Loading...
HomeMy WebLinkAboutItem 5a. REVIEW A TREE REMOVAL APPLICATION TO REMOVE SEVEN (7) TREES AT 29 PRADO RD TREE COMMITTEE AGENDA REPORT SUBJECT: REQUEST FOR THE REMOVAL OF SEVEN (7) TREES AT 29 PRADO ROAD (APPLICATION NO. TREE-0605-2026) FROM: Walter Gault, Urban Forestry Program Coordinator / City Arborist Phone Number: (805) 781-7578 Email: wgault@slocity.org RECOMMENDATION Review the proposed tree removal application for consistency with the Municipal Code Section 12.24.090(E) and provide a recommendation to the Community Development Director. 1.0 APPLICATION DESCRIPTION The City of San Luis Obispo, the property owner and applicant, has requested the removal of seven (7) trees (one (1) Catalina cherry, one (1) Italian stone pine, one (1) Canary Island palm, one (1) toyon, one (1) Victorian box), and two (2) coast live oaks at 29 Prado Road (Attachment A, Tree Removal Application Form). The removal request is related to GRAD-1480-2026, full depth reconstruction of the existing transit yard parking lot (Attachment B, Grading Plan). Twenty-five trees on-site were inventoried, impacts were assessed and a tree protection plan prepared (Attachment C, Tree Inventory and Protection Plan). The applicant has proposed a 1:1 on-site compensatory replanting plan (Attachment D, Replanting Locations). Meeting Date: 9/28/2026 Item Number: 5a Time Estimate: 30 minutes Figure 1: Location of proposed tree removals outlined in red (29 Prado Rd.). Page 11 of 93 Item 5a Table 1: List of trees requested for removal (see photo details in Attachment E) 2.0 COMMITTEE PURVIEW The Tree Committee’s role is to review the removal request in accordance with the process set forth in San Luis Obispo Municipal Code (SLOMC) Chapter 12.24, specifically Section 12.24.090(F)(2) - tree removals related to ministerial development permits on parcels other than R-1 or R-2. This code section utilizes the relevant additional application requirements in subsection (D)(2) and the criteria set forth in subsection (G). 3.0 TREE REGULATIONS The City’s Tree Ordinance (Municipal Code Chapter 12.24) was adopted with the purpose of establishing a comprehensive program for installing, maintaining, and preserving trees within the City. This ordinance establishes policies, regulations, and specifications necessary to govern installation, maintenance, removal, and preservation of trees to beautify the city; to purify the air; to provide shade a nd wind protection; to add environmental and economic value; and to preserve trees with historic or unusual value. Criteria for Construction Related Tree Removal Applications. SLOMC §12.24.090 subsection (F)(3) requires review by the Tree Committee using the criteria set forth in SLOMC §12.24.090(G). Applicable criteria are provided in italics below and followed by a description of the proposed tree removals as it relates to that criterion.  (G)(1). Size of Tree. The scale of the tree shall be considered , as well as the size of the tree’s canopy. Larger, more visually prominent trees may have a higher preservation priority than smaller, less visually prominent trees. The trees proposed for removal are generally not large or visually prominent.  (G)(2). Location of Tree on Private Property. The location of the tree on private property shall be considered. Trees located in a private rear yard, which are not highly visible from the public right-of-way, may have a lower preservation priority than trees with a high visual impact to the neighborhood. All trees requested for removal are not visible from the public right-of-way Tree ID # Common Botanical DSH (in.) Removal Reason 1 Catalina cherry Prunus ilicifolia 5 Poor condition 2 Italian stone pine Pinus pinea 13 CRZ impact 3 Canary Island palm Phoenix canariensis 38 Future (utility) conflict 4 California toyon Heteromeles arbutifolia 8 CRZ impact 6 Victorian box Pittosporum undulatum 8 CRZ impact 10 Coast live oak Quercus agrifolia 2 CRZ impact 21 Coast live oak Quercus agrifolia 9 CRZ impact Page 12 of 93 Item 5a  (G)(3). Species of Tree. Native trees shall have a higher preservation priority than non-native trees. Four (4) trees (#1, 4, 10, 21) are native. The remaining three (3) trees (#2, 3 and 6) are non-native.  (G)(4). Forestry Best Practice. The number of healthy trees that a given parcel of land will support shall be considered, and whether removal would enhance the health or survival of remaining trees. Applications that increase biodiversity of native trees and tree age distribution within a given area are preferred. Tree #1 (Catalina cherry) is in poor health; Tree #2 (Italian stone pine) will cause severe root damage due to vehicle traffic; Tree #3 (Canary Island palm) will conflict with utility light pole in future; Tree #10 is a volunteer in a poor location. The locations identified for replanting are more compatible with the site, long-term and will provide greater ecosystems services.  (G)(6). Compliance with Subsection J of This Section Regarding Compensatory Plantings. The approving authority may consider an application proposal to provide compensatory plantings in excess of required minimums in evaluating this criterion. The applicant is proposing to meet the minimum required replanting rate of 1:1 on- site with seven (7) compensatory trees.  (G)(7). Heritage Trees. Heritage trees have the highest preservation priority. None of the trees proposed for removal are heritage trees. 4.0 ACTIONS 4.1 Recommend findings of consistency with the Tree Regulations. An action recommending approval of the proposed tree removals based on consistency will be forwarded to the Community Development Director for final action. This action may include recommendations regarding the compensatory replanting plan with size and species of tree. 4.2 Recommend findings of inconsistency with the Tree Regulations. An action recommending denial of the proposed tree removals should include findings that cite the basis for denial and should reference inconsistency with the General Plan, Tree Regulations, or other policy documents. 4.3 Continue the project to a hearing date certain, or uncertain. An action continuing the review of the proposed tree removals should include direction to the applicant and staff on pertinent issues. Page 13 of 93 Item 5a 5.0 ATTACHMENTS A - Tree Removal Application Form (29 Prado Rd.) B - Grading Plan (29 Prado Rd.) C - Photo Log (29 Prado Rd.) D - Replanting Locations (29 Prado Rd.) E - Tree Inventory and Protection Plan (29 Prado Rd.) Page 14 of 93 City of San Luis Obispo, Community Development, 919 Palm Street, San Luis Obispo, CA, 93401-3218, 805.781.7170, slocity.org TREE REMOVAL APPLICATION For all Non-Construction and Construction related tree removals Owner Name: Applicant Name: Address: Address: City: Zip: City: Zip: Phone: Phone: Email: Email: Address of Tree(s): Number of trees applying to remove: Tree Species: Reason for Removal: Is this removal a City Tree?YES NO DON’T KNOW Dog in yard? YES NO Is this associated with a Building Permit or Development Plan? _____ YES _____ NO If YES, please provide appropriate reference numbers: Is this property governed by a Homeowners Association(HOA)? YES NO If YES, please provide HOA Board Approved Meeting minutes authorizing tree removal(s) with your tree removalapplication. ALL ITEMS BELOW MUST BE INCLUDED TO PROCESS TREE REMOVAL APPLICATIONS Tree(s) banded with ribbon or duct tape for identification Site plan drawing or photo of tree site with Tree ID (Tree#1, Tree #2, etc.) Supporting documentation (repair, receipts, etc.) Photo log showing damage or reasons for removal 1 Replanting plan2 Arborist Report3 INCOMPLETE APPLICATIONS WILL NOT BE ACCEPTED. FAILURE TO KEEP TREES BANDED MAY RESULT IN A REJECTED APPLICATION. Include a photo log that clearly shows the trees requested for removal. All tree(s) must be uniquely identified by a number and a ribbon, or an identifier wrapped around the truck in the photo and prior to inspection. Include a replanting plan in accordance with Section 12.24.090(J)of the City’s Municipal Code. A minimum 1:1 replanting rate is required for plantings onsite, and a minimum 2:1 replanting rate is required for plantings offsite or within the public right-of-way. An application for tree removal on a site where a discretionary or ministerial development permit is requested shall include an arborist report and a site plan that includes accurate drip line delineation and cross sections of construction work impacting both trees proposed for removal and trees planned to remain. City of San Luis Obispo Alejandra Celio 990 Palm St 919 Palm Stt San Luis Obispo 93401 San Luis Obispo 93401 805-783-7865 acelio@slocity.org 29 Prado St, San Luis Obispo, CA 7 Catalina Cherry, Italian Stone Pine, Canary Island Palm, CA Toyon, Victorian Box, Coast Live Oak (x2) The Arborist Report recommends removing six trees due to unavoidable root damage from planned maintenance activities. One additional Canary Island Palm is proposed for removal because it will interfere with security lighting. Page 15 of 93 Tree Removal Decisions as outlined in Section 12.24.090 of the City’s Municipal Code SELECT TYPE OF TREE REMOVAL APPLICATION BEING SUBMITTED DECISION MAKER Imminent Hazard to Life or Property SLOMC 12.24.090(E)(1)(a)City Arborist Tree Health and Hazard Mitigation SLOMC 12.24.090(E)City Arborist Convenience Removal SLOMC 12.24.090(E)(3) Tree Committee makes recommendation to Community Development Director Community Development Director Minor Ministerial Development Permit SLOMC 12.24.090(F)(1) Removal for residential or accessory construction on an R-1 or R-2 lot City Arborist Discretionary Permits Construction Tree Removal SLOMC 12.24.090(F)(3) Community Development Director Major Development / Tentative Tract Map/ Conditional Use Permit SLOMC 12.24.090(F)(4)Planning Commission Submittal Instructions Submit Tree Removal applications to the City of San Luis Obispo, Community Development Department at the following address: 919 Palm Street, San Luis Obispo, CA 93401 or by email to trees@slocity.org. Payment of the “Tree Removal Permit” fee shall be submitted along with this application. Refer to the City’s current Comprehensive Fee Schedule for the current fee. Property Owner Authorization: By signing this application, I certify that I have reviewed this completed application and the attached material and consent to its filing. I agree to allow the Community Development Department to duplicate and distribute submitted materials to interested persons as it determines is necessary for the processing of the application. Signed Date Applicant/ Representative Certification: By signing this application, I certify that the information provided is accurate. I understand the City might not approve what I’m applying for or might set conditions of approval. I agree to allow the Community Development Department to duplicate and distribute submitted materials to interested persons as it determines is necessary for processing of the application. Signed Date Permission to Access Property: This section is to be completed by the property owner and/or occupant who controls access to the property. To adequately evaluate the submitted proposal, Community Development Department Staff, Commissioners and City Council Members will have to gain access to the exterior of the real property in order to adequately review and report on the proposed request. Your signature below certifies that you agree to give the City permission to access the project site from 8 a.m. to 5 p.m., Monday through Friday, as part of the normal review of this application. Signed Date Indemnification Agreement: The Owner/Applicant shall defend, indemnify and hold harmless the City or its agents or officers and employees from any claim, action or proceeding against the City or its agents, officers or employees, to attack, set aside, void, or annul, in whole or in part, the City’s approval of this project. In the event that the City fails to promptly notify the Owner / Applicant of any such claim, action or proceeding, or that the City fails to cooperate fully in the defense of said claim, this condition shall thereafter be of no further force or effect. Signed Date 08/24/26 Page 16 of 93 Page 17 of 93 Page 18 of 93 Page 19 of 93 Page 20 of 93 Page 21 of 93 Page 22 of 93 Existing Vegetation to be removed, as needed Page 23 of 93 Page 24 of 93 Page 25 of 93 Page 26 of 93 1343 Bishop Street, San Luis Obispo, CA 93401 Tel: 805 234 8760 - Email: rodney@heritagetreeconsulting.com July 14, 2026 To:Alejandra Celio - Engineer II - City of San Luis Obispo Public Works Department 919 Palm, San Luis Obispo, CA From: Rodney Thurman – Heritage Tree Arboricultural Consulting Inc, San Luis Obispo, CA Re: Tree Protection Report - City of San Luis Obispo bus yard parking lot improvements. Ms. Celio, The following is an assessment and tree protection plan for twenty-five (25) trees located within or adjacent to the proposed footprint of parking lot improvements at the City of San Luis Obispo bus yard. Assignment 1.Assess tree health, stability, construction impacts, feasibility of retention and tree protection needs. 2.Prepare written arborist report in accordance with City of San Luis Obispo’s municipal code 12.24.090.D(2)(a) to include tree protection requirements according to the city standard specifications (77-1.03A(2))s. Report includes: Inventory of all trees on site or off site, which have critical root zones that may be impacted by construction. Site map showing location, species, diameter at standard height (dsh) of all regulated trees in study area including off site trees that may be impacted. Indicate tree(s) that will be removed or impacted. Photographs of trees Delineation of tree protection zones on tree protection map. Calculation of mitigation trees to be planted for removal of regulated trees. Summary There were twenty-five (25) trees included in this study. All trees had critical root zones (CRZs) within or adjacent to construction impacts. This plan proposes retaining and protecting 75% of the trees inventoried. Tree protection measures shall be implemented and supervision of construction crews by an International Society of Arboriculture (ISA) certified arborist will be required while crews are working within or near the critical root zone of trees. All trees requiring arborist supervision are listed in the Tree Inventory & Tree Protection Table and shown on the Tree Inventory and Tree Protection Map. See Appendices A & D, respectively. All tree protection measures and tree protection zone delineations are also provided in Appendices A & D. Page 27 of 93 2 Of the twenty-five (25) trees inventoried, only six (6) were listed for removal. Five (5) of the trees were listed due to heavy construction impacts and one (1) tree was listed for removal due to poor health. None of the trees had regulated diameters therefore no mitigation tree plantings should be required. If any regulated tree does require removal for any reason, then a 1:1 replacement ratio is required by the city if trees are planted on site. A 2:1 replanting ratio will be required if the new trees will be planted on a different property or within the public right-of-way off site. The minimum container size and trunk diameter shall be 15-gallon with diameters between 0.75" to 1.5". The trees shall be planted and staked according to city engineering standards. Introduction The site is located at the City of San Luis Obispo Bus Yard parking lot north of the bus dispatch building at 29 Prado Road. The project proposes upgrading the parking lot which will include scarification and removal of asphalt as well as some curbing. Ultimately the entire parking area is being redesigned and will be completely repaved. I have assessed the health and stability of the trees at the location as well as the proposed construction impacts that may be caused to trees within or adjacent to the construction envelope and have prepared the following report to present my findings. The report is based on the City of San Luis Obispo’s municipal code 12.24.090.D(2)(a) – Tree Regulations. This report has been prepared in accordance with the code quoted below. An arborist report that identifies and discusses each tree within the development footprint (including, but not limited to, structural development, grading, staging areas, ground cover removal, changes in drainage patterns, and associated off-site improvements) including those trees proposed for removal and those trees that will remain. Methodology Tree Diameter Measurements Diameter at Standard Height (DSH) was measured at 4.5’ above ground. For multi-stem trees that divided below 4.5’, if at least 1 stem met the minimum diameter criteria for the species, I measured below the division at the narrowest point on the trunk. If it was not possible to measure below the division, I measured each stem individually, then squared the diameter of each stem. Finally, I summed the squared diameters and took the square root of the sum to get the calculated diameter of the tree. Critical Root Zone (CRZ) Measurements CRZs were determined by giving a radius of 1-foot per every inch of tree diameter. E.g., a 12- inch diameter tree would have a 12-foot CRZ radius measured from the outside of the trunk or at the dripline of the tree, whichever is greater. Page 28 of 93 3 Tree Protection Zone (TPZ) Measurements Generally, TPZ distances followed the distances listed for CRZs and preferably encompass the entire CRZ. Exceptions to the standard were made when; 1) proposed tree-root encroachments into the CRZ were less than 25%. 2) if proposed tree-root encroachments over 25% would not compromise the structural stability or health of the tree. Tree Condition Ratings All trees in the inventory were given a condition rating. The rating was based on the health, structure and presence of disease and insects. See the following definitions: 1. Dead = Severely declining or no foliage, large dead branches, decay cavities, loss of bark, roots decayed or dead. 2. Very Poor = Evidence of multiple large past failures, advanced disease, uncontrollable pest infestations or disease infection. Tree in severe decline. 3. Poor = Tree may be suppressed, drought stressed, or had at least 1 large branch failure. Disease or pest infestations may be present. Can potentially be retained with attention to mitigation pruning, cultural care changes, pest and disease control. 4. Fair = May have had minor past failures. Some pests or structural defects may be present, small deadwood. Minor to moderate drought stress present. Defects may be mitigated with pruning and pests can be controlled. 1. Good = A relatively healthy tree with minor to no structural defects with minimal to no pest observed. Defects can be mitigated with pruning and pests can be controlled. 2. Very Good = Trees that have had professional arboricultural care. No structural defects, disease or pests identified. 3. Excellent = Specimen tree with superior form, root structure and health. Tree has been regularly cared for by professional arborists over its lifetime, E.g., estate or arboretum tree. Trees Removal Standard The city’s ordinance states that native trees 10” diameter and greater require a permit to remove. The ordinance also states that non-native trees 20” diameter and larger require a permit to remove. Further, it states that palms 12” diameter or larger also require a permit to remove. In the case where a tree is planted in the right of way or is within 10’ of the back side of a city sidewalk, a permit to remove is also required, regardless of the diameter size. Mitigation for the trees approved for removal within 10‘ of back of sidewalk is also required. See mitigation section below for replanting requirements for all regulated trees approved for removal. If a tree was multi-stemmed and did not have at least one (1) stem measuring at or above the minimum diameter for the species, then regardless of the calculated diameter, the tree would not be considered a regulated tree requiring a permit to remove, nor would it require mitigation. Page 29 of 93 4 Mitigation According to the City of San Luis Obispo’s municipal code 12.24.090 (J) Compensatory Tree Planting: Tree removals authorized under subsection E or F of this section shall be compensated by planting a minimum of one new tree for each tree authorized to be removed when planted on the same property (on site) or two new trees for each tree authorized to be removed when planted on a different property or within the public right-of-way (off site). In approving an application for tree removal, the authorized approving authority shall require compensatory plantings of a size consistent with city engineering standards as set forth in the following table: Container Size Trunk Diameter (inches) 15-gallon 0.75" to 1.5" 24-inch box 1.5" to 2.5" 36-inch box 2.5" to 3.5" 48-inch box 3.5" to 4.5" The authorized approving authority may require subsequent compensatory tree plantings in the event that the original replacement plantings fail to establish and/or may require a bond ensuring that replacement trees shall be planted and maintained. Tree Protection All trees listed for protection will require protective fencing and in some case trunk protection guards before and during construction. Supervision of construction crews working in the CRZ of the protected tree(s) shall be monitored by an ISA certified arborist. Trees Inventoried I inventoried twenty-five (25) trees that had critical root zones (CRZs) within or adjacent to the construction impact zone. See Appendix A – Tree Inventory and Tree Protection Table for an accounting of all trees included in the assessment. See Appendix B for photographs of trees. All trees are plotted on the Tree Inventory and Tree Protection Map included in Appendix D of this report. The map is adapted from the 50% plan set created by your engineering consultant. Only eight (8) trees were planted in the formal landscape areas within the parking lot. The remaining seventeen (17) trees were a combination of landscape and volunteer trees of native and non-native species that had recruited naturally. Impact Assessments Typically impacts of 25% to 35% are a reasonable encroachment into the CRZs of trees, but I did allow for greater impacts to the trees in the periphery area because they had a contiguous growing area on the non-project side that was not going to be disturbed. Page 30 of 93 5 Overall, impacts divided into 3 groups. 25% or less impact – 10 trees 26-35% impact – 8 trees. 36-75% impact – 7 trees. Trees with impacts of 50% or greater were listed for removal. The heaviest impacts to trees were within the interior parking lot because of the close proximity of trees in the landscape to the curbing and asphalt proposed for removal. On the periphery of the project, the trees were mostly set back further from the excavation areas and therefore were not impacted as greatly. There were, however, some trees in the periphery areas that were growing directly against the fencing where removal of the asphalt would remove 50% of their critical roots. Trees Proposed for Removal I have proposed the removal of six (6) trees due to construction impacts or health issues. Tree 1 – A Catalina cherry - Based on health only, I recommended this tree be removed. It is in very poor condition which is evident in his declining canopy and yellowing leaf color. See Appendix B - Photo 1. Tree 2 – An Italian stone pine - Based on construction impacts, I recommend this tree be removed. Removal and replacement of the asphalt on the northwest and west sides of the tree as well as curbing on the northeast side of the tree will damage approximately 70% of the tree’s critical roots as well as structural roots. The tree will heavily decline and potentially die due to root loss . It will also likely be structurally unstable. See Appendix B - Photo 2. Tree 4 – A California toyon - Based on construction impacts, I recommend this tree be removed. Removal and replacement of the asphalt on the northwest and west sides of the tree will damage approximately 75% of the tree’s critical roots. The tree will heavily decline and potentially die due to root loss. See Appendix B - Photo 4. Tree 6 – Victorian Box - Based on construction impacts, I recommend this tree be removed. Removal and replacement of the asphalt on the northwest side of the tree will damage approximately 50% of the tree’s critical roots. The tree will heavily decline and potentially die due to root loss. See Appendix B - Photos 5 & 6. Tree 10 – A coast live oak - Based on construction impacts, I recommend this tree be removed. Removal and replacement of the asphalt on the southwest side of the tree will damage approximately 50% of the tree’s critical roots. The tree will heavily decline and potentially die due to root loss. See Appendix B - Photo 8. Tree 21 - A coast live oak - Based on construction impacts, I recommend this tree be removed. Removal and replacement of the asphalt on the southeast side of the tree will damage approximately 50% of the tree’s critical roots. The tree will heavily decline and potentially die due to root loss. See Appendix B - Photos 12 & 13. Page 31 of 93 6 Mitigation Plantings None of the trees recommended for removal are of a regulated diameter, therefore no mitigation trees should be required to be replanted. However, the city’s arborist or planning director will make the final decision regarding mitigation tree planting. Tree Protection and Tree Protection Zone (TPZ) Establishment Heritage Tree has prepared a Tree Inventory and Tree Protection Map which was adapted from the 50% plan set Grading Map created by your engineering consultant. The map is provided in Appendix D of this report. I recommend the city have the engineering consultant use the provided arborist notes and fencing delineation provided on Heritage Tree’s map to create a Tree Protection Map sheet entitled TPP-1 to be included in the project plan set. A full sized, more readable tree protection map will be sent to you from Heritage Tree as a separate file. Tree protection fencing and trunk protection diagrams are also provided in Appendix B - Tree Protection Diagrams. Use the map and the description of tree protection provided below to guide you in establishing the TPZ as well as any other tree protection measures required during the construction of this project. Trees to be Protected The following trees require protection with orange vinyl protection fencing: 3, 5, 7, 8. See Appendix B - Photos 3, 5 & 7. The following trees require protection with the existing chain-link fencing at the perimeter of the project: 9, 11-20 and 22-25. See Appendix B - Photos 9-12 & 14. TPZ Fencing & Signage Vinyl Fencing - Establish tree protection zone fencing directly behind the existing curbing for trees 3,5,7 & 8. See Appendix C - Tree Protection Diagrams – Diagram 1, for a schematic showing how to properly install tree protection fencing. See Appendix A – Tree Inventory and Tree Protection Table for tree protection notes. See Appendix D – Tree Inventory and Tree Protection Map for delineation of TPZ fencing. All fencing shall remain in place until the city performs a final inspection and the construction permit has been closed. Chain-Link Fencing - By default, the existing chain-link fencing around the perimeter of the project will create a tree protection zone. See Appendix A – Tree Inventory and Tree Protection Table for tree protection notes. See Appendix D – Tree Inventory and Tree Protection Map for delineation of TPZ fencing. The only additional requirement is to place tree protection signage on the fencing. See below for details. Page 32 of 93 7 Tree Protection Signage Weatherproof, tree protection signs stating “Tree Protection Zone – Do Not Enter” shall be placed on the fencing, be spaced 10 feet apart and remain on the fencing for the duration of the project. At least 1 sign shall be posted on fencing if the section is 10 feet in length or less. Signs shall also include the Project Arborist’s name and contact information. For example of sign placement and signage, see Appendix B - Tree Protection - Diagrams 1 & 2. Pre-Construction Meeting A meeting with all project managers and contractors involved in the project must take place with the project arborist before beginning construction activities. Any new contractors brought on site shall also meet with the project arborist to ensure they are aware of all tree protection measures. Construction Crew Monitoring & Tree Protection Inspections Crews working within the CRZ’s of trees shall be monitored by the project arborist. The arborist will provide guidance regarding tree protection measures, root pruning or any other root disturbing activities. The following trees will require supervision of construction crews. 3,5,7,8,11,14,16,17 & 19. The City will require you to show that tree protection fencing is in place before commencing demolition and construction. An ISA certified arborist shall inspect the tree protection fencing and report to city staff that all was installed to specifications. The city may also require periodic inspections of the protected trees and tree protection measures. A final inspection of protected trees will also be required by the city before a permit closure will be granted. Maintenance of tree protection fencing and adherence to all protection measures throughout the duration of the project will be very important to ensure your project remains in compliance with the city’s requirements. Heritage Tree is available to perform follow up inspections at your request for an additional fee. Conclusion Asphalt, curbing and road base materials being removed to improve the parking area will be excavated to depths of 13 to 28 inches. Damage to roots of some of the trees is inevitable. Fortunately, many of the trees in the scope of this project were smaller or offset far enough that the impacts would not remove critical roots beyond what the individual species could tolerate, nor would it destabilize the trees. Tree losses were kept to a minimum with only 6 out of 25 trees in the study being listed for removal. Only two (2) trees, the Italian stone pine and a Victorian box contributed to the formal landscape. Page 33 of 93 8 Maintaining tree protection will be your ongoing responsibility during construction of this project. Following all tree protection measures and consulting with the project arborist during potential root disturbing activities will be critical to the survival and continued health of the trees being preserved. Respectfully Submitted, Rodney D. Thurman ISA Board Certified Master Arborist PN-2684BUM ISA Urban Forest Professional - ISA Utility Arborist - ISA Tree Risk Assessor Qualification Appendices: tree inventory and tree protection table, photographs, tree protection diagrams, tree inventory and tree protection map Page 34 of 93 Page 35 of 93 Page 36 of 93 11 # Botanical Name Common Name Cond.DSH Calculated DSH Remove ? Replant ? Impact % Condition Comments Impact Notes Tree Protection Notes 13 Eucalyptus sideroxylon red ironbark eucalyptus fair 17 17 5 moderately vigorous tree Root impacts are within tolerances Use existing chain link fence to create Tree Protection Zone (TPZ). Prune any roots 1/2" diameter and larger exposed by excavation. Use loppers, pruning saw or reciprocating saw for root prune. 14 Eucalyptus sideroxylon red ironbark eucalyptus fair 16 16 25 moderately vigorous tree Root impacts are within tolerances Use existing chain link fence to create Tree Protection Zone (TPZ). Prune any roots 1/2" diameter and larger exposed by excavation. Use loppers, pruning saw or reciprocating saw for root prune. Project arborist to oversee excavation and root pruning. 15 Eucalyptus sideroxylon red ironbark eucalyptus fair 25 25 20 moderately vigorous tree Root impacts are within tolerances Use existing chain link fence to create Tree Protection Zone (TPZ). Prune any roots 1/2" diameter and larger exposed by excavation. Use loppers, pruning saw or reciprocating saw for root prune. 16 Quercus agrifolia coast live oak fair 4,6,7 10 25 moderately vigorous tree Root impacts are within tolerances Use existing chain link fence to create Tree Protection Zone (TPZ). Prune any roots 1/2" diameter and larger exposed by excavation. Use loppers, pruning saw or reciprocating saw for root prune. Project arborist to oversee excavation and root pruning. 17 Pinus radiata Monterey pine good 16 16 30 vigorous tree Root impacts due to excavation are slightly higher than normal, but the tree can withstand them. No anticipated tree decline or destabilization. Use existing chain link fence to create Tree Protection Zone (TPZ). Prune any roots 1/2" diameter and larger exposed by excavation. Use loppers, pruning saw or reciprocating saw for root prune. Project arborist to oversee excavation and root pruning. 18 Prunus illicifolia Catalina cherry very poor 2 2 0 tree is in decline No root impacts anticipated. Use existing chain link fence to create Tree Protection Zone (TPZ). Page 37 of 93 Page 38 of 93 13 Appendix B – Photographs Photo 1 –View south of Tree 1. Tree is in decline and has been listed for removal. 84 85 83 3 4 1 Page 39 of 93 14 84 Photo 2 – View southwest of Tree 2, an Italian stone pine. Impacts to roots will be too great to allow for retention. 2 Page 40 of 93 15 Photo 3 – View of west of Tree 3. Although impacts are within the critical root zone because palms have fibrous roots, they and withstand greater impacts. Tree will require arborist supervision during construction. 3 Page 41 of 93 16 Photo 4 – View west of Tree 4, a California toyon. Impacts to roots will be too great to allow for retention. 4 Page 42 of 93 17 Photo 5 –View west of trees 5-7. Impacts to Tree 6 roots will be too great to allow for retention. Trees 5&7 will require arborist supervision during construction. 5 6 7 Page 43 of 93 18 Photo 6 –Close view of Tree 6 roots. Removal of curbing and asphalt to rear of tree will be too great of an impact to allow retention of tree. Page 44 of 93 19 Photo 7 –View southeast of Tree 8. Tree will require arborist supervision during construction. 8 Page 45 of 93 20 Photo 8 –View northeast of Tree 10. Tree is growing against fence and Impacts to roots will be too great to allow for retention. 10 Page 46 of 93 21 Photo 9 –View northeast of Trees 9-15. All trees are growing behind chain-link fence. Trees 11 & 14 will require arborist supervision during construction. 10 9 1112 13 1415 Page 47 of 93 22 Photo 10 –View northeast of Trees 13-17. All trees are growing behind chain-link fence. Trees 14,16 &17 will require arborist supervision during construction. 17 16 15 14 13 Page 48 of 93 23 Photo 11 –View northeast of Trees 18 & 19. All trees are growing behind chain-link fence. Tree 19 will require arborist supervision during construction. 1819 Page 49 of 93 24 Photo 12 –View north of Trees 20 & 21. All trees are growing behind chain-link fence. Impacts to roots of Tree 21 will be too great to allow for retention. 2021 Page 50 of 93 25 Photo 13 –Close view of Tree 21. Impacts to roots will be too great to allow for retention. 21 Page 51 of 93 26 Photo 14 –View northwest of Trees 22 & 25. All trees are growing behind chain-link fence. Impacts to roots are within tolerances. 222324 25 Page 52 of 93 27 Appendix C – Tree Protection Diagrams Diagram 1 -Tree Protection Fencing Diagram 2 –Tree Protection Signage Page 53 of 93 28 Appendix D – Tree Protection Map Page 54 of 93