Loading...
HomeMy WebLinkAbout01. 25.08.15 FMAP-0167-2025 Map Check #1 Responses Final Map Review #1 Project Address 1364 San Marcos Project Name SB-9 Urban Lot Split - Senate Bill 9 SB9 Parcel Map SLO 24-0045 Application Number FMAP-0167-2025 Planning Ethan Estrada (805) 781-7576 | ejestrad@slocity.org ☐ Ready for Action ☒ Needs Resubmit (see below) On review of the proposed plans, the following comments are provided: 1. The language provided in the draft affidavit of intent to owner occupy is acceptable. Please provide a recorded agreement. Engineering Hephzibah Dadala (805) 781-7575 | hdadala@slocity.org ☐ Ready for Action ☒ Needs Resubmit (see below) On review of the proposed plans, the following comments are provided: 1. See technical comments on “1st Surveying map check” redlines provided by Surveying. 2. Update the City Engineer’s Statement and PE License to #87574 for the current Supervising Civil Engineer. 3. Lot lines do not match from approved tentative parcel map and parcel map submitted. Make combined square footage of Parcel 1 and 2 on final and tentative parcel map match. Currently, total square footage Parcel 1 and 2 on the final parcel map is 15933 SF and total square footage Parcel 1 and 2 on the approved tentative parcel map is 15908 SF. 4. Correct the spelling of “OBISPO”, currently spelled “IN THE CITY OF OBIPSO”, in the parcel map description at the bottom right corner of both sheets 1 and 2. 25.08.15 Map Check #1 Responses from Applicant Applicant will provide a copy of the original recorded affidavit with the mylars. Redline comments have been addressed with the updated Parcel Map and Closure Calculations (MBS has gone back out and located the “missing monuments” along the Northerly and Southerly lines of the parent parcel). City Engineer’s Statement has been Updated as requested. Spelling of “Obispo” has been corrected on both sheets. (See Response Below) * Engineering Comment #3 Response: Surveyor has gone back out and located the “missing monuments” along the Northerly and Southerly lines of the parent parcel. Please refer to the updated the Map Sheets & Closure Calculations. Page 2 Utilities Shawna Scott (805) 781-7176 | sscott@slocity.org ☐ Ready for Action ☒ Needs Resubmit (see below) On review of the proposed plans, the following comments are provided: 1. The language provided in the draft shared private sewer lateral agreement is acceptable. Please provide a recorded agreement. Building Sean McCaffrey 805-781-7168 | smccaffr@slocity.org ☐ Ready for Action ☒ Needs Resubmit (see below) On review of the proposed plans, the following comments are provided: 1. Sean is just on this review to verify shared sewer is okay with the utility's department as i will leave the call to them if for some reason is works out for best interest for everyone. The plumbing code will requi re these to be separated if building has final say on this. (311 CPC). Fire Julianna Hutchinson 805-783-7805 | jhutchin@slocity.org ☒ Ready for Action ☐ Needs Resubmit (see below) On review of the proposed plans, the following comments are provided: 1. (comment) Applicant will provide an original copy of the executed shared sewer lateral agreement with the mylars so it can record concurrently with the Parcel Map. Project has been in communication with the Utilities Department regarding the City’s preferred approach to providing future sewerage to Parcel 1, since project inception. Utilities Department indicates that a shared Sewer Lateral is preferred because it results in fewer connections to the public main. Applicant has already conducted rehabilitation of the existing sewer lateral (including provisions for future sewerage to Parcel 1, as requested by the Utilities Department. Applicant will provide an executed original copy of the shared sewer lateral agreement with the mylars (addresses future ownership, maintenance and repair of the shared, private lateral), which will record concurrently with the Parcel Map.