Loading...
HomeMy WebLinkAboutStreets and Sidewalk Maintenance 2027 SPECIAL PROVISIONS FOR CITY OF SAN LUIS OBISPO Job Order Contract for Streets and Sidewalk Maintenance 2027 Specification No. 1000199 October 2026 PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION 919 Palm Street San Luis Obispo, CA 93401 (805) 781-7200 Job Order Contract for Streets and Sidewalk Maintenance 2027 Specification No. 1000199 Approval Date: October 06, 2026 <<Signature Date>> TABLE OF CONTENTS NOTICE TO BIDDERS .................................................................... ERROR! BOOKMARK NOT DEFINED. BID SUBMISSION ....................................................................... ERROR! BOOKMARK NOT DEFINED. BID DOCUMENTS ...................................................................... ERROR! BOOKMARK NOT DEFINED. PROJECT INFORMATION .......................................................... ERROR! BOOKMARK NOT DEFINED. QUALIFICATIONS ....................................................................... ERROR! BOOKMARK NOT DEFINED. AWARD ....................................................................................... ERROR! BOOKMARK NOT DEFINED. ACCOMMODATION .................................................................... ERROR! BOOKMARK NOT DEFINED. BID FORMS .................................................................................... ERROR! BOOKMARK NOT DEFINED. BID ITEM LIST FOR JOB ORDER CONTRACT FOR STREETS AND SIDEWALK MAINTENANCE 2027, SPECIFICATION NO. 1000199 ................................................................................................................ A LIST OF SUBCONTRACTORS ................................................... ERROR! BOOKMARK NOT DEFINED. PUBLIC CONTRACT CODE SECTION 10285.1 STATEMENT . ERROR! BOOKMARK NOT DEFINED. PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIREERROR! BOOKMARK NOT DEFINED. PUBLIC CONTRACT CODE SECTION 10232 STATEMENT .... ERROR! BOOKMARK NOT DEFINED. LABOR CODE SECTION 1725.5 STATEMENTS ...................... ERROR! BOOKMARK NOT DEFINED. NON-COLLUSION DECLARATION ............................................ ERROR! BOOKMARK NOT DEFINED. BIDDER ACKNOWLEDGEMENTS ............................................. ERROR! BOOKMARK NOT DEFINED. QUALIFICATIONS ....................................................................... ERROR! BOOKMARK NOT DEFINED. ATTACH BIDDER'S BOND TO ACCOMPANY BID .................... ERROR! BOOKMARK NOT DEFINED. SPECIAL PROVISIONS .................................................................. ERROR! BOOKMARK NOT DEFINED. DIVISION I GENERAL PROVISIONS ......................................... ERROR! BOOKMARK NOT DEFINED. 1 GENERAL ............................................................................. ERROR! BOOKMARK NOT DEFINED. 3 CONTRACT AWARD AND EXECUTION ............................. ERROR! BOOKMARK NOT DEFINED. 4 SCOPE OF WORK ............................................................... ERROR! BOOKMARK NOT DEFINED. 5 CONTROL OF WORK .......................................................... ERROR! BOOKMARK NOT DEFINED. 6 CONTROL OF MATERIALS ................................................. ERROR! BOOKMARK NOT DEFINED. 7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLICERROR! BOOKMARK NOT DEFINED. 8 PROSECUTION AND PROGRESS ..................................... ERROR! BOOKMARK NOT DEFINED. 9 PAYMENT ............................................................................. ERROR! BOOKMARK NOT DEFINED. DIVISION II GENERAL CONSTRUCTION ................................. ERROR! BOOKMARK NOT DEFINED. 12 TEMPORARY TRAFFIC CONTROL .................................. ERROR! BOOKMARK NOT DEFINED. 14 ENVIRONMENTAL STEWARDSHIP ................................. ERROR! BOOKMARK NOT DEFINED. 15 EXISTING FACILITIES ....................................................... ERROR! BOOKMARK NOT DEFINED. DIVISION V SURFACINGS AND PAVEMENTS ......................... ERROR! BOOKMARK NOT DEFINED. 37 BITUMINOUS SEALS ......................................................... ERROR! BOOKMARK NOT DEFINED. 39 ASPHALT CONCRETE .................................................................................................................... 5 DIVISION VIII MISCELLANEOUS CONSTRUCTION .............................................................................. 6 73 CONCRETE CURBS AND SIDEWALKS ......................................................................................... 6 77 LOCAL INFRASTRUCTURE ............................................................................................................ 7 DIVISION IX TRAFFIC CONTROL DEVICES ......................................................................................... 13 84 MARKINGS ..................................................................................................................................... 13 DIVISION XIII APPENDICES .................................................................................................................. 14 APPENDIX A - FORM OF AGREEMENT ....................................... ERROR! BOOKMARK NOT DEFINED. APPENDIX B – BIKE LANE BUFFER ............................................ ERROR! BOOKMARK NOT DEFINED. APPENDIX C – CATCH BASIN STANDARD 3355A ...................... ERROR! BOOKMARK NOT DEFINED. APPENDIX D - CA MUTCD-FIGURE-6P-19……………………………………………………....…………….20 APPENDIX E - CA MUTCD-FIGURE-6P-20………………………………………………………….…...…….21 APPENDIX F - CA MUTCD-FIGURE-6P-35………………………………….................................………….22 APPENDIX G - CA MUTCD-FIGURE-6P-52……………………………………..……………………..……….23 APPENDIX H - CA MUTCD-FIGURE-6P-102…………..………………………………….………………..….24 APPENDIX I - TRAFFIC LOGIX RUBBER TRAFFIC CALMING PRODUCT………………………….…….25 APPENDIX J - TRAFFIC LOGIX SOLAR RADAR SIGN………………………………………………...…….26 NOTICE TO BIDDERS i NOTICE TO BIDDERS BID SUBMISSION Sealed bids will be received by the City of San Luis Obispo at the Public Works Administration Office located at 919 Palm Street, San Luis Obispo, California 93401, until 2:00 p.m. on November 5, 2026 at which time they will be publicly opened and read aloud. Public bid opening may be accessed via Microsoft Teams video conference and conference call. Use the following link: or join by phone with this number: +1 209-645-4165 with Conference ID: 692 447 461 Submit bid in a sealed envelope plainly marked: JOB ORDER CONTRACT FOR STREETS AND SIDEWALK MAINTENANCE 2027, SPECIFICATION NO. 1000199 Any bid received after the time and date specified will not be considered and will be returned to the bidder unopened. Bids received by Fax or Email will not be considered. By submission of bid you agree to comply with all instruction and requirements in this notice and the contract documents. All bids must be submitted on the Bid Item List form(s) provided and submitted with all other Bid Forms included in these Special Provisions. Each bid must be accompanied by either a: 1. certified check 2. cashier's check 3. bidder's bond made payable to the City of San Luis Obispo for an amount equal to ten percent of the bid amount as a guaranty. Guaranty will be forfeited to the City San Luis Obispo if the bidder, to whom the contract is awarded, fails to enter into the contract. The City of San Luis Obispo reserves the right to accept or reject any or all bids or waive any immaterial irregularities in a bid. All bids are to be compared based on the City Engineer's estimate of the quantities of work to be done, as shown on the Bid Item List. Bids will only be accepted from bidders that are licensed in compliance with the provisions of Chapter 9, Division III of Business and Professions Code. NOTICE TO BIDDERS NOTICE TO BIDDERS ii The award of the contract, if awarded, will be to the lowest responsive bid submitted by a responsible contractor whose bid complies with the requirements prescribed. If the contract is awarded, the contract will be awarded within 60 calendar days after th e opening of the bids. Failure to raise defects in the notice to bidders or bid forms prior to bid opening constitute a waiver of those defects. BID DOCUMENTS A copy of the plans and special provisions may be downloaded, free of charge, from the City’s website at: www.slocity.org/government/department-directory/public-works/public-works-bids- proposals No printed copies are available for purchase at the City office. Request must include Specification Number. The office of the City Engineer is located at: 919 Palm Street San Luis Obispo, CA 93401 Standard Specifications and Engineering Standards referenced in the Special Provisions may be downloaded, free of charge, from the City’s website at: www.slocity.org/government/department-directory/public-works/documents- online/construction-documents You are responsible to obtain all issued addenda prior to bid opening. Addenda will be available to download at the City’s website listed above or at the office of the City Engineer. All questions must be submitted through BidNet, and if the City determines that a response is necessary, the City will post an addendum on BidNet. Contact the project manager, James Yanez at 805-540-7209 or the Public Works and Utilities Department at (805) 781-7200 prior to bid opening to verify the number of addenda issued. You are responsible to verify your contact information is correct on the plan holders list located on the City’s website at: www.slocity.org/government/department-directory/public-works/public-works-bids- proposals. NOTICE TO BIDDERS NOTICE TO BIDDERS iii PROJECT INFORMATION In general, the project consists of repairing utility trenches, roadway failures, damaged concrete, and completing other minor maintenance work on an as needed basis. The project estimated construction cost is $1,398,444 Contract time is established as 36 Months. The fixed liquidated damages amount is established at $500 per day for failure to complete the work within the contract time. Pursuant to Labor Code section 1720 et seq., the project is subject to the prevailing wage requirements applicable to the locality in which the work is to be performed for each craft, classification or type of worker needed to perform the work, including employer payments for health and welfare, pension, vacation, apprenticeship and similar purposes. In compliance with section 1773 of the Labor Code, the State of California Department of Industrial Relations (“DIR”) has established prevailing hourly wage rates for each type of workman. Current wage rates are on file with the City and may also be obtained from the DIR’s website at: https://www.dir.ca.gov/oprl/DPreWageDetermination.htm Each contractor and subcontractor must pay no less than the specified rates to all workers employed to work on the project. The schedule of per diem wages is based upon a working day of eight hours. The rate for holiday and overtime work must be at least time and one-half. This project is subject to compliance monitoring and enforcement by the DIR. QUALIFICATIONS You must possess a valid Class “A” Contractor's License at the time of the bid opening. You and any subcontractors must be registered with the DIR pursuant to section 1725.5 of the Labor Code. Subject to limited legal exceptions for joint venture bids and federally-funded projects, City may not accept a bid from a bidder without proof that the bidder is registered with the DIR to perform public work under Labor Code section 1725.5. You must have experience constructing projects similar to the work specified for this project. Provide three similar reference projects completed as either the prime or subcontractor. All referenced projects must have been completed within the last five years from this project’s bid opening date. Two of the three reference projects must have been completed as prime contractor under contract with a city, county, state or federal government agency. NOTICE TO BIDDERS NOTICE TO BIDDERS iv All referenced projects must be for street construction, paving, trench repair work (including open trench utility work), and minor concrete work (including the replacement of curb ramps). Failure to provide reference projects as specified in this section and as required on the qualification form may be cause to reject a bid. The City reserves the right to reject any bid based on non-responsiveness if a bidder fails to provide a bid that complies with all bidding instructions. The City reserves the right to reject a responsive bid based on the non -responsibility of the bidder if the Director of Public Works and Utilities or Designee finds, after providing notice and a hearing to the bidder, that the bidder lacks the 1. knowledge 2. experience, 3. or is otherwise not responsible as defined in Section 3.24 of the San Luis Obispo Municipal Code to complete the project in the best interest of the City. Rejected bidders may appeal this determination. Appeal must comply with the requirements in this Notice to Bidders. It is the City of San Luis Obispo’s intent to award the contract to the lowest responsive bid submitted by a responsible bidder. If in the bidder’s opinion the contract may be improperly awarded, the bidder may protest the contract award. Only a bidder who has actually submitted a bid is eligible to submit a bid protest against another bidder. Subcontractors are not eligible to submit bid protests. A bidder may not rely on the bid protest submitted by another bidder, but must timely pursue its own protest . Protests must be filed no later than five working days after the bid opening date. Protest must be in writing and received by the project manager located at: 919 Palm Street San Luis Obispo, CA 93401. Valid protests must contain the following information: 1. basis for the protest. The protest must refer to the specific portion or portions of the Contract Documents upon which the protest is based 2. all supporting documentation 3. the ruling expected by the City to remedy the protest. Any protest not containing all required information will be deemed invalid and rejected. NOTICE TO BIDDERS NOTICE TO BIDDERS v The City will consider additional documentation or other supporting information regarding the protest if submitted in compliance with the specified time limits. Anything submitted after the specified time limit may not be considered. The Director of Public Works and Utilities or Designee may request additional information to be submitted, unless otherwise specified, and will notify the protester of ruling. If the protester is not satisfied with ruling, the protester may appeal the ruling to the City Council in compliance with Chapter 1.20 of the City of San Luis Obispo Municipal Code. The procedure and time limits set forth in this Section are mandatory and are the bidder’s sole and exclusive remedy in the event of a bid protest. A bidder’s failure to comply with these procedures will constitute a waiver of any right to further pursue a bid protest, including appeal of the ruling to the City Council, filing a Government Code Claim, or initiation of legal proceedings. City reserves the right, acting in its sole discretion, to reject any bid protest that it determines lacks merit, to award the Contract to the bidder it has determined to be the responsible bidder submitting the lowest responsive bid, and to issue a Notice to Proceed with the Work notwithstanding any pending or continuing challenge to its determination. Pursuant to the Public Records Act (Government Code § 7920.000 et seq.), the City will make public records available upon request. AWARD The lowest bidder will be determined using the BID TOTAL based on the quantities supplied by the City and the bidder’s unit price. As a condition to executing a contract with the City, a payment bond and performance bond each equal to one hundred percent of the total contract price a re required in compliance with Section 3-1.05 of the Standard Specifications. Each bond must be issued and executed by a surety admitted in California. You may substitute securities in lieu of retention under the contract in compliance with the provisions of the Public Contract Code § 22300. ACCOMMODATION If any accommodations are needed to participate in the bid process, please contact Kelly Mokbel at (805) 781-7200 or by Telecommunications Device for the Deaf at (805) 781- 7107. Requests should be made as early as possible in the bidding process to allow time for accommodation. BID FORMS A BID FORMS All bid forms must be completed and submitted with your bid. Failure to submit these forms and required bid guaranty (bid bond, cashier’s check, or certified check) may be cause to reject the bid as nonresponsive. Staple all bid forms together. THE UNDERSIGNED, agrees that they have carefully examined: 1. the location of the proposed work 2. the plans and specifications 3. read the accompanying instructions to bidders and propose to furnish all: 1. materials 2. labor to complete all the required work satisfactorily in compliance with 3. plans 4. specifications 5. special provisions for the prices set forth in the bid item list: BID ITEM LIST FOR JOB ORDER CONTRACT FOR STREETS AND SIDEWALK MAINTENANCE 2021, SPECIFICATION NO. 1000199 Item Item Unit of Estimated Item Price Total No. SS(1) Description Measure Quantity (in figures) (in figures) 1 15, 42, 77 Edge Grind LF 500 2 39, 77 1.75” Thin Maintenance Overlay SQFT 500 3 39, 77 2” AC Grind & AC Overlay – ½” Aggregate SQFT 200 4 39, 77 6” AC Pavement – Excavation & Restoration SQFT 8,000 5 39, 77 10” AC Pavement – Excavation & Restoration SQFT 3,000 6 77 8” PCC with 3” max AC Cap – Excavation & Restoration SQFT 1,800 7 26, 77 Class II Aggregate TON 50 8 26, 77 Trench Backfill Sand TON 50 9 39 AC Dike – Caltrans A87B LF 220 10 39, 77 Pavement Reinforcing Fabric SQYD 10 11 37 Fog Seal SQYD 20 12 84 Pavement Marking – Caltrans A24 SQFT 100 13 84 12-inch White Limit Line LF 50 BID FORMS BID FORMS B Item Item Unit of Estimated Item Price Total No. SS(1) Description Measure Quantity (in figures) (in figures) 14 84 Traffic Stripe – Caltrans A20A Detail 1 LF 50 15 84 Traffic Stripe – Caltrans A20A Detail 2 LF 50 16 84 Traffic Stripe – Caltrans A20A Detail 8 LF 50 17 84 Traffic Stripe – Caltrans A20A Detail 9 LF 50 18 84 Traffic Stripe – Caltrans A20A Detail 22 LF 50 19 84 Traffic Stripe – Caltrans A20B Detail 29 LF 50 20 84 Traffic Stripe – Caltrans A20D Detail 38 LF 50 21 84 Traffic Stripe – Caltrans A20D Detail 39 LF 50 22 84 Traffic Stripe – Caltrans A20D Detail 39A LF 50 23 84 Reflective Pavement Marker – All types EA 5 24 84 Hi-Vis Crosswalk – Std. 7350 LF 20 25 84 Bike Lane Buffer LF 50 26 84 Green Bike Lane Coating – Std. 7360 SQFT 250 27 15 Remove Traffic Stripe LF 100 28 15 Remove Pavement Marking SQFT 100 29 73 Remove & Replace Sidewalk – Std. 4110 (Area – Under 60 SQFT) SQFT 60 30 73 Remove & Replace Sidewalk – Std. 4110 (Area – 60 to 180 SQFT) SQFT 180 31 73 Remove & Replace Sidewalk – Std. 4110 (Area – Over 180 SQFT) SQFT 200 32 77 Stump Grind with Stump Grinder EA 1 33 77 Stump Removal with Excavator EA 1 34 77 Root Removal HR 10 35 73 Remove & Replace Curb and Gutter – Std. 4030 LF 80 36 73 Remove & Replace Curb Ramp – Std. 4440 SQFT 1,500 37 73 Remove & Replace Cross Gutter – Std. 4310 SQFT 10 38 73 Remove & Replace Driveway Ramp – Std. 2110, 2111, 2115, 2116 SQFT 400 39 73 Mission Style PCC Coloring and Salt Finish SQFT 300 BID FORMS BID FORMS C Item Item Unit of Estimated Item Price Total No. SS(1) Description Measure Quantity (in figures) (in figures) 40 73 Mission Style Tile Installation - Std. 4220 LF 20 41 73 Single Mission Style Tile Installation – Std. 4220 EA 100 42 77 Install Sidewalk Underdrain Std. 3415 LF 15 43 73 Replace Truncated Domes – Std. 4440 SQFT 50 44 73, 84 Repaint Curb LF 100 45 73 Furnish & Install Metal Post – Std. 7210 EA 5 46 73 Furnish & Install Metal Post – Std. 7215 EA 5 47 15, 56 Furnish & Install Sign EA 5 48 77 Remove Existing Parking Meter Pole EA 5 49 77 Traffic Logix Safe Pace Evolution 15FM- Furnish and install on (E) Streetlight Pole EA 1 50 77 Traffic Logix Safe Pace Evolution 15FM- Install City Furnished Equipment on (E) City Street Pole EA 1 51 77 Traffic Logix Safe Pace Evolution 15FM-Furnish and Install on (N) Punch Post EA 1 52 77 Traffic Logix Safe Pace Evolution 15FM-Install City Furnished Equipment on (N) Punch Post EA 1 53 15 Reconstruct Guardrail – Caltrans A77A1 LF 10 54 73 Furnish & Install Tree Well – Std. 8130, 4’ x 4’ EA 1 55 73 Furnish & Install Tree Well – Std. 8130, 5’ x 5’ EA 1 56 73 Furnish & Install Tree Well – Std. 8130, 6’ x 6’ EA 1 57 15 Enlarge Tree Grate Opening EA 20 58 51, 77 Catch basin – Std. 3350 EA 1 59 51, 77 Catch basin – Std. 3355 EA 1 60 51, 77 Catch basin – Std. 3355A EA 1 61 51, 77 Catch basin – Std. 3360 EA 1 62 15 Adjust Utility Cover – Std. 6040 EA 25 63 15, 77 Manhole Frame & Cover Replacement – Std. 6040 EA 12 64 15, 77 Manhole Replacement – Std. 3530 or 6610 EA 1 BID FORMS BID FORMS D Item Item Unit of Estimated Item Price Total No. SS(1) Description Measure Quantity (in figures) (in figures) 65 77 Install Water meter box- 3/4" or 1" per Std 6210 EA 5 66 77 Install Water Meter box -1 1/2" or 2" per Std 6210 EA 5 67 77 Manhole Coating EA 10 68 77 Construct Well / Cleanout – G5 – Std. 6710 EA 3 69 77 Potholing (Depth – 0’ to Under 4’) EA 20 70 77 Potholing (Depth – 4’ to Under 8’) EA 15 71 77 Potholing (Depth – 8’ and Over) EA 15 72 77 Pipe Excavation & Restoration (Depth - 0’ to Under 2.5’) LF 20 73 77 Pipe Excavation & Restoration (Depth - 2.5’ to Under 8.5’) Shoring Required LF 20 74 77 Pipe Excavation & Restoration (Depth – 8.5’ and Over) Shoring Required LF 20 75 12 Traffic Control – Eng. Std. Appendix G – Figure A HR 40 76 12 Traffic Control – Eng. Std. Appendix G – Figure B HR 70 77 12 Traffic Control – Eng. Std. Appendix G – Figure C HR 10 78 12 Traffic Control – Eng. Std. Appendix G – Figure D HR 30 79 12 Traffic Control – Eng. Std. Appendix G – Figure E HR 90 80 12 Traffic Control – Eng. Std. Appendix G – Figure F HR 10 81 12 Traffic Control – Eng. Std. Appendix G – Figure G HR 20 82 12 Traffic Control – Eng. Std. Appendix G – Figure H HR 40 83 12 Traffic Control – Eng. Std. Appendix G – Figure I HR 10 84 12 Traffic Control – Eng. Std. Appendix G – Figure J HR 10 85 12 Traffic Control – Eng. Std. Appendix G – Figure K HR 110 86 12 Traffic Control – Eng. Std. Appendix G – Figure L HR 20 87 12 Traffic Control – Eng. Std. Appendix G – Figure M HR 200 88 12 Traffic Control – Eng. Std. Appendix G – Figure N HR 30 89 12 Traffic Control – Eng. Std. Appendix G – Figure O HR 20 90 12 Traffic Control – Eng. Std. Appendix G – Figure P HR 100 BID FORMS BID FORMS E Item Item Unit of Estimated Item Price Total No. SS(1) Description Measure Quantity (in figures) (in figures) 91 12 Traffic Control – Eng. Std. Appendix G – Figure Q HR 100 92 12 Minor Traffic Control HR 1,000 93 12 Traffic Control – CA MUTCD – Figure 6P-19 HR 20 94 12 Traffic Control – CA MUTCD – Figure 6P-20 HR 20 95 12 Traffic Control – CA MUTCD – Figure 6P-35 HR 20 96 12 Traffic Control – CA MUTCD – Figure 6P-52 HR 20 97 12 Traffic Control – CA MUTCD – Figure 6P-102 HR 20 98 77 Pexco City Post (Embedded Anchor Cup Mount), 36” height, 3 retroreflective wraps color per Engineer EA 30 99 77 Pexco City Post (Embedded Anchor Cub AC Mount), 18” height, 3 retroreflective wraps color per Engineer EA 20 100 77 Furnish and Install Modular Rubber Traffic Calming Speed Hump/Table/Cushion (Traffic Logix) SQFT 400 101 77 Abandon and Grout (E) Sanitary Sewer with Flowable Fill LF 100 Total Project Bid $ Company Name: (1) refers to section in the Standard Specifications, with modifications in the Special Provisions, that describe required work. BID FORMS BID FORMS F LIST OF SUBCONTRACTORS Pursuant to Section 4100 of the Public Contract Code and section 2-1.33C of the standard specifications, the Bidder is required to furnish the following information for each Subcontractor performing more than 1/2 percent (0.5%) of the total base bid. Do no t list alternative subcontractors for the same work. Subcontracting must not total more than fifty percent (50%) of the submitted bid except as allowed in section 5-1.13 of the standard specifications. For Streets & Highways projects, subcontractors performing less than ten thousand dollars ($10,000) worth of work need not be mentioned. Subcontractors must be registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 to be listed. NOTE: If there are no subcontractors, write “NONE” and submit with bid. Name Under Which Subcontractor is Licensed License Number DIR Public Works Registration Number Address and Phone Number of Office, Mill or Shop Specific Description of Subcontract % of Total Base Bid Attach additional sheets as needed. BID FORMS BID FORMS G LABOR CODE SECTION 1725.5 STATEMENTS The bidder has delinquent liability to an employee or the state for any assessment of back wages or related damages, interest, fines, or penalties pursuant to any final judgment, order, or determination by a court or any federal, state, or local administrative agency, including a confirmed arbitration award. Any judgment, order, or determination that is under appeal is excluded, provided that the contractor has secured the payment of any amount eventually found due through a bond or other appropriate means. Yes No The bidder is currently debarred under Section 1777.1 or under any other federal or state law providing for the debarment of contractors from public works. Yes No NOTE: The above Statements are part of the Bid. Signing this Bid on the signature portion constitute signature of this Statement. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution. BID FORMS BID FORMS H NONCOLLUSION DECLARATION TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID The undersigned declares: I am the ____________________ [title] of _____________________________________ [business name], the party making the foregoing bid. The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, `organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose. Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on _______________ [date], at __________________________________ [city], _______ [state]. s/________________________________________ __________________________________________ Name [print] BID FORMS BID FORMS I BIDDER ACKNOWLEDGEMENTS By signing below, the bidder acknowledges and confirms that this bid is based on the information contained in all contract documents, including the notice to bidders, plans, specifications, special provisions, and addendum number(s) . (Note: You are responsible to verify the number of addenda prior to the bid opening.) The undersigned further agrees that in case of default in executing the required contract, with necessary bonds, within ten days, (not including Saturdays, Sundays, and legal holidays), after having received a mailed notice that the contract is ready for signature, the proceeds of the check or bond accompanying his bid will become the property of the City of San Luis Obispo. Licensed in accordance with an act providing for the registration of contractors, License No. , Expiration Date . The above statement is made under penalty of perjury, and any bid not containing this information may be considered non-responsive and may be rejected by the City. Signature of Bidder (Print Name and Title of Bidder) DIR– Public Works Registration No: Business Name (DBA): Owner/Legal Name: Indicate One: Sole-proprietor  Partnership Corporation List Partners/Corporate Officers: Name Title Name Title Name Title Business Address Street Address Mailing Address City, State, Zip Code Phone Number Fax Number Email Address Date BID FORMS BID FORMS J QUALIFICATIONS Failure to furnish complete reference information ON THIS FORM, as specified in this project’s Notice to Bidders and indicated below, may be cause to reject the bid. Additional information may be attached but is not a substitute for this form. Reference Number 1 Customer Name & Contact Individual Telephone & Email Project Name (Site Address): Is this similar to the project being bid or did this project include paving or concrete activity? Yes □ No □ Describe the services provided and how this project is similar to that which is being bid: Date project completed: Was this contract for a public agency? Yes □ No □ Reference Number 2 Customer Name & Contact Individual Telephone & Email Project Name (Site Address): Is this similar to the project being bid or did this project include open trench utility work? Yes □ No □ Describe the services provided and how this project is similar to that which is being bid: Date project completed: Was this contract for a public agency? Yes □ No □ Reference Number 3 Customer Name & Contact Individual Telephone & Email Project Name (Site Address): Is this similar to the project being bid or did this project include the installation of curb ramps? Yes □ No □ Describe the services provided and how this project is similar to that which is being bid: Date project completed: Was this contract for a public agency? Yes □ No □ BID FORMS BID FORMS K ATTACH BIDDER'S BOND TO ACCOMPANY BID Know all men by these presents: That we ____________________________________________, AS PRINCIPAL, and _______________________________________________________, AS SURETY, are held and firmly bound unto the City of San Luis Obispo in the sum of: ____________________________________________________ Dollars (_____________) to be paid to said City or its certain attorney, its successors and assigns; for which payment, well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors or assigns, jointly and severally, firmly by these presents: THE CONDITION OF THIS OBLIGATION IS SUCH, that if the certain bid of the above bounden ______________________________________________________________________ to construct ___________________________________________________________________ (insert name of street and limits to be improved or project) dated _____________________ is accepted by the City of San Luis Obispo, and if the above bounden _______________________________________________________, his heirs, executors, administrators, successors, and assigns shall duly enter into and execute a contract for such construction and shall execute and deliver the two bonds described within ten (10) days (not including Saturdays, Sundays, or legal holidays) after the above bounden, ______________________________________________________, has received notice by and from the said City of San Luis Obispo that said contract is ready for execution, then this obligation shall become null and void; otherwise, it shall be and remain in full force and virtue. IN WITNESS WHEREOF, we hereunto set our hands and seals this ___ day of ______, 20____. Bidder Principal: Signature Date Title: Surety: Bidder's signature is not required to be notarized. Surety's signature must be notarized. Equivalent form may be substituted (Rev. 6-30-14) SPECIAL PROVISIONS 1 SPECIAL PROVISIONS ORGANIZATION Special provisions are under headings that correspond with the main section heading of the Standard Specifications. Each special provision begins with a revision clause that describes or introduces a revision to the Standard Specifications. Any paragraph a dded or deleted by a revision clause does not change the paragraph number of the Standard Specifications for any other reference to a paragraph of the Standard Specifications. DIVISION I GENERAL PROVISIONS 1 GENERAL Add to Section 1-1.01 GENERAL: The work must be done in compliance with the City of San Luis Obispo, Department of Public Works and Utilities: 1. Job Order Contract for Streets and Sidewalk Maintenance 2027 Special Provisions 2. City of San Luis Obispo Standard Specifications and Engineering Standards – 2025 edition 3. State of California, Department of Transportation Standard Specifications and Standard Plans – 2024 edition In case of conflict between documents, governing ranking must comply with section 5 - 1.02 of the City of San Luis Obispo’s Standard Specifications. Failure to comply with any obligation under the contract documents constitutes a breach of contract. Add to Section 1-1.07 DEFINITIONS, Glossary: Contract Documents: The executed Contract, including the component parts listed in Article III of the Agreement. 4 SCOPE OF WORK Add to Section 4-1.03 WORK DESCRIPTION: Comply with the provisions of Sections 12, 13, 15, 26, 37, 39, 42, 51, 56, 73, 77, and 84 for general, material, construction, and payment specifics. This Agreement will serve as the basis for Job Order Contract Task Orders issued periodically throughout the contract term. The Engineer will identify locations requiring maintenance or repair work and contact the Contractor to schedule a Task Order scoping meeting. Work will be performed using the bid items and corresponding unit prices established in the Bid Item List. SPECIAL PROVISIONS SPECIAL PROVISIONS 2 Within ten (10) calendar days of verbal notification of the proposed work, the Contractor shall meet with the Engineer at the project site to review the proposed scope of work, site conditions, and estimated quantities. Following the scoping meeting, the E ngineer will issue a Task Order to the Contractor by means of a Purchase Order and/or written Notice to Proceed. The Task Order will identify the authorized scope of work, estimated quantities, number of working days allowed for completion, and required st art date. Within five (5) calendar days following issuance of the Task Order, the Contractor shall submit a traffic control plan, when required, for review and approval by the Engineer. The Contractor shall not begin work requiring traffic control until the traffic control plan has been approved by the Engineer. 5 CONTROL OF WORK Add to Section 5-1.13A: You must notify the Engineer if any subcontractors are performing work on an issued Task Order, prior to the execution of that Task Order. 6 CONTROL OF MATERIALS Add to Section 6-2.03: Settlement of any pavement repair is considered a substantial defect. Guarantee periods will be one year after the completion of each individual Task Order. This period begins on the date the Task Order is accepted as complete by the Engineer. 7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC Add to Section 7-1.03B PUBLIC CONVENIENCE, Traffic Control Plan Normal working hours are Monday through Friday between 7:00 a.m. and 4:00 p.m. Modified working hours may be required for individual sites when determined necessary by the Engineer. You may also request modified work hours to facilitate the work, which will be considered by the Engineer. Jack hammering, sawcutting, grinding, or any other type of demolition work producing similar noise levels is prohibited between the hours of 11:00 a.m. and 1:00 p.m. within 500 feet of a food service establishment. Upon approval of the traffic control plan, the City will issue approval to proceed with JOC Task Order. Contractor is responsible for complying with all conditions of the traffic control plan. Complete work using due diligence to restore free flowing of traffic. 8 PROSECUTION AND PROGRESS Replace the 1st paragraph in Section 8-1.02A SCHEDULE, General with: Provide a Level 1 schedule for Task Orders of durations greater than 10 working days. SPECIAL PROVISIONS SPECIAL PROVISIONS 3 9 PAYMENT Replace Sections 9-1.06B and 9-1.06C with: The estimated quantities in these Special Provisions are furnished as a tool to the Contractor as what might be expected of this Contract. The quantities will vary based on the City’s needs. Payment will be made for actual quantities completed at the unit price provided. Replace Section 9-1.07 with: Bid items prices shall be adjusted annually from the month of contract award by modifying the unit price up or down in conformance with the California Construction Cost Index as published by the California Department of General Services. The factor for the adjustment of bid items shall be calculated at the contract 12-month and 24-month period utilizing the following formula: Factor = 1 + ( 𝐵𝑟𝑟𝑟𝑐𝑛𝑟 𝐼𝑛𝑐𝑐𝑥−𝐵𝑎𝑟𝑐 𝐼𝑛𝑐𝑐𝑥 𝑎𝑟 𝐵𝑛𝑛𝑟𝑟𝑎𝑐𝑟 𝐸𝑥𝑐𝑐𝑟𝑟𝑖𝑛𝑛 𝐵𝑎𝑟𝑐 𝐼𝑛𝑐𝑐𝑥 𝑎𝑟 𝐵𝑛𝑛𝑟𝑟𝑎𝑐𝑟 𝐸𝑥𝑐𝑐𝑟𝑖𝑛𝑛 ) DIVISION II GENERAL CONSTRUCTION 12 TEMPORARY TRAFFIC CONTROL Add to Section 12-1.01: Some work locations will require the implementation of a simplified traffic control. These locations will be paid per the “Minor Traffic Control” bid item instead of one of the pre - established figures in Engineering Standards – Appendix G. “Minor Traffic Control” will apply to minor repair locations, on local streets, where approximately 10 cones, and the use of barricades, can delineate traffic around a small work area. Add to Section 12-1.04: Traffic delineation and trench protection must be maintained at all times. If barricades are required after sunset, lights/flashing beacons will be required. When traffic control is required to be present during non-work hours, the cost will be included in the working day hourly compensation. 14 ENVIRONMENTAL STEWARDSHIP Add to Section 14-9.02 AIR POLLUTION CONTROL, General: The City has obtained an annual permit for construction from the Air Pollution Control District (APCD). The annual APCD permit and construction log files are located on the City’s website: http://www.slocity.org/government/department-directory/public-works/documents- online/construction-documents SPECIAL PROVISIONS SPECIAL PROVISIONS 4 A copy of the permit can also be found in Appendix H of the City Standards. You are required to comply with the APCD permit including all notification and construction logs using the appropriate equipment. Provide training to all workers in the construction area. You must comply with section 77-1 of the standard specifications. Add Section 14-9.02A AIR POLLUTION CONTROL, Construction: Where contamination is encountered, you are responsible to: 1. monitor 2. record 3. report H2S and Hydrocarbon FID readings taken every hour during work in the contamination zone or as directed by the Engineer. Appropriate Personal Protective Equipment (PPE) must be used. Add Section 14-9.02C AIR POLLUTION CONTROL, Payment: Full compensation for APCD compliance and applicable engineering standards is included in the payment for other bid items unless a bid item of work is shown on the bid list item. Add to Section 14-9.02D: Full compensation for APCD compliance and applicable engineering standards will be paid by force account when contamination is encountered. 15 EXISTING FACILITIES Add to Section 15-2.02 Obliterate Roads, Detours, and Surfacing Micro-milling must be utilized for bike lane and at existing curb ramp edge grinds. Micro - milling machines shall: Be equipped with a micro-milling drum with tungsten-carbide-tipped cutting teeth spaced no greater than ¼ inch apart on center. The configuration of the teeth shall be such that the deviation in elevation between any 2 teeth does not exceed 1/16 inch. Be c apable of removing asphalt concrete pavement to a tolerance of +/- 1/8 inch. Be equipped with an automatic grade control system operating in “profile” mode. Micro-milling shall result in a grid-patterned textured pavement surface with longitudinal ridges approximately the same distance apart as the cutting teeth. The ridges shall be consistent in depth, width, and profile. The distance between the top of the r idge and the adjacent valleys shall not exceed 1/8 inch. Add to Section 15-1.04 Payment The linear foot price for Edge Grinds shall include full compensation for furnishing all labor, materials, tools, equipment, personnel, and incidentals, and for doing all the work SPECIAL PROVISIONS SPECIAL PROVISIONS 5 involved with bike lane and at existing curb ramp edge grinds and no additional compensation therefore. Add to Section 15-2.02B(1): Portland concrete cement (PCC) pavement must be saw-cut with a diamond saw to a minimum depth of 8 inches. As an alternate to sawcutting and excavation, you may use a grinding device such as a “zipper” on asphalt pavement, to remove the trench repair area. Replace Section 15-2.02C(3) with: Section 15-2.02C(3) Payment: Traffic stripe removal will be paid per linear foot, regardless of width and the number of passes to remove stripes entirely and to the satisfaction of the Engineer. Add to Section 15-2.04A: All existing manholes, valve wells, cleanouts, and boxes within work limits must be replaced in accordance with current Engineering Standards. Replace Section 15-2.04D with: 15-2.04D Reconstruct Metal Beam Guard Railing Limits of removal and replacement will be determined by the Engineer and indicated in the issued Task Order for that work. Replacement Metal Guard Beam Rail shall conform with Section 83. Replace Section 15-2.07E with: 15-2.07E Modify Tree Grate: Tree well grates are to be modified as needed to accommodate increasing trunk size. The grate is to be cut to the nearest concentric ring as directed by the Engineer. Cuts must be neat and smoothed to remove jagged edges. Grates must be removed for cutting if needed to protect the tree or other adjacent improvements. 39 ASPHALT CONCRETE Add to Section 39-1.01: Paving is not to be done without the inspection of the Engineer. Add to Section 39-1.02B MATERIALS, Tack Coat: SPECIAL PROVISIONS SPECIAL PROVISIONS 6 All vertical edges to be paved against shall be tack coated. These include, but are not limited to, curb faces, gutter lips, swale edges, cross gutter edges, and asphalt concrete edges. Add to Section 39-6: Due to the potential for oil price fluctuation throughout the length of the contract, the City will pay the actual plant price per ton of asphalt concrete placed, plus a 15% material markup. You will provide documentation of AC costs at the end of each Tas k Order. Documentation consists of AC load tickets that include the date, tonnage, and location. You are responsible for AC trucking and delivery expenses. This expense is covered in the respective bid item for that work. DIVISION VIII MISCELLANEOUS CONSTRUCTION 73 CONCRETE CURBS AND SIDEWALKS Add to Section 73-1.03: At the time of Task Order issuance, the Engineer will indicate which curb ramp or driveway Engineering Standard will be used. You must meet with the Engineer for an average of 1 .5 hour per curb ramp or driveway being replaced. This includes: 1. Before saw-cutting to agree on the limits of demolition and removal. 2. After formwork is set, to verify that grades meet those stated on the plans. 3. Upon completion to verify finished grades. Curb ramp and driveway design may vary from Engineering Standards, as directed by the Engineer, to accommodate ADA requirements. Only 2 intersection curb ramps, on the same side of the street, can be under construction at any given time. You are responsible for restoring all existing: 1. utility boxes 2. cleanouts 3. posts within the: 1. sidewalk 2. driveway 3. island paving 4. curb ramp limits of replacement. The City will pay material invoice and current Caltrans Material markup for utility boxes not covered by bit items that require replacement. SPECIAL PROVISIONS SPECIAL PROVISIONS 7 Where paint is required on newly placed concrete, the concrete shall be cured a minimum of seven (7) days prior to painting. Add to Section 73-1.04: Payment for the removal/replacement of asphalt concrete as specified in the Engineering Standards will be accounted for in the bid items based on the type/thickness of asphalt concrete replacement that is required at each location. Add to Section 73-4.04: Full compensation for “Mission Style PCC Coloring and Salt Finish” includes all additional costs required to install Mission Style concrete when compared to standard gray colored concrete. When Mission Style tile is also required, it is paid by a separate bid item, “Mission Style Tile Installation per Std. 4220”. “Single Mission Tile Installation – Std. 4220” will be used for replacement of a single Mission Tile and surrounding grout without doing any other curb & gutter and/or sidewalk improvements at various locations within the Mission Style Sidewalk District. Full compensation for “Single Mission Tile Installation – Std. 4220” includes tile mortar bed, tile, and grout surrounding all four sides of the tile, in place complete. Add to Section 73-4.04: Removal of Existing Meter Poles- Payment per Each pole removed and repaired: Remove existing parking meter poles embedded within the sidewalk at locations designated by the Engineer. Work shall include removal of the existing pole and all attached equipment designated for removal. After removal, cut the remaining pole approximately 2 inches below the top surface of the existing concrete. Remove all loose, damaged, or deteriorated material surrounding the remaining pole and prepare the opening for repair. Fill the remaining opening with concrete or an Engineer -approved cementitious repair material and finish the repair flush with the surrounding sidewalk surface. The completed repair shall match the existing sidewalk texture and finish as closely as practical and shall be smooth, secure, and free of trip hazards. The Contractor shall remove and properly dispose of all demolished materials, debris, and excess repair materials from the project site. The bid item shall include all labor, equipment, materials, disposal, and incidental work necessary to complete the rem oval and sidewalk repair in accordance with the Plans and Specifications. 77 LOCAL INFRASTRUCTURE Add to Section 77-1.03A: SPECIAL PROVISIONS SPECIAL PROVISIONS 8 Vacuum excavation is the preferred method for potholing utilities, but site -specific conditions may require alternative methods. 1-sack cement slurry shall be used as subsequent backfill when vacuum excavation is used. Dimensions of pavement potholing window must be approved by Engineer before starting work. Full compensation for “Potholing” is measured from the top of existing grade to the top of utility and includes the replacement of initial and subsequent backfill. Add to Section 77-1.03A(2)(h): Tree removal must be authorized by the City Arborist. Tree trunk diameter is measured at 4.5 feet above adjacent ground surface. Stump grinding or removal is required for all tree removals and must include the major roots within the planting area. Engineer or City Arborist must authorize and oversee all approved root pruning or shaving activities. Minor root pruning or shaving is expected during reconstruction of damaged sidewalk. Add to Section 77-1.03B TRENCH CONSTRUCTION, General with: The contractor shall anticipate the minimum of one water service, one gas service and one sewer lateral for each property. The sewer lateral locations are unknown and the repair of the sewer laterals shall be factored into the payment for the mainline bein g installed. Water and gas services will be marked by Underground Service Alert or USA. Add to Section 77-1.04: Full compensation for “Pipe Excavation & Restoration” includes all excavation required to reach the top of pipe from top of existing grade, complete pipe excavation, installation and replacement of pipe, bedding, initial backfill, and subsequent backfill. The City will provide pipe and fittings to be used for replacement or pay material invoice and 15% markup if pipe and fittings are supplied by you. Add to Section 77-3.02B(1): Joints and Fittings for HDPE must be of the same manufacturer as the pipe. Add Section 77-3.03D(1) Manhole Coating: Manhole coating shall consist of applying an approved by the Engineer corrosion protective coating system to the interior surfaces, as specified herein. The coating system shall be applied to all exposed brick, concrete, grout, mortar, and cementitious sur faces within the manhole, including unlined concrete pipes within the manhole, bench -to-pipe transitions, bench, risers, cones, adjusting rings, etc. Coating of the metallic manhole frame and cover shall not be required. SPECIAL PROVISIONS SPECIAL PROVISIONS 9 The Contractor shall coat all manholes marked on the plans with a high -build polyurethane elastomer such as SANCON 100 or approved equal. The Contractor is responsible for inspecting the existing manholes for leaks or concrete failures. The Contractor shall repair manhole prior to coating by patch or chemical grouting in accordance with coating manufacturer recommendation and as directed by the Engineer. Coating shall stop at the top of the cone or as directed by the Engineer. All pipe liner installation shall be completed prior to commencing any coating of manholes. The Contractor shall provide a smooth transition and tight seal without any annular gaps between the completed manholes and the completed sewer pipe. The Contractor shall Spark Test the new manhole per NACE RP0274 standards. Spark Test shall be witnessed by the Engineer. The Contractor shall terminate the coating at the spring line of the channel with a ¼” cut groove. For those manholes that are connected to pipes to be lined with CIPP, the Contractor shall insure that the bench shall be formed to eliminate offsets where the lined pipe meets the manhole interior face and shall match incoming and outgoing pipes and provi de a smooth, even transition where required. Materials shall be delivered to the site in factory sealed and labeled containers. Date of manufacture shall appear on each container. Materials shall be handled and stored according to the strictest requirements of the manufacturer and in accordance with all local, state, and federal laws and regulations. At each manhole, the Engineer shall inspect and accept the work completed to -date at the completion of each of the milestones listed below before the Contractor shall commence work on the next milestone: • Completion of the cleaning and surface preparation activities required by these specifications. • Completion of all void-filling activities and underlayment application, prior to surface coating application. • Completion of the surface coating installation prior to testing. • Spark testing of the final surface coating as required by these specifications. • Final clean-up and inspection. The Contractor shall provide a written warranty to cover workmanship and materials for each manhole coated for a period of not less than five (5) years from the date of final clean up and inspection of the manhole. The warranty shall be delivered to the City prior to and as a condition of final acceptance of work. By executing this contract, the Contractor certifies and agrees that any testing performed by the City during construction (e.g., spark testing, adhesion testing and/or other testing) SPECIAL PROVISIONS SPECIAL PROVISIONS 10 shall not in any way modify the warranty, nor relieve the Contractor for responding to defects during the warranty period. Add to Section 77-3.03F(2) Abandonment of Sewerlines: 77-3.03F(2)(a) Abandon and Grout Existing Sanitary Sewer Lateral or Main Where Abandon and Grout Existing Sanitary Sewer with Flowable Fill is required, the work to be performed under this section shall include the abandonment in place of existing sanitary sewer by completely filling with flowable fill, as specified in the Special Provisions and as directed by the Engineer. Flowable fill (abandonment grout) shall be controlled low-strength material consisting of fluid mixture of cement, fly ash, aggregate, water and with admixtures as necessary to provide workable properties. Placement of flowable fill may be by grouting techniques in sewer pipes or other restricted areas, or as mass placement by chutes or tremie methods in unrestricted locations with open access. Long - term hardened strength shall be within specified range. In th is specification, the words “flowable fill” and “one sack sand/cement mixture” and “abandonment grout” are used interchangeable. The Contractor shall notify the Engineer a minimum of 48-hours prior to the abandonment of any sanitary sewer. The Contractor shall not begin any abandonment operations until the replacement sanitary sewer has been constructed, tested, and all service connections have been installed and approved by the Engineer, if applicable. Reference Standards: 1. These Special Provisions 2. ASTM C150 – Standard Specification for Portland Cement. 3. ASTM 494 – Standard Specification for Chemical Admixture for Concrete. 4. ASTM C618 – Standard Specification for Fly Ash and Raw or Calcinated Natural Pozzolan for use as neral Admixture in Portland Cement Concrete. 5. ASTM C940 – Standard test Method for Expansion and Bleeding of Freshly Mixed Grout for Replaced Aggregate Concrete in the Laboratory. 6. ASTM C1017 – Standard Specification for Chemical Admixture for Use in Producing Flowing Concrete. 7. ASTM C1107 – Standard Specification for Packaged Dry, Hydraulic-Cement Grout (Non-Shrink). Submittals: 1. Submit flowable fill mix design report to Engineer. A. Flowable fill type and production method. Describe if fill will be mixed to final proportions and consistency in batch plant or if constituents will be added in transit to mixer at placement location. B. Aggregate gradation of fill. Aggregate gradation of mix shall be used as pilot curve for quality control during production. SPECIAL PROVISIONS SPECIAL PROVISIONS 11 C. Fill mix constituents and proportions including materials by weight and volume, and air content. Give types and amounts of admixtures including air entrainment or air generating compounds. D. Fill densities and viscosities, including wet density at point of placement. E. Initial time of set. F. Bleeding and shrinkage. G. Compressive strength. 2. Submit technical information for equipment and operational procedures including projected injection rate, grout pressure, method for controlling grout pressure, bulkhead and vent design and number of stages for grout application. Flowable Fill: 1. Design Mix Criteria. Provide design of one or more mixes to meet design criteria and conditions for placement which include the following: A. Cement: ASTM C150 Type I or II. Volume and weight per cubic yard of fill. Provide minimum cement content of 50 pounds per cubic yard. B. Fly ash: ASTM C619, Class C or F. Volume and weight per cubic yard of fill. Provide minimum fly ash content of 200 pounds per cubic yard. C. Potable water: Volume and weight per cubic yard of fill. Amount of water determined by mix design testing. D. Aggregate gradation: 100 percent passing 3/8-inch sieve and not more than 10 percent passing No. 200 sieve. Mix design report shall define pilot gradation based on the following sieve sizes: 3/8 -inch, No. 4, 8, 16, 30, 50, 100 and 200. Do no deviate from pilot gradation by more than plus or minus 10 percentage points for any sieve for production material. E. Aggregate source material: Screened or crushed aggregate, pit or bank run fine gravels or sand, or crushed concrete. If crushed concrete is used, add at least 30 percent natural aggregate to provide workability. F. Admixtures: use admixtures meeting ASTM C494 an ASTM C1017 as needed to improve pumpability, to control time of set and to reduce bleeding. G. Fluidifier: Use fluidifier meeting ASTM C937 as necessary to hold solid constituents in suspension. Add shrinkage compensator if necessary. H. Performance additive: Use flowable fill performance additive, fi needed, to control fill properties. 2. Flowable Fill Requirements: A. Unconfined compressive strength: minimum 75 psi and maximum 150 psi at 56 days as determined based on an average of three tests for same placement. Present at least three acceptable strength tests for proposed mix design in mix design report. B. Placement characteristics: self-leveling. SPECIAL PROVISIONS SPECIAL PROVISIONS 12 C. Shrinkage characteristics: non-shrink. D. Water bleeding for fill to be placed by grouting method in pipes: not to exceed 2 percent according to ASTM C940. E. Minimum wet density: 90 pounds per cubic foot. 3. Grout Plugs: A. Cement-based dry-pack grout conforming to ASTM C1107, Grade B or C. Preparation: 1. Notify inspector at least 24-hours in advance of grouting with flowable fill. 2. Select fill placement equipment and follow procedures with sufficient safety and care to avoid damage to existing underground utilities and structures. Operate equipment at pressure that will not distort or imperil portions of the work, new or existing. 3. Cut and cap portions of the piping system to remain. 4. Clean sewer lines and video to identify connections and locate obstructions. Locate previously unidentified connections which have not been redirected or reconnected as part of the work and report them to the Engineer. During placement of fill, compensate for irregularities in sewer pipe, such as obstructions or open joints, to ensure no voids remain unfilled. 5. Perform demolition work prior to starting fill placement. Clean placement areas for pipes and manholes of debris that may hinder fill placement. Remove excessive amounts of sludge and other substances that may degrade performance of the fill. Do not leave sludge or other debris in place if filling more than 2 percent of placement volume. Dispose of waste material in accordance with applicable codes and regulations. 6. Remove free water prior to fill placement. Equipment: 1. Mix flowable fill in automated batch plant and deliver it to site in ready -mix trucks. Performance additives may be added at placement site if required by mix design. 2. Use concrete or grout pumps capable of continuous delivery at planned placement rate. Full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all work related to abandonment and grouting of existing sanitary sewers with flowable fill is included in the payment for Bid item Abandon and Grout (E ) Sanitary Sewer with Flowable Fill. SPECIAL PROVISIONS SPECIAL PROVISIONS 13 Add to Section 77-3.04: Maximum manhole depth is assumed to be 8 feet, measured from finished grade to invert. If a deeper manhole is required, you will be paid an additional prorated amount per linear foot of depth, based on your bid item price. Full compensation for “Construct Well / Cleanout” includes all labor, materials and equipment required to connect new cleanout to sewer line. Add to Section 77-1.03B: This item shall consist of grinding stumps and associated exposed root material as directed by the Engineer. Stumps shall be ground to a minimum depth of 18 inches below the existing ground surface using suitable stump grinding equipment. Stump Removal by Excavation will be measured and paid for on a per each (EA) basis for each stump completely removed as directed by the Engineer. Payment shall include all labor, excavation, equipment, loading, hauling, disposal of the stump and associated roots, backfilling of the excavation, and all other incidental work necessary to complete the removal. For purposes of this item, complete removal shall mean removal of the stump and the associated root system necessary to accomplish the directed removal. Removal of every individual root is not required unless specifically directed by the Engineer. Add to Section 77-3.04C: TrafficLogix Safe Pace Evolution 15 FM height and install requirement to be per city standard 7210 and 7215. DIVISION IX TRAFFIC CONTROL DEVICES 84 MARKINGS Add to Section 84-2.03B Application of Stripes and Markings: Preformed thermoplastic is only allowed with the approval of the Engineer. Add to Section 84-1.04 Payment: Bike lane coating is measured by the square foot for the area applied regardless of the number of coats to complete installation per the manufacturer’s recommendations. SPECIAL PROVISIONS SPECIAL PROVISIONS 14 DIVISION XIII APPENDICES Additional project details and instructions may be found on: i. Appendix B – Bike Lane Buffer ii. Appendix C – Catch Basin Standard 3355A iii. Appendix D-CA MUTCD Figure 6P-19 iv. Appendix E-CA MUTCD Figure 6P-20 v. Appendix F-CA MUTCD Figure 6P-35 vi. Appendix G-CA MUTCD Figure 6P-52 vii. Appendix H-CA MUTCD Figure 6P-102 viii. Appendix I-Traffic Logix Rubber Traffic Calming Product ix. Appendix J-Traffic Logix Solar Radar APPENDIX APPENDIX 0 APPENDIX A - FORM OF AGREEMENT THIS AGREEMENT, made on _____________, by and between the City of San Luis Obispo, a municipal corporation and charter city, San Luis Obispo County, California (hereinafter called the City) and COMPANY NAME (hereinafter called the Contractor). WITNESSETH: That the City and the Contractor for the consideration stated herein agree as follows: ARTICLE 1, SCOPE OF WORK: The Contractor shall perform everything required to be performed, shall provide and furnish all of the labor, materials, necessary tools, expendable equipment, and all utility and transportation services required to complete all the work of construction of NAME OF PROJECT, SPEC NO. in strict compliance with the plans and specifications therefor, including any and all Addenda, adopted by the City, in strict compliance with the Contract Documents hereinafter enumerated. It is agreed that said labor, materials, tools, equipment, and services shall be furnished and said work performed and completed under the direction and supervision and subject to the approval of the City or its authorized representatives. ARTICLE II, CONTRACT PRICE: The City shall pay the Contractor as full consideration for the faithful performance of this Contract, subject to any additions or deductions as provided in the Contract Documents, the contract prices as follows: Item No. Item Unit of Measure Estimated Quantity Item Price (in figures) Total (in figures) 1. 2. 3. BID TOTAL: $ .00 Payments are to be made to the Contractor in compliance with and subject to the provisions embodied in the documents made a part of this Contract. If any dispute arises regarding the work or contract price, Contractor must follow the procedures in the contract documents, including the requirements on change order requests and dispute resolution. APPENDIX APPENDIX 1 ARTICLE III, COMPONENT PARTS OF THIS CONTRACT: The Contract consists of the following documents, all of which are as fully a part thereof as if herein set out in full, and if not attached, as if hereto attached: 1. Notice to Bidders and Information for Bidders 2. Standard Specifications and Engineering Standards 3. Special Provisions, any Addenda, Plans and Contract Change Orders 4. Caltrans Standard Specifications and Standard Plans 2024 5. Accepted Bid and Bid Bond 6. List of Subcontractors 7. Labor Code Section 1725.5 Statements 8. Bidder Acknowledgements 9. Qualifications 10. Noncollusion Declaration 11. Agreement and Bonds 12. Insurance Requirements and Forms ARTICLE IV INDEMNIFICATION: The Contractor shall indemnify, defend with legal counsel approved by City, and hold harmless City, its officers, officials, employees and volunteers from and against all liability, loss, damage, expense, cost (including without limitation reasonable legal counsel fees, expert fees and all other costs and fees of litigation) of every nature arising out of or in connection with the acts or omissions of Contractor, its employees, subcontractors, representatives, or agents, in bidding or performing the work or in failing to comply with any obligation of Contractor under this Agreement, except such loss or damage which is caused by the sole or active negligence or willful misconduct of the City. Should conflict of interest principles preclude a single legal counsel from representing both the City and the Contractor, or should the City otherwise find the Contractor’s legal counsel unacceptable, then the Contractor shall reimburse the City its costs of defense, including without limitation reasonable legal counsel fees, expert fees and all other costs and fees of litigation. The Contractor shall promptly pay any final judgment rendered against the City (and its officers, officials, employees and volunteers) with respect to claims determined by a trier of fact to have been the result of the Contractor’s acts or omissions in bidding or performing the work or in failing to comply with any obligation of Contractor under this Agreement. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement. The Contractor obligations under this section apply regardless of whether such claim, charge, damage, demand, action, proceeding, loss, stop notice, cost, expense, judgment, civil fine or penalty, or liability was caused in part or contributed to by an Indemnitee. However, without affecting the rights of the City under any provision of this agreement, the Contractor shall not be required to indemnify and hold harmless the City for liability attributable to the active negligence of City, provided such active negligence is determined by agreement between the parties or by the findings of a court of competent jurisdiction. In instances where the City is shown to have been actively negligent and where the City’s active negligence accounts for only a percentage of the liability involved, the obligation of APPENDIX APPENDIX 2 the Contractor will be for that entire portion or percentage of liability not attributable to the active negligence of the City. ARTICLE V: It is further expressly agreed by and between the parties hereto that should there be any conflict between the terms of this instrument and the bid of said Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said bid conflicting herewith. ARTICLE VI LABOR CODE COMPLIANCE: This Agreement is subject to all applicable requirements of Chapter 1 of Part 7 of Division 2 of the Labor Code, including requirements pertaining to wages, working hours and workers’ compensation insurance, as further specified in the contract documents. The project is subject to the prevailing wage requirements applicable to the locality in which the work is to be performed for each craft, classification or type of worker needed to perform the work, including employer payments for health and welfare, pension, vacation, apprenticeship and similar purposes. Copies of these prevailing rates are on file with the City and are available online at http://www.dir.ca.gov/DLSR. City may not enter into the Agreement with a bidder without proof that the bidder and its subcontractors are registered with the DIR to perform public work pursuant to Labor Code section 1725.5, subject to limited legal exceptions. Pursuant to Labor Code § 1861, by signing this Agreement, Contractor certifies as follows: “I am aware of the provisions of Labor Code § 3700 which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work on this contract.” IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands this year and date first above written. CITY OF SAN LUIS OBISPO A Municipal Corporation __________________________________ Whitney McDonald, City Manager APPROVED AS TO FORM CONTRACTOR: Name of Company ________________________________ By:________________________________ J. Christine Dietrick Name of CAO/President APPENDIX APPENDIX 3 City Attorney Its: CAO/PRESIDENT (2nd signature required if Corporation): By:________________________________ Name of Corporate Officer Its: ____________________ Appendix B Appendix C California MUTCD 2026 Edition (FHWA’s MUTCD 2023 Edition, as amended for use in California) Page 1389 Figure 6P-19(CA). Detour for One Travel Direction (TA-19(CA)) B W11-1 IN RO AD M4-10 R11-2 W20-1 D3-1 M3-3 M4-9 M4-9c A 10 0 f t Note: See Tables 6P-2 and 6B-1 for the meaning of the symbols and/or letter codes used in this figure. DE T O U R Shared Roadway Bicycle Marking (optional). Refer to Section 9E.09 DETOUR DETOUR R11-4 R3-2 R6-1 W20-1 W20-1 M4-9 DETOUR M4-8a M4-10 R6-1M4-10 IN ROAD R3-1 DE T O U R M4-9c W20-3 D3-1 M4-9 SC9(CA) LEGEND Shared Roadway Bicycle Marking (optional). Refer to Section 9E.09 W16-1P R5-1 W16-1P W11-1 M4-9c M4-9 D3-1 Direction of Detour Traffic M4-9c D3-1 Typical Application 19(CA) January 18, 2026Chapter 6P – Typical Applications (Figures) Part 6 Temporary Traffic Control Appendix D A C B A B Notes: See Table 6P-2 for the meanings of the symbols used in this figure. See Table 6B-1 for the meanings of the letter codes used in this figure. M4-8a M4-8a R3-2 R3-2 W20-3 W20-2 R3-1 R3-1 M4-10R M4-10L R11-4 R11-2 R11-2 W20-3 W20-2 M4-9L (modified) M4-9L (modified) M4-9L (modified) M4-9R (modified) M4-9R (modified) M4-9R (modified) M4-9R (modified) M4-9L (modified) Typical Application 20 D3-1 D3-1 D3-1 D3-1 D3-1 D3-1 W20-1 W20-1 W20-1 W20-1 W20-1 C W20-1 California MUTCD 2026 Edition (FHWA’s MUTCD 2023 Edition, as amended for use in California) Page 1391 Figure 6P-20. Detour for a Closed Street (TA-20) January 18, 2026Chapter 6P – Typical Applications (Figures) Part 6 Temporary Traffic Control Appendix E January 18, 2026 Work vehicle Truck-mounted attenuator (optional) Shadow Vehicle 1 Truck-mounted attenuator Shadow Vehicle 2 Truck-mounted attenuator (optional) SC11(CA) W20-5L Note: See Table 6P-2 for the meanings of the symbols used in this figure. Typical Application 35 California MUTCD 2026 Edition (FHWA’s MUTCD 2023 Edition, as amended for use in California) Page 1422 Figure 6P-35. Mobile Operation on a Multi-Lane Road (TA-35) Chapter 6P – Typical Applications (Figures) Part 6 Temporary Traffic Control Appendix F January 18, 2026 California MUTCD 2026 Edition (FHWA’s MUTCD 2023 Edition, as amended for use in California) Page 1458 Figure 6P-52. Short-Term or Short-Duration Work in a Circular Intersection (TA-52) A B C A B C A B C ABC 100 ft 50 to 100 ft W20-1 W20-1 W20-1 W20-1 W20-7 W20-7 W20-7 W20-7 W20-4 W20-4 W20-4 W20-4 Notes: See Table 6P-2 for the meanings of the symbols used in this figure. See Table 6B-1 for the meanings of the letter codes used in this figure. Typical Application 52 Chapter 6P – Typical Applications (Figures) Part 6 Temporary Traffic Control Appendix G California MUTCD 2026 Edition (FHWA’s MUTCD 2023 Edition, as amended for use in California) Page 1466 Figure 6P-102(CA). Lane Shift on Road With Low Traffic Volumes (TA-102(CA)) W20-1 W6-3 Buffer space(optional) Typical Application 102(CA) Truck-mounted attenuator (optional) A A 1/3 L min. Work vehicle (optional) (optional) 1/2 L min. 10 feet min. to edge of pavement or outside edge of paved shoulder 1/2 L min. G20-2 W1-4 W13-1P W20-1 W13-1P W6-3 W1-4 W1-4 G20-2 Notes: 1. See Table 6P-2 for meanings of the symbols used in this figure. 2. See Table 6B-1 for the meanings of the letter codes used in this figure. (optional) January 18, 2026Chapter 6P – Typical Applications (Figures) Part 6 Temporary Traffic Control Appendix H Appendix I Traffic Logix Corp 3 Harriett Lane Spring Valley, NY 10977 Phone: 866.915.6449 www.trafficlogix.com Patterns - Speed Humps, Speed Cushions and Speed Tables CLASSIC SERIES V3 SERIES Classic Series is available in various widths and lengths in creating Cushions, Humps or Tables Standard height is 3” Lengths include 7’, 10.5’, 14’ and 21’ And starting at 14’ lengths, heights include 3” and 4” Markings include: White Arrows; MUTCD, Yellow or White Squares/ Chevrons or in combinations. NOT available in Yellow Arrow or Yellow MUTCD pattern AVAILABLE ONLY IN 7’ L x 6’ W x 3” H Markings in White only 7’ x 6’ Profile Shown 7’ x 6’ Profile Shown 7’ x 6’ Profile Shown 7’ x 6’ Profile Shown All Black Standard Arrows White Squares Yellow Squares MUTCD TYPE B TYPE A Appendix I The goals of traffic calming are simple; to reduce vehicle speeds, improve neighborhood safety, and enhance quality of life. Traffic calming involves changes in street alignment, installation of barriers and other physical measures to reduce traffic speeds and/or cut-through volume. The goal of traffic calming is to improve street safety, and neighborhood livability. Traffic Logix® offers a complete line of traffic calming solutions including rubber solutions as well as innovative radar speed signs. Our solutions have been installed on thousands of streets in hundreds of cities across the world. We are dedicated to meeting the growing concern of towns, cities, counties, gated communities, and military bases; ensuring the safety of the streets that our children play on and that all of us live on. Members of : Introduct I on Appendix I contents 1.Product overview 2.Components 3.Speed Hump 4.Speed Table 5.Speed Cushions 7.Features & options/Custom Solutions 8.SuperFlex Curbing/CycleLane 9.Installation overview 10.Lane Separators/Alley Bumps 11.Private communities 12.SafePace Signs/ On the web Appendix I I nterlock I ng solut I on o verv I ew The Traffic Logix® patented interlocking system consists of modular rubber units with molded reflective tape. These components can be assembled to create a variety of traffic calming solutions including speed humps, speed tables, speed cushions, traffic islands and street narrowing. The modular system presents unlimited possibilities for different configurations and can be installed on asphalt or concrete and as permanent or temporary solutions. Our sought after SafePace® series of radar speed signs offer another alternative to calm streets by alerting drivers to their speeds. Our traffic calming solutions are ideal for residential roads, private communities, industrial and corporate settings, and school and work zones. Traffic Logix (866)915-6449www.trafficlogix.com1 ■ Environmentally friendly ■ Lightweight - easy to transport and install ■ Extremely durable ■ Will never fade or crack like asphalt ■ Uniform and consistent profile ■ Aesthetic appearance, residential appeal ■ Unique patented design ■ Expandable to any size roadway ■ Interlocking feature adds extra stability ■ Allows for custom solution design ■ Conforms to ITE standards ■ Highly visible ■ Molded tape has a much longer lifespan than paint ■ Available in a variety of colors and patterns ■ Save labor costs ■ Avoid street closures ■ No heavy equipment, only basic tools are required ■ Can be removed, stored and relocated Made of Recycled Rubbe R ModulaR InteRlock Ing des Ign (see page 7) Molded ReflectI ve tape sIMple InstallatI on (see page 9) Appendix I COMPONENT PRODUCT #LENGTH (in) WIDTH (in) HEIGHT (in) WEIGHT (lb.) MI D D L E U N I T S 1 MSH03 42 18 0 - 3 50 2 MSH33 42 18 3 75 3 MSH34 42 18 3-4 88 LE F T E N D C A P U N I T S 4 LSH03 42 18 0 - 3 48 5 LSH33 42 18 3 68 6 LSH34 42 18 3 - 4 75 RI G H T E N D C A P U N I T S 7 RSH03 42 18 0 - 3 48 8 RSH33 42 18 3 68 9 RSH34 42 18 3 - 4 75 components (InterlockIng s peed hump/table/cushIons) Traffic Logix (866)915-6449www.trafficlogix.com 2 Appendix I s peed h ump Speed humps are raised traffic calming devices that range in height from 3 to 4 inches. They are parabolic in shape and are placed across the road to slow traffic. Speed humps are the most popular physical traffic calming measure in the United States today. A speed hump will typically slow traffic in a more gradual manner than speed bumps, although less so than speed tables. Also available with arrow taping or white striping * Traffic Logix® interlocking units can be used for any road width in increments of 18”. Dimensions:3” x 7’ x any width* width shown is 22.5’ Units:MSH03 - 26 units LSH03 - 2 units RSH03 - 2 units Dimensions:4” x 14’ x any width* width above is 22.5” Units:MSH03 - 26 units MSH34 - 26 units LSH03 - 2 units RSH03 - 2 units LSH34 - 2 units RSH34 - 2 units Traffic Logix (866)915-6449www.trafficlogix.com3 14’ Hump Profile Appendix I Dimensions:3” high *width shown 22.5’ *length shown 14’ Units:MSH03 - 26 units MSH33 - 26 units LSH03 - 2 units RSH03 - 2 units LSH33 - 2 units RSH33 - 2 units Dimensions:3” high *width shown 22.5’ *length shown 21’ Units:MSH03 - 26 units MSH33 - 52 units LSH03 - 2 units RSH03 - 2 units LSH33 - 4 units RSH33 - 4 units s peed table Speed tables are raised traffic calming devices that are 3 inches high and flat- topped. This design facilitates a smoother ride and can therefore be driven over at a higher speed than speed humps. Speed tables are used when less drastic vehicle slowing is desired. Also available with arrow taping or white striping * Traffic Logix® interlocking units can be used for any road width in increments of 18” . Traffic Logix (866)915-6449www.trafficlogix.com 4 14’ Table Profile Appendix I s peed c ush I ons Dimensions:3” x 6’ x 7’ Units:MSH03 - 4 units LSH03 - 2 units RSH03 - 2 units Speed cushions are an innovative traffic calming device installed across the width of the road. Designed as small speed humps, speed cushions compel residential vehicles to reduce their speed in order to drive over them. Emergency response vehicles, however, can straddle the cushions, due to their wider axle, thereby driving over the cushions without significantly affecting response time. In addition, speed cushions are more affordable than speed humps or tables since they require less material. Traffic Logix (866)915-6449www.trafficlogix.com5 Appendix I Traffic Logix (866)915-6449www.trafficlogix.com 6 Traffic Logix® rubber speed cushions address a serious problem which cities often face when contemplating traffic calming - how to slow residential traffic without impeding emergency response vehicles. The split speed hump design of the Traffic Logix ®rubber speed cushions is emergency response friendly, allowing fire engines and ambulances to straddle the cushions so that response times are not affected. Speed Cushion shown with optional arrow markings indicating direction of traffic flow. Taping is available in white or yellow striping or arrows. Appendix I The Traffic Logix SafePace ® Evolution lSFM variable message sign is a versatile display sign that allows you to customize messaging to each driver's behavior. The versatile Evolution 15FM variable messaging sign offers the ability to display custom text, graphics, or speed display all on the compact, lightweight sign face. The flexible sign offers the ability to to display either driver speed in full 15" digits with speed activated digit color changes or your choice of driver responsive text or graphics on the full matrix speed display sign. EV 15FM Specifications Digit Size 15" Height 33.1" Weight 28Ibs 24/7, 365 Scheduling ✓ Data Collection ✓ Solar Compatibility ✓ Battery Operated ✓ Custom Messaging ✓ Cloud Compatibility ✓ Trailer Compatibility ✓ Dolly Compatibility ✓ Hitch Compatibility ✓ Warranty 2 Years Features Compact design offers all the features and visibility you'd expect from a full size variable message sign. Allows for animated text or graphics such as moving arrows or a scrolling message. Includes integrated flashing speed violator strobe to alert speeding drivers. Dual Color Display: LED digit color can be programmed to change based on driver speed Ultra low power consumption including the most power­ efficient radar technology available and optional solar power. Stealth Mode allows the sign to collect baseline traffic data while speed display appears blank to motorists. Universal Mounting: Optional mounting brackets let you use one sign at multiple locations with the turn of a key. 1-800-236-0112 www.tapconet.comDistributed by Appendix J 30" (w) text 411 (h) digits 15" (h) 33.1" (h) ._. .... digits 811 (w) �' (d) Feature Specifications Digits Unit with "YOUR SPEED" sign mounted Dimensions First digit: lS"(h) x 1.S"(w) Other digits: lS"{h) x 8"(w) Full size sign: 33.l"(h) x 30"(w) x 5.625"{d) Sign Weight {includes ''YOUR SPEED" sign {2 lbs) mounted) AC Powered 28 lbs Battery Powered Model 28 lbs (not including batteries) Solar powered model Operating Temperatures F (C): Full Matrix Sign with 3-Digit Speed Display Faceplate Communications Programming 28 lbs (does not include batteries, solar panel or bracket) General Specifications -40° {-40 °) to 185° (85°) Miles per hour (mph) 3-99. Kilometers per hour (km/h) 5-160. High-Intensity prismatic reflective sheeting on "YOUR SPEED" signs with black colored text. MUTCD approved colors and format Bluetooth, GSM/GPRS SafePace® Pro management software SafePace® Cloud remote management 24/7 365 day unlimited programming and scheduling Feature Specifications Power Options (Electrical Specifications) AC power input DC power input DC power options Solar panel option Internal Radar: Model Radar RF out Radar f-center Pickup distance Beam angle Beam polarization LEDs Digits (Amber) Digits (Red) Speed Violator Strobes Ambient light sensor Construction Weatherproof Rating Sign Batteries 1QQ~240 VAC 12 V DC 12V, 18Ah Lead acid batteries. SOW solar panel Radar Doppler (FCC approved) DF 300 5 mW maximum 24.125 GHz+/-25 MHz Up to 1,200 feet 24 ° (vertical) x 12° (horizontal) Linear Display 1590 768 LEDs: Color: Yellow {590 nm) Viewing angle at 50% IV: 30° Partial Flux (Brightness): 9000-24000 Ev,[lux]/LED 768 LEDs: Color: Red (633 nm) Viewing angle at 50% IV: 30° Partial Flux (Brightness): 7100-18000 Ev,[lux]/LED 54 LEDs: Color: White (2700 k - 6500 k) Viewing angle at 50% IV: 150° Luminous Flux: typically 331m @ 4000 K Luminous Efficacy: typically 176 lm/W @4000 K 1 sensor and automatic brightness adjustment Enclosure Vandal resistant, lightweight polymer. Matte black front for reduced glare and maximum contrast. Light gray body to minimize heat absorption Weatherproof, NEMA 3, IPSS level compliant. Non-sealed and ventilated 2 years 1 year 1-800-236-0112 www.tapconet.comDistributed by Appendix J >dZ/>d>dZ/>WZDdZ^Λ^d tZZEdzΘZd/&/d/KE^ WŽǁĞƌDĞĂƐƵƌĞŵĞŶƚdŽůĞƌĂŶĐĞ͗Ϭͬнϯй Dy/DhDZd/E'^ DŽĚƵůĞdLJƉĞ dDWZdhZK&&//Ed^ D,E/>d 7 (/_)$;_L Q IR #J PDVROD UFD %/9'3 2,5,(502175($/4 &&$1$'$+5$ZZZJPDVRODUFD 'DͲWϲͲϯϲͲϱϬt WĞĂŬ WŽǁĞƌ DĂdžŝŵƵŶWŽǁĞƌsŽůƚĂŐĞ DĂdžŝŵƵŶWŽǁĞƌƵƌƌĞŶƚ / KƉĞŶͲĐŝƌĐƵŝƚ ǀŽůƚĂŐĞ s ^ŚŽƌƚͲĐŝƌĐƵŝƚ ĐƵƌƌĞŶƚ / 'D ŵƉ tĂƌƌĂŶƚLJ Ϯ LJĞĂƌƐǁŽƌŬŵĂŶƐŚŝƉ͕ϭϬLJĞĂƌƐϵϬй͕ϮϬ LJĞĂƌƐϴϬй KƉĞƌĂ ŽŶĂůdĞŵƉĞƌĂƚƵƌĞ Ͳ ƚŽн  DĂdžŝŵƵŶ^LJƐƚĞŵsŽůƚĂŐĞ ϭϬϬϬs;/ͬh>Ϳ DĂdž^ĞƌŝĞƐ&ƵƐĞ ZĂ ŶŐ ϭϬ &ŝƌĞ ZĂ ŶŐ ůĂƐƐ EŽŵŝŶĂůKƉĞƌĂ ŶŐĞůůdĞŵƉ͘;EKdͿ ϰϱнͬͲϮ  sŽůƚĂŐĞdĞŵƉĞƌĂƚƵƌĞŽ ŝĞŶƚ;sKͿ ͲϬ͘ϯϭйͬ ƵƌƌĞŶƚdĞŵƉĞƌĂƚƵƌĞŽ ŝĞŶƚ;/ƐĐͿ Ϭ͘Ϭϯϯйͬ WŽǁĞƌdĞŵƉĞƌĂƚƵƌĞŽĞ ĐŝĞŶƚ;WŵĂdžͿ ͲϬ͘ϰϮйͬ &ƌŽŶƚ 'ůĂƐƐ;ŵĂƚĞƌŝĂůͬƚŚŝĐŬŶĞƐƐͿ ,ŝŐŚƚƌĂŶƐŵŝƐƐŝŽŶůŽǁͲŝƌŽŶƚĞŵƉĞƌĞĚŐůĂƐƐͬϯ͘Ϯŵŵ DĞĐŚĂŶŝĐĂů>ŽĂĚϱϬƉƐĨ͕ϮϰϱŬŐͬƐƋŵ͕ϮϰϬϬWĂ͕Ϭ͘ϯϰƉƐŝ͕ĨƌŽŶƚĂŶĚďĂĐŬ DŽĚƵůĞŝŵĞŶƐŝŽŶ;>džtdž,Ϳ ϲϮϬdžϲϲϱdžϯϱ ŵŵ tĞŝŐŚƚ ϰ͘ϴ ŬŐ ^ŽůĂƌĞůů;ƚLJƉĞͬĚŝŵĞŶƐŝŽŶͿWŽůLJͲĐƌLJƐƚĂůůŝŶĞƐŽůĂƌĐĞůůƐͬϭϱϲdžϭϱϲŵŵ :ƵŶĐ ŽŶŽdž;ƉƌŽƚĞĐ ŽŶĚĞŐƌĞĞͿ/W ϲϱ ĂĐŬƐŚĞĞƚ;ŵĂƚĞƌŝĂůͿ &ůƵŽƌŽƉŽůLJŵĞƌ ĐŽĂ ŶŐͬWdͬƉŽůLJŽůĞ Ŷ &ƌĂŵĞ;ŵĂƚĞƌŝĂůͬĐŽůŽƵƌͿ ĞĚĂůƵŵŝŶƵŵͬ^ŝůǀĞƌ s ŵƉ ŽĐ ƐĐ WŽǁĞƌtĂƌƌĂŶƚLJ ;Ϳ Ϯ͘ϴϲ ;sͿ ϮϮ͘Ϭ ;Ϳ ϯ͘ϭϳ WŵĂdž;tͿ ϱϬ ;sͿ ϭϳ͘ϱ &86 ϮϲϰϳϴϮ ϱϬtͲW Appendix J