HomeMy WebLinkAboutProject LocationReference Documents:
City Standard Specifications - August 2020 Edition
City Engineering Standards - August 2020 Edition
SAN LUIS OBISPO COUNTY, CALIFORNIA
RIGHETTI
COMMUNITY PARK
APPROVED BY
SPECIFICATION NO.DATE SHEET
JUNE/JULY, 2025
2000054 FILE NO./LOCATION G0011417-11-01
G001 TITLE SHEET
G002 BID ALTERNATES
G003 GENERAL NOTES & ABBREVIATIONS
G004 GENERAL NOTES & STORMWATER COMPLIANCE
G101 PROJECT REFERENCE PLAN
G102 SITE ACCESSIBILITY PLAN
G103 FIRE ACCESSIBILITY PLAN
G104 ABBREVIATIONS, GENERAL NOTES, SYMBOLS, AND
CODE ANALYSIS
G-201 CAL GREEN REQUIREMENTS
G-202 CAL GREEN REQUIREMENTS
G-203 CAL GREEN REQUIREMENTS
CIVIL ENGINEERING PLANS
CD101 EXISTING CONDITIONS
CS101 SITE PLAN
CS102 SITE PLAN
CS103 SITE PLAN
CS104 SITE PLAN
CG101 GRADING AND DRAINAGE
CG102 GRADING AND DRAINAGE
CG103 GRADING AND DRAINAGE
CG104 GRADING AND DRAINAGE
CG105 WALL PROFILES
CE001 EROSION CONTROL NOTES & DETAILS
CE101 EROSION CONTROL PLAN
CE102 EROSION CONTROL PLAN
CE103 EROSION CONTROL PLAN
CE104 EROSION CONTROL PLAN
CC501 CONSTRUCTION DETAILS
CC502 CONSTRUCTION DETAILS
CC503 CONSTRUCTION DETAILS
CC504 CONSTRUCTION DETAILS
CC505 CONSTRUCTION DETAILS
CC506 CONSTRUCTION DETAILS
LANDSCAPE ARCHITECTURE PLANS
LC001 MASTER CONSTRUCTION SCHEDULE
LC101 CONSTRUCTION PLAN
LC102 CONSTRUCTION PLAN
LC103 CONSTRUCTION PLAN
LC104 CONSTRUCTION PLAN
LC401 ENLARGEMENT - MULTI SPORT COURTS
LC402 ENLARGEMENT - PICKLEBALL COURTS
LC403 ENLARGEMENT - TENNIS COURS
LC404 ENLARGEMENT - PLAYGROUND
LC405 ENLARGEMENT - PLAY EQUIPMENT PLAN
LC501-514 CONSTRUCTION DETAILS
LC701-709 MANUFACTURER CUTSHEETS
LI001-002 IRRIGATION NOTES, SCHEDULE & CALCUATIONS
LI101 IRRIGATION PLAN
LI102 IRRIGATION PLAN
LI103 IRRIGATION PLAN
LI104 IRRIGATION PLAN
LI501 IRRIGATION DETAILS
LP001 PLANTING NOTES, SCHEDULE & DETAILS
LP002 PLANTING SCHEDULE
LP101 PLANTING PLAN
LP102 PLANTING PLAN
LP103 PLANTING PLAN
LP104 PLANTING PLAN
LP501 SOIL AMENDMENTS
ARCHITECTURAL PLANS (RESTROOMS)
A101 FLOOR PLAN
A111 REFLECTED CEILING PLAN
A121 ROOF PLAN
A201 EXTERIOR ELEVATIONS SOUTH
A202 EXTERIOR ELEVATIONS NORTH
A301 BUILDING SECTIONS
A501 FINISH PLANS
A511 INTERIOR ELEVATIONS
A512 INTERIOR ELEVATIONS
A601 DOOR AND LOUVER SCHEDULES
A901 ACCESSIBILITY DETAILS
A902 ACCESSIBILITY DETAILS
A903 DETAILS
A904 DETAILS
STRUCTURAL ENGINEERING PLANS
S101 SHEET INDEX, ABBREVIATIONS & SYMBOLS
S102 GENERAL NOTES
S103 GENERAL NOTES
S104 GENERAL NOTES & SPECIAL INSPECTIONS
& TESTS
S201 FOUNDATION PLAN
S202 ROOF FRAMING PLAN
S203 ABUTMENT PLANS
S221 ELEVATIONS BLDG-1
S222 ELEVATIONS BLDG-2
S301 TYPICAL CONCRETE DETAILS
S302 TYPICAL CONCRETE DETAILS
S303 TYPICAL CONCRETE DETAILS
S311 CONCRETE DETAILS
S312 CONCRETE DETAILS
S321 CMU FOUNDATION DETAILS
S322 MASONRY DETAILS
S331 BRIDGE ABUTMENT DETAILS
S332 BRIDGE ABUTMENT DETAILS
S401 TYPICAL MASONRY DETAILS
S402 TYPICAL MASONRY DETAILS
S403 TYPICAL MASONRY DETAILS
S601 TYPICAL WOOD DETAILS
S602 TYPICAL WOOD DETAILS
S603 TYPICAL WOOD DETAILS
S604 TYPICAL WOOD DETAILS
S605 TYPICAL WOOD DETAILS
S621 ROOF FRAMING DETAILS
SPORT COURT POST TENSION PLANS
PT001 STRUCTURAL GENERAL NOTES
PT002 STRUCTURAL GENERAL NOTES
PT101 TYPICAL DETAILS
PT102 TYPICAL DETAILS
PT201 POST-TENSIONED SLAB-ON-GRADE-KEY PLAN
PT301 TENDON LAYOUT PLAN - BASKETBALL COURTS
PT302 TENDON LAYOUT PLAN - TENNIS COURT
PT303 TENDON LAYOUT PLAN - PICKLEBALL COURTS
PT401 STRUCTURAL DETAILS
ELECTRICAL PLANS
E001 GENERAL ELECTRICAL NOTES, LEGEND, AND
ABBREVIATIONS
E002 ELECTRICAL SINGLE LINE DIAGRAM
E003 ELECTRICAL PANEL SCHEDULES
E004 FIXTURE SCHEDULES
E101 PARTIAL ELECTRICAL SITE PLAN - AREA A
E102 PARTIAL ELECTRICAL SITE PLAN - AREA B
E103 PARTIAL ELECTRICAL SITE PLAN - AREA C
E104 PARTIAL ELECTRICAL SITE PLAN - AREA D
E201 RESTROOMS ELECTRICAL PLANS
E202 TYPICAL BRIDGE ELECTRICAL PLANS
E301 ELECTRICAL DETAILS
E302 ELECTRICAL DETAILS
E303 ELECTRICAL DETAILS
E304 EXTERIOR LIGHTING CUTSHEETS
E305 INTERIOR LIGHTING CUTSHEETS
E306 ELECTRIC VEHICLE CHARGING STATION CUT SHEET
E401 INDOOR LIGHTING - T24 ENGERGY COMPLIANCE
E402 OUTDOOR LIGHTING - T24 ENGERGY COMPLIANCE
RESTROOM FIRE SPRINKLER PLANS
FP-0.00 FIRE SPRINKLER COVER PLAN
FP-0.01 SITE PLAN
FP-0.02 DETAILS
FP-1.00 PIPING PLAN
FP-2.00 REFLECTED CEILING PLAN
FP-3.00 SEISMIC BRACING PLAN
FP-4.00 SECTIONS
RESTROOM PLUMBING PLANS
P-000 PLUMBING GENERAL
P-001 PLUMBING DETAILS
P-200 PLUMBING PLANS - WASTE & VENT
P-201 PLUMBING PLANS - WATER
BIKE PARK PLANS
BP-1.0 BIKE PARK - GENERAL NOTES
BP-2.0 BIKE PARK - CONSTRUCTION PLAN
BP-3.0 BIKE PARK - LAYOUT PLAN
BP-4.0 BIKE PARK - ROUGH GRADING PLAN
BP-4.1 BIKE PARK - FINE GRADING & DRAINAGE PLAN
BP-5.0 BIKE PARK - MATERIALS PLAN
BP-5.1 BIKE PARK - PAINTING PLAN
BP-6.0 BIKE PARK - STANDARD DETAILS
BP-7.0 BIKE PARK - DETAILS
BP-7.1 BIKE PARK - DETAILS
BP-7.2 BIKE PARK - DETAILS
index to plans
sheet no.description
BID SET
Phone:
Fax:
OWNER
City of San Luis Obispo Public Works
990 Palm Street
San Luis Obispo, CA 93401
Wyatt Banker-Hix, Supervising Civil Engineer
805-295-1609
Phone:
Fax:
ARCHITECT / LANDSCAPE ARCHITECT / CIVIL / STRUCTURAL
RRM Design Group
3765 S. Higuera St. Ste 102
San Luis Obispo, CA 93401
(805) 543-1794
(805) 543-4609
Phone:
Fax:
ELECTRICAL ENGINEER
Thoma Electric
3562 Empleo St., Ste. C
San Luis Obispo, CA 93401
Christopher Jose
(805) 543-3850
SCOPE OF WORK
PROJECT GENERALLY INCLUDES, BUT IS NOT LIMITED TO:
·DEMOLITION OF EXISTING SITE INCLUDING REMOVAL OF EXISTING VEGETATION IN
IMPROVEMENT AREAS OUTSIDE OF CREEK LIMITS.
·CONSTRUCTION GENERALLY INCLUDES THE FOLLOWING AMENITIES: BASKETBALL, TENNIS,
BOCCE AND PICKLEBALL COURTS, PICNIC AREAS, PLAYGROUND, SOCCER FIELD, BIKE
PUMP TRACK, BIKE SKILLS COURSE, TWO RESTROOM BUIDLINGS, AND PARKING LOTS.
·CONSTRUCTION OF BIO-RETENTION TREATMENT AREAS AND BASINS.
·THREE (3) PRE-FABRICATED BRIDGES AND CONCRETE ABUTMENTS
·SITE UTILITIES, INCLUDING NEW POTABLE & RECYCLED WATER, SEWER, AND ELECTRICAL.
·SITE FURNISHINGS, INCLUDING BENCHES, TABLES, WASTE RECEPTACLES, DRINKING
FOUNTAIN, AND LIGHT POLES.
·NEW LANDSCAPING AND IRRIGATION IMPROVEMENTS.
PROJECT DIRECTORY
DEFERRED SUBMITTALS
CONTRACTOR SHALL PROVIDE FULL PRODUCT SUBMITTAL
DOCUMENTS REQUIRED FOR CITY APPROVAL INCLUDING
CUT-SHEETS, WARRANTY, INSTALLATION INSTRUCTIONS, STAMPED
STRUCTURAL CALCULATIONS, SITE LAYOUT FOR EACH OF THE
FOLLOWING:
1.PRE-FABRICATED SHADE STRUCTURES
2.PLAY EQUIPMENT
3.PRE-FABRICATED BRIDGE STRUCTURES #1, #2, #3
4.BRIDGE ABUTMENTS & ABUTMENT FOUNDATIONS
Chris Dufour, Project Manager (PRIMARY CONTACT)
Phone:
Fax:
PUMP TRACK ENGINEER
WORMHOUDT INC
849 Almar Ave. Suite 280
Santa Cruz, CA 95060
Zachary Wormhoudt
(831) 426-8424
DATUM:
TOPOGRAPHIC SURVEY
PREPARED BY:RRM DESIGN GROUP
DATE:JANUARY, 2016
PROJECT No.:1417-11-RC22
SURVEY NOTES
1.ALL MEASUREMENTS LISTED, SHOWN AND
REPRESENTED HEREON ARE BASED ON GROUND
DISTANCES.
2.THE CONTOUR INTERVAL IS 1 FOOT.
3.UNDERGROUND UTILITY LOCATIONS ARE PLOTTED
BASED ON ABOVE GROUND SURFACE STRUCTURES
AND PUBLIC IMPROVEMENT PLANS PREPARED BY
CANNON ASSOCIATES FOR TRACT 3063 PHASE 1.
ADDITIONAL UNDERGROUND UTILITY LINES MAY EXIST.
FOR MORE INFORMATION REGARDING UTILITY
LOCATION, SIZE, DEPTH, CONDITION, AND CAPACITY
CONTACT UTILITY OR MUNICIPAL/PUBLIC SERVICE
FACILITY.
CORDINATES SHOWN ARE BASED ON HORIZONTAL CONTROL POINTS
8097 & 8208 AS PUBLISHED IN THE CITY OF SAN LUIS OBISPO 2007
HORIZONTAL CONTROL NETWORK (NORTH AMERICAN DATUM OF 1983
(NAD83) EPOCH DATE 1991.35, ZONE 5 CALIFORNIA).
THE BASIS OF BEARINGS SHOWN ARE BASED ON TRACT MAP
3063-PHASE 1 FILED IN BOOK 37 OF MAPS AT PAGES 59 THROUGH 71 IN
THE COUNTY RECORDER'S OFFICE, COUNTY OF SAN lUIS OBISPO, STATE
OF CALIFORNIA.
ELEVATIONS SHOWN ARE BASED ON THE CITY OF SAN LUIS OBISPO 2007
BENCH MARK SYSTEM, BM NO. 397, BEING A LEAD AND TACK AT THE
BCR OF THE SOUTHWEST CORNER OF TANK FARM ROAD AND
BROOKPINE STREET. ELEVATION = 258.00' (NAVD88)
Phone:
Fax:
MECHANICAL ENGINEER
3CE
1500 Palm St.
San Luis Obispo, CA 93401
Denver Stanger
(805) 540-5388
sheet no.description sheet no.description
STORMWATER
WDID NUMBER -
DIG ALERT
DIAL TOLL FREE
AT LEAST 2 DAYS
BEFORE YOU DIG
Wyatt Banker-Hix, Supervising Civil Engineer R.C.E. C86141 Approved Date
Brian A. Nelson, City Engineer
R
E
*ISTER E D P R O F ES SIONA
L
E
N
*
I
N
E
ER
S
T
ATE OF C A L I F O R N IACI9IL
No. C 8
:Y A T T A B A N
.
E
R
-
+I
;
7/31/2025