intact subsurface deposits may be present. Therefore, construction of the project could damage or destroy archeological resources. Impacts to such resources would be City of San Luis Obispo Palm Nipomo Parking Structure Project 76 potentially significant and mitigation would be required to ensure that any discovered archaeological resources would be protected and curated if encountered during project construction activities. Mitigation Measures The following mitigation measures would reduce potential impacts to archaeological resources to a less than significant level. CR-2(a) Retain a Qualified Principal Investigator A qualified principal investigator, defined as an archaeologist who meets the Secretary of the Interior’s Standards for professional archaeology (hereafter qualified archaeologist), shall be retained to carry out all mitigation measures related to archaeological resources. CR-2(b) City of San Luis Obispo Consolidated Approach for Archaeological Investigations Mitigation of archaeological resources within the project area shall follow the Consolidated Approach as outlined in the City of San Luis Obispo Archaeological Resource Preservation Program Guidelines. The Consolidated Approach shall include (1) the preparation of a Research Design and Mitigation Plan prepared by the qualified archaeologist and submitted for written approval to the City’s Community Development Director (Director), which shall include but not be limited to the research design, laboratory and field methods, public interpretation, and location of curation; (2) monitoring of demolition and clearing of pavement within the project area; (3) fieldwork after the removal of pavement consisting of a Phase I inventory, Phase 2 Testing and Evaluation, and Phase 3 Data Recovery aimed at locating archaeological remains, evaluating their significance and integrity, and mitigating impacts through data recovery excavation; (4) the completion of special studies, such as faunal analysis, if appropriate, and the curation of recovered artifacts; and (5) the completion of a technical report documenting the results of the consolidated approach prepared in accordance with current professional standards and submitted to the Director. CR-2(c) Archaeological Monitoring An archaeological monitor shall be present for all project-related ground-disturbing construction activities. The monitor(s) shall be onsite on a full-time basis during earthmoving activities within native soils, including grading, trenching, vegetation removal, or other excavation activities. Under consultation between the qualified archaeologist and the City, monitoring may be reduced or eliminated based on observed conditions. CR-2(d) Unanticipated Discovery of Archaeological Resources In the event that cultural resources are encountered during the implementation of Mitigation Measures CR-2(b) or CR-2(c), all work shall be halted in the vicinity of the discovery until a qualified archaeologist can assess the significance of the resource. If the resources are found to be significant, they must be avoided or mitigated pursuant to the qualified archaeologist’s direction and the testing plan outlined under Mitigation Measure CR-2(b). Mitigation may involve preservation in place or documentation and excavation of the resource. A report by the archaeologist evaluating the find and identifying mitigation actions taken shall be submitted to the City. Environmental Impact Analysis Cultural and Tribal Cultural Resources Final Environmental Impact Report 77 PLAN REQUIREMENTS AND TIMING The City shall retain a qualified archaeologist prior to the issuance of demolition and grading permits. The qualified archaeologist shall prepare and submit the Research Design and Testing and Mitigation Plan prior to the issuance of demolition and grading permits. All fieldwork conducted under the consolidated approach must be completed prior to the issuance of grading permits. The requirement that ground disturbance be observed by an archaeological monitor and that construction work be stopped in the event of discovery of archaeological resources shall be included on construction plans prior to the issuance of grading permits. MONITORING The City shall review construction plans and periodically inspect project construction to ensure compliance with this measure. Significance After Mitigation Impacts to archaeological resources would be less than significant with incorporation of mitigation measures CR-2(a) through CR-2(d). Impact CR-3N-6 CONSTRUCTION OF THE PROJECT WOULD RESULT IN GROUND DISTURBANCE THAT COULD INDIRECTLY OR DIRECTLY DESTROY A UNIQUE PALEONTOLOGICAL RESOURCE. THIS IMPACT WOULD BE CLASS II, SIGNIFICANT BUT MITIGABLE. According to mapping by Dibblee and Minch (2004), the project site consists of younger Quaternary alluvium that dates to the Holocene. These sediments consist of gravel and sand deposited over the last 10,000 years by local rivers (Dibblee and Minch, 2004). Geotechnical studies have supported this mapping, and further detailed depths of 25-44 feet to bedrock, the Mesozoic Franciscan Melange, throughout the project site (Earth Systems Pacific 2011). Furthermore, Earth Systems Pacific (2011) documented some parts of the project site where artificial fill was present in the subsurface to depths of 3 and 5 feet. It should be noted that fill was only documented in two of the eight boreholes across the site, and was not present in the others (Earth Systems Pacific 2011). Using these data, as well as the paleontological literature review presented above, Rincon Consultants’ paleontologists assigned SVP paleontological sensitivities to geologic units likely to be impacted by construction in the project site. It should be noted that while the Franciscan Melange has high sensitivity, it is deep enough (20 to 44 feet) that it should not be impacted by the anticipated depths of ground disturbance (14 feet). Artificial Fill As a product of manmade activities, artificial fill has no paleontological sensitivity. Quaternary Alluvium As discussed above, Pleistocene-aged alluvial sediments have preserved fossil resources throughout California, including San Luis Obispo County. While the Quaternary alluvium mapped in the project area is too young to preserve fossils in the upper layers, it increases with age in depth. Therefore, deeper levels may be of an appropriate age to preserve fossil resources. Quaternary alluvium is thus assigned a low-to-high paleontological sensitivity, increasing with depth. While the exact depth at which this transition occurs has not been established for the project area, 10 feet is a reasonable estimate. City of San Luis Obispo Palm Nipomo Parking Structure Project 78 Because project construction has the potential to disturb sensitive geologic units, impacts would be potentially significant. Mitigation Measures The following mitigation measures would reduce potential impacts to paleontological resources to a less than significant level. CR-3(a) Retain a Qualified Project Paleontologist A qualified project paleontologist, defined as a paleontologist who meets the standards of the SVP (2010), shall be retained to carry out all mitigation measures related to paleontological resources. CR-3(b) Paleontological Worker Environmental Awareness Program (WEAP) Prior to the start of construction, the project paleontologist or his or her designee shall conduct training for construction personnel regarding the appearance of fossils and the procedures for notifying paleontological staff should fossils be discovered by construction staff. The WEAP shall be fulfilled at the time of a preconstruction meeting at which a qualified paleontologist shall attend. CR-3(c) Paleontological Monitoring Ground-disturbing construction activities (including grading, trenching, foundation work, and other excavations) in previously undisturbed sediments that exceed 10 feet in depth shall be monitored on a full-time basis during initial ground disturbance. Monitoring shall be conducted by a qualified paleontological monitor, who is defined as an individual who has experience with collection and salvage of paleontological resources and meets the minimum standards of the SVP (2010). The duration and timing of the monitoring will be determined by the project paleontologist and the location and extent of proposed ground disturbance. If the project paleontologist determines that full-time monitoring is no longer warranted, based on the specific geologic conditions at the surface or at depth, the project paleontologist may recommend that monitoring be reduced to periodic spot-checking or cease entirely. Monitoring is not necessary in artificial fill or for activities that do not reach 10 feet in depth. CR-3(d) Fossil Discoveries In the event of a fossil discovery by the paleontological monitor or construction personnel, all work in the immediate vicinity of the find shall cease. The project paleontologist shall evaluate the find before restarting construction activity in the area. If it is determined that the fossil(s) is (are) scientifically significant, the project paleontologist shall complete the following conditions to mitigate impacts to significant fossil resources: 1) Salvage of Fossils. The project paleontologist (or paleontological monitor) should recover significant fossils following standard field procedures for collecting paleontological resources, as described by the SVP (2010). Typically, fossils can be safely salvaged quickly by a single paleontologist and not disrupt construction activity. In some cases larger fossils (such as complete skeletons or large mammal fossils) require more extensive excavation and longer salvage periods. In this case the paleontologist should have the authority to temporarily direct, divert, or halt construction activity to ensure that the fossil(s) can be removed in a safe and timely manner. Environmental Impact Analysis Cultural and Tribal Cultural Resources Final Environmental Impact Report 79 2) Preparation and Curation of Recovered Fossils. Once salvaged, significant fossils should be identified to the lowest possible taxonomic level, prepared to a curation-ready condition, and curated in a scientific institution with a permanent paleontological collection (such as the University of California Museum of Paleontology), along with all pertinent field notes, photos, data, and maps. Fossils of undetermined significance at the time of collection may also warrant curation at the discretion of the project paleontologist. Significance After Mitigation Mitigation Measures CR-3(a) through CR-3(d) would reduce the potential impacts to paleontological resources to a less than significant level. Impact CR-4N-7 NO TRIBAL CULTURAL RESOURCES WERE IDENTIFIED WITHIN THE PROJECT SITE, BUT AREA IS GENERALLY CONSIDERED SENSITIVE FOR CULTURAL RESOURCES. THIS IMPACT WOULD BE CLASS III, LESS THAN SIGNIFICANT. Native American consultation efforts completed by the City pursuant to the requirements AB 52 and SB 18. The efforts under SB 18 and AB 52 did not identify specific tribal cultural resources within the project area; however, it did identify the project site as sensitive, consistent with the results of the Cultural Resources Study. As a result of the general cultural resources sensitivity of the area, Patti Dunton of the Salinan Tribe of Monterey and San Luis Obispo Counties requested that fieldwork be conducted at the project area after the removal of pavement and that project-related ground disturbance be observed by a Salinan tribal monitor. As no tribal cultural resources were identified or known to exist in the project area, the project would result in a less than significant impact on tribal cultural resources. Mitigation Measures No mitigation measures are required. Significance After Mitigation No mitigation measures are required. Impacts are less than significant. Impact CR-5N-8 GROUND-DISTURBING ACTIVITIES ASSOCIATED WITH CONSTRUCTION OF THE PROJECT HAS THE POTENTIAL TO DISTURB UNIDENTIFIED HUMAN REMAINS. THIS IMPACT WOULD BE CLASS II, SIGNIFICANT BUT MITIGABLE. Unanticipated discovery of human remains during project excavation would require compliance with Health and Safety Code §7050.5 and Cal. Public Res. Code Sections 5097.94 and 5097.98. Cal. Public Res. Code §5097.98 also addresses the disposition of Native American burials, protects such remains, and established the Native American Heritage Commission to resolve any related disputes. Compliance with Health and Safety Code §7050.5 and Cal. Public Res. Code §§ 5097.94 and 5097.98 would ensure that unanticipated discovery of human remains during project excavation, including those interred outside of formal cemeteries, would be addressed appropriately by the County Coroner and NAHC (if required). Mitigation Measures Compliance with existing regulations and mitigation measure CR-2(d) would ensure that potential impacts to human remains and burial grounds would be less than significant. City of San Luis Obispo Palm Nipomo Parking Structure Project 80 Significance After Mitigation Impacts to human burial grounds would be less than significant with implementation of mitigation measure CR-2(d). c. Cumulative Impacts Planned buildout of the City of San Luis Obispo under the General Plan would cumulatively increase the potential for adverse effects on cultural and tribal cultural resources in the city. The project would incrementally contribute to this cumulative effect. Impacts to cultural and tribal cultural resources are generally site-specific. Accordingly, as required under applicable laws and regulations, potential impacts associated with cumulative developments would be addressed on a case-by-case basis. The proposed project, as well as other cumulative projects in the city, would be required to comply with existing state and local regulations described in Section 4.2.1(b), Regulatory Setting, which address the protection of cultural and tribal cultural resources in the city. As described under Impacts CR-2, CR-3, and CR-5, with implementation of required mitigation, the project would reduce potential impacts to archaeological and/or paleontological resources to less than significant levels. In addition, as described in Impact CR-4, the project would result in a less than significant impact on tribal cultural resources. Therefore, the project would not contribute substantially to the cumulative loss of archaeological, paleontological, or tribal cultural resources in the city. However, as described in Impact CR-1, the project would result in a significant and unavoidable impact associated with the removal of two historic structures that are part of the Downtown Historic District. The project would also result in a significant and unavoidable impact on the Downtown Historic District. Mitigation measure CR-1 would reduce the project’s impacts to historical resources to the greatest extent possible; however, this measure would not eliminate the permanent cumulative or individual impacts to the identified historic resources, and no other feasible mitigation measures are available. As such, the project would contribute to the cumulative loss of historic resources in the city. This would be a Class I, significant and unavoidable, cumulative impact to historical resources. Cultural Arts District Parking Structure Project Phase 1B & Phase 2 Mitigation and Monitoring Plan prepared for City of San Luis Obispo Public Works Department 919 Palm Street San Luis Obispo, California 93401 prepared by Rincon Consultants, Inc. 1530 Monterey Street, Suite D San Luis Obispo, California 93401 November 2022 Please cite this report as follows: Montgomery, Courtney, Ashley Losco, Ken Victorino, Christopher Duran, Christopher Bersbach, and Shawn Decker 2022 Cultural Arts District Parking Structure Project Phase 1B & Phase 2 Mitigation and Monitoring Plan, San Luis Obispo County, California. Rincon Consultants Project No. 22-12836. Report on file at Rincon Consultants, Inc. 180 North Ashwood Avenue Ventura, California 93001 Table of Contents Phase 1B & Phase 2 Mitigation and Monitoring Plan i Table of Contents 1 Introduction ....................................................................................................................................1 Project Location and Description ..................................................................................... 10 Environmental Resource Sensitivity ................................................................................ 10 2 Plan Check Requirements ............................................................................................................ 15 3 Monitoring Requirements ........................................................................................................... 21 4 Archaeological Testing Requirements ......................................................................................... 24 5 Resource Discovery Plan .............................................................................................................. 25 Discovery of Archaeological Resources ........................................................................... 25 Discovery of Human Remains .......................................................................................... 26 Discovery of Paleontological Resources .......................................................................... 26 6 Reporting of Monitoring Results and Curation Finds .................................................................. 27 Reporting of Archaeological Monitoring Results ............................................................. 27 Curation of Archaeological Finds ..................................................................................... 27 Reporting of Paleontological Monitoring Results ............................................................ 27 Curation of Paleontological Resources ............................................................................ 28 7 References ................................................................................................................................... 29 Figures Figure 1 Project Location Depicted on Topographic Background ................................................. 11 City of San Luis Obispo Cultural Arts District Parking Structure Project ii This page intentionally left blank. Introduction Phase 1B & Phase 2 Mitigation and Monitoring Plan 1 1 Introduction Rincon Consultants, Inc. (Rincon) was retained by the City of San Luis Obispo (City) to provide Mitigation Monitoring and Reporting Program (MMRP) compliance services in support of Phase 1B and Phase 2 of the Cultural Arts District Parking Structure Project (formerly known as the Palm Nipomo Parking Structure) in San Luis Obispo, California. The Mitigation and Monitoring Plan (MMP) will address the details, timing, and responsibility of all required mitigation monitoring activities. The current Phase 1A of the Cultural Arts District Parking Structure Project (project) consists of undergrounding existing dry utilities in preparation for the main phases of construction. Phase 1B consists of demolition and Phase 2 consists of site preparation and construction of the parking structure and surrounding site improvements. Phase 1B and Phase 2 are subject to mitigation requirements outlined in the Final EIR for the Palm Nipomo Parking Structure Project adopted by the City Council in July 2018 (2018 Final EIR; City of San Luis Obispo 2018). The City intends to submit for building permit approval for all project phases in 2022 and intends to commence Phase 1B in Spring 2023 and Phase 2 in Fall 2023. This MMP was prepared by Rincon Consultants, Inc. (Rincon) in compliance with the Mitigation Monitoring and Reporting Program prepared in support of the 2018 Final EIR for the Palm Nipomo Parking Structure Project. The Mitigation Monitoring and Reporting Program includes the following mitigation measures for Aesthetics, Air Quality, Biological Resources, Cultural Resources, Geology and Soils, Hazards and Hazardous Materials, Historic Resources, Noise, Paleontological Resources, and Transportation: AESTHETICS/VISUAL RESOURCES 1. Prior to issuance of building permits, the applicant shall prepare and submit a comprehensive lighting plan for Architectural Review Committee review and approval. The lighting plan shall be consistent with the Municipal Code Night Sky Ordinance, and prepared using guidance and best practices endorsed by the International Dark Sky Association. The lighting plan shall address all aspects of the lighting, including but not limited to all buildings, infrastructure, driveways, paths, plazas, safety, and signage. The lighting plan must include identification of all types, sizes, and intensities of wall mounted building lights and landscape accent lighting, and a photometric map must be provided. The lighting plan shall include the following: a. The point source of all exterior lighting shall be shielded from offsite views b. Light trespass from exterior lights shall be minimized by directing light downward and utilizing cut-off fixtures or shields c. Lumination from exterior lights shall be the lowest level allowed by public safety standards d. Exterior lighting shall be designed to not focus illumination onto exterior walls e. Any signage visible from offsite shall not be internally laminated City of San Luis Obispo Cultural Arts District Parking Structure Project 2 2. To minimize impacts on residential development in proximity to the project site, roof and building materials shall be non-reflective, and shall be muted in hues consistent with standards in the Community Design Guidelines, Section 6.1-C. AIR QUALITY 3. Construction projects shall implement the following dust control measures so as to reduce PM10 emissions in accordance with San Luis Obispo Air Pollution Control District (SLOAPCD) requirements.  Reduce the amount of the disturbed area where possible  Water trucks or sprinkler systems shall be used during construction in sufficient quantities to prevent airborne dust from leaving the site. Increased watering frequency shall be required whenever wind speeds exceed 15 mph. Reclaimed (non- potable) water shall be used whenever possible  All dirt stock pile areas shall be sprayed daily as needed  Permanent dust control measures identified in the approved project revegetation and landscape plans shall be implemented as soon as possible following completion of any soil disturbing activities  Exposed ground areas that are planned to be reworked at dates greater than one month after initial grading shall be sown with a fast germinating, non-invasive grass seed and watered until vegetation is established  All disturbed soil areas not subject to revegetation shall be stabilized using approved chemical soil binders, jute netting, or other methods approved in advance by the SLOAPCD  All roadways, driveways, sidewalks, etc. to be paved shall be completed as soon as possible after grading unless seeding or soil binders are used  Vehicle speed for all construction vehicles shall not exceed 15 miles per hour (mph) on any unpaved surface at the construction site  All trucks hauling dirt, sand, soil, or other loose materials are to be covered or shall maintain at least two feet of freeboard (minimum vertical distance between top of load and top of trailer) in accordance with California Vehicle Code Section 23114  Install wheel washers where vehicles enter and exit unpaved roads onto streets, or wash off trucks and equipment leaving the site  Sweep streets at the end of each day if visible soil material is carried onto adjacent paved roads. Water sweepers with reclaimed water shall be used where feasible  All of these fugitive dust mitigation measures shall be shown on grading and building plans  The contractor or builder shall designate a person or persons to monitor the fugitive dust emissions and enhance the implementation of the measures as necessary to minimize dust complaints, reduce visible emissions below 20 percent opacity, and to prevent transport of dust offsite. Their duties shall include holidays and weekend periods when work may not be in progress. The name and telephone number of Introduction Phase 1B & Phase 2 Mitigation and Monitoring Plan 3 such persons shall be provided to the SLOAPCD Compliance Division prior to the start of any grading, earthwork, or demolition. 4. The following standard air quality mitigation measures shall be implemented during construction activities at the project site:  Maintain all construction equipment in proper tune according to manufacturer’s specifications  Fuel all off-road and portable diesel powered equipment with ARB certified motor vehicle diesel fuel (non-taxed version suitable for sue off-road)  Use diesel construction equipment meeting ARB’s Tier 2 certified engines or cleaner off-road heavy-duty diesel engines, and comply with the State Off-Road Regulation  Use on-road heavy-duty trucks that meet the ARB’s 2007 or cleaner certification standard for on-road heavy-duty diesel engines, and comply with the State On-Road Regulation  Construction or trucking companies with fleets that do not have engines in their fleet that meet the engine standards identified in the above two measures (e.g., captive or NOX exempt area fleets) may be eligible by proving alternative compliance  All on- and off-road diesel equipment shall not idle for more than 5 minutes. Signs shall be posted in the designated queuing areas and or job sites to remind drivers and operators of the 5 minute idling limit  Diesel idling within 1,000 feet of sensitive receptors is not permitted  Staging and queuing areas shall not be located within 1,000 feet of sensitive receptors  Electrify equipment when feasible  Substitute gasoline-powered in place of diesel-powered equipment, where feasible  Use alternatively fueled construction equipment onsite where feasible, such as compressed natural gas, liquefied natural gas, propane or biodiesel 5. The following BACT for diesel-fueled construction equipment shall be implemented during construction activities at the project site, where feasible:  Further reduce emissions by expanding use of Tier 3 and Tier 4 off-road and 2010 on-road compliant engines where feasible  Repower equipment with the cleanest engines available  Install California Verified Diesel Emission Control Strategies, such as level 2 diesel particulate filters (these strategies are listed at: www.arb.ca.gov/diesel/verdev/vt/cvt.htm) 6. To reduce ROG and NOX levels during the architectural coating phase, low or no VOC- emission paint shall be used with levels of 50 g/L or less. City of San Luis Obispo Cultural Arts District Parking Structure Project 4 BIOLOGICAL RESOURCES 7. To avoid disturbance of nesting and special-status birds, activities related to the project, including, but not limited to, vegetation removal, ground disturbance, and construction and demolition shall occur outside of the bird breeding season (typically February through August in the project region). If construction must begin within the breeding season, then a pre-construction nesting bird survey shall be conducted no more than 3 days prior to initiation of ground disturbance and vegetation removal activities. The nesting bird pre-construction survey shall be conducted within the Project Boundary, including a 300-foot buffer (500-foot for raptors), on foot, and within inaccessible areas (i.e., private lands) afar using binoculars to the extent practical. The survey shall be conducted by a biologist familiar with the identification of avian species known to occur in the area. If nests are found, an avoidance buffer (which is dependent upon the species, the proposed work activity, and existing disturbances associated with land uses outside of the site) shall be determined and demarcated by the biologist with bright orange construction fencing, flagging, construction lathe, or other means to mark the boundary. All construction personnel shall be notified as to the existence of the buffer zone and to avoid entering the buffer zone during the nesting season. No ground- disturbing activities shall occur within this buffer until the avian biologist has confirmed that breeding/nesting is completed and the young have fledged the nest. Encroachment into the buffer shall occur only at the discretion of the qualified biologist. CULTURAL RESOURCES 8. A qualified principal investigator, defined as an archaeologist who meets the Secretary of the Interior’s Standards for professional archaeology (hereafter qualified archaeologist), shall be retained to carry out all mitigation measures related to archaeological resources. 9. Mitigation of archaeological resources within the project area shall follow the Consolidated Approach as outlined in the City of San Luis Obispo Archaeological Resource Preservation Program Guidelines. The Consolidated Approach shall include (1) the preparation of a Research Design and Mitigation Plan prepared by the qualified archaeologist and submitted for written approval to the City’s Community Development Director (Director), which shall include but not be limited to the research design, laboratory and field methods, public interpretation, and location of curation; (2) monitoring of demolition and clearing of pavement within the project area; (3) fieldwork after the removal of pavement consisting of a Phase I inventory, Phase 2 Testing and Evaluation, and Phase 3 Data Recovery aimed at locating archaeological remains, evaluating their significance and integrity, and mitigating impacts through data recovery excavation; (4) the completion of special studies, such as faunal analysis, if appropriate, and the curation of recovered artifacts; and (5) the completion of a technical report documenting the results of the consolidated approach prepared in accordance with current professional standards and submitted to the Director. 10. An archaeological monitor shall be present for all project-related ground-disturbing construction activities. The monitor(s) shall be onsite on a full-time basis during earthmoving activities, including grading, trenching, vegetation removal, or other excavation activities. Under consultation between the qualified archaeologist and the City, monitoring may be reduced or eliminated based on observed conditions. Introduction Phase 1B & Phase 2 Mitigation and Monitoring Plan 5 11. In the event that cultural resources are encountered during the implementation of Mitigation Measures 9 or 10, all work shall be halted in the vicinity of the discovery until a qualified archaeologist can assess the significance of the resource. If the resources are found to be significant, they must be avoided or mitigated pursuant to the qualified archaeologist’s direction and the testing plan outlined under Mitigation Measure 9. Mitigation may involve preservation in place or documentation and excavation of the resource. A report by the archaeologist evaluating the find and identifying mitigation actions taken shall be submitted to the City GEOLOGY AND SOILS 12. Once the final maximum loads of the project have been determined, a design-level geotechnical report shall be prepared that identifies the most appropriate geotechnical improvements to onsite soils, the foundation, and parking structure to minimize expansive soil hazards. Recommendations could include, but are not limited to the following:  Use imported non-expansive materials combined with pre-moistening of the soils to provide protection for slabs and flatwork  Provide a layer of non-expansive material 18 to 24 inches thick  Use post-tensioned slabs-on-grade  Implement shoring methods, such as shotcrete-faced soil nail walls, tangent drilled caissons, whaler-braced retaining walls, and steel I-beam and lagging walls  Use over-excavation and recompaction  Utilize a deep foundation system, such as caissons or rammed aggregate piers  A certified soils engineer shall be retained for monitoring during construction of the project. The certified soils engineer shall also provide any necessary soil testing during construction, to ensure compliance with the design-level geotechnical report, and to provide site-specific guidance as subsurface materials are encountered. HAZARDS AND HAZARDOUS MATERIALS 13. Prior to issuance of grading permits, additional soil samples testing for total petroleum hydrocarbons shall be performed. A work plan shall be completed to address the sampling protocols to be followed, as well as the number of samples to be taken and the chemical analysis required. Upon City of San Luis Obispo approval, the work plan shall be implemented and the results of the soil sampling shall be forwarded to the City of San Luis Obispo. The City shall review the data to determine if any additional investigation or remedial activities are deemed necessary. No work shall resume in that area until the lead local regulatory agency has provided written authorization that the area does not warrant any additional action. If concentrations of contaminants warrant remediation, contaminated materials shall be remediated either prior to or concurrent with construction. Remediation shall generally include a management plan which establishes design and implementation of remediation. Cleanup may include excavation, disposal, bio-remediation, or any other City of San Luis Obispo Cultural Arts District Parking Structure Project 6 treatment of conditions subject to regulatory action. All necessary reports, regulations and permits shall be followed to achieve cleanup of the site. The contaminated materials shall be remediated under the supervision of an environmental consultant licensed to oversee such remediation and under the direction of the lead oversight agency. The remediation program shall also be approved by the San Luis Obispo Fire Department. All proper waste handling and disposal procedures shall be followed. Upon completion of the remediation, the environmental consultant shall prepare a report summarizing the project, the remediation approach implemented, and the analytical results after completion of the remediation, including all waste disposal or treatment manifests. HISTORICAL RESOURCES 14. Impacts to historical resources shall be minimized through the preparation of archival historic building documentation packages for both 610 and 614 Monterey Street. Prior to issuance of demolition permits, the City of San Luis Obispo shall ensure that documentation of both properties is completed in the form of a Historic American Building Survey (HABS)-Like documentation that shall comply with the Secretary of the Interior’s Standards for Architectural and Engineering Documentation (NPS 1990). The documentation shall generally follow the HABS Level III requirements and include high- quality digital photographic recordation of the buildings and their overall setting, detailed historic narrative report, and compilation of historic research. The documentation shall be completed by a qualified architectural historian or historian who meets the Secretary of the Interior’s Professional Qualification Standards for History and/or Architectural History (NPS 1983). Individual archival documentation packages shall be completed for both properties and offered as donated material to the San Luis Obispo Library and the History Center of San Luis Obispo County, where it would be available to local researchers. Completion of this mitigation measure shall be monitored and enforced by the lead agency. NOISE 15. Construction vehicles and haul trucks shall utilize roadways which avoid residential neighborhoods and sensitive receptors where possible. The applicant shall submit a proposed construction vehicle and hauling route for City review and approval prior to grading/building permit issuance. The approved construction vehicle and hauling route shall be used for all construction vehicles and hauling trips during the duration of construction. 16. Except for emergency repair of public service utilities or where an exception is issued by the Community Development Department, no operation of tools or equipment used in construction, drilling, repair, alteration, or demolition work shall occur daily between the hours of 7:00 PM and 7:00 AM, or anytime on Sundays, holidays, or after sunset, where that operation creates a noise disturbance that exceeds 75 dBA for single family residential, 80 dBA for multi-family residential, and 85 dBA for mixed residential/commercial land uses across a residential or commercial property line for a maximum of 10 days. For construction activities lasting more than 10 days, noise from construction equipment shall not exceed 60 dBA for single family residential, 65 dBA for multi-family residential, and 70 dBA for mixed residential/commercial land uses across a residential or commercial property line. Introduction Phase 1B & Phase 2 Mitigation and Monitoring Plan 7 17. For all construction activity at the project site, noise attenuation techniques shall be employed to reduce noise levels to extent feasible in accordance with the City of San Luis Obispo Municipal Code, Title 9, Chapter 9.12 (Noise Control). Such techniques shall include:  Sound blankets on noise-generating equipment Stationary construction equipment that generates noise levels above 60 dBA at the project boundaries shall be shielded with barriers that meet a sound transmission class (a rating of how well noise barriers attenuate sound) of 25.  All diesel equipment shall be operated with closed engine doors and shall be equipped with factory-recommended mufflers  For stationary equipment, the applicant shall designate equipment areas with appropriate acoustic shielding on building and grading plans. Equipment and shielding shall be installed prior to construction and remain in the designated location throughout construction activities  Electrical power shall be used to power air compressors and similar power tools  The movement of construction-related vehicles, with the exception of passenger vehicles, along roadways adjacent to sensitive receptors shall be limited to the hours between 7:00 AM and 7:00 PM, Monday through Saturday and no movement of heavy equipment shall occur on Sundays or official holidays (e.g., Thanksgiving, Labor Day)  Temporary sound barriers shall be constructed between construction sites and affected uses 18. The contractor shall inform residents and business operators at properties within 300 feet of the project site of proposed construction timelines and noise complaint procedures to minimize potential annoyance related to construction noise. Proof of mailing the notices shall be provided to the Community Development Department before the City issues a zoning clearance. Signs shall be in place before beginning of and throughout grading and construction activities. Noise-related complaints shall be directed to the City’s Community Development Department. 19. Prior to the issuance of grading permits, the City of San Luis Obispo shall review and coordinate the construction schedules of any other projects within 300 feet of the project to ensure that construction schedules do not overlap. PALEONTOLOGICAL RESOURCES 20. A qualified project paleontologist, defined as a paleontologist who meets the standards of the SVP (2010), shall be retained to carry out all mitigation measures related to paleontological resources. 21. Prior to the start of construction, the project paleontologist or his or her designee shall conduct training for construction personnel regarding the appearance of fossils and the procedures for notifying paleontological staff should fossils be discovered by construction staff. The WEAP shall be fulfilled at the time of a preconstruction meeting at which a qualified paleontologist shall attend. City of San Luis Obispo Cultural Arts District Parking Structure Project 8 22. Ground-disturbing construction activities (including grading, trenching, foundation work, and other excavations) in previously undisturbed sediments that exceed 10 feet in depth shall be monitored on a full-time basis during initial ground disturbance. Monitoring shall be conducted by a qualified paleontological monitor, who is defined as an individual who has experience with collection and salvage of paleontological resources and meets the minimum standards of the SVP (2010). The duration and timing of the monitoring will be determined by the project paleontologist and the location and extent of proposed ground disturbance. If the project paleontologist determines that full-time monitoring is no longer warranted, based on the specific geologic conditions at the surface or at depth, the project paleontologist may recommend that monitoring be reduced to periodic spot-checking or cease entirely. Monitoring is not necessary in artificial fill or for activities that do not reach 10 feet in depth. 23. In the event of a fossil discovery by the paleontological monitor or construction personnel, all work in the immediate vicinity of the find shall cease. The project paleontologist shall evaluate the find before restarting construction activity in the area. If it is determined that the fossil(s) is (are) scientifically significant, the project paleontologist shall complete the following conditions to mitigate impacts to significant fossil resources: a. Salvage of Fossils. The project paleontologist (or paleontological monitor) shall recover significant fossils following standard field procedures for collecting paleontological resources, as described by the SVP (2010). Typically, fossils can be safely salvaged quickly by a single paleontologist and not disrupt construction activity. In some cases, larger fossils (such as complete skeletons or large mammal fossils) require more extensive excavation and longer salvage periods. In this case the paleontologist shall have the authority to temporarily direct, divert or halt construction activity to ensure that the fossil(s) can be removed in a safe and timely manner. b. Preparation and Curation of Recovered Fossils. Once salvaged, significant fossils shall be identified to the lowest possible taxonomic level, prepared to a curation- ready condition, and curated in a scientific institution with a permanent paleontological collection (such as the University of California Museum of Paleontology), along with all pertinent field notes, photos, data, and maps. Fossils of undetermined significance at the time of collection may also warrant curation at the discretion of the project paleontologist. TRANSPORTATION 24. Prior to the issuance of each building permit, the construction contractor shall meet with the Public Works department to determine traffic management strategies to reduce, to the maximum extent feasible, traffic congestion and the effects of parking demand by construction workers during construction of this project. The construction contractor will develop a Construction Traffic Management Plan for review and approval by the Public Works department. The plan shall include at least the following items and requirements:  A set of comprehensive traffic control measures, including scheduling of major truck trips and deliveries to avoid peak traffic and pedestrian hours, detour signs if Introduction Phase 1B & Phase 2 Mitigation and Monitoring Plan 9 required, lane closure procedures, sidewalk closure procedures, signs, cones for drivers, and designated construction access routes.  Notification procedures for adjacent property owners and public safety personnel regarding when major deliveries, detours, and lane closures will occur.  Location of construction staging areas for materials, equipment, and vehicles (must be located on the project site).  Identification of haul routes for movement of construction vehicles that would minimize impacts on vehicular and pedestrian traffic, circulation and safety; and provision for monitoring surface streets used for haul routes so that any damage and debris attributable to the haul trucks can be identified and corrected by the project applicant.  Temporary construction fences to contain debris and material and to secure the site.  Provisions for removal of trash generated by project construction activity.  A process for responding to and tracking complaints pertaining to construction activity.  Provisions for monitoring surface streets used for truck routes so that any damage and debris attributable to the trucks can be identified and corrected. It is anticipated that this Construction Traffic Management Plan would be developed in the context of a larger Construction Management Plan, which would address other issues such as hours of construction onsite, limitations on noise and dust emissions, and other applicable items. 25. Subject to approval of the Public Works Director, the City shall incorporate improvements to the intersections of Dana Street/Nipomo Street and Monterey Street/Nipomo Street to enhance pedestrian safety and accessibility. The improvements shall be consistent with the City’s Circulation Element and Downtown Physical Concept Plan (2017) and shall balance the needs of each mode of use. At a minimum the project should consider:  High visibility crosswalk, or other intersection enhancements, with directional curb ramps across Nipomo Street from the northwest corner of Dana Street/Nipomo Street to the southwest corner of the parking structure.  High visibility crosswalk, or other intersection enhancements, with directional curb ramps from the southeast corner of Monterey Street/Nipomo Street across Nipomo Street.  Standard crosswalks, or other intersection enhancements, with directional curb ramps across Monterey Street and Dana Street where they intersect with Nipomo Street.  Reduce the curb radii on the southwest corner of Dana Street/Nipomo Street and the northeast corner of Monterey Street/Nipomo Street. City of San Luis Obispo Cultural Arts District Parking Structure Project 10 If the Community Development Director or hearing body determines that the above mitigation measures are ineffective or physically infeasible, they may add, delete, or modify the mitigation to meet the intent of the original measures. This MMP serves to comply, in part, with these mitigation measures by providing the standards and methods for monitoring to occur during project implementation. This document outlines the steps to be taken during unanticipated discoveries to mitigate potential significant impacts and provides methods for determining if and when monitoring may be reduced or eliminated during the course of project execution. Project Location and Description The project would remove of an existing 77-space surface parking lot and five existing residential structures, and construct a five-level parking structure, commercial space, and non-profit theater on five parcels, identified as Assessor’s Parcel Numbers (APNs) 002-412-001, 002-412-002, 002-412- 003, 002-412-004, 002-412-011, and 002-412-012. Main vehicular access to the structure would be from Palm Street, with secondary access from Nipomo Street. Vehicle access would not be provided from Monterey Street, but a direct pedestrian connection would be provided from the structure to Monterey Street. The parking structure’s maximum height would be 50 feet, excluding elevator towers. The maximum height of the commercial space would be 41 feet above existing grade. The theater would be a three-story structure with a gross floor area of roughly 23,841 square feet. The maximum height of the theater would be approximately 43 feet above existing grade. Section 2.5, Project Characteristics, of the 2018 Final EIR provides a detailed description of the project. The project site is depicted on the San Luis Obispo, California United States Geological Survey (USGS) 7.5-minute topographic map (Figure 1). The project area is bounded on the northwest by Palm Street, on the southwest by Nipomo Street, on the southeast by Monterey Street, and on the northeast by existing residential development. Environmental Resource Sensitivity AESTHETICS/VISUAL RESOURCES BACKGROUND The project site is located in the northwestern portion of the City’s designated Downtown Planning Area, adjacent to the Downtown Core. The majority of the project site and adjacent parcels to the east, south, and west are located within the City’s Downtown Historic District, which affects its visual context along Monterey and Nipomo Streets. Because of the project site’s location in a developed urban area, views of the project site are generally limited, with long-range views blocked by existing development or vegetation. The utility poles and wires that surround and cross over the site are another dominant visual feature of the project site. Elevations onsite range from 190 and 206 feet above mean sea level, and slopes are generally toward the northwest. AIR QUALITY BACKGROUND The South Coast Air Basin is in non-attainment for particulate matter (PM10), and the work area is located within 1,000 feet of sensitive receptors, including Mission College Preparatory Academy, existing residential units, and San Luis Obispo Children’s Museum). In accordance with the standards of the San Luis Obispo Air Pollution Control District CEQA Handbook standard mitigation measures Introduction Phase 1B & Phase 2 Mitigation and Monitoring Plan 11 Figure 1 Project Location Depicted on Topographic Background City of San Luis Obispo Cultural Arts District Parking Structure Project 12 are required during construction of the proposed utility improvements to reduce potential air quality impacts below applicable thresholds of significance. BIOLOGICAL BACKGROUND The project site is currently developed with a surface parking lot, one detached garage, and five residences, and is surrounded by urban land uses. The site does not provide suitable habitat for wildlife or sensitive plant or animal species, or any riparian habitat or other sensitive natural community identified in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service. However, trees on the site may support nesting birds protected under the Migratory Bird Treaty Act. The federal Migratory Bird Treaty Act (16 United States Code Section 703-711) protects all migratory birds, their nests and eggs against take, possession, or destruction. The MBTA was enacted in 1918 and is enforced by the U.S. Fish and Wildlife Service. Abiding by the MBTA requires that active nests be avoided. CULTURAL BACKGROUND The current project is located in the City of San Luis Obispo in close proximity to the Mission San Luis Obispo de Tolosa. In 2018, the City conducted an environmental impact report to determine the potential environmental impacts for the Palm Nipomo Parking Structure Project (City of San Luis Obispo 2018). As part of this analysis the City determined that the current project site was within an archaeologically sensitive area; however, all portions of the project site are developed with hardscaping and likely disturbed due to previous development. As such, a pedestrian survey or archaeological testing was infeasible. Given the project is within areas determined to be sensitive for archaeological resources and in accordance with the City’s Archaeological Resource Preservation Program Guidelines, the project required archaeological monitoring during project-related ground disturbing activities to mitigate potential impacts to cultural resources (City of San Luis Obispo 2018; City of San Luis Obispo 2009). GEOLOGY/SOILS BACKGROUND The site is relatively flat with no significant slopes on or immediately adjacent to the site, and is not subject to geological hazards including landslides and slope instability. The soils consist of alluvial sediments overlying bedrock, with a potential for expansion. The soils are comprised of laterally discontinuous zones of sandy clay, clay, and clayey gravel extending to depths of 25 to 40 feet below the surface. HAZARDS AND HAZARDOUS MATERIALS BACKGROUND A hazardous materials assessment for the project site was prepared in April 2011 by Earth Systems Pacific. Based on the results of a government database records search, the project site is not included on a list of hazardous material sites compiled pursuant to Government Code Section 65962.5. Archived documents at the City of San Luis Obispo Fire Department indicate that the previous use of the site as a welding/automobile repair shop contained several areas of oil-stained soil, a dry well, and a hydraulic lift. It is unknown whether or not soil sampling was conducted at the time of removal of these features and there is a potential that these or other undocumented buried features would be encountered during excavation. Furthermore, soil samples taken in 2005 at three and four feet indicate the presence of total petroleum hydrocarbons in quantities that exceed City of San Luis Obispo Fire Department action levels. Introduction Phase 1B & Phase 2 Mitigation and Monitoring Plan 13 HISTORICAL RESOURCES BACKGROUND The project site is partially located within the locally designated City of San Luis Obispo Downtown Historic District (historic district). The historical resources analysis conducted as part of the 2018 Final EIR indicated the presence of two properties in the project site that contribute to the historic district, 610 and 614 Monterey Street; 614 Monterey Street has also been found individually eligible for historical designation. Due to their designation as contributors to the historic district, and in the case of 614 Monterey Street, its local eligibility, these properties are considered historical resources under CEQA and would be demolished by the project. The 2018 Final EIR determined that, due to the demolition of 610 and 614 Monterey Street, impacts to historical resources as a result of the project would be significant and unavoidable. However, implementation of Mitigation Measure CR-1 is required to reduce impacts to historical resources to the greatest extent possible. In addition to the direct impacts discussed above, the 2018 Final EIR analyzed the potential indirect impacts to historical resources associated with the project, in particular to the locally-designated Hays-Lattimer Adobe and Harmony Creamery. The 2018 Final EIR concluded that although the project would negatively affect the historic integrity of the Hays-Lattimer Adobe and Harmony Creamery, both would retain their ability to convey their significance and therefore, indirect impacts would therefore be less than significant. Therefore, no mitigation additional mitigation is required. NOISE BACKGROUND The primary noise sources in the project area are from U.S. 101, light vehicle traffic along Palm Street, Nipomo Street, and Monterey Street, and occasional noise from the Mission College Preparatory school athletic field. Noise-sensitive receptors closest to the project site include the following: single- and multi-family residential units adjacent to the northeast project boundary; the San Luis Obispo Children’s Museum located across Monterey Street, approximately 50 feet from the southeast project boundary; the Reis Family Mortuary across Nipomo Street, approximately 50 feet from the western project boundary; residential suites on the second story of the mixed-use development on the south corner of the intersection of Dana Street and Nipomo Street, approximately 60 feet from the southern project boundary; single-family residences located across Nipomo Street, approximately 90 feet from the western project boundary; and the Mission College Preparatory school athletic field across Palm Street, approximately 75 feet from the northwest project boundary. PALEONTOLOGICAL BACKGROUND The project site and surrounding region was mapped at a scale of 1:24,000 by Dibblee and Minch (2004), who identified a single geologic unit, Quaternary alluvium, underlying the project site. A geotechnical report for the project found alluvium at the surface or below the artificial fill, reaching a depth of 25 to 44 feet (Earth Systems Pacific 2011). Early Holocene and Pleistocene alluvial sediments have produced scientifically significant fossils throughout California, including San Luis Obispo County, yielding taxa such as mammoth (Mammuthus), mastodon (Mammut), horse (Equus), bison (Bison), camel (Camelops), ground sloth (Paramylodon), and rodent (Sciuridae) (Jefferson et al. 1992; Jefferson 2010; Paleobiology Database 2022; University of California Museum of Paleontology 2022). City of San Luis Obispo Cultural Arts District Parking Structure Project 14 TRANSPORTATION BACKGROUND Regional access to the project site is provided by U.S. 101, located west and north of the study area, and Highway 1, which coincides with and is designated Santa Rosa Street (north of U.S. Highway 101) near the project site. All of the study area roadways are classified as Local Commercial streets in the City’s General Plan Circulation Element. Plan Check Requirements Phase 1B & Phase 2 Mitigation and Monitoring Plan 15 2 Plan Check Requirements The following outlines the mitigation requirements that shall be reflected on final plans and/or project specifications. 1. Prior to issuance of building permits the Community Development Director or other City compliance monitor shall confirm Architectural Review Committee review and approval of a comprehensive lighting plan consistent with the Municipal Code Night Sky Ordinance, and prepared using guidance and best practices endorsed by the International Dark Sky Association. The lighting plan shall include:  Identification of all types, sizes, and intensities of wall mounted building lights and landscape accent lighting  A photometric map  Shielding of point sources of all exterior lighting from offsite views  Directing light downward and cut-off fixtures or shields  Lumination from exterior lights at the lowest level allowed by public safety standards  Exterior lighting design that does not focus illumination onto exterior walls  No internal illumination of any signage visible from offsite 2. Prior to issuance of building permits the Community Development Director or other City compliance monitor shall review the final building plans to verify that roof and building materials are non-reflective, and are muted in hues consistent with standards in the Community Design Guidelines, Section 6.1-C. 3. Prior to issuance of grading permit the Community Development Director or other City compliance monitor shall review the final grading plans to verify the following air quality mitigation requirements are reflected in final plans or specifications (these requirements may be developed in the context of a larger Construction Management Plan): FUGITIVE DUST CONTROL REQUIREMENTS  Reduce the amount of the disturbed area where possible  Water trucks or sprinkler systems shall be used during construction in sufficient quantities to prevent airborne dust from leaving the site. Increased watering frequency shall be required whenever wind speeds exceed 15 mph. Reclaimed (non- potable) water shall be used whenever possible  All dirt stock pile areas shall be sprayed daily as needed  Permanent dust control measures identified in the approved project revegetation and landscape plans shall be implemented as soon as possible following completion of any soil disturbing activities City of San Luis Obispo Cultural Arts District Parking Structure Project 16  Exposed ground areas that are planned to be reworked at dates greater than one month after initial grading shall be sown with a fast germinating, non-invasive grass seed and watered until vegetation is established  All disturbed soil areas not subject to revegetation shall be stabilized using approved chemical soil binders, jute netting, or other methods approved in advance by the SLOAPCD  All roadways, driveways, sidewalks, etc. to be paved shall be completed as soon as possible after grading unless seeding or soil binders are used  Vehicle speed for all construction vehicles shall not exceed 15 miles per hour (mph) on any unpaved surface at the construction site  All trucks hauling dirt, sand, soil, or other loose materials are to be covered or shall maintain at least two feet of freeboard (minimum vertical distance between top of load and top of trailer) in accordance with California Vehicle Code Section 23114  Install wheel washers where vehicles enter and exit unpaved roads onto streets, or wash off trucks and equipment leaving the site  Sweep streets at the end of each day if visible soil material is carried onto adjacent paved roads. Water sweepers with reclaimed water shall be used where feasible  All of these fugitive dust mitigation measures shall be shown on grading and building plans  The contractor or builder shall designate a person or persons to monitor the fugitive dust emissions and enhance the implementation of the measures as necessary to minimize dust complaints, reduce visible emissions below 20 percent opacity, and to prevent transport of dust offsite. Their duties shall include holidays and weekend periods when work may not be in progress. The name and telephone number of such persons shall be provided to the SLOAPCD Compliance Division prior to the start of any grading, earthwork, or demolition. STANDARD CONTROL MEASURES FOR CONSTRUCTION EQUIPMENT  Maintain all construction equipment in proper tune according to manufacturer’s specifications  Fuel all off-road and portable diesel powered equipment with ARB certified motor vehicle diesel fuel (non-taxed version suitable for sue off-road)  Use diesel construction equipment meeting ARB’s Tier 2 certified engines or cleaner off-road heavy-duty diesel engines, and comply with the State Off-Road Regulation  Use on-road heavy-duty trucks that meet the ARB’s 2007 or cleaner certification standard for on-road heavy-duty diesel engines, and comply with the State On-Road Regulation  Construction or trucking companies with fleets that do not have engines in their fleet that meet the engine standards identified in the above two measures (e.g., captive or NOX exempt area fleets) may be eligible by proving alternative compliance Plan Check Requirements Phase 1B & Phase 2 Mitigation and Monitoring Plan 17  All on- and off-road diesel equipment shall not idle for more than 5 minutes. Signs shall be posted in the designated queuing areas and or job sites to remind drivers and operators of the 5 minute idling limit  Diesel idling within 1,000 feet of sensitive receptors is not permitted  Staging and queuing areas shall not be located within 1,000 feet of sensitive receptors  Electrify equipment when feasible  Substitute gasoline-powered in place of diesel-powered equipment, where feasible  Use alternatively fueled construction equipment onsite where feasible, such as compressed natural gas, liquefied natural gas, propane or biodiesel BEST AVAILABLE CONTROL TECHNOLOGY (BACT) FOR CONSTRUCTION EQUIPMENT  Further reduce emissions by expanding use of Tier 3 and Tier 4 off-road and 2010 on-road compliant engines where feasible  Repower equipment with the cleanest engines available  Install California Verified Diesel Emission Control Strategies, such as level 2 diesel particulate filters (these strategies are listed at: www.arb.ca.gov/diesel/verdev/vt/cvt.htm) ARCHITECTURAL COATING  Low or no VOC-emission paint shall be used with levels of 50 g/L or less 4. Prior to issuance of grading and building permits the Community Development Director or other City compliance monitor shall review and approve a design-level geotechnical report that identifies the most appropriate geotechnical improvements to onsite soils, the foundation, and parking structure to minimize expansive soil hazards. 5. Prior to issuance of grading and building permits the Community Development Director or other City compliance monitor shall review the grading and building final plans to verify all geotechnical improvements to onsite soils, the foundation, and parking structure identified in the approved design-level geotechnical report are reflected on final grading and building plans. 6. Prior to issuance of grading permit the Community Development Director or other City compliance monitor shall review and approve a work plan for soil sample testing for site associated potential constituents of concern including metals, polycyclic aromatic hydrocarbons, and total petroleum hydrocarbons. The work plan shall address the sampling protocols to be followed, the number of samples to be taken, and the chemical analysis required. Upon City of San Luis Obispo approval, the work plan shall be implemented and the results of the soil sampling shall be forwarded to the City of San Luis Obispo. The City shall review the data to determine if any additional investigation or remedial activities are deemed necessary. No work shall resume in that area until the lead local regulatory agency has provided written authorization that the area does not warrant any additional action. If concentrations of contaminants warrant remediation or other special handling, contaminated materials shall be remediated either prior to or concurrent with construction. Impacted soil not requiring remediation would be excavated, stored, transported, and disposed City of San Luis Obispo Cultural Arts District Parking Structure Project 18 following a lead oversight agency approved soil management plan. If remediation of soil impacts beyond the planned area of excavation is warranted, a remedial action plan may be required. All necessary reports, regulations and permits shall be followed to achieve cleanup of the site. The contaminated materials shall be properly managed under the supervision of an environmental consultant licensed to oversee such remediation and under the direction of the lead oversight agency (likely San Luis Obispo County Public Health Environmental Health Services Division). Permitting for the excavation of contaminated soil may also be required from the San Luis Obispo Air Pollution Control District. The remediation or soil management program shall also be approved by the San Luis Obispo City Fire Department. All proper waste handling and disposal procedures shall be followed. Upon completion of the remediation or soil management activities, the environmental consultant shall prepare a report summarizing the project, the remediation approach or soil management implemented, and the analytical results, including all waste disposal or treatment manifests. The remediation or management of impacted soil can be performed concurrently with excavation for project construction. HAZWOPER certified workers may be required. 7. Prior to issuance of demolition permits the Community Development Director or other City compliance monitor shall review and approve archival historic building documentation packages for both 610 and 614 Monterey Street that comply with the Secretary of the Interior’s Standards for Architectural and Engineering Documentation (NPS 1990). The documentation shall follow the Historic American Building Survey (HABS) Level III requirements and include high-quality digital photographic recordation of the buildings and their overall setting, detailed historic narrative report, and compilation of historic research. The documentation shall be completed by a qualified architectural historian or historian who meets the Secretary of the Interior’s Professional Qualification Standards for History and/or Architectural History (NPS 1983). Individual archival documentation packages shall be completed both properties and offered as donated material to the San Luis Obispo Library and the History Center of San Luis Obispo County, where it would be available to local researchers. Completion of this mitigation measure shall be monitored and enforced by the lead agency. 8. Prior to issuance of grading and building permits the Public Works Director or other City compliance monitor shall review and approve a construction vehicle and hauling route that shall be used for all construction vehicles and hauling trips during the duration of construction. (This measure may be developed in the context of a larger Construction Management Plan.) 9. Prior to issuance of grading and building permits the Public Works Director or other City compliance monitor shall review the final grading and building plans to verify the following noise mitigation requirements are reflected in final plans or specifications (these requirements may be developed in the context of a larger Construction Management Plan): CONSTRUCTION WORK HOURS  Except for emergency repair of public service utilities or where an exception is issued by the Community Development Department, no operation of tools or equipment used in construction, drilling, repair, alteration, or demolition work shall occur daily between the hours of 7:00 PM and 7:00 AM, or anytime on Sundays, holidays, or after sunset, where that operation creates a noise disturbance that exceeds 75 dBA for single family residential, 80 dBA for multi-family residential, and 85 dBA for mixed residential/commercial land uses across a residential or commercial property line for a maximum of 10 days. For construction activities Plan Check Requirements Phase 1B & Phase 2 Mitigation and Monitoring Plan 19 lasting more than 10 days, noise from construction equipment shall not exceed 60 dBA for single family residential, 65 dBA for multi-family residential, and 70 dBA for mixed residential/commercial land uses across a residential or commercial property line. CONSTRUCTION EQUIPMENT NOISE MANAGEMENT TECHNIQUES  For all construction activity at the project site, noise attenuation techniques shall be employed to reduce noise levels to extent feasible in accordance with the City of San Luis Obispo Municipal Code, Title 9, Chapter 9.12 (Noise Control). Such techniques shall include:  Sound blankets on noise-generating equipment Stationary construction equipment that generates noise levels above 60 dBA at the project boundaries shall be shielded with barriers that meet a sound transmission class (a rating of how well noise barriers attenuate sound) of 25.  All diesel equipment shall be operated with closed engine doors and shall be equipped with factory-recommended mufflers  For stationary equipment, the applicant shall designate equipment areas with appropriate acoustic shielding on building and grading plans. Equipment and shielding shall be installed prior to construction and remain in the designated location throughout construction activities  Electrical power shall be used to power air compressors and similar power tools  The movement of construction-related vehicles, with the exception of passenger vehicles, along roadways adjacent to sensitive receptors shall be limited to the hours between 7:00 AM and 7:00 PM, Monday through Saturday and no movement of heavy equipment shall occur on Sundays or official holidays (e.g., Thanksgiving, Labor Day)  Temporary sound barriers shall be constructed between construction sites and affected uses 10. Prior to issuance of grading permits the Public Works Director or other City compliance monitor shall review and coordinate the construction schedules of any other projects within 300 feet of the project to ensure that construction schedules do not overlap. 11. Prior to issuance of zoning clearance the Community Development Director or other City compliance monitor shall review and approve proof that the contractor has mailed notices to residents and business operators at properties within 300 feet of the project site of proposed construction timelines and noise complaint procedures to minimize potential annoyance related to construction noise. 12. Prior to issuance of each building permit the Public Works Director or other City compliance monitor shall review and approve a Construction Traffic Management Plan that identifies traffic management strategies to reduce, to the maximum extent feasible, traffic congestion and the effects of parking demand by construction workers during construction of this project. (This measure may be developed in the context of a larger Construction Management Plan.) The Construction Traffic Management Plan shall include: City of San Luis Obispo Cultural Arts District Parking Structure Project 20  A set of comprehensive traffic control measures, including scheduling of major truck trips and deliveries to avoid peak traffic and pedestrian hours, detour signs if required, lane closure procedures, sidewalk closure procedures, signs, cones for drivers, and designated construction access routes.  Notification procedures for adjacent property owners and public safety personnel regarding when major deliveries, detours, and lane closures will occur.  Location of construction staging areas for materials, equipment, and vehicles (must be located on the project site).  Identification of haul routes for movement of construction vehicles that would minimize impacts on vehicular and pedestrian traffic, circulation and safety; and provision for monitoring surface streets used for haul routes so that any damage and debris attributable to the haul trucks can be identified and corrected by the project applicant.  Temporary construction fences to contain debris and material and to secure the site.  Provisions for removal of trash generated by project construction activity.  A process for responding to and tracking complaints pertaining to construction activity.  Provisions for monitoring surface streets used for truck routes so that any damage and debris attributable to the trucks can be identified and corrected. 13. Prior to issuance of grading and building permits the Public Works Director or other City compliance monitor shall review the grading and building final plans to verify required improvements to the intersections of Dana Street/Nipomo Street and Monterey Street/Nipomo Street are reflected on final grading and building plans. The required improvements shall be consistent with the City’s Circulation Element and Downtown Physical Concept Plan (2017) and shall balance the needs of pedestrian, bicycle, and vehicle modes of use. At a minimum the required improvements shall include:  High visibility crosswalk, or other intersection enhancements, with directional curb ramps across Nipomo Street from the northwest corner of Dana Street/Nipomo Street to the southwest corner of the parking structure.  High visibility crosswalk, or other intersection enhancements, with directional curb ramps from the southeast corner of Monterey Street/Nipomo Street across Nipomo Street.  Standard crosswalks, or other intersection enhancements, with directional curb ramps across Monterey Street and Dana Street where they intersect with Nipomo Street.  Reduce the curb radii on the southwest corner of Dana Street/Nipomo Street and the northeast corner of Monterey Street/Nipomo Street. Additional plans requiring review and approval by the Community Development Director prior to Encroachment Permit issuance include an archaeological monitoring plan consistent with the requirements of the City’s Archaeological Resource Preservation Guidelines, which is incorporated in this MMP as Section 3, Monitoring Requirements. Monitoring Requirements Phase 1B & Phase 2 Mitigation and Monitoring Plan 21 3 Monitoring Requirements AIR QUALITY MITIGATION MONITORING REQUIREMENTS Periodically during construction (minimum once per month) the City compliance monitor shell field verify compliance with the Fugitive Dust Control Requirements, Standard Control Measures for Construction Equipment, BACT for Construction Equipment, and Architectural Coating mitigation requirements reflected in final plans and specifications. Periodic field monitoring shall continue until the City compliance monitor has determined that the specific mitigation requirements have been fully met and/or construction is complete. BIOLOGICAL RESOURCES/NESTING BIRD MITIGATION MONITORING REQUIREMENTS If construction activities related to the project, including, but not limited to, vegetation removal, ground disturbance, and construction and demolition, must begin between February through August, prior to initiation of construction activities the City compliance monitor shall ensure a qualified biologist completes a pre-construction nesting bird survey no more than 3 days prior to initiation of ground disturbance and vegetation removal activities. The nesting bird pre-construction survey shall be conducted within the Project Boundary, including a 300-foot buffer (500-foot for raptors), on foot, and within inaccessible areas (i.e., private lands) afar using binoculars to the extent practical. If nests are found, an avoidance buffer (which is dependent upon the species, the proposed work activity, and existing disturbances associated with land uses outside of the site) shall be determined and demarcated with bright orange construction fencing, flagging, construction lathe, or other means to mark the boundary by the qualified biologist under the supervision of the City compliance monitor. The City compliance monitor shall notify all construction personnel as to the existence of the buffer zone and to avoid entering the buffer zone during the nesting season. No ground- disturbing activities shall occur within this buffer until the qualified biologist has confirmed that breeding/nesting is completed and the young have fledged the nest. Encroachment into the buffer shall occur only at the discretion of the qualified biologist. CULTURAL/ARCHAEOLOGICAL RESOURCES MITIGATION MONITORING REQUIREMENTS In compliance with the 2018 Final EIR archaeological monitoring is required for all project-related ground disturbance . All archaeological monitoring efforts shall be conducted under the direction of an archaeologist meeting the Secretary of the Interior’s Professional Qualifications Standards for archaeology (National Park Service [NPS] 1983; hereafter, Qualified Archaeologist). Archaeological monitor(s) shall be onsite during all project-related earthmoving activities. Earthmoving activities include, but are not limited to, vegetation removal, grading, excavation, trenching, and all other excavation activities. During monitoring, the monitors shall examine the work areas for the presence of prehistoric artifacts (e.g., chipped stone tools and production debris, stone milling tools, ceramics), historic-period debris (e.g., metal, glass, ceramics), and/or soil discoloration that might indicate the presence of a cultural midden. Each monitor shall maintain a daily log documenting ground disturbing activity, work locations, description and provenience of any archaeological discoveries (if any), and any necessary action items for monitoring City of San Luis Obispo Cultural Arts District Parking Structure Project 22 In the event of a find, the archaeological monitors retain the authority to temporarily halt and redirect work until the resource(s) have been evaluated and the area cleared for construction activities to recommence. If the archaeological resource is prehistoric in nature, a local Native American group will be contacted to and given the opportunity consult with the City regarding the find and provide recommendation. A Native American monitor will be retained for the remainder of earth disturbing activities should a prehistoric resource be found during construction. Protocols in the case of a find are discussed in greater detail in Section 4 below. Monitoring shall continue until the Qualified Archaeologist, in coordination with the City (and Native American monitor if present), has determined that the monitoring may be reduced or eliminated. Reasons for reducing or eliminating monitoring may include but not be limited to observed field conditions such as: soils that appear to lack any organic material (sterile), soils that are determined to be not native to the area, areas found to be heavily disturbed by modern activities, or the encounter of undisturbed hardpan/bedrock type soil conditions or depth of excavation (i.e., exceeds a depth where cultural resources may reasonably be expected). When/if culturally sterile soils are encountered during monitoring, the Qualified Archaeologist will provide a written recommendation (via email or other method acceptable to the City) to reduce or eliminate the monitoring effort. Should the City accept the recommendation, the reduction or elimination will commence immediately upon approval. NOISE MITIGATION MONITORING REQUIREMENTS Prior to initiation of grading and construction activities the City compliance monitor shall field verify signs are in place directing noise-related complaints to the City’s Community Development Department. Periodically during construction (minimum once per week) the City compliance monitor shall field verify compliance with signage requirements, in addition to the Construction Work Hours and Construction Equipment Noise Management Techniques mitigation requirements reflected in final plans and specifications. Periodic field monitoring shall continue until the City compliance monitor has determined that the specific mitigation requirements have been fully met and/or construction is complete. PALEONTOLOGICAL RESOURCES MITIGATION MONITORING REQUIREMENTS In compliance with the 2018 Final EIR, paleontological monitoring is required during initial ground disturbance of sediments deeper than 10 feet below surface, with the project paleontologist (defined as an individual meeting the standards of a Qualified Professional Paleontologist per SVP [2010]) modifying the monitoring schedule as appropriate (City of San Luis Obispo 2007). Excavations that are less than 10 feet below the surface or are in previously disturbed sediments, do not require monitoring. Monitoring will be conducted by a paleontological monitor (defined as an individual meeting the standards of a Qualified Paleontological Monitor per the standards of the SVP [2010]). Monitoring will consist of the visual inspection of excavated or graded areas, trench and pit sidewalls, and spoils piles. Paleontological monitoring is documented in daily electronic monitoring logs, which at a minimum, include a description of areas monitored, monitor name(s), a summary of monitoring activities, and a description of the disturbed geologic units within a stratigraphic context. In paleontologically sensitive areas, or in adjacent areas that can provide context for the geology and paleontology, Monitoring Requirements Phase 1B & Phase 2 Mitigation and Monitoring Plan 23 outcrops and cut exposures will be examined and observed geologic features will be recorded when/if available. The paleontological monitor will be equipped with hand tools and supplies (e.g., geological hammer, shovel, pick, chisels, whisk broom, buckets, specimen bags, field notebook, forms, pens, markers, and glue) to allow for the rapid salvage of fossil remains. At all times, the paleontological monitor will wear the appropriate personal protective equipment in compliance with the on-site contractor PPE work rules, including a hard hat, heavy footwear, sleeved shirt, long pants, safety glasses, and a high-visibility safety vest. In the event of a find, the paleontological monitor retains the authority to temporarily halt and redirect work until the resource(s) have been evaluated and the area cleared for construction activities to recommence. Monitoring shall continue until the project paleontologist, in coordination with the City, has determined that the monitoring may be reduced or eliminated. Reasons for reducing or eliminating monitoring may include but not be limited to observed field conditions such as: soils that appear to lack any potential to encounter paleontological resources (sterile), soils that are determined to be not native to the area, or areas found to be heavily disturbed by modern activities. When/if paleontologically sterile soils are encountered during monitoring, the project paleontologist will provide a written recommendation (via email or other method acceptable to the City) to reduce or eliminate the monitoring effort. Should the City accept the recommendation, the reduction or elimination will commence immediately upon approval. If the construction schedule changes or excavations begin in a new area, the project paleontologist may reinstate paleontological monitoring. City of San Luis Obispo Cultural Arts District Parking Structure Project 24 4 Archaeological Testing Requirements In compliance with Mitigation Measure 9, “fieldwork after the removal of pavement consisting of a Phase I inventory, Phase II Testing and Evaluation, and Phase III Data Recovery aimed at locating archaeological remains, evaluating their significance and integrity, and mitigating impacts through data recovery excavation; the completion of special studies, such as faunal analysis, if appropriate” is required. As part of mitigation, an extended Phase I of CA-SLO-2431H shall be conducted. If CA-SLO-2431H contains subsurface cultural materials, the resource shall be evaluated for significance and eligibility for listing in the CRHR through the implementation of a Phase II evaluation program. Phase II evaluations shall include any necessary archival research to identify significant historical associations as well as mapping of surface artifacts, collection of functionally or temporally diagnostic tools and debris, and excavation of a sample of the cultural deposit to characterize the nature of the sites, define the artifact and feature contents, determine horizontal boundaries and depth below surface, and retrieve representative samples of artifacts and other remains. If the resource is found eligible for listing on the NRHP, CRHR, or local register, a Phase III data recovery program shall be conducted to mitigate the impacts to the resource if avoidance remains infeasible. A data recovery program shall include the development of a site-specific research design, testing program, laboratory analysis, and reporting with the intention of extracting data from the resource to the point of redundancy. Cultural materials collected from the sites shall be processed and analyzed in the laboratory according to standard archaeological procedures. The age of archaeological resources shall be determined using radiocarbon dating or other appropriate procedures; metal, ceramic, faunal remains, and other cultural materials shall be identified and analyzed according to current professional standards. The significance of the resource shall be evaluated according to the criteria of the CRHR. The results of the investigations shall be presented in a technical report following the standards of the California Office of Historic Preservation publication “Archaeological Resource Management Reports: Recommended Content and Format (1990 or latest edition).” Any necessary archaeological data recovery excavation shall be carried out by a Registered Professional Archaeologist according to a research design reviewed and approved by the City, as the lead agency, and prepared in advance of fieldwork and using appropriate archaeological field and laboratory methods consistent with the California Office of Historic Preservation Planning Bulletin 5 (1991), Guidelines for Archaeological Research Design, or the latest edition thereof. Upon completion of the work, all artifacts, other cultural remains, records, photographs, and other documentation shall be curated an appropriate curation facility to be determined on a case-by-case basis in consultation with the City and interested parties (e.g., historical organizations). Resource Discovery Plan Phase 1B & Phase 2 Mitigation and Monitoring Plan 25 5 Resource Discovery Plan The following outlines the procedures to be followed in the inadvertent discovery of cultural resources, including human remains. Discovery of Archaeological Resources The procedure for dealing appropriately with unanticipated resources encountered during construction will include, but not be limited to, the following: For the discovery of previously unknown archaeological resources: The archaeological monitor will divert construction activity in the immediate vicinity of the find by signaling to construction staff and notifying the designated construction foreman. The monitor will report the discovery to Rincon’s qualified archaeologist and the City’s construction inspector. The “immediate vicinity” will vary depending upon specific circumstances. If the archaeological resource is prehistoric in nature, a local Native American group will consult about the find, and a Native American monitor will be retained for the remainder of earth disturbing activities. Upon completion of the above notification, the archaeological monitor will determine the nature and extent of the cultural remains and make a preliminary assessment of their integrity and potential importance. If the archaeological monitor determines that the discovery is not cultural, or is an isolated artifact, the monitor will immediately notify the qualified archaeologist and construction manager that activities may resume as soon as the archaeological item(s) has been properly photographed and recorded. If potentially significant cultural features, artifact concentrations, or intact deposits are discovered, the archaeological monitor will divert construction activity in the immediate vicinity and report the discovery to the qualified archaeologist and the City’s construction inspector so that appropriate notifications to the City can be issued. A temporary Construction Exclusion Zone (CEZ), consisting of lath and flagging tape, will be erected around the discovery. The size of the CEZ may be reduced or enlarged as the significance and extent of the find is determined and treatment measures are implemented. For the purposes of the current effort, a minimum 100-foot radius shall be established for any remains that are suspected of being human (see Section 4.2 for further direction related to the discovery of human remains). Isolated artifacts shall be marked by an orange cone or flagging with no additional radius. In the case of the discovery of an intact archaeological site, a radius of 100 feet may be established so that the resource may be evaluated. This radius may be reduced or expanded based on the nature of the resource and the area required for archaeologists to work safely. The CEZ will not be removed until the potentially significant cultural resource has been evaluated to assess whether it is classified as a “historical resource,” pursuant to the California Environmental Quality Act (CCR, § 15064.5[a]). To minimize construction delays, if a potentially significant cultural resource is discovered during monitoring, Rincon will immediately contact the City to formulate a plan for further treatment. Cultural resources identified within the site shall be recorded according to current archaeological standards. This shall include the preparation of California Department of Parks and Recreation (DPR) Series 523 forms. Pertinent information concerning the resource(s) shall be recorded, including the site type, components, size, and provenience. Upon completion, the Series 523 forms shall be City of San Luis Obispo Cultural Arts District Parking Structure Project 26 submitted to the California Historical Resources Information System’s Central Coast Information Center, located at the Santa Barbra Museum of Natural History for primary number and trinomial designation. Final copies of the Series 523 forms shall be included in the final monitoring report. In addition to the Series 523 forms, a final compliance report shall be prepared as presented in Section 5.1 below. Discovery of Human Remains There is a possibility that the project’s construction-related activities may encounter human burials or cremations. Therefore, if the project’s construction-related activities find potential human bone, ground-disturbing activities in the area of the discovery shall immediately be halted or redirected while a temporary CEZ surrounding the site of discovery is established to allow for further examination and treatment of the find. The qualified archaeologist shall also immediately notify the City and the San Luis Obispo County Coroner’s Office by telephone, pursuant to Health and Safety Code 7050.5. By law, the Coroner will determine within 48 hours of being notified if the remains are subject to his or her authority. If the human remains are determined to be prehistoric, the coroner will notify the Native American Heritage Commission, which will determine and notify a most likely descendant (MLD). The MLD shall complete the inspection of the site within 48 hours of being granted access and provide recommendations for the treatment of any human remains and artifacts associated with Native American burials. Discovery of Paleontological Resources In the event of a paleontological resource discovery, all work in the immediate vicinity of the discovery will be halted and a 50-foot buffer will be delineated around the discovery, to create a construction equipment exclusion zone to allow the paleontological monitor a safe zone to work within. The project paleontologist will determine if the discovery has fossil(s) that have the potential to be significant, and if they do, they shall recover the fossils following standard field procedures. Most fossils can be safely salvaged quickly by a single paleontological monitor and not disrupt construction activity. In some cases, larger fossils (such as complete skeletons or large mammal fossils) require more extensive excavation and longer salvage periods. During recovery of potentially significant fossils, the paleontological monitor will document all identification and recovery efforts, including assigning a unique field number to each fossil specimen, fossil locality, or sediment sample, and record the field number and associated specimen/sample data (identification by taxon and element, sample size, etc.), corresponding geologic data (particularly lithology, stratigraphic unit, stratigraphic level within the unit, inferred age, etc.), and geographic site data (UTM coordinate location, elevation, etc.) in their field notes. Reporting of Monitoring Results and Curation Finds Phase 1B & Phase 2 Mitigation and Monitoring Plan 27 6 Reporting of Monitoring Results and Curation Finds Reporting of Archaeological Monitoring Results At the conclusion of the construction activities requiring archeological monitoring, an archaeological monitoring report shall be prepared under the direction of the qualified archaeologist. The monitoring report will outline the methodology of archaeological mitigation at the project site, describe the construction activity and duration, and present the results of the monitoring. The level of effort to complete a monitoring report is dependent on the number of resources recovered during monitoring activities. Should the monitoring effort be negative for the identification of cultural resources, a negative letter report shall be prepared. The letter report shall include, at a minimum, the dates of monitoring, activities conducted, personnel, and field logs. If archaeological materials are recovered, a comprehensive technical report will also be required to describe and interpret findings and data. The technical report shall be prepared in accordance with the Archaeological Resources Management Reports (ARMR): Recommended Contents and Format. If required, the ARMR-format report shall include a complete description of resources identified during monitoring, treatment of those resources, National Register of Historic Places (NRHP) eligibility recommendations, site records, and site maps. The final version of the monitoring report shall be submitted to the City and the Central Coast Information Center of the California Historical Resources Information Center. Curation of Archaeological Finds Recovered archaeological finds not associated with burials will be temporarily stored by Rincon until either an appropriate on-site reburial location or repository is agreed upon by the City, other interested Native American groups, and/or MLD. If necessary, curation preparation will include creating acid-free labels and tags, placing artifacts in archival quality bags and boxes, and submitting a hard copy of the report on acid-free paper with and the artifacts to the selected curation facility. Permanent treatment of human remains and associated funerary items shall be determined by the MLD in coordination with the City. Reporting of Paleontological Monitoring Results At the conclusion of construction activities requiring paleontological monitoring, a paleontological monitoring report shall be prepared under the direction of the project paleontologist. The monitoring report will present the paleontological mitigation and the methods by which it was satisfied within the project site. The level of effort to complete a monitoring report is dependent on the nature of the resources recovered during construction. Should the monitoring effort be negative for the identification of paleontological resources, a negative letter report shall be prepared. The letter report shall include, at a minimum, the dates of monitoring, activities conducted, personnel, and field logs. If paleontological resources are recovered, a comprehensive technical report will be City of San Luis Obispo Cultural Arts District Parking Structure Project 28 required to describe and interpret findings and data consistent with the requirements of the SVP (2010). Curation of Paleontological Resources All paleontological resources and data recovered from the project site shall be curated together at the Santa Barbara Museum of Natural History. All collected fossil resources are the property of the City and shall be provided to the Santa Barbara Museum of Natural History along with a deed of gift. Curation would require placement of fossils into archival specimen trays with labels containing relevant curatorial information. A copy of the Project’s curation agreement with the Santa Barbara Museum of Natural History is attached as Appendix 1. References Phase 1B & Phase 2 Mitigation and Monitoring Plan 29 7 References National Park Service 1983 Archaeology and Historic Preservation: Secretary of the Interior’s Standards and Guidelines. Washington, DC. https://www.nps.gov/history/local- law/arch_stnds_0.htm, accessed April 1, 2022. City of San Luis Obispo 2018 Final Environmental Impact Report and Mitigation Monitoring and Reporting Program for the Palm Nipomo Parking Structure Project. On file with the City of San Luis Obispo City of San Luis Obispo 2009 Archaeological Resource Preservation Program Guidelines. https://www.slocity.org/home/showpublisheddocument/4140/6354976496520000 00, accessed May 27, 2022 Earth Systems Pacific 2011 Geotechnical, Geologic, and Hazardous Materials Assessment Report, Palm and Nipomo Parking Structure, Palm and Nipomo Streets, San Luis Obispo, California. April 21, 2011. Jefferson, G.T. 2010 A catalogue of late Quaternary vertebrates from California. Natural History Museum of Los Angeles County Technical Report. Volume 7, pp. 5-172. Jefferson, G.T., H.L. Fierstine, J.R. Wesling, and T.-L. Ku. 1992 Pleistocene terrestrial vertebrates from near Point San Luis, and other localities in San Luis Obispo County, California, Bulletin of the Southern California Academy of Sciences. Volume 91, pp. 26-38. Paleobiology Database 2022 The Paleobiology Database, http://paleobiodb.org/ (accessed June 2022) Society of Vertebrate Paleontology (SVP) 2010 Standard Procedures for the Assessment and Mitigation of Adverse Impacts to Paleontological Resources. Society of Vertebrate Paleontology Impact Mitigation Guidelines Revision Committee. https://vertpaleo.org/wp- content/uploads/2021/01/SVP_Impact_Mitigation_Guidelines-1.pdf. University of California Museum of Paleontology 2022 UCMP online database specimen search portal, http://ucmpdb.berkeley.edu/ (accessed June 2022) Appendix 1 CURATION AGREEMENT WITH THE SANTA BARBARA MUSEUM OF NATURAL HISTORY June 21st, 2022 Zachary Lerma Rincon Consultants 213-788-4842 x4001 Subject: Repository agreement for acceptance of fossils from San Luis Obispo Cultural Arts Parking Project (22-12836) from the City of San Luis Obispo Dear Zachary, This letter serves as confirmation of the conditions regarding acceptance of the fossil material from the San Luis Obispo Cultural Arts Parking Project (22-12836) into the Earth Science Collection at the Santa Barbara Museum of Natural History (SBMNH). The SBMNH actively curates and provides a safe repository for specimens using contemporary methods for preserving fossils, including maintaining microenvironments in environmentally-controlled collections ranges, maintaining a digital database that archives all contextual data associated with each specimen, and maintaining a fossil preparation laboratory to repair and conserve fossils. The SBMNH is willing to consider accepting the collection(s) if all of the following conditions are met:  All collections must be accompanied by deed-of-gift and transfer of ownership documentation giving free and clear title of the collection to SBMNH.  Material from government lands must be accompanied by a copy of the official collecting permit.  All localities must be described in detail, including a precise description of the geographic location with GPS coordinates (stating datum used), lithology, stratigraphy (including unit designation), relative/absolute ages, and depositional environment if known.  All localities must be plotted on standard USGS topographic or geologic maps and located within Santa Barbara, Ventura, or San Luis Obispo counties. In certain situations, collections derived from localities outside of those counties may be accepted on a case-by-case basis with prior approval from the Earth Science Curator.  All collections must include a specimen catalog that clearly correlates physical specimens to locality and preparation data.  All collections must include printed and digital copies of final reports, any field notes, environmental impact reports, maps, charts, photographs, and other documentation as appropriate. All records must include site number and accession number.  All specimens must be fully stabilized and prepared. Specimens must be accompanied by notes on preparation methods, including consolidants and tools used.  All specimens must be identified to the lowest taxonomic level possible.  Larger specimens (e.g., mammoth limb bones) must be fully supported in archival cradles (field jackets are not acceptable).  If the collection is relatively large, it must be accompanied by the same specimen cabinets, drawers, and archival-quality trays used by SBMNH. Confer with the Earth Science Curator for estimated costs. Our estimated costs for curation, cataloging, and labeling of specimens are $20/locality and $12/specimen. For invertebrates and microfauna that are from the same locality and taxon, cataloging as lots is acceptable and counted as a single specimen. The estimated costs of permanent storage, including maintenance, is $300 per cubic foot of fully prepared fossils. Sincerely, Jonathan M. Hoffman, Ph.D. Dibblee Curator of Earth Science Vertebrate Zoology Department (805) 682-4711 ext. 157 jhoffman@sbnature2.org 136 Wooten, Eric From:Purrington, Teresa Sent:Wednesday, August 16, 2023 1:32 PM To:CityClerk Subject:08-15-2023 Council Action Update and Agenda Forecast Attachments:Agenda Forecast & Pending Items.pdf; 08-15-2023 City Council Action Update.pdf Good Afternoon, Attached is the August 15, 2023, Council Action Update and the current Agenda Forecast. Thank you, Teresa Bcc: Action Update and Forecast Group Teresa Purrington pronouns she/her/hers City Clerk City Administration 990 Palm Street, San Luis Obispo, CA 93401-3218 E TPurring@slocity.org T 805.781.7102 slocity.org Stay connected with the City by signing up for e-notifications 1 Council Action Update August 15, 2023, 5:30 p.m. Council Chambers, 990 Palm Street, San Luis Obispo Council Members Present: Council Member Emily Francis, Council Member Andy Pease, Council Member Michelle Shoresman, Vice Mayor Jan Marx, Mayor Erica A. Stewart City Staff Present: Derek Johnson, City Manager, Christine Dietrick, City Attorney, Teresa Purrington, City Clerk _____________________________________________________________________ 1. CALL TO ORDER A Regular Meeting of the San Luis Obispo City Council, also acting as the San Luis Obispo Public Financing Authority Board of Directors, was called to order on August 15, 2023 at 5:30 p.m. in the Council Chambers, 990 Palm Street, San Luis Obispo, by Mayor Stewart. 2. PLEDGE OF ALLEGIANCE Council Member Francis led the Council in the Pledge of Allegiance. 3. PRESENTATIONS 3.a 40TH ANNIVERSARY OF THE DOWNTOWN FARMER'S MARKET PROCLAMATION Mayor Stewart presented a proclamation recognizing the 40th Anniversary of the Downtown Farmer's Market to Bettina Swigger on behalf of Downtown SLO. 3.b INTRODUCTION AND OATH OF OFFICE - WHITNEY MCDONALD, ASSISTANT CITY MANAGER City Manager Derek Johnson introduced Whitney McDonald, the new Assistant City Manager. City Clerk Teresa Purrington administered Assistant City Manager McDonald's Oath of Office. 3.c CITY MANAGER REPORT City Manager Derek Johnson provided a report on upcoming projects. 2 5. CONSENT AGENDA Motion By Council Member Pease Second By Mayor Stewart To approve Consent Calendar Items 5a to 5j. 5.a WAIVE READING IN FULL OF ALL RESOLUTIONS AND ORDINANCES Waive reading of all resolutions and ordinances as appropriate. 5.b MINUTES REVIEW - JULY 11, 2023, JULY 18, 2023, AND JULY 24, 2023 COUNCIL MINUTES Approve the following minutes of the City Council: • July 11, 2023 - Rescheduled Regular Meeting • July 18, 2023 - Regular Meeting • July 24, 2023 - Special Meeting 5.c ANNUAL SPECIAL TAX LEVY REPORT FOR THE CITY OF SAN LUIS OBISPO COMMUNITY FACILITIES DISTRICT NO. 2019-1 (SAN LUIS RANCH) FOR FY 2023-24 Vice Mayor Marx declared a conflict with this item and recused, as she owns property in the San Luis Ranch development. Receive and file the Annual Special Tax Levy Report for the City of San Luis Obispo Community Facilities No. 2019-1 (San Luis Ranch) for FY 2023/24. Ayes (4): Council Member Francis, Council Member Pease, Council Member Shoresman, and Mayor Stewart Recused (1): Vice Mayor Marx CARRIED (4 to 0) 5.d ANNUAL SPECIAL TAX LEVY REPORT FOR THE CITY OF SAN LUIS OBISPO COMMUNITY FACILITIES DISTRICT NO. 2017-1 (AVILA RANCH) FOR FISCAL YEAR 2023-2024 Receive and file the Annual Special Tax Levy Report for the City of San Luis Obispo Community Facilities No. 2017-1 (Avila Ranch) for Fiscal Year 2023-24. 5.e AUTHORIZATION TO ADVERTISE JOHNSON WATERLINE REPLACEMENT – IRIS TO BISHOP, SPECIFICATION NO. 2000578 3 1. Approve the project plans and special provisions for Johnson Waterline Replacement – Iris to Bishop, Specification Number 2000578; and 2. Authorize staff to advertise for bids; and 3. Authorize the City Manager to award the construction contract for the bid total if the lowest responsible bid is within the Engineer’s Estimate of $4,160,000; and 4. Approve the transfer of $165,000 from the Storm Drain Annual Asset Maintenance Account (2090742) to the project account (2000578); and 5. Approve the transfer of $1,061,031 from the Recycled Water Broad Street – Tank Farm to Aerovista project (2000528) to the project account (2000578) and defer the 2000528 project to the next Financial Plan; and 6. Appropriate $483,969 from Water Fund Unreserved Working Capital and reduce the 2024-25 allocation for Water Storage Tank Maintenance (2000034) by $483,969; and 7. Authorize the City Engineer to approve Contract Change Orders up to the available project budget; and 8. Find the Project categorically exempt from the California Environmental Quality Act pursuant to State CEQA Guidelines Sections 15302 and 15303; and 9. Adopt a Draft Resolution entitled, “Resolution of City Council of the City of San Luis Obispo, California, authorizing use of the Water Fund Unreserved Working Capital Fund to support the Johnson Waterline Replacement – Iris to Bishop, Specification Number 2000578.” 5.f AUTHORIZATION TO AMEND THE “BUY LOCAL BONUS” PROGRAM TO INCLUDE INCENTIVES FOR PARTICIPATING IN CUSTOMER SATISFACTION SURVEY Authorize the City Manager to amend the “Buy Local Bonus” Memorandum of Understanding with the San Luis Obispo Chamber of Commerce to include the purchase of gift cards as an incentive for participating in the Community Development Department customer satisfaction survey in an amount not to exceed $600. 5.g FINAL ACCEPTANCE OF PUBLIC IMPROVEMENTS FOR TRACT 3044 – A RESIDENTIAL SUBDIVISION AT 3725 ORCUTT ROAD 4 Adopt a Draft Resolution entitled, “A Resolution of the City Council of the City of San Luis Obispo, California, accepting the completed public improvements for Tract 3044; certifying the completed private subdivision improvements for Tract 3044; releasing the securities for the completed portions of Tract 3044; and authorizing the Director of Public Works to release the remaining securities once all Tract 3044 improvements are deemed complete.” 5.h AUTHORIZATION TO APPLY FOR FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA) ASSISTANCE TO FIREFIGHTERS GRANT (AFG) 1. Authorize the Fire Department to submit a grant application to the Federal Assistance to Firefighters Grant (AFG) Program in the amount of $98,845.45 to send two EMT firefighters through certified paramedic training; and 2. Authorize the City Manager, or their designee, to execute the grant documents and approve the budget changes necessary to appropriate the grant amount upon notification that the grant has been awarded. 5.i APPROVE THE SOLE SOURCE PURCHASE OF A 2022 PIERCE ARROW TYPE 1 PUMPING FIRE ENGINE TO REPLACE FIRE ENGINE 4 Approve the sole source purchase of a 2022 Pierce Arrow Type 1 Pumping Fire Engine in the amount of $881,584.76. 5.j MULTI -JURISDICTIONAL HAZARD MITIGATION GRANT PROGRAM 1. Authorize Fire Department to participate in a grant application process from the Federal Emergency Management Agency (FEMA) for funding to develop a multi-jurisdictional Hazard Mitigation Plan (HMP); and 2. Authorize the City Manager, or their designee, to execute the grant documents and approve the budget changes necessary to appropriate the grant amount upon notification that the grant has been awarded. 6. PUBLIC HEARING AND BUSINESS ITEMS 6.a 2022-23 STORMS AFTER-ACTION REPORT AND POST-INCIDENT ACTION PLAN (Estimated Time: 30 minutes) Action: By consensus, the City Council received and filed the 2022-2023 Storms After-Action Report and Post-Incident Improvement Plan. 5 6.b APPROVING THE SALE OF LEASE REVENUE BONDS, SERIES 2023 (CULTURAL ARTS DISTRICT PARKING PROJECT) IN AN AGGREGATE PRINCIPAL AMOUNT NOT TO EXCEED $50,000,000, EXECUTION OF BOND DOCUMENTS AND RELATED ACTIONS (Est. Time: 30 minutes) Motion By Vice Mayor Marx Second By Council Member Pease City Council Action: Approve a Draft Resolution entitled, “A Resolution of the City Council of the City of San Luis Obispo authorizing the execution and delivery by the City of a 1) Ground Lease, 2) a Lease Agreement, 3) an Indenture, 4) a Bond Purchase Agreement and a 5) Continuing Disclosure Certificate in connection with the issuance of San Luis Obispo Public Financing Authority Lease Revenue Bonds (Cultural Arts District Parking Project), Series 2023, approving the issuance of such bonds in an aggregate principal amount of not to exceed $50,000,000, authorizing the distribution of an Official Statement in connection with the offering and sale of such bonds and authorizing the execution of necessary documents and certificates and related actions." Ayes (5): Council Member Francis, Council Member Pease, Council Member Shoresman, Vice Mayor Marx, and Mayor Stewart CARRIED (5 to 0) Motion By Vice Chair Marx Second By Board Member Shoresman San Luis Obispo Public Financing Authority Board of Directors Action: Approve a Draft Resolution entitled, “A Resolution of the Board of Directors of the San Luis Obispo Public Financing Authority authorizing the execution and delivery of a 1) Ground Lease, 2) a Lease Agreement, 3) an Indenture, and a 4) Bond Purchase Agreement in connection with the issuance of San Luis Obispo Public Financing Authority Lease Revenue Bonds (Cultural Arts District Parking Project), Series 2023, authorizing the issuance of such bonds in an aggregate principal amount of not to exceed $50,000,000, authorizing the distribution of an Official Statement in connection therewith and authorizing the execution of necessary documents and certificates and related actions.” 6 Ayes (5): Board Member Francis, Board Member Pease, Board Member Shoresman, Vice Chair Marx, and Chair Stewart CARRIED (5 to 0) 8. ADJOURNMENT The meeting was adjourned at 9:27 p.m. The next Regular City Council Meeting is scheduled for September 5, 2023 at 5:30 p.m. in the Council Chambers at City Hall, 990 Palm Street, San Luis Obispo. City of San Luis Obispo Council Agenda Forecast Time Estimate Item #Item Description - Should match Subject of CAR and include if Reso or Ordinance Legal Ad Report Writer/Presenter Docket Deadline Council Meetings 2023 (Approved by Council) 9/5/2023 REGULAR MEETING: 5:30 PM 8/14/2023 3. PRESENTATIONS/INTRODUCTIONS 3 3a.Proclamation - Drive Electric Week - Barry Rands Stewart 10 3b.City Manager Report Johnson 30 5. CONSENT ITEMS 5a.Waive Reading of Resolutions/Ordinances Purrington 5b.Minutes Purrington 5c. Authorize Grant Application to CA Strategic Growth Council's Community Resilience Center Program Hermann/Pohlman 5d. Declaration of "Surplus Exempt" status under CA Surplus Land Act for City-owned property (610 & 614 Monterey Street; portion of Parking Lot 14)Hermann/Hill 5e.Award a Construction Contract for the Cheng Park Revitalization Project, Spec. No. 91385-10 Horn/Long 5f.Authorization to advertise on-call EnerGov support services RFQ Tway/Loew 6. PUBLIC HEARING ITEMS AND BUSINESS ITEMS 90 6a.Prado Interchange Considering Approval of the Environmental Document and Confirming the Project Preferred Alternative Design Horn/Banker-Hix 7. STUDY SESSION ITEMS 90 7a.Police Department Strategic Plan Development Update Scott/Amoroso 3:43 Closed - Only Consent Items can be added 9/19/2023 CLOSED SESSION - (Pending Council Approval - 4:45 PM Start)8/28/2023 30 1a Labor Negotiations Domini REGULAR MEETING: 5:30 PM 8/28/2023 3. PRESENTATIONS/INTRODUCTIONS 10 3b.City Manager Report Johnson 30 5. CONSENT ITEMS 5a.Waive Reading of Resolutions/Ordinances Purrington 5b.Minutes Purrington 5c.Equipment Surplus Designation and Authorization of Sale (Water Distribution, Wastewater Treatment, and Irrigation Assets)Floyd/Whittington 5d.Approve use of Funding for Recycled Water User Site Improvements Floyd/Boerman 6. PUBLIC HEARING ITEMS AND BUSINESS ITEMS 20 6a. Award Construction Contract for the Cultural Arts District Parking Structure Horn/Kacsinta 45 6b. Introduce an Ordinance to adopt Clean Energy Choice for New Buildings Program Alternative X Hermann/Read/Loew 1:45 Closed - Only Consent Items can be added 10/3/2023 REGULAR MEETING: 5:30 PM 9/11/2023 3. PRESENTATIONS/INTRODUCTIONS 10 3b.Mobility Services Division Overview Horn/Rice 10 3c.City Manager Report Johnson 30 5. CONSENT ITEMS 5a.Waive Reading of Resolutions/Ordinances Purrington 5b.Minutes Purrington 5c. O-XXXX Second Reading - Clean Energy Choice for New Buildings Program Alternative X Hermann/Read/Loew 5d. Approve an Upated Agreement with Village Host Pizza & Grill for Park Maintenance & Outdoor Dining Avakian/Hyfield 5e.Avila Ranch Tract 3089 Phases 2 and 3 Final Map Approval Tway/LaChaine 5f.Bullock Ranch Tract 3136 Final Map Approval Tway/LaChaine 6. PUBLIC HEARING ITEMS AND BUSINESS ITEMS 30 6a.FY 2022-23 Year End Budget Review (Unaudited)Jackson/Harnett 60 6b. Introduce an Ordinance amending Title 6 (Animals) to adopt by reference San Luis Obispo County Code Title 9 X Scott/Amoroso/Amberg 7. STUDY SESSION ITEMS 60 7a.Code Enforcement Update Tway/Loew 3:20 Closed - Only Consent Items can be added 10/17/2023 REGULAR MEETING: 5:30 PM 9/25/2023 3. PRESENTATIONS/INTRODUCTIONS 30 3a.Cal Poly Presentation - Housing Update and Water Plans 10 3b.City Manager Report Johnson 30 5. CONSENT ITEMS 5a.Waive Reading of Resolutions/Ordinances Purrington 5b.Minutes Purrington 5c.O-XXXX Second Reading - Amending Title 6 (Animals to adopt by reference San Luis Obispo County Code Title 9 X Scott/Amoroso/Amberg 6. PUBLIC HEARING ITEMS AND BUSINESS ITEMS 30 6a. Annual Report for Tourism Business Improvement District X Hermann/Cano 7. STUDY SESSION ITEMS 60 7a.Transit Innovations Plan Adoption Horn/Fuchs 75 7b.Existing Building Electrification Retrofit Policy Options Hermann/Read 3:55 Closed - Only Consent Items can be added 11/7/2023 REGULAR MEETING: 5:30 PM 10/16/2023 3. PRESENTATIONS/INTRODUCTIONS 10 3b.City Manager Report Johnson 30 5. CONSENT ITEMS 5a.Waive Reading of Resolutions/Ordinances Purrington 5b.Minutes Purrington 5c. Amendment to the Second Restated JPA with the SLO County Integrated Waste Management Authority Floyd/Lehman 5d.Authorize Updated Facility Ground Lease Between Channel Island YMCA and the City-HOLD Avakian/Symens 6. PUBLIC HEARING ITEMS AND BUSINESS ITEMS 30 6a. Annual Public Hearing for the Tourism Business Improvement District X Hermann/Cano 7. STUDY SESSION ITEMS 1:10 Printed on 8/16/2023 at 1:25 PM Page 1 City of San Luis Obispo Council Agenda Forecast Time Estimate Item #Item Description - Should match Subject of CAR and include if Reso or Ordinance Legal Ad Report Writer/Presenter Docket Deadline 11/14/2023 RESCHEDULED REGULAR MEETING: 5:30 PM 10/30/2023 3. PRESENTATIONS/INTRODUCTIONS 10 3b.City Manager Report Johnson 30 5. CONSENT ITEMS 5a.Waive Reading of Resolutions/Ordinances Purrington 5b.Minutes Purrington 5c.FY 2023-24 Q1 Budget Report Jackson/Harnett 5d. 6. PUBLIC HEARING ITEMS AND BUSINESS ITEMS 45 6a.Ordinance for state housing law implementation X Tway/Bell 7. STUDY SESSION ITEMS 1:25 12/5/2023 REGULAR MEETING: 5:30 PM 11/13/2023 3. PRESENTATIONS/INTRODUCTIONS 10 3b.City Manager Report Johnson 30 5. CONSENT ITEMS 5a.Waive Reading of Resolutions/Ordinances Purrington 5b.Minutes Purrington 5c.Successor Memorandum of Understanding for The International Association of Firefighters, Local 3523 Domini/Andrews 5d.DEI High Impact Grant Funding Approval Hermann/Veloz-Passalacqua 6. PUBLIC HEARING ITEMS AND BUSINESS ITEMS 0:40 Printed on 8/16/2023 at 1:25 PM Page 2 137 Wooten, Eric From:Hill, Robert Sent:Monday, August 14, 2023 4:09 PM To:Kersten, Markie Cc:Dietrick, Christine; Hermann, Greg Subject:RE: Privileged/Confidential -Surplus Land Act/SLO Rep Hi Markie, Thanks so much for your great research and work on this item. I have addressed your comments and filled in the blanks where needed in both the CAR and the Resolution, with special attention double-checking all of the site addresses and APNs. My changes are preserved in the offline versions on sharepoint. Meanwhile, I have started the routing in eScribe and I am sure that will find your desk shortly! Bob From: Kersten, Markie <mkersten@slocity.org> Sent: Thursday, August 10, 2023 2:11 PM To: Hill, Robert <rhill@slocity.org> Cc: Dietrick, Christine <cdietric@slocity.org>; Hermann, Greg <GHermann@slocity.org> Subject: RE: Privileged/Confidential -Surplus Land Act/SLO Rep Hi Bob and Greg, Here’s a link to a folder with the draft CAR and the reso I drafted: Exempt Surplus DeclaraƟon I suggested some edits to the CAR and left some questions in both docs for Bob/Greg’s review. I am around all day today and tomorrow to discuss. I know Bob does not return until Monday, which is my day off with the baby, but I am happy to jump on a quick call on Monday if there’s anything we need to touch base on as the report needs to begin routing by EOD. Thanks Bob for your excellent draft CAR! Markie From: Hill, Robert <rhill@slocity.org> Sent: Thursday, July 27, 2023 6:06 PM To: Kersten, Markie <mkersten@slocity.org> Cc: Dietrick, Christine <cdietric@slocity.org>; Hermann, Greg <GHermann@slocity.org> Subject: RE: Privileged/Confidential -Surplus Land Act/SLO Rep Hi Markie, Thanks for the chance to speak further about this item by phone earlier this week. As we discussed, I have docketed a consent item on the 9/5 Council agenda and created the item in eScribe. For now, here is an offline draft of the Council Agenda Report. I am sure it needs some refinement, but I think (hope!) the core elements are there: CAR - Declaration of Surplus Exempt status (610 and 614 Monterey Street; portion of Parking Lot 14).docx Really appreciative! 138 Bob From: Kersten, Markie <mkersten@slocity.org> Sent: Tuesday, July 18, 2023 12:34 PM To: Hill, Robert <rhill@slocity.org> Subject: FW: Privileged/Confidential -Surplus Land Act/SLO Rep Hi Bob, I wanted to circle back with an update. Please see below for Christine’s concurrence with my analysis and her recommended path forward. I will start drafting a resolution later this week, and circulate to you within the next week for input. Let me know if you have any questions. Best, Markie From: Dietrick, Christine <cdietric@slocity.org> Sent: Thursday, July 13, 2023 6:55 PM To: Johnson, Derek <djohnson@slocity.org> Cc: Kersten, Markie <mkersten@slocity.org>; Taffe, McKenzie <mtaffe@slocity.org> Subject: Privileged/Confidential -Surplus Land Act/SLO Rep Derek, see Markie’s analysis below. I’ve reviewed the statute and attached HCD materials and we had a chance to discuss earlier this evening. We recommend that we move forward with a draft resolution declaring the property exempt surplus land, based on the reasoning below, ask for HCD review prior to presenting to CC and then, assuming they agree with our findings, proceed to CC and then on with the Lease. Let us know if you want to talk further or have any concerns. As Markie, notes there’s no guarantee, but I do think the language she notes applies on its face and that this is a practical and good faith manner in which to proceed. McKenzie, can you please add this to the Council matters list and add this to the task on our list flagged for Markie and me and set a due date two weeks out? Thx. C. Christine Dietrick pronouns she/her/hers City Attorney City Attorney's Office 990 Palm Street, San Luis Obispo, CA 93401-3249 E cdietrick@slocity.org T 805.781.7140 slocity.org Stay connected with the City by signing up for e-notifications The information contained in this e-mail message is intended only for the CONFIDENTIAL use of the designated addressee named above. The information transmitted is subject to the attorney-client privilege 139 and/or represents confidential attorney work product. Recipients should not file copies of this email with publicly accessible records. If you are not the designated addressee named above or the authorized agent responsible for delivering it to the designated addressee, you received this document through inadvertent error and any further review, dissemination, distribution or copying of this communication by you or anyone else is strictly prohibited. IF YOU RECEIVED THIS COMMUNICATION IN ERROR, PLEASE NOTIFY US IMMEDIATELY BY TELEPHONING THE SENDER NAMED ABOVE AT (805) 781-7140. Thank you. From: Kersten, Markie <mkersten@slocity.org> Sent: Thursday, July 13, 2023 4:03 PM To: Dietrick, Christine <cdietric@slocity.org> Subject: Surplus Land Act/SLO Rep Hi Christine, I’ve had some time to dig a bit deeper into application of the Surplus Land Act to our ground lease of a portion to the Palm/Nipomo parking structure parcel to SLO Rep. As an initial matter, I believe this ground lease constitutes a disposition of surplus public property. Unless the property is considered exempt surplus (more on that below), we should have gone through the Notice of Availability (NOA) process prior to entering into an ENA with SLO Rep. However, I think our best argument is that this property is considered “exempt surplus” under the Act. In such case, Council would need to declare the property “exempt surplus” at a public meeting supported by written findings and no NOA would be required, but we would be required to report our findings to HCD 30 days prior to disposition. The risk with this approach is that we are already in violation of the statute by virtue of our ENA with SLO Rep and we would be flagging this for HCD, but it appears that if we were to receive a Notice of Violation from HCD for such violation, our compliance option is to cure the violation, which we are doing by having Council declare this “exempt surplus.” Please find my analysis below. The Surplus Land Act requires all local agencies to offer surplus land for sale or lease to affordable home developers and certain other entities before selling or leasing the land to any other individual or entity. It’s worth noting that this requirement applies even if the land is not currently zoned or planned for residential use. Surplus land is defined as “land owned in fee simple for which a local agency’s governing body takes formal action at a regular public meeting declaring land to be surplus and not necessary for a local agency’s use. “Agency use” does not include commercial or industrial uses or activities, including nongovernmental retail, entertainment, or office development. (Gov. Code § 54221(c)(2)(A).) We had previously discussed whether we could argue that this is not “surplus” land as we need SLO Rep’s current location for agency use, necessitating their move to the new location, but based on the statutory definition of “agency use” and its express exclusion for nongovernmental entertainment uses, I don’t think this is a defensible argument. Such argument would also be somewhat in tension with our conclusion that SLO Rep is not required to comply with the competitive bidding requirements for construction of the theater as it is not a public agency constructing a public building. However, as previewed above, surplus land that meets one or more of the exemptions listed in the statute is not required to go through the NOA process. I believe the exemption for “exchange of surplus land” may apply here: Surplus land (new SLO Rep site) that a local agency is exchanging for another property necessary for the local agency’s use (the current SLO Rep location). (Gov. Code § 54221(f)(1)(C).) I’m unable to find any case law or secondary authority that flesh this exemption out, but the plain text appears to be on point. It’s a little strange here that both properties subject to the exchange are City-owned and encumbered by private leases, but I don’t see why that would preclude application of this exemption. This isn’t a bullet proof approach, but I don’t think one exists. The alternative is that Council declares this “surplus” and we go through the NOA process and hope that we don’t get a reasonable offer from an interested party. As I noted above, I don’t think our NOA could indicate that a theater must be built; the property would need to be available for provision of affordable housing or other specified uses in the statute. Happy to chat further. Markie Markie Kersten pronouns she/her/hers 140 Assistant City Attorney City Attorney's Office 990 Palm Street, San Luis Obispo, CA 93401-3249 E mkersten@slocity.org T 805.781.7141 slocity.org Stay connected with the City by signing up for e-notifications The information contained in this e-mail message is intended only for the CONFIDENTIAL use of the designated addressee named above. The information transmitted is subject to the attorney-client privilege and/or represents confidential attorney work product. Recipients should not file copies of this email with publicly accessible records. If you are not the designated addressee named above or the authorized agent responsible for delivering it to the designated addressee, you received this document through inadvertent error and any further review, dissemination, distribution or copying of this communication by you or anyone else is strictly prohibited. IF YOU RECEIVED THIS COMMUNICATION IN ERROR, PLEASE NOTIFY US IMMEDIATELY BY TELEPHONING THE SENDER NAMED ABOVE AT (805) 781-7140. Thank you. 142 Wooten, Eric From:Hermann, Greg Sent:Friday, August 11, 2023 7:13 AM To:Kersten, Markie; Hill, Robert Cc:Dietrick, Christine Subject:RE: Privileged/Confidential -Surplus Land Act/SLO Rep Hi Markie, Thanks so much for the assist on this. We really appreciate it. I took a quick and think we are in good shape. Bob will be able to fill in the blanks when he gets back. Thanks again, Greg From: Kersten, Markie <mkersten@slocity.org> Sent: Thursday, August 10, 2023 2:11 PM To: Hill, Robert <rhill@slocity.org> Cc: Dietrick, Christine <cdietric@slocity.org>; Hermann, Greg <GHermann@slocity.org> Subject: RE: Privileged/Confidential -Surplus Land Act/SLO Rep Hi Bob and Greg, Here’s a link to a folder with the draft CAR and the reso I drafted: Exempt Surplus DeclaraƟon I suggested some edits to the CAR and left some questions in both docs for Bob/Greg’s review. I am around all day today and tomorrow to discuss. I know Bob does not return until Monday, which is my day off with the baby, but I am happy to jump on a quick call on Monday if there’s anything we need to touch base on as the report needs to begin routing by EOD. Thanks Bob for your excellent draft CAR! Markie From: Hill, Robert <rhill@slocity.org> Sent: Thursday, July 27, 2023 6:06 PM To: Kersten, Markie <mkersten@slocity.org> Cc: Dietrick, Christine <cdietric@slocity.org>; Hermann, Greg <GHermann@slocity.org> Subject: RE: Privileged/Confidential -Surplus Land Act/SLO Rep Hi Markie, Thanks for the chance to speak further about this item by phone earlier this week. As we discussed, I have docketed a consent item on the 9/5 Council agenda and created the item in eScribe. For now, here is an offline draft of the Council Agenda Report. I am sure it needs some refinement, but I think (hope!) the core elements are there: CAR - Declaration of Surplus Exempt status (610 and 614 Monterey Street; portion of Parking Lot 14).docx Really appreciative! 143 Bob From: Kersten, Markie <mkersten@slocity.org> Sent: Tuesday, July 18, 2023 12:34 PM To: Hill, Robert <rhill@slocity.org> Subject: FW: Privileged/Confidential -Surplus Land Act/SLO Rep Hi Bob, I wanted to circle back with an update. Please see below for Christine’s concurrence with my analysis and her recommended path forward. I will start drafting a resolution later this week, and circulate to you within the next week for input. Let me know if you have any questions. Best, Markie From: Dietrick, Christine <cdietric@slocity.org> Sent: Thursday, July 13, 2023 6:55 PM To: Johnson, Derek <djohnson@slocity.org> Cc: Kersten, Markie <mkersten@slocity.org>; Taffe, McKenzie <mtaffe@slocity.org> Subject: Privileged/Confidential -Surplus Land Act/SLO Rep Derek, see Markie’s analysis below. I’ve reviewed the statute and attached HCD materials and we had a chance to discuss earlier this evening. We recommend that we move forward with a draft resolution declaring the property exempt surplus land, based on the reasoning below, ask for HCD review prior to presenting to CC and then, assuming they agree with our findings, proceed to CC and then on with the Lease. Let us know if you want to talk further or have any concerns. As Markie, notes there’s no guarantee, but I do think the language she notes applies on its face and that this is a practical and good faith manner in which to proceed. McKenzie, can you please add this to the Council matters list and add this to the task on our list flagged for Markie and me and set a due date two weeks out? Thx. C. Christine Dietrick pronouns she/her/hers City Attorney City Attorney's Office 990 Palm Street, San Luis Obispo, CA 93401-3249 E cdietrick@slocity.org T 805.781.7140 slocity.org Stay connected with the City by signing up for e-notifications The information contained in this e-mail message is intended only for the CONFIDENTIAL use of the designated addressee named above. The information transmitted is subject to the attorney-client privilege and/or represents confidential attorney work product. Recipients should not file copies of this email with 144 publicly accessible records. If you are not the designated addressee named above or the authorized agent responsible for delivering it to the designated addressee, you received this document through inadvertent error and any further review, dissemination, distribution or copying of this communication by you or anyone else is strictly prohibited. IF YOU RECEIVED THIS COMMUNICATION IN ERROR, PLEASE NOTIFY US IMMEDIATELY BY TELEPHONING THE SENDER NAMED ABOVE AT (805) 781-7140. Thank you. From: Kersten, Markie <mkersten@slocity.org> Sent: Thursday, July 13, 2023 4:03 PM To: Dietrick, Christine <cdietric@slocity.org> Subject: Surplus Land Act/SLO Rep Hi Christine, I’ve had some time to dig a bit deeper into application of the Surplus Land Act to our ground lease of a portion to the Palm/Nipomo parking structure parcel to SLO Rep. As an initial matter, I believe this ground lease constitutes a disposition of surplus public property. Unless the property is considered exempt surplus (more on that below), we should have gone through the Notice of Availability (NOA) process prior to entering into an ENA with SLO Rep. However, I think our best argument is that this property is considered “exempt surplus” under the Act. In such case, Council would need to declare the property “exempt surplus” at a public meeting supported by written findings and no NOA would be required, but we would be required to report our findings to HCD 30 days prior to disposition. The risk with this approach is that we are already in violation of the statute by virtue of our ENA with SLO Rep and we would be flagging this for HCD, but it appears that if we were to receive a Notice of Violation from HCD for such violation, our compliance option is to cure the violation, which we are doing by having Council declare this “exempt surplus.” Please find my analysis below. The Surplus Land Act requires all local agencies to offer surplus land for sale or lease to affordable home developers and certain other entities before selling or leasing the land to any other individual or entity. It’s worth noting that this requirement applies even if the land is not currently zoned or planned for residential use. Surplus land is defined as “land owned in fee simple for which a local agency’s governing body takes formal action at a regular public meeting declaring land to be surplus and not necessary for a local agency’s use. “Agency use” does not include commercial or industrial uses or activities, including nongovernmental retail, entertainment, or office development. (Gov. Code § 54221(c)(2)(A).) We had previously discussed whether we could argue that this is not “surplus” land as we need SLO Rep’s current location for agency use, necessitating their move to the new location, but based on the statutory definition of “agency use” and its express exclusion for nongovernmental entertainment uses, I don’t think this is a defensible argument. Such argument would also be somewhat in tension with our conclusion that SLO Rep is not required to comply with the competitive bidding requirements for construction of the theater as it is not a public agency constructing a public building. However, as previewed above, surplus land that meets one or more of the exemptions listed in the statute is not required to go through the NOA process. I believe the exemption for “exchange of surplus land” may apply here: Surplus land (new SLO Rep site) that a local agency is exchanging for another property necessary for the local agency’s use (the current SLO Rep location). (Gov. Code § 54221(f)(1)(C).) I’m unable to find any case law or secondary authority that flesh this exemption out, but the plain text appears to be on point. It’s a little strange here that both properties subject to the exchange are City-owned and encumbered by private leases, but I don’t see why that would preclude application of this exemption. This isn’t a bullet proof approach, but I don’t think one exists. The alternative is that Council declares this “surplus” and we go through the NOA process and hope that we don’t get a reasonable offer from an interested party. As I noted above, I don’t think our NOA could indicate that a theater must be built; the property would need to be available for provision of affordable housing or other specified uses in the statute. Happy to chat further. Markie Markie Kersten pronouns she/her/hers Assistant City Attorney 145 City Attorney's Office 990 Palm Street, San Luis Obispo, CA 93401-3249 E mkersten@slocity.org T 805.781.7141 slocity.org Stay connected with the City by signing up for e-notifications The information contained in this e-mail message is intended only for the CONFIDENTIAL use of the designated addressee named above. The information transmitted is subject to the attorney-client privilege and/or represents confidential attorney work product. Recipients should not file copies of this email with publicly accessible records. If you are not the designated addressee named above or the authorized agent responsible for delivering it to the designated addressee, you received this document through inadvertent error and any further review, dissemination, distribution or copying of this communication by you or anyone else is strictly prohibited. IF YOU RECEIVED THIS COMMUNICATION IN ERROR, PLEASE NOTIFY US IMMEDIATELY BY TELEPHONING THE SENDER NAMED ABOVE AT (805) 781-7140. Thank you. 148 Wooten, Eric From:Kacsinta, Madeline Sent:Tuesday, August 1, 2023 1:11 PM To:Marquart, Ben Cc:Ryan Stefanek Subject:RE: City of San Luis Obispo, Cultural Arts District Parking Structure Ok, thank you so much for following up with this. Madeline Kacsinta Engineer III Public Works 919 Palm, San Luis Obispo, CA 93401-3218 E MKacsint@slocity.org T 805.781.7094 slocity.org Stay connected with the City by signing up for e-notifications From: Marquart, Ben <bmarquar@slocity.org> Sent: Tuesday, August 1, 2023 12:58 PM To: Kacsinta, Madeline <MKacsint@slocity.org> Cc: Ryan Stefanek <rstefanek@kitchell.com> Subject: FW: City of San Luis Obispo, Cultural Arts District Parking Structure Madeline- Based on the services being dropped, there shouldn’t be any more charter lines on the poles being removed. We should field verify though. Ben From: Schwiebert, Ryan M <Ryan.M.Schwiebert@charter.com> Sent: Monday, April 3, 2023 11:30 AM To: Marquart, Ben <bmarquar@slocity.org> Cc: Gauna, Samuel <sgauna@slocity.org> Subject: RE: City of San Luis Obispo, Cultural Arts District Parking Structure Hi Ben, the service drops have been removed. Thanks Ryan Schwiebert | Construction Coordinator 270 Bridge St | San Luis Obispo, Ca 93401 Office: 805-783-4942 Cell: 805-503-8543 149 From: Marquart, Ben <bmarquar@slocity.org> Sent: Thursday, March 30, 2023 1:30 PM To: Schwiebert, Ryan M <Ryan.M.Schwiebert@charter.com> Cc: Gauna, Samuel <sgauna@slocity.org> Subject: [EXTERNAL] RE: City of San Luis Obispo, Cultural Arts District Parking Structure CAUTION: The e-mail below is from an external source. Please exercise caution before opening attachments, clicking links, or following guidance. Hi Ryan- Just wanted to touch base again to confirm the project scheduling and see where we are at with removing the services to these locations? Thank You, Ben Marquart Engineering Inspector IV Public Works 919 Palm Street, San Luis Obispo, CA 93401-7314 E bmarquart@slocity.org T 805.781.7061 slocity.org Stay connected with the City by signing up for e-notifications From: Schwiebert, Ryan M <Ryan.M.Schwiebert@charter.com> Sent: Friday, March 17, 2023 10:13 AM To: Marquart, Ben <bmarquar@slocity.org> Cc: Gauna, Samuel <sgauna@slocity.org> Subject: RE: City of San Luis Obispo, Cultural Arts District Parking Structure This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Hi Ben, I’ll work on getting this scheduled out, should be a couple of weeks to get the drops removed. I’ll let you know when it’s been completed. Thanks, Ryan Schwiebert | Construction Coordinator 270 Bridge St | San Luis Obispo, Ca 93401 Office: 805-783-4942 Cell: 805-503-8543 150 From: Marquart, Ben <bmarquar@slocity.org> Sent: Wednesday, March 15, 2023 1:36 PM To: Moore, Jason D <Jason.D.Moore@charter.com> Cc: Gauna, Samuel <sgauna@slocity.org> Subject: [EXTERNAL] City of San Luis Obispo, Cultural Arts District Parking Structure CAUTION: The e-mail below is from an external source. Please exercise caution before opening attachments, clicking links, or following guidance. Jason- Nice meeting you over the phone today. To recap, I am newly assigned to the City of San Luis Obispo, Cultural Arts District Parking Structure project and was looking to get up to speed with Charter’s involvement in the project or if any requests for service disconnection have been made yet? I have four sites (610 Monterey St, 614 Monterey St, 633A Palm St, and 633B Palm St) that are scheduled for demolition, and I need to verify that there are no con nections to the residences or property and if so, have them removed. Here ae my questions. 1. Have any requests been made to Charter to remove services at the above addresses? 2. Is there a process to get on Charters schedule? 3. What timeframe are we looking at? 4. Is there anything else you might need from me (the City) to proceed? Thank you for your time, Ben Marquart Engineering Inspector IV Public Works 919 Palm Street, San Luis Obispo, CA 93401-7314 E bmarquart@slocity.org C 805.540.9192 slocity.org Stay connected with the City by signing up for e-notifications 155 From:Kacsinta, Madeline Sent:Wednesday, July 26, 2023 3:27 PM To:Stewart, Erica A Subject:RE: Cultural Arts District Parking Structure Project Stakeholder Update Attachments:Phase 1B-2 Mitigation and Monitoring Plan.pdf; PalmNipomo_FEIR_CR and TCR.pdf; Cultural Resources Inventory Report 2011.pdf Hi Erica, Thank you for reaching out about the local Chumash tribes’ involvement in this project. The original cultural resources study (attached) was conducted by Applied Earthworks in 2011. In 2017, the City of SLO conducted SB 18 and AB 52 outreach for the project as part of their EIR. I’m attaching the CR/TCR section of the EIR for your review. Based on the EIR mitigation measures, Rincon Consulting developed a mitigation and monitoring plan (attached). As part of that plan, Rincon conducted a series of 35-centimeter-wide shovel test pits throughout the project site. Of the 25 shovel test pits excavated, all were negative for cultural resources. Modern debris was noted in many of the test pits. Because of these negative results, the tribe is not required to conduct monitoring on site. The City will have an archeological monitor on-site per the Mitigation and Monitoring Plan, and if any cultural resources are found, we will involve the tribe(s) and insure they are involved and feel comfortable with our steps in moving forward in the project. While the City is not required to have the local tribe conduct monitoring, we are always open to allowing the tribe on- site to participate in the project if they are interested. We have been in contact with Mona Tucker, of the yak titʸu titʸu yak tiłhini tribe, and have provided her will all of the information included in this email. I will be in touch with her shortly to give her an estimated timeline of the project and be available for any questions or concerns the tribe or she may have. I appreciate your diligence in insuring we are including the local tribes and am always happy to provide more information. Luckily, the bid came in lower than the original estimate, and we are now under the threshold that we had prepared for in terms of funding. Because of this, I believe the next time we will take this to City Council will be at the regularly scheduled meeting on August 15th. I apologize for the error in my previous message. Please let me know if there is any additional follow-up that I can provide you at this time. We will be sending regular updates once the project begins to make sure all stakeholders are aware of the progress and potential challenges. I am also happy to provide information at any time during the project, so please feel free to reach out. Bests, Madeline Kacsinta Engineer III Public Works 919 Palm, San Luis Obispo, CA 93401-3218 E MKacsint@slocity.org T 805.781.7094 156 slocity.org Stay connected with the City by signing up for e-notifications From: Stewart, Erica A <estewart@slocity.org> Sent: Wednesday, July 26, 2023 8:44 AM To: Kacsinta, Madeline <MKacsint@slocity.org> Subject: Re: Cultural Arts District Parking Structure Project Stakeholder Update Hi Madeline, Thank you for the update. There is a lot of good information. I have a couple of questions. All of the soil information is interesting. When does the local Chumash review the site? Also, will there be a separate meeting to discuss securing bonding or will this be part of the normal city council meeting on August 15? under phase 2, it’s mentioned that the target council date is August 22. Thanks, Erica Erica A. Stewart pronouns she/her/hers Mayor Office of the City Council 990 Palm Street, San Luis Obispo, CA 93401-3249 Eestewart@slocity.org C805.540.1154 slocity.org Stay connected with the City by signing up fore-notifications From: Kacsinta, Madeline <MKacsint@slocity.org> Sent: Tuesday, July 25, 2023 5:06:07 PM To: Johnson, Derek <djohnson@slocity.org>; Horn, Matt <mhorn@slocity.org>; Stanwyck, Shelly <sstanwyc@slocity.org> Cc: Nelson, Brian <BNelson@slocity.org>; Hussey, Gaven <ghussey@slocity.org>; Szentesi, Whitney <wszentes@slocity.org>; Hermann, Greg <GHermann@slocity.org>; Jackson, Emily <ejackson@slocity.org>; Cleary, Greg <gcleary@slocity.org>; kevin@slorep.org <kevin@slorep.org>; lstandish@sloma.org <lstandish@sloma.org>; thomas@historycenterslo.org <thomas@historycenterslo.org>; mjenkins@slocm.org <mjenkins@slocm.org>; < ; msusank@missionprep.org <msusank@missionprep.org>; ; ; Ashley Scarcella <ashley@verdinmarketing.com>; Tway, Timothea (Timmi) <TTway@slocity.org>; Hill, Robert <rhill@slocity.org>; Loew, Michael <Mloew@slocity.org>; Cohen, Rachel <rcohen@slocity.org>; Rice, Jennifer <jrice@slocity.org>; Kersten, Markie <mkersten@slocity.org> Subject: Cultural Arts District Parking Structure Project Stakeholder Update BCC: City Council Dear Stakeholders, Staff is pleased to provide an update on the progress of the Cultural Arts District Parking Structure Project. We are excited to share that the project has achieved several significant milestones. Below are the latest developments: Phase 1A: Dry Utility Relocation  John Madonna Construction's work is nearly completed.  The City is awaiting PG&E and AT&T to schedule work. 157 Phase 1B: Demolition/Site Prep  The parking lot was reopened after demolition of the 3 existing structures on June 2nd.  Bark has been placed on empty lots for dust control during the summer months.  Demolition of the parking lot is scheduled for September.  After discovery of soil contaminates, 22 soil samples were taken and assessed.  All samples have been returned, and no soil mitigation is required below the top 1 foot of soil across the entire site.  Soil remediation is being included in this phase, with Edwards Construction handling the removal of 1 foot of soil.  Benefits of soil remediation during Phase 1B include: o Efficient mobilization: Edwards Construction, trained in HAZWOPER, will conduct soil remediation after parking lot demolition. o Clean site for Phase 2: The larger General Contractor in Phase 2 can mobilize immediately without HAZWOPER training and commence work on the shoring wall. o Avoid Rainy Season: Soil remediation during Phase 1B reduces potential runoff of contaminants during the upcoming rainy season. o Ground-breaking ceremony: A ground-breaking ceremony to mark the project's beginning can now take place on-site prior to Phase 2 commencing. o Time efficiency: Mobilizing Edwards earlier may help compensate for the 1-month bid delay, aiding in time management. o Cost savings: Handling soil remediation through Edwards can avoid mark-ups by the larger General Contractor, potentially resulting in cost savings. Phase 2: Parking Structure/Frontage Improvements  The project received 2 bids on July 25, 2023.  Construction Estimate was $44,600,000.  Swinerton's bid is $41,070,044, while Bomel's bid is $48,801,492 (Swinerton is the apparent low bidder).  The target council meeting to secure bonding is for 8/22/23.  The target council meeting to award the construction contract is 9/19/23.  Construction is expected to start in fall 2023, with the City collaborating closely with the contractor on the timeline and providing regular updates to all stakeholders. We are grateful for your continued support and engagement in this important project. If you have any questions or require further information, please do not hesitate to contact me. Best regards, Madeline Kacsinta Engineer III Public Works 919 Palm, San Luis Obispo, CA 93401-3218 E MKacsint@slocity.org T 805.781.7094 slocity.org Stay connected with the City by signing up for e-notifications Palm Nipomo Parking Structure Project Final Environmental Impact Report SCH#2017051011 prepared by City of San Luis Obispo Public Works Department 919 Palm Street San Luis Obispo, California 93401 Contact: Scott Lee, Parking Manager prepared with the assistance of Rincon Consultants, Inc. 1530 Monterey Street, Suite D San Luis Obispo, California 93401 July 2018 Volume I Palm Nipomo Parking Structure Project Final Environmental Impact Report SCH#2017051011 prepared by City of San Luis Obispo Public Works Department 919 Palm Street San Luis Obispo, California 93401 Contact: Scott Lee, Parking Manager prepared with the assistance of Rincon Consultants, Inc. 1530 Monterey Street, Suite D San Luis Obispo, California 93401 July 2018 Volume I This report prepared on 50% recycled paper with 50% post-consumer content. Table of Contents Final Environmental Impact Report i Table of Contents Executive Summary ................................................................................................................................ 1 Project Synopsis .................................................................................................................. 1 Project Alternativ ................................................................................................................ 3 Significant and Unavoidable Impacts .................................................................................. 5 1 Introduction ..................................................................................................................................19 1.1 Environmental Impact Report Background.......................................................................19 1.2 Purpose and Legal Authority .............................................................................................19 1.3 Scope and Content ............................................................................................................20 1.4 Lead, Responsible, and Trustee Agencies .........................................................................21 1.5 Environmental Review Process .........................................................................................21 2 Project Description .......................................................................................................................25 2.1 Project Applicant ...............................................................................................................25 2.2 Lead Agency Contact Person .............................................................................................25 2.3 Project Location ................................................................................................................25 2.4 Existing Site Characteristics ..............................................................................................25 Setting ...............................................................................................................29 2.4.1 Current Land Use Designation and Zoning .......................................................29 2.4.2 Surrounding Land Uses .....................................................................................29 2.4.3 2.5 Project Characteristics ......................................................................................................30 Project Objectives .............................................................................................37 2.5.1 Required Approvals ..........................................................................................37 2.5.2 3 Environmental Setting ..................................................................................................................39 3.1 Regional Setting ................................................................................................................39 3.2 Project Site Setting ............................................................................................................39 3.3 Cumulative Development .................................................................................................40 4 Environmental Impact Analysis ....................................................................................................41 4.1 Aesthetics ..........................................................................................................................43 Setting ...............................................................................................................43 4.1.1 4.1.2 Impact Analysis .................................................................................................53 4.2 Cultural and Tribal Cultural Resources..............................................................................59 Setting ...............................................................................................................59 4.2.1 Impact Analysis .................................................................................................69 4.2.2 4.3 Noise .................................................................................................................................81 Setting ...............................................................................................................81 4.3.1 Impact Analysis .................................................................................................87 4.3.2 4.4 Transportation ................................................................................................................101 4.4.1 Setting .............................................................................................................101 4.4.2 Impact Analysis ...............................................................................................112 City of San Luis Obispo Palm Nipomo Parking Structure Project ii 5 Issues Addressed in the Initial Study ..........................................................................................127 5.1 Impacts Less than Significant with Mitigation ................................................................127 5.2 Issues with Less than Significant Impact or No Impact ...................................................133 6 Other CEQA Required Discussions ..............................................................................................145 6.1 Growth Inducing Effects ..................................................................................................145 Population Growth .........................................................................................145 6.1.1 Economic Growth ...........................................................................................145 6.1.2 Precedent Setting Action ................................................................................146 6.1.3 Development of Isolated or Adjacent Area of Open Space ............................146 6.1.4 6.1.5 Removal of an Impediment to Growth ...........................................................146 6.2 Energy Use and Conservation .........................................................................................146 Existing Conditions ..........................................................................................147 6.2.1 Analysis of Project Impacts and Determination of Significance .....................151 6.2.2 6.3 Significant Unavoidable Effects .......................................................................................154 6.4 Significant Irreversible Environmental Effects ................................................................154 7 Alternatives .................................................................................................................................155 7.1 Alternatives Considered but Eliminated from Further Discussion .................................155 7.2 Alternative 1: No Project/No Development....................................................................156 7.2.1 Alternative Description ...................................................................................156 7.2.2 Impact Analysis ...............................................................................................156 7.3 Alternative 2: Project Plus Live/Work Units ....................................................................156 7.3.1 Alternative Description ...................................................................................156 7.3.2 Impact Analysis ...............................................................................................157 7.4 Alternative 3: Parking Structure, Commercial and Residential ......................................158 7.4.1 Alternative Description ...................................................................................158 7.4.2 Impact Analysis ...............................................................................................158 7.5 Alternative 4: Historic Resource Preservation ................................................................160 7.5.1 Alternative Description ...................................................................................160 7.5.2 Impact Analysis ...............................................................................................160 7.6 Environmentally Superior Alternative ............................................................................161 8 References ..................................................................................................................................163 8.1 Bibliography ....................................................................................................................163 8.2 List of Preparers ..............................................................................................................166 9 Response to Comments on the Draft EIR ...................................................................................167 9.1 Responses to Public Testimony on the Draft EIR ............................................................167 9.2 Responses to Written Comments on the Draft EIR ........................................................175 Tables Table 1 Project Characteristics ........................................................................................................ 2 Table 2 Class I, Significant and Unavoidable Environmental Impacts ............................................. 6 Table 3 Class II, Significant but Mitigable Environmental Impacts .................................................. 9 Table 4 Class III, Less than Significant Environmental Impacts .....................................................18 Table 5 Designated Historic Buildings Within and Adjacent to the Project Site ...........................62 Table of Contents Final Environmental Impact Report iii Table 6 Impacts to Historical Resources ........................................................................................72 Table 7 Noise Measurement Results .............................................................................................83 Table 8 Maximum Noise Exposure for Noise-Sensitive Uses Due To Transportation Noise Sources ..........................................................................................................................................85 Table 9 Maximum Noise Levels for Nonscheduled, Intermittent, Short-Term Operation (Less than 10 Days) of Mobile Equipment .............................................................................................86 Table 10 Maximum Noise Levels for Repetitively Scheduled, Relatively Long-Term Operation (10 Days or More) of Stationary Equipment .......................................................................................86 Table 11 Exterior Noise Limits (Not to be Exceeded More than 30 Minutes in Any Hour) .............87 Table 12 Maximum Periods for Increased Noise Levels ..................................................................87 Table 13 California Department of Transportation Vibration Annoyance Potential Criteria ..........90 Table 14 Significance of Changes in Operational Roadway Noise Exposures .................................91 Table 15 Construction Noise Levels by Phase..................................................................................92 Table 16 Vibration Source Levels for Construction Equipment .......................................................96 Table 17 Existing and Existing Plus Project Noise Levels on Studied Roadway Segments ..............98 Table 18 Cumulative and Cumulative Plus Project Noise Levels on Roadway Segments..............100 Table 19 Study Intersections and Segments ..................................................................................101 Table 20 Level of Service Criteria ...................................................................................................104 Table 21 Existing Average Daily Trips ............................................................................................105 Table 22 Existing Intersection LOS for Vehicles (PM Peak Hour) ..................................................105 Table 23 Existing Roadway Segment LOS for Vehicles (PM Peak Hour) ........................................107 Table 24 Existing Intersection LOS for Pedestrians (PM Peak Hour) .............................................107 Table 25 Existing Roadway Segment LOS for Pedestrians (PM Peak Hour) ..................................107 Table 26 Existing Roadway Segment LOS for Bicycles (PM Peak Hour).........................................108 Table 27 Existing Roadway Segment LOS for Public Transit (PM Peak Hour) ...............................109 Table 28 Weekday Vehicle Trip Generation (PM Peak Hour) ........................................................112 Table 29 Existing and Existing Plus Project Intersection LOS for Vehicles (PM Peak Hour) ..........115 Table 30 Existing and Existing Plus Project Segment LOS for Vehicles (PM Peak Hour) ...............116 Table 31 Existing and Existing Plus Project Intersection LOS for Pedestrians (PM Peak Hour) .....118 Table 32 Existing and Existing Plus Project Segment LOS for Pedestrians (PM Peak Hour) ..........118 Table 33 Existing and Existing Plus Project Segment LOS for Bicycles (PM Peak Hour) ................119 Table 34 Existing and Existing Plus Project Segment LOS for Transit (PM Peak Hour) ..................119 Table 35 Cumulative and Cumulative Plus Project Intersection LOS for Vehicles (PM Peak Hour)122 Table 36 Cumulative and Cumulative Plus Project Segment LOS for Vehicles (PM Peak Hour) ...122 City of San Luis Obispo Palm Nipomo Parking Structure Project iv Table 37 Cumulative and Cumulative Plus Project Segment LOS for Bicycles (PM Peak Hour) ....124 Table 38 Cumulative and Cumulative Plus Project Segment LOS for Transit (PM Peak Hour) ......124 Table 39 Cumulative and Cumulative Plus Project Intersection LOS for Pedestrians (PM Peak Hour) ........................................................................................................................................125 Table 40 Cumulative and Cumulative Plus Project Roadway Segment LOS for Pedestrians (PM Peak Hour) ..................................................................................................................................125 Table 41 Project Energy Use Relative to Statewide Energy Use ....................................................152 Table 42 Project Operational Vehicle Fuel Consumption ..............................................................152 Table 43 Alternatives and Impact Comparisons ............................................................................162 Table 44 Public Hearing Comment Summary ................................................................................168 Table 45 Comments Received on the Draft EIR .............................................................................176 Figures Figure 1 Environmental Review Process .........................................................................................23 Figure 2 Regional Location ..............................................................................................................26 Figure 3 Project Planning Area ........................................................................................................27 Figure 4 Project Site Location and Surrounding Uses .....................................................................28 Figure 5 Site Plan.............................................................................................................................31 Figure 6 Nipomo Street Elevation ...................................................................................................32 Figure 7 Conceptual Project Renderings (View of Parking Structure and Commercial Space from Corner of Palm and Nipomo Streets) ............................................................................................35 Figure 8 Conceptual Project Renderings (View of Commercial Space and Parking Structure from Nipomo Streets) ............................................................................................................................36 Figure 9 Site Photographs ...............................................................................................................45 Figure 10 Noise Measurement Locations .........................................................................................84 Figure 11 Study Intersections and Road Segments ........................................................................102 Figure 12 Existing Weekday PM Peak Hour Traffic Volumes ..........................................................106 Figure 13 Existing Plus Project Weekday PM Peak Hour Traffic Volumes ......................................117 Figure 14 Cumulative and Cumulative Plus Project Traffic Volumes ..............................................123 Appendices Appendix A Notice of Preparation and Initial Study Appendix B Cultural Resources Inventory Report and Native American Correspondence Appendix C Noise Modeling Worksheets Appendix D Transportation Impact Study Executive Summary Final Environmental Impact Report 1 Executive Summary This section summarizes the characteristics of the proposed Palm Nipomo Parking Structure Project, alternatives to the project, and the environmental impacts, mitigation measures, and residual impacts associated with the project. City staff prepared an Initial Study and circulated a Notice of Preparation (NOP) for the project on May 1, 2017. The Initial Study identified potentially significant impacts with respect to aesthetics, cultural resources, noise, and transportation and traffic, and this document is an environmental impact report (EIR) that further analyzes those impacts. All other CEQA issue areas were addressed in the Initial Study (Appendix A) and are summarized in Section 5.0, Issues Addressed in the Initial Study. Project Synopsis Project Applicant City of San Luis Obispo Public Works Department 919 Palm Street San Luis Obispo, California 93401 (805) 781-7203 Lead Agency Contact Person City of San Luis Obispo Public Works Department 919 Palm Street San Luis Obispo, California 93401 (805) 781-7203 Contact: Scott Lee, Parking Manager Project Description This EIR has been prepared to examine the potential environmental effects of the Palm Nipomo Parking Structure Project. The following is a summary of the full project description, which is located in Section 2.0, Project Description. The project would involve the removal of an existing 77-space surface parking lot and five residential structures (including detached garage) and construction of an above-ground, five-level parking structure, non-profit theater, and commercial space on a 1.38-acre site located in the city of San Luis Obispo. The parking structure would provide up to 445 parking spaces.1 Main vehicular access to the structure would be provided from Palm Street, with secondary access from Nipomo Street. The theater would entail a three-story structure with a gross floor area of 23,841 square feet 1 The parking structure is undergoing design refinement with respect to the ultimate number of parking spaces. Based on the current design, the structure would provide 410 parking spaces; however, the analysis conservatively assumes a maximum of up to 445 parking spaces would be provided. City of San Luis Obispo Palm Nipomo Parking Structure Project 2 and up to 255290 theater seats fronting Monterey Street. The project would also include 5,000 square feet of commercial space on two levels fronting Nipomo Street. The project would require a General Plan Amendment, Zone Change, Planning Commission Use Permit, and Architectural Review. Table 1 summarizes the characteristics of the proposed project. Table 1 Project Characteristics Address 609, 610, 614, 630, 633 Palm Street and 970, 972 Nipomo Street APN 002-412-001, 002-412-002, 002-412-003, 002-412-004, 002-412- 011, and 002-412-012 Maximum Building Height Parking Structure 50 feet structure + 14 feet for elevator tower Commercial 41 feet Theater 43 feet Lot Area Approx. 60,329 square feet (sf) (1.38 acres) Building Footprint1 Approx. 44,487 sf Building Gross Floor Area2 191,591 sf Parking Structure Gross Floor Area 162,750 sf Ground Floor 32,500 sf Parking Level 2 32,750 sf Parking Level 3 32,750 sf Parking Level 4 32,750 sf Parking Level 5 32,000 sf Commercial Gross Floor Area 5,000 sf 1st Floor 2,500 sf 2nd Floor 2,500 sf Theater Gross Floor Area 23,841 sf 1st Floor (Basement) 6,357 sf 2nd Floor (Main) 9,487 sf 3rd Floor 5,744 sf Roof Balcony & Exit Stairs 2,253 sf Total Parking Spaces3 445 Net New Parking Spaces 368 1 Building footprint is sum of ground or main levels of each use. 2 The gross floor area is the sum of all floors or levels for all uses. 3 The parking structure is undergoing design refinement with respect to the ultimate number of parking spaces. Based on the current design, the structure would provide 410 parking spaces; however, the analysis conservatively assumes a maximum of up to 445 parking spaces would be provided. sf = square feet Executive Summary Final Environmental Impact Report 3 Project Objectives Objectives for this project include the following:  Provide a minimum of 400 parking spaces  Accommodate cultural uses on Monterey Street in front of the structure  Include a pedestrian-level public use plaza area at the corner of Nipomo and Monterey Streets  Provide a direct pedestrian connection from the structure to Monterey Street  Preserve the large oak tree on site  Consider contextual sensitivity of surrounding properties (e.g., Lattimer-Hayes adobe) Project Alternatives As required by Section 15126(d) of the State CEQA Guidelines, this EIR examines a range of reasonable alternatives to the project that could feasibly achieve similar objectives. This includes the following five alternatives:  Alternative 1. No Project /No Development assumes the project is not approved, that none of the proposed entitlements are implemented, and that no further development would occur on the project site.  Alternative 2. Project Plus Live/Work Units would be the same as the proposed project described above, except the 5,000 square feet of commercial space would be reduced to 2,500 square feet of commercial space and four residential units would be included.  Alternative 3. Parking Structure, Commercial, and Residential would be the same as the preferred project described above, except the theater would be replaced with 22 two-bedroom residential units.  Alternative 4. Historic Resource Preservation would include the parking structure and 5,000 square feet of commercial space, but retain the two houses at 610 and 614 Monterey Street. The theater would not be included as part of this alternative. Alternative 4. The Historic Resource Preservation Alternative would be the environmentally superior alternative, as it would avoid direct impacts to historical resources because the two contributing structures to the Downtown Historic District and the linkage between properties in the district they provide would remain in place. However, aesthetic and noise impacts would remain significant and unavoidable. Alternative 1. No Project/No Development could also be considered environmentally superior to the proposed project because the site would remain as is and it would not result in any significant environmental impacts; however, it would not meet the project objectives. Alternative 2. Project Plus Live/Work Units would result in a similar magnitude of environmental impacts as the proposed project, as buildout would be almost identical. This alternative would not reduce any of the significant and unavoidable impacts. Alternative 3. Parking Structure, Commercial, and Residential would result in a similar magnitude of environmental impacts as the proposed project. The addition of 22 residential units in place of the theater would not result in inferior or superior environmental conditions relative to the proposed project and would not eliminate the significant impacts to historical resources, visual City of San Luis Obispo Palm Nipomo Parking Structure Project 4 character, or from construction noise. Most of the issues addressed in the Initial Study would be the same as the proposed project, with an incremental increase in public services demanded and water/wastewater generated. The complete alternatives analysis is included in Section 7.0, Alternatives. Areas of Concern Pursuant to State CEQA Guidelines § 15123(b)(2), this EIR acknowledges the areas of controversy and issues to be resolved which are known to the City of San Luis Obispo or were raised during the scoping process. An Initial Study and Notice of Preparation (NOP) of an EIR was prepared and circulated for a 30-day agency- and public-review period beginning on May 1, 2017. Several comment letters from members of the public were received in response to the NOP. In addition, an EIR Scoping Meeting was also held at the Planning Commission Meeting on May 10, 2017, and comments on the scope of the EIR were received from members of the public and the City Planning Commissioners. The NOP and Initial Study, and NOP comment letters are included in Appendix A of this EIR. Key issues of concern that were identified in the NOP responses and voiced at the EIR scoping meeting included the following: Comment/Area of Concern EIR Section Where Addressed Impacts on views of Cerro San Luis Obispo 4.1 Aesthetics Size and scale of the project and its aesthetic compatibility with the historical character or surrounding development 4.1 Aesthetics Impacts to historical resources, including adobe on the project site 4.2 Cultural and Tribal Cultural Resources Impacts to tribal cultural resources 4.2 Cultural and Tribal Cultural Resources Increase in operational noise and its impact on sensitive receptors 4.3 Noise Vehicle trips generated by project 4.4 Transportation Pedestrian-vehicle conflicts; pedestrian safety crossing Nipomo Street 4.4 Transportation Induced travel 4.4 Transportation Calculation methodology for greenhouse gas emissions 5.0 Issues Addressed in Initial Study Alternatives to the project 7.0 Alternatives Revisions to the Draft EIR Under the provisions CEQA Section 15088, a 45-day public review period of the Draft EIR is required. The Draft EIR was circulated from December 14, 2017 until March 1, 2018. Each written and verbal comment that the City received is included in Section 9.0, Responses to Comments. Responses to these comments have been prepared to address the environmental concerns raised by the commenters and to indicate where and how the Draft EIR addresses pertinent environmental issues. The Draft EIR and responses to comments collectively comprise the Final EIR for the project. The responses to comments summarize the comment and direct the commenter to the section of the Draft EIR that addresses their comment. In some cases, revisions have been made to the Draft EIR to clarify information, data, or intent, or to make minor typographical corrections or minor working changes. Any changes made to the text of the Draft EIR are noted in the Final EIR as changes from the Draft EIR. Where a comment results in a change to the Draft EIR text, a notation is made in the response indicating that the text is revised. Changes in the Draft EIR text are signified by strikeouts where text is removed and by underline font where text is added. If text is added where Executive Summary Final Environmental Impact Report 5 the font is already bold or underlined, additions are noted using underlined bold font. Revisions were made to the proposed number of theater seats. These changes are shown on page 2 of the Executive Summary and Section 2.5, Project Characteristics. Although the total number of seats increased from 155 to 191, this did not change any of the impacts as project effects were calculated based on building square footage and/or number of employees, which did not change. In addition, a revision was made to the theater footprint shown on Figure 5, Site Plan, based on refinements to the project design. As previously noted, the building square footage did not change and this revision did not change any of the impacts. Summary of Impacts and Mitigation Measures Table 2 through Table 4 provide a summary of the potential environmental impacts of the project. The mitigation measures associated with each impact, which are to be implemented in order to reduce the environmental impacts to the maximum extent feasible, are also summarized therein. In accordance with the State CEQA Guidelines, the tables identify the following types of potential impacts associated with the project:  Class I, Significant and Unavoidable. An impact that cannot be reduced to below the threshold level given reasonably available and feasible mitigation measures. Such an impact requires a ‘Statement of Overriding Considerations’ to be issued if the project is approved per §15093 of the State CEQA Guidelines.  Class II, Significant but Mitigable. An impact that can be reduced to below the threshold level given reasonably available and feasible mitigation measures. Such an impact requires ‘Findings’ to be made under §15091 of the State CEQA Guidelines.  Class III, Less than Significant. An impact that may be adverse, but does not exceed the threshold levels and does not require mitigation measures. However, mitigation measures that could further lessen the environmental effect may be suggested if readily available and easily achievable.  Class IV, Beneficial. An effect that would reduce existing environmental problems or hazards. Significant and Unavoidable Impacts The project would result in five significant and unavoidable (Class I) impacts. Issue areas with Class I impacts include aesthetics (visual character and cumulative visual character), cultural resources (historic resources and cumulative historic resources), and noise (construction noise) as summarized in Table 2. City of San Luis Obispo Palm Nipomo Parking Structure Project 6 Table 2 Class I, Significant and Unavoidable Environmental Impacts Impact Mitigation Measures Residual Impact Aesthetics Impact AES-2. The project would permanently alter the existing visual character of the site because it would introduce new structures that are substantially different in terms of size, scale, and massing. This impact is Class I, significant and unavoidable. As discussed in the impact analysis and described in the project description, the project includes various features that are intended to mitigate visual impacts. No additional mitigation measures are feasible. The project design features would reduce visual impacts to the extent feasible; however, due to the size, scale, and massing of the project, impacts related to a change in visual character would remain significant and unavoidable. Cumulative Aesthetics Impact. The project would result in a significant and unavoidable impact associated with change in visual character due to the increase in size, scale, and massing of the project. This combined with other cumulative development in the area would increase the intensity of development in the area and permanently alter the visual character. Therefore, the project would result in a Class I, significant and unavoidable, cumulative impact. As discussed in the impact analysis and described in the project description, the project includes various features that are intended to mitigate visual impacts. No additional mitigation measures are feasible to address cumulative impacts. The project features would reduce the project’s visual impacts to the extent feasible; however, impacts to change in visual character would be cumulatively considerable. Cultural and Tribal Cultural Resources Impact CR-1. Construction of the project would result in demolition of two structures on the project site that are historic resources, and adversely affect the Downtown Historic District. This would cause a substantial adverse change in the significance of historic resources as defined in CEQA Guidelines §15064.5. This impact is Class I, significant and unavoidable. CR-1 Historical Building Documentation Packages. Impacts to historical resources shall be minimized through the preparation of archival historic building documentation packages for both 610 and 614 Monterey Street. Prior to issuance of demolition permits, the City of San Luis Obispo shall ensure that documentation of both properties is completed in the form of a Historic American Building Survey (HABS)-Like documentation that shall comply with the Secretary of the Interior’s Standards for Architectural and Engineering Documentation (NPS 1990). The documentation shall generally follow the HABS Level III requirements and include high-quality digital photographic recordation of the buildings and their overall setting, detailed historic narrative report, and compilation of historic research. The documentation shall be completed by a qualified architectural historian or historian who meets the Secretary of the Interior’s Professional Qualification Standards for History and/or Architectural History (NPS 1983). Individual archival documentation packages shall be completed both properties and offered as donated material to the San Luis Obispo Library and the History Center of San Luis Obispo County, where it would be available to local researchers. Completion of this mitigation measure shall be monitored and enforced by the lead agency. Implementation of Mitigation Measure CR-1 would reduce impacts to historical resources to the greatest extent possible; however, this measure would not eliminate the permanent impacts to the identified historic resources, and no other feasible mitigation measures are available. Therefore, the project would result in a significant and unavoidable impact to historic resources. Executive Summary Final Environmental Impact Report 7 Impact Mitigation Measures Residual Impact Cumulative Cultural Resources Impact. The project would result in a significant and unavoidable impact associated with the removal of historic structures that contribute to the Downtown Historic District. As such, the project would contribute to the cumulative loss of historic resources in the City. This would be a Class I, significant and unavoidable, cumulative impact to historical resources. No additional mitigation is available to address cumulative cultural resources impacts. Implementation of Mitigation Measure CR-1 would reduce this impact to the greatest extent possible; however, cumulative cultural resources impacts would remain significant and unavoidable. Noise Impact N-1. Short-term construction activity would temporarily generate noise that would exceed City noise thresholds. Mitigation is available to reduce temporary construction noise, but would not be sufficient to reduce impacts to less than the applicable thresholds. This impact is Class I, significant and unavoidable. N-1(a) Construction Vehicle Travel Route. Construction vehicles and haul trucks shall utilize roadways which avoid residential neighborhoods and sensitive receptors where possible. The applicant shall submit a proposed construction vehicle and hauling route for City review and approval prior to grading/building permit issuance. The approved construction vehicle and hauling route shall be used for all construction vehicles and hauling trips during the duration of construction. N-1(b) Construction Activity Timing. Except for emergency repair of public service utilities or where an exception is issued by the Community Development Department, no operation of tools or equipment used in construction, drilling, repair, alteration, or demolition work shall occur daily between the hours of 7:00 PM and 7:00 AM, or anytime on Sundays, holidays, or after sunset, where that operation creates a noise disturbance that exceeds 75 dBA for single family residential, 80 dBA for multi-family residential, and 85 dBA for mixed residential/commercial land uses across a residential or commercial property line for a maximum of 10 days. For construction activities lasting more than 10 days, noise from construction equipment shall not exceed 60 dBA for single family residential, 65 dBA for multi-family residential, and 70 dBA for mixed residential/commercial land uses across a residential or commercial property line. Mitigation Measures N-1(a) through N-1(d) would require implementation of noise reduction devices and techniques during construction, and would reduce noise associated with on- and offsite construction activity to the maximum extent feasible. However, temporary noise impacts associated with onsite and offsite construction activity would be significant and unavoidable. N-1(c) Construction Equipment Best Management Practices (BMPs). For all construction activity at the project site, noise attenuation techniques shall be employed to reduce noise levels to extent feasible in accordance with the City of San Luis Obispo Municipal Code, Title 9, Chapter 9.12 (Noise Control). Such techniques shall include:  Sound blankets on noise-generating equipment  Stationary construction equipment that generates noise levels above 60 dBA at the project boundaries shall be shielded with barriers that meet a sound transmission class (a rating of how well noise barriers attenuate sound) of 25 City of San Luis Obispo Palm Nipomo Parking Structure Project 8 Impact Mitigation Measures Residual Impact  All diesel equipment shall be operated with closed engine doors and shall be equipped with factory- recommended mufflers  For stationary equipment, the applicant shall designate equipment areas with appropriate acoustic shielding on building and grading plans. Equipment and shielding shall be installed prior to construction and remain in the designated location throughout construction activities  Electrical power shall be used to power air compressors and similar power tools  The movement of construction-related vehicles, with the exception of passenger vehicles, along roadways adjacent to sensitive receptors shall be limited to the hours between 7:00 AM and 7:00 PM, Monday through Saturday and no movement of heavy equipment shall occur on Sundays or official holidays (e.g., Thanksgiving, Labor Day)  Temporary sound barriers shall be constructed between construction sites and affected uses N-1(d) Neighborhood Property Owner Notification and Construction Noise Complaints. The contractor shall inform residents and business operators at properties within 300 feet of the project site of proposed construction timelines and noise complaint procedures to minimize potential annoyance related to construction noise. Proof of mailing the notices shall be provided to the Community Development Department before the City issues a zoning clearance. Signs shall be in place before beginning of and throughout grading and construction activities. Noise- related complaints shall be directed to the City’s Community Development Department. Executive Summary Final Environmental Impact Report 9 Table 3 Class II, Significant but Mitigable Environmental Impacts Impact Mitigation Measures Residual Impact Aesthetics Impact AES-3. Implementation of the project would result in an increase in nighttime lighting and daytime glare at the project site; however, with mitigation, this increase would not adversely affect day or nighttime views in the area. This impact would be Class II, significant but mitigable. AES-3(a) Lighting Plan. Prior to issuance of building permits, the applicant shall prepare and submit a comprehensive lighting plan for Architectural Review Committee review and approval. The lighting plan shall be consistent with the Municipal Code Night Sky Ordinance, and prepared using guidance and best practices endorsed by the International Dark Sky Association. The lighting plan shall address all aspects of the lighting, including but not limited to all buildings, infrastructure, driveways, paths, plazas, safety, and signage. The lighting plan must include identification of all types, sizes, and intensities of wall mounted building lights and landscape accent lighting, and a photometric map must be provided. The lighting plan shall include the following: a. The point source of all exterior lighting shall be shielded from offsite views b. Light trespass from exterior lights shall be minimized by directing light downward and utilizing cut-off fixtures or shields c. Lumination from exterior lights shall be the lowest level allowed by public safety standards d. Exterior lighting shall be designed to not focus illumination onto exterior walls e. Any signage visible from offsite shall not be internally laminated AES-3(b) Glare Reduction. To minimize impacts on residential development in proximity to the project site, roof and building materials shall be non-reflective, and shall be muted in hues consistent with standards in the Community Design Guidelines, Section 6.1-C. Implementation of Mitigation Measures AES-3(a) and AES-3(b) would reduce impacts associated with light and glare to a less than significant level. Cultural and Tribal Cultural Resources Impact CR-2. Construction of the project would result in ground disturbance that could cause a substantial adverse change in the significance of an archaeological resource as defined in CEQA Guidelines 15064. This impact would be Class II, significant but mitigable. CR-2(a) Retain a Qualified Principal Investigator. A qualified principal investigator, defined as an archaeologist who meets the Secretary of the Interior’s Standards for professional archaeology (hereafter qualified archaeologist), shall be retained to carry out all mitigation measures related to archaeological resources. CR-2(b) City of San Luis Obispo Consolidated Approach for Archaeological Investigations. Mitigation of archaeological resources within the project area shall follow the Consolidated Approach as outlined in the City of San Luis Obispo Archaeological Resource Preservation Program Guidelines. The Consolidated Approach shall include (1) the preparation of a Research Design and Mitigation Plan prepared by the qualified archaeologist and submitted for written approval to the City’s Community Development Director (Director), which shall include but not be limited to the research design, laboratory and field methods, public interpretation, and location of curation; (2) monitoring of demolition and Implementation of Mitigation Measures CR-2(a) through CR-2(d) would reduce impacts to archaeological resources to a less than significant level. City of San Luis Obispo Palm Nipomo Parking Structure Project 10 Impact Mitigation Measures Residual Impact clearing of pavement within the project area; (3) fieldwork after the removal of pavement consisting of a Phase I inventory, Phase 2 Testing and Evaluation, and Phase 3 Data Recovery aimed at locating archaeological remains, evaluating their significance and integrity, and mitigating impacts through data recovery excavation; (4) the completion of special studies, such as faunal analysis, if appropriate, and the curation of recovered artifacts; and (5) the completion of a technical report documenting the results of the consolidated approach prepared in accordance with current professional standards and submitted to the Director. CR-2(c) Archaeological Monitoring. An archaeological monitor shall be present for all project-related ground- disturbing construction activities. The monitor(s) shall be onsite on a full-time basis during earthmoving activities, including grading, trenching, vegetation removal, or other excavation activities. Under consultation between the qualified archaeologist and the City, monitoring may be reduced or eliminated based on observed conditions. CR-2(d) Unanticipated Discovery of Archaeological Resources. In the event that cultural resources are encountered during the implementation of mitigation measures CR-2b or CR-2c, all work shall be halted in the vicinity of the discovery until a qualified archaeologist can assess the significance of the resource. If the resources are found to be significant, they must be avoided or mitigated pursuant to the qualified archaeologist’s direction and the testing plan outlined under MM CR-2b. Mitigation may involve preservation in place or documentation and excavation of the resource. A report by the archaeologist evaluating the find and identifying mitigation actions taken shall be submitted to the City. Impact CR-3. Construction of the project would result in ground disturbance that could indirectly or directly destroy a unique paleontological resource. This impact would be Class II, significant but mitigable. CR-3(a) Qualified Project Paleontologist. A qualified project paleontologist, defined as a paleontologist who meets the standards of the SVP (2010), shall be retained to carry out all mitigation measures related to paleontological resources. CR-3(b) Worker Environmental Awareness Program (WEAP). Prior to the start of construction, the project paleontologist or his or her designee shall conduct training for construction personnel regarding the appearance of fossils and the procedures for notifying paleontological staff should fossils be discovered by construction staff. The WEAP shall be fulfilled at the time of a preconstruction meeting at which a qualified paleontologist shall attend. CR-3(c) Paleontological Monitoring. Ground-disturbing construction activities (including grading, trenching, foundation work, and other excavations) in previously undisturbed sediments that exceed 10 feet in depth shall be monitored on a full-time basis during initial ground disturbance. Monitoring shall be conducted by a qualified paleontological monitor, who is defined as an individual who has experience with collection and salvage of paleontological resources and meets the minimum Implementation of Mitigation Measures CR-3(a) through CR-3(d) would reduce impacts to paleontological resources to a less than significant level. Executive Summary Final Environmental Impact Report 11 Impact Mitigation Measures Residual Impact standards of the SVP (2010). The duration and timing of the monitoring will be determined by the project paleontologist and the location and extent of proposed ground disturbance. If the project paleontologist determines that full-time monitoring is no longer warranted, based on the specific geologic conditions at the surface or at depth, the project paleontologist may recommend that monitoring be reduced to periodic spot- checking or cease entirely. Monitoring is not necessary in artificial fill or for activities that do not reach 10 feet in depth. CR-3(d) Fossil Discoveries. In the event of a fossil discovery by the paleontological monitor or construction personnel, all work in the immediate vicinity of the find shall cease. The project paleontologist shall evaluate the find before restarting construction activity in the area. If it is determined that the fossil(s) is (are) scientifically significant, the project paleontologist shall complete the following conditions to mitigate impacts to significant fossil resources: 1) Salvage of Fossils. The project paleontologist (or paleontological monitor) shall recover significant fossils following standard field procedures for collecting paleontological resources, as described by the SVP (2010). Typically, fossils can be safely salvaged quickly by a single paleontologist and not disrupt construction activity. In some cases, larger fossils (such as complete skeletons or large mammal fossils) require more extensive excavation and longer salvage periods. In this case the paleontologist shall have the authority to temporarily direct, divert or halt construction activity to ensure that the fossil(s) can be removed in a safe and timely manner. 2) Preparation and Curation of Recovered Fossils. Once salvaged, significant fossils shall be identified to the lowest possible taxonomic level, prepared to a curation- ready condition, and curated in a scientific institution with a permanent paleontological collection (such as the University of California Museum of Paleontology), along with all pertinent field notes, photos, data, and maps. Fossils of undetermined significance at the time of collection may also warrant curation at the discretion of the project paleontologist. Impact CR-5. Ground-disturbing activities associated with construction of the project have the potential to disturb unidentified human remains. This impact would be Class II, significant but mitigable. Compliance with existing regulations and Mitigation Measure CR-2(d) would ensure that impacts to human remains and burial grounds would remain less than significant. Implementation of Mitigation Measure CR- 2(d) would reduce this impact to a less than significant level. Cumulative Noise Impact. Construction of the proposed project could overlap with the construction of other projects in the vicinity (Monterey Place and the Vesper Hotel at the N-4 Coordination of Construction Timing. Prior to the issuance of grading permits, the City of San Luis Obispo shall review and coordinate the construction schedules of any other projects within 300 feet of the project to ensure that construction schedules do not overlap. Implementation of Mitigation Measure N-4 would avoid additional cumulative construction noise impacts and reduce City of San Luis Obispo Palm Nipomo Parking Structure Project 12 Impact Mitigation Measures Residual Impact Creamery) which would result in a significant cumulative impact. The project’s incremental contribution would be cumulatively considerable. cumulative impacts to a less than significant level. Transportation Impact T-3. Implementation of the project would result in pedestrian access impacts due to the difficulty of crossing Nipomo Street at an uncontrolled location. This impact would be Class II, significant but mitigable. T-3 Pedestrian Access. Subject to approval of the Public Works Director, the City shall incorporate improvements to the intersections of Dana Street/Nipomo Street and Monterey Street/Nipomo Street to enhance pedestrian safety and accessibility. The improvements shall be consistent with the City’s Circulation Element and Downtown Physical Concept Plan (2017) and shall balance the needs of each mode of use. At a minimum the project should consider:  High visibility crosswalk, or other intersection enhancements, with directional curb ramps across Nipomo Street from the northwest corner of Dana Street/Nipomo Street to the southwest corner of the parking structure.  High visibility crosswalk, or other intersection enhancements, with directional curb ramps from the southeast corner of Monterey Street/Nipomo Street across Nipomo Street.  Standard crosswalks, or other intersection enhancements, with directional curb ramps across Monterey Street and Dana Street where they intersect with Nipomo Street.  Reduce the curb radii on the southwest corner of Dana Street/Nipomo Street and the northeast corner of Monterey Street/Nipomo Street. Implementation of Mitigation Measure T-3 would reduce this impact to a less than significant level. Cumulative Traffic Impact. Under Cumulative plus Project conditions, one study intersection (the project driveway at Nipomo Street) would operate at an unacceptable level of service for pedestrians during the evening peak hour. This impact would be Class II, significant but mitigable. Mitigation Measure T-3 would be required. Implementation of Mitigation Measure T-3 would reduce impacts to a less than significant level. Air Quality (from Initial Study) Construction of the project would generate temporary increases in localized air pollutant emissions (fugitive dust, ozone precursors, and diesel particulate matter emissions) within 1,000 of sensitive receptors. In addition the South Coast Air Basin is in non-attainment for SCCAB is in non-attainment for PM10. This impact would be Class II, significant but mitigable. AQ-1 Fugitive Dust Control Measures. Construction projects shall implement the following dust control measures so as to reduce PM10 emissions in accordance with San Luis Obispo Air Pollution Control District (SLOAPCD) requirements.  Reduce the amount of the disturbed area where possible  Water trucks or sprinkler systems shall be used during construction in sufficient quantities to prevent airborne dust from leaving the site. Increased watering frequency shall be required whenever wind speeds exceed 15 mph. Reclaimed (non-potable) water shall Implementation of Mitigation Measures AQ-1 and AQ-2(a) through AQ-2(c) would reduce impacts to a less than significant level. Executive Summary Final Environmental Impact Report 13 Impact Mitigation Measures Residual Impact be used whenever possible  All dirt stock pile areas shall be sprayed daily as needed  Permanent dust control measures identified in the approved project revegetation and landscape plans shall be implemented as soon as possible following completion of any soil disturbing activities  Exposed ground areas that are planned to be reworked at dates greater than one month after initial grading shall be sown with a fast germinating, non- invasive grass seed and watered until vegetation is established  All disturbed soil areas not subject to revegetation shall be stabilized using approved chemical soil binders, jute netting, or other methods approved in advance by the SLOAPCD  All roadways, driveways, sidewalks, etc. to be paved shall be completed as soon as possible after grading unless seeding or soil binders are used  Vehicle speed for all construction vehicles shall not exceed 15 miles per hour (mph) on any unpaved surface at the construction site  All trucks hauling dirt, sand, soil, or other loose materials are to be covered or shall maintain at least two feet of freeboard (minimum vertical distance between top of load and top of trailer) in accordance with California Vehicle Code Section 23114  Install wheel washers where vehicles enter and exit unpaved roads onto streets, or wash off trucks and equipment leaving the site  Sweep streets at the end of each day if visible soil material is carried onto adjacent paved roads. Water sweepers with reclaimed water shall be used where feasible  All of these fugitive dust mitigation measures shall be shown on grading and building plans  The contractor or builder shall designate a person or persons to monitor the fugitive dust emissions and enhance the implementation of the measures as necessary to minimize dust complaints, reduce visible emissions below 20 percent opacity, and to prevent transport of dust offsite. Their duties shall include holidays and weekend periods when work may not be in progress. The name and telephone number of such persons shall be provided to the SLOAPCD Compliance Division prior to the start of any grading, earthwork, or demolition. AQ-2(a) Standard Control Measures for Construction Equipment. The following standard air quality mitigation measures shall be implemented during construction activities at the project site:  Maintain all construction equipment in proper tune according to manufacturer’s specifications  Fuel all off-road and portable diesel powered equipment with ARB certified motor vehicle diesel fuel City of San Luis Obispo Palm Nipomo Parking Structure Project 14 Impact Mitigation Measures Residual Impact (non-taxed version suitable for sue off-road)  Use diesel construction equipment meeting ARB’s Tier 2 certified engines or cleaner off-road heavy-duty diesel engines, and comply with the State Off-Road Regulation  Use on-road heavy-duty trucks that meet the ARB’s 2007 or cleaner certification standard for on-road heavy-duty diesel engines, and comply with the State On-Road Regulation  Construction or trucking companies with fleets that do not have engines in their fleet that meet the engine standards identified in the above two measures (e.g., captive or NOX exempt area fleets) may be eligible by proving alternative compliance  All on- and off-road diesel equipment shall not idle for more than 5 minutes. Signs shall be posted in the designated queuing areas and or job sites to remind drivers and operators of the 5 minute idling limit  Diesel idling within 1,000 feet of sensitive receptors is not permitted  Staging and queuing areas shall not be located within 1,000 feet of sensitive receptors  Electrify equipment when feasible  Substitute gasoline-powered in place of diesel- powered equipment, where feasible  Use alternatively fueled construction equipment onsite where feasible, such as compressed natural gas, liquefied natural gas, propane or biodiesel AQ-2(b) Best Available Control Technology (BACT) for Construction Equipment. The following BACT for diesel- fueled construction equipment shall be implemented during construction activities at the project site, where feasible:  Further reduce emissions by expanding use of Tier 3 and Tier 4 off-road and 2010 on-road compliant engines where feasible  Repower equipment with the cleanest engines available  Install California Verified Diesel Emission Control Strategies, such as level 2 diesel particulate filters (these strategies are listed at: www.arb.ca.gov/diesel/verdev/vt/cvt.htm) AQ-2(c) Architectural Coating. To reduce ROG and NOX levels during the architectural coating phase, low or no VOC-emission paint shall be used with levels of 50 g/L or less. Biological Resources (from Initial Study) Construction of the project would involve general construction activity and tree removal that may affect protected nesting birds. Impacts to migratory bird species would be potentially significant unless mitigation is BIO-1 Nesting Bird Protection. To avoid disturbance of nesting and special-status birds, activities related to the project, including, but not limited to, vegetation removal, ground disturbance, and construction and demolition shall occur outside of the bird breeding season (typically February through August in the project region). If construction must begin within the breeding season, then Implementation of Mitigation Measure BIO-1 would reduce impacts to a less than significant level. Executive Summary Final Environmental Impact Report 15 Impact Mitigation Measures Residual Impact incorporated. a pre-construction nesting bird survey shall be conducted no more than 3 days prior to initiation of ground disturbance and vegetation removal activities. The nesting bird pre-construction survey shall be conducted within the Project Boundary, including a 300-foot buffer (500-foot for raptors), on foot, and within inaccessible areas (i.e., private lands) afar using binoculars to the extent practical. The survey shall be conducted by a biologist familiar with the identification of avian species known to occur in the area. If nests are found, an avoidance buffer (which is dependent upon the species, the proposed work activity, and existing disturbances associated with land uses outside of the site) shall be determined and demarcated by the biologist with bright orange construction fencing, flagging, construction lathe, or other means to mark the boundary. All construction personnel shall be notified as to the existence of the buffer zone and to avoid entering the buffer zone during the nesting season. No ground- disturbing activities shall occur within this buffer until the avian biologist has confirmed that breeding/nesting is completed and the young have fledged the nest. Encroachment into the buffer shall occur only at the discretion of the qualified biologist. Geology and Soils (from Initial Study) Implementation of the project would occur on soils that have moderate to high expansion potential. This impact would be potentially significant unless mitigation is incorporated. GEO-1 Minimization of Expansive Soil Hazards. Once the final maximum loads of the project have been determined, a design-level geotechnical report shall be prepared that identifies the most appropriate geotechnical improvements to onsite soils, the foundation, and parking structure to minimize expansive soil hazards. Recommendations could include, but are not limited to the following:  Use imported non-expansive materials combined with pre-moistening of the soils to provide protection for slabs and flatwork  Provide a layer of non-expansive material 18 to 24 inches thick  Use post-tensioned slabs-on-grade  Implement shoring methods, such as shotcrete-faced soil nail walls, tangent drilled caissons, whaler-braced retaining walls, and steel I-beam and lagging walls  Use over-excavation and recompaction  Utilize a deep foundation system, such as caissons or rammed aggregate piers A certified soils engineer shall be retained for monitoring during construction of the project. The certified soils engineer shall also provide any necessary soil testing during construction, to ensure compliance with the design-level geotechnical report, and to provide site- specific guidance as subsurface materials are encountered. Implementation of Mitigation Measure GEO-1 would reduce impacts to a less than significant level. City of San Luis Obispo Palm Nipomo Parking Structure Project 16 Impact Mitigation Measures Residual Impact Hazardous Materials (from Initial Study) Construction of the project would require excavation and removal of existing fill, which has the potential to be contaminated. Therefore, construction activities could expose workers to contaminated soil onsite. This impact would be potentially significant unless mitigation is incorporated. HAZ-1 Hazardous Materials Soil Sampling and Remediation. Prior to issuance of grading permits, additional soil samples testing for total petroleum hydrocarbons shall be performed. A work plan shall be completed to address the sampling protocols to be followed, as well as the number of samples to be taken and the chemical analysis required. Upon City of San Luis Obispo approval, the work plan shall be implemented and the results of the soil sampling shall be forwarded to the City of San Luis Obispo. The City shall review the data to determine if any additional investigation or remedial activities are deemed necessary. No work shall resume in that area until the lead local regulatory agency has provided written authorization that the area does not warrant any additional action. If concentrations of contaminants warrant remediation, contaminated materials shall be remediated either prior to or concurrent with construction. Remediation shall generally include a management plan which establishes design and implementation of remediation. Cleanup may include excavation, disposal, bio-remediation, or any other treatment of conditions subject to regulatory action. All necessary reports, regulations and permits shall be followed to achieve cleanup of the site. The contaminated materials shall be remediated under the supervision of an environmental consultant licensed to oversee such remediation and under the direction of the lead oversight agency. The remediation program shall also be approved by the San Luis Obispo Fire Department. All proper waste handling and disposal procedures shall be followed. Upon completion of the remediation, the environmental consultant shall prepare a report summarizing the project, the remediation approach implemented, and the analytical results after completion of the remediation, including all waste disposal or treatment manifests. Implementation of Mitigation Measure HAZ-1 would reduce impacts to a less than significant level Transportation (from Initial Study) Construction of the project would result in short term construction traffic, construction parking, and modifications to existing pedestrian, bicycle, and transit circulation during the construction period. This impact would be potentially significant unless mitigation is incorporated. T-1 Construction Management Plan. Prior to the issuance of each building permit, the construction contractor shall meet with the Public Works department to determine traffic management strategies to reduce, to the maximum extent feasible, traffic congestion and the effects of parking demand by construction workers during construction of this project. The construction contractor will develop a construction management plan for review and approval by the Public Works department. The plan shall include at least the following items and requirements:  A set of comprehensive traffic control measures, including scheduling of major truck trips and deliveries to avoid peak traffic and pedestrian hours, detour signs if required, lane closure procedures, sidewalk closure procedures, signs, cones for drivers, and designated construction access routes.  Notification procedures for adjacent property owners and public safety personnel regarding when major Implementation of Mitigation Measure T-1 would reduce impacts to a less than significant level. Executive Summary Final Environmental Impact Report 17 Impact Mitigation Measures Residual Impact deliveries, detours, and lane closures will occur.  Location of construction staging areas for materials, equipment, and vehicles (must be located on the project site).  Identification of haul routes for movement of construction vehicles that would minimize impacts on vehicular and pedestrian traffic, circulation and safety; and provision for monitoring surface streets used for haul routes so that any damage and debris attributable to the haul trucks can be identified and corrected by the project applicant.  Temporary construction fences to contain debris and material and to secure the site.  Provisions for removal of trash generated by project construction activity.  A process for responding to and tracking complaints pertaining to construction activity.  Provisions for monitoring surface streets used for truck routes so that any damage and debris attributable to the trucks can be identified and corrected.  It is anticipated that this Construction Traffic Management Plan would be developed in the context of a larger Construction Management Plan, which would address other issues such as hours of construction onsite, limitations on noise and dust emissions, and other applicable items. City of San Luis Obispo Palm Nipomo Parking Structure Project 18 Table 4 Class III, Less than Significant Environmental Impacts Impact Mitigation Measures Residual Impact Aesthetics Impact AES-1. The project would not have a substantial adverse impact on a scenic vista because it is not located in a city-designated scenic vista. This impact would be Class III, less than significant. No mitigation measures are required. Less than Significant Cultural and Tribal Cultural Resources Impact CR-4. No Tribal Cultural Resources were identified within the project site, but area is generally considered sensitive for cultural resources. This impact would be Class III, less than significant. No mitigation measures are required. Less than Significant Noise Impact N-2. Short term construction activities would generate intermittent levels of groundborne vibration that would be perceptible, but would not exceed applicable thresholds. This impact would be Class III, less than significant. No mitigation measures are required. Less than Significant Impact N-3. The project would generate operational noise from project-generated traffic and new commercial and parking uses. Noise from the project would not exceed acceptable noise levels at existing off -site sensitive receptors. This impact would be Class III, less than significant. No mitigation measures are required. Less than Significant Cumulative Noise Impact. Under Cumulative Plus Project Conditions, noise levels would not exceed thresholds. Impacts would not be significant or cumulatively considerable. No mitigation measures are required. Less than Significant Transportation Impact T-1. Under Existing Plus Project conditions, all intersections and segments would operate at acceptable levels of service for vehicles, pedestrians, bicycles, and transit. These impacts would be Class III, less than significant. No mitigation measures are required. Less than Significant Impact T-2. The project would not add roadway capacity that would induce travel and would not generate new travel demand as a land use. In addition, the City actively manages parking demand and encourages non-auto modes of travel. Therefore, the project would have a negligible impact on vehicle miles traveled (VMT). This impact would be Class III, less than significant. No mitigation measures are required. Less than Significant Cumulative Traffic Impact. Under Cumulative plus Project conditions, all study intersections and segments would operate at acceptable levels of service for vehicles, and all segments would operate at acceptable levels of service for bicycles and transit. These impacts would be Class III, less than significant. No mitigation measures are required. Less than Significant Introduction Final Environmental Impact Report 19 1 Introduction This document is an Environmental Impact Report (EIR) that examines the potential effects of constructing the Palm-Nipomo Project on a 1.38-acre site in the City of San Luis Obispo, California. The project is described in detail in Section 2.0, Project Description. This chapter describes: (1) the background of the EIR; (2) the purpose of and legal authority for the EIR; (3) the scope and content of the EIR; (4) lead, responsible and trustee agencies; and (5) the environmental review process required under the California Environmental Quality Act (CEQA). 1.1 Environmental Impact Report Background The City of San Luis Obispo prepared an Initial Study and circulated a Notice of Preparation (NOP) of this EIR for a 30-day agency and public review period starting on May 1, 2017. The Initial Study serves as the scoping document for this EIR. The Initial Study determined that the proposed project required the preparation of an EIR to further evaluate potential impacts related to the following environmental issue areas: aesthetics, cultural resources, noise, and transportation. The City received two letters in response to the NOP. The Initial Study, NOP, and NOP comment letters are presented in Appendix A to this EIR. An EIR scoping meeting was also held on May 10, 2017, in the City Council Chamber, and comments on the scope of the EIR were received from private citizens and the Planning Commissioners. Key issues of concern that were noted in the NOP responses and voiced at the EIR scoping meeting included the following:  Impacts on views of Cerro San Luis Obispo  Size and scale of the project and its aesthetic compatibility with the historical character or surrounding development  Impacts to historical resources, including the adobe on the project site  Impacts to tribal cultural resources  Increase in operational noise and its impact on sensitive receptors  Vehicle trips generated by project  Pedestrian-vehicle conflicts; pedestrian safety crossing Nipomo Street  Induced travel  Sources of greenhouse gas emissions  Alternatives to the project 1.2 Purpose and Legal Authority This EIR has been prepared in accordance with CEQA and the CEQA Guidelines. In accordance with Section 15121(a) of the CEQA Guidelines, the purpose of this EIR is to serve as an informational document that: City of San Luis Obispo Palm Nipomo Parking Structure Project 20 “will inform public agency decision-makers and the public generally of the significant environmental effects of a project, identify possible ways to minimize the significant effects, and describe reasonable alternatives to the project” This report serves as an informational document for the public and the City of San Luis Obispo decision-makers. The proposed project requires discretionary approval from the City and, therefore, is subject to CEQA’s environmental review requirements. The process will culminate with Planning Commission and City Council hearings to consider certification of a Final EIR and make a decision whether to approve the proposed project, possibly with conditions of approval, or with modifications to the project. 1.3 Scope and Content This EIR addresses the issues determined to be potentially significant in the Initial Study, and based on responses to the NOP and scoping discussions among the public, consulting staff, and the City. The environmental issues addressed in impact sections in this EIR include:  Aesthetics  Cultural Resources  Noise  Transportation All other impacts were addressed in the Initial Study and the associated technical studies prepared as part of the project application and are summarized in Section 5.0, Issues Addressed in the Initial Study. The impact analysis contained in Section 4.0 includes a description of the physical and regulatory setting, followed by an analysis of the proposed project’s impacts in that area. Each potential impact is numbered separately, followed by an explanation of how the level of impact was determined. When appropriate, the EIR identifies feasible mitigation measures. Following the mitigation measures are a discussion of any residual impacts or secondary impacts. The alternatives section of the EIR (Section 7.0) was prepared in accordance with Section 15126.6 of the CEQA Guidelines that requires an EIR to examine a reasonable range of alternatives capable of avoiding or minimizing a project’s significant effects while achieving most of the basic project objectives. The alternatives discussion evaluates the CEQA-required “no project” alternative and three alternative development scenarios for the site. It also identifies the environmentally superior alternative among the alternatives assessed. In preparing the EIR, use was made of pertinent City policies and guidelines, existing EIRs and background documents prepared by the City, and documents that guide land use in the city. A full reference list is contained in Section 8.0, References, of this EIR. The level of detail contained throughout this EIR is consistent with the requirements of CEQA and applicable court decisions. The State CEQA Guidelines provide the standard of adequacy on which this document is based. The Guidelines state: “An EIR should be prepared with a sufficient degree of analysis to provide decision-makers with information which enables them to make a decision which intelligently takes account of environmental consequences. An evaluation of the environmental effects of the proposed project need not be exhaustive, but the sufficiency of an EIR is to be reviewed in light of what is reasonably feasible. Disagreement among experts does not make an EIR inadequate, but the EIR Introduction Final Environmental Impact Report 21 should summarize the main points of disagreement among the experts. The courts have looked not for perfection, but for adequacy, completeness, and a good faith effort at full disclosure (Section 15151).” 1.4 Lead, Responsible, and Trustee Agencies The State CEQA Guidelines define “lead,” “responsible” and “trustee” agencies. The City of San Luis Obispo is the lead agency for the project because it has the principal responsibility for approving the project. A “responsible agency” refers to a public agency other than the lead agency that has discretionary approval over the project. The Regional Water Quality Control Board is a Responsible Agency because the proposed project would require a National Pollutant Discharge Elimination System Permit. A “trustee agency” refers to a state agency having jurisdiction by law over natural resources affected by a project. There are no trustee agencies with jurisdiction on the site. 1.5 Environmental Review Process The environmental review process required under CEQA is summarized below and shown in Figure 1. The steps appear in sequential order. 1. Notice of Preparation (NOP) Distributed. Immediately after deciding that an EIR is required, the lead agency must file a NOP soliciting input on the EIR scope to "responsible," "trustee," and involved federal agencies; to the State Clearinghouse, if one or more state agencies is a responsible or trustee agency; and to parties previously requesting notice in writing. The NOP must be posted in the County Clerk's office for 30 days. A scoping meeting to solicit public input on the issues to be assessed in the EIR is not required, but may be conducted by the lead agency. 2. Draft EIR Prepared. The Draft EIR must contain: a) table of contents or index; b) summary; c) project description; d) environmental setting; e) significant impacts (direct, indirect, cumulative, growth-inducing and unavoidable impacts); f) alternatives; g) mitigation measures; and h) irreversible changes. 3. Public Notice and Review. A lead agency must prepare a Public Notice of Availability of an EIR. The Notice must be placed in the County Clerk's office for 30 days (Public Resources Code Section 21092) and sent to anyone requesting it. Additionally, public notice of Draft EIR availability must be given through at least one of the following procedures: a) publication in a newspaper of general circulation; b) posting on and off the project site; and c) direct mailing to owners and occupants of contiguous properties. The lead agency must consult with and request comments on the Draft EIR from responsible and trustee agencies, and adjacent cities and counties. The minimum public review period for a Draft EIR is 30 days. When a Draft EIR is sent to the State Clearinghouse for review, the public review period must be 45 days, unless a shorter period is approved by the Clearinghouse (Public Resources Code 21091). Distribution of the Draft EIR may be required through the State Clearinghouse. 4. Notice of Completion. A lead agency must file a Notice of Completion with the State Clearinghouse as soon as it completes a Draft EIR. City of San Luis Obispo Palm Nipomo Parking Structure Project 22 5. Final EIR. A Final EIR must include a) the Draft EIR; b) copies of comments received during public review; c) list of persons and entities commenting; and d) responses to comments. 6. Certification of Final EIR. The lead agency shall certify: a) the Final EIR has been completed in compliance with CEQA; b) the Final EIR was presented to the decision-making body of the lead agency; and c) the decision-making body reviewed and considered the information in the Final EIR prior to approving a project. 7. Lead Agency Project Decision. A lead agency may: a) disapprove a project because of its significant environmental effects; b) require changes to a project to reduce or avoid significant environmental effects; or c) approve a project despite its significant environmental effects, if the proper findings and statement of overriding considerations are adopted. 8. Findings/Statement of Overriding Considerations. For each significant impact of the project identified in the EIR, the lead or responsible agency must find, based on substantial evidence, that either: a) the project has been changed to avoid or substantially reduce the magnitude of the impact; b) changes to the project are within another agency's jurisdiction and such changes have or should be adopted; or c) specific economic, social, or other considerations make the mitigation measures or project alternatives infeasible. If an agency approves a project with unavoidable significant environmental effects, it must prepare a written Statement of Overriding Considerations that set forth the specific social, economic or other reasons supporting the agency's decision. 9. Mitigation Monitoring/Reporting Program. When an agency makes findings on significant effects identified in the EIR, it must adopt a reporting or monitoring program for mitigation measures that were adopted or made conditions of project approval to mitigate significant effects. 10. Notice of Determination. An agency must file a Notice of Determination after deciding to approve a project for which an EIR is prepared. A local agency must file the Notice with the County Clerk. The Notice must be posted for 30 days and sent to anyone previously requesting notice. Posting of the Notice starts a 30-day statute of limitations on CEQA challenges. Introduction Final Environmental Impact Report 23 Figure 1 Environmental Review Process City of San Luis Obispo Palm Nipomo Parking Structure Project 24 This page left intentionally blank. Project Description Final Environmental Impact Report 25 2 Project Description This section describes the proposed project, including the project applicant, the project site and surrounding land uses, major project characteristics, project objectives, and discretionary actions needed for approval. 2.1 Project Applicant City of San Luis Obispo 919 Palm Street San Luis Obispo, California 93401 (805) 781-7203 2.2 Lead Agency Contact Person City of San Luis Obispo Public Works Department 919 Palm Street San Luis Obispo, California 93401 (805) 781-7203 Contact: Scott Lee, Parking Manager 2.3 Project Location The project site is a 1.38-acre property located in San Luis Obispo, California. Figure 2 shows the regional location of the project. The site lies in the City’s Downtown Planning Area, adjacent to the Downtown Core. The majority of the site (except for APN 002-412-003) is also located in the City’s Downtown Historic District. Figure 3 shows the location of the project in the context of these planning areas. The project site located at the intersections of Palm and Nipomo streets and Nipomo and Monterey streets (609, 610, 614, 630, 633 Palm Street and 970, 972 Nipomo Street). The property consists of six parcels, including Assessor’s Parcel Numbers (APN) 002-412-001, 002- 412-002, 002-412-003, 002-412-004, 002-412-011, and 002-412-012 (Figure 4). 2.4 Existing Site Characteristics This section describes the current characteristics of the project site. Additional details of the current setting at the site and surrounding locations can be found in Section 3.0, Environmental Setting, as well as in the individual issue area discussions in Section 4.0, Environmental Impact Analysis. City of San Luis Obispo Palm Nipomo Parking Structure Project 26 Figure 2 Regional Location Project Description Final Environmental Impact Report 27 Figure 3 Project Planning Area City of San Luis Obispo Palm Nipomo Parking Structure Project 28 Figure 4 Project Site Location and Surrounding Uses Project Description Final Environmental Impact Report 29 Setting 2.4.1 As shown in Figure 3, the project site is located within the City’s Downtown Planning Area, adjacent to the City’s Downtown Core. The majority of the site (except for APN 002-412-003) is also located in the City’s Downtown Historic District. As such, the existing setting is urban and characterized by a wide variety of uses. The project site has been previously graded and developed and is surrounded by roads and urban structures. A 77-space surface parking lot, one detached garage, and four residential structures with five residences (three single-family residences and one secondary unit adjacent to Palm Street with two apartments) currently occupy the site. Two of the residential units, 610 and 614 Monterey Street, are on the City’s List of Contributing Historic Resources, which identifies structures that contribute to the significance of designated historic districts. The existing parking lot provides public parking in metered stalls owned and operated by the City of San Luis Obispo. Ingress and egress to the lot is available from an at-grade driveway on Palm Street. Elevations onsite range from 190 and 206 feet above mean sea level, and slopes are generally toward the northwest. Mature trees are scattered throughout the site and located on surrounding public sidewalks on Nipomo and Palm Streets. One of the trees on the site is a large oak tree along Monterey Street, which has the potential to be recognized as a “significant tree” by the City Council Tree Committee. The project site also includes several landscaped planting medians and areas. Partial views of Cerro San Luis are available from the central portion of the site. Current Land Use Designation and Zoning 2.4.2 The project site is composed of six parcels. Five of the parcels are currently zoned Office with a Historic Overlay (O-H), as defined by the City’s Zoning Ordinance, and have Office General Plan land use designations (APN 002-412-001, 002-412-002, 002-412-004, 002-412-011, and 002-412-012). These five parcels are located in the City’s Downtown Historic District. One parcel is zoned Medium- High Density Residential (R-3) and has a Medium-High Density Residential General Plan land use designation (APN 002-412-003). Surrounding Land Uses 2.4.3 The area surrounding the site is urbanized. The existing uses surrounding the site are shown in Figure 4, and include the following:  West. Existing development across Nipomo Street includes the Reis Family Mortuary & Crematory with surface parking lot and a residential complex comprised of multiple buildings. The area comprising the mortuary has a land use designation of Office and is zoned Office with a Historic Overlay (O-H), while the residential complex has a land use designation of Medium-High Density Residential and is zoned Medium-High Density Residential (R-3).  South. South of the site is the San Luis Obispo Children’s Museum and two residences designated as City contributing historic resources along Monterey Street. The parcel that houses the museum has a land use designation of Public and is zoned Public Facility with a Historic Overlay (PF-H), while the parcels containing the residential units have land use designation of General Retail and are zoned Downtown Commercial with a Special Consideration and Historic Overlay (C-D-S-H). Along Nipomo to the southwest is the Soda Works mixed commercial and residential complex with a land use designation of General Retail and zoned Downtown Commercial with a Planned Development and Historic Overlay (C-D-H-PD). City of San Luis Obispo Palm Nipomo Parking Structure Project 30  East. Adjacent to the project site is a two-story multi-family residential complex with surface parking fronting Palm Street and a single-family residence with detached garage, identified as the Hays-Lattimer Adobe historic resource, fronting Monterey Street. The multi-family residential building has a land use designation of Medium-High Density Residential and is zoned Medium-High Density Residential (R-3), while the single family residence has a land use designation of Office and is zoned Office with Historic Overlay (O-H).  North. The Mission College Preparatory School athletic field is located north of the project site across Palm Street. The school is located just west of the athletic field along Palm Street. The area has a land use designation of Medium-High Density Residential. The athletic field is zoned Medium-High Density Residential (R-3), while the school is zoned Medium-High Density Residential with a Historic Overlay (R-3-H). 2.5 Project Characteristics The project would involve the removal of an existing 77-space surface parking lot and five residential structures (including detached garage) and construction of an above-ground five-level parking structure, non-profit theater, and commercial space. Figure 5 shows the proposed site plan. The parking structure would provide up to 445 parking spaces.2 Main vehicular access to the structure would be from Palm Street, with secondary access from Nipomo Street. Vehicle access would not be provided from Monterey Street; however, a direct pedestrian connection would be provided from the structure to Monterey Street. Pedestrian access would also be provided to public sidewalks from each corner of the structure and bicycle access would be provided from Nipomo Street. The parking structure’s maximum height, excluding elevator towers, would be 50 feet (Figure 6). The maximum height of the elevator towers would be 64 feet above grade. The top deck of the parking structure would include a public use space in the northwest corner nearest to Palm and Nipomo Streets. The project would also include 5,000 square feet of commercial space on two levels fronting Nipomo Street. The maximum height of the commercial space would be 41 feet above existing grade. In addition, the project would include a new structure for the San Luis Obispo Little Theatre (now the San Luis Obispo Repertory Theatre or SLO REP) that would front Monterey Street. The theater would be a three-story structure with a gross floor area of roughly 23,841 square feet. The base level would house a rehearsal area, workshop, storage and other amenities. The main level would be comprised of a main theater with 155191 seats, and a smaller theatre with 10099 reconfigurable seats, generating a total of 255290 seats. The third floor would include offices and a conference room. Entry to the theater would be provided at the street level through a public plaza along Monterey Street. The street level plaza would include a public seating area and incorporate public art. The maximum height of the theater would be approximately 43 feet above existing grade. 2 The parking structure is undergoing design refinement with respect to the ultimate number of parking spaces. Based on the current design, the structure would provide 410 parking spaces; however, the analysis conservatively assumes a maximum of up to 445 parking spaces would be provided. Motorcycle parking would be provided in accordance with the ratios required in the City’s Zoning Regulations (§17.16.060). Project Description Final Environmental Impact Report 31 Figure 5 Site Plan City of San Luis Obispo Palm Nipomo Parking Structure Project 32 Figure 6 Nipomo Street Elevation Project Description Final Environmental Impact Report 33 Construction and Demolition Project construction would last approximately 12 months and is anticipated to start in 2019. Project construction would include site preparation, demolition, grading, building construction, architectural coating, and paving. The project would involve the removal of almost all existing public and private improvements and existing trees and vegetation on the site, with the exception of the large oak tree along Monterey Street and the two trees at the corner of Nipomo and Monterey Streets. Demolition activities would involve removal of the existing surface parking lot, four residential structures3, and detached garage. The project would excavate to a depth of approximately 14 feet at the highest point of the site, along the southern and eastern boundaries of the parking structure. In total, earthwork for buildout of the project is estimated to require 6,400 cubic yards of cut, and 700 cubic yards of fill, resulting in a need for approximately 5,700 cubic yards of soil export. The parking structure would be constructed using drilled caissons or rammed aggregate piers to support the structure. The project would not utilize the method of driven piles. Site Access and Circulation Vehicle As mentioned above, vehicle access into and out of the parking structure would be provided via driveways on Palm Street and Nipomo Street, with one lane for ingress and one lane for egress at each driveway. Each driveway entrance would have storage to accommodate two inbound vehicles. The parking structure exits would be designed so that exiting vehicles would have at least 10 feet of a clear sight triangle to the sidewalk on both sides of the exit, unobstructed by building corners, columns, or any other visual impediments. This distance is measured from eight feet behind the stop bar and two feet to the right of the centerline where a driver would be located in a stopped vehicle. Motorcycle parking would be provided in accordance with the ratios required in the City’s Zoning Regulations. Pedestrian Sidewalks on Nipomo Street would be widened to approximately 12 to 18.5 feet. The sidewalks on Palm Street and Monterey Street would be reconstructed, but remain at their current widths. As shown on Figure 5, a pedestrian crosswalk would be installed across Monterey Street, as well as a “bump out” of the sidewalk that extends into the street to increase pedestrian visibility at the crosswalk. Bicycle Bicycle parking would be provided near the parking structure’s Nipomo Street entrance. Access would be shared with the pedestrian entrance, but the width would be 10 feet wide to accommodate both. Short- and long-term bicycle parking would be provided in accordance with the ratios required in the City’s Zoning Regulations. 3 As noted in Section 2.4.1 Setting, there are four residential structures containing five residences (three single-family residences and one secondary unit containing two separate apartments). City of San Luis Obispo Palm Nipomo Parking Structure Project 34 Conceptual Design The following characteristics are proposed design features of the project.  The parking structure would be set back ten feet from the eastern boundary. The theater would be set back from Monterey Street with a public plaza area in front.  The façade of parking structure and commercial space would be designed to resemble a neighborhood building instead of a typical parking structure and with an architectural style similar to the surrounding Spanish Colonial architecture. Architectural design elements would include arches, stucco, tile roof, rusticated base, and multi-paned mullion pattern (Figure 76).  The openings on the parking structure would be articulated with mullions and sized to reflect traditional window openings in a building. Openings on the east side would have solid rails approximately 3.5 feet high.  The Nipomo Street facade reflects and would complement the downtown architecture and steps down the building form to a two-story structure along Nipomo Street (Figure 87).  The theater would have a contemporary design with the primary exterior finish materials being a multi-colored terra cotta, rain-screen panel system eliciting a color scheme complimenting that of the nearby historic Mission San Luis Obispo de Tolosa-namely white, dun, and varying shades of terra cotta clay. Accent and secondary materials would be smooth troweled stucco in a dun tone, and split face and split fluted concrete masonry unit blocks in a terra cotta tone. In addition, there would be two prominent, curved glass curtain walls with brushed aluminum muntins that face Monterey Street. Conceptual Lighting Outdoor lighting would be fully shielded or recessed and downcast, consistent with the City’s Municipal Code. Proposed exterior lighting would consist of dimmable white light-emitting diodes (LED) mounted to the buildings. Lighting inside the parking structure would consist of LED downlights with shielding elements. When viewed from outside of the parking structure, these shielding elements would eliminate any direct views of the light source. Lighting on the rooftop parking level would be provided by pole-mounted LED luminaires compliant with the City of San Luis Obispo Municipal Code, which requires rooftop lights to minimize spill and include full-cutoffs that reduce light pollution at night. To comply with the Title 24 energy codes, the parking structure would be controlled with photocells to conserve energy during daytime operational hours. The parking structure would also utilize occupancy sensors which would turn the lights off when no activity is detected in the structure. The lighting concept for the plaza area is to provide low-level pedestrian lights (recessed wall lights and/or bollard lights) that give a safe light level for night use. Additionally, there would be accent lighting in the planters to illuminate the courtyard trees. Non-emergency lighting would be on automatic shut-off timers and lighting would be on motion-activated sensors where appropriate. Streetlights would be installed per City Engineering Standards, and the approved conceptual Downtown Lighting Plan (for streetlights along Monterey Street). Project Description Final Environmental Impact Report 35 Figure 76 Conceptual Project Renderings (View of Parking Structure and Commercial Space from Corner of Palm and Nipomo Streets) Source: RRM Design Group, 2016 City of San Luis Obispo Palm Nipomo Parking Structure Project 36 Figure 87 Conceptual Project Renderings (View of Commercial Space and Parking Structure from Nipomo Streets) Source: RRM Design Group, 2016 Project Description Final Environmental Impact Report 37 Landscaping and Trees Landscaping would consist of new street trees in accordance with the City of San Luis Obispo’s street tree list (e.g., Brisbane Box, Carrotwood, Ficus, Queen Palms) along Palm, Nipomo, and Monterey streets, ranging from 8 to 12 feet high. After five years, the trees would be expected to achieve heights in the range of 16 to 30 feet tall. Existing trees, including the fern pine and oak on the corner of Monterey and Nipomo streets and the large oak tree on Monterey Street would remain. In addition, landscaping would include drought-tolerant shrub planters along the pedestrian plaza/walkways. Landscape irrigation would be designed to minimize the use of water and meet all water conservation practices required by the City’s Municipal Code. Utilities Water, firewater, and wastewater service for the project would be provided by the City via adjacent main lines that surround the project site. No utility extensions would be required. Project Objectives 2.5.1 Objectives for this project include the following:  Provide a minimum of 400 parking spaces  Accommodate cultural uses on Monterey Street in front of the structure  Include a pedestrian-level public use plaza area at the corner of Nipomo and Monterey Streets  Provide a direct pedestrian connection from the structure to Monterey Street  Preserve the large oak tree on site  Consider contextual sensitivity of surrounding properties (e.g., Lattimer-Hayes adobe) Required Approvals 2.5.2 The following approvals would be required for the project:  General Plan Amendment. Amend General Plan Land Use Map from Office and Medium-High Density Residential to Public  Zone Change. Amend Zoning Map from Office with Historic Overlay (O-H) and Medium-High Density Residential to Public Facility with a Historic Overlay (PF-H)  Planning Commission Use Permit. To allow the multi-level parking structure and non-profit theater with deviations to the setback requirements and building height limits4, and to request a variances forto the floor to area ratio to exceed 1.0 and to the maximum lot coverage to exceed the 60 percent maximum lot coverage 4  Architectural Review. Including both Cultural Heritage Committee and Architectural Review Commission review In addition, the following approval would be required:  Regional Water Quality Control Board – National Pollutant Discharge Elimination System Permit 4 Zoning Regulations Table 9: Subsection 6. Parking as a principal use. Use Permit approval may include deviations to otherwise applicable setback requirements and building height limits. A multi-level parking facility shall require the approval of a Use Permit by the Planning Commission. Environmental Impact Analysis Cultural and Tribal Cultural Resources Final Environmental Impact Report 59 4.2 Cultural and Tribal Cultural Resources This section analyzes potential impacts to cultural and tribal resources as a result of the proposed project. The analysis is based on the 2011 Cultural Resources Study prepared by Applied Earthworks (Appendix C). Setting 4.2.1 a. Environmental Setting Prehistoric Setting The project site is located in what is described generally as the Central Coast archaeological region, one of eight organizational divisions of California (Jones and Klar 2007, Moratto 1984). The Central Coast archaeological region extends from Monterey Bay to Morro Bay, and includes the County of San Luis Obispo. The prehistoric cultural chronology for the Central Coast is generally divided into six periods: Paleoindian (ca. 10,000–6,000 B.C.), Millingstone (6,000–3,000 B.C.), Early and Early-Middle Transition (3,000–600 B.C.), Middle (600 B.C. - A.D. 1000), Middle-Late Transition (A.D. 1000–A.D. 1250), and Late (A.D. 1250–historic contact [ca. A.D. 1769]) (Jones and Klar 2007). Several chronological sequences have been devised to understand cultural changes along the Central Coast from the Millingstone Period to contact. Jones (1993) and Jones and Waugh (1995) presented a Central Coast sequence that integrates data from archaeological studies conducted since the 1980s. Three periods, including the Early, Middle, and Late periods, are presented in their prehistoric sequence subsequent to the Millingstone Period. More recently, Jones and Ferneau (2002) updated the sequence following the Millingstone Period as follows: Early, Early-Middle Transition, Middle, Middle-Late Transition, and Late periods. The archaeology of the Central Coast subsequent to the Millingstone Period is distinct from that of the Bay Area to the north and Central Valley to the east. The region has more in common with the Santa Barbara Channel area during the Middle and Middle-Late Transition periods, but few similarities during the Late period (Jones and Ferneau 2002). Historic Setting Post-European contact history for California is divided generally into three periods: the Spanish Period (1769–1822), the Mexican Period (1822–1848), and the American Period (1848–present). The Spanish Period brought the establishment of the California mission system, while the Mexican Period is largely known for the division of the land of California into private land holdings. Following the Mexican-American war, the United States purchased California from Mexico; population of the state subsequently increased, particularly during the Gold Rush. Following the arrival of the first Europeans, Padre Junipero Serra founded Mission San Luis Obispo de Tolosa in 1772. The population of native people at the mission declined rapidly. In 1803, there was a peak of 919 Native Americans residing at the mission, but by 1838 the population had declined to 170. In 1822, California became a Mexican Territory, and the mission lands gradually became private ranchos through Mexican land grants. In 1846, the Bear Flag Rebellion resulted in California’s independence from Mexico, and control of the territory soon fell into the hands of the United States. City of San Luis Obispo Palm Nipomo Parking Structure Project 60 The City of San Luis Obispo was incorporated in 1876 (Angel 1883). The city’s early development is closely associated with Mission San Luis Obispo de Tolosa, the Coast Line Stage which carried U.S. mail for Wells Fargo and Company through San Luis Obispo to points north and south of the City, and the pacific railway which made San Luis Obispo the commercial center of the region and provided access for passenger steamer service (Kocher 1972; Tognazzini 1993; Cooper 1875; Angel 1883). The completion of the mainline Southern Pacific rail line allowed travel and shipment of goods with greater opportunities for selling and buying commodities. The establishment of California Polytechnic State University in 1903 as a vocational school on 281 acres was also a significant draw for the city. Later development was driven by the completion of U.S. Highway 101 as San Luis Obispo was a prime location for travelers to rest on the long trip from San Francisco to Los Angeles and the establishment of the nearby military base at Camp San Luis Obispo (City of San Luis Obispo 1983; Krieger 1988; Palmer et al. 2001). Beginning in 1945, following the end of World War II, San Luis Obispo experienced a period of modernization in the second half of the twentieth century, mainly due to returning soldiers. The influx of new commerce required new development, with older buildings demolished to make way for more modern structures and parking lots. Many of the older buildings demolished were residential homes. City landmarks and many remaining adobes were lost during this period. Growth required an influx of parking to accommodate downtown customers. Many city surface parking lots were established in the downtown, including the one on the current project. Project Site Historic Context Properties lining Monterey and Higuera streets between Nipomo and Santa Rosa streets were rapidly developed in the 1860s for both commercial and residential purposes. The Harris and Ward Map established Block 9, bounded by Palm, Broad, Monterey, and Nipomo streets, divided into six lots. The project site encompasses Lots 1 and 2 whose owners were identified as: Lot 1, illegible and Lot 2, Roberto Villa. Roberto Villa presented a Petition for Grant for Lot 2 in 1870. He had settled on the land in 1855 and his property and a solitary structure appear on an 1859 petition for land that also depicts a fence on Lot 1 (at the corner of Palm and Nipomo Streets). By 1874, the project site had been divided into three lots (Applied EarthWorks 2011). During the last quarter of the nineteenth century, the project area experienced little change while Monterey Street, to the east, continued to develop with commercial and residential infill. Within the project area, dwellings at 610, 614, and 630 Monterey Street exhibited small additions to the rears of the buildings. The 1886, 1888, and 1891 Sanborn Maps show three residences within the project area, including an outhouse at the rear of the adobe on Lot 3. James Moore operated a dyeing and cleaning business in a shed at 614 Monterey Street. Three small ancillary buildings and one a shed were present at 610 Monterey Street. All of the buildings are no longer present on the project site. Shortly after the turn of the twentieth century, the city began improving streets by grading roads and filling in low places with gravel, and new development followed these improvements. Within the project area, a house was constructed in Lot 1 along with an outhouse or shed. During this same time, James Moore moved his dyeing and cleaning business from 614 Monterey Street to 610 Monterey Street. By the 1930s, the structures at 610 and 614 Monterey Street were demolished and new residences were constructed in their place in 1937 and 1933, respectively. By 1957, the house on Lot 1 was moved to the south of the lot and a welding shop was constructed in its place. New surface parking lots established in the 1960s and 1970s frequently replaced older buildings and historic uses of the properties. Within the project site, two dwellings and the welding shop were demolished to make room for the parking lot that exists today. Environmental Impact Analysis Cultural and Tribal Cultural Resources Final Environmental Impact Report 61 Documented Cultural Resources This section is based on the results of the 2011 Cultural Resources Study (Appendix C) and 2017 updated records search, of which the methods are further described in section 4.2.2(a) below. Archaeological Resources The results of the records searches identify the presence of one archaeological site within the project site (CA-SLO-2341H) and two archaeological sites adjacent to the project site (CA-SLO- 1890/H and CA-SLO-2206H). Resource CA-SLO-2341H was identified in 2003 during a citywide water line installation project and consists of a series of historic archaeological features. The nearest component of CA-SLO-2341H to the current project site was a black powder flask (1790-1860) located at the intersection of Palm and Nipomo streets adjacent to the current project site. Resources CA-SLO-1890/H and CA-SLO-2206H both consist of historic refuse deposits. Resource CA- SLO-1890/H also includes a historic house and the remnants of an adobe structure. The site record also suggests that the archaeological site contains a prehistoric component, but no discussion is given for such remains and the site is described as containing “virtually no pre-1880 refuse.” The results of the records search further identified studies conducted by Bertrando and Bertrando within the project area that consisted of archaeological testing within the project area in 1997 and in 1999. The testing conducted in 1997 identified historical material in the upper 12 inches of soil. The testing conducted in 1999 identified the remains of the rock foundation of a house constructed circa 1905 and additional historic artifacts including glass, ceramics, nails, shell, and ceramic roof tiles all thought to be associated with the house and with a welding shop (1926–1996) that was located on the property. As part of the 2011 Cultural Resources Study, Applied Earthworks staff also conducted a pedestrian survey of the project site for archaeological and architectural resources. The project area has very little exposed ground surface, though narrow strips of exposed soil are present along the Monterey Street boundary of the project site which contained historic-period debris, including glass, ceramic fragments, ferrous metal items, and shell. The study concluded that it is likely that subsurface cultural remains are intact. Built Environment Resources The project site is partially located within the Downtown Historic District, which was locally designated in 1987, and is therefore considered a historical resource under CEQA. Figure 3 shows the boundaries of the Downtown Historic District relative to the project site. The Downtown Historic District extends east from U.S. Highway 101 and Dana Street to just beyond Osos Street, and runs north from Marsh Street to Palm Street. It contains many of the city’s most important historic buildings, and while they are primarily commercial, there is also a small subsection of residential properties largely concentrated west of Broad Street, in the project area. The buildings on the north side of Monterey Street create a historic streetscape that connects the area west of Mission Plaza to the westernmost section of the Downtown Historic District on Dana Street. In this area, the historic district transitions from commercial to residential, which is a physical characteristic of the district that helps conveys the reasons for its significance. The City maintains a Master List of Historic Resources, which identifies buildings that are considered historically significant on their own merits, and a List of Contributing Historic Resources, which identifies structures that contribute to the significance of designated historic districts, although they City of San Luis Obispo Palm Nipomo Parking Structure Project 62 may not be individually significant. In general, buildings within the district display a variety of architectural styles but are primarily one to two stories in height and 50 to 75 feet in width. Two Master List properties and two contributing properties lie within or adjacent to the current project area (Table 5). The single-story vernacular residence with a detached garage at 610 Monterey Street, located on the project site, is a contributing property built in 1937 by Klien Williams. Although the 2011 Cultural Resources Study recommended it as ineligible for the CRHR and local listing, it is currently listed as a contributor to the Downtown Historic District and is thus considered a historical resource for the purposes of CEQA. The single-story, mission-influenced vernacular residence at 614 Monterey Street, located on the project site, was built by Louis R. Heyd in 1935 and is also is a contributing property to the Downtown Historic District. The 2011 Cultural Resources Study identified this property as being eligible for local listing on the City’s Master List because of its rarity and its representation of the vernacular renewal of adobe architecture prior to World War II. The property is therefore considered a historical resource for the purposes of CEQA. The Hays-Lattimer adobe is a Master List property located immediately adjacent to the east of the project site at 638-642 Monterey Street. Constructed in 1860, the property contains a weather- boarded single-story adobe residence. The two-story Harmony Creamery at 991 Nipomo Street, also located adjacent to the project site, is another Master List property. Built in 1930 by the Harmony Valley Creamer Association, it is Spanish Colonial Revival in style. The residential buildings on the project site located at 633 and 633 ½ Palm Street are located just outside the City’s Downtown Historic District. They were each recommended ineligible for listing on the CRHR and local listing, and were not found to qualify as contributing resources to the Downtown Historic District; neither is considered a historical resource under CEQA as a result. Table 5 Designated Historic Buildings Within and Adjacent to the Project Site Address Local Designation Location Relative to Project Site 610 Monterey Street Contributing property to Downtown Historic District Within 614 Monterey Street Contributing property to Downtown Historic District Within 638-342 Monterey Street (Hays-Lattimer Adobe) On Master List of Historic Resources, Downtown Historic District Adjacent 991 Nipomo Street (Harmony Creamery) On Master List of Historic Resources, Downtown Historic District Adjacent Paleontological Setting The project site lies between the San Lucia Mountains and the San Luis Mountains in the Coast Ranges geomorphic province. The Coast Ranges are northwest-trending mountain ranges and valleys that run along the Pacific coast from Santa Barbara to the Oregon border (Norris and Webb, 1990). The Coast Ranges record a thick sequence of sedimentary strata dating back to the Mesozoic Franciscan Melange (~251 million years ago), with granitic and metamorphic rocks of the Salinian block present in the southern Coast Ranges, where the project is located (Norris and Webb 1990). Environmental Impact Analysis Cultural and Tribal Cultural Resources Final Environmental Impact Report 63 The Franciscan Melange records deposition of volcanic and clastic sediments into a subduction zone during the Mesozoic era, followed by subsequent metamorphism (Wakabayashi 1992). The Franciscan Melange is known to contain a wide range of fossils, including radiolarians, mollusks, diatoms, foraminifers, and marine vertebrates (Schlocker 1974; Elder 2015; Hilton 2003). A search of the University of California Museum of Paleontology (UCMP) online collection records shows that fossils of all of these organisms have been recovered from Franciscan rocks in and around San Luis Obispo County (UCMP 2017). The most impressive of these fossils is a large marine reptile, Plesiosaur hesternus, recovered from Oakley Ranch (Hilton 2003). More recently, the Pleistocene history of the region (2.6 million–10,000 years ago) is marked by glacially controlled sea level fluctuations and tectonic uplift during which the shoreline advanced and retreated as much as 30 miles across the continental shelf (Hall 2007). Sea level advance cut a system of marine terraces, 12 of which are exposed in the Point San Luis area eight to nine miles southwest of the city. These terraces range in age from 83,000 to 49,000 years, and reach elevations of 79 feet above modern sea level. The formations that compose these terraces are the most paleontologically productive in the region (City of San Luis Obispo 2014). Jefferson et al. (1992) reported three vertebrate localities along the coast within nine miles of San Luis Obispo. These localities occur in Pleistocene fluvial deposits overlying marine terraces, and include assemblages of the Rancholabrean mammals Equus sp. and E. occidentalis (horse); Camelops sp. and C. hesternus (camel); Bison antiquus and B. latifrons (bison), and Mammut americanum (mammoth). Other localities in San Luis Obispo County are noted as well (UCMP 2017). b. Regulatory Setting The primary applicable federal and state laws and regulations protecting cultural resources are the National Historic Preservation Act, as amended, CEQA, and California Public Resources Code (Cal. Public Res. Code) §§5024.1 and 21084.1. These and other federal, state, and local laws and regulations and ordinances that pertain to cultural resources are described below. Federal The project does not involve federal funding or permitting, and as a result, does not have a federal nexus. Therefore, compliance with reference to the National Historic Preservation Act (NHPA) of 1966 and other federal laws is provided here for informational purposes only. National Historic Preservation Act [16 United States Code (U.S.C.) Section 470 et seq.] The NHPA establishes the federal government policy on historic preservation and the programs, including the National Register of Historic Places (NRHP), through which this policy is implemented. Under the NHPA, significant cultural resources, referred to as “historic properties,” include any prehistoric or historic district, site, building, structure, or object included in, or determined eligible for inclusion in, the NRHP. Historic properties also include resources determined to be National Historic Landmarks. National Historic Landmarks are nationally significant historic places designated by the Secretary of the Interior because they possess exceptional value or quality in illustrating or interpreting United States heritage. A property is considered historically significant if it meets one of the NRHP criteria and retains sufficient historic integrity to convey its significance. This act also established the Advisory Council on Historic Preservation, an independent federal agency that administers Section 106 of the NHPA by developing procedures to protect cultural resources City of San Luis Obispo Palm Nipomo Parking Structure Project 64 included in, or eligible for inclusion in, the NRHP. Regulations are published in 36 Code of Federal Regulations (C.F.R.) Parts 60, 63, and 800. Archaeological Resources Protection Act (ARPA) [16 U.S.C. 470] This statute was enacted to secure, for the present and future benefit of the American people, the protection of archaeological resources and sites which are on public lands and Indian lands. It was also enacted to foster increased cooperation and exchange of information between governmental authorities, the professional archaeological community, and private individuals (Sec. 2(4)(b)). State California Environmental Quality Act, Public Resources Code §21083.2 and California Code of Regulations (CCR), Title 14, §15064.5 CEQA requires a lead agency to consider the effects of a project on historical resources (Cal. Public Res. Code §21084.1). The CEQA Guidelines §15064.5(b) provides specific guidance for determining the significance of impacts on historical resources and unique archaeological resources (CEQA Guidelines §15064.5(b) and Cal. Public Res. Code §21083.2). Under CEQA, these resources are called “historical resources” whether they are of historic or prehistoric age. Public Resources Code §21084.1 defines historical resources as those listed, or eligible for listing, in the California Register of Historical Resources (CRHR), or those listed in the historical register of a local jurisdiction (county or city) unless the preponderance of the evidence demonstrates that the resource is not historically or culturally significant. NRHP-listed “historic properties” located in California are considered historical resources for the purposes of CEQA and are also listed in the CRHR. The CRHR criteria for listing such resources are based on, and are very similar to, the NRHP criteria. Cal. Public Res. Code §21083.2 and CEQA Guidelines §15064.5(c) provide further definitions and guidance for archaeological sites and their treatment. Different legal rules apply to the two different categories of cultural resources, though the two categories sometimes overlap where a “unique archaeological resource” also qualifies as a “historical resource.” In such an instance, the more stringent rules for the protection of archaeological resources that are historical resources apply. CEQA Guidelines §15064.5 also prescribes a process and procedures for addressing the existence of, or probable likelihood, of Native American human remains, as well as the unexpected discovery of any human remains during implementation of a project. This includes consultations with appropriate Native American tribes. The CEQA Guidelines define procedures, types of activities, persons, and public agencies required to comply with CEQA. CEQA Guidelines §15064.5(b) prescribes that project effects that would “cause a substantial adverse change in the significance of an historical resource” are significant effects on the environment. Substantial adverse changes include physical changes to both the historical resource and its immediate surroundings. Section 15126.4(a)(1) states that an EIR shall describe feasible measures which could minimize significant adverse impacts. Section 15126.5(b) describes mitigation measures related to impacts on historical resources. CEQA also requires that public agencies and private interests identify the potential environmental consequences of their proposed projects on any object or site considered to be a historical resource Environmental Impact Analysis Cultural and Tribal Cultural Resources Final Environmental Impact Report 65 of California, including paleontological resources (Cal. Public Res. Code §21084.1, CCR Title 14, §15064.5). California Register of Historical Resources (Cal. Public Res. Code §5024.1 and 14 CCR §4850) Cal. Public Res. Code §5024.1 establishes the CRHR, which lists all California properties considered to be significant historical resources. The CRHR also includes all properties listed or determined eligible for listing in the NRHP, including properties evaluated and determined eligible under §106. The criteria for listing on the CRHR, criteria 1–4, are similar to those of the NRHP: [Resources that are] associated with events that have made a significant contribution to the 1. broad patterns of California’s history and cultural heritage [Resources that are] associated with the lives of persons important in our past 2. [Resources that] embody the distinctive characteristics of a type, period, region, or method of 3. construction, or represents the work of an important creative individual, or possesses high artistic value [Resources that have] yielded, or may be likely to yield, information important in prehistory or 4. history The CRHR regulations govern the nomination of resources to the CRHR (14 CCR §4850). The regulations set forth the criteria for eligibility as well as guidelines for assessing historical integrity and resources that have special considerations. California Public Resources Code Cal. Public Res. Code also protects paleontological resources in specific contexts. In particular, Cal. Public Res. Code §5097.5 prohibits “knowing and willful” excavation, removal, destruction, injury, and defacement of any paleontological feature on public lands without express authorization from the agency with jurisdiction. Violation of this prohibition is a misdemeanor and is subject to fine and/or imprisonment (Cal. Public Res. Code § 5097.5(c)), and persons convicted of such a violation may also be required to provide restitution (Cal. Public Res. Code § 5097.5(d)(1)). Additionally, Cal. Public Res. Code §30244 requires “reasonable mitigation measures” to address impacts on paleontological resources identified by the State Historic Preservation Officer. Section 5097.5 of the Cal. Public Res. Code states: “No person shall knowingly and willfully excavate upon, or remove, destroy, injure or deface any historic or prehistoric ruins, burial grounds, archaeological or vertebrate paleontological site, including fossilized footprints, inscriptions made by human agency, or any other archaeological, paleontological or historical feature, situated on public lands, except with the express permission of the public agency having jurisdiction over such lands. Violation of this section is a misdemeanor.” As used in this Cal. Public Res. Code section, “public lands” means lands owned by, or under the jurisdiction of, the state or any city, county, district, authority, or public corporation, or any agency thereof. Consequently, local agencies are required to comply with Cal. Public Res. Code §5097.5 for their own activities, including construction and maintenance, as well as for permit actions (e.g., encroachment permits) undertaken by others. City of San Luis Obispo Palm Nipomo Parking Structure Project 66 Codes Governing Human Remains Section 15064.5 of the CEQA Guidelines also assigns special importance to human remains and specifies procedures to be used when Native American remains are discovered. The disposition of human remains is governed by Health and Safety Code §7050.5 and Cal. Public Res. Code §§5097.94 and 5097.98, and falls within the jurisdiction of the NAHC. If human remains are discovered, the County Coroner must be notified within 48 hours and there should be no further disturbance to the site where the remains were found. If the remains are determined by the coroner to be Native American, the coroner is responsible for contacting the NAHC within 24 hours. The NAHC, pursuant to Cal. Public Res. Code §5097.98, will immediately notify those persons it believes to be most likely descended from the deceased Native Americans so they can inspect the burial site and make recommendations for treatment or disposal. California Tribal Cultural Resources and Consultation (Assembly Bill 52, Chapter 532) Assembly Bill (AB) 52 became law on January 1, 2015. It establishes a formal consultation process for California Indian tribes as part of CEQA and equates significant impacts on tribal cultural resources with significant environmental impacts. Several new Public Resources Codes have been written to codify the law’s requirements. Cal. Public Res. Code §21074 defines a California Native American Tribe as a tribe located in California that is on the contact list maintained by the Native American Heritage Commission. It also defines what types of resources are to be considered tribal cultural resources. Cal. Public Res. Code §21080.3.1 describes formal tribal consultation requirements; Cal. Public Res. Code §21080.3.2 provides that if the California tribe requests consultation to include project alternatives and mitigation measures, such consultation would be required; Cal. Public Res. Code §21082.3 provides that any mitigation measures agreed upon during consultation shall be recommended for inclusion in the environmental document and affirms the lead agency’s obligation to keep confidential any information obtained from a Native American tribe during the consultation process; and Cal. Public Res. Code §21083.4 provides examples of mitigation for impacts to Tribal Cultural Resources. Senate Bill 18 (Chapter 905, Statutes of 2004) Senate Bill (SB) 18 requires cities and counties to consult with Native American tribes to help protect traditional tribal cultural places through the land use planning process for general plan adoption or amendments and to specific plan adoption or amendments. Local San Luis Obispo Zoning Regulations, Chapter 17.54 Establishes the Historical Preservation Overlay Zone (H) and describes its purposes and application, allowed uses and property development standards. Historic Preservation Ordinance, San Luis Obispo Municipal Code 14.1 The City Municipal Code contains specific requirements for the demolition and relocation of structures listed in the inventory of historic resources. These requirements are stated in Municipal Code §§14.01.100 and 14.01.110. Environmental Impact Analysis Cultural and Tribal Cultural Resources Final Environmental Impact Report 67 The City Municipal Code states that the Cultural Heritage Committee (CHC) shall review and make recommendations to the City Council regarding demolition applications for structures listed in the inventory of historic resources. An application for demolition of a listed historic resource shall be approved only if the proposed demolition is found consistent with the general plan, and 1) the historic resource is a hazard to public health of safety, and repair or stabilization is not structurally feasible; or 2) denial of the application will constitute an economic hardship as described in §14.01.100(J)(1-3) of the municipal code. Additional procedures regarding the timing of the demolition, documentation and acknowledgment of the historic resource are also delineated. Likewise, the relocation of a structure listed on the inventory of historical resources is subject to review by the CHC and Architectural Review Commission (ARC). Relocation shall be permitted only when relocation is consistent with the goals and policies of the general plan, any applicable area or specific plans, and the Historic Preservation Program Guidelines, as well as additional criteria defined in Municipal Code §14.01.110(B)(1-6). The timing, plan, procedures, and documentation are also delineated. City of San Luis Obispo Municipal Code Demolition and Moving of Buildings Appendix Chapter 2, Chapter 201, of the San Luis Obispo Municipal Code, establishes procedures and requirements for the relocation or demolition of historic buildings. City of San Luis Obispo Historic Preservation Program Guidelines The guidelines establish procedures for the treatment of historic resources, including construction in historic districts and on properties with historic resources. They also include a discussion of the city’s existing historic districts and provide a summary of their significance and character-defining features. City of San Luis Obispo Archaeological Resource Preservation Program Guidelines The guidelines establish procedures to be used for the identification, evaluation, and preservation of archaeological and other cultural resources. Cultural resources refer to the artifacts, human remains, and sites containing evidence of past human activities, including prehistoric Native American archaeological sites, historic archaeological sites, sites or natural landscapes associated with important human events, and Native American sacred places and cultural landscapes. City of San Luis Obispo Community Design Guidelines The guidelines establish site and architectural design standards for development projects, including projects involving historic resources and historic districts, and demolitions. City of San Luis Obispo General Plan Conservation and Open Space Element. The Conservation and Open Space Element of the General Plan establishes citywide policies and programs regarding identification and treatment of cultural resources. The following policies apply to this project:  Policy 3.3.1 Historic Preservation. Significant historic and architectural resources should be identified, preserved, and rehabilitated.  Policy 3.3.2 Demolitions. Historically or architecturally significant buildings shall not be demolished or substantially changed in outward appearance, unless doing so is necessary to City of San Luis Obispo Palm Nipomo Parking Structure Project 68 remove a threat to health and safety and other means to eliminate or reduce the threat to acceptable levels are infeasible.  Policy 3.3.3 Historical Documentation. Buildings and other cultural features that are not historically significant but which have historical or architectural value should be preserved or relocated where feasible. Where preservation or relocation is not feasible, the resources shall be documented and the information retained in a secure but publicly accessible location. An acknowledgement of the resources should be incorporated within the site through historic signage and the reuse or display of historic material and artifacts.  Policy 3.5.1. Archaeological Resource Protection. The City shall provide for the protection of both known and potential archaeological resources. To avoid significant damage to important archaeological sites, all available measures, including purchase of the property in fee or easement, shall be explored at the time of a development proposal. Where such measures are not feasible and development would adversely affect identified archaeological or paleontological resources, mitigation shall be required pursuant to the Archaeological Resource Preservation Program Guidelines.  Policy 3.5.2. Native American Sites. All Native American cultural and archaeological sites shall be protected as open space wherever possible.  Policy 3.5.4 Archaeological Sensitive Areas. Development within an archaeologically sensitive area shall require a preliminary site survey by a qualified archaeologist knowledgeable in Native American cultures, prior to a determination of the potential environmental impacts of the project.  Policy 3.5.5 Archaeological Resources Present. Where a preliminary site survey finds substantial archaeological resources, before permitting construction, the City shall require a mitigation plan to protect the resources. Possible mitigation measures include: presence of a qualified professional during initial grading or trenching; project redesign; covering with a layer of fill; excavation removal and curation in an appropriate facility under the direction of a qualified professional.  Policy 3.5.6 Qualified Archaeologist Present. Where substantial archaeological resources are discovered during construction or grading activities, all such activities in the immediate area of the find shall cease until a qualified archaeologist knowledgeable in Native American cultures can determine the significance of the resource and recommend alternative mitigation measures.  Policy 3.5.7 Native American Participation. Native American participation shall be included in the City’s Guidelines for resource assessment and impact mitigation. Native American representatives should be present during archaeological excavation and during construction in an area likely to contain cultural resources. The Native American community shall be consulted as knowledge of cultural resources expands and as the City considered updates or significant changes to its General Plan.  Policy 3.6.3 Construction within Historic Districts. The Cultural Heritage Committee and Architectural Review Commission will provide specific guidance on the construction of new buildings within historic districts. Environmental Impact Analysis Cultural and Tribal Cultural Resources Final Environmental Impact Report 69 Impact Analysis 4.2.2 a. Methodology and Significance Thresholds Methodology Cultural Resources Methodology Direct impacts are assessed by identifying known cultural resources in the project study area, determining if any archaeological sites or historic structures are located within the project area, assessing the significance of the resources that may be affected, and determining the appropriate mitigation. Removal, demolition, or alteration of historical resources can permanently impact the historic fabric of an archaeological site, structure, or historic district. As previously mentioned, in 2011 Applied Earthworks prepared a Cultural Resources Study of the project site and vicinity (Appendix C). The study involved a records search at the Central Coast Information Center of the California Historical Resources Information System at the University of California Santa Barbara, archival and historical research, field survey of the property, predictive modeling of archaeological resources, evaluation of any potentially significant historic structures on the property, and assessment of potential impacts to the surrounding Downtown Historic District. The records search was conducted to identify previous cultural resources evaluations and previously recorded cultural resources on the project site as well as within a 200-foot radius of the project site. The archival research focused on the review of primary and secondary source materials related to the history and development of the project site and vicinity. Sources examined during the records and archival search included maps pinpointing cultural resources locations, survey coverage maps, site record and report files, city directories, Great Registers, historical maps, and newspapers. The State Historic Property Data Files, National Register of Historic Places, National Register of Determined Eligible Properties, California Points of Historic Interest, California Office of Historic Preservation Archaeological Determinations of Eligibility, and the California Department of Transportation State and Local Bridge Surveys were also analyzed. The results of the records search further identified studies conducted by Bertrando and Bertrando within the project site that consisted of archaeological testing in 1997 and 1999. In 2017, Rincon Consultants conducted an updated records search to expand the radius to 0.25-mile and to identify any cultural resources recorded since 2011. Archaeological sites and historic structures located within the project area are described in Section 4.2.1, Setting. Native American Consultation The City conducted Native American consultation consistent with Senate Bill 18 and Assembly Bill 52 for the project to identify potential concerns or issues associated with Native American cultural resources near the project. Rincon contacted the NAHC to determine if any sites recorded in the NAHC’s Sacred Lands File occur in or near the project site. The NAHC responded on May 1, 2017 that the search of the sacred land files for the USGS quadrangle in which the project is located “provided negative results” (citation). The NAHC did provide a list of Native American tribes with traditional lands or cultural places in the project area that may have knowledge of cultural resources at the project site. The Native American scoping did not identify any specific resources important to the consulted groups in or near the project site. However, Patti Dunton of the Salinan Tribe of Monterey City of San Luis Obispo Palm Nipomo Parking Structure Project 70 and San Luis Obispo Counties noted that the project site is sensitive for cultural resources and requested an archaeological survey of the project area before and after the asphalt is removed. She asked that if resources are identified that all further ground-disturbing areas be monitored by a cultural resources specialist from the Salinan Tribe. Native American correspondence can be found in Appendix C. Paleontological Resources Methodology Rincon Consultants paleontologists evaluated the paleontological sensitivity of the geologic units present on the project site based on a review of existing information in the primary literature on known fossils within those geologic units, review of previous geotechnical studies of the project site, and consultation of the online database maintained by the University of California Museum of Paleontology (UCMP) for fossil localities in San Luis Obispo County recorded from geologic units present in the project site. Rincon Consultants’ paleontologists assigned paleontological sensitivity to each geologic unit within the project site. The potential for impacts to significant paleontological resources is based on the potential for ground disturbance to directly impact paleontologically sensitive geologic units. Paleontological sensitivity is defined by the Society of Vertebrate Paleontology (SVP). The SVP broadly defines significant paleontological resources as follows (SVP 2010:11): “Fossils and fossiliferous deposits consisting of identifiable vertebrate fossils, large or small, uncommon invertebrate, plant, and trace fossils, and other data that provide taphonomic, taxonomic, phylogenetic, paleoecologic, stratigraphic, and/or biochronologic information. Paleontological resources are considered to be older than recorded human history and/or older than middle Holocene (i.e., older than about 5,000 radiocarbon years).” Significant paleontological resources are determined to be fossils or assemblages of fossils that are unique, unusual, rare, diagnostically important, or are common but have the potential to provide valuable scientific information for evaluating evolutionary patterns and processes, or which could improve our understanding of paleochronology, paleoecology, paleophylogeography, or depositional histories. New or unique specimens can provide new insights into evolutionary history; however, additional specimens of even well represented lineages can be equally important for studying evolutionary pattern and process, evolutionary rates, and paleophylogeography. Even unidentifiable material can provide useful data for dating geologic units if radiocarbon dating is possible. As such, common fossils (especially vertebrates) may be scientifically important, and therefore considered highly significant. The SVP (2010) describes sedimentary rock units as having high, low, undetermined, or no potential for containing significant nonrenewable paleontological resources. This criterion is based on rock units within which vertebrate or significant invertebrate fossils have been determined by previous studies to be present or likely to be present. While these standards were specifically written to protect vertebrate paleontological resources, all fields of paleontology have adopted these guidelines: I. HIGH POTENTIAL (SENSITIVITY) Rock units from which significant vertebrate or significant invertebrate fossils or significant suites of plant fossils have been recovered are considered to have a high potential for containing significant non-renewable fossiliferous resources. These units include but are not limited to, sedimentary formations and some volcanic formations which contain significant nonrenewable paleontological Environmental Impact Analysis Cultural and Tribal Cultural Resources Final Environmental Impact Report 71 resources anywhere within their geographical extent, and sedimentary rock units temporally or lithologically suitable for the preservation of fossils. Sensitivity comprises both (a) the potential for yielding abundant or significant vertebrate fossils or for yielding a few significant fossils, large or small, vertebrate, invertebrate, or botanical and (b) the importance of recovered evidence for new and significant taxonomic, phylogenetic, ecologic, or stratigraphic data. Areas which contain potentially datable organic remains older than Recent, including deposits associated with nests or middens, and areas which may contain new vertebrate deposits, traces, or trackways are also classified as significant. II. LOW POTENTIAL (SENSITIVITY) Sedimentary rock units that are potentially fossiliferous, but have not yielded fossils in the past or contain common and/or widespread invertebrate fossils of well documented and understood taphonomic, phylogenetic species and habitat ecology. Reports in the paleontological literature or field surveys by a qualified vertebrate paleontologist may allow determination that some areas or units have low potentials for yielding significant fossils prior to the start of construction. Generally, these units will be poorly represented by specimens in institutional collections and will not require protection or salvage operations. However, as excavation for construction gets underway it is possible that significant and unanticipated paleontological resources might be encountered and require a change of classification from Low to High Potential and, thus, require monitoring and mitigation if the resources are found to be significant. III. UNDETERMINED POTENTIAL (SENSITIVITY) Specific areas underlain by sedimentary rock units for which little information is available are considered to have undetermined fossiliferous potentials. Field surveys by a qualified vertebrate paleontologist to specifically determine the potentials of the rock units are required before programs of impact mitigation for such areas may be developed. IV. NO POTENTIAL Rock units of metamorphic or igneous origin are commonly classified as having no potential for containing significant paleontological resources. The loss of significant paleontological resources that meet the criteria outlined above would be considered a significant impact under CEQA, and the CEQA lead agency is responsible for ensuring that paleontological resources are protected in compliance with CEQA and other applicable statutes. Significance Thresholds If a project may cause a substantial adverse change in the characteristics of a resource that convey its significance or justify its eligibility for inclusion in the CRHR or a local register, either through demolition, destruction, relocation, alteration, or other means, then the project is judged to have a significant effect on the environment (CEQA Guidelines, §15064.5[b]). The following thresholds are based on Appendix G of the CEQA Guidelines. Impacts would be significant if the project would: Cause a substantial adverse change in the significance of a historical resource 1. Cause a substantial adverse change in the significance of an archaeological resource 2. Directly or indirectly destroy a unique paleontological resource or site or unique geologic 3. feature Disturb any human remains, including those interred outside of formal cemeteries 4. City of San Luis Obispo Palm Nipomo Parking Structure Project 72 Cause a substantial adverse change in the significance of a tribal cultural resource, defined in 5. Public Resources Code §21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is: A. Listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code §5020.1(k) B. A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code §5024.1. In applying the criteria set forth in subdivision (c) of Public Resource Code §5024.1, the lead agency shall consider the significance of the resource to a California Native American tribe b. Project Impacts Impact CR-1N-4 CONSTRUCTION OF THE PROJECT WOULD RESULT IN THE DEMOLITION OF TWO STRUCTURES ON THE PROJECT SITE THAT ARE HISTORIC RESOURCES, AND ADVERSELY AFFECT THE DOWNTOWN HISTORIC DISTRICT. THIS WOULD CAUSE A SUBSTANTIAL ADVERSE CHANGE IN THE SIGNIFICANCE OF HISTORICAL RESOURCES AS DEFINED IN CEQA GUIDELINES §15064.5. THIS IMPACT WOULD BE CLASS I, SIGNIFICANT AND UNAVOIDABLE. The CEQA guidelines define direct impacts as direct or primary effects caused by a project at the same place, and indirect impacts as affects caused by a project but occur at a different place. The project proposes a number of actions, each of which will result in impacts to historical resources. Table 6 summarizes each of the proposed project actions and the resulting type and level of impact that would result to historical resources. Table 6 Impacts to Historical Resources Project Action Type of Impact Level of Impact Demolition of 633 and 633½ Palm Street1 Direct Less than significant Demolition of 610 Monterey Street Direct Significant Demolition of 614 Monterey Street Direct Significant New Construction Indirect/Direct Significant/Less than significant 1 As discussed above, based on the 2011 Cultural Resources Study, these structures were found to not meet the definition of historical resources under CEQA. Demolition of 633 and 633 ½ Palm Street The project would result in the demolition of the buildings at 633 and 633 ½ Palm Street. Although demolition of these buildings would be a direct impact, as discussed above, neither is considered a historical resource as defined by CEQA. Both buildings were evaluated in 2011 and found to not meet the definition of historical resources under CEQA and they are located outside the boundaries of the Downtown Historic District. Thus, their demolition would not diminish the integrity of the Downtown Historic District and would not constitute a significant impact on historical resources. Demolition of 610 Monterey Street The project would result in the demolition of the structure at 610 Monterey Street. As a contributing resource to the Downtown Historic District, this property is a historical resource as defined by CEQA. Demolition of this property is potentially inconsistent with Policies 3.3.1 and 3.3.2 Environmental Impact Analysis Cultural and Tribal Cultural Resources Final Environmental Impact Report 73 of the City’s Conservation and Open Space Element of the General Plan, and would be considered a significant adverse impact under CEQA. Demolition of 614 Monterey Street The project would result in the demolition of the structure at 614 Monterey Street. As both a contributing resource to the Downtown Historic District and a property that was found individually eligible for local designation in 2011, this property is a historical resource as defined by CEQA. Demolition of this property is potentially inconsistent with Policies 3.3.1 and 3.3.2 of the City’s Conservation and Open Space Element of the General Plan, and would be considered a significant adverse impact under CEQA. New Construction The project has the potential to result in direct and indirect impacts to historical resources, specifically the Downtown Historic District, the adjacent locally-designated Hays-Lattimer Adobe located at 638-642 Monterey Street, and the locally-designated Harmony Creamery at 991 Nipomo Street. In consideration of these potential impacts this analysis follows the guidance of the City of San Luis Obispo’s Historic Preservation Program Guidelines, which states “construction in historic districts and on properties that contain listed historic resources shall conform with the goals and policies of the General Plan, the Historic Preservation Ordinance, these Guidelines, the Community Design Guidelines, any applicable specific or area plan, and the Secretary of the Interior’s Standards for the Treatment of Historic Properties (City of San Luis Obispo 2010:6). The City of San Luis Obispo’s Historic Preservation Program Guidelines state “new structures in historic districts shall be designed to be architecturally compatible with the district’s prevailing historic character as measured by their consistency with the scale, massing, rhythm, signature architectural elements, exterior materials, siting, and street yard setbacks of the districts historic structures” (City of San Luis Obispo 2010:7). Further guidance is provided in the Secretary of the Interior’s Standards for the Treatment of Historic Properties, which is recognized by CEQA as mitigating potential adverse impacts caused by a project to below the level of significance. According to the Secretary of the Interior’s Standards, new construction in or near historic properties, including districts, should be differentiated but compatible; attention should be devoted to ensuring that the new construction is complementary to the historic property but does not create a false sense of history by imitating or replicating a historic building or property. The Secretary of the Interior’s Standards include setting, in terms of the character of the surrounding environment, as a character-defining feature that weighs in the analysis of a resource’s retention of historic integrity. The proposed project would adversely affect the Downtown Historic District by inserting a new visual feature that is inconsistent with the height, scale, and massing of the resources that characterize the historic district. As described in the setting above, these resources within the district are primarily one to two stories in height and 50 to 75 feet in width. Although the commercial space and non-profit theater would be 41 to 43 feet high, the maximum height of the project would be 50 feet. The project would also have an approximately 200 x 200 square foot floor area. This is substantially taller and wider than the other adjacent historic resources, and would interrupt the rhythm and overall setting of the district. The parking structure and commercial space would be designed in a Spanish Colonial architectural style that is compatible with the surrounding historic properties; however, the theater would be Modernistic in style. The project would be visible from the contributing properties along Dana Street, adjacent Hays-Lattimer adobe, and Harmony City of San Luis Obispo Palm Nipomo Parking Structure Project 74 Creamery, and the visual impacts of the project may reach as far as the Dr. George B. Nichols House at 664 Monterey Street, the Carnegie Library at 696 Monterey Street, and the San Luis Obispo de Tolosa Mission, all Master List Properties. Since the designation of the Downtown Historic District in 1987, Nipomo Street between Higuera and Palm streets has sustained several other changes to historic character. Three buildings were removed (one relocated outside of the district) for the creation of the existing parking area at Palm and Nipomo street in 1997. The new Children’s Museum at the corner of Nipomo and Monterey streets is modern in appearance and inconsistent with the architecture of the surrounding properties. The new Soda Water Works building was also constructed with a modern appearance. Both of these properties are inside the Downtown Historic District boundaries but are no longer contributing resources. The project would further result in direct impacts to the Downtown Historic District by removing two contributing structures and introducing new, nonconforming structures. This would physically and visually disconnect the contributing historic resources on Dana Street5 from the remainder of the district to the east, resulting in a loss of integrity of the historic district. The proposed project would also interrupt the transition from commercial to residential that occurs in this area of the historic district, which is a physical characteristic of the district that helps conveys the reasons for its significance. As a result, the proposed project would result in a significant adverse impact to the Downtown Historic District. As described above, the Hays-Lattimer adobe is located immediately adjacent to the east of the project site and is a historical resource for the purposes of CEQA. Project construction activities would generate groundborne vibration that has the potential to result in damage to the historic adobe building. The Federal Transit Administration (FTA) thresholds for damage to fragile historic buildings, state that vibration impacts would be significant if vibration exceeds 88 VdB. As discussed in Section 4.3, Noise, the project would not generate vibration levels higher than 87 VdB at a distance of 25 feet. The adobe structure is approximately 60 feet from where construction of the nearest structure would occur. Direct impacts to the Hays-Lattimer adobe from groundborne vibration would therefore be less than significant. As noted above, the Secretary of the Interior’s Standards include setting, in terms of the character of the surrounding environment, as a character-defining feature that weighs in the analysis of a resource’s retention of historic integrity. The setting of the Hays-Lattimer and Harmony Creamery is consistent with the larger Downtown Historic District and is characterized by one to two-story buildings that are approximately 50 to 75 feet wide. Although the commercial building along Nipomo Street and the theater along Monterey Street would be lower (approximately 41 to 43 feet tall) than the parking structure, the proposed project as a whole is substantially larger in its scale, massing, and height and would alter the surrounding setting of both historical resources. Although this change would negatively affect their historic integrity, both would continue to convey the reasons for their significance. Indirect impacts to the Hays-Lattimer adobe and Harmony Creamery would therefore be less than significant. Mitigation Measures The following mitigation measure is required. 5 The Dana Street group is a small subsection of residential properties within the otherwise commercial Downtown Historic Distr ict, which is representative of the early residential settlement of downtown San Luis Obispo and contributes to the significance of the district. Environmental Impact Analysis Cultural and Tribal Cultural Resources Final Environmental Impact Report 75 CR-1 Historic Building Documentation Packages Impacts to historical resources shall be minimized through the preparation of archival historic building documentation packages for both 610 and 614 Monterey Street. Prior to issuance of demolition permits, the City of San Luis Obispo shall ensure that documentation of both properties is completed in the form of a Historic American Building Survey (HABS)-Like documentation that shall comply with the Secretary of the Interior’s Standards for Architectural and Engineering Documentation (NPS 1990). The documentation shall generally follow the HABS Level III requirements and include high-quality digital photographic recordation of the buildings and their overall setting, detailed historic narrative report, and compilation of historic research. The documentation shall be completed by a qualified architectural historian or historian who meets the Secretary of the Interior’s Professional Qualification Standards for History and/or Architectural History (NPS 1983). Individual archival documentation packages shall be completed for both properties and offered as donated material to the San Luis Obispo Library and the History Center of San Luis Obispo County, where it would be available to local researchers. PLAN REQUIREMENTS AND TIMING The City shall complete archival documentation of the 610 and 614 Monterey Street properties to the issuance of project grading permits. MONITORING The Community Development Director shall confirm completion of and approve the archival documentation. The City shall confirm submittal of the documentation to the History Center of San Luis Obispo County and the San Luis Obispo County Library. Significance After Mitigation Mitigation Measure CR-1 would reduce impacts to historical resources to the greatest extent possible; however, this measure would not eliminate the permanent impacts to the identified historic resources, and no other feasible mitigation measures are available. Therefore, the project would result in a significant and unavoidable impact to historic resources. Impact CR-2N-5 CONSTRUCTION OF THE PROJECT WOULD RESULT IN GROUND DISTURBANCE THAT COULD CAUSE A SUBSTANTIAL ADVERSE CHANGE IN THE SIGNIFICANCE OF AN ARCHAEOLOGICAL RESOURCE AS DEFINED IN CEQA GUIDELINES 15064. THIS IMPACT WOULD BE CLASS II, SIGNIFICANT BUT MITIGATABLE. The project site is currently developed with an asphalt parking lot and residential structures. During archaeological testing conducted in 1996 and 1999, subsurface historical archaeological materials were identified in the 0.5-acre surface parking lot at the corner of Palm and Nipomo streets within the project site. During the survey conducted for the project in 2011, historic-period debris was observed in the small amount of exposed native soils along Monterey Street. Additionally, similar work in the project vicinity has shown that subsurface archaeological deposits exist throughout the city. Approximately 0.125 mile (660 feet) from the project site, trenches uncovered a mission-era midden containing a significant Native American deposit and it is unclear whether that deposit extends to the project site. Based on the results of work within the project site and the vicinity, it is likely that additional remains related to the mission and post-mission occupation of the area are present. Additional intact subsurface deposits may be present. Therefore, construction of the project could damage or destroy archeological resources. Impacts to such resources would be City of San Luis Obispo Palm Nipomo Parking Structure Project 76 potentially significant and mitigation would be required to ensure that any discovered archaeological resources would be protected and curated if encountered during project construction activities. Mitigation Measures The following mitigation measures would reduce potential impacts to archaeological resources to a less than significant level. CR-2(a) Retain a Qualified Principal Investigator A qualified principal investigator, defined as an archaeologist who meets the Secretary of the Interior’s Standards for professional archaeology (hereafter qualified archaeologist), shall be retained to carry out all mitigation measures related to archaeological resources. CR-2(b) City of San Luis Obispo Consolidated Approach for Archaeological Investigations Mitigation of archaeological resources within the project area shall follow the Consolidated Approach as outlined in the City of San Luis Obispo Archaeological Resource Preservation Program Guidelines. The Consolidated Approach shall include (1) the preparation of a Research Design and Mitigation Plan prepared by the qualified archaeologist and submitted for written approval to the City’s Community Development Director (Director), which shall include but not be limited to the research design, laboratory and field methods, public interpretation, and location of curation; (2) monitoring of demolition and clearing of pavement within the project area; (3) fieldwork after the removal of pavement consisting of a Phase I inventory, Phase 2 Testing and Evaluation, and Phase 3 Data Recovery aimed at locating archaeological remains, evaluating their significance and integrity, and mitigating impacts through data recovery excavation; (4) the completion of special studies, such as faunal analysis, if appropriate, and the curation of recovered artifacts; and (5) the completion of a technical report documenting the results of the consolidated approach prepared in accordance with current professional standards and submitted to the Director. CR-2(c) Archaeological Monitoring An archaeological monitor shall be present for all project-related ground-disturbing construction activities. The monitor(s) shall be onsite on a full-time basis during earthmoving activities within native soils, including grading, trenching, vegetation removal, or other excavation activities. Under consultation between the qualified archaeologist and the City, monitoring may be reduced or eliminated based on observed conditions. CR-2(d) Unanticipated Discovery of Archaeological Resources In the event that cultural resources are encountered during the implementation of Mitigation Measures CR-2(b) or CR-2(c), all work shall be halted in the vicinity of the discovery until a qualified archaeologist can assess the significance of the resource. If the resources are found to be significant, they must be avoided or mitigated pursuant to the qualified archaeologist’s direction and the testing plan outlined under Mitigation Measure CR-2(b). Mitigation may involve preservation in place or documentation and excavation of the resource. A report by the archaeologist evaluating the find and identifying mitigation actions taken shall be submitted to the City. Environmental Impact Analysis Cultural and Tribal Cultural Resources Final Environmental Impact Report 77 PLAN REQUIREMENTS AND TIMING The City shall retain a qualified archaeologist prior to the issuance of demolition and grading permits. The qualified archaeologist shall prepare and submit the Research Design and Testing and Mitigation Plan prior to the issuance of demolition and grading permits. All fieldwork conducted under the consolidated approach must be completed prior to the issuance of grading permits. The requirement that ground disturbance be observed by an archaeological monitor and that construction work be stopped in the event of discovery of archaeological resources shall be included on construction plans prior to the issuance of grading permits. MONITORING The City shall review construction plans and periodically inspect project construction to ensure compliance with this measure. Significance After Mitigation Impacts to archaeological resources would be less than significant with incorporation of mitigation measures CR-2(a) through CR-2(d). Impact CR-3N-6 CONSTRUCTION OF THE PROJECT WOULD RESULT IN GROUND DISTURBANCE THAT COULD INDIRECTLY OR DIRECTLY DESTROY A UNIQUE PALEONTOLOGICAL RESOURCE. THIS IMPACT WOULD BE CLASS II, SIGNIFICANT BUT MITIGABLE. According to mapping by Dibblee and Minch (2004), the project site consists of younger Quaternary alluvium that dates to the Holocene. These sediments consist of gravel and sand deposited over the last 10,000 years by local rivers (Dibblee and Minch, 2004). Geotechnical studies have supported this mapping, and further detailed depths of 25-44 feet to bedrock, the Mesozoic Franciscan Melange, throughout the project site (Earth Systems Pacific 2011). Furthermore, Earth Systems Pacific (2011) documented some parts of the project site where artificial fill was present in the subsurface to depths of 3 and 5 feet. It should be noted that fill was only documented in two of the eight boreholes across the site, and was not present in the others (Earth Systems Pacific 2011). Using these data, as well as the paleontological literature review presented above, Rincon Consultants’ paleontologists assigned SVP paleontological sensitivities to geologic units likely to be impacted by construction in the project site. It should be noted that while the Franciscan Melange has high sensitivity, it is deep enough (20 to 44 feet) that it should not be impacted by the anticipated depths of ground disturbance (14 feet). Artificial Fill As a product of manmade activities, artificial fill has no paleontological sensitivity. Quaternary Alluvium As discussed above, Pleistocene-aged alluvial sediments have preserved fossil resources throughout California, including San Luis Obispo County. While the Quaternary alluvium mapped in the project area is too young to preserve fossils in the upper layers, it increases with age in depth. Therefore, deeper levels may be of an appropriate age to preserve fossil resources. Quaternary alluvium is thus assigned a low-to-high paleontological sensitivity, increasing with depth. While the exact depth at which this transition occurs has not been established for the project area, 10 feet is a reasonable estimate. City of San Luis Obispo Palm Nipomo Parking Structure Project 78 Because project construction has the potential to disturb sensitive geologic units, impacts would be potentially significant. Mitigation Measures The following mitigation measures would reduce potential impacts to paleontological resources to a less than significant level. CR-3(a) Retain a Qualified Project Paleontologist A qualified project paleontologist, defined as a paleontologist who meets the standards of the SVP (2010), shall be retained to carry out all mitigation measures related to paleontological resources. CR-3(b) Paleontological Worker Environmental Awareness Program (WEAP) Prior to the start of construction, the project paleontologist or his or her designee shall conduct training for construction personnel regarding the appearance of fossils and the procedures for notifying paleontological staff should fossils be discovered by construction staff. The WEAP shall be fulfilled at the time of a preconstruction meeting at which a qualified paleontologist shall attend. CR-3(c) Paleontological Monitoring Ground-disturbing construction activities (including grading, trenching, foundation work, and other excavations) in previously undisturbed sediments that exceed 10 feet in depth shall be monitored on a full-time basis during initial ground disturbance. Monitoring shall be conducted by a qualified paleontological monitor, who is defined as an individual who has experience with collection and salvage of paleontological resources and meets the minimum standards of the SVP (2010). The duration and timing of the monitoring will be determined by the project paleontologist and the location and extent of proposed ground disturbance. If the project paleontologist determines that full-time monitoring is no longer warranted, based on the specific geologic conditions at the surface or at depth, the project paleontologist may recommend that monitoring be reduced to periodic spot-checking or cease entirely. Monitoring is not necessary in artificial fill or for activities that do not reach 10 feet in depth. CR-3(d) Fossil Discoveries In the event of a fossil discovery by the paleontological monitor or construction personnel, all work in the immediate vicinity of the find shall cease. The project paleontologist shall evaluate the find before restarting construction activity in the area. If it is determined that the fossil(s) is (are) scientifically significant, the project paleontologist shall complete the following conditions to mitigate impacts to significant fossil resources: 1) Salvage of Fossils. The project paleontologist (or paleontological monitor) should recover significant fossils following standard field procedures for collecting paleontological resources, as described by the SVP (2010). Typically, fossils can be safely salvaged quickly by a single paleontologist and not disrupt construction activity. In some cases larger fossils (such as complete skeletons or large mammal fossils) require more extensive excavation and longer salvage periods. In this case the paleontologist should have the authority to temporarily direct, divert, or halt construction activity to ensure that the fossil(s) can be removed in a safe and timely manner. Environmental Impact Analysis Cultural and Tribal Cultural Resources Final Environmental Impact Report 79 2) Preparation and Curation of Recovered Fossils. Once salvaged, significant fossils should be identified to the lowest possible taxonomic level, prepared to a curation-ready condition, and curated in a scientific institution with a permanent paleontological collection (such as the University of California Museum of Paleontology), along with all pertinent field notes, photos, data, and maps. Fossils of undetermined significance at the time of collection may also warrant curation at the discretion of the project paleontologist. Significance After Mitigation Mitigation Measures CR-3(a) through CR-3(d) would reduce the potential impacts to paleontological resources to a less than significant level. Impact CR-4N-7 NO TRIBAL CULTURAL RESOURCES WERE IDENTIFIED WITHIN THE PROJECT SITE, BUT AREA IS GENERALLY CONSIDERED SENSITIVE FOR CULTURAL RESOURCES. THIS IMPACT WOULD BE CLASS III, LESS THAN SIGNIFICANT. Native American consultation efforts completed by the City pursuant to the requirements AB 52 and SB 18. The efforts under SB 18 and AB 52 did not identify specific tribal cultural resources within the project area; however, it did identify the project site as sensitive, consistent with the results of the Cultural Resources Study. As a result of the general cultural resources sensitivity of the area, Patti Dunton of the Salinan Tribe of Monterey and San Luis Obispo Counties requested that fieldwork be conducted at the project area after the removal of pavement and that project-related ground disturbance be observed by a Salinan tribal monitor. As no tribal cultural resources were identified or known to exist in the project area, the project would result in a less than significant impact on tribal cultural resources. Mitigation Measures No mitigation measures are required. Significance After Mitigation No mitigation measures are required. Impacts are less than significant. Impact CR-5N-8 GROUND-DISTURBING ACTIVITIES ASSOCIATED WITH CONSTRUCTION OF THE PROJECT HAS THE POTENTIAL TO DISTURB UNIDENTIFIED HUMAN REMAINS. THIS IMPACT WOULD BE CLASS II, SIGNIFICANT BUT MITIGABLE. Unanticipated discovery of human remains during project excavation would require compliance with Health and Safety Code §7050.5 and Cal. Public Res. Code Sections 5097.94 and 5097.98. Cal. Public Res. Code §5097.98 also addresses the disposition of Native American burials, protects such remains, and established the Native American Heritage Commission to resolve any related disputes. Compliance with Health and Safety Code §7050.5 and Cal. Public Res. Code §§ 5097.94 and 5097.98 would ensure that unanticipated discovery of human remains during project excavation, including those interred outside of formal cemeteries, would be addressed appropriately by the County Coroner and NAHC (if required). Mitigation Measures Compliance with existing regulations and mitigation measure CR-2(d) would ensure that potential impacts to human remains and burial grounds would be less than significant. City of San Luis Obispo Palm Nipomo Parking Structure Project 80 Significance After Mitigation Impacts to human burial grounds would be less than significant with implementation of mitigation measure CR-2(d). c. Cumulative Impacts Planned buildout of the City of San Luis Obispo under the General Plan would cumulatively increase the potential for adverse effects on cultural and tribal cultural resources in the city. The project would incrementally contribute to this cumulative effect. Impacts to cultural and tribal cultural resources are generally site-specific. Accordingly, as required under applicable laws and regulations, potential impacts associated with cumulative developments would be addressed on a case-by-case basis. The proposed project, as well as other cumulative projects in the city, would be required to comply with existing state and local regulations described in Section 4.2.1(b), Regulatory Setting, which address the protection of cultural and tribal cultural resources in the city. As described under Impacts CR-2, CR-3, and CR-5, with implementation of required mitigation, the project would reduce potential impacts to archaeological and/or paleontological resources to less than significant levels. In addition, as described in Impact CR-4, the project would result in a less than significant impact on tribal cultural resources. Therefore, the project would not contribute substantially to the cumulative loss of archaeological, paleontological, or tribal cultural resources in the city. However, as described in Impact CR-1, the project would result in a significant and unavoidable impact associated with the removal of two historic structures that are part of the Downtown Historic District. The project would also result in a significant and unavoidable impact on the Downtown Historic District. Mitigation measure CR-1 would reduce the project’s impacts to historical resources to the greatest extent possible; however, this measure would not eliminate the permanent cumulative or individual impacts to the identified historic resources, and no other feasible mitigation measures are available. As such, the project would contribute to the cumulative loss of historic resources in the city. This would be a Class I, significant and unavoidable, cumulative impact to historical resources. Cultural Arts District Parking Structure Project Phase 1B & Phase 2 Mitigation and Monitoring Plan prepared for City of San Luis Obispo Public Works Department 919 Palm Street San Luis Obispo, California 93401 prepared by Rincon Consultants, Inc. 1530 Monterey Street, Suite D San Luis Obispo, California 93401 November 2022 Please cite this report as follows: Montgomery, Courtney, Ashley Losco, Ken Victorino, Christopher Duran, Christopher Bersbach, and Shawn Decker 2022 Cultural Arts District Parking Structure Project Phase 1B & Phase 2 Mitigation and Monitoring Plan, San Luis Obispo County, California. Rincon Consultants Project No. 22-12836. Report on file at Rincon Consultants, Inc. 180 North Ashwood Avenue Ventura, California 93001 Table of Contents Phase 1B & Phase 2 Mitigation and Monitoring Plan i Table of Contents 1 Introduction ....................................................................................................................................1 Project Location and Description ..................................................................................... 10 Environmental Resource Sensitivity ................................................................................ 10 2 Plan Check Requirements ............................................................................................................ 15 3 Monitoring Requirements ........................................................................................................... 21 4 Archaeological Testing Requirements ......................................................................................... 24 5 Resource Discovery Plan .............................................................................................................. 25 Discovery of Archaeological Resources ........................................................................... 25 Discovery of Human Remains .......................................................................................... 26 Discovery of Paleontological Resources .......................................................................... 26 6 Reporting of Monitoring Results and Curation Finds .................................................................. 27 Reporting of Archaeological Monitoring Results ............................................................. 27 Curation of Archaeological Finds ..................................................................................... 27 Reporting of Paleontological Monitoring Results ............................................................ 27 Curation of Paleontological Resources ............................................................................ 28 7 References ................................................................................................................................... 29 Figures Figure 1 Project Location Depicted on Topographic Background ................................................. 11 City of San Luis Obispo Cultural Arts District Parking Structure Project ii This page intentionally left blank. Introduction Phase 1B & Phase 2 Mitigation and Monitoring Plan 1 1 Introduction Rincon Consultants, Inc. (Rincon) was retained by the City of San Luis Obispo (City) to provide Mitigation Monitoring and Reporting Program (MMRP) compliance services in support of Phase 1B and Phase 2 of the Cultural Arts District Parking Structure Project (formerly known as the Palm Nipomo Parking Structure) in San Luis Obispo, California. The Mitigation and Monitoring Plan (MMP) will address the details, timing, and responsibility of all required mitigation monitoring activities. The current Phase 1A of the Cultural Arts District Parking Structure Project (project) consists of undergrounding existing dry utilities in preparation for the main phases of construction. Phase 1B consists of demolition and Phase 2 consists of site preparation and construction of the parking structure and surrounding site improvements. Phase 1B and Phase 2 are subject to mitigation requirements outlined in the Final EIR for the Palm Nipomo Parking Structure Project adopted by the City Council in July 2018 (2018 Final EIR; City of San Luis Obispo 2018). The City intends to submit for building permit approval for all project phases in 2022 and intends to commence Phase 1B in Spring 2023 and Phase 2 in Fall 2023. This MMP was prepared by Rincon Consultants, Inc. (Rincon) in compliance with the Mitigation Monitoring and Reporting Program prepared in support of the 2018 Final EIR for the Palm Nipomo Parking Structure Project. The Mitigation Monitoring and Reporting Program includes the following mitigation measures for Aesthetics, Air Quality, Biological Resources, Cultural Resources, Geology and Soils, Hazards and Hazardous Materials, Historic Resources, Noise, Paleontological Resources, and Transportation: AESTHETICS/VISUAL RESOURCES 1. Prior to issuance of building permits, the applicant shall prepare and submit a comprehensive lighting plan for Architectural Review Committee review and approval. The lighting plan shall be consistent with the Municipal Code Night Sky Ordinance, and prepared using guidance and best practices endorsed by the International Dark Sky Association. The lighting plan shall address all aspects of the lighting, including but not limited to all buildings, infrastructure, driveways, paths, plazas, safety, and signage. The lighting plan must include identification of all types, sizes, and intensities of wall mounted building lights and landscape accent lighting, and a photometric map must be provided. The lighting plan shall include the following: a. The point source of all exterior lighting shall be shielded from offsite views b. Light trespass from exterior lights shall be minimized by directing light downward and utilizing cut-off fixtures or shields c. Lumination from exterior lights shall be the lowest level allowed by public safety standards d. Exterior lighting shall be designed to not focus illumination onto exterior walls e. Any signage visible from offsite shall not be internally laminated City of San Luis Obispo Cultural Arts District Parking Structure Project 2 2. To minimize impacts on residential development in proximity to the project site, roof and building materials shall be non-reflective, and shall be muted in hues consistent with standards in the Community Design Guidelines, Section 6.1-C. AIR QUALITY 3. Construction projects shall implement the following dust control measures so as to reduce PM10 emissions in accordance with San Luis Obispo Air Pollution Control District (SLOAPCD) requirements.  Reduce the amount of the disturbed area where possible  Water trucks or sprinkler systems shall be used during construction in sufficient quantities to prevent airborne dust from leaving the site. Increased watering frequency shall be required whenever wind speeds exceed 15 mph. Reclaimed (non- potable) water shall be used whenever possible  All dirt stock pile areas shall be sprayed daily as needed  Permanent dust control measures identified in the approved project revegetation and landscape plans shall be implemented as soon as possible following completion of any soil disturbing activities  Exposed ground areas that are planned to be reworked at dates greater than one month after initial grading shall be sown with a fast germinating, non-invasive grass seed and watered until vegetation is established  All disturbed soil areas not subject to revegetation shall be stabilized using approved chemical soil binders, jute netting, or other methods approved in advance by the SLOAPCD  All roadways, driveways, sidewalks, etc. to be paved shall be completed as soon as possible after grading unless seeding or soil binders are used  Vehicle speed for all construction vehicles shall not exceed 15 miles per hour (mph) on any unpaved surface at the construction site  All trucks hauling dirt, sand, soil, or other loose materials are to be covered or shall maintain at least two feet of freeboard (minimum vertical distance between top of load and top of trailer) in accordance with California Vehicle Code Section 23114  Install wheel washers where vehicles enter and exit unpaved roads onto streets, or wash off trucks and equipment leaving the site  Sweep streets at the end of each day if visible soil material is carried onto adjacent paved roads. Water sweepers with reclaimed water shall be used where feasible  All of these fugitive dust mitigation measures shall be shown on grading and building plans  The contractor or builder shall designate a person or persons to monitor the fugitive dust emissions and enhance the implementation of the measures as necessary to minimize dust complaints, reduce visible emissions below 20 percent opacity, and to prevent transport of dust offsite. Their duties shall include holidays and weekend periods when work may not be in progress. The name and telephone number of Introduction Phase 1B & Phase 2 Mitigation and Monitoring Plan 3 such persons shall be provided to the SLOAPCD Compliance Division prior to the start of any grading, earthwork, or demolition. 4. The following standard air quality mitigation measures shall be implemented during construction activities at the project site:  Maintain all construction equipment in proper tune according to manufacturer’s specifications  Fuel all off-road and portable diesel powered equipment with ARB certified motor vehicle diesel fuel (non-taxed version suitable for sue off-road)  Use diesel construction equipment meeting ARB’s Tier 2 certified engines or cleaner off-road heavy-duty diesel engines, and comply with the State Off-Road Regulation  Use on-road heavy-duty trucks that meet the ARB’s 2007 or cleaner certification standard for on-road heavy-duty diesel engines, and comply with the State On-Road Regulation  Construction or trucking companies with fleets that do not have engines in their fleet that meet the engine standards identified in the above two measures (e.g., captive or NOX exempt area fleets) may be eligible by proving alternative compliance  All on- and off-road diesel equipment shall not idle for more than 5 minutes. Signs shall be posted in the designated queuing areas and or job sites to remind drivers and operators of the 5 minute idling limit  Diesel idling within 1,000 feet of sensitive receptors is not permitted  Staging and queuing areas shall not be located within 1,000 feet of sensitive receptors  Electrify equipment when feasible  Substitute gasoline-powered in place of diesel-powered equipment, where feasible  Use alternatively fueled construction equipment onsite where feasible, such as compressed natural gas, liquefied natural gas, propane or biodiesel 5. The following BACT for diesel-fueled construction equipment shall be implemented during construction activities at the project site, where feasible:  Further reduce emissions by expanding use of Tier 3 and Tier 4 off-road and 2010 on-road compliant engines where feasible  Repower equipment with the cleanest engines available  Install California Verified Diesel Emission Control Strategies, such as level 2 diesel particulate filters (these strategies are listed at: www.arb.ca.gov/diesel/verdev/vt/cvt.htm) 6. To reduce ROG and NOX levels during the architectural coating phase, low or no VOC- emission paint shall be used with levels of 50 g/L or less. City of San Luis Obispo Cultural Arts District Parking Structure Project 4 BIOLOGICAL RESOURCES 7. To avoid disturbance of nesting and special-status birds, activities related to the project, including, but not limited to, vegetation removal, ground disturbance, and construction and demolition shall occur outside of the bird breeding season (typically February through August in the project region). If construction must begin within the breeding season, then a pre-construction nesting bird survey shall be conducted no more than 3 days prior to initiation of ground disturbance and vegetation removal activities. The nesting bird pre-construction survey shall be conducted within the Project Boundary, including a 300-foot buffer (500-foot for raptors), on foot, and within inaccessible areas (i.e., private lands) afar using binoculars to the extent practical. The survey shall be conducted by a biologist familiar with the identification of avian species known to occur in the area. If nests are found, an avoidance buffer (which is dependent upon the species, the proposed work activity, and existing disturbances associated with land uses outside of the site) shall be determined and demarcated by the biologist with bright orange construction fencing, flagging, construction lathe, or other means to mark the boundary. All construction personnel shall be notified as to the existence of the buffer zone and to avoid entering the buffer zone during the nesting season. No ground- disturbing activities shall occur within this buffer until the avian biologist has confirmed that breeding/nesting is completed and the young have fledged the nest. Encroachment into the buffer shall occur only at the discretion of the qualified biologist. CULTURAL RESOURCES 8. A qualified principal investigator, defined as an archaeologist who meets the Secretary of the Interior’s Standards for professional archaeology (hereafter qualified archaeologist), shall be retained to carry out all mitigation measures related to archaeological resources. 9. Mitigation of archaeological resources within the project area shall follow the Consolidated Approach as outlined in the City of San Luis Obispo Archaeological Resource Preservation Program Guidelines. The Consolidated Approach shall include (1) the preparation of a Research Design and Mitigation Plan prepared by the qualified archaeologist and submitted for written approval to the City’s Community Development Director (Director), which shall include but not be limited to the research design, laboratory and field methods, public interpretation, and location of curation; (2) monitoring of demolition and clearing of pavement within the project area; (3) fieldwork after the removal of pavement consisting of a Phase I inventory, Phase 2 Testing and Evaluation, and Phase 3 Data Recovery aimed at locating archaeological remains, evaluating their significance and integrity, and mitigating impacts through data recovery excavation; (4) the completion of special studies, such as faunal analysis, if appropriate, and the curation of recovered artifacts; and (5) the completion of a technical report documenting the results of the consolidated approach prepared in accordance with current professional standards and submitted to the Director. 10. An archaeological monitor shall be present for all project-related ground-disturbing construction activities. The monitor(s) shall be onsite on a full-time basis during earthmoving activities, including grading, trenching, vegetation removal, or other excavation activities. Under consultation between the qualified archaeologist and the City, monitoring may be reduced or eliminated based on observed conditions. Introduction Phase 1B & Phase 2 Mitigation and Monitoring Plan 5 11. In the event that cultural resources are encountered during the implementation of Mitigation Measures 9 or 10, all work shall be halted in the vicinity of the discovery until a qualified archaeologist can assess the significance of the resource. If the resources are found to be significant, they must be avoided or mitigated pursuant to the qualified archaeologist’s direction and the testing plan outlined under Mitigation Measure 9. Mitigation may involve preservation in place or documentation and excavation of the resource. A report by the archaeologist evaluating the find and identifying mitigation actions taken shall be submitted to the City GEOLOGY AND SOILS 12. Once the final maximum loads of the project have been determined, a design-level geotechnical report shall be prepared that identifies the most appropriate geotechnical improvements to onsite soils, the foundation, and parking structure to minimize expansive soil hazards. Recommendations could include, but are not limited to the following:  Use imported non-expansive materials combined with pre-moistening of the soils to provide protection for slabs and flatwork  Provide a layer of non-expansive material 18 to 24 inches thick  Use post-tensioned slabs-on-grade  Implement shoring methods, such as shotcrete-faced soil nail walls, tangent drilled caissons, whaler-braced retaining walls, and steel I-beam and lagging walls  Use over-excavation and recompaction  Utilize a deep foundation system, such as caissons or rammed aggregate piers  A certified soils engineer shall be retained for monitoring during construction of the project. The certified soils engineer shall also provide any necessary soil testing during construction, to ensure compliance with the design-level geotechnical report, and to provide site-specific guidance as subsurface materials are encountered. HAZARDS AND HAZARDOUS MATERIALS 13. Prior to issuance of grading permits, additional soil samples testing for total petroleum hydrocarbons shall be performed. A work plan shall be completed to address the sampling protocols to be followed, as well as the number of samples to be taken and the chemical analysis required. Upon City of San Luis Obispo approval, the work plan shall be implemented and the results of the soil sampling shall be forwarded to the City of San Luis Obispo. The City shall review the data to determine if any additional investigation or remedial activities are deemed necessary. No work shall resume in that area until the lead local regulatory agency has provided written authorization that the area does not warrant any additional action. If concentrations of contaminants warrant remediation, contaminated materials shall be remediated either prior to or concurrent with construction. Remediation shall generally include a management plan which establishes design and implementation of remediation. Cleanup may include excavation, disposal, bio-remediation, or any other City of San Luis Obispo Cultural Arts District Parking Structure Project 6 treatment of conditions subject to regulatory action. All necessary reports, regulations and permits shall be followed to achieve cleanup of the site. The contaminated materials shall be remediated under the supervision of an environmental consultant licensed to oversee such remediation and under the direction of the lead oversight agency. The remediation program shall also be approved by the San Luis Obispo Fire Department. All proper waste handling and disposal procedures shall be followed. Upon completion of the remediation, the environmental consultant shall prepare a report summarizing the project, the remediation approach implemented, and the analytical results after completion of the remediation, including all waste disposal or treatment manifests. HISTORICAL RESOURCES 14. Impacts to historical resources shall be minimized through the preparation of archival historic building documentation packages for both 610 and 614 Monterey Street. Prior to issuance of demolition permits, the City of San Luis Obispo shall ensure that documentation of both properties is completed in the form of a Historic American Building Survey (HABS)-Like documentation that shall comply with the Secretary of the Interior’s Standards for Architectural and Engineering Documentation (NPS 1990). The documentation shall generally follow the HABS Level III requirements and include high- quality digital photographic recordation of the buildings and their overall setting, detailed historic narrative report, and compilation of historic research. The documentation shall be completed by a qualified architectural historian or historian who meets the Secretary of the Interior’s Professional Qualification Standards for History and/or Architectural History (NPS 1983). Individual archival documentation packages shall be completed for both properties and offered as donated material to the San Luis Obispo Library and the History Center of San Luis Obispo County, where it would be available to local researchers. Completion of this mitigation measure shall be monitored and enforced by the lead agency. NOISE 15. Construction vehicles and haul trucks shall utilize roadways which avoid residential neighborhoods and sensitive receptors where possible. The applicant shall submit a proposed construction vehicle and hauling route for City review and approval prior to grading/building permit issuance. The approved construction vehicle and hauling route shall be used for all construction vehicles and hauling trips during the duration of construction. 16. Except for emergency repair of public service utilities or where an exception is issued by the Community Development Department, no operation of tools or equipment used in construction, drilling, repair, alteration, or demolition work shall occur daily between the hours of 7:00 PM and 7:00 AM, or anytime on Sundays, holidays, or after sunset, where that operation creates a noise disturbance that exceeds 75 dBA for single family residential, 80 dBA for multi-family residential, and 85 dBA for mixed residential/commercial land uses across a residential or commercial property line for a maximum of 10 days. For construction activities lasting more than 10 days, noise from construction equipment shall not exceed 60 dBA for single family residential, 65 dBA for multi-family residential, and 70 dBA for mixed residential/commercial land uses across a residential or commercial property line. Introduction Phase 1B & Phase 2 Mitigation and Monitoring Plan 7 17. For all construction activity at the project site, noise attenuation techniques shall be employed to reduce noise levels to extent feasible in accordance with the City of San Luis Obispo Municipal Code, Title 9, Chapter 9.12 (Noise Control). Such techniques shall include:  Sound blankets on noise-generating equipment Stationary construction equipment that generates noise levels above 60 dBA at the project boundaries shall be shielded with barriers that meet a sound transmission class (a rating of how well noise barriers attenuate sound) of 25.  All diesel equipment shall be operated with closed engine doors and shall be equipped with factory-recommended mufflers  For stationary equipment, the applicant shall designate equipment areas with appropriate acoustic shielding on building and grading plans. Equipment and shielding shall be installed prior to construction and remain in the designated location throughout construction activities  Electrical power shall be used to power air compressors and similar power tools  The movement of construction-related vehicles, with the exception of passenger vehicles, along roadways adjacent to sensitive receptors shall be limited to the hours between 7:00 AM and 7:00 PM, Monday through Saturday and no movement of heavy equipment shall occur on Sundays or official holidays (e.g., Thanksgiving, Labor Day)  Temporary sound barriers shall be constructed between construction sites and affected uses 18. The contractor shall inform residents and business operators at properties within 300 feet of the project site of proposed construction timelines and noise complaint procedures to minimize potential annoyance related to construction noise. Proof of mailing the notices shall be provided to the Community Development Department before the City issues a zoning clearance. Signs shall be in place before beginning of and throughout grading and construction activities. Noise-related complaints shall be directed to the City’s Community Development Department. 19. Prior to the issuance of grading permits, the City of San Luis Obispo shall review and coordinate the construction schedules of any other projects within 300 feet of the project to ensure that construction schedules do not overlap. PALEONTOLOGICAL RESOURCES 20. A qualified project paleontologist, defined as a paleontologist who meets the standards of the SVP (2010), shall be retained to carry out all mitigation measures related to paleontological resources. 21. Prior to the start of construction, the project paleontologist or his or her designee shall conduct training for construction personnel regarding the appearance of fossils and the procedures for notifying paleontological staff should fossils be discovered by construction staff. The WEAP shall be fulfilled at the time of a preconstruction meeting at which a qualified paleontologist shall attend. City of San Luis Obispo Cultural Arts District Parking Structure Project 8 22. Ground-disturbing construction activities (including grading, trenching, foundation work, and other excavations) in previously undisturbed sediments that exceed 10 feet in depth shall be monitored on a full-time basis during initial ground disturbance. Monitoring shall be conducted by a qualified paleontological monitor, who is defined as an individual who has experience with collection and salvage of paleontological resources and meets the minimum standards of the SVP (2010). The duration and timing of the monitoring will be determined by the project paleontologist and the location and extent of proposed ground disturbance. If the project paleontologist determines that full-time monitoring is no longer warranted, based on the specific geologic conditions at the surface or at depth, the project paleontologist may recommend that monitoring be reduced to periodic spot-checking or cease entirely. Monitoring is not necessary in artificial fill or for activities that do not reach 10 feet in depth. 23. In the event of a fossil discovery by the paleontological monitor or construction personnel, all work in the immediate vicinity of the find shall cease. The project paleontologist shall evaluate the find before restarting construction activity in the area. If it is determined that the fossil(s) is (are) scientifically significant, the project paleontologist shall complete the following conditions to mitigate impacts to significant fossil resources: a. Salvage of Fossils. The project paleontologist (or paleontological monitor) shall recover significant fossils following standard field procedures for collecting paleontological resources, as described by the SVP (2010). Typically, fossils can be safely salvaged quickly by a single paleontologist and not disrupt construction activity. In some cases, larger fossils (such as complete skeletons or large mammal fossils) require more extensive excavation and longer salvage periods. In this case the paleontologist shall have the authority to temporarily direct, divert or halt construction activity to ensure that the fossil(s) can be removed in a safe and timely manner. b. Preparation and Curation of Recovered Fossils. Once salvaged, significant fossils shall be identified to the lowest possible taxonomic level, prepared to a curation- ready condition, and curated in a scientific institution with a permanent paleontological collection (such as the University of California Museum of Paleontology), along with all pertinent field notes, photos, data, and maps. Fossils of undetermined significance at the time of collection may also warrant curation at the discretion of the project paleontologist. TRANSPORTATION 24. Prior to the issuance of each building permit, the construction contractor shall meet with the Public Works department to determine traffic management strategies to reduce, to the maximum extent feasible, traffic congestion and the effects of parking demand by construction workers during construction of this project. The construction contractor will develop a Construction Traffic Management Plan for review and approval by the Public Works department. The plan shall include at least the following items and requirements:  A set of comprehensive traffic control measures, including scheduling of major truck trips and deliveries to avoid peak traffic and pedestrian hours, detour signs if Introduction Phase 1B & Phase 2 Mitigation and Monitoring Plan 9 required, lane closure procedures, sidewalk closure procedures, signs, cones for drivers, and designated construction access routes.  Notification procedures for adjacent property owners and public safety personnel regarding when major deliveries, detours, and lane closures will occur.  Location of construction staging areas for materials, equipment, and vehicles (must be located on the project site).  Identification of haul routes for movement of construction vehicles that would minimize impacts on vehicular and pedestrian traffic, circulation and safety; and provision for monitoring surface streets used for haul routes so that any damage and debris attributable to the haul trucks can be identified and corrected by the project applicant.  Temporary construction fences to contain debris and material and to secure the site.  Provisions for removal of trash generated by project construction activity.  A process for responding to and tracking complaints pertaining to construction activity.  Provisions for monitoring surface streets used for truck routes so that any damage and debris attributable to the trucks can be identified and corrected. It is anticipated that this Construction Traffic Management Plan would be developed in the context of a larger Construction Management Plan, which would address other issues such as hours of construction onsite, limitations on noise and dust emissions, and other applicable items. 25. Subject to approval of the Public Works Director, the City shall incorporate improvements to the intersections of Dana Street/Nipomo Street and Monterey Street/Nipomo Street to enhance pedestrian safety and accessibility. The improvements shall be consistent with the City’s Circulation Element and Downtown Physical Concept Plan (2017) and shall balance the needs of each mode of use. At a minimum the project should consider:  High visibility crosswalk, or other intersection enhancements, with directional curb ramps across Nipomo Street from the northwest corner of Dana Street/Nipomo Street to the southwest corner of the parking structure.  High visibility crosswalk, or other intersection enhancements, with directional curb ramps from the southeast corner of Monterey Street/Nipomo Street across Nipomo Street.  Standard crosswalks, or other intersection enhancements, with directional curb ramps across Monterey Street and Dana Street where they intersect with Nipomo Street.  Reduce the curb radii on the southwest corner of Dana Street/Nipomo Street and the northeast corner of Monterey Street/Nipomo Street. City of San Luis Obispo Cultural Arts District Parking Structure Project 10 If the Community Development Director or hearing body determines that the above mitigation measures are ineffective or physically infeasible, they may add, delete, or modify the mitigation to meet the intent of the original measures. This MMP serves to comply, in part, with these mitigation measures by providing the standards and methods for monitoring to occur during project implementation. This document outlines the steps to be taken during unanticipated discoveries to mitigate potential significant impacts and provides methods for determining if and when monitoring may be reduced or eliminated during the course of project execution. Project Location and Description The project would remove of an existing 77-space surface parking lot and five existing residential structures, and construct a five-level parking structure, commercial space, and non-profit theater on five parcels, identified as Assessor’s Parcel Numbers (APNs) 002-412-001, 002-412-002, 002-412- 003, 002-412-004, 002-412-011, and 002-412-012. Main vehicular access to the structure would be from Palm Street, with secondary access from Nipomo Street. Vehicle access would not be provided from Monterey Street, but a direct pedestrian connection would be provided from the structure to Monterey Street. The parking structure’s maximum height would be 50 feet, excluding elevator towers. The maximum height of the commercial space would be 41 feet above existing grade. The theater would be a three-story structure with a gross floor area of roughly 23,841 square feet. The maximum height of the theater would be approximately 43 feet above existing grade. Section 2.5, Project Characteristics, of the 2018 Final EIR provides a detailed description of the project. The project site is depicted on the San Luis Obispo, California United States Geological Survey (USGS) 7.5-minute topographic map (Figure 1). The project area is bounded on the northwest by Palm Street, on the southwest by Nipomo Street, on the southeast by Monterey Street, and on the northeast by existing residential development. Environmental Resource Sensitivity AESTHETICS/VISUAL RESOURCES BACKGROUND The project site is located in the northwestern portion of the City’s designated Downtown Planning Area, adjacent to the Downtown Core. The majority of the project site and adjacent parcels to the east, south, and west are located within the City’s Downtown Historic District, which affects its visual context along Monterey and Nipomo Streets. Because of the project site’s location in a developed urban area, views of the project site are generally limited, with long-range views blocked by existing development or vegetation. The utility poles and wires that surround and cross over the site are another dominant visual feature of the project site. Elevations onsite range from 190 and 206 feet above mean sea level, and slopes are generally toward the northwest. AIR QUALITY BACKGROUND The South Coast Air Basin is in non-attainment for particulate matter (PM10), and the work area is located within 1,000 feet of sensitive receptors, including Mission College Preparatory Academy, existing residential units, and San Luis Obispo Children’s Museum). In accordance with the standards of the San Luis Obispo Air Pollution Control District CEQA Handbook standard mitigation measures Introduction Phase 1B & Phase 2 Mitigation and Monitoring Plan 11 Figure 1 Project Location Depicted on Topographic Background City of San Luis Obispo Cultural Arts District Parking Structure Project 12 are required during construction of the proposed utility improvements to reduce potential air quality impacts below applicable thresholds of significance. BIOLOGICAL BACKGROUND The project site is currently developed with a surface parking lot, one detached garage, and five residences, and is surrounded by urban land uses. The site does not provide suitable habitat for wildlife or sensitive plant or animal species, or any riparian habitat or other sensitive natural community identified in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service. However, trees on the site may support nesting birds protected under the Migratory Bird Treaty Act. The federal Migratory Bird Treaty Act (16 United States Code Section 703-711) protects all migratory birds, their nests and eggs against take, possession, or destruction. The MBTA was enacted in 1918 and is enforced by the U.S. Fish and Wildlife Service. Abiding by the MBTA requires that active nests be avoided. CULTURAL BACKGROUND The current project is located in the City of San Luis Obispo in close proximity to the Mission San Luis Obispo de Tolosa. In 2018, the City conducted an environmental impact report to determine the potential environmental impacts for the Palm Nipomo Parking Structure Project (City of San Luis Obispo 2018). As part of this analysis the City determined that the current project site was within an archaeologically sensitive area; however, all portions of the project site are developed with hardscaping and likely disturbed due to previous development. As such, a pedestrian survey or archaeological testing was infeasible. Given the project is within areas determined to be sensitive for archaeological resources and in accordance with the City’s Archaeological Resource Preservation Program Guidelines, the project required archaeological monitoring during project-related ground disturbing activities to mitigate potential impacts to cultural resources (City of San Luis Obispo 2018; City of San Luis Obispo 2009). GEOLOGY/SOILS BACKGROUND The site is relatively flat with no significant slopes on or immediately adjacent to the site, and is not subject to geological hazards including landslides and slope instability. The soils consist of alluvial sediments overlying bedrock, with a potential for expansion. The soils are comprised of laterally discontinuous zones of sandy clay, clay, and clayey gravel extending to depths of 25 to 40 feet below the surface. HAZARDS AND HAZARDOUS MATERIALS BACKGROUND A hazardous materials assessment for the project site was prepared in April 2011 by Earth Systems Pacific. Based on the results of a government database records search, the project site is not included on a list of hazardous material sites compiled pursuant to Government Code Section 65962.5. Archived documents at the City of San Luis Obispo Fire Department indicate that the previous use of the site as a welding/automobile repair shop contained several areas of oil-stained soil, a dry well, and a hydraulic lift. It is unknown whether or not soil sampling was conducted at the time of removal of these features and there is a potential that these or other undocumented buried features would be encountered during excavation. Furthermore, soil samples taken in 2005 at three and four feet indicate the presence of total petroleum hydrocarbons in quantities that exceed City of San Luis Obispo Fire Department action levels. Introduction Phase 1B & Phase 2 Mitigation and Monitoring Plan 13 HISTORICAL RESOURCES BACKGROUND The project site is partially located within the locally designated City of San Luis Obispo Downtown Historic District (historic district). The historical resources analysis conducted as part of the 2018 Final EIR indicated the presence of two properties in the project site that contribute to the historic district, 610 and 614 Monterey Street; 614 Monterey Street has also been found individually eligible for historical designation. Due to their designation as contributors to the historic district, and in the case of 614 Monterey Street, its local eligibility, these properties are considered historical resources under CEQA and would be demolished by the project. The 2018 Final EIR determined that, due to the demolition of 610 and 614 Monterey Street, impacts to historical resources as a result of the project would be significant and unavoidable. However, implementation of Mitigation Measure CR-1 is required to reduce impacts to historical resources to the greatest extent possible. In addition to the direct impacts discussed above, the 2018 Final EIR analyzed the potential indirect impacts to historical resources associated with the project, in particular to the locally-designated Hays-Lattimer Adobe and Harmony Creamery. The 2018 Final EIR concluded that although the project would negatively affect the historic integrity of the Hays-Lattimer Adobe and Harmony Creamery, both would retain their ability to convey their significance and therefore, indirect impacts would therefore be less than significant. Therefore, no mitigation additional mitigation is required. NOISE BACKGROUND The primary noise sources in the project area are from U.S. 101, light vehicle traffic along Palm Street, Nipomo Street, and Monterey Street, and occasional noise from the Mission College Preparatory school athletic field. Noise-sensitive receptors closest to the project site include the following: single- and multi-family residential units adjacent to the northeast project boundary; the San Luis Obispo Children’s Museum located across Monterey Street, approximately 50 feet from the southeast project boundary; the Reis Family Mortuary across Nipomo Street, approximately 50 feet from the western project boundary; residential suites on the second story of the mixed-use development on the south corner of the intersection of Dana Street and Nipomo Street, approximately 60 feet from the southern project boundary; single-family residences located across Nipomo Street, approximately 90 feet from the western project boundary; and the Mission College Preparatory school athletic field across Palm Street, approximately 75 feet from the northwest project boundary. PALEONTOLOGICAL BACKGROUND The project site and surrounding region was mapped at a scale of 1:24,000 by Dibblee and Minch (2004), who identified a single geologic unit, Quaternary alluvium, underlying the project site. A geotechnical report for the project found alluvium at the surface or below the artificial fill, reaching a depth of 25 to 44 feet (Earth Systems Pacific 2011). Early Holocene and Pleistocene alluvial sediments have produced scientifically significant fossils throughout California, including San Luis Obispo County, yielding taxa such as mammoth (Mammuthus), mastodon (Mammut), horse (Equus), bison (Bison), camel (Camelops), ground sloth (Paramylodon), and rodent (Sciuridae) (Jefferson et al. 1992; Jefferson 2010; Paleobiology Database 2022; University of California Museum of Paleontology 2022). City of San Luis Obispo Cultural Arts District Parking Structure Project 14 TRANSPORTATION BACKGROUND Regional access to the project site is provided by U.S. 101, located west and north of the study area, and Highway 1, which coincides with and is designated Santa Rosa Street (north of U.S. Highway 101) near the project site. All of the study area roadways are classified as Local Commercial streets in the City’s General Plan Circulation Element. Plan Check Requirements Phase 1B & Phase 2 Mitigation and Monitoring Plan 15 2 Plan Check Requirements The following outlines the mitigation requirements that shall be reflected on final plans and/or project specifications. 1. Prior to issuance of building permits the Community Development Director or other City compliance monitor shall confirm Architectural Review Committee review and approval of a comprehensive lighting plan consistent with the Municipal Code Night Sky Ordinance, and prepared using guidance and best practices endorsed by the International Dark Sky Association. The lighting plan shall include:  Identification of all types, sizes, and intensities of wall mounted building lights and landscape accent lighting  A photometric map  Shielding of point sources of all exterior lighting from offsite views  Directing light downward and cut-off fixtures or shields  Lumination from exterior lights at the lowest level allowed by public safety standards  Exterior lighting design that does not focus illumination onto exterior walls  No internal illumination of any signage visible from offsite 2. Prior to issuance of building permits the Community Development Director or other City compliance monitor shall review the final building plans to verify that roof and building materials are non-reflective, and are muted in hues consistent with standards in the Community Design Guidelines, Section 6.1-C. 3. Prior to issuance of grading permit the Community Development Director or other City compliance monitor shall review the final grading plans to verify the following air quality mitigation requirements are reflected in final plans or specifications (these requirements may be developed in the context of a larger Construction Management Plan): FUGITIVE DUST CONTROL REQUIREMENTS  Reduce the amount of the disturbed area where possible  Water trucks or sprinkler systems shall be used during construction in sufficient quantities to prevent airborne dust from leaving the site. Increased watering frequency shall be required whenever wind speeds exceed 15 mph. Reclaimed (non- potable) water shall be used whenever possible  All dirt stock pile areas shall be sprayed daily as needed  Permanent dust control measures identified in the approved project revegetation and landscape plans shall be implemented as soon as possible following completion of any soil disturbing activities City of San Luis Obispo Cultural Arts District Parking Structure Project 16  Exposed ground areas that are planned to be reworked at dates greater than one month after initial grading shall be sown with a fast germinating, non-invasive grass seed and watered until vegetation is established  All disturbed soil areas not subject to revegetation shall be stabilized using approved chemical soil binders, jute netting, or other methods approved in advance by the SLOAPCD  All roadways, driveways, sidewalks, etc. to be paved shall be completed as soon as possible after grading unless seeding or soil binders are used  Vehicle speed for all construction vehicles shall not exceed 15 miles per hour (mph) on any unpaved surface at the construction site  All trucks hauling dirt, sand, soil, or other loose materials are to be covered or shall maintain at least two feet of freeboard (minimum vertical distance between top of load and top of trailer) in accordance with California Vehicle Code Section 23114  Install wheel washers where vehicles enter and exit unpaved roads onto streets, or wash off trucks and equipment leaving the site  Sweep streets at the end of each day if visible soil material is carried onto adjacent paved roads. Water sweepers with reclaimed water shall be used where feasible  All of these fugitive dust mitigation measures shall be shown on grading and building plans  The contractor or builder shall designate a person or persons to monitor the fugitive dust emissions and enhance the implementation of the measures as necessary to minimize dust complaints, reduce visible emissions below 20 percent opacity, and to prevent transport of dust offsite. Their duties shall include holidays and weekend periods when work may not be in progress. The name and telephone number of such persons shall be provided to the SLOAPCD Compliance Division prior to the start of any grading, earthwork, or demolition. STANDARD CONTROL MEASURES FOR CONSTRUCTION EQUIPMENT  Maintain all construction equipment in proper tune according to manufacturer’s specifications  Fuel all off-road and portable diesel powered equipment with ARB certified motor vehicle diesel fuel (non-taxed version suitable for sue off-road)  Use diesel construction equipment meeting ARB’s Tier 2 certified engines or cleaner off-road heavy-duty diesel engines, and comply with the State Off-Road Regulation  Use on-road heavy-duty trucks that meet the ARB’s 2007 or cleaner certification standard for on-road heavy-duty diesel engines, and comply with the State On-Road Regulation  Construction or trucking companies with fleets that do not have engines in their fleet that meet the engine standards identified in the above two measures (e.g., captive or NOX exempt area fleets) may be eligible by proving alternative compliance Plan Check Requirements Phase 1B & Phase 2 Mitigation and Monitoring Plan 17  All on- and off-road diesel equipment shall not idle for more than 5 minutes. Signs shall be posted in the designated queuing areas and or job sites to remind drivers and operators of the 5 minute idling limit  Diesel idling within 1,000 feet of sensitive receptors is not permitted  Staging and queuing areas shall not be located within 1,000 feet of sensitive receptors  Electrify equipment when feasible  Substitute gasoline-powered in place of diesel-powered equipment, where feasible  Use alternatively fueled construction equipment onsite where feasible, such as compressed natural gas, liquefied natural gas, propane or biodiesel BEST AVAILABLE CONTROL TECHNOLOGY (BACT) FOR CONSTRUCTION EQUIPMENT  Further reduce emissions by expanding use of Tier 3 and Tier 4 off-road and 2010 on-road compliant engines where feasible  Repower equipment with the cleanest engines available  Install California Verified Diesel Emission Control Strategies, such as level 2 diesel particulate filters (these strategies are listed at: www.arb.ca.gov/diesel/verdev/vt/cvt.htm) ARCHITECTURAL COATING  Low or no VOC-emission paint shall be used with levels of 50 g/L or less 4. Prior to issuance of grading and building permits the Community Development Director or other City compliance monitor shall review and approve a design-level geotechnical report that identifies the most appropriate geotechnical improvements to onsite soils, the foundation, and parking structure to minimize expansive soil hazards. 5. Prior to issuance of grading and building permits the Community Development Director or other City compliance monitor shall review the grading and building final plans to verify all geotechnical improvements to onsite soils, the foundation, and parking structure identified in the approved design-level geotechnical report are reflected on final grading and building plans. 6. Prior to issuance of grading permit the Community Development Director or other City compliance monitor shall review and approve a work plan for soil sample testing for site associated potential constituents of concern including metals, polycyclic aromatic hydrocarbons, and total petroleum hydrocarbons. The work plan shall address the sampling protocols to be followed, the number of samples to be taken, and the chemical analysis required. Upon City of San Luis Obispo approval, the work plan shall be implemented and the results of the soil sampling shall be forwarded to the City of San Luis Obispo. The City shall review the data to determine if any additional investigation or remedial activities are deemed necessary. No work shall resume in that area until the lead local regulatory agency has provided written authorization that the area does not warrant any additional action. If concentrations of contaminants warrant remediation or other special handling, contaminated materials shall be remediated either prior to or concurrent with construction. Impacted soil not requiring remediation would be excavated, stored, transported, and disposed City of San Luis Obispo Cultural Arts District Parking Structure Project 18 following a lead oversight agency approved soil management plan. If remediation of soil impacts beyond the planned area of excavation is warranted, a remedial action plan may be required. All necessary reports, regulations and permits shall be followed to achieve cleanup of the site. The contaminated materials shall be properly managed under the supervision of an environmental consultant licensed to oversee such remediation and under the direction of the lead oversight agency (likely San Luis Obispo County Public Health Environmental Health Services Division). Permitting for the excavation of contaminated soil may also be required from the San Luis Obispo Air Pollution Control District. The remediation or soil management program shall also be approved by the San Luis Obispo City Fire Department. All proper waste handling and disposal procedures shall be followed. Upon completion of the remediation or soil management activities, the environmental consultant shall prepare a report summarizing the project, the remediation approach or soil management implemented, and the analytical results, including all waste disposal or treatment manifests. The remediation or management of impacted soil can be performed concurrently with excavation for project construction. HAZWOPER certified workers may be required. 7. Prior to issuance of demolition permits the Community Development Director or other City compliance monitor shall review and approve archival historic building documentation packages for both 610 and 614 Monterey Street that comply with the Secretary of the Interior’s Standards for Architectural and Engineering Documentation (NPS 1990). The documentation shall follow the Historic American Building Survey (HABS) Level III requirements and include high-quality digital photographic recordation of the buildings and their overall setting, detailed historic narrative report, and compilation of historic research. The documentation shall be completed by a qualified architectural historian or historian who meets the Secretary of the Interior’s Professional Qualification Standards for History and/or Architectural History (NPS 1983). Individual archival documentation packages shall be completed both properties and offered as donated material to the San Luis Obispo Library and the History Center of San Luis Obispo County, where it would be available to local researchers. Completion of this mitigation measure shall be monitored and enforced by the lead agency. 8. Prior to issuance of grading and building permits the Public Works Director or other City compliance monitor shall review and approve a construction vehicle and hauling route that shall be used for all construction vehicles and hauling trips during the duration of construction. (This measure may be developed in the context of a larger Construction Management Plan.) 9. Prior to issuance of grading and building permits the Public Works Director or other City compliance monitor shall review the final grading and building plans to verify the following noise mitigation requirements are reflected in final plans or specifications (these requirements may be developed in the context of a larger Construction Management Plan): CONSTRUCTION WORK HOURS  Except for emergency repair of public service utilities or where an exception is issued by the Community Development Department, no operation of tools or equipment used in construction, drilling, repair, alteration, or demolition work shall occur daily between the hours of 7:00 PM and 7:00 AM, or anytime on Sundays, holidays, or after sunset, where that operation creates a noise disturbance that exceeds 75 dBA for single family residential, 80 dBA for multi-family residential, and 85 dBA for mixed residential/commercial land uses across a residential or commercial property line for a maximum of 10 days. For construction activities Plan Check Requirements Phase 1B & Phase 2 Mitigation and Monitoring Plan 19 lasting more than 10 days, noise from construction equipment shall not exceed 60 dBA for single family residential, 65 dBA for multi-family residential, and 70 dBA for mixed residential/commercial land uses across a residential or commercial property line. CONSTRUCTION EQUIPMENT NOISE MANAGEMENT TECHNIQUES  For all construction activity at the project site, noise attenuation techniques shall be employed to reduce noise levels to extent feasible in accordance with the City of San Luis Obispo Municipal Code, Title 9, Chapter 9.12 (Noise Control). Such techniques shall include:  Sound blankets on noise-generating equipment Stationary construction equipment that generates noise levels above 60 dBA at the project boundaries shall be shielded with barriers that meet a sound transmission class (a rating of how well noise barriers attenuate sound) of 25.  All diesel equipment shall be operated with closed engine doors and shall be equipped with factory-recommended mufflers  For stationary equipment, the applicant shall designate equipment areas with appropriate acoustic shielding on building and grading plans. Equipment and shielding shall be installed prior to construction and remain in the designated location throughout construction activities  Electrical power shall be used to power air compressors and similar power tools  The movement of construction-related vehicles, with the exception of passenger vehicles, along roadways adjacent to sensitive receptors shall be limited to the hours between 7:00 AM and 7:00 PM, Monday through Saturday and no movement of heavy equipment shall occur on Sundays or official holidays (e.g., Thanksgiving, Labor Day)  Temporary sound barriers shall be constructed between construction sites and affected uses 10. Prior to issuance of grading permits the Public Works Director or other City compliance monitor shall review and coordinate the construction schedules of any other projects within 300 feet of the project to ensure that construction schedules do not overlap. 11. Prior to issuance of zoning clearance the Community Development Director or other City compliance monitor shall review and approve proof that the contractor has mailed notices to residents and business operators at properties within 300 feet of the project site of proposed construction timelines and noise complaint procedures to minimize potential annoyance related to construction noise. 12. Prior to issuance of each building permit the Public Works Director or other City compliance monitor shall review and approve a Construction Traffic Management Plan that identifies traffic management strategies to reduce, to the maximum extent feasible, traffic congestion and the effects of parking demand by construction workers during construction of this project. (This measure may be developed in the context of a larger Construction Management Plan.) The Construction Traffic Management Plan shall include: City of San Luis Obispo Cultural Arts District Parking Structure Project 20  A set of comprehensive traffic control measures, including scheduling of major truck trips and deliveries to avoid peak traffic and pedestrian hours, detour signs if required, lane closure procedures, sidewalk closure procedures, signs, cones for drivers, and designated construction access routes.  Notification procedures for adjacent property owners and public safety personnel regarding when major deliveries, detours, and lane closures will occur.  Location of construction staging areas for materials, equipment, and vehicles (must be located on the project site).  Identification of haul routes for movement of construction vehicles that would minimize impacts on vehicular and pedestrian traffic, circulation and safety; and provision for monitoring surface streets used for haul routes so that any damage and debris attributable to the haul trucks can be identified and corrected by the project applicant.  Temporary construction fences to contain debris and material and to secure the site.  Provisions for removal of trash generated by project construction activity.  A process for responding to and tracking complaints pertaining to construction activity.  Provisions for monitoring surface streets used for truck routes so that any damage and debris attributable to the trucks can be identified and corrected. 13. Prior to issuance of grading and building permits the Public Works Director or other City compliance monitor shall review the grading and building final plans to verify required improvements to the intersections of Dana Street/Nipomo Street and Monterey Street/Nipomo Street are reflected on final grading and building plans. The required improvements shall be consistent with the City’s Circulation Element and Downtown Physical Concept Plan (2017) and shall balance the needs of pedestrian, bicycle, and vehicle modes of use. At a minimum the required improvements shall include:  High visibility crosswalk, or other intersection enhancements, with directional curb ramps across Nipomo Street from the northwest corner of Dana Street/Nipomo Street to the southwest corner of the parking structure.  High visibility crosswalk, or other intersection enhancements, with directional curb ramps from the southeast corner of Monterey Street/Nipomo Street across Nipomo Street.  Standard crosswalks, or other intersection enhancements, with directional curb ramps across Monterey Street and Dana Street where they intersect with Nipomo Street.  Reduce the curb radii on the southwest corner of Dana Street/Nipomo Street and the northeast corner of Monterey Street/Nipomo Street. Additional plans requiring review and approval by the Community Development Director prior to Encroachment Permit issuance include an archaeological monitoring plan consistent with the requirements of the City’s Archaeological Resource Preservation Guidelines, which is incorporated in this MMP as Section 3, Monitoring Requirements. Monitoring Requirements Phase 1B & Phase 2 Mitigation and Monitoring Plan 21 3 Monitoring Requirements AIR QUALITY MITIGATION MONITORING REQUIREMENTS Periodically during construction (minimum once per month) the City compliance monitor shell field verify compliance with the Fugitive Dust Control Requirements, Standard Control Measures for Construction Equipment, BACT for Construction Equipment, and Architectural Coating mitigation requirements reflected in final plans and specifications. Periodic field monitoring shall continue until the City compliance monitor has determined that the specific mitigation requirements have been fully met and/or construction is complete. BIOLOGICAL RESOURCES/NESTING BIRD MITIGATION MONITORING REQUIREMENTS If construction activities related to the project, including, but not limited to, vegetation removal, ground disturbance, and construction and demolition, must begin between February through August, prior to initiation of construction activities the City compliance monitor shall ensure a qualified biologist completes a pre-construction nesting bird survey no more than 3 days prior to initiation of ground disturbance and vegetation removal activities. The nesting bird pre-construction survey shall be conducted within the Project Boundary, including a 300-foot buffer (500-foot for raptors), on foot, and within inaccessible areas (i.e., private lands) afar using binoculars to the extent practical. If nests are found, an avoidance buffer (which is dependent upon the species, the proposed work activity, and existing disturbances associated with land uses outside of the site) shall be determined and demarcated with bright orange construction fencing, flagging, construction lathe, or other means to mark the boundary by the qualified biologist under the supervision of the City compliance monitor. The City compliance monitor shall notify all construction personnel as to the existence of the buffer zone and to avoid entering the buffer zone during the nesting season. No ground- disturbing activities shall occur within this buffer until the qualified biologist has confirmed that breeding/nesting is completed and the young have fledged the nest. Encroachment into the buffer shall occur only at the discretion of the qualified biologist. CULTURAL/ARCHAEOLOGICAL RESOURCES MITIGATION MONITORING REQUIREMENTS In compliance with the 2018 Final EIR archaeological monitoring is required for all project-related ground disturbance . All archaeological monitoring efforts shall be conducted under the direction of an archaeologist meeting the Secretary of the Interior’s Professional Qualifications Standards for archaeology (National Park Service [NPS] 1983; hereafter, Qualified Archaeologist). Archaeological monitor(s) shall be onsite during all project-related earthmoving activities. Earthmoving activities include, but are not limited to, vegetation removal, grading, excavation, trenching, and all other excavation activities. During monitoring, the monitors shall examine the work areas for the presence of prehistoric artifacts (e.g., chipped stone tools and production debris, stone milling tools, ceramics), historic-period debris (e.g., metal, glass, ceramics), and/or soil discoloration that might indicate the presence of a cultural midden. Each monitor shall maintain a daily log documenting ground disturbing activity, work locations, description and provenience of any archaeological discoveries (if any), and any necessary action items for monitoring City of San Luis Obispo Cultural Arts District Parking Structure Project 22 In the event of a find, the archaeological monitors retain the authority to temporarily halt and redirect work until the resource(s) have been evaluated and the area cleared for construction activities to recommence. If the archaeological resource is prehistoric in nature, a local Native American group will be contacted to and given the opportunity consult with the City regarding the find and provide recommendation. A Native American monitor will be retained for the remainder of earth disturbing activities should a prehistoric resource be found during construction. Protocols in the case of a find are discussed in greater detail in Section 4 below. Monitoring shall continue until the Qualified Archaeologist, in coordination with the City (and Native American monitor if present), has determined that the monitoring may be reduced or eliminated. Reasons for reducing or eliminating monitoring may include but not be limited to observed field conditions such as: soils that appear to lack any organic material (sterile), soils that are determined to be not native to the area, areas found to be heavily disturbed by modern activities, or the encounter of undisturbed hardpan/bedrock type soil conditions or depth of excavation (i.e., exceeds a depth where cultural resources may reasonably be expected). When/if culturally sterile soils are encountered during monitoring, the Qualified Archaeologist will provide a written recommendation (via email or other method acceptable to the City) to reduce or eliminate the monitoring effort. Should the City accept the recommendation, the reduction or elimination will commence immediately upon approval. NOISE MITIGATION MONITORING REQUIREMENTS Prior to initiation of grading and construction activities the City compliance monitor shall field verify signs are in place directing noise-related complaints to the City’s Community Development Department. Periodically during construction (minimum once per week) the City compliance monitor shall field verify compliance with signage requirements, in addition to the Construction Work Hours and Construction Equipment Noise Management Techniques mitigation requirements reflected in final plans and specifications. Periodic field monitoring shall continue until the City compliance monitor has determined that the specific mitigation requirements have been fully met and/or construction is complete. PALEONTOLOGICAL RESOURCES MITIGATION MONITORING REQUIREMENTS In compliance with the 2018 Final EIR, paleontological monitoring is required during initial ground disturbance of sediments deeper than 10 feet below surface, with the project paleontologist (defined as an individual meeting the standards of a Qualified Professional Paleontologist per SVP [2010]) modifying the monitoring schedule as appropriate (City of San Luis Obispo 2007). Excavations that are less than 10 feet below the surface or are in previously disturbed sediments, do not require monitoring. Monitoring will be conducted by a paleontological monitor (defined as an individual meeting the standards of a Qualified Paleontological Monitor per the standards of the SVP [2010]). Monitoring will consist of the visual inspection of excavated or graded areas, trench and pit sidewalls, and spoils piles. Paleontological monitoring is documented in daily electronic monitoring logs, which at a minimum, include a description of areas monitored, monitor name(s), a summary of monitoring activities, and a description of the disturbed geologic units within a stratigraphic context. In paleontologically sensitive areas, or in adjacent areas that can provide context for the geology and paleontology, Monitoring Requirements Phase 1B & Phase 2 Mitigation and Monitoring Plan 23 outcrops and cut exposures will be examined and observed geologic features will be recorded when/if available. The paleontological monitor will be equipped with hand tools and supplies (e.g., geological hammer, shovel, pick, chisels, whisk broom, buckets, specimen bags, field notebook, forms, pens, markers, and glue) to allow for the rapid salvage of fossil remains. At all times, the paleontological monitor will wear the appropriate personal protective equipment in compliance with the on-site contractor PPE work rules, including a hard hat, heavy footwear, sleeved shirt, long pants, safety glasses, and a high-visibility safety vest. In the event of a find, the paleontological monitor retains the authority to temporarily halt and redirect work until the resource(s) have been evaluated and the area cleared for construction activities to recommence. Monitoring shall continue until the project paleontologist, in coordination with the City, has determined that the monitoring may be reduced or eliminated. Reasons for reducing or eliminating monitoring may include but not be limited to observed field conditions such as: soils that appear to lack any potential to encounter paleontological resources (sterile), soils that are determined to be not native to the area, or areas found to be heavily disturbed by modern activities. When/if paleontologically sterile soils are encountered during monitoring, the project paleontologist will provide a written recommendation (via email or other method acceptable to the City) to reduce or eliminate the monitoring effort. Should the City accept the recommendation, the reduction or elimination will commence immediately upon approval. If the construction schedule changes or excavations begin in a new area, the project paleontologist may reinstate paleontological monitoring. City of San Luis Obispo Cultural Arts District Parking Structure Project 24 4 Archaeological Testing Requirements In compliance with Mitigation Measure 9, “fieldwork after the removal of pavement consisting of a Phase I inventory, Phase II Testing and Evaluation, and Phase III Data Recovery aimed at locating archaeological remains, evaluating their significance and integrity, and mitigating impacts through data recovery excavation; the completion of special studies, such as faunal analysis, if appropriate” is required. As part of mitigation, an extended Phase I of CA-SLO-2431H shall be conducted. If CA-SLO-2431H contains subsurface cultural materials, the resource shall be evaluated for significance and eligibility for listing in the CRHR through the implementation of a Phase II evaluation program. Phase II evaluations shall include any necessary archival research to identify significant historical associations as well as mapping of surface artifacts, collection of functionally or temporally diagnostic tools and debris, and excavation of a sample of the cultural deposit to characterize the nature of the sites, define the artifact and feature contents, determine horizontal boundaries and depth below surface, and retrieve representative samples of artifacts and other remains. If the resource is found eligible for listing on the NRHP, CRHR, or local register, a Phase III data recovery program shall be conducted to mitigate the impacts to the resource if avoidance remains infeasible. A data recovery program shall include the development of a site-specific research design, testing program, laboratory analysis, and reporting with the intention of extracting data from the resource to the point of redundancy. Cultural materials collected from the sites shall be processed and analyzed in the laboratory according to standard archaeological procedures. The age of archaeological resources shall be determined using radiocarbon dating or other appropriate procedures; metal, ceramic, faunal remains, and other cultural materials shall be identified and analyzed according to current professional standards. The significance of the resource shall be evaluated according to the criteria of the CRHR. The results of the investigations shall be presented in a technical report following the standards of the California Office of Historic Preservation publication “Archaeological Resource Management Reports: Recommended Content and Format (1990 or latest edition).” Any necessary archaeological data recovery excavation shall be carried out by a Registered Professional Archaeologist according to a research design reviewed and approved by the City, as the lead agency, and prepared in advance of fieldwork and using appropriate archaeological field and laboratory methods consistent with the California Office of Historic Preservation Planning Bulletin 5 (1991), Guidelines for Archaeological Research Design, or the latest edition thereof. Upon completion of the work, all artifacts, other cultural remains, records, photographs, and other documentation shall be curated an appropriate curation facility to be determined on a case-by-case basis in consultation with the City and interested parties (e.g., historical organizations). Resource Discovery Plan Phase 1B & Phase 2 Mitigation and Monitoring Plan 25 5 Resource Discovery Plan The following outlines the procedures to be followed in the inadvertent discovery of cultural resources, including human remains. Discovery of Archaeological Resources The procedure for dealing appropriately with unanticipated resources encountered during construction will include, but not be limited to, the following: For the discovery of previously unknown archaeological resources: The archaeological monitor will divert construction activity in the immediate vicinity of the find by signaling to construction staff and notifying the designated construction foreman. The monitor will report the discovery to Rincon’s qualified archaeologist and the City’s construction inspector. The “immediate vicinity” will vary depending upon specific circumstances. If the archaeological resource is prehistoric in nature, a local Native American group will consult about the find, and a Native American monitor will be retained for the remainder of earth disturbing activities. Upon completion of the above notification, the archaeological monitor will determine the nature and extent of the cultural remains and make a preliminary assessment of their integrity and potential importance. If the archaeological monitor determines that the discovery is not cultural, or is an isolated artifact, the monitor will immediately notify the qualified archaeologist and construction manager that activities may resume as soon as the archaeological item(s) has been properly photographed and recorded. If potentially significant cultural features, artifact concentrations, or intact deposits are discovered, the archaeological monitor will divert construction activity in the immediate vicinity and report the discovery to the qualified archaeologist and the City’s construction inspector so that appropriate notifications to the City can be issued. A temporary Construction Exclusion Zone (CEZ), consisting of lath and flagging tape, will be erected around the discovery. The size of the CEZ may be reduced or enlarged as the significance and extent of the find is determined and treatment measures are implemented. For the purposes of the current effort, a minimum 100-foot radius shall be established for any remains that are suspected of being human (see Section 4.2 for further direction related to the discovery of human remains). Isolated artifacts shall be marked by an orange cone or flagging with no additional radius. In the case of the discovery of an intact archaeological site, a radius of 100 feet may be established so that the resource may be evaluated. This radius may be reduced or expanded based on the nature of the resource and the area required for archaeologists to work safely. The CEZ will not be removed until the potentially significant cultural resource has been evaluated to assess whether it is classified as a “historical resource,” pursuant to the California Environmental Quality Act (CCR, § 15064.5[a]). To minimize construction delays, if a potentially significant cultural resource is discovered during monitoring, Rincon will immediately contact the City to formulate a plan for further treatment. Cultural resources identified within the site shall be recorded according to current archaeological standards. This shall include the preparation of California Department of Parks and Recreation (DPR) Series 523 forms. Pertinent information concerning the resource(s) shall be recorded, including the site type, components, size, and provenience. Upon completion, the Series 523 forms shall be City of San Luis Obispo Cultural Arts District Parking Structure Project 26 submitted to the California Historical Resources Information System’s Central Coast Information Center, located at the Santa Barbra Museum of Natural History for primary number and trinomial designation. Final copies of the Series 523 forms shall be included in the final monitoring report. In addition to the Series 523 forms, a final compliance report shall be prepared as presented in Section 5.1 below. Discovery of Human Remains There is a possibility that the project’s construction-related activities may encounter human burials or cremations. Therefore, if the project’s construction-related activities find potential human bone, ground-disturbing activities in the area of the discovery shall immediately be halted or redirected while a temporary CEZ surrounding the site of discovery is established to allow for further examination and treatment of the find. The qualified archaeologist shall also immediately notify the City and the San Luis Obispo County Coroner’s Office by telephone, pursuant to Health and Safety Code 7050.5. By law, the Coroner will determine within 48 hours of being notified if the remains are subject to his or her authority. If the human remains are determined to be prehistoric, the coroner will notify the Native American Heritage Commission, which will determine and notify a most likely descendant (MLD). The MLD shall complete the inspection of the site within 48 hours of being granted access and provide recommendations for the treatment of any human remains and artifacts associated with Native American burials. Discovery of Paleontological Resources In the event of a paleontological resource discovery, all work in the immediate vicinity of the discovery will be halted and a 50-foot buffer will be delineated around the discovery, to create a construction equipment exclusion zone to allow the paleontological monitor a safe zone to work within. The project paleontologist will determine if the discovery has fossil(s) that have the potential to be significant, and if they do, they shall recover the fossils following standard field procedures. Most fossils can be safely salvaged quickly by a single paleontological monitor and not disrupt construction activity. In some cases, larger fossils (such as complete skeletons or large mammal fossils) require more extensive excavation and longer salvage periods. During recovery of potentially significant fossils, the paleontological monitor will document all identification and recovery efforts, including assigning a unique field number to each fossil specimen, fossil locality, or sediment sample, and record the field number and associated specimen/sample data (identification by taxon and element, sample size, etc.), corresponding geologic data (particularly lithology, stratigraphic unit, stratigraphic level within the unit, inferred age, etc.), and geographic site data (UTM coordinate location, elevation, etc.) in their field notes. Reporting of Monitoring Results and Curation Finds Phase 1B & Phase 2 Mitigation and Monitoring Plan 27 6 Reporting of Monitoring Results and Curation Finds Reporting of Archaeological Monitoring Results At the conclusion of the construction activities requiring archeological monitoring, an archaeological monitoring report shall be prepared under the direction of the qualified archaeologist. The monitoring report will outline the methodology of archaeological mitigation at the project site, describe the construction activity and duration, and present the results of the monitoring. The level of effort to complete a monitoring report is dependent on the number of resources recovered during monitoring activities. Should the monitoring effort be negative for the identification of cultural resources, a negative letter report shall be prepared. The letter report shall include, at a minimum, the dates of monitoring, activities conducted, personnel, and field logs. If archaeological materials are recovered, a comprehensive technical report will also be required to describe and interpret findings and data. The technical report shall be prepared in accordance with the Archaeological Resources Management Reports (ARMR): Recommended Contents and Format. If required, the ARMR-format report shall include a complete description of resources identified during monitoring, treatment of those resources, National Register of Historic Places (NRHP) eligibility recommendations, site records, and site maps. The final version of the monitoring report shall be submitted to the City and the Central Coast Information Center of the California Historical Resources Information Center. Curation of Archaeological Finds Recovered archaeological finds not associated with burials will be temporarily stored by Rincon until either an appropriate on-site reburial location or repository is agreed upon by the City, other interested Native American groups, and/or MLD. If necessary, curation preparation will include creating acid-free labels and tags, placing artifacts in archival quality bags and boxes, and submitting a hard copy of the report on acid-free paper with and the artifacts to the selected curation facility. Permanent treatment of human remains and associated funerary items shall be determined by the MLD in coordination with the City. Reporting of Paleontological Monitoring Results At the conclusion of construction activities requiring paleontological monitoring, a paleontological monitoring report shall be prepared under the direction of the project paleontologist. The monitoring report will present the paleontological mitigation and the methods by which it was satisfied within the project site. The level of effort to complete a monitoring report is dependent on the nature of the resources recovered during construction. Should the monitoring effort be negative for the identification of paleontological resources, a negative letter report shall be prepared. The letter report shall include, at a minimum, the dates of monitoring, activities conducted, personnel, and field logs. If paleontological resources are recovered, a comprehensive technical report will be City of San Luis Obispo Cultural Arts District Parking Structure Project 28 required to describe and interpret findings and data consistent with the requirements of the SVP (2010). Curation of Paleontological Resources All paleontological resources and data recovered from the project site shall be curated together at the Santa Barbara Museum of Natural History. All collected fossil resources are the property of the City and shall be provided to the Santa Barbara Museum of Natural History along with a deed of gift. Curation would require placement of fossils into archival specimen trays with labels containing relevant curatorial information. A copy of the Project’s curation agreement with the Santa Barbara Museum of Natural History is attached as Appendix 1. References Phase 1B & Phase 2 Mitigation and Monitoring Plan 29 7 References National Park Service 1983 Archaeology and Historic Preservation: Secretary of the Interior’s Standards and Guidelines. Washington, DC. https://www.nps.gov/history/local- law/arch_stnds_0.htm, accessed April 1, 2022. City of San Luis Obispo 2018 Final Environmental Impact Report and Mitigation Monitoring and Reporting Program for the Palm Nipomo Parking Structure Project. On file with the City of San Luis Obispo City of San Luis Obispo 2009 Archaeological Resource Preservation Program Guidelines. https://www.slocity.org/home/showpublisheddocument/4140/6354976496520000 00, accessed May 27, 2022 Earth Systems Pacific 2011 Geotechnical, Geologic, and Hazardous Materials Assessment Report, Palm and Nipomo Parking Structure, Palm and Nipomo Streets, San Luis Obispo, California. April 21, 2011. Jefferson, G.T. 2010 A catalogue of late Quaternary vertebrates from California. Natural History Museum of Los Angeles County Technical Report. Volume 7, pp. 5-172. Jefferson, G.T., H.L. Fierstine, J.R. Wesling, and T.-L. Ku. 1992 Pleistocene terrestrial vertebrates from near Point San Luis, and other localities in San Luis Obispo County, California, Bulletin of the Southern California Academy of Sciences. Volume 91, pp. 26-38. Paleobiology Database 2022 The Paleobiology Database, http://paleobiodb.org/ (accessed June 2022) Society of Vertebrate Paleontology (SVP) 2010 Standard Procedures for the Assessment and Mitigation of Adverse Impacts to Paleontological Resources. Society of Vertebrate Paleontology Impact Mitigation Guidelines Revision Committee. https://vertpaleo.org/wp- content/uploads/2021/01/SVP_Impact_Mitigation_Guidelines-1.pdf. University of California Museum of Paleontology 2022 UCMP online database specimen search portal, http://ucmpdb.berkeley.edu/ (accessed June 2022) Appendix 1 CURATION AGREEMENT WITH THE SANTA BARBARA MUSEUM OF NATURAL HISTORY June 21st, 2022 Zachary Lerma Rincon Consultants 213-788-4842 x4001 Subject: Repository agreement for acceptance of fossils from San Luis Obispo Cultural Arts Parking Project (22-12836) from the City of San Luis Obispo Dear Zachary, This letter serves as confirmation of the conditions regarding acceptance of the fossil material from the San Luis Obispo Cultural Arts Parking Project (22-12836) into the Earth Science Collection at the Santa Barbara Museum of Natural History (SBMNH). The SBMNH actively curates and provides a safe repository for specimens using contemporary methods for preserving fossils, including maintaining microenvironments in environmentally-controlled collections ranges, maintaining a digital database that archives all contextual data associated with each specimen, and maintaining a fossil preparation laboratory to repair and conserve fossils. The SBMNH is willing to consider accepting the collection(s) if all of the following conditions are met:  All collections must be accompanied by deed-of-gift and transfer of ownership documentation giving free and clear title of the collection to SBMNH.  Material from government lands must be accompanied by a copy of the official collecting permit.  All localities must be described in detail, including a precise description of the geographic location with GPS coordinates (stating datum used), lithology, stratigraphy (including unit designation), relative/absolute ages, and depositional environment if known.  All localities must be plotted on standard USGS topographic or geologic maps and located within Santa Barbara, Ventura, or San Luis Obispo counties. In certain situations, collections derived from localities outside of those counties may be accepted on a case-by-case basis with prior approval from the Earth Science Curator.  All collections must include a specimen catalog that clearly correlates physical specimens to locality and preparation data.  All collections must include printed and digital copies of final reports, any field notes, environmental impact reports, maps, charts, photographs, and other documentation as appropriate. All records must include site number and accession number.  All specimens must be fully stabilized and prepared. Specimens must be accompanied by notes on preparation methods, including consolidants and tools used.  All specimens must be identified to the lowest taxonomic level possible.  Larger specimens (e.g., mammoth limb bones) must be fully supported in archival cradles (field jackets are not acceptable).  If the collection is relatively large, it must be accompanied by the same specimen cabinets, drawers, and archival-quality trays used by SBMNH. Confer with the Earth Science Curator for estimated costs. Our estimated costs for curation, cataloging, and labeling of specimens are $20/locality and $12/specimen. For invertebrates and microfauna that are from the same locality and taxon, cataloging as lots is acceptable and counted as a single specimen. The estimated costs of permanent storage, including maintenance, is $300 per cubic foot of fully prepared fossils. Sincerely, Jonathan M. Hoffman, Ph.D. Dibblee Curator of Earth Science Vertebrate Zoology Department (805) 682-4711 ext. 157 jhoffman@sbnature2.org 158 Wooten, Eric From:Ryan Stefanek <rstefanek@kitchell.com> Sent:Wednesday, July 19, 2023 3:39 PM To:Kacsinta, Madeline Cc:Tally Perry Subject:RE: Addendum 4 - Soils Attachments:Addendum 4_CADPS (002) Rincon revisions 071923.docx; SLO Cultural Arts CM Contract-FE.pdf Hey Madeline, See aƩached for Rincon for comments and marked up map. They appear to be inline with what we noted but worth taking a look. Let me know if you have any quesƟons! Thanks, Ryan Stefanek, Project Manager I Kitchell CEM 1540 Marsh St. Suite 150 San Luis Obispo, CA 93401 Cell: 805-674-6598 | Direct: 916-713-6975 Follow us: Facebook | Twitter | LinkedIn | KitchellProgress.com From: Ryan Stefanek Sent: Wednesday, July 19, 2023 1:51 PM To: Kacsinta, Madeline <MKacsint@slocity.org> Cc: Tally Perry <tperry@kitchell.com> Subject: RE: Addendum 4 - Soils Awesome! I am sƟll waiƟng on Rincon’s informaƟon and we will share/review to ensure it is inline with the teams understanding. Thanks, Ryan Stefanek, Project Manager I Kitchell CEM 1540 Marsh St. Suite 150 San Luis Obispo, CA 93401 Cell: 805-674-6598 | Direct: 916-713-6975 Follow us: Facebook | Twitter | LinkedIn | KitchellProgress.com From: Kacsinta, Madeline <MKacsint@slocity.org> Sent: Wednesday, July 19, 2023 1:39 PM To: Ryan Stefanek <rstefanek@kitchell.com> 159 Cc: Tally Perry <tperry@kitchell.com> Subject: RE: Addendum 4 - Soils EXTERNAL EMAIL Thank you for your quick response on this! Addendum 3 is out! Madeline Kacsinta Engineer III Public Works 919 Palm, San Luis Obispo, CA 93401-3218 E MKacsint@slocity.org T 805.781.7094 slocity.org Stay connected with the City by signing up for e-notifications From: Ryan Stefanek <rstefanek@kitchell.com> Sent: Wednesday, July 19, 2023 11:47 AM To: Kacsinta, Madeline <MKacsint@slocity.org> Cc: Tally Perry <tperry@kitchell.com> Subject: RE: Addendum 4 - Soils Hey Madeline, As discussed, see aƩached Addendum 4 with comments from Kitchell. Also aƩached are the redlined map from Rincon as well as the soils management plan Thanks, Ryan Stefanek, Project Manager I Kitchell CEM 1540 Marsh St. Suite 150 San Luis Obispo, CA 93401 Cell: 805-674-6598 | Direct: 916-713-6975 Follow us: Facebook | Twitter | LinkedIn | KitchellProgress.com From: Kacsinta, Madeline <MKacsint@slocity.org> Sent: Wednesday, July 19, 2023 8:22 AM To: Ryan Stefanek <rstefanek@kitchell.com> Cc: Tally Perry <tperry@kitchell.com> Subject: RE: Addendum 4 - Soils EXTERNAL EMAIL 160 Thank you! I have a meeting with the design team at 9am, and them am meeting with Brian to push out addendum 3 today. I have this in as Addendum 4, which could give us one more day, but if we can get it in Addendum 3, that would be great. Madeline Kacsinta Engineer III Public Works 919 Palm, San Luis Obispo, CA 93401-3218 E MKacsint@slocity.org T 805.781.7094 slocity.org Stay connected with the City by signing up for e-notifications From: Ryan Stefanek <rstefanek@kitchell.com> Sent: Wednesday, July 19, 2023 8:19 AM To: Kacsinta, Madeline <MKacsint@slocity.org> Cc: Tally Perry <tperry@kitchell.com> Subject: RE: Addendum 4 - Soils This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Hi Madeline, Understood and we will prioriƟze this. We spoke to Rincon yesterday and they are trying to find a Ɵme slot today to meet. If not we will at least ask them to get any feedback on your document. We will keep you updated. Thanks, Ryan Stefanek, Project Manager I Kitchell CEM 1540 Marsh St. Suite 150 San Luis Obispo, CA 93401 Cell: 805-674-6598 | Direct: 916-713-6975 Follow us: Facebook | Twitter | LinkedIn | KitchellProgress.com From: Kacsinta, Madeline <MKacsint@slocity.org> Sent: Wednesday, July 19, 2023 8:11 AM To: Ryan Stefanek <rstefanek@kitchell.com> Cc: Tally Perry <tperry@kitchell.com> Subject: Addendum 4 - Soils 161 EXTERNAL EMAIL Hi Ryan, Can you please look this over and get Rincons interpretation on what the contractor needs to do for the non- hazardous soil remediation? Also, I will need to provide them with a map of the area that will be removed to 1-ft depth so that they can calculate the remining amount of soil to be removed. Can I would like to provide an amendment to the soils report to include additional soil sample results. Can you help me out with this? This addendum HAS to go out by tomorrow, so this takes priority over any other work you guys are doing on this project. Thank you, Madeline Kacsinta Engineer III Public Works 919 Palm, San Luis Obispo, CA 93401-3218 E MKacsint@slocity.org T 805.781.7094 slocity.org Stay connected with the City by signing up for e-notifications AGREEMENT THIS AGREEMENT is made and entered into in the City of San Luis Obispo on _________________ by and between the CITY OF SAN LUIS OBISPO, a municipal corporation, hereinafter referred to as City, and KITCHELL CEM, INC., hereinafter referred to as Consultant. W I T N E S S E T H WHEREAS, on July 28, 2022, requested proposals for Resident Engineer and Construction Management Services, Cultural Arts District Parking Structure, City Project Specification No. 90435-CM. WHEREAS, pursuant to said request, Consultant submitted a proposal that was accepted by City for said services. NOW THEREFORE, in consideration of their mutual promises, obligations and covenants hereinafter contained, the parties hereto agree as follows: 1. Contract Term. The term of this agreement shall be from the date this Agreement is made and entered, as first written above until all work has been completed. 2. Work Delays. Should the Consultant be obstructed or delayed in the work required to be done hereunder by changes in the work or by any default, act, or omission of the City, or by strikes, fire, earthquake, or any other Act of God, or by the inability to obtain materials, equipment, or labor due to federal government restrictions arising out of defense or war programs, then the time of completion may, at the City's sole option, be extended for such periods as may be agreed upon by the City and the Consultant. In the event that there is insufficient time to grant such extensions prior to the completion date of the contract, the City may, at the time of acceptance of the work, waive liquidated damages that may have accrued for failure to complete on time, due to any of the above, after hearing evidence as to the reasons for such delay, and making a finding as to the causes of same. 3. Termination for Cause. If, during the term of the contract, the City determines that the Consultant is not faithfully abiding by any term or condition contained herein, the City may notify the Consultant in writing of such defect or failure to perform. This notice must give the Consultant a 10 (ten) calendar day notice of time thereafter in which to perform said work or cure the deficiency. If the Consultant has not performed the work or cured the deficiency within the ten days specified in the notice, such shall constitute a breach of the contract and the City may terminate the contract immediately by written notice to the Consultant to said effect. Thereafter, neither party shall have any further duties, obligations, responsibilities, or rights under the contract except, however, any and all obligations of the Consultant's surety shall remain in full force and effect, and shall not be extinguished, reduced, or in any manner waived by the termination thereof. In said event, the Consultant shall be entitled to the reasonable value of its services performed from the beginning date in which the breach occurs up to the day it received DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 1/5/2023 | 8:53 AM PST the City's Notice of Termination, minus any offset from such payment representing the City's damages from such breach. "Reasonable value" includes fees or charges for goods or services as of the last milestone or task satisfactorily delivered or completed by the Consultant as may be set forth in the Agreement payment schedule; compensation for any other work, services or goods performed or provided by the Consultant shall be based solely on the City's assessment of the value of the work-in-progress in completing the overall workscope. The City reserves the right to delay any such payment until completion or confirmed abandonment of the project, as may be determined in the City's sole discretion, so as t o permit a full and complete accounting of costs. In no event, however, shall the Consultant be entitled to receive in excess of the compensation quoted in its proposal. 4. Termination for Convenience. The City also reserves the right to terminate the contract for convenience, providing a 30 (thirty) calendar day notice, at any time upon a determination by the Director that termination of the contract is in the best interest of the City. Upon termination notice from the City, Consultant must, unless otherwise directed, cease work and follow the City’s directions as to work in progress and finished goods. For termination of any services pursuant to this Agreement, the City’s liability will be the lesser of a reasonable price for the services rendered prior to termination. 5. Ability to Perform. The Consultant warrants that it possesses, or has arranged through subcontracts, all capital and other equipment, labor, materials, and licenses necessary to carry out and complete the work hereunder in compliance with any and all applicable federal, state, county, city, and special district laws, ordinances, and regulations. 6. Sub-contract Provisions. No portion of the work pertinent to this contract shall be subcontracted without written authorization by the City, except that which is expressly identified in the Consultant’s proposal. Any substitution of sub-consultants must be approved in writing by the City. For any sub-contract for services in excess of $25,000, the subcontract shall contain all provisions of this agreement. 7. Contract Assignment. The Consultant shall not assign, transfer, convey or otherwise dispose of the contract, or its right, title or interest, or its power to execute such a contract to any individual or business entity of any kind without the previous written consent of the City. 8. Inspection. The Consultant shall furnish City with every reasonable opportunity for City to ascertain that the services of the Consultant are being performed in accordance with the requirements and intentions of this contract. All work done and all materials furnished, if any, shall be subject to the City's inspection and approval. The inspection of such work shall not relieve Consultant of any of its obligations to fulfill its contract requirements. 9. Record Retention and Audit. For the purpose of determining compliance with various laws and regulations as well as performance of the contract, the Consultant and sub - consultants shall maintain all books, documents, papers, accounting records and other evidence pertaining to the performance of the contract, including but not limited to the cost of administering the contract. Materials shall be made available at their respective offices at all reasonable times during the contract period and for three years from the date of final DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 payment under the contract. Authorized representatives of the City shall have the option of inspecting and/or auditing all records. For Federally funded projects, access to records shall also include authorized representatives of the State and Federal government. Copies shall be furnished if requested. 10. Conflict of Interest. The Consultant shall disclose any financial, business, or other relationship with the City that may have an impact upon the outcome of this contract, or any ensuing City construction project. The Consultant shall also list current clients who may have a financial interest in the outcome of this contract, or any ensuing City construction project which will follow. The Consultant staff shall provide a Conflict of Interest Statement where determined necessary by the City. The Consultant covenants that it presently has no interest, and shall not acquire any interest—direct, indirect or otherwise—that would conflict in any manner or degree with the performance of the work hereunder. The Consultant further covenants that, in the performance of this work, no sub-consultant or person having such an interest shall be employed. The Consultant certifies that no one who has or will have any financial interest in performing this work is an officer or employee of the City. It is hereby expressly agreed that, in the performance of the work hereunder, the Consultant shall at all times be deemed an independent Consultant and not an agent or employee of the City. 11. Rebates, Kickbacks or Other Unlawful Consideration. The Consultant warrants that this contract was not obtained or secured through rebates, kickbacks or other unlawful consideration, either promised or paid to any City employee. For breach or violation of the warranty, the City shall have the right in its discretion; to terminate the contract without liability; to pay only for the value of the work actually performed; to deduct from the contract price; or otherwise recover the full amount of such rebate, kickback or other unlawful consideration. 12. Covenant Against Contingent Fees. The Consultant warrants by execution of this contract that no person or selling agency has been employed, or retained, to solicit or secure this contract upon an agreement or understanding, for a commission, percentage, brokerage, or contingent fee, excepting bona fide employees or bona fide established commercial or selling agencies maintained by the Consultant for the purpose of securing business. For breach or violation of this warranty, the City has the right to annul this contract without liability; pay only for the value of the work actually performed, or in its discretion, to deduct from the contract price or consideration, or otherwise recover the full amount of such commission, percentage, brokerage, or contingent fee. 13. Compliance with Laws and Wage Rates. The Consultant shall keep itself fully informed of and shall observe and comply with all applicable state and federal laws and county and City of San Luis Obispo ordinances, regulations and adopted codes during its performance of the work. This includes compliance with prevailing wage rates and their payment in accordance with California Labor Code. For purposed of this paragraph, “construction” includes work performed during the design and preconstruction phases of construction, including but not limited to, inspection and land surveying work. 14. Payment of Taxes. The contract prices shall include full compensation for all taxes that the Consultant is required to pay. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 15. Permits, Licenses and Filing Fees. The Consultant shall procure all permits and licenses, pay all charges and fees, and file all notices as they pertain to the completion of the Consultant’s work. The City will pay all application fees for permits required for the completion of the project including building and regulatory permit application fees. Consultant will provide a 10 day notice for the City to issue a check. 16. Safety Provisions. The Consultant shall conform to the rules and regulations pertaining to safety established by OSHA and the California Division of Industrial Safety. 17. Public and Employee Safety. Whenever the Consultant's operations create a condition hazardous to the public or City employees, it shall, at its expense and without cost to the City, furnish, erect and maintain such fences, temporary railings, barricades, lights, signs and other devices and take such other protective measures as are necessary to prevent accidents or damage or injury to the public and employees. 18. Preservation of City Property. The Consultant shall provide and install suitable safeguards, approved by the City, to protect City property from injury or damage. If City property is injured or damaged resulting from the Consultant's operations, it shall be replaced or restored at the Consultant's expense. The facilities shall be replaced or restored to a condition as good as when the Consultant began work. 19. Immigration Act of 1986. The Consultant warrants on behalf of itself and all sub- consultants engaged for the performance of this work that only persons authorized to work in the United States pursuant to the Immigration Reform and Control Act of 1986 and other applicable laws shall be employed in the performance of the work hereunder. 20. Consultant Non-Discrimination. In the award of subcontracts or in performance of this work, the Consultant agrees that it will not engage in, nor permit such sub-consultants as it may employ, to engage in discrimination in employment of persons on any basis prohibited by State or Federal law. 21. Accuracy of Specifications. The specifications for this project are believed by the City to be accurate and to contain no affirmative misrepresentation or any concealment of fact. Consultants are cautioned to undertake an independent analysis of any test results in the specifications, as City does not guaranty the accuracy of its interpretation of test results contained in the specifications package. In preparing its proposal, the Consultant and all sub-consultants named in its proposal shall bear sole responsibility for proposal preparation errors resulting from any misstatements or omissions in the specifications that could easily have been ascertained by examining either the project site or accurate test data in the City's possession. Although the effect of ambiguities or defects in the specifications will be as determined by law, any patent ambiguity or defect shall give rise to a duty of Consultant to inquire prior to proposal submittal. Failure to so inquire shall cause any such ambiguity or defect to be construed against the Consultant. An ambiguity or defect shall be considered patent if it is of such a nature that the Consultant, assuming reasonable skill, ability and diligence on its part, knew or should have known of the existence of the ambiguity or defect. Furthermore, failure of the Consultant or sub - consultants to notify City in writing of specification defects or ambiguities prior to proposal DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 submittal shall waive any right to assert said defects or ambiguities subsequent to submittal of the proposal. To the extent that these specifications constitute performance specifications, the City shall not be liable for costs incurred by the successful Consultant to achieve the project’s objective or standard beyond the amounts provided therefor in the proposal. In the event that, after awarding the contract, any dispute arises as a result of any actual or alleged ambiguity or defect in the specifications, or any other matter whatsoever, Consultant shall immediately notify the City in writing, and the Consultant and all sub- consultants shall continue to perform, irrespective of whether or not the ambiguity or defect is major, material, minor or trivial, and irrespective of whether or not a change order, time extension, or additional compensation has been granted by City. Failure to provide the hereinbefore described written notice within one (1) working day of Consultant's becoming aware of the facts giving rise to the dispute shall constitute a waiver of the right to assert the causative role of the defect or ambiguity in the plans or specifications concerning the dispute. 22. Hold Harmless and Indemnification. (a) Non-design, construction Professional Services: To the extent the Scope of Services involve a “construction contract” as that phrase is used in Civil Code Section 2783, this paragraph shall apply in place of paragraph A. To the fullest extent permitted by law (including, but not limited to California Civil Code Sections 2782 and 2782.8), Consultant shall indemnify, defend, and hold harmless the City, and its elected officials, officers, employees, volunteers, and agents (“City Indemnitees”), from and against any and all causes of action, claims, liabilities, obligations, judgments, or damages, including reasonable legal counsels’ fees and costs of litigation (“claims”), to the extent caused by the Consultant’s performance or Consultant’s failure to perform its obligations under this Agreement or out of the operations conducted by Consultant, except for such loss or damage arising from the active negligence, sole negligence or willful misconduct of the City. In the event the City Indemnitees are made a party to any action, lawsuit, or other adversarial proceeding arising from Consultant’s performance of this Agreement, the Consultant shall provide a defense to the City Indemnitees or at the City’s option, reimburse the City Indemnitees their costs of defense, including reasonable legal fees, incurred in defense of such claims. (b) The review, acceptance or approval of the Consultant’s work or work product by any indemnified party shall not affect, relieve or reduce the Consultant’s indemnification or defense obligations. This Section survives completion of the services or the termination of this contract. The provisions of this Section are not limited by and do not affect the provisions of this contract relating to insurance. 23. Non-Exclusive Contract. The City reserves the right to contract for the services listed in this proposal from other consultants during the contract term. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 24. Standards. Documents shall conform to City Standards and City furnished templates shall be used. 25. Consultant Endorsement. Technical reports, plans and specifications shall be stamped and signed by the Consultant where required. 26. Required Deliverable Products and Revisions. Deliverables include all items necessary to provide the work scope outlined in the Request for Proposal, incorporated herein by reference and attached hereto as Exhibit A. City staff will review any documents or materials provided by the Consultant and, where necessary, the Consultant will respond to staff comments and make such changes as deemed appropriate. 27. Ownership of Materials. Upon completion of all work under this contract, ownership and title to all reports, documents, plans, specifications, and estimates produced as part of this contract will automatically be vested in the city and no further agreement will be necessary to transfer ownership to the City. The Consultant shall furnish the City all necessary copies of data needed to complete the review and approval process. It is understood and agreed that all calculations, drawings and specifications, whether in hard copy or machine readable form, are intended for one-time use in the construction of the project for which this contract has been entered into. The Consultant is not liable for claims, liabilities, or losses arising out of, or connected with the modification, or misuse by the City of the machine-readable information and data provided by the Consultant under this agreement. Further, the Consultant is not liable for claims, liabilities, or losses arising out of, or connected with any use by City of the project documentation on other projects, except such use as may be authorized in writing by the Consultant. 28. Release of Reports and Information. Any reports, information, data, or other material given to, prepared by or assembled by the Consultant as part of the work or serv ices under these specifications shall be the property of City and shall not be made available to any individual or organization by the Consultant without the prior written approval of the City. The Consultant shall not issue any news release or public relations item of any nature, whatsoever, regarding work performed or to be performed under this contract without prior review of the contents thereof by the City and receipt of the City’s written permission. 29. Copies of Reports and Information. If the City requests additional copies of reports, drawings, specifications, or any other material in addition to what the Consultant is required to furnish in limited quantities as part of the work or services under these specifications, the Consultant shall provide such additional copies as are requested, and City shall compensate the Consultant for the costs of duplicating of such copies at the Consultant's direct expense. 30. Attendance at Meetings and Hearings. Consultant shall attend as many "working" meetings with staff as necessary in performing workscope tasks. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 31. Requests for Review. The Consultant shall respond to all requests for submittal review or contractor RFI’s within two weeks of receipt of the information from the City. 32. Project Proposal Submittal. Upon completion of the project scoping meeting, the Consultant shall submit a proposed workscope, compensation and schedule within 10 working days. The cost proposal shall include all costs including miscellaneous direct cost items. 33. Consultant Invoices. The Consultant shall deliver a monthly invoice to the City, itemized by project work phase or, in the case of on-call contracts, by project title. Invoice must include a breakdown of hours billed and miscellaneous charges and any sub-consultant invoices, similarly broken down, as supporting detail. 34. Payment. For providing services as specified in this Agreement, City will pay and Consultant shall receive therefore compensation in a total sum not to exceed the individual agreed upon project fee. Should the Consultant’s designs, drawings or specifications contain errors or deficiencies, the Consultant shall be required to correct them at no increase in cost to the City. For on-call services, the City will pay and the Consultant shall receive compensation as agreed to on a project by project basis. The Consultant shall be reimbursed for hours worked at the hourly rates attached to this agreement. Hourly rates include direct salary costs, employee benefits, overhead and fee. In addition, the Consultant shall be reimbursed for direct costs other than salary and vehicle cost that have been identified and are attached to this agreement. The Consultant’s personnel shall be reimbursed for per diem expenses at a rate not to exceed that currently authorized for State employees under State Department of Personnel Administration rules. 35. Payment Terms. The City's payment terms are 30 days from the receipt and approval by the City of an original invoice and acceptance by the City of the materials, supplies, equipment or services provided by the Consultant (Net 30). 36. Resolution of Disputes. Any dispute, other than audit, concerning a question of fact arising under this contract that is not disposed of by agreement shall be decided by a committee consisting of the City’s Project Manager and the City Director of Public Works, who may consider written or verbal information submitted by the Consultant. Not later than thirty days after completion of all deliverables necessary to complete the p lans, specifications and estimate, the Consultant may request review by the City Council of unresolved claims or disputes, other than audit, in accordance with Chapter 1.20 Appeals Procedure of the Municipal Code. Any dispute concerning a question of fact arising under an audit of this contract that is not disposed of by agreement, shall be reviewed by the City’s Chief Fiscal Officer. Not later than 30 days after issuance of the final audit report, the Consultant may request a review by the City’s Chief Fiscal Officer of unresolved audit issues. The request for review must be submitted in writing. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 Neither the pendency of a dispute, nor its consideration by the City will excuse the consultant from full and timely performance in accordance with the terms of this contract. 37. Disadvantaged Business Enterprise (DBE) Use for Federally Funded Projects. This agreement is subject to Title 49, Part 26 Code of Federal Regulations entitled “Participation by Disadvantaged Business Enterprises in Department of Transportation Financial Assistance Programs” when project work is for a federally funded project. In order to ensure the State Department of Transportation achieves its federally mandated statewide overall DBE goal, the City encourages the participation of DBEs as defined in 49 CFR 26 in the performance of this agreement. The City will make a determination on a project by project basis for reasonably expected DBE participation to compete for the sub-consulting opportunities in this agreement. The Consultant is responsible to be fully informed regarding the requirements of 49 CFR, Part 26. The Consultant shall notify the City of any changes to its anticipated DBE participation on federally funded projects, maintain records of DBE usage and complete and submit to the City the final report of DBE utilization prior to receiving final payment. Records shall show the name and business address of each DBE and the total dollar amount actually paid to each. The Consultant shall pay all sub-consultants within 10 calendar days from receipt of each payment made to the Consultant by the City. The Consultant shall carry out applicable requirements of Title 49 CFR 26 in the award and administration of US DOT assisted agreements. Failure by the Consultant to carry out these requirements is a material breach of this agreement, which may result in the termination of this agreement or such other remedy as the City deems appropriate. 38. Agreement Parties. City: Matt Horn Public Works Director City of San Luis Obispo 919 Palm Street San Luis Obispo, CA 93401 Consultant: Randy Rominger 1540 Marsh Street Stan Luis Obispo, CA 93401 All written notices to the parties hereto shall be sent by United States mail, postage prepaid by registered or certified mail addressed as shown above. 39. Incorporation by Reference. City Request for Proposals Specification No. 90435-CM dated July 28, 2022, Consultant's proposal dated September 1, 2022, and Consultant’s Revised Fee Proposal dated November 9, 2022, are hereby incorporated in and made a part of this Agreement and are attached hereto as Exhibits A, B, and C respectively. Should there be any conflict between terms set forth in the City Request for Proposals Specification No. 90435-CM and Consultant’s proposal dated September 1, 2022, or Revise Fee Proposal dated November 9, 2022, the terms in this agreement and City Request for Proposals Specification No. 90435-CM will govern. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 40. Amendments. Any amendment, modification or variation from the terms of this Agreement shall be in writing and shall be effective only upon approval by the City Engineer. 41. Working Out of Scope. If, at any time during the project, the consultant is directed to do work by persons other than the City Project Manager and the Consultant believes that the work is outside of the scope of the original contract, the Consultant shall inform the Project Manager immediately. If the Project Manager and Consultant both agree that the work is outside of the project scope and is necessary to the successful completion of the project, then a fee will be established for such work based on Consultant's hourly billing rates or a lump sum price agreed upon between the City and the Consultant. Any extra work performed by Consultant without prior written approval from the City Project Manager shall be at Consultant's own expense. 42. Complete Agreement. This written agreement, including all writings specifically incorporated herein by reference, shall constitute the complete agreement between the parties hereto. No oral agreement, understanding or representation not reduced to writing and specifically incorporated herein shall be of any force or effect, nor shall any such oral agreement, understanding or representation be binding upon the parties hereto. For and in consideration of the payments and agreements hereinbefore mentioned to be made and performed by City, Consultant agrees with City to do everything required by this Agreement, the said specification and incorporated documents. Authority to Execute Agreement. Both City and Consultant do covenant that each individual executing this agreement on behalf of each party is a person duly authorized and empowered to execute Agreements for such party. IN WITNESS WHEREOF, the parties hereto have caused this instrument to be executed the day and year first above written. CITY OF SAN LUIS OBISPO: CONSULTANT: ________________________________ Kitchell CEM, Inc. _______________________________ Matt Horn, Director of Public Works Wendy Cohen President APPROVED AS TO FORM: _______________________________ Christine Dietrick, City Attorney ________________________________ Randy Rominger Principal-in-Charge DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 EXHIBIT A DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 REQUEST FOR PROPOSALS RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES CULTURAL ARTS DISTRICT PARKING STRUCTURE CITY PROJECT NO. 90435-CM July 2022 The City of San Luis Obispo (City) is currently soliciting proposals for Resident Engineer and Construction Management Services for its Cultural Arts District Parking Structure Project. Each proposal must specify each and every item as set forth in the attached specifications. Any and all exceptions must be clearly stated in the proposal. Failure to set forth any item in the specifications without taking exception may be grounds for rejection. The City reserves the right to reject any and all proposals and to waive any irregularity or informality in any proposal or in the RFP process, as long as, in the judgment of the City, such action will not negate fair competition and will permit proper comparative evaluation of the proposals submitted. This RFP is posted on the City’s website at: https://www.slocity.org/doing-business/doing-business-with-the-city/bids-and-proposals Any changes, additions, or deletions to this RFP will be in the form of written addenda issued by the City. Any addenda will be posted on the website. Prospective proposers must check the website for addenda or other relevant new information during the response period. The City is not responsible for the failure of any prospective proposer to receive such addenda. All addenda so issued will become a part of this RFP. If your firm is interested and qualified, please submit the following in separately sealed envelopes plainly marked with the proposal title, specification number, Consultant name, and time and date of the proposal opening. All proposals must be submitted to the front counter at the Public Works Department, 919 Palm Street, by, 2:00 p.m. on September 1st, 2022. If you have any questions about the proposal process, please contact the Engineer directly. MANUEL GUZMAN Construction Engineering Manager mguzman@slocity.org EXHIBIT A DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 2  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT Table of Contents I. INTRODUCTION ..............................................................................................4   PURPOSE ............................................................................................................................................... 4   PROJECT LOCATION ........................................................................................................................... 4   BACKGROUND ...................................................................................................................................... 4   CONSTRUCTION CONTRACT DURATION .......................................................................................... 5  II. SCHEDULE AND SUBMITTAL ............................................................................6  A. RFP SCHEDULE .................................................................................................................................... 6  B. PROPOSAL SUBMITTAL ....................................................................................................................... 6  III. GENERAL INSTRUCTIONS ................................................................................7  A. CITY RIGHTS & OPTIONS ..................................................................................................................... 7  B. CHANGES TO THE RFP ........................................................................................................................ 8  C. COMMUNICATIONS ............................................................................................................................... 8  D. INSURANCE ........................................................................................................................................... 9  E. EXCEPTIONS & DEVIATIONS ............................................................................................................. 10  F. AWARD AND STANDARD AGREEMENT ........................................................................................... 10  G. PREVAILING WAGE............................................................................................................................. 10  H. FAIR EMPLOYMENT PRACTICE ........................................................................................................ 10  I. PROTEST OF AWARD ......................................................................................................................... 11  IV. PROPOSAL FORMAT ...................................................................................... 12   COVER LETTER ................................................................................................................................... 12   FIRM QUALIFICATIONS ...................................................................................................................... 12   ORGANIZATION AND APPROACH ..................................................................................................... 12   SCOPE OF WORK ............................................................................................................................... 13   CONTRACT AGREEMENT .................................................................................................................. 13   REFERENCES ...................................................................................................................................... 13   FEE PROPOSAL .................................................................................................................................. 13   OPTIONAL – ADDITIONAL SUPPORTING INFORMATION ............................................................... 14  V. CONSULTANT EVALUATION & CONTRACT AWARD ........................................ 15   PROPOSAL RESPONSIVENESS ........................................................................................................ 15   EVALUATION PROCEDURES ............................................................................................................. 15   CONTRACT AWARD ............................................................................................................................ 16  VII. APPENDICIES ................................................................................................. 17  APPENDIX A – SCOPE OF SERVICES ......................................................................... 17  DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 3  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT APPENDIX B – VICINITY MAP .................................................................................. 23  APPENDIX C – SAMPLE CONTRACT ......................................................................... 24  APPENDIX D – QUALITY ASSURANCE PROGRAM .................................................... 34  APPENDIX E – CONTRACT DOCUMENTS FOR PHASE 1B OF THE CULTURAL ARTS  DISTRICT PARKING STRUCTURE .............................................................................. 35  APPENDIX F – CONTRACT DOCUMENTS FOR PHASE 2 OF THE CULTURAL ARTS  DISTRICT PARKING STRUCTURE .............................................................................. 36  APPENDIX G1 –MITIGATION MONITORING AND REPORTING PROGRAM ............... 37  APPENDIX G2 – PHASE 1B AND 2 MITIGATION AND MONITORING PLAN ............... 37  APPENDIX H – CURRENT PROJECT  DELIVERY SCHEDULE ........................................ 38  DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 4  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT VI. INTRODUCTION PURPOSE The purpose of this Request for Proposal (RFP) is to provide interested parties with sufficient information regarding the resident engineer and construction management services the City of San Luis Obispo Department of Public Works (City) is seeking for its Cultural Arts District Parking Structure Project (Project). This information is intended to enable interested parties to prepare and submit proposals for a single construction management and resident engineer team to manage the construction for this Project. See Scope of Services attached as Appendix A. PROJECT LOCATION The Project is located on the corner of Palm Street and Nipomo Street. See Vicinity Map Attached as Appendix B. BACKGROUND The proposed scope is to provide construction management and resident engineer services to manage the Cultural Arts District Parking Structure Project. It is anticipated that a single team will work together to manage the demolition of an existing parking lot and buildings (the “Existing Site”) and construction of a new cast-in-place parking facility consisting of at least 399 parking spaces (the “Cultural Arts District Parking Structure”) in downtown San Luis Obispo (the “Project”). Two future buildings are planned immediately adjacent to the Cultural Arts District Parking Structure: a “liner building” along the Nipomo Street frontage and part of the Palm Street frontage; and a theater at the corner of Monterey and Nipomo Streets. Although neither of these buildings are part of this scope of work, they both have some shared access points and utilities that need to be coordinated as a part of this Project. The Project will be constructed in phases, under separate construction contracts, as follows: 1. Phase 1A: Dry Utility Undergrounding. This Project will underground PG&E and telecom facilities crossing the site. Note: This contract inspection and management will not be part of this work scope. 2. Phase 1B: Cultural Arts District Parking Structure On-Site Improvement Plans. Phase 1 includes site structure and parking lot demolition, grading, and permanent shoring work in preparation for garage construction in Phase 2. 3. Phase 2: Cultural Arts District Parking Structure. Phase 2 includes vertical construction of the parking structure, including frontage improvements and utility work. Phase 1B: On-Site Improvements, generally consists of: 1) Demolition and disposal of three residential lots and structures located at 633 Palm Street, 610 Monterey Street, and 614 Monterey Street 2) Demolition and site clearing of existing asphalt parking lot, including paving, landscaping, meters, and miscellaneous improvements. 3) Grading of pad area for Phase 2 4) Construction of permanent shoring along the north-east property line. 5) Existing tree protection. Phase 2: Cultural Arts District Parking Structure, generally consists of: 1) A new five-level cast-in-place parking structure with an approximately 32,000sf footprint (approximately 163,000sf gross), and approximately 399 total parking spaces. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 5  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT a. Level 1 (the ground floor) consists of standard parking, accessible parking, EV parking, and bicycle parking. b. Level 2 consists of standard parking, accessible parking, and EV parking. c. Level 3 and Level 4 consist of standard parking and accessible parking. d. Level 5 (the roof deck) consists of standard parking and accessible parking, with photovoltaic overhead panels. e. Two elevators. f. Automated revenue/payment system. 2) On-site and off-site improvements including: a. Off-site road improvements including new bulb-outs and decorative crosswalks and intersections. b. Construction of curb, gutter, driveway aprons, and sidewalk. c. Underground utilities and stormwater chambers. d. Pedestrian entry plazas (temporary where installed with future SLOREP Theatre Improvements). e. Planting and irrigation. Note that the Phase 2 contract will include provisions for the contractor to provide an office space and a conference room for the construction management team and provide electricity, phone, internet, water and sanitation services. CONSTRUCTION CONTRACT DURATION Phase 1B of the Project is planned to begin construction in Spring 2023 and last for approximately 6 months, not including contract close-out. Phase 2 of the Project is planned to begin construction in Fall 2023 and last for approximately 23 months, not including contract close-out. The above durations only reflect anticipated duration of the construction contract work and must be appropriately accounted for in the proposal. As part of the proposal, a general review of construction contract duration may be performed at the proposing firm’s option. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 6  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT VII. SCHEDULE AND SUBMITTAL A. RFP SCHEDULE The following represents the tentative schedule for this RFP. Any change in the scheduled dates for the Proposal Submission Deadline, or Interviews will be advertised in the form of an addendum to this RFP. The schedule for other milestones dates may be adjusted without notice. RFP Schedule Date Issued July 30, 2022 Proposal Submission Date September 1st, 2022, at 2:00 PM Evaluation of Proposals Previous + 4 Weeks Top 3 Ranked Consultants Interviewed Previous + 2 Weeks Finalize Staff Recommendation Previous + 1 Week Award by Public Works Director Previous + 1 Week Notice to Proceed 1 day from Award B. PROPOSAL SUBMITTAL If your firm is interested and qualified, please submit a proposal in a sealed envelope by 2:00 p.m. on September 1st, 2022. The proposal must be a maximum of 15 pages total, not including staff resumés and fee proposal (see Section IV.G for fee proposal requirements). DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 7  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT VIII. GENERAL INSTRUCTIONS A. CITY RIGHTS & OPTIONS 1. All proposals must be submitted to the City’s Public Works Department, 919 Palm Street, in sealed envelopes no later than 2:00 p.m. on September 1st, 2022. Late proposals will not be considered. 2. All costs incurred in the preparation and submission of proposals and related documentation will be borne solely by the proposer. 3. An impartial Selection Committee will develop a ranking of consultant proposals and recommend the most qualified consultant for tentative selection and contract negotiations. 4. The cost proposal of the top ranked consultant will be reviewed and may be negotiated with the consultant. Upon successful contract negotiations, staff will recommend a contract be awarded. 5. Consultant fees will be negotiated with the selected firm and finalized prior to the award of contract. 6. This RFP does not constitute an offer of employment or to contract for services. In addition, this RFP does not commit the City to negotiate a contract. The issuance of this RFP does not constitute an agreement by the City that any subsequent selection processes will occur, or that any contract will be entered into by the City. 7. The City has the right to use any or all ideas or concepts presented in any proposal or interview without restriction, without conversation to all applicants. 8. The City reserves the option to accept or reject any or all proposals, wholly or in part, received by reason of this request, and make more than one award, or no award, as the best interests of the City may appear. 9. All documents submitted to the City in response to this RFP will become the exclusive property of the City. 10. The City reserves the right to award the contract to the firm that presents the proposal which, in the judgment of the City, best accomplishes the desired results. 11. Any contract awarded pursuant to this Request for Proposal will incorporate the requirements and specifications contained in this Request for Proposal. All information presented in a proposer’s proposal will be considered binding upon selection of the successful proposer, unless otherwise modified and agreed to by the City during subsequent negotiations. 12. The City reserves the right to remedy technical errors, modify the published scope of services and approve or disapprove the use of all sub-consultants. 13. The contract will expire upon full completion of the scope of work. 14. Under the provisions of the California Public Records Act (the “Act”), Government Code section 6252 et seq., all “public records” (as defined in the Act) of a local agency, such as the City, must be available for inspection and copying upon the request of any person. Under the Act, the City may be obligated to provide a copy of any and all responses to this RFP, if such requests are made after the contract is awarded. One exception to this required disclosure is information which fits within the definition of a confidential trade secret [Government Code section 6254(k)] or contains other technical, financial or other data whose public disclosure could cause injury to the proposer’s competitive position. If DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 8  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT any proposer believes that information contained in its response to this RFP should be protected from disclosure, the proposer MUST specifically identify the pages of the response that contains the information by properly marking the applicable pages and inserting the following notice in the front of its response: NOTICE: The data on pages _ of this response identified by an asterisk (*) contain technical or financial information, which are trade secrets, or information for which disclosure would result in substantial injury to the proposer’s competitive position. Proposer requests that such data be used only for the evaluation of the response but understands that the disclosure will be limited to the extent the City considers proper under the law. If an agreement is entered into with the proposer, the City shall have the right to use or disclose the data as provided in the agreement, unless otherwise obligated by law. The City will not honor any attempt by proposer to designate its entire proposal as proprietary. If there is any dispute, lawsuit, claim or demand as to whether information within the response to the RFP is protected from disclosure under the Act, proposer shall indemnify, defend, and hold harmless, the City arising out of such dispute, lawsuit, claim or demand. 15. The proposing firm warrants that no official or employee of the City has an interest, has been employed or retained to solicit or aid in the procuring of a contract resulting from this RFP, if any, and further warrants that such person will not be employed in the performance of such contract without immediate written notice to the City. 16. Firms submitting a proposal shall warrant that their offer is made without any previous understanding, agreement, or connection with any person, firm, or corporation submitting a separate proposal for the same Project and is in all respects fair, without outside control, collusion, fraud, or otherwise illegal action. This condition will not apply to proposals which are submitted by firms who have partnered with others to submit a cooperative proposal that clearly identifies a primary contractor and the associated sub-contractors. 17. Unforeseen additional items and/or services may be required. The City therefore reserves the right to negotiate with the successful proposer for additional items and/or services beyond what is described in Appendix A to be added to the final contract. B. CHANGES TO THE RFP This RFP is posted on the City’s website at: https://www.slocity.org/doing-business/doing-business-with-the-city/bids-and-proposals Any changes, additions, or deletions to this RFP will be in the form of written addenda issued by the City. Any addenda will be posted on the website. Prospective proposers must check the website for addenda or other relevant new information during the response period. The City is not responsible for the failure of any prospective proposer to receive such addenda. All addenda so issued will become a part of this RFP. Any proposer who has already submitted their proposal and desires to make corrections, may remove and replace their proposal up to the date and time for which this RFP closes. C. COMMUNICATIONS All communications concerning this RFP must be directed to mguzman@slocity.org. All other communication is not binding and will in no way modify the RFP or the obligations of the City. All DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 9  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT questions will receive a response within five (5) business days. The proceedings of the Selection Committee are confidential, and members of the Selection Committee are not to be contacted by the proposers. After the solicitation has closed, proposers can request to view the RFP award information. Any questions and requests for information must be addressed to the Engineer. D. INSURANCE The Consultant shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Consultant, its agents, representatives, employees or subconsultants. Minimum Scope of Insurance. Coverage shall be at least as broad as: 1. Insurance Services Office Commercial General Liability coverage (occurrence form CG 20 10 Prior to 1993 or CG 20 10 07 04 with CG 20 37 10 01 or the exact equivalent as determined by the City). 2. Insurance Services Office form number CA 0001 (Ed. 1/87) covering Automobile Liability, code 1 (any auto). 3. Workers' Compensation insurance as required by the State of California and Employer's Liability Insurance. 4. Errors and Omissions Liability insurance as appropriate to the consultant's profession. Minimum Limits of Insurance. Consultant shall maintain limits no less than: 1. General Liability: $2,000,000 per occurrence for bodily injury, personal injury and property damage. If Commercial General Liability or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this Project /location or the general aggregate limit shall be twice the required occurrence limit. 2. Automobile Liability: $1,000,000 per accident for bodily injury and property damage. 3. Employer's Liability: $1,000,000 per accident for bodily injury or disease. 4. Professional / Errors and Omissions Liability: $2,000,000 per occurrence. Deductibles and Self-Insured Retentions. Any deductibles or self-insured retentions must be declared to and approved by the City. At the option of the City, either: the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the City, its officers, officials, employees and volunteers; or the Consultant shall procure a bond guaranteeing payment of losses and related investigations, claim administration and defense expenses. Other Insurance Provisions. The general liability and automobile liability policies are to contain, or be endorsed to contain, the following provisions: 1. The City, its officers, officials, employees, agents and volunteers are to be covered as insureds as respects: liability arising out of activities performed by or on behalf of the Consultant; products and completed operations of the Consultant; premises owned, occupied or used by the Consultant; or automobiles owned, leased, hired or borrowed by the Consultant. The coverage shall contain no special limitations on the scope of protection afforded to the City, its officers, official, employees, agents or volunteers. 2. For any claims related to this Project, the Consultant's insurance coverage shall be primary insurance as respects the City, its officers, officials, employees, agents and volunteers. Any insurance or self-insurance maintained by the City, its officers, officials, employees, agents or volunteers shall be excess of the Consultant's insurance and shall not contribute with it. 3. The Consultant's insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 10  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT 4. Each insurance policy required by this clause shall be end orsed to state that coverage shall not be suspended, voided, canceled by either party, reduced in coverage or in limits except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. The Consultant agrees to notify the City in the event that the policy is suspended, voided or reduced in coverage or limits. A minimum of 30 days prior written notice by certified mail, return receipt requested, will be provided. Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M. Best's rating of no less than A:VII. Verification of Coverage. Consultant shall furnish the City with a certificate of insurance showing maintenance of the required insurance coverage. Original endorsements effecting general liability and automobile liability coverage required by this clause must also be provided. The endorsements are to be signed by a person authorized by that insurer to bind coverage on its behalf. All endorsements are to be received and approved by the City before work commences. E. EXCEPTIONS & DEVIATIONS Any exceptions to or deviations from the requirements set forth in this RFP must be declared in the proposal submitted by the proposer. The City may waive any immaterial deviation or defect in a proposal. F. AWARD AND STANDARD AGREEMENT The City reserves the right to make awards within sixty (60) days after the date of the RFP closing. The successful proposer is expected to execute a contract reflecting the template in Appendix C. This sample contract is for reference to the anticipated terms and conditions governing the City and the successful proposer. The proposer must take exception in their proposal to any section of the attached contract they do not agree with. Failing to do so will be deemed as acceptance by the proposer to the terms spelled out in the sample contract. The City reserves the right, in its sole discretion, to add, delete, or modify, or negotiate additional terms and conditions to the attached contract. BEFORE BEGINNING ANY WORK OR SUBMITTING A PROPOSAL, IT IS ADVISED THAT PROPOSERS READ THE CITY INSURANCE AND INDEMNIFICATION REQUIREMENTS IN THE ATTACHED SAMPLE CONTRACT. G. PREVAILING WAGE A portion of this work is prevailing wage work. For any work proposed by the prime consultant or a subconsultant (any tier) under this contract, in accordance with Labor Code Section 1720 et seq., employees must be paid at least the prevailing rate wages for public works performed on the Project . Prime consultant and any applicable subconsultant (any tier) must register with the Department of Industrial Relations (DIR) prior to contract award, must remain registered for the entire term of the contract, and must submit certified payroll records to DIR at least monthly for such work. Firms can register at: http://www.dir.ca.gov/Public-Works/PublicWorks.html H. FAIR EMPLOYMENT PRACTICE The Consultant and all subconsultants must comply with all laws and regulations governing nondiscrimination in employment, including the Americans with Disabilities Act of 1990, the Fair Employment and Housing Act (California Government Code Section 129000 et seq.), and the applicable regulations promulgated thereunder Title 2, Division 4.1, Chapter 5 of the California Code of Regulations Section 11000 et seq. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 11  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT The Consultant, with regard to the work performed by them during the Contract, must not discriminate on the grounds of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or military and veteran status of any person in employment or the selection and retention of subcontractors, including procurement of materials and leases of equipment. I. PROTEST OF AWARD Any objection to the City’s final decision will be handled according to applicable state and local procurement laws. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 12  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT IX. PROPOSAL FORMAT A qualifying proposal must address all the following points and shall be in the format outlined in this section. The technical proposal will be a maximum of 15 pages total, not including staff resumés. COVER LETTER The cover letter will be addressed to: Manuel Guzman Construction Engineering Manager The letter must be on proposer’s letterhead and include the proposer’s contact name, mailing address, telephone number and email address. The letter will address the proposer’s understanding of the services being requested and any other pertinent information the proposer believes should be included. The name, address, telephone number, and email address of the person authorized to represent the firm with respect to all notices, negotiations, discussions, and other communications relating to this proposal, to any negotiation relating to the contract should be included in the letter. The letter must be signed by the individual authorized to bind the Consultant to the representations, commitments, and statements in the proposal. FIRM QUALIFICATIONS The City will only consider proposals that demonstrate firms have successfully completed comparable Project s. These Project s must illustrate the quality, type, and past performance of the Project team. Submittals must include a detailed description of a minimum of three (3) Project s within the past five (5) years which include the following information: 1. Contracting agency 2. Contracting agency Project Manager and contact information 3. Contract amount 4. Date of contract 5. Date of completion 6. Consultant Project Manager and contact information 7. Consultant Resident Engineer and contact information 8. Project Objective 9. Project Outcome: include original construction contract amount and final amount. ORGANIZATION AND APPROACH 1. Provide an organizational chart identifying the Project manager for the work and each key person who would be assigned to carry out the work and their respective roles in performing the work – specifically the Resident Engineer(s) and any Assistant Resident Engineers, inspectors, materials sampling and testing, other key support or contract administration staff. Provide a separate description of the experience and qualifications of the Project manager and each key person, including a summary of experience on similar Project s. Resumés should be included for all key individuals as an appendix to the submittal. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 13  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT 2. Describe your Project and management approach. Provide a detailed description of how the team and scope of work will be managed. 3. A list of no more than three references for the consultant and no more than three references for each subconsultants, including the names, addresses and telephone numbers of recent related clients/Project s, preferably other public agencies and a listing of the specific Project s and key individuals that have participated in them. Include the dollar amount related to the participation. Identify how much experience the firm and subconsultant has had with public agencies. 4. Describe your cost control and budgeting methodology for this Project. 5. Provide responses to the following: a. Describe critical construction related issues associated with the Project and how you will address these. b. Describe critical environmental issues and how you will address these. c. Describe how cost and schedule for the construction contract and your scope of work could be minimized. SCOPE OF WORK This section should establish that the proposer understands the City’s objectives and requirements, demonstrate the proposer’s ability to meet those requirements and outline clearly and concisely the plan for accomplishing the specified work in accordance with the time schedule as outlined in Appendix A, Scope of Services: 1. Include a detailed Scope of Work Statement describing all services to be provided. 2. Indication of information and participation the proposer will require from City staff. 3. Describe Project deliverables for each phase of your work. CONTRACT AGREEMENT Indicate any issues or proposed changes to the sample contract included as Appendix C. The Consultant must provide a brief statement affirming that the proposal terms will remain in effect for one hundred twenty (120) days following the date proposal submittals are due. A contract will not be awarded to a consultant without an adequate financial management and accounting system as required by 48 CFR Part 31 and 2 CFR Part 200. REFERENCES A list of no more than three references for the consultant and three references for each subconsultant, including the names, addresses and telephone numbers. These references may be the same as the references listed above in IV. Proposal Format, Section C. Organization and Approach. FEE PROPOSAL Within separate sealed envelope, submit a complete fee proposal for the scope of services. Provide separate subtotals for Phase 1B and Phase 2 broken down by task and staff billing rates with estimated hours. Clearly identify fees for subconsultant services. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 14  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT OPTIONAL – ADDITIONAL SUPPORTING INFORMATION Provide additional supporting information, not requested above, that you believe is pertinent to evaluating your firm’s ability to provide comparable program services. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 15  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT X. CONSULTANT EVALUATION & CONTRACT AWARD PROPOSAL RESPONSIVENESS Responses to this RFP must be complete. Responses that do not include the proposal content requirements identified within this RFP and subsequent addenda will be considered incomplete and will receive no further consideration. EVALUATION PROCEDURES Proposals will be evaluated according to each weighted Evaluation Criteria and scored on a zero to five-point rating scale shown in the table below. The scores for the Evaluation Criteria will then be multiplied according to their assigned weight to arrive at a weighted score for each firm. A firm’s proposal with a high weighted total will be deemed of higher quality than a proposal or interview with a lesser-weighted total. The top 3 ranked firms may be selected for an interview, which would be used to confirm ratings. Rating Scale 0 Not Acceptable Non-responsive, fails to meet RFP specifications. The approach has no probability of success in achieving Project objectives per the RFP. 1 Poor Below average, falls short of expectations, is substandard to that which is the average or expected norm, has a low probability of success in achieving Project objectives per the RFP. 2 Fair Has a reasonable probability of success, however, some objectives may not be met. 3 Average Acceptable, achieves all objectives in a reasonable fashion per the RFP. This will be the baseline score for each item with adjustments based on interpretation of the proposal by Selection Committee. 4 Above Average/Good Very good probability of success, better than that which is average or expected as the norm. Achieves all objectives per RFP requirements and expectations. 5 Excellent/ Exceptional Exceeds expectations, very innovative, clearly superior to that which is average or expected as the norm. Excellent probability of success and in achieving all objectives and meeting RFP requirements and expectations. The Proposal Evaluation Criteria and their respective weights are as follows: No. Criteria Weight 1 Understanding of Work Involved 5 2 Organization and Approach 5 3 Quality & Experience of Staff for Work 5 4 Firm Qualifications & References 5 TOTAL 20 DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 16  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT CONTRACT AWARD The final selection of the awarded consultant will be contingent upon successful contract negotiations and approval by the Public Works Director. The City Public Works Director will administer and enforce the provisions of the contract. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 17  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT XII. APPENDICIES APPENDIX A – SCOPE OF SERVICES Consultant shall provide an experienced registered Civil Engineer Construction Manager and support staff (as required) to manage the Project. Project Management services will include, but not be limited to, all items associated with construction management and inspection services necessary for Project completion and closeout. Typical Duties – The Work Tasks, defined in section below, generally include the following: 1. Maintain an awareness of safety and health requirements and enforce applicable contract provisions for the protection of the public and Project personnel. 2. Provide technical and administrative management services for the Project, coordination and oversight of all activities related to the construction of the Project and provide constant communication to the Project Manager of activities and concerns on the Project. Review all prepared documents with the Project Manager prior to submission to the Contractor. 3. Evaluate cost reduction incentive proposals and provide recommendations to Project Manager for acceptance or denial. 4. Perform the duties of Resident Engineer and Assistant Resident Engineer in accordance with Caltrans procedures including construction inspection, pay quantity calculations, materials sampling and testing, and compliance monitoring with Project plans, specifications, permits, environmental documents, and agreements. 5. Review and monitor the contractor’s schedule through weekly meetings, and maintain an as-built schedule. 6. Maintain binders of job records. 7. Prepare daily inspection and materials records and weekly status reports, and stormwater compliance documentation. 8. Prepare all correspondence related to Project activities and review with the Project Manager. 9. Identify actual and potential problems associated with the construction Project and consult with the design engineer and Project Manager to implement engineering solutions. 10. Coordinate submittal reviews and timely approvals with the design team and Project Manager. 11. Prepare and approve progress payments and supporting documentation. The City will provide signature authorization of monthly payments. 12. Pre-negotiate and prepare contract change orders. The City will provide signature authorization of contract change orders. 13. Perform labor and subcontracting compliance tasks including labor interviews and verifying certified payrolls and subcontractors utilization. 14. Complete record drawing markups daily, final Project certification, as outlined in Task 5, “Post-Construction Services.” 15. Recommend Project acceptance in accordance with City Standard Specifications and procedures. 16. Ensure full compliance to Americans with Disabilities Act (ADA). Work Tasks - A preliminary scope of services follows and includes identified work tasks. Task 1 – Pre-Construction Services DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 18  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT This task includes pre-construction services including, but not limited to the following:  Review and familiarization with contract plans, specifications, permits and agreements, including subsurface utility relocation work. If contract conflicts, errors, or omissions are discovered, convey to City and design engineer for correction if prior to Project advertisement  Assist the City in evaluation of bids received.  Review Resident Engineer files. Resident Engineer’s files consist of design engineer memos to Resident Engineers, and technical reports, environmental document, permits, and studies.  Prepare a Resident Engineer’s Project schedule which includes all pre-construction and utility relocations by others, and notification timelines noted on all permits, agreements, and contract documents. Upon receipt of Contractor’s schedule, evaluate and confer with the Contractor regarding workability of the schedule or suggest changes that may improve the schedule and update Resident Engineer’s schedule.  Prepare Project instructions and establish proposed contract administration and record keeping procedures to be used during construction for review and approval by Project Manager.  Attend meeting with City and Design Engineer to discuss design features. The intent of this meeting is to answer questions from the Resident Engineer, meet key staff, and review contract administration procedures.  Establish electronic records file structure and protocol for daily uploading to City network.  Prepare meeting agenda identifying attendees and conduct a pre-construction conference with the Contractor awarded the construction contract. Prepare and circulate meeting minutes.  Follow Caltrans Standard Specifications Section 5-1.43, Potential Claims and Dispute Resolution in establishing a Dispute Resolution Advisor (DRA) or Dispute Resolution Board (DRB) as mutually agreed to by the City and the Contractor. The agreed to process shall be reviewed and approved by Project Manager.  Establish correspondence protocols for contractor – construction management communications to allow for clear tracking of correspondence sequences and responses. Task 2 – Construction Services This task includes Project management, construction administration, scheduling, Project observation/inspection, and materials testing during construction. Consultant management services shall be in accordance with the Caltrans Local Assistance Program and Construction Manuals, including but not limited to the following: Project Coordination and Communication  Serve as the focal point for coordination among the contactor, surveyors, material testers, design team, the Project Manager, other agencies, utility companies, and other parties. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 19  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT  Maintain close contact with Project Manager and the design team and review all correspondence with the Project Manager prior to issuance. Maintain and track correspondence in an organized manner throughout the Project.  Receive all Contractor correspondence and prepare and transmit responses. Coordinate with applicable parties, as required, to develop responses.  Conduct weekly, or as necessary, construction contract coordination meetings with the Contractor. Take minutes and distribute to parties designated in the Project instructions. Schedules, Progress Meetings, and Reports  Review Contractor’s planned schedule for conformance with the specifications and for reasonableness of the sequence and duration of the activities. Provide acceptance or correction noticing to Contractor.  Review work progress as compared to the planned schedule and notify Contractor of schedule slippage. Analyze schedule to determine impact of weather and change orders. Obtain from Contactor updates of construction schedule incorporating actual progress, weather delays, and change order impacts. Negotiate time extensions due to change orders and other delays.  Prepare and submit a monthly progress report to Project Manager describing key issues, cost status, and schedule status.  Maintain as-built schedule Payment  Review Contractor’s initial schedule of values for reasonableness and ease of monitoring.  Prepare monthly quantity calculations to support progress payments.  Review and approve quantities submitted with monthly progress payment requests, negotiate differences over amount, and process payments through the Project Manager. Submittals and Requests for Information (RFI)  Receive, stamp, and log submittals, and review and approve, or distribute for review as necessary.  Monitor the review and return of submittals to Contactor. Provide reminders in advance of deadlines for submittal reviewers  Develop and maintain a submittal tracking list to identify parties responsible for review and acceptance, and received and response due dates.  Receive, process, and monitor Requests for Information (RFI) from Contactor.  Prepare responses to RFI related to construction issues in a timely manner.  Transmit design-related RFI to Design Engineer and copy the Project Manager.  Conduct meetings with Contractor and other parties, as needed, to discuss and resolve RFI. Change Orders  Evaluate potential change orders for compliance with permits, environmental documents and other on-site and construction constraints. Provide appropriate feedback for modifications or adjustments to change order proposals. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 20  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT  Prepare Cost Request Bulletins, perform quantity and cost analysis, as required, for negotiation of change orders, and negotiate payment for contract change orders.  Prepare change orders related to construction issues based on drawings, specifications, and other information from the City, design team, Project Manager, or Contractor.  Perform change order administration, including obtaining City approval of change order requests, issuing proposed change orders to Contractor, maintaining logs of proposed change orders, receiving change order quotations from Contractor, negotiating change order costs and time extension, processing final negotiated change orders, and incorporating approved change order into progress payment breakdown.  Prepare recommendations to accompany change order documents and forward to Project Manager for review and approval. Obtain Contractor signature and provide to the City for execution. Construction Observation/Inspection Services  Provide experienced and qualified inspectors who are acceptable to the City.  The inspectors will ensure compliance with all aspects of the construction contract by continuously monitoring, evaluating, approving or rejecting the Contractor’s work in accordance with the approved construction contract documents.  Review laboratory, shop and mill test reports of materials and equipment, and coordinate as required with the Design Engineers.  Review the safety programs developed by the Contractor as required by the contract documents and monitor the Contractor's compliance.  Determine that the Contractor’s work is being performed in accordance with City requirements and in accordance with the requirements of the contract documents. Endeavor to guard the City against defects and deficiencies in the work. As appropriate, require special inspection or testing, or make recommendations to the City regarding special inspection or testing of work not in accordance with the provisions of the contract documents, whether or not such work is fabricated, installed or completed. Subject to review by City, reject work, which does not conform to the requirements of the City or the contract documents.  Record the progress of the Project. Provide accurate and precise daily inspection reports. Submit written daily progress reports to the City, including information on Contractor and the entire Project, showing percentages of completion and the number and status of change orders.  Keep daily logs containing a record of weather, Contractor's work on the site, number of workers, work accomplished, problems encountered, and other relevant data. Make the log available to the City. Prepare and send a Weekly Statement of Working Days to the Contractor.  Check certified payrolls and monitor Contractor's compliance with labor code requirements.  Monitor all inspection activities, both City provided and any consulted out inspections.  Consolidate punch list items indicating work remaining for Project closeout. Claims  Receive and analyze Notices of Potential Claim and Claims submitted. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 21  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT  Review Notices and Claims with the Contract to verify understanding and determine if reasonable solution exists to address and eliminate the Claim. Review resolutions with the Project Manager and prepare appropriate response.  Perform claims administration, including coordinating and monitoring claims response preparation, logging claims, and tracking claims status, and response deadlines. Task 3 – Geotechnical and Materials Testing and Specialty Inspection Materials testing and specialty inspection services will be required for construction of the Project and provided by the Consultant or subconsultant, as directed by the Consultant. Consultant shall review and monitor testing for compliance with the Project requirements. The materials testing requirements include, but are not limited to, the following:  Select and retain the professional services of special consultants and certified testing laboratories. Monitor and coordinate their services.  Provide a quality control service including inspection and testing of all materials, such as but not limited to, steel strength, concrete strength, gravel gradations, soil compaction in accordance with the Project plans and specifications. Task 4 – Surveying Surveying is anticipated to be performed by Consultant’s Staff as directed by the Construction Manager. The Construction Manager shall review and monitor surveys to verify compliance with the Project requirements. The surveying requirements include, but are not limited to, the following:  Provide construction surveying services per the latest Caltrans “Survey Manual” and its revisions.  Surveys performed by the Engineer shall conform to the requirements of the Land Surveyor’s Act. Responsible Charge for the work shall reside with a January 1, 1982 Registered Civil Engineer or a licensed Land Surveyor in the State of California.  The minimum standard of survey quality shall be that of similar surveys performed by Caltrans.  The City will designate the existing horizontal and vertical control monuments that are to be the basis of all surveys. City will provide the California coordinate system values and elevations of these monuments. The Consultant shall adjust all Consultant performed surveys to the designated control monuments and their values.  Monuments established by the Consultant shall be marked by the Consultant with State furnished disks, plugs, or tags. In addition, the Consultant shall identify Consultant established monuments by tagging or stamping the monuments with the license or registration number of the Engineer’s surveyor who is in “responsible charge” of the work. Replacement of survey monuments shall be the responsibility of the Consultant. All new monuments shall be set in accordance with current City and Land Surveyors Act requirements. Task 5 – Construction Environmental Mitigation and Monitoring DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 22  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT The Environmental Monitor shall sign off and approve compliance with the approved MMRP and document implementation of all BMP and on and off-site mitigation measures included in the Project specifications. Work Tasks – Provide a scope of services and work tasks necessary for oversight and compliance with Phase 1B and Phase 2 Mitigation and Monitoring Plan prepared by Rincon (attachment G1 and G2). See appendix G1 and G2 for full listing of services require for inclusion in this task of the proposal. For example, the environmental monitoring requirements include, but are not limited to, the following:  Consultant shall provide qualified biologists to perform pre-construction surveys. The pre-construction surveys should also include a photograph record of the pre- construction condition of the site. Initial field inspections to establish no species are present (nesting surveys, etc.)  Training of the construction crews on what to look out for (including new crew orientation). Live training is required for when the job starts to include: foreman, supervisors, Project managers, and resident engineers. Once this initial training is completed then Project specific training videos shall be created for small crew changes.  Air Quality monitoring  Cultural/Archeological monitoring during all Project earthmoving activities  Verify placement of noise related signage  Paleontological monitoring for initial ground disturbance deeper than 10-feet Task 6 – Post-Construction Services The post-construction services task includes Project closeout after the work is complete. The post-construction services requirements include, but are not limited to, the following:  Compile record drawing information, and provide one copy of red-lined Project drawings to the City.  Compile any outstanding claims and documentation together in a coherent package.  The design consultant will provide Project changes to original design mylars to complete the record set.  Final payment will be recommended by Consultant to the City and all remaining Project files (organized in the manner specified in the Caltrans Construction Manual or otherwise specified in Project Plans & Specifications) will be transmitted to the City.  Project Certification and a Notice of Completion shall be provided in consultation with the City.  All claims shall be processed in accordance with Caltrans 2015 Standard Specifications Section 5-1.43, Potential Claims and Dispute Resolution. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 23  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT APPENDIX B – VICINITY MAP DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 24  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT APPENDIX C – SAMPLE CONTRACT AGREEMENT THIS AGREEMENT is made and entered into in the City of San Luis Obispo on _____________ by and between the CITY OF SAN LUIS OBISPO, a municipal corporation, hereinafter referred to as City, and [CONSULTANT’S NAME IN CAPITAL LETTERS], hereinafter referred to as Consultant. W I T N E S S E T H WHEREAS, on [DATE], requested proposals for Structural Engineering Design Services per Specification No. 90435-CM. WHEREAS, pursuant to said request, Consultant submitted a proposal that was accepted by City for said services. NOW THEREFORE, in consideration of their mutual promises, obligations and covenants hereinafter contained, the parties hereto agree as follows: 1. Contract Term. The term of this agreement shall be from the date this Agreement is made and entered, as first written above until all work has been completed. 2. Work Delays. Should the Consultant be obstructed or delayed in the work required to be done hereunder by changes in the work or by any default, act, or omission of the City, or by strikes, fire, earthquake, or any other Act of God, or by the inability to obtain materials, equipment, or labor due to federal government restrictions arising out of defense or war programs, then the time of completion may, at the City's sole option, be extended for such periods as may be agreed upon by the City and the Consultant. In the event that there is insufficient time to grant such extensions prior to the completion date of the contract, the City may, at the time of acceptance of the work, waive liquidated damages that may have accrued for failure to complete on time, due to any of the above, after hearing evidence as to the reasons for such delay, and making a finding as to the causes of same. 3. Termination for Cause. If, during the term of the contract, the City determines that the Consultant is not faithfully abiding by any term or condition contained herein, the City may notify the Consultant in writing of such defect or failure to perform. This notice must give the Consultant a 10 (ten) calendar day notice of time thereafter in which to perform said work or cure the deficiency. If the Consultant has not performed the work or cured the deficiency within the ten days specified in the notice, such shall constitute a breach of the contract and the City may terminate the contract immediately by written notice to the Consultant to said effect. Thereafter, neither party shall have any further duties, obligations, responsibilities, or rights under the contract except, however, any and all obligations of the Consultant's surety shall remain in full force and effect, and shall not be extinguished, reduced, or in any manner waived by the termination thereof. In said event, the Consultant shall be entitled to the reasonable value of its services performed from the beginning date in which the breach occurs up to the day it received the City's Notice DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 25  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT of Termination, minus any offset from such payment representing the City's damages from such breach. "Reasonable value" includes fees or charges for goods or services as of the last milestone or task satisfactorily delivered or completed by the Consultant as may be set forth in the Agreement payment schedule; compensation for any other work, services or goods performed or provided by the Consultant shall be based solely on the City's assessment of the value of the work-in-progress in completing the overall workscope. The City reserves the right to delay any such payment until completion or confirmed abandonment of the Project, as may be determined in the City's sole discretion, so as to permit a full and complete accounting of costs. In no event, however, shall the Consultant be entitled to receive in excess of the compensation quoted in its proposal. 4. Termination for Convenience. The City also reserves the right to terminate the contract for convenience, providing a 30 (thirty) calendar day notice, at any time upon a determination by the Director that termination of the contract is in the best interest of the City. Upon termination notice from the City, Consultant must, unless otherwise directed, cease work and follow the City’s directions as to work in progress and finished goods. For termination of any services pursuant to this Agreement, the City’s liability will be the lesser of a reasonable price for the services rendered prior to termination. 5. Ability to Perform. The Consultant warrants that it possesses, or has arranged through subcontracts, all capital and other equipment, labor, materials, and licenses necessary to carry out and complete the work hereunder in compliance with any and all applicable federal, state, county, city, and special district laws, ordinances, and regulations. 6. Sub-contract Provisions. No portion of the work pertinent to this contract shall be subcontracted without written authorization by the City, except that which is expressly identified in the Consultant’s proposal. Any substitution of sub-consultants must be approved in writing by the City. For any sub-contract for services in excess of $25,000, the subcontract shall contain all provisions of this agreement. 7. Contract Assignment. The Consultant shall not assign, transfer, convey or otherwise dispose of the contract, or its right, title or interest, or its power to execute such a contract to any individual or business entity of any kind without the previous written consent of the City. 8. Inspection. The Consultant shall furnish City with every reasonable opportunity for City to ascertain that the services of the Consultant are being performed in accordance with the requirements and intentions of this contract. All work done and all materials furnished, if any, shall be subject to the City's inspection and approval. The inspection of such work shall not relieve Consultant of any of its obligations to fulfill its contract requirements. 9. Record Retention and Audit. For the purpose of determining compliance with various laws and regulations as well as performance of the contract, the Consultant and sub-consultants shall maintain all books, documents, papers, accounting records and other evidence pertaining to the performance of the contract, including but not limited to the cost of administering the contract. Materials shall be made available at their respective offices at all reasonable times during the contract period and for three years from the date of final payment under the contract. Authorized representatives of the City shall have the option of inspecting and/or auditing all records. For Federally funded Project s, access to records shall also include authorized representatives of the State and Federal government. Copies shall be furnished if requested. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 26  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT 10. Conflict of Interest. The Consultant shall disclose any financial, business, or other relationship with the City that may have an impact upon the outcome of this contract, or any ensuing City construction Project. The Consultant shall also list current clients who may have a financial interest in the outcome of this contract, or any ensuing City construction Project which will follow. The Consultant staff shall provide a Conflict of Interest Statement where determined necessary by the City. The Consultant covenants that it presently has no interest, and shall not acquire any interest— direct, indirect or otherwise—that would conflict in any manner or degree with the performance of the work hereunder. The Consultant further covenants that, in the performance of this work, no sub-consultant or person having such an interest shall be employed. The Consultant certifies that no one who has or will have any financial interest in performing this work is an officer or employee of the City. It is hereby expressly agreed that, in the performance of the work hereunder, the Consultant shall at all times be deemed an independent Consultant and not an agent or employee of the City. 11. Rebates, Kickbacks or Other Unlawful Consideration. The Consultant warrants that this contract was not obtained or secured through rebates, kickbacks or other unlawful consideration, either promised or paid to any City employee. For breach or violation of the warranty, the City shall have the right in its discretion; to terminate the contract without liability; to pay only for the value of the work actually performed; to deduct from the contract price; or otherwise recover the full amount of such rebate, kickback or other unlawful consideration. 12. Covenant Against Contingent Fees. The Consultant warrants by execution of this contract that no person or selling agency has been employed, or retained, to solicit or secure this contract upon an agreement or understanding, for a commission, percentage, brokerage, or contingent fee, excepting bona fide employees or bona fide established commercial or selling agencies maintained by the Consultant for the purpose of securing business. For breach or violation of this warranty, the City has the right to annul this contract without liability; pay only for the value of the work actually performed, or in its discretion, to deduct from the contract price or consideration, or otherwise recover the full amount of such commission, percentage, brokerage, or contingent fee. 13. Compliance with Laws and Wage Rates. The Consultant shall keep itself fully informed of and shall observe and comply with all applicable state and federal laws and county and City of San Luis Obispo ordinances, regulations and adopted codes during its performance of the work. This includes compliance with prevailing wage rates and their payment in accordance with California Labor Code. For purposed of this paragraph, “construction” includes work performed during the design and preconstruction phases of construction, including but not limited to, inspection and land surveying work. 14. Payment of Taxes. The contract prices shall include full compensation for all taxes that the Consultant is required to pay. 15. Permits, Licenses and Filing Fees. The Consultant shall procure all permits and licenses, pay all charges and fees, and file all notices as they pertain to the completion of the Consultant’s work. The City will pay all application fees for permits required for the completion of the Project including building and regulatory permit application fees. Consultant will provide a 10 day notice for the City to issue a check. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 27  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT 16. Safety Provisions. The Consultant shall conform to the rules and regulations pertaining to safety established by OSHA and the California Division of Industrial Safety. 17. Public and Employee Safety. Whenever the Consultant's operations create a condition hazardous to the public or City employees, it shall, at its expense and without cost to the City, furnish, erect and maintain such fences, temporary railings, barricades, lights, signs and other devices and take such other protective measures as are necessary to prevent accidents or damage or injury to the public and employees. 18. Preservation of City Property. The Consultant shall provide and install suitable safeguards, approved by the City, to protect City property from injury or damage. If City property is injured or damaged resulting from the Consultant's operations, it shall be replaced or restored at the Consultant's expense. The facilities shall be replaced or restored to a condition as good as when the Consultant began work. 19. Immigration Act of 1986. The Consultant warrants on behalf of itself and all sub-consultants engaged for the performance of this work that only persons authorized to work in the United States pursuant to the Immigration Reform and Control Act of 1986 and other applicable laws shall be employed in the performance of the work hereunder. 20. Consultant Non-Discrimination. In the award of subcontracts or in performance of this work, the Consultant agrees that it will not engage in, nor permit such sub-consultants as it may employ, to engage in discrimination in employment of persons on any basis prohibited by State or Federal law. 21. Accuracy of Specifications. The specifications for this Project are believed by the City to be accurate and to contain no affirmative misrepresentation or any concealment of fact. Consultants are cautioned to undertake an independent analysis of any test results in the specifications, as City does not guaranty the accuracy of its interpretation of test results contained in the specifications package. In preparing its proposal, the Consultant and all sub- consultants named in its proposal shall bear sole responsibility for proposal preparation errors resulting from any misstatements or omissions in the specifications that could easily have been ascertained by examining either the Project site or accurate test data in the City's possession. Although the effect of ambiguities or defects in the specifications will be as determined by law, any patent ambiguity or defect shall give rise to a duty of Consultant to inquire prior to proposal submittal. Failure to so inquire shall cause any such ambiguity or defect to be construed against the Consultant. An ambiguity or defect shall be considered patent if it is of such a nature that the Consultant, assuming reasonable skill, ability and diligence on its part, knew or should have known of the existence of the ambiguity or defect. Furthermore, failure of the Consultant or sub-consultants to notify City in writing of specification defects or ambiguities prior to proposal submittal shall waive any right to assert said defects or ambiguities subsequent to submittal of the proposal. To the extent that these specifications constitute performance specifications, the City shall not be liable for costs incurred by the successful Consultant to achieve the Project ’s objective or standard beyond the amounts provided therefor in the proposal. In the event that, after awarding the contract, any dispute arises as a result of any actual or alleged ambiguity or defect in the specifications, or any other matter whatsoever, Consultant DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 28  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT shall immediately notify the City in writing, and the Consultant and all sub-consultants shall continue to perform, irrespective of whether or not the ambiguity or defect is major, material, minor or trivial, and irrespective of whether or not a change order, time extension, or additional compensation has been granted by City. Failure to provide the hereinbefore described written notice within one (1) working day of Consultant's becoming aware of the facts giving rise to the dispute shall constitute a waiver of the right to assert the causative role of the defect or ambiguity in the plans or specifications concerning the dispute. 22. Hold Harmless and Indemnification. (a) Non-design, non-construction Professional Services: To the fullest extent permitted by law (including, but not limited to California Civil Code Sections 2782 and 2782.8), Consultant shall indemnify, defend, and hold harmless the City, and its elected officials, officers, employees, volunteers, and agents (“City Indemnitees”), from and against any and all causes of action, claims, liabilities, obligations, judgments, or damages, including reasonable legal counsels’ fees and costs of litigation (“claims”), arising out of the Consultant’s performance or Consultant’s failure to perform its obligations under this Agreement or out of the operations conducted by Consultant, including the City’s active or passive negligence, except for such loss or damage arising from the sole or active negligence or willful misconduct of the City. In the event the City Indemnitees are made a party to any action, lawsuit, or other adversarial proceeding arising from Consultant’s performance of this Agreement, the Consultant shall provide a defense to the City Indemnitees or at the City’s option, reimburse the City Indemnitees their costs of defense, including reasonable legal fees, incurred in defense of such claims. (b) Non-design, construction Professional Services: To the extent the Scope of Services involve a “construction contract” as that phrase is used in Civil Code Section 2783, this paragraph shall apply in place of paragraph A. To the fullest extent permitted by law (including, but not limited to California Civil Code Sections 2782 and 2782.8), Consultant shall indemnify, defend, and hold harmless the City, and its elected officials, officers, employees, volunteers, and agents (“City Indemnitees”), from and against any and all causes of action, claims, liabilities, obligations, judgments, or damages, including reasonable legal counsels’ fees and costs of litigation (“claims”), arising out of the Consultant’s performance or Consultant’s failure to perform its obligations under this Agreement or out of the operations conducted by Consultant, except for such loss or damage arising from the active negligence, sole negligence or willful misconduct of the City. In the event the City Indemnitees are made a party to any action, lawsuit, or other adversarial proceeding arising from Consultant’s performance of this Agreement, the Consultant shall provide a defense to the City Indemnitees or at the City’s option, reimburse the City Indemnitees their costs of defense, including reasonable legal fees, incurred in defense of such claims. (c) Design Professional Services:   To the fullest extent permitted by law, Consultant shall indemnify, defend, and hold harmless City and any and all of its officials, employees and agents (“Indemnified Parties”) from and against any and all claims, losses, liabilities, damages, costs and expenses, including attorney’s fees and costs, to the extent they arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant. Consultant’s duty to defend shall consist of reimbursement of defense costs incurred DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 29  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT by City in direct proportion to the Consultant’s proportionate percentage of fault. Consultant’s percentage of fault shall be determined, as applicable, by a court of law, jury or arbitrator. In the event any loss, liability or damage is incurred by way of settlement or resolution without a court, jury or arbitrator having made a determination of the Consultant’s percentage of fault, the Parties agree to mediation with a neutral third-party to determine the Consultant’s proportionate percentage of fault for purposes of determining the amount of indemnity and defense cost reimbursement owed to the City. Notwithstanding the foregoing and without diminishing any rights of City in the preceding paragraph, for any liability, claim, demand, allegation against City arising out of, related to, or pertaining to any act or omission of Consultant, but which is not a design professional service, Consultant shall defend, indemnify, and hold harmless the Indemnified Parties from and against any and all damages, costs, expenses (including reasonable attorney fees and expert witness fees), judgments, settlements, and/or arbitration awards, whether for personal or bodily injury, property damage, or economic injury, and arising out of, related to, any concurrent or contributory negligence on the part of the City except for the sole or active negligence of, or willful misconduct of the City. (d) The review, acceptance or approval of the Consultant’s work or work product by any indemnified party shall not affect, relieve or reduce the Consultant’s indemnification or defense obligations. This Section survives completion of the services or the termination of this contract. The provisions of this Section are not limited by and do not affect the provisions of this contract relating to insurance. 23. Non-Exclusive Contract. The City reserves the right to contract for the services listed in this proposal from other consultants during the contract term. 24. Standards. Documents shall conform to City Standards and City furnished templates shall be used. 25. Consultant Endorsement. Technical reports, plans and specifications shall be stamped and signed by the Consultant where required. 26. Required Deliverable Products and Revisions. Deliverables include all items necessary to provide the work scope outlined in the Request for Proposal, incorporated herein by reference and attached hereto as Exhibit [X]. City staff will review any documents or materials provided by the Consultant and, where necessary, the Consultant will respond to staff comments and make such changes as deemed appropriate. 27. Ownership of Materials. Upon completion of all work under this contract, ownership and title to all reports, documents, plans, specifications, and estimates produced as part of this contract will automatically be vested in the city and no further agreement will be necessary to transfer ownership to the City. The Consultant shall furnish the City all necessary copies of data needed to complete the review and approval process. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 30  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT It is understood and agreed that all calculations, drawings and specifications, whether in hard copy or machine readable form, are intended for one-time use in the construction of the Project for which this contract has been entered into. The Consultant is not liable for claims, liabilities, or losses arising out of, or connected with the modification, or misuse by the City of the machine-readable information and data provided by the Consultant under this agreement. Further, the Consultant is not liable for claims, liabilities, or losses arising out of, or connected with any use by City of the Project documentation on other Project s, except such use as may be authorized in writing by the Consultant. 28. Release of Reports and Information. Any reports, information, data, or other material given to, prepared by or assembled by the Consultant as part of the work or services under these specifications shall be the property of City and shall not be made available to any individual or organization by the Consultant without the prior written approval of the City. The Consultant shall not issue any news release or public relations item of any nature, whatsoever, regarding work performed or to be performed under this contract without prior review of the contents thereof by the City and receipt of the City’s written permission. 29. Copies of Reports and Information. If the City requests additional copies of reports, drawings, specifications, or any other material in addition to what the Consultant is required to furnish in limited quantities as part of the work or services under these specifications, the Consultant shall provide such additional copies as are requested, and City shall compensate the Consultant for the costs of duplicating of such copies at the Consultant's direct expense. 30. Attendance at Meetings and Hearings. Consultant shall attend as many "working" meetings with staff as necessary in performing workscope tasks. 31. Requests for Review. The Consultant shall respond to all requests for submittal review or contractor RFI’s within two weeks of receipt of the information from the City. 32. Project Proposal Submittal. Upon completion of the Project scoping meeting, the Consultant shall submit a proposed workscope, compensation and schedule within 10 working days. The cost proposal shall include all costs including miscellaneous direct cost items. 33. Consultant Invoices. The Consultant shall deliver a monthly invoice to the City, itemized by Project work phase or, in the case of on-call contracts, by Project title. Invoice must include a breakdown of hours billed and miscellaneous charges and any sub-consultant invoices, similarly broken down, as supporting detail. 34. Payment. For providing services as specified in this Agreement, City will pay and Consultant shall receive therefore compensation in a total sum not to exceed the individual agreed upon Project fee. Should the Consultant’s designs, drawings or specifications contain errors or deficiencies, the Consultant shall be required to correct them at no increase in cost to the City. For on-call services, the City will pay and the Consultant shall receive compensation as agreed to on a Project by Project basis. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 31  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT The Consultant shall be reimbursed for hours worked at the hourly rates attached to this agreement. Hourly rates include direct salary costs, employee benefits, overhead and fee. In addition, the Consultant shall be reimbursed for direct costs other than salary and vehicle cost that have been identified and are attached to this agreement. The Consultant’s personnel shall be reimbursed for per diem expenses at a rate not to exceed that currently authorized for State employees under State Department of Personnel Administration rules. 35. Payment Terms. The City's payment terms are 30 days from the receipt and approval by the City of an original invoice and acceptance by the City of the materials, supplies, equipment or services provided by the Consultant (Net 30). 36. Resolution of Disputes. Any dispute, other than audit, concerning a question of fact arising under this contract that is not disposed of by agreement shall be decided by a committee consisting of the City’s Project Manager and the City Director of Public Works, who may consider written or verbal information submitted by the Consultant. Not later than thirty days after completion of all deliverables necessary to complete the plans, specifications and estimate, the Consultant may request review by the City Council of unresolved claims or disputes, other than audit, in accordance with Chapter 1.20 Appeals Procedure of the Municipal Code. Any dispute concerning a question of fact arising under an audit of this contract that is not disposed of by agreement, shall be reviewed by the City’s Chief Fiscal Officer. Not later than 30 days after issuance of the final audit report, the Consultant may request a review by the City’s Chief Fiscal Officer of unresolved audit issues. The request for review must be submitted in writing. Neither the pendency of a dispute, nor its consideration by the City will excuse the consultant from full and timely performance in accordance with the terms of this contract. 37. Disadvantaged Business Enterprise (DBE) Use for Federally Funded Project s. This agreement is subject to Title 49, Part 26 Code of Federal Regulations entitled “Participation by Disadvantaged Business Enterprises in Department of Transportation Financial Assistance Programs” when Project work is for a federally funded Project. In order to ensure the State Department of Transportation achieves its federally mandated statewide overall DBE goal, the City encourages the participation of DBEs as defined in 49 CFR 26 in the performance of this agreement. The City will make a determination on a Project by Project basis for reasonably expected DBE participation to compete for the sub-consulting opportunities in this agreement. The Consultant is responsible to be fully informed regarding the requirements of 49 CFR, Part 26. The Consultant shall notify the City of any changes to its anticipated DBE participation on federally funded Project s, maintain records of DBE usage and complete and submit to the City the final report of DBE utilization prior to receiving final payment. Records shall show the name and business address of each DBE and the total dollar amount actually paid to each. The Consultant shall pay all sub-consultants within 10 calendar days from receipt of each payment made to the Consultant by the City. The Consultant shall carry out applicable requirements of Title 49 CFR 26 in the award and administration of US DOT assisted agreements. Failure by the Consultant to carry out these DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 32  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT requirements is a material breach of this agreement, which may result in the termination of this agreement or such other remedy as the City deems appropriate. 38. Agreement Parties. City: Matt Horn Public Works Director City of San Luis Obispo 919 Palm Street San Luis Obispo, CA 93401 Consultant: All written notices to the parties hereto shall be sent by United States mail, postage prepaid by registered or certified mail addressed as shown above. 39. Incorporation by Reference. City Request for Proposals Specification No. 90435-CM and Consultant's proposal dated [DATE], are hereby incorporated in and made a part of this Agreement and are attached hereto as Exhibit [X]. Should there be any conflict between terms set forth in the City Request for Proposals Specification No. 90435-CM and Consultant’s proposal dated [DATE], the terms in this agreement and City Request for Qualifications Specification No. 90435-CM will govern. 40. Amendments. Any amendment, modification or variation from the terms of this Agreement shall be in writing and shall be effective only upon approval by the City Engineer. 41. Working Out of Scope. If, at any time during the Project, the consultant is directed to do work by persons other than the City Project Manager and the Consultant believes that the work is outside of the scope of the original contract, the Consultant shall inform the Project Manager immediately. If the Project Manager and Consultant both agree that the work is outside of the Project scope and is necessary to the successful completion of the Project, then a fee will be established for such work based on Consultant's hourly billing rates or a lump sum price agreed upon between the City and the Consultant. Any extra work performed by Consultant without prior written approval from the City Project Manager shall be at Consultant's own expense. 42. Complete Agreement. This written agreement, including all writings specifically incorporated herein by reference, shall constitute the complete agreement between the parties hereto. No oral agreement, understanding or representation not reduced to writing and specifically incorporated herein shall be of any force or effect, nor shall any such oral agreement, understanding or representation be binding upon the parties hereto. For and in consideration of the payments and agreements hereinbefore mentioned to be made and performed by City, Consultant agrees with City to do everything required by this Agreement, the said specification and incorporated documents. Authority to Execute Agreement. Both City and Consultant do covenant that each individual executing this agreement on behalf of each party is a person duly authorized and empowered to execute Agreements for such party. IN WITNESS WHEREOF, the parties hereto have caused this instrument to be executed the day and year first above written. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 33  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT CITY OF SAN LUIS OBISPO: CONSULTANT: ________________________________ Name of Company _______________________________ Matt Horn, Director of Public Works By: Name of CAO/President Its: CAO/President APPROVED AS TO FORM: _______________________________ Christine Dietrick, City Attorney (2nd signature required if Corporation): ________________________________ By: Name of Corporate Officer Its: ____________________ DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 34  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT APPENDIX D – QUALITY ASSURANCE PROGRAM (Attached as a separate document in BidSync) DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 35  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT APPENDIX E – CONTRACT DOCUMENTS FOR PHASE 1B OF THE CULTURAL ARTS DISTRICT PARKING STRUCTURE (Attached as a separate document in BidSync) DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 36  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT APPENDIX F – CONTRACT DOCUMENTS FOR PHASE 2 OF THE CULTURAL ARTS DISTRICT PARKING STRUCTURE (Attached as a separate document in BidSync) DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 37  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT APPENDIX G1 –MITIGATION MONITORING AND REPORTING PROGRAM APPENDIX G2 – PHASE 1B AND 2 MITIGATION AND MONITORING PLAN (Attached as a separate document in BidSync) DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 City of San Luis Obispo          RFP No. 90435‐CM          July 2022       Page 38  RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES FOR THE CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT APPENDIX H – CURRENT PROJECT DELIVERY SCHEDULE (Attached as a separate document in BidSync) DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 EXHIBIT B DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 REQUEST FOR PROPOSALS // CITY PROJECT NO. 90435-CM RESIDENT ENGINEER AND CONSTRUCTION MANAGEMENT SERVICES CULTURAL ARTS DISTRICT PARKING STRUCTURE September 1, 2022 EXHIBIT BDocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 1540 MARSH STREET, SUITE 150, SAN LUIS OBISPO, CA 93401 | TEL. 805.706.0276 | WWW.KITCHELL.COM September 1, 2022 Mr. Manuel Guzman, Construction Engineering Manager City of San Luis Obispo 919 Palm Street San Luis Obispo, CA 93401 Re: Proposal for Resident Engineer and Construction Management Services, Cultural Arts District Parking Structure, City Project No. 90435-CM Dear Mr. Guzman and Members of the Selection Committee: As an experienced construction manager with a solid foundation in general contracting, Kitchell is known for delivering quality projects and providing high value services to our clients. It is with great pleasure that we submit our proposal to perform resident engineer and construction management services for the New Cultural Arts District Parking Structure project. Our relational project management approach coupled with an extensive record of successful project delivery will fulfill your expectations and provide you satisfaction with the end result. Our commitment to these goals has resulted in more than eighty-five percent of our work derived from repeat business. We Have the Right Team With over 303 project and construction management professionals, we have the capacity, skill and enthusiasm to implement our time-tested project management tools and techniques to achieve project success. Project Director Tully Wyatt will work with you to ensure your complete satisfaction with our services and deliverables. Resident Engineer Andy Goh will fulfill the Resident Engineer duties and responsibilities as defined by Caltrans. Senior Project Manager/Assistant Resident Engineer Tom Fee will serve as our on-site representative to the City and will function as an extension of your staff, working integrally with City personnel, design professionals, the contractor, special consultants and stakeholders to deliver the project on time, under budget and with high quality. Our proposed project team members have demonstrated a long-term commitment to the pursuit of project excellence, are at the top of their respective professions, and will be dedicated to the task of serving the City through interactive collaboration, effective oversight of design professionals, contractors, outside agencies and effective management of the project as a whole. Local Commitment As a firm invested in the Central Coast for the long term through our established local San Luis Obispo office and widening project base, we understand the local construction market and will serve as a local resource in receiving responsive bids from qualified contractors. Our long-term commitment to local clients by staff members who understand the issues unique to the Central Coast, provides the City with assurance that we share your desire for success. Depth of In-house Resources Unlike most construction management firms, Kitchell has a full complement of in-house engineering and architectural support service professionals consisting of registered architects and licensed engineers in every discipline. In addition, Kitchell has in-house facilities management, commissioning, estimating and scheduling personnel each skilled and qualified in their respective disciplines. This team of dedicated professionals is equipped to resolve highly complex technical challenges on a moment’s notice. Kitchell would consider it an honor to serve the City of San Luis Obispo in carrying out resident engineer and construction management services for the New Cultural Arts District Parking Structure project as a collaborative member of the City’s team. We appreciate your consideration and look forward to the opportunity to personally demonstrate our qualifications as we progress in the selection process. Sincerely, Wendy Cohen, CCM Randy Rominger, LEED AP, Assoc. DBIA President Principal-in-Charge (Authorized to bind the firm) FIRM CONTACT/AUTHORIZED REPRESENTATIVE Name: Randy Rominger, Principal-in-Charge | Address: 1540 Marsh Street, Suite 150 | San Luis Obispo, CA 93401 tel. 805.706.0276 | email. rrominger@kitchell.com | Kitchell acknowledges and accepts receipt of Addendum #1 dated July 25, 2022. Randy is the authorized to represent the firm with respect to all notices, negotiations, discussions and other communications relating to this proposal. E. Cover Letter DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 2 F. Firm Qualifications Industry Leading Expertise Established in 1950, Kitchell is a 100% employee-owned company dedicated to providing construction management and general contracting services in the Western United States. Our firm’s innovations in management and reliability in delivering projects on time and within or under budget have earned us a reputation for superior performance. Since Kitchell’s inception, we have completed over $53 billion in public sector construction representing more 3,600 projects in parking structures, civic centers, education facilities, courthouses, municipal office buildings, detention and criminal justice centers, healthcare facilities, sports complexes, police/fire stations and performing/cultural arts centers. Having been in business for 72 years, Kitchell has proven its long-term stability and financial strength. As a construction management firm, Kitchell is consistently ranked amongst Engineering News Record’s top construction management firms. Focusing on the public sector has allowed us to develop management and project control techniques targeted to its specific needs. Our methods have been very successful—more than 85% of our work comes from repeat clients. We deliver our services using a variety of delivery strategies including agency and multiple prime CM, construction management at risk, lease-leaseback, design-build and the traditional design-bid-build. EXPERIENCE AT A GLANCE 14M SF OF PARKING PARKING STALLS 45,000 CENTRAL COAST CONSTRUCTION $1.7B CAL POLY SAN LUIS OBISPO, YAK?IT?UT?U RESIDENTIAL COMMUNITY SAN LUIS OBISPO, CA (COMPLETED 2020) Construction management services for a $204 million, 562,446 SF project featuring eight structures with four and five levels above grade. The project featured single, double and quad units totaling 1,475 beds for first year students and associated parking totaling 154,363 SF and over 450 stalls. 1. Contracting Agency:California Polytechnic State University, San Luis Obispo 2. Contracting Agency PM:Anthony Palazzo, Executive Director tel. 805.756.6538 | email. arpalazzo@calpoly.edu 3. Contract Amount:$3.9 million 4. Date of Contract:Jan 2013 5. Date of Completion:Jan 2020 6. Consultant PM:Tully Wyatt, Project Manager | tel. 805.440.2278 | email. twyatt@kitchell.com 7. Consultant RE:None 8. Project Objective:See description above. 9. Project Outcome:$165 million (Original Construction) | $172 million (Final Amount) PARKING STRUCTURE COMPLETED IN PAST 5 YEARS 5 yrs Randy Rominger PROJECT TEAM: Tully Wyatt DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 3 CITY OF CHANDLER, OREGON STREET PARKING STRUCTURE CHANDLER, AZ (COMPLETED 2019) Construction management services for a new $23 million, five-level, 293,000 SF, 932-space parking garage for the City of Chandler, which includes a road realignment along Oregon Street as well as intersection improvements at Arizona Avenue and Chicago Street. As Downtown Chandler’s largest garage, the project added much needed parking options for those accessing City Hall as well as restaurants and other venues in the bustling area. The structure is located to the west of City Hall across Arizona Avenue on the northwest corner of Chicago and Oregon streets. SAN LUIS OBISPO RTA, BUS MAINTENANCE FACILITY SAN LUIS OBISPO, CA (COMPLETED 2022) Construction management services for a new $17.5 million (construction cost), 28,650 SF, single story bus maintenance facility with over 2,600 SF of mezzanine/equipment platform located on a 6.44-acre site. The facility accommodates operations, administration and maintenance areas and includes detached enclosures on-site, including a trash enclosure and canopy over bus parking. Work also includes off-site improvements, specifically the T-intersection for future Elks Lane realignment. 1. Contracting Agency:City of Chandler 2. Contracting Agency PM:Paul Ahlas, Construction Project Manager - PW & U - Capital Projects tel. 480.782.3328 | email. paul.ahlas@chandleraz.gov 3. Contract Amount:$1.2 million 4. Date of Contract:June 2018 5. Date of Completion:December 2019 6. Consultant PM:Ralph Schulte tel. 515.822.8735 | email. rschulte@kitchell.com 7. Consultant RE:None 8. Project Objective:See description above. 9. Project Outcome:$19 million (Original Construction) | $20.8 million (Final Amount) 1. Contracting Agency:San Luis Obispo Regional Transit Authority 2. Contracting Agency PM:Geoff Straw, Executive Director tel. 805.781.4472 | email. gstraw@slorta.org 3. Contract Amount:$1.6 million 4. Date of Contract:June 2020 5. Date of Completion:February 2022 6. Consultant PM:Tully Wyatt, Project Manager tel. 805.440.2278 | email. twyatt@kitchell.com 7. Consultant RE:Troy Hart, Resident Engineer | tel. 805.448.8653 | email. thart@kitchell.com 8. Project Objective:See description above. 9. Project Outcome:$16.8 million (Original Construction) | $17.4 million (Final Amount) PARKING STRUCTURE COMPLETED IN PAST 5 YEARS COMPLETED IN PAST 5 YEARS 5 yrs 5 yrs Andy Goh Randy Rominger PROJECT TEAM:PROJECT TEAM: Heather Brown Tully Wyatt Ryan Stefanek DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 4 Additional Parking Structure Experience CITY OF SANTA MONICA, PARKING STRUCTURE 6, SANTA MONICA, CA A $44.6 million project consisting of demolition and rebuilding of a public parking structure located directly behind Santa Monica’s largest tourist attraction, the 3rd Street Promenade. The new structure is 11-stories (eight levels above grade and three levels subterranean) and contains approximately 750 total spaces. Other features include 30 electrical vehicle charging stations and infrastructure for future charging stations, a 90-bicycle bike rack and rooftop solar panels. The structure is LEED Gold Certified. SALINAS VALLEY MEMORIAL HEALTHCARE SYSTEM, PARKING GARAGE ANNEX, SALINAS, CA A new $36 million, 79,700 SF, four-level parking structure serving as an extension to the existing parking structure. The new garage provides a net increase of 166 parking stalls and includes a basement level with 20,000 SF of office and hospital support space. SMUD HEADQUARTERS REHABILITATION & PARKING STRUCTURE, SACRAMENTO, CA A $135 million complete renovation of the 120,000 SF office building and 45,000 SF parking garage. The building is divided into three sections: south wing, core and north wing. The south wing is four levels above grade with a full floor below grade; the core is five levels above grade and one floor below grade; and the north wing has three parking levels and a two-story office portion above the parking garage. UC SAN DIEGO, NORTH TORREY PINES LIVING AND LEARNING NEIGHBORHOOD, SAN DIEGO, CA A new $628 million project consisting of over 1.6 million GSF of student housing, parking, academic space and retail targeting LEED Platinum certification. The Living Learning Neighborhood provides approximately 2,000 new beds, resident facilities and support space for undergraduate students, new instruction and research space for departments and programs within the Divisions of Social Sciences and Arts and Humanities as well as general assignment classrooms. Buildings are varied heights with some individual buildings reaching up to 14 stories. The neighborhood also includes an underground parking structure with 1,200 spaces. G. Organization & Approach TULLY WYATT, dbia, leed ap Project Director CORE TEAM ANDY GOH, pe Resident Engineer TOM FEE Sr. Project Manager/Assist. Resident Engineer RYAN STEFANEK Quality Assurance Manager MATTHEW HARMS Project Engineer SUBCONSULTANTS CHARLES ZANOLI Testing & Inspections (Earth Systems) STEVE WEBSTER, ls BRIAN HELLWIG Surveying (RRM Design Group) COLBY BOGGS MICHAEL TOM, ms CASEY CLARK CHRISTOPHER DURAN, rpa DUSTIN MERRICK, rpa JENNIFER DICENZO Environmental Monitoring (Rincon Consulting) As-Needed In-House Support Services RANDY ROMINGER, leed ap, assoc. dbia Principal-in-Charge HEATHER BROWN, pe, leed ap, cpmp Engineering & Architectural Services Director MATT CHAPPELL, eit, cep Estimating Manager RICK STASSI Scheduling Manager 1. Provide an organizational chart identifying the Project manager for the work and each key person who would be assigned to carry out the work and their respective roles. Resumés should be included for all key individuals as an appendix. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 5 Roles & Responsibilities Our project team has been assembled based on their ability to deliver to the City of San Luis Obispo (SLO) the most efficient, cost effective and best-suited skills of our professional and support personnel. The ultimate success of the Cultural Arts District Parking Structure project is heavily dependent upon the experiences of the team. In developing our project team, staffing continuity is a key element in our approach to managing the project. The proposed team is proven in its capabilities and understands the complexities of parking structure construction. Kitchell’s project team is familiar with the local contracting community and has developed strong local contractor and subcontractor relationships. This maximizes the competitiveness translating to lower bid prices from the other important team members—the contractor and its subcontractors. Project Director Tully Wyatt will facilitate communication and decision making at all levels. He will ensure total team commitment of all resources to achieve the City’s objectives for the project, be present at key meetings and will be available continuously to the project team and City management staff. He will conduct risk assessments, participate in issue resolution and perform periodic site reviews to ensure the City’s objectives for schedule, budget and quality are being achieved. As a California Registered Civil Engineer, Andy Goh will fulfill the Resident Engineer duties and responsibilities as defined by Caltrans. He will study and become completely familiar with project plans, specifications, permits, environmental documents and agreements. He will work with our on- site team to organize and conduct construction inspections, materials testing and special inspections and environmental mitigation monitoring. He will review pay quantity calculations and ensure our team is monitoring the contractor’s compliance with the contract documents. Senior Project Manager/Assistant Resident Engineer Tom Fee will serve as Kitchell’s full-time on-site representative to the City of SLO and will function as an extension of your staff, working integrally with the project team. He will work in close coordination with Andy to fulfill the Resident Engineer responsibilities and will manage cost and time in accordance with the master project budget and schedule. He will drive the advancement of project efforts from preconstruction through completion. Tom will perform preconstruction services and deliverables and will be responsible for the timely completion of all construction phase deliverables. He will manage and administer contracts, report progress, interpret documents, conduct progress meetings, manage the progress payment process, facilitate resolution of field issues, and coordinate project punchlist, completion and turn over. Tom’s parking structure experience and his understanding of the local construction market will prove to be valuable assets to the City and the project team. Quality Assurance Manager Ryan Stefanek will serve on-site full-time during the construction phase and will develop and implement a project-specific quality assurance program. He will manage and coordinate submittal compliance, preinstallation meetings, mock-up reviews, inspections, testing, surveying, environmental mitigation monitoring and SWPPP compliance. Project Engineer Matthew Harms will serve on-site full-time during the construction phase. He will be responsible for the preparation and processing of project-related documentation including requests for information, submittals, design supplements, and project closeout documentation. He will maintain Kitchell’s project information system. As-Needed In-House Support Services Principal-in-Charge Randy Rominger will be responsible for ensuring client satisfaction with our team’s services, personnel, quality and contractual obligations. Estimating Manager Matt Chappel will lead our estimating team to validate project cost in accordance with the established project budget, lead estimating efforts that may be requested of Kitchell, participate in bid analysis and review contractor proposed change quotations. Engineering and Architectural Services Manager Heather Brown will lead our team’s registered architects and licensed engineers to provide engineering support services as needed throughout the course of the project. Scheduling Manager Rick Stassi will lead our scheduling team to provide scheduling support to the project team assisting in the development and maintenance of the Resident Engineer’s schedule. He will also assist the project team with in-depth review and analysis of contractor submitted schedules, monthly updates and delay fragnets. Subconsultants Charles Zanoli with Earth Systems will perform code compliance inspections as well as materials testing and special inspections as described in Task 3 of the RFP. Charles will also support applicable portions of Task 2. Steve Webster and Brian Hellwig with RRM Design Group will perform surveying as described in the RFP, Task 4. Colby Boggs, Michael Tom, Casey Clark, Christopher Duran, Dustin Merrick and Jennifer DiCenzo of Rincon Consulting will perform construction environmental mitigation and monitoring as described in the RFP, Task 5. Our proposed construction management team is 100% dedicated to your success from conception through completion. We will support the City of San Luis Obispo to ensure your Cultural Arts District Parking Structure project moves forward smoothly through closeout. Our team’s commitment goes beyond the job—they strive to see success in the community where they live and work. 100 % Dedicated to the success of your Cultural Arts District Parking Structure DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 6 Project & Management Approach Our approach to project management and the use of proper documentation from our project management information system, developed and proven over time, provides our team with the information necessary to keep the Phase 1B and Phase 2 projects within the established parameters for budget, schedule and quality. Kitchell will act as liaison with the City, design professionals and other consultants to facilitate and coordinate the execution of construction contracts, construction coordination and overall project management. We will act as the City’s representative, advising and consulting with the City and the design professional. We will monitor the work of contractors for deficiencies in the work and conduct a quality assurance program in cooperation with the design professionals and City quality assurance personnel. Earth Systems, our materials testing subconsultant will be carefully scheduled and monitored. We will notify the contractors and City Staff of deficiencies and follow through to ensure corrections are made in a timely manner. Informal ongoing punch lists will be generated to correct deficiencies as the projects proceed instead of waiting until the conclusion of the project to resolve quality issues in a timely manner. We will administer and coordinate the contracts, paying special attention to cost, contractor performance and quality. Through on-site coordination, regular progress meetings, thorough documentation and consistent schedule updates, we will ensure construction is completed on schedule, within budget and within the prescribed expectations of quality. Upon commencing services, our team develops several project management tools to facilitate complete and efficient delivery of services. These documents include a responsibility matrix, deliverables checklist, master schedule, cost control report, quality assurance (QA) plan and risk assessment. The responsibility matrix includes both external (among the entire project team) and internal (among the Kitchell team) responsibilities to bring clarity to assignments. Our Project Director Tully Wyatt attends progress meetings monthly (more often as the needs dictate) and conducts an on-site quality assurance assessment with the on-site team. The on-site team develops and implements a QA mitigation plan for the identified QA deficiencies. Tully conducts project health assessments with the on-site team on a quarterly basis. The project health assessment includes a risk assessment, review of the deliverables checklist, review of the project schedule, review of the cost control plan and review of the QA plan. The on-site team develops and implements a mitigation plan following each quarterly health assessment. 2. Describe your Project and management approach. Provide a detailed description of how the team and scope of work will be managed. 3. A list of no more than three references for the consultant and no more than three references for each subconsultants including a listing of the specific Projects and key individuals that have participated in them. Include the dollar amount related to the participation. Identify how much experience each firm has had with public agencies. Public Agency 1:San Luis Obispo Regional Transit Authority | Geoff Straw, Executive Director Address/tel.:253 Elks Lane | San Luis Obispo, CA 93401 | tel. 805.541.2228 ext. 4465 Project/Amount:Bus Maintenance Facility ($17.5 million) Staff:Randy Rominger, Tully Wyatt and Ryan Stefanek Public Agency 1:County of San Luis Obispo, Department of Airports | Craig Piper, Deputy Director Address/tel.:903 Airport Drive, Suite 5 | San Luis Obispo, CA 93401 | tel. 805.781.5205 Project/Amount:San Luis Obispo County Regional Airport Passenger Terminal ($39.5 million) Staff:Charles Zanoli Public Agency 2:Cal Poly San Luis Obispo | Anthony Palazzo, Executive Director Address/tel.:1 Grand Avenue | San Luis Obispo, CA 93407 | tel. 805.756.6538 Project/Amount:yak?it?ut?u Residential Community ($204 million) Staff:Randy Rominger and Tully Wyatt References Don’t take our word for it...Our clients are our strongest advocates! Our firm’s success is a reflection of the abilities of our staff and Kitchell as a whole. Below are references for which Kitchell has provided construction management services for their large public works capital improvement projects. In addition, we have included two references for each of our subconsultants. We encourage you to contact each of the references to the quality of our work and satisfaction with our services. Public Agency 2:Cal Poly San Luis Obispo | Howie Conroy, Construction Inspector Address/tel.:1 Grand Avenue | San Luis Obispo, CA 93407 | tel. 805.756.2173 Project/Amount:yak?it?ut?u Residential Community ($204 million) Staff:Charles Zanoli Public Agency 3:County of San Luis Obispo | Robert Ruiz, Program Manager Address/tel.:1087 Santa Rosa Street | San Luis Obispo, CA 93408 | tel. 805.788.2114 Project/Amount:New Animal Shelter ($20.3 million) | Probation Department Building ($16 million) Staff:New Animal Shelter: Randy Rominger and Tully Wyatt | Probation Dept. Bldg: Randy Rominger Kitchell Earth Systems DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 7 Public Agency 1:City of San Luis Obispo | Robert Hill, Sustainability & Natural Resources Official Address/tel.:919 Palm Street | San Luis Obispo, CA 93401 | tel. 805.781.7211 Project/Amount:Cerro San Luis Natural Reserve Initial Study/Negative Declaration (dollar amount N/A) Staff:Colby Boggs, Michael Tom, Casey Clark, Christopher Duran, Dustin Merrick & Jennifer DiCenzo Public Agency 1:City of San Luis Obispo | Hal Hannula, Supervising Civil Engineer Address/tel.:919 Palm Street | San Luis Obispo, CA 93401 | tel. 805.781.7201 Project/Amount:Police Station ($300,525), Public Safety Dispatch Center ($611,711), Jennifer Street Bridge ($38,600) Staff:Steve Webster and Brian Hellwig Public Agency 2:County of Santa Barbara | Travis Seawards, Deputy Director Address/tel.:123 East Anapamu Street | Santa Barbara, CA 93101 | tel. 805.568.2518 Project/Amount:Arctic Cold Project EIR Planning & Environmental Services ($280,220) Staff:Colby Boggs, Michael Tom, Casey Clark, Christopher Duran, Dustin Merrick & Jennifer DiCenzo Budgeting at California Polytechnic State University, San Luis Obispo, yak?it?ut?u Residential Community Kitchell was vested in maintaining the project budget at the yak?it?ut?u Residential Community. Aside from providing complete reviews of each contractor initiated change order request, we also tapped into our Estimating Department to review potential large scale changes to the project’s parking structure facility. In addition, we met bi-weekly with the Owner to review all approved, pending and potential changes to the project relative to the project contingency. These efforts at cost control and of continual budget review afforded the University the opportunities to provide additional facilities to the project (added a 2nd story to the administrative building), provide additional redundancies to vital systems like the lift station, emergency systems, and add critical infrastructure pieces to the campus electrical system (manholes, splice boxes). The combined team effort kept the project moving forward while managing these changes within the project budget. Public Agency 2:Lucia Mar Unified School District | Bryan Hagwood, Sr. Bond Project Manager Address/tel.:222 Stanley Avenue | Arroyo Grande, CA 93420 | tel. 805.474.3000 Project/Amount:Shell Beach ES Parking Lot ($225,270), Arroyo Grande HS Track ($7,000), Oceano ES ($91,280) Staff:Steve Webster and Brian Hellwig Public Agency Experience Kitchell brings more than 72 years of experience working with public agencies representing over $53 billion in construction encompassing over 3,600 projects. Focusing on the public sector has allowed us to develop management and project control techniques targeted to its specific needs. Earth Systems brings over 50 years of experience in the public sector. With an office in San Luis Obispo, Earth Systems brings extensive background in materials testing and special inspection, with a staff of over 20 highly qualified technicians and inspectors. They have worked with many jurisdictions throughout San Luis Obispo and Santa Barbara Counties including City of San Luis Obispo, City of Pismo Beach and City of Grover Beach to name a few. RRM Design Group brings more than 45 years of experience working with public agencies. Their work culture emphasizes collaboration, frequent communication and accessibility. Focusing on the public sector has allowed them to work with many clients in the Central Coast including the City and County of San Luis Obispo, City of Grover Beach, City of Paso Robles, City of San Mateo, City of Santa Barbara, City of Cloverdale and City of Ukiah to name a few. Rincon Consulting brings more than 26 years of experience working with public agencies including the City and County of San Luis Obispo, Santa Barbara County, City of Paso Robles and City of Santa Maria to name a few. 4. Describe your cost control and budgeting methodology for this Project. Budget Management One of our initial efforts will be to work with the City to understand/refine the budget, including identification of all cost components with reasonable budget assumptions to use until actual costs are accrued. We establish and maintain a cost control system in Procore to track all costs associated with the project against the established budget. As the project progresses, projected costs will be entered into the model, providing a real time assessment as to the status against budget. We often perform detailed estimates and reconcile to the design professional’s estimates, which provides an unbiased professional opinion of probable construction costs. Construction costs along with project soft costs are updated to reflect the latest information and tracked continuously against the established budget. We provide recommendations on construction feasibility, availability of materials and labor, time requirements for installation and construction, and factors related to cost including costs of alternative designs or materials, preliminary budgets and possible economies. If it appears the project construction budget will not be met, we offer alternatives and solutions to bring costs back in line. Rincon Consulting RRM Design Group DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 8 5. Provide responses to the following: We studied the documents published with the RFP and identified several potential critical construction and environmental issues, identified below with our proposed solutions for: Construction Related Issues Proposed Solution Local traffic surges every morning and afternoon (Mission Prep High and Old Mission Middle School) off Palm Street and adjacent streets, for student drop off and pick up. Establish access/egress restrictions, delivery moratoriums, work hours, etc. in the contract documents. Higuera Street and Marsh Street are natural traffic arteries for construction materials deliveries. During the deck pours, concrete trucks stack up to continuously pour concrete. Both streets contain critical commercial and retail outlets. Plan all deck pours and concrete truck staging either on-site (off streets) or remote with radio notification for minimal disruptions. If any businesses could be affected by steady traffic, discuss with City to review specific activities with affected business. Post-tensioned (PT) concrete placement quality control is exacting and unforgiving. Create stringent protocols for concrete placement, finishing, flatness, curing and sealants. Individuals (person) finishing concrete (swirl) may influence finish variation due to handling of trowel, pressure, etc. Ensure same finishing team is committed start to finish. Note that after placement, PT concrete cannot be readily repaired/ground for finish issues due to finish and cables, etc. Proper coordination for all PT slab systems including MEP, fire protection, ceiling inserts, bollard embeds, railings, bent U embeds, bolted wheel stops, etc. Perform thorough clash detection using Building Information Modeling (BIM) for all systems in or supported by PT decks to ensure there are no overhead clearance issues or in slab conflicts requiring retrofit. (No post install drilling allowed). Any structural changes requiring cutting or drilling into finished PT concrete. Resolve all identified constructability issues prior to bidding to mitigate cutting or drilling later. Any cutting or drilling PT concrete requires X-Ray cable locating and mapping, etc. This parking plan is essentially open building. Consider drainage and watertightness. When performing constructability reviews, check all decks for positive drainage including covered areas susceptible to wind driven water intrusion in all areas of the vehicle and pedestrian egress. Contractor use of tower crane for construction delivery. In bidding instruction include recommendations for tower crane placement (if used). Then have engineer revise structural plan to accommodate tower crane option. Parking structure fire separation/rating at the adjacent residential buildings. Review any portion of non-rated parking structure juxtaposed to the adjacent residential buildings for space separation and/ or rated wall conditions required. b) Describe critical environmental issues and how you will address these.a) Describe critical construction related issues associated with the Project and how you will address these. Environmental Issues Proposed Solution Storm water runoff in direct proximity to San Luis and Brizziolani creek beds Prioritize the SWPPP plan including ample retention basin/s. Monitor plan so it is constantly maintained. Provide effective track out plates to remove on-site soils and other contaminates from vehicles. This particular location is critical for all storm water to be properly contained and handled. Possible high ground water table/underground stream effect on over excavation, foundations, elevator pit, and shored wall on east side. Verify the geotech engineer has reviewed and coordinated with structural engineer. Also review seasonal water table heights with mitigation plans for these soil conditions, etc. Elevators: Plan elevator design, pits, etc. in relation to high water table and/or possible hydrostatic pressure seasonally. Plan any water stop rings, sump pit, and hydraulic cements, etc. to prevent ground water from penetrating the elevator pit from below. Potential tree drip and root damage at property line. Have arborist inspect trees at property line (on private property) for potential issues due to construction, that may require special protection, or removal and replacement. Potential for excessive noise levels due to construction activities. Check equipment noise dBs at adjacent buildings with mitigation options such as temporary sound walls, etc. Specify noise mitigation requirements in the contract documents DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 9 c) Describe how cost and schedule for the construction contract and your scope of work could be minimized. Cost & Schedule for the Construction Contract Construction cost and schedule can be minimized in a variety of ways. We analyzed the documents and have some suggestions, categorized as incentives, risk assignment and value analysis: Incentives: We assessed the Phase 1B and Phase 2 schedule durations and do not recommend they be reduced in the bid documents; however, schedule compression can be achieved through early delivery incentives and/or the use of bid alternates for reduced construction duration. Risk Assignment: As a rule, contractors don’t assume risk—they price it. Our risk assessment includes assignment of risk the contractor may consider to be onerous, or inappropriately assigned to them and thereby assign a premium to managing the risk item. An example is permanent shoring. Permanent shoring is shown on the east side property line on the Phase 1B Plan. The documents instruct the contractor to design all permanent shoring. There are two private structures on the zero-lot-line directly adjacent to the shoring. The contractor is to insure the permanent shoring design covers any additional foundation surcharge, etc. for zero deflection. Prospective bidders would likely consider this an onerous assignment of risk and charge a premium. We suggest the design professional design the permanent shoring or an allowance be established in the bid documents for permanent shoring design. Value Analysis: We identified a number of ideas the City may want to consider in realizing some time and/or cost savings. A few examples include: `Precast stair treads in lieu of poured in place. The cost of precast elements fluctuate; however, even if they’re higher in material cost, time and cost savings can be realized through faster installations and reduced labor. `The quantity of EV charging stations can be phased to meet the demand. We recommend installing the infrastructure for the charging stations but adding the equipment in phases to meet demand. This has the added benefit of taking advantage of future improvements in this emerging technology. `The copper dome details include specific details for copper dome construction, radius, materials, spire, waterproofing, roof gutter, etc. The City may want to consider a prefabricated unit. This could result in time and cost savings. Optimized Staffing Plan Our scope of work and resulting fees can be minimized through an optimized staffing plan, task assignment evaluation and reduced construction duration: Optimized Staffing Plan: We assembled our proposed staffing plan to deliver the highest qualified team at the best value. We accomplished this by assigning Resident Engineer Andy Goh on a part time basis working in close coordination with Assistant Resident Engineer Tom Fee. Through this strategy, the City receives the benefit of Andy’s expertise whenever needed without incurring the cost of a full- time team member. Task Assignment Evaluation: We assembled a team of in-house employees and subconsultants to perform all the tasks described in the RFP. We recommend primary responsibility for surveying be transferred to the contractor. This will appropriately place liability for survey errors on the contractor for remedy. We also recommend the City use in-house code compliance inspectors if this function can be performed by the City at lower cost. Reduced Construction Duration: Any schedule reductions achieved through the above measures could result in reduced duration of CM-RE services and result in fee savings as long as added staffing would not be required for added shifts or acceleration. During preconstruction, the Kitchell team assisted with re-scoping the project to bring the project in budget and developed a delivery plan including multiple bid packages and phasing to optimize the construction schedule. During construction, the Kitchell team provided day-to-day leadership throughout construction including cost, schedule and quality components of the project. The Kitchell team approached every day with the same enthusiasm, modifying plans as necessary to keep the project moving. They effectively communicated and coordinated with all involved in the project including the building department and other agencies having jurisdiction, the design team and contractors. We are grateful to have such capable staff on the project and would like to take this opportunity to recognize their dedication. -Andy Newman, Deputy Director, Butte County Association of Governments Butte Regional Transit Operations Center (BRTOC) Kitchell was a key partner in the successful delivery of the County of San Luis Obispo’s Animal Services Facility project. The first design-build project for the County. Kitchell provided preconstruction guidance on the $20.3M project and then was the day-to-day Construction Manager during construction. Kitchell’s staff was competent, professional and a pleasure to work with. - Robert Ruiz, Manager Project Delivery Division, County of San Luis Obispo ““ ““ Client Testimonials DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 10 H. Scope of Work This section should establish that the proposer understands the City’s objectives and requirements, demonstrate the proposer’s ability to meet those requirements and outline clearly and concisely the plan for accomplishing the specified work in accordance with the time schedule as outlined in Appendix A, Scope of Services: A Plan for Accomplishing the Specified Work We have thoroughly reviewed the Scope of Services contained in Appendix A of the RFP in conjunction with the contract documents, quality assurance plan, mitigation and monitoring plan, and project delivery schedule accompanying the RFP. Through this review and our periodic discussions with City personnel prior to issuance of the RFP, we have developed an understanding of the City’s objectives for the Cultural Arts District Parking Structure project. The succeeding paragraphs describe our plan for accomplishing the scope of work within the prescribed schedule. Scope of Services Statement We will perform the scope of services defined in Appendix A of the RFP, which includes: performing the duties of the Resident Engineer as defined by Caltrans, assist with bid evaluation, review available project documents, prepare and maintain the Resident Engineer’s project schedule, develop project procedures in collaboration with the City, establish and maintain the project management information/document control system, establish a dispute resolution process, provide project administration, coordination & communications, monitor/evaluate the contractor’s schedule, conduct progress meetings, issue progress reports, evaluate payment requests, manage the submittal and RFI processes, manage/mitigate change orders, conduct construction observations/inspections, evaluate & negotiate claims, perform materials testing & specialty inspections, perform surveying, perform construction environmental mitigation & monitoring, and manage project completion & closeout City Staff Participation We often use a responsibility matrix to clarify team participation requirements in granular detail. Our need for City staff participation generally boils down to providing project information and documentation, a designated representative who can render timely decisions, access to City personnel who have the authority to authorize contract modifications, and liaison with City departments and other local authorities involved in the project. Workplan Task 1: Preconstruction Services Upon commencing preconstruction phase services, Resident Engineer Andy Goh and Assistant Resident Engineer Tom Fee will perform an immersive study of all available project documents to become intimately familiar the available project information. They will use this base of information to build and implement a strategy to ensure successful delivery of the project, described in greater detail herein. Construction Management Plan Upon commencing services, we will work with the City to develop the construction management plan. This effort will serve as the project team’s primary point of reference and will establish the framework for project execution. The construction management plan will include the following: `Communications protocols, progress reporting requirements, roles and responsibilities, and project procedures to establish clarity on how the City, designer, contractor and Kitchell interact as a team and administer and coordinate the work of the project. `Master Budget and Master Schedule: Kitchell will evaluate the City’s current schedule, budget, and design to establish time and cost expectations. From this evaluation, Kitchell will develop a master budget and master schedule to track progress and develop strategies to remain on schedule and within budget. `Project Logistics Plan to identify and resolve project logistical challenges such as ensuring undisrupted activity to the surrounding community, access/egress issues, noise mitigation measures, staging operations, and many other logistical challenges. TASK TASK TASK TASK TASK TASK 1 2 3 4 5 6 Preconstruction Services Construction Services Geotech. & Materials Testing & Special Inspections Surveying Construction Environmental Mitigation & Monitoring Post Construction Deliverables DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 11 `General Conditions and Bid Forms/Procedures to convey clear scope of work and concise bidding/contract execution procedures to the bidding community and provide ample project administrative control. `Quality Assurance Plan to establish a clearly defined process for achieving the City’s quality objectives. The construction management plan is an evolving document and will be updated continually throughout the project. Many of these elements are explained in greater detail in relevant sections of our proposal. Resident Engineer’s Master Project Schedule We will develop and maintain the overall Critical Path Method (CPM) Resident Engineer’s master project schedule with milestones. Our project schedules provide information in a concise, clear, and effective format. The schedule will incorporate all remaining preconstruction and construction activities. In the process, we will evaluate and propose alternatives for project logistics, phasing and sequencing. We will advise the project team regarding factors including long-lead materials procurement, rapidly changing materials prices, weather, overall schedule requirements, favorable/unfavorable bidder climate and regulatory requirements. The project team will determine the pertinent factors. They will then be compiled, evaluated, and reduced to a set of recommendations for incorporation. Quality Assurance Plan Kitchell has a standard Quality Assurance (QA) program, which will serve as a vital tool in developing a project-specific QA plan and facilitating the contractor’s implementation of their Quality Control (QC) plan. We will take a proactive approach to quality assurance to see that project receives the best project quality for its investment. Primary aspects of Kitchell’s QA program include: `Conducting design and constructability reviews to improve buildability and help eliminate potential change orders `Establishing clear QA/QC processes and procedures including inspections, materials testing & special inspections; as well as delivered materials verification against approved submittals. `Participating in pre-installation meetings prior to each construction operation to ensure proper installations and applications without costly rework. `Requiring mock-ups of important building components and finishes to ensure that the specified quality expectations will be met. Bid Administration Successful administration of the bid phases will result in a project that meets the City’s goals for receiving responsive and responsible bid proposals from prospective qualified bidders. Kitchell performs a variety of services in administering and assisting in the contractor selection process. Our bid phase services often include: `Extensive bidder solicitation to generate a competitive bidding environment `Conducting pre-bid conferences to clarify bidding requirements and provide bidders with a venue to conduct their pre-bid investigations `Developing methods for tracking, responding to, and expediting questions received prior to receipt of bids `Reviewing addenda and advising the team of time, cost or constructability impacts `Assisting in assembling construction documents, bid documents, general conditions, addenda and distribution to all prospective bidders `Reviewing and analyzing bids and making recommendations to the owner for contract awards `Assist and coordinate the resolution of bid protests `Post-bid meetings and analysis of bid alternates `Assist with contract development, award, and formal issuance of Notice to Proceed Task 2: Construction Services Project Coordination & Communication Conveying clearly defined communications are paramount to project success. Kitchell will organize and establish effective communication among the project team members. We will ensure that responsibilities for completing tasks are assigned to appropriate team members, they are understood by all, and are tracked throughout the design and construction process. Written communications are date stamped, logged, and tracked for responses. Our project personnel are trained in Procore online data control system for generating and/or tracking communications, costs, requests for information, submittals, daily logs, drawings, and other project documents. We are also flexible in adapting to other project administration systems as dictated by City and project demands. Logs are distributed for all outstanding items. These logs are reviewed, prioritized, and correspondence is produced from Procore for all due and delinquent items. This enables the team to proactively address and resolve issues without experiencing the consequences of delayed response. Schedule Management Careful monitoring and regular reporting of activities against the contractor’s schedule will provide early information about overall progress. We will follow up on potential delay issues through active communication with City staff and the project team. We will continually review and monitor progress of the work against the scheduled milestones, and provide recommendations necessary to prevent, minimize, or recover from delays. The accepted critical path schedule will become the baseline upon which we measure progress, as well as record an accurate history of how the project is built through consistent schedule updates. We will use the weekly on-site project construction meetings as a forum to discuss the status of the schedule with the contractor. We will continuously monitor the schedule and enforce the provisions of the contract documents regarding scheduled progress. We will also enforce the provisions of the specifications regarding scheduled progress of the project. We have developed specific language used extensively in contract documents requiring the contractor to follow rigid specifications in the development and maintenance of a CPM schedule that is dollar and manpower loaded. In the event that a contractor submits a delay claim, the contractor must provide justification substantiating that an actual delay to the work occurred. Additionally, the contractor must provide a schedule analysis showing that the delay affected work activities critical to scheduled project completion. Finally, the contractor must substantiate the number of delay days claimed. The contractor’s documentation to substantiate the claim is then reviewed and analyzed, and entitlement, if any, is determined. PRECONSTRUCTION DELIVERABLES: –Resident Engineer’s master project schedule –Project Procedures –Quality Assurance plan DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 12 Progress Meetings We consider meetings an effective means of collaborating on ideas, resolving issues, building relationships, and reporting information in a relational environment. Subject matter for construction progress meetings will include the coordination and implementation of design elements, identification and resolution of issues, schedule coordination and compliance, tracking and management of RFIs, submittals, change orders, payment applications, and general coordination of testing and inspections. To memorialize important statements made and actions required, concise, accurate meeting minutes issued in a timely manner are just as important as the meetings themselves. We adhere to Kitchell’s 48-hour turnaround policy on issuing meeting minutes. Progress Reports Progress reports provide a snapshot of project status. We will generate reports electronically to summarize project activities, report schedule and budget status, address current project issues and forecast future activities. Photographs showing project progress are included along with applicable logs and other pertinent information. Payment Kitchell, in consultation with the design professional and the City, will implement a standard procedure for the review, processing, and payment of the contractor payment applications as well as invoices applicable to the project budget. This procedure will facilitate timely, accurate and appropriate payments, thereby limiting the City’s exposure to overpayments or interest fees. Submittals Kitchell’s submittal activities begin weeks before the contractor begins work. To ensure that the contractor fulfills the specified submittal requirements, we comb the specifications for any required submittals and enter them into our project administration software. This enables us to work from a submittal schedule tied to individualized submittal due dates. Once the contractor transmits submittals for approval, submittal status transitions from “scheduled” to “logged” by simply entering actual receipt dates to the pre-entered submittal information. We utilize our computerized submittal schedules and submittal logs to mitigate delays due to delinquent contractor submittals or consultant reviews. Requests for Information During construction, prompt resolution of the contractor’s requests for information (RFIs) will help mitigate change orders. For this reason, we have implemented an efficient RFI processing and monitoring system through our project administration software. We have also developed specification language to reduce erroneous RFIs. We will use the RFI Log to track requests for information including important receipt and response dates and ball-in-court status. Most importantly, the RFI Log prioritizes when a response is required to be submitted to the contractor. This will help mitigate delays due to delinquent RFI responses. The RFI Log is updated weekly and is distributed to all team members during the weekly meetings. Change Orders Our change order mitigation process will include a thorough evaluation of each change order request against the contract documents for validity. Valid change order requests will be systematically reviewed for onerous or excessive cost items. Kitchell, in conjunction with the City and the design professional, will develop and follow specific procedures for resolving change order disputes. The team will maintain emphasis on critical issues and ensure that all appropriate team members are informed of the proposed changes and the impact on cost and time immediately when the issues arise. Construction Observation/Inspection Our construction management personnel are well equipped to conduct field inspection support, oversight, and quality assurance. We have assisted in selecting, coordinating and administering over $300 million of special consultant contracts. This experience will be very useful in administering and coordinating the work of building inspectors, testing and inspection personnel, mitigation monitoring personnel and others as required by the City. We will conduct field observations and generate daily reports. Our project team will collect and report daily project information to develop a written history of the project. Information included in our daily reports includes activities performed, important events of the day, visitors, materials received, crew size, weather data, and issues to resolve. This collection of daily reports document daily construction events forming an as-built history of construction schedule implementation. Dispute Resolution/Claims We have found that unresolved disputes diminish in an environment of partnership. We recommend implementation of a dispute resolution ladder to enable issues to be escalated from the field to progressive levels of the project hierarchy enabling issues to be resolved without becoming stymied in conflict and indecision. SCHEDULE MANAGEMENT CITY OF SANTA MONICA, PARKING STRUCTURE 6 Kitchell was responsible for setting and maintaining the project schedule. Several factors had to be considered for establishing this schedule. First and foremost was how to facilitate a major construction project in a high-traffic downtown area. Second was the timing for delivery of materials – how it would affect neighboring businesses and residents, safety precautions to accommodate pedestrian traffic, etc. Kitchell met with the entire project team each week to monitor schedule issues, make adjustments as needed and report progress updates and changes to the client. With the demolition, however, there were a lot of unforeseen issues that affected the schedule early on. Once the existing structure was demolished and site excavation had begun, the general contractor discovered underground storage tanks and hazardous materials that required remediation. The additional work to remove the tanks and hazardous materials caused about a four-week delay. Despite these early challenges with unforeseen conditions during demolition and the need to bring in a new electrical connection, the project was delivered and operational on time. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 13 In the event parties disagree over design intent, unforeseen changes, utility conflicts, schedule delays and other issues, and agreement isn’t reached through dialogue, Kitchell will implement a dispute resolution process involving an objective analysis of merit and entitlement. Kitchell will meet with the City to recommend a solution then attempt settlement with the involved parties. If settlement negotiations are unsuccessful, Kitchell will recommend the matter be resolved through a formal dispute resolution process outlined in applicable contracts. Having a wide range of subject-matter experts, construction and engineering professionals, we will be able to review, assess and recommend action on additional cost matters, and scope entitlement or denials. Lastly, we can identify if contractor costs are appropriate based on our database of cost estimates developed for multiple projects in the region. TASK 3: GEOTECHNICAL & MATERIALS TESTING & SPECIALTY INSPECTION Earth Systems will perform the materials testing and specialty inspection scope of services described in the RFP. TASK 4: SURVEYING RRM will perform the survey scope of services as defined in the latest version of the Caltrans Survey Manual. TASK 5: CONSTRUCTION ENVIRONMENTAL MITIGATION & MONITORING Rincon will perform the environmental mitigation and monitoring scope as defined in the RFP including providing qualified biologist(s), air quality monitoring, cultural/archaeological monitoring, paleontological monitoring, and placing noise mitigation signage. TASK 6: POST-CONSTRUCTION SERVICES We will review the front-end documents to ensure they clearly reflect the City’s expectations for contract closeout and warranty issue response. We will also develop procedures that define each team member’s roles and responsibilities during the start-up, closeout and warranty phases. Kitchell will participate in walk-through inspections. From these inspections, a punch list of remaining items to be addressed will be generated. We will work with the City to verify that these items are corrected before moving on to final completion. Kitchell will assist in determining final completion and scheduling final inspection. We will manage submittal of required closeout documents including warranties, guarantees, affidavits, releases, bonds, and waivers, as well as coordinate delivery of all keys, manuals and maintenance stock. We will work with the City to secure as-built drawings, records, logs, photographs, change orders and shop drawings as required by the contract documents. CONSTRUCTION DELIVERABLES: –Project documentation via electronic uploads –Meeting minutes –Reports: Daily Observation, Inspection, Monthly Progress –Logs –Schedule reviews –Review/Recommendations: Changes, Claims, Payment Applications MATERIALS TESTING & SPECIALTY INSPECTION DELIVERABLES: –Materials testing and specialty inspection reports SURVEYING DELIVERABLES: –Survey records POST-CONSTRUCTION DELIVERABLES: –Red-lined project as-built drawings –Compilation of outstanding claims and other financial closeout documentation ENVIRONMENTAL MITIGATION & MONITORING DELIVERABLES: –Environmental mitigation and monitoring reports Three-Step Claim Analysis Process Merit Evaluation: Performed to determine the legal basis of the claim, if any. Settlement Negotiations: Conducted with the contractor. Entitlement Analysis: If the claim has merit, an entitlement analysis is performed to determine time and monetary entitlement. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 14 Contract Agreement Indicate any issues or proposed changes to the sample contract included as Appendix C. The Consultant must provide a brief statement affirming that the proposal terms will remain in effect for one hundred twenty (120) days following the date proposal submittals are due. Kitchell has reviewed the sample contract in Appendix C of the RFP, and has identified the following exceptions. We request the following redlined changes to the indemnity provisions: 22. Hold Harmless and Indemnification. `(a) Non-design, non-construction Professional Services: To the fullest extent permitted by law (including, but not limited to California Civil Code Sections 2782 and 2782.8), Consultant shall indemnify, defend, and hold harmless the City, and its elected officials, officers, employees, volunteers, and agents (“City Indemnitees”), from and against any and all causes of action, claims, liabilities, obligations, judgments, or damages, including reasonable legal counsels’ fees and costs of litigation (“claims”), arising out of to the extent caused by the Consultant’s negligent performance or Consultant’s negligent failure to perform its obligations under this Agreement or out of the operations conducted by Consultant, including the City’s active or passive negligence, except for such loss or damage arising from the sole or active negligence or willful misconduct of the City. In the event the City Indemnitees are made a party to any action, lawsuit, or other adversarial proceeding arising from Consultant’s performance of this Agreement, the Consultant shall provide a defense to the City Indemnitees or at the City’s option, reimburse the City Indemnitees and pay their costs of defense, including reasonable legal fees, incurred in defense of such claims. `(b) Non-design, construction Professional Services: To the extent the Scope of Services involve a “construction contract” as that phrase is used in Civil Code Section 2783, this paragraph shall apply in place of paragraph A. To the fullest extent permitted by law (including, but not limited to California Civil Code Sections 2782 and 2782.8), Consultant shall indemnify, defend, and hold harmless the City, and its elected officials, officers, employees, volunteers, and agents (“City Indemnitees”), from and against any and all causes of action, claims, liabilities, obligations, judgments, or damages, including reasonable legal counsels’ fees and costs of litigation (“claims”), arising out of to the extent caused by the Consultant’s negligent performance or Consultant’s negligent failure to perform its obligations under this Agreement or out of the operations conducted by Consultant, including the City’s active or passive negligence, except for such loss or damage arising from the sole or active negligence or willful misconduct of the City. In the event the City Indemnitees are made a party to any action, lawsuit, or other adversarial proceeding arising from Consultant’s performance of this Agreement, the Consultant shall provide a defense to the City Indemnitees or at the City’s option, reimburse the City Indemnitees and pay their costs of defense, including reasonable legal fees, incurred in defense of such claims. `(c) Design Professional Services: To the fullest extent permitted by law, Consultant shall indemnify, defend, and hold harmless City and any and all of its officials, employees and agents (“Indemnified Parties”) from and against any and all claims, losses, liabilities, damages, costs and expenses, including attorney’s fees and costs, to the extent they are caused by arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant. Consultant’s duty to defend shall consist of reimbursement of defense costs incurred by City in direct proportion to the Consultant’s proportionate percentage of fault. Consultant’s percentage of fault shall be determined, as applicable, by a court of law, jury or arbitrator. In the event any loss, liability or damage is incurred by way of settlement or resolution without a court, jury or arbitrator having made a determination of the Consultant’s percentage of fault, the Parties agree to mediation with a neutral third-party to determine the Consultant’s proportionate percentage of fault for purposes of determining the amount of indemnity and defense cost reimbursement owed to the City. Notwithstanding the foregoing and without diminishing any rights of City in the preceding paragraph, for any liability, claim, demand, allegation against City caused by a negligent arising out of, related to, or pertaining to any act or omission of Consultant, but which is not a design professional service, Consultant shall defend, indemnify, and hold harmless the Indemnified Parties from and against any and all damages, costs, expenses (including reasonable attorney fees and expert witness fees), judgments, settlements, and/or arbitration awards, whether for personal or bodily injury, property damage, or economic injury, and arising out of, related to, any concurrent or contributory negligence on the part of the City except for the sole or active negligence of, or willful misconduct of the City. In addition, we request the non-applicable indemnifications provisions be struck. We believe paragraphs (a) and (c) should be struck. In our opinion, the dispute resolution provisions in Article 36 are somewhat unusual and biased in favor of the Owner. We request the opportunity to meet with the City and explore mutually agreeable changes to the dispute resolution language. Statement of Affirmation Kitchell certifies that the proposal terms will remain in effect for one hundred twenty (120) days following the date proposal submittals due date, September 1, 2022. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 15 References Fee Proposal Optional- Additional Supporting Information A list of no more than three references for the consultant and three references for each subconsultant, including the names, addresses and telephone numbers. These references may be the same as the references listed above in IV. Proposal Format, Section C. Organization and Approach. Within a separate sealed envelope, submit a complete fee proposal for the scope of services. Provide separate subtotals for Phase 1B and Phase 2 broken down by task and staff billing rates with estimated hours. Clearly identify fees for subconsultant services. Please see pages 6 and 7 for details on no more than three references for Kitchell and each of our subconsultants. Please see the separately sealed envelope for details on our complete fee proposal for the scope of services. We have provided separate subtotals for Phase 1B and Phase 2 broken down by task and staff billing rates with estimated hours, as well as clearly identified fees for subconsultant services. None. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX i EDUCATION MBA, Florida Institute of Technology BS, Architecture Engineering, California Polytechnic State University, San Luis Obispo INDUSTRY CERTIFICATIONS Designated Design-Build Professional LEED Accredited Professional OSHA 30 Hour Certification TULLY WYATT, dbia, leed ap PROJECT DIRECTOR As local San Luis Obispo resident, Tully brings over 19 years of industry experience as a dedicated, organized and detail oriented construction professional. He is a skilled leader who believes in transparent, ongoing communication and maximizing technology to expedite information, guaranteeing that all team members, including subcontractors, are constantly informed of decisions or changes in real time. Tully has a wide range of experience in alternate delivery methods, including CMAR and design-build, as well as extensive project experience, including his most recent work at San Luis Obispo Regional Transit Authority Bus Maintenance Facility where he is serving as a Senior Project Manager. As a local resident for many years, Tully is committed to his local community and clients. His commitment to local clients ensures Tully understands the issues unique to San Luis Obispo, providing the City with assurance that he shares your desire for success. PROJECT EXPERIENCE California Polytechnic State University, San Luis Obispo, yak?it?ut?u Residential Community, San Luis Obispo, CA: A $204 million, 562,446 SF design-build project featuring eight structures with four and five levels above grade. The project featured single, double and quad units totaling 1,475 beds for first year students and an associated parking structure totaling 154,363 SF and over 480 stalls. Situated adjacent to the Grand Avenue entrance of the campus, the community is richly programmed with study areas, large scale living rooms for 50 students or more, outdoor courtyards and circulation routes, a mailroom, recreation center, offices and admissions welcome center. Outdoor spaces include a large lawn with an amphitheater and a courtyard with volleyball and basketball courts, natural features, gardens, contemplative spaces, and bike paths – all designed to support new students’ engagement in the Cal Poly experience. This project is LEED Platinum certified. San Luis Obispo Regional Transit Authority, Bus Maintenance Facility, San Luis Obispo, CA: A new $17.5 million (construction cost), 28,650 SF, single story bus maintenance facility with over 2,600 SF of mezzanine/equipment platform located on a 6.44-acre site. The facility accommodates operations, administration and maintenance areas and includes detached enclosures on-site, including a trash enclosure and canopy over bus parking. Work also includes off-site improvements, specifically the T-intersection for future Elks Lane realignment. California Polytechnic State University, San Luis Obispo, Recreation Center, San Luis Obispo, CA: A $57.5 million, LEED Gold certified recreation expansion that added 85,000 SF to the facility and renovated another 90,000 SF. Additions included a lobby/lounge, three fitness rooms, a two-court gym, a multi-activity center, tripled exercise space, a wellness center, an indoor jogging track, restrooms, leisure pool and deck, an additional sand volleyball court, and six racquetball courts rebuilt with Squash and Wallyball configurations. Renovations included men’s and women’s locker rooms. The recreation center remained operational during the construction period. San Luis Obispo County Community College District, Measure L Bond Program, San Luis Obispo, CA: A $275 million bond program which addresses crucial facility needs, including a new instructional building on the San Luis Obispo campus, a new campus center, a new career training facility and new early childhood center at the Paso Robles campus; the replacement of temporary classrooms, and repairs and upgrades to roofs, heating and air conditioning units, aquatic center and other infrastructure and utilities technology upgrades. County of San Luis Obispo, Probation Department Building, San Luis Obispo, CA: A new $16 million, 31,000 SF, two-story office building featuring office space for county probation staff, interview rooms, training, conference and evidence rooms, armory, secured sallyport, break rooms, locker and changing rooms, restrooms with showers, a public lobby, secured parking for employee vehicles and department vehicles as well as an emergency generator. Santa Barbara County, Staff Augmentation Services, Santa Barbara, CA: Tully alongside Kitchell is currently providing staff augmentation services to Santa Barbara County for over 27 projects totaling more than $73.1 million. Our services include project and construction management for capital and facilities/maintenance projects, project development, programming, scope of work development, RFP/bidding document production, overseeing bidding process and closeout. City of Santa Maria, Historic Smith-Enos House Structural Improvements, Santa Maria, CA: A $180,000 project providing structural improvements to the historic Smith-Enos House in Santa Maria. The modernization and revitalization of the structure is phase one of a multi-phase approach to the renovation of the house, which aims to rehabilitate the interior and exterior of the historic residence to recreate a new indoor public recreation venue featuring cultural and historic exhibits. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX ii EDUCATION MBA, Business Administration, Arizona State University MS, Civil Engineering, Arizona State University BS, Civil Engineering, Arizona State University INDUSTRY CERTIFICATIONS Professional Engineer #C 45731, CA Professional Engineer #24771, AZ Professional Engineer #125612, TX ANDY GOH, pe RESIDENT ENGINEER With more than 34 years of strong, relevant management experience in a wide variety of public works service areas and operations, Andy has led teams to the successful completion of hundreds of infrastructure projects, many of which are fast-track, high profile or federally funded. He is well-versed in complex public policy issues and applicable laws governing municipal operations and project delivery. Under his leadership over the years, his teams have provided customer service-first public service with strategic forward-thinking and incorporated best management practices and use of technology to improve and enhance service delivery. Andy has successfully led his teams in completing many major and complex capital improvement projects in various markets including street transportation, public transit, water and wastewater, public safety and aviation. Proactive in establishing constructive and collaborative partnerships, he prides himself on his ability to build solid and lasting relationships. Andy is results-driven and decisive, while remaining an approachable and progressive leader with a strong commitment to the client’s strategic vision.  PROJECT EXPERIENCE City of Chandler, Oregon Street Parking Structure, Chandler, AZ: A new $23 million, five-level, 293,000 SF, 932-space parking garage for the City of Chandler, which includes a road realignment along Oregon Street as well as intersection improvements at Arizona Avenue and Chicago Street. As Downtown Chandler’s largest garage, the project added much needed parking options for those accessing City Hall as well as restaurants and other venues in the bustling area. The structure is located to the west of City Hall across Arizona Avenue on the northwest corner of Chicago and Oregon streets. City of Tempe, Tempe City Hall Parking Structure, Tempe, AZ: A $16 million (construction cost), five-level, 175,000 SF, 440 stalls parking structure. The five-story mixed- use facility includes parking on all five levels with retail and office space in portions of the first two levels. The exterior cladding of the building consists of light gauge metal stud walls with an adhered stone finish. Tempe East Valley Bus Operation & Maintenance Facility, Tempe, AZ: A $39 million, 103,890 SF, 250-bus LEED Gold certified facility featuring administrative offices, operations/ driver facilities for over 500 operators, a bus maintenance building, bus canopies, and a full liquid natural gas and compressed natural gas (LNG/CNG) fueling center with fare retrieval and bus wash on a 25-acre site. City of Tempe, Center for the Arts, Tempe, AZ: A new $68 million, 88,000 SF performing and visual arts center consisting of two theaters, multi-use areas, gallery and administrative space as well as 20 acres of site development. The facility includes a 600-seat main theater, 200-seat black box theater, public space, stage support, a 3,000 SF multi-use space for rehearsals and events, a 3,500 SF visual arts gallery, administration, gift shop, catering kitchen and donor room. Special features include a 20,000 SF underfloor air distribution (UFAD) system, high-end architectural concrete components such as scalloped walls, battered/radius walls and a cast-in-place dome in the main theater. Site development features include a reflecting pool, pedestrian paths and a park located next to a riparian area on the southwest shore of the Tempe Town Lake, adjacent to a downstream dam. City of Tempe, Curry Road Pedestrian Improvements, Tempe, AZ: A $600,000 road improvement project consisting of the removal and replacement of curbs, gutters, sidewalks, roadway medians, landscaping and a 48” concrete irrigation pipe. This project was funded by the ARRA. City of Tempe, Tempe Town Lake Pedestrian Bridge, Tempe, AZ: A new $5.5 million CMAR suspension bridge totaling 1,000 LF pedestrian and bicyclist bridge connecting the north and south shores of Tempe Town Lake. The bridge, which is lit with vibrant blue hues after dark, consists of four spans of 228 feet each and weighs about 165,000 pounds in total. The bridge is 12 feet wide and 34 feet tall, with arches suspended by 32 metal cables. The bridge has a total of 128 steel cables which criss-cross each other and add to the bridge’s distinctive shape. City of Chandler, Chandler Public Safety Training Center, Chandler, AZ: A new $27 million, 58,090 SF shared resource facility for the Chandler Police Department and Chandler Fire Department. It was built in multiple phases with Phase 1 providing an administrative, educational and tactical training building. Phase 2 provides a separate, state-of-the-art indoor police firing range complex. The finished facility includes an auditorium, offices, tactical training, fitness, firearms simulation system, breakroom, secure parking and exterior secure break areas. This new training complex is the hub for integrated police and fire training and the combined public safety training center. City of Tempe, Apache Boulevard Police Substation, 911 Call Center, and Property & Evidence Facility, Tempe, AZ: An 82,800 SF facility prominently located on Apache Boulevard housing various police functions including patrol, SWAT team, a 911 Call Center and a Property & Evidence Facility. The second floor of the Apache Substation includes a 911 Call Center and Dispatch Center with space allowing users to collaborate, flexible access to the console areas and a separate training area. The entire facility includes complete redundant power and cooling systems. Adjacent to the Substation and Call Center is a 28,800SF property and evidence storage facility. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX iii EDUCATION Coursework, Art, Saddleback College AFFILIATIONS Construction Management Association of America (CMAA) TOM FEE SR. PROJECT MANAGER/ASSISTANT RESIDENT ENGINEER Tom has more than 30 years of experience successfully leading teams managing program development and construction for both public and private clients. As a construction expert, he specializes in all processes from predevelopment through construction delivery, authoring construction management guidelines and redevelopment use plans. Tom’s experience encompasses commercial, industrial, civic/municipal, public private partnership, planning, commercial mixed use, telecommunications, criminal justice, healthcare, hospitality and residential, providing services including program development, plan and specification constructability review, bidding and buyout, estimates, change order review, baseline scheduling and dispute resolution. He believes in a proactive project management approach, increasing productivity and providing exemplary results for his clients. PROJECT EXPERIENCE City of Los Angeles, Metropolis LA R2, Los Angeles, CA: Tom managed on-site construction for the R2 portion of the downtown Los Angeles Metropolis LA. R2 is a type I concrete condominium single structure with 40 levels above grade and two levels below grade. A total of 514 luxury condominiums with a connected (post tensioned) 11-story parking structure totaling 658,495 SF and 1,821 stalls. The roof of the parking structure is a landscaped deck featuring a swimming pool, spa, fire features, volleyball, sporting area, a dog park and a play space. The overall project is located within the 6.3 acre, $1 billion Metropolis development. R2 also includes 36,482 SF of retail located at the ground floor and an amenity level. City of Beverly Hills, La Cienega Tennis Center, Beverly Hills, CA: As construction manager for the City of Beverly Hills, Tom managed overall construction of the La Cienega Park and Tennis Center. The project included a 138,000 SF, post tensioned parking garage with City tennis courts located on the parking structure roof. The project also included a park, two baseball fields, soccer field and the Margaret Herrick Museum and Library. Los Angeles Unified School District, Central Los Angeles Region High School #12, Los Angeles, CA: A new $20.2 million concrete podium style construction with below grade parking and steel frame parking structure for upper floors. Tom served as the Cost Estimator responsible for reviewing the contractor’s baseline schedule, monthly pay application and time impact analysis by general contractor, preparation of independent cost estimates for change orders, evaluation of general contractor cost estimates and negotiation of final change order amounts. University of California, Santa Barbara, San Nicolas and San Rafael Residence Halls, Santa Barbara, CA: Two fast-tracked complete interior replacement projects totaling approximately $3 million located on the UCSB campus, San Nicolas Hall, a seven- story building with 265 rooms and San Rafael Hall, which consists of housing clusters accommodating approximately 500 students. Construction volume required CPM schedules to be updated twice per day, working closely with the university and subcontractors to guarantee delivery. Projects were completed sequentially on-time and within budget. University of California, Santa Barbara, Biotech Seawater Laboratory, Santa Barbara, CA: A $7 million biotech seawater lab/marine studies facility which can replicate any global ocean condition. Tom served as the Superintendent responsible for managing site construction to completion and certification for a project with extremely complicated logistics for structural concrete involving corrosion resistance, direct seawater filtering, piping and storage tanks. Due to the complexity of the project, constant interface with staff and facilities management during construction was required. Department of General Services, Caltrans District 11 Headquarters, San Diego, CA: Senior Project Manager responsible for managing program, infrastructure planning, constructability review, master schedule, project budget, public bidding, award and physical delivery of the 12-acre, 320,000 SF, five building campus. Project was completed under project and ahead of schedule. Dynegy, The Plant University, Morro Bay, CA: Programming for a redevelopment of a 12 million cu. ft. waterfront power plant while still in operation. The site consists of 50 acres of oil storage, brownfield certification, city lease arrangements, etc. The final program and site use plan was projected at $175 million and included a post graduate university for sustainable power engineering and water studies, classrooms, labs, housing, commercial mixed-use space and convention center. Kern County, Park Wi-Fi, Kern County, CA: Kitchell is providing project management services for the County’s park Wi-Fi project. The American Rescue Plan Act (ARPA) provided the County with funds thereby allowing them to provide public access internet Wi-Fi coverage to the 43 County-owned parks scattered among the 8,163 square miles that encompass Kern County – roughly the same size as the State of New Jersey. Our services include planning, scope development, consultant/contractor procurement, estimating, commissioning, and project management from concept through completion for each of the park sites. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX iv EDUCATION MBA, Business Analytics, Cal Poly San Luis Obispo BA, Politics, University of California, Santa Cruz Certificate, Business Analytics INDUSTRY CERTIFICATIONS OSHA 30-Hour Certified Construction Manager-in-Training (In Progress) RYAN STEFANEK QUALITY ASSURANCE MANAGER Ryan brings eight years of experience in the construction industry. He started his career as a field laborer with a general contractor performing carpenter duties while pursuing a master’s degree in business analytics at California Polytechnic State University in San Luis Obispo. Over the years, Ryan transitioned to construction management as a project intern and worked his way up to project engineer. He is passionate about construction and feels that working in the industry is a mixture of marathons and sprints. Ryan excels at planning and responding quickly to project demands. Ryan brings a proven ability to lead cross-functional teams through routine and complex processes. Skilled in guiding team building exercises that focus on morale and personal and professional growth. He takes a responsive leadership approach and uses critical thinking skills to solve issues during the initial stages. Equipped with a Master’s Degree in Business Administration and a Certification in Business Analytics Ryan has a solid ability to research and analyze data with strong attention to detail and an eye for spotting inaccuracies. In addition, Ryan has proven expertise in project planning, scheduling and implementation. As a highly skilled professional, Ryan is well versed in the process of providing QA/AC oversight as a component of Kitchell’s services. He provides an informed high-altitude view of the projects issues with quality delivery. Ryan’s recent experience includes serving as Project Engineer III for a four-story cast in place concrete structure in the City of San Luis Obispo. He also brings recent experience from the San Luis Obispo Regional Transit Authority Bus Maintenance Facility project. PROJECT EXPERIENCE California Polytechnic State University, Multi-Use Facility, San Luis Obispo, CA: Construction of a $100 million four-story cast in place concrete structure that housed multiple facilities for the University including a commercial kitchen, videography studio and multiple laboratory spaces. Ryan’s responsibilities included managing multiple disciples of subcontractors including MEPs and finish trades and ensured coordination and compliance with the contract documents. He also led the weekly owner and architect walks and verified quality concerns were communicated and corrected with subcontractors. San Luis Obispo Regional Transit Authority, Bus Maintenance Facility, San Luis Obispo, CA: A new $17.5 million (construction cost), 28,650 SF, single story bus maintenance facility with over 2,600 SF of mezzanine/equipment platform located on a 6.44-acre site. The facility accommodates operations, administration and maintenance areas and includes detached enclosures on-site, including a trash enclosure and canopy over bus parking. Work also includes off-site improvements, specifically the T-intersection for future Elks Lane realignment. San Luis Obispo County Community College District, Measure L Bond Program, San Luis Obispo, CA: A $275 million bond program which addresses crucial facility needs, including a new instructional building on the San Luis Obispo campus, a new campus center, a new career training facility and new early childhood center at the Paso Robles campus; the replacement of temporary classrooms, and repairs and upgrades to roofs, heating and air conditioning units, aquatic center and other infrastructure and utilities technology upgrades. Projects within this program are being delivered via multi-prime delivery method. California Polytechnic State University, San Luis Obispo, Neighborhood UU - Building 65, Building 19 and Plaza Improvements, San Luis Obispo, CA: Preconstruction services for a $30 million, 59,100 SF project consisting of renovation of 34,600 SF of space in Building 19 including complete renovation of the entire top floor, renovation of electrical and plumbing systems (as related to the top floor scope of work) in the bottom floor of Building 19 and the surrounding plaza area to the north of the building as well as new landscaping and site improvements to the plaza. Work in Building 65 consists of 24,500 SF of renovations including the Chumash Auditorium, lobby area and public areas on that floor as well as exterior improvements at the upper level and interior circulation spine at the lower level of the building to increase and improve student seating and study areas. Custom Homes, San Luis Obispo County: Carpenter and supervisor for $3 million of custom home construction encompassing more than 25 projects. Self-preformed work includes demolition, electrical, carpentry, finish carpentry and concrete. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX v EDUCATION BS, Civil Engineering, California Polytechnic State University, San Luis Obispo, CA MATT HARMS PROJECT ENGINEER Matt is a highly skilled professional supporting project managers with one year of industry experience. He has a passion for the construction management industry and finds working in CM strengthens his strategic and analytical skill sets. He is well-versed in the process of reviewing, issuing and processing RFIs and submittals, updating drawings and meeting minutes and negotiating change orders with team members on all sides of the table. Matt is familiar with a variety of software including Bluebeam, Procore, BIM 360, Assemble, Revit and AutoCAD. His recent experience includes serving as a field engineer for a $90.2 million ocean outfall booster pump rehabilitation and $6 million piping replacement. PROJECT EXPERIENCE Orange County Sanitation District, Ocean Outfall Booster Pump Rehabilitation, Huntington Beach, CA: A $90.2 million, 40,000 SF ocean outfall booster pump rehabilitation delivered via design-bid-build. The project encompassed the construction of a new low flow outfall pump station, rehabilitation of the existing central power generation building, rehabilitation of an effluent pump station annex and rehabilitation of the existing electrical distribution system. Matt’s responsibilities included acquiring daily permits for labor, analyzing budget for labor distribution reports, quality control for concrete pours, creating purchase orders, creating and evaluating change orders, safety meeting, safety walks, safety orientation for new employees and subcontractors, schedule meetings and submittals. Orange County Sanitation District, P2-123 Return Activated Sludge Piping Replacement, Huntington Beach, CA: A $6 million, 1,400 LF project encompassing the removal and replacement of a deteriorating return activation sludge piping, valves, valve actuators and wiring, flexible couplings and pipe supports. In addition, the project also included the installation of 12 new 14” isolation valves and installing new sluice gates. Matt’s responsibilities included acquiring daily permits for labor, analyzing budget for labor distribution reports, quality control for concrete pours, creating purchase orders, creating and evaluating change orders, safety meeting, safety walks, safety orientation for new employees and subcontractors, schedule meetings and submittals. California Polytechnic State University San Luis Obispo, Highway Realignment, San Luis Obispo, CA: Design services for highway improvements along the 101 in the Central Coast starting south of El Campo Road near Arroyo Grande to North of Hemi Road near Nipomo. Main goals of the project included improving safety, maintaining overall circulation and operations of US 101, as well as emphasize sustainability. Matt’s responsibilities included performing initial site studies, such as geotechnical site investigation, a water runoff analysis and traffic impact study to name a few. In addition, Matt also assisted in technical write-ups and assisted with corridor modeling design. California Polytechnic State University San Luis Obispo, Higuera and Chorro Street Intersection Improvement Proposal (Cal Poly Project), San Luis Obispo, CA: For this project, Matt determined the level of service for Higuera Street and designed an improved system layout for the intersection. The project goal was to increase safety in all aspects, such as pedestrian and vehicular safety while decreasing congestion. Matt’s responsibilities included analysis of Higuera and Chorro intersection in downtown San Luis Obispo. He recorded pedestrian and vehicle volumes, crash data and traffic signal parameters. Matt’s studies also included a traffic warrant study, traffic signal analysis, synchro analysis, safety analysis, critical lane volume studies and intersection sight distance analysis. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX vi EDUCATION BS, Natural Resources Management, Cal Poly State University, San Luis Obispo AA, Engineering Technology, Cuesta Community College INDUSTRY CERTIFICATIONS ICC Certified Special Inspector: Reinforced Concrete (#1025543-49) ICC Certified Special Inspector: Structural Masonry (#1025543-84) ICC Certified Special Inspector: Prestressed Concrete (#1025543-92) ICC Certified Special Inspector: Structural Steel, Bolting and Welding (#1025543-S1, S2 & W) ICC Certified Master of Special Inspection (#1025543-MI) ICC Certified Special Inspector: Spray Applied Fireproofing (#1025543-86) NICET Level III, Transportation Engineering Technology (#86954) AWS-CWI QCI-88 & 96, Certified Welding Inspector (#95011151) DSA Masonry Inspector (#5852 CHARLES ZANOLI TESTING & INSPECTION With over 30 years in the construction industry, Charles is a highly qualified inspector with a wealth of experience in materials testing and special inspection. Certified by numerous regulatory agencies, he specializes in testing and inspection of reinforced concrete, pre-stressed concrete, structural masonry, asphalt concrete, bolts, spray-approved fire-proofing and soils. He has a broad base of project experience, including numerous structures at California Polytechnic State University at San Luis Obispo, K-12 school projects throughout San Luis Obispo and Santa Barbara counties, and public works facilities and infrastructure. Charles is certified by APWA as a public works inspector and is a ICC- certified Master Inspector, certified by ICC for inspection of reinforced concrete, pre-stressed concrete, structural masonry, structural steel and welding, and spray-applied fire-proofing to name a few. Charles studied engineering technology and obtained a bachelor’s degree in Natural Resource Management from California Polytechnic State University. PROJECT EXPERIENCE California Polytechnic State University, San Luis Obispo, yak?it?ut?u Residential Community, San Luis Obispo, CA: A $204 million, 562,446 SF design-build project featuring eight structures with four and five levels above grade. The project featured single, double and quad units totaling 1,475 beds for first year students and an associated parking structure totaling 154,363 SF and over 480 stalls. Situated adjacent to the Grand Avenue entrance of the campus, the community is richly programmed with study areas, large scale living rooms for 50 students or more, outdoor courtyards and circulation routes, a mailroom, recreation center, offices and admissions welcome center. Outdoor spaces include a large lawn with an amphitheater and a courtyard with volleyball and basketball courts, natural features, gardens, contemplative spaces, and bike paths – all designed to support new students’ engagement in the Cal Poly experience. This project is LEED Platinum certified. Hotel San Luis Obispo (Hotel SLO), Multi-Story Hotel and Parking Structure, San Luis Obispo, CA: Hotel San Luis Obispo is located at 955 Morro Street in downtown San Luis Obispo. The approximately 110,000 SF structure was constructed as part of a mixed-use project in the Chinatown District of the city. The hotel encompasses 78 rooms and suites, two on-site restaurants, a spa, garden courtyard, pool, gym and social event/meeting spaces for up to 350 guests. The multi-story building has a subterranean parking level, accessed via a ramp from Morro Street, that entailed cuts of up to 17 feet. It utilized a conventional reinforced concrete slab with poured-in-place retaining and shear walls and concrete columns. The first floor was constructed utilizing a conventionally reinforced concrete slab, while the upper floors were supported by post-tensioned concrete slabs with wood-framed construction. Vespera on Ocean, Pismo Beach, CA: Vespera on Ocean is a 124-room Marriott Autograph hotel located at 147 Stimson Avenue in Pismo Beach. Earth Systems conducted a geotechnical engineering investigation for the project, which comprises an underground parking level, a street level concrete podium deck and three stories of stud-framed hotel rooms, and exterior pool and recreation areas. Challenges at the beach-front site included the potential for liquefaction and dynamic settlement, subsurface water, and shoring of excavations adjacent to adjacent buildings and infrastructure. Development of the site involved cuts of up to 16 feet to accommodate the subterranean parking level. San Luis Obispo County Regional Airport Passenger Terminal, San Luis Obispo, CA: Earth Systems provided a geotechnical engineering report, materials testing and special inspection for the recently completed San Luis Obispo County Regional Airport passenger terminal. At approximately 56,000 SF, the new terminal is about 45,000 SF larger than the previous facility. The $39.5 building includes a main entry, lobby, ticketing, baggage retrieval, rental car and security screening areas, airport administration offices, a public parking lot and main aircraft parking lot. It is of structural steel and masonry construction with a masonry veneer. The building is supported by conventional continuous footing foundations and concrete slabs-on grade. Hotel Cerro, San Luis Obispo, CA: Earth Systems prepared reports to provide geotechnical engineering criteria for the construction of the Hotel Cerro in downtown San Luis Obispo, California. The 65-room structure includes 65 guest rooms, restaurant space, a conference center, a spa and a rooftop pool deck. The structure consisted of wood and steel frame and concrete cast-in-place construction. William and Linda Frost Center for Research and Innovation, California Polytechnic State University at San Luis Obispo, CA: The $125 million William and Linda Frost Center for Research and Innovation will be an interdisciplinary building that will house three colleges – the College of Science and Mathematics, the College of Agriculture Food and Environmental Sciences, and the College of Liberal Arts. Currently under construction, the 102,000 SF structure will have four levels and will include a total of 20 laboratories, a technology center, studio space, classrooms, faculty offices, and conference rooms. A new plant conservatory is planned for the hillside overlooking the Poly Canyon Village student housing complex. ADDITIONAL INDUSTRY CERTIFICATIONS DSA Pneumatically Pl. Concrete (#5954) ACI Concrete Field Testing Technician, Grade 1 (No. 00931544) Certified Nuclear Gauge Operator Hazardous Waste Operations and Emergency Response, 40-hour and 8-hour refresher courses (OSHA 29 CFR 1910.120 and Title 8, CCR 5192) DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX vii EDUCATION BS, Agricultural Engineering, California Polytechnic State University, San Luis Obispo, CA LICENSES Professional Land Surveyor #LS7561, CA STEVE WEBSTER, ls SUPERVISOR OF SURVEYING Steve has over 38 years of surveying experience in the office and the field. As a project manager, his primary responsibility is the management of construction projects. While at RRM Design Group, he has performed surveying services, such as construction staking and boundary and topographic surveying, for both public and private sector clients. Along with field surveying duties, Steve prepares construction stake calculations, conducts research and analysis of boundaries, and creates boundary, topographic, and ALTA maps. He has experience with surveying equipment such as total and robotic stations and GPS. PROJECT EXPERIENCE Lucia Mar Unified School District, Arroyo Grande High School Parking, Arroyo Grande, CA: RRM provided numerous layout concepts to maximize the existing parking layout to accommodate a bus drop-off site and separate parking for the newly constructed Performing Arts Center. RRM reviewed existing pavement conditions (to determine areas that needed to be overlaid versus reconstructed) and prepared final construction documents showing re-stripping of the area, relocation of parking lot lighting, and pavement reconditioning. The total parking lot spaces provided were 367. California Polytechnic State University, San Luis Obispo, Parking Structure, San Luis Obispo, CA: RRM Design Group worked with Watry Design Group to design a new 1,300 car parking structure and multi-modal facility which will serve as the first of three planned centers of public transportation on the Cal Poly San Luis Obispo campus. Inn at The Pier Engineering, Pismo Beach, CA: RRM was hired for engineering and surveying services for The Inn at The Pier hotel with 104 guest rooms in Pismo Beach. The hotel has 132 parking spaces, including 127 underground spaces. RRM licensed land surveyors prepared and submitted the application to facilitate the lot merger for 6 lots through the City of Pismo Beach approval process. Arroyo Grande Hospital, Parking Lot, Arroyo Grande, CA: RRM prepared studies to review how the parking at Arroyo Grande Community Hospital could be increased to allow for more parking on the site. After the plan was approved, RRM prepared the construction documents to extend the current parking areas. The construction documents consisted of grading, layout, electrical and landscape plans. Lucia Mar Unified School District, Shell Beach Elementary School Parking Lot, Pismo Beach, CA: Lucia Mar Unified School District hired RRM to make several campus upgrades at Shell Beach Elementary School. This past spring, RRM completed updates to reconfigure the student drop-off areas and school parking lot to improve the flow of traffic. Sierra Vista Medical Center Parking Structure Construction Staking, San Luis Obispo, CA: RRM implemented the design and provided construction for phasing, staging, grading, drainage, hydrology, parking, circulation, accessibility, off-site road design, and upgrades to existing and new utility infrastructure. Following a two-year comprehensive planning and design study led by RRM Design Group, the San Luis Obispo City Council approved the Medical Center Master Plan for Tenet Health Care’s Sierra Vista Hospital facilities. The Plan calls for adding a new, 4-story, 85,000 SF tower to accommodate increased healthcare demands, replace existing aging facilities, and add a new 45,000 SF medical office building to serve the increasing demand for medical offices in San Luis Obispo. The Plan also includes a new five-story, 400-space parking structure and a comprehensive reorganization of the vehicle circulation. The Pismo Hotel Land Surveying Services, Pismo Beach, CA: RRM was retained for surveying services for the Pismo Hotel in Pismo Beach. RRM provided site survey control, monitoring of adjacent structures, construction staking of on-site and off-site utilities and improvements, building grid lines, verified placement of all anchor bolts for buildings, benchmarks for finish floor elevations, and framing and hold-down placements. RRM also provided calculations and staking of 965 feet of sheet piles and a post-construction ALTA/ ACSM Land Title Survey (As-Built). DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX viii EDUCATION AS, Surveying and Forest Practices, Kings River Community College, Reedley, CA BRIAN HELLWIG SUPERVISOR OF SURVEYING With a beginning in forestry and two decades of surveying experience, Brian is an expert surveyor. Brian offers experience in boundary surveying and construction staking of various projects such as commercial, residential, and mixed-use developments. He has experience with surveying equipment such as total and robotic stations, high-definition three-dimensional terrestrial laser scanning, GPS, and various surveying software. Brian’s previous work ranges from the expansive Hearst Boundary survey to the beautiful downtown Big Bear Streetscape. His open communication style ensures that all parties involved in a project are updated with up-to-date and relevant information at every intersection. PROJECT EXPERIENCE Inn at The Pier Engineering, Pismo Beach, CA: RRM was hired for engineering and surveying services for The Inn at The Pier hotel with 104 guest rooms in Pismo Beach. The hotel has 132 parking spaces, including 127 underground spaces. RRM licensed land surveyors prepared and submitted the application to facilitate the lot merger for 6 lots through the City of Pismo Beach approval process. The Pismo Hotel Land Surveying Services, Pismo Beach, CA: RRM was retained for surveying services for The Pismo Hotel in Pismo Beach. RRM provided site survey control, monitoring of adjacent structures, construction staking of on-site and off-site utilities and improvements, building grid lines, verified placement of all anchor bolts for buildings, benchmarks for finish floor elevations, and framing and hold-down placements. RRM also provided calculations and staking of 965 feet of sheet piles and a post-construction ALTA/ ACSM Land Title Survey (As-Built). City of Pismo Beach, Pismo Beach Pier Plaza and Parking Lot Upgrade, Pismo Beach, CA: The City of Pismo Beach hired RRM to repurpose a portion of the existing parking lot and expanded an existing small plaza at the base of the Pismo Pier. The plaza is connected to two separate promenade boardwalks that run parallel to the beach. The highlight of the plaza is two concrete slides that whisk giddy beachgoers of all ages from the plaza onto the sand 16 feet below. Improvements include accessible access to the beach, stepped seating, reconfigured parking lot, and a newly constructed restroom building. Lucia Mar Unified School District, Shell Beach Elementary School Parking Lot, Pismo Beach, CA: Lucia Mar Unified School District hired RRM to make several campus upgrades at Shell Beach Elementary School. This past spring, RRM completed updates to reconfigure the student drop-off areas and school parking lot to improve the flow of traffic. Lucia Mar Unified School District, Shell Beach Elementary School Parking Lot, Pismo Beach, CA: Lucia Mar Unified School District hired RRM to make several campus upgrades at Shell Beach Elementary School. This past spring, RRM completed updates to reconfigure the student drop-off areas and school parking lot to improve the flow of traffic. Sierra Vista Medical Center, Parking Structure Construction Staking, San Luis Obispo, CA: RRM implemented the design and provided construction for phasing, staging, grading, drainage, hydrology, parking, circulation, accessibility, off-site road design, and upgrades to existing and new utility infrastructure. Following a two-year comprehensive planning and design study led by RRM Design Group, the San Luis Obispo City Council approved the Medical Center Master Plan for Tenet Health Care’s Sierra Vista Hospital facilities. The Plan calls for adding a new, 4-story, 85,000 SF tower to accommodate increased healthcare demands, replace existing aging facilities, and add a new 45,000 SF medical office building to serve the increasing demand for medical offices in San Luis Obispo. The Plan also includes a new five-story, 400-space parking structure and a comprehensive reorganization of the vehicle circulation. Edward C. Little Water Recycling Facility, Visitor Center Renovation, El Segundo, CA: A $9.6 million renovation of the visitor center resulting in a multipurpose visitor center that will better enable West Basin to educate guests about the District’s mission, various water recycling treatment processes, as well as water-related issues in the region. ADDITIONAL EXPERIENCE `Lucia Mar Unified School District, Oceano Elementary School Infrastructure Rehabilitation, Oceano, CA `City of San Luis Obispo, Police Station, San Luis Obispo, CA `City of San Luis Obispo, Public Safety Dispatch Center, San Luis Obispo, CA `Sierra Vista Hospital Heliport, San Luis Obispo, CA DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX ix EDUCATION MS, Botany, California State University, Chico BS, Ecology and Evolution, University of California, Santa Barbara CERTIFICATIONS/ REGISTRATIONS Certified Ecologist, Ecological Society of America California Rapid Assessment Method, CRAM.org Wetland Delineation Training, Richard Chinn Environmental PERMITS Rare, Threatened, and Endangered Plant Voucher Collecting Permit No. 2081(a)- 16-022-V – CDFW, 2018 COLBY BOGGS SENIOR ECOLOGIST Colby is a Principal and Senior Ecologist with Rincon Consultants. He brings over 23 years of professional experience as a botanist, ecologist, wetlands specialist, and biological sciences educator and researcher. His duties at Rincon include biological field surveys for special status species, habitat and plant community mapping, wetlands assessments, biological resources analyses, construction and mitigation monitoring, conservation planning, regulatory compliance, and the preparation of biological reports, environmental documents and permit applications in support of CEQA, NEPA, Porter-Cologne Water Quality Control Act, California Fish and Game Code, California Coastal Act, Clean Water Act, Rivers and Harbors Act of 1899, and State and federal Endangered Species Acts. PROJECT EXPERIENCE County of San Luis Obispo, QA/QC Biological Resources, On-call and Planning Consultant Services for General Cannabis Case Processing, San Luis Obispo County, CA: Colby worked with County staff, applicants and agents to process applications for proposed cannabis operations which included indoor and outdoor cultivation and ancillary uses such as distribution, processing, nursery, and small-scale non-volatile manufacturing. He reviewed submitted application materials specific to biological resources, determined application completeness in concurrence with County staff and prepared documentation of CEQA analysis (IS-MNDs). Recently processed cases included production of the IS-MNDs for DRC2018-00010 Greenview, LLC and DRC2019-00110 Synergy Farms – Cano. City of Paso Robles, QA/QC Biological Resources, Olsen-South Chandler Ranch, Paso Robles, CA: Colby provided QA/QC for the Biological Resources section of the Paso Robles Olsen/South Chandler Ranch Specific Plan Project. The 358-acre Specific Plan area represented a key development area for the City, identified in the General Plan Land Use Element. The project included a specific plan, general plan amendment, zone change, multiple tentative tract maps, an oak tree removal permit, roadway abandonments and multiple development agreements. The EIR analysis required a hybrid of programmatic and project-specific elements to address the long-term impacts of buildout within the specific plan area as well as specific impacts of the proposed residential, commercial and recreational uses in the specific plan area. City of San Luis Obispo, QA/QC Biological Resources, San Luis Ranch Specific Plan Project EIR, San Luis Obispo County, CA: Colby provided QA/QC for the Biological Resources section of the San Luis Ranch Project on behalf of the City of San Luis Obispo. The 131-acre project site represented a key development area for the City, identified in the land use and circulation element update. The proposed project included a specific plan, general plan amendment and development plan for a 131-acre project site, including annexation of the site into the City of San Luis Obispo. This specific plan included a mixture of residential, commercial, office and hotel uses, with a portion of the site preserved for agriculture and open space uses. Our EIR approach on this project was a unique hybrid of programmatic and project-specific elements developed in close coordination with City staff to address both the specific impacts of the proposed development and the long-term impacts of buildout within the specific plan area. South San Luis Obispo County Sanitation District, QA/QC Biological Resources, Wastewater Treatment Plan Redundancy Project CEQA Technical Studies, Oceano, San Luis Obispo County, CA: Colby served as Biological Resources Technical Advisor for this project. The South San Luis Obispo County Sanitation District Redundancy project involves the construction and operation of backup infrastructure at the District’s wastewater treatment facility in Oceano. In support of Clean Water State Revolving Fund and United States Department of Agriculture funding pursuits for the project, Rincon prepared technical studies compliant with CEQAPlus and NEPA requirements. Technical studies include an Environmental Report for Categorical Exclusion, a Federal Clean Air Act Conformity Analysis, a Cultural Resources Assessment, and a Biological Evaluation. Rincon is also coordinating with U.S. Department of Agriculture staff to facilitate the environmental review process and receive a Biological Opinion from United States Fish and Wildlife Service for impacts to California red- legged frog. County of Santa Barbara, QA/QC Biological Resources, Arctic Cold Agricultural Refrigeration Facility EIR, Santa Barbara County, CA: Colby is currently providing QA/QC for the Biological Resources section of an EIR for the proposed Arctic Cold Agricultural Refrigeration Facility in northern Santa Barbara County. The proposed project includes a Conditional Use Permit and Development Plan for a freezer/processor facility on a 109-acre property east of Santa Maria. Because the property is currently used for active agricultural production with a mix of row crops, livestock grazing, and a vegetable cooling plant that is not a part of the proposed project, and includes abandoned petroleum wells, the environmental evaluation focuses on agricultural resources, air quality and greenhouse gas emissions, biological resources, hazards and hazardous materials, transportation, and utilities and service systems. City of Santa Maria, QA/QC Biological Resources, Area 9 Specific Plan EIR, Santa Maria, CA: Colby provided QA/QC for the Biological Resources section of the EIR for the Area 9 Specific Plan. This project incorporated a range of land use components in a 900-acre Specific Plan area, including agricultural manufacturing, commercial manufacturing, industrial, commercial office, community commercial, open space, and mixed-use residential. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX x EDUCATION MS, Biological Sciences, California Polytechnic State University, San Luis Obispo BS, Ecology and Systematic Biology, Concentration in Wildlife Biology; California Polytechnic State University, San Luis Obispo MICHAEL TOM, ms SENIOR BIOLOGIST Michael has experience conducting general and focused surveys for a variety of plant and animal species. He is proficient in maintaining herpetology collections and providing assistance with a number of vertebrate and invertebrate species. Michael has working knowledge and training with the fauna and flora of the Central Coast, San Joaquin Valley, and desert regions of California. He has also received specific training in survey protocols, habitat requirements and natural histories of the California Redlegged Frog (CRLF) and desert tortoise. Michael has assisted in special status species, general wildlife and preconstruction surveys. He has performed protocol level surveys as well as preconstruction clearance and monitoring for San Joaquin Kit fox. He has also performed protocol level surveys for desert tortoise, blunt nosed leopard lizard and California red-legged frog and has performed preconstruction surveys for giant garter snake, western pond turtles, coast horned lizards, western spade foot toads, and nesting birds. He has been authorized by the U.S. Fish and Wildlife Service under Biological Opinions for projects to handle CRLF and has handled the species on those projects where they were encountered. PROJECT EXPERIENCE SLO Creek California Red-legged Frog Habitat Assessment, San Luis Obispo County. San Luis Obispo County, Supply line 36-9-09 emergency repair, Los Berros Creek, CA: Conducted preconstruction surveys and monitoring for California red-legged frog. Captured and relocated one California red-legged frog. Santa Barbara County, Jail Northern Branch Facility, Santa Barbara, CA: California red-legged frog habitat assessment in Santa Barbara County. San Luis Obispo County, Arroyo Grande Creek at Rodriguez Road Grade Stabilization Project: Conducted preconstruction surveys and monitoring for California red-legged frog. Santa Rosa Creek Road 7.0 Emergency Culvert Repair Project Monitoring, San Luis Obispo County, CA: Michael conducted preconstruction surveys and monitoring for California red-legged frog. San Luis Obispo County, California red-legged frog focused biological monitoring for the Arroyo Grande Creek Levee Maintenance Project, San Luis Obispo County, CA: Biological monitoring for the Old Los Berros Culvert Repair and Duckbill Valve Replacement project. San Luis Obispo County, City of Arroyo Grande, CA: California red-legged frog, western pond turtle and nesting bird preconstruction surveys for the City of Arroyo Grande. California red-legged frog and California tiger salamander focused construction monitoring/relocation for the Salinas Road Interchange project, Salinas, CA: Captured and handled four California red-legged frogs under the supervision of the authorized biologist. San Benito County, Vallecitos Oil Field and Gas Wells, Four Focused Project Locations: California Tiger Salamander and California Redlegged Frog Habitat Assessment. California Academy of Sciences and California Polytechnic State University Biological Sciences Department: Four years of reptile and amphibian husbandry experience (including handling of snakes, frogs, turtles, salamanders and lizards) combined from the California Academy of Sciences and California Polytechnic State University Biological Sciences Department. PROJECT AUTHORIZATIONS `California red-legged frog handling and relocation authorization, Los Osos Valley Road Interchange Project, BO (1- 8-08-F-27) `California red-legged frog handling and relocation authorization, Supply line 36-9-09 emergency repair, Los Berros Creek. Authorization under RGP 63 through Emergency Section 7 Consultation with the USFWS. `USFWS California red-legged frog handling authorization (Under supervision), Rodriguez Waterline Stabilization Project. BO 8-8-12-F-17 `NMFS steelhead monitoring authorization under the supervision of lead fisheries biologist Don Alley, Heritage Ranch Community Services District Gallery Well Repair Project. BO 151422SWR03SR8572 `USFWS California red-legged frog, San Joaquin kit fox and California condor monitoring authorization, Heritage Ranch Community Services District Gallery Well Repair Project. `USFWS California red-legged frog handling authorization (Under supervision), Salinas Road Interchange Project. BO 8-8-09-F-65R DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX xi EDUCATION BS, Forestry and Natural Resources, Concentration in Wildlife Biology, California Polytechnic State University, San Luis Obispo CERTIFICATIONS/ REGISTRATIONS International Society of Arboriculture Certified Arborist WE-12031A USFS and CPUC approved Botanist, Avian Biologist, and Bat Biologist Department of Pesticide Regulation Qualified Applicators License Category E (Forest and Right-of-Way) License #151384 Certified Recycled Water Site Supervisor #5770 Professional Association of Diving Instructors Certified Open Water Diver CPR/First Aid Certified CASEY CLARK BIOLOGIST/ARBORIST/PROJECT MANAGER Casey serves as a biologist, arborist and project manager under Rincon’s Natural Resources group. He is a personable, creative, and multifaceted California based biologist with an expertise in botany and plant ecology. His responsibilities include leading and managing a variety of natural resources projects involving habitat suitability assessments, special-status species surveys, habitat restoration success criteria monitoring, vegetation community classification and mapping, noxious weed surveys and risk assessments, jurisdictional delineations, resource constraints analyses and arboricultural assessments. Mr. Clark has prepared extensive biological resources technical reports in support of the California Environmental Quality Act and the National Environmental Policy Act. He has six years of experience in the environmental consulting industry and graduated cum laude from Cal Poly San Luis Obispo with a Bachelor of Science in Forestry and Natural Resources where the focus of his coursework was in botany, wildlife biology, ecology, and resource conservation. PROJECT EXPERIENCE East Bay Municipal Utilities District, Quarry Site Restoration Project, Oakland, CA: As Lead Biologist and Project Manager Casey prepared a competitive proposal that secured a contract that contained rare plant surveys, a wetland delineation survey, and an arborist survey for a potential East Bay Municipal Utilities District restoration project within an abandoned 60- acre quarry site outside of San Leandro, California. Casey lead the arborist surveys and prepared a comprehensive Arborist Condition Report. He performed background research for potential rare plants within the quarry site and managed the successful execution and delivery of the Wetland Delineation Report. He served as the primary client-facing biologist managing all aspects of the project, including budget, deliverable preparation and staff. The project was successfully completed within budget. Liberty Utilities, 650 Line Rebuild Project, Truckee, CA: Casey served as lead biologist managing all project-related botanical tasks. He led full floristic field surveys, including assessments for noxious weeds and rare plants and performed restoration success criteria monitoring for the rebuild of approximately nine miles of power line reconstruction within the Tahoe National Forest between the north shore of Lake Tahoe and Truckee, California. He also prepared a comprehensive Botanical Resources Technical Report, Rare Plant Survey report, and Invasive Plant Risk Assessment Report in cooperation with project mitigation measures. Casey also utilized the data collected from bat roost habitat assessments and emergence reports to prepare a Bat Emergence Survey Report. San Diego Gas & Electric Company, Del Mar Reconfiguration Project, San Diego County, CA: Lead project biologist managing all botanical tasks for the reconfiguration of an existing 69 kilovolt power line, removal of an existing 69 kilovolt power line and conversion of portions of existing 12 kilovolt distribution lines from an overhead to underground configuration in San Diego County. Lead rare plant surveys and prepared a report documenting over 25 species of special-status plants. Casey conducted and prepared preconstruction surveys and reports, baseline restoration monitoring surveys and reports, monarch butterfly monitoring, focused coastal California gnatcatcher surveys, nesting bird surveys and reports, and conducted habitat assessments and emergence surveys for potential bat roosts. Southern California Gas Company, Confidential Project, Various Counties/Cities, Southern California: Lead surveys and prepared a Biological Resources Technical Report in compliance with CEQA that identified existing or potential sensitive natural vegetation communities, potentially jurisdictional aquatic features, and special-status plant and animal species and their associated habitat for the installation of a proposed 30-inch diameter natural gas pipeline beneath the Colorado River and the removal of the existing 30-inch-diameter natural gas pipeline and it’s supporting suspension bridge over the river, extending southeast from the community of Ehrenberg in Arizona into the City of Blythe in California. Assisted a permitted biologist in focused western yellow-billed cuckoo and southwestern willow surveys and report creation for client and agency submittal. Southwest Gas Company, Helendale Hawes Line High-Pressure Main Replacement Project, Various Counties/Cities Southern California: Casey lead surveys and prepared a Biological Resources Technical Report in compliance with CEQA that identified existing or potential sensitive natural vegetation communities, potentially jurisdictional aquatic features, and special-status plant and animal species and their associated habitat. The project involved the replacement of approximately 12 miles of 30-inch diameter natural gas pipeline traveling immediately adjacent to the Mojave River in Helendale, California. East Bay Municipal Utilities District, Walnut Creek Water Treatment Plant Pretreatment Upgrades Project, Walnut Creek, CA: As Arborist and Project Manager, Casey prepared a competitive proposal successfully securing a contract containing an arborist survey for the 13.5 acre Walnut Creek Water Treatment Plant Upgrade Project in Walnut Creek, California. Lead the arborist surveys and prepared a comprehensive Arborist Condition Report, which made tree protection and removal recommendations based off protected tree classifications, health condition and potential construction impact designations. As the primary client facing biologist managing all aspects of the project, including budget, deliverable preparation, and staff. Successful executive of the project granted additional arborist work at the Lafayette Water Treatment facility in Lafayette, California. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX xii EDUCATION MA, Anthropology, Northern Arizona University BS, Anthropology-Cultural Resources Management California State Polytechnic University, Pomona CERTIFICATIONS/ REGISTRATIONS Registered Professional Archaeologist #415730, CA AFFILIATIONS Section 106 Compliance Advanced Section 106 Society for American Archaeology Society for CA Archeology CHRISTOPHER DURAN, rpa SENIOR ARCHAEOLOGIST Christopher Duran is a Principal and Senior Archaeologist at Rincon Consultants, Inc. He brings more than a decade of professional experience in cultural resources management and exceeds the SOI’s Professional Qualification Standards. In addition, he has worked throughout California for various federal, state, and local agencies and has worked on several projects for private sector clients including developers and utility companies. Christopher has worked on hundreds of projects managing several millions of dollars in cultural resources investigations. He is an expert in cultural resources management and has worked on projects in compliance Sections 106 and 110 of the National Historic Preservation Act (NHPA), the National Environmental Policy Act (NEPA), and the California Environmental Quality Act (CEQA) as they pertain to cultural resources. PROJECT EXPERIENCE Watt Communities, LLC., Braverman Drive Tentative Map Project Phase II and III Cultural Resources Investigations, City of Santee, CA: As Project Manager/Principal Investigator, Christopher managed Phase II test investigations and managed field personnel and reporting during the site evaluation phase of a residential development project in Santee that includes one significant prehistoric site, CA-SDI-5669. Evaluation determined that CA- SDI-5669 is eligible for listing in the California Register of Historical Resources and required mitigation prior to ground disturbance related to construction of the development. Christopher prepared and executed a Data Recovery Plan and Research Design to mitigate the site. Santa Barbara County, Hollister Avenue Road Widening Project Cultural Resources Investigation, Cities of Goleta and Santa Barbara, CA: The project included the survey and documentation of a roadway interchange. Christopher led the field survey effort, document production and recommendations for the project. Southern California Gas Company, On-Call Cultural Resource Studies for Southern California Gas Company, Southern California: As Principal Investigator/Project Manager, Christopher prepared scopes of work, cost estimates and requests for service for archaeological studies throughout Southern California Gas Company’s (SoCalGas) jurisdiction. To date, studies managed for SoCalGas include emergency monitoring projects on Bureau of Land Management (BLM) lands during evaluation of the integrity of Lines 2000 and 3000 that required coordination between SoCalGas, BLM and a qualified subcontractor that performed the work. Additional undertakings performed under this contract include monitoring at Mission Santa Barbara, survey of two deep well anodes in the Mojave Desert, archaeological monitoring during wetland delineation on Burton Mesa (Santa Barbara County), and monitoring during pipeline installation for the Goleta Storage Project. Christopher also managed subcontractor performance, tracked and managed invoicing, reviewed project deliverables and scheduled qualified staff to perform the work. Naval Facilities Engineering Command, Stuart Mesa West Phase II Archaeological Investigation, Camp Pendleton, San Diego County, CA: As Field Director, Christopher managed field crews, conducting test excavations, reporting and collections management. Narven Enterprises, Archaeological Testing at 1441-1447 Sixth Avenue, San Diego, CA: As Principal Investigator/Project Manager, Christopher coordinated the reparation and implementation of an archaeological testing plan (ATP) for potential subsurface deposits on a proposed redevelopment site in downtown San Diego. He reviewed and approved ATP prior to submission to the client. The ATP was based upon the results of reviewing Sanborn Fire Insurance maps dating to the turn of the nineteenth century that documented previous development on the property. Christopher served as on-call Principal Investigator during mechanical excavations on the property, the results of which were negative. Bureau of Indian Affairs, Ewiiaapaayp Reservation Road Construction Cultural Resources Inventory, Ewiiaapaayp Indian Reservation, San Diego County, CA: As Project Manager/Principal Investigator, Christopher managed field crews, budgeting, and maintained contact and coordination with the primary contractor, Bureau of Indian Affairs and Tribal Government. Bureau of Indian Affairs, La Posta Reservation Road Construction Cultural Resources Inventory, La Posta Indian Reservation, San Diego County, CA: As Project Manager/ Principal Investigator, Christopher managed field crews, budgeting, and maintaining contact and coordination with primary contractor, Bureau of Indian Affairs and Tribal Government. Bureau of Indian Affairs, Santa Ysabel Reservation Road Reconstruction Cultural Resources Inventory, Santa Ysabel Reservation, San Diego County, CA: As Project Manager/Principal Investigator, Christopher prepared technical documents and provided agency consultation. Bureau of Land Management, Palm Springs South Coast Field Office, Canyon Lake Fuels Reduction Cultural Resources Inventory Project, Riverside County, CA: As Project Manager/Principal Investigator, Christopher managed fieldwork, field crew, scheduling, budgeting, preparing the technical report and maintained client contact. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX xiii EDUCATION MA, Public Archaeology, California State University Northridge BS, Anthropology – Emphasis in Physical Anthropology, University of California, Santa Barbara AFFILIATIONS Register of Professional Archaeologists Member Society for California Archaeology Member Society for American Archaeology Member DUSTIN MERRICK, rpa ARCHAEOLOGIST/PROJECT MANAGER Dustin is an Archaeologist with Rincon Consultants, Inc. He has extensive experience with pedestrian survey, archaeological excavations, monitoring, site mapping, and site recordation. Dustin also has experience managing projects throughout the Central Coast. He has worked with both prehistoric and historic archaeology throughout the Central Coast and Mojave Desert areas as well as the Channel Islands. He is experienced in protecting and managing cultural resources and specializes in osteological, faunal, and paleoethnobotanical analyses, specializing in prehistoric coastal and near-shore island environments. PROJECT EXPERIENCE Water Resource Recovery Facility Project, San Luis Obispo, CA: Dustin managed archaeological and paleontological resource monitoring and directed all fieldwork associated with the project. In addition, he worked directly with the City of San Luis Obispo and Native American monitor for the reinternment of cultural materials. Pacific Gas and Electric Cambria Access Road Maintenance Project, San Luis Obispo County, CA: Dustin was field lead for the survey within United States Forest Service lands and was the primary author of the technical cultural resource constraints report. Pacific Gas and Electric Tassajara Road Maintenance Project, San Luis Obispo County, CA: Dustin was field lead for the survey within United States Forest Service lands, coordinated with the Native American Heritage Commission and local tribe members and was the primary author of the technical cultural resource constraints report. Central Coast Blue Test Injection Well Extended Phase I Study, City of Pismo Beach, CA: Dustin managed all cultural resources components including survey, testing and monitoring and was the lead author on the cultural resources study. Cathodic Anode Well Project, Santa Barbara County, CA: Dustin was the field lead for the survey within Bureau of Land Management lands, coordinated with the Native American Heritage Commission and local tribe members and was the primary author of the technical report. Organic Liberty Cultivation Project, Santa Barbara County, CA: Dustin was field lead for the survey, coordinated with the Native American Heritage Commission and local tribe members and was the primary author of the technical report. In addition, he was the lead for the cultural resources and tribal cultural resources section in the environmental impact report. Pacific Gas and Electric Vandenberg-Divide Project, Santa Barbara County, CA: Dustin was field lead for the survey within Vandenberg Airforce Base lands and was the primary author of the technical cultural resource constraints report. Pacific Gas and Electric Gates Tulare Project, Tulare County, CA: Dustin was field lead for the survey within Bureau of Land Management lands, coordinated with the Native American Heritage Commission and local tribe members and was the primary author of the technical cultural resource constraints report. California High Speed Rail, Madera County, CA: Dustin was field lead for multiple monitoring and survey efforts, coordinated with the local tribe members and was the primary author of multiple technical cultural resource reports. Rexford Solar project, Tulare County, CA: Dustin coordinated with the Native American Heritage Commission and local tribe members and was the primary author of the technical cultural resource report. In addition, he was the project manager for the project and assisted the survey effort. Bellefield Solar, Mojave, CA: Dustin led the survey and is the project manager for the Phase II testing. In Addition, Mr. Merrick coordinated with the Native American Heritage Commission and local tribe members and was the primary author of the technical cultural resource report. Aratina Solar Project, Mojave, CA: Dustin participated in the survey, coordinated with the Native American Heritage Commission and local tribe members and was the primary author of the technical report. APN 038-260-049 Phase I Cultural Resources Study Project, Kings County, CA: Dustin conducted a pedestrian survey of the property directly west and south of the Avenal Animal Shelter, conducted Native American outreach and co-authored the technical report. Solar Cultural Resources Investigation, Kern County, CA: Dustin served as a crew member for the pedestrian survey and recorded prehistoric and historic sites using ArcPad GIS software. Cave Valley School Extended Phase I Study, Cool, CA: Dustin led the extended Phase I excavation and was the lead author on the cultural resources study. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX xiv EDUCATION BA, Anthropology, San Diego State University, San Diego, California Minor, Geology, San Diego State University, San Diego, California JENNIFER DICENZO PALEONTOLOGICAL PROGRAM MANAGER Jennifer has over 10 years of fieldwork and consulting experience in California paleontology and archaeology. She received her BA degree in anthropology with a focus in archaeology and a minor in geology with a focus on paleontology, at San Diego State University in 2012. She has made substantial contributions supervising field staff, surveying, construction mitigation monitoring, data recovery, fossil salvage, laboratory fossil preparation, writing technical assessments, developing, and administering monitoring and mitigation plans, report writing, managing projects, business development and graphic design. Jennifer has coordinated compliance monitoring on a range of projects including renewable energy, transmission lines, housing and commercial developments, transportation and utility. She has written and supervised the preparation of numerous technical documents including paleontological resources assessments and technical reports, impact analyses, paleontological mitigation and monitoring plans, paleontological section of if environmental impact reports, environmental assessment reports, initial studies for mitigated negative declarations, paleontological monitoring reports and paleontological survey reports. PROJECT EXPERIENCE County of San Luis Obispo, San Luis Obispo County Paso Basin Land Use Management Area Planting Ordinance Program Environmental Impact Report, San Luis Obispo County, CA: As Senior Paleontologist/Project Manager, Jennifer was responsible for overseeing the paleontological study for incorporation into the Program Environmental Impact Report. The study included reviewing existing literature and geological mapping to provide a paleontological resources assessment and sensitivity analysis and provided measures to mitigate impacts to fossil resources. City of San Luis Obispo, Utilities Department –Water Resource Recovery Facility Project, San Luis Obispo County, CA: As Senior Paleontologist, Jennifer was responsible for providing oversight and coordination of paleontological fieldwork for this ongoing mass excavation into Quaternary older alluvial deposits. Southern California Edison – Valle Substation Project, Ventura County, CA: As Senior Paleontologist/Project Manager, Jennifer was responsible for providing oversight and coordination of all fieldwork and prepared a summary of findings for a paleontological survey of a proposed utility improvements project. City of Port Hueneme –Bubbling Springs Routine Maintenance Agreement Project, Ventura County, CA: As Senior Paleontologist/Project Manager, Jennifer oversaw a paleontological initial study to be incorporated into the mitigated negative declaration for the project. The study included reviewing existing literature and geological mapping to provide a paleontological resources assessment and sensitivity analysis and provided measures to mitigate impacts to fossil resources. Caltrans District 8 – French Valley Parkway/I-15 Project, Riverside County, CA: As Paleontologist, Jennifer was one of two paleontologists responsible for surveying, planning, construction mitigation monitoring and writing the paleontological technical sections of the final survey and monitoring reports of results of excavations into the highly sensitive Pauba Formation in a complex area of the project requiring work on a busy freeway and city streets. Casitas Municipal Water District – Ventura-Santa Barbara Intertie Project, Ventura County, CA: As Senior/Project Manager, Jennifer was responsible for managing paleontological consulting, monitoring, and reporting for several ongoing projects related the Ventura-Santa Barbara Intertie Project. Jennifer supervised and coordinated paleontological field personnel and provides guidance related to handling of paleontological resource localities during excavations into multiple geologic units with a range of sensitivity. Santa Clarita Valley Water Agency, South Wells PFAS Groundwater Treatment Facility Project, Ventura County, CA: As Senior Paleontologist/Project Manager, Jennifer oversaw a paleontological initial study to be incorporated into the mitigated negative declaration for the project. The study included reviewing of existing literature and geological mapping to provide a paleontological resources assessment and sensitivity ratings and provided measures to mitigate impacts to fossil resources during construction of a proposed per- and polyfluoroalkyl substances treatment facility. Southern California Edison – Valley South Subtransmission Line Project, Riverside County, CA: As Senior Paleontologist, Jennifer was responsible for leading a crew of 8+ team members through 17 miles of a future linear transmission line. All survey work was incorporated into the Proponents Environmental Assessment (PEA) for Southern California Edison. This included proper BLM authorization and permitting to conduct surveying and a research design for field reconnaissance related to the PEA, EIS/EIR documentation for the transmission line. Greystar/City of San Diego – Sixth and Olive Project, San Diego County, CA: As Project Manager/Senior Paleontologist, Jennifer was responsible for recovering 70 fossil specimens from 9 localities. She drafted the budget, prepared the proposal, attended preconstruction meetings with City of San Diego, provided record search and literature review results, then applied cross trained archaeological and paleontological field and technical support during the project, provided project management/scheduling, salvaged fossil specimens, prepared fossil specimens in the laboratory, curated the fossil collection, and wrote the final paleontological monitoring report for a mass excavation 70+ feet into San Diego Formation near Balboa Park in eastern Downtown San Diego. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX xv RANDY ROMINGER, leed ap, assoc. dbia Principal-in-Charge Randy has over 38 years of experience in the construction industry involving the management of multi-million dollar projects for public and private sector clients. He has specialized in a variety of project types including parking structures, civic/ municipal, healthcare, corrections and education. Randy is an effective leader who believes trust, efficient conflict resolution, commitment, personal accountability and a goal-oriented approach are keys to a happy team and a successful project. EDUCATION BS, Construction Management, Colorado State University LICENSES & CERTIFICATIONS General Building Contractor B License #816632, CA LEED Accredited Professional; Assoc. Design-Build Prof. PROJECT EXPERIENCE California Polytechnic State University, San Luis Obispo, yak?it?ut?u Residential Community, San Luis Obispo, CA: A $204 million, 562,446 SF design-build project featuring eight structures with four and five levels above grade. The project featured single, double and quad units totaling 1,475 beds for first year students and an associated parking structure totaling 154,363 SF and over 480 stalls. Madera County Government Center, Madera, CA: A new $40 million, four-story, 131,000 SF administration building consisting of office space for county officials, customer service areas, board chambers as well as various conference and meeting rooms. The project also includes a new 400-car parking structure. San Luis Obispo Regional Transit Authority, Bus Maintenance Facility, San Luis Obispo, CA: A new $17.5 million (construction cost), 28,650 SF, single story bus maintenance facility with over 2,600 SF of mezzanine/ equipment platform located on a 6.44-acre site. The facility accommodates operations, administration and maintenance areas and includes detached enclosures on-site, including a trash enclosure and canopy over bus parking. Work also includes off-site improvements, specifically the T-intersection for future Elks Lane realignment. San Luis Obispo County, New Animal Shelter, San Luis Obispo, CA: A new $20.3 million, 16,000 SF design- build Animal Services Facility created to replace the existing animal services shelter constructed in 1975. The new facility improves public visitation and access, provides expanded services, security and incorporates larger kennel spaces with allowance for future expansion and overflow. San Luis Obispo County Community College District, Measure L Bond Program, San Luis Obispo, CA: A $275 million bond program which addresses crucial facility needs, including a new instructional building on the San Luis Obispo campus, a new campus center, a new career training facility and new early childhood center at the Paso Robles campus; the replacement of temporary classrooms, and repairs and upgrades to roofs, heating and air conditioning units, aquatic center and other infrastructure and utilities technology upgrades. MATT CHAPPELL, eit, cep Estimating Manager Matt has more than 26 years of experience in private and public construction and design. His experience includes project management, agency/contractor coordination, scheduling and project budgets, utility construction and estimating on multiple municipal and education projects. As a Certified Estimating Professional (CEP) by the Association for the Advancement of Cost Engineering (AACE), Matt exemplifies the well-rounded construction estimating professional. EDUCATION BS, Civil Engineering, University of Nebraska LICENSES & CERTIFICATIONS Engineer in Training #EI-7956, NB Certified Estimating Professional #130-10 PROJECT EXPERIENCE San Luis Obispo County, New Animal Shelter, San Luis Obispo, CA: A new $20.3 million, 16,000 SF design- build Animal Services Facility created to replace the existing animal services shelter constructed in 1975. The new facility improves public visitation and access, provides expanded services, security and incorporates larger kennel spaces with allowance for future expansion and overflow. County of San Luis Obispo, Probation Department Building, San Luis Obispo, CA: A new $16 million, 31,000 SF, two-story office building featuring office space for county probation staff, interview rooms, training, conference and evidence rooms, armory, secured sallyport, break rooms, locker and changing rooms, restrooms with showers, a public lobby, parking as well as an emergency generator. City of Chandler, Oregon Street Parking Structure, Chandler, AZ: A new $23 million, five-level, 293,000 SF, 932-space parking garage for the City of Chandler, which includes a road realignment along Oregon Street as well as intersection improvements at Arizona Avenue and Chicago Street. California Department of General Services, Richards Boulevard Office Complex, Sacramento, CA: A new $1 billion design-build office campus totaling approximately 1.25 million GSF consisting of four 7- to 11-story office buildings with two multi-floor podiums at the base for the towers. Site improvements include a seven-level parking garage with 1,294 spaces and an additional 318 surface parking spaces. Butte County Association of Governments, Butte Regional Transit Operations Center (BRTOC), Chico, CA: A new $38 million, 41,000 SF LEED Silver certified transit facility built to replace the outdated maintenance and operations facilities with a new bus maintenance building, operations building and an administrative office facility, along with associated on-site and off-site improvements, including an 8,000 SF tenant improvement. Work includes renovation of the existing building. The facility houses twelve additional executive offices and a new Board Room for Butte County Association of Governments official board meetings. AS-NEEDED IN-HOUSE SUPPORT SERVICES DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // APPENDIX xvi RICK STASSI Scheduling Manager Rick has over 45 years of technical and analytical industry scheduling experience, with a diverse career in the engineering and project management fields. His experience encompasses project controls, engineering support, customer service and information technology support as well as scheduling, with excellent interpersonal and team building skills. Rick is familiar with a wide range of systems and software including Procore, MS Project, Power BI, Primavera, Prolog and AutoCAD. His experience includes high volume projects across several industries including water/ wastewater, aviation, civic/municipal, commercial and transportation. EDUCATION Coursework, Engineering, Sacramento City College PROJECT EXPERIENCE California Polytechnic State University, San Luis Obispo, Vista Grande Dining Facility, San Luis Obispo, CA: A new $39.8 million, 35,000 SF, three-story dining complex facility which replaces a 43-year old facility. The new complex, which is double the size of the old facility, features six micro-restaurants with exhibition-style cooking as well as increased seating and lounge space encompassed in a modern LEED Gold certified building. San Luis Obispo County Community College District, Measure L Bond Program, San Luis Obispo, CA: A $275 million bond program which addresses crucial facility needs, including a new instructional building on the San Luis Obispo campus, a new campus center, a new career training facility and new early childhood center at the Paso Robles campus; the replacement of temporary classrooms, and repairs and upgrades to roofs, heating and air conditioning units, aquatic center and other infrastructure and utilities technology upgrades. California Department of General Services, Richards Boulevard Office Complex, Sacramento, CA: A new $1 billion design-build office campus totaling approximately 1.25 million GSF consisting of four 7- to 11-story office buildings with two multi-floor podiums at the base for the towers. Site improvements include a seven-level parking garage with 1,294 spaces and an additional 318 surface parking spaces. Sacramento Municipal Utility District, SMUD Headquarters Rehabilitation, Sacramento, CA: A $135 million complete renovation of the 120,000 SF office building and 45,000 SF parking garage. The north wing has a three level parking structure and a two-story office portion above the parking garage. This project is designed to achieve LEED Gold certification. Atascadero Unified School District, Measure I-10 & B-14 Bond Program, Atascadero, CA: A $126.2 million bond program providing expansion of vocational education programs and facilities, computer and technology upgrades and construction of a new science, technology, engineering and math facility at the high school as well as a new administration/classroom building at the middle school. HEATHER BROWN, pe, cpmp, leed ap Engineering & Architectural Services Director Heather brings more than 27 years of experience in the construction industry, where she has worked on a wide variety of public, higher education and commercial facilities. Her experience includes project management, mechanical and plumbing design, assessing and renovating both HVAC and plumbing systems, preparing calculations and AutoCAD drawings. Heather is responsible for the management of engineers and architects working with code, access compliance, design and constructability reviews, life cycle studies, value engineering sessions, energy studies, specifications development, needs assessments, master planning studies, facility assessments and construction inspections. EDUCATION MBA, Finance, California State University Sacramento BS, Mechanical Engineering, University of Portland, Oregon LICENSES & CERTIFICATIONS Mechanical Engineer #M31667, CA LEED Accredited Professional Commissioning Process Management Professional PROJECT EXPERIENCE San Luis Obispo Community College District, Photovoltaic Feasibility Study - Main and North Campus, San Luis Obispo, CA: Kitchell performed a study exploring the feasibility of installing on-site solar photovoltaic systems at Cuesta College’s Main and North Campus. The report investigated the electrical demand of the campuses over the pre-pandemic fully operating time frame of 2018-2020, the existing electrical site conditions, and civil infrastructure to determine the feasibility of installing an on-site solar photovoltaic system. Civic Park Condominiums, Cupertino, CA: Mechanical Engineer for this 132,000 SF, 4-story mixed development with 80 condominium units and 20,000 SF of retail and office space. The project also included a 120,000 SF, 3-level parking garage. Sacramento Municipal Utility District, SMUD Headquarters Rehabilitation, Sacramento, CA: A $135 million complete renovation of the 120,000 SF office building and 45,000 SF parking garage. The north wing has a three level parking structure and a two-story office portion above the parking garage. This project is designed to achieve LEED Gold certification. City of Chandler, Oregon Street Parking Structure, Chandler, AZ: A new $23 million, five-level, 293,000 SF, 932-space parking garage for the City of Chandler, which includes a road realignment along Oregon Street as well as intersection improvements at Arizona Avenue and Chicago Street. Butte County Association of Governments, Butte Regional Transit Operations Center (BRTOC), Chico, CA: A new $38 million, 41,000 SF LEED Silver certified transit facility built to replace the outdated maintenance and operations facilities with a new bus maintenance building, operations building and an administrative office facility, along with associated on-site and off-site improvements, including an 8,000 SF tenant improvement. Work includes renovation of the existing building. The facility houses twelve additional executive offices and a new Board Room for Butte County Association of Governments official board meetings. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 1540 Marsh Street, Suite 150 San Luis Obispo, CA 93401 www.kitchell.com DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 EXHIBIT C DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 1 Fee Proposal Within a separate sealed envelope, submit a complete fee proposal for the scope of services. Provide separate subtotals for Phase 1B and Phase 2 broken down by task and staff billing rates with estimated hours. Clearly identify fees for subconsultant services. Compensation for Services Kitchell’s philosophy for determining our compensation for services is driven by matching value to cost. In other words, we strive to provide the most appropriate complement of services and delivery methods to meet your objectives. Our primary goal is to align our understanding of the project success factors with your expectations. Our approach can be best described as “bottom-up-planning,” where we define the tasks to be performed, produce a detailed scope of services, identify staff that will implement the tasks, calculate the staff time requirement for each task and determine the resulting compensation. We believe this method provides you with the most cost- effective fee for the services provided. Typically, we prefer to be compensated on a lump sum fixed fee basis derived by using the approach just described. This arrangement eliminates the perception that the construction manager would benefit financially from construction cost overruns and change orders. We do not make it a practice to request changes to our contract for minor scope changes, or for major scope changes which can be managed within our established staffing plan and schedule. Billing amounts are determined using the method most appropriate to match the cost of carrying out our services. We are accustomed to billing using various compensation methods, which include: a fixed billing schedule, percentage of project/contract completion, and predetermined hourly rates, among other methods. Kitchell has worked under many different compensation methods and is flexible in meeting your preferences. Reimbursable Expenses Reimbursable expenses are those customary and reasonable costs associated with carrying out our Construction Management services and includes subconsultant invoices, Resident Engineer’s travel, printing, postage, and a copier/scanner for the job site office. We will charge only actual costs plus 10% to cover invoice processing and insurance. We understand the Phase 2 construction contract will include provisions for the contractor to provide an office space and a conference room for the construction management team including electricity, phone, internet, water, and sanitation services. Preconstruction services and Phase 1B construction services will be managed from our San Luis Obispo Office. Proposed Fees Phase 1B and Phase 2 fees are summarized below and broken down in detail by task and staff billing rates with estimated hours in the succeeding table. Subconsultant fees are identified within their respective tasks and include Kitchell’s mark-up on their fees. Our fee is based upon utilizing a full-time Project Inspector provided by Earth Systems. This position may not be redundant with City inspection, and if eliminated, would render $852,720 savings. Refer to the attached subconsultant fee proposal for further information regarding assumptions each firm used in deriving their fees. Rincon’s fees are for basic services. Their fee proposal also includes optional services the City may wish to consider. Our fees are based upon the scope of services described in Appendix A of the RFP and the following durations: Preconstruction services, 3-4 months from commencement of services to start of Phase 1B construction; Phase 1B, 6 months construction with post-construction concurrent with Phase 2 construction; Phase 2, 23 months construction in sequence with Phase 1B construction followed by 3 months for post-construction. Please see the following page for details. Task Phase 1B Phase B Task 1: Preconstruction Services $41,750 $22,500 Task 2: Construction Services $584,580 $2,788,440 Task 3: Geotechnical & Materials Testing & Specialty Inspection $111,553 $469,975 Task 4: Surveying $3,960 $19,800 Task 5: Construction Environmental Mitigation & Monitoring $29,638 $28,679 Task 6: Post-Construction Services $12,200 $126,500 Grand Totals:$783,681 $3,455,894 EXHIBIT C REVISED 11.9.2022 $3,436,094 $405,060 $600,201 DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 2 Description Rate/ Unit Price Phase 1B Phase 2 Hrs/Units Amount Hrs/Units Amount Task 1: Preconstruction Services Project Director $230 12 $2,760 2 $460 Resident Engineer $220 76 $16,720 40 $8,800 Assistant Resident Engineer/Sr. PM $205 76 $15,580 40 $8,200 Sr. Scheduler $180 20 $3,600 16 $2,880 Sr. Estimator $180 8 $1,440 12 $2,160 Reimbursable Expenses Allowance -$1,650 -$0 Task 2: Construction Services Project Director $230 48 $11,040 184 $42,320 Resident Engineer $220 96 $21,120 736 $161,920 Assistant Resident Engineer/Sr. PM $205 920 $186,600 3,680 $754,400 Quality Assurance Manager $170 960 $163,200 3,660 $622,200 Project Engineer ---3,600 $396,000 Project Inspector (By Earth Systems)$187 960 $179,520 3,600 $673,200 Sr. Scheduler $180 72 $12,960 300 $54,000 Sr. Estimator ---200 $36,000 Reimbursable Expenses Allowance -$8,140 -$48,400 Task 3: Geotechnical and Materials Testing and Specialty Inspection (Performed by Earth Systems) Earth Systems’ Fee with Kitchell Mark-up Quotation -$111,553 -$469,975 Task 4: Surveying (Performed by RRM) RRM’s Fee with Kitchell Mark-Up Quotation -$3,960 -$19,800 Task 5: Construction Environmental Mitigation and Monitoring (Performed by Rincon) Rincon’s Fee with Kitchell Mark-Up Quotation -$29,638 -$28,679 Task 6: Post-Construction Services Project Director ---24 $5,520 Resident Engineer ---24 $5,280 Assistant Resident Engineer/Sr. PM ---96 $19,680 Quality Assurance Manager $170 20 $3,400 240 $40,800 Project Engineer $110 80 $8,800 480 $52,800 Reimbursable Expenses Allowance -$0 -$2,420 DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 3 Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 2 Scope of Work Phase 1B Task 1 Project Initiation and Project Management This task includes project management, client coordination, quality assurance/quality control, and administration needed to prepare and execute the mitigation and monitoring plan for the project. The Rincon Principal and/or Project Manager will participate in one (1) project kickoff call with Kitchell and City staff. As part of this task, Rincon will undertake ongoing environmental compliance coordination with Kitchell and the City, review the overall project schedule, and establish a communication protocol to coordinate project changes or other issues that may arise throughout the duration of Phase 1B and Phase 2 construction activities. The project management task will also focus on maintenance of the project schedule. Rincon will manage the project team associated with environmental compliance activities including any optional tasks (if necessary), on-site monitoring, and reporting; coordinate the environmental review process schedule; and provide project updates for the environmental compliance. Rincon’s principal in charge and/or project manager will review and comment on the meeting minutes project status and budget updates. In addition to the kickoff meeting, Rincon proposes to attend up to six (6) coordination meetings with Kitchell and City staff, if applicable. Task 2 Nesting Bird Surveys and Reporting As outlined in the Plan, project activities that occur during the nesting bird season (February 1 through August 31) to be supported by a nesting bird survey conducted by a qualified biologist no more than three days prior to the initiation of ground disturbance and/or vegetation removal activities. A qualified Rincon biologist will conduct a nesting bird survey within three days prior to ground disturbing and/or vegetation removal activities for Phase 1B and Phase 2 as two separate surveys based on our understanding of the timing for each of these phases (see task 7). The nesting bird surveys will be conducted within the project boundary plus a 500-foot buffer for raptors and within the project area plus a 300-foot buffer for all other bird species where safely and legally accessible. The surveys will be conducted on foot within all accessible areas. Binoculars will be used for all inaccessible areas (e.g., private lands). This scope of work and associated cost assumes an individual nesting bird survey and report will be required for each of two phases: Phase 1B and Phase 2. Each nesting bird survey can be completed by one biologist in a single 4-hour day. If active an active nest(s) is found during a given survey, additional field time will be required to complete the survey (i.e., observation and documentation time necessary to assess nesting status such as clutch size and egg/fledging presence) and will be included as an amendment. If either of the project’s phases are to occur outside of the nesting bird season, a nesting bird survey and report will not be prepared for that phase. Upon completion of each nesting bird survey, Rincon will prepare a brief letter report that includes the purpose, methodology, and results. If active nests are found, a figure depicting the nest(s) location will be prepared. The reports will include a recommended avoidance buffer and monitoring period if an active nest is found within the survey area. Since the number of nests that may be identified is unknown, our cost does not include installing nest buffer(s), additional coordination, or monitoring the Rincon Consulting Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 3 active nest(s). If required, these monitoring tasks will be included as an additional scope of work to be authorized by the City prior to completion. The cost for this task assumes the draft letter reports will be submitted electronically for client review. Response to comments with up to two hours of staff time for each report is included. The final drafts will be compiled and submitted electronically. Task 3 Archaeological Construction Monitoring and Reporting for Phase 1B As discussed in the Plan, archaeological monitoring is required during initial ground disturbance. Rincon will conduct the required archaeological construction monitoring and reporting during Phase 1B activities. Additionally, a qualified principal investigator, defined as an archaeologist who meets the Secretary of the Interior’s Professional Qualifications Standard for archeology, shall be retained to oversee all mitigation measures related to archaeological resources, outlined in the following tasks. Task 3.1 Project Kickoff and WEAP Training Prior to the start of construction, Rincon will prepare a WEAP training program. The training will be presented to all on-site personnel and will include a briefing regarding the types of archaeological resources and/or fossils that could be found in the project area and the procedures to follow should archaeological or paleontological resources be encountered. The training will also include a discussion of applicable laws and penalties for removal or disturbance of archaeological or paleontological materials found on site. The training will provide instruction for workers with procedures to follow in the event of an archaeological resource or fossil discovery, including reporting procedures, and will provide contact information for the on-site monitor(s), Qualified Archaeologist, and Qualified Paleontologist. This training will be accomplished at the pre-construction kick-off meeting and will be conducted by the Qualified Archaeologist, Qualified Paleontologist, or their designated representative(s). Task 3.2 Archaeological Monitoring Rincon will provide a qualified archaeologist to observe all project-related ground-disturbing construction activities for Phase 1B of the project. The monitor shall be on-site on a full-time basis during initial earthmoving activities, including grading, trenching, vegetation removal, or other excavation activities. Under consultation between the qualified archaeologist and the City, monitoring may be reduced or eliminated based on observed conditions. The qualified archaeologist will observe soil disturbances, inspect exposed soils, and will re-direct equipment in the event potential resources are encountered. The monitor will conduct a cursory inspection of any discoveries; however, in the event resources potentially significant under CEQA are encountered, further investigation beyond the scope of work described may be required. The monitor will prepare daily monitoring logs that include a description of construction activities, soil descriptions (color, grain size, sediments, etc.), and cultural materials identified, if any. The monitoring logs will be reviewed as necessary by a Rincon senior archaeologist and filed at Rincon’s San Luis Obispo office. Rincon requires that construction staff provide 48-hour notice for mobilization of a monitor. Rincon will provide up to five (5), 8-hour days of archaeological monitoring at a day rate of $1500 per day. Should more than 5, 8 hour days for monitoring be required, Rincon can provide additional monitoring at the standard $1500 day rate Rincon will charge a half day rate of $800 for every day the monitor is on-site for less than 4 hours or if work is cancelled without 48 hours notification. Rincon assumes no cultural resources will be encountered during monitoring. A scope and budget augmentation will be requested to address finds encountered during monitoring. This scope and cost do DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 4 Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 4 not include analysis, laboratory preparation, or documentation of identified cultural resources discovered during monitoring. In the event cultural resources are encountered during the construction, all work shall be halted in the vicinity of the discovery until a qualified archaeologist can assess the significance of the resource. If the resources are found to be significant, they must be avoided or mitigated pursuant to the qualified archaeologist’s direction and mitigation measures outlined in the Plan. Mitigation may involve preservation in place or documentation and excavation of the resource. A report by the archaeologist evaluating the find and identifying mitigation actions taken shall be submitted to the Kitchell and the City. Task 4 Paleontological Construction Monitoring for Phase 1B Task 4.1 Paleontological Monitoring Rincon will provide a qualified paleontological monitor to be on site during initial project-related ground-disturbing activities of 10 feet or more in depth within previously undisturbed sediments. The monitor will inspect excavated or graded areas and trench sidewalls for evidence of paleontological resources. Monitoring procedures may also include onsite sample screening of sedimentary matrix for the presence of microfossils, at the discretion of the Qualified Paleontologist. Rincon will provide up to five (5), 8-hour days of paleontological monitoring. Rincon will charge a minimum 4 hours/day for every day the monitor is on-site for less than 4 hours or if work is cancelled without proper notification. An approximate daily monitoring rate for paleontological services would be $1,500 per day. If fossils are discovered, the monitor will temporarily divert construction to assess the find. If deemed scientifically significant or potentially significant, the monitor will collect the fossil specimen(s) and pertinent associated data in a manner that would minimize or avoid construction delays. All scientifically significant fossils recovered during monitoring will be prepared, identified, and curated permanently into a permanent repository. Optional Task 5 Historic American Building Survey Documentation Phase 1B and 2 are subject to the requirements of MMRP Measure CR-1 outlined in the Final EIR MMRP, which requires historic American building survey documentation prior to construction. If authorized, Rincon will prepare the required Historic American Building Survey (HABS)-level III documentation of two buildings, 610 and 614 Monterey Street prior to initiation of Phase 1B and Phase 2 construction activities. For this effort, Rincon’s project team will be led by Architectural History Project Manager JulieAnn Murphy with oversight provided by Architectural History Principal Shannon Carmack. Both Ms. Murphy and Ms. Carmack meet and exceed the Secretary of Interior’s Professional Qualification Standards (PQS) for History and Architectural History (36 CFR, Part 61). Additionally, they have prepared several HABS- like documentation packages for buildings and structures located throughout California. Photographs A Rincon Architectural Historian meeting the PQS Standards will conduct site visits to 610 Monterey Street and 614 Monterey Street. The purpose of the site visit will be to photograph the buildings. Photographs will be taken using a professional-quality single lens reflex digital camera. Large-format photographs and site drawings/plans will not be included as a component of the HABS package; either can be provided but would require a contract amendment. Images captured will include context views, elevations/exteriors, architectural details, overall interiors, and interior details (if warranted). A Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 5 maximum of 30 views of each building will be taken. The actual number of views obtained will depend upon site conditions, access, and safety considerations. Rincon assumes the City’s staff will facilitate access to the buildings, including the interiors and exteriors of the buildings. Given the close proximity of the buildings, Rincon further assumes one site visit will be sufficient to complete documentation. Following completion of the site visit, Rincon will upload photographs to an FTP site for review by the City to confirm that the photographs are adequate and will satisfy the HABS documentation requirements. Supplemental Research and Preparation of HABS Reports Rincon will prepare a HABS-level III report for the buildings in a format consistent with the Secretary of the Interior’s Standards and Guidelines for Architectural and Engineering Documentation: Historic American Building Survey. The report will include a physical description of the buildings and available information on their design and history. It will document the buildings’ construction history, architecture, and historical significance. Rincon will draw on existing documentation to the greatest extent feasible and will perform additional research as needed. The scope for this task does not include preparation of updated Department of Parks and Recreation (DPR) forms. Compilation of HABS Documentation Packages Upon completion the tasks described above, Rincon will assemble a HABS-level III documentation package for each building. The package will include photographs and the HABS-level III report. It will integrate any additional data collected. A map indicating the location from which each photograph was taken, and a photograph log, will be included for reference. A draft digital copy of each package will be submitted to the City for review and approval, following which point it will be finalized. Following finalization, Rincon will send original hard copies of the packages to San Luis Obispo Library and the History Center of San Luis Obispo County to satisfy the specific requirements of MMRP Measure CR-1. The photographs and the report will be printed on acid-free archival-bond paper and labeled and stored in archival sleeves and folders accordingly. The entire package will be housed in an acid-free storage container prior to delivery. Should additional hard or electronic copies of the documentation packages be requested, a change order will be necessary. Optional Task 6 Extended Phase 1 Testing Based on the findings of the Mitigation and Monitoring Plan prepared by Rincon in 2022, the anticipated method for investigating subsurface remains associated with CA-SLO-2431H is through an Extended Phase 1 (XPI) investigation consisting of mechanical backhoe trenching subsequent to demolition and pavement removal. Use of a backhoe will allow for an expedited review of the soil profiles and an assessment as to the potential to encounter buried archaeological deposits. The area of disturbance for demolition and pavement removal for Phase 1B and Phase 2 of the project is approximately 300 feet by 200 feet. Therefore, four backhoe trenches oriented from east to west and spaced approximately 20 meters (66 feet) apart will be necessary. Rincon assumes the XPI investigation will be negative for subsurface archaeological material that will require formal evaluation. In the event subsurface deposits that require such evaluation are identified during the XPI investigation, a budget amendment would be necessary to document and evaluate the finds. If the XPI investigation is positive, a Phase 2 significance evaluation may also be necessary to determine if the project will have a significant impact on the resource and to evaluate the deposit(s) for significance under CEQA. If an intact archaeological deposit is encountered during the Phase 2 that cannot be avoided by project design, a Phase 3 data recovery DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 5 Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 6 excavation of the deposit would likely be necessary to mitigate impacts. Phase 2 and Phase 3 testing would require a separate scope of work and cost. Optional Task 6.1 Extended Phase 1 Testing Plan Rincon will prepare an XPI work plan upon authorization. The work plan will include a discussion of the goals of the study, methods to be employed, and factors that determined the scope. Rincon assumes this plan will be submitted electronically and approved with a single combined round of comments from the City. Optional Task 6.2 Extended Phase 1 Fieldwork This work effort will be conducted under the direction of Rincon archaeologist Dustin Merrick, MA, RPA, who meets the Secretary of the Interior’s Professional Qualification Standard for prehistoric and historic archaeology. Under the direction of the Qualified Archaeologist, two Rincon archaeologists will direct the mechanical excavation of a series of up to four (4) trenches totaling approximately 800 linear feet to assess the presence or absence of subsurface archaeological deposits associated with CA-SLO-2341H within the project site. XPI fieldwork will require a two-person crew for no more than five (5), eight (8) hour days inclusive of travel time. Trenching will be performed by a qualified excavation contractor under the direction of the Rincon field director. This scope of work assumes costs for the excavation contractor will not exceed $1,200 per day. Rincon assumes that the presence of a Native American monitor will not be required for excavation activities, as no prehistoric resources are anticipated. For the purposes of this proposal, Rincon estimates that no more than four (4) trenches will be excavated. Excavation will be conducted using a standard backhoe fit with a flat blade. Excavation will be conducted in small lifts (10 to 20 cm) so that any archaeological materials, features or deposits can be identified immediately upon exposure. Stratigraphic soil profiles will be drawn of at least one side wall of a representative sample of the trenches. In lieu of hand excavation, Rincon will screen samples of excavated soils from the trenches to identify the amounts and types of artifacts and ecofacts that may be present in particular soil strata. Samples will be screened from different stratigraphic layers as identified in the field and at systematic intervals during trenching. The excavated soils will be dry screened through 1/8-inch (3-millimeter) mesh. Artifacts and ecofacts recovered during screening will be analyzed and documented in the field; no artifacts, samples, or specimens will be collected during the testing and no laboratory analysis is currently proposed. Artifacts recovered will be reburied within the trenches during backfilling. Excavation forms will be prepared providing all pertinent data (e.g., trench number, date, provenience, location justification, and termination justification). All excavation locations will be recorded using a sub- meter-accurate handheld GPS unit and documented both with notes and photographs. Should feature(s) be encountered that require hand excavation, Rincon will expose the feature so that it can be identified and its location recorded but will not complete full excavation of the feature. Complete recovery of the feature would be proposed for Phase 3 efforts, if needed. Should the feature consist of human remains, Rincon will cease work and notify the Kitchell, the City and the County Coroner. Rincon will submit a budget augmentation for the additional work related to the treatment of human remains that are Native American in origin. Optional Task 6.3 Extended Phase I Reporting Rincon will prepare a technical report to document the results of the investigation. The report will be prepared following the California Office of Historic Preservation’s Archaeological Resource Management Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 7 Reports (ARMR) Guidelines. The report will include a discussion of the findings of the study and all appropriate maps, figures, photographs, and tables. The report will also provide management recommendations for the project and outline procedures to be followed in the event of an unanticipated discovery during project construction. No more than one round of revisions to the XPI report will be necessary following review by Kitchell and the City. In addition to the XPI testing report, Rincon will prepare Department of Parks and Recreation 523 series forms to update the existing resource record (CA-SLO-2341H) that was identified within the current project boundaries. Phase 2 Task 7 Nesting Bird Surveys and Reporting As described under Task 2, project activities that occur during the nesting bird season (February 1 through August 31) to be supported by a nesting bird survey conducted by a qualified biologist no more than three days prior to the initiation of ground disturbance and/or vegetation removal activities. Upon completion of the nesting bird survey, Rincon will prepare a brief letter report that includes the purpose, methodology, and results as described in greater detail under Task 2. Task 8 Archaeological Construction Monitoring and Reporting for Phase 2 As discussed in the Plan, archaeological monitoring is required during initial ground disturbance. Rincon will conduct the required archaeological construction monitoring and reporting during Phase 2 activities. Additionally, a qualified principal investigator, defined as an archaeologist who meets the Secretary of the Interior’s Professional Qualifications Standard for archeology, shall be retained to oversee all mitigation measures related to archaeological resources, outlined in the following tasks. Task 8.1 Project Kickoff and WEAP Training Rincon will present the previously prepared WEAP for Phase 1B during the initiation of Phase 2 construction activities. The training will be presented to all on-site personnel and will include a briefing regarding the types of archaeological resources and/or fossils that could be found in the project area and the procedures to follow should archaeological or paleontological resources be encountered. The training will also include a discussion of applicable laws and penalties for removal or disturbance of archaeological or paleontological materials found on site. The training will provide instruction for workers with procedures to follow in the event of an archaeological resource or fossil discovery, including reporting procedures, and will provide contact information for the on-site monitor(s), Qualified Archaeologist, and Qualified Paleontologist. This training will be conducted on the first day of Phase 2 construction monitoring. Rincon assumes the Phase 1B WEAP will be sufficient and new WEAP or any preconstruction preparation will be required Task 8.2 Archaeological Monitoring Rincon will provide a qualified archaeologist to observe all project-related ground-disturbing construction activities for Phase 2 of the project. The monitor shall be on-site on a full-time basis during initial earthmoving activities, including grading, trenching, vegetation removal, or other excavation activities. Under consultation between the qualified archaeologist and the City, monitoring may be reduced or eliminated based on observed conditions. The qualified archaeologist will observe soil DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 6 Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 8 disturbances, inspect exposed soils, and will re-direct equipment in the event potential resources are encountered. The monitor will conduct a cursory inspection of any discoveries; however, in the event resources potentially significant under CEQA are encountered, further investigation beyond the scope of work described may be required. The monitor will prepare daily monitoring logs that include a description of construction activities, soil descriptions (color, grain size, sediments, etc.), and cultural materials identified, if any. The monitoring logs will be reviewed as necessary by a Rincon senior archaeologist and filed at Rincon’s San Luis Obispo office. Rincon requires that construction staff provide 48-hour notice for mobilization of a monitor. Rincon will provide up to five (5), 8-hour days of archaeological monitoring at a day rate of $1500 per day. Should more than 5, 8 hour days for monitoring be required, Rincon can provide additional monitoring at the standard $1500 day rate Rincon will charge a half day rate of $800 for every day the monitor is on-site for less than 4 hours or if work is cancelled without 48 hours notification. Rincon assumes no cultural resources will be encountered during monitoring. A scope and budget augmentation will be requested to address finds encountered during monitoring. This scope and cost do not include analysis, laboratory preparation, or documentation of identified cultural resources discovered during monitoring. In the event cultural resources are encountered during the construction, all work shall be halted in the vicinity of the discovery until a qualified archaeologist can assess the significance of the resource. If the resources are found to be significant, they must be avoided or mitigated pursuant to the qualified archaeologist’s direction and mitigation measures outlined in the Plan. Mitigation may involve preservation in place or documentation and excavation of the resource. A report by the archaeologist evaluating the find and identifying mitigation actions taken shall be submitted to the Kitchell and the City. Task 8.3 Archaeological Monitoring Letter Report Upon completion of the monitoring effort, Rincon will prepare a letter report that will describe the results, analysis, and conclusions of the archaeological monitoring effort. The letter report will be submitted to Kitchell and the City for review and approval within 30 days following the completion of monitoring. Rincon will respond to one (1) round of consolidated, minor comments on the draft letter report from Kitchell and the City staff. A copy of the final version of the letter report will be submitted to the City within 30 days of approval. All deliverables will be presented electronically. After the final copy is accepted by the City, the final report will be submitted to the Central Coast Information Center. Rincon assumes the archaeological monitoring letter report findings will be negative. Should a resource be discovered during archaeological monitoring, Rincon will request a scope and budget augmentation for the additional scope and cost. Rincon assumes that a single letter report for Phases 1B and 2 will suffice; therefore, we have budgeted a single letter report as a cost-saving measure. Task 9 Paleontological Construction Monitoring for Phase 2 Task 9.1 Paleontological Monitoring Rincon will provide a qualified paleontological monitor to be on site during initial project-related ground-disturbing activities of 10 feet or more in depth within previously undisturbed sediments. The monitor will inspect excavated or graded areas and trench sidewalls for evidence of paleontological resources. Monitoring procedures may also include onsite sample screening of sedimentary matrix for the presence of microfossils, at the discretion of the Qualified Paleontologist. Rincon will provide up to five (5), 8-hour days of paleontological monitoring. Rincon will charge a minimum 4 hours/day for every Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 9 day the monitor is on-site for less than 4 hours or if work is cancelled without proper notification. An approximate daily monitoring rate for paleontological services would be $1,500 per day. If fossils are discovered, the monitor will temporarily divert construction to assess the find. If deemed scientifically significant or potentially significant, the monitor will collect the fossil specimen(s) and pertinent associated data in a manner that would minimize or avoid construction delays. All scientifically significant fossils recovered during monitoring will be prepared, identified, and curated permanently into a permanent repository. Task 9.2 Paleontological Negative Findings Letter Report Rincon will prepare a final monitoring letter report that will outline the methodology of paleontological monitoring at the project site, describe the construction activity and duration, describe the lithology of the depositional units exposed during excavations, and present the results of the monitoring. The level of effort to complete a monitoring report is dependent on the number of resources recovered during monitoring activities. Rincon assumes that a single letter report for Phases 1B and 2 will suffice; therefore, we have budgeted a single letter report as a cost-saving measure. Assumptions Our scope of work and cost for this project has incorporated the following assumptions. ▪ This proposal assumes no cultural resources will be discovered during cultural resources monitoring and the current scope of work and cost estimate does not include analysis, collection, laboratory preparation, or documentation of identified cultural resources discovered during monitoring. A scope and budget augmentation will be requested to address finds encountered during monitoring. ▪ Access to the project boundary will be provided by Kitchell. The project boundary within private lands will be surveyed with the use of binoculars for the nesting bird survey. ▪ Rincon is not responsible for delays due to weather, site conditions (e.g., prohibited access, flooding, fire, safety) or other conditions out of Rincon’s control. ▪ One WEAP training by the archaeological and paleontological monitors on the first day of monitoring will be sufficient to train the entire construction crew and no additional WEAP training will be necessary. If additional training for new crew members is needed, Rincon can provide recorded presentations. ▪ Rincon assumes negative findings during paleontological monitoring, and the current cost estimate does not include expenses related to the treatment and curation of fossil specimens. Should fossils be recovered during monitoring, Rincon will immediately prepare an estimate for the anticipated costs associated with documentation and reporting requirements for the discovery. ▪ Kitchell will provide current project site plans for inclusion in the Archaeological Monitoring Technical Memorandum ▪ In light of the current COVID-19 pandemic, Rincon staff will conduct the nesting bird survey in accordance with the most current relevant, local COVID-19 safety protocols and social distancing guidance. ▪ Rincon is not responsible for damage to subsurface structures, utilities, pipelines, or other objects that are not marked or identified to us by client or Underground Service Alert utility notification service, provided that we have made appropriate inquiries to USA utility notification services. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 7 Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 10 ▪ Rincon assumes that the extended Phase I testing will not discover a resource that could be considered a historical resource under CEQA, and the current scope of work and cost estimate does not include analysis, collection, laboratory preparation, or documentation of identified cultural resources discovered during testing. If a cultural resource be discovered that has the potential to be a historic resource under CEQA, a scope and budget augmentation will be requested to address finds encountered during testing. ▪ Rincon is not responsible for delays due to weather, site conditions (e.g., prohibited access, flooding, fire, safety) or other conditions out of Rincon’s control. ▪ If additional effort is required beyond that identified in the work program outlined above, Rincon will perform the work on a time and materials basis with an amendment of the project cost and scope of work approved by Kitchell. These rates do not include overtime or penalties for missed meal periods. Should overtime be required, hours greater than eight (8) hours per day onsite or 40 hours per week onsite will be charged at a rate consistent with California state law (generally 1.5 times). As part of this work program, Rincon assumes a meal period will be allotted before the fifth hour of work. If a meal period is not allotted by the end of the fifth hour on any workday, an additional hour of labor will be charged. No additional services would be provided without receipt of prior written approval. Schedule Construction monitoring activities (Tasks 2, 3, 4, and optional Tasks 5 and 6) would proceed alongside the planned project construction schedule for Phase 1B. Similarly, construction monitoring activities (Tasks 7, 8, and 9) would proceed alongside the planned project construction schedule for Phase 2. Cost Rincon will complete the work scope for the tasks identified above to not exceed of $53,016 for Tasks 1 through 4 and $107,163 including all optional tasks. No other services will be provided without your express written authorization. Please see Table 1 below for a cost breakdown of each task. Table 1 Cost Summary Tasks Cost Phase 1B Task 1 Project Initiation and Project Management $4,165 Task 2 Nesting Bird Surveys and Reporting $3,265 Task 3 Archeological Construction Monitoring and Reporting for Phase 1B Task 3.1 Project Kickoff and WEAP Training $2,508 Task 3.2 Archaeological Monitoring $8,503 Task 4 Paleontological Construction for Phase 1B and Phase 2 Task 4.1 Paleontological Monitoring $8,503 Optional Task 5 Historic American Building Survey Documentation $19,609 Optional Task 6 Extended Phase 1 Testing Optional Task 6.1 Extended Phase I Testing Plan $4,744 Optional Task 6.2 Extended Phase I Fieldwork $23,204 Optional Task 6.3 Extended Phase 1 Reporting $6,590 Kitchell Proposal to Provide Construction Environmental Mitigation and Monitoring Services for the Cultural Arts District Parking Structure Project Page 11 Phase 2 Task 7 Nesting Bird Surveys and Reporting $3,265 Task 8 Archaeological Construction Monitoring and Reporting for Phase 2 Task 8.1 Project Kickoff and WEAP Training – Task 8.2 Archaeological Monitoring $8,503 Task 8.3 Archaeological Monitoring Letter Report $3,739 Task 9 Paleontological Construction Monitoring for Phase 2 Task 9.1 Paleontological Monitoring $8,503 Task 9.2 Paleontological Negative Findings Letter Report $2,062 Total $107,163 All work will be performed on a time and materials basis in accordance with the work scope outlined above. Should the actual effort required to complete the tasks be less than anticipated, the amount billed will be less than the total cost outlined above. This cost estimate is in effect for a period of 30 days, during which time all of the elements of this proposal are fully negotiable to meet the needs of Kitchell. This work effort will be managed by Rincon Project Manager Dustin Merrick, M.A., Registered Professional Archaeologist (RPA), and Rincon Principal Christopher Duran, M.A., RPA. Both Mr. Merrick and Mr. Duran meet the Secretary of the Interior’s Professional Qualification Standards for prehistoric and historic archaeology (NPS 1983). Rincon is prepared to begin the work scope outlined above following receipt of a signed copy of this proposal as well as a retainer of $13,250 (approximately 25 percent of the proposed budget, not including optional tasks). Thank you for your consideration and for this opportunity to support your project. If you have any questions regarding this proposal, please contact Mr. Merrick at (805) 762-4064 or dmerrick@rinconconsultants.com, or Mr. Duran at (805) 644-4455, extension 22 or cduran@rinconconsultants.com. Sincerely, Rincon Consultants, Inc. Dustin Merrick, MA, RPA Project Manager/Archaeologist Christopher Duran, MA, RPA Principal/Senior Archaeologist Attachments Attachment 1 Reference List Attachment 2 Resumes of Key Personnel DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 8 RRM Design Group 1 SCOPE OF SERVICES TASK S.1: CONSTRUCTION STAKING This task will include the following: SUBTASK S.1A: PHASE 1B STAKING Rough Grade/Shoring Staking • One (1) set of rough grade and shoring offset stakes with grades to finish grade SUBTASK S.1B: PHASE 2 Sawcut • One (1) set of stakes will be provided for sawcut lines Sewer • One (1) set of offset stakes will be provided for sewer services with grades to flowline Water • One (1) set of offset stakes will be provided for water services with grades to finish the surface or top of curb Storm Drain • One (1) set of offset stakes at an interval of no greater than 50 feet, angle points and tees with grades to flowline. Double offsets will be provided for utility holes, drainage chambers and drain inlets with grades to flowline in/flowline out and rim/top of grate Building • One (1) set of offset stakes at grid lines 1 through 14, A, A.1, A.3, A.4, A.6, A.8, A.9, B, B.2, B.3, B.6, B.7, C, C.1, C.2, C.3, C.5, C.6, C.7, C.8, D, E for level one (1) with grades to finish surface Walls • One (1) set of offset stakes to centerline of wall with grades to top of footing or finish surface. • Street lights/transformers/vault • One (1) set of double offsets stakes to street lights transformers and vaults with grades top of curb or finish surface • Curb, flatwork • One (1) set of offset stakes to face of curb at an interval of no greater than 50 feet along straight sections and interval of no greater than 25 feet on curves sections, grade breaks, angle points and radius points with grades to top of curb or finish surface NOTE: Gas lines and conduits are not included in this proposal 2 MOVE-IN SCHEDULE: It will be the contractor’s responsibility to review the following move-in schedule with respect to possible phasing and overall project schedule. Any changes to this move-in schedule must be made prior to the award of contract. MOVE-IN SCHEDULE AND FEES Item No. Description No. of Move-ins 1 Rough Grade/Shoring 2 2 Sawcut 1 3, 4 Sewer/Water 1 5 Storm Drain 1 6 Building 1 7 Walls 1 8 Street Lights/Transformers/Vault 1 9 Curb, Flatwork 3 Total Moves to Site: 11 Deliverables: • Construction Stakes Fixed Fee: • Subtask S.1A: $3,600.00 (see footnote 1) This fee is based on prevailing wage • Subtask S.1B: $18,000.00 (see footnote 1) This fee is based on prevailing wage TASK S.2: RE-STAKING AND ADDITIONAL SERVICES All re-staking and services beyond the scope of work described herein will be performed on an hourly basis based on standard billing rates at the time the services are requested. Fee: Time and Materials • Hourly (see footnote 2) Fee Footnotes 1. Fixed fee tasks will be billed as the work progresses until the task is completed and the total amount stated in the contract for the task is invoiced. 2. Amounts billed for tasks shown as “Time and Materials” (T&M) will reflect actual hours worked. TOTAL RRM SERVICE FIX FEES: $21,600.00 Any work outside the scope of the original agreement between RRM Design Group and the Client and authorized by Client, is subject to the Terms and Conditions of the Prime Agreement. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 9 BILL RATE RANGES Subject to change effective March 1st each year  EXHIBIT A-1 SCHEDULE 1 Bill Rate Ranges Subject to change effective March 1st each year ARCHITECTURE INTERIOR DESIGN Architect 95$ -155$ Designer I 60$ -95$ Associate Manager of Architecture 140$ -200$ Designer II 70$ -120$ Design Director 145$ -240$ Interior Designer I 75$ -125$ Designer I 70$ -100$ Interior Designer II 90$ -150$ Designer II 80$ -125$ Intern 45$ -85$ Designer III 95$ -150$ Job Captain 105$ -165$ Intern 45$ -85$ Senior Interior Designer 110$ -195$ Job Captain 95$ -150$ Manager of Architecture 165$ -280$ LANDSCAPE ARCHITECTURE Principal 185$ -350$ Assistant Designer 70$ -110$ Project Architect 115$ -185$ Associate Designer 80$ -125$ Project Designer 115$ -185$ Designer 95$ -140$ Project Manager 115$ -185$ Design Director 135$ -235$ Senior Architect 135$ -235$ Intern 45$ -85$ Senior Designer 135$ -220$ Landscape Architect 95$ -145$ Senior Project Manager 135$ -240$ Manager of Landscape Architecture 150$ -245$ Principal 185$ -350$ ENGINEERING & SURVEYING Principal Landscape Architect 135$ -235$ Associate Engineer 115$ -170$ Senior Landscape Architect 115$ -175$ Construction Inspector 105$ -175$ Designer I 55$ -95$ PLANNING Designer II 75$ -125$ Assistant Planner 90$ -130$ Designer III (Structural only)90$ -135$ Associate Planner 105$ -170$ Engineer I 90$ -140$ Intern 45$ -85$ Engineer II 105$ -165$ GIS Specialist 80$ -150$ Land Surveyor 115$ -170$ Senior GIS Specialist 105$ -185$ Manager of Engineering Services 170$ -280$ Manager of Planning 175$ -265$ Manager of Surveying 155$ -235$ Principal 185$ -350$ Party Chief 90$ -150$ Principal Planner 165$ -250$ Principal 185$ -350$ Senior Planner 135$ -205$ Project Engineer 125$ -185$ Senior Urban Designer 135$ -210$ Project Manager 150$ -245$ Urban Designer 105$ -170$ Senior Associate Engineer 130$ -210$ Senior Designer 110$ -185$ CORPORATE SERVICES Senior Land Surveyor 135$ -210$ Administrative Assistant 60$ -95$ Senior Party Chief 115$ -185$ Administrative Coordinator 75$ -130$ Senior Project Engineer 140$ -230$ Assistant Office Manager 90$ -135$ Supervisor of Surveying 145$ -220$ Chief Executive Officer 195$ -500$ Survey Technician I 60$ -100$ File Clerk/Administrative Support 45$ -65$ Survey Technician II 75$ -115$ Marketing Assistant 45$ -85$ Survey Technician III 90$ -155$ Marketing Coordinator 65$ -115$ Surveying Crew Rates Marketing Manager 125$ -235$ REGULAR Marketing Specialist 90$ -155$ One person w/ GPS or Robotic Workstation 125$ -155$ Office Coordinator 75$ -130$ Two person 175$ -290$ Proposal Coordinator 80$ -140$ Three person 235$ -390$ Receptionist 45$ -80$ PREVAILING WAGE Senior Marketing Specialist 105$ -190$ One person w/ GPS or Robotic Workstation 150$ -180$ Two person 225$ -340$ Three person 325$ -490$      Rev 3/1/2022 3 CONSTRUCTION STAKING CONDITIONS: 1. It will be the contractor’s responsibility to inform RRM of changes in the Plans and Specifications that will affect the location of improvements. RRM will not be liable for misplaced improvements due to such changes that were not brought to our attention. Additional work caused by changes to the Plans and Specifications will be billed on an hourly basis. Also, any construction based on staking requested by the contractor based on unapproved plans and specifications will be done at the contractor’s sole risk. RRM will not be held liable for damages suffered by the contractor resulting from changes to the plans after RRM has set stakes. 2. To provide for reasonable preparation and organization, requests for staking should be made at least 48 hours in advance. Although RRM will make every effort to accommodate the unforeseen, no guarantee can be made without sufficient notice. 3. The contractor will be responsible for ensuring that the construction site is clear of debris and vehicles before ordering stakes. If staking is requested and site conditions do not allow the survey crew to work, you will be charged hourly for the time lost. This does not include poor site conditions caused by weather or other circumstances beyond the control of the contractor. 4. Any claim against RRM for losses or damages resulting from errors in staking (either horizontal or vertical) must be accompanied by proof of the actual location of the stake used and the information written on the lath (i.e., stakes must still be in place in the field when the claim is made). 5. The contractor will be responsible for discussing offsets for stakes prior to fieldwork. Otherwise, offsets will be chosen according to standard practice in this County, and any changes requested after the completion of staking will be billed to the contractor as an extra. 6. For your convenience, we will provide the job superintendent with a “construction staking request form” that must be signed before any extra work beyond the scope of the contract is done. Copies of this signed form will be sent with each monthly billing for your records. 7. Stakes shall be used only for their intended purpose. For example, rough grade stakes shall not be used for finish grading or building layout. 8. Three (3) consecutive points shown to be on the same slope rate must be used in common order that the contractor may detect any variation out of a perfect straight grade. In case any discrepancy is found, it shall be reported to the surveyor. Otherwise, the surveyor will not be responsible for any error in grade of the finished work. DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 CITY OF SAN LUIS OBISPO CULTURAL ARTS DISTRICT PARKING STRUCTURE PROJECT - RFP NO. 90435-CM // PAGE 10 Earth Systems EARTH SYSTEMS | AUGUST 29, 2022 | CITY OF SAN LUIS OBISPO - CULTURAL ARTS DISTRICT PARKING STRUCTURE Earth Systems FEE BREAKDOWN Hours/Units Rate Total Earth Systems Fee Breakdown PROJECT: DATE: Hours/Units Rate Total PHASE IB - Cultural Arts District Parking Structure On-Site Improvements - 120 Work Day Duration Project Inspector 960 $170.00 $163,200.00 Subtotal Task 2 $163,200.00 Geotechnical Observation - Professional 40 $200.00 $8,000.00 Project Management/Quality Control 40 $225.00 $9,000.00 Grading Observation and Testing 320 $140.00 $44,800.00 Special Inspection - Shoring Wall 120 $145.00 $17,400.00 Reporting and Document Posting 40 $125.00 $5,000.00 Compaction Tests (per test)150 $10.00 $1,500.00 Mileage (per trip)170 $7.50 $1,275.00 Laboratory Testing - Per Fee Schedule (Allotment) $12,000.00 DIR/ECPR Posting 20 $90.00 $1,800.00 Subtotal Task 3 $100,775.00 Hours/Units Rate Total PHASE 2 - Project Inspector 3600 $170.00 $612,000.00 Subtotal Task 2 $612,000.00 Geotechnical Observation - Professional 40 $200.00 $8,000.00 Project Management/Quality Control 100 $225.00 $22,500.00 Grading Observation and Testing - 2023 280 $140.00 $39,200.00 Special Inspection - 2023 320 $145.00 $46,400.00 Grading Observation and Testing -2024 120 $140.00 $16,800.00 Special Inspection -2024 1600 $145.00 $232,000.00 Reporting and Document Posting 180 $125.00 $22,500.00 Compaction Tests (per test)150 $10.00 $1,500.00 Mileage (per trip)700 $7.50 $5,250.00 Laboratory Testing - Per Fee Schedule (Allotment) $25,000.00 DIR/ECPR Posting 90 $90.00 $8,100.00 Subtotal Task 3 $427,250.00 TOTAL TASK 2 $775,200.00 TOTAL TASK 3 $528,025.00 Task 2 - Construction Observations/Inspections Task 3 – Geotechnical and Materials Testing and Specialty Inspection City of San Luis Obispo - Cultural Arts District Parking Structure August 29, 2022 Cultural Arts District Parking Structure - 450 Work Day Duration Task 2 - Construction Observations/Inspections Task 3 – Geotechnical and Materials Testing and Specialty Inspection PHASE 1B - Cultural Arts District Parking Structure On-Site Improvements - 120 Work Day Duration Hours/Units Rate Total PHASE 2 - Cultural Arts District Parking Structure - 450 Work Day Duration DocuSign Envelope ID: 39089CD9-7632-471F-8036-895978DF81A8 Certificate Of Completion Envelope Id: 39089CD97632471F8036895978DF81A8 Status: Completed Subject: Complete with DocuSign: Resident Engineer and Construction Management - Agreement.pdf Department: Supplier: Source Envelope: Document Pages: 93 Signatures: 4 Envelope Originator: Certificate Pages: 5 Initials: 0 Argelia Chang AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) 990 Palm Street San Luis Obispo, CA 93422 achang@slocity.org IP Address: 104.129.202.169 Record Tracking Status: Original 12/15/2022 11:55:07 AM Holder: Argelia Chang achang@slocity.org Location: DocuSign Signer Events Signature Timestamp Wendy Cohen wcohen@kitchell.com President Kitchell CEM, Inc. Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 104.220.121.60 Sent: 12/15/2022 11:58:04 AM Resent: 12/22/2022 4:26:12 PM Viewed: 12/23/2022 7:27:46 AM Signed: 12/23/2022 7:27:50 AM Electronic Record and Signature Disclosure: Accepted: 11/14/2022 12:37:10 PM ID: f59ea0e7-4d0e-4510-85e7-51548060a030 Randy Rominger rrominger@kitchell.com Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 174.87.132.185 Signed using mobile Sent: 12/23/2022 7:27:55 AM Viewed: 12/23/2022 2:07:31 PM Signed: 12/23/2022 2:08:04 PM Electronic Record and Signature Disclosure: Accepted: 12/23/2022 2:07:31 PM ID: ab204dce-8a22-46ed-ba83-0c357d81b18c Christine Dietrick cdietric@slocity.org Security Level: Email, Account Authentication (None) Signature Adoption: Drawn on Device Using IP Address: 104.129.202.90 Sent: 12/23/2022 2:08:09 PM Resent: 1/5/2023 8:01:21 AM Viewed: 1/5/2023 8:40:44 AM Signed: 1/5/2023 8:44:44 AM Electronic Record and Signature Disclosure: Accepted: 6/15/2020 2:16:11 PM ID: a47fa5a6-25c4-499a-ad2d-b3750c2fd621 Matt Horn mhorn@slocity.org Director of Public Works Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 47.32.158.228 Sent: 1/5/2023 8:44:50 AM Viewed: 1/5/2023 8:53:08 AM Signed: 1/5/2023 8:53:26 AM Electronic Record and Signature Disclosure: Signer Events Signature Timestamp Accepted: 11/7/2018 6:54:10 PM ID: abbb6413-5f03-483d-8739-5befeff5edf7 In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Argelia Chang achang@slocity.org Administrative Assistant III City of San Luis Obispo Security Level: Email, Account Authentication (None) Sent: 1/5/2023 8:53:30 AM Resent: 1/5/2023 8:53:38 AM Viewed: 1/5/2023 8:55:42 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Daniel Clancy dclancy@slocity.org Purchasing Analyst City of San Luis Obispo Security Level: Email, Account Authentication (None) Sent: 1/5/2023 8:53:32 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Manuel Guzman mguzman@slocity.org Security Level: Email, Account Authentication (None) Sent: 1/5/2023 8:53:33 AM Viewed: 1/5/2023 8:57:14 AM Electronic Record and Signature Disclosure: Accepted: 12/18/2020 9:05:30 AM ID: bda270ba-efa2-4807-a1cc-c5e70f600cee Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 12/15/2022 11:58:04 AM Certified Delivered Security Checked 1/5/2023 8:53:08 AM Signing Complete Security Checked 1/5/2023 8:53:26 AM Completed Security Checked 1/5/2023 8:53:33 AM Payment Events Status Timestamps Electronic Record and Signature Disclosure ELECTRONIC RECORD AND SIGNATURE DISCLOSURE From time to time, Carahsoft OBO City of San Luis Obispo (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through your DocuSign, Inc. (DocuSign) Express user account. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to these terms and conditions, please confirm your agreement by clicking the 'I agree' button at the bottom of this document. Getting paper copies At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. For such copies, as long as you are an authorized user of the DocuSign system you will have the ability to download and print any documents we send to you through your DocuSign user account for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. To indicate to us that you are changing your mind, you must withdraw your consent using the DocuSign 'Withdraw Consent' form on the signing page of your DocuSign account. This will indicate to us that you have withdrawn your consent to receive required notices and disclosures electronically from us and you will no longer be able to use your DocuSign Express user account to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through your DocuSign user account all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. Electronic Record and Signature Disclosure created on: 5/10/2017 10:25:58 AM Parties agreed to: Wendy Cohen, Randy Rominger, Christine Dietrick, Matt Horn, Manuel Guzman How to contact Carahsoft OBO City of San Luis Obispo: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: keriksso@slocity.org To advise Carahsoft OBO City of San Luis Obispo of your new e-mail address To let us know of a change in your e-mail address where we should send notices and disclosures electronically to you, you must send an email message to us at keriksso@slocity.org and in the body of such request you must state: your previous e-mail address, your new e-mail address. We do not require any other information from you to change your email address.. In addition, you must notify DocuSign, Inc to arrange for your new email address to be reflected in your DocuSign account by following the process for changing e-mail in DocuSign. To request paper copies from Carahsoft OBO City of San Luis Obispo To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an e-mail to keriksso@slocity.org and in the body of such request you must state your e-mail address, full name, US Postal address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with Carahsoft OBO City of San Luis Obispo To inform us that you no longer want to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your DocuSign account, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an e-mail to keriksso@slocity.org and in the body of such request you must state your e-mail, full name, IS Postal Address, telephone number, and account number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software Operating Systems: Windows2000? or WindowsXP? Browsers (for SENDERS): Internet Explorer 6.0? or above Browsers (for SIGNERS): Internet Explorer 6.0?, Mozilla FireFox 1.0, NetScape 7.2 (or above) Email: Access to a valid email account Screen Resolution: 800 x 600 minimum Enabled Security Settings: •Allow per session cookies •Users accessing the internet behind a Proxy Server must enable HTTP 1.1 settings via proxy connection ** These minimum requirements are subject to change. If these requirements change, we will provide you with an email message at the email address we have on file for you at that time providing you with the revised hardware and software requirements, at which time you will have the right to withdraw your consent. Acknowledging your access and consent to receive materials electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please verify that you were able to read this electronic disclosure and that you also were able to print on paper or electronically save this page for your future reference and access or that you were able to e-mail this disclosure and consent to an address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format on the terms and conditions described above, please let us know by clicking the 'I agree' button below. By checking the 'I Agree' box, I confirm that: • I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF ELECTRONIC RECORD AND SIGNATURE DISCLOSURES document; and • I can print on paper the disclosure or save or send the disclosure to a place where I can print it, for future reference and access; and • Until or unless I notify Carahsoft OBO City of San Luis Obispo as described above, I consent to receive from exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to me by Carahsoft OBO City of San Luis Obispo during the course of my relationship with you. 162 From:Tally Perry <tperry@kitchell.com> Sent:Thursday, June 29, 2023 1:31 PM To:Marquart, Ben Cc:Ryan Stefanek Subject:CADPS - Phase 1B.2 Storm Water Pollution Prevention Plan Attachments:23.06.28 312301 Storm Water Pollution Prevention Plan.pdf Follow Up Flag:Follow up Flag Status:Flagged This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Hi Ben! Hope you are enjoying your week off. Please find the attached Storm Water Pollution Prevention Plan from ECG. I reviewed this in accordance with Spec Section 312301 and RRM’s Appendix D and it meets the requirements. This has also been submitted in Procore, but we will approve it in there on our side once we get the “OK” from you. Thank you! Tally Perry, Project Engineer II Kitchell CEM 1540 Marsh Street San Luis Obispo, CA 93401 Cell: 801-557-2289 | Direct: 916-713-6981 Follow us: Facebook | Twitter | LinkedIn | KitchellProgress.com Storm Water Pollution Prevention Plan Submittal #31 2301-1 Rev. 0 Spec Sections 31 2301 SLO Phase 1B Downtown Cultural Arts Parking Structure Site Prep City of San Luis Obispo 919 Palm Street San Luis Obispo, CA 93401 Kitchell CEM Attn: Ryan Stefanek 1540 Marsh St. Suite #150, San Luis Obispo CA 93401 Submitted by: Edwards Construction Group, INC. LICENSE 1057451 PO BOX 350, NIPOMO, CA, 93444 Phone (805) 335.1161 Fax (805) 614.9906  06/28/23 Micheleen Collins STORM WATER POLLUTION PREVENTION PLAN Project Name: SLO Phase 1B Downtown Parking Structure Site Prep Prepared For: The City of San Luis Obispo Edwards Construction Group Risk Level: 1 Site Addresses: 609 Palm Street 972 Nipomo Street 633 Palm Street 630 Monterey Street 970 Nipomo Street 610 Monterey Street 614 Monterey Street Estimated Project Construction Dates: August 1, 2023 – November 1, 2023 705 Fiero Lane, Suite 10 San Luis Obispo, CA 93401 (805) 550-8546 phone Prepared By: Daniel Parker-King, RCE, QSD/P Permit Registration Submittal Date: _______ WDID No: 3 40C399332 Date: June 27, 2023 SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 2 TABLE OF CONTENTS Acronyms .............................................................................................................................................................. 4 Legally Responsible Person ................................................................................................................................... 5 SWPPP Certification .............................................................................................................................................. 6 Storm Water Multi-Application and Report Tracking System ............................................................................................ 6 Annual Fee.......................................................................................................................................................................... 7 1.0 SWPPP Requirements............................................................................................................................... 8 1.1 Introduction ......................................................................................................................................................... 8 1.2 Permit Registration Documents ........................................................................................................................... 8 1.3 Swppp availability and implementation .............................................................................................................. 9 1.4 Pollution Prevention Team .................................................................................................................................. 9 1.5 Duly Authorized Representatives ........................................................................................................................ 9 1.6 Permits and Governing Documents ..................................................................................................................... 9 1.7 SWPPP Amendments ......................................................................................................................................... 10 1.8 Retention of Records ......................................................................................................................................... 10 1.9 Exceedance Response Actions (ERA’s) ............................................................................................................... 11 1.10 Annual Comprehensive Facility Compliance Evaluation .................................................................................... 11 1.11 Annual Report .................................................................................................................................................... 12 1.12 Termination and Changes to General Permit Coverage ..................................................................................... 12 2.0 Facility Information ................................................................................................................................ 12 2.1 Facility Description ............................................................................................................................................. 12 2.1.1 Facility Location ............................................................................................................................................ 12 2.1.2 Existing Conditions ........................................................................................................................................ 13 2.1.3 Description of Drainage Areas and Existing Drainage ................................................................................... 14 2.1.4 Developed Condition .................................................................................................................................... 15 2.2 Project Risk Level ............................................................................................................................................... 15 2.2.1 Project Sediment Risk: .................................................................................................................................. 16 2.2.2 Receiving Water Risk: .................................................................................................................................... 18 2.2.3 Combined Risk: ............................................................................................................................................. 18 2.3 Construction Site Estimates ............................................................................................................................... 18 2.4 Construction Schedule ....................................................................................................................................... 18 2.5 Identification of Potential Pollutant Source ....................................................................................................... 18 3.0 Best Management Practices .................................................................................................................. 20 3.1 Contractor Information ...................................................................................................................................... 20 3.2 BMP Installation Schedule ................................................................................................................................. 20 3.3 Erosion & Sediment Control Best Management Practices ................................................................................. 22 3.4 Non-Storm Water and Material Management Best Management Practices ..................................................... 22 3.5 Post-Construction Best Management Practices ................................................................................................. 23 3.6 Housekeeping Requirements ............................................................................................................................. 23 3.7 Non-Storm Water Management ........................................................................................................................ 24 3.8 Erosion Control .................................................................................................................................................. 24 3.9 Sediment Control ............................................................................................................................................... 25 3.10 Inspection, Maintenance & Repair .................................................................................................................... 25 3.11 Training .............................................................................................................................................................. 25 3.12 Inspection and Entry .......................................................................................................................................... 26 4.0 Construction Site Monitoring Program .................................................................................................. 27 4.1 Construction Site Monitoring Program (CSMP) ................................................................................................. 27 4.2 Visual Monitoring & Inspection ......................................................................................................................... 28 4.3 Non-Storm Water Discharge Monitoring ........................................................................................................... 29 4.4 Water Quality Sampling and Analysis ................................................................................................................ 29 4.5 Construction Activity ......................................................................................................................................... 29 4.6 Quality Assurance and Quality Control .............................................................................................................. 30 SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 3 4.7 Reporting Requirements and Records Retention .............................................................................................. 32 5.0 General Procedures and Requirements .................................................................................................. 32 5.1 SWPPP Availability and Implementation ........................................................................................................... 32 5.2 SWPPP Amendments ......................................................................................................................................... 33 5.1 Retention of Records ......................................................................................................................................... 33 5.2 Reporting Requirements .................................................................................................................................... 33 5.3 Required Non-Compliance Reporting ................................................................................................................ 34 5.4 Annual Report .................................................................................................................................................... 34 5.5 Changes to Permit Coverage .............................................................................................................................. 34 5.6 Notice of Termination ........................................................................................................................................ 34 APPENDIX A NPDES CONSTRUCTION GENERAL PERMIT ............................................................................. 36 APPENDIX B BMPS FROM THE 2009 CALIFORNIA CONSTRUCTION BMP HANDBOOK ......................... 37 APPENDIX C LIST OF POTENTIAL NON-VISIBLE POLLUTANTS ................................................................... 38 APPENDIX D SWPPP CONTRACTOR/SUBCONTRACTOR AGREEMENTS ................................................... 40 APPENDIX E CONTRACTOR/SUBCONTRACTOR INFORMATION .................................................................. 41 APPENDIX F SWPPP TRAINING LOG ................................................................................................................... 42 APPENDIX G SITE MAP EROSION CONTROL PLAN ......................................................................................... 44 APPENDIX H RISK LEVEL CALCULATIONS ....................................................................................................... 45 APPENDIX I CHAIN-OF-CUSTODY (COC) FORM ............................................................................................... 48 APPENDIX J SWPPP AMENDMENT(S) & LOG ............................................................................................................ 50 APPENDIX K CORRECTIVE ACTION LOG .................................................................................................................... 52 APPENDIX L SAMPLING LOG ................................................................................................................................ 59 APPENDIX M ANNUAL FEE STATEMENT AND RECIEPTS .............................................................................. 64 APPENDIX N CONSTRUCTION SITE MONITORING INSPECTION FORM ...................................................... 68 APPENDIX O RAIN EVENT ACTION PLAN .......................................................................................................... 75 SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 4 ACRONYMS ASTM American Society of Testing and Materials BAT Best Available Technology BCT Best Conventional Pollutant Control Technology BMP Best Management Practice BPT Best Practicable Control Technology Currently Available CFR Code of Federal Regulations CGP Construction General Permit – NPDES Construction General Permit for Storm Water Discharges associated with Construction Activities COC Chain of custody COT City of Tehachapi CSMP Construction Site Monitoring Program CWA Clean Water Act of 1987 EPA Environment Protection Agency LRP Legally Responsible Person MS4 Municipal Storm Sewer System NAL Numeric Action Levels NEL Numeric Effluent Limitations NOAA National Oceanic and Atmospheric Administration (www.noaa.gov) NOI Notice of Intent NOT Notice of Termination NPDES National Pollution Discharge Elimination System POC Pollutants of Concern PoP Probability of Precipitation PRD Permit Registration Documents QSD Qualified SWPPP Developer QSP Qualified SWPPP Practitioner REAP Rain Event Action Plan RUSLE Revised Universal Soil Loss Equation RWQCB Regional Water Quality Control Board SAP Sampling and Analysis Plan SMARTS Storm water Multi- Application Report Tracking System SWAMP Surface Water Ambient Monitoring Program SWPPP Storm Water Pollution Prevention Plan SWPPM Storm Water Pollution Prevention Manager SWRCB State of California Water Resources Control Board SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 5 LEGALLY RESPONSIBLE PERSON Approval and Certification of the Stormwater Pollution Prevention Plan Facility Name SLO Phase 1B Downtown Parking Structure Site Prep Waste Discharge Identification (WDID): _________________________________________ “I certify under penalty of law that this document and all Attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, to the best of my knowledge and belief, the information submitted is, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." _______________________________________ Legally Responsible Person _______________________________________ ____________________ Signature of [Duly Authorized Representative of] Date Legally Responsible Person or Approved Signatory _______________________________________ ____________________ Name of [Duly Authorized Representative of] Legally Telephone Number Responsible Person or Approved Signatory [if applicable] SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 6 SWPPP CERTIFICATION This SWPPP was prepared under the direction of Daniel Parker-King, a Qualified SWPPP Developer (QSD). ___________________________________________ 6/27/23 Daniel Parker-King, RCE, QSD/P Date Mr. Parker-King possesses the following QSD qualifications per Section VII of the Construction General Permit: California Registered Civil Engineer, C74672, Expiration 12.31.23 QSD Certification Number C74672 Contact Information for questions or concerns: Hive Engineering 705 Fiero Lane, Suite 10 San Luis Obispo, CA 93401 (805) 550-8546 This SWPPP conforms to the required elements of the Construction General Permit Order No. 2009-0009-DWQ and amendments Order No. 2010-0014-DWQ and Order No. 2012-0006-DWQ issued by the State of California, State Water Resource Control Board. A QSD is required to prepare any necessary SWPPP amendments or annual reports. This SWPPP (including all inspections, amendments and reports) and the Construction General Permit shall be maintained for three years from the date submitted. These records shall be available at the construction site until construction is complete. When the original SWPPP is retained by a crewmember in a construction vehicle and it is not currently at the construction site, current copies of the BMPs and map/drawing will be left with the field crew and the original SWPPP shall be made available via a request by radio/telephone.) STORM WATER MULTI-APPLICATION AND REPORT TRACKING SYSTEM The Construction General Permit requires all dischargers to electronically file all Permit Registration Documents (PRDs), Notices of Termination (NOT), changes of information (COI’s), annual reporting, and other compliance documents required by the Construction General Permit through the State Water Board’s Storm water Multi-Application and Report Tracking System (SMARTS) website. SMARTS can be found at https://smarts.waterboards.ca.gov/smarts/faces/SwSmartsLogin.jsp SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 7 ANNUAL FEE The Edwards Construction Group will be accessed an annual fee of $XXX.XX. Checks are to be made payable to “SWRCB” and can be sent overnight to: SWRCB Storm Water Section 1001 I Street – 15th Floor Sacramento, CA 95814 The Fee Statement may be found in Appendix M of this SWPPP. SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 8 1.0 SWPPP REQUIREMENTS 1.1 INTRODUCTION The Cultural Arts District Parking Structure site comprises approximately 1.2 acres and spans several addresses including, 609 Palm Street, 972 Nipomo Street, 633 Palm Street, 630 Monterey Street, 970 Nipomo Street, 610 Monterey Street, 614 Monterey Street, in San Luis Obispo, California. The property is owned by The City of San Luis Obispo. This Stormwater Pollution Prevention Plan (SWPPP) is designed to comply with California’s General Permit for Stormwater Discharges Associated with Industrial Activities (General Permit) Order No. 2014-0057-DWQ (NPDES No. CAS000001) issued by the State Water Resources Control Board (State Water Board). This SWPPP has been prepared following the SWPPP Template provided on the California Stormwater Quality Association Stormwater Best Management Practice Handbook Portal: Industrial and Commercial (CASQA 2014). In accordance with the General Permit, Section X.A, this SWPPP contains the following required elements: · Facility Name and Contact Information · Site Map · Storm Water Pollution Prevention Plan · Signed Certification Statement · Annual Fee (Appendix M) 1.2 PERMIT REGISTRATION DOCUMENTS Required Permit Registration Documents (PRDs) were submitted to the State Water Board via the Stormwater Multi Application and Report Tracking System (SMARTS) by the Legally Responsible Person (LRP), or authorized personnel (i.e., Approved Signatory) under the direction of the LRP. To obtain coverage, the Edwards Construction Group must electronically file Permit Registration Documents (PRDs) prior to the commencement of construction activity. Failure to obtain coverage under the Construction General Permit for storm water discharges to waters of the United States is a violation of the CWA and the California Water Code. The project-specific PRDs include:  Notice of Intent (NOI)  Risk Assessment (Appendix H)  Site Map (Appendix G)  Storm Water Pollution Prevention Plan  Signed Certification Statement  Annual Fee (Appendix M) The annual fee is required no later than seven days prior to the commencement of construction activities. Permit coverage shall not commence until the annual fee and PRDs are received by the State Water Board, and a Waste Discharger Identification (WDID) number is assigned and sent by State Water Board Storm water Multi-Application and Report Tracking System (SMARTS). SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 9 1.3 SWPPP AVAILABILITY AND IMPLEMENTATION The SWPPP is available on-site to all employees during all hours of operation (see Section 2.5 for the Operations Schedule), and will be made available upon request by a State or Municipal inspector. The SWPPP will be implemented by August 1, 2023. 1.4 POLLUTION PREVENTION TEAM Facility staff that have been designated as Pollution Prevention Team members are listed below in Table 1.1., along with their responsibilities and duties. A list of alternate team members is also provided, and these personnel will perform SWPPP activities when regular members of the Pollution Prevention Team are absent or unavailable. This table will be updated as needed when there are changes to staff and staff responsibilities. All team members will be trained to perform the duties assigned to them. Employee training logs are provided in Appendix C. Table 1.1 Pollution Prevention Team Name Title Phone Number Responsibilities and Duties 1.5 DULY AUTHORIZED REPRESENTATIVES Duly Authorized Representative(s) who are responsible for SWPPP implementation and have authority to sign PRDs [is/are] listed below in Table 1.2. Written authorizations from the LRP for these individuals are provided in Appendix D. Table 1.2 Duly Authorized Representatives Name Title Phone Number 1.6 PERMITS AND GOVERNING DOCUMENTS In addition to the General Permit, the following documents have been taken into account while preparing this SWPPP: · Regional Water Board requirements; SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 10 · Basin Plan requirements; · TMDL Requirements; · Spill Prevention Control and Countermeasures Plan; · Hazardous Material Business Plan; · Hazardous Waste Regulations and Permits; · Air Quality Regulations and Permits ; and · Clean Water Act Section 401 Water Quality Certifications and 404 Permits. 1.7 SWPPP AMENDMENTS This SWPPP will be amended or revised as needed. A list of amendments (Amendment Log) is included in the front of this SWPPP (page 7), and amendment certifications are included in Appendix E. The Amendment Log will include the date of initial preparation and the date of each amendment. The SWPPP should be revised when: · There is a General Permit violation; · There is a reduction or increase in the total industrial area exposed to stormwater; · BMPs do not meet the objectives of reducing or eliminating pollutants in stormwater discharges; · There is a change in industrial operations which may affect the discharge of pollutants to surface waters, groundwater(s), or a municipal separate storm sewer system (MS4); · There is a change to the parties responsible for implementing the SWPPP; or · Otherwise deemed necessary by the QISP. The following items will be included in each amendment: · Who requested the amendment; · The location of proposed change; · The reason for change; · The original BMP(s) proposed, if any; and · The new BMP(s) proposed. · Amendments will be logged at the front of the SWPPP and certification kept in Appendix E. The SWPPP text will be revised replaced, and/or hand annotated as necessary to properly convey the amendment. SWPPP amendments must be certified and submitted by the LRP or their designated Duly Authorized Representative via SMARTS within 30 days whenever the SWPPP contains significant revisions. With the exception of significant revisions, SWPPP changes will be certified and uploaded to SMARTS once every three (3) months in the reporting year. 1.8 RETENTION OF RECORDS Paper or electronic records of documents required by this SWPPP will be retained for a minimum of five (5) years from the date generated or date submitted, whichever is later, for the following items: · Employee Training Records; SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 11 · BMP Implementation Records; · Spill and Clean-up Related Records; · Records of Sampling and Analysis Information • The date, exact location, and time of sampling or measurement; • The date(s) analyses were performed; • The individual(s) that performed the analyses; • The analytical techniques or methods used; and • The results of such analyses; · Records of Visual Observations • The date • The industrial areas/drainage areas of the facility observed during the inspection (Location); • The approximate time of the observation; • Presence and probable source of observed pollutants; and • Name of the individual(s) that conducted the observations; • Response to the observations including identification of SWPPP revisions if needed. • Level 1 ERA Reports; • Level 2 ERA Action Plan; • Level 2 ERA Technical Report; and • Annual Reports from SMARTS (checklist and any explanations). 1.9 EXCEEDANCE RESPONSE ACTIONS (ERA’S) If a General Permit NAL exceedance occurs in a given reporting year, a Level 1 ERA Evaluation and a Level 1 ERA Report will be required in the following year, or, if in a subsequent year, a Level 2 ERA Action Plan and a Level 2 ERA Report will be required in accordance with the General Permit. The results of either of the ERA reports may require that the SWPPP be amended. 1.10 ANNUAL COMPREHENSIVE FACILITY COMPLIANCE EVALUATION The General Permit (Section XV) requires the Discharger to conduct one Annual Comprehensive Facility Compliance Evaluation (Annual Evaluation) for each reporting year (July 1 to June 30). Annual Evaluations will be conducted at least eight (8) months and not more than sixteen (16) months after the previous Annual Evaluation. The planned window for conducting the Annual Evaluation is between April and June of each year. The SWPPP will be revised, as appropriate based on the results of the Annual Evaluation, and the revisions will be implemented within 90 days of the Annual Evaluation. At a minimum, Annual Evaluations will consist of: · A review of all sampling, visual observation, and inspection and monitoring records and sampling and analysis results conducted during the previous reporting year; · A visual inspection of all areas of industrial activity and associated potential pollutant sources for evidence of, or the potential for, pollutants entering the stormwater conveyance system; SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 12 · A visual inspection of all drainage areas previously identified as having no exposure to industrial activities and materials in accordance with the definitions in Section XVII; · A visual inspection of equipment needed to implement the BMPs; · A visual inspection of any BMPs; · A review and effectiveness assessment of all BMPs for each area of industrial activity and associated potential pollutant sources to determine if the BMPs are properly designed, implemented, and are effective in reducing and preventing pollutants in industrial stormwater discharges and authorized NSWDs; and · An assessment of any other factors needed to comply with the Annual Reporting requirements in General Permit Section XVI.B. 1.11 ANNUAL REPORT The Annual Report will be prepared, certified, and electronically submitted no later than July 15th following each reporting year using the standardized format and checklists in SMARTS based on the reporting requirements identified in Section XVI of the General Permit. Annual reports will be submitted in SMARTS and in accordance with information required by the on- line forms. 1.12 TERMINATION AND CHANGES TO GENERAL PERMIT COVERAGE When any of the following conditions occur, termination of coverage under the General Permit will be requested by certifying and submitting a Notice of Termination (NOT) via SMARTS: · Operation of the facility has been transferred to another entity; · The facility has ceased operations, completed closure activities, and removed all industrial related pollutant generating sources; · The facility’s operations have changed and are no longer subject to the General Permit. The SWPPP and all of the provisions of the General Permit will be complied with until a valid NOT is received and accepted by the Board. If ownership changes, the new owner of the facility will be notified of the General Permit and regulatory requirements for permit coverage. 2.0 FACILITY INFORMATION 2.1 FACILITY DESCRIPTION 2.1.1 Facility Location The Cultural Arts District Parking Structure site comprises approximately 1.2 acres and spans several addresses including, 609 Palm Street, 972 Nipomo Street, 633 Palm Street, 630 Monterey Street, 970 Nipomo Street, 610 Monterey Street, 614 Monterey Street, in San Luis Obispo, California. The property is owned by The City of San Luis Obispo, and is located within Section 26, Township 30S, Range 12E. These phase 1b site preparation plans consist of tree protection, demolition and clearing. Phase 2 (under separate cover) includes on-site rough grading, temporary and permanent shoring, improvements, buildings, precise grading, landscape, and associated frontage improvements. SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 13 The general construction activities to be performed at the Project Site may include, but are not limited to the following: · Demolition of existing structure · Demolition of existing underground utilities (Sewer, Water, Electric, etc…) · Tree removal · Site grading · Washout Areas · Construction entrance/exit Figure 2.1: Vicinity Map Figure 2.2: Site Map 2.1.2 Existing Conditions The existing site consists of four structures, a garage, a parking lot, trees, minor landscaping and associated utilities. Most of the site slopes gently to the west towards the corner of Pismo and Nipomo St. The southwest corner of the property slopes towards the corner of Monterey and Nipomo. There are two structures on the northern corner of the site and three structures on SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 14 the southern corner. The rest of the site is paved with parking areas broken up by small landscaped planters. Existing sources of contamination at the site include: · Contaminated Soil · Erosion and Sediment from stormwater runoff · Hydrocarbons from vehicular parking · Existing utilities (sewer) Figure 2.3: Existing Conditions 2.1.3 Description of Drainage Areas and Existing Drainage The site is divided into two drainage areas ranging from 5%-10%. Drainage area A1 (44,900 SF) flows to the northwest, while drainage area B1 (13,700 SF) flows to the south and southwest. Offsite drainage is received from area A2 (13,692 SF), flowing into area A1. Area A2 previously contained an apartment and home but they have been removed. The elevations of the project ranges from 188 to 205 above mean sea level (msl). Stormwater is conveyed through surface runoff, and flows off site into the city’s municipal stormwater system. SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 15 Demolition to occur as a part of this project will keep the drainage patterns relatively the same, creating pervious area. The construction of a parking structure during the second phase will add impervious areas. Drainage areas and their directions can be seen in Figure 4. Figure 2.4: Drainage Areas The site is located within the Stenner Lake Watershed.. 2.1.4 Developed Condition Post demolition surface drainage will generally be directed as it has historically. Storm water will flow offsite to the City of San Luis Obispo storm drain system, and ultimately to Brizziolari Creek. Post construction drainage patterns and conveyance systems are presented on the Improvement Plans. 2.2 PROJECT RISK LEVEL This SWPPP utilized a Risk-Based Permitting Approach under the Construction General Permit (SWRCB Order No. 2009-0009 DWQ), as set forth by the SWRCB and RWQCB. There are two major steps to site planning and risk determination. The project’s overall risk is broken up into two elements – (1) project sediment risk (the relative amount of sediment that can be discharged, given the project and location details) and (2) receiving water risk (the risk sediment discharges pose to the receiving waters) SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 16 2.2.1 Project Sediment Risk: Project Sediment Risk can be determined using two separate methods. Method 1 establishes sediment risk based on the following Soil Loss Equation (RUSLE) to obtain an estimate of project-related bare ground soil loss expressed in tons/acre. The RUSLE equation is as follows: A = (R)(K)(LS)(C)(P) Where: A = the rate of sheet and rill erosion R = rainfall-runoff erosivity factor K = soil erodibility factor LS = length-slope factor C = cover factor (erosion controls) (taken as 1.0 to simulate bare ground) P = management operations and support practices (sediment controls) (taken as 1.0 to simulate bare ground) Method 2 (also known as the “map option”) utilizes GIS maps where the product of K and LS are predetermined (located below in Figure 2 and 3) and an online calculator for determining R factor for determining soil loss. For this option, the R factor for the project is calculated using the online calculator at https://www.epa.gov/npdes/rainfall-erosivity-factor-calculator-small-construction-sites. To determine soil loss in tons per acre, the discharger multiplies the R factor times the value for K times LS from the map. Figure 2.5. K Factor SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 17 Figure 2.6. LS Factor Calculated Using Google Earth KML Figure 2.7. R Value from EPA Website Method 2 was utilized in this SWPPP. Using the SWRCB “Risk Assessment R-Factor Calculation Notification” for the R factor with construction start dates of 08/1/23 and an end construction date of 11/1/2023, the R factor was determined to be 3.3. The K factor and LS factor were determined to be 0.24 and 1.25 respectively. Multiplying the above numbers together yields a Project Sediment Risk Factor of 0.99 tons/acre. Since 0.99 tons/acre is less than 15 tons/acre, the site can be classified as to having a Low Sediment Risk. SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 18 2.2.2 Receiving Water Risk: The project area can neither discharge (either directly or indirectly) to a 303(d)-listed waterbody impaired by sediment nor to a waterbody with designated beneficial use. This project site has been classified as a Low Receiving Water Risk. 2.2.3 Combined Risk: The Combined Risk Level Matrix table in the Construction General Permit Order No. 2009-0009-DWQ (Appendix A) was utilized to determine the combined risk. Using this table, it was determined that the Project Site is a Risk Level 1. Table 1. Combined Risk Level Matrix Receiving Water Risk Sediment Risk Low Medium High Low Level 1 Level 2 High Level 2 Level 3 2.3 CONSTRUCTION SITE ESTIMATES “Construction activities” refers to actions that result in a disturbance of the land, including demolition, clearing, grading, excavating, vertical construction, landscaping and other similar activities. It also includes “construction-related activities,” areas that support the construction project such as stockpiles, borrow areas, concrete truck washouts, fueling areas, material storage areas and equipment storage areas. The following estimates are from the planned construction-related activities in the staging yard. More specific information pertaining to the other proposed well pads can be found in their respective site map/ erosion control plans within Appendix G. · Total project area: 1.2 acres · Site area to be disturbed: 1.2 acres • Percentage impervious area before and after demolition: 67% and 0% • Runoff coefficient before and after construction: NIC 2.4 CONSTRUCTION SCHEDULE • Demolition 8/01/2023 to 09/30/2023 • Grading Utilities & Vertical Construction 10/1/2023 to 10/1/2025 (NIC) 2.5 IDENTIFICATION OF POTENTIAL POLLUTANT SOURCE The pollutant of greatest concern on most construction sites is sediment which may become detached during construction related activities. Non-visible pollutants may be attached to the soils and run-off the site, SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 19 potentially polluting the receiving body of water. Pollutant sources include, but are not limited to the following: a. Disturbances caused by demolition, clearing, grading and excavation activities related to site preparation. b. Storm-related precipitation c. Dust control through water spraying d. Leaks from equipment and/or portable toilets e. Wash out and maintenance areas f. Transporting of concrete and/ or asphalt materials g. Transporting of construction materials and fuels h. Flushing of water lines i. Vehicle fluids j. Cement materials k. Raw landscape materials l. General litter m. PVC pipe n. RCP pipe For a list of potential non-visible pollutants, refer to Appendix C: List of Potential Non-visible Pollutants & Pollutant Testing Guidance Table. SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 20 3.0 BEST MANAGEMENT PRACTICES 3.1 CONTRACTOR INFORMATION Appendix E includes the names and contact information of the Storm Water Pollution Prevention Plan Manager (SWPPPM) and a list of names of all contractors, subcontractors, and individuals who will be directed by the SWPPPM. This list shall include telephone numbers and work addresses. Specific areas of responsibility of each subcontractor and emergency contact numbers shall also be included. The discharger shall ensure that all BMPs required by the Construction General Permit are implemented by a Qualified SWPPPM. The SWPPPM shall be a person responsible for non-storm water and storm water visual observations, sampling and analysis and shall have primary responsibility and significant authority for the implementation, maintenance, inspection of the site to ensure full compliance with the SWPPP and the Permit. Best Management Practices (BMPs) were chosen for this project to reduce or eliminate pollutants in storm water discharge, and to comply with the Provisions of Attachment C of the General Order (Risk Level 1 Requirements) as well as those in the Construction General Permit Order. BMPs are shown in the erosion and sediment control plan provided in Appendix B. The Construction General Permit Order requires: Dischargers minimize or prevent pollutants in storm water discharges and authorized non-storm water discharges through the use of controls, structures, and management practices that achieve Best Available Technology Economically Achievable (BAT) for toxic and non-conventional pollutants and Best Conventional Pollutant Control Technology (BCT) for conventional pollutants. Storm water discharges and authorized non-storm water discharges regulated by the Construction General Permit not contain a hazardous substance equal to or in excess of reportable quantities established in 40 C.F.R. §§ 117.3 and 302.4, unless a separate NPDES Permit has been issued to regulate those discharges. 3.2 BMP INSTALLATION SCHEDULE The Contractor is responsible for ensuring that appropriate BMPs are in place during the operations requiring the BMPs. Below is a schedule intended to provide the minimum BMPs necessary during each phase of the contractor’s operation. Additional BMPs may be necessary. Some BMPs installed early in the project shall remain in place upon completion of the project, while others must be removed prior to the completion of the project. Appendix B provides BMP Fact Sheets on design and implementation guidelines for each BMP. Those identified by “*” should only be implemented when applicable. The following BMPs shall be installed / utilized prior to clearing and grubbing operations: EC-1 Scheduling EC-2 Preservation of Existing Vegetation SE-7 Street Sweeping and Vacuuming NS-9 Vehicle and Equipment Fueling NS-10 Vehicle & Equipment Maintenance WM-1 Material Delivery and Storage WM-2 Material Use SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 21 WM-3 Stockpile Management WM-4 Spill Prevention and Control WM-5 Solid Waste Management WM-6 Hazardous Waste Management WM-9 Sanitary/Septic Waste Management The following BMPs shall be installed / utilized during grading/mobilization operations: WE-1 Wind Erosion Control TC-1 Stabilized Construction Entrance/Exit NS-1 Water Conservation Practices SE-1 Silt Fences SE-5 Fiber Rolls The following BMPs shall be installed / utilized upon completion of drainage work: (NOT IN CONTRACT) EC-9 Drainage Swales The following BMPs shall be installed / utilized during vertical construction: (NOT IN CONTRACT) EC-1 Scheduling EC-2 Preservation of Existing Vegetation WM-1 Material Delivery and Storage WM-2 Material Use WM-3 Stockpile Management WM-4 Spill Prevention and Control WM-5 Solid Waste Management WM-8 Concrete Waste Management* WM-9 Sanitary/Septic Waste Management The following BMPs may be utilized during utility operations: (NOT IN CONTRACT) WM-1 Material Delivery and Storage WM-2 Material Use WM-3 Stockpile Management WM-4 Spill Prevention and Control WM-5 Solid Waste Management WM-8 Concrete Waste Management* WM-9 Sanitary/Septic Waste Management All BMPs, except those designated as post-construction BMPs in Section 3.5, are to be removed prior to contract acceptance. It is not anticipated that this project will necessitate the stockpiling of materials. However, if materials are stockpile on-site and the stockpiles are inactive (not scheduled to be re-disturbed for at least 14 days), then the stockpiled areas shall be covered and a berm placed around the materials in accordance with WM-3 “Stockpile Management.” SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 22 3.3 EROSION & SEDIMENT CONTROL BEST MANAGEMENT PRACTICES Appendix B provides BMP Fact Sheets on design and implementation guidelines for each BMP to reduce or eliminate pollutants in storm water discharges. All BMPs are required to be implemented. The following BMPs are to be incorporated into this SWPPP: EC-1 Scheduling EC-2 Preservation of Existing Vegetation EC-8 Wood Mulching EC-16 Non-Vegetative Stabilization SE-1 Silt Fences SE-5 Fiber Rolls SE-7 Street Sweeping and Vacuuming SE-10 Storm Drain Inlet Protection TC-1 Stabilized Construction Entrance/Exit TC-3 Entrance/Outlet Tire Wash WE-1 Wind Erosion Control WM-9 Sanitary/Septic Waste Management 3.4 NON-STORM WATER AND MATERIAL MANAGEMENT BEST MANAGEMENT PRACTICES Non-storm water discharges may contribute significant pollutant loads to receiving waters. Measures to control spills, leakage, and dumping, and to prevent illicit connections during construction must be addressed through structural as well as non-structural Best Management Practices (BMPs). BMPs are designated in this SWPPP to prevent non-storm water discharges. All BMPs are required to be implemented. Those identified by “*” should only be implemented when applicable. NS-1 Water Conservation Practices NS-2 Dewatering Operations NS-3 Paving and Grinding Operations NS-7 Potable Water/Irrigation NS-8 Vehicle and Equipment Cleaning NS-9 Vehicle and Equipment Fueling WM-1 Material Delivery/Storage WM-2 Material Use WM-3 Stockpile Management WM-4 Spill Prevention and Control WM-5 Solid Waste Management WM-6 Hazardous Waste Management WM-7 Contaminated Soil Management WM-8 Concrete Waste Management WM-10 Liquid Waste Management Vehicle and Equipment Cleaning is prohibited from occurring on-site. Fueling and maintenance of equipment and vehicles shall take place in designated areas only. Materials storage on–site will be minimized. SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 23 3.5 POST-CONSTRUCTION BEST MANAGEMENT PRACTICES This SWPPP contains Post-Construction BMPs, which are designated to reduce or eliminate pollutants after construction is completed. BMPs serving dual purpose roles (construction and post-construction protection) include: NOT APPLICABLE – OUT OF SCOPE 3.6 HOUSEKEEPING REQUIREMENTS All Risk Level 1 dischargers are required to adhere to the minimum housekeeping requirements as specified in Attachment C of the Construction General Permit. They include, but are not limited to: Construction Materials: All Risk Level 1 dischargers shall implement good site management measures for construction materials that could potentially be a threat to the water quality if discharged. At minimum, they include: · Conduct an inventory of products to be used. · Cover and berm loose stockpiled construction material that are not actively being used. · Store chemicals in watertight containers (with appropriate secondary containment to prevent any spillage or leakage) or in a storage shed. · Minimize exposure of construction materials to precipitation. · Implement BMPs to prevent the off-site tracking of loose construction and landscape materials. Waste Management: Risk Level 1 dischargers shall implement good housekeeping for waste management. They include, but are not limited to: · Prevent disposal of any rinse or wash waters or materials on impervious or pervious site surfaces or into the storm drain system. · Ensure containment of sanitation facilities. · Clean or replace sanitation facilities and inspect them for leaks regularly. · Cover waste disposal containers at the end of every business day and during rain events. · Prevent discharges from disposal containers to the drainage system or receiving water. · Contain and protect stockpile waste from wind or rain, unless actively being used. · Implement procedures that effectively address hazardous and non-hazardous spills. · Develop a spill response plan. · Ensure containment of concrete washout areas and other washout areas that may contain pollutants. There shall be no discharge to the underlying soil. Vehicle Storage and Maintenance: Risk Level 1 dischargers shall implement good housekeeping for vehicle storage and maintenance. They include, but are not limited to: • Prevent oil, grease or fuel to leak in to the ground, storm drains or surface waters. SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 24 • Place all equipment or vehicles, which are to be fueled, maintained and stored in a designated area fitted with appropriate BMPs. • Clean leaks immediately and dispose of material properly. Landscape Materials: Risk Level 1 dischargers shall implement good housekeeping for landscape materials. They include, but are not limited to: • Contained stockpiled materials when they are not actively being used. • Contained fertilizers when they are not actively being used. • Discontinue the application of erodible landscape materials within 2 days before a forecast rain event or during periods of precipitation. • Apply erodible landscape materials according to the manufacture recommendations. • Stack erodible landscaped materials on pallets and covering or storing such materials when not being used or applied. 3.7 NON-STORM WATER MANAGEMENT Risk Level 1 dischargers shall implement measure to control all non-storm water discharges during construction. Non-storm water discharges are any discharges not directly associated with a rain event. Non- storm water discharges can include, but are not limited to leaks from equipment or vehicles, flushing of water lines or washing of equipment. Risk Level 1 requirements include: · Dischargers shall implement measures to control all non-storm water discharges during construction. · Dischargers shall wash vehicles in such a manner as to prevent pollutants from entering surface waters. · Streets shall be cleaned in such a manner as to prevent unauthorized non-storm water discharges from reaching surface waters or the storm drain system. 3.8 EROSION CONTROL The primary pollutant identified during construction is sediment. Erosion and sedimentation controls will be implemented as necessary along the boundaries of the construction areas within the Project Site to minimize, as necessary, the amount of sediment transported off-site by storm water runoff. These control measures will be put in place as needed at the onset of construction activities and will remain in place (as needed) during construction and through periods of inactivity. Dischargers shall provide effective soil cover for inactive areas. Descriptions and diagrams of the BMPs are included in Appendix B. All disturbed areas shall provide effective soil cover for inactive areas and all finished slopes, open space, utility backfill and completed lots. All disturbed areas of the construction Project Site will be stabilized in a manner similar to its original condition. Both temporary (water trucks) and permanent measures will also be applied to control dust generation. Final stabilization will need to be completed prior to submitting a Notice of Termination (NOT). SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 25 3.9 SEDIMENT CONTROL Dischargers shall establish and maintain effective perimeter controls. Silt barriers consisting of silt fences, fiber rolls, sandbags, hay bales, and/or berms will be set up around the construction site as necessary so that sediment will not be discharged off-site. Sedimentation control will be in place and maintained on all disturbed areas during the rainy season. Sediment control BMPs will be implemented as needed. Construction sites that require silt barriers around them are sites where the ground surface has been disturbed by construction activities such as grading and /or excavation. Sediment buildup along silt barriers will be monitored and removed as necessary. Removed sediment will be deposited in an area that will not allow sediment to be discharged off-site. All loose soil and debris, which may create a potential hazard, will be hauled offsite and disposed of at an approved location. All construction entrances and exits shall be stabilized to sufficiently control sediment discharge from the site. 3.10 INSPECTION, MAINTENANCE & REPAIR All storm water control measures shall be properly maintained at regular intervals by trained personnel consistent with Project Site operational maintenance schedules. Inspections will be performed by a QSP or someone under his direction weekly, before, during, after qualifying storm events (0.5 inches per storm event), and once each 24-hour period during extended storm events during business. These inspections will be conducted to identify BMP effectiveness. If any structural defects are observed interfering with design performance of BMPs, repairs or design changes will be implemented by the SWPPM within 72 hours. 3.11 TRAINING The SWPPM is responsible for training project personnel on the following topics: · Erosion Control BMPs · Sediment Control BMPs · Non-Storm Water BMPs · Waste Management and Materials Pollution Control BMPs · Emergency Procedures specific to the construction site storm water management Inspections will be conducted by a QSP. A QSP may train individuals to conduct the inspections, and collect storm water samples for non-visible pollutants. Trained individuals will also have received training and have experience with respect to erosion control methods, either through scholastic institutions, previous job experiences, or through workshops conducted by recognized regulatory agencies or professional organizations. Training records (Appendix F) will document attendees, the subjects covered and the date of training. Training logs/records are to be recorded and stored with the rest of the record materials · To ensure that the preparation, implementation, and oversight of the SWPPP is sufficient for effective pollution prevention, Section II, Part H of the Construction General Permit specifies that the Qualified SWPPP Developer and Qualified SWPPP Practitioners responsible for creating, revising, overseeing, and implementing the SWPPP must attend a State Water Board sponsored or approved QSD and QSP training course. · SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 26 3.12 INSPECTION AND ENTRY The discharger shall allow the Regional Water Board, State Water Board, U.S. EPA, and/or, in the case of construction sites which discharge through a municipal separate storm sewer, an authorized representative of the municipal operator of the separate storm sewer system receiving the discharge, upon the presentation of credentials and other documents as may be required by law, to: · Enter upon the discharger’s premises at reasonable times where a regulated construction activity is being conducted or where records must be kept under the conditions of the Construction General Permit; · Access and copy at reasonable times any records that must be kept under the conditions of the Construction General Permit; · Inspect at reasonable times the complete construction site, including any off-site staging areas or material storage areas, and the erosion/sediment controls; and · Sample or monitor at reasonable times for the purpose of ensuring Construction General Permit compliance. SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 27 4.0 CONSTRUCTION SITE MONITORING PROGRAM 4.1 CONSTRUCTION SITE MONITORING PROGRAM (CSMP) The Construction General Permit requires the following types of monitoring for Risk Level 1 projects: · Visual inspections of Best Management Practices (BMPs); · Visual monitoring of the site related to qualifying storm events; · Visual monitoring of the site for non-storm water discharges; · Sampling and analysis of construction site runoff; · Sampling and analysis of non-storm water discharges; Storm event monitoring should be conducted during business hours; and when the National Oceanographic and Atmospheric Administration (NOAA) (http://www.srh.noaa.gov/forecast) forecasts a rain event with a 50% or greater probability of producing a ½ inch or more of rain. Table 4.1: Summary of Risk Level 1 Monitoring Type of Monitoring What When Location Visual Inspection BMP Presence and effectiveness of all BMPs Weekly and Every 24 hours during an extended storm event. Overall site Stormwater Pre-storm All drainage areas and BMPs. Within 2 business days before each qualifying storm event. Overall site Post-storm All drainage areas and BMPs. Within 2 business days after each qualifying storm event. Overall site Non-storm water Operations and BMPs identified in Section 3.4 Quarterly Staging areas Sampling & Analysis BMP failure/spill (non-visible) Runoff affected and not affected by the discharge/spill. Use Appendix C as a guide. Within first 2 hours of discharge from site. Location of discharge. Non-storm water Operations and BMPs identified in Section 3.4 If non-storm water is discharged off site. Location of discharge. Rain events and resulting monitoring periods should be separated into qualifying rain events. A qualifying rain event is defined as any event producing precipitation of ½ inch or more within a 48 hour or greater period. Monitoring locations provide clear views of BMPs, disturbed areas and extend through the entire site. Dischargers must maintain on-site records of all visual observations, personnel performing the observations, observation dates, weather conditions, locations observed, and corrective actions taken in response to the observations. The Construction Site Monitoring Inspection Form (Appendix N) should be used to track all monitoring activities. SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 28 Figure 4.1 Overview of Monitoring Locations 4.2 VISUAL MONITORING & INSPECTION All storm water monitoring must be completed within two (2) business days of each qualifying rain event at identified locations. Appendix G shows the monitoring locations. BMP Inspection The purpose of these inspections is to identify BMPs that: · Need maintenance to operate effectively; · Failed; or · Could fail to operate as intended. If deficiencies are identified during BMP inspections, repairs or design changes to BMPs must be initiated within 72 hours of identification and need to be completed as soon as possible. All BMP inspections must be documented on a Construction Site Monitoring Inspection Form (Appendix N). Storm Water Inspection Dischargers must conduct a pre-storm event inspection of: · All storm water drainage areas to identify and resolve prior to the storm event, any spills, leaks, or uncontrolled pollutant sources · All BMPs to identify proper implementation · Any storm water storage and containment areas to detect and remedy leaks if found SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 29 Dischargers must conduct a post-storm event inspection within two business days (48 hours) to identify whether: · BMPs were adequately designed, implemented, and effective, and · If any additional BMPs necessary (and amend the SWPPP accordingly). 4.3 NON-STORM WATER DISCHARGE MONITORING Quarterly non-storm water discharge monitoring will include the visual inspection of each drainage area during daylight hours for the presence of non-storm water discharges and their sources in July – September, October – December, January – March, and April – June quarters. If non-storm water is discharged off site, the effluent must be sampled. Quarterly monitoring should be recorded on Construction Site Monitoring Inspection Form in Appendix N. Potential non-storm water discharges within this project include: · Grading and Land Development · Site Stabilization · Vehicle and equipment cleaning, fueling and maintenance · Sanitary/Septic waste facilities · Concrete wash out areas · Contaminated Soils Quarterly inspections need to include each drainage area of the project and document: · Presence or indications of unauthorized and authorized non-storm water discharges and their sources · Pollutant characteristics of the non-storm water discharge (floating and suspended material sheen, discoloration, turbidity, odor, etc.) · Personnel performing the observations · Dates and approximate time each drainage area and non-storm water discharge was observed · Response taken to observations 4.4 WATER QUALITY SAMPLING AND ANALYSIS The project is required to collect samples of: · runoff for non-visible pollutants in the event of a BMP failure, breach or spill · non-storm water discharge Sampling personnel will collect storm water grab samples at discharge locations according to procedures outlined in Section 4.6 Quality Assurance and Quality Control. Appendix G shows the monitoring locations for all monitoring. Appendix L contains the Sampling Activity Log. Sampling is not required outside of scheduled business hours or under dangerous conditions. An explanation of why samples were not taken will be included with on-site inspection documents. 4.5 CONSTRUCTION ACTIVITY Non-Visible Pollutant Sampling SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 30 If there is a breach, spill or BMP failure, runoff affected by the non-visible pollutants will be sampled within the first two hours of discharge. It is important to note that covered construction materials or those that are in their final constructed form, do not need to be monitored. Materials that are stored exposed to precipitation and may generate runoff need to be considered for non-visible pollutant monitoring. Appendix C provides further guidance. Non-Stormwater Sampling If non-storm water is discharged off site, the effluent must be sampled. All non-storm water sample analyses should be conducted by a state certified laboratory. 4.6 QUALITY ASSURANCE AND QUALITY CONTROL The QSP is responsible for non-storm water and storm water visual observations, sampling and analysis, and for ensuring full compliance with the permit and implementation of all elements of the SWPPP. Prior to the rainy season, all sampling personnel and alternates will review the Monitoring Plan. Qualifications of designated personnel describing environmental sampling training and experience are provided in Appendix F. Sampling personnel will be designated and trained to collect, maintain and ship samples in accordance with the Surface Water Ambient Monitoring Program’s (SWAMP) 2008 Quality Assurance Program Plan (QAPP) (http://www.swrcb.ca.gov/water_issues/programs/swamp/tools.shtml#qa). Supplies and Storage An adequate stock of supplies and equipment for non-visible pollutants will be available on the project site or provided by the approved laboratory (Appendix I) prior to a sampling event. Monitoring supplies and equipment will be stored in a cool-temperature environment that will not come into contact with rain or direct sunlight. Sampling personnel will be available to collect samples in accordance with the sampling schedule. Supplies maintained at the project site will include, but will not be limited to, surgical gloves, sample collection equipment, coolers, appropriate number and volume of sample bottles, identification labels, re- sealable storage bags, paper towels, personal rain gear, ice, Sampling Activity Log forms (Appendix L), and Chain of Custody (COC) forms (Appendix I). Sample Collection and Handling Procedures All sampling and sample preservation must be in accordance with the current edition of Standard Methods for the Examination of Water and Wastewater (American Public Health Association). To maintain sample integrity and prevent cross-contamination, sampling collection personnel will: · Wear a clean pair of surgical gloves prior to the collection and handling of each sample at each location. · Not contaminate the inside of the sample bottle by not allowing it to come into contact with any material other than the water sample. · Discard sample bottles or sample lids that have been dropped onto the ground prior to sample collection. · Not leave the cooler lid open for an extended period of time once samples are placed inside. · Not touch the exposed end of a sampling tube, if applicable. · Avoid allowing rainwater to drip from rain gear or other surfaces into sample bottles. SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 31 · Not eat, smoke, or drink during sample collection. · Not sneeze or cough in the direction of an open sample bottle. · Minimize the exposure of the samples to direct sunlight, as sunlight may cause biochemical transformation of the sample to take place. · Decontaminate sampling equipment prior to sample collection using a TSP-soapy water wash, distilled water rinse, and final rinse with distilled water. · Dispose of decontamination water/soaps appropriately; i.e., not discharge to the storm drain system or receiving water. Any samples provided to a lab will be provided within 48 hours and use only the sample bottle provided by the lab (Appendix I). For an initial verification of laboratory or field analysis, duplicate samples will be collected at a rate of 10 percent or 1 duplicate per sampling event. The duplicate sample will be collected, handled, and analyzed using the same protocols as primary samples, and will be collected where contaminants are likely, and not on the upstream sample. A duplicate sample will be collected immediately after the primary sample has been collected. Duplicate samples will not influence any evaluations or conclusions; however, they will be used as a check on laboratory quality assurance. Non-Visible Pollutants The Contractor shall notify the QSP if non-visible pollutants are expected. Sample Documentation Procedures All original data documented on sample bottle identification labels, Chain of Custody forms (Appendix I), Sampling Activity Logs (Appendix L), and Construction Site Monitoring Inspection Form (Appendix N) will be recorded using waterproof ink. These will be considered accountable documents. If an error is made on an accountable document, the individual will make corrections by lining through the error and entering the correct information. The erroneous information will not be obliterated. All corrections will be initialed and dated. Copies of the Construction Site Monitoring Inspection Form are provided in Appendix N. Sampling and field analysis activities will be documented using the following: • Sample Bottle Identification Labels: Sampling personnel will attach an identification label to each sample bottle. At a minimum, the following information will be recorded on the label, as appropriate… · Project name • Project number • Unique sample identification number and location. [Project Number]-[Six digit sample collection date]-[Location] (Example: 0G5304-081801-Upstream). Quality assurance/quality control (QA/QC) samples shall be identified similarly using a unique sample number or designation (Example: 0G5304-081801-DUP1) · Collection date/time (No time applied to QA/QC samples) · Analysis constituent • Sampling Activity Logs: A log of sampling events will identify… SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 32 o Sampling date · Separate times for sample collection of upstream, downstream, run-on, and QA/QC samples recorded to the nearest minute · Unique sample identification number and location · Analysis constituent · Names of sampling personnel · Weather conditions (including precipitation amount) · Field analysis results · Other pertinent data · Chain of Custody (COC) forms (Appendix I): All samples to be analyzed by a laboratory will be accompanied by a COC form provided by the laboratory. Only the sample collectors will sign the COC form over to the lab. COC procedures will be strictly adhered to for QA/QC purposes. · Storm Water Quality Sampling Log (Appendix L): When applicable, the Contractor’s storm water inspector will document in the log that samples for sedimentation/siltation and/or turbidity were taken during a rain event. 4.7 REPORTING REQUIREMENTS AND RECORDS RETENTION Records of all monitoring inspections are required to remain onsite during the construction period and for a minimum of three years. Records shall include the following items: · The date, place, and time of facility inspections, sampling, visual observations (inspections), and/or measurements, including precipitation; · The individual(s) who performed the facility inspections, sampling, visual observation (inspections), and/or measurements; · The date and approximate time of analyses; · The individual(s) who performed the analyses; · A summary of all analytical results from the last three years, the method detection limits and reporting limits, and the analytical techniques or methods used; · Rain gauge readings from site inspections; · QA/QC records and results; · Non-storm water discharge inspections and visual observations (inspections) and storm water discharge visual observation records; · Visual observation and sample collection exemption records (Appendix O); and · The records of any corrective actions and follow-up activities that resulted from analytical results, visual observations (inspections), or inspections (Appendix K). Most reporting will occur in the Annual Report (Appendix P). 5.0 GENERAL PROCEDURES AND REQUIREMENTS 5.1 SWPPP AVAILABILITY AND IMPLEMENTATION The General Construction Permit Section XIV.C requires the SWPPP be available at the construction site during working hours while construction is occurring and shall be made available upon request by a State or Municipal inspector. When the original SWPPP is retained by a crewmember in a construction vehicle SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 33 and is not currently at the construction site, current copies of the BMPs and map/drawing will be left with the field crew and the original SWPPP shall be made available via a request by radio/telephone. 5.2 SWPPP AMENDMENTS The General Construction Permit Section XIV.A requires that SWPPP be amended or revised by a QSD and that the SWPPP include a listing of the date of initial preparation and the date of each amendment. Amendments must be signed by a QSD. All amendments are to be dated, attached to the SWPPP and logged in Appendix J. This SWPPP should be amended if any BMP is not installed according to the site map or if a BMP is changed due to ineffectiveness. The following items shall be in each amendment: 1.0 Who requested the amendment 2.0 The location of the proposed change 3.0 The reason for the change 4.0 The original BMP proposed, if any 5.0 The new BMP The amendments for this SWPPP, along with the required approval can be found in the SWPPP Amendment Log located in Appendix J. Any amendment to the SWPPP must be approved by the QSD. 5.1 RETENTION OF RECORDS The Construction General Permit Section I.J.69 and IV.G requires that all dischargers maintain a paper or electronic copy of all required records for three years from the date generated or date submitted, whichever is last. The records must be available at the construction site until construction is completed. The discharger shall furnish the RWQCB, SWRCB, OR USEPA, within a reasonable time, any requested information to determine compliance with the Construction General Permit. The final SWPPP shall be maintained for the time period indicated. 5.2 REPORTING REQUIREMENTS As per the Construction General Permit, a Legally Responsible Person must submit electronically all project/permit related documents (also known as Permit Registration Documents, or PRDs) for new projects commencing on or after July 1, 2010 prior to commencement of construction activities through the Storm water Multi- Application Report Tracking System (SMARTS). SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 34 5.3 REQUIRED NON-COMPLIANCE REPORTING <LRP> shall give advanced notice to the RWQCB of any changes in the construction-related activity which may result in a non-compliance with the storm water requirement of the Construction General Permit. Examples of non-compliance include, but are not limited to: · Self-reporting of any discharge violations; · Discharges which contain a hazardous substance. 5.4 ANNUAL REPORT Diversified Project Services International Inc. shall prepared and electronically submit an Annual Report via SMARTS no later than September 1 of each year. Reporting requirements include: · Sampling and analysis results including laboratory reports, analytical methods and reporting limits and change of custody forms · Corrective actions and compliance activities · Violations of the Construction General Permit · Date, time, place and name(s) of the inspector(s) for all sampling, inspections and field measurements · Visual observation and sample collections records · Training Documentations 5.5 CHANGES TO PERMIT COVERAGE The General Construction Permit Section II. C allows a permittee to reduce or increase the total acreage covered under the Construction General Permit when: · A portion of the project is complete · When conditions for termination of coverage have been met · When ownership of a portion of the project is sold to a different entity · When new acreage is added to the project 5.6 NOTICE OF TERMINATION The General Construction Permit Section II. D requires that within 90 days of when construction is complete or ownership has been transferred, the discharger shall electronically file a Notice of Termination (NOT), a final site map, and photos through the State Water Boards SMARTS system. Filing a NOT certifies that all Construction General Permit requirements have been met. The NOT is submitted when the construction project is complete and all Construction General Permit requirements for termination and final stabilization have been met. These requirements include: · The site will not pose any additional sediment discharge risk than it did prior to construction activity. SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 35 · All construction related equipment, materials and any temporary BMPs no longer needed are removed from the site. · Post-Construction storm water management measures are installed and a long-term maintenance plan that is designed for a minimum of 5-years has been developed. The NOT must demonstrate through photos, RUSLE results, or results of testing and analysis that the project meets all of the requirements of Section II.D.1 of the Construction General Permit by one of the following methods: · 70% final cover method (no computational proof required). · RUSLE/RUSLE2 method (computational proof required). · Custom Method SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 36 APPENDIX A NPDES CONSTRUCTION GENERAL PERMIT For the complete construction general permit, see separate binder onsite. SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 37 APPENDIX B BMPS FROM THE 2009 CALIFORNIA CONSTRUCTION BMP HANDBOOK SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 38 APPENDIX C LIST OF POTENTIAL NON-VISIBLE POLLUTANTS Scheduling EC-1 November 2009 California Stormwater BMP Handbook 1 of 3 Construction www.casqa.org Description and Purpose Scheduling is the development of a written plan that includes sequencing of construction activities and the implementation of BMPs such as erosion control and sediment control while taking local climate (rainfall, wind, etc.) into consideration. The purpose is to reduce the amount and duration of soil exposed to erosion by wind, rain, runoff, and vehicle tracking, and to perform the construction activities and control practices in accordance with the planned schedule. Suitable Applications Proper sequencing of construction activities to reduce erosion potential should be incorporated into the schedule of every construction project especially during rainy season. Use of other, more costly yet less effective, erosion and sediment control BMPs may often be reduced through proper construction sequencing. Limitations  Environmental constraints such as nesting season prohibitions reduce the full capabilities of this BMP. Implementation  Avoid rainy periods. Schedule major grading operations during dry months when practical. Allow enough time before rainfall begins to stabilize the soil with vegetation or physical means or to install sediment trapping devices.  Plan the project and develop a schedule showing each phase of construction. Clearly show how the rainy season relates Categories EC Erosion Control  SE Sediment Control  TC Tracking Control  WE Wind Erosion Control  NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control Legend:  Primary Objective  Secondary Objective Targeted Constituents Sediment  Nutrients Trash Metals Bacteria Oil and Grease Organics Potential Alternatives None If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Scheduling EC-1 November 2009 California Stormwater BMP Handbook 2 of 3 Construction www.casqa.org to soil disturbing and re-stabilization activities. Incorporate the construction schedule into the SWPPP.  Include on the schedule, details on the rainy season implementation and deployment of: ­ Erosion control BMPs ­ Sediment control BMPs ­ Tracking control BMPs ­ Wind erosion control BMPs ­ Non-stormwater BMPs ­ Waste management and materials pollution control BMPs  Include dates for activities that may require non-stormwater discharges such as dewatering, sawcutting, grinding, drilling, boring, crushing, blasting, painting, hydro-demolition, mortar mixing, pavement cleaning, etc.  Work out the sequencing and timetable for the start and completion of each item such as site clearing and grubbing, grading, excavation, paving, foundation pouring utilities installation, etc., to minimize the active construction area during the rainy season. ­ Sequence trenching activities so that most open portions are closed before new trenching begins. ­ Incorporate staged seeding and re-vegetation of graded slopes as work progresses. ­ Schedule establishment of permanent vegetation during appropriate planting time for specified vegetation.  Non-active areas should be stabilized as soon as practical after the cessation of soil disturbing activities or one day prior to the onset of precipitation.  Monitor the weather forecast for rainfall.  When rainfall is predicted, adjust the construction schedule to allow the implementation of soil stabilization and sediment treatment controls on all disturbed areas prior to the onset of rain.  Be prepared year round to deploy erosion control and sediment control BMPs. Erosion may be caused during dry seasons by un-seasonal rainfall, wind, and vehicle tracking. Keep the site stabilized year round, and retain and maintain rainy season sediment trapping devices in operational condition.  Apply permanent erosion control to areas deemed substantially complete during the project’s defined seeding window. Costs Construction scheduling to reduce erosion may increase other construction costs due to reduced economies of scale in performing site grading. The cost effectiveness of scheduling techniques should be compared with the other less effective erosion and sedimentation controls to achieve a cost effective balance. Scheduling EC-1 November 2009 California Stormwater BMP Handbook 3 of 3 Construction www.casqa.org Inspection and Maintenance  Verify that work is progressing in accordance with the schedule. If progress deviates, take corrective actions.  Amend the schedule when changes are warranted.  Amend the schedule prior to the rainy season to show updated information on the deployment and implementation of construction site BMPs. References Stormwater Quality Handbooks Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), November 2000. Stormwater Management for Construction Activities Developing Pollution Prevention Plans and Best Management Practices (EPA 832-R-92-005), U.S. Environmental Protection Agency, Office of Water, September 1992. Preservation Of Existing Vegetation EC-2 November 2009 California Stormwater BMP Handbook 1 of 4 Construction www.casqa.org Description and Purpose Carefully planned preservation of existing vegetation minimizes the potential of removing or injuring existing trees, vines, shrubs, and grasses that protect soil from erosion. Suitable Applications Preservation of existing vegetation is suitable for use on most projects. Large project sites often provide the greatest opportunity for use of this BMP. Suitable applications include the following:  Areas within the site where no construction activity occurs, or occurs at a later date. This BMP is especially suitable to multi year projects where grading can be phased.  Areas where natural vegetation exists and is designated for preservation. Such areas often include steep slopes, watercourse, and building sites in wooded areas.  Areas where local, state, and federal government require preservation, such as vernal pools, wetlands, marshes, certain oak trees, etc. These areas are usually designated on the plans, or in the specifications, permits, or environmental documents.  Where vegetation designated for ultimate removal can be temporarily preserved and be utilized for erosion control and sediment control. Categories EC Erosion Control  SE Sediment Control TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control Legend:  Primary Objective  Secondary Objective Targeted Constituents Sediment  Nutrients Trash Metals Bacteria Oil and Grease Organics Potential Alternatives None If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Preservation Of Existing Vegetation EC-2 November 2009 California Stormwater BMP Handbook 2 of 4 Construction www.casqa.org Limitations  Requires forward planning by the owner/developer, contractor, and design staff.  Limited opportunities for use when project plans do not incorporate existing vegetation into the site design.  For sites with diverse topography, it is often difficult and expensive to save existing trees while grading the site satisfactory for the planned development. Implementation The best way to prevent erosion is to not disturb the land. In order to reduce the impacts of new development and redevelopment, projects may be designed to avoid disturbing land in sensitive areas of the site (e.g., natural watercourses, steep slopes), and to incorporate unique or desirable existing vegetation into the site’s landscaping plan. Clearly marking and leaving a buffer area around these unique areas during construction will help to preserve these areas as well as take advantage of natural erosion prevention and sediment trapping. Existing vegetation to be preserved on the site must be protected from mechanical and other injury while the land is being developed. The purpose of protecting existing vegetation is to ensure the survival of desirable vegetation for shade, beautification, and erosion control. Mature vegetation has extensive root systems that help to hold soil in place, thus reducing erosion. In addition, vegetation helps keep soil from drying rapidly and becoming susceptible to erosion. To effectively save existing vegetation, no disturbances of any kind should be allowed within a defined area around the vegetation. For trees, no construction activity should occur within the drip line of the tree. Timing  Provide for preservation of existing vegetation prior to the commencement of clearing and grubbing operations or other soil disturbing activities in areas where no construction activity is planned or will occur at a later date. Design and Layout  Mark areas to be preserved with temporary fencing. Include sufficient setback to protect roots. − Orange colored plastic mesh fencing works well. − Use appropriate fence posts and adequate post spacing and depth to completely support the fence in an upright position.  Locate temporary roadways, stockpiles, and layout areas to avoid stands of trees, shrubs, and grass.  Consider the impact of grade changes to existing vegetation and the root zone.  Maintain existing irrigation systems where feasible. Temporary irrigation may be required.  Instruct employees and subcontractors to honor protective devices. Prohibit heavy equipment, vehicular traffic, or storage of construction materials within the protected area. Preservation Of Existing Vegetation EC-2 November 2009 California Stormwater BMP Handbook 3 of 4 Construction www.casqa.org Costs There is little cost associated with preserving existing vegetation if properly planned during the project design, and these costs may be offset by aesthetic benefits that enhance property values. During construction, the cost for preserving existing vegetation will likely be less than the cost of applying erosion and sediment controls to the disturbed area. Replacing vegetation inadvertently destroyed during construction can be extremely expensive, sometimes in excess of $10,000 per tree. Inspection and Maintenance During construction, the limits of disturbance should remain clearly marked at all times. Irrigation or maintenance of existing vegetation should be described in the landscaping plan. If damage to protected trees still occurs, maintenance guidelines described below should be followed:  Verify that protective measures remain in place. Restore damaged protection measures immediately.  Serious tree injuries shall be attended to by an arborist.  Damage to the crown, trunk, or root system of a retained tree shall be repaired immediately.  Trench as far from tree trunks as possible, usually outside of the tree drip line or canopy. Curve trenches around trees to avoid large roots or root concentrations. If roots are encountered, consider tunneling under them. When trenching or tunneling near or under trees to be retained, place tunnels at least 18 in. below the ground surface, and not below the tree center to minimize impact on the roots.  Do not leave tree roots exposed to air. Cover exposed roots with soil as soon as possible. If soil covering is not practical, protect exposed roots with wet burlap or peat moss until the tunnel or trench is ready for backfill.  Cleanly remove the ends of damaged roots with a smooth cut.  Fill trenches and tunnels as soon as possible. Careful filling and tamping will eliminate air spaces in the soil, which can damage roots.  If bark damage occurs, cut back all loosened bark into the undamaged area, with the cut tapered at the top and bottom and drainage provided at the base of the wood. Limit cutting the undamaged area as much as possible.  Aerate soil that has been compacted over a trees root zone by punching holes 12 in. deep with an iron bar, and moving the bar back and forth until the soil is loosened. Place holes 18 in. apart throughout the area of compacted soil under the tree crown.  Fertilization − Fertilize stressed or damaged broadleaf trees to aid recovery. − Fertilize trees in the late fall or early spring. Preservation Of Existing Vegetation EC-2 November 2009 California Stormwater BMP Handbook 4 of 4 Construction www.casqa.org ­ Apply fertilizer to the soil over the feeder roots and in accordance with label instructions, but never closer than 3 ft to the trunk. Increase the fertilized area by one-fourth of the crown area for conifers that have extended root systems.  Retain protective measures until all other construction activity is complete to avoid damage during site cleanup and stabilization. References County of Sacramento Tree Preservation Ordinance, September 1981. Stormwater Quality Handbooks Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), November 2000. Stormwater Management of the Puget Sound Basin, Technical Manual, Publication #91-75, Washington State Department of Ecology, February 1992. Water Quality Management Plan for The Lake Tahoe Region, Volume II, Handbook of Management Practices, Tahoe Regional Planning Agency, November 1988. Hydraulic Mulch EC-3 July 2012 California Stormwater BMP Handbook 1 of 5 Construction www.casqa.org Description and Purpose Hydraulic Mulch consists of various types of fibrous materials mixed with water and sprayed onto the soil surface in slurry form to provide a layer of temporary protection from wind and water erosion. Suitable Applications Hydraulic mulch as a temporary, stand alone, erosion control BMP is suitable for disturbed areas that require temporary protection from wind and water erosion until permanent soil stabilization activities commence. Examples include:  Rough-graded areas that will remain inactive for longer than permit-required thresholds (e.g., 14 days) or otherwise require stabilization to minimize erosion or prevent sediment discharges.  Soil stockpiles.  Slopes with exposed soil between existing vegetation such as trees or shrubs.  Slopes planted with live, container-grown vegetation or plugs.  Slopes burned by wildfire. Categories EC Erosion Control  SE Sediment Control TC Tracking Control WE Wind Erosion Control  NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control Legend:  Primary Category  Secondary Category Targeted Constituents Sediment  Nutrients Trash Metals Bacteria Oil and Grease Organics Potential Alternatives EC-4 Hydroseeding EC-5 Soil Binders EC-6 Straw Mulch EC-7 Geotextiles and Mats EC-8 Wood Mulching EC-14 Compost Blanket EC-16 Non-Vegetative Stabilization If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Hydraulic Mulch EC-3 July 2012 California Stormwater BMP Handbook 2 of 5 Construction www.casqa.org Hydraulic mulch can also be applied to augment other erosion control BMPs such as:  In conjunction with straw mulch (see EC-6 Straw Mulch) where the rate of hydraulic mulch is reduced to 100-500 lbs per acre and the slurry is applied over the straw as a tackifying agent to hold the straw in place.  Supplemental application of soil amendments, such as fertilizer, lime, gypsum, soil bio- stimulants or compost. Limitations In general, hydraulic mulch is not limited by slope length, gradient or soil type. However, the following limitations typically apply:  Most hydraulic mulch applications, particularly bonded fiber matrices (BFMs), require at least 24 hours to dry before rainfall occurs.  Temporary applications (i.e., without a vegetative component) may require a second application in order to remain effective for an entire rainy season.  Treatment areas must be accessible to hydraulic mulching equipment.  Availability of water sources in remote areas for mixing and application.  As a stand-alone temporary BMP, hydraulic mulches may need to be re-applied to maintain their erosion control effectiveness, typically after 6-12 months depending on the type of mulch used.  Availability of hydraulic mulching equipment may be limited just prior to the rainy season and prior to storms due to high demand.  Cellulose fiber mulches alone may not perform well on steep slopes or in course soils.  This BMP consists of a mixture of several constituents (e.g., fibers/mulches, tackifiers, and other chemical constituents), some of which may be proprietary and may come pre-mixed by the manufacturer. The water quality impacts of these constituents are relatively unknown and some may have water quality impacts due to their chemical makeup. Refer to specific chemical properties identified in the product Material Safety Data Sheet; products should be evaluated for project-specific implementation by the SWPPP Preparer. Refer to factsheet EC-05 for further guidance on selecting soil binders. Implementation  Where feasible, it is preferable to prepare soil surfaces prior to application by roughening embankments and fill areas with a crimping or punching type roller or by track walking.  The majority of hydraulic mulch applications do not necessarily require surface/soil preparation (See EC-15 Soil Preparation) although in almost every case where re-vegetation is included as part of the practice, soil preparation can be beneficial. One of the advantages of hydraulic mulch over other erosion control methods is that it can be applied in areas where soil preparation is precluded by site conditions, such as steep slopes, rocky soils, or inaccessibility. Hydraulic Mulch EC-3 July 2012 California Stormwater BMP Handbook 3 of 5 Construction www.casqa.org  Avoid mulch over spray onto roads, sidewalks, drainage channels, existing vegetation, etc.  Hydraulic mulching is generally performed utilizing specialized machines that have a large water-holding/mixing tank and some form of mechanical agitation or other recirculation method to keep water, mulch and soil amendments in suspension. The mixed hydraulic slurry can be applied from a tower sprayer on top of the machine or by extending a hose to areas remote from the machine.  Where possible apply hydraulic mulch from multiple directions to adequately cover the soil. Application from a single direction can result in shadowing, uneven coverage and failure of the BMP.  Hydraulic mulch can also include a vegetative component, such as seed, rhizomes, or stolons (see EC-4 Hydraulic Seed).  Typical hydraulic mulch application rates range from 2,000 pounds per acre for standard mulches (SMs) to 3,500 pounds per acre for BFMs. However, the required amount of hydraulic mulch to provide adequate coverage of exposed topsoil may appear to exceed the standard rates when the roughness of the soil surface is changed due to soil preparation methods (see EC-15 Soil Preparation) or by slope gradient.  Other factors such as existing soil moisture and soil texture can have a profound effect on the amount of hydraulic mulch required (i.e. application rate) applied to achieve an erosion- resistant covering.  Avoid use of mulch without a tackifier component, especially on slopes.  Mulches used in the hydraulic mulch slurry can include: ­ Cellulose fiber ­ Thermally-processed wood fibers ­ Cotton ­ Synthetics ­ Compost (see EC-14, Compost Blanket)  Additional guidance on the comparison and selection of temporary slope stabilization methods is provided in Appendix F of the Handbook. Categories of Hydraulic Mulches Standard Hydraulic Mulch (SM) Standard hydraulic mulches are generally applied at a rate of 2,000 pounds per acre and are manufactured containing around 5% tackifier (i.e. soil binder), usually a plant-derived guar or psyllium type. Most standard mulches are green in color derived from food-color based dyes. Hydraulic Mulch EC-3 July 2012 California Stormwater BMP Handbook 4 of 5 Construction www.casqa.org Hydraulic Matrices (HM) and Stabilized Fiber Matrices (SFM) Hydraulic matrices and stabilized fiber matrices are slurries which contain increased levels of tackifiers/soil binders; usually 10% or more by weight. HMs and SFMs have improved performance compared to a standard hydraulic mulch (SM) because of the additional percentage of tackifier and because of their higher application rates, typically 2,500 – 4,000 pounds per acre. Hydraulic matrices can include a mixture of fibers, for example, a 50/50 blend of paper and wood fiber. In the case of an SFM, the tackifier/soil binder is specified as a polyacrylamide (PAM). Bonded Fiber Matrix (BFM) Bonded fiber matrices (BFMs) are hydraulically-applied systems of fibers, adhesives (typically guar based) and chemical cross-links. Upon drying, the slurry forms an erosion-resistant blanket that prevents soil erosion and promotes vegetation establishment. The cross-linked adhesive in the BFM should be biodegradable and should not dissolve or disperse upon re- wetting. BFMs are typically applied at rates from 3,000 to 4,000 lbs/acre based on the manufacturer’s recommendation. BFMs should not be applied immediately before, during or immediately after rainfall or if the soil is saturated. Depending on the product, BFMs typically require 12 to 24 hours to dry and become effective. Mechanically-Bonded Fiber Matrices (MBFM) Mechanically-bonded fiber matrices (MBFMs) are hydraulically applied systems similar to BFM that use crimped synthetic fibers and PAM and are typically applied to a slope at a higher application rate than a standard BFM. Hydraulic Compost Matrix (HCM) Hydraulic compost matrix (HCM) is a field-derived practice whereby finely graded or sifted compost is introduced into the hydraulic mulch slurry. A guar-type tackifier can be added for steeper slope applications as well as any specified seed mixtures. A HCM can help to accelerate seed germination and growth. HCMs are particularly useful as an in-fill for three-dimensional re-vegetation geocomposites, such as turf reinforcement mats (TRM) (see EC-7 Geotextiles and Mats). Costs Average installed costs for hydraulic mulch categories are is provided in Table 1, below. Table 1 HYDRAULIC MULCH BMPs INSTALLED COSTS BMP Installed Cost/Acre Standard Hydraulic Mulching (SM) $1,700 - $3,600 per acre Hydraulic Matrices (HM) and Stabilized Fiber Matrices Guar-based PAM-based $2,000 - $4,000 per acre $2,500 - $5,610 per acre Bonded Fiber Matrix (BFM) $3,900 - $6,900 per acre Mechanically Bonded Fiber Matrix (MBFM) $4,500 - $6,000 per acre Hydraulic Compost Matrix (HCM) $3,000 - $3,500 per acre Hydraulic Mulch EC-3 July 2012 California Stormwater BMP Handbook 5 of 5 Construction www.casqa.org Source: Cost information received from individual product manufacturers solicited by Geosyntec Consultants (2004) Inspection and Maintenance  Maintain an unbroken, temporary mulched ground cover throughout the period of construction when the soils are not being reworked.  BMPs must be inspected in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Areas where erosion is evident should be repaired and BMPs re-applied as soon as possible. Care should be exercised to minimize the damage to protected areas while making repairs, as any area damaged will require re-application of BMPs.  Compare the number of bags or weight of applied mulch to the area treated to determine actual application rates and compliance with specifications. References Soil Stabilization BMP Research for Erosion and Sediment Controls: Cost Survey Technical Memorandum, State of California Department of Transportation (Caltrans), July 2007. Controlling Erosion of Construction Sites, Agricultural Information #347, U.S. Department of Agriculture (USDA), Natural Resources Conservation Service (NRCS) (formerly Soil Conservation Service – SCS). Guides for Erosion and Sediment Control in California, USDA Soils Conservation Service, January 1991. Manual of Standards of Erosion and Sediment Control Measures, Association of Bay Area Governments, May 1995. Sedimentation and Erosion Control, An Inventory of Current Practices Draft, US EPA, April 1990. Soil Erosion by Water, Agriculture Information Bulletin #513, U.S. Department of Agriculture, Soil Conservation Service. Stormwater Quality Handbooks Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), March 2003. Guidance Document: Soil Stabilization for Temporary Slopes, State of California Department of Transportation (Caltrans), November 1999 Stormwater Management of the Puget Sound Basin, Technical Manual, Publication #91-75, Washington State Department of Ecology, February 1992. Water Quality Management Plan for the Lake Tahoe Region, Volume II, Handbook of Management Practices, Tahoe Regional Planning Agency, November 1988. Hydroseeding EC-4 July 2012 California Stormwater BMP Handbook 1 of 4 Construction www.casqa.org Description and Purpose Hydroseeding typically consists of applying a mixture of a hydraulic mulch, seed, fertilizer, and stabilizing emulsion with a hydraulic mulcher, to temporarily protect exposed soils from erosion by water and wind. Hydraulic seeding, or hydroseeding, is simply the method by which temporary or permanent seed is applied to the soil surface. Suitable Applications Hydroseeding is suitable for disturbed areas requiring temporary protection until permanent stabilization is established, for disturbed areas that will be re-disturbed following an extended period of inactivity, or to apply permanent stabilization measures. Hydroseeding without mulch or other cover (e.g. EC-7, Erosion Control Blanket) is not a stand-alone erosion control BMP and should be combined with additional measures until vegetation establishment. Typical applications for hydroseeding include:  Disturbed soil/graded areas where permanent stabilization or continued earthwork is not anticipated prior to seed germination.  Cleared and graded areas exposed to seasonal rains or temporary irrigation.  Areas not subject to heavy wear by construction equipment or high traffic. Categories EC Erosion Control  SE Sediment Control TC Tracking Control WE Wind Erosion Control  NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control Legend:  Primary Category  Secondary Category Targeted Constituents Sediment  Nutrients Trash Metals Bacteria Oil and Grease Organics Potential Alternatives EC-3 Hydraulic Mulch EC-5 Soil Binders EC-6 Straw Mulch EC-7 Geotextiles and Mats EC-8 Wood Mulching EC-14 Compost Blanket EC-16 Non-Vegetative Stabilization If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Hydroseeding EC-4 July 2012 California Stormwater BMP Handbook 2 of 4 Construction www.casqa.org Limitations  Availability of hydroseeding equipment may be limited just prior to the rainy season and prior to storms due to high demand.  Hydraulic seed should be applied with hydraulic mulch or a stand-alone hydroseed application should be followed by one of the following: ­ Straw mulch (see Straw Mulch EC-6) ­ Rolled erosion control products (see Geotextiles and Mats EC-7) ­ Application of Compost Blanket (see Compost Blanket EC-14) Hydraulic seed may be used alone only on small flat surfaces when there is sufficient time in the season to ensure adequate vegetation establishment and coverage to provide adequate erosion control.  Hydraulic seed without mulch does not provide immediate erosion control.  Temporary seeding may not be appropriate for steep slopes (i.e., slopes readily prone to rill erosion or without sufficient topsoil).  Temporary seeding may not be appropriate in dry periods without supplemental irrigation.  Temporary vegetation may have to be removed before permanent vegetation is applied.  Temporary vegetation may not be appropriate for short term inactivity (i.e. less than 3-6 months).  This BMP consists of a mixture of several constituents (e.g., fibers/mulches, tackifiers, and other chemical constituents), some of which may be proprietary and may come pre-mixed by the manufacturer. The water quality impacts of these constituents are relatively unknown and some may have water quality impacts due to their chemical makeup. Additionally these constituents may require non-visible pollutant monitoring. Refer to specific chemical properties identified in the product Material Safety Data Sheet; products should be evaluated for project-specific implementation by the SWPPP Preparer. Refer to factsheet EC-05 for further guidance on selecting soil binders. Implementation In order to select appropriate hydraulic seed mixtures, an evaluation of site conditions should be performed with respect to: ­ Soil conditions - Maintenance requirements ­ Site topography and exposure (sun/wind) - Sensitive adjacent areas ­ Season and climate - Water availability ­ Vegetation types - Plans for permanent vegetation Hydroseeding EC-4 July 2012 California Stormwater BMP Handbook 3 of 4 Construction www.casqa.org The local office of the U.S.D.A. Natural Resources Conservation Service (NRCS), Resource Conservation Districts and Agricultural Extension Service can provide information on appropriate seed mixes. The following steps should be followed for implementation:  Where appropriate or feasible, soil should be prepared to receive the seed by disking or otherwise scarifying (See EC-15, Soil Preparation) the surface to eliminate crust, improve air and water infiltration and create a more favorable environment for germination and growth.  Avoid use of hydraulic seed in areas where the BMP would be incompatible with future earthwork activities.  Hydraulic seed can be applied using a multiple step or one step process. ­ In a multiple step process, hydraulic seed is applied first, followed by mulch or a Rolled Erosion Control Product (RECP). ­ In the one step process, hydraulic seed is applied with hydraulic mulch in a hydraulic matrix. When the one step process is used to apply the mixture of fiber, seed, etc., the seed rate should be increased to compensate for all seeds not having direct contact with the soil.  All hydraulically seeded areas should have mulch, or alternate erosion control cover to keep seeds in place and to moderate soil moisture and temperature until the seeds germinate and grow.  All seeds should be in conformance with the California State Seed Law of the Department of Agriculture. Each seed bag should be delivered to the site sealed and clearly marked as to species, purity, percent germination, dealer's guarantee, and dates of test. The container should be labeled to clearly reflect the amount of Pure Live Seed (PLS) contained. All legume seed should be pellet inoculated. Inoculant sources should be species specific and should be applied at a rate of 2 lb of inoculant per 100 lb seed.  Commercial fertilizer should conform to the requirements of the California Food and Agricultural Code, which can be found at http://www.leginfo.ca.gov/.html/fac_table_of_contents.html. Fertilizer should be pelleted or granular form.  Follow up applications should be made as needed to cover areas of poor coverage or germination/vegetation establishment and to maintain adequate soil protection.  Avoid over spray onto roads, sidewalks, drainage channels, existing vegetation, etc.  Additional guidance on the comparison and selection of temporary slope stabilization methods is provided in Appendix F of the Handbook. Hydroseeding EC-4 July 2012 California Stormwater BMP Handbook 4 of 4 Construction www.casqa.org Costs Average cost for installation and maintenance may vary from as low as $1,900 per acre for flat slopes and stable soils, to $4,000 per acre for moderate to steep slopes and/or erosive soils. Cost of seed mixtures vary based on types of required vegetation. BMP Installed Cost per Acre Hydraulic Seed $1,900-$4,000 Source: Cost information received from individual product manufacturers solicited by Geosyntec Consultants (2004). Inspection and Maintenance  BMPs must be inspected in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Areas where erosion is evident should be repaired and BMPs re-applied as soon as possible. Care should be exercised to minimize the damage to protected areas while making repairs, as any area damaged will require re-application of BMPs.  Where seeds fail to germinate, or they germinate and die, the area must be re-seeded, fertilized, and mulched within the planting season, using not less than half the original application rates.  Irrigation systems, if applicable, should be inspected daily while in use to identify system malfunctions and line breaks. When line breaks are detected, the system must be shut down immediately and breaks repaired before the system is put back into operation.  Irrigation systems should be inspected for complete coverage and adjusted as needed to maintain complete coverage. References Soil Stabilization BMP Research for Erosion and Sediment Controls: Cost Survey Technical Memorandum, State of California Department of Transportation (Caltrans), July 2007. Stormwater Quality Handbooks Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), March 2003. Guidance Document: Soil Stabilization for Temporary Slopes, State of California Department of Transportation (Caltrans), November 1999. Soil Binders EC-5 July 2012 California Stormwater BMP Handbook 1 of 8 Construction www.casqa.org Description and Purpose Soil binding consists of application and maintenance of a soil stabilizer to exposed soil surfaces. Soil binders are materials applied to the soil surface to temporarily prevent water and wind induced erosion of exposed soils on construction sites. Suitable Applications Soil binders are typically applied to disturbed areas requiring temporary protection. Because soil binders, when used as a stand-alone practice, can often be incorporated into the soil, they are a good alternative to mulches in areas where grading activities will soon resume. Soil binders are commonly used in the following areas:  Rough graded soils that will be inactive for a short period of time  Soil stockpiles  Temporary haul roads prior to placement of crushed rock  Compacted soil road base  Construction staging, materials storage, and layout areas Limitations  Soil binders are temporary in nature and may need reapplication.  Soil binders require a minimum curing time until fully effective, as prescribed by the manufacturer. Curing time Categories EC Erosion Control  SE Sediment Control TC Tracking Control WE Wind Erosion Control  NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control Legend:  Primary Category  Secondary Category Targeted Constituents Sediment  Nutrients Trash Metals Bacteria Oil and Grease Organics Potential Alternatives EC-3 Hydraulic Mulch EC-4 Hydroseeding EC-6 Straw Mulch EC-7 Geotextiles and Mats EC-8 Wood Mulching If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Soil Binders EC-5 July 2012 California Stormwater BMP Handbook 2 of 8 Construction www.casqa.org may be 24 hours or longer. Soil binders may need reapplication after a storm event.  Soil binders will generally experience spot failures during heavy rainfall events. If runoff penetrates the soil at the top of a slope treated with a soil binder, it is likely that the runoff will undercut the stabilized soil layer and discharge at a point further down slope.  Plant-material-based soil binders do not generally hold up to pedestrian or vehicular traffic across treated areas as well as polymeric emulsion blends or cementitious-based binders.  Soil binders may not sufficiently penetrate compacted soils.  Some soil binders are soil texture specific in terms of their effectiveness. For example, polyacrylamides (PAMs) work very well on silt and clayey soils but their performance decreases dramatically in sandy soils.  Some soil binders may not perform well with low relative humidity. Under rainy conditions, some agents may become slippery or leach out of the soil.  Soil binders may not cure if low temperatures occur within 24 hours of application.  The water quality impacts of some chemical soil binders are relatively unknown and some may have water quality impacts due to their chemical makeup. Additionally, these chemical may require non-visible pollutant monitoring. Products should be evaluated for project- specific implementation by the SWPPP Preparer. Refer to the product Material Safety Data Sheet for chemical properties. Implementation General Considerations  Soil binders should conform to local municipality specifications and requirements.  Site soil types will dictate appropriate soil binders to be used.  A soil binder must be environmentally benign (non-toxic to plant and animal life), easy to apply, easy to maintain, economical, and should not stain paved or painted surfaces. Soil binders should not pollute stormwater when cured. Obtain a Material Safety Data Sheet (MSDS) from the manufacturer to ensure non-toxicity.  Stormwater runoff from PAM treated soils should pass through one of the following sediment control BMP prior to discharging to surface waters. ­ When the total drainage area is greater than or equal to 5 acres, PAM treated areas should drain to a sediment basin. ­ Areas less than 5 acres should drain to sediment control BMPs, such as a sediment trap, or a series of check dams. The total number of check dams used should be maximized to achieve the greatest amount of settlement of sediment prior to discharging from the site. Each check dam should be spaced evenly in the drainage channel through which stormwater flows are discharged off site. Soil Binders EC-5 July 2012 California Stormwater BMP Handbook 3 of 8 Construction www.casqa.org  Performance of soil binders depends on temperature, humidity, and traffic across treated areas.  Avoid over spray onto roads, sidewalks, drainage channels, existing vegetation, etc.  Additional guidance on the comparison and selection of temporary slope stabilization methods is provided in Appendix F of the Handbook. Selecting a Soil Binder Properties of common soil binders used for erosion control are provided on Table 1 at the end of this Fact Sheet. Use Table 1 to select an appropriate soil binder. Refer to WE-1, Wind Erosion Control, for dust control soil binders. Factors to consider when selecting a soil binder include the following:  Suitability to situation - Consider where the soil binder will be applied, if it needs a high resistance to leaching or abrasion, and whether it needs to be compatible with any existing vegetation. Determine the length of time soil stabilization will be needed, and if the soil binder will be placed in an area where it will degrade rapidly. In general, slope steepness is not a discriminating factor for the listed soil binders.  Soil types and surface materials - Fines and moisture content are key properties of surface materials. Consider a soil binder's ability to penetrate, likelihood of leaching, and ability to form a surface crust on the surface materials.  Frequency of application - The frequency of application is related to the functional longevity of the binder, which can be affected by subgrade conditions, surface type, climate, and maintenance schedule.  Frequent applications could lead to high costs. Application frequency may be minimized if the soil binder has good penetration, low evaporation, and good longevity. Consider also that frequent application will require frequent equipment clean up. Plant-Material-Based (Short Lived, <6 months) Binders Guar: Guar is a non-toxic, biodegradable, natural galactomannan-based hydrocolloid treated with dispersant agents for easy field mixing. It should be mixed with water at the rate of 11 to 15 lb per 1,000 gallons. Recommended minimum application rates are as follows: Application Rates for Guar Soil Stabilizer Slope (H:V): Flat 4:1 3:1 2:1 1:1 lb/acre: 40 45 50 60 70 Psyllium: Psyllium is composed of the finely ground muciloid coating of plantago seeds that is applied as a dry powder or in a wet slurry to the surface of the soil. It dries to form a firm but rewettable membrane that binds soil particles together, but permits germination and growth of seed. Psyllium requires 12 to 18 hours drying time. Application rates should be from 80 to 200 lb/acre, with enough water in solution to allow for a uniform slurry flow. Soil Binders EC-5 July 2012 California Stormwater BMP Handbook 4 of 8 Construction www.casqa.org Starch: Starch is non-ionic, cold water soluble (pre-gelatinized) granular cornstarch. The material is mixed with water and applied at the rate of 150 lb/acre. Approximate drying time is 9 to 12 hours. Plant-Material-Based (Long Lived, 6-12 months) Binders Pitch and Rosin Emulsion: Generally, a non-ionic pitch and rosin emulsion has a minimum solids content of 48%. The rosin should be a minimum of 26% of the total solids content. The soil stabilizer should be non-corrosive, water dilutable emulsion that upon application cures to a water insoluble binding and cementing agent. For soil erosion control applications, the emulsion is diluted and should be applied as follows:  For clayey soil: 5 parts water to 1 part emulsion  For sandy soil: 10 parts water to 1 part emulsion Application can be by water truck or hydraulic seeder with the emulsion and product mixture applied at the rate specified by the manufacturer. Polymeric Emulsion Blend Binders Acrylic Copolymers and Polymers: Polymeric soil stabilizers should consist of a liquid or solid polymer or copolymer with an acrylic base that contains a minimum of 55% solids. The polymeric compound should be handled and mixed in a manner that will not cause foaming or should contain an anti-foaming agent. The polymeric emulsion should not exceed its shelf life or expiration date; manufacturers should provide the expiration date. Polymeric soil stabilizer should be readily miscible in water, non-injurious to seed or animal life, non-flammable, should provide surface soil stabilization for various soil types without totally inhibiting water infiltration, and should not re-emulsify when cured. The applied compound typically requires 12 to 24 hours drying time. Liquid copolymer should be diluted at a rate of 10 parts water to 1 part polymer and the mixture applied to soil at a rate of 1,175 gallons/acre. Liquid Polymers of Methacrylates and Acrylates: This material consists of a tackifier/sealer that is a liquid polymer of methacrylates and acrylates. It is an aqueous 100% acrylic emulsion blend of 40% solids by volume that is free from styrene, acetate, vinyl, ethoxylated surfactants or silicates. For soil stabilization applications, it is diluted with water in accordance with the manufacturer’s recommendations, and applied with a hydraulic seeder at the rate of 20 gallons/acre. Drying time is 12 to 18 hours after application. Copolymers of Sodium Acrylates and Acrylamides: These materials are non-toxic, dry powders that are copolymers of sodium acrylate and acrylamide. They are mixed with water and applied to the soil surface for erosion control at rates that are determined by slope gradient: Slope Gradient (H:V) lb/acre Flat to 5:1 3.0 – 5.0 5:1 to 3:1 5.0 – 10.0 2:1 to 1:1 10.0 – 20.0 Soil Binders EC-5 July 2012 California Stormwater BMP Handbook 5 of 8 Construction www.casqa.org Poly-Acrylamide (PAM) and Copolymer of Acrylamide: Linear copolymer polyacrylamide for use as a soil binder is packaged as a dry flowable solid, as a liquid. Refer to the manufacturer’s recommendation for dilution and application rates as they vary based on liquid or dry form, site conditions and climate.  Limitations specific to PAM are as follows: ­ Do not use PAM on a slope that flows into a water body without passing through a sediment trap or sediment basin. ­ The specific PAM copolymer formulation must be anionic. Cationic PAM should not be used in any application because of known aquatic toxicity problems. Only the highest drinking water grade PAM, certified for compliance with ANSI/NSF Standard 60 for drinking water treatment, should be used for soil applications. ­ PAM designated for erosion and sediment control should be “water soluble” or “linear” or “non-cross linked”. ­ PAM should not be used as a stand-alone BMP to protect against water-based erosion. When combined with mulch, its effectiveness increases dramatically. Hydro-Colloid Polymers: Hydro-Colloid Polymers are various combinations of dry flowable poly-acrylamides, copolymers and hydro-colloid polymers that are mixed with water and applied to the soil surface at rates of 55 to 60 lb/acre. Drying times are 0 to 4 hours. Cementitious-Based Binders Gypsum: This is a formulated gypsum based product that readily mixes with water and mulch to form a thin protective crust on the soil surface. It is composed of high purity gypsum that is ground, calcined and processed into calcium sulfate hemihydrate with a minimum purity of 86%. It is mixed in a hydraulic seeder and applied at rates 4,000 to 12,000 lb/acre. Drying time is 4 to 8 hours. Applying Soil Binders After selecting an appropriate soil binder, the untreated soil surface must be prepared before applying the soil binder. The untreated soil surface must contain sufficient moisture to assist the agent in achieving uniform distribution. In general, the following steps should be followed:  Follow manufacturer’s written recommendations for application rates, pre-wetting of application area, and cleaning of equipment after use.  Prior to application, roughen embankment and fill areas.  Consider the drying time for the selected soil binder and apply with sufficient time before anticipated rainfall. Soil binders should not be applied during or immediately before rainfall.  Avoid over spray onto roads, sidewalks, drainage channels, sound walls, existing vegetation, etc. Soil Binders EC-5 July 2012 California Stormwater BMP Handbook 6 of 8 Construction www.casqa.org  Soil binders should not be applied to frozen soil, areas with standing water, under freezing or rainy conditions, or when the temperature is below 40°F during the curing period.  More than one treatment is often necessary, although the second treatment may be diluted or have a lower application rate.  Generally, soil binders require a minimum curing time of 24 hours before they are fully effective. Refer to manufacturer's instructions for specific cure time.  For liquid agents: ­ Crown or slope ground to avoid ponding. ­ Uniformly pre-wet ground at 0.03 to 0.3 gal/yd2 or according to manufacturer’s recommendations. ­ Apply solution under pressure. Overlap solution 6 to 12 in. ­ Allow treated area to cure for the time recommended by the manufacturer; typically at least 24 hours. ­ Apply second treatment before first treatment becomes ineffective, using 50% application rate. ­ In low humidities, reactivate chemicals by re-wetting with water at 0.1 to 0.2 gal/yd2. Costs Costs vary according to the soil stabilizer selected for implementation. The following are approximate installed costs: Soil Binder Cost per Acre (2004)1 Estimated Cost per Acre (2009)2 Plant-Material-Based (Short Lived) Binders $700-$900 $770-$990 Plant-Material-Based (Long Lived) Binders $1,200-$1,500 $1,320-$1,650 Polymeric Emulsion Blend Binders $700 -$1,500 $770-$1,650 Cementitious-Based Binders $800-$1,200 $880-$1,350 1. Source: Cost information received from individual product manufacturers solicited by Geosyntec Consultants (2004). 2. 2009 costs reflect a 10% escalation over year 2004 costs. Escalation based on informal survey of industry trends. Note: Expected cost increase is offset by competitive economic conditions. Inspection and Maintenance  BMPs must be inspected in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events. Soil Binders EC-5 July 2012 California Stormwater BMP Handbook 7 of 8 Construction www.casqa.org  Areas where erosion is evident should be repaired and BMPs re-applied as soon as possible. Care should be exercised to minimize the damage to protected areas while making repairs, as any area damaged will require re-application of BMPs.  Reapply the selected soil binder as needed to maintain effectiveness. Table 1 Properties of Soil Binders for Erosion Control Evaluation Criteria Binder Type Plant Material Based (Short Lived) Plant Material Based (Long Lived) Polymeric Emulsion Blends Cementitious- Based Binders Relative Cost Low Moderate to High Low to High Low to Moderate Resistance to Leaching High High Low to Moderate Moderate Resistance to Abrasion Moderate Low Moderate to High Moderate to High Longevity Short to Medium Medium Medium to Long Medium Minimum Curing Time before Rain 9 to 18 hours 19 to 24 hours 0 to 24 hours 4 to 8 hours Compatibility with Existing Vegetation Good Poor Poor Poor Mode of Degradation Biodegradable Biodegradable Photodegradable/ Chemically Degradable Photodegradable/ Chemically Degradable Labor Intensive No No No No Specialized Application Equipment Water Truck or Hydraulic Mulcher Water Truck or Hydraulic Mulcher Water Truck or Hydraulic Mulcher Water Truck or Hydraulic Mulcher Liquid/Powder Powder Liquid Liquid/Powder Powder Surface Crusting Yes, but dissolves on rewetting Yes Yes, but dissolves on rewetting Yes Clean Up Water Water Water Water Erosion Control Application Rate Varies (1) Varies (1) Varies (1) 4,000 to 12,000 lbs/acre (1) See Implementation for specific rates. Soil Binders EC-5 July 2012 California Stormwater BMP Handbook 8 of 8 Construction www.casqa.org References Erosion Control Pilot Study Report, State of California Department of Transportation (Caltrans), June 2000. Manual of Standards of Erosion and Sediment Control Measures, Association of Bay Area Governments, May 1995. Sedimentation and Erosion Control, An Inventory of Current Practices Draft, US EPA, April 1990. Stormwater Quality Handbooks Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), March 2003. Guidance Document: Soil Stabilization for Temporary Slopes, State of California Department of Transportation (Caltrans), November 1999. Stormwater Management for Construction Activities, Developing Pollution Prevention Plans and Best Management Practices, EPA 832-R-92005; USEPA, April 1992. Straw Mulch EC-6 July 2012 California Stormwater BMP Handbook 1 of 4 Construction www.casqa.org Description and Purpose Straw mulch consists of placing a uniform layer of straw and incorporating it into the soil with a studded roller or crimper, or anchoring it with a tackifier or stabilizing emulsion. Straw mulch protects the soil surface from the impact of rain drops, preventing soil particles from becoming dislodged. Suitable Applications Straw mulch is suitable for disturbed areas requiring temporary protection until permanent stabilization is established. Straw mulch can be specified for the following applications:  As a stand-alone BMP on disturbed areas until soils can be prepared for permanent vegetation. The longevity of straw mulch is typically less than six months.  Applied in combination with temporary seeding strategies  Applied in combination with permanent seeding strategies to enhance plant establishment and final soil stabilization  Applied around containerized plantings to control erosion until the plants become established to provide permanent stabilization Limitations Availability of straw and straw blowing equipment may be limited just prior to the rainy season and prior to storms due to high demand. Categories EC Erosion Control  SE Sediment Control TC Tracking Control WE Wind Erosion Control  NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control Legend:  Primary Category  Secondary Category Targeted Constituents Sediment  Nutrients Trash Metals Bacteria Oil and Grease Organics Potential Alternatives EC-3 Hydraulic Mulch EC-4 Hydroseeding EC-5 Soil Binders EC-7 Geotextiles and Mats EC-8 Wood Mulching EC-14 Compost Blanket If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Straw Mulch EC-6 July 2012 California Stormwater BMP Handbook 2 of 4 Construction www.casqa.org  There is a potential for introduction of weed seed and unwanted plant material if weed-free agricultural straw is not specified.  Straw mulch applied by hand is more time intensive and potentially costly.  Wind may limit application of straw and blow straw into undesired locations.  May have to be removed prior to permanent seeding or prior to further earthwork.  “Punching” of straw does not work in sandy soils, necessitating the use of tackifiers.  Potential fugitive dust control issues associated with straw applications can occur. Application of a stabilizing emulsion or a water stream at the same time straw is being blown can reduce this problem.  Use of plastic netting should be avoided in areas where wildlife may be entrapped and may be prohibited for projects in certain areas with sensitive wildlife species, especially reptiles and amphibians. Implementation  Straw should be derived from weed-free wheat, rice, or barley. Where required by the plans, specifications, permits, or environmental documents, native grass straw should be used.  Use tackifier to anchor straw mulch to the soil on slopes.  Crimping, punch roller-type rollers, or track walking may also be used to incorporate straw mulch into the soil on slopes. Track walking can be used where other methods are impractical.  Avoid placing straw onto roads, sidewalks, drainage channels, sound walls, existing vegetation, etc.  Straw mulch with tackifier should not be applied during or immediately before rainfall.  Additional guidance on the comparison and selection of temporary slope stabilization methods is provided in Appendix F of the Handbook. Application Procedures  When using a tackifier to anchor the straw mulch, roughen embankment or fill areas by rolling with a crimping or punching-type roller or by track walking before placing the straw mulch. Track walking should only be used where rolling is impractical.  Apply straw at a rate of between 3,000 and 4,000 lb/acre, either by machine or by hand distribution and provide 100% ground cover. A lighter application is used for flat surfaces and a heavier application is used for slopes.  Evenly distribute straw mulch on the soil surface.  Anchoring straw mulch to the soil surface by "punching" it into the soil mechanically (incorporating) can be used in lieu of a tackifier. Straw Mulch EC-6 July 2012 California Stormwater BMP Handbook 3 of 4 Construction www.casqa.org  Methods for holding the straw mulch in place depend upon the slope steepness, accessibility, soil conditions, and longevity. ­ A tackifier acts to glue the straw fibers together and to the soil surface. The tackifier should be selected based on longevity and ability to hold the fibers in place. A tackifier is typically applied at a rate of 125 lb/acre. In windy conditions, the rates are typically 180 lb/acre. ­ On very small areas, a spade or shovel can be used to punch in straw mulch. ­ On slopes with soils that are stable enough and of sufficient gradient to safely support construction equipment without contributing to compaction and instability problems, straw can be "punched" into the ground using a knife blade roller or a straight bladed coulter, known commercially as a "crimper.” Costs Average annual cost for installation and maintenance is included in the table below. Application by hand is more time intensive and potentially more costly. BMP Unit Cost per Acre Straw mulch, crimped or punched $2,458-$5,375 Straw mulch with tackifier $1,823-$4,802 Source: Cost information received from individual product suppliers solicited by Geosyntec Consultants (2004). Inspection and Maintenance  BMPs must be inspected in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Areas where erosion is evident should be repaired and BMPs re-applied as soon as possible. Care should be exercised to minimize the damage to protected areas while making repairs, as any area damaged will require re-application of BMPs.  The key consideration in inspection and maintenance is that the straw needs to last long enough to achieve erosion control objectives. Straw mulch as a stand-alone BMP is temporary and is not suited for long-term erosion control.  Maintain an unbroken, temporary mulched ground cover while disturbed soil areas are inactive. Repair any damaged ground cover and re-mulch exposed areas.  Reapplication of straw mulch and tackifier may be required to maintain effective soil stabilization over disturbed areas and slopes. Straw Mulch EC-6 July 2012 California Stormwater BMP Handbook 4 of 4 Construction www.casqa.org References Soil Stabilization BMP Research for Erosion and Sediment Controls: Cost Survey Technical Memorandum, State of California Department of Transportation (Caltrans), July 2007. Erosion and Sediment Control Manual, Oregon Department of Environmental Quality, February 2005. Controlling Erosion of Construction Sites, Agricultural Information Bulletin #347, U.S. Department of Agriculture (USDA), Natural Resources Conservation Service (NRCS) (formerly Soil Conservation Service – SCS). Guides for Erosion and Sediment Control in California, USDA Soils Conservation Service, January 1991. Manual of Standards of Erosion and Sediment Control Measures, Association of Bay Area Governments, May 1995. Soil Erosion by Water, Agricultural Information Bulletin #513, U.S. Department of Agriculture, Soil Conservation Service. Stormwater Quality Handbooks Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), March 2003. Stormwater Management of the Puget Sound Basin, Technical Manual, Publication #91-75, Washington State Department of Ecology, February 1992. Water Quality Management Plan for the Lake Tahoe Region, Volume II, Handbook of Management Practices, Tahoe Regional Planning Agency, November 1988. Geotextiles and Mats EC-7 July 2012 California Stormwater BMP Handbook 1 of 12 Construction www.casqa.org Description and Purpose Mattings, or Rolled Erosion Control Products (RECPs), can be made of natural or synthetic materials or a combination of the two. RECPs are used to cover the soil surface to reduce erosion from rainfall impact, hold soil in place, and absorb and hold moisture near the soil surface. Additionally, RECPs may be used to stabilize soils until vegetation is established or to reinforce non-woody surface vegetation. Suitable Applications RECPs are typically applied on slopes where erosion hazard is high and vegetation will be slow to establish. Mattings are also used on stream banks, swales and other drainage channels where moving water at velocities between 3 ft/s and 6 ft/s are likely to cause scour and wash out new vegetation, and in areas where the soil surface is disturbed and where existing vegetation has been removed. RECPs may also be used when seeding cannot occur (e.g., late season construction and/or the arrival of an early rain season). RECPs should be considered when the soils are fine grained and potentially erosive. RECPs should be considered in the following situations.  Steep slopes, generally steeper than 3:1 (H:V)  Slopes where the erosion potential is high  Slopes and disturbed soils where mulch must be anchored  Disturbed areas where plants are slow to develop Categories EC Erosion Control  SE Sediment Control TC Tracking Control WE Wind Erosion Control  NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control Legend:  Primary Category  Secondary Category Targeted Constituents Sediment  Nutrients Trash Metals Bacteria Oil and Grease Organics Potential Alternatives EC-3 Hydraulic Mulch EC-4 Hydroseeding If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Geotextiles and Mats EC-7 July 2012 California Stormwater BMP Handbook 2 of 12 Construction www.casqa.org  Channels with flows exceeding 3.3 ft/s  Channels to be vegetated  Stockpiles  Slopes adjacent to water bodies Limitations  RECP installed costs are generally higher than other erosion control BMPs, limiting their use to areas where other BMPs are ineffective (e.g. channels, steep slopes).  RECPs may delay seed germination, due to reduction in soil temperature.  RECPs are generally not suitable for excessively rocky sites or areas where the final vegetation will be mowed (since staples and netting can catch in mowers). If a staple or pin cannot be driven into the soil because the underlying soil is too hard or rocky, then an alternative BMP should be selected.  If used for temporary erosion control, RECPs should be removed and disposed of prior to application of permanent soil stabilization measures.  The use of plastic should be limited to covering stockpiles or very small graded areas for short periods of time (such as through one imminent storm event) until more environmentally friendly measures, such as seeding and mulching, may be installed. - Plastic sheeting is easily vandalized, easily torn, photodegradable, and must be disposed of at a landfill. - Plastic sheeting results in 100% runoff, which may cause serious erosion problems in the areas receiving the increased flow.  RECPs may have limitations based on soil type, slope gradient, or channel flow rate; consult the manufacturer for proper selection.  Not suitable for areas that have foot traffic (tripping hazard) – e.g., pad areas around buildings under construction.  RECPs that incorporate a plastic netting (e.g. straw blanket typically uses a plastic netting to hold the straw in place) may not be suitable near known wildlife habitat. Wildlife can become trapped in the plastic netting.  RECPs may have limitations in extremely windy climates. However, when RECPs are properly trenched at the top and bottom and stapled in accordance with the manufacturer’s recommendations, problems with wind can be minimized. Geotextiles and Mats EC-7 July 2012 California Stormwater BMP Handbook 3 of 12 Construction www.casqa.org Implementation Material Selection  Natural RECPs have been found to be effective where re-vegetation will be provided by re- seeding. The choice of material should be based on the size of area, side slopes, surface conditions such as hardness, moisture, weed growth, and availability of materials.  Additional guidance on the comparison and selection of temporary slope stabilization methods is provided in Appendix F of the Handbook.  The following natural and synthetic RECPs are commonly used: Geotextiles  Material can be a woven or a non-woven polypropylene fabric with minimum thickness of 0.06 in., minimum width of 12 ft and should have minimum tensile strength of 150 lbs (warp), 80 lbs (fill) in conformance with the requirements in ASTM Designation: D 4632. The permittivity of the fabric should be approximately 0.07 sec–1 in conformance with the requirements in ASTM Designation: D4491. The fabric should have an ultraviolet (UV) stability of 70 percent in conformance with the requirements in ASTM designation: D4355. Geotextile blankets must be secured in place with wire staples or sandbags and by keying into tops of slopes to prevent infiltration of surface waters under geotextile. Staples should be made of minimum 11 gauge steel wire and should be U-shaped with 8 in. legs and 2 in. crown.  Geotextiles may be reused if they are suitable for the use intended. Plastic Covers  Generally plastic sheeting should only be used as stockpile covering or for very small graded areas for short periods of time (such as through one imminent storm event). If plastic sheeting must be used, choose a plastic that will withstand photo degradation.  Plastic sheeting should have a minimum thickness of 6 mils, and must be keyed in at the top of slope (when used as a temporary slope protection) and firmly held in place with sandbags or other weights placed no more than 10 ft apart. Seams are typically taped or weighted down their entire length, and there should be at least a 12 in. to 24 in. overlap of all seams. Edges should be embedded a minimum of 6 in. in soil (when used as a temporary slope protection).  All sheeting must be inspected periodically after installation and after significant rainstorms to check for erosion, undermining, and anchorage failure. Any failures must be repaired immediately. If washout or breakages occur, the material should be re-installed after repairing the damage to the slope. Erosion Control Blankets/Mats  Biodegradable RECPs are typically composed of jute fibers, curled wood fibers, straw, coconut fiber, or a combination of these materials. In order for an RECP to be considered 100% biodegradable, the netting, sewing or adhesive system that holds the biodegradable mulch fibers together must also be biodegradable. See typical installation details at the end of this fact sheet. Geotextiles and Mats EC-7 July 2012 California Stormwater BMP Handbook 4 of 12 Construction www.casqa.org - Jute is a natural fiber that is made into a yarn that is loosely woven into a biodegradable mesh. The performance of jute as a stand-alone RECP is low. Most other RECPs outperform jute as a temporary erosion control product and therefore jute is not commonly used. It is designed to be used in conjunction with vegetation. The material is supplied in rolled strips, which should be secured to the soil with U-shaped staples or stakes in accordance with manufacturers’ recommendations. - Excelsior (curled wood fiber) blanket material should consist of machine produced mats of curled wood excelsior with 80 percent of the fiber 6 in. or longer. The excelsior blanket should be of consistent thickness. The wood fiber must be evenly distributed over the entire area of the blanket. The top surface of the blanket should be covered with a photodegradable extruded plastic mesh. The blanket should be smolder resistant without the use of chemical additives and should be non-toxic and non-injurious to plant and animal life. Excelsior blankets should be furnished in rolled strips, a minimum of 48 in. wide, and should have an average weight of 0.8 lb/yd2, 10 percent, at the time of manufacture. Excelsior blankets must be secured in place with wire staples. Staples should be made of minimum 11 gauge steel wire and should be U-shaped with 8 in. legs and 2 in. crown. - Straw blanket should be machine produced mats of straw with a lightweight biodegradable netting top layer. The straw should be attached to the netting with biodegradable thread or glue strips. The straw blanket should be of consistent thickness. The straw should be evenly distributed over the entire area of the blanket. Straw blanket should be furnished in rolled strips a minimum of 6.5 ft wide, a minimum of 80 ft long and a minimum of 0.5 lb/yd2. Straw blankets must be secured in place with wire staples. Staples should be made of minimum 11 gauge steel wire and should be U-shaped with 8 in. legs and 2 in. crown. - Wood fiber blanket is composed of biodegradable fiber mulch with extruded plastic netting held together with adhesives. The material is designed to enhance re-vegetation. The material is furnished in rolled strips, which must be secured to the ground with U- shaped staples or stakes in accordance with manufacturers’ recommendations. - Coconut fiber blanket should be a machine produced mat of 100 percent coconut fiber with biodegradable netting on the top and bottom. The coconut fiber should be attached to the netting with biodegradable thread or glue strips. The coconut fiber blanket should be of consistent thickness. The coconut fiber should be evenly distributed over the entire area of the blanket. Coconut fiber blanket should be furnished in rolled strips with a minimum of 6.5 ft wide, a minimum of 80 ft. long and a minimum of 0.5 lb/yd2. Coconut fiber blankets must be secured in place with wire staples. Staples should be made of minimum 11 gauge steel wire and should be U-shaped with 8 in. legs and 2 in. crown. - Coconut fiber mesh is a thin permeable membrane made from coconut or corn fiber that is spun into a yarn and woven into a biodegradable mat. It is designed to be used in conjunction with vegetation and typically has longevity of several years. The material is supplied in rolled strips, which must be secured to the soil with U-shaped staples or stakes in accordance with manufacturers’ recommendations. Geotextiles and Mats EC-7 July 2012 California Stormwater BMP Handbook 5 of 12 Construction www.casqa.org - Straw coconut fiber blanket should be machine produced mats of 70 percent straw and 30 percent coconut fiber with a biodegradable netting top layer and a biodegradable bottom net. The straw and coconut fiber should be attached to the netting with biodegradable thread or glue strips. The straw coconut fiber blanket should be of consistent thickness. The straw and coconut fiber should be evenly distributed over the entire area of the blanket. Straw coconut fiber blanket should be furnished in rolled strips a minimum of 6.5 ft wide, a minimum of 80 ft long and a minimum of 0.5 lb/yd2. Straw coconut fiber blankets must be secured in place with wire staples. Staples should be made of minimum 11 gauge steel wire and should be U-shaped with 8 in. legs and 2 in. crown.  Non-biodegradable RECPs are typically composed of polypropylene, polyethylene, nylon or other synthetic fibers. In some cases, a combination of biodegradable and synthetic fibers is used to construct the RECP. Netting used to hold these fibers together is typically non- biodegradable as well. - Plastic netting is a lightweight biaxially oriented netting designed for securing loose mulches like straw or paper to soil surfaces to establish vegetation. The netting is photodegradable. The netting is supplied in rolled strips, which must be secured with U- shaped staples or stakes in accordance with manufacturers’ recommendations. - Plastic mesh is an open weave geotextile that is composed of an extruded synthetic fiber woven into a mesh with an opening size of less than ¼ in. It is used with re- vegetation or may be used to secure loose fiber such as straw to the ground. The material is supplied in rolled strips, which must be secured to the soil with U-shaped staples or stakes in accordance with manufacturers’ recommendations. - Synthetic fiber with netting is a mat that is composed of durable synthetic fibers treated to resist chemicals and ultraviolet light. The mat is a dense, three dimensional mesh of synthetic (typically polyolefin) fibers stitched between two polypropylene nets. The mats are designed to be re-vegetated and provide a permanent composite system of soil, roots, and geomatrix. The material is furnished in rolled strips, which must be secured with U-shaped staples or stakes in accordance with manufacturers’ recommendations. - Bonded synthetic fibers consist of a three dimensional geomatrix nylon (or other synthetic) matting. Typically it has more than 90 percent open area, which facilitates root growth. It’s tough root reinforcing system anchors vegetation and protects against hydraulic lift and shear forces created by high volume discharges. It can be installed over prepared soil, followed by seeding into the mat. Once vegetated, it becomes an invisible composite system of soil, roots, and geomatrix. The material is furnished in rolled strips that must be secured with U-shaped staples or stakes in accordance with manufacturers’ recommendations. - Combination synthetic and biodegradable RECPs consist of biodegradable fibers, such as wood fiber or coconut fiber, with a heavy polypropylene net stitched to the top and a high strength continuous filament geomatrix or net stitched to the bottom. The material is designed to enhance re-vegetation. The material is furnished in rolled strips, Geotextiles and Mats EC-7 July 2012 California Stormwater BMP Handbook 6 of 12 Construction www.casqa.org which must be secured with U-shaped staples or stakes in accordance with manufacturers’ recommendations. Site Preparation  Proper soil preparation is essential to ensure complete contact of the RECP with the soil. Soil Roughening is not recommended in areas where RECPs will be installed.  Grade and shape the area of installation.  Remove all rocks, clods, vegetation or other obstructions so that the installed blankets or mats will have complete, direct contact with the soil.  Prepare seedbed by loosening 2 to 3 in. of topsoil. Seeding/Planting Seed the area before blanket installation for erosion control and re-vegetation. Seeding after mat installation is often specified for turf reinforcement application. When seeding prior to blanket installation, all areas disturbed during blanket installation must be re-seeded. Where soil filling is specified for turf reinforcement mats (TRMs), seed the matting and the entire disturbed area after installation and prior to filling the mat with soil. Fertilize and seed in accordance with seeding specifications or other types of landscaping plans. The protective matting can be laid over areas where grass has been planted and the seedlings have emerged. Where vines or other ground covers are to be planted, lay the protective matting first and then plant through matting according to design of planting. Check Slots Check slots shall be installed as required by the manufacturer. Laying and Securing Matting  Before laying the matting, all check slots should be installed and the seedbed should be friable, made free from clods, rocks, and roots. The surface should be compacted and finished according to the requirements of the manufacturer’s recommendations.  Mechanical or manual lay down equipment should be capable of handling full rolls of fabric and laying the fabric smoothly without wrinkles or folds. The equipment should meet the fabric manufacturer’s recommendations or equivalent standards. Anchoring  U-shaped wire staples, metal geotextile stake pins, or triangular wooden stakes can be used to anchor mats and blankets to the ground surface.  Wire staples should be made of minimum 11 gauge steel wire and should be U-shaped with 8 in. legs and 2 in. crown.  Metal stake pins should be 0.188 in. diameter steel with a 1.5 in. steel washer at the head of the pin, and 8 in. in length.  Wire staples and metal stakes should be driven flush to the soil surface. Geotextiles and Mats EC-7 July 2012 California Stormwater BMP Handbook 7 of 12 Construction www.casqa.org Installation on Slopes Installation should be in accordance with the manufacturer's recommendations. In general, these will be as follows:  Begin at the top of the slope and anchor the blanket in a 6 in. deep by 6 in. wide trench. Backfill trench and tamp earth firmly.  Unroll blanket down slope in the direction of water flow.  Overlap the edges of adjacent parallel rolls 2 to 3 in. and staple every 3 ft (or greater, per manufacturer’s specifications).  When blankets must be spliced, place blankets end over end (shingle style) with 6 in. overlap. Staple through overlapped area, approximately 12 in. apart.  Lay blankets loosely and maintain direct contact with the soil. Do not stretch.  Staple blankets sufficiently to anchor blanket and maintain contact with the soil. Staples should be placed down the center and staggered with the staples placed along the edges. Steep slopes, 1:1 (H:V) to 2:1 (H:V), require a minimum of 2 staples/yd2. Moderate slopes, 2:1 (H:V) to 3:1 (H:V), require a minimum of 1 ½ staples/yd2. Check manufacturer’s specifications to determine if a higher density staple pattern is required. Installation in Channels Installation should be in accordance with the manufacturer's recommendations. In general, these will be as follows:  Dig initial anchor trench 12 in. deep and 6 in. wide across the channel at the lower end of the project area.  Excavate intermittent check slots, 6 in. deep and 6 in. wide across the channel at 25 to 30 ft intervals along the channels.  Cut longitudinal channel anchor trenches 4 in. deep and 4 in. wide along each side of the installation to bury edges of matting, whenever possible extend matting 2 to 3 in. above the crest of the channel side slopes.  Beginning at the downstream end and in the center of the channel, place the initial end of the first roll in the anchor trench and secure with fastening devices at 12 in. intervals. Note: matting will initially be upside down in anchor trench.  In the same manner, position adjacent rolls in anchor trench, overlapping the preceding roll a minimum of 3 in.  Secure these initial ends of mats with anchors at 12 in. intervals, backfill and compact soil.  Unroll center strip of matting upstream. Stop at next check slot or terminal anchor trench. Unroll adjacent mats upstream in similar fashion, maintaining a 3 in. overlap. Geotextiles and Mats EC-7 July 2012 California Stormwater BMP Handbook 8 of 12 Construction www.casqa.org  Fold and secure all rolls of matting snugly into all transverse check slots. Lay mat in the bottom of the slot then fold back against itself. Anchor through both layers of mat at 12 in. intervals, then backfill and compact soil. Continue rolling all mat widths upstream to the next check slot or terminal anchor trench.  Alternate method for non-critical installations: Place two rows of anchors on 6 in. centers at 25 to 30 ft. intervals in lieu of excavated check slots.  Staple shingled lap spliced ends a minimum of 12 in. apart on 12 in. intervals.  Place edges of outside mats in previously excavated longitudinal slots; anchor using prescribed staple pattern, backfill, and compact soil.  Anchor, fill, and compact upstream end of mat in a 12 in. by 6 in. terminal trench.  Secure mat to ground surface using U-shaped wire staples, geotextile pins, or wooden stakes.  Seed and fill turf reinforcement matting with soil, if specified. Soil Filling (if specified for turf reinforcement mat (TRM)) Installation should be in accordance with the manufacturer’s recommendations. Typical installation guidelines are as follows:  After seeding, spread and lightly rake ½-3/4 inches of fine topsoil into the TRM apertures to completely fill TRM thickness. Use backside of rake or other flat implement.  Alternatively, if allowed by product specifications, spread topsoil using lightweight loader, backhoe, or other power equipment. Avoid sharp turns with equipment.  Always consult the manufacturer's recommendations for installation.  Do not drive tracked or heavy equipment over mat.  Avoid any traffic over matting if loose or wet soil conditions exist.  Use shovels, rakes, or brooms for fine grading and touch up.  Smooth out soil filling just exposing top netting of mat. Temporary Soil Stabilization Removal  Temporary soil stabilization removed from the site of the work must be disposed of if necessary. Costs Installed costs can be relatively high compared to other BMPs. Approximate costs for installed materials are shown below: Geotextiles and Mats EC-7 July 2012 California Stormwater BMP Handbook 9 of 12 Construction www.casqa.org Rolled Erosion Control Products Installed Cost per Acre (2004)1 Estimated Cost per Acre (2009)2 Biodegradable Jute Mesh $6,000-$7,000 $6,600-$7,700 Curled Wood Fiber $8,000-$10,500 $8,800-$11,050 Straw $8,000-$10,500 $8,800-$11,050 Wood Fiber $8,000-$10,500 $8,800-$11,050 Coconut Fiber $13,000-$14,000 $14,300-$15,400 Coconut Fiber Mesh $30,000-$33,000 $33,000-$36,300 Straw Coconut Fiber $10,000-$12,000 $11,000-$13,200 Non-Biodegradable Plastic Netting $2,000-$2,200 $2,200-$2,220 Plastic Mesh $3,000-$3,500 $3,300-$3,850 Synthetic Fiber with Netting $34,000-$40,000 $37,400-$44,000 Bonded Synthetic Fibers $45,000-$55,000 $49,500-$60,500 Combination with Biodegradable $30,000-$36,000 $33,000-$39,600 1. Source: Cost information received from individual product manufacturers solicited by Geosyntec Consultants (2004). 2. 2009 costs reflect a 10% escalation over year 2004 costs. Escalation based on informal survey of industry trends. Note: Expected cost increase is offset by competitive economic conditions. Inspection and Maintenance  RECPs must be inspected in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Areas where erosion is evident shall be repaired and BMPs reapplied as soon as possible. Care should be exercised to minimize the damage to protected areas while making repairs, as any area damaged will require reapplication of BMPs.  If washout or breakage occurs, re-install the material after repairing the damage to the slope or channel.  Make sure matting is uniformly in contact with the soil.  Check that all the lap joints are secure.  Check that staples are flush with the ground. References Erosion and Sediment Control Manual, Oregon Department of Environmental Quality, February 2005 Erosion Control Pilot Study Report, State of California Department of Transportation (Caltrans), June 2000. Guides for Erosion and Sediment Controls in California, USDA Soils Conservation Service, January 1991. Geotextiles and Mats EC-7 July 2012 California Stormwater BMP Handbook 10 of 12 Construction www.casqa.org National Management Measures to Control Nonpoint Source Pollution from Urban Areas, United States Environmental Protection Agency, 2002. Stormwater Quality Handbooks Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), March 2003. Guidance Document: Soil Stabilization for Temporary Slopes, State of California Department of Transportation (Caltrans), November 1999. Stormwater Management of the Puget Sound Basin, Technical Manual, Publication #91-75, Washington State Department of Ecology, February 1992. Water Quality Management Plan for The Lake Tahoe Region, Volume II, Handbook of Management Practices, Tahoe Regional Planning Agency, November 1988. Geotextiles and Mats EC-7 July 2012 California Stormwater BMP Handbook 11 of 12 Construction www.casqa.org Geotextiles and Mats EC-7 July 2012 California Stormwater BMP Handbook 12 of 12 Construction www.casqa.org Wood Mulching EC-8 January 2011 California Stormwater BMP Handbook 1 of 3 Construction www.casqa.org Description and Purpose Wood mulching consists of applying a mixture of shredded wood mulch, bark or compost to disturbed soils. The primary function of wood mulching is to reduce erosion by protecting bare soil from rainfall impact, increasing infiltration, and reducing runoff. Suitable Applications Wood mulching is suitable for disturbed soil areas requiring temporary protection until permanent stabilization is established. Limitations  Not suitable for use on slopes steeper than 3:1 (H:V). Best suited to flat areas or gentle slopes or 5:1 (H:V) or flatter.  Wood mulch and compost may introduce unwanted species.  Not suitable for areas exposed to concentrated flows.  May need to be removed prior to further earthwork. Implementation Mulch Selection There are many types of mulches. Selection of the appropriate type of mulch should be based on the type of application, site conditions, and compatibility with planned or future uses. Categories EC Erosion Control  SE Sediment Control TC Tracking Control WE Wind Erosion Control  NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control Legend:  Primary Objective  Secondary Objective Targeted Constituents Sediment  Nutrients Trash Metals Bacteria Oil and Grease Organics Potential Alternatives EC-3 Hydraulic Mulch EC-4 Hydroseeding EC-5 Soil Binders EC-6 Straw Mulch EC-7 Geotextiles and Mats If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Wood Mulching EC-8 January 2011 California Stormwater BMP Handbook 2 of 3 Construction www.casqa.org Application Procedures Prior to application, after existing vegetation has been removed, roughen embankment and fill areas by rolling with a device such as a punching type roller or by track walking. The construction application procedures for mulches vary significantly depending upon the type of mulching method specified. Two methods are highlighted here:  Green Material: This type of mulch is produced by the recycling of vegetation trimmings such as grass, shredded shrubs, and trees. Methods of application are generally by hand although pneumatic methods are available. ­ Green material can be used as a temporary ground cover with or without seeding. ­ The green material should be evenly distributed on site to a depth of not more than 2 in.  Shredded Wood: Suitable for ground cover in ornamental or revegetated plantings. ­ Shredded wood/bark is conditionally suitable. See note under limitations. ­ Distribute by hand or use pneumatic methods. ­ Evenly distribute the mulch across the soil surface to a depth of 2 to 3 in.  Avoid mulch placement onto roads, sidewalks, drainage channels, existing vegetation, etc. Costs Average annual cost for installation and maintenance (3-4 months useful life) is around $4,000 per acre, but cost can increase if the source is not close to the project site. Inspection and Maintenance  Inspect BMPs in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Areas where erosion is evident shall be repaired and BMPs reapplied as soon as possible. Care should be exercised to minimize the damage to protected areas while making repairs, as any area damaged will require reapplication of BMPs.  Regardless of the mulching technique selected, the key consideration in inspection and maintenance is that the mulch needs to last long enough to achieve erosion control objectives. If the mulch is applied as a stand alone erosion control method over disturbed areas (without seed), it should last the length of time the site will remain barren or until final re-grading and revegetation.  Where vegetation is not the ultimate cover, such as ornamental and landscape applications of bark or wood chips, inspection and maintenance should focus on longevity and integrity of the mulch.  Reapply mulch when bare earth becomes visible. Wood Mulching EC-8 January 2011 California Stormwater BMP Handbook 3 of 3 Construction www.casqa.org References Controlling Erosion of Construction Sites Agriculture Information Bulletin #347, U.S. Department of Agriculture (USDA), Natural Resources Conservation Service (NRCS) (formerly Soil Conservation Service – SCS). Guides for Erosion and Sediment Control in California, USDA Soils Conservation Service, January 1991. Manual of Standards of Erosion and Sediment Control Measures, Association of Bay Area Governments, May 1995. Proposed Guidance Specifying Management Measures for Sources of Nonpoint Pollution in Coastal Waters, Work Group Working Paper, USEPA, April 1992. Sedimentation and Erosion Control, An Inventory of Current Practices Draft, U.S. EPA, April 1990. Soil Erosion by Water Agricultural Information Bulletin #513, U.S. Department of Agriculture, Soil Conservation Service. Stormwater Quality Handbooks Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), November 2000. Water Quality Management Plan for the Lake Tahoe Region, Volume II, Handbook of Management Practices, Tahoe Regional Planning Agency, November 1988. Earth Dikes and Drainage Swales EC-9 November 2009 California Stormwater BMP Handbook 1 of 7 Construction www.casqa.org Description and Purpose An earth dike is a temporary berm or ridge of compacted soil used to divert runoff or channel water to a desired location. A drainage swale is a shaped and sloped depression in the soil surface used to convey runoff to a desired location. Earth dikes and drainage swales are used to divert off site runoff around the construction site, divert runoff from stabilized areas and disturbed areas, and direct runoff into sediment basins or traps. Suitable Applications Earth dikes and drainage swales are suitable for use, individually or together, where runoff needs to be diverted from one area and conveyed to another.  Earth dikes and drainage swales may be used: - To convey surface runoff down sloping land - To intercept and divert runoff to avoid sheet flow over sloped surfaces - To divert and direct runoff towards a stabilized watercourse, drainage pipe or channel - To intercept runoff from paved surfaces - Below steep grades where runoff begins to concentrate - Along roadways and facility improvements subject to flood drainage Categories EC Erosion Control  SE Sediment Control TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control Legend:  Primary Objective  Secondary Objective Targeted Constituents Sediment  Nutrients Trash Metals Bacteria Oil and Grease Organics Potential Alternatives None If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Earth Dikes and Drainage Swales EC-9 November 2009 California Stormwater BMP Handbook 2 of 7 Construction www.casqa.org - At the top of slopes to divert runon from adjacent or undisturbed slopes - At bottom and mid slope locations to intercept sheet flow and convey concentrated flows - Divert sediment laden runoff into sediment basins or traps Limitations Dikes should not be used for drainage areas greater than 10 acres or along slopes greater than 10 percent. For larger areas more permanent drainage structures should be built. All drainage structures should be built in compliance with local municipal requirements.  Earth dikes may create more disturbed area on site and become barriers to construction equipment.  Earth dikes must be stabilized immediately, which adds cost and maintenance concerns.  Diverted stormwater may cause downstream flood damage.  Dikes should not be constructed of soils that may be easily eroded.  Regrading the site to remove the dike may add additional cost.  Temporary drains and swales or any other diversion of runoff should not adversely impact upstream or downstream properties.  Temporary drains and swales must conform to local floodplain management requirements.  Earth dikes/drainage swales are not suitable as sediment trapping devices.  It may be necessary to use other soil stabilization and sediment controls such as check dams, plastics, and blankets, to prevent scour and erosion in newly graded dikes, swales, and ditches.  Sediment accumulation, scour depressions, and/or persistent non-stormwater discharges can result in areas of standing water suitable for mosquito production in drainage swales. Implementation The temporary earth dike is a berm or ridge of compacted soil, located in such a manner as to divert stormwater to a sediment trapping device or a stabilized outlet, thereby reducing the potential for erosion and offsite sedimentation. Earth dikes can also be used to divert runoff from off site and from undisturbed areas away from disturbed areas and to divert sheet flows away from unprotected slopes. An earth dike does not itself control erosion or remove sediment from runoff. A dike prevents erosion by directing runoff to an erosion control device such as a sediment trap or directing runoff away from an erodible area. Temporary diversion dikes should not adversely impact adjacent properties and must conform to local floodplain management regulations, and should not be used in areas with slopes steeper than 10%. Slopes that are formed during cut and fill operations should be protected from erosion by runoff. A combination of a temporary drainage swale and an earth dike at the top of a slope can divert Earth Dikes and Drainage Swales EC-9 November 2009 California Stormwater BMP Handbook 3 of 7 Construction www.casqa.org runoff to a location where it can be brought to the bottom of the slope (see EC-11, Slope Drains). A combination dike and swale is easily constructed by a single pass of a bulldozer or grader and compacted by a second pass of the tracks or wheels over the ridge. Diversion structures should be installed when the site is initially graded and remain in place until post construction BMPs are installed and the slopes are stabilized. Diversion practices concentrate surface runoff, increasing its velocity and erosive force. Thus, the flow out of the drain or swale must be directed onto a stabilized area or into a grade stabilization structure. If significant erosion will occur, a swale should be stabilized using vegetation, chemical treatment, rock rip-rap, matting, or other physical means of stabilization. Any drain or swale that conveys sediment laden runoff must be diverted into a sediment basin or trap before it is discharged from the site. General  Care must be applied to correctly size and locate earth dikes, drainage swales. Excessively steep, unlined dikes, and swales are subject to erosion and gully formation.  Conveyances should be stabilized.  Use a lined ditch for high flow velocities.  Select flow velocity based on careful evaluation of the risks due to erosion of the measure, soil types, overtopping, flow backups, washout, and drainage flow patterns for each project site.  Compact any fills to prevent unequal settlement.  Do not divert runoff onto other property without securing written authorization from the property owner.  When possible, install and utilize permanent dikes, swales, and ditches early in the construction process.  Provide stabilized outlets. Earth Dikes Temporary earth dikes are a practical, inexpensive BMP used to divert stormwater runoff. Temporary diversion dikes should be installed in the following manner:  All dikes should be compacted by earth moving equipment.  All dikes should have positive drainage to an outlet.  All dikes should have 2:1 or flatter side slopes, 18 in. minimum height, and a minimum top width of 24 in. Wide top widths and flat slopes are usually needed at crossings for construction traffic.  The outlet from the earth dike must function with a minimum of erosion. Runoff should be conveyed to a sediment trapping device such as a Sediment Trap (SE-3) or Sediment Basin Earth Dikes and Drainage Swales EC-9 November 2009 California Stormwater BMP Handbook 4 of 7 Construction www.casqa.org (SE-2) when either the dike channel or the drainage area above the dike are not adequately stabilized.  Temporary stabilization may be achieved using seed and mulching for slopes less than 5% and either rip-rap or sod for slopes in excess of 5%. In either case, stabilization of the earth dike should be completed immediately after construction or prior to the first rain.  If riprap is used to stabilize the channel formed along the toe of the dike, the following typical specifications apply: Channel Grade Riprap Stabilization 0.5-1.0% 4 in. Rock 1.1-2.0% 6 in. Rock 2.1-4.0% 8 in. Rock 4.1-5.0% 8 in. -12 in. Riprap  The stone riprap, recycled concrete, etc. used for stabilization should be pressed into the soil with construction equipment.  Filter cloth may be used to cover dikes in use for long periods.  Construction activity on the earth dike should be kept to a minimum. Drainage Swales Drainage swales are only effective if they are properly installed. Swales are more effective than dikes because they tend to be more stable. The combination of a swale with a dike on the downhill side is the most cost effective diversion. Standard engineering design criteria for small open channel and closed conveyance systems should be used (see the local drainage design manual). Unless local drainage design criteria state otherwise, drainage swales should be designed as follows:  No more than 5 acres may drain to a temporary drainage swale.  Place drainage swales above or below, not on, a cut or fill slope.  Swale bottom width should be at least 2 ft  Depth of the swale should be at least 18 in.  Side slopes should be 2:1 or flatter.  Drainage or swales should be laid at a grade of at least 1 percent, but not more than 15 percent.  The swale must not be overtopped by the peak discharge from a 10-year storm, irrespective of the design criteria stated above. Earth Dikes and Drainage Swales EC-9 November 2009 California Stormwater BMP Handbook 5 of 7 Construction www.casqa.org  Remove all trees, stumps, obstructions, and other objectionable material from the swale when it is built.  Compact any fill material along the path of the swale.  Stabilize all swales immediately. Seed and mulch swales at a slope of less than 5 percent, and use rip-rap or sod for swales with a slope between 5 and 15 percent. For temporary swales, geotextiles and mats (EC-7) may provide immediate stabilization.  Irrigation may be required to establish sufficient vegetation to prevent erosion.  Do not operate construction vehicles across a swale unless a stabilized crossing is provided.  Permanent drainage facilities must be designed by a professional engineer (see the local drainage design criteria for proper design).  At a minimum, the drainage swale should conform to predevelopment drainage patterns and capacities.  Construct the drainage swale with a positive grade to a stabilized outlet.  Provide erosion protection or energy dissipation measures if the flow out of the drainage swale can reach an erosive velocity. Costs  Cost ranges from $15 to $55 per ft for both earthwork and stabilization and depends on availability of material, site location, and access.  Small dikes: $2.50 - $6.50/linear ft; Large dikes: $2.50/yd3.  The cost of a drainage swale increases with drainage area and slope. Typical swales for controlling internal erosion are inexpensive, as they are quickly formed during routine earthwork. Inspection and Maintenance  Inspect BMPs prior to forecast rain, daily during extended rain events, after rain events, weekly during the rainy season, and at two-week intervals during the non-rainy season.  Inspect BMPs subject to non-stormwater discharges daily while non-stormwater discharges occur.  Inspect ditches and berms for washouts. Replace lost riprap, damaged linings or soil stabilizers as needed.  Inspect channel linings, embankments, and beds of ditches and berms for erosion and accumulation of debris and sediment. Remove debris and sediment and repair linings and embankments as needed.  Temporary conveyances should be completely removed as soon as the surrounding drainage area has been stabilized or at the completion of construction Earth Dikes and Drainage Swales EC-9 November 2009 California Stormwater BMP Handbook 6 of 7 Construction www.casqa.org References Erosion and Sediment Control Handbook, S.J. Goldman, K. Jackson, T.A. Bursetynsky, P.E., McGraw Hill Book Company, 1986. Manual of Standards of Erosion and Sediment Control Measures, Association of Bay Area Governments, May 1995. Metzger, M.E. 2004. Managing mosquitoes in stormwater treatment devices. University of California Division of Agriculture and Natural Resources, Publication 8125. On-line: http:// anrcatalog.ucdavis.edu/pdf/8125.pdf National Association of Home Builders (NAHB). Stormwater Runoff & Nonpoint Source Pollution Control Guide for Builders and Developers. National Association of Home Builders, Washington, D.C., 1995 National Management Measures to Control Nonpoint Source Pollution from Urban Areas, United States Environmental Protection Agency, 2002. Southeastern Wisconsin Regional Planning Commission (SWRPC). Costs of Urban Nonpoint Source Water Pollution Control Measures. Technical Report No. 31. Southeastern Wisconsin Regional Planning Commission, Waukesha, WI. 1991 Stormwater Quality Handbooks Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), November 2000. Stormwater Management of the Puget Sound Basin, Technical Manual, Publication #91-75, Washington State Department of Ecology, February 1992. Water Quality Management Plan for the Lake Tahoe Region, Volume II, Handbook of Management Practices, Tahoe Regional Planning Agency, November 1988. Earth Dikes and Drainage Swales EC-9 November 2009 California Stormwater BMP Handbook 7 of 7 Construction www.casqa.org Velocity Dissipation Devices EC-10 January 2011 California Stormwater BMP Handbook 1 of 5 Construction www.casqa.org Description and Purpose Outlet protection is a physical device composed of rock, grouted riprap, or concrete rubble, which is placed at the outlet of a pipe or channel to prevent scour of the soil caused by concentrated, high velocity flows. Suitable Applications Whenever discharge velocities and energies at the outlets of culverts, conduits, or channels are sufficient to erode the next downstream reach. This includes temporary diversion structures to divert runon during construction.  These devices may be used at the following locations: Outlets of pipes, drains, culverts, slope drains, diversion ditches, swales, conduits, or channels. Outlets located at the bottom of mild to steep slopes. Discharge outlets that carry continuous flows of water. Outlets subject to short, intense flows of water, such as flash floods. Points where lined conveyances discharge to unlined conveyances Limitations  Large storms or high flows can wash away the rock outlet protection and leave the area susceptible to erosion. Categories EC Erosion Control  SE Sediment Control TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control Legend:  Primary Objective  Secondary Objective Targeted Constituents Sediment  Nutrients Trash Metals Bacteria Oil and Grease Organics Potential Alternatives None If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Velocity Dissipation Devices EC-10 January 2011 California Stormwater BMP Handbook 2 of 5 Construction www.casqa.org  Sediment captured by the rock outlet protection may be difficult to remove without removing the rock.  Outlet protection may negatively impact the channel habitat.  Grouted riprap may break up in areas of freeze and thaw.  If there is not adequate drainage, and water builds up behind grouted riprap, it may cause the grouted riprap to break up due to the resulting hydrostatic pressure.  Sediment accumulation, scour depressions, and/or persistent non-stormwater discharges can result in areas of standing water suitable for mosquito production in velocity dissipation devices. Implementation General Outlet protection is needed where discharge velocities and energies at the outlets of culverts, conduits or channels are sufficient to erode the immediate downstream reach. This practice protects the outlet from developing small eroded pools (plange pools), and protects against gully erosion resulting from scouring at a culvert mouth. Design and Layout As with most channel design projects, depth of flow, roughness, gradient, side slopes, discharge rate, and velocity should be considered in the outlet design. Compliance to local and state regulations should also be considered while working in environmentally sensitive streambeds. General recommendations for rock size and length of outlet protection mat are shown in the rock outlet protection figure in this BMP and should be considered minimums. The apron length and rock size gradation are determined using a combination of the discharge pipe diameter and estimate discharge rate: Select the longest apron length and largest rock size suggested by the pipe size and discharge rate. Where flows are conveyed in open channels such as ditches and swales, use the estimated discharge rate for selecting the apron length and rock size. Flows should be same as the culvert or channel design flow but never the less than the peak 5 year flow for temporary structures planned for one rainy season, or the 10 year peak flow for temporary structures planned for two or three rainy seasons.  There are many types of energy dissipaters, with rock being the one that is represented in the attached figure.  Best results are obtained when sound, durable, and angular rock is used.  Install riprap, grouted riprap, or concrete apron at selected outlet. Riprap aprons are best suited for temporary use during construction. Grouted or wired tied rock riprap can minimize maintenance requirements.  Rock outlet protection is usually less expensive and easier to install than concrete aprons or energy dissipaters. It also serves to trap sediment and reduce flow velocities.  Carefully place riprap to avoid damaging the filter fabric. Velocity Dissipation Devices EC-10 January 2011 California Stormwater BMP Handbook 3 of 5 Construction www.casqa.org - Stone 4 in. to 6 in. may be carefully dumped onto filter fabric from a height not to exceed 12 in. - Stone 8 in. to 12 in. must be hand placed onto filter fabric, or the filter fabric may be covered with 4 in. of gravel and the 8 in. to 12 in. rock may be dumped from a height not to exceed 16 in. - Stone greater than 12 in. shall only be dumped onto filter fabric protected with a layer of gravel with a thickness equal to one half the D50 rock size, and the dump height limited to twice the depth of the gravel protection layer thickness.  For proper operation of apron: Align apron with receiving stream and keep straight throughout its length. If a curve is needed to fit site conditions, place it in upper section of apron.  Outlets on slopes steeper than 10 percent should have additional protection. Costs Costs are low if material is readily available. If material is imported, costs will be higher. Average installed cost is $150 per device. Inspection and Maintenance  Inspect BMPs in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Inspect BMPs subjected to non-stormwater discharges daily while non-stormwater discharges occur. Minimize areas of standing water by removing sediment blockages and filling scour depressions.  Inspect apron for displacement of the riprap and damage to the underlying fabric. Repair fabric and replace riprap that has washed away. If riprap continues to wash away, consider using larger material.  Inspect for scour beneath the riprap and around the outlet. Repair damage to slopes or underlying filter fabric immediately.  Temporary devices should be completely removed as soon as the surrounding drainage area has been stabilized or at the completion of construction. References County of Sacramento Improvement Standards, Sacramento County, May 1989. Erosion and Sediment Control Handbook, S.J. Goldman, K. Jackson, T.A. Bursztynsky, P.E., McGraw Hill Book Company, 1986. Handbook of Steel Drainage & Highway Construction, American Iron and Steel Institute, 1983. Velocity Dissipation Devices EC-10 January 2011 California Stormwater BMP Handbook 4 of 5 Construction www.casqa.org Manual of Standards of Erosion and Sediment Control Measures, Association of Bay Area Governments, May 1995. Metzger, M.E. 2004. Managing mosquitoes in stormwater treatment devices. University of California Division of Agriculture and Natural Resources, Publication 8125. On-line: http:// anrcatalog.ucdavis.edu/pdf/8125.pdf Stormwater Quality Handbooks Construction Site Best Management Practices (BMPs) Manual, state of California Department of Transportation (Caltrans), November 2000. Stormwater Management of the Puget Sound Basin, Technical Manual, Publication #91-75, Washington State Department of Ecology, February 1992. Water Quality Management Plan for the Lake Tahoe Region, Volume II, Handbook of Management Practices, Tahoe Regional Planning Agency, November 1988. Velocity Dissipation Devices EC-10 January 2011 California Stormwater BMP Handbook 5 of 5 Construction www.casqa.org Pipe Diameter inches Discharge ft3/s Apron Length, La ft Rip Rap D50 Diameter Min inches 12 5 10 10 13 4 6 18 10 20 30 40 10 16 23 26 6 8 12 16 24 30 40 50 60 16 26 26 30 8 8 12 16 For larger or higher flows consult a Registered Civil Engineer Source: USDA - SCS Slope Drains EC-11 January 2011 California Stormwater BMP Handbook 1 of 7 Construction www.casqa.org Description and Purpose A slope drain is a pipe used to intercept and direct surface runoff or groundwater into a stabilized watercourse, trapping device, or stabilized area. Slope drains are used with earth dikes and drainage ditches to intercept and direct surface flow away from slope areas to protect cut or fill slopes. Suitable Applications  Where concentrated flow of surface runoff must be conveyed down a slope in order to prevent erosion.  Drainage for top of slope diversion dikes or swales.  Drainage for top of cut and fill slopes where water can accumulate.  Emergency spillway for a sediment basin. Limitations Installation is critical for effective use of the pipe slope drain to minimize potential gully erosion.  Maximum drainage area per slope drain is 10 acres. (For large areas use a paved chute, rock lined channel, or additional pipes.)  Severe erosion may result when slope drains fail by overtopping, piping, or pipe separation. Categories EC Erosion Control  SE Sediment Control TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control Legend:  Primary Objective  Secondary Objective Targeted Constituents Sediment  Nutrients Trash Metals Bacteria Oil and Grease Organics Potential Alternatives EC-9 Earth Dike, Drainage Swales If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Slope Drains EC-11 January 2011 California Stormwater BMP Handbook 2 of 7 Construction www.casqa.org ­ During large storms, pipe slope drains may become clogged or over charged, forcing water around the pipe and causing extreme slope erosion. ­ If the sectional downdrain is not sized correctly, the runoff can spill over the drain sides causing gully erosion and potential failure of the structure.  Dissipation of high flow velocities at the pipe outlet is required to avoid downstream erosion.  Sediment accumulation, scour depressions, and/or persistent non-stormwater discharges can result in areas of standing water suitable for mosquito production in energy dissipaters associated with slope drain outlets. Implementation General The slope drain is applicable for any construction site where concentrated surface runoff can accumulate and must be conveyed down the slope in order to prevent erosion. The slope drain is effective because it prevents the stormwater from flowing directly down the slope by confining all the runoff into an enclosed pipe or channel. Due to the time lag between grading slopes and installation of permanent stormwater collection systems and slope stabilization measures, temporary provisions to intercept runoff are sometimes necessary. Particularly in steep terrain, slope drains can protect unstabilized areas from erosion. Installation The slope drain may be a rigid pipe, such as corrugated metal, a flexible conduit, or a lined terrace drain with the inlet placed on the top of a slope and the outlet at the bottom of the slope. This BMP typically is used in combination with a diversion control, such as an earth dike or drainage swale at the top of the slope. The following criteria must be considered when siting slope drains.  Permanent structures included in the project plans can often serve as construction BMPs if implemented early. However, the permanent structure must meet or exceed the criteria for the temporary structure.  Inlet structures must be securely entrenched and compacted to avoid severe gully erosion.  Slope drains must be securely anchored to the slope and must be adequately sized to carry the capacity of the design storm and associated forces.  Outlets must be stabilized with riprap, concrete or other type of energy dissipator, or directed into a stable sediment trap or basin. See EC-10, Velocity Dissipation Devices.  Debris racks are recommended at the inlet. Debris racks located several feet upstream of the inlet can usually be larger than racks at the inlet, and thus provide enhanced debris protection and less plugging.  Safety racks are also recommended at the inlet and outlet of pipes where children or animals could become entrapped.  Secure inlet and surround with dikes to prevent gully erosion and anchor pipe to slope. Slope Drains EC-11 January 2011 California Stormwater BMP Handbook 3 of 7 Construction www.casqa.org  When using slope drains, limit drainage area to 10 acres per pipe. For larger areas, use a rock lined channel or a series of pipes.  Size to convey at least the peak flow of a 10-year storm. The design storm is conservative due to the potential impact of system failures.  Maximum slope generally limited to 2:1 (H:V) as energy dissipation below steeper slopes is difficult.  Direct surface runoff to slope drains with interceptor dikes. See BMP EC-9, Earth Dikes and Drainage Swales. Top of interceptor dikes should be 12 in. higher than the top of the slope drain.  Slope drains can be placed on or buried underneath the slope surface.  Recommended materials include both metal and plastic pipe, either corrugated or smooth wall. Concrete pipe can also be used.  When installing slope drains: ­ Install slope drains perpendicular to slope contours. ­ Compact soil around and under entrance, outlet, and along length of pipe. ­ Securely anchor and stabilize pipe and appurtenances into soil. ­ Check to ensure that pipe connections are watertight. ­ Protect area around inlet with filter cloth. Protect outlet with riprap or other energy dissipation device. For high energy discharges, reinforce riprap with concrete or use reinforced concrete device. ­ Protect outlet of slope drains using a flared end section when outlet discharges to a flexible energy dissipation device. ­ A flared end section installed at the inlet will improve flow into the slope drain and prevent erosion at the pipe entrance. Use a flared end section with a 6 in. minimum toe plate to help prevent undercutting. The flared section should slope towards the pipe inlet. Design and Layout The capacity for temporary drains should be sufficient to convey at least the peak runoff from a 10-year rainfall event. The pipe size may be computed using the Rational Method or a method established by the local municipality. Higher flows must be safely stored or routed to prevent any offsite concentration of flow and any erosion of the slope. The design storm is purposely conservative due to the potential impacts associated with system failures. As a guide, temporary pipe slope drains should not be sized smaller than shown in the following table: Slope Drains EC-11 January 2011 California Stormwater BMP Handbook 4 of 7 Construction www.casqa.org Minimum Pipe Diameter (Inches) Maximum Drainage Area (Acres) 12 1.0 18 3.0 21 5.0 24 7.0 30 10.0 Larger drainage areas can be treated if the area can be subdivided into areas of 10 acres or less and each area is treated as a separate drainage. Drainage areas exceeding 10 acres must be designed by a Registered Civil Engineer and approved by the agency that issued the grading permit. Materials: Soil type, rainfall patterns, construction schedule, local requirements, and available supply are some of the factors to be considered when selecting materials. The following types of slope drains are commonly used:  Rigid Pipe: This type of slope drain is also known as a pipe drop. The pipe usually consists of corrugated metal pipe or rigid plastic pipe. The pipe is placed on undisturbed or compacted soil and secured onto the slope surface or buried in a trench. Concrete thrust blocks must be used when warranted by the calculated thrust forces. Collars should be properly installed and secured with metal strappings or watertight collars.  Flexible Pipe: The flexible pipe slope drain consists of a flexible tube of heavy duty plastic, rubber, or composite material. The tube material is securely anchored onto the slope surface. The tube should be securely fastened to the metal inlet and outlet conduit sections with metal strappings or watertight collars.  Section Downdrains: The section downdrain consists of pre-fabricated, section conduit of half round or third round material. The sectional downdrain performs similar to a flume or chute. The pipe must be placed on undisturbed or compacted soil and secured into the slope.  Concrete-lined Terrace Drain: This is a concrete channel for draining water from a terrace on a slope to the next level. These drains are typically specified as permanent structures and if installed early, can serve as slope drains during construction, which should be designed according to local drainage design criteria. Costs  Cost varies based on pipe selection and selected outlet protection. Slope Drains EC-11 January 2011 California Stormwater BMP Handbook 5 of 7 Construction www.casqa.org Corrugated Steel Pipes, Per Foot Size Supplied and Installed Cost (No Trenching Included) 12” $19.60 per LF 15” $22.00 18” $26.00 24” $32.00 30” $50.00 PVC Pipes, Per Foot Size Supplied and Installed Cost (No Trenching Included) 12” $24.50 14” $49.00 16” $51.00 18” $54.00 20” $66.00 24” $93.00 30” $130.00 Inspection and Maintenance  Inspect BMPs in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Inspect BMPs subjected to non-stormwater discharges daily while non-stormwater discharges occur. Minimize areas of standing water by removing sediment blockages and filling scour depressions.  Inspect outlet for erosion and downstream scour. If eroded, repair damage and install additional energy dissipation measures. If downstream scour is occurring, it may be necessary to reduce flows being discharged into the channel unless other preventative measures are implemented.  Insert inlet for clogging or undercutting. Remove debris from inlet to maintain flows. Repair undercutting at inlet and if needed, install flared section or rip rap around the inlet to prevent further undercutting.  Inspect pipes for leakage. Repair leaks and restore damaged slopes.  Inspect slope drainage for accumulations of debris and sediment. Slope Drains EC-11 January 2011 California Stormwater BMP Handbook 6 of 7 Construction www.casqa.org  Remove built up sediment from entrances and outlets as required. Flush drains if necessary; capture and settle out sediment from discharge.  Make sure water is not ponding onto inappropriate areas (e.g., active traffic lanes, material storage areas, etc.).  Pipe anchors must be checked to ensure that the pipe remains anchored to the slope. Install additional anchors if pipe movement is detected. References Draft – Sedimentation and Erosion Control, An Inventory of Current Practices, U.S.E.P.A., April 1990. Metzger, M.E. 2004. Managing mosquitoes in stormwater treatment devices. University of California Division of Agriculture and Natural Resources, Publication 8125. On-line: http:// anrcatalog.ucdavis.edu/pdf/8125.pdf National Association of Home Builders (NAHB). Stormwater Runoff & Nonpoint Source Pollution Control Guide for Builders and Developers. National Association of Home Builders, Washington, D.C., 1995 National Management Measures to Control Nonpoint Source Pollution from Urban Areas, United States Environmental Protection Agency, 2002. Stormwater Quality Handbooks Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), November 2000. Stormwater Management of the Puget Sound Basin, Technical Manual, Publication #91-75, Washington State Department of Ecology, February 1992. Water Quality Management Plan for the Lake Tahoe Region, Volume II, Handbook of Management Practices, Tahoe Regional Planning Agency, November 1988. Slope Drains EC-11 January 2011 California Stormwater BMP Handbook 7 of 7 Construction www.casqa.org Streambank Stabilization EC-12 January 2011 California Stormwater BMP Handbook 1 of 10 Construction www.casqa.org Description and Purpose Stream channels, streambanks, and associated riparian areas are dynamic and sensitive ecosystems that respond to changes in land use activity. Streambank and channel disturbance resulting from construction activities can increase the stream’s sediment load, which can cause channel erosion or sedimentation and have adverse affects on the biotic system. BMPs can reduce the discharge of sediment and other pollutants to minimize the impact of construction activities on watercourses. Streams on the 303(d) list and listed for sediment may require numerous measures to prevent any increases in sediment load to the stream. Suitable Applications These procedures typically apply to all construction projects that disturb or occur within stream channels and their associated riparian areas. Limitations Specific permit requirements or mitigation measures such as Regional Water Quality Control Board (RWQCB) 401 Certification, U.S. Army Corps of Engineers 404 permit and approval by California Department of Fish and Game supercede the guidance in this BMP.  If numerical based water quality standards are mentioned in any of these and other related permits, testing and sampling may be required. Streams listed as 303(d) impaired for sediment, silt, or turbidity, are required to Categories EC Erosion Control  SE Sediment Control  TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control  WM Waste Management and Materials Pollution Control Legend:  Primary Objective  Secondary Objective Targeted Constituents Sediment  Nutrients Trash Metals Bacteria Oil and Grease Organics Potential Alternatives Combination of erosion and sediment controls. If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Streambank Stabilization EC-12 January 2011 California Stormwater BMP Handbook 2 of 10 Construction www.casqa.org conduct sampling to verify that there is no net increase in sediment load due to construction activities. Implementation Planning  Proper planning, design, and construction techniques can minimize impacts normally associated with in stream construction activities. Poor planning can adversely affect soil, fish, wildlife resources, land uses, or land users. Planning should take into account: scheduling; avoidance of in-stream construction; minimizing disturbance area and construction time period; using pre-disturbed areas; selecting crossing location; and selecting equipment. Scheduling  Construction activities should be scheduled according to the relative sensitivity of the environmental concerns and in accordance with EC-1, Scheduling. Scheduling considerations will be different when working near perennial streams vs. ephemeral streams and are as follows.  When in-stream construction is conducted in a perennial stream, work should optimally be performed during the rainy season. This is because in the summer, any sediment-containing water that is discharged into the watercourse will cause a large change in both water clarity and water chemistry. During the rainy season, there is typically more and faster flowing water in the stream so discharges are diluted faster. However, should in-stream work be scheduled for summer, establishing an isolation area, or diverting the stream, will significantly decrease the amount of sediment stirred up by construction work. Construction work near perennial streams should optimally be performed during the dry season (see below).  When working in or near ephemeral streams, work should be performed during the dry season. By their very nature, ephemeral streams are usually dry in the summer, and therefore, in-stream construction activities will not cause significant water quality problems. However, when tying up the site at the end of the project, wash any fines (see Washing Fines) that accumulated in the channel back into the bed material, to decrease pollution from the first rainstorm of the season.  When working near ephemeral or perennial streams, erosion and sediment controls (see silt fences, straw bale barriers, etc.) should be implemented to keep sediment out of stream channel. Minimize Disturbance  Minimize disturbance through: selection of the narrowest crossing location; limiting the number of equipment trips across a stream during construction; and, minimizing the number and size of work areas (equipment staging areas and spoil storage areas). Place work areas at least 50 ft from stream channel. Field reconnaissance should be conducted during the planning stage to identify work areas. Use of Pre-Disturbed Areas  Locate project sites and work areas in areas disturbed by prior construction or other activity when possible. Streambank Stabilization EC-12 January 2011 California Stormwater BMP Handbook 3 of 10 Construction www.casqa.org Selection of Project Site  Avoid steep and unstable banks, highly erodible or saturated soils, or highly fractured rock.  Select project site that minimizes disturbance to aquatic species or habitat. Equipment Selection  Select equipment that reduces the amount of pressure exerted on the ground surface, and therefore, reduces erosion potential and/or use overhead or aerial access for transporting equipment across drainage channels. Use equipment that exerts ground pressures of less than 5 or 6 lb/in2, where possible. Low ground pressure equipment includes: wide or high flotation tires (34 to 72 in. wide); dual tires; bogie axle systems; tracked machines; lightweight equipment; and, central tire inflation systems. Streambank Stabilization Preservation of Existing Vegetation  Preserve existing vegetation in accordance with EC-2, Preservation of Existing Vegetation. In a streambank environment, preservation of existing vegetation provides the following benefits. Water Quality Protection  Vegetated buffers on slopes trap sediment and promote groundwater recharge. The buffer width needed to maintain water quality ranges from 15 to 100 ft. On gradual slopes, most of the filtering occurs within the first 30 ft. Steeper slopes require a greater width of vegetative buffer to provide water quality benefits. Streambank Stabilization  The root system of riparian vegetation stabilizes streambanks by increasing tensile strength in the soil. The presence of vegetation modifies the moisture condition of slopes (infiltration, evapo transpiration, interception) and increases bank stability. Riparian Habitat  Buffers of diverse riparian vegetation provide food and shelter for riparian and aquatic organisms. Minimizing impacts to fisheries habitat is a major concern when working near streams and rivers. Riparian vegetation provides shade, shelter, organic matter (leaf detritus and large woody debris), and other nutrients that are necessary for fish and other aquatic organisms. Buffer widths for habitat concerns are typically wider than those recommended for water quality concerns (100 to 1500 ft).  When working near watercourses, it is important to understand the work site’s placement in the watershed. Riparian vegetation in headwater streams has a greater impact on overall water quality than vegetation in downstream reaches. Preserving existing vegetation upstream is necessary to maintain water quality, minimize bank failure, and maximize riparian habitat, downstream of the work site. Limitations  Local county and municipal ordinances regarding width, extent and type of vegetative buffer required may exceed the specifications provided here; these ordinances should be investigated prior to construction. Streambank Stabilization EC-12 January 2011 California Stormwater BMP Handbook 4 of 10 Construction www.casqa.org Streambank Stabilization Specific Installation  As a general rule, the width of a buffer strip between a road and the stream is recommended to be 50 ft plus four times the percent slope of the land, measured between the road and the top of stream bank. Hydraulic Mulch  Apply hydraulic mulch on disturbed streambanks above mean high water level in accordance with EC-3, Hydraulic Mulch to provide temporary soil stabilization. Limitations  Do not place hydraulic mulch or tackifiers below the mean high water level, as these materials could wash into the channel and impact water quality or possibly cause eutrophication (eutrophication is an algal bloom caused by excessively high nutrient levels in the water). Hydroseeding  Hydroseed disturbed streambanks in accordance with EC-4, Hydroseeding. Limitations  Do not place tackifiers or fertilizers below the mean high water level, as these materials could wash into the channel and impact water quality or possibly cause eutrophication. Soil Binders  Apply soil binders to disturbed streambanks in accordance with EC-5, Soil Binders. Limitations  Do not place soil binders below the mean high water level. Soil binder must be environmentally benign and non-toxic to aquatic organisms. Straw Mulch  Apply straw mulch to disturbed streambanks in accordance with EC-6, Straw Mulch. Limitations  Do not place straw mulch below the mean high water level, as this material could wash into the channel and impact water quality or possibly cause eutrophication. Geotextiles and Mats  Install geotextiles and mats as described in EC-7, Geotextiles and Mats, to stabilize disturbed channels and streambanks. Not all applications should be in the channel, for example, certain geotextile netting may snag fish gills and are not appropriate in fish bearing streams. Geotextile fabrics that are not biodegradable are not appropriate for in stream use. Additionally, geotextile fabric or blankets placed in channels must be adequate to sustain anticipated hydraulic forces. Earth Dikes, Drainage Swales, and Lined Ditches  Convey, intercept, or divert runoff from disturbed streambanks using EC-9, Earth Dikes and Drainage Swales. Streambank Stabilization EC-12 January 2011 California Stormwater BMP Handbook 5 of 10 Construction www.casqa.org Limitations  Do not place earth dikes in watercourses, as these structures are only suited for intercepting sheet flow, and should not be used to intercept concentrated flow.  Appropriately sized velocity dissipation devices (EC-10) must be placed at outlets to minimize erosion and scour. Velocity Dissipation Devices  Place velocity dissipation devices at outlets of pipes, drains, culverts, slope drains, diversion ditches, swales, conduits or channels in accordance with EC-10, Velocity Dissipation Devices. Slope Drains  Use slope drains to intercept and direct surface runoff or groundwater into a stabilized watercourse, trapping device or stabilized area in accordance with EC-11, Slope Drains. Limitations  Appropriately sized outlet protection and velocity dissipation devices (EC-10) must be placed at outlets to minimize erosion and scour. Streambank Sediment Control Silt Fences  Install silt fences in accordance with SE-1, Silt Fence, to control sediment. Silt fences should only be installed where sediment laden water can pond, thus allowing the sediment to settle out. Fiber Rolls  Install fiber rolls in accordance with SE-5, Fiber Rolls, along contour of slopes above the high water level to intercept runoff, reduce flow velocity, release the runoff as sheet flow and provide removal of sediment from the runoff. In a stream environment, fiber rolls should be used in conjunction with other sediment control methods such as SE-1, Silt Fence or SE-9 Straw Bale Barrier. Install silt fence, straw bale barrier, or other erosion control method along toe of slope above the high water level. Gravel Bag Berm  A gravel bag berm or barrier can be utilized to intercept and slow the flow of sediment laden sheet flow runoff in accordance with SE-6, Gravel Bag Berm. In a stream environment gravel bag barriers can allow sediment to settle from runoff before water leaves the construction site and can be used to isolate the work area from the live stream. Limitations  Gravel bag barriers are not recommended as a perimeter sediment control practice around streams. Straw Bale Barrier  Install straw bale barriers in accordance with SE-9, Straw Bale Barrier, to control sediment. Straw bale barriers should only be installed where sediment laden water can pond, thus allowing the sediment to settle out. Install a silt fence in accordance with SE-1, Silt Fence, Streambank Stabilization EC-12 January 2011 California Stormwater BMP Handbook 6 of 10 Construction www.casqa.org on down slope side of straw bale barrier closest to stream channel to provide added sediment control. Rock Filter Description and Purpose Rock filters are temporary erosion control barriers composed of rock that is anchored in place. Rock filters detain the sediment laden runoff, retain the sediment, and release the water as sheet flow at a reduced velocity. Typical rock filter installations are illustrated at the end of this BMP. Applications  Near the toe of slopes that may be subject to flow and rill erosion. Limitations  Inappropriate for contributing drainage areas greater than 5 acres.  Requires sufficient space for ponded water.  Ineffective for diverting runoff because filters allow water to slowly seep through.  Rock filter berms are difficult to remove when construction is complete.  Unsuitable in developed areas or locations where aesthetics is a concern. Specifications  Rock: open graded rock, 0.75 to 5 in. for concentrated flow applications.  Woven wire sheathing: 1 in. diameter, hexagonal mesh, galvanized 20gauge (used with rock filters in areas of concentrated flow).  In construction traffic areas, maximum rock berm heights should be 12 in. Berms should be constructed every 300 ft on slopes less than 5%, every 200 ft on slopes between 5% and 10%, and every 100 ft on slopes greater than 10%. Maintenance  Inspect and verify that activity-based BMPs are in place prior to the commencement of associated activities. While activities associated with the BMP are under way, inspect weekly during the rainy season and at two-week intervals in the non-rainy season to verify continued BMP implementation.  Inspect BMPs subject to non-stormwater discharges daily while non-stormwater discharges occur.  Reshape berms as needed and replace lost or dislodged rock, and filter fabric.  Sediment that accumulates in the BMP must be periodically removed in order to maintain BMP effectiveness. Sediment should be removed when the sediment accumulation reaches one third of the barrier height. Sediment removed during maintenance may be incorporated into earthwork on the site or disposed at an appropriate location. Streambank Stabilization EC-12 January 2011 California Stormwater BMP Handbook 7 of 10 Construction www.casqa.org K-rail Description and Purpose This is temporary sediment control that uses K-rails to form the sediment deposition area, or to isolate the near bank construction area. Install K-rails at toe of slope in accordance with procedures described in NS-5, Clear Water Diversion. Barriers are placed end to end in a pre-designed configuration and gravel filled bags are used at the toe of the barrier and at their abutting ends to seal and prevent movement of sediment beneath or through the barrier walls. Appropriate Applications  This technique is useful at the toe of embankments, cuts or fills slopes. Limitations  The K-rail method should not be used to dewater a project site, as the barrier is not watertight. Implementation  Refer to NS-5, Clear Water Diversion, for implementation requirements. Instream Construction Sediment Control There are three different options currently available for reducing turbidity while working in a stream or river. The stream can be isolated from the area in which work is occurring by means of a water barrier, the stream can be diverted around the work site through a pipe or temporary channel, or one can employ construction practices that minimize sediment suspension. Whatever technique is implemented, an important thing to remember is that dilution can sometimes be the solution. A probable “worst time” to release high TSS into a stream system might be when the stream is very low; summer low flow, for example. During these times, the flow may be low while the biological activity in the stream is very high. Conversely, the addition of high TSS or sediment during a big storm discharge might have a relatively low impact, because the stream is already turbid, and the stream energy is capable of transporting both suspended solids, and large quantities of bedload through the system. The optimum time to “pull” in-stream structures may be during the rising limb of a storm hydrograph. Techniques to minimize Total Suspended Solids (TSS)  Padding - Padding laid in the stream below the work site may trap some solids that are deposited in the stream during construction. After work is done, the padding is removed from the stream, and placed on the bank to assist in re-vegetation.  Clean, washed gravel - Using clean, washed gravel decreases solid suspension, as there are fewer small particles deposited in the stream.  Excavation using a large bucket - Each time a bucket of soil is placed in the stream, a portion is suspended. Approximately the same amount is suspended whether a small amount of soil is placed in the stream, or a large amount. Therefore, using a large excavator bucket instead of a small one, will reduce the total amount of soil that washes downstream. Streambank Stabilization EC-12 January 2011 California Stormwater BMP Handbook 8 of 10 Construction www.casqa.org  Use of dozer for backfilling - Using a dozer for backfilling instead of a backhoe follows the same principles – the fewer times soil is deposited in the stream, the less soil will be suspended.  Partial dewatering with a pump - Partially dewatering a stream with a pump reduces the amount of water, and thus the amount of water that can suspend sediment. Washing Fines Definition and Purpose  Washing fines is an “in-channel” sediment control method, which uses water, either from a water truck or hydrant, to wash stream fines that were brought to the surface of the channel bed during restoration, back into the interstitial spaces of the gravel and cobbles.  The purpose of this technique is to reduce or eliminate the discharge of sediment from the channel bottom during the first seasonal flow. Sediment should not be allowed into stream channels; however, occasionally in-channel restoration work will involve moving or otherwise disturbing fines (sand and silt sized particles) that are already in the stream, usually below bankfull discharge elevation. Subsequent re-watering of the channel can result in a plume of turbidity and sedimentation.  This technique washes the fines back into the channel bed. Bedload materials, including gravel cobbles, boulders and those fines, are naturally mobilized during higher storm flows. This technique is intended to delay the discharge until the fines would naturally be mobilized. Appropriate Applications  This technique should be used when construction work is required in channels. It is especially useful in intermittent or ephemeral streams in which work is performed “in the dry”, and which subsequently become re-watered. Limitations  The stream must have sufficient gravel and cobble substrate composition.  The use of this technique requires consideration of time of year and timing of exp ected stream flows.  The optimum time for the use of this technique is in the fall, prior to winter flows.  Consultation with, and approval from the Department of Fish and Game and the Regional Water Quality Control Board may be required. Implementation  Apply sufficient water to wash fines, but not cause further erosion or runoff.  Apply water slowly and evenly to prevent runoff and erosion.  Consult with Department of Fish and Game and the Regional Water Quality Control Board for specific water quality requirements of applied water (e.g. chlorine). Streambank Stabilization EC-12 January 2011 California Stormwater BMP Handbook 9 of 10 Construction www.casqa.org Inspection and Maintenance  None necessary Costs Cost may vary according to the combination of practices implemented. Inspection and Maintenance  Inspect and verify that activity-based BMPs are in place prior to the commencement of associated activities. While activities associated with the BMP are under way, inspect BMPs in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events until final stabilization is achieved.  Inspect BMPs subject to non-stormwater discharges daily while non-stormwater discharges occur.  Inspect and repair equipment (for damaged hoses, fittings, and gaskets). References Manual of Standards of Erosion and Sediment Control Measures, Association of Bay Area Governments, May 1995. Proposed Guidance Specifying Management Measures for Sources of Nonpoint Pollution in Coastal Waters, Work Group Working Paper, USEPA, April 1992. Sedimentation and Erosion Control Practices, An Inventory of Current Practices (Draft), UESPA, 1990. Stormwater Quality Handbooks Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), November 2000. Stormwater Management for Construction Activities, Developing Pollution Prevention Plans and Best Management Practices, EPA 832-R-92005; USEPA, April 1992. Water Quality Management Plan for the Lake Tahoe Region, Volume II, Handbook of Management Practices, Tahoe Regional Planning Agency, November 1988. Streambank Stabilization EC-12 January 2011 California Stormwater BMP Handbook 10 of 10 Construction www.casqa.org Reserved EC-13 November 2009 California Stormwater BMP Handbook 1 of 1 Construction www.casqa.org BMP Factsheet removed in 2009. Formerly PAM. See SE-11, Active Treatment Systems. Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control Legend:  Primary Category  Secondary Category Targeted Constituents Sediment Nutrients Trash Metals Bacteria Oil and Grease Organics Potential Alternatives If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Compost Blanket EC-14 July 2012 California Stormwater BMP Handbook 1 of 6 Construction www.casqa.org Description and Purpose A compost blanket is applied to slopes and earth disturbed areas to prevent erosion, and in some cases, increase infiltration and/or establish vegetation. The compost blanket can be applied by hand, conveyor system, compost spreader, or pneumatic delivery (blower) system. The blanket thickness is determined from the slope steepness and anticipated precipitation. A compost blanket protects the soil surface from raindrop erosion, particularly rills and gullies that may form under other methods of erosion control. A compost blanket, if properly installed, can be very successful at vegetation establishment, weed suppression and erosion control. The compost blanket comes into direct contact with the underlying soil, reducing rill formation. Furthermore, compost provides organic matter and nutrients important for vegetation growth. The compost blanket provides soil structure that allows water to infiltrate the soil surface and retain moisture, which also promotes seed germination and vegetation growth, in addition to reducing runoff. Compost is typically derived from combinations of feedstocks, biosolids, leaf and yard trimmings, manure, wood, or mixed solid waste. Many types of compost are products of municipal recycle or "Greenwaste" programs. Compost is organic and biodegradable and can be left onsite. There are many types of compost with a variety of properties with specific functions, and accordingly, compost selection is an important design consideration in the application of this type of erosion control. Categories EC Erosion Control  SE Sediment Control TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control Legend:  Primary Category  Secondary Category Targeted Constituents Sediment  Nutrients Trash Metals Bacteria Oil and Grease Organics Potential Alternatives EC-3 Hydraulic Mulch EC-4 Hydroseeding EC-5 Soil Binders EC-7 Geotextiles and Mats EC-8 Wood Mulching If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Compost Blanket EC-14 July 2012 California Stormwater BMP Handbook 2 of 6 Construction www.casqa.org Suitable Applications A compost blanket is appropriate for slopes and earth disturbed areas requiring protection until permanent stabilization is established. A compost blanket can also used in combination with temporary and/or permanent seeding strategies to enhance plant establishment. Examples include:  Rough-graded areas that will remain inactive for longer than 14 days  Soil stockpiles  Slopes with exposed soil between existing vegetation such as trees or shrubs  Slopes planted with live, container-grown vegetation  Disturbed areas where plants are slow to develop A compost blanket is typically used on slopes of 2:1 (H:V) or gentler. However, a compost blanket can be effective when applied to slopes as steep as 1:1 (H:V) with appropriate design considerations including slope length, blanket thickness, adding components such as a tackifier, or using compost blankets in conjunction with other techniques, such as compost socks and berms or fiber rolls. Compost can be pre-seeded prior to application to the soil (recommended by the EPA for construction site stormwater runoff control) or seeded after the blanket has been installed. The compost medium can also remove pollutants in stormwater including heavy metals; oil and grease; and hydrocarbons (USEPA, 1998). Limitations  Compost can potentially leach nutrients (dissolved phosphorus and nitrogen) into runoff and potentially impact water quality. Compost should not be used directly upstream from nutrient impaired waterbodies (Adams et. al, 2008).  Compost may also contain other undesirable constituents that are detrimental to water quality. Carefully consider the qualifications and experience of any compost producer/supplier.  A compost blanket applied by hand is more time intensive and potentially costly. Using a pneumatic blower truck is the recommended cost effective method of application.  When blowers are used, the treatment areas should be within 300 ft of a road or surface capable of supporting trucks.  Wind may limit application of compost and result in application to undesired locations.  Compost blankets should not be applied in areas of concentrated flows.  Steeper slopes may require additional blanket thickness and other stability measures such as using tackifiers or slope interruption devices (compost socks and berms, or fiber rolls). The same applies for sites with high precipitation totals or during the rainy season. Compost Blanket EC-14 July 2012 California Stormwater BMP Handbook 3 of 6 Construction www.casqa.org Implementation  Additional guidance on the comparison and selection of temporary slope stabilization methods is provided in Appendix F of the Handbook. Compost Materials  California Compost Regulations (Title 14, California Code of Regulations, Division 7, Chapter 3.1, Article 7, Section 17868.3) define and require a quality of compost for application. Compost should comply with all physical and chemical requirements. Specific requirements are provided in Table 1 below, taken from Caltrans Standard Special Provision 10-1 (SSP 10-1), Erosion Control (Compost Blanket).  The compost producer should be fully permitted as specified under the California Integrated Waste Management Board, Local Enforcement Agencies and any other State and Local Agencies that regulate Solid Waste Facilities. If exempt from State permitting requirements, the composting facility should certify that it follows guidelines and procedures for production of compost meeting the environmental health standards of Title 14, California Code of Regulations, Division 7, Chapter 3.1, Article 7.  The compost producer should be a participant in United States Composting Council's Seal of Testing Assurance program.  Compost moisture should be considered for composition quality and application purposes. A range of 30-50% is typical. Compost that is too dry is hard to apply and compost that is too wet is more difficult (and more expensive) to transport. For arid or semi-arid areas, or for application during the dry season, use compost with greater moisture content than areas with wetter climates. For wetter or more humid climates or for application during the wet season, drier composts can be used as the compost will absorb moisture from the ambient air.  Organic content of the compost is also important and should range from 30 to 65% depending on site conditions.  Compost should be high-quality mature compost. Immature compost can potentially leach nutrients.  Compost should not be derived from mixed municipal solid waste and should be free of visible contaminants.  Compost should not contain paint, petroleum products, pesticides or any other chemical residues harmful to animal life or plant growth. Metal concentrations in compost should not exceed the maximum metal concentrations listed under Title 14, California Code of Regulations, Division 7, Chapter 3.1, Section 17868.2.  Compost should not possess objectionable odors.  Compost should be weed free. Compost Blanket EC-14 July 2012 California Stormwater BMP Handbook 4 of 6 Construction www.casqa.org Table 1. Physical/Chemical Requirements of Compost Reference - Caltrans SSP-10 Erosion Control Blanket (Compost) Property Test Method Requirement pH *TMECC 04.11-A Elastometric pH 1:5 Slurry Method pH Units 6.0–8.0 Soluble Salts TMECC 04.10-A Electrical Conductivity 1:5 Slurry Method dS/m (mmhos/cm) 0-10.0 Moisture Content TMECC 03.09-A Total Solids & Moisture at 70+/- 5 deg C % Wet Weight Basis 30-60 Organic Matter Content TMECC 05.07-A Loss-On-Ignition Organic Matter Method (LOI) % Dry Weight Basis 30–65 Maturity TMECC 05.05-A Germination and Vigor Seed Emergence Seedling Vigor % Relative to Positive Control 80 or Above 80 or Above Stability TMECC 05.08-B Carbon Dioxide Evolution Rate mg CO2-C/g OM per day 8 or below Particle Size TMECC 02.02-B Sample Sieving for Aggregate Size Classification % Dry Weight Basis 100% Passing, 3 inch 90-100% Passing, 1 inch 65-100% Passing, 3/4 inch 0 - 75% Passing, 1/4 inch Maximum length 6 inches Pathogen TMECC 07.01-B Fecal Coliform Bacteria < 1000 MPN/gram dry wt. Pass Pathogen TMECC 07.01-B Salmonella < 3 MPN/4 grams dry wt. Pass Physical Contaminants TMECC 02.02-C Man Made Inert Removal and Classification: Plastic, Glass and Metal % > 4mm fraction Combined Total: < 1.0 Physical Contaminants TMECC 02.02-C Man Made Inert Removal and Classification: Sharps (Sewing needles, straight pins and hypodermic needles) % > 4mm fraction None Detected *TMECC refers to "Test Methods for the Examination of Composting and Compost," published by the United States Department of Agriculture and the United States Compost Council (USCC). Installation  Prior to compost application, prepare the slope by removing loose rocks, roots, stumps, and other debris greater than 2” in diameter. Prepare the slope area surface by scarifying or track walking/roughening if necessary.  Select method to apply the compost blanket. A pneumatic blower is most cost effective and most adaptive in applying compost to steep, rough terrain, and hard to reach locations.  A compost blanket thickness of 1” to 4” should be applied to slopes of 2:1 (H:V) or gentler, based on site-specific conditions. Increase blanket thickness with increased slope steepness and/or during installation during the rainy season (for example, 2” to 3” should be used for a Compost Blanket EC-14 July 2012 California Stormwater BMP Handbook 5 of 6 Construction www.casqa.org 3:1 slope, while 1” to 2” can be used for a 4:1 slope). Erosion control using a compost blanket is not recommended for slopes greater than 1:1 (H:V).  For steeper slopes, tackifiers should be utilized and/or other stabilization techniques employed. For example, compost socks or berms can be installed at intervals over the compost blanket (in a similar manner as Fiber Rolls, SE-5).  Compost socks or berms (or equivalent linear sediment control BMP) should be placed at the top and/or bottom of the slope for additional erosion control performance.  For optimum vegetation establishment, a blanket thickness of 1” to 2” is recommended. If vegetation establishment is not the primary function of the compost blanket, a thicker blanket may be recommended based on slope or rainfall conditions.  Evenly distribute compost on the soil surface to the desired blanket thickness (1/2” to 4” as calculated prior based on site conditions and objectives). Even distribution is an important factor in preventing future rill and gully erosion.  The compost blanket should extend 3 to 6 feet over the top of the shoulder of the slope. A compost sock or compost berm can be used at the top of the slope as an auxiliary technique to prevent runoff from flowing underneath the compost blanket.  Use additional anchoring and erosion control BMPs in conjunction of the compost blanket as needed. Costs The cost associated with a compost blanket is similar to that of a straw mat and generally less expensive than a geotextile blanket (USEPA, 2009). Caltrans has provided a recent estimate for $5,000 to $8,000 per acre for application of an unseeded 1 inch compost blanket (Caltrans Compost Specifications, 2009). Recently obtained vendor costs indicate that proprietary blends of compost that are seeded and contain a nutrient rich “tackifier” can cost approximately $0.35 per square foot, or approximately $15,000 per acre for a 2 inch blanket. Application by hand is more time intensive and likely more costly. Inspection and Maintenance  BMPs must be inspected in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Areas where erosion is evident, another layer of compost should be reapplied as soon as possible. It may be necessary to install an additional type of stormwater BMP at the top of slope or as a slope interrupter to control flow, such as a fiber roll (SE-5) or compost sock (SE-11).  Care should be exercised to minimize the damage to protected areas while making repairs, as any area damaged will require reapplication of BMPs.  Limit or prohibit foot traffic to minimize damage to BMP or impede vegetation establishment. Compost Blanket EC-14 July 2012 California Stormwater BMP Handbook 6 of 6 Construction www.casqa.org References An Analysis of Composting as an Environmental Remediation Technology, U.S. Environmental Protection Agency (USEPA), Solid Waste and Emergency Response (5305W), EPA530-R-8-008, 1998. Characteristics of Compost: Moisture Holding and Water Quality Improvement, Center for Research in Water Resources, Kirchoff, C., Malina, J., and Barrett, M., 2003. Compost Utilization for Erosion Control, The University of Georgia College of Agricultural and Environmental Sciences, pubs.caes.uga.edu/caespubs/pubcd/B1200.htm, Faucette, B. and Risse, M., 2009. Demonstration Project Using Yard Debris Compost for Erosion Control, Final Report, presented to Metropolitan Service District, W&H Pacific, 1993. Erosion and Sediment Control Manual, Oregon Department of Environmental Quality, 2005. Standard Special Provision 10-1, Erosion Control (Compost Blanket), California Department of Transportation (Caltrans). 2007 Update. Evaluation of Environmental Benefits and Impacts of Compost and Industry Standard Erosion and Sediment Controls Measures Used in Construction Activities, Dissertation, Institute of Ecology, University of Georgia, Faucette, B., 2004. Filter Sock Presentation provided at Erosion, Sediment Control and Stormwater Management with Compost BMPs Workshop, U.S. Composting Council 13th Annual Conference and Trade Show, McCoy, S., 2005. National Pollutant Discharge Elimination System (NPDES), Compost Blankets, U.S. Environmental Protection Agency (USEPA). http://cfpub.epa.gov/npdes/stormwater/menuofbmps/index.cfm?action=factsheet_results&vie w=specific&bmp=118, 2009. Standard Specifications for Transportation Materials and Methods of Sampling and Testing Designation M10-03, Compost for Erosion/Sediment Control (Compost Blankets), Provisional, American Association of State Highway Transportation Officials (AASHTO), 2003. Stormwater Best Management Practices (BMPs) Field Trials of Erosion Control Compost in Reclamation of Rock Quarry Operations, Nonpoint Source Protection Program CWA §319(h), Texas Commission on Environmental Quality, Adams, T., McFarland, A., Hauck, L., Barrett, M., and Eck, B., 2008. Soil Preparation/Roughening EC-15 November 2009 California Stormwater BMP Handbook 1 of 4 Construction www.casqa.org Description and Purpose Soil Preparation/Roughening involves assessment and preparation of surface soils for BMP installation. This can include soil testing (for seed base, soil characteristics, or nutrients), as well as roughening surface soils by mechanical methods (including sheepsfoot rolling, track walking, scarifying, stair stepping, and imprinting) to prepare soil for additional BMPs, or to break up sheet flow. Soil Preparation can also involve tilling topsoil to prepare a seed bed and/or incorporation of soil amendments, to enhance vegetative establishment. Suitable Applications Soil preparation: Soil preparation is essential to proper vegetative establishment. In particular, soil preparation (i.e. tilling, raking, and amendment) is suitable for use in combination with any soil stabilization method, including RECPs or sod. Soil preparation should not be confused with roughening. Roughening: Soil roughening is generally referred to as track walking (sometimes called imprinting) a slope, where treads from heavy equipment run parallel to the contours of the slope and act as mini terraces. Soil preparation is most effective when used in combination with erosion controls. Soil Roughening is suitable for use as a complementary process for controlling erosion on a site. Roughening is not intended to be used as a stand-alone BMP, and should be used with perimeter controls, additional erosion control measures, grade breaks, and vegetative establishment for maximum effectiveness. Roughening is intended to only affect surface soils and should not compromise slope stability or overall compaction. Suitable applications for soil roughening include: Categories EC Erosion Control  SE Sediment Control  TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control Legend:  Primary Category  Secondary Category Targeted Constituents Sediment  Nutrients Trash Metals Bacteria Oil and Grease Organics Potential Alternatives EC-3 Hydraulic Mulch EC-5 Soil Binders EC-7 Geotextiles and Mats If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Soil Preparation/Roughening EC-15 November 2009 California Stormwater BMP Handbook 2 of 4 Construction www.casqa.org  Along any disturbed slopes, including temporary stockpiles, sediment basins, or compacted soil diversion berms and swales.  Roughening should be used in combination with hydraulically applied stabilization methods, compost blanket, or straw mulch; but should not be used in combination with RECPs or sod because roughening is intended to leave terraces on the slope. Limitations  Preparation and roughening must take place prior to installing other erosion controls (such as hydraulically applied stabilizers) or sediment controls (such as fiber rolls) on the faces of slopes.  In such cases where slope preparation is minimal, erosion control/revegetation BMPs that do not require extensive soil preparation - such as hydraulic mulching and seeding applications - should be employed.  Consideration should be given to the type of erosion control BMP that follows surface preparation, as some BMPs are not designed to be installed over various types of tillage/roughening, i.e., RECPs (erosion control blankets) should not be used with soil roughening due to a “bridging” effect, which suspends the blanket above the seed bed.  Surface roughness has an effect on the amount of mulch material that needs to be applied, which shows up as a general increase in mulch material due to an increase in surface area (Topographic Index -see EC-3 Hydraulic Mulching). Implementation  Additional guidance on the comparison and selection of temporary slope stabilization methods is provided in Appendix F of the Handbook. General A roughened surface can significantly reduce erosion. Based on tests done at the San Diego State Erosion Research Laboratory, various roughening techniques on slopes can result in a 12 - 76% reduction in the erosion rate versus smooth slopes. Materials Minimal materials are required unless amendments and/or seed are added to the soil. The majority of soil roughening/preparation can be done with equipment that is on hand at a normal construction site, such as bull dozers and compaction equipment. Installation Guidelines Soil Preparation  Where appropriate or feasible, soil should be prepared to receive the seed by disking or otherwise scarifying the surface to eliminate crust, improve air and water infiltration and create a more favorable environment for germination and growth.  Based upon soil testing conducted, apply additional soil amendments (e.g. fertilizers, additional seed) to the soil to help with germination. Follow EC-4, Hydroseeding, when selecting and applying seed and fertilizers. Soil Preparation/Roughening EC-15 November 2009 California Stormwater BMP Handbook 3 of 4 Construction www.casqa.org Cut Slope Roughening:  Stair-step grade or groove the cut slopes that are steeper than 3:1.  Use stair-step grading on any erodible material soft enough to be ripped with a bulldozer. Slopes consisting of soft rock with some subsoil are particularly suited to stair-step grading.  Make the vertical cut distance less than the horizontal distance, and slightly slope the horizontal position of the "step" in toward the vertical wall.  Do not make individual vertical cuts more than 2 feet (0.6 m) high in soft materials or more than 3 feet (0.9 m) high in rocky materials.  Groove the slope using machinery to create a series of ridges and depressions that run across the slope, on the contour. Fill Slope Roughening:  Place on fill slopes with a gradient steeper than 3:1 in lifts not to exceed 8 inches (0.2 m), and make sure each lift is properly compacted.  Ensure that the face of the slope consists of loose, uncompacted fill 4-6 inches (0.1-0.2 m) deep.  Use grooving or tracking to roughen the face of the slopes, if necessary.  Do not blade or scrape the final slope face. Roughening for Slopes to be Mowed:  Slopes which require mowing activities should not be steeper than 3:1.  Roughen these areas to shallow grooves by track walking, scarifying, sheepsfoot rolling, or imprinting.  Make grooves close together (less than 10 inches), and not less than 1 inch deep, and perpendicular to the direction of runoff (i.e., parallel to the slope contours).  Excessive roughness is undesirable where mowing is planned. Roughening With Tracked Machinery:  Limit roughening with tracked machinery to soils with a sandy textural component to avoid undue compaction of the soil surface.  Operate tracked machinery up and down the slope to leave horizontal depressions in the soil. Do not back-blade during the final grading operation.  Seed and mulch roughened areas as soon as possible to obtain optimum seed germination and growth. Soil Preparation/Roughening EC-15 November 2009 California Stormwater BMP Handbook 4 of 4 Construction www.casqa.org Costs Costs are based on the additional labor of tracking or preparation of the slope plus the cost of any required soil amendment materials. Inspection and Maintenance  BMPs must be inspected in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Check the seeded slopes for signs of erosion such as rills and gullies. Fill these areas slightly above the original grade, then reseed and mulch as soon as possible.  Inspect BMPs weekly during normal operations, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events. References Soil Stabilization BMP Research for Erosion and Sediment Controls: Cost Survey Technical Memorandum, State of California Department of Transportation (Caltrans), July 2007. Erosion and Sediment Control Manual, Oregon Department of Environmental Quality, February 2005. Non-Vegetative Stabilization EC-16 July 2012 California Stormwater BMP Handbook 1 of 5 Construction www.casqa.org Description and Purpose Non-vegetative stabilization methods are used for temporary or permanent stabilization of areas prone to erosion and should be used only where vegetative options are not feasible; examples include:  Areas of vehicular or pedestrian traffic such as roads or paths;  Arid environments where vegetation would not provide timely ground coverage, or would require excessive irrigation;  Rocky substrate, infertile or droughty soils where vegetation would be difficult to establish; and  Areas where vegetation will not grow adequately within the construction time frame. There are several non-vegetative stabilization methods and selection should be based on site-specific conditions. Decomposed Granite (DG) is a permanent erosion protection method that consists of a layer of stabilized decomposed granite placed over an erodible surface. Degradable Mulches of various types (see EC-3, EC-6, EC-8) can be used for temporary non-vegetative stabilization; examples include straw mulch, compost, wood chips or hydraulic mulch. Geotextiles and Mats can be used for temporary non- vegetative stabilization (see EC-7). These BMPs are typically manufactured from degradable or synthetic materials and are Categories EC Erosion Control  SE Sediment Control  TR Tracking Control WE Wind Erosion Control  NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control Legend:  Primary Category  Secondary Category Targeted Constituents Sediment  Nutrients Trash Metals Bacteria Oil and Grease Organics Potential Alternatives None If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Non-Vegetative Stabilization EC-16 July 2012 California Stormwater BMP Handbook 2 of 5 Construction www.casqa.org designed and specified based on their functional longevity, i.e., how long they will persist and provide erosion protection. All geotextiles and mats should be replaced when they exceed their functional longevity or when permanent stabilization methods are instituted. Gravel Mulch is a non-degradable erosion control product that is composed of washed and screened coarse to very coarse gravel, 16 mm to 64 mm (0.6” - 2.5”), similar to an AASHTO No. 3 coarse aggregate. Rock Slope Protection consists of utilizing large rock or rip-rap (4”- 24”) to stabilize slopes with a high erosion potential and those subject to scour along waterways. Soil Binders can be used for temporary non-vegetative stabilization (see EC-5). The key to their use is functional longevity. In most cases, the soil binder will need to be routinely monitored and re-applied to maintain an erosion-resistant coverage. Suitable Applications Non-vegetated stabilization methods are suitable for use on disturbed soil areas and on material stockpiles that need to be temporarily or permanently protected from erosion by water and wind. Non-vegetated stabilization should only be utilized when vegetation cannot be established in the required timeframe, due to soil or climactic conditions, or where vegetation may be a potential fire hazard. Decomposed Granite (DG) and Gravel Mulch are suitable for use in areas where vegetation establishment is difficult, on flat surfaces, trails and pathways, and when used in conjunction with a stabilizer or tackifier, on shallow slopes (i.e., 10:1 [H:V]). DG and gravel can also be used on shallow rocky slopes where vegetation cannot be established for permanent erosion control. Degradable Mulches can be used to cover and protect soil surfaces from erosion both in temporary and permanent applications. In many cases, the use of mulches by themselves requires routine inspection and re-application. See EC-3 Hydraulic Mulch, EC-6 Straw Mulch, EC-8 Wood Mulch, or EC-14 Compost Blankets for more information. Geotextiles and Mats can be used as a temporary stand-alone soil stabilization method. Depending on material selection, geotextiles and mats can be a short-term (3 mos – 1 year) or long-term (1-2 years) temporary stabilization method. For more information on geotextiles and mats see EC-7 Geotextiles and Mats. Rock Slope Protection can be used when the slopes are subject to scour or have a high erosion potential, such as slopes adjacent to flowing waterways or slopes subject to overflow from detention facilities (spillways). Soil Binders can be used for temporary stabilization of stockpiles and disturbed areas not subject to heavy traffic. See EC-5 Soil Binders for more information. Limitations General  Refer to EC-3, EC-6, EC-8, and EC-14 for limitations on use of mulches. Refer to EC-7 for limitations on use of geotextiles and mats. Refer to EC-5 for limitations on use of Soil Binders. Non-Vegetative Stabilization EC-16 July 2012 California Stormwater BMP Handbook 3 of 5 Construction www.casqa.org Decomposed Granite  Not available in some geographic regions.  If not tackified, material may be susceptible to erosion even on slight slopes (e.g., 30:1 [H:V]).  Installed costs may be more expensive than vegetative stabilization methods. Gravel Mulch  Availability is limited in some geographic regions.  If not properly screened and washed, can contain fine material that can erode and/or create dust problems.  If inadequately sized, material may be susceptible to erosion on sloped areas.  Pore spaces fill with dirt and debris over time; may provide a growing medium for weeds. Rock Slope Protection  Installation is labor intensive.  Installed costs can be significantly higher than vegetative stabilization methods.  Rounded stones may not be used on slopes greater than 2:1 [H:V]. Implementation General Non-vegetated stabilization should be used in accordance with the following general guidance:  Should be used in conjunction with other BMPs, including drainage, erosion controls and sediment controls.  Refer to EC-3, EC-6, EC-8, and EC-14 for implementation details for mulches. Refer to EC-7 for implementation details for geotextiles and mats. Refer to EC-5 for implementation details for soil binders.  Non-vegetated stabilization measures should be implemented as soon as the disturbance in the areas they are intended to protect has ceased.  Additional guidance on the comparison and selection of temporary slope stabilization methods is provided in Appendix F of the Handbook. Decomposed Granite Stabilization  If used for a road or path should be installed on a prepared base.  Should be mixed with a stabilizer if used for roads or pathways, or on slope applications.  Though porous it is recommended to prevent standing water on or next to a decomposed granite road or pathway. Non-Vegetative Stabilization EC-16 July 2012 California Stormwater BMP Handbook 4 of 5 Construction www.casqa.org Gravel Mulch  Should be sized based on slope, rainfall, and upgradient run-on conditions. Stone size should be increased as potential for erosion increases (steeper slopes, high intensity rainfall).  If permanent, a weed control fabric should be placed prior to installation.  Should be installed at a minimum 2” depth.  Should completely cover all exposed surfaces. Rock Slope Protection  Rock slope protection installation should follow Caltrans Standard Specification 72-2: Rock Slope Protection. Refer to the specification for rock conformity requirements and installation methods.  When using rock slope protection, rock size and installation method should be specified by an Engineer.  A geotextile fabric should be placed prior to installation. Costs  Costs are highly variable depending not only on technique chosen, but also on materials chosen within specific techniques. In addition, availability of certain materials will vary by region/location, which will also affect the cost. Costs of mulches, geotextiles and mats, and soil binders are presented in their respective fact sheets. Costs for decomposed granite, gravel mulch stabilization and rock slope protection may be higher depending on location and availability of materials. Caltrans has provided an estimate for gravel mulch of $10 - $15/yd2 in flat areas and $11 - $23/yd2 on side slopes. Inspection and Maintenance General  BMPs must be inspected in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  For permanent installation, require inspection periodically and after major storm events to look for signs of erosion or damage to the stabilization.  All damage should be repaired immediately.  Refer to EC-3, EC-6, EC-8, and EC-14 for inspection and maintenance requirements for mulches. Refer to EC-7 for inspection and maintenance requirements for geotextiles and mats. Refer to EC-5 for inspection and maintenance requirements for soil binders. Decomposed Granite and Gravel Mulch Stabilization  Rake out and add decomposed granite or gravel as needed to areas subject to rill erosion. Inspect upgradient drainage controls and repair/modify as necessary. Non-Vegetative Stabilization EC-16 July 2012 California Stormwater BMP Handbook 5 of 5 Construction www.casqa.org  Should remain stable under loose surface material. Any significant problem areas should be repaired to restore uniformity to the installation. References Arid Zone Forestry: A Guide for Field Technicians. Food and Agriculture Organization of the United Nations, 1989. Design of Roadside Channels with Flexible Linings, Hydraulic Engineering Circular Number 15, Third Edition, Federal Highway Administration, 2007. Design Standards for Urban Infrastructure - Soft Landscape Design, Department of Territory and Municipal Services - Australian Capital Territory http://www.tams.act.gov.au/work/ standards_and_procedures/design_standards_for_urban_infrastructure Erosion and Sediment Control Handbook: A Guide for Protection of State Waters through the use of Best Management Practices during Land Disturbing Activities, Tennessee Department of Environment and Conservation, 2002. Gravel Mulch, Landscape Architecture Non-Standard Specification 10-2, California Department of Transportation (Caltrans), http://www.dot.ca.gov/hq/LandArch/roadside/detail-gm.htm Maine Erosion and Sediment Control BMPs, DEPLW0588, Maine Department of Environmental Protection: Bureau of Land and Water Quality, 2003. National Menu of Best Management Practices, US Environmental Protection Agency, 2006. Standard Specification 72-2: Rock Slope Protection. California Department of Transportation, 2006. Stormwater Quality Handbooks Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), March 2003. Water Conservation Practices NS-1 January 2011 California Stormwater BMP Handbook 1 of 2 Construction www.casqa.org Description and Purpose Water conservation practices are activities that use water during the construction of a project in a manner that avoids causing erosion and the transport of pollutants offsite. These practices can reduce or eliminate non-stormwater discharges. Suitable Applications Water conservation practices are suitable for all construction sites where water is used, including piped water, metered water, trucked water, and water from a reservoir. Limitations  None identified. Implementation  Keep water equipment in good working condition.  Stabilize water truck filling area.  Repair water leaks promptly.  Washing of vehicles and equipment on the construction site is discouraged.  Avoid using water to clean construction areas. If water must be used for cleaning or surface preparation, surface should be swept and vacuumed first to remove dirt. This will minimize amount of water required. Categories EC Erosion Control  SE Sediment Control  TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control  WM Waste Management and Materials Pollution Control Legend:  Primary Objective  Secondary Objective Targeted Constituents Sediment  Nutrients Trash Metals Bacteria Oil and Grease Organics Potential Alternatives None If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Water Conservation Practices NS-1 January 2011 California Stormwater BMP Handbook 2 of 2 Construction www.casqa.org  Direct construction water runoff to areas where it can soak into the ground or be collected and reused.  Authorized non-stormwater discharges to the storm drain system, channels, or receiving waters are acceptable with the implementation of appropriate BMPs.  Lock water tank valves to prevent unauthorized use. Costs The cost is small to none compared to the benefits of conserving water. Inspection and Maintenance  Inspect and verify that activity based BMPs are in place prior to the commencement of authorized non-stormwater discharges.  Inspect BMPs in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Inspect BMPs subject to non-stormwater discharges daily while non-stormwater discharges are occuring.  Repair water equipment as needed to prevent unintended discharges. ­ Water trucks ­ Water reservoirs (water buffalos) ­ Irrigation systems ­ Hydrant connections References Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), November 2000. Dewatering Operations NS-2 July 2012 California Stormwater BMP Handbook 1 of 10 Construction www.casqa.org Description and Purpose Dewatering operations are practices that manage the discharge of pollutants when non-stormwater and accumulated precipitation (stormwater) must be removed from a work location to proceed with construction work or to provide vector control. The General Permit incorporates Numeric Action Levels (NAL) for turbidity (see Section 2 of this handbook to determine your project’s risk level and if you are subject to these requirements). Discharges from dewatering operations can contain high levels of fine sediment that, if not properly treated, could lead to exceedances of the General Permit requirements or Basin Plan standards. The dewatering operations described in this fact sheet are not Active Treatment Systems (ATS) and do not include the use of chemical coagulations, chemical flocculation or electrocoagulation. Suitable Applications These practices are implemented for discharges of non- stormwater from construction sites. Non-stormwaters include, but are not limited to, groundwater, water from cofferdams, water diversions, and waters used during construction activities that must be removed from a work area to facilitate construction. Practices identified in this section are also appropriate for implementation when managing the removal of accumulated Categories EC Erosion Control SE Sediment Control  TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control  WM Waste Management and Materials Pollution Control Legend:  Primary Category  Secondary Category Targeted Constituents Sediment  Nutrients Trash Metals Bacteria Oil and Grease  Organics Potential Alternatives SE-5: Fiber Roll SE-6: Gravel Bag Berm If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Dewatering Operations NS-2 July 2012 California Stormwater BMP Handbook 2 of 10 Construction www.casqa.org precipitation (stormwater) from depressed areas at a construction site. Stormwater mixed with non-stormwater should be managed as non-stormwater. Limitations  Dewatering operations will require, and should comply with applicable local and project- specific permits and regulations. In some areas, all dewatering activities, regardless of the discharge volume, require a dewatering permit.  Site conditions will dictate design and use of dewatering operations.  The controls discussed in this fact sheet primarily address sediment. Other secondary pollutant removal benefits are discussed where applicable.  The controls detailed in this fact sheet only allow for minimal settling time for sediment particles. Use only when site conditions restrict the use of the other control methods.  Avoid dewatering discharges where possible by using the water for dust control. Implementation  A Construction Site Monitoring Plan (CSMP) should be included in the project Stormwater Pollution Prevention Plan (SWPPP).  Regional Water Quality Control Board (RWQCB) Regions may require notification and approval prior to any discharge of water from construction sites.  The destination of discharge from dewatering activities will typically determine the type of permit required for the discharge. For example, when discharging to a water of the U.S., a dewatering permit may be required through the site’s governing RWQCB. When discharging to a sanitary sewer or Municipal Separate Storm Sewer System (MS4), a permit may need to be obtained from the owner of the sanitary sewer or MS4 in addition to obtaining an RWQCB dewatering permit. Additional permits or permissions from other agencies may be required for dewatering cofferdams or diversions.  Dewatering discharges should not cause erosion at the discharge point. Appropriate BMPs should be implemented to maintain compliance with all applicable permits.  Maintain dewatering records in accordance with all local and project-specific permits and regulations. Sediment Treatment A variety of methods can be used to treat water during dewatering operations. Several devices are presented below and provide options to achieve sediment removal. The sediment particle size and permit or receiving water limitations on sediment or turbidity are key considerations for selecting sediment treatment option(s); in some cases, the use of multiple devices may be appropriate. Use of other enhanced treatment methods (i.e., introduction of chemicals or electric current to enhance flocculation and removal of sediment) must comply with: 1) for storm drain or surface water discharges, the requirements for Active Treatment Systems (see SE-11); or 2) for sanitary sewer discharges, the requirements of applicable sanitary sewer discharge permits. Dewatering Operations NS-2 July 2012 California Stormwater BMP Handbook 3 of 10 Construction www.casqa.org Sediment Basin (see also SE-2) Description:  A sediment basin is a temporary basin with a controlled release structure that is formed by excavation or construction of an embankment to detain sediment-laden runoff and allow sediment to settle out before discharging. Sediment basins are generally larger than Sediment Traps (SE-3) and have a designed outlet structure. Appropriate Applications:  Effective for the removal of trash, gravel, sand, silt, some metals that settle out with the sediment. Implementation:  Excavation and construction of related facilities is required.  Temporary sediment basins should be fenced if safety is a concern.  Outlet protection is required to prevent erosion at the outfall location. Maintenance:  Maintenance is required for safety fencing, vegetation, embankment, inlet and outlet, as well as other features.  Removal of sediment is required when the storage volume is reduced by one-third. Sediment Trap (See also SE-3) Description:  A sediment trap is a temporary basin formed by excavation and/or construction of an earthen embankment across a waterway or low drainage area to detain sediment-laden runoff and allow sediment to settle out before discharging. Sediment traps are generally smaller than Sediment Basins (SE-2) and do not have a designed outlet (but do have a spillway or overflow). Appropriate Applications: Effective for the removal of large and medium sized particles (sand and gravel) and some metals that settle out with the sediment. Implementation:  Excavation and construction of related facilities is required.  Trap inlets should be located to maximize the travel distance to the trap outlet.  Use rock or vegetation to protect the trap outlets against erosion. Maintenance:  Maintenance is required for vegetation, embankment, inlet and outfall structures, as well as other features.  Removal of sediment is required when the storage volume is reduced by one-third. Dewatering Operations NS-2 July 2012 California Stormwater BMP Handbook 4 of 10 Construction www.casqa.org Weir Tanks Description:  A weir tank separates water and waste by using weirs. The configuration of the weirs (over and under weirs) maximizes the residence time in the tank and determines the waste to be removed from the water, such as oil, grease, and sediments. Appropriate Applications:  The tank removes trash, some settleable solids (gravel, sand, and silt), some visible oil and grease, and some metals (removed with sediment). To achieve high levels of flow, multiple tanks can be used in parallel. If additional treatment is desired, the tanks can be placed in series or as pre-treatment for other methods. Implementation:  Tanks are delivered to the site by the vendor, who can provide assistance with set-up and operation.  Tank size will depend on flow volume, constituents of concern, and residency period required. Vendors should be consulted to appropriately size tank.  Treatment capacity (i.e., volume and number of tanks) should provide at a minimum the required volume for discrete particle settling for treatment design flows. Maintenance:  Periodic cleaning is required based on visual inspection or reduced flow.  Oil and grease disposal should be conducted by a licensed waste disposal company. Dewatering Operations NS-2 July 2012 California Stormwater BMP Handbook 5 of 10 Construction www.casqa.org Dewatering Tanks Description:  A dewatering tank removes debris and sediment. Flow enters the tank through the top, passes through a fabric filter, and is discharged through the bottom of the tank. The filter separates the solids from the liquids. Appropriate Applications:  The tank removes trash, gravel, sand, and silt, some visible oil and grease, and some metals (removed with sediment). To achieve high levels of flow, multiple tanks can be used in parallel. If additional treatment is desired, the tanks can be placed in series or as pre- treatment for other methods. Implementation:  Tanks are delivered to the site by the vendor, who can provide assistance with set-up and operation.  Tank size will depend on flow volume, constituents of concern, and residency period required. Vendors should be consulted to appropriately size tank. Maintenance:  Periodic cleaning is required based on visual inspection or reduced flow.  Oil and grease disposal should be conducted by licensed waste disposal company. Dewatering Operations NS-2 July 2012 California Stormwater BMP Handbook 6 of 10 Construction www.casqa.org Gravity Bag Filter Description:  A gravity bag filter, also referred to as a dewatering bag, is a square or rectangular bag made of non-woven geotextile fabric that collects gravel, sand, silt, and fines. Appropriate Applications:  Effective for the removal of sediments (gravel, sand, silt, and fines). Some metals are removed with the sediment. Implementation:  Water is pumped into one side of the bag and seeps through the top, bottom, and sides of the bag.  Place filter bag on pavement or a gravel bed or paved surface. Avoid placing a dewatering bag on unprotected bare soil. If placing the bag on bare soil is unavoidable, a secondary barrier should be used, such as a rock filter bed placed beneath and beyond the edges of the bag to, prevent erosion and capture sediments that escape the bag.  Perimeter control around the downstream end of the bag should be implemented. Secondary sediment controls are important especially in the initial stages of discharge, which tend to allow fines to pass through the bag. Maintenance:  Inspection of the flow conditions, bag condition, bag capacity, and the secondary barrier (as applicable) is required.  Replace the bag when it no longer filters sediment or passes water at a reasonable rate.  Caution should be taken when removing and disposing of the bag, to prevent the release of captured sediment  Properly dispose of the bag offsite. If sediment is removed from the bag prior to disposal (bags can potentially be reused depending upon their condition), dispose of sediment in accordance with the general maintenance procedures described at the end of this BMP Fact Sheet. FLOW FILTERED WATERPUMP DISCHARGE HOSE AVAILABLE IN VARIOUS SHAPES AND SIZES FORSEDIMENT CONTAINMENT DEWATERING BAG TIE DOWN STRAP WATER PUMP Place filter on gravel or pavement Dewatering Operations NS-2 July 2012 California Stormwater BMP Handbook 7 of 10 Construction www.casqa.org Sand Media Particulate Filter Description:  Water is treated by passing it through canisters filled with sand media. Generally, sand filters provide a final level of treatment. They are often used as a secondary or higher level of treatment after a significant amount of sediment and other pollutants have been removed using other methods. Appropriate Applications:  Effective for the removal of trash, gravel, sand, and silt and some metals, as well as the reduction of biochemical oxygen demand (BOD) and turbidity.  Sand filters can be used for stand-alone treatment or in conjunction with bag and cartridge filtration if further treatment is required.  Sand filters can also be used to provide additional treatment to water treated via settling or basic filtration. Implementation:  The filters require delivery to the site and initial set up. The vendor can provide assistance with installation and operation. Maintenance:  The filters require regular service to monitor and maintain the level of the sand media. If subjected to high loading rates, filters can plug quickly.  Venders generally provide data on maximum head loss through the filter. The filter should be monitored daily while in use, and cleaned when head loss reaches target levels.  If cleaned by backwashing, the backwash water may need to be hauled away for disposal, or returned to the upper end of the treatment train for another pass through the series of dewatering BMPs. Dewatering Operations NS-2 July 2012 California Stormwater BMP Handbook 8 of 10 Construction www.casqa.org Pressurized Bag Filter Description:  A pressurized bag filter is a unit composed of single filter bags made from polyester felt material. The water filters through the unit and is discharged through a header. Vendors provide bag filters in a variety of configurations. Some units include a combination of bag filters and cartridge filters for enhanced contaminant removal. Appropriate Applications:  Effective for the removal of sediment (sand and silt) and some metals, as well as the reduction of BOD, turbidity, and hydrocarbons. Oil absorbent bags are available for hydrocarbon removal.  Filters can be used to provide secondary treatment to water treated via settling or basic filtration. Implementation:  The filters require delivery to the site and initial set up. The vendor can provide assistance with installation and operation. Maintenance:  The filter bags require replacement when the pressure differential equals or exceeds the manufacturer’s recommendation. Dewatering Operations NS-2 July 2012 California Stormwater BMP Handbook 9 of 10 Construction www.casqa.org Cartridge Filter Description:  Cartridge filters provide a high degree of pollutant removal by utilizing a number of individual cartridges as part of a larger filtering unit. They are often used as a secondary or higher (polishing) level of treatment after a significant amount of sediment and other pollutants are removed. Units come with various cartridge configurations (for use in series with bag filters) or with a larger single cartridge filtration unit (with multiple filters within). Appropriate Applications:  Effective for the removal of sediment (sand, silt, and some clays) and metals, as well as the reduction of BOD, turbidity, and hydrocarbons. Hydrocarbons can effectively be removed with special resin cartridges.  Filters can be used to provide secondary treatment to water treated via settling or basic filtration. Implementation:  The filters require delivery to the site and initial set up. The vendor can provide assistance. Maintenance:  The cartridges require replacement when the pressure differential equals or exceeds the manufacturer’s recommendation. Costs  Sediment control costs vary considerably depending on the dewatering and sediment treatment system that is selected. Pressurized filters tend to be more expensive than gravity settling, but are often more effective. Simple tanks are generally rented on a long-term basis (one or more months) and can range from $360 per month for a 1,000 gallon tank to $2,660 per month for a 10,000 gallon tank. Mobilization and demobilization costs vary considerably. Inspection and Maintenance  Inspect and verify that dewatering BMPs are in place and functioning prior to the commencement of activities requiring dewatering.  Inspect dewatering BMPs daily while dewatering activities are being conducted. Dewatering Operations NS-2 July 2012 California Stormwater BMP Handbook 10 of 10 Construction www.casqa.org  Inspect all equipment before use. Monitor dewatering operations to ensure they do not cause offsite discharge or erosion.  Sample dewatering discharges as required by the General Permit.  Unit-specific maintenance requirements are included with the description of each unit.  Sediment removed during the maintenance of a dewatering device may be either spread onsite and stabilized, or disposed of at a disposal site as approved by the owner.  Sediment that is commingled with other pollutants should be disposed of in accordance with all applicable laws and regulations and as approved by the owner. References Blueprint for a Clean Bay: Best Management Practices to Prevent Stormwater Pollution from Construction Related Activities; Santa Clara Valley Nonpoint Source Pollution Control Program, 1995. Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), March 2003; Updated March 2004. Stormwater Management for Construction Activities, Developing Pollution Prevention Plans and Best Management Practices, EPA 832-R-92005; USEPA, April 1992. Labor Surcharge & Equipment Rental Rates, April 1, 2002 through March 31, 2003, California Department of Transportation (Caltrans). Erosion and Sediment Control Manual, Oregon Department of Environmental Quality, February 2005. Paving and Grinding Operations NS-3 July 2012 California Stormwater BMP Handbook 1 of 5 Construction www.casqa.org Description and Purpose Prevent or reduce the discharge of pollutants from paving operations, using measures to prevent runon and runoff pollution, properly disposing of wastes, and training employees and subcontractors. The General Permit incorporates Numeric Action Levels (NAL) for pH and turbidity (see Section 2 of this handbook to determine your project’s risk level and if you are subject to these requirements). Many types of construction materials associated with paving and grinding operations, including mortar, concrete, and cement and their associated wastes have basic chemical properties that can raise pH levels outside of the permitted range. Additional care should be taken when managing these materials to prevent them from coming into contact with stormwater flows, which could lead to exceedances of the General Permit requirements. Suitable Applications These procedures are implemented where paving, surfacing, resurfacing, or sawcutting, may pollute stormwater runoff or discharge to the storm drain system or watercourses. Limitations  Paving opportunities may be limited during wet weather. Discharges of freshly paved surfaces may raise pH to environmentally harmful levels and trigger permit violations. Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control  WM Waste Management and Materials Pollution Control  Legend:  Primary Category  Secondary Category Targeted Constituents Sediment  Nutrients Trash Metals Bacteria Oil and Grease  Organics Potential Alternatives None If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Paving and Grinding Operations NS-3 July 2012 California Stormwater BMP Handbook 2 of 5 Construction www.casqa.org Implementation General  Avoid paving during the wet season when feasible.  Reschedule paving and grinding activities if rain is forecasted.  Train employees and sub-contractors in pollution prevention and reduction.  Store materials away from drainage courses to prevent stormwater runon (see WM-1, Material Delivery and Storage).  Protect drainage courses, particularly in areas with a grade, by employing BMPs to divert runoff or to trap and filter sediment.  Stockpile material removed from roadways away from drain inlets, drainage ditches, and watercourses. These materials should be stored consistent with WM-3, Stockpile Management.  Disposal of PCC (Portland cement concrete) and AC (asphalt concrete) waste should be in conformance with WM-8, Concrete Waste Management. Saw Cutting, Grinding, and Pavement Removal  Shovel or vacuum saw-cut slurry and remove from site. Cover or barricade storm drains during saw cutting to contain slurry.  When paving involves AC, the following steps should be implemented to prevent the discharge of grinding residue, uncompacted or loose AC, tack coats, equipment cleaners, or unrelated paving materials: ­ AC grindings, pieces, or chunks used in embankments or shoulder backing should not be allowed to enter any storm drains or watercourses. Install inlet protection and perimeter controls until area is stabilized (i.e. cutting, grinding or other removal activities are complete and loose material has been properly removed and disposed of)or permanent controls are in place. Examples of temporary perimeter controls can be found in EC-9, Earth Dikes and Drainage Swales; SE-1, Silt Fence; SE-5, Fiber Rolls, or SE-13 Compost Socks and Berms ­ Collect and remove all broken asphalt and recycle when practical. Old or spilled asphalt should be recycled or disposed of properly.  Do not allow saw-cut slurry to enter storm drains or watercourses. Residue from grinding operations should be picked up by a vacuum attachment to the grinding machine, or by sweeping, should not be allowed to flow across the pavement, and should not be left on the surface of the pavement. See also WM-8, Concrete Waste Management, and WM-10, Liquid Waste Management.  Pavement removal activities should not be conducted in the rain.  Collect removed pavement material by mechanical or manual methods. This material may be recycled for use as shoulder backing or base material. Paving and Grinding Operations NS-3 July 2012 California Stormwater BMP Handbook 3 of 5 Construction www.casqa.org  If removed pavement material cannot be recycled, transport the material back to an approved storage site. Asphaltic Concrete Paving  If paving involves asphaltic cement concrete, follow these steps: ­ Do not allow sand or gravel placed over new asphalt to wash into storm drains, streets, or creeks. Vacuum or sweep loose sand and gravel and properly dispose of this waste by referring to WM-5, Solid Waste Management. ­ Old asphalt should be disposed of properly. Collect and remove all broken asphalt from the site and recycle whenever possible. Portland Cement Concrete Paving  Do not wash sweepings from exposed aggregate concrete into a storm drain system. Collect waste materials by dry methods, such as sweeping or shoveling, and return to aggregate base stockpile or dispose of properly. Allow aggregate rinse to settle. Then, either allow rinse water to dry in a temporary pit as described in WM-8, Concrete Waste Management, or pump the water to the sanitary sewer if authorized by the local wastewater authority. Sealing Operations  During chip seal application and sweeping operations, petroleum or petroleum covered aggregate should not be allowed to enter any storm drain or water courses. Apply temporary perimeter controls until structure is stabilized (i.e. all sealing operations are complete and cured and loose materials have been properly removed and disposed).  Inlet protection (SE-10, Storm Drain Inlet Protection) should be used during application of seal coat, tack coat, slurry seal, and fog seal.  Seal coat, tack coat, slurry seal, or fog seal should not be applied if rainfall is predicted to occur during the application or curing period. Paving Equipment  Leaks and spills from paving equipment can contain toxic levels of heavy metals and oil and grease. Place drip pans or absorbent materials under paving equipment when not in use. Clean up spills with absorbent materials and dispose of in accordance with the applicable regulations. See NS-10, Vehicle and Equipment Maintenance, WM-4, Spill Prevention and Control, and WM-10, Liquid Waste Management.  Substances used to coat asphalt transport trucks and asphalt spreading equipment should not contain soap and should be non-foaming and non-toxic.  Paving equipment parked onsite should be parked over plastic to prevent soil contamination.  Clean asphalt coated equipment offsite whenever possible. When cleaning dry, hardened asphalt from equipment, manage hardened asphalt debris as described in WM-5, Solid Waste Management. Any cleaning onsite should follow NS-8, Vehicle and Equipment Cleaning. Paving and Grinding Operations NS-3 July 2012 California Stormwater BMP Handbook 4 of 5 Construction www.casqa.org Thermoplastic Striping  Thermoplastic striper and pre-heater equipment shutoff valves should be inspected to ensure that they are working properly to prevent leaking thermoplastic from entering drain inlets, the stormwater drainage system, or watercourses.  Pre-heaters should be filled carefully to prevent splashing or spilling of hot thermoplastic. Leave six inches of space at the top of the pre-heater container when filling thermoplastic to allow room for material to move.  Do not pre-heat, transfer, or load thermoplastic near drain inlets or watercourses.  Clean truck beds daily of loose debris and melted thermoplastic. When possible, recycle thermoplastic material. Raised/Recessed Pavement Marker Application and Removal  Do not transfer or load bituminous material near drain inlets, the stormwater drainage system, or watercourses.  Melting tanks should be loaded with care and not filled to beyond six inches from the top to leave room for splashing.  When servicing or filling melting tanks, ensure all pressure is released before removing lids to avoid spills.  On large-scale projects, use mechanical or manual methods to collect excess bituminous material from the roadway after removal of markers. Costs  All of the above are low cost measures. Inspection and Maintenance  Inspect and verify that activity-based BMPs are in place prior to the commencement of paving and grinding operations.  BMPs must be inspected in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Sample stormwater runoff required by the General Permit.  Keep ample supplies of drip pans or absorbent materials onsite.  Inspect and maintain machinery regularly to minimize leaks and drips. References Blueprint for a Clean Bay: Best Management Practices to Prevent Stormwater Pollution from Construction Related Activities; Santa Clara Valley Nonpoint Source Pollution Control Program, 1995. Paving and Grinding Operations NS-3 July 2012 California Stormwater BMP Handbook 5 of 5 Construction www.casqa.org Hot Mix Asphalt-Paving Handbook AC 150/5370-14, Appendix I, U.S. Army Corps of Engineers, July 1991. Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), March 2003. Erosion and Sediment Control Manual, Oregon Department of Environmental Quality, February 2005. Temporary Stream Crossing NS-4 January 2011 California Stormwater BMP Handbook 1 of 8 Construction www.casqa.org Description and Purpose A temporary stream crossing is a temporary culvert, ford or bridge placed across a waterway to provide access for construction purposes for a period of less than one year. Temporary access crossings are not intended to maintain traffic for the public. The temporary access will eliminate erosion and downstream sedimentation caused by vehicles. Suitable Applications Temporary stream crossings should be installed at all designated crossings of perennial and intermittent streams on the construction site, as well as for dry channels that may be significantly eroded by construction traffic. Temporary streams crossings are installed at sites:  Where appropriate permits have been secured (404 Permits, and 401 Certifications)  Where construction equipment or vehicles need to frequently cross a waterway  When alternate access routes impose significant constraints  When crossing perennial streams or waterways causes significant erosion  Where construction activities will not last longer than one year Categories EC Erosion Control  SE Sediment Control  TC Tracking Control  WE Wind Erosion Control NS Non-Stormwater Management Control  WM Waste Management and Materials Pollution Control Legend:  Primary Objective  Secondary Objective Targeted Constituents Sediment  Nutrients Trash Metals Bacteria Oil and Grease Organics Potential Alternatives None If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Temporary Stream Crossing NS-4 January 2011 California Stormwater BMP Handbook 2 of 8 Construction www.casqa.org  Where appropriate permits have been obtained for the stream crossing Limitations The following limitations may apply:  Installation and removal will usually disturb the waterway.  Installation may require Regional Water Quality Control Board (RWQCB) 401 Certification, U.S. Army Corps of Engineers 404 permit and approval by California Department of Fish and Game. If numerical-based water quality standards are mentioned in any of these and other related permits, testing and sampling may be required.  Installation may require dewatering or temporary diversion of the stream. See NS-2, Dewatering Operations and NS-5, Clear Water Diversion.  Installation may cause a constriction in the waterway, which can obstruct flood flow and cause flow backups or washouts. If improperly designed, flow backups can increase the pollutant load through washouts and scouring.  Use of natural or other gravel in the stream for construction of Cellular Confinement System (CCS) ford crossing will be contingent upon approval by fisheries agencies.  Ford crossings may degrade water quality due to contact with vehicles and equipment.  May be expensive for a temporary improvement.  Requires other BMPs to minimize soil disturbance during installation and removal.  Fords should only be used in dry weather. Implementation General The purpose of this BMP is to provide a safe, erosion-free access across a stream for construction equipment. Minimum standards and specifications for the design, construction, maintenance, and removal of the structure should be established by an engineer registered in California. Temporary stream crossings may be necessary to prevent construction equipment from causing erosion of the stream and tracking sediment and other pollutants into the stream. Temporary stream crossings are used as access points to construction sites when other detour routes may be too long or burdensome for the construction equipment. Often heavy construction equipment must cross streams or creeks, and detour routes may impose too many constraints such as being too narrow or poor soil strength for the equipment loadings. Additionally, the contractor may find a temporary stream crossing more economical for light– duty vehicles to use for frequent crossings, and may have less environmental impact than construction of a temporary access road. Location of the temporary stream crossing should address:  Site selection where erosion potential is low. Temporary Stream Crossing NS-4 January 2011 California Stormwater BMP Handbook 3 of 8 Construction www.casqa.org  Areas where the side slopes from site runoff will not spill into the side slopes of the crossing. The following types of temporary stream crossings should be considered:  Culverts – A temporary culvert is effective in controlling erosion but will cause erosion during installation and removal. A temporary culvert can be easily constructed and allows for heavy equipment loads.  Fords - Appropriate during the dry season in arid areas. Used on dry washes and ephemeral streams, and low-flow perennial streams. CCS, a type of ford crossing, is also appropriate for use in streams that would benefit from an influx of gravels. A temporary ford provides little sediment and erosion control and is ineffective in controlling erosion in the stream channel. A temporary ford is the least expensive stream crossing and allows for maximum load limits. It also offers very low maintenance. Fords are more appropriate during the dry ice season and in arid areas of California.  Bridges - Appropriate for streams with high flow velocities, steep gradients and where temporary restrictions in the channel are not allowed. Design During the long summer construction season in much of California, rainfall is infrequent and many streams are dry. Under these conditions, a temporary ford may be sufficient. A ford is not appropriate if construction will continue through the winter rainy season, if summer thunderstorms are likely, or if the stream flows during most of the year. Temporary culverts and bridges should then be considered and, if used, should be sized to pass a significant design storm (i.e., at least a 10-year storm). The temporary stream crossing should be protected against erosion, both to prevent excessive sedimentation in the stream and to prevent washout of the crossing. Design and installation requires knowledge of stream flows and soil strength. Designs should be prepared under direction of, and approved by, a registered civil engineer and for bridges, a registered structural engineer. Both hydraulic and construction loading requirements should be considered with the following:  Comply with any special requirements for culvert and bridge crossings, particularly if the temporary stream crossing will remain through the rainy season.  Provide stability in the crossing and adjacent areas to withstand the design flow. The design flow and safety factor should be selected based on careful evaluation of the risks due to over topping, flow backups, or washout.  Install sediment traps immediately downstream of crossings to capture sediments. See SE-3, Sediment Trap.  Avoid oil or other potentially hazardous materials for surface treatment.  Culverts are relatively easy to construct and able to support heavy equipment loads.  Fords are the least expensive of the crossings, with maximum load limits. Temporary Stream Crossing NS-4 January 2011 California Stormwater BMP Handbook 4 of 8 Construction www.casqa.org  CCS crossing structures consist of clean, washed gravel and cellular confinement system blocks. CCS are appropriate for streams that would benefit from an influx of gravel; for example, salmonid streams, streams or rivers below reservoirs, and urban, channelized streams. Many urban stream systems are gravel-deprived due to human influences, such as dams, gravel mines, and concrete channels.  CCS allow designers to use either angular or naturally occurring rounded gravel, because the cells provide the necessary structure and stability. In fact, natural gravel is optimal for this technique, because of the habitat improvement it will provide after removal of the CCS.  A gravel depth of 6 to 12 in. for a CCS structure is sufficient to support most construction equipment.  An advantage of a CCS crossing structure is that relatively little rock or gravel is needed, because the CCS provides the stability.  Bridges are generally more expensive to design and construct, but provide the least disturbance of the streambed and constriction of the waterway flows. Construction and Use  Stabilize construction roadways, adjacent work area, and stream bottom against erosion.  Construct during dry periods to minimize stream disturbance and reduce costs.  Construct at or near the natural elevation of the streambed to prevent potential flooding upstream of the crossing.  Install temporary erosion control BMPs in accordance with erosion control BMP fact sheets to minimize erosion of embankment into flow lines.  Any temporary artificial obstruction placed within flowing water should only be built from material, such as clean gravel or sandbags, that will not introduce sediment or silt into the watercourse.  Temporary water body crossings and encroachments should be constructed to minimize scour. Cobbles used for temporary water body crossings or encroachments should be clean, rounded river cobble.  Vehicles and equipment should not be driven, operated, fueled, cleaned, maintained, or stored in the wet or dry portions of a water body where wetland vegetation, riparian vegetation, or aquatic organisms may be destroyed.  The exterior of vehicles and equipment that will encroach on the water body within the project should be maintained free of grease, oil, fuel, and residues.  Drip pans should be placed under all vehicles and equipment placed on docks, barges, or other structures over water bodies when the vehicle or equipment is planned to be idle for more than one hour. Temporary Stream Crossing NS-4 January 2011 California Stormwater BMP Handbook 5 of 8 Construction www.casqa.org  Disturbance or removal of vegetation should not exceed the minimum necessary to complete operations. Precautions should be taken to avoid damage to vegetation by people or equipment. Disturbed vegetation should be replaced with the appropriate soil stabilization measures.  Riparian vegetation, when removed pursuant to the provisions of the work, should be cut off no lower than ground level to promote rapid re-growth. Access roads and work areas built over riparian vegetation should be covered by a sufficient layer of clean river run cobble to prevent damage to the underlying soil and root structure. The cobble must be removed upon completion of project activities.  Conceptual temporary stream crossings are shown in the attached figures. Costs Caltrans Construction Cost index for temporary bridge crossings is $45-$95/ft2. Inspection and Maintenance  Inspect and verify that activity-based BMPs are in place prior to the commencement of associated activities. While activities associated with the BMP are under way, inspect BMPs in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Check for blockage in the channel, sediment buildup or trapped debris in culverts, blockage behind fords or under bridges.  Check for erosion of abutments, channel scour, riprap displacement, or piping in the soil.  Check for structural weakening of the temporary crossings, such as cracks, and undermining of foundations and abutments.  Remove sediment that collects behind fords, in culverts, and under bridges periodically.  Replace lost or displaced aggregate from inlets and outlets of culverts and cellular confinement systems.  Remove temporary crossing promptly when it is no longer needed. References California Bank and Shore Rock Slope Protection Design – Practitioners Guide and Field Evaluations of Riprap Methods, Caltrans Study No. F90TL03, October 2000. Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), November 2000. Temporary Stream Crossing NS-4 January 2011 California Stormwater BMP Handbook 6 of 8 Construction www.casqa.org Temporary Stream Crossing NS-4 January 2011 California Stormwater BMP Handbook 7 of 8 Construction www.casqa.org Temporary Stream Crossing NS-4 January 2011 California Stormwater BMP Handbook 8 of 8 Construction www.casqa.org Clear Water Diversion NS-5 August 2011 California Stormwater BMP Handbook 1 of 10 Construction www.casqa.org Description and Purpose Clear water diversion consists of a system of structures and measures that intercept clear surface water runoff upstream of a project, transport it around the work area, and discharge it downstream with minimal water quality degradation from either the project construction operations or the construction of the diversion. Clear water diversions are used in a waterway to enclose a construction area and reduce sediment pollution from construction work occurring in or adjacent to water. Structures commonly used as part of this system include diversion ditches, berms, dikes, slope drains, rock, gravel bags, wood, aqua barriers, cofferdams, filter fabric or turbidity curtains, drainage and interceptor swales, pipes, or flumes. Suitable Applications A clear water diversion is typically implemented where appropriate permits (1601 Agreement) have been secured and work must be performed in a flowing stream or water body.  Clear water diversions are appropriate for isolating construction activities occurring within or near a water body such as streambank stabilization, or culvert, bridge, pier or abutment installation. They may also be used in combination with other methods, such as clear water bypasses and/or pumps.  Pumped diversions are suitable for intermittent and low flow streams.  Excavation of a temporary bypass channel, or passing the flow through a heavy pipe (called a “flume”) with a trench Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control  WM Waste Management and Materials Pollution Control Legend:  Primary Objective  Secondary Objective Targeted Constituents Sediment  Nutrients Trash Metals Bacteria Oil and Grease Organics Potential Alternatives None If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Clear Water Diversion NS-5 August 2011 California Stormwater BMP Handbook 2 of 10 Construction www.casqa.org excavated under it, is appropriate for the diversion of streams less than 20 ft wide, with flow rates less than 100 cfs.  Clear water diversions incorporating clean washed gravel may be appropriate for use in salmonid spawning streams. Limitations  Diversion and encroachment activities will usually disturb the waterway during installation and removal of diversion structures.  Installation may require Regional Water Quality Control Board (RWQCB) 401 Certification, U.S. Army Corps of Engineers 404 permit and approval by California Department of Fish and Game. If numerical-based water quality standards are mentioned in any of these and other related permits, testing and sampling may be required.  Diversion and encroachment activities may constrict the waterway, which can obstruct flood flows and cause flooding or washouts. Diversion structures should not be installed without identifying potential impacts to the stream channel.  Diversion or isolation activities are not appropriate in channels where there is insufficient stream flow to support aquatic species in the area dewatered as a result of the diversion.  Diversion or isolation activities are inappropriate in deep water unless designed or reviewed by an engineer registered in California.  Diversion or isolation activities should not completely dam stream flow.  Dewatering and removal may require additional sediment control or water treatment. See NS-2, Dewatering Operations.  Not appropriate if installation, maintenance, and removal of the structures will disturb sensitive aquatic species of concern. Implementation General  Implement guidelines presented in EC-12, Streambank Stabilization to minimize impacts to streambanks.  Where working areas encroach on flowing streams, barriers adequate to prevent the flow of muddy water into streams should be constructed and maintained between working areas and streams. During construction of the barriers, muddying of streams should be held to a minimum.  Diversion structures must be adequately designed to accommodate fluctuations in water depth or flow volume due to tides, storms, flash floods, etc.  Heavy equipment driven in wet portions of a water body to accomplish work should be completely clean of petroleum residue, and water levels should be below the fuel tanks, gearboxes, and axles of the equipment unless lubricants and fuels are sealed such that inundation by water will not result in discharges of fuels, oils, greases, or hydraulic fluids. Clear Water Diversion NS-5 August 2011 California Stormwater BMP Handbook 3 of 10 Construction www.casqa.org  Excavation equipment buckets may reach out into the water for the purpose of removing or placing fill materials. Only the bucket of the crane/ excavator/backhoe may operate in a water body. The main body of the crane/excavator/backhoe should not enter the water body except as necessary to cross the stream to access the work site.  Stationary equipment such as motors and pumps located within or adjacent to a water body, should be positioned over drip pans.  When any artificial obstruction is being constructed, maintained, or placed in operation, sufficient water should, at all times, be allowed to pass downstream to maintain aquatic life.  Equipment should not be parked below the high water mark unless allowed by a permit.  Disturbance or removal of vegetation should not exceed the minimum necessary to complete operations. Precautions should be taken to avoid damage to vegetation by people or equipment. Disturbed vegetation should be replaced with the appropriate erosion control measures.  Riparian vegetation approved for trimming as part of the project should be cut off no lower than ground level to promote rapid re-growth. Access roads and work areas built over riparian vegetation should be covered by a sufficient layer of clean river run cobble to prevent damage to the underlying soil and root structure. The cobble should be removed upon completion of project activities.  Drip pans should be placed under all vehicles and equipment placed on docks, barges, or other structures over water bodies when the vehicle or equipment is planned to be idle for more than 1 hour.  Where possible, avoid or minimize diversion and encroachment impacts by scheduling construction during periods of low flow or when the stream is dry. Scheduling should also consider seasonal releases of water from dams, fish migration and spawning seasons, and water demands due to crop irrigation.  Construct diversion structures with materials free of potential pollutants such as soil, silt, sand, clay, grease, or oil. Temporary Diversions and Encroachments  Construct diversion channels in accordance with EC-9, Earth Dikes and Drainage Swales.  In high flow velocity areas, stabilize slopes of embankments and diversion ditches using an appropriate liner, in accordance with EC-7, Geotextiles and Mats, or use rock slope protection.  Where appropriate, use natural streambed materials such as large cobbles and boulders for temporary embankment and slope protection, or other temporary soil stabilization methods.  Provide for velocity dissipation at transitions in the diversion, such as the point where the stream is diverted to the channel and the point where the diverted stream is returned to its natural channel. See also EC-10, Velocity Dissipation Devices. Clear Water Diversion NS-5 August 2011 California Stormwater BMP Handbook 4 of 10 Construction www.casqa.org Temporary Dry Construction Areas  When dewatering behind temporary structures to create a temporary dry construction area, such as cofferdams, pass pumped water through a sediment-settling device, such as a portable tank or settling basin, before returning water to the water body. See also NS-2, Dewatering Operations.  Any substance used to assemble or maintain diversion structures, such as form oil, should be non-toxic and non-hazardous.  Any material used to minimize seepage underneath diversion structures, such as grout, should be non-toxic, non-hazardous, and as close to a neutral pH as possible. Comparison of Diversion and Isolation Techniques:  Gravel bags are relatively inexpensive, but installation and removal can be labor intensive. It is also difficult to dewater the isolated area. Sandbags should not be used for this technique in rivers or streams, as sand should never be put into or adjacent to a stream, even if encapsulated in geotextile.  Gravel Bag Berms (SE-6) used in conjunction with an impermeable membrane are cost effective, and can be dewatered relatively easily. If spawning gravel is used, the impermeable membrane can be removed from the stream, and the gravel can be spread out and left as salmonid spawning habitat if approved in the permit. Only clean, washed gravel should be used for both the gravel bag and gravel berm techniques.  Cofferdams are relatively expensive, but frequently allow full dewatering. Also, many options now available are relatively easy to install.  Sheet pile enclosures are a much more expensive solution, but do allow full dewatering. This technique is not well suited to small streams, but can be effective on large rivers or lakes, and where staging and heavy equipment access areas are available.  K-rails are an isolation method that does not allow full dewatering, but can be used in small to large watercourses, and in fast-water situations.  A relatively inexpensive isolation method is filter fabric isolation. This method involves placement of gravel bags or continuous berms to ‘key-in’ the fabric, and subsequently staking the fabric in place. This method should be used in relatively calm water, and can be used in smaller streams. Note that this is not a dewatering method, but rather a sediment isolation method.  Turbidity curtains should be used where sediment discharge to a stream is unavoidable. They can also be used for in-stream construction, when dewatering an area is not required.  When used in watercourses or streams, cofferdams must be used in accordance with permit requirements.  Manufactured diversion structures should be installed following manufacturer’s specifications. Clear Water Diversion NS-5 August 2011 California Stormwater BMP Handbook 5 of 10 Construction www.casqa.org  Filter fabric and turbidity curtain isolation installation methods can be found in the specific technique descriptions that follow. Filter Fabric Isolation Technique Definition and Purpose A filter fabric isolation structure is a temporary structure built into a waterway to enclose a construction area and reduce sediment pollution from construction work in or adjacent to water. This structure is composed of filter fabric, gravel bags, and steel t-posts. Appropriate Applications  Filter fabric may be used for construction activities such as streambank stabilization, or culvert, bridge, pier or abutment installation. It may also be used in combination with other methods, such as clean water bypasses and/or pumps.  Filter fabric isolation is relatively inexpensive. This method involves placement of gravel bags or continuous berms to ‘key-in’ the fabric, and subsequently staking the fabric in place.  If spawning gravel is used, all other components of the isolation can be removed from the stream, and the gravel may be spread out and left as salmonid spawning habitat if approved in the permit. Whether spawning gravel or other types of gravel are used, only clean washed gravel should be used as infill for the gravel bags or continuous berm.  This method should be used in relatively calm water, and can be used in smaller streams. This is not a dewatering method, but rather a sediment isolation method.  Water levels inside and outside the fabric curtain must be about the same, as differential heads will cause the curtain to collapse. Limitations  Do not use if the installation, maintenance and removal of the structures will disturb sensitive aquatic species of concern.  Filter fabrics are not appropriate for projects where dewatering is necessary.  Filter fabrics are not appropriate to completely dam stream flow. Design and Installation  For the filter fabric isolation method, a non-woven or heavy-duty fabric is recommended over standard silt fence. Using rolled geotextiles allows non-standard widths to be used.  Anchor filter fabric with gravel bags filled with clean, washed gravel. Do not use sand. If a bag should split open, the gravel can be left in the stream, where it can provide aquatic habitat benefits. If a sandbag splits open in a watercourse, the sand could cause a decrease in water quality, and could bury sensitive aquatic habitat.  Another anchor alternative is a continuous berm, made with the Continuous Berm Machine. This is a gravel-filled bag that can be made in very long segments. The length of the berms is usually limited to 18 ft for ease of handling (otherwise, it gets too heavy to move). Clear Water Diversion NS-5 August 2011 California Stormwater BMP Handbook 6 of 10 Construction www.casqa.org  Place the fabric on the bottom of the stream, and place either a bag of clean, washed gravel or a continuous berm over the bottom of the silt fence fabric, such that a bag-width of fabric lies on the stream bottom. The bag should be placed on what will be the outside of the isolation area.  Pull the fabric up, and place a metal t-post immediately behind the fabric, on the inside of the isolation area; attach the silt fence to the post with three diagonal nylon ties.  Continue placing fabric as described above until the entire work area has been isolated, staking the fabric at least every 6 ft. Inspection and Maintenance  Immediately repair any gaps, holes or scour.  Remove and properly dispose of sediment buildup.  Remove BMP upon completion of construction activity. Recycle or reuse if applicable.  Revegetate areas disturbed by BMP removal if needed. Turbidity Curtain Isolation Technique Definition and Purpose A turbidity curtain is a fabric barrier used to isolate the near shore work area. The barriers are intended to confine the suspended sediment. The curtain is a floating barrier, and thus does not prevent water from entering the isolated area; rather, it prevents suspended sediment from getting out. Appropriate Applications Turbidity curtains should be used where sediment discharge to a stream is unavoidable. They are used when construction activities adjoin quiescent waters, such as lakes, ponds, and slow flowing rivers. The curtains are designed to deflect and contain sediment within a limited area and provide sufficient retention time so that the sediment particles will fall out of suspension. Limitations  Turbidity curtains should not be used in flowing water; they are best suited for use in ponds, lakes, and very slow-moving rivers.  Turbidity curtains should not be placed across the width of a channel.  Removing sediment that has been deflected and settled out by the curtain may create a discharge problem through the resuspension of particles and by accidental dumping by the removal equipment. Design and Installation  Turbidity curtains should be oriented parallel to the direction of flow.  The curtain should extend the entire depth of the watercourse in calm-water situations.  In wave conditions, the curtain should extend to within 1 ft of the bottom of the watercourse, such that the curtain does not stir up sediment by hitting the bottom repeatedly. If it is Clear Water Diversion NS-5 August 2011 California Stormwater BMP Handbook 7 of 10 Construction www.casqa.org desirable for the curtain to reach the bottom in an active-water situation, a pervious filter fabric may be used for the bottom 1 ft.  The top of the curtain should consist of flexible flotation buoys, and the bottom should be held down by a load line incorporated into the curtain fabric. The fabric should be a brightly colored impervious mesh.  The curtain should be held in place by anchors placed at least every 100 ft.  First, place the anchors, then tow the fabric out in a furled condition, and connect to the anchors. The anchors should be connected to the flotation devices, and not to the bottom of the curtain. Once in place, cut the furling lines, and allow the bottom of the curtain to sink.  Consideration must be given to the probable outcome of the removal procedure. It must be determined if it will create more of a sediment problem through re-suspension of the particles or by accidental dumping of material during removal. It is recommended that the soil particles trapped by the turbidity curtain only be removed if there has been a significant change in the original contours of the affected area in the watercourse.  Particles should always be allowed to settle for a minimum of 6 to 12 hours prior to their removal or prior to removal of the turbidity curtain. Maintenance and Inspection:  The curtain should be inspected for holes or other problems, and any repairs needed should be made promptly.  Allow sediment to settle for 6 to 12 hours prior to removal of sediment or curtain. This means that after removing sediment, wait an additional 6 to 12 hours before removing the curtain.  To remove, install furling lines along the curtain, detach from anchors, and tow out of the water. K-rail River Isolation Definition and Purpose This temporary sediment control or stream isolation method uses K-rails to form the sediment deposition area, or to isolate the in-stream or near-bank construction area. Barriers are placed end-to-end in a pre-designed configuration and gravel-filled bags are used at the toe of the barrier and at their abutting ends to seal and prevent movement of sediment beneath or through the barrier walls. Appropriate Applications The K-rail isolation can be used in streams with higher water velocities than many other isolation techniques.  This technique is also useful at the toe of embankments, and cut or fill slopes. Clear Water Diversion NS-5 August 2011 California Stormwater BMP Handbook 8 of 10 Construction www.casqa.org Limitations  The K-rail method should not be used to dewater a project site, as the barrier is not watertight. Design and Installation  To create a floor for the K-rail, move large rocks and obstructions. Place washed gravel and gravel-filled bags to create a level surface for K-rails to sit. Washed gravel should always be used.  Place the bottom two K-rails adjacent to each other, and parallel to the direction of flow; fill the center portion with gravel bags. Then place the third K-rail on top of the bottom two. There should be sufficient gravel bags between the bottom K-rails such that the top rail is supported by the gravel. Place plastic sheeting around the K-rails, and secure at the bottom with gravel bags.  Further support can be added by pinning and cabling the K-rails together. Also, large riprap and boulders can be used to support either side of the K-rail, especially where there is strong current. Inspection and Maintenance:  The barrier should be inspected and any leaks, holes, or other problems should be addressed immediately.  Sediment should be allowed to settle for at least 6 to 12 hours prior to removal of sediment, and for 6 to 12 hours prior to removal of the barrier. Stream Diversions The selection of which stream diversion technique to use will depend upon the type of work involved, physical characteristics of the site, and the volume of water flowing through the project. Advantages of a Pumped Diversion  Downstream sediment transport can be nearly eliminated.  Dewatering of the work area is possible.  Pipes can be moved around to allow construction operations.  The dams can serve as temporary access to the site.  Increased flows can be managed by adding more pumping capacity. Disadvantages of a Pumped Diversion  Flow volume is limited by pump capacity.  A pumped diversion requires 24 hour monitoring of pumps.  Sudden rain could overtop dams.  Erosion at the outlet. Clear Water Diversion NS-5 August 2011 California Stormwater BMP Handbook 9 of 10 Construction www.casqa.org  Minor in-stream disturbance is required to install and remove dams. Advantages of Excavated Channels and Flumes  Excavated channels isolate work from water flow and allow dewatering.  Excavated channels can handle larger flows than pumps. Disadvantages of Excavated Channels and Flumes  Bypass channel or flume must be sized to handle flows, including possible floods.  Channels must be protected from erosion.  Flow diversion and re-direction with small dams involves in-stream disturbance and mobilization of sediment. Design and Installation  Installation guidelines will vary based on existing site conditions and type of diversion used.  Pump capacity must be sufficient for design flow.  A standby pump is required in case a primary pump fails.  Dam materials used to create dams upstream and downstream of diversion should be erosion resistant; materials such as steel plate, sheet pile, sandbags, continuous berms, inflatable water bladders, etc., would be acceptable. When constructing a diversion channel, begin excavation of the channel at the proposed downstream end, and work upstream. Once the watercourse to be diverted is reached and the excavated channel is stable, breach the upstream end and allow water to flow down the new channel. Once flow has been established in the diversion channel, install the diversion weir in the main channel; this will force all water to be diverted from the main channel. Inspection and Maintenance  Pumped diversions require 24 hour monitoring of pumps.  Inspect embankments and diversion channels for damage to the linings, accumulating debris, sediment buildup, and adequacy of the slope protection. Remove debris and repair linings and slope protection as required. Remove holes, gaps, or scour.  Upon completion of work, the diversion or isolation structure should be removed and flow should be redirected through the new culvert or back into the original stream channel. Recycle or reuse if applicable.  Revegetate areas disturbed by BMP removal if needed. Costs Costs of clear water diversion vary considerably and can be very high. Clear Water Diversion NS-5 August 2011 California Stormwater BMP Handbook 10 of 10 Construction www.casqa.org Inspection and Maintenance  Inspect and verify that activity-based BMPs are in place prior to the commencement of associated activities. While activities associated with the BMP are under way, inspect BMPs in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Inspect BMPs subject to non-stormwater discharges daily while non-stormwater discharges occur.  Refer to BMP-specific inspection and maintenance requirements. References California Bank and Shore Rock Slope Protection Design – Practitioners Guide and Field Evaluations of Riprap Methods, Caltrans Study No. F90TL03, October, 2000. Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), November 2000. Illicit Connection/Discharge NS-6 January 2011 California Stormwater BMP Handbook 1 of 3 Construction www.casqa.org Description and Purpose Procedures and practices designed for construction contractors to recognize illicit connections or illegally dumped or discharged materials on a construction site and report incidents. Suitable Applications This best management practice (BMP) applies to all construction projects. Illicit connection/discharge and reporting is applicable anytime an illicit connection or discharge is discovered or illegally dumped material is found on the construction site. Limitations Illicit connections and illegal discharges or dumping, for the purposes of this BMP, refer to discharges and dumping caused by parties other than the contractor. If pre-existing hazardous materials or wastes are known to exist onsite, they should be identified in the SWPPP and handled as set forth in the SWPPP. Implementation Planning  Review the SWPPP. Pre-existing areas of contamination should be identified and documented in the SWPPP.  Inspect site before beginning the job for evidence of illicit connections, illegal dumping or discharges. Document any pre-existing conditions and notify the owner. Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control  WM Waste Management and Materials Pollution Control Legend:  Primary Objective  Secondary Objective Targeted Constituents Sediment Nutrients  Trash  Metals  Bacteria  Oil and Grease  Organics  Potential Alternatives None If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Illicit Connection/Discharge NS-6 January 2011 California Stormwater BMP Handbook 2 of 3 Construction www.casqa.org  Inspect site regularly during project execution for evidence of illicit connections, illegal dumping or discharges.  Observe site perimeter for evidence for potential of illicitly discharged or illegally dumped material, which may enter the job site. Identification of Illicit Connections and Illegal Dumping or Discharges  General – unlabeled and unidentifiable material should be treated as hazardous.  Solids - Look for debris, or rubbish piles. Solid waste dumping often occurs on roadways with light traffic loads or in areas not easily visible from the traveled way.  Liquids - signs of illegal liquid dumping or discharge can include: ­ Visible signs of staining or unusual colors to the pavement or surrounding adjacent soils ­ Pungent odors coming from the drainage systems ­ Discoloration or oily substances in the water or stains and residues detained within ditches, channels or drain boxes ­ Abnormal water flow during the dry weather season  Urban Areas - Evidence of illicit connections or illegal discharges is typically detected at storm drain outfall locations or at manholes. Signs of an illicit connection or illegal discharge can include: ­ Abnormal water flow during the dry weather season ­ Unusual flows in sub drain systems used for dewatering ­ Pungent odors coming from the drainage systems ­ Discoloration or oily substances in the water or stains and residues detained within ditches, channels or drain boxes ­ Excessive sediment deposits, particularly adjacent to or near active offsite construction projects  Rural Areas - Illicit connections or illegal discharges involving irrigation drainage ditches are detected by visual inspections. Signs of an illicit discharge can include: ­ Abnormal water flow during the non-irrigation season ­ Non-standard junction structures ­ Broken concrete or other disturbances at or near junction structures Reporting Notify the owner of any illicit connections and illegal dumping or discharge incidents at the time of discovery. For illicit connections or discharges to the storm drain system, notify the local stormwater management agency. For illegal dumping, notify the local law enforcement agency. Cleanup and Removal The responsibility for cleanup and removal of illicit or illegal dumping or discharges will vary by location. Contact the local stormwater management agency for further information. Illicit Connection/Discharge NS-6 January 2011 California Stormwater BMP Handbook 3 of 3 Construction www.casqa.org Costs Costs to look for and report illicit connections and illegal discharges and dumping are low. The best way to avoid costs associated with illicit connections and illegal discharges and dumping is to keep the project perimeters secure to prevent access to the site, to observe the site for vehicles that should not be there, and to document any waste or hazardous materials that exist onsite before taking possession of the site. Inspection and Maintenance  Inspect and verify that activity-based BMPs are in place prior to the commencement of associated activities. While activities associated with the BMP are under way, inspect BMPs in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Inspect the site regularly to check for any illegal dumping or discharge.  Prohibit employees and subcontractors from disposing of non-job related debris or materials at the construction site.  Notify the owner of any illicit connections and illegal dumping or discharge incidents at the time of discovery. References Blueprint for a Clean Bay: Best Management Practices to Prevent Stormwater Pollution from Construction Related Activities; Santa Clara Valley Nonpoint Source Pollution Control Program, 1995. Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), November 2000. Stormwater Management for Construction Activities, Developing Pollution Prevention Plans and Best Management Practices, EPA 832-R-92005; USEPA, April 1992. Potable Water/Irrigation NS-7 January 2011 California Stormwater BMP Handbook 1 of 2 Construction www.casqa.org Description and Purpose Potable Water/Irrigation consists of practices and procedures to manage the discharge of potential pollutants generated during discharges from irrigation water lines, landscape irrigation, lawn or garden watering, planned and unplanned discharges from potable water sources, water line flushing, and hydrant flushing. Suitable Applications Implement this BMP whenever potable water or irrigation water discharges occur at or enter a construction site. Limitations None identified. Implementation  Direct water from offsite sources around or through a construction site, where feasible, in a way that minimizes contact with the construction site.  Discharges from water line flushing should be reused for landscaping purposes where feasible.  Shut off the water source to broken lines, sprinklers, or valves as soon as possible to prevent excess water flow.  Protect downstream stormwater drainage systems and watercourses from water pumped or bailed from trenches excavated to repair water lines. Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control  WM Waste Management and Materials Pollution Control Legend:  Primary Objective  Secondary Objective Targeted Constituents Sediment  Nutrients  Trash Metals  Bacteria Oil and Grease Organics  Potential Alternatives None If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Potable Water/Irrigation NS-7 January 2011 California Stormwater BMP Handbook 2 of 2 Construction www.casqa.org  Inspect irrigated areas within the construction limits for excess watering. Adjust watering times and schedules to ensure that the appropriate amount of water is being used and to minimize runoff. Consider factors such as soil structure, grade, time of year, and type of plant material in determining the proper amounts of water for a specific area. Costs Cost to manage potable water and irrigation are low and generally considered to be a normal part of related activities. Inspection and Maintenance  Inspect and verify that activity-based BMPs are in place prior to the commencement of associated activities. While activities associated with the BMP are under way, inspect BMPs in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events..  Inspect BMPs subject to non-stormwater discharges daily while non-stormwater discharges occur.  Repair broken water lines as soon as possible.  Inspect irrigated areas regularly for signs of erosion and/or discharge. References Blueprint for a Clean Bay: Best Management Practices to Prevent Stormwater Pollution from Construction Related Activities; Santa Clara Valley Nonpoint Source Pollution Control Program, 1995. Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), November 2000. Stormwater Management for Construction Activities, Developing Pollution Prevention Plans and Best Management Practices, EPA 832-R-92005; USEPA, April 1992. Vehicle and Equipment Cleaning NS-8 January 2011 California Stormwater BMP Handbook 1 of 3 Construction www.casqa.org Description and Purpose Vehicle and equipment cleaning procedures and practices eliminate or reduce the discharge of pollutants to stormwater from vehicle and equipment cleaning operations. Procedures and practices include but are not limited to: using offsite facilities; washing in designated, contained areas only; eliminating discharges to the storm drain by infiltrating the wash water; and training employees and subcontractors in proper cleaning procedures. Suitable Applications These procedures are suitable on all construction sites where vehicle and equipment cleaning is performed. Limitations Even phosphate-free, biodegradable soaps have been shown to be toxic to fish before the soap degrades. Sending vehicles/equipment offsite should be done in conjunction with TC-1, Stabilized Construction Entrance/Exit. Implementation Other options to washing equipment onsite include contracting with either an offsite or mobile commercial washing business. These businesses may be better equipped to handle and dispose of the wash waters properly. Performing this work offsite can also be economical by eliminating the need for a separate washing operation onsite. If washing operations are to take place onsite, then: Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control  WM Waste Management and Materials Pollution Control Legend:  Primary Objective  Secondary Objective Targeted Constituents Sediment  Nutrients  Trash Metals Bacteria Oil and Grease  Organics  Potential Alternatives None If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Vehicle and Equipment Cleaning NS-8 January 2011 California Stormwater BMP Handbook 2 of 3 Construction www.casqa.org  Use phosphate-free, biodegradable soaps.  Educate employees and subcontractors on pollution prevention measures.  Do not permit steam cleaning onsite. Steam cleaning can generate significant pollutant concentrates.  Cleaning of vehicles and equipment with soap, solvents or steam should not occur on the project site unless resulting wastes are fully contained and disposed of. Resulting wastes should not be discharged or buried, and must be captured and recycled or disposed according to the requirements of WM-10, Liquid Waste Management or WM-6, Hazardous Waste Management, depending on the waste characteristics. Minimize use of solvents. Use of diesel for vehicle and equipment cleaning is prohibited.  All vehicles and equipment that regularly enter and leave the construction site must be cleaned offsite.  When vehicle and equipment washing and cleaning must occur onsite, and the operation cannot be located within a structure or building equipped with appropriate disposal facilities, the outside cleaning area should have the following characteristics: ­ Located away from storm drain inlets, drainage facilities, or watercourses ­ Paved with concrete or asphalt and bermed to contain wash waters and to prevent runon and runoff ­ Configured with a sump to allow collection and disposal of wash water ­ No discharge of wash waters to storm drains or watercourses ­ Used only when necessary  When cleaning vehicles and equipment with water: ­ Use as little water as possible. High-pressure sprayers may use less water than a hose and should be considered ­ Use positive shutoff valve to minimize water usage ­ Facility wash racks should discharge to a sanitary sewer, recycle system or other approved discharge system and must not discharge to the storm drainage system, watercourses, or to groundwater Costs Cleaning vehicles and equipment at an offsite facility may reduce overall costs for vehicle and equipment cleaning by eliminating the need to provide similar services onsite. When onsite cleaning is needed, the cost to establish appropriate facilities is relatively low on larger, long- duration projects, and moderate to high on small, short-duration projects. Vehicle and Equipment Cleaning NS-8 January 2011 California Stormwater BMP Handbook 3 of 3 Construction www.casqa.org Inspection and Maintenance  Inspect and verify that activity-based BMPs are in place prior to the commencement of associated activities. While activities associated with the BMP are under way, inspect BMPs in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Inspect BMPs subject to non-stormwater discharges daily while non-stormwater discharges occur.  Inspection and maintenance is minimal, although some berm repair may be necessary.  Monitor employees and subcontractors throughout the duration of the construction project to ensure appropriate practices are being implemented.  Inspect sump regularly and remove liquids and sediment as needed.  Prohibit employees and subcontractors from washing personal vehicles and equipment on the construction site. References Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), November 2000. Swisher, R.D. Surfactant Biodegradation, Marcel Decker Corporation, 1987. Vehicle and Equipment Fueling NS-9 January 2011 California Stormwater BMP Handbook 1 of 3 Construction www.casqa.org Description and Purpose Vehicle equipment fueling procedures and practices are designed to prevent fuel spills and leaks, and reduce or eliminate contamination of stormwater. This can be accomplished by using offsite facilities, fueling in designated areas only, enclosing or covering stored fuel, implementing spill controls, and training employees and subcontractors in proper fueling procedures. Suitable Applications These procedures are suitable on all construction sites where vehicle and equipment fueling takes place. Limitations Onsite vehicle and equipment fueling should only be used where it is impractical to send vehicles and equipment offsite for fueling. Sending vehicles and equipment offsite should be done in conjunction with TC-1, Stabilized Construction Entrance/ Exit. Implementation  Use offsite fueling stations as much as possible. These businesses are better equipped to handle fuel and spills properly. Performing this work offsite can also be economical by eliminating the need for a separate fueling area at a site.  Discourage “topping-off” of fuel tanks. Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control  WM Waste Management and Materials Pollution Control Legend:  Primary Objective  Secondary Objective Targeted Constituents Sediment Nutrients Trash Metals Bacteria Oil and Grease  Organics Potential Alternatives None If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Vehicle and Equipment Fueling NS-9 January 2011 California Stormwater BMP Handbook 2 of 3 Construction www.casqa.org  Absorbent spill cleanup materials and spill kits should be available in fueling areas and on fueling trucks, and should be disposed of properly after use.  Drip pans or absorbent pads should be used during vehicle and equipment fueling, unless the fueling is performed over an impermeable surface in a dedicated fueling area.  Use absorbent materials on small spills. Do not hose down or bury the spill. Remove the adsorbent materials promptly and dispose of properly.  Avoid mobile fueling of mobile construction equipment around the site; rather, transport the equipment to designated fueling areas. With the exception of tracked equipment such as bulldozers and large excavators, most vehicles should be able to travel to a designated area with little lost time.  Train employees and subcontractors in proper fueling and cleanup procedures.  When fueling must take place onsite, designate an area away from drainage courses to be used. Fueling areas should be identified in the SWPPP.  Dedicated fueling areas should be protected from stormwater runon and runoff, and should be located at least 50 ft away from downstream drainage facilities and watercourses. Fueling must be performed on level-grade areas.  Protect fueling areas with berms and dikes to prevent runon, runoff, and to contain spills.  Nozzles used in vehicle and equipment fueling should be equipped with an automatic shutoff to control drips. Fueling operations should not be left unattended.  Use vapor recovery nozzles to help control drips as well as air pollution where required by Air Quality Management Districts (AQMD).  Federal, state, and local requirements should be observed for any stationary above ground storage tanks. Costs  All of the above measures are low cost except for the capital costs of above ground tanks that meet all local environmental, zoning, and fire codes. Inspection and Maintenance  Inspect BMPs in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Vehicles and equipment should be inspected each day of use for leaks. Leaks should be repaired immediately or problem vehicles or equipment should be removed from the project site.  Keep ample supplies of spill cleanup materials onsite. Vehicle and Equipment Fueling NS-9 January 2011 California Stormwater BMP Handbook 3 of 3 Construction www.casqa.org  Immediately clean up spills and properly dispose of contaminated soil and cleanup materials. References Blueprint for a Clean Bay: Best Management Practices to Prevent Stormwater Pollution from Construction Related Activities; Santa Clara Valley Nonpoint Source Pollution Control Program, 1995. Coastal Nonpoint Pollution Control Program: Program Development and Approval Guidance, Working Group Working Paper; USEPA, April 1992. Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), November 2000. Stormwater Management for Construction Activities, Developing Pollution Prevention Plans and Best Management Practices, EPA 832-R-92005; USEPA, April 1992. Vehicle & Equipment Maintenance NS-10 January 2011 California Stormwater BMP Handbook 1 of 4 Construction www.casqa.org Description and Purpose Prevent or reduce the contamination of stormwater resulting from vehicle and equipment maintenance by running a “dry and clean site”. The best option would be to perform maintenance activities at an offsite facility. If this option is not available then work should be performed in designated areas only, while providing cover for materials stored outside, checking for leaks and spills, and containing and cleaning up spills immediately. Employees and subcontractors must be trained in proper procedures. Suitable Applications These procedures are suitable on all construction projects where an onsite yard area is necessary for storage and maintenance of heavy equipment and vehicles. Limitations Onsite vehicle and equipment maintenance should only be used where it is impractical to send vehicles and equipment offsite for maintenance and repair. Sending vehicles/equipment offsite should be done in conjunction with TC-1, Stabilized Construction Entrance/Exit. Outdoor vehicle or equipment maintenance is a potentially significant source of stormwater pollution. Activities that can contaminate stormwater include engine repair and service, changing or replacement of fluids, and outdoor equipment storage and parking (engine fluid leaks). For further information on vehicle or equipment servicing, see NS-8, Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control  WM Waste Management and Materials Pollution Control Legend:  Primary Objective  Secondary Objective Targeted Constituents Sediment Nutrients  Trash  Metals Bacteria Oil and Grease  Organics  Potential Alternatives None If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Vehicle & Equipment Maintenance NS-10 January 2011 California Stormwater BMP Handbook 2 of 4 Construction www.casqa.org Vehicle and Equipment Cleaning, and NS-9, Vehicle and Equipment Fueling. Implementation  Use offsite repair shops as much as possible. These businesses are better equipped to handle vehicle fluids and spills properly. Performing this work offsite can also be economical by eliminating the need for a separate maintenance area.  If maintenance must occur onsite, use designated areas, located away from drainage courses. Dedicated maintenance areas should be protected from stormwater runon and runoff, and should be located at least 50 ft from downstream drainage facilities and watercourses.  Drip pans or absorbent pads should be used during vehicle and equipment maintenance work that involves fluids, unless the maintenance work is performed over an impermeable surface in a dedicated maintenance area.  Place a stockpile of spill cleanup materials where it will be readily accessible.  All fueling trucks and fueling areas are required to have spill kits and/or use other spill protection devices.  Use adsorbent materials on small spills. Remove the absorbent materials promptly and dispose of properly.  Inspect onsite vehicles and equipment daily at startup for leaks, and repair immediately.  Keep vehicles and equipment clean; do not allow excessive build-up of oil and grease.  Segregate and recycle wastes, such as greases, used oil or oil filters, antifreeze, cleaning solutions, automotive batteries, hydraulic and transmission fluids. Provide secondary containment and covers for these materials if stored onsite.  Train employees and subcontractors in proper maintenance and spill cleanup procedures.  Drip pans or plastic sheeting should be placed under all vehicles and equipment placed on docks, barges, or other structures over water bodies when the vehicle or equipment is planned to be idle for more than 1 hour.  For long-term projects, consider using portable tents or covers over maintenance areas if maintenance cannot be performed offsite.  Consider use of new, alternative greases and lubricants, such as adhesive greases, for chassis lubrication and fifth-wheel lubrication.  Properly dispose of used oils, fluids, lubricants, and spill cleanup materials.  Do not place used oil in a dumpster or pour into a storm drain or watercourse.  Properly dispose of or recycle used batteries.  Do not bury used tires. Vehicle & Equipment Maintenance NS-10 January 2011 California Stormwater BMP Handbook 3 of 4 Construction www.casqa.org  Repair leaks of fluids and oil immediately. Listed below is further information if you must perform vehicle or equipment maintenance onsite. Safer Alternative Products  Consider products that are less toxic or hazardous than regular products. These products are often sold under an “environmentally friendly” label.  Consider use of grease substitutes for lubrication of truck fifth-wheels. Follow manufacturers label for details on specific uses.  Consider use of plastic friction plates on truck fifth-wheels in lieu of grease. Follow manufacturers label for details on specific uses. Waste Reduction Parts are often cleaned using solvents such as trichloroethylene, trichloroethane, or methylene chloride. Many of these cleaners are listed in California Toxic Rule as priority pollutants. These materials are harmful and must not contaminate stormwater. They must be disposed of as a hazardous waste. Reducing the number of solvents makes recycling easier and reduces hazardous waste management costs. Often, one solvent can perform a job as well as two different solvents. Also, if possible, eliminate or reduce the amount of hazardous materials and waste by substituting non-hazardous or less hazardous materials. For example, replace chlorinated organic solvents with non-chlorinated solvents. Non-chlorinated solvents like kerosene or mineral spirits are less toxic and less expensive to dispose of properly. Check the list of active ingredients to see whether it contains chlorinated solvents. The “chlor” term indicates that the solvent is chlorinated. Also, try substituting a wire brush for solvents to clean parts. Recycling and Disposal Separating wastes allows for easier recycling and may reduce disposal costs. Keep hazardous wastes separate, do not mix used oil solvents, and keep chlorinated solvents (like,- trichloroethane) separate from non-chlorinated solvents (like kerosene and mineral spirits). Promptly transfer used fluids to the proper waste or recycling drums. Don’t leave full drip pans or other open containers lying around. Provide cover and secondary containment until these materials can be removed from the site. Oil filters can be recycled. Ask your oil supplier or recycler about recycling oil filters. Do not dispose of extra paints and coatings by dumping liquid onto the ground or throwing it into dumpsters. Allow coatings to dry or harden before disposal into covered dumpsters. Store cracked batteries in a non-leaking secondary container. Do this with all cracked batteries, even if you think all the acid has drained out. If you drop a battery, treat it as if it is cracked. Put it into the containment area until you are sure it is not leaking. Costs All of the above are low cost measures. Higher costs are incurred to setup and maintain onsite maintenance areas. Vehicle & Equipment Maintenance NS-10 January 2011 California Stormwater BMP Handbook 4 of 4 Construction www.casqa.org Inspection and Maintenance  Inspect and verify that activity-based BMPs are in place prior to the commencement of associated activities. While activities associated with the BMP are under way, inspect BMPs in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Inspect BMPs subject to non-stormwater discharges daily while non-stormwater discharges occur.  Keep ample supplies of spill cleanup materials onsite.  Maintain waste fluid containers in leak proof condition.  Vehicles and equipment should be inspected on each day of use. Leaks should be repaired immediately or the problem vehicle(s) or equipment should be removed from the project site.  Inspect equipment for damaged hoses and leaky gaskets routinely. Repair or replace as needed. References Blueprint for a Clean Bay: Best Management Practices to Prevent Stormwater Pollution from Construction Related Activities; Santa Clara Valley Nonpoint Source Pollution Control Program, 1995. Coastal Nonpoint Pollution Control Program; Program Development and Approval Guidance, Working Group, Working Paper; USEPA, April 1992. Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), November 2000. Pile Driving Operations NS-11 January 2011 California Stormwater BMP Handbook 1 of 2 Construction www.casqa.org Description and Purpose The construction and retrofit of bridges and retaining walls often include driving piles for foundation support and shoring operations. Driven piles are typically constructed of precast concrete, steel, or timber. Driven sheet piles are also used for shoring and cofferdam construction. Proper control and use of equipment, materials, and waste products from pile driving operations will reduce or eliminate the discharge of potential pollutants to the storm drain system, watercourses, and waters of the United States. Suitable Applications These procedures apply to all construction sites near or adjacent to a watercourse or groundwater where permanent and temporary pile driving (impact and vibratory) takes place, including operations using pile shells as well as construction of cast-in-steel-shell and cast-in-drilled-hole piles. Limitations None identified. Implementation  Use drip pans or absorbent pads during vehicle and equipment operation, maintenance, cleaning, fueling, and storage. Refer to NS-8, Vehicle and Equipment Cleaning, NS-9, Vehicle and Equipment Fueling, and NS-10, Vehicle and Equipment Maintenance. Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control  WM Waste Management and Materials Pollution Control Legend:  Primary Objective  Secondary Objective Targeted Constituents Sediment  Nutrients Trash Metals Bacteria Oil and Grease  Organics Potential Alternatives None If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Pile Driving Operations NS-11 January 2011 California Stormwater BMP Handbook 2 of 2 Construction www.casqa.org  Have spill kits and cleanup materials available at all locations of pile driving. Refer to WM- 4, Spill Prevention and Control.  Equipment that is stored or in use in streambeds, or on docks, barges, or other structures over water bodies should be kept leak free.  Park equipment over plastic sheeting or equivalent where possible. Plastic is not a substitute for drip pans or absorbent pads. The storage or use of equipment in streambeds or other bodies of water must comply with all applicable permits.  Implement other BMPs as applicable, such as NS-2, Dewatering Operations, WM-5, Solid Waste Management, WM-6, Hazardous Waste Management, and WM-10, Liquid Waste Management.  When not in use, store pile-driving equipment away from concentrated flows of stormwater, drainage courses, and inlets. Protect hammers and other hydraulic attachments from runon and runoff by placing them on plywood and covering them with plastic or a comparable material prior to the onset of rain.  Use less hazardous products, e.g., vegetable oil, when practicable. Costs All of the above measures can be low cost. Inspection and Maintenance  Inspect and verify that activity-based BMPs are in place prior to the commencement of associated activities. While activities associated with the BMP are under way, inspect BMPs in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Inspect BMPs subject to non-stormwater discharges daily while non-stormwater discharges occur.  Inspect equipment every day at startup and repair equipment as needed (i.e., worn or damaged hoses, fittings, and gaskets). Recheck equipment at shift changes or at the end of the day and scheduled repairs as needed. References Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), November 2000. Stormwater Management for Construction Activities, Developing Pollution Prevention Plans and Best Management Practices, EPA 832-R-92005; USEPA, April 1992. Concrete Curing NS-12 July 2012 California Stormwater BMP Handbook 1 of 3 Construction www.casqa.org Description and Purpose Concrete curing is used in the construction of structures such as bridges, retaining walls, pump houses, large slabs, and structured foundations. Concrete curing includes the use of both chemical and water methods. Concrete and its associated curing materials have basic chemical properties that can raise the pH of water to levels outside of the permitted range. Discharges of stormwater and non-stormwater exposed to concrete during curing may have a high pH and may contain chemicals, metals, and fines. The General Permit incorporates Numeric Action Levels (NAL) for pH (see Section 2 of this handbook to determine your project’s risk level and if you are subject to these requirements). Proper procedures and care should be taken when managing concrete curing materials to prevent them from coming into contact with stormwater flows, which could result in a high pH discharge. Suitable Applications Suitable applications include all projects where Portland Cement Concrete (PCC) and concrete curing chemicals are placed where they can be exposed to rainfall, runoff from other areas, or where runoff from the PCC will leave the site. Limitations  Runoff contact with concrete waste can raise pH levels in the water to environmentally harmful levels and trigger permit violations. Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control  WM Waste Management and Materials Pollution Control  Legend:  Primary Category  Secondary Category Targeted Constituents Sediment  Nutrients Trash Metals  Bacteria Oil and Grease  Organics Potential Alternatives None If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Concrete Curing NS-12 July 2012 California Stormwater BMP Handbook 2 of 3 Construction www.casqa.org Implementation Chemical Curing  Avoid over spray of curing compounds.  Minimize the drift by applying the curing compound close to the concrete surface. Apply an amount of compound that covers the surface, but does not allow any runoff of the compound.  Use proper storage and handling techniques for concrete curing compounds. Refer to WM- 1, Material Delivery and Storage.  Protect drain inlets prior to the application of curing compounds.  Refer to WM-4, Spill Prevention and Control. Water Curing for Bridge Decks, Retaining Walls, and other Structures  Direct cure water away from inlets and watercourses to collection areas for evaporation or other means of removal in accordance with all applicable permits. See WM-8 Concrete Waste Management.  Collect cure water at the top of slopes and transport to a concrete waste management area in a non-erosive manner. See EC-9 Earth Dikes and Drainage Swales, EC-10, Velocity Dissipation Devices, and EC-11, Slope Drains.  Utilize wet blankets or a similar method that maintains moisture while minimizing the use and possible discharge of water. Education  Educate employees, subcontractors, and suppliers on proper concrete curing techniques to prevent contact with discharge as described herein.  Arrange for the QSP or the appropriately trained contractor’s superintendent or representative to oversee and enforce concrete curing procedures. Costs All of the above measures are generally low cost. Inspection and Maintenance  Inspect and verify that activity-based BMPs are in place prior to the commencement of associated activities.  BMPs must be inspected in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Inspect BMPs subject to non-stormwater discharges daily while non-stormwater discharges occur. Concrete Curing NS-12 July 2012 California Stormwater BMP Handbook 3 of 3 Construction www.casqa.org  Sample non-stormwater discharges and stormwater runoff that contacts uncured and partially cured concrete as required by the General Permit.  Ensure that employees and subcontractors implement appropriate measures for storage, handling, and use of curing compounds.  Inspect cure containers and spraying equipment for leaks. References Blue Print for a Clean Bay-Construction-Related Industries: Best Management Practices for Stormwater Pollution Prevention; Santa Clara Valley Non Point Source Pollution Control Program, 1992. Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), March 2003. Stormwater Management for Construction Activities, Developing Pollution Prevention Plans and Best Management Practices, EPA 832-R-92005; USEPA, April 1992. Erosion and Sediment Control Manual, Oregon Department of Environmental Quality, February 2005. Concrete Finishing NS-13 July 2012 California Stormwater BMP Handbook 1 of 3 Construction www.casqa.org Description and Purpose Concrete finishing methods are used for bridge deck rehabilitation, paint removal, curing compound removal, and final surface finish appearances. Methods include sand blasting, shot blasting, grinding, or high pressure water blasting. Stormwater and non-stormwater exposed to concrete finishing by-products may have a high pH and may contain chemicals, metals, and fines. Proper procedures and implementation of appropriate BMPs can minimize the impact that concrete-finishing methods may have on stormwater and non-stormwater discharges. The General Permit incorporates Numeric Action Levels (NAL) for pH (see Section 2 of this handbook to determine your project’s risk level and if you are subject to these requirements). Concrete and its associated curing materials have basic chemical properties that can raise pH levels outside of the permitted range. Additional care should be taken when managing these materials to prevent them from coming into contact with stormwater flows, which could lead to exceedances of the General Permit requirements. Suitable Applications These procedures apply to all construction locations where concrete finishing operations are performed. Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control  WM Waste Management and Materials Pollution Control  Legend:  Primary Category  Secondary Category Targeted Constituents Sediment  Nutrients Trash Metals  Bacteria Oil and Grease Organics  Potential Alternatives None If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Concrete Finishing NS-13 July 2012 California Stormwater BMP Handbook 2 of 3 Construction www.casqa.org Limitations  Runoff contact with concrete waste can raise pH levels in the water to environmentally harmful levels and trigger permit violations. Implementation  Collect and properly dispose of water from high-pressure water blasting operations.  Collect contaminated water from blasting operations at the top of slopes. Transport or dispose of contaminated water while using BMPs such as those for erosion control. Refer to EC-9, Earth Dikes and Drainage Swales, EC-10, Velocity Dissipation Devices, and EC-11, Slope Drains.  Direct water from blasting operations away from inlets and watercourses to collection areas for infiltration or other means of removal (dewatering). Refer to NS-2 Dewatering Operations.  Protect inlets during sandblasting operations. Refer to SE-10, Storm Drain Inlet Protection.  Refer to WM-8, Concrete Waste Management for disposal of concrete debris.  Minimize the drift of dust and blast material as much as possible by keeping the blasting nozzle close to the surface.  When blast residue contains a potentially hazardous waste, refer to WM-6, Hazardous Waste Management. Education  Educate employees, subcontractors, and suppliers on proper concrete finishing techniques to prevent contact with discharge as described herein.  Arrange for the QSP or the appropriately trained contractor’s superintendent or representative to oversee and enforce concrete finishing procedures. Costs These measures are generally of low cost. Inspection and Maintenance  Inspect and verify that activity-based BMPs are in place prior to the commencement of associated activities.  BMPs must be inspected in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Inspect BMPs subject to non-stormwater discharges daily while non-stormwater discharges occur.  Sample non-stormwater discharges and stormwater runoff that contacts concrete dust and debris as required by the General Permit. Concrete Finishing NS-13 July 2012 California Stormwater BMP Handbook 3 of 3 Construction www.casqa.org  Sweep or vacuum up debris from sandblasting at the end of each shift.  At the end of each work shift, remove and contain liquid and solid waste from containment structures, if any, and from the general work area.  Inspect containment structures for damage prior to use and prior to onset of forecasted rain. References Blueprint for a Clean Bay: Best Management Practices to Prevent Stormwater Pollution from Construction Related Activities; Santa Clara Valley Nonpoint Source Pollution Control Program, 1995. Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), March 2003. Stormwater Management for Construction Activities, Developing Pollution Prevention Plans and Best Management Practices, EPA 832-R-92005; USEPA, April 1992. Material Over Water NS-14 January 2011 California Stormwater BMP Handbook 1 of 3 Construction www.casqa.org Description and Purpose Procedures for the proper use, storage, and disposal of materials and equipment on barges, boats, temporary construction pads, or similar locations that minimize or eliminate the discharge of potential pollutants to a watercourse. Suitable Applications Applies where materials and equipment are used on barges, boats, docks, and other platforms over or adjacent to a watercourse including waters of the United States. These procedures should be implemented for construction materials and wastes (solid and liquid), soil or dredging materials, or any other materials that may cause or contribute to exceedances of water quality standards. Limitations Dredge and fill activities are regulated by the US Army Corps of Engineers and Regional Boards under Section 404/401 of the Clean Water Act. Implementation  Refer to WM-1, Material Delivery and Storage and WM-4, Spill Prevention and Control.  Use drip pans and absorbent materials for equipment and vehicles and ensure that an adequate supply of spill clean up materials is available.  Drip pans should be placed under all vehicles and equipment placed on docks, barges, or other structures over Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control  WM Waste Management and Materials Pollution Control  Legend:  Primary Objective  Secondary Objective Targeted Constituents Sediment  Nutrients  Trash  Metals  Bacteria  Oil and Grease  Organics  Potential Alternatives None If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Material Over Water NS-14 January 2011 California Stormwater BMP Handbook 2 of 3 Construction www.casqa.org water bodies when the vehicle or equipment is expected to be idle for more than 1 hour.  Maintain equipment in accordance with NS-10, Vehicle and Equipment Maintenance. If a leaking line cannot be repaired, remove equipment from over the water.  Provide watertight curbs or toe boards to contain spills and prevent materials, tools, and debris from leaving the barge, platform, dock, etc.  Secure all materials to prevent discharges to receiving waters via wind.  Identify types of spill control measures to be employed, including the storage of such materials and equipment. Ensure that staff is trained regarding the use of the materials, deployment and access of control measures, and reporting measures.  In case of spills, contact the local Regional Board as soon as possible but within 48 hours.  Refer to WM-5, Solid Waste Management (non-hazardous) and WM-6, Hazardous Waste Management. Ensure the timely and proper removal of accumulated wastes  Comply with all necessary permits required for construction within or near the watercourse, such as Regional Water Quality Control Board, U.S. Army Corps of Engineers, Department of Fish and Game or and other local permitting.  Discharges to waterways should be reported to the Regional Water Quality Control Board immediately upon discovery. A written discharge notification must follow within 7 days. Follow the spill reporting procedures contained in SWPPP. Costs These measures are generally of low to moderate cost. Exceptions are areas for temporary storage of materials, engine fluids, or wastewater pump out. Inspection and Maintenance  Inspect and verify that activity–based BMPs are in place prior to the commencement of associated activities. While activities associated with the BMP are under way, inspect BMPs in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Inspect BMPs subject to non-stormwater discharge daily while non-stormwater discharges occur.  Ensure that employees and subcontractors implement the appropriate measures for storage and use of materials and equipment.  Inspect and maintain all associated BMPs and perimeter controls to ensure continuous protection of the water courses, including waters of the United States. References Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), November 2000. Material Over Water NS-14 January 2011 California Stormwater BMP Handbook 3 of 3 Construction www.casqa.org Stormwater Management for Construction Activities, Developing Pollution Prevention Plans and Best Management Practices, EPA 832-R-92005; USEPA, April 1992. Demolition Adjacent to Water NS-15 January 2011 California Stormwater BMP Handbook 1 of 2 Construction www.casqa.org Description and Purpose Procedures to protect water bodies from debris and wastes associated with structure demolition or removal over or adjacent to watercourses. Suitable Applications Full bridge demolition and removal, partial bridge removal (barrier rail, edge of deck) associated with bridge widening projects, concrete channel removal, or any other structure removal that could potentially affect water quality. Limitations None identified. Implementation  Refer to NS-5, Clear Water Diversion, to direct water away from work areas.  Use attachments on construction equipment such as backhoes to catch debris from small demolition operations.  Use covers or platforms to collect debris.  Platforms and covers are to be approved by the owner.  Stockpile accumulated debris and waste generated during demolition away from watercourses and in accordance with WM-3, Stockpile Management.  Ensure safe passage of wildlife, as necessary. Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control  WM Waste Management and Materials Pollution Control Legend:  Primary Objective  Secondary Objective Targeted Constituents Sediment  Nutrients  Trash  Metals  Bacteria  Oil and Grease  Organics  Potential Alternatives None If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Demolition Adjacent to Water NS-15 January 2011 California Stormwater BMP Handbook 2 of 2 Construction www.casqa.org  Discharges to waterways shall be reported to the Regional Water Quality Control Board immediately upon discovery. A written discharge notification must follow within 7 days. Follow the spill reporting procedures in the SWPPP.  For structures containing hazardous materials, i.e., lead paint or asbestos, refer to BMP WM-6, Hazardous Waste Management. For demolition work involving soil excavation around lead-painted structures, refer to WM-7, Contaminated Soil Management. Costs Cost may vary according to the combination of practices implemented. Inspection and Maintenance  Inspect and verify that activity–based BMPs are in place prior to the commencement of associated activities. While activities associated with the BMP are under way, inspect BMPs in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Inspect BMPs subject to non-stormwater discharge daily while non-stormwater discharges occur.  Any debris-catching devices shall be emptied regularly. Collected debris shall be removed and stored away from the watercourse and protected from runon and runoff. References Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), November 2000. Stormwater Management for Construction Activities, Developing Pollution Prevention Plans and Best Management Practices, EPA 832-R-92005; USEPA, April 1992. Temporary Batch Plants NS-16 July 2012 California Stormwater BMP Handbook 1 of 6 Construction www.casqa.org Description and Purpose The construction of roads, bridges, retaining walls, and other large structures in remote areas, often requires temporary batch plant facilities to manufacture Portland Cement Concrete (PCC) or asphalt cement (AC). Temporary batch plant facilities typically consist of silos containing fly ash, lime, and cement; heated tanks of liquid asphalt; sand and gravel material storage areas; mixing equipment; above ground storage tanks containing concrete additives and water; and designated areas for sand and gravel truck unloading, concrete truck loading, and concrete truck washout. Proper control and use of equipment, materials, and waste products from temporary batch plant facilities will reduce the discharge of potential pollutants to the storm drain system or watercourses, reduce air emissions, and mitigate noise impacts. The General Permit draft incorporates Numeric Action Levels (NAL) for pH (see Section 2 of this handbook to determine your project’s risk level and if you are subject to these requirements). Many types of batch plant materials, including mortar, concrete, cement and block and their associated wastes have basic chemical properties that can raise pH levels outside of the permitted range. Additional care should be taken when managing these materials to prevent them from coming into contact with stormwater flows which may cause an exceedance of the General Permit requirements. Suitable Applications These procedures typically apply to construction sites where temporary batch plant facilities are used; however, some of the Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control  WM Waste Management and Materials Pollution Control Legend:  Primary Category  Secondary Category Targeted Constituents Sediment  Nutrients Trash  Metals  Bacteria Oil and Grease Organics Potential Alternatives None If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Temporary Batch Plants NS-16 July 2012 California Stormwater BMP Handbook 2 of 6 Construction www.casqa.org practices described are applicable to construction sites with general concrete use. Limitations The General Permit for discharges of stormwater associated with industrial activities (General Industrial Permit) may be applicable to temporary batch plants. Specific permit requirements or mitigation measures such as Air Resources Board (ARB), Air Quality Management District (AQMD), Air Pollution Control District (APCD, Regional Water Quality Control Board (RWQCB), county ordinances and city ordinances may require alternative mitigation measures for temporary batch plants. Contact the local regulatory agencies to determine if a permit is required. Implementation Planning  Temporary batch plants may be subject to the General Industrial Permit. To obtain a copy of this permit and the application forms, visit http://www.waterboards.ca.gov or contact the State Water Resources Control Board.  Proper planning, design, and construction of temporary batch plants should be implemented to minimize potential water quality, air pollution, and noise impacts associated with temporary batch plants.  BMPs and a Construction Site Monitoring Plan (CSMP) should be included in the project Stormwater Pollution Prevention Plan (SWPPP). BMPs should be implemented, inspected, and maintained in accordance with these plans.  Temporary batch plants should be managed to comply with AQMD Statewide Registration Program and/or local AQMD Portable Equipment Registration requirements.  Construct temporary batch plants downwind of existing developments whenever possible.  Placement of access roads should be planned to mitigate water and air quality impacts. Layout and Design  Temporary batch plants should be properly located and designed to mitigate water quality impacts to receiving water bodies. Batch plants should be located away from watercourses, drainage courses, and drain inlets. Batch plants should be located to minimize the potential for stormwater runon onto the site.  Temporary batch plant facilities (including associated stationary equipment and stockpiles) should be located at least 300 ft from any recreational area, school, residence, or other structure not associated with the construction project.  Construct continuous interior AC or PCC berms around batch plant equipment (mixing equipment, silos, concrete drop points, conveyor belts, admixture tanks, etc.) to facilitate proper containment and cleanup of releases. Rollover or flip top curbs or dikes should be placed at ingress and egress points (SE-12, Temporary Silt Dike).  Direct runoff from the paved or unpaved portion of the batch plant into a sump and pipe to a lined washout area or dewatering tank. Temporary Batch Plants NS-16 July 2012 California Stormwater BMP Handbook 3 of 6 Construction www.casqa.org  Direct stormwater and non-stormwater runoff from unpaved portions of batch plant facility to catchment ponds or tanks.  Construct and remove concrete washout facilities in accordance with WM-8, Concrete Waste Management.  Layout of a typical batch plant and associated BMP is located at the end of this BMP fact sheet. Operational Procedures  Washout of concrete trucks should be conducted in a designated area in accordance with WM-8, Concrete Waste Management.  Do not dispose of concrete into drain inlets, the stormwater drainage system, or watercourses.  Washing of concrete mixing and transport equipment (including concrete truck washout) should occur in a designated area in accordance with WM-8, Concrete Waste Management.  Washing equipment, tools, or vehicles to remove PCC should be conducted in accordance with NS-7, Potable Water/Irrigation, NS-8, Vehicle and Equipment Cleaning, and WM-8, Concrete Waste Management..  All dry material transfer points should be ducted through a fabric or cartridge type filter unless there are no visible emissions from the transfer point.  Equip all bulk storage silos, including auxiliary bulk storage trailers, with fabric or cartridge type filter(s).  Maintain silo vent filters in proper operating condition.  Equip silos and auxiliary bulk storage trailers with dust-tight service hatches.  Fabric dust collection system should be capable of controlling particulate matter in accordance with the California Air Resources Control Board and local Air Pollution Control District Regulations.  Fabric dust collectors (except for vent filters) should be equipped with an operational pressure differential gauge to measure the pressure drop across the filters.  All transfer points should be equipped with a wet suppression system to control fugitive particulate emissions unless there are no visible emissions.  All conveyors should be covered, unless the material being transferred results in no visible emissions.  There should be no visible emissions beyond the property line, while the equipment is being operated.  Collect dust emissions from the loading of open-bodied trucks, at the drip point of dry batch plants, or dust emissions from the drum feed for central mix plants. Temporary Batch Plants NS-16 July 2012 California Stormwater BMP Handbook 4 of 6 Construction www.casqa.org  Equip silos and auxiliary bulk storage trailers with a visible and/or audible warning mechanism to warn operators that the silo or trailer is full.  All open-bodied vehicles transporting material should be loaded with a final layer of wet sand and the truck should be covered with a tarp to reduce emissions. Tracking Control  Plant roads (batch truck and material delivery truck roads) and areas between stockpiles and conveyor hoppers should be stabilized (TC-2, Stabilized Construction Roadway), watered, treated with dust-suppressant chemicals (WE-1, Wind Erosion Control), or paved with a cohesive hard surface that can be repeatedly swept, maintained intact, and cleaned as necessary to control dust emissions.  Trucks should not track PCC from plants onto public roads. Use appropriate practices from TC-1, Stabilized Construction Entrance/Exit, to prevent tracking. Materials Storage  WM-1, Material Delivery and Storage, should be implemented at all batch plants using concrete components or compounds. An effective strategy is to cover and contain materials.  WM-2, Material Use should be conducted in a way to minimize or eliminate the discharge of materials to storm drain system or watercourse.  Ensure that finer materials are not dispersed into the air during operations, such as unloading of cement delivery trucks.  Stockpiles should be covered and enclosed with perimeter sediment barriers per WM-3, Stockpile Management. Uncovered stockpiles should be sprayed with water and/or dust- suppressant chemicals as necessary to control dust emissions, unless the stockpiled material results in no visible emissions. An operable stockpile watering system should be onsite at all times.  Store bagged and boxed materials on pallets and cover or store in a completely enclosed storage area on non-working days and prior to rain.  Minimize stockpiles of demolished PCC by recycling them in a timely manner.  Provide secondary containment for liquid materials (WM-1, Material Delivery and Storage, WM-10, Liquid Waste Management). Containment should provide sufficient volume to contain precipitation from a 25-year storm plus 10% of the aggregate volume of all containers or plus 100% of the largest container, whichever is greater.  Handle solid and liquid waste in accordance with WM-5, Solid Waste Management, WM-10, Liquid Waste Management, and WM-8, Concrete Waste Management.  Maintain adequate supplies of spill cleanup materials and train staff to respond to spills per WM-4, Spill Prevention and Control.  Immediately contain and clean up spilled cement and fly ash and contain. Temporary Batch Plants NS-16 July 2012 California Stormwater BMP Handbook 5 of 6 Construction www.casqa.org Equipment Maintenance  Equipment should be maintained to prevent fluid leaks and spills per NS-9, Vehicle and Equipment Fueling, and NS-10, Vehicle and Equipment Maintenance.  Maintain adequate supplies of spill cleanup materials and train staff to respond to spills per WM-4, Spill Prevention and Control.  Incorporate other BMPs such as WM-5, Solid Waste Management, WM-6, Hazardous Waste Management, and WM-10, Liquid Waste Management. Costs Costs will vary depending on the size of the facility and combination of BMPs implemented. Inspection and Maintenance  Inspect and verify that activity–based BMPs are in place prior to the commencement of associated activities.  BMPs must be inspected in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Inspect BMPs subject to non-stormwater discharge daily while non-stormwater discharges occur.  Sample non-stormwater discharges and stormwater runoff that contacts cementitious materials or fly ash as required by the General Permit.  Inspect and repair equipment (for damaged hoses, fittings, and gaskets).  Inspect and maintain a Stabilized Construction Entrance/Exit (TC-1) as needed.  Inspect and maintain stabilized haul roads as needed (TC-2, Stabilized Construction Roadway).  Inspect and maintain materials and waste storage areas as needed. References Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), March 2003. Stormwater Management for Construction Activities, Developing Pollution Prevention Plans and Best Management Practices, EPA 832-R-92005; USEPA, April 1992. Temporary Batch Plants NS-16 July 2012 California Stormwater BMP Handbook 6 of 6 Construction www.casqa.org PERIMETER SEDIMENT CONTROL OR TRAFFIC BARRIER AS APPLICABLE TO SITE Silt Fence SE-1 July 2012 California Stormwater BMP Handbook Portal 1 of 9 Construction www.casqa.org Description and Purpose A silt fence is made of a woven geotextile that has been entrenched, attached to supporting poles, and sometimes backed by a plastic or wire mesh for support. The silt fence detains water, promoting sedimentation of coarse sediment behind the fence. Silt fence does not retain soil fine particles like clays or silts. Suitable Applications Silt fences are suitable for perimeter control, placed below areas where sheet flows discharge from the site. They could also be used as interior controls below disturbed areas where runoff may occur in the form of sheet and rill erosion and around inlets within disturbed areas (SE-10). Silt fences should not be used in locations where the flow is concentrated. Silt fences should always be used in combination with erosion controls. Suitable applications include:  At perimeter of a project.  Below the toe or down slope of exposed and erodible slopes.  Along streams and channels.  Around temporary spoil areas and stockpiles.  Around inlets.  Below other small cleared areas. Categories EC Erosion Control SE Sediment Control  TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control Legend:  Primary Category  Secondary Category Targeted Constituents Sediment (coarse sediment)  Nutrients Trash Metals Bacteria Oil and Grease Organics Potential Alternatives SE-5 Fiber Rolls SE-6 Gravel Bag Berm SE-12 Manufactured Linear Sediment Controls SE-13 Compost Socks and Berms SE-14 Biofilter Bags If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Silt Fence SE-1 July 2012 California Stormwater BMP Handbook Portal 2 of 9 Construction www.casqa.org Limitations  Do not use in streams, channels, drain inlets, or anywhere flow is concentrated.  Do not use in locations where ponded water may cause a flooding hazard.  Do not use silt fence to divert water flows or place across any contour line.  Improperly installed fences are subject to failure from undercutting, overtopping, or collapsing.  Must be trenched and keyed in.  Not intended for use as a substitute for Fiber Rolls (SE-5), when fiber rolls are being used as a slope interruption device.  Do not use on slopes subject to creeping, slumping, or landslides. Implementation General A silt fence is a temporary sediment barrier consisting of woven geotextile stretched across and attached to supporting posts, trenched-in, and, depending upon the strength of fabric used, supported with plastic or wire mesh fence. Silt fences trap coarse sediment by intercepting and detaining sediment-laden runoff from disturbed areas in order to promote sedimentation behind the fence. The following layout and installation guidance can improve performance and should be followed:  Silt fence should be used in combination with erosion controls up-slope in order to provide the most effective sediment control.  Silt fence alone is not effective at reducing turbidity. (Barrett and Malina, 2004)  Designers should consider diverting sediment laden water to a temporary sediment basin or trap. (EPA, 2012)  Use principally in areas where sheet flow occurs.  Install along a level contour, so water does not pond more than 1.5 ft at any point along the silt fence.  Provide sufficient room for runoff to pond behind the fence and to allow sediment removal equipment to pass between the silt fence and toes of slopes or other obstructions. About 1200 ft2 of ponding area should be provided for every acre draining to the fence.  Efficiency of silt fences is primarily dependent on the detention time of the runoff behind the control. (Barrett and Malina, 2004)  The drainage area above any fence should not exceed a quarter of an acre. (Rule of Thumb- 100-feet of silt fence per 10,000 square feet of disturbed area.) (EPA 2012) Silt Fence SE-1 July 2012 California Stormwater BMP Handbook Portal 3 of 9 Construction www.casqa.org  The maximum length of slope draining to any point along the silt fence should be 100 ft per foot of silt fence.  Turn the ends of the filter fence uphill to prevent stormwater from flowing around the fence.  Leave an undisturbed or stabilized area immediately down slope from the fence where feasible.  Silt fences should remain in place until the disturbed area draining to the silt fence is permanently stabilized, after which, the silt fence fabric and posts should be removed and properly disposed.  J-Hooks, which have ends turning up the slope to break up long runs of fence and provide multiple storage areas that work like mini-retention areas, may be used to increase the effectiveness of silt fence.  Be aware of local regulations regarding the type and installation requirements of silt fence, which may differ from those presented in this fact sheet. Design and Layout In areas where high winds are anticipated the fence should be supported by a plastic or wire mesh. The geotextile fabric of the silt fence should contain ultraviolet inhibitors and stabilizers to provide longevity equivalent to the project life or replacement schedule.  Layout in accordance with the attached figures.  For slopes that contain a high number of rocks or large dirt clods that tend to dislodge, it may be necessary to protect silt fence from rocks (e.g., rockfall netting) ensure the integrity of the silt fence installation. Standard vs. Heavy Duty Silt Fence Standard Silt Fence  Generally applicable in cases where the area draining to fence produces moderate sediment loads. Heavy Duty Silt Fence  Heavy duty silt fence usually has 1 or more of the following characteristics, not possessed by standard silt fence. o Fabric is reinforced with wire backing or additional support. o Posts are spaced closer than pre-manufactured, standard silt fence products.  Use is generally limited to areas affected by high winds.  Area draining to fence produces moderate sediment loads. Materials Standard Silt Fence  Silt fence material should be woven geotextile with a minimum width of 36 in. The fabric should conform to the requirements in ASTM designation D6461.  Wooden stakes should be commercial quality lumber of the size and shape shown on the plans. Each stake should be free from decay, splits or cracks longer than the Silt Fence SE-1 July 2012 California Stormwater BMP Handbook Portal 4 of 9 Construction www.casqa.org thickness of the stake or other defects that would weaken the stakes and cause the stakes to be structurally unsuitable.  Staples used to fasten the fence fabric to the stakes should be not less than 1.75 in. long and should be fabricated from 15 gauge or heavier wire. The wire used to fasten the tops of the stakes together when joining two sections of fence should be 9 gauge or heavier wire. Galvanizing of the fastening wire will not be required. Heavy-Duty Silt Fence  Some silt fence has a wire backing to provide additional support, and there are products that may use prefabricated plastic holders for the silt fence and use metal posts instead of wood stakes. Installation Guidelines – Traditional Method Silt fences are to be constructed on a level contour. Sufficient area should exist behind th e fence for ponding to occur without flooding or overtopping the fence.  A trench should be excavated approximately 6 in. wide and 6 in. deep along the line of the proposed silt fence (trenches should not be excavated wider or deeper than necessary for proper silt fence installation).  Bottom of the silt fence should be keyed-in a minimum of 12 in.  Posts should be spaced a maximum of 6 ft apart and driven securely into the ground a minimum of 18 in. or 12 in. below the bottom of the trench.  When standard strength geotextile is used, a plastic or wire mesh support fence should be fastened securely to the upslope side of posts using heavy–duty wire staples at least 1 in. long. The mesh should extend into the trench.  When extra-strength geotextile and closer post spacing are used, the mesh support fence may be eliminated.  Woven geotextile should be purchased in a long roll, then cut to the length of the barrier. When joints are necessary, geotextile should be spliced together only at a support post, with a minimum 6 in. overlap and both ends securely fastened to the post.  The trench should be backfilled with native material and compacted.  Construct the length of each reach so that the change in base elevation along the reach does not exceed 1/3 the height of the barrier; in no case should the reach exceed 500 ft.  Cross barriers should be a minimum of 1/3 and a maximum of ½ the height of the linear barrier.  See typical installation details at the end of this fact sheet. Silt Fence SE-1 July 2012 California Stormwater BMP Handbook Portal 5 of 9 Construction www.casqa.org Installation Guidelines - Static Slicing Method  Static Slicing is defined as insertion of a narrow blade pulled behind a tractor, similar to a plow blade, at least 10 inches into the soil while at the same time pulling silt geotextile fabric into the ground through the opening created by the blade to the depth of the blade. Once the geotextile is installed, the soil is compacted using tractor tires.  This method will not work with pre-fabricated, wire backed silt fence.  Benefits: o Ease of installation (most often done with a 2 person crew). o Minimal soil disturbance. o Better level of compaction along fence, less susceptible to undercutting o Uniform installation.  Limitations: o Does not work in shallow or rocky soils. o Complete removal of geotextile material after use is difficult. o Be cautious when digging near potential underground utilities. Costs  It should be noted that costs vary greatly across regions due to available supplies and labor costs.  Average annual cost for installation using the traditional silt fence installation method (assumes 6 month useful life) is $7 per linear foot based on vendor research. Range of cost is $3.50 - $9.10 per linear foot. Inspection and Maintenance  BMPs must be inspected in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Repair undercut silt fences.  Repair or replace split, torn, slumping, or weathered fabric. The lifespan of silt fence fabric is generally 5 to 8 months.  Silt fences that are damaged and become unsuitable for the intended purpose should be removed from the site of work, disposed, and replaced with new silt fence barriers.  Sediment that accumulates in the BMP should be periodically removed in order to maintain BMP effectiveness. Sediment should be removed when the sediment accumulation reaches 1/3 of the barrier height.  Silt fences should be left in place until the upgradient area is permanently stabilized. Until then, the silt fence should be inspected and maintained regularly. Silt Fence SE-1 July 2012 California Stormwater BMP Handbook Portal 6 of 9 Construction www.casqa.org  Remove silt fence when upgradient areas are stabilized. Fill and compact post holes and anchor trench, remove sediment accumulation, grade fence alignment to blend with adjacent ground, and stabilize disturbed area. References Manual of Standards of Erosion and Sediment Control Measures, Association of Bay Area Governments, May 1995. Monitoring Data on Effectiveness of Sediment Control Techniques, Proceedings of World Water and Environmental Resources Congress, Barrett M. and Malina J. 2004. National Management Measures to Control Nonpoint Source Pollution from Urban Areas, United States Environmental Protection Agency, 2002. Proposed Guidance Specifying Management Measures for Sources of Nonpoint Pollution in Coastal Waters, Work Group-Working Paper, USEPA, April 1992. Sedimentation and Erosion Control Practices, and Inventory of Current Practices (Draft), USEPA, 1990. Southeastern Wisconsin Regional Planning Commission (SWRPC). Costs of Urban Nonpoint Source Water Pollution Control Measures. Technical Report No. 31. Southeastern Wisconsin Regional Planning Commission, Waukesha, WI. 1991. Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), March 2003. Stormwater Management Manual for The Puget Sound Basin, Washington State Department of Ecology, Public Review Draft, 1991. U.S. Environmental Protection Agency (USEPA). Stormwater Best Management Practices: Silt Fences. U.S. Environmental Protection Agency, Office of Water, Washington, DC, 2012. U.S. Environmental Protection Agency (USEPA). Stormwater Management for Industrial Activities: Developing Pollution Prevention Plans and Best Management Practices. U.S. Environmental Protection Agency, Office of Water, Washington, DC, 1992. Water Quality Management Plan for the Lake Tahoe Region, Volume II, Handbook of Management Practices, Tahoe Regional Planning Agency, November 1988. Soil Stabilization BMP Research for Erosion and Sediment Controls: Cost Survey Technical Memorandum, State of California Department of Transportation (Caltrans), July 2007. Erosion and Sediment Control Manual, Oregon Department of Environmental Quality, February 2005. Silt Fence SE-1 July 2012 California Stormwater BMP Handbook Portal 7 of 9 Construction www.casqa.org Silt Fence SE-1 July 2012 California Stormwater BMP Handbook Portal 8 of 9 Construction www.casqa.org Silt Fence SE-1 July 2012 California Stormwater BMP Handbook Portal 9 of 9 Construction www.casqa.org Sediment Basin SE-2 January 2011 California Stormwater BMP Handbook 1 of 18 Construction www.casqa.org Description and Purpose A sediment basin is a temporary basin formed by excavation or by constructing an embankment so that sediment-laden runoff is temporarily detained under quiescent conditions, allowing sediment to settle out before the runoff is released. Sediment basin design guidance presented in this fact sheet is intended to provide options, methods, and techniques to optimize temporary sediment basin performance and basin sediment removal. Basin design guidance provided in this fact sheet is not intended to guarantee basin effluent compliance with numeric discharge limits (numeric action levels or numeric effluent limits for turbidity). Compliance with discharge limits requires a thoughtful approach to comprehensive BMP planning, implementation, and maintenance. Therefore, optimally designed and maintained sediment basins should be used in conjunction with a comprehensive system of BMPs that includes:  Diverting runoff from undisturbed areas away from the basin  Erosion control practices to minimize disturbed areas on- site and to provide temporary stabilization and interim sediment controls (e.g., stockpile perimeter control, check dams, perimeter controls around individual lots) to reduce the basin’s influent sediment concentration. At some sites, sediment basin design enhancements may be required to adequately remove sediment. Traditional Categories EC Erosion Control SE Sediment Control  TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control Legend:  Primary Category  Secondary Category Targeted Constituents Sediment  Nutrients Trash  Metals Bacteria Oil and Grease Organics Potential Alternatives SE-3 Sediment Trap (for smaller areas) If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Sediment Basin SE-2 January 2011 California Stormwater BMP Handbook 2 of 18 Construction www.casqa.org (a.k.a. “physical”) enhancements such as alternative outlet configurations or flow deflection baffles increase detention time and other techniques such as outlet skimmers preferentially drain flows with lower sediment concentrations. These “physical” enhancement techniques are described in this fact sheet. To further enhance sediment removal particularly at sites with fine soils or turbidity sensitive receiving waters, some projects may need to consider implementing Active Treatment Systems (ATS) whereby coagulants and flocculants are used to enhance settling and removal of suspended sediments. Guidance on implementing ATS is provided in SE-11. Suitable Applications Sediment basins may be suitable for use on larger projects with sufficient space for constructing the basin. Sediment basins should be considered for use:  Where sediment-laden water may enter the drainage system or watercourses  On construction projects with disturbed areas during the rainy season  At the outlet of disturbed watersheds between 5 acres and 75 acres and evaluated on a site by site basis  Where post construction detention basins are required  In association with dikes, temporary channels, and pipes used to convey runoff from disturbed areas Limitations Sediment basins must be installed only within the property limits and where failure of the structure will not result in loss of life, damage to homes or buildings, or interruption of use or service of public roads or utilities. In addition, sediment basins are attractive to children and can be very dangerous. Local ordinances regarding health and safety must be adhered to. If fencing of the basin is required, the type of fence and its location should be shown in the SWPPP and in the construction specifications.  As a general guideline, sediment basins are suitable for drainage areas of 5 acres or more, but not appropriate for drainage areas greater than 75 acres. However, the tributary area should be evaluated on a site by site basis.  Sediment basins may become an “attractive nuisance” and care must be taken to adhere to all safety practices. If safety is a concern, basin may require protective fencing.  Sediment basins designed according to this fact sheet are only effective in removing sediment down to about the silt size fraction. Sediment-laden runoff with smaller size fractions (fine silt and clay) may not be adequately treated unless chemical (or other appropriate method) treatment is used in addition to the sediment basin.  Basins with a height of 25 ft or more or an impounding capacity of 50 ac-ft or more must obtain approval from California Department of Water Resources Division of Safety of Dams (http://www.water.ca.gov/damsafety/). Sediment Basin SE-2 January 2011 California Stormwater BMP Handbook 3 of 18 Construction www.casqa.org  Water that stands in sediment basins longer than 96 hours may become a source of mosquitoes (and midges), particularly along perimeter edges, in shallow zones, in scour or below-grade pools, around inlet pipes, along low-flow channels, and among protected habitats created by emergent or floating vegetation (e.g. cattails, water hyacinth), algal mats, riprap, etc.  Basins require large surface areas to permit settling of sediment. Size may be limited by the available area. Implementation General A sediment basin is a controlled stormwater release structure formed by excavation or by construction of an embankment of compacted soil across a drainage way, or other suitable location. It is intended to trap sediment before it leaves the construction site. The basin is a temporary measure expected to be used during active construction in most cases and is to be maintained until the site area is permanently protected against erosion or a permanent detention basin is constructed. Sediment basins are suitable for nearly all types of construction projects. Whenever possible, construct the sediment basins before clearing and grading work begins. Basins should be located at the stormwater outlet from the site but not in any natural or undisturbed stream. A typical application would include temporary dikes, pipes, and/or channels to convey runoff to the basin inlet. Many development projects in California are required by local ordinances to provide a stormwater detention basin for post-construction flood control, desilting, or stormwater pollution control. A temporary sediment basin may be constructed by rough grading the post- construction control basins early in the project. Sediment basins if properly designed and maintained can trap a significant amount of the sediment that flows into them. However, traditional basins do not remove all inflowing sediment. Therefore, they should be used in conjunction with erosion control practices such as temporary seeding, mulching, diversion dikes, etc., to reduce the amount of sediment flowing into the basin. Planning To improve the effectiveness of the basin, it should be located to intercept runoff from the largest possible amount of disturbed area. Locations best suited for a sediment basin are generally in lower elevation areas of the site (or basin tributary area) where site drainage would not require significant diversion or other means to direct water to the basin but outside jurisdictional waterways. However, as necessary, drainage into the basin can be improved by the use of earth dikes and drainage swales (see BMP EC-9). . The basin should not be located where its failure would result in the loss of life or interruption of the use or service of public utilities or roads. Construct before clearing and grading work begins when feasible.  Do not locate the basin in a jurisdictional stream. Sediment Basin SE-2 January 2011 California Stormwater BMP Handbook 4 of 18 Construction www.casqa.org  Basin sites should be located where failure of the structure will not cause loss of life, damage to homes or buildings, or interruption of use or service of public roads or utilities.  Basins with a height of 25 ft or more or an impounding capacity of 50 ac-ft must obtain approval from the Division of Dam Safety. Local dam safety requirements may be more stringent.  Limit the contributing area to the sediment basin to only the runoff from the disturbed soil areas. Use temporary concentrated flow conveyance controls to divert runoff from undisturbed areas away from the sediment basin.  The basin should be located: (1) by excavating a suitable area or where a low embankment can be constructed across a swale, (2) where post-construction (permanent) detention basins will be constructed, and (3) where the basins can be maintained on a year-round basis to provide access for maintenance, including sediment removal and sediment stockpiling in a protected area, and to maintain the basin to provide the required capacity. Design When designing a sediment basin, designers should evaluate the site constraints that could affect the efficiency of the BMP. Some of these constraints include: the relationship between basin capacity, anticipated sediment load, and freeboard, available footprint for the basin, maintenance frequency and access, and hydraulic capacity and efficiency of the temporary outlet infrastructure. Sediment basins should be designed to maximize sediment removal and to consider sediment load retained by the basin as it affects basin performance. Three Basin Design Options (Part A) are presented below along with a Typical Sediment/Detention Basin Design Methodology (Part B). Regardless of the design option that is selected, designers also need to evaluate the sediment basin capacity with respect to sediment accumulation (See “Step 3. Evaluate the Capacity of the Sediment Basin”), and should incorporate approaches identified in “Step 4. Other Design Considerations” to enhance basin performance. A) Basin Design Options: Option 1: Design sediment basin(s) using the standard equation: s s V QA2.1 (Eq. 1) Where: As = Minimum surface area for trapping soil particles of a certain size Vs = Settling velocity of the design particle size chosen (Vs = 0.00028 ft/s for a design particle size of 0.01 mm at 68°F) 1.2 = Factor of safety recommended by USEPA to account for the reduction in basin efficiency caused due to turbulence and other non ideal conditions. Sediment Basin SE-2 January 2011 California Stormwater BMP Handbook 5 of 18 Construction www.casqa.org CIAQ (Eq.2) Where Q = Peak basin influent flow rate measured in cubic feet per second (ft3/s) C = Runoff coefficient (unitless) I = Peak rainfall intensity for the 10-year, 6-hour rain event (in/hr) A = Area draining into the sediment basin in acres The design particle size should be the smallest soil grain size determined by wet sieve analysis, or the fine silt sized (0.01 mm [or 0.0004 in.]) particle, and the Vs used should be 100 percent of the calculated settling velocity. This sizing basin method is dependent on the outlet structure design or the total basin length with an appropriate outlet. If the designer chooses to utilize the outlet structure to control the flow duration in the basin, the basin length (distance between the inlet and the outlet) should be a minimum of twice the basin width; the depth should not be less than 3 ft nor greater than 5 ft for safety reasons and for maximum efficiency (2 ft of sediment storage, 2 ft of capacity). If the designer chooses to utilize the basin length (with appropriate basin outlet) to control the flow duration in the basin, the basin length (distance between the inlet and the outlet) should be a specifically designed to capture 100% of the design particle size; the depth should not be less than 3 ft nor greater than 5 ft for safety reasons and for maximum efficiency (2 ft of sediment storage, 2 ft of capacity). Basin design guidance provided herein assumes standard water properties (e.g., estimated average water temperature, kinematic viscosity, etc.) as a basis of the design. Designers can use an alternative design (Option 3) with site specific water properties as long as the design is as protective as Option 1. The design guidance uses the peak influent flow rate to size sediment basins. Designers can use an alternative design (Option 3) with site specific average flow rates as long as the design is as protective as Option 1. The basin should be located on the site where it can be maintained on a year-round basis and should be maintained on a schedule to retain the 2 ft of capacity. Option 2: Design pursuant to local ordinance for sediment basin design and maintenance, provided that the design efficiency is as protective or more protective of water quality than Option 1. Option 3: The use of an equivalent surface area design or equation provided that the design efficiency is as protective or more protective of water quality than Option 1. Sediment Basin SE-2 January 2011 California Stormwater BMP Handbook 6 of 18 Construction www.casqa.org B) Typical Sediment/Detention Basin Design Methodology: Design of a sediment basin requires the designer to have an understanding of the site constraints, knowledge of the local soil (e.g., particle size distribution of potentially contributing soils), drainage area of the basin, and local hydrology. Designers should not assume that a sediment basin for location A is applicable to location B. Therefore, designers can use this factsheet as guidance but will need to apply professional judgment and knowledge of the site to design an effective and efficient sediment basin. The following provides a general overview of typical design methodologies: Step 1. Hydrologic Design  Evaluate the site constraints and assess the drainage area for the sediment basin. Designers should consider on- and off-site flows as well as changes in the drainage area associated with site construction/disturbance. To minimize additional construction during the course of the project, the designer should consider identifying the maximum drainage area when calculating the basin dimensions.  If a local hydrology manual is not available it is recommended to follow standard rational method procedures to estimate the flow rate. The references section of this factsheet provides a reference to standard hydrology textbooks that can provide standard methodologies. If local rainfall depths are not available, values can be obtained from standard precipitation frequency maps from NOAA (downloaded from http://www.wrcc.dri.edu/pcpnfreq.html). Step 2. Hydraulic Design  Calculate the surface area required for the sediment basin using Equation 1. In which the flow rate is estimated for a 10-yr 6-hr event using rational method procedure listed in local hydrology manual and Vs is estimated using Stokes Law presented in Equation 3. 281.2 dVs (Eq.3) Where Vs = Settling velocity in feet per second at 68˚F d = diameter of sediment particle in millimeters (smallest soil grain size determined by wet sieve analysis or fine silt (0.01 mm [or 0.0004 in.])  In general the basin outlet design requires an iterative trial and error approach that considered the maximum water surface elevation, the elevation versus volume (stage- storage) relationship, the elevation verses basin outflow (a.k.a.-discharge) relationship, and the estimated inflow hydrograph. To adequately design the basins to settle sediment, the outlet configuration and associated outflow rates can be estimated by numerous methodologies. The following provides some guidance for design the basin outlet:  An outlet should have more than one orifice.  An outlet design typically utilizes multiple horizontal rows of orifices (approximately 3 or more) with at least 2 orifices per row (see Figures 1 and 2 at the end of this fact sheet). Sediment Basin SE-2 January 2011 California Stormwater BMP Handbook 7 of 18 Construction www.casqa.org  Orifices can vary in shape.  Select the appropriate orifice diameter and number of perforations per row with the objective of minimizing the number of rows while maximizing the detention time.  The diameter of each orifice is typically a maximum of 3-4 inches and a minimum of 0.25-0.5 inches.  If a rectangular orifice is used, it is recommended to have minimum height of 0.5 inches and a maximum height of 6 inches.  Rows are typically spaced at three times the diameter center to center vertically with a minimum distance of approximately 4 inches on center and a maximum distance of 1 foot on center.  To estimate the outflow rate, each row is calculated separately based on the flow through a single orifice then multiplied by the number of orifices in the row. This step is repeated for each of the rows. Once all of the orifices are estimated, the total outflow rate versus elevation (stage-discharge curve) is developed to evaluate the detention time within the basin.  Flow through a single orifice can be estimated using an Equation 4: 5.0)2('gHABCQ (Eq.4) Where Q = Outflow rate in ft3/s C΄ = Orifice coefficient (unitless) A = Area of the orifice (ft2) g = acceleration due to gravity (ft3/s) H = Head above the orifice (ft) B = Anticipated Blockage or clogging factor (unitless), It is dependent on anticipated sediment and debris load, trash rack configuration etc, so the value is dependent on design engineers professional judgment and/or local requirements (B is never greater than 1 and a value of 0.5 is generally used)  Care must be taken in the selection of orifice coefficient ("C΄"); 0.60 is most often recommended and used. However, based on actual tests, Young and Graziano (1989), "Outlet Hydraulics of Extended Detention Facilities for Northern Virginia Planning District Commission", recommends the following:  C΄ = 0.66 for thin materials; where the thickness is equal to or less than the orifice diameter, or  C΄ = 0.80 when the material is thicker than the orifice diameter  If different sizes of orifices are used along the riser then they have to be sized such that not more than 50 percent of the design storm event drains in one-third of the drawdown time (to provide adequate settling time for events smaller than the design storm event) Sediment Basin SE-2 January 2011 California Stormwater BMP Handbook 8 of 18 Construction www.casqa.org and the entire volume drains within 96 hours or as regulated by the local vector control agency. If a basin fails to drain within 96 hours, the basin must be pumped dry.  Because basins are not maintained for infiltration, water loss by infiltration should be disregarded when designing the hydraulic capacity of the outlet structure.  Floating Outlet Skimmer: The floating skimmer (see Figure 3 at the end of this fact sheet is an alternative outlet configuration (patented) that drains water from upper portion of the water column. This configuration has been used for temporary and permanent basins and can improve basin performance by eliminating bottom orifices which have the potential of discharging solids. Some design considerations for this alternative outlet device includes the addition of a sand filter or perforated under drain at the low point in the basin and near the floating skimmer. These secondary drains allow the basin to fully drain. More detailed guidelines for sizing the skimmer can be downloaded from http://www.fairclothskimmer.com/.  Hold and Release Valve: An ideal sediment/detention basin would hold all flows to the design storm level for sufficient time to settle solids, and then slowly release the storm water. Implementing a reliable valve system for releasing detention basins is critical to eliminate the potential for flooding in such a system. Some variations of hold and release valves include manual valves, bladder devices or electrically operated valves. When a precipitation event is forecast, the valve would be close for the duration of the storm and appropriate settling time. When the settling duration is met (approximately 24 or 48 hours), the valve would be opened and allow the stormwater to be released at a rate that does not resuspend settled solids and in a non-erosive manner. If this type of system is used the valve should be designed to empty the entire basin within 96 hours or as stipulated by local vector control regulations. Step 3. Evaluate the Capacity of the Sediment Basin  Typically, sediment basins do not perform as designed when they are not properly maintained or the sediment yield to the basin is larger than expected. As part of a good sediment basin design, designers should consider maintenance cycles, estimated soil loss and/or sediment yield, and basin sediment storage volume. The two equations below can be used to quantify the amount of soil entering the basin.  The Revised Universal Soil Loss Equation (RUSLE, Eq.5) can be used to estimate annual soil loss and the Modified Universal Soil Equation (MUSLE, Eq.6) can be used to estimate sediment yield from a single storm event. PCLSKRA (Eq.5) PCLSKqQYp 56.095 (Eq.6) Where: A = annual soil loss, tons/acre-year R = rainfall erosion index, in 100 ft.tons/acre.in/hr Sediment Basin SE-2 January 2011 California Stormwater BMP Handbook 9 of 18 Construction www.casqa.org K = soil erodibility factor, tons/acre per unit of R LS = slope length and steepness factor (unitless) C = vegetative cover factor (unitless) P = erosion control practice factor (unitless) Y = single storm sediment yield in tons Q = runoff volume in acre-feet qp = peak flow in cfs  Detailed descriptions and methodologies for estimating the soil loss can be obtained from standard hydrology text books (See References section).  Determination of the appropriate equation should consider construction duration and local environmental factors (soils, hydrology, etc.). For example, if a basin is planned for a project duration of 1 year and the designer specifies one maintenance cycle, RUSLE could be used to estimate the soil loss and thereby the designer could indicate that the sediment storage volume would be half of the soil loss value estimated. As an example for use of MUSLE, a project may have a short construction duration thereby requiring fewer maintenance cycles and a reduced sediment storage volume. MUSLE would be used to estimate the anticipated soil loss based on a specific storm event to evaluate the sediment storage volume and appropriate maintenance frequency.  The soil loss estimates are an essential step in the design and it is essential that the designer provide construction contractors with enough information to understand maintenance frequency and/or depths within the basin that would trigger maintenance. Providing maintenance methods, frequency and specification should be included in design bid documents such as the SWPPP Site Map.  Once the designer has quantified the amount of soil entering the basin, the depth required for sediment storage can be determined by dividing the estimated sediment loss by the surface area of the basin. Step 4. Other Design Considerations  Consider designing the volume of the settling zone for the total storm volume associated with the 2-year event or other appropriate design storms specified by the local agency. This volume can be used as a guide for sizing the basin without iterative routing calculations. The depth of the settling zone can be estimated by dividing the estimated 2-yr storm volume by the surface area of the basin.  The basin volume consists of two zones: - A sediment storage zone at least 1 ft deep. - A settling zone at least 2 ft deep. Sediment Basin SE-2 January 2011 California Stormwater BMP Handbook 10 of 18 Construction www.casqa.org - The basin depth must be no less than 3 ft (not including freeboard).  Proper hydraulic design of the outlet is critical to achieving the desired performance of the basin. The outlet should be designed to drain the basin within 24 to 96 hours (also referred to as “drawdown time”). The 24-hour limit is specified to provide adequate settling time; the 96-hour limit is specified to mitigate vector control concerns.  Confirmation of the basin performance can be evaluated by routing the design storm (10-yr 6-hr, or as directed by local regulations) through the basin based on the basin volume (stage- storage curve) and the outlet design (stage-discharge curve based on the orifice configuration or equivalent outlet design).  Sediment basins, regardless of size and storage volume, should include features to accommodate overflow or bypass flows that exceed the design storm event. - Include an emergency spillway to accommodate flows not carried by the principal spillway. The spillway should consist of an open channel (earthen or vegetated) over undisturbed material (not fill) or constructed of a non-erodible riprap (or equivalent protection) on fill slopes. - The spillway control section, which is a level portion of the spillway channel at the highest elevation in the channel, should be a minimum of 20 ft in length.  Rock, vegetation or appropriate erosion control should be used to protect the basin inlet, outlet, and slopes against erosion.  The total depth of the sediment basin should include the depth required for sediment storage, depth required for settling zone and freeboard of at least 1 foot or as regulated by local flood control agency for a flood event specified by the local agency.  The basin alignment should be designed such that the length of the basin is more than twice the width of the basin; the length should be determined by measuring the distance between the inlet and the outlet. If the site topography does not allow for this configuration baffles should be installed so that the ratio is satisfied. If a basin has more than one inflow point, any inflow point that conveys more than 30 percent of the total peak inflow rate has to meet the required length to width ratio.  An alternative basin sizing method proposed by Fifield (2004) can be consulted to estimate an alternative length to width ratio and basin configuration. These methods can be considered as part of Option 3 which allows for alternative designs that are protective or more protective of water quality.  Baffles (see Figure 4 at the end of this fact sheet) can be considered at project sites where the existing topography or site constraints limit the length to width ratio. Baffles should be constructed of earthen berms or other structural material within the basin to divert flow in the basin, thus increasing the effective flow length from the basin inlet to the outlet riser. Baffles also reduce the change of short circuiting and allows for settling throughout the basin. Sediment Basin SE-2 January 2011 California Stormwater BMP Handbook 11 of 18 Construction www.casqa.org  Baffles are typically constructed from the invert of the basin to the crest of the emergency spillway (i.e., design event flows are meant to flow around the baffles and flows greater than the design event would flow over the baffles to the emergency spillway).  Use of other materials for construction of basin baffles (such as silt fence) may not be appropriate based on the material specifications and will require frequent maintenance (maintain after every storm event). Maintenance may not be feasible when required due to flooded conditions resulting from frequent (i.e., back to back) storm events. Use of alternative baffle materials should not deviate from the intended purpose of the material, as described by the manufacturer.  Sediment basins are best used in conjunction with erosion controls.  Basins with an impounding levee greater than 4.5 ft tall, measured from the lowest point to the impounding area to the highest point of the levee, and basins capable of impounding more than 35,000 ft3, should be designed by a Registered Civil Engineer. The design should include maintenance requirements, including sediment and vegetation removal, to ensure continuous function of the basin outlet and bypass structures.  A forebay, constructed upstream of the basin, may be provided to remove debris and larger particles.  The outflow from the sediment basin should be provided with velocity dissipation devices (see BMP EC-10) to prevent erosion and scouring of the embankment and channel.  The principal outlet should consist of a corrugated metal, high density polyethylene (HDPE), or reinforced concrete riser pipe with dewatering holes and an anti-vortex device and trash rack attached to the top of the riser, to prevent floating debris from flowing out of the basin or obstructing the system. This principal structure should be designed to accommodate the inflow design storm.  A rock pile or rock-filled gabions can serve as alternatives to the debris screen, although the designer should be aware of the potential for extra maintenance involved should the pore spaces in the rock pile clog.  The outlet structure should be placed on a firm, smooth foundation with the base securely anchored with concrete or other means to prevent floatation.  Attach riser pipe (watertight connection) to a horizontal pipe (barrel). Provide anti-seep collars on the barrel.  Cleanout level should be clearly marked on the riser pipe. Installation  Securely anchor and install an anti-seep collar on the outlet pipe/riser and provide an emergency spillway for passing major floods (see local flood control agency).  Areas under embankments must be cleared and stripped of vegetation. Sediment Basin SE-2 January 2011 California Stormwater BMP Handbook 12 of 18 Construction www.casqa.org  Chain link fencing should be provided around each sediment basin to prevent unauthorized entry to the basin or if safety is a concern. Costs The cost of a sediment basin is highly variable and is dependent of the site configuration. To decrease basin construction costs, designers should consider using existing site features such as berms or depressed area to site the sediment basin. Designers should also consider potential savings associated with designing the basin to minimize the number of maintenance cycles and siting the basin in a location where a permanent BMP (e.g., extended detention basin) is required for the project site. Inspection and Maintenance  BMPs must be inspected in accordance with General Permit requirements for the associated project type and risk level and as required by local requirements. It is recommended that at a minimum, basins be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Examine basin banks for seepage and structural soundness.  Check inlet and outlet structures and spillway for any damage or obstructions. Repair damage and remove obstructions as needed.  Check inlet and outlet area for erosion and stabilize if required.  Check fencing for damage and repair as needed.  Sediment that accumulates in the basin must be periodically removed in order to maintain BMP effectiveness. Sediment should be removed when sediment accumulation reaches one- half the designated sediment storage volume. Sediment removed during maintenance should be managed properly. The sediment should be appropriately evaluated and used or disposed of accordingly. Options include: incorporating sediment into earthwork on the site (only if there is no risk that sediment is contaminated); or off-site export/disposal at an appropriate location (e.g., sediment characterization and disposal to an appropriate landfill).  Remove standing water from basin within 96 hours after accumulation.  If the basin does not drain adequately (e.g., due to storms that are more frequent or larger than the design storm or other unforeseen site conditions), dewatering should be conducted in accordance with appropriate dewatering BMPs (see NS-2) and in accordance with local permits as applicable.  To minimize vector production: - Remove accumulation of live and dead floating vegetation in basins during every inspection. - Remove excessive emergent and perimeter vegetation as needed or as advised by local or state vector control agencies. Sediment Basin SE-2 January 2011 California Stormwater BMP Handbook 13 of 18 Construction www.casqa.org References A Current Assessment of Urban Best Management Practices: Techniques for Reducing Nonpoint Source Pollution in the Coastal Zones, Metropolitan Washington Council of Governments, March 1992. Draft-Sedimentation and Erosion Control, an Inventory of Current Practices, USEPA. April 1990. U.S. Environmental Protection Agency (USEPA). Erosion and Sediment Control, Surface Mining in the Eastern U.S., U.S. Environmental Protection Agency, Office of Water, Washington, DC,Washington, D.C., 1976. Fifield, J.S. Designing for Effective Sediment and Erosion Control on Construction Sites. Forester Press, Santa Barbara, CA. 2004. Goldman S.J., Jackson K. and Bursztynsky T.A. Erosion and Sediment Control Handbook. McGraw-Hill Book Company, 1986. U.S. Environmental Protection Agency (USEPA). Guidance Specifying Management Measures for Nonpoint Pollution in Coastal Waters. EPA 840-B-9-002. U.S. Environmental Protection Agency, Office of Water, Washington, DC, 1993. Guidelines for the Design and Construction of Small Embankment Dams, Division of Safety of Dams, California Department of Water Resources, March 1986. Haan C.T., Barfield B.J. and Hayes J.C. Design Hydrology and Sedimentology for Small Catchments. Academic Press. 1994. Inlet/Outlet Alternatives for Extended Detention Basins. State of California Department of Transportation (Caltrans), 2001. Manual of Standards of Erosion and Sediment Control Measures, Association of Bay Area Governments, May 1995. McLean, J., 2000. Mosquitoes in Constructed Wetlands: A Management Bugaboo? In T.R. Schueler and H.K. Holland [eds.], The Practice of Watershed Protection. pp. 29-33. Center for Watershed Protection, Ellicott City, MD, 2000. Metzger, M.E., D. F. Messer, C. L. Beitia, C. M. Myers, and V. L. Kramer. The Dark Side of Stormwater Runoff Management: Disease Vectors Associated with Structural BMPs, 2002. National Management Measures to Control Nonpoint Source Pollution from Urban Areas, United States Environmental Protection Agency, 2002. Proposed Guidance Specifying Management Measures for Sources of Nonpoint Pollution in Coastal Water, Work Group-Working Paper, USEPA, April 1992. Stormwater Management of the Puget Sound Basin, Technical Manual, Publication #91-75, Washington State Department of Ecology, February 1992. Sediment Basin SE-2 January 2011 California Stormwater BMP Handbook 14 of 18 Construction www.casqa.org Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), November 2000. Water Quality Management Plan for the Lake Tahoe Region, Volume II Handbook of Management Practices, Tahoe Regional Planning Agency, November 1988. Young, G.K. and Graziano, F., Outlet Hydraulics of Extended Detention Facilities for Northern Virginia Planning District Commission, 1989. Sediment Basin SE-2 January 2015 California Stormwater BMP Handbook 15 of 18 Construction www.casqa.org FIGURE 1: TYPICAL TEMPORARY SEDIMENT BASIN MULTIPLE ORIFICE DESIGN NOT TO SCALE Sediment Basin SE-2 January 2011 California Stormwater BMP Handbook 16 of 18 Construction www.casqa.org FIGURE 2: MULTIPLE ORIFICE OUTLET RISER NOT TO SCALE Sediment Basin SE-2 January 2011 California Stormwater BMP Handbook 17 of 18 Construction www.casqa.org FIGURE 3: TYPICAL SKIMMER NOT TO SCALE Sediment Basin SE-2 January 2011 California Stormwater BMP Handbook 18 of 18 Construction www.casqa.org FIGURE 4: TYPICAL TEMPORARY SEDIMENT BASIN WITH BAFFLES NOT TO SCALE Sediment Trap SE-3 January 2011 California Stormwater BMP Handbook 1 of 6 Construction www.casqa.org Description and Purpose A sediment trap is a containment area where sediment-laden runoff is temporarily detained under quiescent conditions, allowing sediment to settle out or before the runoff is discharged by gravity flow. Sediment traps are formed by excavating or constructing an earthen embankment across a waterway or low drainage area. Trap design guidance provided in this fact sheet is not intended to guarantee compliance with numeric discharge limits (numeric action levels or numeric effluent limits for turbidity). Compliance with discharge limits requires a thoughtful approach to comprehensive BMP planning, implementation, and maintenance. Therefore, optimally designed and maintained sediment traps should be used in conjunction with a comprehensive system of BMPs. Suitable Applications Sediment traps should be considered for use:  At the perimeter of the site at locations where sediment- laden runoff is discharged offsite.  At multiple locations within the project site where sediment control is needed.  Around or upslope from storm drain inlet protection measures.  Sediment traps may be used on construction projects where the drainage area is less than 5 acres. Traps would be Categories EC Erosion Control SE Sediment Control  TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control Legend:  Primary Objective  Secondary Objective Targeted Constituents Sediment  Nutrients Trash  Metals Bacteria Oil and Grease Organics Potential Alternatives SE-2 Sediment Basin (for larger areas) If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Sediment Trap SE-3 January 2011 California Stormwater BMP Handbook 2 of 6 Construction www.casqa.org placed where sediment-laden stormwater may enter a storm drain or watercourse. SE-2, Sediment Basins, must be used for drainage areas greater than 5 acres.  As a supplemental control, sediment traps provide additional protection for a water body or for reducing sediment before it enters a drainage system. Limitations  Requires large surface areas to permit infiltration and settling of sediment.  Not appropriate for drainage areas greater than 5 acres.  Only removes large and medium sized particles and requires upstream erosion control.  Attractive and dangerous to children, requiring protective fencing.  Conducive to vector production.  Should not be located in live streams. Implementation Design A sediment trap is a small temporary ponding area, usually with a gravel outlet, formed by excavation or by construction of an earthen embankment. Its purpose is to collect and store sediment from sites cleared or graded during construction. It is intended for use on small drainage areas with no unusual drainage features and projected for a quick build-out time. It should help in removing coarse sediment from runoff. The trap is a temporary measure with a design life of approximately six months to one year and is to be maintained until the site area is permanently protected against erosion by vegetation and/or structures. Sediment traps should be used only for small drainage areas. If the contributing drainage area is greater than 5 acres, refer to SE-2, Sediment Basins, or subdivide the catchment area into smaller drainage basins. Sediment usually must be removed from the trap after each rainfall event. The SWPPP should detail how this sediment is to be disposed, such as in fill areas onsite, or removal to an approved offsite dump. Sediment traps used as perimeter controls should be installed before any land disturbance takes place in the drainage area. Sediment traps are usually small enough that a failure of the structure would not result in a loss of life, damage to home or buildings, or interruption in the use of public roads or utilities. However, sediment traps are attractive to children and can be dangerous. The following recommendations should be implemented to reduce risks:  Install continuous fencing around the sediment trap or pond. Consult local ordinances regarding requirements for maintaining health and safety.  Restrict basin side slopes to 3:1 or flatter. Sediment trap size depends on the type of soil, size of the drainage area, and desired sediment removal efficiency (see SE-2, Sediment Basin). As a rule of thumb, the larger the basin volume Sediment Trap SE-3 January 2011 California Stormwater BMP Handbook 3 of 6 Construction www.casqa.org the greater the sediment removal efficiency. Sizing criteria are typically established under the local grading ordinance or equivalent. The runoff volume from a 2-year storm is a common design criteria for a sediment trap. The sizing criteria below assume that this runoff volume is 0.042 acre-ft/acre (0.5 in. of runoff). While the climatic, topographic, and soil type extremes make it difficult to establish a statewide standard, the following criteria should trap moderate to high amounts of sediment in most areas of California:  Locate sediment traps as near as practical to areas producing the sediment.  Trap should be situated according to the following criteria: (1) by excavating a suitable area or where a low embankment can be constructed across a swale, (2) where failure would not cause loss of life or property damage, and (3) to provide access for maintenance, including sediment removal and sediment stockpiling in a protected area.  Trap should be sized to accommodate a settling zone and sediment storage zone with recommended minimum volumes of 67 yd3/acre and 33 yd3/acre of contributing drainage area, respectively, based on 0.5 in. of runoff volume over a 24-hour period. In many cases, the size of an individual trap is limited by available space. Multiple traps or additional volume may be required to accommodate specific rainfall, soil, and site conditions.  Traps with an impounding levee greater than 4.5 ft tall, measured from the lowest point to the impounding area to the highest point of the levee, and traps capable of impounding more than 35,000 ft3, should be designed by a Registered Civil Engineer. The design should include maintenance requirements, including sediment and vegetation removal, to ensure continuous function of the trap outlet and bypass structures.  The outlet pipe or open spillway must be designed to convey anticipated peak flows.  Use rock or vegetation to protect the trap outlets against erosion.  Fencing should be provided to prevent unauthorized entry. Installation Sediment traps can be constructed by excavating a depression in the ground or creating an impoundment with a small embankment. Sediment traps should be installed outside the area being graded and should be built prior to the start of the grading activities or removal of vegetation. To minimize the area disturbed by them, sediment traps should be installed in natural depressions or in small swales or drainage ways. The following steps must be followed during installation:  The area under the embankment must be cleared, grubbed, and stripped of any vegetation and root mat. The pool area should be cleared.  The fill material for the embankment must be free of roots or other woody vegetation as well as oversized stones, rocks, organic material, or other objectionable material. The embankment may be compacted by traversing with equipment while it is being constructed.  All cut-and-fill slopes should be 3:1 or flatter.  When a riser is used, all pipe joints must be watertight. Sediment Trap SE-3 January 2011 California Stormwater BMP Handbook 4 of 6 Construction www.casqa.org  When a riser is used, at least the top two-thirds of the riser should be perforated with 0.5 in. diameter holes spaced 8 in. vertically and 10 to 12 in. horizontally. See SE-2, Sediment Basin.  When an earth or stone outlet is used, the outlet crest elevation should be at least 1 ft below the top of the embankment.  When crushed stone outlet is used, the crushed stone used in the outlet should meet AASHTO M43, size No. 2 or 24, or its equivalent such as MSHA No. 2. Gravel meeting the above gradation may be used if crushed stone is not available. Costs Average annual cost per installation and maintenance (18 month useful life) is $0.73 per ft3 ($1,300 per drainage acre). Maintenance costs are approximately 20% of installation costs. Inspection and Maintenance  Inspect BMPs in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Inspect outlet area for erosion and stabilize if required.  Inspect trap banks for seepage and structural soundness, repair as needed.  Inspect outlet structure and spillway for any damage or obstructions. Repair damage and remove obstructions as needed.  Inspect fencing for damage and repair as needed.  Inspect the sediment trap for area of standing water during every visit. Corrective measures should be taken if the BMP does not dewater completely in 96 hours or less to prevent vector production.  Sediment that accumulates in the BMP must be periodically removed in order to maintain BMP effectiveness. Sediment should be removed when the sediment accumulation reaches one-third of the trap capacity. Sediment removed during maintenance may be incorporated into earthwork on the site or disposed of at an appropriate location.  Remove vegetation from the sediment trap when first detected to prevent pools of standing water and subsequent vector production.  BMPs that require dewatering shall be continuously attended while dewatering takes place. Dewatering BMPs per NS-2 shall be implemented at all times during dewatering activities. References Brown, W., and T. Schueler. The Economics of Stormwater BMPs in the Mid-Atlantic Region. Prepared for Chesapeake Research Consortium, Edgewater, MD, by the Center for Watershed Protection, Ellicott City, MD, 1997. Sediment Trap SE-3 January 2011 California Stormwater BMP Handbook 5 of 6 Construction www.casqa.org Draft – Sedimentation and Erosion Control, an Inventory of Current Practices, USEPA, April 1990. Manual of Standards of Erosion and Sediment Control Measures, Association of Bay Area Governments, May 1995. Metzger, M.E., D.F. Messer, C.L. Beitia, C.M. Myers, and V.L. Kramer, The Dark Side of Stormwater Runoff Management: Disease Vectors Associated with Structural BMPs, 2002. National Management Measures to Control Nonpoint Source Pollution from Urban Areas, United States Environmental Protection Agency, 2002. Proposed Guidance Specifying Management Measures for Sources of Nonpoint Pollution in Coastal Waters, Work Group-Working Paper, USEPA, April 1992. Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), November 2000. Stormwater Management Manual for The Puget Sound Basin, Washington State Department of Ecology, Public Review Draft, 1991. U.S. Environmental Protection Agency (USEPA). Guidance Specifying Management Measures for Nonpoint Pollution in Coastal Waters. EPA 840-B-9-002. U.S. Environmental Protection Agency, Office of Water, Washington, DC, 1993. Water Quality Management Plan for the Lake Tahoe Region, Volume II, Handbook of Management Practices, Tahoe Regional Planning Agency, November 1988. Sediment Trap SE-3 January 2011 California Stormwater BMP Handbook 6 of 6 Construction www.casqa.org Check Dams SE-4 July 2012 California Stormwater BMP Handbook Portal 1 of 7 Construction www.casqa.org Description and Purpose A check dam is a small barrier constructed of rock, gravel bags, sandbags, fiber rolls, or other proprietary products, placed across a constructed swale or drainage ditch. Check dams reduce the effective slope of the channel, thereby reducing scour and channel erosion by reducing flow velocity and increasing residence time within the channel, allowing sediment to settle. Suitable Applications Check dams may be appropriate in the following situations:  To promote sedimentation behind the dam.  To prevent erosion by reducing the velocity of channel flow in small intermittent channels and temporary swales.  In small open channels that drain 10 acres or less.  In steep channels where stormwater runoff velocities exceed 5 ft/s.  During the establishment of grass linings in drainage ditches or channels.  In temporary ditches where the short length of service does not warrant establishment of erosion-resistant linings.  To act as a grade control structure. Categories EC Erosion Control  SE Sediment Control  TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control Legend:  Primary Category  Secondary Category Targeted Constituents Sediment  Nutrients Trash Metals Bacteria Oil and Grease Organics Potential Alternatives SE-5 Fiber Rolls SE-6 Gravel Bag Berm SE-8 Sandbag Barrier SE-12 Manufactured Linear Sediment Controls SE-14 Biofilter Bags If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Check Dams SE-4 July 2012 California Stormwater BMP Handbook Portal 2 of 7 Construction www.casqa.org Limitations  Not to be used in live streams or in channels with extended base flows.  Not appropriate in channels that drain areas greater than 10 acres.  Not appropriate in channels that are already grass-lined unless erosion potential or sediment-laden flow is expected, as installation may damage vegetation.  Require extensive maintenance following high velocity flows.  Promotes sediment trapping which can be re-suspended during subsequent storms or removal of the check dam.  Do not construct check dams with straw bales or silt fence.  Water suitable for mosquito production may stand behind check dams, particularly if subjected to daily non-stormwater discharges. Implementation General Check dams reduce the effective slope and create small pools in swales and ditches that drain 10 acres or less. Using check dams to reduce channel slope reduces the velocity of stormwater flows, thus reducing erosion of the swale or ditch and promoting sedimentation. Thus, check dams are dual-purpose and serve an important role as erosion controls as well as as sediment controls. Note that use of 1-2 isolated check dams for sedimentation will likely result in little net removal of sediment because of the small detention time and probable scour during longer storms. Using a series of check dams will generally increase their effectiveness. A sediment trap (SE-3) may be placed immediately upstream of the check dam to increase sediment removal efficiency. Design and Layout Check dams work by decreasing the effective slope in ditches and swales. An important consequence of the reduced slope is a reduction in capacity of the ditch or swale. This reduction in capacity should be considered when using this BMP, as reduced capacity can result in overtopping of the ditch or swale and resultant consequences. In some cases, such as a “permanent” ditch or swale being constructed early and used as a “temporary” conveyance for construction flows, the ditch or swale may have sufficient capacity such that the temporary reduction in capacity due to check dams is acceptable. When check dams reduce capacities beyond acceptable limits, either:  Don’t use check dams. Consider alternative BMPs, or.  Increase the size of the ditch or swale to restore capacity. Maximum slope and velocity reduction is achieved when the toe of the upstream dam is at the same elevation as the top of the downstream dam (see “Spacing Between Check Dams” detail at the end of this fact sheet). The center section of the dam should be lower than the edge sections (at least 6 inches), acting as a spillway, so that the check dam will direct flows to the center of Check Dams SE-4 July 2012 California Stormwater BMP Handbook Portal 3 of 7 Construction www.casqa.org the ditch or swale (see “Typical Rock Check Dam” detail at the end of this fact sheet). Bypass or side-cutting can occur if a sufficient spillway is not provided in the center of the dam. Check dams are usually constructed of rock, gravel bags, sandbags, and fiber rolls. A number of products can also be used as check dams (e.g. HDPE check dams, temporary silt dikes (SE-12)), and some of these products can be removed and reused. Check dams can also be constructed of logs or lumber, and have the advantage of a longer lifespan when compared to gravel bags, sandbags, and fiber rolls. Check dams should not be constructed from straw bales or silt fences, since concentrated flows quickly wash out these materials. Rock check dams are usually constructed of 8 to 12 in. rock. The rock is placed either by hand or mechanically, but never just dumped into the channel. The dam should completely span the ditch or swale to prevent washout. The rock used should be large enough to stay in place given the expected design flow through the channel. It is recommended that abutments be extended 18 in. into the channel bank. Rock can be graded such that smaller diameter rock (e.g. 2-4 in) is located on the upstream side of larger rock (holding the smaller rock in place); increasing residence time. Log check dams are usually constructed of 4 to 6 in. diameter logs, installed vertically. The logs should be embedded into the soil at least 18 in. Logs can be bolted or wired to vertical support logs that have been driven or buried into the soil. See fiber rolls, SE-5, for installation of fiber roll check dams. Gravel bag and sand bag check dams are constructed by stacking bags across the ditch or swale, shaped as shown in the drawings at the end of this fact sheet (see “Gravel Bag Check Dam” detail at the end of this fact sheet). Manufactured products, such as temporary silt dikes (SE-12), should be installed in accordance with the manufacturer’s instructions. Installation typically requires anchoring or trenching of products, as well as regular maintenance to remove accumulated sediment and debris. If grass is planted to stabilize the ditch or swale, the check dam should be removed when the grass has matured (unless the slope of the swales is greater than 4%). The following guidance should be followed for the design and layout of check dams:  Install the first check dam approximately 16 ft from the outfall device and at regular intervals based on slope gradient and soil type.  Check dams should be placed at a distance and height to allow small pools to form between each check dam.  For multiple check dam installation, backwater from a downstream check dam should reach the toes of the upstream check dam.  A sediment trap provided immediately upstream of the check dam will help capture sediment. Due to the potential for this sediment to be resuspended in subsequent storms, the sediment trap should be cleaned following each storm event. Check Dams SE-4 July 2012 California Stormwater BMP Handbook Portal 4 of 7 Construction www.casqa.org  High flows (typically a 2-year storm or larger) should safely flow over the check dam without an increase in upstream flooding or damage to the check dam.  Where grass is used to line ditches, check dams should be removed when grass has matured sufficiently to protect the ditch or swale. Materials  Rock used for check dams should typically be 8-12 in rock and be sufficiently sized to stay in place given expected design flows in the channel. Smaller diameter rock (e.g. 2 to 4 in) can be placed on the upstream side of larger rock to increase residence time.  Gravel bags used for check dams should conform to the requirements of SE-6, Gravel Bag Berms.  Sandbags used for check dams should conform to SE-8, Sandbag Barrier.  Fiber rolls used for check dams should conform to SE-5, Fiber Rolls.  Temporary silt dikes used for check dams should conform to SE-12, Temporary Silt Dikes. Installation  Rock should be placed individually by hand or by mechanical methods (no dumping of rock) to achieve complete ditch or swale coverage.  Tightly abut bags and stack according to detail shown in the figure at the end of this section (pyramid approach). Gravel bags and sandbags should not be stacked any higher than 3 ft.  Upper rows or gravel and sand bags shall overlap joints in lower rows.  Fiber rolls should be trenched in, backfilled, and firmly staked in place.  Install along a level contour.  HDPE check dams, temporary silt dikes, and other manufactured products should be used and installed per manufacturer specifications. Costs Cost consists of labor costs if materials are readily available (such as gravel on-site). If material must be imported, costs will increase. For other material and installation costs, see SE-5, SE-6, SE-8, SE-12, and SE-14. Inspection and Maintenance  BMPs must be inspected in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Replace missing rock, bags, rolls, etc. Replace bags or rolls that have degraded or have become damaged. Check Dams SE-4 July 2012 California Stormwater BMP Handbook Portal 5 of 7 Construction www.casqa.org  If the check dam is used as a sediment capture device, sediment that accumulates behind the BMP should be periodically removed in order to maintain BMP effectiveness. Sediment should be removed when the sediment accumulation reaches one-third of the barrier height.  If the check dam is used as a grade control structure, sediment removal is not required as long as the system continues to control the grade.  Inspect areas behind check dams for pools of standing water, especially if subjected to daily non-stormwater discharges.  Remove accumulated sediment prior to permanent seeding or soil stabilization.  Remove check dam and accumulated sediment when check dams are no longer needed. References Draft – Sedimentation and Erosion Control, and Inventory of Current Practices, USEPA, April 1990. Manual of Standards of Erosion and Sediment Control Measures, Association of Bay Area Governments, May 1995. Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), March 2003. Stormwater Management of the Puget Sound Basin, Technical Manual, Publication #91-75, Washington State Department of Ecology, February 1992. Erosion and Sediment Control Manual, Oregon Department of Environmental Quality, February 2005. Metzger, M.E. 2004. Managing mosquitoes in stormwater treatment devices. University of California Division of Agriculture and Natural Resources, Publication 8125. On-line: http:// anrcatalog.ucdavis.edu/pdf/8125.pdf Check Dams SE-4 July 2012 California Stormwater BMP Handbook Portal 6 of 7 Construction www.casqa.org Check Dams SE-4 July 2012 California Stormwater BMP Handbook Portal 7 of 7 Construction www.casqa.org Fiber Rolls SE-5 July 2012 California Stormwater BMP Handbook Portal 1 of 5 Construction www.casqa.org Description and Purpose A fiber roll consists of straw, coir, or other biodegradable materials bound into a tight tubular roll wrapped by netting, which can be photodegradable or natural. Additionally, gravel core fiber rolls are available, which contain an imbedded ballast material such as gravel or sand for additional weight when staking the rolls are not feasible (such as use as inlet protection). When fiber rolls are placed at the toe and on the face of slopes along the contours, they intercept runoff, reduce its flow velocity, release the runoff as sheet flow, and provide removal of sediment from the runoff (through sedimentation). By interrupting the length of a slope, fiber rolls can also reduce sheet and rill erosion until vegetation is established. Suitable Applications Fiber rolls may be suitable:  Along the toe, top, face, and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow.  At the end of a downward slope where it transitions to a steeper slope.  Along the perimeter of a project.  As check dams in unlined ditches with minimal grade.  Down-slope of exposed soil areas.  At operational storm drains as a form of inlet protection. Categories EC Erosion Control  SE Sediment Control  TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control Legend:  Primary Category  Secondary Category Targeted Constituents Sediment  Nutrients Trash Metals Bacteria Oil and Grease Organics Potential Alternatives SE-1 Silt Fence SE-6 Gravel Bag Berm SE-8 Sandbag Barrier SE-12 Manufactured Linear Sediment Controls SE-14 Biofilter Bags If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Fiber Rolls SE-5 July 2012 California Stormwater BMP Handbook Portal 2 of 5 Construction www.casqa.org  Around temporary stockpiles. Limitations  Fiber rolls are not effective unless trenched in and staked.  Not intended for use in high flow situations.  Difficult to move once saturated.  If not properly staked and trenched in, fiber rolls could be transported by high flows.  Fiber rolls have a very limited sediment capture zone.  Fiber rolls should not be used on slopes subject to creep, slumping, or landslide.  Rolls typically function for 12-24 months depending upon local conditions. Implementation Fiber Roll Materials  Fiber rolls should be prefabricated.  Fiber rolls may come manufactured containing polyacrylamide (PAM), a flocculating agent within the roll. Fiber rolls impregnated with PAM provide additional sediment removal capabilities and should be used in areas with fine, clayey or silty soils to provide additional sediment removal capabilities. Monitoring may be required for these installations.  Fiber rolls are made from weed free rice straw, flax, or a similar agricultural material bound into a tight tubular roll by netting.  Typical fiber rolls vary in diameter from 9 in. to 20 in. Larger diameter rolls are available as well. Installation  Locate fiber rolls on level contours spaced as follows: ­ Slope inclination of 4:1 (H:V) or flatter: Fiber rolls should be placed at a maximum interval of 20 ft. ­ Slope inclination between 4:1 and 2:1 (H:V): Fiber Rolls should be placed at a maximum interval of 15 ft. (a closer spacing is more effective). ­ Slope inclination 2:1 (H:V) or greater: Fiber Rolls should be placed at a maximum interval of 10 ft. (a closer spacing is more effective).  Prepare the slope before beginning installation.  Dig small trenches across the slope on the contour. The trench depth should be ¼ to 1/3 of the thickness of the roll, and the width should equal the roll diameter, in order to provide area to backfill the trench. Fiber Rolls SE-5 July 2012 California Stormwater BMP Handbook Portal 3 of 5 Construction www.casqa.org  It is critical that rolls are installed perpendicular to water movement, and parallel to the slope contour.  Start building trenches and installing rolls from the bottom of the slope and work up.  It is recommended that pilot holes be driven through the fiber roll. Use a straight bar to drive holes through the roll and into the soil for the wooden stakes.  Turn the ends of the fiber roll up slope to prevent runoff from going around the roll.  Stake fiber rolls into the trench. ­ Drive stakes at the end of each fiber roll and spaced 4 ft maximum on center. ­ Use wood stakes with a nominal classification of 0.75 by 0.75 in. and minimum length of 24 in.  If more than one fiber roll is placed in a row, the rolls should be overlapped, not abutted.  See typical fiber roll installation details at the end of this fact sheet. Removal  Fiber rolls can be left in place or removed depending on the type of fiber roll and application (temporary vs. permanent installation). Typically, fiber rolls encased with plastic netting are used for a temporary application because the netting does not biodegrade. Fiber rolls used in a permanent application are typically encased with a biodegradeable material and are left in place. Removal of a fiber roll used in a permanent application can result in greater disturbance.  Temporary installations should only be removed when up gradient areas are stabilized per General Permit requirements, and/or pollutant sources no longer present a hazard. But, they should also be removed before vegetation becomes too mature so that the removal process does not disturb more soil and vegetation than is necessary. Costs Material costs for regular fiber rolls range from $20 - $30 per 25 ft roll. Material costs for PAM impregnated fiber rolls range between 7.00-$9.00 per linear foot, based upon vendor research. Inspection and Maintenance  BMPs must be inspected in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Repair or replace split, torn, unraveling, or slumping fiber rolls.  If the fiber roll is used as a sediment capture device, or as an erosion control device to maintain sheet flows, sediment that accumulates in the BMP should be periodically removed Fiber Rolls SE-5 July 2012 California Stormwater BMP Handbook Portal 4 of 5 Construction www.casqa.org in order to maintain BMP effectiveness. Sediment should be removed when sediment accumulation reaches one-third the designated sediment storage depth.  If fiber rolls are used for erosion control, such as in a check dam, sediment removal should not be required as long as the system continues to control the grade. Sediment control BMPs will likely be required in conjunction with this type of application.  Repair any rills or gullies promptly. References Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), March 2003. Erosion and Sediment Control Manual, Oregon Department of Environmental Quality, February 2005. Fiber Rolls SE-5 July 2012 California Stormwater BMP Handbook Portal 5 of 5 Construction www.casqa.org Gravel Bag Berm SE-6 May 2011 California Stormwater BMP Handbook Portal 1 of 4 Construction www.casqa.org Description and Purpose A gravel bag berm is a series of gravel-filled bags placed on a level contour to intercept sheet flows. Gravel bags pond sheet flow runoff, allowing sediment to settle out, and release runoff slowly as sheet flow, preventing erosion. Suitable Applications Gravel bag berms may be suitable:  As a linear sediment control measure: ­ Below the toe of slopes and erodible slopes ­ As sediment traps at culvert/pipe outlets ­ Below other small cleared areas ­ Along the perimeter of a site ­ Down slope of exposed soil areas ­ Around temporary stockpiles and spoil areas ­ Parallel to a roadway to keep sediment off paved areas ­ Along streams and channels  As a linear erosion control measure: - Along the face and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow. Categories EC Erosion Control  SE Sediment Control  TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control Legend:  Primary Category  Secondary Category Targeted Constituents Sediment  Nutrients Trash Metals Bacteria Oil and Grease Organics Potential Alternatives SE-1 Silt Fence SE-5 Fiber Roll SE-8 Sandbag Barrier SE-12 Temporary Silt Dike SE-14 Biofilter Bags If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Gravel Bag Berm SE-6 May 2011 California Stormwater BMP Handbook Portal 2 of 4 Construction www.casqa.org ­ At the top of slopes to divert runoff away from disturbed slopes. ­ As chevrons (small check dams) across mildly sloped construction roads. For use check dam use in channels, see SE-4, Check Dams. Limitations  Gravel berms may be difficult to remove.  Removal problems limit their usefulness in landscaped areas.  Gravel bag berm may not be appropriate for drainage areas greater than 5 acres.  Runoff will pond upstream of the berm, possibly causing flooding if sufficient space does not exist.  Degraded gravel bags may rupture when removed, spilling contents.  Installation can be labor intensive.  Durability of gravel bags is somewhat limited and bags may need to be replaced when installation is required for longer than 6 months.  Easily damaged by construction equipment.  When used to detain concentrated flows, maintenance requirements increase. Implementation General A gravel bag berm consists of a row of open graded gravel-filled bags placed on a level contour. When appropriately placed, a gravel bag berm intercepts and slows sheet flow runoff, causing temporary ponding. The temporary ponding allows sediment to settle. The open graded gravel in the bags is porous, which allows the ponded runoff to flow slowly through the bags, releasing the runoff as sheet flows. Gravel bag berms also interrupt the slope length and thereby reduce erosion by reducing the tendency of sheet flows to concentrate into rivulets, which erode rills, and ultimately gullies, into disturbed, sloped soils. Gravel bag berms are similar to sand bag barriers, but are more porous. Generally, gravel bag berms should be used in conjunction with temporary soil stabilization controls up slope to provide effective erosion and sediment control. Design and Layout  Locate gravel bag berms on level contours.  When used for slope interruption, the following slope/sheet flow length combinations apply: ­ Slope inclination of 4:1 (H:V) or flatter: Gravel bags should be placed at a maximum interval of 20 ft, with the first row near the slope toe. ­ Slope inclination between 4:1 and 2:1 (H:V): Gravel bags should be placed at a maximum interval of 15 ft. (a closer spacing is more effective), with the first row near the slope toe. Gravel Bag Berm SE-6 May 2011 California Stormwater BMP Handbook Portal 3 of 4 Construction www.casqa.org Slope inclination 2:1 (H:V) or greater: Gravel bags should be placed at a maximum interval of 10 ft. (a closer spacing is more effective), with the first row near the slope toe.  Turn the ends of the gravel bag barriers up slope to prevent runoff from going around the berm.  Allow sufficient space up slope from the gravel bag berm to allow ponding, and to provide room for sediment storage.  For installation near the toe of the slope, gravel bag barriers should be set back from the slope toe to facilitate cleaning. Where specific site conditions do not allow for a set-back, the gravel bag barrier may be constructed on the toe of the slope. To prevent flows behind the barrier, bags can be placed perpendicular to a berm to serve as cross barriers.  Drainage area should not exceed 5 acres.  In Non-Traffic Areas: ­ Height = 18 in. maximum ­ Top width = 24 in. minimum for three or more layer construction ­ Top width = 12 in. minimum for one or two layer construction ­ Side slopes = 2:1 (H:V) or flatter  In Construction Traffic Areas: ­ Height = 12 in. maximum ­ Top width = 24 in. minimum for three or more layer construction. ­ Top width = 12 in. minimum for one or two layer construction. ­ Side slopes = 2:1 (H:V) or flatter.  Butt ends of bags tightly.  On multiple row, or multiple layer construction, overlap butt joints of adjacent row and row beneath.  Use a pyramid approach when stacking bags. Materials  Bag Material: Bags should be woven polypropylene, polyethylene or polyamide fabric or burlap, minimum unit weight of 4 ounces/yd2, Mullen burst strength exceeding 300 lb/in2 in conformance with the requirements in ASTM designation D3786, and ultraviolet stability exceeding 70% in conformance with the requirements in ASTM designation D4355. Gravel Bag Berm SE-6 May 2011 California Stormwater BMP Handbook Portal 4 of 4 Construction www.casqa.org  Bag Size: Each gravel-filled bag should have a length of 18 in., width of 12 in., thickness of 3 in., and mass of approximately 33 lbs. Bag dimensions are nominal, and may vary based on locally available materials.  Fill Material: Fill material should be 0.5 to 1 in. crushed rock, clean and free from clay, organic matter, and other deleterious material, or other suitable open graded, non-cohesive, porous gravel. Costs Material costs for gravel bags are average and are dependent upon material availability. $2.50- 3.00 per filled gravel bag is standard based upon vendor research. Inspection and Maintenance  BMPs must be inspected in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Gravel bags exposed to sunlight will need to be replaced every two to three months due to degrading of the bags.  Reshape or replace gravel bags as needed.  Repair washouts or other damage as needed.  Sediment that accumulates in the BMP should be periodically removed in order to maintain BMP effectiveness. Sediment should be removed when the sediment accumulation reaches one-third of the barrier height.  Remove gravel bag berms when no longer needed and recycle gravel fill whenever possible and properly dispose of bag material. Remove sediment accumulation and clean, re-grade, and stabilize the area. References Handbook of Steel Drainage and Highway Construction, American Iron and Steel Institute, 1983. Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), March 2003. Stormwater Pollution Plan Handbook, First Edition, State of California, Department of Transportation Division of New Technology, Materials and Research, October 1992. Erosion and Sediment Control Manual, Oregon Department of Environmental Quality, February 2005. Street Sweeping and Vacuuming SE-7 January 2011 California Stormwater BMP Handbook 1 of 2 Construction www.casqa.org Description and Purpose Street sweeping and vacuuming includes use of self-propelled and walk-behind equipment to remove sediment from streets and roadways, and to clean paved surfaces in preparation for final paving. Sweeping and vacuuming prevents sediment from the project site from entering storm drains or receiving waters. Suitable Applications Sweeping and vacuuming are suitable anywhere sediment is tracked from the project site onto public or private paved streets and roads, typically at points of egress. Sweeping and vacuuming are also applicable during preparation of paved surfaces for final paving. Limitations Sweeping and vacuuming may not be effective when sediment is wet or when tracked soil is caked (caked soil may need to be scraped loose). Implementation  Controlling the number of points where vehicles can leave the site will allow sweeping and vacuuming efforts to be focused, and perhaps save money.  Inspect potential sediment tracking locations daily.  Visible sediment tracking should be swept or vacuumed on a daily basis. Categories EC Erosion Control SE Sediment Control  TC Tracking Control  WE Wind Erosion Control NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control Legend:  Primary Objective  Secondary Objective Targeted Constituents Sediment  Nutrients Trash  Metals Bacteria Oil and Grease  Organics Potential Alternatives None If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Street Sweeping and Vacuuming SE-7 January 2011 California Stormwater BMP Handbook 2 of 2 Construction www.casqa.org  Do not use kick brooms or sweeper attachments. These tend to spread the dirt rather than remove it.  If not mixed with debris or trash, consider incorporating the removed sediment back into the project Costs Rental rates for self-propelled sweepers vary depending on hopper size and duration of rental. Expect rental rates from $58/hour (3 yd3 hopper) to $88/hour (9 yd3 hopper), plus operator costs. Hourly production rates vary with the amount of area to be swept and amount of sediment. Match the hopper size to the area and expect sediment load to minimize time spent dumping. Inspection and Maintenance  Inspect BMPs in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  When actively in use, points of ingress and egress must be inspected daily.  When tracked or spilled sediment is observed outside the construction limits, it must be removed at least daily. More frequent removal, even continuous removal, may be required in some jurisdictions.  Be careful not to sweep up any unknown substance or any object that may be potentially hazardous.  Adjust brooms frequently; maximize efficiency of sweeping operations.  After sweeping is finished, properly dispose of sweeper wastes at an approved dumpsite. References Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), November 2000. Labor Surcharge and Equipment Rental Rates, State of California Department of Transportation (Caltrans), April 1, 2002 – March 31, 2003. Sandbag Barrier SE-8 July 2012 California Stormwater BMP Handbook Portal 1 of 6 Construction www.casqa.org Description and Purpose A sandbag barrier is a series of sand-filled bags placed on a level contour to intercept or to divert sheet flows. Sandbag barriers placed on a level contour pond sheet flow runoff, allowing sediment to settle out. Suitable Applications Sandbag barriers may be a suitable control measure for the applications described below. It is important to consider that sand bags are less porous than gravel bags and ponding or flooding can occur behind the barrier. Also, sand is easily transported by runoff if bags are damaged or ruptured. The SWPPP Preparer should select the location of a sandbag barrier with respect to the potential for flooding, damage, and the ability to maintain the BMP.  As a linear sediment control measure: - Below the toe of slopes and erodible slopes. - As sediment traps at culvert/pipe outlets. - Below other small cleared areas. - Along the perimeter of a site. - Down slope of exposed soil areas. - Around temporary stockpiles and spoil areas. - Parallel to a roadway to keep sediment off paved areas. - Along streams and channels. Categories EC Erosion Control  SE Sediment Control  TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control Legend:  Primary Category  Secondary Category Targeted Constituents Sediment  Nutrients Trash Metals Bacteria Oil and Grease Organics Potential Alternatives SE-1 Silt Fence SE-5 Fiber Rolls SE-6 Gravel Bag Berm SE-12 Manufactured Linear Sediment Controls SE-14 Biofilter Bags If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Sandbag Barrier SE-8 July 2012 California Stormwater BMP Handbook Portal 2 of 6 Construction www.casqa.org  As linear erosion control measure: - Along the face and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow. - At the top of slopes to divert runoff away from disturbed slopes. - As check dams across mildly sloped construction roads. Limitations  It is necessary to limit the drainage area upstream of the barrier to 5 acres.  Sandbags are not intended to be used as filtration devices.  Easily damaged by construction equipment.  Degraded sandbags may rupture when removed, spilling sand.  Installation can be labor intensive.  Durability of sandbags is somewhat limited and bags will need to be replaced when there are signs of damage or wear.  Burlap should not be used for sandbags. Implementation General A sandbag barrier consists of a row of sand-filled bags placed on a level contour. When appropriately placed, a sandbag barrier intercepts and slows sheet flow runoff, causing temporary ponding. The temporary ponding allows sediment to settle. Sand-filled bags have limited porosity, which is further limited as the fine sand tends to quickly plug with sediment, limiting or completely blocking the rate of flow through the barrier. If a porous barrier is desired, consider SE-1, Silt Fence, SE-5, Fiber Rolls, SE-6, Gravel Bag Berms or SE-14, Biofilter Bags. Sandbag barriers also interrupt the slope length and thereby reduce erosion by reducing the tendency of sheet flows to concentrate into rivulets which erode rills, and ultimately gullies, into disturbed, sloped soils. Sandbag barriers are similar to gravel bag berms, but less porous. Generally, sandbag barriers should be used in conjunction with temporary soil stabilization controls up slope to provide effective erosion and sediment control. Design and Layout  Locate sandbag barriers on a level contour.  When used for slope interruption, the following slope/sheet flow length combinations apply: - Slope inclination of 4:1 (H:V) or flatter: Sandbags should be placed at a maximum interval of 20 ft, with the first row near the slope toe. - Slope inclination between 4:1 and 2:1 (H:V): Sandbags should be placed at a maximum interval of 15 ft. (a closer spacing is more effective), with the first row near the slope toe. Sandbag Barrier SE-8 July 2012 California Stormwater BMP Handbook Portal 3 of 6 Construction www.casqa.org - Slope inclination 2:1 (H:V) or greater: Sandbags should be placed at a maximum interval of 10 ft. (a closer spacing is more effective), with the first row near the slope toe.  Turn the ends of the sandbag barrier up slope to prevent runoff from going around the barrier.  Allow sufficient space up slope from the barrier to allow ponding, and to provide room for sediment storage.  For installation near the toe of the slope, sand bag barriers should be set back from the slope toe to facilitate cleaning. Where specific site conditions do not allow for a set-back, the sand bag barrier may be constructed on the toe of the slope. To prevent flows behind the barrier, bags can be placed perpendicular to a berm to serve as cross barriers.  Drainage area should not exceed 5 acres.  Butt ends of bags tightly.  Overlap butt joints of row beneath with each successive row.  Use a pyramid approach when stacking bags.  In non-traffic areas - Height = 18 in. maximum - Top width = 24 in. minimum for three or more layer construction - Side slope = 2:1 (H:V) or flatter  In construction traffic areas - Height = 12 in. maximum - Top width = 24 in. minimum for three or more layer construction. - Side slopes = 2:1 (H:V) or flatter.  See typical sandbag barrier installation details at the end of this fact sheet. Materials  Sandbag Material: Sandbag should be woven polypropylene, polyethylene or polyamide fabric, minimum unit weight of 4 ounces/yd2, Mullen burst strength exceeding 300 lb/in2 in conformance with the requirements in ASTM designation D3786, and ultraviolet stability exceeding 70% in conformance with the requirements in ASTM designation D4355. Use of burlap is not an acceptable substitute, as sand can more easily mobilize out of burlap.  Sandbag Size: Each sand-filled bag should have a length of 18 in., width of 12 in., thickness of 3 in., and mass of approximately 33 lbs. Bag dimensions are nominal, and may vary based on locally available materials. Sandbag Barrier SE-8 July 2012 California Stormwater BMP Handbook Portal 4 of 6 Construction www.casqa.org  Fill Material: All sandbag fill material should be non-cohesive, Class 3 (Caltrans Standard Specification, Section 25) or similar permeable material free from clay and deleterious material, such as recycled concrete or asphalt. Costs Empty sandbags cost $0.25 - $0.75. Average cost of fill material is $8 per yd3. Additional labor is required to fill the bags. Pre-filled sandbags are more expensive at $1.50 - $2.00 per bag. These costs are based upon vendor research. Inspection and Maintenance  BMPs must be inspected in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Sandbags exposed to sunlight will need to be replaced every two to three months due to degradation of the bags.  Reshape or replace sandbags as needed.  Repair washouts or other damage as needed.  Sediment that accumulates behind the BMP should be periodically removed in order to maintain BMP effectiveness. Sediment should be removed when the sediment accumulation reaches one-third of the barrier height.  Remove sandbags when no longer needed and recycle sand fill whenever possible and properly dispose of bag material. Remove sediment accumulation, and clean, re-grade, and stabilize the area. References Standard Specifications for Construction of Local Streets and Roads, California Department of Transportation (Caltrans), July 2002. Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), March 2003. Erosion and Sediment Control Manual, Oregon Department of Environmental Quality, February 2005. Sandbag Barrier SE-8 July 2012 California Stormwater BMP Handbook Portal 5 of 6 Construction www.casqa.org Sandbag Barrier SE-8 July 2012 California Stormwater BMP Handbook Portal 6 of 6 Construction www.casqa.org Straw Bale Barrier SE-9 May 2011 California Stormwater BMP Handbook Portal 1 of 6 Construction www.casqa.org Description and Purpose A straw bale barrier is a series of straw bales placed on a level contour to intercept sheet flows. Straw bale barriers pond sheet-flow runoff, allowing sediment to settle out. Suitable Applications Straw bale barriers may be suitable:  As a linear sediment control measure: - Below the toe of slopes and erodible slopes - As sediment traps at culvert/pipe outlets - Below other small cleared areas - Along the perimeter of a site - Down slope of exposed soil areas - Around temporary stockpiles and spoil areas - Parallel to a roadway to keep sediment off paved areas - Along streams and channels  As linear erosion control measure: - Along the face and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow Categories EC Erosion Control  SE Sediment Control  TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control Legend:  Primary Objective  Secondary Objective Targeted Constituents Sediment  Nutrients Trash Metals Bacteria Oil and Grease Organics Potential Alternatives SE-1 Silt Fence SE-5 Fiber Rolls SE-6 Gravel Bag Berm SE-8 Sandbag Barrier SE-12 Temporary Silt Dike SE-14 Biofilter Bags If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Straw Bale Barrier SE-9 May 2011 California Stormwater BMP Handbook Portal 2 of 6 Construction www.casqa.org - At the top of slopes to divert runoff away from disturbed slopes - As check dams across mildly sloped construction roads Limitations Straw bale barriers:  Are not to be used for extended periods of time because they tend to rot and fall apart  Are suitable only for sheet flow on slopes of 10 % or flatter  Are not appropriate for large drainage areas, limit to one acre or less  May require constant maintenance due to rotting  Are not recommended for concentrated flow, inlet protection, channel flow, and live streams  Cannot be made of bale bindings of jute or cotton  Require labor-intensive installation and maintenance  Cannot be used on paved surfaces  Should not to be used for drain inlet protection  Should not be used on lined ditches  May introduce undesirable non-native plants to the area Implementation General A straw bale barrier consists of a row of straw bales placed on a level contour. When appropriately placed, a straw bale barrier intercepts and slows sheet flow runoff, causing temporary ponding. The temporary ponding provides quiescent conditions allowing sediment to settle. Straw bale barriers also interrupt the slope length and thereby reduce erosion by reducing the tendency of sheet flows to concentrate into rivulets, which erode rills, and ultimately gullies, into disturbed, sloped soils. Straw bale barriers have not been as effective as expected due to improper use. These barriers have been placed in streams and drainage ways where runoff volumes and velocities have caused the barriers to wash out. In addition, failure to stake and entrench the straw bale has allowed undercutting and end flow. Use of straw bale barriers in accordance with this BMP should produce acceptable results. Design and Layout  Locate straw bale barriers on a level contour. - Slopes up to 10:1 (H:V): Straw bales should be placed at a maximum interval of 50 ft (a closer spacing is more effective), with the first row near the toe of slope. - Slopes greater than 10:1 (H:V): Not recommended. Straw Bale Barrier SE-9 May 2011 California Stormwater BMP Handbook Portal 3 of 6 Construction www.casqa.org  Turn the ends of the straw bale barrier up slope to prevent runoff from going around the barrier.  Allow sufficient space up slope from the barrier to allow ponding, and to provide room for sediment storage.  For installation near the toe of the slope, consider moving the barrier away from the slope toe to facilitate cleaning. To prevent flow behind the barrier, sand bags can be placed perpendicular to the barrier to serve as cross barriers.  Drainage area should not exceed 1 acre, or 0.25 acre per 100 ft of barrier.  Maximum flow path to the barrier should be limited to 100 ft.  Straw bale barriers should consist of two parallel rows. - Butt ends of bales tightly - Stagger butt joints between front and back row - Each row of bales must be trenched in and firmly staked  Straw bale barriers are limited in height to one bale laid on its side.  Anchor bales with either two wood stakes or four bars driven through the ba le and into the soil. Drive the first stake towards the butt joint with the adjacent bale to force the bales together.  See attached figure for installation details. Materials  Straw Bale Size: Each straw bale should be a minimum of 14 in. wide, 18 in. in height, 36 in. in length and should have a minimum mass of 50 lbs. The straw bale should be composed entirely of vegetative matter, except for the binding material.  Bale Bindings: Bales should be bound by steel wire, nylon or polypropylene string placed horizontally. Jute and cotton binding should not be used. Baling wire should be a minimum diameter of 14 gauge. Nylon or polypropylene string should be approximately 12 gauge in diameter with a breaking strength of 80 lbs force.  Stakes: Wood stakes should be commercial quality lumber of the size and shape shown on the plans. Each stake should be free from decay, splits or cracks longer than the thickness of the stake, or other defects that would weaken the stakes and cause the stakes to be structurally unsuitable. Steel bar reinforcement should be equal to a #4 designation or greater. End protection should be provided for any exposed bar reinforcement. Costs Straw bales cost $5 - $7 each. Adequate labor should be budgeted for installation and maintenance. Straw Bale Barrier SE-9 May 2011 California Stormwater BMP Handbook Portal 4 of 6 Construction www.casqa.org Inspection and Maintenance Maintenance  Inspect BMPs in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Straw bales degrade, especially when exposed to moisture. Rotting bales will need to be replaced on a regular basis.  Replace or repair damaged bales as needed.  Repair washouts or other damages as needed.  Sediment that accumulates in the BMP must be periodically removed in order to maintain BMP effectiveness. Sediment should be removed when the sediment accumulation reaches one-third of the barrier height. Sediment removed during maintenance may be incorporated into earthwork on the site or disposed at an appropriate location.  Remove straw bales when no longer needed. Remove sediment accumulation, and clean, re- grade, and stabilize the area. Removed sediment should be incorporated in the project or disposed of. References Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), November 2000. Straw Bale Barrier SE-9 May 2011 California Stormwater BMP Handbook Portal 5 of 6 Construction www.casqa.org Straw Bale Barrier SE-9 May 2011 California Stormwater BMP Handbook Portal 6 of 6 Construction www.casqa.org Storm Drain Inlet Protection SE-10 July 2012 California Stormwater BMP Handbook 1 of 10 Construction www.casqa.org Description and Purpose Storm drain inlet protection consists of a sediment filter or an impounding area in, around or upstream of a storm drain, drop inlet, or curb inlet. Storm drain inlet protection measures temporarily pond runoff before it enters the storm drain, allowing sediment to settle. Some filter configurations also remove sediment by filtering, but usually the ponding action results in the greatest sediment reduction. Temporary geotextile storm drain inserts attach underneath storm drain grates to capture and filter storm water. Suitable Applications  Every storm drain inlet receiving runoff from unstabilized or otherwise active work areas should be protected. Inlet protection should be used in conjunction with other erosion and sediment controls to prevent sediment-laden stormwater and non-stormwater discharges from entering the storm drain system. Limitations  Drainage area should not exceed 1 acre.  In general straw bales should not be used as inlet protection.  Requires an adequate area for water to pond without encroaching into portions of the roadway subject to traffic.  Sediment removal may be inadequate to prevent sediment discharges in high flow conditions or if runoff is heavily sediment laden. If high flow conditions are expected, use Categories EC Erosion Control SE Sediment Control  TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control Legend:  Primary Category  Secondary Category Targeted Constituents Sediment  Nutrients Trash  Metals Bacteria Oil and Grease Organics Potential Alternatives SE-1 Silt Fence SE-5 Fiber Rolls SE-6 Gravel Bag Berm SE-8 Sandbag Barrier SE-14 Biofilter Bags SE-13 Compost Socks and Berms If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Storm Drain Inlet Protection SE-10 July 2012 California Stormwater BMP Handbook 2 of 10 Construction www.casqa.org other onsite sediment trapping techniques in conjunction with inlet protection.  Frequent maintenance is required.  Limit drainage area to 1 acre maximum. For drainage areas larger than 1 acre, runoff should be routed to a sediment-trapping device designed for larger flows. See BMPs SE-2, Sediment Basin, and SE-3, Sediment Traps.  Excavated drop inlet sediment traps are appropriate where relatively heavy flows are expected, and overflow capability is needed. Implementation General Inlet control measures presented in this handbook should not be used for inlets draining more than one acre. Runoff from larger disturbed areas should be first routed through SE-2, Sediment Basin or SE-3, Sediment Trap and/or used in conjunction with other drainage control, erosion control, and sediment control BMPs to protect the site. Different types of inlet protection are appropriate for different applications depending on site conditions and the type of inlet. Alternative methods are available in addition to the methods described/shown herein such as prefabricated inlet insert devices, or gutter protection devices. Design and Layout Identify existing and planned storm drain inlets that have the potential to receive sediment- laden surface runoff. Determine if storm drain inlet protection is needed and which method to use.  The key to successful and safe use of storm drain inlet protection devices is to know where runoff that is directed toward the inlet to be protected will pond or be diverted as a result of installing the protection device. - Determine the acceptable location and extent of ponding in the vicinity of the drain inlet. The acceptable location and extent of ponding will influence the type and design of the storm drain inlet protection device. - Determine the extent of potential runoff diversion caused by the storm drain inlet protection device. Runoff ponded by inlet protection devices may flow around the device and towards the next downstream inlet. In some cases, this is acceptable; in other cases, serious erosion or downstream property damage can be caused by these diversions. The possibility of runoff diversions will influence whether or not storm drain inlet protection is suitable; and, if suitable, the type and design of the device.  The location and extent of ponding, and the extent of diversion, can usually be controlled through appropriate placement of the inlet protection device. In some cases, moving the inlet protection device a short distance upstream of the actual inlet can provide more efficient sediment control, limit ponding to desired areas, and prevent or control diversions.  Seven types of inlet protection are presented below. However, it is recognized that other effective methods and proprietary devices exist and may be selected. Storm Drain Inlet Protection SE-10 July 2012 California Stormwater BMP Handbook 3 of 10 Construction www.casqa.org - Silt Fence: Appropriate for drainage basins with less than a 5% slope, sheet flows, and flows under 0.5 cfs. - Excavated Drop Inlet Sediment Trap: An excavated area around the inlet to trap sediment (SE-3). - Gravel bag barrier: Used to create a small sediment trap upstream of inlets on sloped, paved streets. Appropriate for sheet flow or when concentrated flow may exceed 0.5 cfs, and where overtopping is required to prevent flooding. - Block and Gravel Filter: Appropriate for flows greater than 0.5 cfs. - Temporary Geotextile Storm drain Inserts: Different products provide different features. Refer to manufacturer details for targeted pollutants and additional features. - Biofilter Bag Barrier: Used to create a small retention area upstream of inlets and can be located on pavement or soil. Biofilter bags slowly filter runoff allowing sediment to settle out. Appropriate for flows under 0.5 cfs. - Compost Socks: Allow filtered run-off to pass through the compost while retaining sediment and potentially other pollutants (SE-13). Appropriate for flows under 1.0 cfs.  Select the appropriate type of inlet protection and design as referred to or as described in this fact sheet.  Provide area around the inlet for water to pond without flooding structures and property.  Grates and spaces around all inlets should be sealed to prevent seepage of sediment-laden water.  Excavate sediment sumps (where needed) 1 to 2 ft with 2:1 side slopes around the inlet. Installation  DI Protection Type 1 - Silt Fence - Similar to constructing a silt fence; see BMP SE-1, Silt Fence. Do not place fabric underneath the inlet grate since the collected sediment may fall into the drain inlet when the fabric is removed or replaced and water flow through the grate will be blocked resulting in flooding. See typical Type 1 installation details at the end of this fact sheet. 1. Excavate a trench approximately 6 in. wide and 6 in. deep along the line of the silt fence inlet protection device. 2. Place 2 in. by 2 in. wooden stakes around the perimeter of the inlet a maximum of 3 ft apart and drive them at least 18 in. into the ground or 12 in. below the bottom of the trench. The stakes should be at least 48 in. 3. Lay fabric along bottom of trench, up side of trench, and then up stakes. See SE-1, Silt Fence, for details. The maximum silt fence height around the inlet is 24 in. 4. Staple the filter fabric (for materials and specifications, see SE-1, Silt Fence) to wooden stakes. Use heavy-duty wire staples at least 1 in. in length. Storm Drain Inlet Protection SE-10 July 2012 California Stormwater BMP Handbook 4 of 10 Construction www.casqa.org 5. Backfill the trench with gravel or compacted earth all the way around.  DI Protection Type 2 - Excavated Drop Inlet Sediment Trap - Install filter fabric fence in accordance with DI Protection Type 1. Size excavated trap to provide a minimum storage capacity calculated at the rate 67 yd3/acre of drainage area. See typical Type 2 installation details at the end of this fact sheet.  DI Protection Type 3 - Gravel bag - Flow from a severe storm should not overtop the curb. In areas of high clay and silts, use filter fabric and gravel as additional filter media. Construct gravel bags in accordance with SE-6, Gravel Bag Berm. Gravel bags should be used due to their high permeability. See typical Type 3 installation details at the end of this fact sheet. 1. Construct on gently sloping street. 2. Leave room upstream of barrier for water to pond and sediment to settle. 3. Place several layers of gravel bags – overlapping the bags and packing them tightly together. 4. Leave gap of one bag on the top row to serve as a spillway. Flow from a severe storm (e.g., 10 year storm) should not overtop the curb.  DI Protection Type 4 – Block and Gravel Filter - Block and gravel filters are suitable for curb inlets commonly used in residential, commercial, and industrial construction. See typical Type 4 installation details at the end of this fact sheet. 1. Place hardware cloth or comparable wire mesh with 0.5 in. openings over the drop inlet so that the wire extends a minimum of 1 ft beyond each side of the inlet structure. If more than one strip is necessary, overlap the strips. Place woven geotextile over the wire mesh. 2. Place concrete blocks lengthwise on their sides in a single row around the perimeter of the inlet, so that the open ends face outward, not upward. The ends of adjacent blocks should abut. The height of the barrier can be varied, depending on design needs, by stacking combinations of blocks that are 4 in., 8 in., and 12 in. wide. The row of blocks should be at least 12 in. but no greater than 24 in. high. 3. Place wire mesh over the outside vertical face (open end) of the concrete blocks to prevent stone from being washed through the blocks. Use hardware cloth or comparable wire mesh with 0.5 in. opening. 4. Pile washed stone against the wire mesh to the top of the blocks. Use 0.75 to 3 in.  DI Protection Type 5 – Temporary Geotextile Insert (proprietary) – Many types of temporary inserts are available. Most inserts fit underneath the grate of a drop inlet or inside of a curb inlet and are fastened to the outside of the grate or curb. These inserts are removable and many can be cleaned and reused. Installation of these inserts differs between manufacturers. Please refer to manufacturer instruction for installation of proprietary devices. Storm Drain Inlet Protection SE-10 July 2012 California Stormwater BMP Handbook 5 of 10 Construction www.casqa.org  DI Protection Type 6 - Biofilter bags – Biofilter bags may be used as a substitute for gravel bags in low-flow situations. Biofilter bags should conform to specifications detailed in SE-14, Biofilter bags. 1. Construct in a gently sloping area. 2. Biofilter bags should be placed around inlets to intercept runoff flows. 3. All bag joints should overlap by 6 in. 4. Leave room upstream for water to pond and for sediment to settle out. 5. Stake bags to the ground as described in the following detail. Stakes may be omitted if bags are placed on a paved surface.  DI Protection Type 7 – Compost Socks – A compost sock can be assembled on site by filling a mesh sock (e.g., with a pneumatic blower). Compost socks do not require special trenching compared to other sediment control methods (e.g., silt fence). Compost socks should conform to specification detailed in SE-13, Compost Socks and Berms. Costs  Average annual cost for installation and maintenance of DI Type 1-4 and 6 (one year useful life) is $200 per inlet.  Temporary geotextile inserts are proprietary and cost varies by region. These inserts can often be reused and may have greater than 1 year of use if maintained and kept undamaged. Average cost per insert ranges from $50-75 plus installation, but costs can exceed $100. This cost does not include maintenance.  See SE-13 for Compost Sock cost information. Inspection and Maintenance  BMPs must be inspected in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Silt Fences. If the fabric becomes clogged, torn, or degrades, it should be replaced. Make sure the stakes are securely driven in the ground and are in good shape (i.e., not bent, cracked, or splintered, and are reasonably perpendicular to the ground). Replace damaged stakes. At a minimum, remove the sediment behind the fabric fence when accumulation reaches one-third the height of the fence or barrier height.  Gravel Filters. If the gravel becomes clogged with sediment, it should be carefully removed from the inlet and either cleaned or replaced. Since cleaning gravel at a construction site may be difficult, consider using the sediment-laden stone as fill material and put fresh stone around the inlet. Inspect bags for holes, gashes, and snags, and replace bags as needed. Check gravel bags for proper arrangement and displacement. Storm Drain Inlet Protection SE-10 July 2012 California Stormwater BMP Handbook 6 of 10 Construction www.casqa.org  Sediment that accumulates in the BMP should be periodically removed in order to maintain BMP effectiveness. Sediment should be removed when the sediment accumulation reaches one-third of the barrier height.  Inspect and maintain temporary geotextile insert devices according to manufacturer’s specifications.  Remove storm drain inlet protection once the drainage area is stabilized. - Clean and regrade area around the inlet and clean the inside of the storm drain inlet, as it should be free of sediment and debris at the time of final inspection. References Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), March 2003. Stormwater Management Manual for The Puget Sound Basin, Washington State Department of Ecology, Public Review Draft, 1991. Erosion and Sediment Control Manual, Oregon Department of Environmental Quality, February 2005. Storm Drain Inlet Protection SE-10 July 2012 California Stormwater BMP Handbook 7 of 10 Construction www.casqa.org Storm Drain Inlet Protection SE-10 June 2012 California Stormwater BMP Handbook 8 of 10 Construction www.casqa.org Storm Drain Inlet Protection SE-10 June 2012 California Stormwater BMP Handbook 9 of 10 Construction www.casqa.org Gravel bags Gravel bags 6. Protection can be effective even if it is not immediately adjacent to the inlet provided that the inlet is protected from potential sources of pollution. Storm Drain Inlet Protection SE-10 June 2012 California Stormwater BMP Handbook 10 of 10 Construction www.casqa.org Active Treatment Systems SE-11 November 2009 California Stormwater BMP Handbook 1 of 8 Construction www.casqa.org Description and Purpose Active Treatment Systems (ATS) reduce turbidity of construction site runoff by introducing chemicals to stormwater through direct dosing or an electrical current to enhance flocculation, coagulation, and settling of the suspended sediment. Coagulants and flocculants are used to enhance settling and removal of suspended sediments and generally include inorganic salts and polymers (USACE, 2001). The increased flocculation aids in sedimentation and ability to remove fine suspended sediments, thus reducing stormwater runoff turbidity and improving water quality. Suitable Applications ATS can reliably provide exceptional reductions of turbidity and associated pollutants and should be considered where turbid discharges to sediment and turbidity sensitive waters cannot be avoided using traditional BMPs. Additionally, it may be appropriate to use an ATS when site constraints inhibit the ability to construct a correctly sized sediment basin, when clay and/or highly erosive soils are present, or when the site has very steep or long slope lengths. Limitations Dischargers choosing to utilize chemical treatment in an ATS must follow all guidelines of the Construction General Permit Attachment F – Active Treatment System Requirements. General limitations are as follows: Categories EC Erosion Control  SE Sediment Control TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control Legend:  Primary Category  Secondary Category Targeted Constituents Sediment  Nutrients Trash Metals Bacteria Oil and Grease Organics Potential Alternatives None If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Active Treatment Systems SE-11 November 2009 California Stormwater BMP Handbook 2 of 8 Construction www.casqa.org  Numeric Effluent Limit (NEL) for all discharges (10 NTU daily flow-weighted average)  Limited availability of chemical residual testing procedures that meet permit requirements for flow-through treatment  Specific field and classroom ATS training required to operate equipment  Batch treatment requires extensive toxicity testing of effluent  Batch treatment requires large footprint to accommodate treatment cells  Requires additional filtration to remove residual floc and treatment chemicals prior to discharge  Petroleum based polymers should not be used  Requires site-specific design and equipment  Limited discharge rates depending on receiving water body  Labor intensive operation and maintenance  ATS costs are higher on a unit basis for smaller sites that would be expected to have a lower volume of treated runoff  ATS costs are seasonably variable due to increases or decreases in rainfall volumes Implementation Turbidity is difficult to control once fine particles are suspended in stormwater runoff from a construction site. Sedimentation ponds are effective at removing larger particulate matter by gravity settling, but are ineffective at removing smaller particulates such as clay and fine silt. Sediment ponds are typically designed to remove sediment no smaller than medium silt (0.02 mm). ATS may be used to reduce the turbidity of stormwater runoff. With an ATS, very high turbidities can be reduced to levels comparable to what is found in streams during dry weather. Criteria for ATS Product Use Chemically treated stormwater discharged from construction sites must be non-toxic to aquatic organisms. The following protocol should be used to evaluate chemicals proposed for stormwater treatment at construction sites. Authorization to use a chemical in the field based on this protocol does not relieve the applicant from responsibility for meeting all discharge and receiving water criteria applicable to a site.  An ATS Plan, which includes an Operation and Maintenance component, a Monitoring, Sampling and Reporting component, a Health and Safety component, and a Spill Prevention component must be prepared and submitted to the Regional Water Quality Control Board (RWQCB). Active Treatment Systems SE-11 November 2009 California Stormwater BMP Handbook 3 of 8 Construction www.casqa.org  Treatment chemicals should be approved by EPA for potable water use or otherwise be demonstrated to be protective of human health and the environment. Chemical residual or whole effluent toxicity testing is required.  Prior to field use of chemical treatment, jar tests are to be conducted to demonstrate that turbidity reduction necessary to meet the NELs and receiving water criteria can be achieved. Test conditions, including but not limited to raw water quality and jar test procedures, should be indicative of field conditions. Although these small-scale tests cannot be expected to reproduce performance under field conditions, they are indicative of treatment capability. A minimum of six site-specific jar tests must be conducted per chemical.  The proposed maximum dosage should be at least a factor of five lower than the no observed effects concentration (NOEC).  Effluent discharge from an ATS to a receiving water is conditional upon the favorable results of full-scale whole effluent bioassay/toxicity testing for batch treatment systems and upon chemical residuals testing for flow-through systems.  Contact the RWQCB for a list of treatment chemicals that may be pre-approved for use. Active Treatment System Design Considerations The design and operation of an ATS should take into consideration the factors that determine optimum, cost-effective performance. While site characteristics will influence system design, it is important to recognize the following overriding considerations:  The right chemical must be used at the right dosage. A dosage that is either too low or too high will not produce the lowest turbidity. There is an optimum dosage rate. This is a situation where the adage “adding more is always better” is not the case.  The coagulant must be mixed rapidly into the water to insure proper dispersion.  The mixing system for batch treatment must be sized to provide adequate mixing for the design storage volume. Lack of adequate mixing during the flocculation phase results in flocs that are too small and/or insufficiently dense. Too much mixing can rapidly destroy floc as it is formed.  Care must be taken in the design of the withdrawal system to minimize outflow velocities and to prevent floc discharge. The discharge should be directed through a filtration system such as sand, bag, or cartridge filter that would catch any unintended floc discharge.  ATS is also regulated for pH of the discharge. A pH-adjusting chemical should be added into the treated water to control pH if the selected coagulant requires alteration of the pH of the discharge outside of the acceptable range. Active Treatment System Design ATS can be designed as batch treatment systems using either ponds or portable trailer-mounted tanks, or as flow-through systems using any number of proprietary designed systems. Active Treatment Systems SE-11 November 2009 California Stormwater BMP Handbook 4 of 8 Construction www.casqa.org Figure has been adapted from Port of Seattle response to Washington Dept. of Ecology Action Order 2948 Batch Treatment Batch Treatment systems consist of the stormwater collection system (either temporary diversion or the permanent site drainage system); a sediment basin, trap or holding tanks; pumps; a chemical feed system; treatment cells; and, interconnecting piping. Batch treatment systems should use a minimum of two lined treatment cells. Multiple treatment cells allow for clarification of treated water while other cells are being filled or emptied. Treatment cells may be basins, traps, or tanks. Portable tanks may also be suitable for some sites. The following equipment should be located in a secured, covered location:  The chemical injector  Secondary contaminant for acid, caustic, buffering compound, and treatment chemical  Emergency shower and eyewash  Monitoring equipment which consists of a pH meter and a turbidimeter (if not already within the instrumentation panel of the chemical injector) Flow-through Treatment At a minimum, a flow-through ATS system consists of the stormwater collection system (either temporary diversion or the permanent site drainage system), an untreated stormwater storage pond or holding tank, and a chemically enhanced filtration system. Stormwater is collected at interception point(s) on the site and is diverted by gravity or by pumping to an untreated stormwater storage pond or other untreated stormwater holding area. Active Treatment Systems SE-11 November 2009 California Stormwater BMP Handbook 5 of 8 Construction www.casqa.org The stormwater is stored until treatment occurs. It is important that the holding pond be large enough to provide adequate storage. Stormwater is then pumped from the untreated stormwater storage pond to the chemically enhanced filtration system where polymer is added. Adjustments to pH may be necessary before chemical addition. The filtration system continually monitors the stormwater for turbidity and pH. If the discharge water is out of the acceptable turbidity or pH range, the water is recycled to the untreated stormwater pond (or holding tank) where it can be retreated. Flow through systems must ensure that:  Cumulative flow volume shall be recorded daily. The data recording system shall have the capacity to record a minimum of seven days of continuous data.  Instrumentation systems are interfaced with system control to provide auto shutoff or recirculation in the event that effluent measurements exceed turbidity or pH.  Upon system upset, power failure, or other catastrophic event, the ATS will default to a recirculation mode or safe shut down.  The instrumentation system provides a method for controlling coagulant dose, to prevent potential overdosing. Sizing Criteria An ATS shall be designed and approved by a Certified Professional in Erosion and Sediment Control (CPESC), a Certified Professional in Storm Water Quality (CPSWQ); a California registered civil engineer; or any other California registered engineer. ATS must be designed to capture and treat (within 72 hours) runoff from the 10-year 24-hour storm event. The runoff volume of the watershed area to be treated from this size storm event is required to be calculated using the Rational Method with a runoff coefficient of 1. If sediment basins are used to capture flow-through or batch treatment, see SE-2, Sediment Basin, for design criteria. Bypass should be provided around the ATS to accommodate extreme storm events. Primary settling should be encouraged in the sediment basin/storage pond. A forebay with access for maintenance may be beneficial. The permissible discharge rate governed by potential downstream effect should be used to calculate the recommended size of the treatment cells. Local requirements related to Phase I or Phase II NPDES permit thresholds should be considered in developing maximum discharge rates the ATS Plan. Costs Costs for ATS may be significant due to equipment rental requirements and cost of chemicals. ATS cost is lower on a treated unit-basis for large construction sites with large volumes of runoff. Inspection and Maintenance ATS must be operated and maintained by individuals with experience in their use and trained in accordance with training requirements below. ATS should be monitored continuously while in Active Treatment Systems SE-11 November 2009 California Stormwater BMP Handbook 6 of 8 Construction www.casqa.org use. A designated responsible person shall be on site daily at all times during treatment operations. Daily on-site visual monitoring of the system for proper performance shall be conducted and recorded in the project data log. The name, phone number, and training documentation of the person responsible for system operation and monitoring shall be included in the project data log. The following monitoring requirements and results should be recorded in the data log: Operational and Compliance Monitoring  Effluent flow rate and volume shall be continuously monitored and recorded at 15- minute or less intervals.  Influent and effluent pH must be continuously monitored and recorded at 15-minute or less intervals.  Influent and effluent turbidity (expressed in NTU) must be continuously monitored and recorded at 15-minute or less intervals.  The type and amount of chemical used for pH adjustment, if any, shall be monitored and recorded.  Dose rate of chemical used in the ATS system (expressed in mg/L) shall be monitored and reported 15-minutes after startup and every 8 hours of operation.  Laboratory duplicates – monthly laboratory duplicates for residual coagulant analysis must be performed and records shall be maintained onsite.  Effluent shall be monitored and recorded for residual chemical/additive levels.  If a residual chemical/additive test does not exist and the ATS is operating in a batch treatment mode of operation refer to the toxicity monitoring requirements below. Toxicity Monitoring Batch Treatment Toxicity testing for systems operated in batch treatment mode should be made in accordance with the following:  Acute toxicity testing on effluent samples representing effluent from each batch prior to discharge shall be undertaken. All bioassays shall be sent to a laboratory certified by the Department of Health Services (DHS) Environmental Laboratory Accreditation Program (ELAP). The required field of testing number for Whole Effluent Toxicity (WET) testing is E113.  Acute toxicity tests shall be conducted with the following species and protocols. The methods to be used in the acute toxicity testing shall be those outlined for a 96-hour acute test in “Methods for Measuring the Acute Toxicity of Effluents and Receiving Water to Freshwater and Marine Organisms, USEPA-841-R-02-012” for Fathead minnow, Pimephales promelas. Rainbow trout, Oncorhynchus mykiss, may be used as a substitute for fathead minnow. Active Treatment Systems SE-11 November 2009 California Stormwater BMP Handbook 7 of 8 Construction www.casqa.org All toxicity tests shall meet quality assurance criteria and test acceptability criteria in the most recent versions of the EPA test method for WET testing. Flow-through Treatment Toxicity testing for systems operated in flow-through treatment mode should be made in accordance with the following:  A residual chemical test method shall be used that has a method detection limit (MDL) of 10% or less than the maximum allowable threshold concentration (MATC) for the specific coagulant in use and for the most sensitive species of the chemical used. The MATC is equal to the geometric mean of the No Observed Effect Concentration (NOEC) and Lowest Observed Effect Concentration (LOEC) Acute and Chronic toxicity results for most sensitive species determined for the specific coagulant.  The residual chemical test method shall produce a result within one hour of sampling.  A California State certified laboratory shall validate the selected residual chemical test. Specifically the lab will review the test protocol, test parameters, and the detection limit of the coagulant. The discharger shall electronically submit this documentation as part of the ATS Plan. Numeric Effluent Limit (NEL) Compliance: All chemically treated stormwater must be sampled and tested for compliance with pH and turbidity limits. These limits have been established by the Construction General Permit. Sampling and testing for other pollutants may also be necessary at some sites. Turbidity limits have been set as 10 NTU as a daily flow-weighted average or 20 NTU from a single sample. pH must be within the range of 6.0 to 9.0 standard units. It is often possible to discharge treated stormwater that has a lower turbidity than the receiving water and that matches the pH. Treated stormwater samples and measurements should be taken from the discharge pipe or another location representative of the nature of the treated stormwater discharge. Samples used for determining compliance with the water quality standards in the receiving water should not be taken from the treatment pond prior to decanting. Compliance with the water quality standards is determined in the receiving water. Operator Training: Operators shall have training specific to using an ATS and liquid coagulants for stormwater discharges in California. The training shall be in the form of a formal class with a certificate and requirements for testing and certificate renewal. Training shall include a minimum of eight hours classroom and 32 hours field training. Standard BMPs: Erosion and sediment control BMPs should be implemented throughout the site to prevent erosion and discharge of sediment to the ATS. Some types of chemical coagulation and flocculation are only achievable in water below a certain turbidity; therefore minimizing the amount of sediment reaching the system will increase the likelihood of meeting effluent limits and will potentially lower costs of chemical dosing. Active Treatment Systems SE-11 November 2009 California Stormwater BMP Handbook 8 of 8 Construction www.casqa.org Sediment Removal and Disposal  Sediment shall be removed from the storage or treatment cells as necessary to ensure that the cells maintain their required water storage (i.e., volume) capability.  Handling and disposal of all solids generated during ATS operations shall be done in accordance with all local, state, and federal laws and regulations.  If sediment is determined to be non-toxic, it may be incorporated into the site away from drainages. References Engineering and Design – Precipitation/Coagulation/Flocculation. United States Army Corps of Engineers, EM 1110-1-4012, 2001. Evaluation of Active Treatment Systems (ATS) for Construction Site Runoff. California Building and Industry Association (prepared by Geosyntec Consultants), 2008. Stormwater Management Manual for Western Washington, Volume II – Construction Stormwater Pollution Prevention, Washington State Department of Ecology, August 2001. Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), November 2000. Manufactured Linear Sediment Controls (MLSC) SE-12 July 2012 California Stormwater BMP Handbook Portal 1 of 3 Construction www.casqa.org Description and Purpose Manufactured linear sediment controls (MLSC) are pre- manufactured devices that are typically specified and installed for drainage and sediment control on the perimeter of disturbed sites or stockpiles and as check dams within channels. Typically, MLSCs can be reused. This fact sheet is intended to provide guidance on BMP selection and implementation of proprietary or vendor- supplied products, for sediment control. Products should be evaluated for project-specific implementation and used if determined to be appropriate by the SWPPP Preparer. Suitable Applications MLSCs are generally used in areas as a substitute for fiber rolls and silt fences in sediment control applications to slow down runoff water, divert drainage or contain fines and sediment. MLSCs are a linear control and application suitability varies based on the specific product type. They may be suitable:  On paved surfaces for perimeter protection.  As check structures in channels.  Along the perimeter of disturbed sites in lieu of silt fence. Categories EC Erosion Control  SE Sediment Control  TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control  Legend:  Primary Category  Secondary Category Targeted Constituents Sediment  Nutrients Trash  Metals Bacteria Oil and Grease Organics Potential Alternatives SE-1 Silt Fence SE-5 Fiber Roll SE-6 Gravel Bag Berm SE-8 Sandbag Barrier If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Manufactured Linear Sediment Controls (MLSC) SE-12 July 2012 California Stormwater BMP Handbook Portal 2 of 3 Construction www.casqa.org  At operational storm drains as a form of inlet protection.  Around temporary stockpiles or material/equipment storage areas.  At the interface between graveled driveways and pavement.  Along the toe of exposed and erodible slopes. Limitations  Limitations vary by product. Product manufacturer’s printed product use instructions should be reviewed by the SWPPP Preparer to determine the project-specific applicability of MLSCs. Implementation General When appropriately placed, MLSCs intercept and slow sheet flow runoff, causing temporary ponding. The temporary ponding provides quiescent conditions allowing sediment to settle. The device is porous, which allows the ponded runoff to flow slowly through the device, releasing the runoff as sheet flows. Generally, MLSCs should be used in conjunction with temporary soil stabilization controls up-slope to provide an effective combination of erosion and sediment control. Design and Layout  MLSCs used on soil should be trenched or attached to the ground per manufacturer specifications in a manner that precludes runoff or ponded water from flowing around or under the device.  MLSCs designed for use on asphalt or concrete may be attached using a variety of methods, including nailing the device to the pavement, or using a high strength adhesive.  Follow manufacturer written specifications when installing MLSCs.  Allow sufficient space up-slope from the silt dike to allow ponding, and to provide room for sediment storage.  For installation near the toe of the slope, MLSCs should be set back 3 feet from the slope toe to facilitate cleaning. Where site conditions do not allow set back, the sediment control may be constructed on the toe of the slope. To prevent flows behind the barrier, sand or gravel bags can be placed perpendicular and between the sediment control and slope to serve as a barrier to parallel flow.  Drainage area should not exceed 5 acres. Materials  Several manufactured products are available. The following search terms or combination of terms can be used with an internet search engine to find manufactured linear sediment controls: Manufactured Linear Sediment Controls (MLSC) SE-12 July 2012 California Stormwater BMP Handbook Portal 3 of 3 Construction www.casqa.org - “silt barrier” - “reusable silt fence” - “silt fence alternative” or - “perimeter sediment control” Costs Manufacturers should be contacted directly for current pricing. Inspection and Maintenance  BMPs must be inspected in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Reshape or replace sections of damaged MLSCs as needed.  Repair washouts or other damage as needed.  Sediment that accumulates behind the BMP should be periodically removed in order to maintain BMP effectiveness. Sediment should be removed when the sediment accumulation reaches one-third of the barrier height.  Remove MLSCs when no longer needed. Remove sediment accumulation and clean, re- grade, and stabilize the area. Removed sediment should be incorporated in the project or disposed of properly. References City of Elko Construction Site Best Management Practices Handbook, December 2005. Construction Site Best Management Practices Handbook, June 2008 Update, Truckee Meadows Regional Stormwater Quality Management Program, June 2008. Complying with the Edwards Aquifer Rules Technical Guidance on Best Management Practices, Texas Commission on Environmental Quality, Revised July 2005, Addendum Sheet, January26, 2011. Stormwater Management Manual for Western Washington Volume II, Construction Stormwater Pollution Prevention, Washington State Department of Ecology, February 2005. Compost Socks and Berms SE-13 July 2012 California Stormwater BMP Handbook 1 of 8 Construction www.casqa.org Description and Purpose Compost socks and berms act as three-dimensional biodegradable filtering structures to intercept runoff where sheet flow occurs and are generally placed at the site perimeter or at intervals on sloped areas. Compost socks are generally a mesh sock containing compost and a compost berm is a dike of compost, trapezoidal in cross section. When employed to intercept sheet flow, both BMPs are placed perpendicular to the flow of runoff, allowing filtered runoff to pass through the compost and retaining sediment (and potentially other pollutants). A compost sock can be assembled on site by filling a mesh sock (e.g. with a pneumatic blower). The compost berm should be constructed using a backhoe or equivalent and/or a pneumatic delivery (blower) system and should be properly compacted. Compost socks and berms act as filters, reduce runoff velocities, and in some cases, aid in establishing vegetation. Compost is organic, biodegradable, and renewable. Compost provides soil structure that allows water to infiltrate the compost medium which helps prevent rill erosion and the retained moisture promotes seed germination and vegetation growth, in addition to providing organic matter and nutrients important for fostering vegetation. Compost improves soil quality and productivity, as well as erosion and sediment control. Categories EC Erosion Control  SE Sediment Control  TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control Legend:  Primary Category  Secondary Category Targeted Constituents Sediment  Nutrients Trash Metals  Bacteria  Oil and Grease  Organics Potential Alternatives SE-1 Silt Fence SE-5 Fiber Roll SE-6 Gravel Bag Berm SE-8 Sandbag Barrier SE-14 Biofilter Bags If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Compost Socks and Berms SE-13 July 2012 California Stormwater BMP Handbook 2 of 8 Construction www.casqa.org The compost of the compost sock or berm can be selected that targets site specific objectives in capturing sediment and other pollutants, supporting vegetation, or additional erosion control. Compost is typically derived from combinations of feedstocks, biosolids, leaf and yard trimmings, manure, wood, or mixed solid waste. Many types of compost are products of municipal recycle or "Greenwaste" programs. Compost is organic and biodegradable and can be left onsite. There are many types of compost with a variety of properties with specific functions, and accordingly compost selection is an important design consideration in the application of this type of erosion and sediment control. Suitable Applications  Along the toe, top, face, and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow (compost berms should only be used at the top of slopes or on slopes 4:1 (H:V) or flatter, all other slope applications should use compost socks)  Along the perimeter of a project  As check dams in unlined ditches (compost socks only)  Down-slope of exposed soil areas  At operational storm drains as a form of inlet protection (compost socks only)  Around temporary stockpiles Compost socks and berms do not require special trenching or BMP removal compared to other sediment control methods (e.g. silt fence or fiber rolls). Compost socks and berms can remain in place after earth disturbing activities are completed or the compost components can be spread over the site providing nutrients for plant growth and augmenting soil structure. BMPs that remain in place are particularly advantageous below embankments, especially adjacent streams, by limiting re-entry and the disturbance to sensitive areas. Compost can be pre-seeded prior to application (recommended by the EPA for construction site stormwater runoff control and required for compost socks) or seeded after installation (for compost berms only). The compost medium can also remove pollutants in stormwater including heavy metals; oil and grease; and hydrocarbons. Limitations  Compost can potentially leach nutrients (dissolved phosphorus and nitrogen) into runoff and potentially impact water quality. Compost should not be used directly upstream from nutrient impaired waterbodies (Adams et. al, 2008).  Compost may also contain other undesirable constituents that are detrimental to water quality. Compost should be obtained from a supplier certified by the California Integrated Waste Management Board or compost should otherwise meet the environmental health standards of Title 14, California Code of Regulations, Division 7, Chapter 3.1, Article 7. Carefully consider the qualifications and experience of any compost producer/supplier. Compost Socks and Berms SE-13 July 2012 California Stormwater BMP Handbook 3 of 8 Construction www.casqa.org  Application by hand is more time intensive and potentially costly. Using a pneumatic blower truck is the recommended cost effective method of assembly.  Compost socks and berms should not be employed at the base of slopes greater than 2:1 (H:V). They can be employed with other erosion control methods for steeper slopes.  Difficult to move once saturated.  Compost berms should not be applied in areas of concentrated flows.  Compost socks and berms are easy to fix; however, they are susceptible to damage by frequent traffic. Compost socks can be used around heavy machinery, but regular disturbance decreases sock performance. Implementation Compost Materials  California Compost Regulations (Title 14, California Code of Regulations, Division 7, Chapter 3.1, Article 7, Section 17868.3) define and require a quality of compost for application. Compost should comply with all physical and chemical requirements. Specific requirements are provided in Table 1, taken from Caltrans Standard Special Provision 10-1 (SSP 10-1), Erosion Control (Compost Blanket).  The compost producer should be fully permitted as specified under the California Integrated Waste Management Board, Local Enforcement Agencies and any other State and Local Agencies that regulate Solid Waste Facilities. If exempt from State permitting requirements, the composting facility should certify that it follows guidelines and procedures for production of compost meeting the environmental health standards of Title 14, California Code of Regulations, Division 7, Chapter 3.1, Article 7.  The compost producer should be a participant in United States Composting Council's Seal of Testing Assurance program.  Compost medium parameter specifications for compost socks and berms have been developed to assist in compost selection, such as those provided by the American Association of State Highway Transportation Officials (AASHTO).  Particle size is important parameter for selecting compost. Well consolidated coarser grades of compost (e.g. small and large pieces) perform better for filtration objectives, while finer grades better support vegetation. Particle size of the compost should be selected based on site conditions, such as expected precipitation, and filtration goals and / or long term plant nutrients.  Compost moisture should be considered for composition quality and application purposes. A range of 30-50% is typical. Compost that is too dry is hard to apply and compost that is too wet is more difficult (and more expensive) to transport. For arid or semi-arid areas, or for application during the dry season, use compost with greater moisture content than areas with wetter climates. For wetter or more humid climates or for application during the wet season, drier composts can be used as the compost will absorb moisture from the ambient air. Compost Socks and Berms SE-13 July 2012 California Stormwater BMP Handbook 4 of 8 Construction www.casqa.org  If vegetation establishment is a desired function of the compost, a compost sample should be inspected by a qualified individual. Vegetation has different nutrient and moisture needs.  Organic content of the compost is also important and should range from 30 to 65% depending on site conditions.  Compost should not be derived from mixed municipal solid waste and should be reasonably free of visible contaminates.  Compost should not contain paint, petroleum products, pesticides or any other chemical residues harmful to animal life or plant growth. Metal concentrations in compost should not exceed the maximum metal concentrations listed under Title 14, California Code of Regulations, Division 7, Chapter 3.1, Section 17868.2.  Compost should not possess objectionable odors.  Compost should be weed free. Compost Socks and Berms SE-13 July 2012 California Stormwater BMP Handbook 5 of 8 Construction www.casqa.org Table 1. Physical/Chemical Requirements of Compost Reference - Caltrans SSP-10 Erosion Control Blanket (Compost) Property Test Method Requirement pH *TMECC 04.11-A Elastometric pH 1:5 Slurry Method pH Units 6.0–8.0 Soluble Salts TMECC 04.10-A Electrical Conductivity 1:5 Slurry Method dS/m (mmhos/cm) 0-10.0 Moisture Content TMECC 03.09-A Total Solids & Moisture at 70+/- 5 deg C % Wet Weight Basis 30-60 Organic Matter Content TMECC 05.07-A Loss-On-Ignition Organic Matter Method (LOI) % Dry Weight Basis 30–65 Maturity TMECC 05.05-A Germination and Vigor Seed Emergence Seedling Vigor % Relative to Positive Control 80 or Above 80 or Above Stability TMECC 05.08-B Carbon Dioxide Evolution Rate mg CO2-C/g OM per day 8 or below Particle Size TMECC 02.02-B Sample Sieving for Aggregate Size Classification % Dry Weight Basis 100% Passing, 3 inch 90-100% Passing, 1 inch 65-100% Passing, 3/4 inch 0 - 75% Passing, 1/4 inch Maximum length 6 inches Pathogen TMECC 07.01-B Fecal Coliform Bacteria < 1000 MPN/gram dry wt. Pass Pathogen TMECC 07.01-B Salmonella < 3 MPN/4 grams dry wt. Pass Physical Contaminants TMECC 02.02-C Man Made Inert Removal and Classification: Plastic, Glass and Metal % > 4mm fraction Combined Total: < 1.0 Physical Contaminants TMECC 02.02-C Man Made Inert Removal and Classification: Sharps (Sewing needles, straight pins and hypodermic needles) % > 4mm fraction None Detected *TMECC refers to "Test Methods for the Examination of Composting and Compost," published by the United States Department of Agriculture and the United States Compost Council (USCC). Installation  Prior to application, prepare locations for socks and berms by removing brush and thick vegetation. The compost of the sock and/or berm should be allowed to come in full contact with the ground surface.  Select method to apply the compost sock or berm. A pneumatic blower is most cost effective and most adaptive in applying compost to steep, rough terrain, and hard to reach locations.  The compost of the berm should be distributed evenly to the surface, compacted, and shaped trapezoidal in cross section. Berm design is generally consists of a base two times the height. AASHTO specification MP 9-03 provides compost berm dimensions based on anticipated Compost Socks and Berms SE-13 July 2012 California Stormwater BMP Handbook 6 of 8 Construction www.casqa.org site precipitation (AASHTO, 2003 and USEPA, 2009). State agencies, such as Oregon Department of Environmental Quality (ODEQ) have developed berm dimension based on slope steepness and length (ODEQ, 2004).  Compost socks can be assembled on site by filling mesh socks with the selected compost. Mesh socks can be tied at one end, filled, and then tied at the other end. The ends of socks can be interlocked until the desired length is achieved. The sock diameter is a function of slope steepness and length. Again, ASSHTO provides specifications for various parameters. Compost socks range from 8” to 18”, but are typically 12” to 18” in diameter.  Compost socks are typically placed in contours perpendicular to sheet flow. They can also be placed in V formation on a slope. Compost socks need to be anchored, typically stakes, through the center of the sock. To prevent water flowing around them, the ends of compost socks should be placed upslope.  Locate compost socks and berms on level contours spaced as follows: ­ Slope inclination of 4:1 (H:V) or flatter: Socks and/or berms should be placed at a maximum interval of 20 ft. ­ Slope inclination between 4:1 and 2:1 (H:V): Socks should be placed at a maximum interval of 15 ft. (a closer spacing is more effective). ­ Slope inclination 2:1 (H:V) or greater: Socks should be placed at a maximum interval of 10 ft. (a closer spacing is more effective).  Place perimeter socks and berms using a j-hook installation. Use of vegetation will also provide additional anchoring.  Compost socks and berms can be placed around the perimeter of an affected area, like a silt fence, if the area is flat or on a contour. Do not place these socks and berms where ponded water could become an issue.  If used at the toe of slopes, the compost sock or berm should at a minimum of 5 to 10 feet away.  Use additional anchoring and erosion control BMPs in conjunction of the compost socks and berms as needed.  Consider using compost berms or socks as necessary at the top and/or bottom of the slope for additional erosion control performance.  Compost socks and berms can also be effective over rocky and frozen ground if installed properly.  It is recommended that the drainage areas of these compost BMPs do not exceed 0.25 acre per 100 feet placement interval and runoff does not exceed 1 cubic foot per second. Compost Socks and Berms SE-13 July 2012 California Stormwater BMP Handbook 7 of 8 Construction www.casqa.org Costs Recently obtained vendor costs indicated $3.50 per linear foot for compost berm application and $2.00 per linear foot for 8” socks and $2.50 per linear foot for 12”socks. Costs do not include final compost sock or berm functions at the end of construction activities, including spreading or removal, if required. ODEQ estimates that compost berms cost 30 percent less than silt fences to install. Inspection and Maintenance  BMPs must be inspected in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Once damage is identified, mend or reapply the sock or berm as needed. Washed out areas should be replaced. If the sock or berm height is breached during a storm, an additional sock can be stacked to increase the sock height and similarly the berm dimensions can be increased, as applicable. An additional sock or berm may be installed upslope, as needed. It may be necessary to apply an additional type of stormwater BMP, such as a compost blanket.  Sediment contained by the sock or berm should be removed prior reaching 1/3 of the exposed height of the BMP. The sediment can be stabilized with the compost sock or berm with vegetation at the end of construction activities.  Care should be exercised to minimize the damage to protected areas while making repairs, as any area damaged will require reapplication of BMPs.  Limit traffic to minimize damage to BMPs or impede vegetation establishment. References An analysis of Composting as an Environmental Remediation Technology, U.S. Environmental Protection Agency (USEPA), Solid Waste and Emergency Response (5305W), EPA530-R-8-008, 1998. Characteristics of Compost: Moisture Holding and Water Quality Improvement, Center for Research in Water Resources, Kirchoff, C., Malina, J., and Barrett, M., 2003. Compost Utilization for Erosion Control, The University of Georgia College of Agricultural and Environmental Sciences, pubs.caes.uga.edu/caespubs/pubcd/B1200.htm, Faucette, B. and Risse, M., 2001. Erosion and Sediment Control Manual, Oregon Department of Environmental Quality, February 2005. Standard Special Provision 10-1, Erosion Control (Compost Blanket), State of California Department of Transportation (Caltrans). 2007 Update. Evaluation of Environmental Benefits and Impacts of Compost and Industry Standard Erosion and Sediment Controls Measures Used in Construction Activities, Dissertation, Institute of Ecology, University of Georgia, Faucette, B., 2004. Compost Socks and Berms SE-13 July 2012 California Stormwater BMP Handbook 8 of 8 Construction www.casqa.org National Pollutant Discharge Elimination System (NPDES), Compost Blankets, U.S. Environmental Protection Agency (USEPA). http://cfpub.epa.gov/npdes/stormwater/menuofbmps/index.cfm?action=factsheet_results&vie w=specific&bmp=118, 2009. Standard Specifications for Transportation Materials and Methods of Sampling and Testing, Designation MP-9, Compost for Erosion/Sediment Control (Filter Berms), Provisional, American Association of State Highway Transportation Officials (AASHTO), 2003. Stormwater Best Management Practices (BMPs) Field Trials of Erosion Control Compost in Reclamation of Rock Quarry Operations, Nonpoint Source Protection Program CWA §319(h), Texas Commission on Environmental Quality, Adams, T., McFarland, A., Hauck, L., Barrett, M., and Eck, B., 2008. Biofilter Bags SE-14 July 2012 California Stormwater BMP Handbook 1 of 3 Construction www.casqa.org Description and Purpose Biofilter bags, or bio-bags, are a multi-purpose sediment control BMP consisting of a plastic mesh bag filled with 100% recycled wood product waste. Biofilter bags come in a variety of sizes (30” x 18” and 30” x 9” being common) and generally have between 1-2 cubic yards of recycled wood waste (or wood chips). Biofilter bags work by detaining flow and allowing a slow rate of discharge through the wood media. This action removes suspended sediment through gravity settling of the detained water and filtration within the bag. Suitable Applications Biofilter bags are a short-term BMP that can be rapidly deployed, maintained, and replaced. Biofilter bags can be an effective short-term solution to place in developed rills to prevent further erosion until permanent measures can be established. Suitable short-term applications include:  As a linear sediment control measure: - Below the toe of slopes and erodible slopes - Below other small cleared areas - Along the perimeter of a site (with low-expected flow) - Down slope of exposed soil areas - Around temporary stockpiles and spoil areas - Parallel to a roadway to keep sediment off paved areas Categories EC Erosion Control SE Sediment Control  TR Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control Legend:  Primary Category  Secondary Category Targeted Constituents Sediment  Nutrients Trash Metals Bacteria Oil and Grease Organics Potential Alternatives SE-1 Silt Fence SE-4 Check Dams SE-5 Fiber Roll SE-6 Gravel Bag Berm SE-8 Sandbag Barrier SE-10 Storm Drain Inlet Protection If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Biofilter Bags SE-14 July 2012 California Stormwater BMP Handbook 2 of 3 Construction www.casqa.org - Along streams and channels  As linear erosion control measure: - Along the face and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow - At the top of slopes to divert runoff away from disturbed slopes - As check dams across mildly sloped construction roads  Inlet Protection (See SE-10)  Supplement to silt fences or other sediment control devices Limitations  Short life-span (maximum usefulness of 2-3 months and should be replaced more frequently if needed); regular maintenance and replacement required to ensure effectiveness. Bags will rapidly fill with sediment and reduce permeability.  Easily damaged by construction vehicles.  If not properly staked, will fail on slope applications.  If improperly installed can allow undercutting or side-cutting flow.  Not effective where water velocities or volumes are high.  Potentially buoyant and easily displaced if not properly installed. Implementation General Biofilter bags are a relatively low cost temporary BMP that are easily deployed and have a simple installation that can be performed by hand. Without proper installation, however, biofilter bags can fail due to their light weight, potential displacement, and multiple joint locations. One of the benefits of utilizing biofilter bags is that the media (wood-product) can be recycled or used onsite when no longer needed (where acceptable). Design and Layout – Linear control  Locate biofilter bags on level contours. - Slopes between 20:1 and 4:1 (H:V): Biofilter bags should be placed at a maximum interval of 20 ft, with the first row near the slope toe. - Slopes between 4:1 and 2:1 (H:V): Biofilter bags should be placed at a maximum interval of 15 ft, with the first row near the slope toe. - Slopes 2:1 (H:V) or steeper: Biofilter bags should be placed at a maximum interval of 10 ft., with the first row placed the slope toe. Biofilter Bags SE-14 July 2012 California Stormwater BMP Handbook 3 of 3 Construction www.casqa.org  Turn the ends of the biofilter bag barriers up slope to prevent runoff from going around the berm.  Allow sufficient space up slope from the biofilter bag berm to allow ponding, and to provide room for sediment storage.  Stake biofilter bags into a 1 to 2 in. deep trench with a width equal to the bag. - Drive one stake at each end of the bag. - Use wood stakes with a nominal classification of 0.75 by 0.75 in. and minimum length of 24 in.  Biofilter bags should be overlapped (6 in.), not abutted. Costs Pre-filled biofilter bags cost approximately $2.50-$3.50 per bag, dependent upon size. Inspection and Maintenance  BMPs must be inspected in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Biofilter bags exposed to sunlight will need to be replaced every two to three months due to degrading of the bags.  Reshape or replace biofilter bags as needed.  Repair washouts or other damage as needed.  Sediment that is retained by the BMP should be periodically removed in order to maintain BMP effectiveness. Sediment should be removed when the sediment accumulation reaches one-third of the barrier height.  Remove biofilter bag berms when no longer needed. Remove sediment accumulation and clean, re-grade, and stabilize the area. Biofilter media may be used on-site, if allowed. References Catalog of Stormwater Best Management Practices for Idaho Cities and Counties. Volume 2, Section 7, BMP 34 – Biofilter Bags, Idaho Department of Environmental Quality, 2005. Erosion and Sediment Control Manual, Oregon Department of Environmental Quality, February 2005. Stormwater Quality Handbooks Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), March 2003. Stabilized Construction Entrance/Exit TC-1 July 2012 California Stormwater BMP Handbook 1 of 6 Construction www.casqa.org Description and Purpose A stabilized construction access is defined by a point of entrance/exit to a construction site that is stabilized to reduce the tracking of mud and dirt onto public roads by construction vehicles. Suitable Applications Use at construction sites:  Where dirt or mud can be tracked onto public roads.  Adjacent to water bodies.  Where poor soils are encountered.  Where dust is a problem during dry weather conditions. Limitations  Entrances and exits require periodic top dressing with additional stones.  This BMP should be used in conjunction with street sweeping on adjacent public right of way.  Entrances and exits should be constructed on level ground only.  Stabilized construction entrances are rather expensive to construct and when a wash rack is included, a sediment trap of some kind must also be provided to collect wash water runoff. Categories EC Erosion Control  SE Sediment Control  TC Tracking Control  WE Wind Erosion Control NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control Legend:  Primary Objective  Secondary Objective Targeted Constituents Sediment  Nutrients Trash Metals Bacteria Oil and Grease Organics Potential Alternatives None If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Stabilized Construction Entrance/Exit TC-1 July 2012 California Stormwater BMP Handbook 2 of 6 Construction www.casqa.org Implementation General A stabilized construction entrance is a pad of aggregate underlain with filter cloth located at any point where traffic will be entering or leaving a construction site to or from a public right of way, street, alley, sidewalk, or parking area. The purpose of a stabilized construction entrance is to reduce or eliminate the tracking of sediment onto public rights of way or streets. Reducing tracking of sediments and other pollutants onto paved roads helps prevent deposition of sediments into local storm drains and production of airborne dust. Where traffic will be entering or leaving the construction site, a stabilized construction entrance should be used. NPDES permits require that appropriate measures be implemented to prevent tracking of sediments onto paved roadways, where a significant source of sediments is derived from mud and dirt carried out from unpaved roads and construction sites. Stabilized construction entrances are moderately effective in removing sediment from equipment leaving a construction site. The entrance should be built on level ground. Advantages of the Stabilized Construction Entrance/Exit is that it does remove some sediment from equipment and serves to channel construction traffic in and out of the site at specified locations. Efficiency is greatly increased when a washing rack is included as part of a stabilized construction entrance/exit. Design and Layout  Construct on level ground where possible.  Select 3 to 6 in. diameter stones.  Use minimum depth of stones of 12 in. or as recommended by soils engineer.  Construct length of 50 ft or maximum site will allow, and 10 ft minimum width or to accommodate traffic.  Rumble racks constructed of steel panels with ridges and installed in the stabilized entrance/exit will help remove additional sediment and to keep adjacent streets clean.  Provide ample turning radii as part of the entrance.  Limit the points of entrance/exit to the construction site.  Limit speed of vehicles to control dust.  Properly grade each construction entrance/exit to prevent runoff from leaving the construction site.  Route runoff from stabilized entrances/exits through a sediment trapping device before discharge.  Design stabilized entrance/exit to support heaviest vehicles and equipment that will use it. Stabilized Construction Entrance/Exit TC-1 July 2012 California Stormwater BMP Handbook 3 of 6 Construction www.casqa.org  Select construction access stabilization (aggregate, asphaltic concrete, concrete) based on longevity, required performance, and site conditions. Do not use asphalt concrete (AC) grindings for stabilized construction access/roadway.  If aggregate is selected, place crushed aggregate over geotextile fabric to at least 12 in. depth, or place aggregate to a depth recommended by a geotechnical engineer. A crushed aggregate greater than 3 in. but smaller than 6 in. should be used.  Designate combination or single purpose entrances and exits to the construction site.  Require that all employees, subcontractors, and suppliers utilize the stabilized construction access.  Implement SE-7, Street Sweeping and Vacuuming, as needed.  All exit locations intended to be used for more than a two-week period should have stabilized construction entrance/exit BMPs. Inspection and Maintenance  Inspect and verify that activity–based BMPs are in place prior to the commencement of associated activities. While activities associated with the BMPs are under way, inspect BMPs in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Inspect local roads adjacent to the site daily. Sweep or vacuum to remove visible accumulated sediment.  Remove aggregate, separate and dispose of sediment if construction entrance/exit is clogged with sediment.  Keep all temporary roadway ditches clear.  Check for damage and repair as needed.  Replace gravel material when surface voids are visible.  Remove all sediment deposited on paved roadways within 24 hours.  Remove gravel and filter fabric at completion of construction Costs Average annual cost for installation and maintenance may vary from $1,200 to $4,800 each, averaging $2,400 per entrance. Costs will increase with addition of washing rack, and sediment trap. With wash rack, costs range from $1,200 - $6,000 each, averaging $3,600 per entrance. References Manual of Standards of Erosion and Sediment Control Measures, Association of Bay Area Governments, May 1995. Stabilized Construction Entrance/Exit TC-1 July 2012 California Stormwater BMP Handbook 4 of 6 Construction www.casqa.org National Management Measures to Control Nonpoint Source Pollution from Urban Areas, USEPA Agency, 2002. Proposed Guidance Specifying Management Measures for Sources of Nonpoint Pollution in Coastal Waters, Work Group Working Paper, USEPA, April 1992. Stormwater Quality Handbooks Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), November 2000. Stormwater Management of the Puget Sound Basin, Technical Manual, Publication #91-75, Washington State Department of Ecology, February 1992. Virginia Erosion and Sedimentation Control Handbook, Virginia Department of Conservation and Recreation, Division of Soil and Water Conservation, 1991. Guidance Specifying Management Measures for Nonpoint Pollution in Coastal Waters, EPA 840-B-9-002, USEPA, Office of Water, Washington, DC, 1993. Water Quality Management Plan for the Lake Tahoe Region, Volume II, Handbook of Management Practices, Tahoe Regional Planning Agency, November 1988. Stabilized Construction Entrance/Exit TC-1 July 2012 California Stormwater BMP Handbook 5 of 6 Construction www.casqa.org 50’ Typical (1) Length should be extended to 12 times the diameter of the largest construction vehicle tire. (2) On small sites length should be the maximum allowed by site. Stabilized Construction Entrance/Exit TC-1 July 2012 California Stormwater BMP Handbook 6 of 6 Construction www.casqa.org 50’ Typical (1) Length should be extended to 12 times the diameter of the largest construction vehicle tire. (2 ) On small sites length should be the maximum allowed by site . Stabilized Construction Roadway TC-2 January 2011 California Stormwater BMP Handbook 1 of 4 Construction www.casqa.org Description and Purpose Access roads, subdivision roads, parking areas, and other onsite vehicle transportation routes should be stabilized immediately after grading, and frequently maintained to prevent erosion and control dust. Suitable Applications This BMP should be applied for the following conditions:  Temporary Construction Traffic: ­ Phased construction projects and offsite road access ­ Construction during wet weather  Construction roadways and detour roads: ­ Where mud tracking is a problem during wet weather ­ Where dust is a problem during dry weather ­ Adjacent to water bodies ­ Where poor soils are encountered Limitations  The roadway must be removed or paved when construction is complete. Categories EC Erosion Control  SE Sediment Control  TC Tracking Control  WE Wind Erosion Control NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control Legend:  Primary Objective  Secondary Objective Targeted Constituents Sediment  Nutrients Trash Metals Bacteria Oil and Grease Organics Potential Alternatives None If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Stabilized Construction Roadway TC-2 January 2011 California Stormwater BMP Handbook 2 of 4 Construction www.casqa.org  Certain chemical stabilization methods may cause stormwater or soil pollution and should not be used. See WE-1, Wind Erosion Control.  Management of construction traffic is subject to air quality control measures. Contact the local air quality management agency.  Materials will likely need to be removed prior to final project grading and stabilization.  Use of this BMP may not be applicable to very short duration projects. Implementation General Areas that are graded for construction vehicle transport and parking purposes are especially susceptible to erosion and dust. The exposed soil surface is continually disturbed, leaving no opportunity for vegetative stabilization. Such areas also tend to collect and transport runoff waters along their surfaces. During wet weather, they often become muddy quagmires that generate significant quantities of sediment that may pollute nearby streams or be transported offsite on the wheels of construction vehicles. Dirt roads can become so unstable during wet weather that they are virtually unusable. Efficient construction road stabilization not only reduces onsite erosion but also can significantly speed onsite work, avoid instances of immobilized machinery and delivery vehicles, and generally improve site efficiency and working conditions during adverse weather Installation/Application Criteria Permanent roads and parking areas should be paved as soon as possible after grading. As an alternative where construction will be phased, the early application of gravel or chemical stabilization may solve potential erosion and stability problems. Temporary gravel roadway should be considered during the rainy season and on slopes greater than 5%. Temporary roads should follow the contour of the natural terrain to the maximum extent possible. Slope should not exceed 15%. Roadways should be carefully graded to drain transversely. Provide drainage swales on each side of the roadway in the case of a crowned section or one side in the case of a super elevated section. Simple gravel berms without a trench can also be used. Installed inlets should be protected to prevent sediment laden water from entering the storm sewer system (SE-10, Storm Drain Inlet Protection). In addition, the following criteria should be considered.  Road should follow topographic contours to reduce erosion of the roadway.  The roadway slope should not exceed 15%.  Chemical stabilizers or water are usually required on gravel or dirt roads to prevent dust (WE-1, Wind Erosion Control).  Properly grade roadway to prevent runoff from leaving the construction site.  Design stabilized access to support heaviest vehicles and equipment that will use it. Stabilized Construction Roadway TC-2 January 2011 California Stormwater BMP Handbook 3 of 4 Construction www.casqa.org  Stabilize roadway using aggregate, asphalt concrete, or concrete based on longevity, required performance, and site conditions. The use of cold mix asphalt or asphalt concrete (AC) grindings for stabilized construction roadway is not allowed.  Coordinate materials with those used for stabilized construction entrance/exit points.  If aggregate is selected, place crushed aggregate over geotextile fabric to at least 12 in. depth. A crushed aggregate greater than 3 in. but smaller than 6 in. should be used. Inspection and Maintenance  Inspect and verify that activity–based BMPs are in place prior to the commencement of associated activities. While activities associated with the BMP are under way, inspect BMPs in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Keep all temporary roadway ditches clear.  When no longer required, remove stabilized construction roadway and re-grade and repair slopes.  Periodically apply additional aggregate on gravel roads.  Active dirt construction roads are commonly watered three or more times per day during the dry season. Costs Gravel construction roads are moderately expensive, but cost is often balanced by reductions in construction delay. No additional costs for dust control on construction roads should be required above that needed to meet local air quality requirements. References Blueprint for a Clean Bay: Best Management Practices to Prevent Stormwater Pollution from Construction Related Activities; Santa Clara Valley Nonpoint Source Pollution Control Program, 1995. Coastal Nonpoint Pollution Control Program; Program Development and Approval Guidance, Working Group, Working Paper; USEPA, April 1992. Manual of Standards of Erosion and Sediment Control Measures, Association of Bay Area Governments, May 1995. Stormwater Quality Handbooks Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), November 2000. Stormwater Management for Construction Activities, Developing Pollution Prevention Plans and Best Management Practices, EPA 832-R-92005; USEPA, April 1992. Stormwater Management of the Puget Sound Basin, Technical Manual, Publication #91-75, Washington State Department of Ecology, February 1992. Stabilized Construction Roadway TC-2 January 2011 California Stormwater BMP Handbook 4 of 4 Construction www.casqa.org Virginia Erosion and Sedimentation Control Handbook, Virginia Department of Conservation and Recreation, Division of Soil and Water Conservation, 1991. Water Quality Management Plan for the Lake Tahoe Region, Volume II, Handbook of Management Practices, Tahoe Regional Planning Agency, November 1988. Entrance/Outlet Tire Wash TC-3 January 2011 California Stormwater BMP Handbook 1 of 3 Construction www.casqa.org Description and Purpose A tire wash is an area located at stabilized construction access points to remove sediment from tires and under carriages and to prevent sediment from being transported onto public roadways. Suitable Applications Tire washes may be used on construction sites where dirt and mud tracking onto public roads by construction vehicles may occur. Limitations  The tire wash requires a supply of wash water.  A turnout or doublewide exit is required to avoid having entering vehicles drive through the wash area.  Do not use where wet tire trucks leaving the site leave the road dangerously slick. Implementation  Incorporate with a stabilized construction entrance/exit. See TC-1, Stabilized Construction Entrance/Exit.  Construct on level ground when possible, on a pad of coarse aggregate greater than 3 in. but smaller than 6 in. A geotextile fabric should be placed below the aggregate.  Wash rack should be designed and constructed/manufactured for anticipated traffic loads. Categories EC Erosion Control SE Sediment Control  TC Tracking Control  WE Wind Erosion Control NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control Legend:  Primary Objective  Secondary Objective Targeted Constituents Sediment  Nutrients Trash Metals Bacteria Oil and Grease Organics Potential Alternatives TC-1 Stabilized Construction Entrance/Exit If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Entrance/Outlet Tire Wash TC-3 January 2011 California Stormwater BMP Handbook 2 of 3 Construction www.casqa.org  Provide a drainage ditch that will convey the runoff from the wash area to a sediment trapping device. The drainage ditch should be of sufficient grade, width, and depth to carry the wash runoff.  Use hoses with automatic shutoff nozzles to prevent hoses from being left on.  Require that all employees, subcontractors, and others that leave the site with mud caked tires and undercarriages to use the wash facility.  Implement SC-7, Street Sweeping and Vacuuming, as needed. Costs Costs are low for installation of wash rack. Inspection and Maintenance  Inspect and verify that activity–based BMPs are in place prior to the commencement of associated activities. While activities associated with the BMP are under way, inspect BMPs in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Inspect BMPs subject to non-stormwater discharge daily while non-stormwater discharges occur.  Remove accumulated sediment in wash rack and/or sediment trap to maintain system performance.  Inspect routinely for damage and repair as needed. References Blueprint for a Clean Bay: Best Management Practices to Prevent Stormwater Pollution from Construction Related Activities; Santa Clara Valley Nonpoint Source Pollution Control Program, 1995. Coastal Nonpoint Pollution Control Program; Program Development and Approval Guidance, Working Group, Working Paper; USEPA, April 1992. Manual of Standards of Erosion and Sediment Control Measures, Association of Bay Area Governments, May 1995. Stormwater Quality Handbooks Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), November 2000. Stormwater Management for Construction Activities, Developing Pollution Prevention Plans and Best Management Practices, EPA 832-R-92005; USEPA, April 1992. Entrance/Outlet Tire Wash TC-3 January 2011 California Stormwater BMP Handbook 3 of 3 Construction www.casqa.org Wind Erosion Control WE-1 May 2011 California Stormwater BMP Handbook 1 of 5 Construction www.casqa.org Description and Purpose Wind erosion or dust control consists of applying water or other chemical dust suppressants as necessary to prevent or alleviate dust nuisance generated by construction activities. Covering small stockpiles or areas is an alternative to applying water or other dust palliatives. California’s Mediterranean climate, with a short “wet” season and a typically long, hot “dry” season, allows the soils to thoroughly dry out. During the dry season, construction activities are at their peak, and disturbed and exposed areas are increasingly subject to wind erosion, sediment tracking and dust generated by construction equipment. Site conditions and climate can make dust control more of an erosion problem than water based erosion. Additionally, many local agencies, including Air Quality Management Districts, require dust control and/or dust control permits in order to comply with local nuisance laws, opacity laws (visibility impairment) and the requirements of the Clean Air Act. Wind erosion control is required to be implemented at all construction sites greater than 1 acre by the General Permit. Suitable Applications Most BMPs that provide protection against water-based erosion will also protect against wind-based erosion and dust control requirements required by other agencies will generally meet wind erosion control requirements for water quality protection. Wind erosion control BMPs are suitable during the following construction activities: Categories EC Erosion Control SE Sediment Control  TC Tracking Control WE Wind Erosion Control  NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control Legend:  Primary Category  Secondary Category Targeted Constituents Sediment  Nutrients Trash Metals Bacteria Oil and Grease Organics Potential Alternatives EC-5 Soil Binders If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Wind Erosion Control WE-1 May 2011 California Stormwater BMP Handbook 2 of 5 Construction www.casqa.org  Construction vehicle traffic on unpaved roads  Drilling and blasting activities  Soils and debris storage piles  Batch drop from front-end loaders  Areas with unstabilized soil  Final grading/site stabilization Limitations  Watering prevents dust only for a short period (generally less than a few hours) and should be applied daily (or more often) to be effective.  Over watering may cause erosion and track-out.  Oil or oil-treated subgrade should not be used for dust control because the oil may migrate into drainageways and/or seep into the soil.  Chemical dust suppression agents may have potential environmental impacts. Selected chemical dust control agents should be environmentally benign.  Effectiveness of controls depends on soil, temperature, humidity, wind velocity and traffic.  Chemical dust suppression agents should not be used within 100 feet of wetlands or water bodies.  Chemically treated subgrades may make the soil water repellant, interfering with long-term infiltration and the vegetation/re-vegetation of the site. Some chemical dust suppressants may be subject to freezing and may contain solvents and should be handled properly.  In compacted areas, watering and other liquid dust control measures may wash sediment or other constituents into the drainage system.  If the soil surface has minimal natural moisture, the affected area may need to be pre-wetted so that chemical dust control agents can uniformly penetrate the soil surface. Implementation Dust Control Practices Dust control BMPs generally stabilize exposed surfaces and minimize activities that suspend or track dust particles. The following table presents dust control practices that can be applied to varying site conditions that could potentially cause dust. For heavily traveled and disturbed areas, wet suppression (watering), chemical dust suppression, gravel asphalt surfacing, temporary gravel construction entrances, equipment wash-out areas, and haul truck covers can be employed as dust control applications. Permanent or temporary vegetation and mulching can be employed for areas of occasional or no construction traffic. Preventive measures include minimizing surface areas to be disturbed, limiting onsite vehicle traffic to 15 mph or less, and controlling the number and activity of vehicles on a site at any given time. Wind Erosion Control WE-1 May 2011 California Stormwater BMP Handbook 3 of 5 Construction www.casqa.org Chemical dust suppressants include: mulch and fiber based dust palliatives (e.g. paper mulch with gypsum binder), salts and brines (e.g. calcium chloride, magnesium chloride), non- petroleum based organics (e.g. vegetable oil, lignosulfonate), petroleum based organics (e.g. asphalt emulsion, dust oils, petroleum resins), synthetic polymers (e.g. polyvinyl acetate, vinyls, acrylic), clay additives (e.g. bentonite, montimorillonite) and electrochemical products (e.g. enzymes, ionic products). Site Condition Dust Control Practices Permanent Vegetation Mulching Wet Suppression (Watering) Chemical Dust Suppression Gravel or Asphalt Temporary Gravel Construction Entrances/Equipment Wash Down Synthetic Covers Minimize Extent of Disturbed Area Disturbed Areas not Subject to Traffic X X X X X X Disturbed Areas Subject to Traffic X X X X X Material Stockpiles X X X X X Demolition X X X Clearing/ Excavation X X X Truck Traffic on Unpaved Roads X X X X X Tracking X X Additional preventive measures include:  Schedule construction activities to minimize exposed area (see EC-1, Scheduling).  Quickly treat exposed soils using water, mulching, chemical dust suppressants, or stone/gravel layering.  Identify and stabilize key access points prior to commencement of construction.  Minimize the impact of dust by anticipating the direction of prevailing winds.  Restrict construction traffic to stabilized roadways within the project site, as practicable.  Water should be applied by means of pressure-type distributors or pipelines equipped with a spray system or hoses and nozzles that will ensure even distribution.  All distribution equipment should be equipped with a positive means of shutoff.  Unless water is applied by means of pipelines, at least one mobile unit should be available at all times to apply water or dust palliative to the project.  If reclaimed waste water is used, the sources and discharge must meet California Department of Health Services water reclamation criteria and the Regional Water Quality Wind Erosion Control WE-1 May 2011 California Stormwater BMP Handbook 4 of 5 Construction www.casqa.org Control Board (RWQCB) requirements. Non-potable water should not be conveyed in tanks or drain pipes that will be used to convey potable water and there should be no connection between potable and non-potable supplies. Non-potable tanks, pipes, and other conveyances should be marked, “NON-POTABLE WATER - DO NOT DRINK.”  Pave or chemically stabilize access points where unpaved traffic surfaces adjoin paved roads.  Provide covers for haul trucks transporting materials that contribute to dust.  Provide for rapid clean up of sediments deposited on paved roads. Furnish stabilized construction road entrances and wheel wash areas.  Stabilize inactive areas of construction sites using temporary vegetation or chemical stabilization methods. For chemical stabilization, there are many products available for chemically stabilizing gravel roadways and stockpiles. If chemical stabilization is used, the chemicals should not create any adverse effects on stormwater, plant life, or groundwater and should meet all applicable regulatory requirements. Costs Installation costs for water and chemical dust suppression vary based on the method used and the length of effectiveness. Annual costs may be high since some of these measures are effective for only a few hours to a few days. Inspection and Maintenance  Inspect and verify that activity-based BMPs are in place prior to the commencement of associated activities.  BMPs must be inspected in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Check areas protected to ensure coverage.  Most water-based dust control measures require frequent application, often daily or even multiple times per day. Obtain vendor or independent information on longevity of chemical dust suppressants. References Best Management Practices and Erosion Control Manual for Construction Sites, Flood Control District of Maricopa County, Arizona, September 1992. California Air Pollution Control Laws, California Air Resources Board, updated annually. Construction Manual, Chapter 4, Section 10, “Dust Control”; Section 17, “Watering”; and Section 18, “Dust Palliative”, California Department of Transportation (Caltrans), July 2001. Wind Erosion Control WE-1 May 2011 California Stormwater BMP Handbook 5 of 5 Construction www.casqa.org Prospects for Attaining the State Ambient Air Quality Standards for Suspended Particulate Matter (PM10), Visibility Reducing Particles, Sulfates, Lead, and Hydrogen Sulfide, California Air Resources Board, April 1991. Stormwater Quality Handbooks Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), March 2003. Material Delivery and Storage WM-1 November 2009 California Stormwater BMP Handbook 1 of 5 Construction www.casqa.org Description and Purpose Prevent, reduce, or eliminate the discharge of pollutants from material delivery and storage to the stormwater system or watercourses by minimizing the storage of hazardous materials onsite, storing materials in watertight containers and/or a completely enclosed designated area, installing secondary containment, conducting regular inspections, and training employees and subcontractors. This best management practice covers only material delivery and storage. For other information on materials, see WM-2, Material Use, or WM-4, Spill Prevention and Control. For information on wastes, see the waste management BMPs in this section. Suitable Applications These procedures are suitable for use at all construction sites with delivery and storage of the following materials:  Soil stabilizers and binders  Pesticides and herbicides  Fertilizers  Detergents  Plaster  Petroleum products such as fuel, oil, and grease Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control  Legend:  Primary Category  Secondary Category Targeted Constituents Sediment  Nutrients  Trash  Metals  Bacteria Oil and Grease  Organics  Potential Alternatives None If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Material Delivery and Storage WM-1 November 2009 California Stormwater BMP Handbook 2 of 5 Construction www.casqa.org  Asphalt and concrete components  Hazardous chemicals such as acids, lime, glues, adhesives, paints, solvents, and curing compounds  Concrete compounds  Other materials that may be detrimental if released to the environment Limitations  Space limitation may preclude indoor storage.  Storage sheds often must meet building and fire code requirements. Implementation The following steps should be taken to minimize risk:  Chemicals must be stored in water tight containers with appropriate secondary containment or in a storage shed.  When a material storage area is located on bare soil, the area should be lined and bermed.  Use containment pallets or other practical and available solutions, such as storing materials within newly constructed buildings or garages, to meet material storage requirements.  Stack erodible landscape material on pallets and cover when not in use.  Contain all fertilizers and other landscape materials when not in use.  Temporary storage areas should be located away from vehicular traffic.  Material Safety Data Sheets (MSDS) should be available on-site for all materials stored that have the potential to effect water quality.  Construction site areas should be designated for material delivery and storage.  Material delivery and storage areas should be located away from waterways, if possible. ­ Avoid transport near drainage paths or waterways. ­ Surround with earth berms or other appropriate containment BMP. See EC-9, Earth Dikes and Drainage Swales. ­ Place in an area that will be paved.  Storage of reactive, ignitable, or flammable liquids must comply with the fire codes of your area. Contact the local Fire Marshal to review site materials, quantities, and proposed storage area to determine specific requirements. See the Flammable and Combustible Liquid Code, NFPA30.  An up to date inventory of materials delivered and stored onsite should be kept. Material Delivery and Storage WM-1 November 2009 California Stormwater BMP Handbook 3 of 5 Construction www.casqa.org  Hazardous materials storage onsite should be minimized.  Hazardous materials should be handled as infrequently as possible.  Keep ample spill cleanup supplies appropriate for the materials being stored. Ensure that cleanup supplies are in a conspicuous, labeled area.  Employees and subcontractors should be trained on the proper material delivery and storage practices.  Employees trained in emergency spill cleanup procedures must be present when dangerous materials or liquid chemicals are unloaded.  If significant residual materials remain on the ground after construction is complete, properly remove and dispose of materials and any contaminated soil. See WM-7, Contaminated Soil Management. If the area is to be paved, pave as soon as materials are removed to stabilize the soil. Material Storage Areas and Practices  Liquids, petroleum products, and substances listed in 40 CFR Parts 110, 117, or 302 should be stored in approved containers and drums and should not be overfilled. Containers and drums should be placed in temporary containment facilities for storage.  A temporary containment facility should provide for a spill containment volume able to contain precipitation from a 25 year storm event, plus the greater of 10% of the aggregate volume of all containers or 100% of the capacity of the largest container within its boundary, whichever is greater.  A temporary containment facility should be impervious to the materials stored therein for a minimum contact time of 72 hours.  A temporary containment facility should be maintained free of accumulated rainwater and spills. In the event of spills or leaks, accumulated rainwater and spills should be collected and placed into drums. These liquids should be handled as a hazardous waste unless testing determines them to be non-hazardous. All collected liquids or non-hazardous liquids should be sent to an approved disposal site.  Sufficient separation should be provided between stored containers to allow for spill cleanup and emergency response access.  Incompatible materials, such as chlorine and ammonia, should not be stored in the same temporary containment facility.  Materials should be covered prior to, and during rain events.  Materials should be stored in their original containers and the original product labels should be maintained in place in a legible condition. Damaged or otherwise illegible labels should be replaced immediately. Material Delivery and Storage WM-1 November 2009 California Stormwater BMP Handbook 4 of 5 Construction www.casqa.org  Bagged and boxed materials should be stored on pallets and should not be allowed to accumulate on the ground. To provide protection from wind and rain throughout the rainy season, bagged and boxed materials should be covered during non-working days and prior to and during rain events.  Stockpiles should be protected in accordance with WM-3, Stockpile Management.  Materials should be stored indoors within existing structures or completely enclosed storage sheds when available.  Proper storage instructions should be posted at all times in an open and conspicuous location.  An ample supply of appropriate spill clean up material should be kept near storage areas.  Also see WM-6, Hazardous Waste Management, for storing of hazardous wastes. Material Delivery Practices  Keep an accurate, up-to-date inventory of material delivered and stored onsite.  Arrange for employees trained in emergency spill cleanup procedures to be present when dangerous materials or liquid chemicals are unloaded. Spill Cleanup  Contain and clean up any spill immediately.  Properly remove and dispose of any hazardous materials or contaminated soil if significant residual materials remain on the ground after construction is complete. See WM-7, Contaminated Soil Management.  See WM-4, Spill Prevention and Control, for spills of chemicals and/or hazardous materials.  If spills or leaks of materials occur that are not contained and could discharge to surface waters, non-visible sampling of site discharge may be required. Refer to the General Permit or to your project specific Construction Site Monitoring Plan to determine if and where sampling is required. Cost  The largest cost of implementation may be in the construction of a materials storage area that is covered and provides secondary containment. Inspection and Maintenance  BMPs must be inspected in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Keep storage areas clean and well organized, including a current list of all materials onsite.  Inspect labels on containers for legibility and accuracy. Material Delivery and Storage WM-1 November 2009 California Stormwater BMP Handbook 5 of 5 Construction www.casqa.org  Repair or replace perimeter controls, containment structures, covers, and liners as needed to maintain proper function. References Blueprint for a Clean Bay: Best Management Practices to Prevent Stormwater Pollution from Construction Related Activities; Santa Clara Valley Nonpoint Source Pollution Control Program, 1995. Coastal Nonpoint Pollution Control Program: Program Development and Approval Guidance, Working Group Working Paper; USEPA, April 1992. Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), March 2003. Stormwater Management for Construction Activities; Developing Pollution Prevention Plans and Best Management Practice, EPA 832-R-92005; USEPA, April 1992. Material Use WM-2 November 2009 California Stormwater BMP Handbook 1 of 4 Construction www.casqa.org Description and Purpose Prevent or reduce the discharge of pollutants to the storm drain system or watercourses from material use by using alternative products, minimizing hazardous material use onsite, and training employees and subcontractors. Suitable Applications This BMP is suitable for use at all construction projects. These procedures apply when the following materials are used or prepared onsite:  Pesticides and herbicides  Fertilizers  Detergents  Petroleum products such as fuel, oil, and grease  Asphalt and other concrete components  Other hazardous chemicals such as acids, lime, glues, adhesives, paints, solvents, and curing compounds  Other materials that may be detrimental if released to the environment Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control  Legend:  Primary Category  Secondary Category Targeted Constituents Sediment  Nutrients  Trash  Metals  Bacteria Oil and Grease  Organics  Potential Alternatives None If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Material Use WM-2 November 2009 California Stormwater BMP Handbook 2 of 4 Construction www.casqa.org Limitations Safer alternative building and construction products may not be available or suitable in every instance. Implementation The following steps should be taken to minimize risk:  Minimize use of hazardous materials onsite.  Follow manufacturer instructions regarding uses, protective equipment, ventilation, flammability, and mixing of chemicals.  Train personnel who use pesticides. The California Department of Pesticide Regulation and county agricultural commissioners license pesticide dealers, certify pesticide applicators, and conduct onsite inspections.  The preferred method of termiticide application is soil injection near the existing or proposed structure foundation/slab; however, if not feasible, soil drench application of termiticides should follow EPA label guidelines and the following recommendations (most of which are applicable to most pesticide applications):  Do not treat soil that is water-saturated or frozen.  Application shall not commence within 24-hours of a predicted precipitation event with a 40% or greater probability. Weather tracking must be performed on a daily basis prior to termiticide application and during the period of termiticide application.  Do not allow treatment chemicals to runoff from the target area. Apply proper quantity to prevent excess runoff. Provide containment for and divert stormwater from application areas using berms or diversion ditches during application.  Dry season: Do not apply within 10 feet of storm drains. Do not apply within 25 feet of aquatic habitats (such as, but not limited to, lakes; reservoirs; rivers; permanent streams; marshes or ponds; estuaries; and commercial fish farm ponds).  Wet season: Do not apply within 50 feet of storm drains or aquatic habitats (such as, but not limited to, lakes; reservoirs; rivers; permanent streams; marshes or ponds; estuaries; and commercial fish farm ponds) unless a vegetative buffer is present (if so, refer to dry season requirements).  Do not make on-grade applications when sustained wind speeds are above 10 mph (at application site) at nozzle end height.  Cover treatment site prior to a rain event in order to prevent run-off of the pesticide into non-target areas. The treated area should be limited to a size that can be backfilled and/or covered by the end of the work shift. Backfilling or covering of the treated area shall be done by the end of the same work shift in which the application is made.  The applicator must either cover the soil him/herself or provide written notification of the above requirement to the contractor on site and to the person commissioning the Material Use WM-2 November 2009 California Stormwater BMP Handbook 3 of 4 Construction www.casqa.org application (if different than the contractor). If notice is provided to the contractor or the person commissioning the application, then they are responsible under the Federal Insecticide Fungicide, and Rodenticide Act (FIFRA) to ensure that: 1) if the concrete slab cannot be poured over the treated soil within 24 hours of application, the treated soil is covered with a waterproof covering (such as polyethylene sheeting), and 2) the treated soil is covered if precipitation is predicted to occur before the concrete slab is scheduled to be poured.  Do not over-apply fertilizers, herbicides, and pesticides. Prepare only the amount needed. Follow the recommended usage instructions. Over-application is expensive and environmentally harmful. Unless on steep slopes, till fertilizers into the soil rather than hydraulic application. Apply surface dressings in several smaller applications, as opposed to one large application, to allow time for infiltration and to avoid excess material being carried offsite by runoff. Do not apply these chemicals before predicted rainfall.  Train employees and subcontractors in proper material use.  Supply Material Safety Data Sheets (MSDS) for all materials.  Dispose of latex paint and paint cans, used brushes, rags, absorbent materials, and drop cloths, when thoroughly dry and are no longer hazardous, with other construction debris.  Do not remove the original product label; it contains important safety and disposal information. Use the entire product before disposing of the container.  Mix paint indoors or in a containment area. Never clean paintbrushes or rinse paint containers into a street, gutter, storm drain, or watercourse. Dispose of any paint thinners, residue, and sludge(s) that cannot be recycled, as hazardous waste.  For water-based paint, clean brushes to the extent practicable, and rinse to a drain leading to a sanitary sewer where permitted, or contain for proper disposal off site. For oil-based paints, clean brushes to the extent practicable, and filter and reuse thinners and solvents.  Use recycled and less hazardous products when practical. Recycle residual paints, solvents, non-treated lumber, and other materials.  Use materials only where and when needed to complete the construction activity. Use safer alternative materials as much as possible. Reduce or eliminate use of hazardous materials onsite when practical.  Document the location, time, chemicals applied, and applicator’s name and qualifications.  Keep an ample supply of spill clean up material near use areas. Train employees in spill clean up procedures.  Avoid exposing applied materials to rainfall and runoff unless sufficient time has been allowed for them to dry.  Discontinue use of erodible landscape material within 2 days prior to a forecasted rain event and materials should be covered and/or bermed. Material Use WM-2 November 2009 California Stormwater BMP Handbook 4 of 4 Construction www.casqa.org  Provide containment for material use areas such as masons’ areas or paint mixing/preparation areas to prevent materials/pollutants from entering stormwater. Costs All of the above are low cost measures. Inspection and Maintenance  Inspect and verify that activity-based BMPs are in place prior to the commencement of associated activities.  BMPs must be inspected in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Ensure employees and subcontractors throughout the job are using appropriate practices. References Blueprint for a Clean Bay: Best Management Practices to Prevent Stormwater Pollution from Construction Related Activities; Santa Clara Valley Nonpoint Source Pollution Control Program, 1995. Coastal Nonpoint Pollution Control Program: Program Development and Approval Guidance, Working Group Working Paper; USEPA, April 1992. Comments on Risk Assessments Risk Reduction Options for Cypermethrin: Docket No. OPP– 2005–0293; California Stormwater Quality Association (CASQA) letter to USEPA, 2006.Environmental Hazard and General Labeling for Pyrethroid Non-Agricultural Outdoor Products, EPA-HQ-OPP-2008-0331-0021; USEPA, 2008. Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), March 2003. Stormwater Management for Construction Activities; Developing Pollution Prevention Plans and Best Management Practice, EPA 832-R-92005; USEPA, April 1992. Stockpile Management WM-3 July 2012 California Stormwater BMP Handbook 1 of 3 Construction www.casqa.org Description and Purpose Stockpile management procedures and practices are designed to reduce or eliminate air and stormwater pollution from stockpiles of soil, soil amendments, sand, paving materials such as portland cement concrete (PCC) rubble, asphalt concrete (AC), asphalt concrete rubble, aggregate base, aggregate sub base or pre-mixed aggregate, asphalt minder (so called “cold mix” asphalt), and pressure treated wood. Suitable Applications Implement in all projects that stockpile soil and other loose materials. Limitations  Plastic sheeting as a stockpile protection is temporary and hard to manage in windy conditions. Where plastic is used, consider use of plastic tarps with nylon reinforcement which may be more durable than standard sheeting.  Plastic sheeting can increase runoff volume due to lack of infiltration and potentially cause perimeter control failure.  Plastic sheeting breaks down faster in sunlight.  The use of Plastic materials and photodegradable plastics should be avoided. Implementation Protection of stockpiles is a year-round requirement. To properly manage stockpiles: Categories EC Erosion Control SE Sediment Control  TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control  WM Waste Management and Materials Pollution Control  Legend:  Primary Category  Secondary Category Targeted Constituents Sediment  Nutrients  Trash  Metals  Bacteria Oil and Grease  Organics  Potential Alternatives None If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Stockpile Management WM-3 July 2012 California Stormwater BMP Handbook 2 of 3 Construction www.casqa.org  On larger sites, a minimum of 50 ft separation from concentrated flows of stormwater, drainage courses, and inlets is recommended.  After 14 days of inactivity, a stockpile is non-active and requires further protection described below. All stockpiles are required to be protected as non-active stockpiles immediately if they are not scheduled to be used within 14 days.  Protect all stockpiles from stormwater runon using temporary perimeter sediment barriers such as compost berms (SE-13), temporary silt dikes (SE-12), fiber rolls (SE-5), silt fences (SE-1), sandbags (SE-8), gravel bags (SE-6), or biofilter bags (SE-14). Refer to the individual fact sheet for each of these controls for installation information.  Implement wind erosion control practices as appropriate on all stockpiled material. For specific information, see WE-1, Wind Erosion Control.  Manage stockpiles of contaminated soil in accordance with WM-7, Contaminated Soil Management.  Place bagged materials on pallets and under cover.  Ensure that stockpile coverings are installed securely to protect from wind and rain.  Some plastic covers withstand weather and sunlight better than others. Select cover materials or methods based on anticipated duration of use. Protection of Non-Active Stockpiles A stockpile is considered non-active if it either is not used for 14 days or if it is scheduled not to be used for 14 days or more. Stockpiles need to be protected immediately if they are not scheduled to be used within 14 days. Non-active stockpiles of the identified materials should be protected as follows: Soil stockpiles  Soil stockpiles should be covered or protected with soil stabilization measures and a temporary perimeter sediment barrier at all times.  Temporary vegetation should be considered for topsoil piles that will be stockpiled for extended periods. Stockpiles of Portland cement concrete rubble, asphalt concrete, asphalt concrete rubble, aggregate base, or aggregate sub base  Stockpiles should be covered and protected with a temporary perimeter sediment barrier at all times. Stockpiles of “cold mix”  Cold mix stockpiles should be placed on and covered with plastic sheeting or comparable material at all times and surrounded by a berm. Stockpiles of fly ash, stucco, hydrated lime Stockpile Management WM-3 July 2012 California Stormwater BMP Handbook 3 of 3 Construction www.casqa.org  Stockpiles of materials that may raise the pH of runoff (i.e., basic materials) should be covered with plastic and surrounded by a berm. Stockpiles/Storage of wood (Pressure treated with chromated copper arsenate or ammoniacal copper zinc arsenate  Treated wood should be covered with plastic sheeting or comparable material at all times and surrounded by a berm. Protection of Active Stockpiles A stockpile is active when it is being used or is scheduled to be used within 14 days of the previous use. Active stockpiles of the identified materials should be protected as follows:  All stockpiles should be covered and protected with a temporary linear sediment barrier prior to the onset of precipitation.  Stockpiles of “cold mix” and treated wood, and basic materials should be placed on and covered with plastic sheeting or comparable material and surrounded by a berm prior to the onset of precipitation.  The downstream perimeter of an active stockpile should be protected with a linear sediment barrier or berm and runoff should be diverted around or away from the stockpile on the upstream perimeter. Costs For cost information associated with stockpile protection refer to the individual erosion or sediment control BMP fact sheet considered for implementation (For example, refer to SE-1 Silt Fence for installation of silt fence around the perimeter of a stockpile.) Inspection and Maintenance  Stockpiles must be inspected in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  It may be necessary to inspect stockpiles covered with plastic sheeting more frequently during certain conditions (for example, high winds or extreme heat).  Repair and/or replace perimeter controls and covers as needed to keep them functioning properly.  Sediment shall be removed when it reaches one-third of the barrier height. References Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), March 2003. Spill Prevention and Control WM-4 January 2011 California Stormwater BMP Handbook 1 of 6 Construction www.casqa.org Description and Purpose Prevent or reduce the discharge of pollutants to drainage systems or watercourses from leaks and spills by reducing the chance for spills, stopping the source of spills, containing and cleaning up spills, properly disposing of spill materials, and training employees. This best management practice covers only spill prevention and control. However, WM-1, Materials Delivery and Storage, and WM-2, Material Use, also contain useful information, particularly on spill prevention. For information on wastes, see the waste management BMPs in this section. Suitable Applications This BMP is suitable for all construction projects. Spill control procedures are implemented anytime chemicals or hazardous substances are stored on the construction site, including the following materials:  Soil stabilizers/binders  Dust palliatives  Herbicides  Growth inhibitors  Fertilizers  Deicing/anti-icing chemicals Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control  Legend:  Primary Objective  Secondary Objective Targeted Constituents Sediment  Nutrients  Trash  Metals  Bacteria Oil and Grease  Organics  Potential Alternatives None If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Spill Prevention and Control WM-4 January 2011 California Stormwater BMP Handbook 2 of 6 Construction www.casqa.org  Fuels  Lubricants  Other petroleum distillates Limitations  In some cases it may be necessary to use a private spill cleanup company.  This BMP applies to spills caused by the contractor and subcontractors.  Procedures and practices presented in this BMP are general. Contractor should identify appropriate practices for the specific materials used or stored onsite Implementation The following steps will help reduce the stormwater impacts of leaks and spills: Education  Be aware that different materials pollute in different amounts. Make sure that each employee knows what a “significant spill” is for each material they use, and what is the appropriate response for “significant” and “insignificant” spills.  Educate employees and subcontractors on potential dangers to humans and the environment from spills and leaks.  Hold regular meetings to discuss and reinforce appropriate disposal procedures (incorporate into regular safety meetings).  Establish a continuing education program to indoctrinate new employees.  Have contractor’s superintendent or representative oversee and enforce proper spill prevention and control measures. General Measures  To the extent that the work can be accomplished safely, spills of oil, petroleum products, substances listed under 40 CFR parts 110,117, and 302, and sanitary and septic wastes should be contained and cleaned up immediately.  Store hazardous materials and wastes in covered containers and protect from vandalism.  Place a stockpile of spill cleanup materials where it will be readily accessible.  Train employees in spill prevention and cleanup.  Designate responsible individuals to oversee and enforce control measures.  Spills should be covered and protected from stormwater runon during rainfall to the extent that it doesn’t compromise clean up activities.  Do not bury or wash spills with water. Spill Prevention and Control WM-4 January 2011 California Stormwater BMP Handbook 3 of 6 Construction www.casqa.org  Store and dispose of used clean up materials, contaminated materials, and recovered spill material that is no longer suitable for the intended purpose in conformance with the provisions in applicable BMPs.  Do not allow water used for cleaning and decontamination to enter storm drains or watercourses. Collect and dispose of contaminated water in accordance with WM-10, Liquid Waste Management.  Contain water overflow or minor water spillage and do not allow it to discharge into drainage facilities or watercourses.  Place proper storage, cleanup, and spill reporting instructions for hazardous materials stored or used on the project site in an open, conspicuous, and accessible location.  Keep waste storage areas clean, well organized, and equipped with ample cleanup supplies as appropriate for the materials being stored. Perimeter controls, containment structures, covers, and liners should be repaired or replaced as needed to maintain proper function. Cleanup  Clean up leaks and spills immediately.  Use a rag for small spills on paved surfaces, a damp mop for general cleanup, and absorbent material for larger spills. If the spilled material is hazardous, then the used cleanup materials are also hazardous and must be sent to either a certified laundry (rags) or disposed of as hazardous waste.  Never hose down or bury dry material spills. Clean up as much of the material as possible and dispose of properly. See the waste management BMPs in this section for specific information. Minor Spills  Minor spills typically involve small quantities of oil, gasoline, paint, etc. which can be controlled by the first responder at the discovery of the spill.  Use absorbent materials on small spills rather than hosing down or burying the spill.  Absorbent materials should be promptly removed and disposed of properly.  Follow the practice below for a minor spill: ­ Contain the spread of the spill. ­ Recover spilled materials. ­ Clean the contaminated area and properly dispose of contaminated materials. Semi-Significant Spills  Semi-significant spills still can be controlled by the first responder along with the aid of other personnel such as laborers and the foreman, etc. This response may require the cessation of all other activities. Spill Prevention and Control WM-4 January 2011 California Stormwater BMP Handbook 4 of 6 Construction www.casqa.org  Spills should be cleaned up immediately: ­ Contain spread of the spill. ­ Notify the project foreman immediately. ­ If the spill occurs on paved or impermeable surfaces, clean up using "dry" methods (absorbent materials, cat litter and/or rags). Contain the spill by encircling with absorbent materials and do not let the spill spread widely. ­ If the spill occurs in dirt areas, immediately contain the spill by constructing an earthen dike. Dig up and properly dispose of contaminated soil. ­ If the spill occurs during rain, cover spill with tarps or other material to prevent contaminating runoff. Significant/Hazardous Spills  For significant or hazardous spills that cannot be controlled by personnel in the immediate vicinity, the following steps should be taken: ­ Notify the local emergency response by dialing 911. In addition to 911, the contractor will notify the proper county officials. It is the contractor's responsibility to have all emergency phone numbers at the construction site. ­ Notify the Governor's Office of Emergency Services Warning Center, (916) 845-8911. ­ For spills of federal reportable quantities, in conformance with the requirements in 40 CFR parts 110,119, and 302, the contractor should notify the National Response Center at (800) 424-8802. ­ Notification should first be made by telephone and followed up with a written report. ­ The services of a spills contractor or a Haz-Mat team should be obtained immediately. Construction personnel should not attempt to clean up until the appropriate and qualified staffs have arrived at the job site. ­ Other agencies which may need to be consulted include, but are not limited to, the Fire Department, the Public Works Department, the Coast Guard, the Highway Patrol, the City/County Police Department, Department of Toxic Substances, California Division of Oil and Gas, Cal/OSHA, etc. Reporting  Report significant spills to local agencies, such as the Fire Department; they can assist in cleanup.  Federal regulations require that any significant oil spill into a water body or onto an adjoining shoreline be reported to the National Response Center (NRC) at 800-424-8802 (24 hours). Use the following measures related to specific activities: Spill Prevention and Control WM-4 January 2011 California Stormwater BMP Handbook 5 of 6 Construction www.casqa.org Vehicle and Equipment Maintenance  If maintenance must occur onsite, use a designated area and a secondary containment, located away from drainage courses, to prevent the runon of stormwater and the runoff of spills.  Regularly inspect onsite vehicles and equipment for leaks and repair immediately  Check incoming vehicles and equipment (including delivery trucks, and employee and subcontractor vehicles) for leaking oil and fluids. Do not allow leaking vehicles or equipment onsite.  Always use secondary containment, such as a drain pan or drop cloth, to catch spills or leaks when removing or changing fluids.  Place drip pans or absorbent materials under paving equipment when not in use.  Use absorbent materials on small spills rather than hosing down or burying the spill. Remove the absorbent materials promptly and dispose of properly.  Promptly transfer used fluids to the proper waste or recycling drums. Don’t leave full drip pans or other open containers lying around  Oil filters disposed of in trashcans or dumpsters can leak oil and pollute stormwater. Place the oil filter in a funnel over a waste oil-recycling drum to drain excess oil before disposal. Oil filters can also be recycled. Ask the oil supplier or recycler about recycling oil filters.  Store cracked batteries in a non-leaking secondary container. Do this with all cracked batteries even if you think all the acid has drained out. If you drop a battery, treat it as if it is cracked. Put it into the containment area until you are sure it is not leaking. Vehicle and Equipment Fueling  If fueling must occur onsite, use designate areas, located away from drainage courses, to prevent the runon of stormwater and the runoff of spills.  Discourage “topping off” of fuel tanks.  Always use secondary containment, such as a drain pan, when fueling to catch spills/ leaks. Costs Prevention of leaks and spills is inexpensive. Treatment and/ or disposal of contaminated soil or water can be quite expensive. Inspection and Maintenance  Inspect and verify that activity–based BMPs are in place prior to the commencement of associated activities. While activities associated with the BMP are under way, inspect BMPs in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events. Spill Prevention and Control WM-4 January 2011 California Stormwater BMP Handbook 6 of 6 Construction www.casqa.org  Inspect BMPs subject to non-stormwater discharge daily while non-stormwater discharges occur.  Keep ample supplies of spill control and cleanup materials onsite, near storage, unloading, and maintenance areas.  Update your spill prevention and control plan and stock cleanup materials as changes occur in the types of chemicals onsite. References Blueprint for a Clean Bay: Best Management Practices to Prevent Stormwater Pollution from Construction Related Activities; Santa Clara Valley Nonpoint Source Pollution Control Program, 1995. Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), November 2000. Stormwater Management for Construction Activities; Developing Pollution Prevention Plans and Best Management Practice, EPA 832-R-92005; USEPA, April 1992. Solid Waste Management WM-5 January 2011 California Stormwater BMP Handbook 1 of 4 Construction www.casqa.org Description and Purpose Solid waste management procedures and practices are designed to prevent or reduce the discharge of pollutants to stormwater from solid or construction waste by providing designated waste collection areas and containers, arranging for regular disposal, and training employees and subcontractors. Suitable Applications This BMP is suitable for construction sites where the following wastes are generated or stored:  Solid waste generated from trees and shrubs removed during land clearing, demolition of existing structures (rubble), and building construction  Packaging materials including wood, paper, and plastic  Scrap or surplus building materials including scrap metals, rubber, plastic, glass pieces, and masonry products  Domestic wastes including food containers such as beverage cans, coffee cups, paper bags, plastic wrappers, and cigarettes  Construction wastes including brick, mortar, timber, steel and metal scraps, pipe and electrical cuttings, non- hazardous equipment parts, styrofoam and other materials used to transport and package construction materials Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control  Legend:  Primary Objective  Secondary Objective Targeted Constituents Sediment  Nutrients  Trash  Metals  Bacteria Oil and Grease  Organics  Potential Alternatives None If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Solid Waste Management WM-5 January 2011 California Stormwater BMP Handbook 2 of 4 Construction www.casqa.org  Highway planting wastes, including vegetative material, plant containers, and packaging materials Limitations Temporary stockpiling of certain construction wastes may not necessitate stringent drainage related controls during the non-rainy season or in desert areas with low rainfall. Implementation The following steps will help keep a clean site and reduce stormwater pollution:  Select designated waste collection areas onsite.  Inform trash-hauling contractors that you will accept only watertight dumpsters for onsite use. Inspect dumpsters for leaks and repair any dumpster that is not watertight.  Locate containers in a covered area or in a secondary containment.  Provide an adequate number of containers with lids or covers that can be placed over the container to keep rain out or to prevent loss of wastes when it is windy.  Cover waste containers at the end of each work day and when it is raining.  Plan for additional containers and more frequent pickup during the demolition phase of construction.  Collect site trash daily, especially during rainy and windy conditions.  Remove this solid waste promptly since erosion and sediment control devices tend to collect litter.  Make sure that toxic liquid wastes (used oils, solvents, and paints) and chemicals (acids, pesticides, additives, curing compounds) are not disposed of in dumpsters designated for construction debris.  Do not hose out dumpsters on the construction site. Leave dumpster cleaning to the trash hauling contractor.  Arrange for regular waste collection before containers overflow.  Clean up immediately if a container does spill.  Make sure that construction waste is collected, removed, and disposed of only at authorized disposal areas. Education  Have the contractor’s superintendent or representative oversee and enforce proper solid waste management procedures and practices.  Instruct employees and subcontractors on identification of solid waste and hazardous waste.  Educate employees and subcontractors on solid waste storage and disposal procedures. Solid Waste Management WM-5 January 2011 California Stormwater BMP Handbook 3 of 4 Construction www.casqa.org  Hold regular meetings to discuss and reinforce disposal procedures (incorporate into regular safety meetings).  Require that employees and subcontractors follow solid waste handling and storage procedures.  Prohibit littering by employees, subcontractors, and visitors.  Minimize production of solid waste materials wherever possible. Collection, Storage, and Disposal  Littering on the project site should be prohibited.  To prevent clogging of the storm drainage system, litter and debris removal from drainage grates, trash racks, and ditch lines should be a priority.  Trash receptacles should be provided in the contractor’s yard, field trailer areas, and at locations where workers congregate for lunch and break periods.  Litter from work areas within the construction limits of the project site should be collected and placed in watertight dumpsters at least weekly, regardless of whether the litter was generated by the contractor, the public, or others. Collected litter and debris should not be placed in or next to drain inlets, stormwater drainage systems, or watercourses.  Dumpsters of sufficient size and number should be provided to contain the solid waste generated by the project.  Full dumpsters should be removed from the project site and the contents should be disposed of by the trash hauling contractor.  Construction debris and waste should be removed from the site biweekly or more frequently as needed.  Construction material visible to the public should be stored or stacked in an orderly manner.  Stormwater runon should be prevented from contacting stored solid waste through the use of berms, dikes, or other temporary diversion structures or through the use of measures to elevate waste from site surfaces.  Solid waste storage areas should be located at least 50 ft from drainage facilities and watercourses and should not be located in areas prone to flooding or ponding.  Except during fair weather, construction and highway planting waste not stored in watertight dumpsters should be securely covered from wind and rain by covering the waste with tarps or plastic.  Segregate potentially hazardous waste from non-hazardous construction site waste.  Make sure that toxic liquid wastes (used oils, solvents, and paints) and chemicals (acids, pesticides, additives, curing compounds) are not disposed of in dumpsters designated for construction debris. Solid Waste Management WM-5 January 2011 California Stormwater BMP Handbook 4 of 4 Construction www.casqa.org  For disposal of hazardous waste, see WM-6, Hazardous Waste Management. Have hazardous waste hauled to an appropriate disposal and/or recycling facility.  Salvage or recycle useful vegetation debris, packaging and surplus building materials when practical. For example, trees and shrubs from land clearing can be used as a brush barrier, or converted into wood chips, then used as mulch on graded areas. Wood pallets, cardboard boxes, and construction scraps can also be recycled. Costs All of the above are low cost measures. Inspection and Maintenance  Inspect and verify that activity–based BMPs are in place prior to the commencement of associated activities. While activities associated with the BMP are under way, inspect BMPs in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Inspect BMPs subject to non-stormwater discharge daily while non-stormwater discharges occur  Inspect construction waste area regularly.  Arrange for regular waste collection. References Processes, Procedures and Methods to Control Pollution Resulting from All Construction Activity, 430/9-73-007, USEPA, 1973. Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), November 2000. Stormwater Management for Construction Activities; Developing Pollution Prevention Plans and Best Management Practice, EPA 832-R-92005; USEPA, April 1992. Hazardous Waste Management WM-6 January 2011 California Stormwater BMP Handbook 1 of 6 Construction www.casqa.org Description and Purpose Prevent or reduce the discharge of pollutants to stormwater from hazardous waste through proper material use, waste disposal, and training of employees and subcontractors. Suitable Applications This best management practice (BMP) applies to all construction projects. Hazardous waste management practices are implemented on construction projects that generate waste from the use of: Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control  Legend:  Primary Objective  Secondary Objective Targeted Constituents Sediment Nutrients  Trash  Metals  Bacteria  Oil and Grease  Organics  Potential Alternatives None If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. ­ Petroleum Products ­ Asphalt Products ­ Concrete Curing Compounds ­ Pesticides ­ Palliatives ­ Acids ­ Septic Wastes ­ Paints ­ Stains ­ Solvents ­ Wood Preservatives ­ Roofing Tar ­ Any materials deemed a hazardous waste in California, Title 22 Division 4.5, or listed in 40 CFR Parts 110, 117, 261, or 302 Hazardous Waste Management WM-6 January 2011 California Stormwater BMP Handbook 2 of 6 Construction www.casqa.org In addition, sites with existing structures may contain wastes, which must be disposed of in accordance with federal, state, and local regulations. These wastes include:  Sandblasting grit mixed with lead-, cadmium-, or chromium-based paints  Asbestos  PCBs (particularly in older transformers) Limitations  Hazardous waste that cannot be reused or recycled must be disposed of by a licensed hazardous waste hauler.  Nothing in this BMP relieves the contractor from responsibility for compliance with federal, state, and local laws regarding storage, handling, transportation, and disposal of hazardous wastes.  This BMP does not cover aerially deposited lead (ADL) soils. For ADL soils refer to WM-7, Contaminated Soil Management. Implementation The following steps will help reduce stormwater pollution from hazardous wastes: Material Use  Wastes should be stored in sealed containers constructed of a suitable material and should be labeled as required by Title 22 CCR, Division 4.5 and 49 CFR Parts 172, 173, 178, and 179.  All hazardous waste should be stored, transported, and disposed as required in Title 22 CCR, Division 4.5 and 49 CFR 261-263.  Waste containers should be stored in temporary containment facilities that should comply with the following requirements: ­ Temporary containment facility should provide for a spill containment volume equal to 1.5 times the volume of all containers able to contain precipitation from a 25 year storm event, plus the greater of 10% of the aggregate volume of all containers or 100% of the capacity of the largest tank within its boundary, whichever is greater. ­ Temporary containment facility should be impervious to the materials stored there for a minimum contact time of 72 hours. ­ Temporary containment facilities should be maintained free of accumulated rainwater and spills. In the event of spills or leaks, accumulated rainwater and spills should be placed into drums after each rainfall. These liquids should be handled as a hazardous waste unless testing determines them to be non-hazardous. Non-hazardous liquids should be sent to an approved disposal site. ­ Sufficient separation should be provided between stored containers to allow for spill cleanup and emergency response access. Hazardous Waste Management WM-6 January 2011 California Stormwater BMP Handbook 3 of 6 Construction www.casqa.org ­ Incompatible materials, such as chlorine and ammonia, should not be stored in the same temporary containment facility. ­ Throughout the rainy season, temporary containment facilities should be covered during non-working days, and prior to rain events. Covered facilities may include use of plastic tarps for small facilities or constructed roofs with overhangs.  Drums should not be overfilled and wastes should not be mixed.  Unless watertight, containers of dry waste should be stored on pallets.  Do not over-apply herbicides and pesticides. Prepare only the amount needed. Follow the recommended usage instructions. Over application is expensive and environmentally harmful. Apply surface dressings in several smaller applications, as opposed to one large application. Allow time for infiltration and avoid excess material being carried offsite by runoff. Do not apply these chemicals just before it rains. People applying pesticides must be certified in accordance with federal and state regulations.  Paint brushes and equipment for water and oil based paints should be cleaned within a contained area and should not be allowed to contaminate site soils, watercourses, or drainage systems. Waste paints, thinners, solvents, residues, and sludges that cannot be recycled or reused should be disposed of as hazardous waste. When thoroughly dry, latex paint and paint cans, used brushes, rags, absorbent materials, and drop cloths should be disposed of as solid waste.  Do not clean out brushes or rinse paint containers into the dirt, street, gutter, storm drain, or stream. “Paint out” brushes as much as possible. Rinse water-based paints to the sanitary sewer. Filter and reuse thinners and solvents. Dispose of excess oil-based paints and sludge as hazardous waste.  The following actions should be taken with respect to temporary contaminant: ­ Ensure that adequate hazardous waste storage volume is available. ­ Ensure that hazardous waste collection containers are conveniently located. ­ Designate hazardous waste storage areas onsite away from storm drains or watercourses and away from moving vehicles and equipment to prevent accidental spills. ­ Minimize production or generation of hazardous materials and hazardous waste on the job site. ­ Use containment berms in fueling and maintenance areas and where the potential for spills is high. ­ Segregate potentially hazardous waste from non-hazardous construction site debris. ­ Keep liquid or semi-liquid hazardous waste in appropriate containers (closed drums or similar) and under cover. Hazardous Waste Management WM-6 January 2011 California Stormwater BMP Handbook 4 of 6 Construction www.casqa.org ­ Clearly label all hazardous waste containers with the waste being stored and the date of accumulation. ­ Place hazardous waste containers in secondary containment. ­ Do not allow potentially hazardous waste materials to accumulate on the ground. ­ Do not mix wastes. ­ Use all of the product before disposing of the container. ­ Do not remove the original product label; it contains important safety and disposal information. Waste Recycling Disposal  Select designated hazardous waste collection areas onsite.  Hazardous materials and wastes should be stored in covered containers and protected from vandalism.  Place hazardous waste containers in secondary containment.  Do not mix wastes, this can cause chemical reactions, making recycling impossible and complicating disposal.  Recycle any useful materials such as used oil or water-based paint.  Make sure that toxic liquid wastes (used oils, solvents, and paints) and chemicals (acids, pesticides, additives, curing compounds) are not disposed of in dumpsters designated for construction debris.  Arrange for regular waste collection before containers overflow.  Make sure that hazardous waste (e.g., excess oil-based paint and sludge) is collected, removed, and disposed of only at authorized disposal areas. Disposal Procedures  Waste should be disposed of by a licensed hazardous waste transporter at an authorized and licensed disposal facility or recycling facility utilizing properly completed Uniform Hazardous Waste Manifest forms.  A Department of Health Services certified laboratory should sample waste to determine the appropriate disposal facility.  Properly dispose of rainwater in secondary containment that may have mixed with hazardous waste.  Attention is directed to "Hazardous Material", "Contaminated Material", and "Aerially Deposited Lead" of the contract documents regarding the handling and disposal of hazardous materials. Hazardous Waste Management WM-6 January 2011 California Stormwater BMP Handbook 5 of 6 Construction www.casqa.org Education  Educate employees and subcontractors on hazardous waste storage and disposal procedures.  Educate employees and subcontractors on potential dangers to humans and the environment from hazardous wastes.  Instruct employees and subcontractors on safety procedures for common construction site hazardous wastes.  Instruct employees and subcontractors in identification of hazardous and solid waste.  Hold regular meetings to discuss and reinforce hazardous waste management procedures (incorporate into regular safety meetings).  The contractor’s superintendent or representative should oversee and enforce proper hazardous waste management procedures and practices.  Make sure that hazardous waste is collected, removed, and disposed of only at authorized disposal areas.  Warning signs should be placed in areas recently treated with chemicals.  Place a stockpile of spill cleanup materials where it will be readily accessible.  If a container does spill, clean up immediately. Costs All of the above are low cost measures. Inspection and Maintenance  Inspect and verify that activity–based BMPs are in place prior to the commencement of associated activities. While activities associated with the BMP are under way, inspect BMPs in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events..  Inspect BMPs subject to non-stormwater discharge daily while non-stormwater discharges occur  Hazardous waste should be regularly collected.  A foreman or construction supervisor should monitor onsite hazardous waste storage and disposal procedures.  Waste storage areas should be kept clean, well organized, and equipped with ample cleanup supplies as appropriate for the materials being stored.  Perimeter controls, containment structures, covers, and liners should be repaired or replaced as needed to maintain proper function. Hazardous Waste Management WM-6 January 2011 California Stormwater BMP Handbook 6 of 6 Construction www.casqa.org  Hazardous spills should be cleaned up and reported in conformance with the applicable Material Safety Data Sheet (MSDS) and the instructions posted at the project site.  The National Response Center, at (800) 424-8802, should be notified of spills of federal reportable quantities in conformance with the requirements in 40 CFR parts 110, 117, and 302. Also notify the Governors Office of Emergency Services Warning Center at (916) 845- 8911.  A copy of the hazardous waste manifests should be provided. References Blueprint for a Clean Bay: Best Management Practices to Prevent Stormwater Pollution from Construction Related Activities; Santa Clara Valley Nonpoint Source Pollution Control Program, 1995. Processes, Procedures and Methods to Control Pollution Resulting from All Construction Activity, 430/9-73-007, USEPA, 1973. Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), November 2000. Stormwater Management for Construction Activities; Developing Pollution Prevention Plans and Best Management Practice, EPA 832-R-92005; USEPA, April 1992. Contaminated Soil Management WM-7 January 2011 California Stormwater BMP Handbook 1 of 5 Construction www.casqa.org Description and Purpose Prevent or reduce the discharge of pollutants to stormwater from contaminated soil and highly acidic or alkaline soils by conducting pre-construction surveys, inspecting excavations regularly, and remediating contaminated soil promptly. Suitable Applications Contaminated soil management is implemented on construction projects in highly urbanized or industrial areas where soil contamination may have occurred due to spills, illicit discharges, aerial deposition, past use and leaks from underground storage tanks. Limitations Contaminated soils that cannot be treated onsite must be disposed of offsite by a licensed hazardous waste hauler. The presence of contaminated soil may indicate contaminated water as well. See NS-2, Dewatering Operations, for more information. The procedures and practices presented in this BMP are general. The contractor should identify appropriate practices and procedures for the specific contaminants known to exist or discovered onsite. Implementation Most owners and developers conduct pre-construction environmental assessments as a matter of routine. Contaminated soils are often identified during project planning and development with known locations identified in the plans, specifications and in the SWPPP. The contractor should review applicable reports and investigate appropriate call-outs in the Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control  Legend:  Primary Objective  Secondary Objective Targeted Constituents Sediment Nutrients  Trash  Metals  Bacteria  Oil and Grease  Organics  Potential Alternatives None If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Contaminated Soil Management WM-7 January 2011 California Stormwater BMP Handbook 2 of 5 Construction www.casqa.org plans, specifications, and SWPPP. Recent court rulings holding contractors liable for cleanup costs when they unknowingly move contaminated soil highlight the need for contractors to confirm a site assessment is completed before earth moving begins. The following steps will help reduce stormwater pollution from contaminated soil:  Conduct thorough, pre-construction inspections of the site and review documents related to the site. If inspection or reviews indicated presence of contaminated soils, develop a plan before starting work.  Look for contaminated soil as evidenced by discoloration, odors, differences in soil properties, abandoned underground tanks or pipes, or buried debris.  Prevent leaks and spills. Contaminated soil can be expensive to treat and dispose of properly. However, addressing the problem before construction is much less expensive than after the structures are in place.  The contractor may further identify contaminated soils by investigating: ­ Past site uses and activities ­ Detected or undetected spills and leaks ­ Acid or alkaline solutions from exposed soil or rock formations high in acid or alkaline forming elements ­ Contaminated soil as evidenced by discoloration, odors, differences in soil properties, abandoned underground tanks or pipes, or buried debris. ­ Suspected soils should be tested at a certified laboratory. Education  Have employees and subcontractors complete a safety training program which meets 29 CFR 1910.120 and 8 CCR 5192 covering the potential hazards as identified, prior to performing any excavation work at the locations containing material classified as hazardous.  Educate employees and subcontractors in identification of contaminated soil and on contaminated soil handling and disposal procedures.  Hold regular meetings to discuss and reinforce disposal procedures (incorporate into regular safety meetings). Handling Procedures for Material with Aerially Deposited Lead (ADL)  Materials from areas designated as containing (ADL) may, if allowed by the contract special provisions, be excavated, transported, and used in the construction of embankments and/or backfill.  Excavation, transportation, and placement operations should result in no visible dust.  Caution should be exercised to prevent spillage of lead containing material during transport. Contaminated Soil Management WM-7 January 2011 California Stormwater BMP Handbook 3 of 5 Construction www.casqa.org  Quality should be monitored during excavation of soils contaminated with lead. Handling Procedures for Contaminated Soils  Minimize onsite storage. Contaminated soil should be disposed of properly in accordance with all applicable regulations. All hazardous waste storage will comply with the requirements in Title 22, CCR, Sections 66265.250 to 66265.260.  Test suspected soils at an approved certified laboratory.  Work with the local regulatory agencies to develop options for treatment or disposal if the soil is contaminated.  Avoid temporary stockpiling of contaminated soils or hazardous material.  Take the following precautions if temporary stockpiling is necessary: ­ Cover the stockpile with plastic sheeting or tarps. ­ Install a berm around the stockpile to prevent runoff from leaving the area. ­ Do not stockpile in or near storm drains or watercourses.  Remove contaminated material and hazardous material on exteriors of transport vehicles and place either into the current transport vehicle or into the excavation prior to the vehicle leaving the exclusion zone.  Monitor the air quality continuously during excavation operations at all locations containing hazardous material.  Procure all permits and licenses, pay all charges and fees, and give all notices necessary and incident to the due and lawful prosecution of the work, including registration for transporting vehicles carrying the contaminated material and the hazardous material.  Collect water from decontamination procedures and treat or dispose of it at an appropriate disposal site.  Collect non-reusable protective equipment, once used by any personnel, and dispose of at an appropriate disposal site.  Install temporary security fence to surround and secure the exclusion zone. Remove fencing when no longer needed.  Excavate, transport, and dispose of contaminated material and hazardous material in accordance with the rules and regulations of the following agencies (the specifications of these agencies supersede the procedures outlined in this BMP): ­ United States Department of Transportation (USDOT) ­ United States Environmental Protection Agency (USEPA) ­ California Environmental Protection Agency (CAL-EPA) Contaminated Soil Management WM-7 January 2011 California Stormwater BMP Handbook 4 of 5 Construction www.casqa.org ­ California Division of Occupation Safety and Health Administration (CAL-OSHA) ­ Local regulatory agencies Procedures for Underground Storage Tank Removals  Prior to commencing tank removal operations, obtain the required underground storage tank removal permits and approval from the federal, state, and local agencies that have jurisdiction over such work.  To determine if it contains hazardous substances, arrange to have tested, any liquid or sludge found in the underground tank prior to its removal.  Following the tank removal, take soil samples beneath the excavated tank and perform analysis as required by the local agency representative(s).  The underground storage tank, any liquid or sludge found within the tank, and all contaminated substances and hazardous substances removed during the tank removal and transported to disposal facilities permitted to accept such waste. Water Control  All necessary precautions and preventive measures should be taken to prevent the flow of water, including ground water, from mixing with hazardous substances or underground storage tank excavations. Such preventative measures may consist of, but are not limited to, berms, cofferdams, grout curtains, freeze walls, and seal course concrete or any combination thereof.  If water does enter an excavation and becomes contaminated, such water, when necessary to proceed with the work, should be discharged to clean, closed top, watertight transportable holding tanks, treated, and disposed of in accordance with federal, state, and local laws. Costs Prevention of leaks and spills is inexpensive. Treatment or disposal of contaminated soil can be quite expensive. Inspection and Maintenance  Inspect and verify that activity–based BMPs are in place prior to the commencement of associated activities. While activities associated with the BMP are under way, inspect BMPs in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Arrange for contractor’s Water Pollution Control Manager, foreman, and/or construction supervisor to monitor onsite contaminated soil storage and disposal procedures.  Monitor air quality continuously during excavation operations at all locations containing hazardous material.  Coordinate contaminated soils and hazardous substances/waste management with the appropriate federal, state, and local agencies. Contaminated Soil Management WM-7 January 2011 California Stormwater BMP Handbook 5 of 5 Construction www.casqa.org  Implement WM-4, Spill Prevention and Control, to prevent leaks and spills as much as possible. References Blueprint for a Clean Bay: Best Management Practices to Prevent Stormwater Pollution from Construction Related Activities; Santa Clara Valley Nonpoint Source Pollution Control Program, 1995. Processes, Procedures and Methods to Control Pollution Resulting from All Construction Activity, 430/9-73-007, USEPA, 1973. Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), November 2000. Stormwater Management for Construction Activities; Developing Pollution Prevention Plans and Best Management Practice, EPA 832-R-92005; USEPA, April 1992. Concrete Waste Management WM-8 July 2012 California Stormwater BMP Handbook 1 of 7 Construction www.casqa.org Description and Purpose Prevent the discharge of pollutants to stormwater from concrete waste by conducting washout onsite or offsite in a designated area, and by employee and subcontractor training. The General Permit incorporates Numeric Action Levels (NAL) for pH (see Section 2 of this handbook to determine your project’s risk level and if you are subject to these requirements). Many types of construction materials, including mortar, concrete, stucco, cement and block and their associated wastes have basic chemical properties that can raise pH levels outside of the permitted range. Additional care should be taken when managing these materials to prevent them from coming into contact with stormwater flows and raising pH to levels outside the accepted range. Suitable Applications Concrete waste management procedures and practices are implemented on construction projects where:  Concrete is used as a construction material or where concrete dust and debris result from demolition activities.  Slurries containing portland cement concrete (PCC) are generated, such as from saw cutting, coring, grinding, grooving, and hydro-concrete demolition.  Concrete trucks and other concrete-coated equipment are washed onsite. Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control  WM Waste Management and Materials Pollution Control  Legend:  Primary Category  Secondary Category Targeted Constituents Sediment  Nutrients Trash Metals  Bacteria Oil and Grease Organics Potential Alternatives None If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Concrete Waste Management WM-8 July 2012 California Stormwater BMP Handbook 2 of 7 Construction www.casqa.org  Mortar-mixing stations exist.  Stucco mixing and spraying.  See also NS-8, Vehicle and Equipment Cleaning. Limitations  Offsite washout of concrete wastes may not always be possible.  Multiple washouts may be needed to assure adequate capacity and to allow for evaporation. Implementation The following steps will help reduce stormwater pollution from concrete wastes:  Incorporate requirements for concrete waste management into material supplier and subcontractor agreements.  Store dry and wet materials under cover, away from drainage areas. Refer to WM-1, Material Delivery and Storage for more information.  Avoid mixing excess amounts of concrete.  Perform washout of concrete trucks in designated areas only, where washout will not reach stormwater.  Do not wash out concrete trucks into storm drains, open ditches, streets, streams or onto the ground. Trucks should always be washed out into designated facilities.  Do not allow excess concrete to be dumped onsite, except in designated areas.  For onsite washout: ­ On larger sites, it is recommended to locate washout areas at least 50 feet from storm drains, open ditches, or water bodies. Do not allow runoff from this area by constructing a temporary pit or bermed area large enough for liquid and solid waste. ­ Washout wastes into the temporary washout where the concrete can set, be broken up, and then disposed properly. ­ Washouts shall be implemented in a manner that prevents leaching to underlying soils. Washout containers must be water tight and washouts on or in the ground must be lined with a suitable impervious liner, typically a plastic type material.  Do not wash sweepings from exposed aggregate concrete into the street or storm drain. Collect and return sweepings to aggregate base stockpile or dispose in the trash.  See typical concrete washout installation details at the end of this fact sheet. Education  Educate employees, subcontractors, and suppliers on the concrete waste management techniques described herein. Concrete Waste Management WM-8 July 2012 California Stormwater BMP Handbook 3 of 7 Construction www.casqa.org  Arrange for contractor’s superintendent or representative to oversee and enforce concrete waste management procedures.  Discuss the concrete management techniques described in this BMP (such as handling of concrete waste and washout) with the ready-mix concrete supplier before any deliveries are made. Concrete Demolition Wastes  Stockpile concrete demolition waste in accordance with BMP WM-3, Stockpile Management.  Dispose of or recycle hardened concrete waste in accordance with applicable federal, state or local regulations. Concrete Slurry Wastes  PCC and AC waste should not be allowed to enter storm drains or watercourses.  PCC and AC waste should be collected and disposed of or placed in a temporary concrete washout facility (as described in Onsite Temporary Concrete Washout Facility, Concrete Transit Truck Washout Procedures, below).  A foreman or construction supervisor should monitor onsite concrete working tasks, such as saw cutting, coring, grinding and grooving to ensure proper methods are implemented.  Saw-cut concrete slurry should not be allowed to enter storm drains or watercourses. Residue from grinding operations should be picked up by means of a vacuum attachment to the grinding machine or by sweeping. Saw cutting residue should not be allowed to flow across the pavement and should not be left on the surface of the pavement. See also NS-3, Paving and Grinding Operations; and WM-10, Liquid Waste Management.  Concrete slurry residue should be disposed in a temporary washout facility (as described in Onsite Temporary Concrete Washout Facility, Concrete Transit Truck Washout Procedures, below) and allowed to dry. Dispose of dry slurry residue in accordance with WM-5, Solid Waste Management. Onsite Temporary Concrete Washout Facility, Transit Truck Washout Procedures  Temporary concrete washout facilities should be located a minimum of 50 ft from storm drain inlets, open drainage facilities, and watercourses. Each facility should be located away from construction traffic or access areas to prevent disturbance or tracking.  A sign should be installed adjacent to each washout facility to inform concrete equipment operators to utilize the proper facilities.  Temporary concrete washout facilities should be constructed above grade or below grade at the option of the contractor. Temporary concrete washout facilities should be constructed and maintained in sufficient quantity and size to contain all liquid and concrete waste generated by washout operations. Concrete Waste Management WM-8 July 2012 California Stormwater BMP Handbook 4 of 7 Construction www.casqa.org  Temporary washout facilities should have a temporary pit or bermed areas of sufficient volume to completely contain all liquid and waste concrete materials generated during washout procedures.  Temporary washout facilities should be lined to prevent discharge to the underlying ground or surrounding area.  Washout of concrete trucks should be performed in designated areas only.  Only concrete from mixer truck chutes should be washed into concrete wash out.  Concrete washout from concrete pumper bins can be washed into concrete pumper trucks and discharged into designated washout area or properly disposed of or recycled offsite.  Once concrete wastes are washed into the designated area and allowed to harden, the concrete should be broken up, removed, and disposed of per WM-5, Solid Waste Management. Dispose of or recycle hardened concrete on a regular basis.  Temporary Concrete Washout Facility (Type Above Grade) ­ Temporary concrete washout facility (type above grade) should be constructed as shown on the details at the end of this BMP, with a recommended minimum length and minimum width of 10 ft; however, smaller sites or jobs may only need a smaller washout facility. With any washout, always maintain a sufficient quantity and volume to contain all liquid and concrete waste generated by washout operations. ­ Materials used to construct the washout area should conform to the provisions detailed in their respective BMPs (e.g., SE-8 Sandbag Barrier). ­ Plastic lining material should be a minimum of 10 mil in polyethylene sheeting and should be free of holes, tears, or other defects that compromise the impermeability of the material. ­ Alternatively, portable removable containers can be used as above grade concrete washouts. Also called a “roll-off”; this concrete washout facility should be properly sealed to prevent leakage, and should be removed from the site and replaced when the container reaches 75% capacity.  Temporary Concrete Washout Facility (Type Below Grade) ­ Temporary concrete washout facilities (type below grade) should be constructed as shown on the details at the end of this BMP, with a recommended minimum length and minimum width of 10 ft. The quantity and volume should be sufficient to contain all liquid and concrete waste generated by washout operations. ­ Lath and flagging should be commercial type. ­ Plastic lining material should be a minimum of 10 mil polyethylene sheeting and should be free of holes, tears, or other defects that compromise the impermeability of the material. Concrete Waste Management WM-8 July 2012 California Stormwater BMP Handbook 5 of 7 Construction www.casqa.org ­ The base of a washout facility should be free of rock or debris that may damage a plastic liner. Removal of Temporary Concrete Washout Facilities  When temporary concrete washout facilities are no longer required for the work, the hardened concrete should be removed and properly disposed or recycled in accordance with federal, state or local regulations. Materials used to construct temporary concrete washout facilities should be removed from the site of the work and properly disposed or recycled in accordance with federal, state or local regulations..  Holes, depressions or other ground disturbance caused by the removal of the temporary concrete washout facilities should be backfilled and repaired. Costs All of the above are low cost measures. Roll-0ff concrete washout facilities can be more costly than other measures due to removal and replacement; however, provide a cleaner alternative to traditional washouts. The type of washout facility, size, and availability of materials will determine the cost of the washout. Inspection and Maintenance  BMPs must be inspected in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Temporary concrete washout facilities should be maintained to provide adequate holding capacity with a minimum freeboard of 4 in. for above grade facilities and 12 in. for below grade facilities. Maintaining temporary concrete washout facilities should include removing and disposing of hardened concrete and returning the facilities to a functional condition. Hardened concrete materials should be removed and properly disposed or recycled in accordance with federal, state or local regulations.  Washout facilities must be cleaned, or new facilities must be constructed and ready for use once the washout is 75% full.  Inspect washout facilities for damage (e.g. torn liner, evidence of leaks, signage, etc.). Repair all identified damage. References Blueprint for a Clean Bay: Best Management Practices to Prevent Stormwater Pollution from Construction Related Activities; Santa Clara Valley Nonpoint Source Pollution Control Program, 1995. Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), November 2000, Updated March 2003. Stormwater Management for Construction Activities; Developing Pollution Prevention Plans and Best Management Practice, EPA 832-R-92005; USEPA, April 1992. Concrete Waste Management WM-8 July 2012 California Stormwater BMP Handbook 6 of 7 Construction www.casqa.org Concrete Waste Management WM-8 July 2012 California Stormwater BMP Handbook 7 of 7 Construction www.casqa.org Sanitary/Septic Waste Management WM-9 November 2009 California Stormwater BMP Handbook 1 of 3 Construction www.casqa.org Description and Purpose Proper sanitary and septic waste management prevent the discharge of pollutants to stormwater from sanitary and septic waste by providing convenient, well-maintained facilities, and arranging for regular service and disposal. Suitable Applications Sanitary septic waste management practices are suitable for use at all construction sites that use temporary or portable sanitary and septic waste systems. Limitations None identified. Implementation Sanitary or septic wastes should be treated or disposed of in accordance with state and local requirements. In many cases, one contract with a local facility supplier will be all that it takes to make sure sanitary wastes are properly disposed. Storage and Disposal Procedures  Temporary sanitary facilities should be located away from drainage facilities, watercourses, and from traffic circulation. If site conditions allow, place portable facilities a minimum of 50 feet from drainage conveyances and traffic areas. When subjected to high winds or risk of high winds, temporary sanitary facilities should be secured to prevent overturning. Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control  Legend:  Primary Category  Secondary Category Targeted Constituents Sediment Nutrients  Trash  Metals Bacteria  Oil and Grease Organics  Potential Alternatives None If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Sanitary/Septic Waste Management WM-9 November 2009 California Stormwater BMP Handbook 2 of 3 Construction www.casqa.org  Temporary sanitary facilities must be equipped with containment to prevent discharge of pollutants to the stormwater drainage system of the receiving water.  Consider safety as well as environmental implications before placing temporary sanitary facilities.  Wastewater should not be discharged or buried within the project site.  Sanitary and septic systems that discharge directly into sanitary sewer systems, where permissible, should comply with the local health agency, city, county, and sewer district requirements.  Only reputable, licensed sanitary and septic waste haulers should be used.  Sanitary facilities should be located in a convenient location.  Temporary septic systems should treat wastes to appropriate levels before discharging.  If using an onsite disposal system (OSDS), such as a septic system, local health agency requirements must be followed.  Temporary sanitary facilities that discharge to the sanitary sewer system should be properly connected to avoid illicit discharges.  Sanitary and septic facilities should be maintained in good working order by a licensed service.  Regular waste collection by a licensed hauler should be arranged before facilities overflow.  If a spill does occur from a temporary sanitary facility, follow federal, state and local regulations for containment and clean-up. Education  Educate employees, subcontractors, and suppliers on sanitary and septic waste storage and disposal procedures.  Educate employees, subcontractors, and suppliers of potential dangers to humans and the environment from sanitary and septic wastes.  Instruct employees, subcontractors, and suppliers in identification of sanitary and septic waste.  Hold regular meetings to discuss and reinforce the use of sanitary facilities (incorporate into regular safety meetings).  Establish a continuing education program to indoctrinate new employees. Costs All of the above are low cost measures. Sanitary/Septic Waste Management WM-9 November 2009 California Stormwater BMP Handbook 3 of 3 Construction www.casqa.org Inspection and Maintenance  BMPs must be inspected in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Arrange for regular waste collection.  If high winds are expected, portable sanitary facilities must be secured with spikes or weighed down to prevent over turning.  If spills or leaks from sanitary or septic facilities occur that are not contained and discharge from the site, non-visible sampling of site discharge may be required. Refer to the General Permit or to your project specific Construction Site Monitoring Plan to determine if and where sampling is required. References Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), March 2003. Stormwater Management for Construction Activities; Developing Pollution Prevention Plans and Best Management Practice, EPA 832-R-92005; USEPA, April 1992. Liquid Waste Management WM-10 November 2009 California Stormwater BMP Handbook 1 of 4 Construction www.casqa.org Description and Purpose Liquid waste management includes procedures and practices to prevent discharge of pollutants to the storm drain system or to watercourses as a result of the creation, collection, and disposal of non-hazardous liquid wastes. Suitable Applications Liquid waste management is applicable to construction projects that generate any of the following non-hazardous by-products, residuals, or wastes:  Drilling slurries and drilling fluids  Grease-free and oil-free wastewater and rinse water  Dredgings  Other non-stormwater liquid discharges not permitted by separate permits Limitations  Disposal of some liquid wastes may be subject to specific laws and regulations or to requirements of other permits secured for the construction project (e.g., NPDES permits, Army Corps permits, Coastal Commission permits, etc.).  Liquid waste management does not apply to dewatering operations (NS-2 Dewatering Operations), solid waste management (WM-5, Solid Waste Management), hazardous wastes (WM-6, Hazardous Waste Management), or Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control  Legend:  Primary Objective  Secondary Objective Targeted Constituents Sediment  Nutrients  Trash  Metals  Bacteria Oil and Grease  Organics Potential Alternatives None If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version. Liquid Waste Management WM-10 November 2009 California Stormwater BMP Handbook 2 of 4 Construction www.casqa.org concrete slurry residue (WM-8, Concrete Waste Management).  Typical permitted non-stormwater discharges can include: water line flushing; landscape irrigation; diverted stream flows; rising ground waters; uncontaminated pumped ground water; discharges from potable water sources; foundation drains; irrigation water; springs; water from crawl space pumps; footing drains; lawn watering; flows from riparian habitats and wetlands; and discharges or flows from emergency fire fighting activities. Implementation General Practices  Instruct employees and subcontractors how to safely differentiate between non-hazardous liquid waste and potential or known hazardous liquid waste.  Instruct employees, subcontractors, and suppliers that it is unacceptable for any liquid waste to enter any storm drainage device, waterway, or receiving water.  Educate employees and subcontractors on liquid waste generating activities and liquid waste storage and disposal procedures.  Hold regular meetings to discuss and reinforce disposal procedures (incorporate into regular safety meetings).  Verify which non-stormwater discharges are permitted by the statewide NPDES permit; different regions might have different requirements not outlined in this permit.  Apply NS-8, Vehicle and Equipment Cleaning for managing wash water and rinse water from vehicle and equipment cleaning operations. Containing Liquid Wastes  Drilling residue and drilling fluids should not be allowed to enter storm drains and watercourses and should be disposed of.  If an appropriate location is available, drilling residue and drilling fluids that are exempt under Title 23, CCR § 2511(g) may be dried by infiltration and evaporation in a containment facility constructed in conformance with the provisions concerning the Temporary Concrete Washout Facilities detailed in WM-8, Concrete Waste Management.  Liquid wastes generated as part of an operational procedure, such as water-laden dredged material and drilling mud, should be contained and not allowed to flow into drainage channels or receiving waters prior to treatment.  Liquid wastes should be contained in a controlled area such as a holding pit, sediment basin, roll-off bin, or portable tank.  Containment devices must be structurally sound and leak free.  Containment devices must be of sufficient quantity or volume to completely contain the liquid wastes generated. Liquid Waste Management WM-10 November 2009 California Stormwater BMP Handbook 3 of 4 Construction www.casqa.org  Precautions should be taken to avoid spills or accidental releases of contained liquid wastes. Apply the education measures and spill response procedures outlined in WM-4, Spill Prevention and Control.  Containment areas or devices should not be located where accidental release of the contained liquid can threaten health or safety or discharge to water bodies, channels, or storm drains. Capturing Liquid Wastes  Capture all liquid wastes that have the potential to affect the storm drainage system (such as wash water and rinse water from cleaning walls or pavement), before they run off a surface.  Do not allow liquid wastes to flow or discharge uncontrolled. Use temporary dikes or berms to intercept flows and direct them to a containment area or device for capture.  Use a sediment trap (SE-3, Sediment Trap) for capturing and treating sediment laden liquid waste or capture in a containment device and allow sediment to settle. Disposing of Liquid Wastes  A typical method to handle liquid waste is to dewater the contained liquid waste, using procedures such as described in NS-2, Dewatering Operations, and SE-2, Sediment Basin, and dispose of resulting solids per WM-5, Solid Waste Management.  Methods of disposal for some liquid wastes may be prescribed in Water Quality Reports, NPDES permits, Environmental Impact Reports, 401 or 404 permits, and local agency discharge permits, etc. Review the SWPPP to see if disposal methods are identified.  Liquid wastes, such as from dredged material, may require testing and certification whether it is hazardous or not before a disposal method can be determined.  For disposal of hazardous waste, see WM-6, Hazardous Waste Management.  If necessary, further treat liquid wastes prior to disposal. Treatment may include, though is not limited to, sedimentation, filtration, and chemical neutralization. Costs Prevention costs for liquid waste management are minimal. Costs increase if cleanup or fines are involved. Inspection and Maintenance  Inspect and verify that activity–based BMPs are in place prior to the commencement of associated activities. While activities associated with the BMP are under way, inspect weekly during the rainy season and of two-week intervals in the non-rainy season to verify continued BMP implementation.  Inspect BMPs subject to non-stormwater discharge daily while non-stormwater discharges occur. Liquid Waste Management WM-10 November 2009 California Stormwater BMP Handbook 4 of 4 Construction www.casqa.org  Remove deposited solids in containment areas and capturing devices as needed and at the completion of the task. Dispose of any solids as described in WM-5, Solid Waste Management.  Inspect containment areas and capturing devices and repair as needed. References Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual, State of California Department of Transportation (Caltrans), November 2000. SWPPP – Campus Dining Facility June 2016 Prepared By: Rick Engineering Company Appendix I: BMP Inspection Form SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 39 Construction Activities and Associated Pollutants Phase Activity Associated Materials or Pollutants Pollutant Category(1) Grading and Land Development Vehicle and equipment use · Equipment operation · Equipment maintenance · Equipment washing · Equipment fueling Oil and Grease Soil preparation/amendments · Use of soil additives/amendments Nutrients Demolition Phase Removal of existing structures · Demolition of asphalt, concrete, masonry, framing, roofing, metal structures. Metals, Oil and Grease, Synthetic Organics Solid waste · Litter, trash and debris · Vegetation Gross Pollutants Landscaping and Site Stabilization Phase Planting / Vegetation Management · Vegetation control (pesticides/herbicides) · Planting · Plant maintenance · Vegetation removal Nutrients, Metals, Synthetic Organics (1) Categories per CASQA BMP Handbook (i.e., Sediment, Nutrients, Bacteria and Viruses, Oil and Grease, Metals, Synthetic Organics, Pesticides, Gross Pollutants, and Vector Production) SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 40 APPENDIX D SWPPP CONTRACTOR/SUBCONTRACTOR AGREEMENTS Agreements will be provided at a later date. SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 41 APPENDIX E CONTRACTOR/SUBCONTRACTOR INFORMATION Contractor(s) and subcontractor(s) will be named later. SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 42 APPENDIX F SWPPP TRAINING LOG SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 43 Trained Contractor Personnel Log Stormwater Management Training Log and Documentation Project Name: WDID #: 3 40C399332 Stormwater Management Topic: (check as appropriate)  Erosion Control  Wind Erosion Control  Non-Stormwater Management Stormwater Sampling  Sediment Control Tracking Control  Waste Management and Materials Pollution Control Objective: Location: Date: Instructor: Telephone Course Length Attendee Roster (Attach additional forms if necessary) Name Company Phone As needed, add proof of external training (e.g., course completion certificates, credentials for QSP, QSD). SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 44 APPENDIX G SITE MAP EROSION CONTROL PLAN SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 45 APPENDIX H RISK LEVEL CALCULATIONS SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 46 A B C 1 Sediment Risk Factor Worksheet Entry 2 A) R Factor 3 Analyses of data indicated that when factors other than rainfall are held constant, soil loss is directly proportional to a rainfall factor composed of total storm kinetic energy (E) times the maximum 30-min intensity (I30) (Wischmeier and Smith, 1958). The numerical value of R is the average annual sum of EI30 for storm events during a rainfall record of at least 22 years. "Isoerodent" maps were developed based on R values calculated for more than 1000 locations in the Western U.S. Refer to the link below to determine the R factor for the project site. 4 http://cfpub.epa.gov/npdes/stormwater/LEW/lewCalculator.cfm 5 R Factor Value 3.3 6 B) K Factor (weighted average, by area, for all site soils) 7 The soil-erodibility factor K represents: (1) susceptibility of soil or surface material to erosion, (2) transportability of the sediment, and (3) the amount and rate of runoff given a particular rainfall input, as measured under a standard condition. Fine- textured soils that are high in clay have low K values (about 0.05 to 0.15) because the particles are resistant to detachment. Coarse-textured soils, such as sandy soils, also have low K values (about 0.05 to 0.2) because of high infiltration resulting in low runoff even though these particles are easily detached. Medium-textured soils, such as a silt loam, have moderate K values (about 0.25 to 0.45) because they are moderately susceptible to particle detachment and they produce runoff at moderate rates. Soils having a high silt content are especially susceptible to erosion and have high K values, which can exceed 0.45 and can be as large as 0.65. Silt-size particles are easily detached and tend to crust, producing high rates and large volumes of runoff. Use Site- specific data must be submitted. 8 Site-specific K factor guidance 9 K Factor Value 0.24 10 C) LS Factor (weighted average, by area, for all slopes) 11 The effect of topography on erosion is accounted for by the LS factor, which combines the effects of a hillslope-length factor, L, and a hillslope-gradient factor, S. Generally speaking, as hillslope length and/or hillslope gradient increase, soil loss increases. As hillslope length increases, total soil loss and soil loss per unit area increase due to the progressive accumulation of runoff in the downslope direction. As the hillslope gradient increases, the velocity and erosivity of runoff increases. Use the LS table located in separate tab of this spreadsheet to determine LS factors. Estimate the weighted LS for the site prior to construction. 12 LS Table 13 LS Factor Value 1.25 14 15 Watershed Erosion Estimate (=RxKxLS) in tons/acre 0.99 16 Site Sediment Risk Factor LOW 17 Low Sediment Risk: < 15 tons/acre 18 Medium Sediment Risk: >=15 and <75 tons/acre 19 High Sediment Risk: >= 75 tons/acre 20 SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 47 Receiving Water (RW) Risk Factor Worksheet Entry Score A. Watershed Characteristics yes/no A.1. Does the disturbed area discharge (either directly or indirectly) to a 303(d)-listed waterbody impaired by sediment (For help with impaired waterbodies please visit the link below) or has a USEPA approved TMDL implementation plan for sediment?: NO LOW http://www.waterboards.ca.gov/water_issues/programs/tmdl/integrated2010.shtml OR A.2. Does the disturbed area discharge to a waterbody with designated beneficial uses of SPAWN & COLD & MIGRATORY? (For help please review the appropriate Regional Board Basin Plan) http://www.waterboards.ca.gov/waterboards_map.shtml Region 1 Basin Plan Region 2 Basin Plan Region 3 Basin Plan Region 4 Basin Plan Region 5 Basin Plan Region 6 Basin Plan Region 7 Basin Plan Region 8 Basin Plan Region 9 Basin Plan Receiving Water Risk Sediment Risk Low Medium High Low Level 1 Level 2 High Level 2 Level 3 SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering 48 APPENDIX I CHAIN-OF-CUSTODY (COC) FORM SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering DESTINATION LAB: ATTN: ADDRESS: Office Phone: Cell Phone: REQUESTED ANALYSIS Notes: SAMPLED BY: Contact: Facility Name Client Sample ID Sample Date Sample Time Sample Matrix Container # Type Pres. SENDER COMMENTS: RELINQUISHED BY Signature: Print: Company: Date: TIME: LABORATORY COMMENTS: RECEIVED BY Signature: Print: Company: Date: TIME: SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering APPENDIX J SWPPP AMENDMENT(S) & LOG SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering Amendment Log Facility Name: Waste Discharge Identification (WDID): Amendment No. Date Page and Section No. Requested By Brief Description of Amendment; include reason for change, site location, and BMP modifications. Prepared and Approved By SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering APPENDIX K CORRECTIVE ACTION LOG SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering EXAMPLE Corrective Action Log Project Name: ______________________________________________ NPDES ID Number: __________________________________________ Section A – Individual Completing this Log Name: Title: Company Name: Email: Address: Phone Number: Section B – Details of the Problem (CGP Part 5.4.1.a) Complete this section within 24 hours of discovering the condition that triggered corrective action. Date problem was first identified: Time problem was first identified: What site conditions triggered this corrective action? (Check the box that applies. See instructions for a description of each triggering condition (1 thru 6).)  ☐ 1 ☐ 2 ☐ 3 ☐ 4 ☐ 5a ☐ 5b ☐ 6 Specific location where problem identified: Provide a description of the specific condition that triggered the need for corrective action and the cause (if identifiable): Section C – Corrective Action Completion (CGP Part 5.4.1.b) Complete this section within 24 hours after completing the corrective action. For site condition # 1, 2, 3, 4, or 6 (those not related to a dewatering discharge) confirm that you met the following deadlines (CGP Part 5.2.1): ☐ Immediately took all reasonable steps to address the condition, including cleaning up any contaminated surfaces so the material will not discharge in subsequent storm events. AND ☐ Completed corrective action by the close of the next business day, unless a new or replacement control, or significant repair, was required. OR ☐ Completed corrective action within seven (7) calendar days from the time of discovery because a new or replacement control, or significant repair, was necessary to complete the installation of the new or modified control or complete the repair. OR ☐ It was infeasible to complete the installation or repair within 7 calendar days from the time of discovery. Provide the following additional information: Explain why 7 calendar days was infeasible to complete the installation or repair: SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering Provide your schedule for installing the stormwater control and making it operational as soon as feasible after the 7 calendar days: For site condition # 5a, 5b, or 6 (those related to a dewatering discharge), confirm that you met the following deadlines: ☐ Immediately took all reasonable steps to minimize or prevent the discharge of pollutants until a solution could be implemented, including shutting off the dewatering discharge as soon as possible depending on the severity of the condition taking safety considerations into account. ☐ Determined whether the dewatering controls were operating effectively and whether they were causing the conditions. ☐ Made any necessary adjustments, repairs, or replacements to the dewatering controls to lower the turbidity levels below the benchmark or remove the visible plume or sheen. Describe any modification(s) made as part of corrective action: (Insert additional rows below if applicable) Date of completion: SWPPP update necessary? If yes, date SWPPP was updated: 1. ☐ Yes ☐ No 2. ☐ Yes ☐ No Section D - Signature and Certification (CGP Part 5.4.2) “I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information contained therein. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information contained is, to the best of my knowledge and belief, true, accurate, and complete. I have no personal knowledge that the information submitted is other than true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.” MANDATORY: Signature of Operator or “Duly Authorized Representative:” Signature: Date: Printed Name: Affiliation: OPTIONAL: Signature of Contractor or Subcontractor Signature: Date: Printed Name: Affiliation: SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering General Instructions This Corrective Action Log Template is provided to assist you creating a corrective action log that complies with the minimum reporting requirements of Part 5.4 of the EPA’s Construction General Permit (CGP). For each triggering condition on your site, you will need to fill out a separate corrective action log. The entire form must be completed to be compliant with the requirements of the permit. (Note: In Section C, if you do not need the number of rows provided in the corrective action log, you may delete these or cross them off. Alternatively, if you need more space to describe any modifications, you may insert additional rows in the electronic version of this form or use the bottom of the page in the field version of this form.) If you are covered under a State CGP, this template may be helpful in developing a log that can be used for that permit; however, you will likely need to modify this form to meet the specific requirements of any State-issued permit. If your permitting authority requires you to use a specific corrective action log, you should not use this template. Instructions for Section A Individual completing this form Enter the name of the person completing this log. Include the person’s contact information (title, affiliated company name, address, email, and phone number). Instructions for Section B You must complete Section B within 24 hours of discovering the condition that triggered corrective action. (CGP Part 5.4) When was the problem first discovered? Specify the date and time when the triggering condition was first discovered. What site conditions triggered this corrective action? (CGP Parts 5.1 and 5.3) Check the box corresponding to the numbered triggering condition below that applies to your site. 1. A stormwater control needs a significant repair or a new or replacement control is needed, or, in accordance with Part Error! Reference source not found., you find it necessary to repeatedly (i.e., 3 or more times) conduct the same routine maintenance fix to the same control at the same location (unless you document in your inspection report under Part Error! Reference source not found. that the specific reoccurrence of this same problem should still be addressed as a routine maintenance fix under Part Error! Reference source not found.); 2. A stormwater control necessary to comply with the requirements of this permit was never installed, or was installed incorrectly; 3. Your discharges are not meeting applicable water quality standards; 4. A prohibited discharge has occurred (see Part 1.3); 5. During discharge from site dewatering activities: a. The weekly average of your turbidity monitoring results exceeds the 50 NTU benchmark (or alternate benchmark if approved by EPA pursuant to Part Error! Reference source not found.); or b. You observe or you are informed by EPA, State, or local authorities of the presence of any of the following at the point of discharge to a receiving water flowing through or immediately adjacent to your site and/or to constructed or natural site drainage features or storm drain inlets: · sediment plume · suspended solids · unusual color · presence of odor SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering · decreased clarity · presence of foam · visible sheen on the water surface or visible oily deposits on the bottom or shoreline of the receiving water 6. EPA requires corrective action as a result of permit violations found during an inspection carried out under Part 4.8. Provide a description of the problem (CGP Part 5.4.1.a) Provide a summary description of the condition you found that triggered corrective action, the cause of the problem (if identifiable), and the specific location where it was found. Be as specific as possible about the location; it is recommended that you refer to a precise point on your site map. Instructions for Section C You must complete Section C within 24 hours after completing the correction action. (CGP Part 5.4) Deadlines for completing corrective action for condition # 1, 2, 3, 4, or 6 (if not relating to a dewatering discharge) (CGP Part 5.2.1) Check the box to confirm that you met the deadlines that apply to each triggering condition. You are always required to check the first box (i.e., Immediately took all reasonable steps to address the condition, including cleaning up any contaminated surfaces so the material will not discharge in subsequent storm events.). Only one of the next three boxes should be checked depending on the situation that applies to this corrective action. Check the second box if the corrective action for this particular triggering condition does not require a new or replacement control, or a significant repair. These actions must be completed by the close of the next business day from the time of discovery of the condition. Check the third box if the corrective action for this particular triggering condition requires a new or replacement control, or a significant repair. These actions must be completed by no later than seven calendar days from the time of discover of the condition. Check the fourth box if the corrective action for this particular triggering condition requires a new or replacement control, or a significant repair, and if it is infeasible to complete the work within seven calendar days. Additionally, you will need to fill out the table below the checkbox that requires: 1. An explanation as to why it was infeasible to complete the installation or repair within seven calendar days of discovering the condition. 2. Provide the schedule you will adhere to for installing the stormwater control and making it operational as soon as feasible after the seventh day following discovery. Note: Per Part 5.2.1.c, where these actions result in changes to any of the stormwater controls or procedures documented in your SWPPP, you must modify your SWPPP accordingly within seven calendar days of completing this work. Deadlines for completing corrective action for condition # 5a, 5b, or 6 related to a dewatering discharge (CGP Part 5.2.2) These deadlines apply to conditions relating to construction dewatering activities. Check the box to confirm that you met the deadlines that apply to each triggering condition. You are required to check all of the boxes in this section to indicate your compliance with the corrective action deadlines. List of modification(s) to correct problem Provide a list of modifications you completed to correct the problem. Date of completion Enter the date you completed the modification. The work must be completed by the deadline you indicated above. SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering SWPPP update necessary? Check “Yes” or “No” to indicate if a SWPPP update is necessary consistent with Part 7.4.1.a in order to reflect changes implemented at your site. If “Yes,” then enter the date you updated your SWPPP. The SWPPP updates must be made within seven calendar days of completing a corrective action. (CGP Part 5.2.1.c) Instructions for Section D Each corrective action log entry must be signed and certified following completion of Section D to be considered complete. (CGP Part 5.4.2) Operator or “Duly Authorized Representative” – MANDATORY (CGP Appendix G Part G.11.2 and CGP Appendix H Section X) At a minimum, the corrective action log must be signed by either (1) the person who signed the NOI, or (2) a duly authorized representative of that person. The following requirements apply: If the signatory will be the person who signed the NOI for permit coverage, as a reminder, that person must be one of the following types of individuals: · For a corporation: By a responsible corporate officer. For the purpose of this subsection, a responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy- or decision-making functions for the corporation, or (ii) the manager of one or more manufacturing, production, or operating facilities, provided, the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long term environmental compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. · For a partnership or sole proprietorship: By a general partner or the proprietor, respectively. · For a municipality, State, Federal, or other public agency: By either a principal executive officer or ranking elected official. For purposes of this subsection, a principal executive officer of a Federal agency includes (i) the chief executive officer of the agency, or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency (e.g., Regional Administrator of EPA). If the signatory will be a duly authorized representative, the following requirements must be met: · The authorization is made in writing by the person who signed the NOI (see above); · The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity such as the position of plant manager, operator of a well or a well field, superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative may thus be either a named individual or any individual occupying a named position); and · The signed and dated written authorization is included in the SWPPP. A copy must be submitted to EPA, if requested. Sign, date and print your name and affiliation. SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering Contractor or Subcontractor - OPTIONAL Where you rely on a contractor or subcontractor to complete this log and the associated corrective action, you should consider requiring the individual(s) to sign and certify each log entry. Note that this does not relieve you, the permitted operator, of the requirement to sign and certify the log as well. If applicable, sign, date, and print your name and affiliation. Recordkeeping Logs must be retained for at least 3 years from the date your permit coverage expires or is terminated. (CGP Part 5.4.4) Keep copies of your signed corrective action log entries at the site or at an easily accessible location so that it can be made immediately available at the time of an on-site inspection or upon request by EPA. (CGP Part 5.4.3) Include a copy of the corrective action log in your SWPPP. (CGP Part 7.2.7.e) Note While EPA has made every effort to ensure the accuracy of all instructions contained in this template, it is the permit, not this template, that determines the actual obligations of regulated construction stormwater discharges. In the event of a conflict between this template and any corresponding provision of the CGP, you must abide by the requirements in the permit. EPA welcomes comments on this Corrective Action Log Template at any time and will consider those comments in any future revision. You may contact EPA for CGP-related inquiries at cgp@epa.gov SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering APPENDIX L SAMPLING LOG SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering Visual Observation Log - Monthly Date and Time of Inspection: Report Date: Facility Name: Weather Antecedent Conditions (last 48 hours): Current Weather: NSWD Observations Were any authorized non-stormwater discharges observed? Yes □ No □ Were any unauthorized non-stormwater discharges observed? Yes □ No □ If yes to either, identify source: Outdoor Industrial Equipment and Storage Area Observations Complete Monthly BMP Inspection Report Yes □ No □ Drainage Area 1: Were any deficiencies or any other potential source of industrial pollutants observed? Yes □ No □ Drainage Area 2: Were any deficiencies or any other potential source of industrial pollutants observed? Yes □ No □ Drainage Area 3: Were any deficiencies or any other potential source of industrial pollutants observed? Yes □ No □ If yes to any, describe: Exception Documentation (explanation required if inspection could not be conducted). Inspector Information Inspector Name: Inspector Title: Signature: Date: SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering Visual Observation Log – Sampling Events Date and Time of Inspection: Report Date: Facility Name: Weather Antecedent Conditions (last 48 hours): Weather: Precipitation Total: Predicted % chance of rain: Estimate storm beginning: (date and time) Estimate storm duration: (hours) Estimate time since last storm: (days or hours) Rain gauge reading: (inches) Sampling Event Observations Observations: If yes identify location and observe drainage area to identify probable cause Odors Yes □ No □ Floating material Yes □ No □ Suspended Material Yes □ No □ Sheen Yes □ No □ Discolorations Yes □ No □ Turbidity Yes □ No □ NSWD Observations Were any authorized non-stormwater discharges observed? Yes □ No □ Were any unauthorized non-stormwater discharges observed? Yes □ No □ If yes to either, identify source Drainage Area Observations Drainage Area Deficiencies Noted SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering Exception Documentation (explanation required if inspection could not be conducted). Inspector Information Inspector Name: Inspector Title: Signature: Date: SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering Sampling Log Facility Name: Date: Time Start: Sampler Name: Field Meter Calibration pH Meter ID No./Description: Calibration Date/Time: Field pH Measurements Discharge Location Identifier pH Time Samples Collected Discharge Location Identifier Constituent Time Oil and Grease Total Suspended Solids Additional Sampling Notes: Time End: SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering APPENDIX M ANNUAL FEE STATEMENT AND RECIEPTS SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering FOR INFORMATION ONLY. SEE THE WATERBOARDS.CA.GOV WEBSITE FOR FEES AND STIPULATONS. CALIFORNIA CODE OF REGULATIONS TITLE 23. Division 3. Chapter 9. Waste Discharge Reports and Requirements Article 1. Fees Section 2200. Annual Fee Schedules. Each person for whom waste discharge requirements have been prescribed pursuant to Section 13263 of the Water Code shall submit, to the state board, an annual fee in accordance with the following schedules. The fee shall be submitted for each waste discharge requirement order issued to that person.1 (a) The annual fees for persons issued waste discharge requirements (WDRs), except as provided in subdivisions (a)(3), (a)(4), (b), and (c), shall be based on the discharge’s threat to water quality (TTWQ) and complexity (CPLX) rating according to the following fee schedule, plus applicable surcharge(s). SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering Oil and gas produced water storage and disposal facilities regulated by waste discharge requirements are subject to a surcharge per barrels of waste water discharged in the prior 12 months according to the following schedule: TTWQ & CPLX Rating No Barrels 1 to 999,999 Barrels 1,000 SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering APPENDIX N CONSTRUCTION SITE MONITORING INSPECTION FORM SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering BMP INSPECTION REPORT Date and Time of Inspection: Date Report Written: Inspection Type: (Circle one) Weekly Complete Parts I,II,III and VII Pre-Storm Complete Parts I,II,III,IV and VII During Rain Event Complete Parts I, II, III, V, and VII Post-Storm Complete Parts I,II,III,VI and VII Part I. General Information Site Information Construction Site Name: Construction stage and completed activities: Approximate area of site that is exposed: Photos Taken: (Circle one) Yes No Photo Reference IDs: Weather Estimate storm beginning: (date and time) Estimate storm duration: (hours) Estimate time since last storm: (days or hours) Rain gauge reading and location: (in) Is a “Qualifying Event” predicted or did one occur (i.e., 0.5” rain with 48-hrs or greater between events)? (Y/N) If yes, summarize forecast: Exemption Documentation (explanation required if inspection could not be conducted). Visual inspections are not required outside of business hours or during dangerous weather conditions such as flooding or electrical storms. Inspector Information Inspector Name: Inspector Title: Signature: Date: SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering Part II. BMP Observations. Describe deficiencies in Part III. Minimum BMPs for Risk Level Sites Failures or other short comings (yes, no, N/A) Action Required (yes/no) Action Implemented (Date) Good Housekeeping for Construction Materials Inventory of products (excluding materials designed to be outdoors) Stockpiled construction materials not actively in use are covered and bermed All chemicals are stored in watertight containers with appropriate secondary containment, or in a completely enclosed storage shed Construction materials are minimally exposed to precipitation BMPs preventing the off-site tracking of materials are implemented and properly effective Good Housekeeping for Waste Management Wash/rinse water and materials are prevented from being disposed into the storm drain system Portable toilets are contained to prevent discharges of waste Sanitation facilities are clean and with no apparent for leaks and spills Equipment is in place to cover waste disposal containers at the end of business day and during rain events Discharges from waste disposal containers are prevented from discharging to the storm drain system / receiving water Stockpiled waste material is securely protected from wind and rain if not actively in use Procedures are in place for addressing hazardous and non- hazardous spills Appropriate spill response personnel are assigned and trained Equipment and materials for cleanup of spills is available onsite Washout areas (e.g., concrete) are contained appropriately to prevent discharge or infiltration into the underlying soil Good Housekeeping for Vehicle Storage and Maintenance Measures are in place to prevent oil, grease, or fuel from leaking into the ground, storm drains, or surface waters All equipment or vehicles are fueled, maintained, and stored in a designated area with appropriate BMPs Vehicle and equipment leaks are cleaned immediately and disposed of properly SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering Part II. BMP Observations Continued. Describe deficiencies in Part III. Minimum BMPs for Risk Level Sites Adequately designed, implemented and effective (yes, no, N/A) Action Required (yes/no) Action Implemented (Date) Good Housekeeping for Landscape Materials Stockpiled landscape materials such as mulches and topsoil are contained and covered when not actively in use Erodible landscape material has not been applied 2 days before a forecasted rain event or during an event Erodible landscape materials are applied at quantities and rates in accordance with manufacturer recommendations Bagged erodible landscape materials are stored on pallets and covered Good Housekeeping for Air Deposition of Site Materials Good housekeeping measures are implemented onsite to control the air deposition of site materials and from site operations Non-Stormwater Management Non-Stormwater discharges are properly controlled Vehicles are washed in a manner to prevent non-stormwater discharges to surface waters or drainage systems Streets are cleaned in a manner to prevent unauthorized non- stormwater discharges to surface waters or drainage systems. Erosion Controls Wind erosion controls are effectively implemented Effective soil cover is provided for disturbed areas inactive (i.e., not scheduled to be disturbed for 14 days) as well as finished slopes, open space, utility backfill, and completed lots The use of plastic materials is limited in cases when a more sustainable, environmentally friendly alternative exists. Sediment Controls Perimeter controls are established and effective at controlling erosion and sediment discharges from the site Entrances and exits are stabilized to control erosion and sediment discharges from the site Sediment basins are properly maintained Linear sediment control along toe of slope, face of slope an at grade breaks (Risk Level 2 & 3 Only) Limit construction activity to and from site to entrances and exits that employ effective controls to prevent offsite tracking (Risk Level 2 & 3 Only) SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering Ensure all storm, drain inlets and perimeter controls, runoff control BMPs and pollutants controls at entrances and exits are maintained and protected from activities the reduce their effectiveness (Risk Level 2 & 3 Only) Inspect all immediate access roads daily (Risk Level 2 & 3 Only) Run-On and Run-Off Controls Run-on to the site is effectively managed and directed away from all disturbed areas. Other Are the project SWPPP and BMP plan up to date, available on-site and being properly implemented? Part III. Descriptions of BMP Deficiencies Deficiency Repairs Implemented: Note - Repairs must begin within 72 hours of identification and, complete repairs as soon as possible. Start Date Action 1. 2. 3. 4. Part IV. Additional Pre-Storm Observations. Note the presence or absence of floating and suspended materials, sheen, discoloration, turbidity, odors, and source(s) of pollutants(s). Yes, No, N/A Do stormwater storage and containment areas have adequate freeboard? If no, complete Part III. Are drainage areas free of spills, leaks, or uncontrolled pollutant sources? If no, complete Part VII and describe below. Notes: Are stormwater storage and containment areas free of leaks? If no, complete Parts III and/or VII and describe below. SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering Part V. Additional During Storm Observations. If BMPs cannot be inspected during inclement weather, list the results of visual inspections at all relevant outfalls, discharge points, and downstream locations. Note odors or visible sheen on the surface of discharges. Complete Part VII (Corrective Actions) as needed. Outfall, Discharge Point, or Other Downstream Location Location Description Location Description Location Description Location Description Location Description Location Description Location Description Location Description Part VI. Additional Post-Storm Observations. Visually observe (inspect) stormwater discharges at all discharge locations within two business days (48 hours) after each qualifying rain event, and observe (inspect) the discharge of stored or contained stormwater that is derived from and discharged subsequent to a qualifying rain event producing precipitation of ½ inch or more at the time of discharge. Complete Part VII (Corrective Actions) as needed. Discharge Location, Storage or Containment Area Visual Observation Notes: SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering Part VII. Additional Corrective Actions Required. Identify additional corrective actions not included with BMP Deficiencies (Part III) above. Note if SWPPP change is required. Required Actions Implementation Date SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering APPENDIX O RAIN EVENT ACTION PLAN SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering Rain Event Action Plan (REAP) Date of REAP WB DID Number: Date Rain Predicted to Occur: Predicted % chance of rain: Predicted Rain Event Triggered Actions Below is a list of suggested actions and items to review for this project. Each active Trade should check all material storage areas, stockpiles, waste management areas, vehicle and equipment storage and maintenance, areas of active soil disturbance, and areas of active work to ensure the proper implementation of BMPs. Project-wide BMPs should be checked and cross- referenced to the BMP progress map. Trade or Activity Suggested action(s) to perform / item(s) to review prior to rain event  Information & Scheduling  Inform trade supervisors of predicted rain  Check scheduled activities and reschedule as needed  Alert erosion/sediment control provider  Alert sample collection contractor (if applicable)  Schedule staff for extended rain inspections  Check Erosion and Sediment Control (ESC) material stock  Review BMP progress map  Other:    Material storage areas  Material under cover or in sheds (ex: treated woods and metals)  Perimeter control around stockpiles  Other:    Waste management areas  Dumpsters closed  Drain holes plugged  Recycling bins covered  Sanitary stations bermed and protected from tipping  Other:    Trade operations  Exterior operations shut down for event (e.g., no concrete pours or paving)  Soil treatments (e.g., fertilizer) ceased within 24 hours of event  Materials and equipment (e.g., tools) properly stored and covered  Waste and debris disposed in covered dumpsters or removed from site  Trenches and excavations protected  Perimeter controls around disturbed areas  Fueling and repair areas covered and bermed  Other:    Site ESC BMPs  Adequate capacity in sediment basins and traps  Site perimeter controls in place  Catch basin and drop inlet protection in place and cleaned  Temporary erosion controls deployed  Temporary perimeter controls deployed around disturbed areas and stockpiles  Roads swept; site ingress and egress points stabilized  Other:    Concrete rinse out area  Adequate capacity for rain  Wash-out bins covered  Other:    Spill and drips  All incident spills and drips, including paint, stucco, fuel, and oil cleaned  Drip pans emptied  Other:  SWPPP SLO Phase 1B Downtown Parking Structure Site Prep Prepared by Hive Engineering  Other / Discussion / Diagrams              Attach a printout of the weather forecast from the NOAA website to the REAP. I certify under penalty of law that this Rain Event Action Plan (REAP) will be performed in accordance with the General Permit by me or under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Date: Qualified SWPPP Practitioner (Use ink please)