SUBJECT: Item 4a – Grand Avenue Paving Project Update – Staff Agenda
Correspondence
Staff received the following question regarding the traffic analysis that was evaluated for
the intersection of Grand and Slack Street. The question is below with staff’s response
shown in italics:
1. The staff report says that the City would pursue a roundabout at Slack and Grand
in the long term because the traffic counts aren’t there for a traffic signal. It had
been mentioned that one major problem with that intersection is that pedestrians
aren’t crossing in groups, but one and two at a time, making it difficult for cars to
move through the intersection. Does staff believe that a roundabout addresses that
concern? And does the calculation for a traffic signal include pedestrian counts, or
just vehicle counts?
Based on observations of conditions at the intersection, staff does believe that the
number of pedestrians crossing Grand Avenue contributes to vehicle delays at the
intersection—particularly when the east sidewalk on Grand was previously closed
due to construction, resulting in a higher than usual number of pedestrians
crossing Grand Avenue. Still, the traffic volumes (vehicles, bicycles, and
pedestrians) and resulting congestion, even during periods with higher pedestrian
crossing volumes, do not currently meet the levels that would warrant installation
of a traffic signal. Further, the intersection has relatively little crash history and
does not meet any of the other criteria needed to warrant installation of a traffic
signal (i.e. proximity to a rail crossing, etc.). If volumes entering the intersection or
crashes increase over time, a traffic signal could be revisited as a potential option
at this intersection.
Even with a relatively high level of pedestrian crossings, staff does believe a
roundabout would improve vehicle traffic operations and reduce pedestrian
crossing exposure at this intersection. One key reason is that a roundabout would
reduce the total crossing distance for pedestrians crossing Grand Avenue and
allow pedestrians to cross only one direction of travel at a time. This reduces the
number of conflict points between vehicles and pedestrians and shortens the
Item 4a – Grand Avenue Paving Project Update – Staff Agenda Correspondence Page 2
duration that pedestrians are within a crosswalk where motor vehicle traffic is
delayed when yielding.