Loading...
HomeMy WebLinkAbout08/15/1995, C-4 - DESIGN SERVICES FOR THE BUS MAINTENANCE FACILITY EXPANSION �Illp^►y��ll�llllllllll�ll�lll r MEETING DATE: IIII NN�� I�u�u►I ci o san lui s osi spo � i - �s COUNCIL AGENDA REPORT ITEM NUMB Meeting of August 15, 1995 FROM: Michael D. McCluskey, Public Works Director Prepared by: Bridget O. Fraser, Engineering Assistant SUBJECT: Design Services for the Bus Maintenance Facility Expansion CAO RECOMMENDATIONS: By motion, 1) approve the Request for Proposals for "Design Services: Bus Maintenance Facility Expansion, Specification No.96-01A (530.9601.522.552) Estimated cost: $28,000 2) appropriate an additional $11,000 in federal grant revenue and state subventions to the project account 3) authorize the City Administrative Officer to award an agreement for design services if the cost does not exceed $28,000. DISCUSSION: The proposed project would add one service bay and a bus washer to the City's bus maintenance building. This addition would increase service capacity and allow more frequent washing of the SLO Transit fleet. The original design of the maintenance building included four service bays, with one bay incorporating a bus washer and washwater recovery system. To save construction costs, the architect eliminated two service bays and the bus washer. This smaller project was built in 1987 and was adequate for the SLO Transit fleet at that time, which included eight buses. Since then, though, the SLO Transit fleet has grown to 14 buses and two trolleys, and there is little room to perform timely service. Currently, the transit contractor washes each vehicle weekly with a hose and handbrush in the parking lot, a labor-intensive process that wastes water. The adopted Short Range Transit Plan recommends washing the front and back of each vehicle daily and the entire exterior weekly, but this level of attention is not feasible with handwashing. Staff has prepared the attached request for proposals to solicit design services by contract from qualified architects. The engineering program has only enough employees to design streets and utilities projects. All other projects (including projects for parks, buildings, and alternative transportation) must be designed by contract. FISCAL IMPACT: additional estimated budgeted (1) needed Costs: Design Services $28,000 $17,000 $11,000 Revenue Sources: FTA Section 9 Grant $22,000 $14,000 $ 8,000 TDA Fund 6.000 3.000 3.000 $28,000 $17,000 $11,000 (1) See page E-9 of the 1995/97 Financial Plan and pages 110-114 of Appendix B to the 1995/97 Financial Plan The City has an approved Federal Transit Administration Section 9 capital grant for the bus maintenance facility expansion which will cover 80 percent of design costs. The additional money needed will come from revenues which can be used only for capital projects. NOTE: RFP documents are available in the Council Office for Review. . 9:1dpt0aIhprM1 aadv.Eol 072585