HomeMy WebLinkAbout01. 25.08.15 FMAP-0167-2025 Map Check #1 Responses
Final Map Review #1
Project Address 1364 San Marcos
Project Name SB-9 Urban Lot Split - Senate Bill 9 SB9 Parcel Map SLO 24-0045
Application Number FMAP-0167-2025
Planning
Ethan Estrada
(805) 781-7576 | ejestrad@slocity.org
☐ Ready for Action
☒ Needs Resubmit (see below)
On review of the proposed plans, the following comments are provided:
1. The language provided in the draft affidavit of intent to owner occupy is acceptable. Please provide a
recorded agreement.
Engineering
Hephzibah Dadala
(805) 781-7575 | hdadala@slocity.org
☐ Ready for Action
☒ Needs Resubmit (see below)
On review of the proposed plans, the following comments are provided:
1. See technical comments on “1st Surveying map check” redlines provided by Surveying.
2. Update the City Engineer’s Statement and PE License to #87574 for the current Supervising Civil
Engineer.
3. Lot lines do not match from approved tentative parcel map and parcel map submitted. Make combined
square footage of Parcel 1 and 2 on final and tentative parcel map match. Currently, total square footage
Parcel 1 and 2 on the final parcel map is 15933 SF and total square footage Parcel 1 and 2 on the
approved tentative parcel map is 15908 SF.
4. Correct the spelling of “OBISPO”, currently spelled “IN THE CITY OF OBIPSO”, in the parcel map
description at the bottom right corner of both sheets 1 and 2.
25.08.15 Map Check #1
Responses from Applicant
Applicant will provide a copy of the original recorded affidavit with the mylars.
Redline comments have been addressed with the
updated Parcel Map and Closure Calculations
(MBS has gone back out and located the “missing
monuments” along the Northerly and Southerly
lines of the parent parcel).
City Engineer’s Statement has been Updated as requested.
Spelling of “Obispo” has been corrected on both sheets.
(See Response Below)
* Engineering Comment #3 Response: Surveyor has gone back out and located the “missing
monuments” along the Northerly and Southerly lines of the parent parcel. Please refer to the updated the
Map Sheets & Closure Calculations.
Page 2
Utilities
Shawna Scott
(805) 781-7176 | sscott@slocity.org
☐ Ready for Action
☒ Needs Resubmit (see below)
On review of the proposed plans, the following comments are provided:
1. The language provided in the draft shared private sewer lateral agreement is acceptable. Please provide a
recorded agreement.
Building
Sean McCaffrey
805-781-7168 | smccaffr@slocity.org
☐ Ready for Action
☒ Needs Resubmit (see below)
On review of the proposed plans, the following comments are provided:
1. Sean is just on this review to verify shared sewer is okay with the utility's department as i will leave the
call to them if for some reason is works out for best interest for everyone. The plumbing code will requi
re these to be separated if building has final say on this. (311 CPC).
Fire
Julianna Hutchinson
805-783-7805 | jhutchin@slocity.org
☒ Ready for Action
☐ Needs Resubmit (see below)
On review of the proposed plans, the following comments are provided:
1. (comment)
Applicant will provide an original copy of the executed shared sewer lateral agreement with the mylars so it
can record concurrently with the Parcel Map.
Project has been in communication with the Utilities Department regarding
the City’s preferred approach to providing future sewerage to Parcel 1,
since project inception. Utilities Department indicates that a shared Sewer
Lateral is preferred because it results in fewer connections to the public
main. Applicant has already conducted rehabilitation of the existing sewer
lateral (including provisions for future sewerage to Parcel 1, as requested
by the Utilities Department. Applicant will provide an executed original
copy of the shared sewer lateral agreement with the mylars (addresses
future ownership, maintenance and repair of the shared, private lateral),
which will record concurrently with the Parcel Map.