FINAL INSPECTION APPROVAL CHECKLIST
PUBLIC WORKS DEPARTMENT
Project Address: 103 Earthwood Prepared By: BF
Checklist Started (Enter Date): 2/18/2022 Checklist Revised (Enter Revision Dates):
Project Description: SFR Tract 3089 Ph1 Lot 1
Building Permit Application Number: BLDG-2897-2021 Planner:
Project Tracking Number, Subdivision, etc: Encroachment Permit:
Items marked with “X” apply to project
General: Encroachment Permit Required for:
Site Clean-up Driveway Approach
Removal of roll-off/drop box ADA Upgrade
Pavement Repairs Curb Ramp/Upgrade
Removal of Pedestrian Protection Structures Curb, gutter, and sidewalk
Removal of Traffic Control Devices and Signs Sidewalk Installation
Sign, meter, furniture restorations within the public r/w Sidewalk Underdrains
Tree Preservation Requirements Street Paveout ( )
Street Tree Planting and Staking Street Trees 2 on Vachell, 1on Earthwood
Receipt of “Record” drawings/Document Plan Revisions Damage Repairs
Misc Project Conditions of Approval and/or Mitigation Measures Sewer Lateral/Abandonment/Manhole access
Recordations/Offers of Dedication/Quit-Claims Street Lights
Benchmark/Survey Monument restoration Final Street Paving/Paveout/Trench Paving
Property Corners Lane closures
Televising Sewer Lateral/Approval for Re-use Dumpsters/storage containers
Street Lights Water Service/Abandonment
Pay final Parking Meter fees Fire Service Lateral / Value On / Off
Landscape Improvements Required Misc Utilities ( )
Deferred submittal for: Borings for soil samples/utilities
Closing of s/w for painting/bldg face upgrades
Accessing utility boxes in s/w (fiber, phone, etc)
Other: ( )
Waterway Management Plan , Water Quality
Flood Damage Prevention Regulations: Improvements, Grading, and Drainage:
FEMA Elevation Certificate Recordation of Land Divisions, Mergers, LLA’s,
(based on Finished Construction) Easement Docs, etc.
FEMA Floodproofing Certificate (incl photos/buildg maint plan) “Record” drawings required
“Wet” Floodproofing Certification Erosion Control Plantings
Final review of floodgates, storage, placards, Eng Cert of Elev’s, Outlets, BMPs, and
floodproofing, utilities, etc Metering Devices
LOMR or LOMA Final Basin Construction
Maintenance of existing Floodproofing Maintenance Report/Maintenance Agreement
Floodproofing Upgrade Required Final Grading and Site Drainage
Required Documentation of final valuation as Interim LID Post Development Water Quality
being “Not Substantial” Treatment per City Engineering Standards
Post Construction Stormwater Compliance
Documentation per RWQCB/PCRs
Site Review, Private Utilities & Parking and Driveway Standards Other Non-standard Items
Certification of grades for low slope building sewers
Certification and Testing of Private Sewer Manholes
Trash Enclosure Detail Requirements
Parking Lot Development, Lighting, Drainage, and Striping
Certification for grades/drainage less than 2%
Pavement Marking, Stop Signs, and Directional Arrows
Bike Parking for short-term and long-term spaces
Motorcycle Parking
Commercial Loading Areas
Sewer video of 6” or larger sewer lines Note: This checklist is offered as a general guide to the permittee, property
Approved utility plans (PG&E, Phone, Catv, etc) owner, project contractors and City staff. This list may change during plan