BUILDING PERMIT
New Single Family
BLDG-2897-2021
Issuance Date: 3/4/2022
Project Address: 103 Earthwood Ln Assessor's Parcel Number: 053-259-014
Unit or Suite(s): Square Footage: 1,811.00
Project Description: NEW SINGLE FAMILY: LOT 1: PLAN CLUSTER 1P; Legel Description:
Contractor:
TRACT3089
WCP Developers LLC
Business: (559) 432-8181
Ucense Type: California State Contractor License License Number: 1035148 Classification: B -General Bulldlng Contractor
Ucense Type: Worker's Compensation License Number: WCWC214711
Other: JP Holdings, LLC
Owner: Avila Ranch Developers, Inc.
Business: (805) 595-5440
Fire Sprinklers: prpytded Stories .1JlQ
Census: 101 -Single Family Residence
Occupancy: Residential, 1 and 2 famlly dwellings (R-3)
Group
Manuel
Fee Name
Meter Cost (1 ")
Building Permit Review -Planning
C&O Recyding -UTIL
Police Citywide Base fee (SF)
W Residential Unit > 1201 sqft
Building Permit Review -Planning
Building Permit Review -Planning
TIF LOVR Base fee (SF) >1400
Consolidated Plan Check Fees
Consolidated lnspectlon Fees
IT Surcharge
Valuation
Type
Fees
Water Service or Trash Enc or Landscape -UTIL
Administrative Fee
SMIP (Residential)
Fire Citywide Base fee (SF)
Slngle Famlly Residential -ENG
Flnal Inspection -SF Residential -PW
Meter Service: Install (.58"-1•)
Dwelling Unit Construction Tax
TIF Avila LOVR Sub Single Family Residential
WW Residential Unit> 1201 sqft
Green Building Fee
Stormwater -Minor Project -BLDG
Total Fees:
Code Year: 2019
SQ. Ft
Fee Amount
216.00
382.00
71.11
794.64
13,767.02
191.00
382.00
10,948.40
1,421.85
5,078.80
301.98
568.85
217.35
24.00
676.87
938.37
247.47
142.21
164.00
2,564.71
12,785.98
8.00
313.36
52,205.97
Factor
Date
Dwelllng Units: 1 Motel Rooms:
Construction Type: V-B
Valuation
181,100.00
Payments
Receipt# Amount
3/2122 34,502-03-02-2022
Total Paid:
52,205.97
52,205.97
Plan Check Account Payment by Contact
co_nta_ct_N_am_a ____ Al:_c""o""'u""'nt""'N""aaaam""'e""'--------------Status Total Credits Total Debits Account Balance
Total Account Balance :
Balance Due: $0.00
Legal Declarations
2 IDENTIFY WHO WILL PERFORM THE WORK
2a -CALIFORNIA LICENSED CONTRACTOR'S DECLARATION I hereby afflnn under penalty of perjury that I am licensed under provisions of Chapter 9
commencing with Section 7000 of Division 3 of the Business and Professions Code, and my license Is In full force and effect.
3 IDENTIFY WORKERS' COMPENSTATION COVERAGE AND LENDING AGENCY
WARNING: Failure to secure workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to
100,000, in addition to the cost of compensation, damages as provided for in section 3708 of the labor code, Interest, and attorney's fees.
I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the perfonnance of the work for which
this permit is issued.
4 DECLARATION BY CONSTRUCTION PERMIT APPLICANT
By my signature below, I certify each of the following:
I am a CA Licensed Contractor.
rA!t,;u,,,
Signature ~ntractor, Authorized Agent or Owner
March 04, 2022
Date
Geo
SC)LLJTI C)r--.J S
DATE:
August19,2022
PROJECT NUMBER:
SL09304-7
CLIENT:
vila Ranch Developers ,
Inc.
c/o Wathen Castonos
Homes
735 Tank Farm Road ,
Suite 290 ,
San Luis Obispo,
California 93401
PROJECT NAME:
Avila Ranch, LLC
Residential
Development,
at Buckley Road and
Vachell Lane,
San Luis Obispo,
California
220 High Street
San Luis Obispo CA 93401
805.543.8539
1021 Tama Lane, SUlte 105
Santa Maria, CA 9 3 455
805.614.6333
201 S . Milpas street, Suite 103
Santa Bart>ara, CA 93103
805.966.2200
info@geosoh.rtions.net
sbinfo@geosolutlons.net
FINAL SPECIAL INSPECTION REPORT LOTS 1-4
INTRODUCTION
This report is submitted in accordance with the requirements of CBC Section 1704.2.4 and
certifies that GeoSolutions, Inc. provided the following special inspection services during the
construction of the residential development at the project address.
POST-TENSION CONCRETE
GeoSolutions, Inc. conducted verification of concrete mix design , periodic inspection of
concrete materials placed in post-tension foundations and slabs for the proposed
residences in accordance with the approved project plans.
GeoSolutions, Inc. conducted verification of size, grade, location and placement of
reinforcing steel , post-tensioning steel cables and hardware in foundations and slabs in
accordance with the project plans .
GeoSolutions, Inc. conducted verification of stressing ram calibration and continuous
inspection during stressing of post-tension tendons including verification of tendon stresses
and tendon elongations in accordance with the approved project plans.
GeoSolutions, Inc. provided the following compressive strength testing: Four sets of
concrete compressive strength specimens were cast in accordance with ASTM C-31
specifications and tested for compressive strength in accordance with ASTM C-39 test
method. The following is the description of the concrete compressive strength specimens
cast and tested for compressive strength by GeoSolutions, Inc.:
Lot 1 Post-Tension Foundation System (Field Set No. 7)
One set of 5-4x8 inch cylinders were cast from approved mix design #550GN 1050
supplied by CalPortland Construction exceeded the project specified compressive
strength of 4,000 psi at 28 days.
Lot 2 Post-Tension Foundation System (Field Set No. 8)
One set of 5-4x8 inch cylinders were cast from approved mix design #550GN1050
supplied by CalPortland Construction exceeded the project specified compressive
strength of 4 ,000 psi at 28 days.
Lot 3 Post-Tension Foundation System (Field Set No . 9)
One set of 5-4x8 inch cylinders were cast from approved mix design #550GN1050
supplied by CalPortland Construction exceeded the project specified compressive
strength of 4,000 psi at 28 days.
Lot 4 Post-Tension Foundation System (Field Set No . 10)
One set of 5-4x8 inch cylinders were cast from approved mix design #550GN1050
supplied by CalPortland Construction exceeded the project specified compressive
strength of 4 ,000 psi at 28 days.
Avila Ranch Residential
August 19, 2022
SHEAR PANEL AND ROOF DIAPHRAGM NAILING
Project SL09304-7
Verification of size, location and placement of nails in building shear panels and roof diaphragms in accordance
with the project plans. Verification of materials used, periodic inspection of structural plywood and nails placed in
shear panels and roof diaphragms in accordance with the approved project plans.
CONCLUSION
Based on our observations, and to the best of our knowledge , the work observed was performed in accordance
with the approved project plans and the 2016 California Building Code.
The opportunity to have been of service is appreciated. If you have any questions, please feel free to contact the
undersigned at (805) 614-6333.
Sincerely,
GeoSolutions, Inc.
1)~ ~ IYl,lltlill
Patrick B. McNeil!
Principal
Attachments: Compression Test
2
Avila Ranch Residential
August19,2022
COMPRESSION TEST RESULTS (CONCRETE)
3
Project SL09304-7
220 High Street. San Luis Obispo, CA 93401
Phone: (805) 543-8539
1021 West Tama Lane, Santa Marla, CA 93455
Phone: (805) 614-6333
E=,C--::,f L ;-r I C--:::>r----.J ~
201 S. Milpas, Suite 103, Santa Barbara, CA 93103
Phone: (805) 966-2200
REPORT OF COMPRESSION TEST RESULTS
PROJECT: Avila Ranch Development
AVILA RANCH DEVELOPERS, INC San Luis Obispo, California
c/o Wathen Caatanos Homes PROJECT#'. SL09304-7
735 Tank Farm Road, Suite 290 DATE CAST: 3/17/22
San Luis Obispo, Califomfa 93401 DATE REC'D: 3/18122
CONTRACTOR: Elite Concrete
GENERAL LOCATION OF PLACEMENT: Lot 1 -Post-Tension Foundation Svstem
SPECIFIC LOCATION OF LOAD: W . Portion of Livina Area Slab/Footinas
MIX CLASS MAX. SIZE YARDS
TIME OF DISCHARGE
OESIGN OF OF LOAD TRUCI< TICKET PER TIME
NUMBER CONCRETE AGGREGATE NUMBER NUMBER NUMBER LOAD BATCHED START FINISH
550GN1050 -1u 5 6382 1739643 9.5 4 :03AM 4:43AM 4 :50AM
TOTAL AIR UNIT TEMPERATURE TYPE OF SAMPLE:
WATER CONTENT WEIGHT SLUMP m.m.ufalnMell) CONCRETE -GROUT -MORTAR
AOOED,gal. ,. pd In. AIR SAMPLE SHOTCRETE -OTHER
0 - -4.25 4a• 10· CONCRETE
WEAT1£R: Clear SAMPLE TIME: 4 :46AM SUPPLIER: CalPortland Construction
FIELD NOTES: Boom pump, vibrator MIX DESIGN STRENGTH: 4,000
PROJECT DESIGN STRENGTH: 3,000
p.s.l. @ 28 days
INSPECTOR: BJ
AELO SAMPLE AGE LAB DATE . DIAMETER TOTAL ULTIMATE TYPE
SET AT BREAK SAMPLE OF AND/OR AREA LOAD STRENGTH TESTED OF
NUMBER (DAYS) NUMBER BREAK DIMENSIONS aq Jne. lbs. Ml BY BREAK
7A 7 54342 3/24/22 4.00x8.00 12.57 53,110 4230 SH 3
7B 28 54343 4/14/22 4 .00x8.00 12.57 66620 5,300 KF 3
7C 28 54344 4/14/22 4 .00X8.00 12.57 65,310 5,200 KF 3
70 28 54345 4/14/22 4 .00x8.00 12.57 65,600 5,220 KF 3
7E Hold 54346 -------
7F FC, (4) 54347 3/21/22 4.00x8.00 12.57 44,070 3,510 LG 3
NUTES:
1 ASTM standard test methods used: C31 C39 C143 C172 C231 C617 C1064 C1231
2 Results relate only to .... _ ,. __ s inspected/tested.
3 This report shal ~W,Jl'~ll ;.,; ~ except in full, without the prior written approval of the agency.
4 Testi~~ns~ ~~lftu ~ ;~iance with approved project plans and specifications.
5 Condition o ·--·v .-
0 r~ ~~
SIGNED: /L._~ ~\::..:: No.£61361 ' l ;i;; DATE: 4/14/22
Cjy__\'--4.:
OFCt>,\.\tCJ
Page 1 of 1
220 High Street, San Lula Obispo, CA 93401
Phone: (805) 543-8539
1021 West Tama Lane, Santa Marla, CA 93455
Phone: (805) 614-6333
201 S. Mllpas. Suite 103, Santa Barbara, CA 93103
Phone:(805)966-2200
REPORT OF COMPRESSION TEST RESULTS
PROJECT: Avila Ranch Development
AVILA RANCH DEVELOPERS, INC San Luis Obispo, California
c/o Wathen Castano& Homes PROJECT#: Sl09304-7
7 35 Tank Fann Road , Suite 290 DATE CAST: 3/17/22
San Lu is Obispo, California 93401 DATE REC'D: 3/18/22
CONTRACTOR: Elite Concrete
GENERAL LOCATION OF PLACEMENT: Lot 2 -Post-Tension Foundation System
SPECIFIC LOCATION OF LOAD: Central Portion of Llvlna Area Slab/Footinas
MIX Cl.ASS MAX.SIZE YARDS
TIME OF DISCHARGE
DESIGN OF OF LOAD TRUCK TICKET PER TIME
NUMBER CONCRETE AGGREGATE NUMBER NUMBER NUMBER LOAD BATCHED START FINISH
550GN1050 -1" 9 6384 1739647 9.5 4 :41 AM 5:13AM 5:20AM
TOTAL AIR UNIT TEMPERATURE TYPE OF SAMPLE:
WATER CONTENT WEIGHT SLUMP (Degrees FalnnhelU CONCRETE • GROUT • MORTAR
ADDED .gal. "' pd In. AIR "-'IMPlE SHOTCRETE • OTHER
0 - -5.25 49° 71 ° CONCRETE
WEATHER : Clear SAMPLE TIME: 5 :16AM SUPPLIER: CalPortland Construction
FIELD NOTES: Boom pump, vl>rator MIX DESIGN STRENGTH: 4,000
PROJECT DESIGN STRENGTH: 3,000
p.s.l. @ 28 days
INSPECTOR: BJ
FIELD SAMPLENJE. LAB DATE DIAMETER TOTAL ULTIMATE TYPE
SET AT BREAK SAMPLE OF AND.10R AREA LOAD STRENGTH TESTED OF
NUMBER (DAYS) NUMBER BREAK DIMENSIONS sq.Ins. lbs. psi. BY BREAK
SA 7 54348 3/24122 4 .00x8.00 12.57 53,990 4 ,300 SH 3
8B 28 54349 4/14122 4 .00x8.00 12.57 60150 4,790 KF 5
SC 28 54350 4/14/22 4 .00x8.00 12.57 61 ,140 4,860 KF 3
80 28 54351 4/14/22 4 .00x8.00 12.57 60,590 4,820 KF 3
SE Hold 54352 -- -
SF FC, (4) 54353 3121/22 4 .00x8.00 12.57 42,700 3400 LG 3
NUlt~:
1 ASTM standard test methods used: C31 C39 C143 C172 C231 C617 C1064 C1231
2 Results relate only to the items inspected/tested.
3 This report 17:,:. -'uced, except in full, without the prior written approval of the agency.
4 Testing/i -'"'
1
w,..~ -.,r ''~mpliance with approved project plans and specifications.
5 Conditi1 ~~:~~R o.c'< ~ 10d ,,
r-R:.:§2 ~\~
SIGNED: ,V,__ 7rN ;;;: Nn c1:R1~R1 :;o ll±i DATE: 4/14122
fl C /V \\.. $
f...OF CAl \~~
Page 1 ofl
220 High Street, San Luis Obispo, CA 93401
Phone: (805) 543-8539
1021 West Tama Lane, Santa Marfa, CA 93455
Phone: (805) 614-6333
201 S. Milpas, Suite 103, Santa Barbara, CA 93103
Phone: (805) 966-2200
REPORT OF COMPRESSION TEST RESULTS
PROJECT: Avila Ranch Development
AVILA RANCH DEVELOPERS, INC San Luis Obispo, California
c/o Wathen Castanos Homes PROJECT#: SL09304-7
735 Tank Farm Road, Suite 290 DATE CAST: 3/17/22
San Luis Obispo, California 93401 DATE REC'D: 3/18/22
CONTRACTOR: Elite Concrete
GENERAL LOCATION OF PLACEMENT: Lot 3-Post-Tension Foundation Svstem
SPECIFIC LOCATION OF LOAD: Garage Slab/Footings
MIX CLASS MAX. SIZE YARDS
TIME OF DISCHARGE
OESIGN OF OF LOAD TRUCK TICKET PER TIME
NUMBER CONCRETE AGGREGATE NUMBER NUMBER NUMBER LOAD BATCHED START FINISH
550GN1050 -1" 16 6384 1739654 9.5 5:30AM 6:33AM 6:42AM
l;
TAI. AIR UNIT TEMPERATURE TYPE OF SAMPLE:
gal.
CONTENT WEIGHT SLUMP (Degrees Fahrllnhell) CONCRETE -GROUT -MORTAR
pcf In. AIR SAMPLE SHOTCRETE • OTHER
0 - -5.00 51° 68" CONCRETE
WEATHER: Clear SAMPLE TIME: 6:35AM SUPPLIER: CalPortland Construction
FIELO NOTES: Boom pump, vibrator MIX DESIGN STRENGTH: 4,000
PROJECT DESIGN STRENGTH: 3,000
p.s.l. @ 28 days
INSPECTOR: BJ
FIELO SAMPLEN31: LAS DATE DIAMETER TOTAL ULTIMATE TYPE
SET AT BREAK SAMPLE OF ANOK>R AREA LOAD STRENGTH TESTED OF
NUMBER (DAYS) NUMBER BREAK DIMENSIONS IQ.Ins. lbs. osi. BY BREAK
9A 7 54336 3/24/22 4 .00x8.00 12.57 54,710 4,350 SH 3
9B 28 54337 4/14/22 4 .00x8.00 12.57 64,430 5130 KF 3
9C 28 54338 4/14/22 4 .00x8.00 12.57 63,400 5,040 KF 3
90 28 54339 4/14122 4 .00x8.00 12.57 63,410 5,040 KF 5
9E Hold 54340 -------
9F FC, (4) 54341 3/21/22 4.00x8.00 12.57 41 ,730 3,320 LG 5
NU le;::,:
1 ASTM standard test methods used: C31 C39 C143 C172 C231 C617 C1064 C1231
2 Results relate only to theAw:!l!_inspected/tested.
3 This report shall n~~ ·r:._i:xJ]l except In full, without the prior written approval of the agency.
4 Testing/inspe~ ~ it.f?"r'L'~: ~' • nee with approved project plans and specifications.
5 Condition of ' " •
e ,~
SIGNED: /,,' ~ ' rec No C6 1361 :::o ~ Ier! DATE: 4/14/22
O~<.P),) C/V \\. ~-:
1;-f' OFCP..\..\r()~
Page 1 of 1
I
220 High Street, San Luis Obispo, CA 93401
Phone: (805) 543-853~
1021 West Tama Lane; Santa Marla, CA 93455
Phone: (805) 614-6333
201 S. Milpas, Suite 103, Santa Barbara, CA 93103
Phone: (805) 966-2200
REPORT OF COMPRESSION TEST RESULTS
PROJECT: Avila Ranch Development
AVILA RANCH DEVELOPERS, INC San Luis Obispo, ballfomia
clo Wathen Castanos Homes PROJECT#:SL09304-7
735 Tank Farm Road, Suite 290 DATE CAST: 3/25/22
San Luis Obispo, CalHomia 93401 DATE REC'D: 3/26/22
CONTRACTOR: Elite Concrete
GENERAL LOCATION OF PLACEMENT: Lot 4-Post-Tension Foundation System
SPECIFIC LOCATION OF LOAD: Perimeter of Garage Slab
MDC CLASS MAX. SIZE VAROS
t• TIME OF DISCHARGE
DESIGN OF OF LOAD TRUCK TICKET PER TIME
NUMBER CONCRETE AGGREGATE NUMBER NUMBER NUMBER LOAD BATCHED START I FINISH
550GN1050 -1i 3 4002. ·1742286 9.s • 4:14AM 4:50AM 4:59AM
TOTAL AIR UNIT TEMPERATURE TYPE OF SAMPLE:
WATER CONTENT WEIGHT SLUMP (Degraes Fahnlithell) CONCRETE • GROUT • MORTAR
ADDED, gal. % pct In AIR I SAMPLE SHOTCRETE-OTHER
0 --6.00 51° 75° CONCRETE
WEATHER: Foggy-SAMPLE TIME: 4:56AM SUPPLIER: CalPortland Construction
FIELD NOTES: Boom pump; vibrator MIX DESIGN STRENGTH: 4,000
PROJECT DESIGN STRENGTH: 3,000
p.s.l. @28 days
INSPECTOR: BJ
FIELD SAMPLE AGE LAB DATE DIAMETER TOTAL ULTIMATE TYPE
SET AT BREAK SAMPLE OF ANDIOR AREA LOAD STRENGTH TESTEI) OF
NUMBER (DAYS) NUMBER BREAK DIMENSIONS sq.Ins. lbs. psL BY BREAK.
10A 7 54539 4/1/22 4.00xB.00 12.57 48,630 3,870 KF 5
108 28 54540 4/22/22 4.00xB.00 12.57 61,620 4,900 DX 5
16c 28 54541 4/22/22 4.00xB.00 12.57 63,560. 5,060 DX 5
100 28 54542 4/22/22 4.otrxs.oo 12.57 58,810 4;680 DX 5
10E Hold 54543 .. ------
10F FC 54544 4/22/22. 4.oox8.oo 12.57 58,620 4,660 AE 3
l'IIVICQ:
1 ASTM standard test methods used: C31 C39 C143 C172. C231 C617 C1064 C1231
2_ R~u.!ts .. rel~te onl to ~he H.8-~ inl5pecte~~t~. _ --
3 This re = _,..
1
produced, except In full, without the prior written approval of the agency.
4 Te ,n: t:-;--' In compliance with approved project plans and specifications.
5 Co~ ~~ii 1-.,.~, :Good •
e:'~1
1GNED: I/A '-'-~:· ~-:;;
o •tti DATE: 4/22/22. . -~,-~~:
OF Cfl\ .. \~a
Page lofl
I
f.
Avila Ranch Residential
August 19, 2022
DAILY FIELD REPORTS
4
Project SL09304-7
Project Number: SL09304-4
220 High Street, San Luis Obispo, CA 93401
Phone:805-543-8539
1021 West Tama Lane, Santa Maria, CA 93455
Phone: 805-614-6333
201 S. Milpas, Suite 103, Santa Barbara, CA 93103
Phone: 805-966-2200
Daily Field Report
Weather: Clear -63F. Date: 3/14/22
Project Name: Avila Ranch Clusters -Lots 1-4 Cllent/Client Rep: Avila Ranch LLC
Job Address: Avila Ranch Clusters -San Luis Obispo, CA -Lots 1-4
D Grading Observation
0 Compaction
Footings
Reinforcing Steel
Items Inspected:
Purpose of Site Visit
O Concrete Observation D R-Meter
0 Grout Observation O Epoxy Embed
D Masonry Observation (!] Post Tension
0 Shotcrete Observation D Wood Framing
Permit#:
D Caisson Observation
0 Helical Pier Observation
0 Other:
Verified size, grade, location and the placement of reinforcing steel, post-tension tendons with hardware,
holdowns and anchor bolts located at Lot # 1-4 to be in general conformance with the approved plans by
IDS Engineering, Inc. dated: 11/19/21.
Corrections :
Re-entrant comer bars need to be within 2• from top of slab. (Pull up or wet set at time of concrete
placement)
Clean all loose debris from the bottom of the footings and maintain 3• clearance between reinforcing steel
and Earth. (Including bedding sand in footings with clearance for holdowns.)
Install all holdowns required with additional reinforcing. (Missing and not on site.)
Cover or tape exposed live greater than 1 •.
Cover all plumbing in contact with concrete.
Pre-saturate all footings and slabs and pads.
Additional inspection is required prior to concrete placement for corrections. Concrete placement is
scheduled for 3/17/22.
Report By: Jeff Corbett :="'..::",':',!':..":""'..,,,.. ICC#5286522-MI Coples To: Phil
E-,n.
220 High Street, San Luis Obispo, CA 93401
Phone:805-543-8539
1021 West Tama Lane, Santa Maria, CA 93455
Phone: 805-614-6333
201 S. Milpas, Suite 103, Santa Barbara, CA 93130
Phone: 805-966-2200
Daily Field Report
Project Number: SL09304-7 Weather: Clear, warm Date: 3/15/22
Project Name: Avila Ranch Development Client/Client Rep: Avila Ranch Developers, Inc.
Job Address: Earthwood Lane, San Luis Obispo, CA Report#:
0 Grading Observation
D Compaction
D Footings
I!] Reinforcing Steel
Items Inspected:
Purpose of Site Visit
O Concrete Observation
0 Grout Observation
D Masonry Observation
0 Shotcrete Observation
OR-Meter
0 Epoxy Embed
I!] Post Tension
0 Wood Framing
O Caisson Observation
0 Helical Pier Observation
0 Other:
Observed corrections to reinforcing steel, post tension tendons, and holdowns installed on lots 1-4 noted in
the field report dated 3/14/22 by Jeff Corbett. All corrections have been implemented, with the following
exceptions.
On lot 4, one STHD14 holdown was missing in the front porch area along the east side of the residence.
On lot 4, one STDH10 holdown along the south side of the residence did not have the additional #4
reinforcement required if a tendon is not within the shear cone.
Placement of re-entrant bars is to be adjusted so that the upper bars are 2-inches from the top of the slab.
Moisture conditioning of the footings was in progress at the time of inspection. Moisture conditioning is to
continue on a daily basis until concrete placement. •
Corrections to be verified immediately prior to placement of concrete.
Report By: Brian Jagger ::!"',.,-=',~•~'T..... ICC #9493966 Coples To:
r
E~n.
220 High Street, San Luis Obispo, CA 93401
Phone: 805-543-853~
1021 West Tama Lane, Santa Maria, CA 93455
Phone: 805-614-6333
201 5. Milpas, Suite 103, Santa _Barbara, CA 93103
Phone: 805-966-2200
Daily Field Report.
Project Number: SL09304-7 Weather: CLEAR 50 (A.M) Date: ~/17/22
Project Name: AVILA RANCH DEVELOPMENT Client/Client Rep: WATHEN CASTANOS
Job Address: EARTHWOOD LANE, SAN LUIS OBISPO, CA Pennlt #:
D Grading Observation
D Compaction
D Footings
0 Reinforcing Steel
Items Inspected:
Purpose of Site Visit
Concrete Observation O R-Meter · O Caisson Observation
0 Grout Observation O Epoxy Embed
0 Masonry Observation D Post Tension
0 Helical Pier Observation
D Other: •
0 Shotcrete Observation O Wood Framing
OBSERVED PLACEMENT AND CONSOLIDATION OF REINFORCED CONCRETE (MIX #550GN1050/
SUPPLIED BY CAL PORTLAND/ APP ROXI MA TEL Y 190 CUBIC YARDS) PLACED WITHIN THE LOTS 1-3
POST TENSION FOUNDATION SYSTEMS TO BE IN GENERAL CONFORMANCE WITH THE PROJECT
PLANS AND DETAILS. CONCRETE PLACED BY BOOM TRUCK PUMP AND CONSOLIDATED BY
MECHANICAL VIBRATION.
CAST (3) SETS OF (6) CONCRETE CYLINDERS FOR COMPRESSIVE STRENGTH TESTING.
Report By: <.~z:.... :::-"..::',1,';;7::i... ICC #8215163 Copies "f o: PHIL
Project Number: SL09304-7
220 High Street, San Luis Obispo, CA 93401
Phone:805-543-8539
102·1 West Tama Lane, Santa Maria; CA 93455
Phone: 805-614-6333
201 S. Milpas, Suite 103, Santa Barbara, CA 93130
Phone: 805-966-2200
Daily Field Rep.Ort
Weather: Clear, warm Date: 3/22/22
Project Name: Avila Ranch Development Client/Client Rep: Avila Ranch Developers, Inc.
Job Address: Earthwood Lane, San Luis Obispo, CA Report#:
Purpose of Site Visit
0 Grading Observation
D Compaction
0 Footings
0 Reinforcing Steel
Items Inspected:
D Concrete Observation
0 Grout Observation
D Masonry Observation
D Shotcrete Observation
QR-Meter
0 Epoxy Embed
I!] Post Tension
0 Wood Framing
O Caisson Observation
0 Helical Pier Observation
0 Other:
Observed tensioning of all post-tension tendons installed in the slabs of the residences under construction
on lots 1, 2, and 3 to the required stress of 33 kips using jack/gauge #2021-076 calibrated February 4, 2022
and jack/gauge #18-387 calibrated February 25, 2022. Tendon elongations were measured to be in
conformance with project plans onsite by IDS Engineering, Inc. Acceptable to cut the ends of tendons at this
time.
Report By: Brian Jagger ~,.,"r:',':':.:';.T,,,. ICC #9493966 Coples To:
220 High Street, San Luis Obispo, CA 93401
Phone: 805-543-8539
1021 West Tama Lane, Santa Maria, CA 93455
Phone:805-614-6333
201 S. Milpas, Suite 103, Santa Barbara, CA 93130
Phone:805-966-2200
Daily Field Report
Project Number: SL09304-7 Weather: Clear, cool Date: 3/25/22
Project Name: Avila Ranch Development -Lots 4-6 Client/Client Rep: Avila Ranch Developers, Inc.
Job Address: Earthwood Lane, San Luis Obispo, CA Report#:
Purpose of Site Visit
0 Grading Observation
0 Compaction
0 Footings
Reinforcing Steel
Items Inspected:
Concrete Observation
0 Grout Observation
0 Masonry Observation
0 Shotcrete Observation
OR-Mater
0 Epoxy Embed
Post Tension
D Wood Framing
D Caisson Observation
D Helical Pier Observation
0 Other:
Observed corrections noted in the field reports dated 3/15/22 and 3/23/22 prior to the start of concrete
placement. Subsequently observed the placement of concrete supplied by Calportland (Product:
550GN1050) for the post-tension foundation systems of the residences under construction on lots 4, 5 and
6. Concrete was placed using a boom pump and consolidated by vibration. Cast-three sets of cylinders for
compressive strength testing (one from concrete placed on each lot). These samples are to remain
undisturbed until picked up by a representative of GeoSolutions.
Report By: Brian Jagger :-v..=,.~.i:::::-,,.,. ICC #9493966 Coples To: Robert
220 High Street, San Luis Obispo, CA 93401
Phone:805-543-8539
1021 West Tama Lane, Santa Maria, CA 93455
Phone:805-614-6333
201 S. Milpas, Suite 103, Santa Barbara, CA 93130
Phone: 805-966-2200
Daily Field Report
Project Number: SL09304-7 Weather: Clear, cool Date: 4/1/22
Project Name: Avila Ranch Development Client/Cllent Rep: Avila Ranch Developers, Inc.
Job Address: Earthwood Lane, San Luis Obispo, CA Report#:
D Grading Observation
D Compaction
D Footings
D Reinforcing Steel
Items Inspected:
Purpose of Site Visit
O Concrete Observation D R-Meter
0 Grout Observation D Epoxy Embed
0 Masonry Observation [!] Post Tension
0 Shotcrete Observation O Wood Framing
0 Caisson Observation
0 Helical Pier Observation
0 Other:
Observed tensioning of all post-tension tendons installed in the slabs of the residences under construction
on lots 4, 5, and 6 to the required stress of 33 kips using jack/gauge #2021-076 calibrated February 4, 2022
and jack/gauge #18-387 calibrated February 25, 2022. Tendon elongations were measured to be in
conformance with project plans onsite by IDS Engineering, Inc. (approved Feb. 3, 2022). Acceptable to cut
the ends of tendons at this time.
Report By: Brian Jagger:"' ... '?:':=.~..... ICC #9493966 Copies To:
220 High Street, San Luis Obispo, CA 93401
Phone:805-543-8539
1021 W~st Tama Lane, Santa Maria, CA 93455
Phone: 805-614-6333
201 S. Milpas, Suite 103, Santa Barbara, CA 93103
Phone: 805-966-2200
Daily Field Report
Project Number: SLO9304-4 Weather: 70 Date: 5/4/22
Project Name: Avila Ranch Client/Client Rep: Phil G
Job Address: Lot 1 103 Earthwood Lane, San Luis Obispo, CA 93401 Permit#:
0 Grading Observation
D Compaction
0 Footings
0 Reinforcing Steel
Items Inspected:
Purpose of Site Visit
O Concrete Observation O R-Meter
0 Grout Observation O Epoxy Embed
0 Masonry Observation D Post Tension
0 Shotcrete Observation [!] Wood Framing
0 Caisson Observation
D Helical Pier Observation
0 Other:
Verified size,grade,location and placement of wood framing for proper nailing,anchoring,and other fastening
of the components of the Interior and exterior shear walls with spacing of 4-inches on center or less at
Lot 1, 103 Earthwood Lane. to be in general conformance with the approved plans dated 2-3-2022. •
Engineer: IDS Engineering
Corrections:
No corrections at this time.
Report By: Terry Flatley:".:::':~-;:= ... Copies To: Phil G Kraig C Pat M
220 High Street, San Luis Obispo, CA 93401
Phone: 805-543-8539
1021 West Tama Lane, Santa Maria, CA 93455
Phone: 805-614-6333
201 S. Milpas, Suite 103, Santa Barbara, CA 93103
Phone: 805-966-2200
Daily Field Report
Project Number: SLO9304-4 Weather: 63 WINDY Date: 5/9/22
Project Name: Avila Ranch Client/Client Rep: Phil G
Job Address: Lot 2 105 Earthwood Lane, San Luis Obispo, CA 93401 Permit#:
D Grading Observation
D Compaction
D Footings
D Reinforcing Steel
Items Inspected:
Purpose of Site Visit
D Concrete Observation D R-Meter
D Grout Observation D Epoxy Embed
0 Masonry Observation D Post Tension
D Shotcrete Observation I!] Wood Framing
0 Caisson Observation
0 Helical Pier Observation
0 Other:
Verified size,grade,location and placement of wood framing for proper nailing,anchoring,and other fastening
of the components of the Interior and exterior shear walls with spacing of 4-inches on center or less at
Lot 2, 103 Earthwood Lane. to be in general conformance with the approved plans dated 2-3-2022.
Engineer: IDS Engineering
Corrections:
Install Lpt4's or A35's at gable fill trusses and at shear at porch
Install Strap At Garage header 1 missing.
Holdowns at rear of home reversed. RFI repair
Call For re-inspection
Report By: Terry Flatley~.::'.:',~'.;~~ Copies To: Phil G Kraig C Pat M
220 High Street, San Luis Obispo, CA 93401
Phone: 805-543-8539
1021 West Tama Lane, Santa Maria, CA 93455
Phone: 805-614-6333
201 S. Milpas, Suite 103, Santa Barbara, CA 93103
Phone: 805-966-2200
Daily Field Report
Project Number: SLO9304-4 Weather:· 63 WINDY Date: 5/9/22
Project Name: Avila Ranch Client/Client Rep: Phil G
Job Address: Lot 2 107 Earthwood Lane, San Luis Obispo, CA 93401 Pennlt #:
D Grading Observation
0 Compaction
D Footings
D Reinforcing Steel
Items Inspected:
Purpose of Site Visit
D Concrete Observation D R-Meter
D Grout Observation D Epoxy Embed
D Masonry Observation D Post Tension
D Shotcrete Observation [!] Wood Framing
D Caisson Observation
D Helical Pier Observation
D Other:
Verified size,grade,location and placement of wood framing for proper nailing,anchoring,and other fastening
of the components of the Interior and exterior shear walls with spacing of 4-inches on center or less at
Lot 2, 107 Earthwood Lane. to be in general conformance with the approved plans dated 2-3-2022.
Engineer: IDS Engineering
Corrections:
Install Lpt4's or A35's at gable fill trusses and at shear at porch
Install Strap At Garage header 1 missing~
Holdowns at rear of home reversed. RFI repair
Call For re-inspection
Report By: Terry Flatley :=--..=:,-:.~-::;::.. Copies To: Phil G Kraig C Pat M
Project Number: SL09304-4
220 High Street, San Luis Obispo, CA 93401
Phone: 805-543-8539
1021 West Tama Lane, Santa Maria, CA 93455
Phone:805-614-6333
201 S. Milpas, Suite 103, Santa Barbara, CA 93103
Phone: 805-966-2200
Daily Field Report
Weather: Clear -64F. Date: 5/11/22
Project Name: Avila Ranch -Lot #2 Client/Client Rep: WC Homes
Job Address: Avila Ranch -Lot #2 -107 Earthwood Lane -San Luis Obispo, CA Permit#:
D Grading Observation
D Compaction
D Footings
D Reinforcing Steel
Items Inspected:
Purpose of Site Visit
D Concrete Observation O R-Meter
D Grout Observation O Epoxy Embed
0 Masonry Observation O Post Tension
0 Shotcrete Observation [!] Wood Framing
0 Caisson Observation
0 Helical Pier Observation
0 Other:
Verified size, grade, location and the placement of wood framing for the proper nailing, bolting, anchoring
and other fastening of the components to the roof diaphragm system & shear walls with four inch nailing
patterns or less located at Lot #2 to be in general conformance with the approved plans by IDS Engineering
dated : 2/3/2022.
Corrections: None at this time.
Report By: Jeff Corbett ~.':'.~":':'.... ICC#5286522-MI Coples To: Phil
C .l; l
Project Number: SL09304-4
220 High Street, San Luis Obispo, CA 93401
Phone:805-543-8539
1021 West Tama Lane, Santa Maria, CA 93455
Phone:805-614-6333
201 S. Milpas, Suite 103, Santa Barbara, CA 93103
Phone:805-966-2200
Daily Field Report
Weather: Clear -64F. Date: 5/11/22
Project Name: Avila Ranch -Lot #2 Client/Client Rep: WC Ho'mes
Job Address: Avila Ranch -Lot #2 -107 Earthwood Lane -San Luis Obispo, CA Permit#:
0 Grading Observation
D Compaction
D Footin~s
0 Reinforcing Steel
Items Inspected:
Purpose of Site Visit
O Concrete Observation O R-Meter
D Grout Observation D Epoxy Embed
D Masonry Observation O Post Tension
0 Shotcrete Observation [!] Wood Framing
D Caisson Observation
D Helical Pier Observation
0 Other:
Verified size, grade, location and the placement of wood framing for the proper nailing, bolting. anchoring
and other fastening of the components to the roof diaphragm system & shear walls with four inch nailing
patterns or less located at Lot #2 to be in general conformance with the approved plans by IDS Engineering
dated : 2/3/2022.
Corrections : None at this time.
Report By: Jeff Corbett :="..=',':',;",.<;':',... ICC#5286522-MI Coples To: Phil
220 High Street, San Luis Obispo, CA 93401
Phone: 805-543-8539
1021 West Tama Lane, Santa Maria, CA 93455
Phone:· 805-614-6333
201 S. Milpas, Suite 103, Santa Barbara, CA 93103
Phone: 805-966-2200
Daily Field-Report
Project Number: SLO9304-4 Weather: 63 WINDY Date: 5/17/22
Project Name: Avila Ranch Cllent/Cllent Rep: Phil G
Job Address: Lot 3 115 Earthwood Lane, San Luis Obispo, CA 93401 Permit#:
0 Grading Observation
D Compaction
0 Footings
0 Reinforcing Steel
Items Inspected:
Purpose of Site Visit
D Concrete Observation D R-Meter
0 Grout Observation O Epoxy Embed
D Masonry Observation D Post Tension
0 Shotcrete Observation [!] Wood Framing
D Caisson Observation .
0 Helical Pier Observation
D Other:
Verified size,grade,location and placement of wood framing for proper nailing,anchoring,and other fastening
of the components of the Interior and exterior shear walls with spacing of 4-inches on center or less at
Lot 3, 115 Earthwood Lane. to be in general conformance with the approved plans dated 2-3-2022.
Engineer: IDS Engineering .
Corrections:
None at this time.
Report By: Terry Flatley~..::",':'.:.-::~ Copies To: Phil G Kraig C Pat M
EL
220 High Street, San Luis Obispo, CA 93401
Phone: 805-543-8539
1021 West Tama Lane, Santa Maria, CA 93455
Phone: 805-614-6333
201 S. Milpas, Suite 103, Santa Barbara, CA 93103
Phone: 805-966-2200
l ;
Daily Field Report
Project Number: SLO9304-4 Weather: 63 WINDY Date: 5/17/22
Project Name: Avila Ranch Cllent/Cllent Rep: Phil G
Job Address: Lot 4 111 Earthwood Lane, San Luis Obispo, CA 93401 Permit#:
D Grading Observation
0 Compaction
D Footings
D Reinforcing Steel
Items Inspected:
Purpose of Site Visit
D Concrete Observation D R-Meter
D Grout Observation D Epoxy Embed
D Masonry Observation O Post Tension
D Shotcrete Observation I!] Wood Framing
D Caisson Observation
D Helical Pier Observation
D Other:
Verified size,grade,location and placement of wood framing for proper nailing,anchoring,and other fastening
of the components of the Interior and exterior shear walls with spacing of 4-inches on center or less at
Lot 4, 111 Earthwood Lane. to be in general conformance with the approved plans dated 2-3-2022.
Engineer: IDS Engineering
Corrections:
None at this time.
Report By: Terry Flatley ~=.':~-:.."::w Copies To: Phil G Kraig C Pat M
Project Number: SL09304-7
220 High Street, San Luis Obispo, CA 93401
Phone: 805-543-8539
1021 West Tama Lane, Santa Maria, CA 93455
Phone: 805-614-6333
201 S. Milpas, Suite 103, Santa Barbara, CA 93130
Phone: 805-966-2200
Daily Field Report
Weather: Clear, warm Data: 3/8/22
Project Name: Avila Ranch Development Client/Client Rep: Avila Ranch Developers, Inc.
Job Address : Earthwood Lane, San Luis Obispo, CA
0 Grading Observation
D Compaction
Footlnga
0 Reinforcing Steel
Items Inspected:
Purpose of Site Vlalt
O Concrete Obaervatlon O R-Meter
0 Grout Obaervatlon O Epoxy Embed
D Maaonry Obaervatlon D Post Tenalon
D Shotcrete Obaervatlon D Wood Framing
Report#:
0 Calaaon Obaervatlon
D Helical Pier Obaervation
D Other:
Observed footing excavations for the residences to be constructed on lots 1-3 for conformance with project
plans onsite by IDS Engineering, Inc. dated November 19, 2021 , as well as the Soils Engineering Report
Update by this office dated August 28, 2018.
Significant dessication cracks were observed in the footing excavations. Per the referenced SER, footing
excavations are to be kept moist until concrete placement. Maintaining moisture in bullding pads and footing
excavations during construction is essential to prevent heaving of expansive soils after construction of
Improvements. GeoSolutions will not approve footing excavations which are not maintained in a moist
condition. Contractor to keep footing excavations moist until concrete placement; daily moisture conditioning
may be requ ired to prevent dessication.
Porch pad footing depths have been increased to a mi nimum of 24-i nches below adjacent grade, in
conformance with RFI #1 -Porch Foundation Depths, dated February 9, 2022.
Footing dimensions were observed to be in general conformance with project plans onsite. Contractor to
remove loose material from the excavations.
Report By: Brian Jagger :--..=-.::,~ ICC #9493966 Coples To:
I
220 High Street, San Luis Obispo, CA 93401
Phone: 805-543-8539
1021 West Tama Lane, Santa Marla, CA 93455
Phone: 805-614-6333
201 S. Mil pas, Suite 103, Santa Barbara, CA 93103
Phone: 805-966-2200
Daily Field Report
Project Number: SL09304-4 Weather: Clear-63F. Date: 3/14/22
Project Name: Avila Ranch Clusters -Lots 1-4 Cllent/Cllent Rep: Avila Ranch LLC
Job Addrees: Avila Ranch Clusters -San Luis Obispo, CA-Lots 1-4 Pennlt#:
D Grading Obeervation
D Compaction
l Footings
l Reinforcing Steel
Item• lnapected:
Purpose of Site Visit
D Concrete Observation D R-Meter
D Grout Observation D Epoxy Embed
D Masonry Observation [!l Poat Tension
D Shotcrete Observation D Wood Framing
D Caisson Observation
D Helcal Pier Observation
D Other:
Verified size, grade, location and the placement of reinforcing steel, post-tension tendons with hardware,
holdowns and anchor bolts located at Lot # 1-4 to be in general conformance with the approved plans by
IDS Engineering, Inc. dated : 11 /19/21 .
Corrections :
Re-entrant comer bars need to be within 2• from top of slab. (Pull up or wet set at time of concrete
placement)
Clean all loose debris from the bottom of the footings and maintain 3• clearance between reinforcing steel
and Earth. (Including bedding sand in footings with clearance for holdowns.)
Install all holdowns required with additional reinforcing. (Missing and not on site.)
Cover or tape exposed live greater than 1 •.
Cover all plumbing In contact with concrete .
Pre-saturate all footings and slabs and pads.
Additional inspection is required prior to concrete placement for corrections. Concrete placement is
scheduled for 3/17/22.
Report By: Jeff Corbett ::""..=:,:',:"~-ICC#5286522-MI Coplea To: Phil
Project Number: SL09304-7
220 High Street, San Luis Obispo, CA 93401
Phone : 805-543-8539
1021 West Tama Lane, Santa Maria, CA 93455
Phone : 805-614-6333
201 S. Milpas, Suite 103, Santa Barbara, CA 93130
Phone : 805-966-2200
Daily Field Report
Weather: Clear, wann Date: 3/15/22
Project Name: Avila Ranch Development Client/Client Rep: Avila Ranch Developers, Inc.
Job Address: Earthwood Lane, San Luis Obispo, CA
D Grading Observation
D Compaction
D Footings
Reinforcing Steel
Item• Inspected:
Purpose of Site Visit
D Concrete Observation D R-Meter
D Grout Observation O Epoxy Embed
D Masonry Observation [!] Post Tension
D Shotcrete Observation D Wood Framing
Report#:
D Caisson Observation
0 Helical Pier Observation
0 Other:
Observed corrections to reinforcing steel, post tens ion tendons , and holdowns installed on lots 1-4 noted in
the field report dated 3/14/22 by Jeff Corbett. All corrections have been implemented , with the following
exceptions.
On lot 4, one STHD14 holdown was missing in the front porch area along the east side of the residence .
On lot 4, one STDH 1Oholdown along the south side of the residence did not have the additional #4
reinforcement required if a tendon is not within the shear cone .
Placement of re-entrant bars is to be adjusted so that the upper bars are 2-inches from the top of the slab .
Moisture conditioning of the footings was in progress at the time of inspection . Moisture conditioning is to
continue on a daily basis until concrete placement.
Corrections to be verified immediately prior to placement of concrete.
Report By: Brian Jagger :"'..::","::.:..."T,.... ICC #9493966 Coples To:
I
220 High Street, San Luis Obispo, CA 93401
Phone: 805-543-8539
1021 West Tama Lane, Santa Maria, CA 93455
Phone: 805-614-6333
201 S. Milpas, Suite 103, Santa Barbara, CA 93103
Phone: 805-966-2200
Daily Field Report
Project Number: SL09304-7 Weather: CLEAR 50 (AM) Date: 3/17/22
Project Name: AVILA RANCH DEVELOPMENT Cllent/Cllent Rep: WATHEN CASTANO$
Job Addreu: EARTHWOOD LANE, SAN LUIS OBISPO, CA Pennlt#:
D Grading Ob9ervatlon
D Compaction
D Footing•
D Reinforcing Steel
Items Inspected:
Purpose of Site Visit
Concrete Observation D R-Meter
D Grout Observation D Epoxy Embed
0 Masonry Observation D Poat Tenalon
0 Shotcrete Observation D Wood Framing
D Caisson Observation
D Helical Pier Observation
D Other:
OBSERVED PLACEMENT AND CONSOLIDATION OF REINFORCED CONCRETE (MIX #550GN1050/
SUPPLIED BY CAL PORTLAND/ APPROXIMATELY 190 CUBIC YARDS) PLACED WITHIN THE LOTS 1-3
POST TENSION FOUNDATION SYSTEMS TO BE IN GENERAL CONFORMANCE WITH THE PROJECT
PLANS AND DETAILS . CONCRETE PLACED BY BOOM TRUCK PUMP AND CONSOLIDATED BY
MECHANICAL VIBRATION .
CAST (3) SETS OF (6) CONCRETE CYLINDERS FOR COMPRESSIVE STRENGTH TESTING .
Report By: caz., t:""..=,;,,~:-:;r.., ICC #8215163 Coples To: PHIL
I
E
Project Number: SL09304-7
220 High Street, San Luis Obispo, CA 93401
Phone: 805-543-8539
1021 West Tama Lane, Santa Maria, CA 93455
Phone:805-614-6333
201 S. Milpas, Suite 103, Santa Barbara, CA 93130
Phone: 805-966-2200
Daily Field Report
Weather: Clear, warm Date: 3/22/22
Project Name: Avila Ranch Development Cllent/Cllent Rep: Avila Ranch Developers, Inc.
Job Addren: Earthwood Lane, San Luis Obispo, CA
D Grading Obeervatlon
D Compaction
D Footing•
D Reinforcing Steel
Item• ln•pected:
Purpose of Site Vlalt
D Concrete Obaervatlon D R-Meter
0 Grout Obeervatlon D Epoxy Embed
0 Maaonry Obaervatlon I!] Poat Tenalon
0 Shotcrete Obaervatlon D Wood Framing
Report#:
D Calason Obaervatlon
0 Helcal Pier Observation
D Other:
Observed tensioning of all post-tension tendons installed in the slabs of the residences under construction
on lots 1, 2, and 3 to the required stress of 33 kips using jack/gauge #2021-076 calibrated February 4 , 2022
and jack/gauge #18-387 calibrated February 25, 2022. Tendon elongations were measured to be in
conformance with project plans onsite by IDS Engineering, Inc. Acceptable to cut the ends of tendons at this
time.
Report By: Brian Jagger :=-=:::..~ ICC #9493966 Cople• To:
I
C..:> I l J I I C ) r--.J ~ ,
220 High Street, San Luis Obispo, CA 93401
Phone: 805-543-8539
1021 West Tama Lane, Santa Marla, CA 93455
Phone: 805-614-6333
201 S. Milpas, Suite 103, Santa Barbara, CA 93103
Phone: 805-966-2200
Daily Field Report
Project Number: SLO9304-4 Weather: 70 Date : 5/4/22
Project Name: Avila Ranch Cllent/Ctlent Rep: Phil G
Job Address: Lot 1 103 Earthwood Lane, San Luis Obispo, CA 93401 Pennlt #:
D Grading Observation
D Compaction
D Footing•
D Reinforcing Steel
Item• lnapected:
Purpose of Site Visit
D Concrete Observation D R-Meter
D Grout Observation D Epoxy Embed
D MHonry Observation O Post Tension
D Shotcrete Observation [!] Wood Framing
D Caluon Observation
D Helical Pl,r Observation
D Other:
Verified size,grade,location and placement of wood framing for proper nailing,anchoring,and other fastening
of the components of the Interior and exterior shear walls with spacing of 4-lnches on center or less at
Lot 1, 103 Earthwood Lane. to be in general confonnance with the approved plans dated 2-3-2022.
Engineer: IDS Engineering
Corrections:
No corrections at this time.
Report By: Terry Flatley :-=:.=~ CoplN To: Phil G Kraig C Pat M
October 23, 2020
City of San Luis Obispo
Public Works Department
919 Palm Street
San Luis Obispo, CA 93401
rrm
design
g roup
RE: Pad Certification for Lots 1-21, 23-28, 31-86, 88-97 & 108-109, Avila Ranch, Tract 3089
Job No. 0661-02-LP 17
This letter is to certify that on October 8, 2020 and October 20, 2020, a field crew from this
office measured the pads for the above-mentioned project. The pads were measured for
elevation referenced from the benchmark being a lead & tack in the top of curb at the
northeast curb return of Industrial Way and Sacramento Drive being "City BM # 98"
elevation of 200 .17 feet (SLO benchmark system rev. January 2001 based on NAVO 1988).
This pad certification is for certifying the as-built pad elevations only as of the date of the
survey stated above.
The results of the survey are shown on the attached sketches.
RRM DESIGN GROUP
10/23/2020
Steven Brian Webster, PLS 7561 Date
www.rrmdesign.com
a California corporation • Lenny Grant, Architect C26973 • Robert Comacho, PE76597 • Steve Webster. LS 7561 • Jeff Ferber. LA 2844
rrm =
7'55..~St.S.,!IJ:J •klflll.a()bapo.CA'3,CII
c,:IIC5(S.U-11'••t l80St~
www.nmdngn.com SCAtE: 1"•50'
AVILA RANCH
TRACT 3089
PAO CERTIFICATION
4:-"~""' T X105.84 1'011\
19 ,os_,., I
XIQS.12 I
100.ml XI l!_ _ ~l~40-~0741
I
I
X1QUI 105.17 >el014~ JCIOIT xt(IUJ
1
13 26 27
IOU ff' IOUffl IOUFP /
I lOStFP I XU:l!.8' I •10L41 I KIOl!IO I /
L --~ ... _ ~ .............. , .. _l 'illll.lA ~S!.._ -_/
ll
10/23/2020
AVILA RANCH
TRACT 3089
PAD CERTIFICATION
J.IUS~StS-..Gh SO'llA0tmo.CAt)CJ1
o:~5411'••':-~
mndt11gn.c«ft
Michael B Stanton, PLS 5702
3559 South Higuera Street
San Luis Obispo, CA 93401
March 9, 2022
Community Development Dept.
City of San Luis Obispo
919 Palm Street
San Luis Obispo, california 93401
Tel: 805 .594.1960
Cell: 805 .440.4215
Fax: 805.594 -1966
RE: Form Certification for Lot 1 of Tract 3089, Phase 1
Contractor: Wathen Castanos
MBS Job# 22-024
Dear Sir or Madam:
Phil Buentiempo has asked me to provide a letter certifying the foundation forms for a
building under construction on lot 1 of Tract 3089, Phase 1.
On March 8, 2022, a field crew from this office checked the position of the foundation
forms based on the calculated property lines from the Tract Map calculated from
centerline straddlers that were measured and located in the field .
Based on our field survey of the forms and a review of Tract 3089, Phase 1 Final Map, the
forms are in general conformance with the approved precise grading plans.
This analysis is based on surveyed form locations based on the position of property lines
calculated from measured centerline monument straddlers .
If you have any questions, or need further information, please do not hesitate to call.
Sincerely,
remiah Herman, PLS 9420
9 I ~02.J...
fii) rn@rn~wrn rrr
ln1 MAR 09 2022 ~.
Wathen Castanos Homes
80
Amount paid: $352.32
Community Development
919 Palm Street, San Luis Obispo, CA 93401-3218
UTILITY SERVICE INSTALLATION WORK-ORDER
Customer Billing Information ICreated By: Vanessa Nichols I Permit -BLDG-2897-2021
Name: Avila Ranch Developers, Inc. Description: 1" Meter and install for new single-
Mailing address: 1446 Tollhouse Rd, Ste . 103
family residence
City, St. Zip: Clovis, CA 93611
Phone: 805-603-8361
Meter Address Suite Size Serial# Mf Read Res Com Landscape Recycled
103 Earthwood Lane 1" X
Important; Please read carefully. Failure to comply could result in additional expense.
1. If metered service is to be used for landscape, an approved backflow device must be installed per approved plan and City
standard prior to the meter set.
2. A minimum of 48 hours prior notification is required for all inspection/installation requests. Call Public Works Inspection at
805-781-7554 to schedule.
3. An encroachment permit is required for any work performed in the public right-of way.
4 . At time of meter installation, a water and sewer billing account will be established using customer information shown above. An
account set-up will be assessed at that time and sewer and water use charges will commence.
CUSTOMER * PUBLIC WORKS INSPECTOR * CORP YARD * -UTILITY BILLING * BUILDING DEPT.
Building & Safety Division Construction Permit Application
Community Development
919 Palm Street, San Luis Obispo, CA 93401-3218
1 IDENTIFY YOUR BUILDING PROJECT
Property Address:IO2, earrtl/VC)(lj Lane, ~on l.M\~ 00~{)0
Property Owner: Avila Ranch Developers Inc
Owner's Mailing Address: 2505 Alluvial Ave, Clovis CA 93611
T 805.781.7180
F 805.781 .7182
Assessor's Parcel# __ -____ _
Phone: 8055955440
Oucensed Design Professional In Responsible Charge or Non -Licensed Designer (when allowed by statutes):
Name: ______________________________ License No. ______ _
Address : ___________________________ ,Phone: ________ _
Description of work: LOf \, p\an ClU$tt.r \ o Dwelli ng Units: __
Occupancy Group: 12-~IU Const Type \/ B Fire Sprinklers lProject Value $ \ ~\~ 00
Floor Area (Sq. Ft): Living \ '(;\ \ Garage L\-'2.L\ Deck _____ Other__.?-ld5 _____ _
Permit Types Required::lgBuilding Mechanical Electrical Plumbing Grading-C .Y __ Demolition
Select Plan Check Consultant: [Jccc []NILLDAN BUREAU VERITAS
IDENTIFY WHO WILL PERFORM THE WORK (Select and Complete e/ther2a or2b)
I hereby affirm under penalty of perjury that I am licensed under provisions of
Chapter 9 commencing with Section 7000 of Division 3 of the Business and Professions Code, and my license is in full force and effect .
Contractor Name: WCP Developers LLC License Class b License No. 1035148
n 2b-OWNER;8UILOER'S DECLARATION I hereby affirm under penalty of perjury that I am exempt from the Contractors ',--::S:-:-tat_e..,..Li,..._ce_n_se-,-L-aw---=for-
ifie reason(s) indicated below by the checkmar1<(s) I have placed next to the applicable item(s) (Sectio n 7031 .5, Business and Professions Code : Any
city or county that requires a permit to construct, alter, improve, demolish , or repair any structure, prior to its issuance, also requires the applicant for the
permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractors' Slate License Law (Chapter 9 (commencing with
Section 7000) of Division 3 ofthe Business and Professions Code) or that he or she Is exempt from licensure and the basis for the alleged exemption .
An~olation of Section 7031 .5 by any applicant fore permit subjects the applicant to a civil penalty of not more than fi~hundred dollars ($500).):
U I, as owner of the property, or my employen with wages as their sole compensation, wlll do 0•11 of orLJportlons of the work, and the
structure is not intended or offered for sale. (Section 7044, Business and Professions Code: The Contractors' State License Law does not apply to an
owner of property who, through employees' or personal effort, builds or improves the property, provided that the improvements are not intended or
offered for sale. if, however, the building or improvement is sold within one year of completion, the Owner-Builder will have the burden of proving that
as not built or improved for the purpose of sale)
LJ I, as owner of the property, am exclusively contracting with licensed Contractors to construct the project (Section 7044, Bus iness and
Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who contracts for
the projects with a licensed Contractor pursuant to the Contractors' State License Law).
D1 am exempt from llcensure under the Contractors' State License L-for the following reason: _____________ _
By my signature below I acknowledge that, except for my personal residence in which I must have resided for al least one year prior to completion of the
improvements covered by this permit, I cannot legally sell a structure that I have built as an owner-builder if it has not been constructed in its entirety by
licensed contractors. I understand that a copy of the applicable law Is available upon request or at http://WwwJegjnfp,ca.goy/cafaw.htmJ.
3 IDENTIFY WORKERS ' COMPENSTATION COVERAGE AND LENDING AGENCY (Complete 3a and 3b)
WARNING: Failure to secure wor1<ers ' compensation coverage is unlawful , and shall subject an employer to crimina l penalties and civil fines up to
100,000, in addition to the cost of compensation , damages as provided for in section 3706 of the labor code, Interest, and attorney's fees .
1&:,WORKERS' COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the folowlng declarations:
U1 have and will maintain a certificate of consent to Nlf-lnsure for workers' compensation, Issued by the Director of Industrial Relatlons
vided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. Policy No. b
I have and will maintain workers' compensation Insurance, as required by SectJon 3700 of the Labor Code, for the performance of the work for
ich this permit is issued. My wor1<ers' compensation Insurance carrier and policy number are:
Carrier redwood fire and casualty insurance co Policy No WCWC214711 Expiration Date 1/1/22 Phone ___ _
DI certify that, In the perfonnance of the work for which this pennlt Is Issued, I shall not employ any person In any manner so as to
become subject to the workers ' compensation 1-s of California, and agree that, if I should become subject to the WOfkers' compensation
provisions of Section 3700 of the Labor Code, I shall forthwith comply with those provisions.
3b -CONSTRUCTION LENDING AGENCY DECLARATION I hereby affirm under penalty of perjury that there is a construction lending agency for the
performance of the work for which this pem,it is issued (Section 3097, Civil Code) as follows:
Lender's Name and Address ____________________________________ _
4 DECLARATION BY CONSTRUCTION PERMIT APPLICANT
By my signature below, I certify each of the following :
I amD• California llcenNd contractor or0the property owner" orOauthorlzed to act on the property owner's behalf"*.
I have read this permit application and the information I have provided is correct. I agree lo comply with applicable city and county ordinances and state
laws relating to building construction. I authorize ~entatives of this city o~nty to enter the above-identified property for inspection purposes.
This pennlt Is to be Issued In the name of theLJLlcensed Contractor orLJthe Property Owner aa the permit holderof record who will be
responsible and liable for the construction.
Print Name Justin Allison
requires separate verif,cation form **requims separate authorization form APPLICATION # Revised 2014
Received From:
SAN LUIS COASTAL UNIFIED SCHOOL DISTRICT
1500 Lizzie St., San Luis Obispo CA 93401
Fiscal Services Department (805) 549-1213
LEVEL ONE FEES
AVILA RANCH DEVELOPERS INC
Address: WC Homes 735 Tank Farm Road, Suite 100, SLO, 93401 Daytime Phone: 805 595 5440
Sum of: Six thousand eight hundred and sixty three dollars 69 cents
Property Address : 103 Earthwood Ln --------------------------------
Property Type: t] Residential D Commercial D Storage
Total Fee: $/sq.ft . 3.79 X 1811 sq.ft. = $
D No Fees Due
Reason:
6,863.69 -------------------
County City X Name: SLO ---------------
Method of Payment: CHECK Check/M.O.#: :fPH--ooo I~ \q ·1-----------
Permit#: 2897-2021
TO DEVELOPER/OWNER/DESIGNEE:
YOU ARE HEREBY NOTIFIED THAT YOU HAVE NINETY (90} DAYS FROM THE DATE OF PAYMENT OF THE FEES IDENTIFIED HEREIN TO
FILE A PROTEST AGAINST THE IMPOSITION OF THESE FEES PURSUANT TO GOVT. CODE SECTION 66020 '
INITTAL HERE:'-------
District Signature:~-~ L -e ~ Date:
Certificate of payment expires 6 months from this date
CITY OF
SAOi lUl$ 061S.pO
CALIFORNIA
Bulldlng & Safety Divliion • 919. Palm Street• San Lula Oblapo, CA
93401-3218
School Fee Payment Certification
Emall this fonn to allvlngston@slcrsd.org and than call 805-549-1213 or amall for an appointment In order to pay
fees.
The City cannot issue a building permit until the fee required by the San Luis Coastal Unified School District has been paid. Tt
applicant is responsible for taking this form to the school district offices at 1500 Lizzie Bldg C. The school district will determin,
If a fee is required, compute and collect the fee from the applicant, and certify payment in part •c• of this form. The applicant
must return this form to the Building Division and pay permit fees before the building permit can be issued. The phone numbeI
for the school district is (805) 549-1213.
A. APPLICANT AND PERMIT INFORMATION
Permit Number: BLDG-2891-2021 Assessor's Parcel Number:053-259-014
Applicant Name: , Avila Ranch Developers, Inc.
Project Address: 103 Earthwood Ln ---------------------------------
B. BUILDING TYPE & SIZE INDICATED BY PERMIT APPLICATION
Bulldlng Type: Building -New Slngle Famlly
Floor Area: #NewSQFT #DamoSQFT Total SQFT
Residential: 1,811.00 0.00 1,811.00
Commercial: 0.00 0.00 0.00
Total: 1,811.00 0.00 1,811.00
February 22, 2022 •
Date
C. SCHOOL DISTRICT VERIFICATION OF FEE PAYMENT
I hereby certify that the required development fee has been paid to the San Luis Coastal Unified School District for the
bulldlng described above.
AB 2926 fee: Sq. Ft.
Signature
1_8_\_I __ x fee _3_· -~--=
TOTAL FEE CALCULATED
L-"'f: ~
s b,8fo ~ • f>9
34 r-2-"2--
Date