HomeMy WebLinkAbout1001-1500 Emails and Calendars Batch 2683
From:Cindy Sconce <CSconce@mgtconsulting.com>
Sent:Monday, September 18, 2023 6:16 PM
To:Cruce, Greg; Bernstorff, Rebecca
Cc:Felt, Chris
Subject:RE: [EXTERNAL]FW: PD - False Alarms
Thanks Greg. Any assistance is welcome.
Cindy Sconce (she/her/hers)
Director, Performance Solutions Group
3600 American River Drive, Suite 150
Sacramento, CA 95864
Cell: 916.276.8807
Email: csconce@mgtconsulting.com
The information contained in this electronic communication is intended only for the use of the addressee, and may be
a confidential communication. If you are not the intended recipient, you are hereby notified that you have received this
transmittal in error; any review, dissemination, distribution, or copying of this transmittal is strictly prohibited.
From: Cruce, Greg <gcruce@slocity.org>
Sent: Monday, September 18, 2023 6:09 PM
To: Bernstorff, Rebecca <rbernstorff@slocity.org>; Cindy Sconce <CSconce@mgtconsulting.com>
Cc: Felt, Chris <cfelt@slocity.org>
Subject: RE: [EXTERNAL]FW: PD - False Alarms
Hi Cindy,
Fleet does not do charge backs for general fund programs. I’m sure we have a per vehicle cost, although it’s
changing because we’re unable to get new vehicles. I’ll be in touch with a total cost.
Thanks
Greg Cruce
Deputy Director - Maintenance Operations
Public Works Department
805.781.7264
gcruce@slocity.org
From: Bernstorff, Rebecca <rbernstorff@slocity.org>
Sent: Monday, September 18, 2023 5:19 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Cc: Felt, Chris <cfelt@slocity.org>; Cruce, Greg <gcruce@slocity.org>
Subject: RE: [EXTERNAL]FW: PD - False Alarms
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
684
Hi Cindy,
Yes, including Chris, our Fleet Supervisor, and Greg, our Maintenance Operations Deputy Director about fleet
charging for PD.
Thanks!
Rebecca Bernstorff
pronouns she/her/hers
Business Services and Administrative Manager
Administration – Community Services Group
E rbernstorff@slocity.org
T 805.781.7203
C 805.540.0219
slocity.org
Stay connected with the City by signing up for e-notifications
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Monday, September 18, 2023 4:45 PM
To: Bernstorff, Rebecca <rbernstorff@slocity.org>
Subject: FW: [EXTERNAL]FW: PD - False Alarms
Hi Rebecca
Melissa from Police is asking about vehicle maintenance charges so they can apply costs to their false alarm permits. Does fleet
charge their costs out to the departments? Based on what Melissa is saying below, it doesn’t sound like the Police department
gets charged directly. Do you have a contact over in Fleet that I can ask whether they have a calculated per vehicle cost for
Police?
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Monday, September 18, 2023 3:59 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: RE: [EXTERNAL]FW: PD - False Alarms
The police department doesn’t budget for vehicle maintenance costs, all of that is in Fleet’s budget (Public Works).
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Monday, September 18, 2023 3:38 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: RE: [EXTERNAL]FW: PD - False Alarms
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
685
Hi Melissa
Which line item on the ICRP would include your vehicle maintenance costs? It looks like fuel is currently being listed under the
indirect column so that is part of the overhead costs already. This cost could be pulled out and placed as direct and we could
develop an addiƟonal direct charge to apply to the false alarms if we think that would be beneficial.
You are correct, we did already incorporate the 20% vendor costs into the fee. We did not include the False Alarm #1 or #2.
Let me know about the vehicle maintenance costs and whether you would like to keep these costs as indirect, which adds to the
overhead, or as direct so that it can be directly applied to the false alarm fees.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Monday, September 18, 2023 2:17 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: RE: [EXTERNAL]FW: PD - False Alarms
Hello,
I took a look at this document and updated some information that you were looking for under the ICRP tab. Also,
wanted to ask if the costs for us to respond to a false alarm can also included vehicle related costs like maintenance
and fuel costs as well (looks like you already added the 20% vendor fee)? Also, should the fee incorporate costs from
False Alarms #1 and #2 that are not charged?
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Wednesday, September 13, 2023 10:22 AM
To: Ellsworth, Melissa <mellswor@slocity.org>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: RE: [EXTERNAL]FW: PD - False Alarms
Ok, done. I also added the language within a twelve month period to the false alarms.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Wednesday, September 13, 2023 10:04 AM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: [EXTERNAL]FW: PD - False Alarms
Hi Cindy,
Hope all is well. Just getting back to you on the False Alarm fees for PD. After consulting with our Attorney’s office,
they are recommending that we calculate the fees based on a cost recovery model. Please see her comments below.
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
686
Additionally, based on the information that Rachel provided from other agencies - I reached out to Monterey, Santa
Barbara, Ventura and SLO County to find out how their fees were calculated. I only heard back from two agencies;
one had no idea how their fees were calculated and the other was time based/cost recovery.
Let me know if you still need additional information. If you can update the matrix and send it to me again so I can
review, that would be appreciated!
Thanks,
Melissa
From: Symens, Sadie <ssymens@slocity.org>
Sent: Wednesday, September 13, 2023 9:45 AM
To: Ellsworth, Melissa <mellswor@slocity.org>; Bernstorff, Rebecca <rbernstorff@slocity.org>
Subject: RE: PD - False Alarms
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Wednesday, September 13, 2023 8:38 AM
To: Symens, Sadie <ssymens@slocity.org>
Subject: RE: PD - False Alarms
.
87
From: Symens, Sadie <ssymens@slocity.org>
Sent: Tuesday, September 12, 2023 1:48 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Subject: RE: PD - False Alarms
Sadie Symens
pronouns she/her/hers
Deputy City Attorney
City Attorney's Office
E ssymens@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
The information contained in this e-mail message is intended only for the CONFIDENTIAL use of the
designated addressee named above. The information transmitted is subject to the attorney-client privilege
and/or represents confidential attorney work product. Recipients should not file copies of this email with
publicly accessible records. If you are not the designated addressee named above or the authorized agent
responsible for delivering it to the designated addressee, you received this document through inadvertent
error and any further review, dissemination, distribution or copying of this communication by you or anyone
88
else is strictly prohibited. IF YOU RECEIVED THIS COMMUNICATION IN ERROR, PLEASE NOTIFY US
IMMEDIATELY BY TELEPHONING THE SENDER NAMED ABOVE AT (805) 781-7140. Thank you.
From: Kersten, Markie <mkersten@slocity.org>
Sent: Friday, September 8, 2023 4:08 PM
To: Bernstorff, Rebecca <rbernstorff@slocity.org>; Ellsworth, Melissa <mellswor@slocity.org>
Cc: Symens, Sadie <ssymens@slocity.org>
Subject: RE: PD - False Alarms
From: Bernstorff, Rebecca <rbernstorff@slocity.org>
Sent: Friday, September 8, 2023 3:09 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Cc: Kersten, Markie <mkersten@slocity.org>
Subject: RE: PD - False Alarms
Hi Melissa,
Thanks for touching base and for providing the context, I appreciate it and apologize for the delay in my reply. I can
see how it may be perceived more as a fine than a fee and why the approach to that may require some legal
perspective. I’m including Markie in to weigh in on if we should move forward with time-based cost analysis for false
alarms (which was my original thought) or if we should take a different approach based on any legalities to it?
The comparative analysis is interesting (attached so Markie could take a look) as it looks like the others may be doing
a flat fee approach.
I’m happy to defer to legal/PD expertise on the best path forward.
Thanks!
Rebecca
Rebecca Bernstorff
pronouns she/her/hers
Business Services and Administrative Manager
Administration – Community Services Group
E rbernstorff@slocity.org
T 805.781.7203
C 805.540.0219
slocity.org
Stay connected with the City by signing up for e-notifications
689
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Thursday, August 31, 2023 4:07 PM
To: Bernstorff, Rebecca <rbernstorff@slocity.org>
Subject: PD - False Alarms
Hi Rebecca,
I just wanted to follow up with you on PD’s False Alarm analysis. The reason why I’m a little confused on this is
because the last Fee Study (2015/16 time frame) indicated the consultant didn’t change any of the excessive alarm
fees because they were “punitive” in nature. All I really want to know is whether or not we can adjust those and if the
reason that was given in 2015/16 still stands or if Christine D. has other thoughts.
We have the time calculations for responding to these false alarms, so that’s not an issue. I asked Cindy Sconce
about this and she really didn’t have an answer. When these fees were actually created back before my time (like in
2005), they were time based so I’m not sure why the consultant didn’t analyze them last time.
At this time, is your recommendation to just have MGT move forward with the time based cost analysis for the false
alarms?
As reference, I’ve included a screenshot from the 2015/16 fee study, specifically the Alarm Fees and notes, which are
also in the attached document.
690
Thanks for your help,
Melissa
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Wednesday, August 30, 2023 4:34 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
Melissa
I did find this in one of my other emails from Rebecca:
In regard to the police fee schedule I think including it in the comparison survey would be really helpful. I can also
include this caveat in my email to the Leadership Team.
We can include it in the comparison survey and see what other agencies are charging for these.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Wednesday, August 30, 2023 3:06 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Subject: FW: [EXTERNAL]RE: SLO UF: Police - revised model
Hi Cindy,
Just checking in to see if you were able to connect with Rebecca yet so we can figure out next steps on the Alarm and
Tobacco fees.
Thanks,
Melissa
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
691
From: Ellsworth, Melissa
Sent: Wednesday, August 23, 2023 3:24 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
Great, thank you
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Wednesday, August 23, 2023 3:15 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
You got it. Let me talk to her first and then circle back with you. I also am going to walk her through the Tobacco fee based on
your other email.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Wednesday, August 23, 2023 3:14 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
Yes, please discuss with Rebecca and then let me know. I just want everyone to be on the same page. Thank you!
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Wednesday, August 23, 2023 3:11 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
I’m happy to jump on a meeƟng with them if you think that would be helpful. It really is about how they view these fees and
them agreeing that as a penalty they can change it to what is reasonable as a deterrent.
Let me know what you decide. I can also run this by Rebecca and see how she wants to approach this if you think that would be
beƩer.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Wednesday, August 23, 2023 3:04 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Subject: [EXTERNAL]RE: SLO UF: Police - revised model
Cindy – do you think it would be best if you were part of this meeting as well? Let me know.
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Tuesday, August 22, 2023 11:13 AM
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
692
To: Ellsworth, Melissa <mellswor@slocity.org>
Subject: SLO UF: Police - revised model
This message is from an External Source. Use caution when deciding to open attachments, click links, or respond.
Melissa
Here is the updated model with the 20% added to the alarm permit and false alarm costs.
Let me know when you have spoken with the Chief and AƩorney and how you want to proceed with those fees.
Thanks!
Cindy Sconce (she/her/hers)
Director, Performance Solutions Group
3600 American River Drive, Suite 150
Sacramento, CA 95864
Cell: 916.276.8807
Email: csconce@mgtconsulting.com
The information contained in this electronic communication is intended only for the use of the addressee, and may be
a confidential communication. If you are not the intended recipient, you are hereby notified that you have received this
transmittal in error; any review, dissemination, distribution, or copying of this transmittal is strictly prohibited.
693
From:Bernstorff, Rebecca
Sent:Monday, September 18, 2023 6:10 PM
To:Loew, Michael
Cc:Tway, Timothea (Timmi)
Subject:RE: Fee Study Update
Hi Mike,
I understand; when would be the best time to schedule the meeting?
My intent was to help solve any questions in a meeting setting to save you time; apologies if it didn’t come across that
way.
Thanks,
Rebecca
Rebecca Bernstorff
pronouns she/her/hers
Business Services and Administrative Manager
Administration – Community Services Group
E rbernstorff@slocity.org
T 805.781.7203
C 805.540.0219
slocity.org
Stay connected with the City by signing up for e-notifications
From: Loew, Michael <Mloew@slocity.org>
Sent: Monday, September 18, 2023 6:08 PM
To: Bernstorff, Rebecca <rbernstorff@slocity.org>
Cc: Tway, Timothea (Timmi) <TTway@slocity.org>
Subject: Fee Study Update
Hi Rebecca,
I am not going to have anything new to provide as an update for the fee study on Wednesday afternoon. I already
have a full schedule on Wednesday and will not have time to complete our assessments until Friday since Neema
does not anticipate being able to get us the data we need until Wednesday morning.
Thanks for understanding,
Mike Loew
Deputy Director
Chief Building Official
694
Community Development
E Mloew@slocity.org
T 805.781.7157
slocity.org
Stay connected with the City by signing up for e-notifications
695
From:Cruce, Greg
Sent:Monday, September 18, 2023 6:09 PM
To:Bernstorff, Rebecca; Cindy Sconce
Cc:Felt, Chris
Subject:RE: [EXTERNAL]FW: PD - False Alarms
Hi Cindy,
Fleet does not do charge backs for general fund programs. I’m sure we have a per vehicle cost, although it’s
changing because we’re unable to get new vehicles. I’ll be in touch with a total cost.
Thanks
Greg Cruce
Deputy Director - Maintenance Operations
Public Works Department
805.781.7264
gcruce@slocity.org
From: Bernstorff, Rebecca <rbernstorff@slocity.org>
Sent: Monday, September 18, 2023 5:19 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Cc: Felt, Chris <cfelt@slocity.org>; Cruce, Greg <gcruce@slocity.org>
Subject: RE: [EXTERNAL]FW: PD - False Alarms
Hi Cindy,
Yes, including Chris, our Fleet Supervisor, and Greg, our Maintenance Operations Deputy Director about fleet
charging for PD.
Thanks!
Rebecca Bernstorff
pronouns she/her/hers
Business Services and Administrative Manager
Administration – Community Services Group
E rbernstorff@slocity.org
T 805.781.7203
C 805.540.0219
slocity.org
Stay connected with the City by signing up for e-notifications
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Monday, September 18, 2023 4:45 PM
To: Bernstorff, Rebecca <rbernstorff@slocity.org>
Subject: FW: [EXTERNAL]FW: PD - False Alarms
696
Hi Rebecca
Melissa from Police is asking about vehicle maintenance charges so they can apply costs to their false alarm permits. Does fleet
charge their costs out to the departments? Based on what Melissa is saying below, it doesn’t sound like the Police department
gets charged directly. Do you have a contact over in Fleet that I can ask whether they have a calculated per vehicle cost for
Police?
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Monday, September 18, 2023 3:59 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: RE: [EXTERNAL]FW: PD - False Alarms
The police department doesn’t budget for vehicle maintenance costs, all of that is in Fleet’s budget (Public Works).
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Monday, September 18, 2023 3:38 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: RE: [EXTERNAL]FW: PD - False Alarms
Hi Melissa
Which line item on the ICRP would include your vehicle maintenance costs? It looks like fuel is currently being listed under the
indirect column so that is part of the overhead costs already. This cost could be pulled out and placed as direct and we could
develop an addiƟonal direct charge to apply to the false alarms if we think that would be beneficial.
You are correct, we did already incorporate the 20% vendor costs into the fee. We did not include the False Alarm #1 or #2.
Let me know about the vehicle maintenance costs and whether you would like to keep these costs as indirect, which adds to the
overhead, or as direct so that it can be directly applied to the false alarm fees.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Monday, September 18, 2023 2:17 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: RE: [EXTERNAL]FW: PD - False Alarms
Hello,
I took a look at this document and updated some information that you were looking for under the ICRP tab. Also,
wanted to ask if the costs for us to respond to a false alarm can also included vehicle related costs like maintenance
and fuel costs as well (looks like you already added the 20% vendor fee)? Also, should the fee incorporate costs from
False Alarms #1 and #2 that are not charged?
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
98
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Wednesday, September 13, 2023 8:38 AM
To: Symens, Sadie <ssymens@slocity.org>
Subject: RE: PD - False Alarms
.
From: Symens, Sadie <ssymens@slocity.org>
Sent: Tuesday, September 12, 2023 1:48 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Subject: RE: PD - False Alarms
Sadie Symens
pronouns she/her/hers
699
Deputy City Attorney
City Attorney's Office
E ssymens@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
The information contained in this e-mail message is intended only for the CONFIDENTIAL use of the
designated addressee named above. The information transmitted is subject to the attorney-client privilege
and/or represents confidential attorney work product. Recipients should not file copies of this email with
publicly accessible records. If you are not the designated addressee named above or the authorized agent
responsible for delivering it to the designated addressee, you received this document through inadvertent
error and any further review, dissemination, distribution or copying of this communication by you or anyone
else is strictly prohibited. IF YOU RECEIVED THIS COMMUNICATION IN ERROR, PLEASE NOTIFY US
IMMEDIATELY BY TELEPHONING THE SENDER NAMED ABOVE AT (805) 781-7140. Thank you.
From: Kersten, Markie <mkersten@slocity.org>
Sent: Friday, September 8, 2023 4:08 PM
To: Bernstorff, Rebecca <rbernstorff@slocity.org>; Ellsworth, Melissa <mellswor@slocity.org>
Cc: Symens, Sadie <ssymens@slocity.org>
Subject: RE: PD - False Alarms
Hi Rebecca and Melissa,
I’m looping Sadie in who can take a look at this next week.
Thanks,
Markie
From: Bernstorff, Rebecca <rbernstorff@slocity.org>
Sent: Friday, September 8, 2023 3:09 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Cc: Kersten, Markie <mkersten@slocity.org>
Subject: RE: PD - False Alarms
Hi Melissa,
Thanks for touching base and for providing the context, I appreciate it and apologize for the delay in my reply. I can
see how it may be perceived more as a fine than a fee and why the approach to that may require some legal
perspective. I’m including Markie in to weigh in on if we should move forward with time-based cost analysis for false
alarms (which was my original thought) or if we should take a different approach based on any legalities to it?
The comparative analysis is interesting (attached so Markie could take a look) as it looks like the others may be doing
a flat fee approach.
I’m happy to defer to legal/PD expertise on the best path forward.
Thanks!
700
Rebecca
Rebecca Bernstorff
pronouns she/her/hers
Business Services and Administrative Manager
Administration – Community Services Group
E rbernstorff@slocity.org
T 805.781.7203
C 805.540.0219
slocity.org
Stay connected with the City by signing up for e-notifications
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Thursday, August 31, 2023 4:07 PM
To: Bernstorff, Rebecca <rbernstorff@slocity.org>
Subject: PD - False Alarms
Hi Rebecca,
I just wanted to follow up with you on PD’s False Alarm analysis. The reason why I’m a little confused on this is
because the last Fee Study (2015/16 time frame) indicated the consultant didn’t change any of the excessive alarm
fees because they were “punitive” in nature. All I really want to know is whether or not we can adjust those and if the
reason that was given in 2015/16 still stands or if Christine D. has other thoughts.
We have the time calculations for responding to these false alarms, so that’s not an issue. I asked Cindy Sconce
about this and she really didn’t have an answer. When these fees were actually created back before my time (like in
2005), they were time based so I’m not sure why the consultant didn’t analyze them last time.
At this time, is your recommendation to just have MGT move forward with the time based cost analysis for the false
alarms?
As reference, I’ve included a screenshot from the 2015/16 fee study, specifically the Alarm Fees and notes, which are
also in the attached document.
701
Thanks for your help,
Melissa
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Wednesday, August 30, 2023 4:34 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
Melissa
I did find this in one of my other emails from Rebecca:
702
In regard to the police fee schedule I think including it in the comparison survey would be really helpful. I can also
include this caveat in my email to the Leadership Team.
We can include it in the comparison survey and see what other agencies are charging for these.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Wednesday, August 30, 2023 3:06 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Subject: FW: [EXTERNAL]RE: SLO UF: Police - revised model
Hi Cindy,
Just checking in to see if you were able to connect with Rebecca yet so we can figure out next steps on the Alarm and
Tobacco fees.
Thanks,
Melissa
From: Ellsworth, Melissa
Sent: Wednesday, August 23, 2023 3:24 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
Great, thank you
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Wednesday, August 23, 2023 3:15 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
You got it. Let me talk to her first and then circle back with you. I also am going to walk her through the Tobacco fee based on
your other email.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Wednesday, August 23, 2023 3:14 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
Yes, please discuss with Rebecca and then let me know. I just want everyone to be on the same page. Thank you!
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Wednesday, August 23, 2023 3:11 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
703
I’m happy to jump on a meeƟng with them if you think that would be helpful. It really is about how they view these fees and
them agreeing that as a penalty they can change it to what is reasonable as a deterrent.
Let me know what you decide. I can also run this by Rebecca and see how she wants to approach this if you think that would be
beƩer.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Wednesday, August 23, 2023 3:04 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Subject: [EXTERNAL]RE: SLO UF: Police - revised model
Cindy – do you think it would be best if you were part of this meeting as well? Let me know.
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Tuesday, August 22, 2023 11:13 AM
To: Ellsworth, Melissa <mellswor@slocity.org>
Subject: SLO UF: Police - revised model
This message is from an External Source. Use caution when deciding to open attachments, click links, or respond.
Melissa
Here is the updated model with the 20% added to the alarm permit and false alarm costs.
Let me know when you have spoken with the Chief and AƩorney and how you want to proceed with those fees.
Thanks!
Cindy Sconce (she/her/hers)
Director, Performance Solutions Group
3600 American River Drive, Suite 150
Sacramento, CA 95864
Cell: 916.276.8807
Email: csconce@mgtconsulting.com
The information contained in this electronic communication is intended only for the use of the addressee, and may be
a confidential communication. If you are not the intended recipient, you are hereby notified that you have received this
transmittal in error; any review, dissemination, distribution, or copying of this transmittal is strictly prohibited.
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
704
From:Loew, Michael
Sent:Monday, September 18, 2023 6:08 PM
To:Bernstorff, Rebecca
Cc:Tway, Timothea (Timmi)
Subject:Fee Study Update
Hi Rebecca,
I am not going to have anything new to provide as an update for the fee study on Wednesday afternoon. I already
have a full schedule on Wednesday and will not have time to complete our assessments until Friday since Neema
does not anticipate being able to get us the data we need until Wednesday morning.
Thanks for understanding,
Mike Loew
Deputy Director
Chief Building Official
Community Development
E Mloew@slocity.org
T 805.781.7157
slocity.org
Stay connected with the City by signing up for e-notifications
705
From:Bernstorff, Rebecca
Sent:Monday, September 18, 2023 5:19 PM
To:Cindy Sconce
Cc:Felt, Chris; Cruce, Greg
Subject:RE: [EXTERNAL]FW: PD - False Alarms
Hi Cindy,
Yes, including Chris, our Fleet Supervisor, and Greg, our Maintenance Operations Deputy Director about fleet
charging for PD.
Thanks!
Rebecca Bernstorff
pronouns she/her/hers
Business Services and Administrative Manager
Administration – Community Services Group
E rbernstorff@slocity.org
T 805.781.7203
C 805.540.0219
slocity.org
Stay connected with the City by signing up for e-notifications
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Monday, September 18, 2023 4:45 PM
To: Bernstorff, Rebecca <rbernstorff@slocity.org>
Subject: FW: [EXTERNAL]FW: PD - False Alarms
Hi Rebecca
Melissa from Police is asking about vehicle maintenance charges so they can apply costs to their false alarm permits. Does fleet
charge their costs out to the departments? Based on what Melissa is saying below, it doesn’t sound like the Police department
gets charged directly. Do you have a contact over in Fleet that I can ask whether they have a calculated per vehicle cost for
Police?
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Monday, September 18, 2023 3:59 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: RE: [EXTERNAL]FW: PD - False Alarms
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
706
The police department doesn’t budget for vehicle maintenance costs, all of that is in Fleet’s budget (Public Works).
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Monday, September 18, 2023 3:38 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: RE: [EXTERNAL]FW: PD - False Alarms
Hi Melissa
Which line item on the ICRP would include your vehicle maintenance costs? It looks like fuel is currently being listed under the
indirect column so that is part of the overhead costs already. This cost could be pulled out and placed as direct and we could
develop an addiƟonal direct charge to apply to the false alarms if we think that would be beneficial.
You are correct, we did already incorporate the 20% vendor costs into the fee. We did not include the False Alarm #1 or #2.
Let me know about the vehicle maintenance costs and whether you would like to keep these costs as indirect, which adds to the
overhead, or as direct so that it can be directly applied to the false alarm fees.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Monday, September 18, 2023 2:17 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: RE: [EXTERNAL]FW: PD - False Alarms
Hello,
I took a look at this document and updated some information that you were looking for under the ICRP tab. Also,
wanted to ask if the costs for us to respond to a false alarm can also included vehicle related costs like maintenance
and fuel costs as well (looks like you already added the 20% vendor fee)? Also, should the fee incorporate costs from
False Alarms #1 and #2 that are not charged?
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Wednesday, September 13, 2023 10:22 AM
To: Ellsworth, Melissa <mellswor@slocity.org>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: RE: [EXTERNAL]FW: PD - False Alarms
Ok, done. I also added the language within a twelve month period to the false alarms.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Wednesday, September 13, 2023 10:04 AM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: [EXTERNAL]FW: PD - False Alarms
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
707
Hi Cindy,
Hope all is well. Just getting back to you on the False Alarm fees for PD. After consulting with our Attorney’s office,
they are recommending that we calculate the fees based on a cost recovery model. Please see her comments below.
Additionally, based on the information that Rachel provided from other agencies - I reached out to Monterey, Santa
Barbara, Ventura and SLO County to find out how their fees were calculated. I only heard back from two agencies;
one had no idea how their fees were calculated and the other was time based/cost recovery.
Let me know if you still need additional information. If you can update the matrix and send it to me again so I can
review, that would be appreciated!
Thanks,
Melissa
From: Symens, Sadie <ssymens@slocity.org>
Sent: Wednesday, September 13, 2023 9:45 AM
To: Ellsworth, Melissa <mellswor@slocity.org>; Bernstorff, Rebecca <rbernstorff@slocity.org>
Subject: RE: PD - False Alarms
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Wednesday, September 13, 2023 8:38 AM
To: Symens, Sadie <ssymens@slocity.org>
Subject: RE: PD - False Alarms
.
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
08
From: Symens, Sadie <ssymens@slocity.org>
Sent: Tuesday, September 12, 2023 1:48 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Subject: RE: PD - False Alarms
Sadie Symens
pronouns she/her/hers
Deputy City Attorney
City Attorney's Office
E ssymens@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
The information contained in this e-mail message is intended only for the CONFIDENTIAL use of the
designated addressee named above. The information transmitted is subject to the attorney-client privilege
and/or represents confidential attorney work product. Recipients should not file copies of this email with
publicly accessible records. If you are not the designated addressee named above or the authorized agent
responsible for delivering it to the designated addressee, you received this document through inadvertent
709
error and any further review, dissemination, distribution or copying of this communication by you or anyone
else is strictly prohibited. IF YOU RECEIVED THIS COMMUNICATION IN ERROR, PLEASE NOTIFY US
IMMEDIATELY BY TELEPHONING THE SENDER NAMED ABOVE AT (805) 781-7140. Thank you.
From: Kersten, Markie <mkersten@slocity.org>
Sent: Friday, September 8, 2023 4:08 PM
To: Bernstorff, Rebecca <rbernstorff@slocity.org>; Ellsworth, Melissa <mellswor@slocity.org>
Cc: Symens, Sadie <ssymens@slocity.org>
Subject: RE: PD - False Alarms
Hi Rebecca and Melissa,
I’m looping Sadie in who can take a look at this next week.
Thanks,
Markie
From: Bernstorff, Rebecca <rbernstorff@slocity.org>
Sent: Friday, September 8, 2023 3:09 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Cc: Kersten, Markie <mkersten@slocity.org>
Subject: RE: PD - False Alarms
Hi Melissa,
Thanks for touching base and for providing the context, I appreciate it and apologize for the delay in my reply. I can
see how it may be perceived more as a fine than a fee and why the approach to that may require some legal
perspective. I’m including Markie in to weigh in on if we should move forward with time-based cost analysis for false
alarms (which was my original thought) or if we should take a different approach based on any legalities to it?
The comparative analysis is interesting (attached so Markie could take a look) as it looks like the others may be doing
a flat fee approach.
I’m happy to defer to legal/PD expertise on the best path forward.
Thanks!
Rebecca
Rebecca Bernstorff
pronouns she/her/hers
Business Services and Administrative Manager
Administration – Community Services Group
E rbernstorff@slocity.org
T 805.781.7203
C 805.540.0219
slocity.org
Stay connected with the City by signing up for e-notifications
710
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Thursday, August 31, 2023 4:07 PM
To: Bernstorff, Rebecca <rbernstorff@slocity.org>
Subject: PD - False Alarms
Hi Rebecca,
I just wanted to follow up with you on PD’s False Alarm analysis. The reason why I’m a little confused on this is
because the last Fee Study (2015/16 time frame) indicated the consultant didn’t change any of the excessive alarm
fees because they were “punitive” in nature. All I really want to know is whether or not we can adjust those and if the
reason that was given in 2015/16 still stands or if Christine D. has other thoughts.
We have the time calculations for responding to these false alarms, so that’s not an issue. I asked Cindy Sconce
about this and she really didn’t have an answer. When these fees were actually created back before my time (like in
2005), they were time based so I’m not sure why the consultant didn’t analyze them last time.
At this time, is your recommendation to just have MGT move forward with the time based cost analysis for the false
alarms?
As reference, I’ve included a screenshot from the 2015/16 fee study, specifically the Alarm Fees and notes, which are
also in the attached document.
711
Thanks for your help,
Melissa
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Wednesday, August 30, 2023 4:34 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
Melissa
I did find this in one of my other emails from Rebecca:
In regard to the police fee schedule I think including it in the comparison survey would be really helpful. I can also
include this caveat in my email to the Leadership Team.
We can include it in the comparison survey and see what other agencies are charging for these.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Wednesday, August 30, 2023 3:06 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Subject: FW: [EXTERNAL]RE: SLO UF: Police - revised model
Hi Cindy,
Just checking in to see if you were able to connect with Rebecca yet so we can figure out next steps on the Alarm and
Tobacco fees.
Thanks,
Melissa
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
712
From: Ellsworth, Melissa
Sent: Wednesday, August 23, 2023 3:24 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
Great, thank you
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Wednesday, August 23, 2023 3:15 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
You got it. Let me talk to her first and then circle back with you. I also am going to walk her through the Tobacco fee based on
your other email.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Wednesday, August 23, 2023 3:14 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
Yes, please discuss with Rebecca and then let me know. I just want everyone to be on the same page. Thank you!
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Wednesday, August 23, 2023 3:11 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
I’m happy to jump on a meeƟng with them if you think that would be helpful. It really is about how they view these fees and
them agreeing that as a penalty they can change it to what is reasonable as a deterrent.
Let me know what you decide. I can also run this by Rebecca and see how she wants to approach this if you think that would be
beƩer.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Wednesday, August 23, 2023 3:04 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Subject: [EXTERNAL]RE: SLO UF: Police - revised model
Cindy – do you think it would be best if you were part of this meeting as well? Let me know.
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Tuesday, August 22, 2023 11:13 AM
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
713
To: Ellsworth, Melissa <mellswor@slocity.org>
Subject: SLO UF: Police - revised model
This message is from an External Source. Use caution when deciding to open attachments, click links, or respond.
Melissa
Here is the updated model with the 20% added to the alarm permit and false alarm costs.
Let me know when you have spoken with the Chief and AƩorney and how you want to proceed with those fees.
Thanks!
Cindy Sconce (she/her/hers)
Director, Performance Solutions Group
3600 American River Drive, Suite 150
Sacramento, CA 95864
Cell: 916.276.8807
Email: csconce@mgtconsulting.com
The information contained in this electronic communication is intended only for the use of the addressee, and may be
a confidential communication. If you are not the intended recipient, you are hereby notified that you have received this
transmittal in error; any review, dissemination, distribution, or copying of this transmittal is strictly prohibited.
714
From:Cindy Sconce <CSconce@mgtconsulting.com>
Sent:Monday, September 18, 2023 4:45 PM
To:Bernstorff, Rebecca
Subject:FW: [EXTERNAL]FW: PD - False Alarms
Hi Rebecca
Melissa from Police is asking about vehicle maintenance charges so they can apply costs to their false alarm permits. Does fleet
charge their costs out to the departments? Based on what Melissa is saying below, it doesn’t sound like the Police department
gets charged directly. Do you have a contact over in Fleet that I can ask whether they have a calculated per vehicle cost for
Police?
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Monday, September 18, 2023 3:59 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: RE: [EXTERNAL]FW: PD - False Alarms
The police department doesn’t budget for vehicle maintenance costs, all of that is in Fleet’s budget (Public Works).
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Monday, September 18, 2023 3:38 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: RE: [EXTERNAL]FW: PD - False Alarms
Hi Melissa
Which line item on the ICRP would include your vehicle maintenance costs? It looks like fuel is currently being listed under the
indirect column so that is part of the overhead costs already. This cost could be pulled out and placed as direct and we could
develop an addiƟonal direct charge to apply to the false alarms if we think that would be beneficial.
You are correct, we did already incorporate the 20% vendor costs into the fee. We did not include the False Alarm #1 or #2.
Let me know about the vehicle maintenance costs and whether you would like to keep these costs as indirect, which adds to the
overhead, or as direct so that it can be directly applied to the false alarm fees.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Monday, September 18, 2023 2:17 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: RE: [EXTERNAL]FW: PD - False Alarms
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
16
.
From: Symens, Sadie <ssymens@slocity.org>
Sent: Tuesday, September 12, 2023 1:48 PM
717
To: Ellsworth, Melissa <mellswor@slocity.org>
Subject: RE: PD - False Alarms
Sadie Symens
pronouns she/her/hers
Deputy City Attorney
City Attorney's Office
E ssymens@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
The information contained in this e-mail message is intended only for the CONFIDENTIAL use of the
designated addressee named above. The information transmitted is subject to the attorney-client privilege
and/or represents confidential attorney work product. Recipients should not file copies of this email with
publicly accessible records. If you are not the designated addressee named above or the authorized agent
responsible for delivering it to the designated addressee, you received this document through inadvertent
error and any further review, dissemination, distribution or copying of this communication by you or anyone
else is strictly prohibited. IF YOU RECEIVED THIS COMMUNICATION IN ERROR, PLEASE NOTIFY US
IMMEDIATELY BY TELEPHONING THE SENDER NAMED ABOVE AT (805) 781-7140. Thank you.
From: Kersten, Markie <mkersten@slocity.org>
Sent: Friday, September 8, 2023 4:08 PM
To: Bernstorff, Rebecca <rbernstorff@slocity.org>; Ellsworth, Melissa <mellswor@slocity.org>
Cc: Symens, Sadie <ssymens@slocity.org>
Subject: RE: PD - False Alarms
Hi Rebecca and Melissa,
I’m looping Sadie in who can take a look at this next week.
Thanks,
Markie
From: Bernstorff, Rebecca <rbernstorff@slocity.org>
Sent: Friday, September 8, 2023 3:09 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Cc: Kersten, Markie <mkersten@slocity.org>
Subject: RE: PD - False Alarms
718
Hi Melissa,
Thanks for touching base and for providing the context, I appreciate it and apologize for the delay in my reply. I can
see how it may be perceived more as a fine than a fee and why the approach to that may require some legal
perspective. I’m including Markie in to weigh in on if we should move forward with time-based cost analysis for false
alarms (which was my original thought) or if we should take a different approach based on any legalities to it?
The comparative analysis is interesting (attached so Markie could take a look) as it looks like the others may be doing
a flat fee approach.
I’m happy to defer to legal/PD expertise on the best path forward.
Thanks!
Rebecca
Rebecca Bernstorff
pronouns she/her/hers
Business Services and Administrative Manager
Administration – Community Services Group
E rbernstorff@slocity.org
T 805.781.7203
C 805.540.0219
slocity.org
Stay connected with the City by signing up for e-notifications
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Thursday, August 31, 2023 4:07 PM
To: Bernstorff, Rebecca <rbernstorff@slocity.org>
Subject: PD - False Alarms
Hi Rebecca,
I just wanted to follow up with you on PD’s False Alarm analysis. The reason why I’m a little confused on this is
because the last Fee Study (2015/16 time frame) indicated the consultant didn’t change any of the excessive alarm
fees because they were “punitive” in nature. All I really want to know is whether or not we can adjust those and if the
reason that was given in 2015/16 still stands or if Christine D. has other thoughts.
We have the time calculations for responding to these false alarms, so that’s not an issue. I asked Cindy Sconce
about this and she really didn’t have an answer. When these fees were actually created back before my time (like in
2005), they were time based so I’m not sure why the consultant didn’t analyze them last time.
At this time, is your recommendation to just have MGT move forward with the time based cost analysis for the false
alarms?
As reference, I’ve included a screenshot from the 2015/16 fee study, specifically the Alarm Fees and notes, which are
also in the attached document.
719
Thanks for your help,
Melissa
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Wednesday, August 30, 2023 4:34 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
Melissa
I did find this in one of my other emails from Rebecca:
720
In regard to the police fee schedule I think including it in the comparison survey would be really helpful. I can also
include this caveat in my email to the Leadership Team.
We can include it in the comparison survey and see what other agencies are charging for these.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Wednesday, August 30, 2023 3:06 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Subject: FW: [EXTERNAL]RE: SLO UF: Police - revised model
Hi Cindy,
Just checking in to see if you were able to connect with Rebecca yet so we can figure out next steps on the Alarm and
Tobacco fees.
Thanks,
Melissa
From: Ellsworth, Melissa
Sent: Wednesday, August 23, 2023 3:24 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
Great, thank you
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Wednesday, August 23, 2023 3:15 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
You got it. Let me talk to her first and then circle back with you. I also am going to walk her through the Tobacco fee based on
your other email.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Wednesday, August 23, 2023 3:14 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
Yes, please discuss with Rebecca and then let me know. I just want everyone to be on the same page. Thank you!
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Wednesday, August 23, 2023 3:11 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
721
I’m happy to jump on a meeƟng with them if you think that would be helpful. It really is about how they view these fees and
them agreeing that as a penalty they can change it to what is reasonable as a deterrent.
Let me know what you decide. I can also run this by Rebecca and see how she wants to approach this if you think that would be
beƩer.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Wednesday, August 23, 2023 3:04 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Subject: [EXTERNAL]RE: SLO UF: Police - revised model
Cindy – do you think it would be best if you were part of this meeting as well? Let me know.
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Tuesday, August 22, 2023 11:13 AM
To: Ellsworth, Melissa <mellswor@slocity.org>
Subject: SLO UF: Police - revised model
This message is from an External Source. Use caution when deciding to open attachments, click links, or respond.
Melissa
Here is the updated model with the 20% added to the alarm permit and false alarm costs.
Let me know when you have spoken with the Chief and AƩorney and how you want to proceed with those fees.
Thanks!
Cindy Sconce (she/her/hers)
Director, Performance Solutions Group
3600 American River Drive, Suite 150
Sacramento, CA 95864
Cell: 916.276.8807
Email: csconce@mgtconsulting.com
The information contained in this electronic communication is intended only for the use of the addressee, and may be
a confidential communication. If you are not the intended recipient, you are hereby notified that you have received this
transmittal in error; any review, dissemination, distribution, or copying of this transmittal is strictly prohibited.
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
722
From:Cindy Sconce <CSconce@mgtconsulting.com>
Sent:Monday, September 18, 2023 4:41 PM
To:Ellsworth, Melissa
Cc:Rachel King
Subject:RE: [EXTERNAL]FW: PD - False Alarms
Ok, let me ask Rebecca about Fleet charges then.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Monday, September 18, 2023 3:59 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: RE: [EXTERNAL]FW: PD - False Alarms
The police department doesn’t budget for vehicle maintenance costs, all of that is in Fleet’s budget (Public Works).
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Monday, September 18, 2023 3:38 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: RE: [EXTERNAL]FW: PD - False Alarms
Hi Melissa
Which line item on the ICRP would include your vehicle maintenance costs? It looks like fuel is currently being listed under the
indirect column so that is part of the overhead costs already. This cost could be pulled out and placed as direct and we could
develop an addiƟonal direct charge to apply to the false alarms if we think that would be beneficial.
You are correct, we did already incorporate the 20% vendor costs into the fee. We did not include the False Alarm #1 or #2.
Let me know about the vehicle maintenance costs and whether you would like to keep these costs as indirect, which adds to the
overhead, or as direct so that it can be directly applied to the false alarm fees.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Monday, September 18, 2023 2:17 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: RE: [EXTERNAL]FW: PD - False Alarms
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
723
Hello,
I took a look at this document and updated some information that you were looking for under the ICRP tab. Also,
wanted to ask if the costs for us to respond to a false alarm can also included vehicle related costs like maintenance
and fuel costs as well (looks like you already added the 20% vendor fee)? Also, should the fee incorporate costs from
False Alarms #1 and #2 that are not charged?
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Wednesday, September 13, 2023 10:22 AM
To: Ellsworth, Melissa <mellswor@slocity.org>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: RE: [EXTERNAL]FW: PD - False Alarms
Ok, done. I also added the language within a twelve month period to the false alarms.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Wednesday, September 13, 2023 10:04 AM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: [EXTERNAL]FW: PD - False Alarms
Hi Cindy,
Hope all is well. Just getting back to you on the False Alarm fees for PD. After consulting with our Attorney’s office,
they are recommending that we calculate the fees based on a cost recovery model. Please see her comments below.
Additionally, based on the information that Rachel provided from other agencies - I reached out to Monterey, Santa
Barbara, Ventura and SLO County to find out how their fees were calculated. I only heard back from two agencies;
one had no idea how their fees were calculated and the other was time based/cost recovery.
Let me know if you still need additional information. If you can update the matrix and send it to me again so I can
review, that would be appreciated!
Thanks,
Melissa
From: Symens, Sadie <ssymens@slocity.org>
Sent: Wednesday, September 13, 2023 9:45 AM
To: Ellsworth, Melissa <mellswor@slocity.org>; Bernstorff, Rebecca <rbernstorff@slocity.org>
Subject: RE: PD - False Alarms
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
725
Sadie Symens
pronouns she/her/hers
Deputy City Attorney
City Attorney's Office
E ssymens@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
The information contained in this e-mail message is intended only for the CONFIDENTIAL use of the
designated addressee named above. The information transmitted is subject to the attorney-client privilege
and/or represents confidential attorney work product. Recipients should not file copies of this email with
publicly accessible records. If you are not the designated addressee named above or the authorized agent
responsible for delivering it to the designated addressee, you received this document through inadvertent
error and any further review, dissemination, distribution or copying of this communication by you or anyone
else is strictly prohibited. IF YOU RECEIVED THIS COMMUNICATION IN ERROR, PLEASE NOTIFY US
IMMEDIATELY BY TELEPHONING THE SENDER NAMED ABOVE AT (805) 781-7140. Thank you.
From: Kersten, Markie <mkersten@slocity.org>
Sent: Friday, September 8, 2023 4:08 PM
To: Bernstorff, Rebecca <rbernstorff@slocity.org>; Ellsworth, Melissa <mellswor@slocity.org>
Cc: Symens, Sadie <ssymens@slocity.org>
Subject: RE: PD - False Alarms
Hi Rebecca and Melissa,
I’m looping Sadie in who can take a look at this next week.
Thanks,
Markie
From: Bernstorff, Rebecca <rbernstorff@slocity.org>
Sent: Friday, September 8, 2023 3:09 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Cc: Kersten, Markie <mkersten@slocity.org>
Subject: RE: PD - False Alarms
Hi Melissa,
Thanks for touching base and for providing the context, I appreciate it and apologize for the delay in my reply. I can
see how it may be perceived more as a fine than a fee and why the approach to that may require some legal
726
perspective. I’m including Markie in to weigh in on if we should move forward with time-based cost analysis for false
alarms (which was my original thought) or if we should take a different approach based on any legalities to it?
The comparative analysis is interesting (attached so Markie could take a look) as it looks like the others may be doing
a flat fee approach.
I’m happy to defer to legal/PD expertise on the best path forward.
Thanks!
Rebecca
Rebecca Bernstorff
pronouns she/her/hers
Business Services and Administrative Manager
Administration – Community Services Group
E rbernstorff@slocity.org
T 805.781.7203
C 805.540.0219
slocity.org
Stay connected with the City by signing up for e-notifications
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Thursday, August 31, 2023 4:07 PM
To: Bernstorff, Rebecca <rbernstorff@slocity.org>
Subject: PD - False Alarms
Hi Rebecca,
I just wanted to follow up with you on PD’s False Alarm analysis. The reason why I’m a little confused on this is
because the last Fee Study (2015/16 time frame) indicated the consultant didn’t change any of the excessive alarm
fees because they were “punitive” in nature. All I really want to know is whether or not we can adjust those and if the
reason that was given in 2015/16 still stands or if Christine D. has other thoughts.
We have the time calculations for responding to these false alarms, so that’s not an issue. I asked Cindy Sconce
about this and she really didn’t have an answer. When these fees were actually created back before my time (like in
2005), they were time based so I’m not sure why the consultant didn’t analyze them last time.
At this time, is your recommendation to just have MGT move forward with the time based cost analysis for the false
alarms?
As reference, I’ve included a screenshot from the 2015/16 fee study, specifically the Alarm Fees and notes, which are
also in the attached document.
727
Thanks for your help,
Melissa
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Wednesday, August 30, 2023 4:34 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
Melissa
I did find this in one of my other emails from Rebecca:
728
In regard to the police fee schedule I think including it in the comparison survey would be really helpful. I can also
include this caveat in my email to the Leadership Team.
We can include it in the comparison survey and see what other agencies are charging for these.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Wednesday, August 30, 2023 3:06 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Subject: FW: [EXTERNAL]RE: SLO UF: Police - revised model
Hi Cindy,
Just checking in to see if you were able to connect with Rebecca yet so we can figure out next steps on the Alarm and
Tobacco fees.
Thanks,
Melissa
From: Ellsworth, Melissa
Sent: Wednesday, August 23, 2023 3:24 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
Great, thank you
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Wednesday, August 23, 2023 3:15 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
You got it. Let me talk to her first and then circle back with you. I also am going to walk her through the Tobacco fee based on
your other email.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Wednesday, August 23, 2023 3:14 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
Yes, please discuss with Rebecca and then let me know. I just want everyone to be on the same page. Thank you!
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Wednesday, August 23, 2023 3:11 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
729
I’m happy to jump on a meeƟng with them if you think that would be helpful. It really is about how they view these fees and
them agreeing that as a penalty they can change it to what is reasonable as a deterrent.
Let me know what you decide. I can also run this by Rebecca and see how she wants to approach this if you think that would be
beƩer.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Wednesday, August 23, 2023 3:04 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Subject: [EXTERNAL]RE: SLO UF: Police - revised model
Cindy – do you think it would be best if you were part of this meeting as well? Let me know.
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Tuesday, August 22, 2023 11:13 AM
To: Ellsworth, Melissa <mellswor@slocity.org>
Subject: SLO UF: Police - revised model
This message is from an External Source. Use caution when deciding to open attachments, click links, or respond.
Melissa
Here is the updated model with the 20% added to the alarm permit and false alarm costs.
Let me know when you have spoken with the Chief and AƩorney and how you want to proceed with those fees.
Thanks!
Cindy Sconce (she/her/hers)
Director, Performance Solutions Group
3600 American River Drive, Suite 150
Sacramento, CA 95864
Cell: 916.276.8807
Email: csconce@mgtconsulting.com
The information contained in this electronic communication is intended only for the use of the addressee, and may be
a confidential communication. If you are not the intended recipient, you are hereby notified that you have received this
transmittal in error; any review, dissemination, distribution, or copying of this transmittal is strictly prohibited.
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
730
From:Kazemi, Neema
Sent:Monday, September 18, 2023 4:33 PM
To:Taylor, Brent; Bernstorff, Rebecca; Nichols, Vanessa
Subject:RE: Building Permit Report (adding # of units)
I’m not sure what else can be done on my end, garbage in equals garbage out. If no one is entering the fields, we
can’t pull information on fields that haven’t been filled.
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Monday, September 18, 2023 4:29 PM
To: Kazemi, Neema <nkazemi@slocity.org>; Bernstorff, Rebecca <rbernstorff@slocity.org>; Nichols, Vanessa
<vnichols@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hi Neema – unfortunately, this data is not providing what we are looking for. Still seeing 4023 permits on this report
with no square footages listed and other fields provided to try and capture the missing data is either “0” or “NULL” or
just not usable as the figure provided does not seem to make sense in context of what we are seeking.
I would expect some of the work classes to have zero square foot such as the ones below, but that is only accounting
for 337 of the 4023 permits with 0 listed.
- Block/ retaining wall
- Re-Roof
- Foundation only
- Alt/Addition where property owner added no sq footage (those would have to be manually sorted through to
determine if sq ft was added)
Not seeing a way to use these alternate fields on this report to capture the square footage data that is being
requested.
Brent Taylor
pronouns he/him/his
Financial Analyst
731
Community Services Group
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema <nkazemi@slocity.org>
Sent: Monday, September 18, 2023 11:01 AM
To: Bernstorff, Rebecca <rbernstorff@slocity.org>; Taylor, Brent <btaylor@slocity.org>; Nichols, Vanessa <vnichols@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hi Brent,
This report should have everything you’ve requested from that tab. The database names are relatively straight forward
so let me know if you have any trouble associating a field name to the additional info field on the permit.
Let me know if I need to add anything else.
Best,
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema
Sent: Monday, September 18, 2023 8:04 AM
To: Bernstorff, Rebecca <rbernstorff@slocity.org>; Taylor, Brent <BTaylor@slocity.org>; Nichols, Vanessa <vnichols@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Good morning,
I’ll update the fields of the report and have it sent over by this afternoon.
Best,
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
732
Stay connected with the City by signing up for e-notifications
From: Bernstorff, Rebecca <rbernstorff@slocity.org>
Sent: Thursday, September 14, 2023 4:43 PM
To: Taylor, Brent <btaylor@slocity.org>; Nichols, Vanessa <vnichols@slocity.org>; Kazemi, Neema <nkazemi@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Importance: High
Hi Neema,
Just following up on this request. I think it’s also going to help make progress in the user fee side of the fee study as
well, so we are really excited to get this report!
Thanks so much!
Rebecca
Rebecca Bernstorff
pronouns she/her/hers
Business Services and Administrative Manager
Administration – Community Services Group
E rbernstorff@slocity.org
T 805.781.7203
C 805.540.0219
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Monday, September 11, 2023 4:49 PM
To: Nichols, Vanessa <vnichols@slocity.org>; Bernstorff, Rebecca <rbernstorff@slocity.org>; Kazemi, Neema
<nkazemi@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
@Kazemi, Neema, can we try the report based on Vanessa’s suggestions below. I think everything is same as you
previously pulled, except for the square footage data which Vanessa indicated can be pulled from the Square Feet tab
under Additional Info. Screenshot below…
733
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
From: Nichols, Vanessa <vnichols@slocity.org>
Sent: Monday, September 11, 2023 3:17 PM
To: Taylor, Brent <btaylor@slocity.org>; Bernstorff, Rebecca <rbernstorff@slocity.org>; Kazemi, Neema <nkazemi@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hi,
734
So, yes you can pull the square footages from the square footage tab which also has it by construction type. The
Number of Units would come from the Dwelling Units field on the general tab. Permit Number, Issue Date and Work
Class are just fields to add to report. You will have to do the average of square footage after you get number of units
and total square footage. Happy to help by showing which fields I am referencing. Let me know if you have any other
questions.
Vanessa Nichols
Building Permit Services Supervisor
Community Development
919 Palm Street, San Luis Obispo, CA 93401-3218
E vnichols@slocity.org
T 805.781.7588
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Monday, September 11, 2023 8:14 AM
To: Nichols, Vanessa <vnichols@slocity.org>; Bernstorff, Rebecca <rbernstorff@slocity.org>; Kazemi, Neema
<nkazemi@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hi Vanessa –
Thanks for the clarification and information. The data that we are trying to gather for impact fee consultant is:
ALL Permits in last 5 years (1/1/2018 – current). Data points for those permits need to include the following:
- Permit Number
- Issue Date
- Type of Construction/ Work Class (SFR, MFR, Commercial, etc)
- Square Footage
- Number of Units
- Multifamily Permits – Average Square Footage per unit
Final data point for the Multifamily properties is to calculate the average sq ft of each unit, so will need to manually
apply calculation (square footage/ # of units) to produce the average for those.
The issue we are having with the reports that Neema helped generate is that for a lot of the Multifamily units, the
square footage is “0” and therefore unable to calculate the average square footage per unit.
Any ideas or suggestions on alternate fields from Energov that we could try in capturing this data would be
appreciated as we are currently unable to provide the data needed to calculate impact fees.
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
735
slocity.org
Stay connected with the City by signing up for e-notifications
From: Nichols, Vanessa <vnichols@slocity.org>
Sent: Friday, September 8, 2023 8:14 AM
To: Bernstorff, Rebecca <rbernstorff@slocity.org>; Kazemi, Neema <nkazemi@slocity.org>; Taylor, Brent <btaylor@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hi Rebecca,
Currently I would say most of our impact fees are based off square footages. The only ones that I can think of that
aren’t are Park Improvement, Park Impact, Fire Citywide, Police Citywide and the Transportation add-on fees for
specific areas, which are all on per unit basis. Commercial Water/Wastewater Impact fee is based off Water Meter
size currently.
Square footages are captured in several different areas in Energov. It depends on the data you are trying to obtain as
to where the square footages should be pulled from. The square footage field located in “Detail” workflow tab is one
area that square footage is captured and if appropriate for scope of work we do try to make sure this square footage
field is completed. I would say that this field is completed most of the time (there was a window of time when this field
was not keeping the data). All the fees are calculated on the back end but for fees to populate a manual input must
happen. The square footage field is not connected to fee generation, so by human error it can be missed. However,
only for new single-family residences would this square footage field generate accurate information. If you ran a report
for only single-family residence and included permit number and this square footage field any that produced zero in
the square footage field on the report could be easily corrected so report was complete. Pulling square footage from
this field for Mixed-Use and Multi-Family projects is not as straightforward as residence and commercial square
footages are combined.
We also currently capture square footages (in ranges) through the Water, Wastewater and Transportation Citywide
impact fees that are charged. You could get number of units, by workclass within each square footage
range. Commercial impact fees can be capture through square footage inputs by type on the Transportation tab and
the water meter sizes under the Water/Wastewater tab under Commercial.
I do believe we have square footage inputs in Energov that would be helpful in your information gathering. I am happy
to assistance in figuring out the best avenue of getting the information you are seeking out of Energov. Nothing about
Energov or our current fee is straightforward.
Hope this long explanation was at least a little helpful!
Vanessa Nichols
Building Permit Services Supervisor
Community Development
919 Palm Street, San Luis Obispo, CA 93401-3218
E vnichols@slocity.org
T 805.781.7588
slocity.org
Stay connected with the City by signing up for e-notifications
From: Bernstorff, Rebecca <rbernstorff@slocity.org>
Sent: Thursday, September 7, 2023 10:25 AM
To: Kazemi, Neema <nkazemi@slocity.org>; Taylor, Brent <btaylor@slocity.org>
736
Cc: Nichols, Vanessa <vnichols@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Thanks for stopping by earlier this week, Vanessa.
Talking through with Brent I now recall why sqft is something we need to capture, and may not have been capturing
before because we usually only care about units.
As a part of the Fee Study, we are working to be in compliance with AB 602, a new law requiring that nexus studies
adopted after July 1, 2022 must calculate the amount of fees based on square footage of proposed units of the
housing development project.
Is this sqft info something that we have been inputting into Energov? If not, I totally understand why but wondering
if/how we do capture that data going forward…
Rebecca Bernstorff
pronouns she/her/hers
Business Services and Administrative Manager
Administration – Community Services Group
E rbernstorff@slocity.org
T 805.781.7203
C 805.540.0219
slocity.org
Stay connected with the City by signing up for e-notifications
From: Bernstorff, Rebecca
Sent: Tuesday, August 29, 2023 10:27 AM
To: Kazemi, Neema <nkazemi@slocity.org>; Taylor, Brent <BTaylor@slocity.org>
Cc: Nichols, Vanessa <vnichols@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Thanks for pulling this together, Neema. Why would 0 be getting put in? I’m having a hard time following why this
would happen and how we get the data to the fee study consultant when it now doesn’t exist in Energov?
In the future, can we have this field be required to include the sqft at the time of adding in the permit to Energov??
Such as a mandatory number that can’t be 0?
Rebecca Bernstorff
pronouns she/her/hers
Business Services and Administrative Manager
737
Administration – Community Services Group
E rbernstorff@slocity.org
T 805.781.7203
C 805.540.0219
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema <nkazemi@slocity.org>
Sent: Tuesday, August 29, 2023 9:12 AM
To: Taylor, Brent <btaylor@slocity.org>
Cc: Bernstorff, Rebecca <rbernstorff@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hi Brent,
This report has the added School fee square footage listed as SQFTInfoNewResidential and
SQFTInfoNewCommercial.
If anything, it just creates more questions. But, let me know if that helps!
Best,
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Monday, August 28, 2023 9:03 AM
To: Kazemi, Neema <nkazemi@slocity.org>
Cc: Bernstorff, Rebecca <rbernstorff@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Issue date looks good now but questioning the Sq Ft field again. I see lots of “0” listed. Even on Multifamily where
there is 13 units, still showing 0 sq footage. I checked a few permits and square footage is not input to the “Details”
screen, but is showing on the “additional details” screen under school fees section. This is what I was talking about
before, where the square footage is not consistently input to the details screen and not capturing the data needed. I
see it on all types of permits – multifamily, SFR, etc. Example below.
738
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
739
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema <nkazemi@slocity.org>
Sent: Monday, August 28, 2023 8:38 AM
To: Taylor, Brent <btaylor@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Sorry, forgot to format on excel after exporting. This should be better!
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Monday, August 28, 2023 8:32 AM
To: Kazemi, Neema <nkazemi@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hi Neema, the issue date is not pulling correctly, can you fix that? Otherwise looks good.
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema <nkazemi@slocity.org>
Sent: Monday, August 28, 2023 8:25 AM
To: Taylor, Brent <btaylor@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hey Brent,
Try this out!
Best,
740
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Wednesday, August 23, 2023 4:15 PM
To: Kazemi, Neema <nkazemi@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Importance: High
Hi Neema – can you please provide ETA for this report adding in the Dwelling Units (i.e. # of units for each permit).
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent
Sent: Monday, August 14, 2023 11:14 AM
To: Kazemi, Neema <nkazemi@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report
Hi Neema – our consultant is requesting additional field be added to this report.
Need to provide the number of units associated with each Permit. Thinking we can use the “Dwelling Units” field on
the Additional Info Screen to capture and add this to report you previously created.
Let me know if this is something we can do.
Thanks.
741
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema <nkazemi@slocity.org>
Sent: Wednesday, August 9, 2023 11:25 AM
To: Taylor, Brent <btaylor@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report
Hi Brent,
I did a quick audit of like ten permits with 0 sq footage and they were all for window retrofits or door replacements.
One was a commercial which was for a hood replacement. It looks like I misspoke, seems like our users in the front
are pretty good about entering square footage if its applicable.
Best,
Neema Kazemi
System Application Specialist - Energov
742
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema
Sent: Wednesday, August 9, 2023 9:37 AM
To: Taylor, Brent <BTaylor@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report
Permits have the SQ footage as a default field on the main details, so it totally depends on users filling it out during
input.
But, there may be SQ footage fields in the additional info that we may fill out as well. Let me see what we got!
Best.
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Wednesday, August 9, 2023 8:51 AM
To: Kazemi, Neema <nkazemi@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report
Hi Neema – no other data needed at this time.
Looks good as is, except the blank sq ft fields. Is there any other Sq Ft fields in Energov which we can try to see if it
will capture the ones showing 0 sq. ft.? I know it defaults to using this one, but front counter doesn’t always input to
that field.
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
743
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema <nkazemi@slocity.org>
Sent: Wednesday, August 9, 2023 8:14 AM
To: Taylor, Brent <btaylor@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report
Hi Brent,
Getting a report with those data points took a few minutes, but is there any fee data you’d like added? Or currently,
there is no address information either.
I can probably get this finished this morning. For now, the only filters I have are BLDG permit and issuedate after
1/1/2018.
Best,
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Wednesday, August 9, 2023 7:42 AM
To: Kazemi, Neema <nkazemi@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: Building Permit Report
Hi Neema, hoping you can help me with putting together a report out of Energov for data that is needed for the Impact
Fee Study project which will update our impact fee amounts.
Consultant is requesting a report on building permits for time range of 1/1/2018 – current. Main data points needed
are issue date, type of construction (SFR, MFR, etc) and the square footage.
This would be for building permits only.
Is this something you would be able to help me with? Would like to provide the report by Friday if possible.
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
744
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
745
From:Taylor, Brent
Sent:Monday, September 18, 2023 4:29 PM
To:Kazemi, Neema; Bernstorff, Rebecca; Nichols, Vanessa
Subject:RE: Building Permit Report (adding # of units)
Hi Neema – unfortunately, this data is not providing what we are looking for. Still seeing 4023 permits on this report
with no square footages listed and other fields provided to try and capture the missing data is either “0” or “NULL” or
just not usable as the figure provided does not seem to make sense in context of what we are seeking.
I would expect some of the work classes to have zero square foot such as the ones below, but that is only accounting
for 337 of the 4023 permits with 0 listed.
- Block/ retaining wall
- Re-Roof
- Foundation only
- Alt/Addition where property owner added no sq footage (those would have to be manually sorted through to
determine if sq ft was added)
Not seeing a way to use these alternate fields on this report to capture the square footage data that is being
requested.
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema <nkazemi@slocity.org>
Sent: Monday, September 18, 2023 11:01 AM
To: Bernstorff, Rebecca <rbernstorff@slocity.org>; Taylor, Brent <btaylor@slocity.org>; Nichols, Vanessa <vnichols@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hi Brent,
This report should have everything you’ve requested from that tab. The database names are relatively straight forward
so let me know if you have any trouble associating a field name to the additional info field on the permit.
Let me know if I need to add anything else.
Best,
Neema Kazemi
System Application Specialist - Energov
746
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema
Sent: Monday, September 18, 2023 8:04 AM
To: Bernstorff, Rebecca <rbernstorff@slocity.org>; Taylor, Brent <BTaylor@slocity.org>; Nichols, Vanessa <vnichols@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Good morning,
I’ll update the fields of the report and have it sent over by this afternoon.
Best,
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Bernstorff, Rebecca <rbernstorff@slocity.org>
Sent: Thursday, September 14, 2023 4:43 PM
To: Taylor, Brent <btaylor@slocity.org>; Nichols, Vanessa <vnichols@slocity.org>; Kazemi, Neema <nkazemi@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Importance: High
Hi Neema,
Just following up on this request. I think it’s also going to help make progress in the user fee side of the fee study as
well, so we are really excited to get this report!
Thanks so much!
Rebecca
Rebecca Bernstorff
pronouns she/her/hers
Business Services and Administrative Manager
747
Administration – Community Services Group
E rbernstorff@slocity.org
T 805.781.7203
C 805.540.0219
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Monday, September 11, 2023 4:49 PM
To: Nichols, Vanessa <vnichols@slocity.org>; Bernstorff, Rebecca <rbernstorff@slocity.org>; Kazemi, Neema
<nkazemi@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
@Kazemi, Neema, can we try the report based on Vanessa’s suggestions below. I think everything is same as you
previously pulled, except for the square footage data which Vanessa indicated can be pulled from the Square Feet tab
under Additional Info. Screenshot below…
748
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
From: Nichols, Vanessa <vnichols@slocity.org>
Sent: Monday, September 11, 2023 3:17 PM
To: Taylor, Brent <btaylor@slocity.org>; Bernstorff, Rebecca <rbernstorff@slocity.org>; Kazemi, Neema <nkazemi@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hi,
749
So, yes you can pull the square footages from the square footage tab which also has it by construction type. The
Number of Units would come from the Dwelling Units field on the general tab. Permit Number, Issue Date and Work
Class are just fields to add to report. You will have to do the average of square footage after you get number of units
and total square footage. Happy to help by showing which fields I am referencing. Let me know if you have any other
questions.
Vanessa Nichols
Building Permit Services Supervisor
Community Development
919 Palm Street, San Luis Obispo, CA 93401-3218
E vnichols@slocity.org
T 805.781.7588
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Monday, September 11, 2023 8:14 AM
To: Nichols, Vanessa <vnichols@slocity.org>; Bernstorff, Rebecca <rbernstorff@slocity.org>; Kazemi, Neema
<nkazemi@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hi Vanessa –
Thanks for the clarification and information. The data that we are trying to gather for impact fee consultant is:
ALL Permits in last 5 years (1/1/2018 – current). Data points for those permits need to include the following:
- Permit Number
- Issue Date
- Type of Construction/ Work Class (SFR, MFR, Commercial, etc)
- Square Footage
- Number of Units
- Multifamily Permits – Average Square Footage per unit
Final data point for the Multifamily properties is to calculate the average sq ft of each unit, so will need to manually
apply calculation (square footage/ # of units) to produce the average for those.
The issue we are having with the reports that Neema helped generate is that for a lot of the Multifamily units, the
square footage is “0” and therefore unable to calculate the average square footage per unit.
Any ideas or suggestions on alternate fields from Energov that we could try in capturing this data would be
appreciated as we are currently unable to provide the data needed to calculate impact fees.
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
750
slocity.org
Stay connected with the City by signing up for e-notifications
From: Nichols, Vanessa <vnichols@slocity.org>
Sent: Friday, September 8, 2023 8:14 AM
To: Bernstorff, Rebecca <rbernstorff@slocity.org>; Kazemi, Neema <nkazemi@slocity.org>; Taylor, Brent <btaylor@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hi Rebecca,
Currently I would say most of our impact fees are based off square footages. The only ones that I can think of that
aren’t are Park Improvement, Park Impact, Fire Citywide, Police Citywide and the Transportation add-on fees for
specific areas, which are all on per unit basis. Commercial Water/Wastewater Impact fee is based off Water Meter
size currently.
Square footages are captured in several different areas in Energov. It depends on the data you are trying to obtain as
to where the square footages should be pulled from. The square footage field located in “Detail” workflow tab is one
area that square footage is captured and if appropriate for scope of work we do try to make sure this square footage
field is completed. I would say that this field is completed most of the time (there was a window of time when this field
was not keeping the data). All the fees are calculated on the back end but for fees to populate a manual input must
happen. The square footage field is not connected to fee generation, so by human error it can be missed. However,
only for new single-family residences would this square footage field generate accurate information. If you ran a report
for only single-family residence and included permit number and this square footage field any that produced zero in
the square footage field on the report could be easily corrected so report was complete. Pulling square footage from
this field for Mixed-Use and Multi-Family projects is not as straightforward as residence and commercial square
footages are combined.
We also currently capture square footages (in ranges) through the Water, Wastewater and Transportation Citywide
impact fees that are charged. You could get number of units, by workclass within each square footage
range. Commercial impact fees can be capture through square footage inputs by type on the Transportation tab and
the water meter sizes under the Water/Wastewater tab under Commercial.
I do believe we have square footage inputs in Energov that would be helpful in your information gathering. I am happy
to assistance in figuring out the best avenue of getting the information you are seeking out of Energov. Nothing about
Energov or our current fee is straightforward.
Hope this long explanation was at least a little helpful!
Vanessa Nichols
Building Permit Services Supervisor
Community Development
919 Palm Street, San Luis Obispo, CA 93401-3218
E vnichols@slocity.org
T 805.781.7588
slocity.org
Stay connected with the City by signing up for e-notifications
From: Bernstorff, Rebecca <rbernstorff@slocity.org>
Sent: Thursday, September 7, 2023 10:25 AM
To: Kazemi, Neema <nkazemi@slocity.org>; Taylor, Brent <btaylor@slocity.org>
751
Cc: Nichols, Vanessa <vnichols@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Thanks for stopping by earlier this week, Vanessa.
Talking through with Brent I now recall why sqft is something we need to capture, and may not have been capturing
before because we usually only care about units.
As a part of the Fee Study, we are working to be in compliance with AB 602, a new law requiring that nexus studies
adopted after July 1, 2022 must calculate the amount of fees based on square footage of proposed units of the
housing development project.
Is this sqft info something that we have been inputting into Energov? If not, I totally understand why but wondering
if/how we do capture that data going forward…
Rebecca Bernstorff
pronouns she/her/hers
Business Services and Administrative Manager
Administration – Community Services Group
E rbernstorff@slocity.org
T 805.781.7203
C 805.540.0219
slocity.org
Stay connected with the City by signing up for e-notifications
From: Bernstorff, Rebecca
Sent: Tuesday, August 29, 2023 10:27 AM
To: Kazemi, Neema <nkazemi@slocity.org>; Taylor, Brent <BTaylor@slocity.org>
Cc: Nichols, Vanessa <vnichols@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Thanks for pulling this together, Neema. Why would 0 be getting put in? I’m having a hard time following why this
would happen and how we get the data to the fee study consultant when it now doesn’t exist in Energov?
In the future, can we have this field be required to include the sqft at the time of adding in the permit to Energov??
Such as a mandatory number that can’t be 0?
Rebecca Bernstorff
pronouns she/her/hers
Business Services and Administrative Manager
752
Administration – Community Services Group
E rbernstorff@slocity.org
T 805.781.7203
C 805.540.0219
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema <nkazemi@slocity.org>
Sent: Tuesday, August 29, 2023 9:12 AM
To: Taylor, Brent <btaylor@slocity.org>
Cc: Bernstorff, Rebecca <rbernstorff@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hi Brent,
This report has the added School fee square footage listed as SQFTInfoNewResidential and
SQFTInfoNewCommercial.
If anything, it just creates more questions. But, let me know if that helps!
Best,
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Monday, August 28, 2023 9:03 AM
To: Kazemi, Neema <nkazemi@slocity.org>
Cc: Bernstorff, Rebecca <rbernstorff@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Issue date looks good now but questioning the Sq Ft field again. I see lots of “0” listed. Even on Multifamily where
there is 13 units, still showing 0 sq footage. I checked a few permits and square footage is not input to the “Details”
screen, but is showing on the “additional details” screen under school fees section. This is what I was talking about
before, where the square footage is not consistently input to the details screen and not capturing the data needed. I
see it on all types of permits – multifamily, SFR, etc. Example below.
753
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
754
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema <nkazemi@slocity.org>
Sent: Monday, August 28, 2023 8:38 AM
To: Taylor, Brent <btaylor@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Sorry, forgot to format on excel after exporting. This should be better!
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Monday, August 28, 2023 8:32 AM
To: Kazemi, Neema <nkazemi@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hi Neema, the issue date is not pulling correctly, can you fix that? Otherwise looks good.
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema <nkazemi@slocity.org>
Sent: Monday, August 28, 2023 8:25 AM
To: Taylor, Brent <btaylor@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hey Brent,
Try this out!
Best,
755
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Wednesday, August 23, 2023 4:15 PM
To: Kazemi, Neema <nkazemi@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Importance: High
Hi Neema – can you please provide ETA for this report adding in the Dwelling Units (i.e. # of units for each permit).
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent
Sent: Monday, August 14, 2023 11:14 AM
To: Kazemi, Neema <nkazemi@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report
Hi Neema – our consultant is requesting additional field be added to this report.
Need to provide the number of units associated with each Permit. Thinking we can use the “Dwelling Units” field on
the Additional Info Screen to capture and add this to report you previously created.
Let me know if this is something we can do.
Thanks.
756
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema <nkazemi@slocity.org>
Sent: Wednesday, August 9, 2023 11:25 AM
To: Taylor, Brent <btaylor@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report
Hi Brent,
I did a quick audit of like ten permits with 0 sq footage and they were all for window retrofits or door replacements.
One was a commercial which was for a hood replacement. It looks like I misspoke, seems like our users in the front
are pretty good about entering square footage if its applicable.
Best,
Neema Kazemi
System Application Specialist - Energov
757
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema
Sent: Wednesday, August 9, 2023 9:37 AM
To: Taylor, Brent <BTaylor@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report
Permits have the SQ footage as a default field on the main details, so it totally depends on users filling it out during
input.
But, there may be SQ footage fields in the additional info that we may fill out as well. Let me see what we got!
Best.
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Wednesday, August 9, 2023 8:51 AM
To: Kazemi, Neema <nkazemi@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report
Hi Neema – no other data needed at this time.
Looks good as is, except the blank sq ft fields. Is there any other Sq Ft fields in Energov which we can try to see if it
will capture the ones showing 0 sq. ft.? I know it defaults to using this one, but front counter doesn’t always input to
that field.
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
758
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema <nkazemi@slocity.org>
Sent: Wednesday, August 9, 2023 8:14 AM
To: Taylor, Brent <btaylor@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report
Hi Brent,
Getting a report with those data points took a few minutes, but is there any fee data you’d like added? Or currently,
there is no address information either.
I can probably get this finished this morning. For now, the only filters I have are BLDG permit and issuedate after
1/1/2018.
Best,
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Wednesday, August 9, 2023 7:42 AM
To: Kazemi, Neema <nkazemi@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: Building Permit Report
Hi Neema, hoping you can help me with putting together a report out of Energov for data that is needed for the Impact
Fee Study project which will update our impact fee amounts.
Consultant is requesting a report on building permits for time range of 1/1/2018 – current. Main data points needed
are issue date, type of construction (SFR, MFR, etc) and the square footage.
This would be for building permits only.
Is this something you would be able to help me with? Would like to provide the report by Friday if possible.
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
759
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
760
From:Ellsworth, Melissa
Sent:Monday, September 18, 2023 3:59 PM
To:Cindy Sconce
Cc:Rachel King
Subject:RE: [EXTERNAL]FW: PD - False Alarms
The police department doesn’t budget for vehicle maintenance costs, all of that is in Fleet’s budget (Public Works).
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Monday, September 18, 2023 3:38 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: RE: [EXTERNAL]FW: PD - False Alarms
Hi Melissa
Which line item on the ICRP would include your vehicle maintenance costs? It looks like fuel is currently being listed under the
indirect column so that is part of the overhead costs already. This cost could be pulled out and placed as direct and we could
develop an addiƟonal direct charge to apply to the false alarms if we think that would be beneficial.
You are correct, we did already incorporate the 20% vendor costs into the fee. We did not include the False Alarm #1 or #2.
Let me know about the vehicle maintenance costs and whether you would like to keep these costs as indirect, which adds to the
overhead, or as direct so that it can be directly applied to the false alarm fees.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Monday, September 18, 2023 2:17 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: RE: [EXTERNAL]FW: PD - False Alarms
Hello,
I took a look at this document and updated some information that you were looking for under the ICRP tab. Also,
wanted to ask if the costs for us to respond to a false alarm can also included vehicle related costs like maintenance
and fuel costs as well (looks like you already added the 20% vendor fee)? Also, should the fee incorporate costs from
False Alarms #1 and #2 that are not charged?
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Wednesday, September 13, 2023 10:22 AM
To: Ellsworth, Melissa <mellswor@slocity.org>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: RE: [EXTERNAL]FW: PD - False Alarms
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
761
Ok, done. I also added the language within a twelve month period to the false alarms.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Wednesday, September 13, 2023 10:04 AM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: [EXTERNAL]FW: PD - False Alarms
Hi Cindy,
Hope all is well. Just getting back to you on the False Alarm fees for PD. After consulting with our Attorney’s office,
they are recommending that we calculate the fees based on a cost recovery model. Please see her comments below.
Additionally, based on the information that Rachel provided from other agencies - I reached out to Monterey, Santa
Barbara, Ventura and SLO County to find out how their fees were calculated. I only heard back from two agencies;
one had no idea how their fees were calculated and the other was time based/cost recovery.
Let me know if you still need additional information. If you can update the matrix and send it to me again so I can
review, that would be appreciated!
Thanks,
Melissa
From: Symens, Sadie <ssymens@slocity.org>
Sent: Wednesday, September 13, 2023 9:45 AM
To: Ellsworth, Melissa <mellswor@slocity.org>; Bernstorff, Rebecca <rbernstorff@slocity.org>
Subject: RE: PD - False Alarms
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
762
.
From: Symens, Sadie <ssymens@slocity.org>
Sent: Tuesday, September 12, 2023 1:48 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Subject: RE: PD - False Alarms
Sadie Symens
pronouns she/her/hers
Deputy City Attorney
City Attorney's Office
763
E ssymens@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
The information contained in this e-mail message is intended only for the CONFIDENTIAL use of the
designated addressee named above. The information transmitted is subject to the attorney-client privilege
and/or represents confidential attorney work product. Recipients should not file copies of this email with
publicly accessible records. If you are not the designated addressee named above or the authorized agent
responsible for delivering it to the designated addressee, you received this document through inadvertent
error and any further review, dissemination, distribution or copying of this communication by you or anyone
else is strictly prohibited. IF YOU RECEIVED THIS COMMUNICATION IN ERROR, PLEASE NOTIFY US
IMMEDIATELY BY TELEPHONING THE SENDER NAMED ABOVE AT (805) 781-7140. Thank you.
From: Kersten, Markie <mkersten@slocity.org>
Sent: Friday, September 8, 2023 4:08 PM
To: Bernstorff, Rebecca <rbernstorff@slocity.org>; Ellsworth, Melissa <mellswor@slocity.org>
Cc: Symens, Sadie <ssymens@slocity.org>
Subject: RE: PD - False Alarms
Hi Rebecca and Melissa,
I’m looping Sadie in who can take a look at this next week.
Thanks,
Markie
From: Bernstorff, Rebecca <rbernstorff@slocity.org>
Sent: Friday, September 8, 2023 3:09 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Cc: Kersten, Markie <mkersten@slocity.org>
Subject: RE: PD - False Alarms
Hi Melissa,
Thanks for touching base and for providing the context, I appreciate it and apologize for the delay in my reply. I can
see how it may be perceived more as a fine than a fee and why the approach to that may require some legal
perspective. I’m including Markie in to weigh in on if we should move forward with time-based cost analysis for false
alarms (which was my original thought) or if we should take a different approach based on any legalities to it?
The comparative analysis is interesting (attached so Markie could take a look) as it looks like the others may be doing
a flat fee approach.
I’m happy to defer to legal/PD expertise on the best path forward.
Thanks!
Rebecca
Rebecca Bernstorff
pronouns she/her/hers
Business Services and Administrative Manager
764
Administration – Community Services Group
E rbernstorff@slocity.org
T 805.781.7203
C 805.540.0219
slocity.org
Stay connected with the City by signing up for e-notifications
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Thursday, August 31, 2023 4:07 PM
To: Bernstorff, Rebecca <rbernstorff@slocity.org>
Subject: PD - False Alarms
Hi Rebecca,
I just wanted to follow up with you on PD’s False Alarm analysis. The reason why I’m a little confused on this is
because the last Fee Study (2015/16 time frame) indicated the consultant didn’t change any of the excessive alarm
fees because they were “punitive” in nature. All I really want to know is whether or not we can adjust those and if the
reason that was given in 2015/16 still stands or if Christine D. has other thoughts.
We have the time calculations for responding to these false alarms, so that’s not an issue. I asked Cindy Sconce
about this and she really didn’t have an answer. When these fees were actually created back before my time (like in
2005), they were time based so I’m not sure why the consultant didn’t analyze them last time.
At this time, is your recommendation to just have MGT move forward with the time based cost analysis for the false
alarms?
As reference, I’ve included a screenshot from the 2015/16 fee study, specifically the Alarm Fees and notes, which are
also in the attached document.
765
Thanks for your help,
Melissa
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Wednesday, August 30, 2023 4:34 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
Melissa
I did find this in one of my other emails from Rebecca:
In regard to the police fee schedule I think including it in the comparison survey would be really helpful. I can also
include this caveat in my email to the Leadership Team.
We can include it in the comparison survey and see what other agencies are charging for these.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Wednesday, August 30, 2023 3:06 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Subject: FW: [EXTERNAL]RE: SLO UF: Police - revised model
Hi Cindy,
Just checking in to see if you were able to connect with Rebecca yet so we can figure out next steps on the Alarm and
Tobacco fees.
Thanks,
Melissa
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
766
From: Ellsworth, Melissa
Sent: Wednesday, August 23, 2023 3:24 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
Great, thank you
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Wednesday, August 23, 2023 3:15 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
You got it. Let me talk to her first and then circle back with you. I also am going to walk her through the Tobacco fee based on
your other email.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Wednesday, August 23, 2023 3:14 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
Yes, please discuss with Rebecca and then let me know. I just want everyone to be on the same page. Thank you!
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Wednesday, August 23, 2023 3:11 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
I’m happy to jump on a meeƟng with them if you think that would be helpful. It really is about how they view these fees and
them agreeing that as a penalty they can change it to what is reasonable as a deterrent.
Let me know what you decide. I can also run this by Rebecca and see how she wants to approach this if you think that would be
beƩer.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Wednesday, August 23, 2023 3:04 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Subject: [EXTERNAL]RE: SLO UF: Police - revised model
Cindy – do you think it would be best if you were part of this meeting as well? Let me know.
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Tuesday, August 22, 2023 11:13 AM
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
767
To: Ellsworth, Melissa <mellswor@slocity.org>
Subject: SLO UF: Police - revised model
This message is from an External Source. Use caution when deciding to open attachments, click links, or respond.
Melissa
Here is the updated model with the 20% added to the alarm permit and false alarm costs.
Let me know when you have spoken with the Chief and AƩorney and how you want to proceed with those fees.
Thanks!
Cindy Sconce (she/her/hers)
Director, Performance Solutions Group
3600 American River Drive, Suite 150
Sacramento, CA 95864
Cell: 916.276.8807
Email: csconce@mgtconsulting.com
The information contained in this electronic communication is intended only for the use of the addressee, and may be
a confidential communication. If you are not the intended recipient, you are hereby notified that you have received this
transmittal in error; any review, dissemination, distribution, or copying of this transmittal is strictly prohibited.
768
From:Cindy Sconce <CSconce@mgtconsulting.com>
Sent:Monday, September 18, 2023 3:38 PM
To:Ellsworth, Melissa
Cc:Rachel King
Subject:RE: [EXTERNAL]FW: PD - False Alarms
Hi Melissa
Which line item on the ICRP would include your vehicle maintenance costs? It looks like fuel is currently being listed under the
indirect column so that is part of the overhead costs already. This cost could be pulled out and placed as direct and we could
develop an addiƟonal direct charge to apply to the false alarms if we think that would be beneficial.
You are correct, we did already incorporate the 20% vendor costs into the fee. We did not include the False Alarm #1 or #2.
Let me know about the vehicle maintenance costs and whether you would like to keep these costs as indirect, which adds to the
overhead, or as direct so that it can be directly applied to the false alarm fees.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Monday, September 18, 2023 2:17 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: RE: [EXTERNAL]FW: PD - False Alarms
Hello,
I took a look at this document and updated some information that you were looking for under the ICRP tab. Also,
wanted to ask if the costs for us to respond to a false alarm can also included vehicle related costs like maintenance
and fuel costs as well (looks like you already added the 20% vendor fee)? Also, should the fee incorporate costs from
False Alarms #1 and #2 that are not charged?
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Wednesday, September 13, 2023 10:22 AM
To: Ellsworth, Melissa <mellswor@slocity.org>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: RE: [EXTERNAL]FW: PD - False Alarms
Ok, done. I also added the language within a twelve month period to the false alarms.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Wednesday, September 13, 2023 10:04 AM
To: Cindy Sconce <CSconce@mgtconsulting.com>
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
770
.
From: Symens, Sadie <ssymens@slocity.org>
Sent: Tuesday, September 12, 2023 1:48 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Subject: RE: PD - False Alarms
Sadie Symens
pronouns she/her/hers
Deputy City Attorney
City Attorney's Office
E ssymens@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
The information contained in this e-mail message is intended only for the CONFIDENTIAL use of the
designated addressee named above. The information transmitted is subject to the attorney-client privilege
771
and/or represents confidential attorney work product. Recipients should not file copies of this email with
publicly accessible records. If you are not the designated addressee named above or the authorized agent
responsible for delivering it to the designated addressee, you received this document through inadvertent
error and any further review, dissemination, distribution or copying of this communication by you or anyone
else is strictly prohibited. IF YOU RECEIVED THIS COMMUNICATION IN ERROR, PLEASE NOTIFY US
IMMEDIATELY BY TELEPHONING THE SENDER NAMED ABOVE AT (805) 781-7140. Thank you.
From: Kersten, Markie <mkersten@slocity.org>
Sent: Friday, September 8, 2023 4:08 PM
To: Bernstorff, Rebecca <rbernstorff@slocity.org>; Ellsworth, Melissa <mellswor@slocity.org>
Cc: Symens, Sadie <ssymens@slocity.org>
Subject: RE: PD - False Alarms
Hi Rebecca and Melissa,
I’m looping Sadie in who can take a look at this next week.
Thanks,
Markie
From: Bernstorff, Rebecca <rbernstorff@slocity.org>
Sent: Friday, September 8, 2023 3:09 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Cc: Kersten, Markie <mkersten@slocity.org>
Subject: RE: PD - False Alarms
Hi Melissa,
Thanks for touching base and for providing the context, I appreciate it and apologize for the delay in my reply. I can
see how it may be perceived more as a fine than a fee and why the approach to that may require some legal
perspective. I’m including Markie in to weigh in on if we should move forward with time-based cost analysis for false
alarms (which was my original thought) or if we should take a different approach based on any legalities to it?
The comparative analysis is interesting (attached so Markie could take a look) as it looks like the others may be doing
a flat fee approach.
I’m happy to defer to legal/PD expertise on the best path forward.
Thanks!
Rebecca
Rebecca Bernstorff
pronouns she/her/hers
Business Services and Administrative Manager
Administration – Community Services Group
E rbernstorff@slocity.org
T 805.781.7203
C 805.540.0219
slocity.org
772
Stay connected with the City by signing up for e-notifications
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Thursday, August 31, 2023 4:07 PM
To: Bernstorff, Rebecca <rbernstorff@slocity.org>
Subject: PD - False Alarms
Hi Rebecca,
I just wanted to follow up with you on PD’s False Alarm analysis. The reason why I’m a little confused on this is
because the last Fee Study (2015/16 time frame) indicated the consultant didn’t change any of the excessive alarm
fees because they were “punitive” in nature. All I really want to know is whether or not we can adjust those and if the
reason that was given in 2015/16 still stands or if Christine D. has other thoughts.
We have the time calculations for responding to these false alarms, so that’s not an issue. I asked Cindy Sconce
about this and she really didn’t have an answer. When these fees were actually created back before my time (like in
2005), they were time based so I’m not sure why the consultant didn’t analyze them last time.
At this time, is your recommendation to just have MGT move forward with the time based cost analysis for the false
alarms?
As reference, I’ve included a screenshot from the 2015/16 fee study, specifically the Alarm Fees and notes, which are
also in the attached document.
773
Thanks for your help,
Melissa
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Wednesday, August 30, 2023 4:34 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
Melissa
I did find this in one of my other emails from Rebecca:
In regard to the police fee schedule I think including it in the comparison survey would be really helpful. I can also
include this caveat in my email to the Leadership Team.
We can include it in the comparison survey and see what other agencies are charging for these.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Wednesday, August 30, 2023 3:06 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Subject: FW: [EXTERNAL]RE: SLO UF: Police - revised model
Hi Cindy,
Just checking in to see if you were able to connect with Rebecca yet so we can figure out next steps on the Alarm and
Tobacco fees.
Thanks,
Melissa
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
774
From: Ellsworth, Melissa
Sent: Wednesday, August 23, 2023 3:24 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
Great, thank you
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Wednesday, August 23, 2023 3:15 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
You got it. Let me talk to her first and then circle back with you. I also am going to walk her through the Tobacco fee based on
your other email.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Wednesday, August 23, 2023 3:14 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
Yes, please discuss with Rebecca and then let me know. I just want everyone to be on the same page. Thank you!
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Wednesday, August 23, 2023 3:11 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
I’m happy to jump on a meeƟng with them if you think that would be helpful. It really is about how they view these fees and
them agreeing that as a penalty they can change it to what is reasonable as a deterrent.
Let me know what you decide. I can also run this by Rebecca and see how she wants to approach this if you think that would be
beƩer.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Wednesday, August 23, 2023 3:04 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Subject: [EXTERNAL]RE: SLO UF: Police - revised model
Cindy – do you think it would be best if you were part of this meeting as well? Let me know.
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Tuesday, August 22, 2023 11:13 AM
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
775
To: Ellsworth, Melissa <mellswor@slocity.org>
Subject: SLO UF: Police - revised model
This message is from an External Source. Use caution when deciding to open attachments, click links, or respond.
Melissa
Here is the updated model with the 20% added to the alarm permit and false alarm costs.
Let me know when you have spoken with the Chief and AƩorney and how you want to proceed with those fees.
Thanks!
Cindy Sconce (she/her/hers)
Director, Performance Solutions Group
3600 American River Drive, Suite 150
Sacramento, CA 95864
Cell: 916.276.8807
Email: csconce@mgtconsulting.com
The information contained in this electronic communication is intended only for the use of the addressee, and may be
a confidential communication. If you are not the intended recipient, you are hereby notified that you have received this
transmittal in error; any review, dissemination, distribution, or copying of this transmittal is strictly prohibited.
776
From:Ellsworth, Melissa
Sent:Monday, September 18, 2023 2:17 PM
To:Cindy Sconce
Cc:Rachel King
Subject:RE: [EXTERNAL]FW: PD - False Alarms
Attachments:Copy of San Luis Obispo Police UF FY24_09-13-23 sworn vs non sworn.xlsm
Hello,
I took a look at this document and updated some information that you were looking for under the ICRP tab. Also,
wanted to ask if the costs for us to respond to a false alarm can also included vehicle related costs like maintenance
and fuel costs as well (looks like you already added the 20% vendor fee)? Also, should the fee incorporate costs from
False Alarms #1 and #2 that are not charged?
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Wednesday, September 13, 2023 10:22 AM
To: Ellsworth, Melissa <mellswor@slocity.org>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: RE: [EXTERNAL]FW: PD - False Alarms
Ok, done. I also added the language within a twelve month period to the false alarms.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Wednesday, September 13, 2023 10:04 AM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: [EXTERNAL]FW: PD - False Alarms
Hi Cindy,
Hope all is well. Just getting back to you on the False Alarm fees for PD. After consulting with our Attorney’s office,
they are recommending that we calculate the fees based on a cost recovery model. Please see her comments below.
Additionally, based on the information that Rachel provided from other agencies - I reached out to Monterey, Santa
Barbara, Ventura and SLO County to find out how their fees were calculated. I only heard back from two agencies;
one had no idea how their fees were calculated and the other was time based/cost recovery.
Let me know if you still need additional information. If you can update the matrix and send it to me again so I can
review, that would be appreciated!
Thanks,
Melissa
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
777
From: Symens, Sadie <ssymens@slocity.org>
Sent: Wednesday, September 13, 2023 9:45 AM
To: Ellsworth, Melissa <mellswor@slocity.org>; Bernstorff, Rebecca <rbernstorff@slocity.org>
Subject: RE: PD - False Alarms
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Wednesday, September 13, 2023 8:38 AM
To: Symens, Sadie <ssymens@slocity.org>
Subject: RE: PD - False Alarms
.
78
From: Symens, Sadie <ssymens@slocity.org>
Sent: Tuesday, September 12, 2023 1:48 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Subject: RE: PD - False Alarms
Sadie Symens
pronouns she/her/hers
Deputy City Attorney
City Attorney's Office
E ssymens@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
The information contained in this e-mail message is intended only for the CONFIDENTIAL use of the
designated addressee named above. The information transmitted is subject to the attorney-client privilege
and/or represents confidential attorney work product. Recipients should not file copies of this email with
publicly accessible records. If you are not the designated addressee named above or the authorized agent
responsible for delivering it to the designated addressee, you received this document through inadvertent
error and any further review, dissemination, distribution or copying of this communication by you or anyone
779
else is strictly prohibited. IF YOU RECEIVED THIS COMMUNICATION IN ERROR, PLEASE NOTIFY US
IMMEDIATELY BY TELEPHONING THE SENDER NAMED ABOVE AT (805) 781-7140. Thank you.
From: Kersten, Markie <mkersten@slocity.org>
Sent: Friday, September 8, 2023 4:08 PM
To: Bernstorff, Rebecca <rbernstorff@slocity.org>; Ellsworth, Melissa <mellswor@slocity.org>
Cc: Symens, Sadie <ssymens@slocity.org>
Subject: RE: PD - False Alarms
Hi Rebecca and Melissa,
I’m looping Sadie in who can take a look at this next week.
Thanks,
Markie
From: Bernstorff, Rebecca <rbernstorff@slocity.org>
Sent: Friday, September 8, 2023 3:09 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Cc: Kersten, Markie <mkersten@slocity.org>
Subject: RE: PD - False Alarms
Hi Melissa,
Thanks for touching base and for providing the context, I appreciate it and apologize for the delay in my reply. I can
see how it may be perceived more as a fine than a fee and why the approach to that may require some legal
perspective. I’m including Markie in to weigh in on if we should move forward with time-based cost analysis for false
alarms (which was my original thought) or if we should take a different approach based on any legalities to it?
The comparative analysis is interesting (attached so Markie could take a look) as it looks like the others may be doing
a flat fee approach.
I’m happy to defer to legal/PD expertise on the best path forward.
Thanks!
Rebecca
Rebecca Bernstorff
pronouns she/her/hers
Business Services and Administrative Manager
Administration – Community Services Group
E rbernstorff@slocity.org
T 805.781.7203
C 805.540.0219
slocity.org
Stay connected with the City by signing up for e-notifications
780
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Thursday, August 31, 2023 4:07 PM
To: Bernstorff, Rebecca <rbernstorff@slocity.org>
Subject: PD - False Alarms
Hi Rebecca,
I just wanted to follow up with you on PD’s False Alarm analysis. The reason why I’m a little confused on this is
because the last Fee Study (2015/16 time frame) indicated the consultant didn’t change any of the excessive alarm
fees because they were “punitive” in nature. All I really want to know is whether or not we can adjust those and if the
reason that was given in 2015/16 still stands or if Christine D. has other thoughts.
We have the time calculations for responding to these false alarms, so that’s not an issue. I asked Cindy Sconce
about this and she really didn’t have an answer. When these fees were actually created back before my time (like in
2005), they were time based so I’m not sure why the consultant didn’t analyze them last time.
At this time, is your recommendation to just have MGT move forward with the time based cost analysis for the false
alarms?
As reference, I’ve included a screenshot from the 2015/16 fee study, specifically the Alarm Fees and notes, which are
also in the attached document.
781
Thanks for your help,
Melissa
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Wednesday, August 30, 2023 4:34 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Cc: Rachel King <rking@mgtconsulting.com>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
Melissa
I did find this in one of my other emails from Rebecca:
In regard to the police fee schedule I think including it in the comparison survey would be really helpful. I can also
include this caveat in my email to the Leadership Team.
We can include it in the comparison survey and see what other agencies are charging for these.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Wednesday, August 30, 2023 3:06 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Subject: FW: [EXTERNAL]RE: SLO UF: Police - revised model
Hi Cindy,
Just checking in to see if you were able to connect with Rebecca yet so we can figure out next steps on the Alarm and
Tobacco fees.
Thanks,
Melissa
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
782
From: Ellsworth, Melissa
Sent: Wednesday, August 23, 2023 3:24 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
Great, thank you
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Wednesday, August 23, 2023 3:15 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
You got it. Let me talk to her first and then circle back with you. I also am going to walk her through the Tobacco fee based on
your other email.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Wednesday, August 23, 2023 3:14 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
Yes, please discuss with Rebecca and then let me know. I just want everyone to be on the same page. Thank you!
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Wednesday, August 23, 2023 3:11 PM
To: Ellsworth, Melissa <mellswor@slocity.org>
Subject: RE: [EXTERNAL]RE: SLO UF: Police - revised model
I’m happy to jump on a meeƟng with them if you think that would be helpful. It really is about how they view these fees and
them agreeing that as a penalty they can change it to what is reasonable as a deterrent.
Let me know what you decide. I can also run this by Rebecca and see how she wants to approach this if you think that would be
beƩer.
Cindy
From: Ellsworth, Melissa <mellswor@slocity.org>
Sent: Wednesday, August 23, 2023 3:04 PM
To: Cindy Sconce <CSconce@mgtconsulting.com>
Subject: [EXTERNAL]RE: SLO UF: Police - revised model
Cindy – do you think it would be best if you were part of this meeting as well? Let me know.
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Tuesday, August 22, 2023 11:13 AM
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
783
To: Ellsworth, Melissa <mellswor@slocity.org>
Subject: SLO UF: Police - revised model
This message is from an External Source. Use caution when deciding to open attachments, click links, or respond.
Melissa
Here is the updated model with the 20% added to the alarm permit and false alarm costs.
Let me know when you have spoken with the Chief and AƩorney and how you want to proceed with those fees.
Thanks!
Cindy Sconce (she/her/hers)
Director, Performance Solutions Group
3600 American River Drive, Suite 150
Sacramento, CA 95864
Cell: 916.276.8807
Email: csconce@mgtconsulting.com
The information contained in this electronic communication is intended only for the use of the addressee, and may be
a confidential communication. If you are not the intended recipient, you are hereby notified that you have received this
transmittal in error; any review, dissemination, distribution, or copying of this transmittal is strictly prohibited.
784
From:Bernstorff, Rebecca
Sent:Monday, September 18, 2023 11:07 AM
To:Loew, Michael
Subject:FW: Building Permit Report (adding # of units)
Attachments:Allpermitsafter2018TransportationTab.xlsx
FYI
Rebecca Bernstorff
pronouns she/her/hers
Business Services and Administrative Manager
Administration – Community Services Group
E rbernstorff@slocity.org
T 805.781.7203
C 805.540.0219
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema <nkazemi@slocity.org>
Sent: Monday, September 18, 2023 11:01 AM
To: Bernstorff, Rebecca <rbernstorff@slocity.org>; Taylor, Brent <btaylor@slocity.org>; Nichols, Vanessa <vnichols@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hi Brent,
This report should have everything you’ve requested from that tab. The database names are relatively straight forward
so let me know if you have any trouble associating a field name to the additional info field on the permit.
Let me know if I need to add anything else.
Best,
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
785
From: Kazemi, Neema
Sent: Monday, September 18, 2023 8:04 AM
To: Bernstorff, Rebecca <rbernstorff@slocity.org>; Taylor, Brent <BTaylor@slocity.org>; Nichols, Vanessa <vnichols@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Good morning,
I’ll update the fields of the report and have it sent over by this afternoon.
Best,
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Bernstorff, Rebecca <rbernstorff@slocity.org>
Sent: Thursday, September 14, 2023 4:43 PM
To: Taylor, Brent <btaylor@slocity.org>; Nichols, Vanessa <vnichols@slocity.org>; Kazemi, Neema <nkazemi@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Importance: High
Hi Neema,
Just following up on this request. I think it’s also going to help make progress in the user fee side of the fee study as
well, so we are really excited to get this report!
Thanks so much!
Rebecca
Rebecca Bernstorff
pronouns she/her/hers
Business Services and Administrative Manager
Administration – Community Services Group
E rbernstorff@slocity.org
T 805.781.7203
C 805.540.0219
slocity.org
Stay connected with the City by signing up for e-notifications
786
From: Taylor, Brent <btaylor@slocity.org>
Sent: Monday, September 11, 2023 4:49 PM
To: Nichols, Vanessa <vnichols@slocity.org>; Bernstorff, Rebecca <rbernstorff@slocity.org>; Kazemi, Neema
<nkazemi@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
@Kazemi, Neema, can we try the report based on Vanessa’s suggestions below. I think everything is same as you
previously pulled, except for the square footage data which Vanessa indicated can be pulled from the Square Feet tab
under Additional Info. Screenshot below…
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
787
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
From: Nichols, Vanessa <vnichols@slocity.org>
Sent: Monday, September 11, 2023 3:17 PM
To: Taylor, Brent <btaylor@slocity.org>; Bernstorff, Rebecca <rbernstorff@slocity.org>; Kazemi, Neema <nkazemi@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hi,
So, yes you can pull the square footages from the square footage tab which also has it by construction type. The
Number of Units would come from the Dwelling Units field on the general tab. Permit Number, Issue Date and Work
Class are just fields to add to report. You will have to do the average of square footage after you get number of units
and total square footage. Happy to help by showing which fields I am referencing. Let me know if you have any other
questions.
Vanessa Nichols
Building Permit Services Supervisor
Community Development
919 Palm Street, San Luis Obispo, CA 93401-3218
E vnichols@slocity.org
T 805.781.7588
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Monday, September 11, 2023 8:14 AM
To: Nichols, Vanessa <vnichols@slocity.org>; Bernstorff, Rebecca <rbernstorff@slocity.org>; Kazemi, Neema
<nkazemi@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hi Vanessa –
Thanks for the clarification and information. The data that we are trying to gather for impact fee consultant is:
ALL Permits in last 5 years (1/1/2018 – current). Data points for those permits need to include the following:
- Permit Number
- Issue Date
- Type of Construction/ Work Class (SFR, MFR, Commercial, etc)
- Square Footage
- Number of Units
- Multifamily Permits – Average Square Footage per unit
Final data point for the Multifamily properties is to calculate the average sq ft of each unit, so will need to manually
apply calculation (square footage/ # of units) to produce the average for those.
The issue we are having with the reports that Neema helped generate is that for a lot of the Multifamily units, the
square footage is “0” and therefore unable to calculate the average square footage per unit.
Any ideas or suggestions on alternate fields from Energov that we could try in capturing this data would be
appreciated as we are currently unable to provide the data needed to calculate impact fees.
788
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
From: Nichols, Vanessa <vnichols@slocity.org>
Sent: Friday, September 8, 2023 8:14 AM
To: Bernstorff, Rebecca <rbernstorff@slocity.org>; Kazemi, Neema <nkazemi@slocity.org>; Taylor, Brent <btaylor@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hi Rebecca,
Currently I would say most of our impact fees are based off square footages. The only ones that I can think of that
aren’t are Park Improvement, Park Impact, Fire Citywide, Police Citywide and the Transportation add-on fees for
specific areas, which are all on per unit basis. Commercial Water/Wastewater Impact fee is based off Water Meter
size currently.
Square footages are captured in several different areas in Energov. It depends on the data you are trying to obtain as
to where the square footages should be pulled from. The square footage field located in “Detail” workflow tab is one
area that square footage is captured and if appropriate for scope of work we do try to make sure this square footage
field is completed. I would say that this field is completed most of the time (there was a window of time when this field
was not keeping the data). All the fees are calculated on the back end but for fees to populate a manual input must
happen. The square footage field is not connected to fee generation, so by human error it can be missed. However,
only for new single-family residences would this square footage field generate accurate information. If you ran a report
for only single-family residence and included permit number and this square footage field any that produced zero in
the square footage field on the report could be easily corrected so report was complete. Pulling square footage from
this field for Mixed-Use and Multi-Family projects is not as straightforward as residence and commercial square
footages are combined.
We also currently capture square footages (in ranges) through the Water, Wastewater and Transportation Citywide
impact fees that are charged. You could get number of units, by workclass within each square footage
range. Commercial impact fees can be capture through square footage inputs by type on the Transportation tab and
the water meter sizes under the Water/Wastewater tab under Commercial.
I do believe we have square footage inputs in Energov that would be helpful in your information gathering. I am happy
to assistance in figuring out the best avenue of getting the information you are seeking out of Energov. Nothing about
Energov or our current fee is straightforward.
Hope this long explanation was at least a little helpful!
Vanessa Nichols
Building Permit Services Supervisor
Community Development
789
919 Palm Street, San Luis Obispo, CA 93401-3218
E vnichols@slocity.org
T 805.781.7588
slocity.org
Stay connected with the City by signing up for e-notifications
From: Bernstorff, Rebecca <rbernstorff@slocity.org>
Sent: Thursday, September 7, 2023 10:25 AM
To: Kazemi, Neema <nkazemi@slocity.org>; Taylor, Brent <btaylor@slocity.org>
Cc: Nichols, Vanessa <vnichols@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Thanks for stopping by earlier this week, Vanessa.
Talking through with Brent I now recall why sqft is something we need to capture, and may not have been capturing
before because we usually only care about units.
As a part of the Fee Study, we are working to be in compliance with AB 602, a new law requiring that nexus studies
adopted after July 1, 2022 must calculate the amount of fees based on square footage of proposed units of the
housing development project.
Is this sqft info something that we have been inputting into Energov? If not, I totally understand why but wondering
if/how we do capture that data going forward…
Rebecca Bernstorff
pronouns she/her/hers
Business Services and Administrative Manager
Administration – Community Services Group
E rbernstorff@slocity.org
T 805.781.7203
C 805.540.0219
slocity.org
Stay connected with the City by signing up for e-notifications
From: Bernstorff, Rebecca
Sent: Tuesday, August 29, 2023 10:27 AM
To: Kazemi, Neema <nkazemi@slocity.org>; Taylor, Brent <BTaylor@slocity.org>
Cc: Nichols, Vanessa <vnichols@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
790
Thanks for pulling this together, Neema. Why would 0 be getting put in? I’m having a hard time following why this
would happen and how we get the data to the fee study consultant when it now doesn’t exist in Energov?
In the future, can we have this field be required to include the sqft at the time of adding in the permit to Energov??
Such as a mandatory number that can’t be 0?
Rebecca Bernstorff
pronouns she/her/hers
Business Services and Administrative Manager
Administration – Community Services Group
E rbernstorff@slocity.org
T 805.781.7203
C 805.540.0219
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema <nkazemi@slocity.org>
Sent: Tuesday, August 29, 2023 9:12 AM
To: Taylor, Brent <btaylor@slocity.org>
Cc: Bernstorff, Rebecca <rbernstorff@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hi Brent,
This report has the added School fee square footage listed as SQFTInfoNewResidential and
SQFTInfoNewCommercial.
If anything, it just creates more questions. But, let me know if that helps!
Best,
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Monday, August 28, 2023 9:03 AM
To: Kazemi, Neema <nkazemi@slocity.org>
Cc: Bernstorff, Rebecca <rbernstorff@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
791
Issue date looks good now but questioning the Sq Ft field again. I see lots of “0” listed. Even on Multifamily where
there is 13 units, still showing 0 sq footage. I checked a few permits and square footage is not input to the “Details”
screen, but is showing on the “additional details” screen under school fees section. This is what I was talking about
before, where the square footage is not consistently input to the details screen and not capturing the data needed. I
see it on all types of permits – multifamily, SFR, etc. Example below.
Brent Taylor
pronouns he/him/his
Financial Analyst
792
Community Services Group
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema <nkazemi@slocity.org>
Sent: Monday, August 28, 2023 8:38 AM
To: Taylor, Brent <btaylor@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Sorry, forgot to format on excel after exporting. This should be better!
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Monday, August 28, 2023 8:32 AM
To: Kazemi, Neema <nkazemi@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hi Neema, the issue date is not pulling correctly, can you fix that? Otherwise looks good.
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema <nkazemi@slocity.org>
Sent: Monday, August 28, 2023 8:25 AM
793
To: Taylor, Brent <btaylor@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hey Brent,
Try this out!
Best,
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Wednesday, August 23, 2023 4:15 PM
To: Kazemi, Neema <nkazemi@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Importance: High
Hi Neema – can you please provide ETA for this report adding in the Dwelling Units (i.e. # of units for each permit).
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent
Sent: Monday, August 14, 2023 11:14 AM
To: Kazemi, Neema <nkazemi@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report
Hi Neema – our consultant is requesting additional field be added to this report.
Need to provide the number of units associated with each Permit. Thinking we can use the “Dwelling Units” field on
the Additional Info Screen to capture and add this to report you previously created.
Let me know if this is something we can do.
794
Thanks.
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema <nkazemi@slocity.org>
Sent: Wednesday, August 9, 2023 11:25 AM
To: Taylor, Brent <btaylor@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report
Hi Brent,
I did a quick audit of like ten permits with 0 sq footage and they were all for window retrofits or door replacements.
One was a commercial which was for a hood replacement. It looks like I misspoke, seems like our users in the front
are pretty good about entering square footage if its applicable.
795
Best,
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema
Sent: Wednesday, August 9, 2023 9:37 AM
To: Taylor, Brent <BTaylor@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report
Permits have the SQ footage as a default field on the main details, so it totally depends on users filling it out during
input.
But, there may be SQ footage fields in the additional info that we may fill out as well. Let me see what we got!
Best.
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Wednesday, August 9, 2023 8:51 AM
To: Kazemi, Neema <nkazemi@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report
Hi Neema – no other data needed at this time.
Looks good as is, except the blank sq ft fields. Is there any other Sq Ft fields in Energov which we can try to see if it
will capture the ones showing 0 sq. ft.? I know it defaults to using this one, but front counter doesn’t always input to
that field.
Brent Taylor
pronouns he/him/his
Financial Analyst
796
Community Services Group
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema <nkazemi@slocity.org>
Sent: Wednesday, August 9, 2023 8:14 AM
To: Taylor, Brent <btaylor@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report
Hi Brent,
Getting a report with those data points took a few minutes, but is there any fee data you’d like added? Or currently,
there is no address information either.
I can probably get this finished this morning. For now, the only filters I have are BLDG permit and issuedate after
1/1/2018.
Best,
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Wednesday, August 9, 2023 7:42 AM
To: Kazemi, Neema <nkazemi@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: Building Permit Report
Hi Neema, hoping you can help me with putting together a report out of Energov for data that is needed for the Impact
Fee Study project which will update our impact fee amounts.
Consultant is requesting a report on building permits for time range of 1/1/2018 – current. Main data points needed
are issue date, type of construction (SFR, MFR, etc) and the square footage.
This would be for building permits only.
Is this something you would be able to help me with? Would like to provide the report by Friday if possible.
Brent Taylor
pronouns he/him/his
Financial Analyst
797
Community Services Group
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
798
From:Kazemi, Neema
Sent:Monday, September 18, 2023 11:01 AM
To:Loew, Michael
Cc:Bernstorff, Rebecca; Nichols, Vanessa
Subject:RE: Fee study Data
Hi Michael,
I’m hoping to have this report ready by Wednesday morning at the latest and will provide an update then.
Best.
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Loew, Michael <Mloew@slocity.org>
Sent: Monday, September 18, 2023 8:45 AM
To: Kazemi, Neema <nkazemi@slocity.org>
Cc: Bernstorff, Rebecca <rbernstorff@slocity.org>; Nichols, Vanessa <vnichols@slocity.org>
Subject: Fee study Data
Hi Neema, I know you were out last week and are just getting back to work, so I apologize for the inconvenience of
this urgent request. In order for the Building and Safety Division to complete our assessment of fees we need some
critical data. Can you please help us pull the following data from Energov related to projects assigned consolidated
plan check/inspection fees:
Number of project with consolidated plan check fee
o Filtered by work class
Overall square footage of projects with consolidated plan check fee
o Filtered by work class
Number of inspections conducted on projects with consolidated inspection fee
o Filtered by work class
Can you please let me know if this is something that you can quickly pull for us, and if so when do you think you can
have it? Feel free to give me a teams call to discuss.
Thanks,
Mike Loew
Deputy Director
799
Chief Building Official
Community Development
E Mloew@slocity.org
T 805.781.7157
slocity.org
Stay connected with the City by signing up for e-notifications
800
From:Kazemi, Neema
Sent:Monday, September 18, 2023 11:01 AM
To:Bernstorff, Rebecca; Taylor, Brent; Nichols, Vanessa
Subject:RE: Building Permit Report (adding # of units)
Attachments:Allpermitsafter2018TransportationTab.xlsx
Follow Up Flag:Follow up
Flag Status:Completed
Hi Brent,
This report should have everything you’ve requested from that tab. The database names are relatively straight forward
so let me know if you have any trouble associating a field name to the additional info field on the permit.
Let me know if I need to add anything else.
Best,
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema
Sent: Monday, September 18, 2023 8:04 AM
To: Bernstorff, Rebecca <rbernstorff@slocity.org>; Taylor, Brent <BTaylor@slocity.org>; Nichols, Vanessa <vnichols@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Good morning,
I’ll update the fields of the report and have it sent over by this afternoon.
Best,
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
801
Stay connected with the City by signing up for e-notifications
From: Bernstorff, Rebecca <rbernstorff@slocity.org>
Sent: Thursday, September 14, 2023 4:43 PM
To: Taylor, Brent <btaylor@slocity.org>; Nichols, Vanessa <vnichols@slocity.org>; Kazemi, Neema <nkazemi@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Importance: High
Hi Neema,
Just following up on this request. I think it’s also going to help make progress in the user fee side of the fee study as
well, so we are really excited to get this report!
Thanks so much!
Rebecca
Rebecca Bernstorff
pronouns she/her/hers
Business Services and Administrative Manager
Administration – Community Services Group
E rbernstorff@slocity.org
T 805.781.7203
C 805.540.0219
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Monday, September 11, 2023 4:49 PM
To: Nichols, Vanessa <vnichols@slocity.org>; Bernstorff, Rebecca <rbernstorff@slocity.org>; Kazemi, Neema
<nkazemi@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
@Kazemi, Neema, can we try the report based on Vanessa’s suggestions below. I think everything is same as you
previously pulled, except for the square footage data which Vanessa indicated can be pulled from the Square Feet tab
under Additional Info. Screenshot below…
802
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
From: Nichols, Vanessa <vnichols@slocity.org>
Sent: Monday, September 11, 2023 3:17 PM
To: Taylor, Brent <btaylor@slocity.org>; Bernstorff, Rebecca <rbernstorff@slocity.org>; Kazemi, Neema <nkazemi@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hi,
803
So, yes you can pull the square footages from the square footage tab which also has it by construction type. The
Number of Units would come from the Dwelling Units field on the general tab. Permit Number, Issue Date and Work
Class are just fields to add to report. You will have to do the average of square footage after you get number of units
and total square footage. Happy to help by showing which fields I am referencing. Let me know if you have any other
questions.
Vanessa Nichols
Building Permit Services Supervisor
Community Development
919 Palm Street, San Luis Obispo, CA 93401-3218
E vnichols@slocity.org
T 805.781.7588
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Monday, September 11, 2023 8:14 AM
To: Nichols, Vanessa <vnichols@slocity.org>; Bernstorff, Rebecca <rbernstorff@slocity.org>; Kazemi, Neema
<nkazemi@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hi Vanessa –
Thanks for the clarification and information. The data that we are trying to gather for impact fee consultant is:
ALL Permits in last 5 years (1/1/2018 – current). Data points for those permits need to include the following:
- Permit Number
- Issue Date
- Type of Construction/ Work Class (SFR, MFR, Commercial, etc)
- Square Footage
- Number of Units
- Multifamily Permits – Average Square Footage per unit
Final data point for the Multifamily properties is to calculate the average sq ft of each unit, so will need to manually
apply calculation (square footage/ # of units) to produce the average for those.
The issue we are having with the reports that Neema helped generate is that for a lot of the Multifamily units, the
square footage is “0” and therefore unable to calculate the average square footage per unit.
Any ideas or suggestions on alternate fields from Energov that we could try in capturing this data would be
appreciated as we are currently unable to provide the data needed to calculate impact fees.
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
804
slocity.org
Stay connected with the City by signing up for e-notifications
From: Nichols, Vanessa <vnichols@slocity.org>
Sent: Friday, September 8, 2023 8:14 AM
To: Bernstorff, Rebecca <rbernstorff@slocity.org>; Kazemi, Neema <nkazemi@slocity.org>; Taylor, Brent <btaylor@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hi Rebecca,
Currently I would say most of our impact fees are based off square footages. The only ones that I can think of that
aren’t are Park Improvement, Park Impact, Fire Citywide, Police Citywide and the Transportation add-on fees for
specific areas, which are all on per unit basis. Commercial Water/Wastewater Impact fee is based off Water Meter
size currently.
Square footages are captured in several different areas in Energov. It depends on the data you are trying to obtain as
to where the square footages should be pulled from. The square footage field located in “Detail” workflow tab is one
area that square footage is captured and if appropriate for scope of work we do try to make sure this square footage
field is completed. I would say that this field is completed most of the time (there was a window of time when this field
was not keeping the data). All the fees are calculated on the back end but for fees to populate a manual input must
happen. The square footage field is not connected to fee generation, so by human error it can be missed. However,
only for new single-family residences would this square footage field generate accurate information. If you ran a report
for only single-family residence and included permit number and this square footage field any that produced zero in
the square footage field on the report could be easily corrected so report was complete. Pulling square footage from
this field for Mixed-Use and Multi-Family projects is not as straightforward as residence and commercial square
footages are combined.
We also currently capture square footages (in ranges) through the Water, Wastewater and Transportation Citywide
impact fees that are charged. You could get number of units, by workclass within each square footage
range. Commercial impact fees can be capture through square footage inputs by type on the Transportation tab and
the water meter sizes under the Water/Wastewater tab under Commercial.
I do believe we have square footage inputs in Energov that would be helpful in your information gathering. I am happy
to assistance in figuring out the best avenue of getting the information you are seeking out of Energov. Nothing about
Energov or our current fee is straightforward.
Hope this long explanation was at least a little helpful!
Vanessa Nichols
Building Permit Services Supervisor
Community Development
919 Palm Street, San Luis Obispo, CA 93401-3218
E vnichols@slocity.org
T 805.781.7588
slocity.org
Stay connected with the City by signing up for e-notifications
From: Bernstorff, Rebecca <rbernstorff@slocity.org>
Sent: Thursday, September 7, 2023 10:25 AM
To: Kazemi, Neema <nkazemi@slocity.org>; Taylor, Brent <btaylor@slocity.org>
805
Cc: Nichols, Vanessa <vnichols@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Thanks for stopping by earlier this week, Vanessa.
Talking through with Brent I now recall why sqft is something we need to capture, and may not have been capturing
before because we usually only care about units.
As a part of the Fee Study, we are working to be in compliance with AB 602, a new law requiring that nexus studies
adopted after July 1, 2022 must calculate the amount of fees based on square footage of proposed units of the
housing development project.
Is this sqft info something that we have been inputting into Energov? If not, I totally understand why but wondering
if/how we do capture that data going forward…
Rebecca Bernstorff
pronouns she/her/hers
Business Services and Administrative Manager
Administration – Community Services Group
E rbernstorff@slocity.org
T 805.781.7203
C 805.540.0219
slocity.org
Stay connected with the City by signing up for e-notifications
From: Bernstorff, Rebecca
Sent: Tuesday, August 29, 2023 10:27 AM
To: Kazemi, Neema <nkazemi@slocity.org>; Taylor, Brent <BTaylor@slocity.org>
Cc: Nichols, Vanessa <vnichols@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Thanks for pulling this together, Neema. Why would 0 be getting put in? I’m having a hard time following why this
would happen and how we get the data to the fee study consultant when it now doesn’t exist in Energov?
In the future, can we have this field be required to include the sqft at the time of adding in the permit to Energov??
Such as a mandatory number that can’t be 0?
Rebecca Bernstorff
pronouns she/her/hers
Business Services and Administrative Manager
806
Administration – Community Services Group
E rbernstorff@slocity.org
T 805.781.7203
C 805.540.0219
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema <nkazemi@slocity.org>
Sent: Tuesday, August 29, 2023 9:12 AM
To: Taylor, Brent <btaylor@slocity.org>
Cc: Bernstorff, Rebecca <rbernstorff@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hi Brent,
This report has the added School fee square footage listed as SQFTInfoNewResidential and
SQFTInfoNewCommercial.
If anything, it just creates more questions. But, let me know if that helps!
Best,
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Monday, August 28, 2023 9:03 AM
To: Kazemi, Neema <nkazemi@slocity.org>
Cc: Bernstorff, Rebecca <rbernstorff@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Issue date looks good now but questioning the Sq Ft field again. I see lots of “0” listed. Even on Multifamily where
there is 13 units, still showing 0 sq footage. I checked a few permits and square footage is not input to the “Details”
screen, but is showing on the “additional details” screen under school fees section. This is what I was talking about
before, where the square footage is not consistently input to the details screen and not capturing the data needed. I
see it on all types of permits – multifamily, SFR, etc. Example below.
807
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
808
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema <nkazemi@slocity.org>
Sent: Monday, August 28, 2023 8:38 AM
To: Taylor, Brent <btaylor@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Sorry, forgot to format on excel after exporting. This should be better!
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Monday, August 28, 2023 8:32 AM
To: Kazemi, Neema <nkazemi@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hi Neema, the issue date is not pulling correctly, can you fix that? Otherwise looks good.
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema <nkazemi@slocity.org>
Sent: Monday, August 28, 2023 8:25 AM
To: Taylor, Brent <btaylor@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hey Brent,
Try this out!
Best,
809
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Wednesday, August 23, 2023 4:15 PM
To: Kazemi, Neema <nkazemi@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Importance: High
Hi Neema – can you please provide ETA for this report adding in the Dwelling Units (i.e. # of units for each permit).
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent
Sent: Monday, August 14, 2023 11:14 AM
To: Kazemi, Neema <nkazemi@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report
Hi Neema – our consultant is requesting additional field be added to this report.
Need to provide the number of units associated with each Permit. Thinking we can use the “Dwelling Units” field on
the Additional Info Screen to capture and add this to report you previously created.
Let me know if this is something we can do.
Thanks.
810
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema <nkazemi@slocity.org>
Sent: Wednesday, August 9, 2023 11:25 AM
To: Taylor, Brent <btaylor@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report
Hi Brent,
I did a quick audit of like ten permits with 0 sq footage and they were all for window retrofits or door replacements.
One was a commercial which was for a hood replacement. It looks like I misspoke, seems like our users in the front
are pretty good about entering square footage if its applicable.
Best,
Neema Kazemi
System Application Specialist - Energov
811
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema
Sent: Wednesday, August 9, 2023 9:37 AM
To: Taylor, Brent <BTaylor@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report
Permits have the SQ footage as a default field on the main details, so it totally depends on users filling it out during
input.
But, there may be SQ footage fields in the additional info that we may fill out as well. Let me see what we got!
Best.
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Wednesday, August 9, 2023 8:51 AM
To: Kazemi, Neema <nkazemi@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report
Hi Neema – no other data needed at this time.
Looks good as is, except the blank sq ft fields. Is there any other Sq Ft fields in Energov which we can try to see if it
will capture the ones showing 0 sq. ft.? I know it defaults to using this one, but front counter doesn’t always input to
that field.
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
812
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema <nkazemi@slocity.org>
Sent: Wednesday, August 9, 2023 8:14 AM
To: Taylor, Brent <btaylor@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report
Hi Brent,
Getting a report with those data points took a few minutes, but is there any fee data you’d like added? Or currently,
there is no address information either.
I can probably get this finished this morning. For now, the only filters I have are BLDG permit and issuedate after
1/1/2018.
Best,
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Wednesday, August 9, 2023 7:42 AM
To: Kazemi, Neema <nkazemi@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: Building Permit Report
Hi Neema, hoping you can help me with putting together a report out of Energov for data that is needed for the Impact
Fee Study project which will update our impact fee amounts.
Consultant is requesting a report on building permits for time range of 1/1/2018 – current. Main data points needed
are issue date, type of construction (SFR, MFR, etc) and the square footage.
This would be for building permits only.
Is this something you would be able to help me with? Would like to provide the report by Friday if possible.
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
813
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
814
From:Loew, Michael
Sent:Monday, September 18, 2023 8:45 AM
To:Kazemi, Neema
Cc:Bernstorff, Rebecca; Nichols, Vanessa
Subject:Fee study Data
Hi Neema, I know you were out last week and are just getting back to work, so I apologize for the inconvenience of
this urgent request. In order for the Building and Safety Division to complete our assessment of fees we need some
critical data. Can you please help us pull the following data from Energov related to projects assigned consolidated
plan check/inspection fees:
Number of project with consolidated plan check fee
o Filtered by work class
Overall square footage of projects with consolidated plan check fee
o Filtered by work class
Number of inspections conducted on projects with consolidated inspection fee
o Filtered by work class
Can you please let me know if this is something that you can quickly pull for us, and if so when do you think you can
have it? Feel free to give me a teams call to discuss.
Thanks,
Mike Loew
Deputy Director
Chief Building Official
Community Development
E Mloew@slocity.org
T 805.781.7157
slocity.org
Stay connected with the City by signing up for e-notifications
815
From:Kazemi, Neema
Sent:Monday, September 18, 2023 8:04 AM
To:Bernstorff, Rebecca; Taylor, Brent; Nichols, Vanessa
Subject:RE: Building Permit Report (adding # of units)
Good morning,
I’ll update the fields of the report and have it sent over by this afternoon.
Best,
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Bernstorff, Rebecca <rbernstorff@slocity.org>
Sent: Thursday, September 14, 2023 4:43 PM
To: Taylor, Brent <btaylor@slocity.org>; Nichols, Vanessa <vnichols@slocity.org>; Kazemi, Neema <nkazemi@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Importance: High
Hi Neema,
Just following up on this request. I think it’s also going to help make progress in the user fee side of the fee study as
well, so we are really excited to get this report!
Thanks so much!
Rebecca
Rebecca Bernstorff
pronouns she/her/hers
Business Services and Administrative Manager
Administration – Community Services Group
E rbernstorff@slocity.org
T 805.781.7203
C 805.540.0219
slocity.org
816
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Monday, September 11, 2023 4:49 PM
To: Nichols, Vanessa <vnichols@slocity.org>; Bernstorff, Rebecca <rbernstorff@slocity.org>; Kazemi, Neema
<nkazemi@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
@Kazemi, Neema, can we try the report based on Vanessa’s suggestions below. I think everything is same as you
previously pulled, except for the square footage data which Vanessa indicated can be pulled from the Square Feet tab
under Additional Info. Screenshot below…
Brent Taylor
pronouns he/him/his
Financial Analyst
817
Community Services Group
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
From: Nichols, Vanessa <vnichols@slocity.org>
Sent: Monday, September 11, 2023 3:17 PM
To: Taylor, Brent <btaylor@slocity.org>; Bernstorff, Rebecca <rbernstorff@slocity.org>; Kazemi, Neema <nkazemi@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hi,
So, yes you can pull the square footages from the square footage tab which also has it by construction type. The
Number of Units would come from the Dwelling Units field on the general tab. Permit Number, Issue Date and Work
Class are just fields to add to report. You will have to do the average of square footage after you get number of units
and total square footage. Happy to help by showing which fields I am referencing. Let me know if you have any other
questions.
Vanessa Nichols
Building Permit Services Supervisor
Community Development
919 Palm Street, San Luis Obispo, CA 93401-3218
E vnichols@slocity.org
T 805.781.7588
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Monday, September 11, 2023 8:14 AM
To: Nichols, Vanessa <vnichols@slocity.org>; Bernstorff, Rebecca <rbernstorff@slocity.org>; Kazemi, Neema
<nkazemi@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hi Vanessa –
Thanks for the clarification and information. The data that we are trying to gather for impact fee consultant is:
ALL Permits in last 5 years (1/1/2018 – current). Data points for those permits need to include the following:
- Permit Number
- Issue Date
- Type of Construction/ Work Class (SFR, MFR, Commercial, etc)
- Square Footage
- Number of Units
- Multifamily Permits – Average Square Footage per unit
818
Final data point for the Multifamily properties is to calculate the average sq ft of each unit, so will need to manually
apply calculation (square footage/ # of units) to produce the average for those.
The issue we are having with the reports that Neema helped generate is that for a lot of the Multifamily units, the
square footage is “0” and therefore unable to calculate the average square footage per unit.
Any ideas or suggestions on alternate fields from Energov that we could try in capturing this data would be
appreciated as we are currently unable to provide the data needed to calculate impact fees.
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
From: Nichols, Vanessa <vnichols@slocity.org>
Sent: Friday, September 8, 2023 8:14 AM
To: Bernstorff, Rebecca <rbernstorff@slocity.org>; Kazemi, Neema <nkazemi@slocity.org>; Taylor, Brent <btaylor@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hi Rebecca,
Currently I would say most of our impact fees are based off square footages. The only ones that I can think of that
aren’t are Park Improvement, Park Impact, Fire Citywide, Police Citywide and the Transportation add-on fees for
specific areas, which are all on per unit basis. Commercial Water/Wastewater Impact fee is based off Water Meter
size currently.
Square footages are captured in several different areas in Energov. It depends on the data you are trying to obtain as
to where the square footages should be pulled from. The square footage field located in “Detail” workflow tab is one
area that square footage is captured and if appropriate for scope of work we do try to make sure this square footage
field is completed. I would say that this field is completed most of the time (there was a window of time when this field
was not keeping the data). All the fees are calculated on the back end but for fees to populate a manual input must
happen. The square footage field is not connected to fee generation, so by human error it can be missed. However,
only for new single-family residences would this square footage field generate accurate information. If you ran a report
for only single-family residence and included permit number and this square footage field any that produced zero in
the square footage field on the report could be easily corrected so report was complete. Pulling square footage from
this field for Mixed-Use and Multi-Family projects is not as straightforward as residence and commercial square
footages are combined.
We also currently capture square footages (in ranges) through the Water, Wastewater and Transportation Citywide
impact fees that are charged. You could get number of units, by workclass within each square footage
range. Commercial impact fees can be capture through square footage inputs by type on the Transportation tab and
the water meter sizes under the Water/Wastewater tab under Commercial.
I do believe we have square footage inputs in Energov that would be helpful in your information gathering. I am happy
to assistance in figuring out the best avenue of getting the information you are seeking out of Energov. Nothing about
Energov or our current fee is straightforward.
Hope this long explanation was at least a little helpful!
819
Vanessa Nichols
Building Permit Services Supervisor
Community Development
919 Palm Street, San Luis Obispo, CA 93401-3218
E vnichols@slocity.org
T 805.781.7588
slocity.org
Stay connected with the City by signing up for e-notifications
From: Bernstorff, Rebecca <rbernstorff@slocity.org>
Sent: Thursday, September 7, 2023 10:25 AM
To: Kazemi, Neema <nkazemi@slocity.org>; Taylor, Brent <btaylor@slocity.org>
Cc: Nichols, Vanessa <vnichols@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Thanks for stopping by earlier this week, Vanessa.
Talking through with Brent I now recall why sqft is something we need to capture, and may not have been capturing
before because we usually only care about units.
As a part of the Fee Study, we are working to be in compliance with AB 602, a new law requiring that nexus studies
adopted after July 1, 2022 must calculate the amount of fees based on square footage of proposed units of the
housing development project.
Is this sqft info something that we have been inputting into Energov? If not, I totally understand why but wondering
if/how we do capture that data going forward…
Rebecca Bernstorff
pronouns she/her/hers
Business Services and Administrative Manager
Administration – Community Services Group
E rbernstorff@slocity.org
T 805.781.7203
C 805.540.0219
slocity.org
Stay connected with the City by signing up for e-notifications
820
From: Bernstorff, Rebecca
Sent: Tuesday, August 29, 2023 10:27 AM
To: Kazemi, Neema <nkazemi@slocity.org>; Taylor, Brent <BTaylor@slocity.org>
Cc: Nichols, Vanessa <vnichols@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Thanks for pulling this together, Neema. Why would 0 be getting put in? I’m having a hard time following why this
would happen and how we get the data to the fee study consultant when it now doesn’t exist in Energov?
In the future, can we have this field be required to include the sqft at the time of adding in the permit to Energov??
Such as a mandatory number that can’t be 0?
Rebecca Bernstorff
pronouns she/her/hers
Business Services and Administrative Manager
Administration – Community Services Group
E rbernstorff@slocity.org
T 805.781.7203
C 805.540.0219
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema <nkazemi@slocity.org>
Sent: Tuesday, August 29, 2023 9:12 AM
To: Taylor, Brent <btaylor@slocity.org>
Cc: Bernstorff, Rebecca <rbernstorff@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hi Brent,
This report has the added School fee square footage listed as SQFTInfoNewResidential and
SQFTInfoNewCommercial.
If anything, it just creates more questions. But, let me know if that helps!
Best,
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
821
From: Taylor, Brent <btaylor@slocity.org>
Sent: Monday, August 28, 2023 9:03 AM
To: Kazemi, Neema <nkazemi@slocity.org>
Cc: Bernstorff, Rebecca <rbernstorff@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Issue date looks good now but questioning the Sq Ft field again. I see lots of “0” listed. Even on Multifamily where
there is 13 units, still showing 0 sq footage. I checked a few permits and square footage is not input to the “Details”
screen, but is showing on the “additional details” screen under school fees section. This is what I was talking about
before, where the square footage is not consistently input to the details screen and not capturing the data needed. I
see it on all types of permits – multifamily, SFR, etc. Example below.
822
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema <nkazemi@slocity.org>
Sent: Monday, August 28, 2023 8:38 AM
To: Taylor, Brent <btaylor@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Sorry, forgot to format on excel after exporting. This should be better!
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Monday, August 28, 2023 8:32 AM
To: Kazemi, Neema <nkazemi@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hi Neema, the issue date is not pulling correctly, can you fix that? Otherwise looks good.
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
slocity.org
823
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema <nkazemi@slocity.org>
Sent: Monday, August 28, 2023 8:25 AM
To: Taylor, Brent <btaylor@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hey Brent,
Try this out!
Best,
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Wednesday, August 23, 2023 4:15 PM
To: Kazemi, Neema <nkazemi@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Importance: High
Hi Neema – can you please provide ETA for this report adding in the Dwelling Units (i.e. # of units for each permit).
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent
Sent: Monday, August 14, 2023 11:14 AM
To: Kazemi, Neema <nkazemi@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report
824
Hi Neema – our consultant is requesting additional field be added to this report.
Need to provide the number of units associated with each Permit. Thinking we can use the “Dwelling Units” field on
the Additional Info Screen to capture and add this to report you previously created.
Let me know if this is something we can do.
Thanks.
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema <nkazemi@slocity.org>
Sent: Wednesday, August 9, 2023 11:25 AM
To: Taylor, Brent <btaylor@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report
Hi Brent,
825
I did a quick audit of like ten permits with 0 sq footage and they were all for window retrofits or door replacements.
One was a commercial which was for a hood replacement. It looks like I misspoke, seems like our users in the front
are pretty good about entering square footage if its applicable.
Best,
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema
Sent: Wednesday, August 9, 2023 9:37 AM
To: Taylor, Brent <BTaylor@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report
Permits have the SQ footage as a default field on the main details, so it totally depends on users filling it out during
input.
But, there may be SQ footage fields in the additional info that we may fill out as well. Let me see what we got!
Best.
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Wednesday, August 9, 2023 8:51 AM
To: Kazemi, Neema <nkazemi@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report
Hi Neema – no other data needed at this time.
Looks good as is, except the blank sq ft fields. Is there any other Sq Ft fields in Energov which we can try to see if it
will capture the ones showing 0 sq. ft.? I know it defaults to using this one, but front counter doesn’t always input to
that field.
826
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema <nkazemi@slocity.org>
Sent: Wednesday, August 9, 2023 8:14 AM
To: Taylor, Brent <btaylor@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report
Hi Brent,
Getting a report with those data points took a few minutes, but is there any fee data you’d like added? Or currently,
there is no address information either.
I can probably get this finished this morning. For now, the only filters I have are BLDG permit and issuedate after
1/1/2018.
Best,
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Wednesday, August 9, 2023 7:42 AM
To: Kazemi, Neema <nkazemi@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: Building Permit Report
Hi Neema, hoping you can help me with putting together a report out of Energov for data that is needed for the Impact
Fee Study project which will update our impact fee amounts.
Consultant is requesting a report on building permits for time range of 1/1/2018 – current. Main data points needed
are issue date, type of construction (SFR, MFR, etc) and the square footage.
This would be for building permits only.
Is this something you would be able to help me with? Would like to provide the report by Friday if possible.
827
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
828
From:Garcia, Tavy
Sent:Friday, September 15, 2023 3:05 PM
To:Kuan-Ting Ko
Subject:Revenue follow up
Attachments:Copy of AllFeesWSchedule.xlsx; CPITypes.xlsx; Revenue open items follow up.xlsx
Hi Tim,
Sorry for the delay, after meeting with CDD a few times, I was able to recalculate the permit fees you selected.
In order to do so, I asked the team for an export of all Energov fees by year as well as the CPI/CCI annual increase
factors for the “vested selections; ”which was the other missing piece of the puzzle.
From what they explained, Energov performs the calculations automatically based on the parameters entered.
There is just one permit fee that I asked Vanessa to take a look at, as I wasn’t able to recalc, but got close.
PS – I uploaded copies of these file to the engagement organizer.
Sincerely,
Tavy F. Garcia
Senior Accountant
Finance
990 Palm, San Luis Obispo, CA 93401-3249
E tgarcia@slocity.org
T 805.781.7079
slocity.org
Stay connected with the City by signing up for e-notifications
Column Labels
Row Labels Baseline FY 2016 CCPI -All Urban Nationwide ENR CCI MCI SLR Vested Vested CPI Grand Total
2019-20
2.6
2019-2020
3.2
2020-2021
1.75
2020-21
2.28
2021-2022
10.88
2021-22
10.88
CCI 2020-21
1.75
CCI 2021-22
10.88
CCI 2022-23
24.52
CCI 2023-24
1.38
(blank)
0.7
1.38
1.75
2
2.3
2.79
3.2
3.3
3.6
3.8
7.9
10
10.88
24.52
Grand Total
Name description startdate enddate cpivalue Type
2015-2016 7/1/2015 6/30/2016 2.3 Baseline FY 2016
2016-2017 7/1/2016 6/30/2017 0.7 Baseline FY 2016
2017-2018 7/1/2017 6/30/2018 2 Baseline FY 2016
2018-2019 7/1/2018 6/30/2019 2.79 Baseline FY 2016
2019-2020 7/1/2019 6/30/2020 3.3 Baseline FY 2016
2020-2021 7/1/2020 6/30/2021 0.7 Baseline FY 2016
2021-2022 7/1/2021 6/30/2022 3.6 Baseline FY 2016
2022-2023 7/1/2022 6/30/2023 7.9 Baseline FY 2016
2023-24 7/1/2023 6/30/2024 3.8 Baseline FY 2016
2023-24 7/1/2023 6/30/2024 1.38 CCPI -All Urban Nationwide
2022-23 7/1/2022 6/30/2023 24.52 CCPI -All Urban Nationwide
2021-22 2021-22 7/1/2021 6/30/2022 10.88 CCPI -All Urban Nationwide
2020-21 2020-21 7/1/2020 6/30/2021 2.28 CCPI -All Urban Nationwide
2022-23 7/1/2022 6/30/2023 24.52 ENR CCI
2023-24 7/1/2023 6/30/2024 1.38 ENR CCI
2019-2020 2019-2020 7/1/2019 6/30/2020 3.2 ENR CCI
2021-2022 2021-2022 7/1/2021 6/30/2022 10.88 ENR CCI
2020-2021 2020-2021 7/1/2020 6/30/2021 1.75 ENR CCI
2021-2022 CCI 2021-22 7/1/2021 6/30/2022 10.88 MCI
2023-24 CCI 2023-24 7/1/2023 6/30/2024 1.38 MCI
2020-21 CCI 2020-21 7/1/2020 6/30/2021 1.75 MCI
2019-20 2019-20 7/1/2019 6/30/2020 2.6 MCI
2022-23 CCI 2022-23 7/1/2022 6/30/2023 24.52 MCI
2016-17 7/1/2016 6/30/2017 0.7 SLR Vested
2017-18 7/1/2017 6/30/2018 2 SLR Vested
2018-19 7/1/2018 6/30/2019 2.79 SLR Vested
2019-20 7/1/2019 6/30/2020 3.2 SLR Vested
2020-21 7/1/2020 6/30/2021 1.75 SLR Vested
21 Increase 11/19/2021 11/18/2022 10 SLR Vested
22 Increase 11/19/2022 6/30/2023 10 SLR Vested
2021-22 7/1/2021 11/18/2021 10.88 SLR Vested
23 Increase 11/19/2023 6/30/2024 10 SLR Vested
2023-24 7/1/2023 11/18/2023 1.38 SLR Vested
2017-18 7/1/2017 6/30/2018 2 Vested CPI
2018-19 7/1/2018 6/30/2019 2.79 Vested CPI
2016-17 7/1/2016 6/30/2017 0.7 Vested CPI
2019-20 7/1/2019 6/30/2020 3.2 Vested CPI
2020-2021 7/1/2020 6/30/2021 1.75 Vested CPI
2021-2022 7/1/2021 6/30/2022 10.88 Vested CPI
2022-23 7/1/2022 6/30/2023 24.52 Vested CPI
2023-24 7/1/2023 6/30/2024 1.38 Vested CPI
29
From:Jackson, Emily
Sent:Friday, September 15, 2023 8:00 AM
To:Bernstorff, Rebecca
Cc:Malicoat, Debbie; Nunez, Jacob
Subject:Re: SLO - Credit Card Fee
Hi Rebecca,
Thanks
Emily Jackson
pronouns she/her/hers
Finance Director
Finance
990 Palm St, San Luis Obispo, CA 93401-3934
E ejackson@slocity.org
T 805.781.7125
slocity.org
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and l
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and l
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and l
Stay connected with the City by signing up for e-notifications
From: Bernstorff, Rebecca <rbernstorff@slocity.org>
Sent: Friday, September 8, 2023 3:03 PM
To: Jackson, Emily <ejackson@slocity.org>
Cc: Malicoat, Debbie <dmalicoa@slocity.org>; Nunez, Jacob <jnunez@slocity.org>
Subject: RE: SLO - Credit Card Fee
830
Thanks!
Rebecca
Rebecca Bernstorff
pronouns she/her/hers
Business Services and Administrative Manager
Administration – Community Services Group
E rbernstorff@slocity.org
T 805.781.7203
C 805.540.0219
slocity.org
Stay connected with the City by signing up for e-notifications
From: Cindy Sconce <CSconce@mgtconsulting.com>
Sent: Tuesday, July 25, 2023 3:44 PM
To: Jackson, Emily <ejackson@slocity.org>; Bernstorff, Rebecca <rbernstorff@slocity.org>
Subject: SLO - Credit Card Fee
This message is from an External Source. Use caution when deciding to open attachments, click links, or respond.
Hi Rebecca and Emily
As a follow up to our conversation regarding credit card fees, one of my colleagues said that they recently did a comparison
survey for one of their clients in Southern California to see what other agencies were doing. Here is what she was able to find
out:
831
In addition, she mentioned that she’s finding that many cities do not charge any fee and the ones that do use a third party
vendor to process the payments so they get the fee directly. Counties seem to charge fees more than cities but they have more
agencies that interface with the public. Most agencies are a bit cautious about layering in the credit card fees to all of their fees
since they do offer cash, check or other forms of payment. There also doesn’t seem to be any issues with charging the consumer
this fee legally since it is considered a pass through fee.
Please let me know if you have any additional questions and if we need to address a change on the fee schedule to
accommodate a new charge.
Cindy Sconce (she/her/hers)
Director, Performance Solutions Group
3600 American River Drive, Suite 150
Sacramento, CA 95864
Cell: 916.276.8807
Email: csconce@mgtconsulting.com
The information contained in this electronic communication is intended only for the use of the addressee, and may be
a confidential communication. If you are not the intended recipient, you are hereby notified that you have received this
transmittal in error; any review, dissemination, distribution, or copying of this transmittal is strictly prohibited.
832
From:Bernstorff, Rebecca
Sent:Thursday, September 14, 2023 4:43 PM
To:Taylor, Brent; Nichols, Vanessa; Kazemi, Neema
Subject:RE: Building Permit Report (adding # of units)
Importance:High
Hi Neema,
Just following up on this request. I think it’s also going to help make progress in the user fee side of the fee study as
well, so we are really excited to get this report!
Thanks so much!
Rebecca
Rebecca Bernstorff
pronouns she/her/hers
Business Services and Administrative Manager
Administration – Community Services Group
E rbernstorff@slocity.org
T 805.781.7203
C 805.540.0219
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Monday, September 11, 2023 4:49 PM
To: Nichols, Vanessa <vnichols@slocity.org>; Bernstorff, Rebecca <rbernstorff@slocity.org>; Kazemi, Neema
<nkazemi@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
@Kazemi, Neema, can we try the report based on Vanessa’s suggestions below. I think everything is same as you
previously pulled, except for the square footage data which Vanessa indicated can be pulled from the Square Feet tab
under Additional Info. Screenshot below…
833
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
From: Nichols, Vanessa <vnichols@slocity.org>
Sent: Monday, September 11, 2023 3:17 PM
To: Taylor, Brent <btaylor@slocity.org>; Bernstorff, Rebecca <rbernstorff@slocity.org>; Kazemi, Neema <nkazemi@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hi,
834
So, yes you can pull the square footages from the square footage tab which also has it by construction type. The
Number of Units would come from the Dwelling Units field on the general tab. Permit Number, Issue Date and Work
Class are just fields to add to report. You will have to do the average of square footage after you get number of units
and total square footage. Happy to help by showing which fields I am referencing. Let me know if you have any other
questions.
Vanessa Nichols
Building Permit Services Supervisor
Community Development
919 Palm Street, San Luis Obispo, CA 93401-3218
E vnichols@slocity.org
T 805.781.7588
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Monday, September 11, 2023 8:14 AM
To: Nichols, Vanessa <vnichols@slocity.org>; Bernstorff, Rebecca <rbernstorff@slocity.org>; Kazemi, Neema
<nkazemi@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hi Vanessa –
Thanks for the clarification and information. The data that we are trying to gather for impact fee consultant is:
ALL Permits in last 5 years (1/1/2018 – current). Data points for those permits need to include the following:
- Permit Number
- Issue Date
- Type of Construction/ Work Class (SFR, MFR, Commercial, etc)
- Square Footage
- Number of Units
- Multifamily Permits – Average Square Footage per unit
Final data point for the Multifamily properties is to calculate the average sq ft of each unit, so will need to manually
apply calculation (square footage/ # of units) to produce the average for those.
The issue we are having with the reports that Neema helped generate is that for a lot of the Multifamily units, the
square footage is “0” and therefore unable to calculate the average square footage per unit.
Any ideas or suggestions on alternate fields from Energov that we could try in capturing this data would be
appreciated as we are currently unable to provide the data needed to calculate impact fees.
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
835
slocity.org
Stay connected with the City by signing up for e-notifications
From: Nichols, Vanessa <vnichols@slocity.org>
Sent: Friday, September 8, 2023 8:14 AM
To: Bernstorff, Rebecca <rbernstorff@slocity.org>; Kazemi, Neema <nkazemi@slocity.org>; Taylor, Brent <btaylor@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hi Rebecca,
Currently I would say most of our impact fees are based off square footages. The only ones that I can think of that
aren’t are Park Improvement, Park Impact, Fire Citywide, Police Citywide and the Transportation add-on fees for
specific areas, which are all on per unit basis. Commercial Water/Wastewater Impact fee is based off Water Meter
size currently.
Square footages are captured in several different areas in Energov. It depends on the data you are trying to obtain as
to where the square footages should be pulled from. The square footage field located in “Detail” workflow tab is one
area that square footage is captured and if appropriate for scope of work we do try to make sure this square footage
field is completed. I would say that this field is completed most of the time (there was a window of time when this field
was not keeping the data). All the fees are calculated on the back end but for fees to populate a manual input must
happen. The square footage field is not connected to fee generation, so by human error it can be missed. However,
only for new single-family residences would this square footage field generate accurate information. If you ran a report
for only single-family residence and included permit number and this square footage field any that produced zero in
the square footage field on the report could be easily corrected so report was complete. Pulling square footage from
this field for Mixed-Use and Multi-Family projects is not as straightforward as residence and commercial square
footages are combined.
We also currently capture square footages (in ranges) through the Water, Wastewater and Transportation Citywide
impact fees that are charged. You could get number of units, by workclass within each square footage
range. Commercial impact fees can be capture through square footage inputs by type on the Transportation tab and
the water meter sizes under the Water/Wastewater tab under Commercial.
I do believe we have square footage inputs in Energov that would be helpful in your information gathering. I am happy
to assistance in figuring out the best avenue of getting the information you are seeking out of Energov. Nothing about
Energov or our current fee is straightforward.
Hope this long explanation was at least a little helpful!
Vanessa Nichols
Building Permit Services Supervisor
Community Development
919 Palm Street, San Luis Obispo, CA 93401-3218
E vnichols@slocity.org
T 805.781.7588
slocity.org
Stay connected with the City by signing up for e-notifications
From: Bernstorff, Rebecca <rbernstorff@slocity.org>
Sent: Thursday, September 7, 2023 10:25 AM
To: Kazemi, Neema <nkazemi@slocity.org>; Taylor, Brent <btaylor@slocity.org>
836
Cc: Nichols, Vanessa <vnichols@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Thanks for stopping by earlier this week, Vanessa.
Talking through with Brent I now recall why sqft is something we need to capture, and may not have been capturing
before because we usually only care about units.
As a part of the Fee Study, we are working to be in compliance with AB 602, a new law requiring that nexus studies
adopted after July 1, 2022 must calculate the amount of fees based on square footage of proposed units of the
housing development project.
Is this sqft info something that we have been inputting into Energov? If not, I totally understand why but wondering
if/how we do capture that data going forward…
Rebecca Bernstorff
pronouns she/her/hers
Business Services and Administrative Manager
Administration – Community Services Group
E rbernstorff@slocity.org
T 805.781.7203
C 805.540.0219
slocity.org
Stay connected with the City by signing up for e-notifications
From: Bernstorff, Rebecca
Sent: Tuesday, August 29, 2023 10:27 AM
To: Kazemi, Neema <nkazemi@slocity.org>; Taylor, Brent <BTaylor@slocity.org>
Cc: Nichols, Vanessa <vnichols@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Thanks for pulling this together, Neema. Why would 0 be getting put in? I’m having a hard time following why this
would happen and how we get the data to the fee study consultant when it now doesn’t exist in Energov?
In the future, can we have this field be required to include the sqft at the time of adding in the permit to Energov??
Such as a mandatory number that can’t be 0?
Rebecca Bernstorff
pronouns she/her/hers
Business Services and Administrative Manager
837
Administration – Community Services Group
E rbernstorff@slocity.org
T 805.781.7203
C 805.540.0219
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema <nkazemi@slocity.org>
Sent: Tuesday, August 29, 2023 9:12 AM
To: Taylor, Brent <btaylor@slocity.org>
Cc: Bernstorff, Rebecca <rbernstorff@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hi Brent,
This report has the added School fee square footage listed as SQFTInfoNewResidential and
SQFTInfoNewCommercial.
If anything, it just creates more questions. But, let me know if that helps!
Best,
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Monday, August 28, 2023 9:03 AM
To: Kazemi, Neema <nkazemi@slocity.org>
Cc: Bernstorff, Rebecca <rbernstorff@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Issue date looks good now but questioning the Sq Ft field again. I see lots of “0” listed. Even on Multifamily where
there is 13 units, still showing 0 sq footage. I checked a few permits and square footage is not input to the “Details”
screen, but is showing on the “additional details” screen under school fees section. This is what I was talking about
before, where the square footage is not consistently input to the details screen and not capturing the data needed. I
see it on all types of permits – multifamily, SFR, etc. Example below.
838
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
839
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema <nkazemi@slocity.org>
Sent: Monday, August 28, 2023 8:38 AM
To: Taylor, Brent <btaylor@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Sorry, forgot to format on excel after exporting. This should be better!
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Monday, August 28, 2023 8:32 AM
To: Kazemi, Neema <nkazemi@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hi Neema, the issue date is not pulling correctly, can you fix that? Otherwise looks good.
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema <nkazemi@slocity.org>
Sent: Monday, August 28, 2023 8:25 AM
To: Taylor, Brent <btaylor@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Hey Brent,
Try this out!
Best,
840
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Wednesday, August 23, 2023 4:15 PM
To: Kazemi, Neema <nkazemi@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report (adding # of units)
Importance: High
Hi Neema – can you please provide ETA for this report adding in the Dwelling Units (i.e. # of units for each permit).
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent
Sent: Monday, August 14, 2023 11:14 AM
To: Kazemi, Neema <nkazemi@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report
Hi Neema – our consultant is requesting additional field be added to this report.
Need to provide the number of units associated with each Permit. Thinking we can use the “Dwelling Units” field on
the Additional Info Screen to capture and add this to report you previously created.
Let me know if this is something we can do.
Thanks.
841
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema <nkazemi@slocity.org>
Sent: Wednesday, August 9, 2023 11:25 AM
To: Taylor, Brent <btaylor@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report
Hi Brent,
I did a quick audit of like ten permits with 0 sq footage and they were all for window retrofits or door replacements.
One was a commercial which was for a hood replacement. It looks like I misspoke, seems like our users in the front
are pretty good about entering square footage if its applicable.
Best,
Neema Kazemi
System Application Specialist - Energov
842
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema
Sent: Wednesday, August 9, 2023 9:37 AM
To: Taylor, Brent <BTaylor@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report
Permits have the SQ footage as a default field on the main details, so it totally depends on users filling it out during
input.
But, there may be SQ footage fields in the additional info that we may fill out as well. Let me see what we got!
Best.
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Wednesday, August 9, 2023 8:51 AM
To: Kazemi, Neema <nkazemi@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report
Hi Neema – no other data needed at this time.
Looks good as is, except the blank sq ft fields. Is there any other Sq Ft fields in Energov which we can try to see if it
will capture the ones showing 0 sq. ft.? I know it defaults to using this one, but front counter doesn’t always input to
that field.
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
843
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
From: Kazemi, Neema <nkazemi@slocity.org>
Sent: Wednesday, August 9, 2023 8:14 AM
To: Taylor, Brent <btaylor@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: RE: Building Permit Report
Hi Brent,
Getting a report with those data points took a few minutes, but is there any fee data you’d like added? Or currently,
there is no address information either.
I can probably get this finished this morning. For now, the only filters I have are BLDG permit and issuedate after
1/1/2018.
Best,
Neema Kazemi
System Application Specialist - Energov
Information Technology
919 Palm, San Luis Obispo, CA 93401-3218
E nkazemi@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Taylor, Brent <btaylor@slocity.org>
Sent: Wednesday, August 9, 2023 7:42 AM
To: Kazemi, Neema <nkazemi@slocity.org>
Cc: Parzanese, Joe <jparzanese@slocity.org>
Subject: Building Permit Report
Hi Neema, hoping you can help me with putting together a report out of Energov for data that is needed for the Impact
Fee Study project which will update our impact fee amounts.
Consultant is requesting a report on building permits for time range of 1/1/2018 – current. Main data points needed
are issue date, type of construction (SFR, MFR, etc) and the square footage.
This would be for building permits only.
Is this something you would be able to help me with? Would like to provide the report by Friday if possible.
Brent Taylor
pronouns he/him/his
Financial Analyst
Community Services Group
844
E btaylor@slocity.org
T 805.781.7091
slocity.org
Stay connected with the City by signing up for e-notifications
845
From:Pringle, Brendan
Sent:Thursday, September 14, 2023 2:19 PM
To:Panchal, Krishna
Subject:FW: Past Due MGT Invoice 52817 for City of San Luis Obispo
Attachments:INV_52817.pdf
Brendan Pringle
Business Analyst
Parks & Recreation
1341 Nipomo St, San Luis Obispo, CA 93401-3218
E bpringle@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From: Bernstorff, Rebecca <rbernstorff@slocity.org>
Sent: Tuesday, September 12, 2023 7:46 AM
To: Derrick Sheng <dsheng@mgtconsulting.com>
Cc: Threisy Paredes <tparedes@mgtconsulting.com>; arinv <arinv@mgtconsulting.com>; Lee Lein Onn
<lonn@mgtconsulting.com>; Patrick Dyer <PDyer@mgtconsulting.com>; Pringle, Brendan <bpringle@slocity.org>
Subject: RE: Past Due MGT Invoice 52817 for City of San Luis Obispo
Derrick,
The payment has been sent. There was a delay in receiving your W-9, so we only recently were able to get you set up
as a vendor in our financial system.
Thanks for your patience,
Rebecca
Rebecca Bernstorff
pronouns she/her/hers
Business Services and Administrative Manager
Administration – Community Services Group
E rbernstorff@slocity.org
T 805.781.7203
C 805.540.0219
slocity.org
Stay connected with the City by signing up for e-notifications
846
From: Derrick Sheng <dsheng@mgtconsulting.com>
Sent: Tuesday, September 12, 2023 6:36 AM
To: Bernstorff, Rebecca <rbernstorff@slocity.org>
Cc: Threisy Paredes <tparedes@mgtconsulting.com>; arinv <arinv@mgtconsulting.com>; Lee Lein Onn
<lonn@mgtconsulting.com>; Patrick Dyer <PDyer@mgtconsulting.com>
Subject: Past Due MGT Invoice 52817 for City of San Luis Obispo
This message is from an External Source. Use caution when deciding to open attachments, click links, or respond.
Hello,
We hope that you are all doing well.
Our records show that we haven’t received payment for invoice 52817, which is overdue.
If the payment has already been sent, please disregard this notice. If you require anything from us, please let me know and I’ll be
happy to assist.
Thank you kindly for your attention to this important matter.
Sending our best,
Derrick Sheng
AR Specialist
4320 West Kennedy Blvd.
Tampa, Florida 33609
Email: dsheng@mgtconsulting.com
The information contained in this electronic communication is intended only for the use of the
addressee, and may be
a confidential communication. If you are not the intended recipient, you are hereby notified that you
have received this
847
transmittal in error; any review, dissemination, distribution, or copying of this transmittal is strictly
prohibited.
Invoice
52817
Date:08/02/2023
Payment Terms:Net 30
Due Date:09/01/2023
PO number:
Bill To:Remit To:
City of San Luis Obispo
919 Palm Street
San Luis Obispo, CA 93401
MGT of America Consulting, LLC
P.O. Box 17780
Clearwater, FL 33762-0780
813-327-4717
arinv@mgtconsulting.com
Project: FSG | FY23 | City of San Luis Obispo | User and Impact Fee Stud | CA
Description Quantity Rate Amount
Project Management 1 $1,755.00 $1,755.00
MGT - User Fee Design 1 $11,670.00 $11,670.00
MGT - User Fee Analysis 1 $2,000.00 $2,000.00
DTA - Impact Fee Study (subcontractor)1 $4,520.00 $4,520.00
SubTotal:$19,945.00
Tax:$0.00
Total:$19,945.00
Company Confidential
848
From:Jamie Radcliff <jradcliff@mgtconsulting.com>
Sent:Thursday, September 14, 2023 2:08 PM
To:Kersten, Markie; White, Kelly
Cc:Cindy Sconce; Rachel King; Bernstorff, Rebecca
Subject:RE: [EXTERNAL]RE: User Fee Study- Cross Support for Attorney
Hi Markie:
I understand! Friday the 22nd will be great.
Thank you,
Jamie Radcliff
Manager
Performance SoluƟons Group
432-208-8194
jradcliff@mgtconsulƟng.com
Impacting Communities for Good
The informaƟon contained in this electronic communicaƟon is intended only for the use of the addressee, and may be
a confidenƟal communicaƟon. If you are not the intended recipient, you are hereby noƟfied that you have received this
transmiƩal in error; any review, disseminaƟon, distribuƟon, or copying of this transmiƩal is strictly prohibited.
From: Kersten, Markie <mkersten@slocity.org>
Sent: Thursday, September 14, 2023 11:47 AM
To: White, Kelly <kwhite@slocity.org>; Jamie Radcliff <jradcliff@mgtconsulting.com>
Cc: Cindy Sconce <CSconce@mgtconsulting.com>; Rachel King <rking@mgtconsulting.com>; Bernstorff, Rebecca
<rbernstorff@slocity.org>
Subject: [EXTERNAL]RE: User Fee Study- Cross Support for Attorney
Thanks. I am out of the office today through Tuesday the 19th, so EOD Wednesday is not realistic for me. Could I
complete my review by EOD Friday the 22nd?
From: White, Kelly <kwhite@slocity.org>
Sent: Thursday, September 14, 2023 9:26 AM
To: Jamie Radcliff <jradcliff@mgtconsulting.com>; Kersten, Markie <mkersten@slocity.org>
Cc: Cindy Sconce <CSconce@mgtconsulting.com>; Rachel King <rking@mgtconsulting.com>; Bernstorff, Rebecca
<rbernstorff@slocity.org>
Subject: RE: User Fee Study- Cross Support for Attorney
Jamie,
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
849
I’ve copied the attorney in our office who is lead for Public Works and Utilities Engineering (Markie – the draft for you
to edit is here).
Can you answer a few questions before Markie spends time on this task?
What does the yellow shading indicate?
Did Engineering believe legal assistance is provided for all these services or just a few? I was expecting to see
an “X” where Engineering believe legal support is provided but there were none until I unhid all the columns but
I’m guessing those are indicating a contribution by those departments/divisions.
Should zero be entered if no assistance is provided for some of the services listed?
Custom Agreements already has two hours entered. Was that an intentional contribution meant to limit our
answer or just a typo?
Kelly White
Senior Legal Analyst
City Attorney's Office
E kwhite@slocity.org
T 805.781.7060
From: Jamie Radcliff <jradcliff@mgtconsulting.com>
Sent: Thursday, September 14, 2023 7:53 AM
To: White, Kelly <kwhite@slocity.org>
Cc: Cindy Sconce <CSconce@mgtconsulting.com>; Rachel King <rking@mgtconsulting.com>; Bernstorff, Rebecca
<rbernstorff@slocity.org>
Subject: User Fee Study- Cross Support for Attorney
This message is from an External Source. Use caution when deciding to open attachments, click links, or respond.
Good Morning Kelly:
I have gathered informaƟon from Engineering, and they report that the AƩorneys (Legal) spend Ɵme on several of the
Engineering inspecƟon fees.
Engineering noted an “X” on the permits with their involvement. They need to replace the “X” with the Ɵme the posiƟon spends
on the permit (in hours or minutes, please indicate which).
Please return to me by COB on Wednesday, September 20th. If you have any quesƟons don't hesitate to reach out.
Thank you!
Jamie Radcliff
Manager
Performance SoluƟons Group
850
432-208-8194
jradcliff@mgtconsulƟng.com
Impacting Communities for Good
The informaƟon contained in this electronic communicaƟon is intended only for the use of the addressee, and may be
a confidenƟal communicaƟon. If you are not the intended recipient, you are hereby noƟfied that you have received this
transmiƩal in error; any review, disseminaƟon, distribuƟon, or copying of this transmiƩal is strictly prohibited.
851
From:Jamie Radcliff <jradcliff@mgtconsulting.com>
Sent:Thursday, September 14, 2023 2:02 PM
To:White, Kelly; Kersten, Markie
Cc:Cindy Sconce; Rachel King; Bernstorff, Rebecca
Subject:RE: [EXTERNAL]RE: User Fee Study- Cross Support for Attorney
Hi Kelly-
It was just the one fee that Engineering reported for the AƩorney.
I apologize – I did use the word several in my email and I can see where that was misleading.
If Markie notes other fees the aƩorney posiƟon touches, please document with a Ɵme esƟmate.
Thank you,
Jamie Radcliff
Manager
Performance SoluƟons Group
432-208-8194
jradcliff@mgtconsulƟng.com
Impacting Communities for Good
The informaƟon contained in this electronic communicaƟon is intended only for the use of the addressee, and may be
a confidenƟal communicaƟon. If you are not the intended recipient, you are hereby noƟfied that you have received this
transmiƩal in error; any review, disseminaƟon, distribuƟon, or copying of this transmiƩal is strictly prohibited.
From: White, Kelly <kwhite@slocity.org>
Sent: Thursday, September 14, 2023 2:42 PM
To: Jamie Radcliff <jradcliff@mgtconsulting.com>; Kersten, Markie <mkersten@slocity.org>
Cc: Cindy Sconce <CSconce@mgtconsulting.com>; Rachel King <rking@mgtconsulting.com>; Bernstorff, Rebecca
<rbernstorff@slocity.org>
Subject: RE: [EXTERNAL]RE: User Fee Study- Cross Support for Attorney
So, Markie just needs to look at one number? I know this is an infinitesimally small part of a huge project but that was
not clear from your original email.
Markie - it’s just the very bottom row (the Custom Agreement) that you need to input or confirm (where it currently
says two hours). If you scan the list and anything else pops out as something you contribute to, please enter the
amount of time. I’ve hid again all the columns that don’t apply to you so you should just see “A” and then from “AC” on.
Kelly White
Senior Legal Analyst
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
852
City Attorney's Office
E kwhite@slocity.org
T 805.781.7060
From: Jamie Radcliff <jradcliff@mgtconsulting.com>
Sent: Thursday, September 14, 2023 10:45 AM
To: White, Kelly <kwhite@slocity.org>; Kersten, Markie <mkersten@slocity.org>
Cc: Cindy Sconce <CSconce@mgtconsulting.com>; Rachel King <rking@mgtconsulting.com>; Bernstorff, Rebecca
<rbernstorff@slocity.org>
Subject: RE: [EXTERNAL]RE: User Fee Study- Cross Support for Attorney
Hi Kelly:
Please see my answers below. Thanks.
Jamie Radcliff
Manager
Performance SoluƟons Group
432-208-8194
jradcliff@mgtconsulƟng.com
Impacting Communities for Good
The informaƟon contained in this electronic communicaƟon is intended only for the use of the addressee, and may be
a confidenƟal communicaƟon. If you are not the intended recipient, you are hereby noƟfied that you have received this
transmiƩal in error; any review, disseminaƟon, distribuƟon, or copying of this transmiƩal is strictly prohibited.
From: White, Kelly <kwhite@slocity.org>
Sent: Thursday, September 14, 2023 11:26 AM
To: Jamie Radcliff <jradcliff@mgtconsulting.com>; Kersten, Markie <mkersten@slocity.org>
Cc: Cindy Sconce <CSconce@mgtconsulting.com>; Rachel King <rking@mgtconsulting.com>; Bernstorff, Rebecca
<rbernstorff@slocity.org>
Subject: [EXTERNAL]RE: User Fee Study- Cross Support for Attorney
Jamie,
I’ve copied the attorney in our office who is lead for Public Works and Utilities Engineering (Markie – the draft for you
to edit is here).
Can you answer a few questions before Markie spends time on this task?
What does the yellow shading indicate? These are new fees- they wanted them broken down into two
categories of document processing. I highlighted because they are new.
Did Engineering believe legal assistance is provided for all these services or just a few? I was expecting to see
an “X” where Engineering believe legal support is provided but there were none until I unhid all the columns but
I’m guessing those are indicating a contribution by those departments/divisions. The custom agreement is the
only fee Engineering thought you would be working on. They estimated two hours. Please edit for accuracy.
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
853
Should zero be entered if no assistance is provided for some of the services listed? No need. Just enter the
time on the fees you provide services to.
Custom Agreements already has two hours entered. Was that an intentional contribution meant to limit our
answer or just a typo? Estimate from Engineering. You may revise as needed.
Kelly White
Senior Legal Analyst
City Attorney's Office
E kwhite@slocity.org
T 805.781.7060
From: Jamie Radcliff <jradcliff@mgtconsulting.com>
Sent: Thursday, September 14, 2023 7:53 AM
To: White, Kelly <kwhite@slocity.org>
Cc: Cindy Sconce <CSconce@mgtconsulting.com>; Rachel King <rking@mgtconsulting.com>; Bernstorff, Rebecca
<rbernstorff@slocity.org>
Subject: User Fee Study- Cross Support for Attorney
This message is from an External Source. Use caution when deciding to open attachments, click links, or respond.
Good Morning Kelly:
I have gathered informaƟon from Engineering, and they report that the AƩorneys (Legal) spend Ɵme on several of the
Engineering inspecƟon fees.
Engineering noted an “X” on the permits with their involvement. They need to replace the “X” with the Ɵme the posiƟon spends
on the permit (in hours or minutes, please indicate which).
Please return to me by COB on Wednesday, September 20th. If you have any quesƟons don't hesitate to reach out.
Thank you!
Jamie Radcliff
Manager
Performance SoluƟons Group
432-208-8194
jradcliff@mgtconsulƟng.com
Impacting Communities for Good
The informaƟon contained in this electronic communicaƟon is intended only for the use of the addressee, and may be
a confidenƟal communicaƟon. If you are not the intended recipient, you are hereby noƟfied that you have received this
transmiƩal in error; any review, disseminaƟon, distribuƟon, or copying of this transmiƩal is strictly prohibited.
854
855
From:Scott, Shawna
Sent:Thursday, September 14, 2023 1:54 PM
To:
Subject:
Attachments:Comprehensive Fee Schedule 23-24.pdf
Hi John,
Pursuant to the current City fee schedule, meter costs are as follows (per meter, starting at the ¾ meter size):
Water Meter Cost: $211.79
Install Water Meter: $164.13
Adapter: $32.09
Account set up: $43.00
Min. 2-hour service fee: $372.07
Lateral installation: $656.53
Application and plan review fees would also apply; please check with the City Community Development Building
Division regarding applicable fees, which may include:
Meter Plan Review: $656.53
Trenched or Bored Excavation –
Water Service base fee: $894.37
Plus per linear foot: $24.18
Minor Encroachment permit: $268.13
Encroachment permit plan review: $359.89
Thank you,
Shawna
Shawna Scott
Special Projects Manager
Public Utilities
879 Morro Street, San Luis Obispo, CA 93401-3218
E sscott@slocity.org
T 805.781.7176
C 805.431.0108
From: City of San Luis Obispo, CA <slocitywebmaster@enotify.visioninternet.com>
Sent: Monday, September 11, 2023 3:13 PM
To: Boerman, Mychal <mboerman@slocity.org>
Subject:
This message is from an External Source. Use caution when deciding to open attachments, click links, or respond.
856
Message submitted from the <City of San Luis Obispo, CA> website.
Site Visitor Name:
Hi Mychal,
I'm the owner of
has four 2 bedroom/1.5 bath units and a 1 bedroom/1 bath unit, plus a laundry room.
Currently there is one water line to the building.
My question is will the City allow me to have six meters such that each unit pays it's own water bill while I pay for the laundry
room?
This year I've spent over $2,000 above the average water bill due to tenants not reporting water issues, which is wasteful and
costly.
I've had a plumber visit but the first step is to check to see if the City will allow us to have separate meters.
Regards,
Comprehensive FEE SCHEDULE
Fiscal Year 2023-2024
Planning Services…………………………………………………………... 2
Engineering Services……………………………………………………….. 6
Public Works Services……………………………………………………... 11
Cannabis Fees…………………………………………………………….....13
General Government……………………………………………………... 14
Fire Development Fees…………………………………………………......16
Other Fire Fees……………………………………………………..............22
Utilities Services…………………………………………………………… 26
Building Plan Check Fees………………………………………………… 27
Building Inspection Fees………………………………………………….. 30
Impact Fees………………………………………………….......................33
35
37 Parks & Recreation Fees……………………………………………………
Police Department Fees……………………………………………………..
The City' s adopted fee schedule is adjusted by 3.8% which reflects the All Urban Consumer Price Index, Los
Angeles area — based on the change from April 2022 – April 2023. (Resolution No. 11017, Section 4)
A 3.05% Information Technology Surcharge is included in fees associated with work in the EnerGov
Computer System.
Impact fees are adjusted annually by the CCCI rate, California Construction Cost Index.
44 Additional Building Fees……………………………………………………
1
Fee Number
FootnoteFee Description FY 2023-24 Application
Fee
It Surcharge* (if
applicable)
First Payment
(Application Fee
+ IT Surcharge
FY 2023-24 Completion
Fee (if applicable)
Total Fee (Aplication,
Completion, and IT Surcharge)
1 Sidewalk Sales Permit $342.24 $10.44 $352.68 $0.00 $352.68
2 Home Occupation Permit $198.62 $6.06 $204.68 $0.00 $204.68
3 Minor Use Permit (Admin)$1,291.89 $115.97 $1,407.87 $2,510.57 $3,918.43
4 Conditional Use Permit (Planning
Commission)$2,976.25 $241.38 $3,217.63 $4,937.84 $8,155.47
5 Variance $1,365.54 $110.68 $1,476.21 $2,263.20 $3,739.41
[1]Planned Development
6 Rezoning $19,604.00 $597.92 $20,201.92 $0.00 $20,201.92
7 Plan Amendment $5,443.01 $166.01 $5,609.02 $0.00 $5,609.02
[1]Rezoning
8 Map Amendment $14,681.19 $447.78 $15,128.96 $0.00 $15,128.96
9 Text Amendment $10,425.62 $317.98 $10,743.60 $0.00 $10,743.60
10 Time Extension
11 Non-profit Special Event Fee $263.32 $8.03 $271.35 $0.00 $271.35
12 Affordable Housing Incentive
Request $559.70 $45.96 $605.66 $947.34 $1,553.01
Airport Land Use Commission
(ALUC) Plan Review Fee
13 Reviews Requiring ALUC Hearing $2,268.58 $105.22 $2,373.80 $1,181.36 $3,555.16
Subdivision Services
14 Lot Line Adjustment $3,764.37 $114.81 $3,879.18 $0.00 $3,879.18
Tentative Subdivision Map
15 1-4 Lots $7,940.68 $242.19 $8,182.87 $0.00 $8,182.87
16 5-10 Lots $13,767.32 $419.90 $14,187.23 $0.00 $14,187.23
17 11-20 lots $18,447.36 $562.64 $19,010.01 $0.00 $19,010.01
18 [1]21+ lots (deposit of $20,000)$30,869.55 $941.52 $31,811.07 $0.00 $31,811.07
19 Certificate of Compliance $2,878.73 $87.80 $2,966.53 $0.00 $2,966.53
20 [2]Environmental Impact
Determination $7,658.35 $233.58 $7,891.93 $0.00 $7,891.93
21 [1,2]Initial Study/Environmental Impact
Report
30% + Contract
Cost
PLANNING FEES
Planning Fees Continued on next page
25% of Filing Fee
2
Fee Number
FootnoteFee Description FY 2023-24 Application
Fee
It Surcharge* (if
applicable)
First Payment
(Application Fee
+ IT Surcharge
FY 2023-24 Completion
Fee (if applicable)
Total Fee (Aplication,
Completion, and IT Surcharge)
Architectural Review
22 Signs $2,607.75 $185.94 $2,793.68 $3,488.61 $6,282.30
23 Conceptual Review $2,732.96 $221.63 $2,954.59 $4,533.62 $7,488.21
24 Development Projects - Moderate $5,572.33 $455.71 $6,028.05 $9,369.04 $15,397.09
25 Development Projects - Major $7,559.87 $609.02 $8,168.89 $12,407.96 $20,576.85
26 Development Project - Minor $2,016.42 $156.95 $2,173.37 $3,129.42 $5,302.79
27 Plan Revision $2,367.13 $178.01 $2,545.14 $3,469.18 $6,014.31
28 Time Extension/Modification 25% of Filing Fee
29 Christmas Tree/Pumpkin Lot Permit $446.58 $13.62 $460.20 $0.00 $460.20
30 Fence Height Exception $706.96 $21.56 $728.52 $0.00 $728.52
31 Voluntary Merger $964.21 $29.41 $993.62 $0.00 $993.62
32 Agreements $1,057.97 $32.27 $1,090.24 $0.00 $1,090.24
33 Bonds/Guarantees (voluntary)$1,057.97 $32.27 $1,090.24 $0.00 $1,090.24
34 Change of Address $308.27 $9.40 $317.67 $0.00 $317.67
35 Street Name Change $5,852.77 $178.51 $6,031.28 $0.00 $6,031.28
36 Street Abandonment $16,516.56 $503.75 $17,020.31 $0.00 $17,020.31
37 Condominium Conversion $18,520.89 $564.89 $19,085.78 $0.00 $19,085.78
PLANNING FEES
Planning Fees Continued on next page
3
Fee Number
FootnoteFee Description FY 2023-24 Application
Fee
It Surcharge* (if
applicable)
First Payment
(Application Fee
+ IT Surcharge
FY 2023-24 Completion
Fee (if applicable)
Total Fee (Aplication,
Completion, and IT Surcharge)
Appeals
38 Tier 1: e.g. Appeals to the City
Council - Applicant $1,933.55 $58.97 $1,992.53 $0.00 $1,992.53
39 Tier 1 Appeal - Non Applicant $773.67 $23.60 $797.27 $0.00 $797.27
40
Tier 2: e.g. Minor/Incidental Arch
Review, Administrative Use Permit,
Variance, Subdivisions <5 lots -
Applicant
$1,074.20 $32.76 $1,106.96 $0.00 $1,106.96
41 Tier 2 Appeal - Non Applicant $429.68 $13.11 $442.79 $0.00 $442.79
42
Tier 3: e.g. Fence Height Exception,
Administrative Approval Application -
Applicant
$376.29 $11.48 $387.76 $0.00 $387.76
43 Tier 3 Appeal - Non Applicant $376.29 $11.48 $387.76 $0.00 $387.76
44 Tier 4: e.g. Home Occupation
permit, Non-Profit Special Event - $161.44 $4.92 $166.37 $0.00 $166.37
45 Tier 4 Appeal - Non Applicant $161.44 $4.92 $166.37 $0.00 $166.37
46 Mills Act Participation Application $1,765.60 $53.85 $1,819.45 $0.00 $1,819.45
47 Director's Action Applications $1,043.97 $31.84 $1,075.81 $0.00 $1,075.81
48 Land Use Documentation Request $528.99 $16.13 $545.12 $0.00 $545.12
Fee Number
FootnoteFee Description FY 2023-24 Application
Fee
It Surcharge* (if
applicable)
First Payment
(Application Fee
+ IT Surcharge
FY 2023-24 Completion
Fee (if applicable)
Total Fee (Aplication,
Completion, and IT Surcharge)
1 Sidewalk Sales Permit $342.24 $10.44 $352.68 $0.00 $352.68
2 Home Occupation Permit $198.62 $6.06 $204.68 $0.00 $204.68
3 Minor Use Permit (Admin)$1,291.89 $115.98 $1,407.88 $2,510.57 $3,918.44
4 Conditional Use Permit (Planning
Commission)$2,976.25 $241.38 $3,217.63 $4,937.84 $8,155.47
5 Variance $1,365.54 $110.68 $1,476.21 $2,263.20 $3,739.41
[1]Planned Development
6 Rezoning $19,604.00 $597.92 $20,201.92 $0.00 $20,201.92
7 Plan Amendment $5,443.01 $166.01 $5,609.02 $0.00 $5,609.02
[1]Rezoning
8 Map Amendment $14,681.19 $447.78 $15,128.96 $0.00 $15,128.97
9 Text Amendment $10,425.62 $317.98 $10,743.60 $0.00 $10,743.60
10 Time Extension
11 Non-profit Special Event Fee $263.32 $8.03 $271.35 $0.00 $271.35
12 Affordable Housing Incentive
Request $559.70 $45.96 $605.66 $947.34 $1,553.00
Airport Land Use Commission
(ALUC) Plan Review Fee
13 Reviews Requiring ALUC Hearing $2,268.58 $105.22 $2,373.80 $1,181.36 $3,555.16
Subdivision Services
14 Lot Line Adjustment $3,764.37 $114.81 $3,879.18 $0.00 $3,879.18
Tentative Subdivision Map
15 1-4 Lots $7,940.68 $242.19 $8,182.87 $0.00 $8,182.87
16 5-10 Lots $13,767.33 $419.90 $14,187.23 $0.00 $14,187.23
17 11-20 lots $18,447.37 $562.64 $19,010.02 $0.00 $19,010.02
18 [1]21+ lots (deposit of $20,000)$30,869.55 $941.52 $31,811.07 $0.00 $31,811.07
19 Certificate of Compliance $2,878.73 $87.80 $2,966.53 $0.00 $2,966.53
20 [2]Environmental Impact
Determination $7,658.36 $233.58 $7,891.94 $0.00 $7,891.93
21 [1,2]Initial Study/Environmental Impact
Report
Planning Fees Continued on next page
PLANNING FEES
PLANNING FEES
25% of Filing Fee
30% + Contract Cost
4
Fee Number
FootnoteFee Description FY 2023-24 Application
Fee
It Surcharge* (if
applicable)
First Payment
(Application Fee
+ IT Surcharge
FY 2023-24 Completion
Fee (if applicable)
Total Fee (Aplication,
Completion, and IT Surcharge)
Architectural Review
22 Signs $2,607.75 $185.94 $2,793.68 $3,488.61 $6,282.30
23 Conceptual Review $2,732.96 $221.63 $2,954.59 $4,533.62 $7,488.21
24 Development Projects - Moderate $5,572.33 $455.71 $6,028.05 $9,369.04 $15,397.09
25 Development Projects - Major $7,559.87 $609.02 $8,168.89 $12,407.96 $20,576.85
26 Development Project - Minor $2,016.42 $156.95 $2,173.37 $3,129.42 $5,302.79
27 Plan Revision $2,367.13 $178.01 $2,545.14 $3,469.18 $6,014.31
28 Time Extension/Modification
29 Christmas Tree/Pumpkin Lot Permit $446.58 $13.62 $460.20 $0.00 $460.20
30 Fence Height Exception $706.95 $21.56 $728.51 $0.00 $728.51
31 Voluntary Merger $964.21 $29.41 $993.62 $0.00 $993.62
32 Agreements $1,057.97 $32.27 $1,090.24 $0.00 $1,090.24
33 Bonds/Guarantees (voluntary)$1,057.97 $32.27 $1,090.24 $0.00 $1,090.24
34 Change of Address $308.28 $9.40 $317.68 $0.00 $317.68
35 Street Name Change $5,852.77 $178.51 $6,031.28 $0.00 $6,031.28
36 Street Abandonment $16,516.55 $503.75 $17,020.30 $0.00 $17,020.30
37 Condominium Conversion $18,520.90 $564.89 $19,085.79 $0.00 $19,085.79
Fee Number
FootnoteFee Description FY 2023-24 Application
Fee
It Surcharge* (if
applicable)
First Payment
(Application Fee
+ IT Surcharge
FY 2023-24 Completion
Fee (if applicable)
Total Fee (Aplication,
Completion, and IT Surcharge)
Appeals
38 Tier 1: e.g. Appeals to the City
Council - Applicant $1,933.56 $58.97 $1,992.54 $0.00 $1,992.54
39 Tier 1 Appeal - Non Applicant $773.67 $23.60 $797.27 $0.00 $797.27
40
Tier 2: e.g. Minor/Incidental Arch
Review, Administrative Use Permit,
Variance, Subdivisions <5 lots -
Applicant
$1,074.20 $32.76 $1,106.96 $0.00 $1,106.96
41 Tier 2 Appeal - Non Applicant $429.68 $13.11 $442.79 $0.00 $442.79
42
Tier 3: e.g. Fence Height Exception,
Administrative Approval Application -
Applicant
$376.29 $11.48 $387.76 $0.00 $387.77
43 Tier 3 Appeal - Non Applicant $376.29 $11.48 $387.76 $0.00 $387.77
44
Tier 4: e.g. Home Occupation
permit, Non-Profit Special Event -
Applicant
$161.44 $4.92 $166.37 $0.00 $166.36
45 Tier 4 Appeal - Non Applicant $161.44 $4.92 $166.37 $0.00 $166.36
46 Mills Act Participation Application $1,765.60 $53.85 $1,819.45 $0.00 $1,819.45
47 Director's Action Applications $1,043.97 $31.84 $1,075.81 $0.00 $1,075.81
48 Land Use Documentation Request $528.99 $16.13 $545.12 $0.00 $545.12
PLANNING FEES
Planning Fees Continued on next page
PLANNING FEES
25% of Filing Fee
5
Fee Number Fee Description
FootnoteFY 2023-24
Rate
*IT Surcharge
(if applicable)Total
1
Plan check fees are based on
Estimated Construction Cost (ECC)
$10,000
flat fee
$1,941.19 $59.21 $2,000.40
each add'l $10,000 $1,419.16 $43.28 $1,462.44
$100,000
base fee
$14,713.68 $448.77 $15,162.45
each add'l $10,000 $146.59 $4.47 $151.06
$500,000
base fee
$20,576.96 $627.60 $21,204.56
each add'l $10,000 $177.48 $5.41 $182.89
$1,000,000
base fee
$29,450.74 $898.25 $30,348.99
each add'l $10,000 $77.91 $2.38 $80.29
$3,000,000
base fee
$45,507.70 $1,387.99 $46,895.69
each add'l $10,000 $151.68 $4.63 $156.30
2
Inspection fees are based on
Estimated Construction Cost (ECC)
$10,000
flat fee
$683.81 N/A $683.81
each add'l $10,000 $1,134.41 N/A $1,134.41
$100,000
base fee
$11,112.03 N/A $11,112.03
each add'l $10,000 $795.02 N/A $795.02
$500,000
base fee
$43,593.36 N/A $43,593.36
each add'l $10,000 $351.48 N/A $351.48
$1,000,000
base fee
$61,543.56 N/A $61,543.56
each add'l $10,000 $334.75 N/A $334.75
$3,000,000
base fee
$129,925.29 N/A $129,925.29
each add'l $10,000 $424.31 N/A $424.31
ENGINEERING FEES
Improvement Plan Check
Construction Inspection
Engineering Fees Continued on Next Page
6
Fee Number Fee Description
FootnoteFY 2023-24
Rate
*IT Surcharge
(if applicable)Total
3 Parcel Map - (up to 4 parcels)$7,966.25 $242.97 $8,209.22
4
Parcel Map - Commercial Zone (5 or
more parcels)
$11,536.62 $351.87 $11,888.48
Plus per parcel or common interest
unit
$60.75 $1.85 $62.60
5 Tract Map (base fee)$17,493.55 $533.55 $18,027.11
Plus per lot or common interest unit $188.68 $5.75 $194.44
6 Lot Line Adjustments $3,453.28 $105.33 $3,558.61
7 Certificates of Compliance $863.33 $26.33 $889.66
Additional Document
Review/Certificates of Correction
$345.33 $10.53 $355.87
8 Curb and Gutter (base fee)$836.78 $25.52 $862.30
plus per linear foot $12.11 $0.37 $12.48
9 Sidewalk (base fee)$751.32 $22.92 $774.23
plus per linear foot $6.72 $0.21 $6.93
10 Driveway Approach/Curb Ramp (base
fee)
$1,093.23 $33.34 $1,126.57
plus per linear foot $11.75 $0.36 $12.11
11 Water Service/Recycled Service(base
fee)
$867.89 $26.47 $894.37
plus per linear foot $23.46 $0.72 $24.18
12 Sewer (base fee)$695.00 $21.20 $716.20
plus per linear foot (Bore)$11.75 $0.36 $12.11
plus per linear foot (Trench)$11.75 $0.36 $12.11
13
Fire Lateral/Hydrant/Water and
Recycled Main Extension (base fee)
$1,905.20 $58.11 $1,963.31
plus per linear foot $28.49 $0.87 $29.35
14 Other/Dry Utilities (base fee)$781.45 $23.83 $805.29
plus per linear foot (Bore)$6.72 $0.21 $6.93
plus per linear foot (Trench)$11.75 $0.36 $12.11
15 Monitoring Well $260.19 $7.94 $268.13
ENGINEERING FEES
Final Maps
Certificate of Compliance or Final Lot
Encroachment Permits
Trenched or Bored Excavation (base fee)
Engineering Fees Continued on Next Page
7
Fee Number Fee Description
FootnoteFY 2023-24
Rate
*IT Surcharge
(if applicable)Total
16
Other Minor Encroachment Permits
not Listed
$260.19 $7.94 $268.13
17
Time Extension for Encroachment
Permit
$174.61 $5.33 $179.94
18 Unpermitted Encroachments $871.35 $26.58 $897.93
19 Encroachment Permit - Plan Review
fee (if required)
$349.24 $10.65 $359.89
20 Annual Encroachment Permit for
Utility Companies
$10,945.76 $333.85 $11,279.60
21 Single Trip Permit $16.61 N/A $16.61
22 Annual Permit $93.42 N/A $93.42
Maximum fee amount established by
Department of Transportation and is
not subject to CPI increases
23
Fiber Infrastructure Protection Fee
(per Call)
$335.99 $10.25 $346.24
24 Minor $222.33 $6.78 $229.11
25 Moderate $360.55 $11.00 $371.55
26 Major $636.56 $19.42 $655.98
27 Minor - first day $85.54 $2.61 $88.15
each additional day $85.54 $2.61 $88.15
28 Moderate - first day $171.07 $5.22 $176.28
each additional day $85.54 $2.61 $88.15
29 Major - first day [1]$342.15 $10.44 $352.59
each additional day $85.54 $2.61 $88.15
30 Public Improvement Plans $1,798.49 $54.85 $1,853.34
31 Building Plans $428.37 $13.07 $441.43
32 Maps / Additional Documents $492.20 $15.01 $507.21
33 Design Exception $343.39 $10.47 $353.86
ENGINEERING FEES
Transportation Permit
Traffic Control Plan Review
4th and subsequent plan review (per
Traffic Control Plan Inspection
Engineering Fees Continued on Next Page
8
Fee Number Fee Description
FootnoteFY 2023-24
Rate
*IT Surcharge
(if applicable)Total
34
0-2499 $350.33 $10.69 $361.02
2500-4999 $525.49 $16.03 $541.52
5000-14999 $875.82 $26.71 $902.53
15000-21999 $1,401.30 $42.74 $1,444.04
22000-43559 $1,751.63 $53.42 $1,805.06
43560+$2,101.96 $64.11 $2,166.07
35 Single Family Residential
0-2500 $350.33 $10.69 $361.02
2501+$1,050.98 $32.05 $1,083.04
36
Square Footage of Site
Disturbance:
Non-Single Family Residential
0-2499 $175.16 $5.34 $180.50
2500-4999 $175.16 $5.34 $180.50
5000-14999 $175.16 $5.34 $180.50
15000-21999 $350.33 $10.68 $361.01
22000-43559 $525.49 $16.03 $541.52
43560+$700.66 $21.37 $722.03
37 Single Family Residential
0-2500 $175.16 $5.34 $180.51
2501+$350.33 $10.68 $361.01
ENGINEERING FEES
Final Inspection Approval / Bluecard
Site Improvements - This includes
Engineering Fees Continued on Next Page
9
Fee Number Fee Description
FootnoteFY 2023-24
Rate
*IT Surcharge
(if applicable)Total
Flood Zone Analysis
38 Minor - Verification only $174.77 $5.33 $180.10
39 Major - New/Substantial Remodel
Analysis/Documentation
$699.08 $21.32 $720.40
Impervious Square Footage:
40 Non-Single Family Residential
0-2499 $175.16 $5.34 $180.51
2500-4999 $350.33 $10.68 $361.01
5000-14999 $700.65 $21.37 $722.02
15000-21999 $700.65 $21.37 $722.02
22000-43559 $1,050.98 $32.05 $1,083.03
43560+$1,401.31 $42.74 $1,444.05
41
0-2500 $175.16 $5.34 $180.51
2501+$700.66 $21.37 $722.03
42 Minor $350.33 $10.68 $361.01
43 Major $875.82 $26.71 $902.54
* Fee is subject to a 3.05% It Surcharge
ENGINEERING FEES
[1] Fees will be set on a Deposit basis and debited by the amount of
staff time and other materials required to provide services or
Consultant Fee plus 30% Admin Fee .
Post Construction Requirements /
Single Family Residential
Drainage Report/Flood Study - Breadth
10
1 Tree/Shrub Hazardous Abatement Actual Cost
2 Commemorative Tree Planting $357.50 N/A $357.50
3 Tree Removal Permit $182.37 N/A $182.37
Final Inspection Approval / Bluecard Signoff
Square Footage of Site Disturbance:
Non-Single Family Residential
4 0-2499 $289.15 $8.82 $297.97
5 2500-4999 $289.15 $8.82 $297.97
6 5000-14999 $289.15 $8.82 $297.97
7 15000-21999 $459.14 $14.00 $473.14
8 22000-43559 $629.13 $19.19 $648.31
9 43560+$799.11 $24.37 $823.48
Single Family Residential
10 0-2500 $289.15 $8.82 $297.97
11 2501+$289.15 $8.82 $297.97
12 Review of Mitigation Measures, Conditions, and
TIFs
$280.33 $8.55 $288.88
Parking in-Lieu Fees [1]
New Construction:
13 Standard (Fee Per Space)$30,794.37 N/A $30,794.37
14 Community Partners (50% Reduction)$15,394.96 N/A $15,394.96
15 Additions to Existing Buildings:
16 Standard (Fee Per Space)$30,794.37 N/A $30,794.37
17 Community Partners (50% Reduction)$15,394.96 N/A $15,394.96
Change in Occupancy Requiring Additional
Parking: [1]
18 Standard (Fee Per Space)$7,698.22 N/A $7,698.22
19 Community Partners (50% Reduction)$3,850.60 N/A $3,850.60
FY 2023-24
Rate
IT Surcharge*
(if applicable)TotalFee Number Fee Description
Public Works Fees
11
Parking Fees
10-Hour Meter Permit
20 Monthly Rate $60.00 N/A $60.00
21 Quarterly Rate $180.00 N/A $180.00
22 Residential 10-hour Meter Permit $20.00 N/A $20.00
23 Residential Parking District Permit $20.00 N/A $20.00
24 Replacement Fee, Initial $20.00 N/A $20.00
25 Replacement Fee, Subsequent $30.00 N/A $30.00
26 Commercial Loading Zone Permit $60.00 N/A $60.00
27 Parking Garage Access Card (Billed Quarterly)$255.00 N/A $255.00
28
Downtown Residential Overnight Parking
Program Parking Garage Access Card (Billed
Quarterly)
$375.00 N/A $375.00
29 Parking Garage Hourly Rate $3.00 N/A $3.00
30 Parking Garage Max Daily Rate $12.00 N/A $12.00
31 Parking Garage Overnight Rate $15.00 N/A $15.00
32 Parking Garage Lost Ticket Rate $6.00 N/A $6.00
33 Parking Garage Validation Program Hourly
Rate
$2.00 N/A $2.00
Electric Vehicle Charging Hourly Rate
34 1st four hours $1.50 N/A $1.50
35 Any additional time thereafter $4.00 N/A $4.00
36 Reserved Parking Space Program Rate $20.00 N/A $20.00
Fees are subject to a 3.05% It Surcharge
[1] Per vehicle space required by zoning regulations and not otherwise
provided. The number of spaces required by the change shall be the
difference between the number required by the new use and the
number required by the previous occupancy.
FY 2023-24
Rate
IT Surcharge*
(if applicable)TotalFee Number Fee Description
Public Works Fees
12
Fee Number Fee Description FY 2023-24 Rate
One Time Application Fee
1 Total One Time Application Fees $27,713.42
All Commercial Cannabis Business Applicants
2 Initial Application Fee $5,903.19
3 Final Application fee when permit issues $21,810.23
Cannabis Yearly License Fee [1]
4 Retail $45,993.29
5 Manufacturing $45,993.29
6 Cultivation $45,993.29
7 Other Business $45,993.29
[1] Prorated on Fiscal Year
Cannabis Fees
13
General Government Fees
Fee Number Fee Description FY 2023-24
Rate
GENERAL GOVERNMENT
Photo Copies
1 Two sided copies should be charged as two pages.
2 Standard or legal $0.47
3 11" x 17"$0.82
Microfiche Copies
4 Standard $0.63
5 11'' x 17''$3.24
6 18'' x 24''$3.93
7 Photographs $6.73
Audio Recordings
8 CD $8.72
9 Tape $17.44
10 Video Recordings $36.13
11 Faxes $3.74
Electronic Documents
These are PDF documents, which the City intends to publish.
Via the City's Web Site of e-mail
12 CD-Counter Pickup $4.99
13 CD-Mail $4.99
14 Late Fee (or 1.5%, whichever is greater)$17.60
Appeals to Advisory Bodies Following Administrative (non-
Planning) Decisions
15 Tree Committee $140.80
16 Construction Board of Appeals $1,339.57
17 Administrative Review Board $350.12
18 All Other Appeals $350.12
19 Community Service Worker Registration Fee $65.46
Finance Front Counter Fees continued on next page
14
General Government Fees
Fee Number Fee Description FY 2023-24
Rate
FINANCE DEPARTMENT
New Business License Processing Fee
20 Application $67.78
21 Zoning Fee $129.79
22 Annual Business License Renewal Processing Fee [1]$56.94
Home Occupancy Business
23 Renewal or New Application [3]$40.67
24 Business License & Tax Certificate Replacement Fee $13.55
Change of Location Only [1]
25 Zoning Fee $129.79
Returned Check Fee
26 Initial returned check $25.00
27 Each subsequent returned check $35.00
28 Annual Business Minimum Tax Fee $25.00
or 0.5%, whichever is greater
28 Annual Downtown Assessment -for locations within
Downtown
$150.00
or 0.5%, whichever is greater
29 SB1186 State Fee - Disability Access [2]$4.00
CREEK & FLOOD PROTECTION
Stormwater Connection Fee
30 Single Property $26.06
31 Larger Developments $68.24
[1] Businesses within the City of San Luis Obispo
[2] Added to new licenses and renewals - does not increase
[3] Consult Planning Fee table for additional Home Occupation Permit fee
15
Square Footage:
1 500 (base cost) $1,156.29 $35.27 $1,191.56
per s.f between tiers (increment)$0.34 $0.01 $0.35
2 5,000 (base cost) $2,668.38 $81.39 $2,749.76
per s.f between tiers (increment)$0.32 $0.01 $0.33
3 10,000 (base cost) $4,269.39 $130.22 $4,399.61
per s.f between tiers (increment)$0.08 $0.00 $0.08
4 50,000 (base cost) $7,738.28 $236.02 $7,974.30
per s.f between tiers (increment)$0.07 $0.00 $0.07
5 100,000 (base cost) $11,029.27 $336.39 $11,365.67
per s.f. >100,000 s.f. (increment)$0.11 $0.00 $0.11
Square Footage:
6 500 (base cost) $1,156.29 $35.27 $1,191.56
per s.f between tiers (increment)$0.34 $0.01 $0.35
7 5,000 (base cost) $2,668.38 $81.39 $2,749.76
per s.f between tiers (increment)$0.32 $0.01 $0.33
8 10,000 (base cost) $4,269.39 $130.22 $4,399.61
per s.f between tiers (increment)$0.08 $0.00 $0.08
9 50,000 (base cost) $7,738.28 $236.02 $7,974.30
per s.f between tiers (increment)$0.07 $0.00 $0.07
10 100,000 (base cost) $11,029.27 $336.39 $11,365.67
per s.f. >100,000 s.f. (increment)$0.11 $0.00 $0.11
Fire- Developmental
Fee Number
Fire Development Fees continued on next page...
Fee Description FY 2023-24 Rate IT Surcharge* (if applicable)Total
Commercial Uses - Structural (All newly constructed, added, or structurally remodeled space for non-residential
occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed
elsewhere in this Fee Schedule)
NEW CONSTRUCTION, ADDITIONS, AND MAJOR REMODELS
Commercial Residential and Multifamily Residential Uses - (All newly constructed, added, or structurally remodeled space
for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically
addressed elsewhere in this Fee Schedule)
16
Square Footage:
11 500 (base cost) $444.73 $13.56 $458.30
per s.f between tiers (increment)$0.09 $0.00 $0.10
12 5,000 (base cost) $889.45 $27.13 $916.58
per s.f between tiers (increment)$0.14 $0.00 $0.14
13 10,000 (base cost) $1,601.03 $48.83 $1,649.86
per s.f between tiers (increment)$0.04 $0.00 $0.04
14 50,000 (base cost) $3,113.10 $94.95 $3,208.05
per s.f between tiers (increment)$0.05 $0.00 $0.05
15 100,000 (base cost) $5,336.74 $162.77 $5,499.51
per s.f. >100,000 s.f. (increment)$0.06 $0.00 $0.06
Square Footage:
16 500 (base cost) $978.41 $29.84 $1,008.25
per s.f between tiers (increment)$0.29 $0.01 $0.30
17 5,000 (base cost) $2,312.59 $70.53 $2,383.12
per s.f between tiers (increment)$0.11 $0.00 $0.11
18 10,000 (base cost) $2,846.26 $86.81 $2,933.07
per s.f between tiers (increment)$0.04 $0.00 $0.04
19 50,000 (base cost) $4,180.45 $127.50 $4,307.95
per s.f between tiers (increment)$0.04 $0.00 $0.04
20 100,000 (base cost) $6,048.31 $184.47 $6,232.79
per s.f. >100,000 s.f. (increment)$0.06 $0.00 $0.06
Square Footage:
21 200 (base cost) $444.73 $13.56 $458.30
per s.f between tiers (increment)
22 400 (base cost) $444.73 $13.56 $458.30
per s.f between tiers (increment)
23 600 (base cost) $444.73 $13.56 $458.30
per s.f between tiers (increment)
24 1,000 (base cost) $444.73 $13.56 $458.30
per s.f between tiers (increment)
25 3,000 (base cost) $444.73 $13.56 $458.30
per s.f. >100,000 s.f. (increment)$0.15 $0.00 $0.16
Fire Development Fees continued on next page...
Attached Accessory and Utility Uses - (All newly constructed, added, or structurally remodeled space for utility and
accessory occupancies classified as CBC Group U, or other utility and accessory occupancies not specifically addressed
elsewhere in this Fee Schedule)
Fire- Developmental
Fee DescriptionFee Number
Low and Moderate Hazard Storage - (All newly constructed, added, or structurally remodeled space for storage
occupancies classified as CBC Group S, or other storage occupancies not specifically addressed elsewhere in this Fee
Schedule)
FY 2023-24 Rate IT Surcharge* (if applicable)Total
Duplicate Floor Plan Review - Commercial Residential and Multifamily Residential Uses
17
Square Footage:
26 200 (base cost) $444.73 $13.56 $458.30
per s.f between tiers (increment)
27 400 (base cost) $444.73 $13.56 $458.30
per s.f between tiers (increment)
28 600 (base cost) $444.73 $13.56 $458.30
per s.f between tiers (increment)
29 1,000 (base cost) $444.73 $13.56 $458.30
per s.f between tiers (increment)
30 3,000 (base cost) $444.73 $13.56 $458.30
per s.f. >100,000 s.f. (increment)$0.15 $0.00 $0.16
Square Footage:
31 500 (base cost) $1,156.29 $35.27 $1,191.56
per s.f between tiers (increment)$0.34 $0.01 $0.35
32 5,000 (base cost) $2,668.38 $81.39 $2,749.76
per s.f between tiers (increment)$0.14 $0.00 $0.14
33 10,000 (base cost) $3,379.94 $103.09 $3,483.02
per s.f between tiers (increment)$0.04 $0.00 $0.04
34 50,000 (base cost) $4,892.02 $149.21 $5,041.23
per s.f between tiers (increment)$0.02 $0.00 $0.02
35 100,000 (base cost) $6,048.31 $184.47 $6,232.79
per s.f. >100,000 s.f. (increment)$0.06 $0.00 $0.06
Square Footage:
36 500 (base cost) $622.62 $18.99 $641.61
per s.f between tiers (increment)$0.37 $0.01 $0.39
37 5,000 (base cost) $2,312.59 $70.53 $2,383.12
per s.f between tiers (increment)$0.25 $0.01 $0.25
38 10,000 (base cost) $3,557.83 $108.51 $3,666.35
per s.f between tiers (increment)$0.05 $0.00 $0.05
39 50,000 (base cost) $5,247.80 $160.06 $5,407.86
per s.f between tiers (increment)$0.07 $0.00 $0.07
40 100,000 (base cost) $8,538.79 $260.43 $8,799.23
per s.f. >100,000 s.f. (increment)$0.08 $0.00 $0.08
Fire Development Fees continued on next page...
Fee Description FY 2023-24 Rate IT Surcharge* (if applicable)Total
Detached Accessory and Utility Uses - (All newly constructed, added, or structurally remodeled space for utility and
accessory occupancies classified as CBC Group U, or other utility and accessory occupancies not specifically addressed
elsewhere in this Fee Schedule)
Shell Buildings for all Commercial Uses - (The enclosure for all newly constructed, added, or structurally remodeled
space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not
specifically addressed elsewhere in this Fee Schedule where the interior is not completed or occupiable)
Commercial Tenant Improvement - Non Structural - (Non-structurally remodeled space for non-residential occupancies
classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this
Fee Schedule where the structure is not altered)
Fire- Developmental
Fee Number
18
Square Footage:
41 500 (base cost) $622.62 $18.99 $641.61
per s.f between tiers (increment)$0.37 $0.01 $0.39
42 5,000 (base cost) $2,312.59 $70.53 $2,383.12
per s.f between tiers (increment)$0.25 $0.01 $0.25
43 10,000 (base cost) $3,557.83 $108.51 $3,666.35
per s.f between tiers (increment)$0.05 $0.00 $0.05
44 50,000 (base cost) $5,247.80 $160.06 $5,407.86
per s.f between tiers (increment)$0.07 $0.00 $0.07
45 100,000 (base cost) $8,538.79 $260.43 $8,799.23
per s.f. >100,000 s.f. (increment)$0.08 $0.00 $0.08
Square Footage:
46 1,000 (base cost) $444.73 $13.56 $458.30
per s.f between tiers (increment)
47 2,500 (base cost) $444.73 $13.56 $458.30
per s.f between tiers (increment)
48 4,000 (base cost) $444.73 $13.56 $458.30
per s.f between tiers (increment)
49 6,000 (base cost) $444.73 $13.56 $458.30
per s.f between tiers (increment)
50 8,000 (base cost) $444.73 $13.56 $458.30
per s.f. >100,000 s.f. (increment)$0.06 $0.00 $0.06
Square Footage:
51 1,000 (base cost) $355.78 $10.85 $366.63
per s.f between tiers (increment)
52 2,500 (base cost) $355.78 $10.85 $366.63
per s.f between tiers (increment)
53 4,000 (base cost) $355.78 $10.85 $366.63
per s.f between tiers (increment)
54 6,000 (base cost) $355.78 $10.85 $366.63
per s.f between tiers (increment)
55 8,000 (base cost) $355.78 $10.85 $366.63
per s.f. >100,000 s.f. (increment)$0.05 $0.00 $0.05
Fee Description
Fire Development Fees continued on next page...
Fee Number
Commercial Residential and Multifamily Residential Remodels - Non Structural - (Non-Structurally remodeled space for
residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically
addressed elsewhere in this Fee Schedule)
Single Family Dwellings and Duplexes - (All newly constructed space for residential occupancies classified as CBC Group
R-3, including custom builds and model homes for tract master plans, or other similar residential occupancies not
specifically addressed elsewhere in this Fee Schedule)
FY 2023-24 Rate IT Surcharge* (if applicable)Total
Duplicate Floor Plan Review - Single Family Dwellings and Duplexes
Fire- Developmental
19
Square Footage:
56 200 (base cost) $355.78 $10.85 $366.63
per s.f between tiers (increment)$0.00 $0.00
57 400 (base cost) $355.78 $10.85 $366.63
per s.f between tiers (increment)$0.00 $0.00
58 600 (base cost) $355.78 $10.85 $366.63
per s.f between tiers (increment)$0.00 $0.00
59 1,000 (base cost) $444.73 $13.56 $458.30
per s.f between tiers (increment)
60 3,000 (base cost) $444.73 $13.56 $458.30
per s.f. >100,000 s.f. (increment)$0.15 $0.00 $0.16
Square Footage:
61 0-2499 $444.73 $13.56 $458.30
62 2500-4999 $444.73 $13.56 $458.30
63 5000-14999 $800.51 $24.42 $824.93
64 15000-21999 $888.33 $27.09 $915.43
65 22000-43559 $1,110.42 $33.87 $1,144.29
66 43560+$1,510.18 $46.06 $1,556.24
(Issued by Building and Safety)
67 1-25 Heads $1,156.29 $35.27 $1,191.56
68 26-50 Heads $1,601.03 $48.83 $1,649.86
69 51-100 Heads $1,778.91 $54.26 $1,833.17
70 101-200 Heads $2,401.54 $73.25 $2,474.79
71 Every 200 Heads above 200 $711.57 $21.70 $733.27
Fire Development Fees continued on next page...
Fee Number Fee Description
Fire- Developmental
FY 2023-24 Rate IT Surcharge* (if applicable)Total
Duplicate Floor Plan Review - Attached or Detached Accessory and Utility Uses
Site Improvements - This includes substantial development of private parking lots which are processed separate of the
structure and include any combination of the following: Underground utilities, parking lot lighting, accessible path of
travel analysis, grading, drainage and compliance with the City's parking and driveway standards.
FIRE SPRINKLER AND SUPPRESSION SYSTEMS
Fire Sprinkler Systems (New Installation)
20
Fire Alarm System (New Installation)
72 1-50 Devices $1,156.29 $35.27 $1,191.56
73 51-100 Devices $1,956.81 $59.68 $2,016.49
74 Every 50 Devices above 100 $711.57 $21.70 $733.27
75 Sprinkler Monitoring System $444.73 $13.56 $458.30
Fire Sprinkler Systems (Tenant Improvement)
76 1-25 Heads $622.62 $18.99 $641.61
77 26-50 Heads $800.51 $24.42 $824.93
78 51-100 Heads $1,245.25 $37.98 $1,283.23
79 101-200 Heads $1,601.03 $48.83 $1,649.86
80 Every 200 Heads above 200 $711.57 $21.70 $733.27
Fire Alarm System (Tenant Improvement)
81 1-50 Devices $1,156.29 $35.27 $1,191.56
82 51-100 Devices $1,956.81 $59.68 $2,016.49
83 Every 50 Devices above 100 $800.51 $24.42 $824.93
84 Sprinkler Monitoring System $444.73 $13.56 $458.30
Other Suppression Systems
85 Insert Gas Systems $1,245.25 $37.98 $1,283.23
86 Dry Chemical Systems $711.57 $21.70 $733.27
87 Wet Chemical/Kitchen Hood $533.68 $16.28 $549.95
88 Foam Systems $2,223.64 $67.82 $2,291.46
89 Paint Spray Booth $800.51 $24.42 $824.93
OTHER MISCELLANEOUS FEES
90 Alternative Method and Material Review $711.57 $21.70 $733.27
91 Expedited Plan Review Fee $0.00 $0.00 $0.00
Fee Description
Fire- Developmental
* Fee is subject to a 3.05% It Surcharge
Fee Number FY 2023-24 Rate IT Surcharge* (if applicable)Total
21
Other Fire Fees
Hazardous Occupancy Permits [1]
1 Aircraft Refueling Vehicles $175.50
2 Aircraft Repair Hangar $351.00
3 Automobile Wrecking Yard $438.75
4 Bonfire or Rubbish Fires $175.50
5 Burning in Public Place $175.50
6 Candles or Open-Flames in Assembly Areas $175.50
7 Combustible Fiber Storage (handle/store over 100 cu ft)$438.75
8 Compressed Gases $175.50
9 Cryogens $351.00
10 Dry Cleaning Plant $351.00
11 Dust Producing Operation $351.00
12 Explosives or Blasting Agents $702.00
13 Fireworks $702.00
14 Flammable or Combustible Liquids (Unless in the CUPA Program)$351.00
15 Fruit Ripening - Ethylene Gas Fogging $351.00
16 Garages - Repair $351.00
17 Hazardous Chemicals (Unless in the CUPA Program):$438.75
18 High-Piled Combustible Stock - exceeding 2500 sq ft $438.75
19 Junk Yards $438.75
20 Liquefied Petroleum Gas $263.25
21 Lumberyard - Storage in excess of 100,000 board feet $438.75
22 Magnesium Working - Process more than 10 lbs daily $351.00
23 Mall (covered)$438.75
24 Organic Coatings - manufacture over 1 gallon a day $438.75
25 Ovens - Industrial, Baking and Drying $175.50
26 Places of Assembly $351.00
27 Refrigeration Equipment - Mechanical refrigeration (see UFC for most
common refrigerants)
$526.50
28 Spraying or Dipping $351.00
29 Tents and Air-supported Structures - excess of 200 sq ft $351.00
30 Tire Re-capping $351.00
31 Waste Material Plant $438.75
32 Welding and Cutting Operations - Any Occupancy $263.25
33 Additional Permitted Use (per permit) [1]$87.75
Other Fire Fees continued on next page…
Fee DescriptionFee Number FY 2023-24
Rate
22
Other Fire Fees
NON-MANDATED / REQUIRED INSPECTIONS
Commercial Business Inspections (Up to 3 stories)
0 – 5,000 sq. ft.
5,001 – 40,000 sq. ft.
40,001 – 120,000 sq. ft.
120,001 – 150,000 sq. ft.
150,001 – or more sq. ft.
Mid Rise Inspections (4 -6 stories)
New Business Inspection
FIRE FALSE ALARM FEES
Initial Permit and Renewal Registrations - see Police
False fire alarms shall be considered excessive when they meet or exceed
the following number:
Two false alarms in any thirty-day period
Three false alarms in any three-hundred-sixty day period
34 False alarms exceeding these numbers $681.23
CERTIFIED UNIFIED PARTICIPATING AGENCY FEES
Hazardous Materials Handlers
35 Remote utility (1-time fee)$674.16
36 1 - 4 Materials handled $388.10
37 5 - 10 Materials handled $442.76
38 11+ Materials handled $530.22
Waste Generators
39 1 Waste stream (professional or medical)$260.55
40 1 - 5 Waste streams (all others)$388.10
41 6+ Waste streams $522.94
42 Waste Stream (DeMinimus)$125.72
Tiered Permitting
43 CE $823.57
44 CA $1,297.31
45 PBR $3,064.71
Underground Storage Tanks (general model)
46 First tank $2,239.31
47 Each additional tank
48 Tank installation $7,308.29
49 Tank removal $5,657.50
50 Minor Modification $2,120.88
51 Major Modification $6,599.50
Above Ground Storage Tanks
52 One Tank $245.98
53 Two Tanks $491.96
54 Three Tanks $588.52
CALARP
55 New Stationary Source Facility $3,228.69
56 Existing Annual Facility Inspection $502.89
57 Site Remediation Oversight $251.45
Other Fire Fees continued on next page…
Fee Number Fee Description FY 2023-24
Rate
23
Other Fire Fees
58 Soil Remediation $251.45
59 Temporary Closure Permit $2,100.84
Closures
60 Temporary Closure $2,239.31
61 Closure in Place $2,829.66
Late Fee
Annual permit fees received 31-60 days after original invoice day
Annual permit fees received 61 + days after original invoice day
FIRE EQUIPMENT AND PERSONNEL STAND-BY FEES
62 Fire Engine/Ladder Truck $506.73
63 Squad or Light Rescue Equipment $315.64
64 Third & Subsequent Fire Inspection Fee $209.54
Additional Site Inspection Fee (one hour min.)
Fire Investigation/Fire Preventions
Firefighter Standby
Administrative/Clerical
Multi-Dwelling Fire and Life Safety Inspection Fee Schedule [2] [3]
Administrative Fee [4]
70 Processing per facility $104.76
71 Each Additional Owner $12.43
Apartment Houses
Fees are waived for units that are built, owned and managed by the San
Luis Obispo Housing Authority, other government agencies or not-for-profit
housing organizations
72 Up to 10 units $419.07
73 11 - 20 Units $628.61
74 21 - 50 Units $838.15
75 51 - 100 Units $1,047.69
76 101 - 200 Units $1,676.30
77 Every additional 100 Units over 200 $419.07
Hotels, Motels, Lodging Houses, Bed & Breakfast Facilities, Youth
Hostel Facilities, Senior Facilities, Sororities, Fraternities and Other
Congregate Residences
Hotel, Motel, Bed & Breakfast
78 1 - 20 Units $419.07
79 21 - 50 Units $628.61
80 51 - 100 Units $1,047.69
81 101 - 200 Units $1,676.30
82 Sorority and Fraternity $838.15
Condominiums
83 Up to 10 Units $419.07
84 11 - 20 Units $628.61
85 21 - 50 Units $838.15
86 51 - 500 Units $1,257.22
Other Fire Fees continued on next page…
Fee Number Fee Description FY 2023-24
Rate
24
Other Fire Fees
OTHER FIRE FEES
87 Hydrant Flow Test (First Hydrant)$209.54
88 Hydrant Flow Test (Each Additional Hydrant)$104.76
89 Reinspection Fee (construction)$209.54
90 Board of Appeals $209.54
91 Emergency Call-Out (Non-Scheduled)$816.80
92 After Hours Call-Out (Scheduled)$204.20
[4] Administrative fee applies to both Apt Houses and Hotels, Motels, etc. Total processing fee calculated will be divided equally
amongst all owners.
[3] These fees are applicable to all multi-dwelling units in the City based on the definitions set forth in the 2007 California
Building Code
[2] Fees are waived for units that are built, owned and managed by the San Luis Obispo Housing Authority, other government
agencies or not-for-profit housing organizations.
[1] For Locations with multiple required permits, fee is calculated at highest permit fee, plus 1/2 hour of inspection per
additional permitted use.
Fee Number Fee Description FY 2023-24
Rate
25
Fee Number Fee Description FY 2023-24 Rate IT Surcharge* (If
applicable)Total
Meter Services
1 Water Meter Cost (.75")$205.52 $6.27 $211.79
2 Water Meter Cost (1")$224.21 $6.84 $231.05
3 Water Meter Cost (1.5")$587.51 $17.92 $605.43
4 Water Meter Cost (2")$742.17 $22.64 $764.81
1 Install Water Meter (3/4" - 1")$159.27 $4.86 $164.13
2 Install Water Meter (1.5" - 2")$318.54 $9.72 $328.26
3 Install Water Meter (larger than 2")Time & Materials
4 Remove Water Meter (5/8" - 1")$159.27 $4.86 $164.13
5 Remove Water Meter (1.5" - 2")$318.54 $9.72 $328.26
6 Remove Water Meter (larger than 2")Time & Materials
7 Adapter Cost (1" Service/.58"x.75" Meter)$31.14 $0.95 $32.09
8 Adapter Cost (1" Service/.75" Meter)$18.48 $0.56 $19.04
9 Adapter Cost (1.5" Service/1" Meter)$180.61 $5.51 $186.12
10 Adapter Cost (2" Service/1" Meter)$139.09 $4.24 $143.33
11 Adapter Cost (2" Service/1.5" Meter)$265.73 $8.10 $273.83
12 Adapter Cost (2" /1" + 1"/.75" Combo Meter)$208.64 $6.36 $215.00
7 Retirement of Service $955.64 N/A $955.64
8 Retirement of Service (larger than 2")$955.64 N/A $955.64
9 Account Set-up $43.00 N/A $43.00
10 Account Set-up After Hours/Weekends
11 Minimum 2 hours service fee $372.07 N/A $372.07
12 Each Additional Hour $180.03 N/A $180.03
13 Disconnect Service for Non-Payment $50.00 N/A $50.00
14 Lateral Installation $637.09 $19.43 $656.53
15 Lateral Abandonment $637.09 $19.43 $656.53
Per Plan Review Submittal
16 New Meter, trash enclosures, landscape plans $637.09 $19.43 $656.53
17 RH20 $637.09 $19.43 $656.53
18 C&D Recycling $79.64 $2.43 $82.07
19 Class I (ex: Automotive Repair, Photo processors)$394.93 N/A $394.93
20 Class II (ex: Restaurant, Bakery)$212.66 N/A $212.66
21 Significant Industrial User (ex: Chemical Manufacturing, Electro-plating)$2,058.80 N/A $2,058.80
22 Industrial User Re-Inspection $95.81 N/A $95.81
* Fee is subject to a 3.05% It Surcharge
Utilities Fees
26
base addtl base addtl base addtl
1-399 $862.41 $1.95 $718.45 $1.64 $574.51 $1.26
400-599 $1,253.12 $1.81 $1,044.92 $1.51 $836.70 $1.17
600-999 $1,619.42 $0.40 $1,349.52 $0.34 $1,079.62 $0.26
1,000-2,999 $1,781.36 $0.32 $1,484.47 $0.27 $1,187.57 $0.21
3,000-Unlimited $2,429.14 $0.81 $2,024.28 $0.67 $1,619.42 $0.51
1-4,999 $2,030.71 $1.34 $1,692.68 $1.12 $1,353.37 $0.88
5,000-9,999 $8,126.67 $0.40 $6,772.01 $0.34 $5,417.35 $0.26
10,000-49,999 $10,157.38 $0.15 $8,464.69 $0.12 $6,772.01 $0.09
50,000-99,999 $16,252.06 $0.08 $13,544.02 $0.06 $10,834.70 $0.04
100,000-Unlimited $20,314.75 $0.21 $16,929.39 $0.16 $13,544.02 $0.12
1-4,999 $1,692.68 $1.13 $1,409.93 $0.92 $1,128.46 $0.74
5,000-9,999 $6,772.01 $1.80 $5,643.56 $0.27 $4,513.82 $0.22
10,000-49,999 $8,464.69 $0.64 $7,053.48 $0.09 $5,643.56 $0.08
50,000-99,999 $13,544.02 $0.36 $11,287.11 $0.05 $9,028.92 $0.04
100,000-Unlimited $16,929.39 $0.89 $14,106.97 $0.13 $11,287.11 $0.11
1-4,999 $3,385.37 $2.24 $2,821.14 $1.88 $2,256.91 $1.45
5,000-9,999 $13,544.02 $0.67 $11,287.11 $0.55 $9,028.92 $0.43
10,000-49,999 $16,929.39 $0.25 $14,106.97 $0.21 $11,287.11 $0.16
50,000-99,999 $27,088.04 $0.13 $22,572.94 $0.11 $18,057.84 $0.08
100,000-Unlimited $33,860.06 $0.34 $28,216.50 $0.27 $22,572.94 $0.22
1-4,999 $1,760.80 $1.17 $1,467.76 $0.96 $1,174.72 $0.78
5,000-9,999 $7,049.62 $0.35 $5,873.62 $0.28 $4,698.90 $0.23
10,000-49,999 $8,811.72 $0.12 $7,342.67 $0.11 $5,873.62 $0.08
50,000-99,999 $14,097.97 $0.06 $11,748.52 $0.05 $9,399.07 $0.04
100,000-Unlimited $17,623.42 $0.18 $14,685.34 $0.13 $11,748.52 $0.11
1-4,999 $3,724.67 $2.48 $3,103.89 $2.06 $2,483.12 $1.60
5,000-9,999 $14,897.40 $0.75 $12,415.57 $0.62 $9,932.45 $0.48
10,000-49,999 $18,622.07 $0.27 $15,518.18 $0.23 $12,415.57 $0.18
50,000-99,999 $29,796.08 $0.15 $24,829.85 $0.12 $19,863.62 $0.09
100,000-Unlimited $37,246.71 $0.36 $31,038.93 $0.30 $24,829.85 $0.23
Building Plan Check Fees
Attached Accessory/Utility Uses
Commercial Shell
Commercial Tenant Improvements
Commercial Uses
Commercial/Multi-Family Residential
Remodel - Non-Structural
Commercial/Multi-Family Residential
Uses
FY 2023-24 Rate
IA, IB IIA, IIIA, VA IIB, IIIB, VB, IV
27
base addtl base addtl base addtl
1-399 $862.41 $1.95 $718.45 $1.64 $574.51 $1.26
400-599 $1,253.12 $1.81 $1,044.92 $1.51 $836.70 $1.17
600-999 $1,619.42 $0.40 $1,349.52 $0.34 $1,079.62 $0.26
1,000-2,999 $1,781.36 $0.32 $1,484.47 $0.27 $1,187.57 $0.21
3,000-Unlimited $2,429.14 $0.81 $2,024.28 $0.67 $1,619.42 $0.51
1-399 $258.33 $0.57 $215.93 $0.49 $172.23 $0.39
400-599 $375.29 $0.54 $312.31 $0.44 $250.62 $0.36
600-999 $484.54 $0.12 $403.57 $0.09 $322.60 $0.08
1,000-2,999 $534.67 $0.09 $444.70 $0.08 $356.01 $0.05
3,000-Unlimited $728.74 $0.25 $607.93 $0.21 $484.54 $0.16
1-4,999 $2,457.41 $0.54 $2,048.69 $0.44 $1,638.70 $0.35
5,000-9,999 $4,916.10 $0.19 $4,096.11 $0.16 $3,277.40 $0.12
10,000-49,999 $5,899.32 $0.02 $4,916.10 $0.02 $3,932.88 $0.01
50,000-99,999 $7,373.51 $0.04 $6,146.09 $0.04 $4,916.10 $0.02
100,000-Unlimited $9,832.20 $0.09 $8,193.51 $0.08 $6,554.81 $0.05
2,500-3,999 $2,607.78 $0.16 $2,173.36 $0.13 $1,738.95 $0.11
4,000-5,999 $2,869.98 $0.19 $2,391.86 $0.16 $1,912.46 $0.12
6,000-7,999 $3,259.41 $0.32 $2,717.03 $0.27 $2,173.36 $0.22
8,000-Unlimited $3,913.60 $0.49 $3,259.41 $0.40 $2,607.78 $0.32
1-4,999 $3,385.37 $2.24 $2,821.14 $1.88 $2,256.91 $1.45
5,000-9,999 $13,544.02 $0.67 $11,287.11 $0.55 $9,028.92 $0.43
10,000-49,999 $16,929.39 $0.25 $14,106.97 $0.21 $11,287.11 $0.16
50,000-99,999 $27,088.04 $0.13 $22,572.94 $0.11 $18,057.84 $0.08
100,000-Unlimited $33,860.06 $0.34 $28,216.50 $0.27 $22,572.94 $0.22
1-499 $795.57 $0.55 $664.48 $0.47 $530.81 $0.36
500-999 $1,021.78 $1.78 $850.84 $1.47 $681.18 $1.18
1,000-1,499 $1,912.46 $0.37 $1,592.43 $0.30 $1,273.69 $0.25
1,500-1,999 $2,102.67 $0.37 $1,751.80 $0.30 $1,402.21 $0.25
2,000-Unlimited $2,294.18 $1.15 $1,912.46 $0.95 $1,529.46 $0.76
Duplicate Commercial/Multi-Family
Residential
Duplicate Single-Family/Duplex
Residential
Building Plan Check Fees
Low & Moderate Hazard Storage
Residential Remodel/Addition - Non-
Structural
Detached Accessory/Utility Uses
Duplicate Accessory/Utility
FY 2023-24 Rate
IA, IB IIA, IIIA, VA IIB, IIIB, VB, IV
28
base addtl base addtl base addtl
1-499 $1,109.18 $2.66 $925.38 $2.22 $739.02 $1.78
500-999 $2,178.51 $4.35 $1,814.78 $3.62 $1,452.34 $2.89
1,000-1,499 $4,358.30 $0.86 $3,632.13 $0.72 $2,905.97 $0.57
1,500-1,999 $4,794.00 $0.86 $3,994.57 $0.72 $3,195.15 $0.57
2,000-Unlimited $5,229.70 $2.61 $4,358.30 $2.17 $3,485.61 $1.73
1-2,499 $4,035.70 $2.23 $3,363.52 $2.23 $2,690.04 $1.79
2,500-3,999 $8,072.69 $0.44 $6,727.03 $0.44 $5,382.65 $0.35
4,000-5,999 $8,879.83 $0.50 $7,400.51 $0.50 $5,919.89 $0.39
6,000-7,999 $10,090.54 $0.83 $8,409.42 $0.83 $6,727.03 $0.65
8,000-Unlimited $12,109.68 $1.25 $10,090.54 $1.25 $8,072.69 $1.00
1-4,999 $1,141.30 $0.76 $951.09 $0.63 $760.87 $0.50
5,000-9,999 $4,567.80 $0.22 $3,805.65 $0.19 $3,044.77 $0.15
10,000-49,999 $5,709.10 $0.08 $4,756.74 $0.06 $3,458.62 $0.05
50,000-99,999 $9,134.31 $0.04 $7,611.28 $0.02 $6,090.83 $0.02
100,000-Unlimited $11,418.21 $0.11 $9,516.03 $0.09 $7,611.28 $0.06
Building Plan Check Fees
Site Improvements
Residential Remodel/Addition - Structural
Single-Family/Duplex Residential
FY 2023-24 Rate
IA, IB IIA, IIIA, VA IIB, IIIB, VB, IV
29
base addtl base addtl base addtl
1-399 $2,128.38 $0.69 $1,773.65 $0.86 $1,418.92 $0.69
400-599 $2,335.30 $3.81 $1,945.88 $4.76 $1,557.73 $3.81
600-999 $3,477.90 $1.15 $2,898.26 $1.43 $2,318.60 $1.15
1,000-2,999 $4,161.66 $0.91 $3,468.90 $1.16 $2,774.87 $0.91
3,000-Unlimited $6,928.82 $1.54 $5,773.37 $1.93 $4,619.21 $1.54
1-4,999 $1,746.66 $1.06 $1,456.20 $0.89 $1,164.44 $0.70
5,000-9,999 $6,541.96 $0.98 $5,452.05 $0.82 $4,360.87 $0.65
10,000-49,999 $11,449.06 $0.13 $9,540.45 $0.11 $7,631.85 $0.08
50,000-99,999 $16,354.88 $0.13 $13,628.85 $0.11 $10,902.82 $0.08
100,000-Unlimited $22,896.84 $0.23 $19,080.91 $0.19 $15,264.98 $0.16
1-4,999 $1,295.54 $0.92 $1,079.62 $0.77 $863.69 $0.62
5,000-9,999 $5,452.05 $0.82 $4,543.38 $0.68 $3,634.70 $0.54
10,000-49,999 $9,540.45 $0.11 $7,950.59 $0.09 $6,359.45 $0.06
50,000-99,999 $13,628.85 $0.11 $11,357.80 $0.09 $9,086.76 $0.08
100,000-Unlimited $19,080.91 $0.19 $15,901.18 $0.15 $12,720.18 $0.12
1-4,999 $2,724.74 $1.81 $2,271.05 $1.51 $1,817.35 $1.17
5,000-9,999 $10,902.82 $1.64 $9,086.76 $1.37 $7,268.12 $1.06
10,000-49,999 $19,080.91 $0.21 $15,901.18 $0.18 $12,720.18 $0.13
50,000-99,999 $27,257.70 $0.22 $22,715.61 $0.18 $18,172.23 $0.13
100,000-Unlimited $38,161.81 $0.37 $31,801.08 $0.32 $25,441.64 $0.25
1-4,999 $1,308.39 $0.88 $1,091.19 $0.74 $872.69 $0.57
5,000-9,999 $5,232.27 $0.78 $4,359.58 $0.65 $3,489.47 $0.53
10,000-49,999 $9,157.45 $0.09 $7,630.56 $0.08 $6,104.97 $0.06
50,000-99,999 $13,081.33 $0.11 $10,901.54 $0.08 $8,721.75 $0.06
100,000-Unlimited $18,313.61 $0.19 $15,261.12 $0.15 $12,208.64 $0.12
1-4,999 $4,089.68 $2.72 $3,407.21 $2.28 $2,724.74 $1.76
5,000-9,999 $16,354.88 $2.45 $13,630.14 $2.04 $10,902.82 $1.59
10,000-49,999 $28,621.36 $0.30 $23,850.48 $0.26 $19,080.91 $1.59
50,000-99,999 $40,887.84 $0.32 $34,072.13 $0.27 $27,257.70 $0.22
100,000-Unlimited $57,242.72 $0.57 $47,702.27 $0.48 $38,161.81 $0.37
Attached Accessory/Utility Uses
Commercial Shell
Commercial Tenant Improvements
Commercial Uses
Commercial/Multi-Family Residential
Remodel - Non-Structural
Building Inspection Fees
Commercial/Multi-Family Residential Uses
FY 2023-24 Rate
IA, IB IIA, IIIA, VA IIB, IIIB, VB, IV
30
base addtl base addtl base addtl
1-399 $1,951.02 $0.81 $1,625.84 $0.67 $1,300.68 $0.54
400-599 $2,112.96 $5.36 $1,759.51 $4.48 $1,408.64 $3.59
600-999 $3,184.86 $1.59 $2,654.05 $1.33 $2,123.24 $1.06
1,000-2,999 $3,822.36 $1.29 $3,184.86 $1.06 $2,547.37 $0.85
3,000-Unlimited $6,371.01 $2.16 $5,309.39 $1.76 $4,246.49 $1.41
1-399 $1,951.02 $0.81 $1,625.84 $0.67 $1,300.68 $0.54
400-599 $2,112.96 $5.36 $1,759.51 $4.48 $1,408.64 $3.59
600-999 $3,186.15 $1.59 $2,654.05 $1.33 $2,123.24 $1.06
1,000-2,999 $3,822.36 $1.29 $3,186.15 $1.06 $2,547.37 $0.85
3,000-Unlimited $6,371.01 $2.14 $5,309.39 $1.76 $4,246.49 $1.41
1-4,999 $2,458.70 $0.55 $2,048.69 $0.47 $1,638.70 $1.76
5,000-9,999 $4,916.10 $0.21 $4,097.40 $0.16 $3,277.40 $1.59
10,000-49,999 $5,900.61 $0.04 $4,916.10 $0.02 $3,932.88 $0.21
50,000-99,999 $7,374.80 $0.05 $6,146.09 $0.04 $4,916.10 $0.22
100,000-Unlimited $9,833.49 $0.09 $8,193.51 $0.08 $6,554.81 $0.37
1-2,499 $4,088.40 $2.72 $3,407.21 $2.28 $2,724.74 $1.81
2,500-3,999 $8,174.23 $1.37 $6,813.14 $1.13 $5,450.77 $0.90
4,000-5,999 $10,219.06 $3.07 $8,514.82 $2.56 $6,813.14 $2.04
6,000-7,999 $16,351.02 $4.09 $13,625.00 $3.40 $10,900.25 $2.72
8,000-Unlimited $24,525.25 $3.07 $20,439.42 $2.56 $16,351.02 $2.04
1-4,999 $2,726.03 $1.81 $2,271.05 $1.52 $1,638.70 $1.76
5,000-9,999 $10,902.82 $1.64 $9,086.76 $1.37 $3,277.40 $1.59
10,000-49,999 $19,080.91 $0.21 $15,901.18 $0.16 $3,932.88 $0.21
50,000-99,999 $27,258.99 $0.22 $22,715.61 $0.18 $4,916.10 $0.22
100,000-Unlimited $38,161.81 $0.39 $31,801.08 $0.32 $6,554.81 $0.37
1-499 $1,471.62 $3.68 $1,226.13 $3.07 $981.94 $2.45
500-999 $2,943.24 $2.94 $2,452.27 $2.45 $1,961.30 $1.96
1,000-1,499 $4,414.85 $2.94 $3,678.40 $2.45 $2,943.24 $1.96
1,500-1,999 $5,885.19 $2.94 $4,905.82 $2.45 $3,923.88 $1.96
2,000-Unlimited $7,356.81 $3.68 $6,131.95 $3.07 $4,905.82 $2.45
1-499 $1,616.85 $3.69 $1,348.23 $3.08 $1,078.33 $2.47
500-999 $3,094.89 $3.10 $2,578.22 $2.58 $2,062.83 $2.06
1,000-1,499 $4,641.06 $3.10 $3,868.61 $2.58 $3,094.89 $2.06
1,500-1,999 $6,188.50 $3.10 $5,157.74 $2.58 $4,125.67 $2.06
2,000-Unlimited $7,737.24 $3.87 $6,446.84 $3.21 $5,157.74 $2.58
Duplicate Commercial/Multi-Family
Residential
Duplicate Single-Family/Duplex
Residential
Low & Moderate Hazard Storage
Residential Remodel/Addition - Non-
Structural
Residential Remodel/Addition - Structural
Detached Accessory/Utility Uses
Duplicate Accessory/Utility
Building Inspection Fees FY 2023-24 Rate
IA, IB IIA, IIIA, VA IIB, IIIB, VB, IV
31
base addtl base addtl base addtl
1-2,499 $4,088.40 $2.72 $3,407.21 $2.28 $2,724.74 $1.81
2,500-3,999 $8,174.23 $1.37 $6,813.14 $1.13 $5,450.77 $0.90
4,000-5,999 $10,219.06 $3.07 $8,514.82 $2.56 $6,813.14 $2.04
6,000-7,999 $16,351.02 $4.09 $13,625.00 $3.40 $10,900.25 $2.72
8,000-Unlimited $24,525.25 $3.07 $20,439.42 $2.56 $16,351.02 $2.04
1-4,999 $903.53 $0.61 $903.53 $0.61 $601.50 $0.40
5,000-9,999 $3,611.57 $0.54 $3,611.57 $0.54 $2,407.29 $0.36
10,000-49,999 $6,320.89 $0.06 $6,320.89 $0.06 $4,213.07 $0.04
50,000-99,999 $9,030.21 $0.06 $9,030.21 $0.06 $6,020.14 $0.05
100,000-Unlimited $12,641.77 $0.12 $12,641.77 $0.12 $8,427.42 $0.08
Single-Family/Duplex Residential
Site Improvements
Building Inspection Fees FY 2023-24 Rate
IA, IB IIA, IIIA, VA IIB, IIIB, VB, IV
32
Transportation
(Citywide)(1)
Transportatio
n (San Luis
Ranch
Subarea)
Transportatio
n (LOVR
Subarea)
Citywide
Transportation
(Orcutt Specific
Plan Area Vested)
Prior to 7/1/2018
Transportation
(LOVR Add on
Fee- Avila
Ranch)
Transportation
(LOVR Add on
Fee- All other
Areas) [4]
Citywide
Transportation
(Orcutt Specific
Plan Area Add on)
After 7/1/2018
Transportation
(Orcutt Specific
Plan Area Add
on) [1]
Transportation
(Orcutt Specific
Plan Area Add on
Vested) Prior to
7/1/2018 [1]
Residential
Single Family
≥ 1,400 sq. ft. (fees are per unit)$15,244.19 $11,847.94 $13,825.31 $5,585.82 $3,239.34 $3,091.70 $12,387.79 $23,821.07 $25,258.54
700 to 1,399 sq. ft. (fees are per sq. ft.)$10.90 $8.46 $9.87 N/A N/A N/A $7.98 N/A N/A
≤ 699 sq. ft. (fees are per unit)$7,622.10 $5,923.97 $6,912.65 $5,585.82 $3,239.34 $3,091.70 $6,193.90 $23,821.07 $25,258.54
Multifamily
≥ 1,100 sq. ft. (fees are per unit)$11,843.85 $9,205.17 $10,741.46 $4,962.14 $1,520.77 $2,071.15 $11,984.55 $16,641.10 $17,644.97
550 to 1,099 sq. ft. (fees are per sq. ft.)$10.77 $8.37 $9.77 N/A N/A N/A $7.90 N/A N/A
≤ 549 sq. ft. (fees are per unit)$5,921.93 $4,602.57 $5,370.72 $4,962.14 $1,520.77 $2,085.50 $5,992.28 $16,641.10 $17,644.97
Non-Residential
Office (fees are per sq. ft.)$14.71 $11.44 $13.35 $11.21 $4.39 $4.39 $11.96 N/A N/A
Service (fees are per sq. ft.)$14.71 $11.44 $13.35 $4.39 $4.39 $4.39 $11.96 N/A N/A
Retail (fees are per sq. ft.) [2]$21.38 $15.74 $19.38 $11.77 $34.63 $27.52 $17.37 N/A N/A
Industrial (fees are per sq. ft.)$8.56 $7.02 $8.20 $2.44 $2.44 $6.96 N/A N/A
Institutional (fees are per sq. ft.)$17.32 $13.46 $15.69 $1.89 $1.89 $14.06 N/A N/A
Lodging (fees are per room)$6,150.38 $4,780.12 $5,577.90 $1,886.26 $1,886.26 $4,997.93 N/A N/A
Specialty (fees are per ADT) (2)$937.67 $728.32 $850.04 $520.46 $3,091.70 $3,091.70 $761.97 $2,620.56 $2,778.70
Per PM Trip Per PM Trip
[1] The Orcutt Area Specific Plan Transportation Fee is in addition to Citywide Transportation Impact Fees. See Council Agenda Report dated 10-16-2018
[2] All OASP retail Transportation "Add On" fees are paid for via
residential land uses (There is no OASP fee for retail). However, Retail is
responsible for paying "Citywide" transpoartion ees as well as safety
impact fees. Office is shown in Work/Live units are porposed within the
[3] Fees shown are subject to an addiional 1.75% administrative charge when special calculations are required.
[4] The LOVR interchange Fee is in adition to the Citywide
Transportation Impact Fee. The last update of the fee occurred in 2019.
See Council Agenda Report dated 7-2-21019
Transportation Impact Fees
FY 2023-24 Rate
33
Parkland Fees Quimby Act Parkland In-Lieu
Fee Parkland Impact Fee
Park
Improvement
Impact Fee
Parkland
Development
Fees (Orcutt
Area)
Residential Subdivision
Single Family (per Dwelling Unit)n/a $4,634.12 $4,235.56 $10,161.07
Multifamily Condominium (per Dwelling unit)n/a $3,336.98 $3,050.19 $7,559.15
Residential, No Subdivision Single Family (per Dwelling Unit)n/a $4,634.12 $4,235.56
Multifamily Apartment (per Dwelling unit)n/a $2,142.78 $3,050.20 $7,559.15
Land Use Category Water Development Impact
Fee(Citywide)Wastewater
Development Impact Fee (Citywide)
Single Family & Multifamily (per Dwelling Unit Size)
≥ 1,201 sq. ft. (fees are per unit)$17,379.27 $16,140.81
801 to 1,200 sq. ft. (fees are per unit)$13,903.42 $12,988.46
451 to 800 sq. ft. (fees are per unit)$12,165.49 $11,365.82
≤ 450 sq. ft. (fees are per unit)$5,244.28 $4,841.08
Mobile/Manufactured Home (per Dwelling Unit)
Mobile/Manufactured Home $10,488.53 $9,685.08
Non-Residential (by Meter Size)
3/4" meter $17,480.88 $16,140.81
1" meter $29,716.93 $27,439.08
1.5" meter $59,435.34 $54,878.18
2" meter $94,397.13 $87,159.81
3" meter $185,957.51 $172,706.41
4" meter $290,233.08 $269,551.28
6" meter $580,467.62 $539,102.58
Police (Citywide)Fire (Citywide)
Residential
Single Family
Per unit $1,003.14 $854.46
Multifamily
Per unit $722.31 $615.69
Non-Residential
Office (fees are per sq. ft.)$0.66 $0.57
Service (fees are per sq. ft.)$0.36 $0.31
Retail (fees are per sq. ft.)$0.36 $0.31
Industrial (fees are per sq. ft.)$0.27 $0.23
Institutional (fees are per sq. ft.)$0.35 $0.34
Lodging (fees are per room)$199.72 $169.70
Specialty (fees are per ADT) (2)Requires Calculation Requires Calculation
FY 2023-24 Rate
Land Use Category
FY 2023-24 Rate
Emergency Services Impact Fees
FY 2023-24 Rate
34
Police Fees
Fee Number Fee Description
POLICE DEPARTMENT
1 Processing charge for return of property taken for safekeeping
2 Clearance Letters
3 Civil SDT
4 Criminal SDT
5 Civil Subpoena
Concealed Weapons Permit (set by penal code 26190)
6 Investigative costs and permit processing
7 Renewal
8 Massage Facility Permit
9 Massage Technician Initial Permit
10 Massage Technician Permit Renewal
11 Local Record Information
12 Impound Vehicle Release (30-day impound)
13 Vehicle Tow Release Fee
14 Record sealing
Property Damage-Only Collisions Investigations
15 Per party per non-injury traffic collision investigation report
16 Administrative Investigations
Administrative Citations (Noise Violation, UIP, Open Alcohol
Container)
17 First citation for each such violation (except open container)
18 First citation (open container)
19 Second citation for each such violation
20 Third citation for each such violation
35
Police Fees
Fee Number Fee Description
Cost Recovery Programs
21 DUI Cost recovery
22 Nuisance abatement
False Alarms and Alarm Permits
23 Permit
24 Renewal
25 Excessive alarms
26 Third
27 Fourth
28 Fifth
29 Sixth
30 Seventh & More
31 Second Response Cost Recovery
Taxi Permit
32 Pedicab Fee
33 Pedicab Renewal Fee
34 Permit fee
35 Permit Renewal fee
36 Electronic Game Center Permit
37 Public Dance Permit
38 Tobacco License Fee - per location
39 Mobile Food Vendor License
PLANNING SUPPORT
40 Administrative Use Permit (bars/nightclubs)
36
Fee
Number FY 2023-24 Rate
Youth Services
Sun-N-Fun
1 Registration Fee 72.50$
2 School Year - hourly option 5.80$
Teacher Work Day
3 Teacher Work Day 64.00$
4 Late Reg TWD
Spring Break Camp
5 Weekly Option 200.00$
6 Late Reg Spring Break Weekly
7 Daily Option 62.00$
8 Late Reg Spring Break Daily
Summer Camp
9 Registration Fee 6.25$
10 Full week Care Option 190.00$
11 Summer School Package*
12 Day Rate Option 50.00$
13 Field Trip Sign Ups
14 Late Registration Fee 10.00$
15 Youth Services Special Events
*Fluctuates per school district schedule
Fee Description
Parks and Recreation Fees
37
Fee
Number FY 2023-24 Rate
Aquatics
Lap Swim
16 Adult per use*4.25$
17 Adult Monthly*63.75$
18 Youth/Senior per*3.75$
19 Youth/Senior monthly*56.25$
Recreational Swim
20 Adult per use*4.75$
21 Youth/Senior per*4.25$
Swim Script
21 Adult per use*38.25$
22 Youth/Senior per*33.75$
Recreational Swim Script
Adult per use*42.75$
Youth/Senior per*38.25$
Lessons
23 Lessons 118.00$
24 Private Lessons 204.00$
Special Classes
25 Lifeguard 257.00$
26 Warm Water Exercise*55.75$
27 Facility Use $66/day + $23/LG
28 Junior Lifeguard Program 249.00$
Recreational Sports
Adult Softball
29 Teams (15 per team)664.00$
*Fees to increase following summer session. Effective August 14th. Rate remains the same as previous Fiscal year prior to this date.
Parks and Recreation Fees
Fee Description
38
Fee
Number FY 2023-24 Rate
Instructional Classes
Instructional Classes *
30 Adult/Senior $8.30-$166.00
31 Youth $4.15-$440.00
Special Events
Triathlon
32 Individual
33 Team
P&R Events
34 Parks and Recreation Sponsored Events $0-$71.00
Special Application Fees
35 Special Event Application $122/$195
36 Banner Permit Application/Installation 252.00$
Film Application Fee
37 Still Photography 123.00$
38 Commercial 156.00$
39 Non-Profit 49.00$
40 Destination Marketing
Permit Fee
41 Permit Processing Fee 18.25$
42 Full Park Use 575.00$
43 Half Park Use 287.00$
Mission Plaza
44 Full Plaza $698.00
45 Full Plaza (Non-Profit/Community Event)$585.00
* Fees vary depending on class and class frequency
Parks and Recreation Fees
Fee Description
39
Fee
Number FY 2023-24 Rate
Indoor Facilities
Ludwick Community Center
46 Assembly Room (Non-Profit)35.00$
47 Assembly Room (For-Profit)73.50$
48 Gymnasium (Non-Profit)44.50$
49 Gymnasium (For-Profit)78.50$
50 Kitchen (Non-Profit)15.25$
51 Kitchen (For-Profit)
52 Floor Covers 93.00$
53 Full Facility Use (14 Hours)1,826.00$
Senior Center
54 Main Room (Non-Profit)35.00$
55 Main Room (For-Profit)73.50$
56 Conference Room (Non-Profit)18.50$
57 Conference Room (For-Profit)24.25$
Meadow Park Building
58 Non-Profit 18.50$
59 For-Profit 24.25$
City/County Library
60 Community Room (Non-Profit)35.00$
61 Community Room (For-Profit)73.50$
62 Conference Room (Non-Profit)18.50$
63 Conference Room (For-Profit)24.25$
Parks and Recreation Fees
Fee Description
40
Fee
Number FY 2023-24 Rate
Outdoor Facilities
64 Outdoor Seating Areas 82.75$
Jack House Gardens
65 Wedding and Reception
66 Full Day WEEKEND (Resident)3,529.00$
67 Full Day WEEKEND (non-resident)3,999.00$
68 Full Day WEEKDAY (Resident)3,293.00$
69 Full Day WEEKDAY (non-resident)3,529.00$
70 Party (1-50) Attendance (4 hour)
71 Under 50 Per Hour 120.75$
72 Under 50 Per Hour (Non-Profit)54.00$
73 50-100 Per Hour 241.75$
74 50-100 Per Hour (Non-Profit)108.25$
75 100+ Per Hour 362.75$
76 100+ Per Hour (Non-Profit)163.25$
77 Security Deposit 604.00$
78 Table/Chair Rental
Softball Fields
79 Hourly Field Use 29.50$
80 Light Fee 26.75$
Multi-Use Courts
81 Hourly Use 6.50$
82 Light Fee 13.00$
Tennis & Volleyball Courts
83 Full Use Facility (Hour)10.50$
Parks and Recreation Fees
Fee Description
41
Fee
Number FY 2023-24 Rate
Damon-Garcia
84 Full Use Facility (Day)547.00$
85 Full Use Facility (Hour)88.00$
86 Full Use Light Fee (Hour)53.00$
87 Maintenance Fee 29.50$
88 Concession Stand Rental 147.50$
89 Lower Fields Facility Use (Day)363.50$
90 Lower Fields Facility Use (Hour)59.00$
91 Lower Fields Light Fee 26.75$
92 Single Field Facility Use (Day)185.75$
93 Single Field Facility Use (Hour)29.50$
94 Single Field Light Fee 26.75$
Baseball Stadium
95 Hourly Field Use 29.50$
96 Lights 26.75$
97 Press box Rental 19.50$
98 Field prep 50.25$
99 Concession Stand Rental 28.00$
Other
100 Bounce House 39.50$
101 Portable BBQ 39.50$
Community Gardens
102 Community Gardens $35/year + .03 per square ft
Fee Description
Parks and Recreation Fees
42
Fee
Number FY 2023-24 Rate
Ranger Service
Junior Ranger Camp
103 Junior Ranger Camp 167.00$
Golf Course
Laguna Lake Golf Course
104 Cart Rental 10.75/Person
105 Pull Carts 5.25/Cart
106 Club Rentals (Regular)$6.25
107 Club Rentals (SnrYth/Stu/Mil)$4.25
108 Alternative Programming Uses $11.00
109 Spectator Fee*5.25$
Tournament Use
110 Shotgun Fee $279.00
111 Daily Use for 39 or Under $13.00
112 Daily Use for 40 or Over $11.00
Rounds
113 Monday-Thursday (Regular)*15.50$
114 Monday-Thursday (Snr/Yth/Stu/Mil)*12.00$
115 Friday-Sunday (Regular)*16.50$
116 Friday-Sunday (Snr/Yth/Stu/Mil)*13.00$
117 Replay*8.75$
118 Off Peak (M-Th 12-3 PM) (Regular)*12.00$
119 Off Peak (M-Th 12-3 PM) (Snr/Yth/Stu/Mil)*12.00$
120 Twilight (after 3 PM)*11.00$
121 Family Rate*30.00$
122 Super Twilight*7.75$
123 10-Play Cards (Regular)$134.00
124 10-Play Cards (Snr/Yth/Stu/Mil)$103.00
*Fees to increase following summer session. Effective August 1st. Rate remains the same as previous Fiscal year prior to this date.
Parks and Recreation Fees
Fee Description
43
Additional Building Fees
Fee Number Fee Description FY 2023-24 Rate
1 A/C Residential - BLDG $88.70
2 After Hours Call Out (Building) - BLDG $536.07
3 Air Handler - BLDG $66.85
4 Antenna/Tower w/ Equipment Shelter - BLDG $790.63
5 Appeal of Building Official Decision - BLDG $1,339.56
6 Awning/Canopy - BLDG $457.66
7 Boiler - BLDG $111.86
8 Building Sewer - BLDG $88.70
9 Balcony/Porch/Deck - BLDG (increases with Sq. ft)$1,300.56
9 Cell Tower/Antenna - BLDG $1,068.07
10 Cell Tower/Antenna - BLDG - add on $116.43
11 Chiller - BLDG $111.86
12 Code Enforcement Fee $428.19
12 Commercial Access Upgrade - Site work - BLDG $1,416.69
13 Commercial Access Upgrade - Upgrades - BLDG $1,133.87
14 Commercial Coach Installation - BLDG $1,882.07
15 Construction Tax - BLDG $183.92
16 Deferred Submittal (Building)$267.40
17 Demolit - Interior or Garage/Utility Build - BLDG $536.08
18 Demolition - Entire Building - BLDG $938.47
19 Doors/Windows- Box Structural $682.11
20 Doors/Windows- Box Non-Structural $461.95
21 Drain Vent Repair/Replace - BLDG $66.85
22 Driveway $221.17
23 Dry Rot / Termite Repair - BLDG $278.98
24 Duct Work Only - BLDG $66.85
25 Electric Car Charging System -BLDG $145.27
26 Electric Service Upgrade (up to 200 amp) -BLDG $145.27
27 Electrical Volume & Current Fee Analysis - BLDG $82.27
28 Evaporative Cooler - BLDG $66.85
29 Exhaust Hood - Type I - BLDG $134.99
30 Exhaust Hood - Type II - BLDG $88.70
31 Exhaust Hood & Duct - Residential - BLDG $66.85
32 Fence or Non-Engineered Wall - BLDG $807.34
33 Fire Permit Handling Fee - BLDG $536.07
34 Fireplace Insert Upgrade -BLDG $386.97
35 Fireplace Retrofit / Chimney Repair - BLDG $771.34
Additional Building Fees Continued on Next Page
44
Additional Building Fees
Fee Number Fee Description FY 2023-24 Rate
36 Fireplace: Masonry $664.82
37 Fixtures - BLDG $66.85
38 Flag, Light, or Sign Pole - BLDG $960.32
39 Foundation New/Replace - BLDG $1,609.53
40 Foundation Repair Only - BLDG $803.48
41 Furnace/Heater Replacement -BLDG $145.27
42 Furnaces - BLDG $88.70
43 Gas System Repair/Replace/Extend - BLDG $63.70
44 Generator Installation - BLDG $102.85
45 Graywater Systems - BLDG $178.70
46 Graywater/Rainwater Harvesting System -BLDG $88.70
47 Grease Trap - BLDG $66.85
48 Guest Quarters Permit $1,385.55
49 Handicap Board of Appeals - BLDG $1,339.56
50 Heat Pump - BLDG $66.85
51 Heater - BLDG $66.85
52 Heater - Wall - BLDG $88.70
53 Inert Gas Systems $1,245.54
54 Inspection Fee $226.84
55 Insulation/Energy Upgrade -BLDG $140.12
56 Make-Up Air System - BLDG $66.85
57 Manufactured Homes $1,010.35
58 Mechanical Volume & Current Fee Analysis - BLDG $82.27
59 Minor Code Corrections - BLDG $278.97
60 Minor Lease Space Improvements - BLDG $1,609.53
61 Minor Repairs - up to 2 inspections - BLDG $367.67
62 Misc Electrical Items NOS - BLDG $88.71
63 Misc Mechanical Items NOS - BLDG $88.70
64 Misc Plumbing Items NOS - BLDG $88.71
65 New/Altered Circuits - 15 or 20 amp - BLDG $66.85
66 New/Altered Circuits - 200+ amps - BLDG $66.85
67 New/Altered Circuits - 25 to 40 amp - BLDG $45.00
68 New/Altered Circuits - 50 to 175 amp - BLDG $53.98
69 Other Electrical Inspections - BLDG $267.40
70 Other Mechanical Inspections - BLDG $267.40
71 Other Plumbing & Gas Inspections - BLDG $267.40
72 Paint Booth - BLDG $1,207.14
73 Partition- BLDG (Per Project)$883.31
74 Patio - Enclosed - BLDG $1,407.69
75 Patio Cover - Open - BLDG $807.34
76 Permit Issuance - BLDG $289.25
77 Photovoltaic Systems (residential roof mount)$190.06
78 Photovoltaic Unit Installation - Residential $82.12
79 Plumbing Volume & Current Fee Analysis - BLDG $80.98
80 Pool/Spa Commercial - BLDG $1,339.56
81 Preliminary Project Consult/Code Analysis - BLDG $267.40
82 Refrigeration Compressor/Condenser - BLDG $111.86
83 Re-Roof Residential - BLDG $278.98
84 Re-roof with Added Ventilation -BLDG $140.12
85 Residential Photovoltaic System $200.55
86 Residential Pool/Spa - Site Built - BLDG $1,072.16
87 Retaining Wall Engineered 1-100 Linear Feet $1,451.53
88 Retaining Wall Engineered each additional linear foot $1.31
89 Retaining Wall Non-Engineered - BLDG $941.03
90 Roof Structure Replacement - BLDG $1,142.34
90 School Tenant Permit $1,070.44
Additional Building Fees Continued on Next Page
45
Additional Building Fees
Fee Number Fee Description FY 2023-24 Rate
91 Secondary Dwelling Units $1,462.86
92 Seismic Strengthening of URM Bldg $55.17
93 Shear Wall / Steel Support Column - BLDG $1,072.16
94 Site Work- Grading 1-1000 Cubic Yards $923.80
95 Each Additional 10,000 Cubic Yards $264.48
96 Sign - Monument or free standing - BLDG $716.06
97 Sign - Wall - BLDG $411.88
98 Skylight $362.86
99 SMIP (Commercial)$32.49
100 SMIP (Residential)$15.08
101 Solar / PV System - Commercial -BLDG $964.19
102 Solar Photovoltaic - Commercial/Multifamily - BLDG $938.46
103 Solar Water System Fixtures - BLDG $88.70
104 Stairs - Repair/Replace - BLDG $1,207.14
105 Stand Alone Electrical Plan Check - BLDG $269.97
106 Stand Alone Mechanical Plan Check - BLDG $134.99
107 Stand Alone Plumbing Plan check - BLDG $267.40
108 Store Front / Facade Alterations: Minor - BLDG $1,207.14
109 Stormwater - Major Project - BLDG $4,692.32
110 Stormwater - Minor Project - BLDG $350.97
111 Stormwater - Moderate Project - BLDG $2,212.47
112 Stucco/Siding - BLDG $509.09
113 Supplemental Inspection (Building) - BLDG $267.40
114 Supplemental Plan Check (Building) - BLDG $267.40
115 T-Bar Ceiling - BLDG $803.48
116 Temporary Service - BLDG $66.85
117 Trash Enclosure - BLDG $1,339.56
118 URM Seismic Strengthening - BLDG $49.05
119 Vapor Recovery - BLDG $671.07
120 Vent Fan (Single Duct) - BLDG $66.85
121 Water Heater - BLDG $87.32
122 Water Heater - BLDG - additional $22.78
123 Water Heater Replacement -BLDG $143.00
124 Walk-in Box/Refrigerator Coil - BLDG $88.70
125 Water Pipe Repair/Replace - BLDG $66.85
126 Window Retrofits (non-structural) -BLDG $233.97
127 Temporary Certificate of Occupancy $997.88
*Fees may be subject to a 3.05% IT Surcharge
46
858
From:White, Kelly
Sent:Thursday, September 14, 2023 12:42 PM
To:Jamie Radcliff; Kersten, Markie
Cc:Cindy Sconce; Rachel King; Bernstorff, Rebecca
Subject:RE: [EXTERNAL]RE: User Fee Study- Cross Support for Attorney
So, Markie just needs to look at one number? I know this is an infinitesimally small part of a huge project but that was
not clear from your original email.
Markie - it’s just the very bottom row (the Custom Agreement) that you need to input or confirm (where it currently
says two hours). If you scan the list and anything else pops out as something you contribute to, please enter the
amount of time. I’ve hid again all the columns that don’t apply to you so you should just see “A” and then from “AC” on.
Kelly White
Senior Legal Analyst
City Attorney's Office
E kwhite@slocity.org
T 805.781.7060
From: Jamie Radcliff <jradcliff@mgtconsulting.com>
Sent: Thursday, September 14, 2023 10:45 AM
To: White, Kelly <kwhite@slocity.org>; Kersten, Markie <mkersten@slocity.org>
Cc: Cindy Sconce <CSconce@mgtconsulting.com>; Rachel King <rking@mgtconsulting.com>; Bernstorff, Rebecca
<rbernstorff@slocity.org>
Subject: RE: [EXTERNAL]RE: User Fee Study- Cross Support for Attorney
Hi Kelly:
Please see my answers below. Thanks.
Jamie Radcliff
Manager
Performance SoluƟons Group
432-208-8194
jradcliff@mgtconsulƟng.com
Impacting Communities for Good
The informaƟon contained in this electronic communicaƟon is intended only for the use of the addressee, and may be
a confidenƟal communicaƟon. If you are not the intended recipient, you are hereby noƟfied that you have received this
transmiƩal in error; any review, disseminaƟon, distribuƟon, or copying of this transmiƩal is strictly prohibited.
From: White, Kelly <kwhite@slocity.org>
Sent: Thursday, September 14, 2023 11:26 AM
To: Jamie Radcliff <jradcliff@mgtconsulting.com>; Kersten, Markie <mkersten@slocity.org>
Cc: Cindy Sconce <CSconce@mgtconsulting.com>; Rachel King <rking@mgtconsulting.com>; Bernstorff, Rebecca
859
<rbernstorff@slocity.org>
Subject: [EXTERNAL]RE: User Fee Study- Cross Support for Attorney
Jamie,
I’ve copied the attorney in our office who is lead for Public Works and Utilities Engineering (Markie – the draft for you
to edit is here).
Can you answer a few questions before Markie spends time on this task?
What does the yellow shading indicate? These are new fees- they wanted them broken down into two
categories of document processing. I highlighted because they are new.
Did Engineering believe legal assistance is provided for all these services or just a few? I was expecting to see
an “X” where Engineering believe legal support is provided but there were none until I unhid all the columns but
I’m guessing those are indicating a contribution by those departments/divisions. The custom agreement is the
only fee Engineering thought you would be working on. They estimated two hours. Please edit for accuracy.
Should zero be entered if no assistance is provided for some of the services listed? No need. Just enter the
time on the fees you provide services to.
Custom Agreements already has two hours entered. Was that an intentional contribution meant to limit our
answer or just a typo? Estimate from Engineering. You may revise as needed.
Kelly White
Senior Legal Analyst
City Attorney's Office
E kwhite@slocity.org
T 805.781.7060
From: Jamie Radcliff <jradcliff@mgtconsulting.com>
Sent: Thursday, September 14, 2023 7:53 AM
To: White, Kelly <kwhite@slocity.org>
Cc: Cindy Sconce <CSconce@mgtconsulting.com>; Rachel King <rking@mgtconsulting.com>; Bernstorff, Rebecca
<rbernstorff@slocity.org>
Subject: User Fee Study- Cross Support for Attorney
This message is from an External Source. Use caution when deciding to open attachments, click links, or respond.
Good Morning Kelly:
I have gathered informaƟon from Engineering, and they report that the AƩorneys (Legal) spend Ɵme on several of the
Engineering inspecƟon fees.
CAUTION: This email originated from outside of the organization. Exercise caution when opening
attachments or clicking links, especially from unknown senders.
860
Engineering noted an “X” on the permits with their involvement. They need to replace the “X” with the Ɵme the posiƟon spends
on the permit (in hours or minutes, please indicate which).
Please return to me by COB on Wednesday, September 20th. If you have any quesƟons don't hesitate to reach out.
Thank you!
Jamie Radcliff
Manager
Performance SoluƟons Group
432-208-8194
jradcliff@mgtconsulƟng.com
Impacting Communities for Good
The informaƟon contained in this electronic communicaƟon is intended only for the use of the addressee, and may be
a confidenƟal communicaƟon. If you are not the intended recipient, you are hereby noƟfied that you have received this
transmiƩal in error; any review, disseminaƟon, distribuƟon, or copying of this transmiƩal is strictly prohibited.
861
From:Avakian, Greg
Sent:Thursday, September 14, 2023 12:42 PM
To:Smith, Kate
Subject:RE: special event permits
Kate-
Yes, P&R leads the City for outside community special events. Our department manages the permits, insurance, etc.
process and acts in the role of facilitator with the other City departments (streets, police, fire, etc.). We have a
formalized City Special Events Committee that meets monthly (pending impacts and needs) that is made up of key
department representatives such as: Public Works (streets, parks maintenance), Fire (food inspections, fire codes),
Travel/Tourism, Police, Parking, etc. that our Rec Manager is in the role of meeting facilitator to review all upcoming
event permits, as well as evaluate post events (SWOT analysis).
At this time, we do not collect any “Deposits” but we are assessing a fee study to hopefully incorporate this into the
reservation permit process in order to hold groups more accountable. As of now, we only have two options:
1. If a violation occurs during the event and staff respond, they can shut down the event (e.g., Fire or Police code
issue, or significant noise or alcohol violation).
2. Post event assessment determines violations (no ABC license, major violation in crowd control or facility
damage), then the Committee can recommend that the group is prohibited from hosting a future event. This
has only happened once or twice in the past 10+ years. Very rare. Our biggest challenge is weddings having
violations for alcohol, noise, facility damage and no repercussions as they are a “one and done” event and not
a reoccurring annual or quarterly event.
My recommendation is (if you don’t have it in place already) is to work with City Attorney and Finance Dept to develop
an Event Deposit that states failure to adhere to all City event guidelines and policies will result in forfeiture of deposit
funds, up to and including payment for fines and/or facility damage. This includes potential of future events being
prohibited.
This has been on my radar since I started but was sidelined during the past 3 yrs with the pandemic and hoping to
institute new policies by June 30 to institute come July 1.
Keep me updated as I’d like to know what other agencies are doing as we also move forward.
Thanks,
-G
Greg Avakian
pronouns he/him/his
Director of Parks and Recreation
Parks & Recreation
1341 Nipomo Street, San Luis Obispo, CA 93401-3934
E gavakian@slocity.org
T 805.781.7120
slocity.org
Stay connected with the City by signing up for e-notifications
From: Smith, Kate <kates@cityofwestsacramento.org>
Sent: Wednesday, September 13, 2023 12:30 PM
862
To: Avakian, Greg <gavakian@slocity.org>
Subject: special event permits
This message is from an External Source. Use caution when deciding to open attachments, click links, or respond.
Hi Greg-
Does your department oversee city wide special event permits? If so, do you have a policy or pracƟce in place if a group violates
their special event permit during the event? (i.e. does not abide by site layout, does not provide medical tent, does not follow
ABC requirements, etc.)
We have had two violaƟons this past year to 2 notable groups, and we do not have a clear policy as to what ramificaƟons there
are when this occurs. I appreciate any feedback you have on this!
Thanks,
KATE SMITH
pronouns she/her/they/them
Director of Parks and Recreation
1110 West Capitol Avenue
West Sacramento, CA 95691
Telephone: (916) 617-4865
kates@cityofwestsacramento.org
www.cityofwestsacramento.org
This message may contain confidential information. If you are not the intended recipient, or believe that you have received this
communication in error, please do not print, copy, re-transmit, disseminate, or otherwise use the information. Also, please
indicate to the sender that you have received this email in error, and delete the copy you received. The sender does not accept
liability for any errors or omissions in the contents of this message, which arise as a result of e-mail transmission. E-mail
correspondence with the City, including attachments, may be subject to the California Public Records Act, and as such may be
subject to public disclosure unless otherwise exempt by the Act.
863
From:ParksRec Accounts Payable
Sent:Thursday, September 14, 2023 12:03 PM
To:Pringle, Brendan
Subject:FW: Emailing - MGT Consulting Inv 52817 PO 617413.pdf
Attachments:MGT Consulting Inv 52817 PO 617413.pdf
It looks like there is something going on with the address….can you follow up with the vendor. The address given on
the W-9 is different from the one provided on the invoice.
From: Accounts Payable <ap@slocity.org>
Sent: Thursday, September 14, 2023 11:49 AM
To: ParksRec Accounts Payable <pr_ap@slocity.org>
Subject: RE: Emailing - MGT Consulting Inv 52817 PO 617413.pdf
Hello PR_AP,
I hope this email finds you well.
The attached invoice’s remit to address does not match the one in Oracle. If you can, please contact your supplier and
obtain an updated W-9 or Proof of remittance so that Purchasing can update the address.
Please let me know if you have any questions, comments, or concerns.
Thank you,
Timothy Holt
Accounting Assistant
Finance
990 Palm Street, San Luis Obispo, CA 93401-3668
E tholt@slocity.org
T 805.781.7448
slocity.org
Stay connected with the City by signing up for e-notifications
From: ParksRec Accounts Payable <pr_ap@slocity.org>
Sent: Monday, September 11, 2023 11:08 AM
To: Accounts Payable <ap@slocity.org>
Subject: Emailing - MGT Consulting Inv 52817 PO 617413.pdf
Invoice
52817
Date:08/02/2023
Payment Terms:Net 30
Due Date:09/01/2023
PO number:
Bill To:Remit To:
City of San Luis Obispo
919 Palm Street
San Luis Obispo, CA 93401
MGT of America Consulting, LLC
P.O. Box 17780
Clearwater, FL 33762-0780
813-327-4717
arinv@mgtconsulting.com
Project: FSG | FY23 | City of San Luis Obispo | User and Impact Fee Stud | CA
Description Quantity Rate Amount
Project Management 1 $1,755.00 $1,755.00
MGT - User Fee Design 1 $11,670.00 $11,670.00
MGT - User Fee Analysis 1 $2,000.00 $2,000.00
DTA - Impact Fee Study (subcontractor)1 $4,520.00 $4,520.00
SubTotal:$19,945.00
Tax:$0.00
Total:$19,945.00
Company Confidential
864
From:Accounts Payable <ap@slocity.org>
Sent:Thursday, September 14, 2023 11:49 AM
To:ParksRec Accounts Payable
Subject:RE: Emailing - MGT Consulting Inv 52817 PO 617413.pdf
Attachments:MGT Consulting Inv 52817 PO 617413.pdf
Hello PR_AP,
I hope this email finds you well.
The attached invoice’s remit to address does not match the one in Oracle. If you can, please contact your supplier and
obtain an updated W-9 or Proof of remittance so that Purchasing can update the address.
Please let me know if you have any questions, comments, or concerns.
Thank you,
Timothy Holt
Accounting Assistant
Finance
990 Palm Street, San Luis Obispo, CA 93401-3668
E tholt@slocity.org
T 805.781.7448
slocity.org
Stay connected with the City by signing up for e-notifications
From: ParksRec Accounts Payable <pr_ap@slocity.org>
Sent: Monday, September 11, 2023 11:08 AM
To: Accounts Payable <ap@slocity.org>
Subject: Emailing - MGT Consulting Inv 52817 PO 617413.pdf
1
Subject:Fee Study Check-In - B&S
Location:Microsoft Teams Meeting
Start:Thu 9/14/2023 3:30 PM
End:Thu 9/14/2023 3:55 PM
Show Time As:Tentative
Recurrence:(none)
Meeting Status:Not yet responded
Organizer:Bernstorff, Rebecca
Required Attendees:Loew, Michael; Cindy Sconce; Ruben Rivas
Optional Attendees:Keller, Erin; Nichols, Vanessa
________________________________________________________________________________
Microsoft Teams meeting
Join on your computer, mobile app or room device
Click here to join the meeting
Or call in (audio only)
+
Find a local number | Reset PIN
Learn More | Meeting options
________________________________________________________________________________
1
Subject:Touch Base - Fee Study Numbers
Location:Microsoft Teams Meeting
Start:Thu 9/14/2023 3:00 PM
End:Thu 9/14/2023 3:25 PM
Recurrence:(none)
Meeting Status:Accepted
Organizer:Pringle, Brendan
Required Attendees:Harvey, Billy
________________________________________________________________________________
Microsoft Teams meeting
Join on your computer, mobile app or room device
Click here to join the meeting
Or call in (audio only)
+
Find a local number | Reset PIN
Learn More | Meeting options
________________________________________________________________________________
1
Subject:Fee Study Check-In - Planning
Location:Microsoft Teams Meeting
Start:Thu 9/14/2023 1:00 PM
End:Thu 9/14/2023 1:30 PM
Show Time As:Tentative
Recurrence:(none)
Meeting Status:Not yet responded
Organizer:Bernstorff, Rebecca
Required Attendees:Cindy Sconce; Corey, Tyler; Cohen, Rachel; Leveille, Brian
________________________________________________________________________________
Microsoft Teams meeting
Join on your computer, mobile app or room device
Click here to join the meeting
Or call in (audio only)
+
Find a local number | Reset PIN
Learn More | Meeting options
________________________________________________________________________________
1
Subject:Fire & B&S Fee Study Check-In
Location:Microsoft Teams Meeting
Start:Wed 9/20/2023 4:30 PM
End:Wed 9/20/2023 4:55 PM
Recurrence:(none)
Meeting Status:Accepted
Organizer:Bernstorff, Rebecca
Required Attendees:Cindy Sconce; Ruben Rivas; Loew, Michael; Maggio, Rodger
Quick check-in on deliverables for the Fire and B&S teams. Thanks!
________________________________________________________________________________
Microsoft Teams meeting
Join on your computer, mobile app or room device
Click here to join the meeting
Or call in (audio only)
+
Find a local number | Reset PIN
Learn More | Meeting options
________________________________________________________________________________
1
Subject:Fee Study
Location:Mike's Office
Start:Thu 9/21/2023 1:00 PM
End:Thu 9/21/2023 1:50 PM
Recurrence:(none)
Organizer:Loew, Michael
Call Handling Mode 2:2
To discuss the next steps on the fee study. We will need to schedule time on Thursday afternoon or Friday morning to
complete a few more spreadsheets.
-Mike
1
Subject:Fee Study Check-In
Location:Whitney's Office
Start:Mon 10/9/2023 11:00 AM
End:Mon 10/9/2023 12:00 PM
Show Time As:Tentative
Recurrence:(none)
Meeting Status:Not yet responded
Organizer:Bernstorff, Rebecca
Required Attendees:Bernstorff, Rebecca; McDonald, Whitney; Jackson, Emily
Optional Attendees:Tway, Timothea (Timmi)
Call Handling Mode 2:2
Hi there,
This was the soonest date I could find for us to meet to discuss (I will provide all materials closer to our meeting):
Fee Study update and schedule for Council (study session, public hearing, adoption)
Communications plan
Credit card surcharge pass through
Business Roundtable Initiative impacts on Fee Study (and other processes)
1
Subject:Park Impact Fee Calculations
Location:Microsoft Teams Meeting
Start:Tue 10/17/2023 3:00 PM
End:Tue 10/17/2023 4:00 PM
Show Time As:Tentative
Recurrence:(none)
Meeting Status:Not yet responded
Organizer:Taylor, Brent
Required Attendees:Bernstorff, Rebecca; Pringle, Brendan; Avakian, Greg
Purpose of meeting is to discuss the Park Impact Fee calculation provided by DTA and to discuss:
See attached spreadsheet (Parks tab) for calculation and notes from DTA.
Additional Notes from DTA on the fee:
________________________________________________________________________________
Microsoft Teams meeting
Join on your computer, mobile app or room device
2
Click here to join the meeting
Download Teams | Join on the web
Learn More | Meeting options
________________________________________________________________________________
I. Inventory of Existing General Government Facilities
Facility Facility Units Quantity
Buildings Square Feet 16,825
Land Acres 1.28
Vehicles Vehicles 48
Equipment Integrated Unit 1
II. Existing General Government Facilities EDU Calculation
Land Use Type
Number of
Persons Served
Number of Units/
Non-Res 1,000 SF
Residents per Unit/
Persons Served per
1,000 Non-Res. SF
EDUs per Unit/
per 1,000 Non-Res
SF
Total
Number of
EDUs
Residential 47,788 22,845 2.09 1.00 22,845
Subtotal Residential 47,788 22,845 22,845
Hotel 999 1,598 0.63 0.60 955
Commercial Retail 8,609 6,261,332 1.38 1.31 8,231
Office 5,618 3,745,250 1.50 1.43 5,371
Industrial 3,325 4,433,036 0.75 0.72 3,179
Institutional / Other 723 482,104 1.50 1.43 691
Subtotal Non-residential 19,274 NA NA NA 18,428
Total 67,062 41,273
III. Existing Facility Standard
Facility Units per
Facility Type [3]Facility Units Quantity 1,000 Persons Served
Buildings Square Feet 16,825 251
Land Acres 1 0.019
Vehicles Vehicles 48 0.716
Equipment Integrated Unit 1 0.015
IV. Future General Government Facilities EDU Calculation
Land Use Type
Number of
Persons Served
Number of Units/
Non-Res 1,000 SF
Residents per Unit/
Persons Served per
1,000 Non-Res. SF
EDUs per Unit/
per 1,000 Non-Res
SF
Total
Number of
EDUs
Residential 9,379 4,483 2.09 1.00 4,483
Subtotal Residential 9,379 4,483 NA NA 4,483
Hotel 87 140 0.63 0.60 83
Commercial Retail 753 547,476 1.38 1.31 720
Office 491 327,476 1.50 1.43 470
Industrial 291 387,614 0.75 0.72 278
Institutional / Other 63 42,154 1.50 1.43 60
Subtotal Non-Residential 1,685 757,244 NA NA 1,611
Total 11,064 NA NA 6,095
V. Future Facility Standard
Facility UnitsFacilities Units Funded
Facility Type Facility Units per 1,000 Persons Served by New Development
Buildings Square Feet 251 2,776
Land Acres 0.019 0.211
Vehicles Vehicles 0.716 7.919
Equipment Integrated Unit 0.014912 0.165
VI. General Government Summary Cost Data
Facility Units Funded Total Facility Cost for Cost
Facility Type Facility Units by Future Development Cost Per Unit Future Development per EDU
Buildings Square Feet 2,776 $750 $2,081,835 $342
Land Acres 0.211 $1,577,093 $333,041 $55
Vehicles Vehicles 7.919 $62,146 $492,133 $81
Equipment Integrated Unit 0.165 $4,176,289 $689,002 $113
Offsetting Revenue $0
Total $3,596,011 $590
VII Land Use Fees Units / Sq. Ft Costs Financed by DIF
Residential $590 4,483 $2,645,321
Hotel $353 140 $49,264
Commercial Retail $776 547,476 $424,658
Office $846 327,476 $277,103
Industrial $423 387,614 $163,996
Institutional / Other $846 42,154 $35,670
$3,596,011
VIII Land Use Fees Units / Sq. Ft Costs Financed by DIF
Residential $0.39 4,483 $2,645,321
Hotel $353 140 $49,264
Commercial Retail $0.78 547,476 $424,658
Office $0.85 327,476 $277,103
Industrial $0.42 387,614 $163,996
Institutional / Other $0.85 42,154 $35,670
$3,596,011
IXI Land Use Fees
APPENDIX A-1
CITY OF SAN LUIS OBISPO, CALIFORNIA
POLICE FACILITIES FACILITIES FEE CALCULATION
Single Family (per SF)$0.39
Multi-Family (per SF) $0.39
Mobile Home (per SF)$0.39
Hotel (per room) $353
Commercial Retail (per SF) $0.78
Office (per SF)$0.85
Industrial (per SF)$0.42
Institutional / Other (per SF) $0.85
Table I - Inventory of Existing Facilities
This table contains the inventory numbers provided to DTA by the City
Note: Since the Equipment and Property Total of $4,176,289 is not divided by any units - it is described as one integrated unit
Table II - Existing Facilities EDU Calculations
These are the current Demographics and land use numbers generated by DTA
This is how Equivalent Dwelling Units (EDUs) are calculated
Table III - Existing Facility Standards - This table calculates the Level of Service (LOS)
DTA uses the information from Table 1 to determine the existing facility standards per 1,000 residents
This is the basis for calculating the Level of Service (LOS) which is the basis of this methodology
Current 2023 level of service standards are as follows
For every 1,000 persons served there are 251 square feet of building space.
For every 1,000 persons served there are .019 acres of land
For every 1,000 persons served there are .716 vehicles
For every 1,000 persons served there are .015 units of equipment
Persons Served Assumption (example)
1,000 residents = 1000 persons served
1000 employees = (1,000 x 50%) = 500 persons served
Table IV - Existing Facility Standards
These are the projected Demographics and land use numbers (Growth) out to 2043 generated by DTA
This is the "Delta" in growth between 2023 and 2043
Table V - Future Facility Standards
This table presents the new development that must be added to maintain the same level of service
calculated in Table III.
Maintain 2043 level of service standards are as follows
For every 1,000 persons served there are 251 square feet of building space.
For every 1,000 persons served there are .019 acres of land
For every 1,000 persons served there are .716 vehicles
For every 1,000 persons served there are .015 units of equipment
Table VI - Future Facility Standards
This table calculates the total facility costs for new development and the EDUs.
Table VII- Land Use Costs
This table presents calculated residential fees per unit and non-residential per square foot and room
Table VIII- Land Use Costs
This table presents calculated residential fees per square foot using information from
the table below and non-residential fees per square foot and room
Average Square Feet (Per Building Permit Information)
Single Family Residential 1,847
Multi Family Residential 1,000
Combined Ave Square Feet 1,531
Calculated Fee per Sq. Ft.$0.39
Table IX- Land Use Costs
This Table presents the development Impact Fees as they are presented in this study.
I. Inventory of Fire & Rescue Facilities
Facility Facility Units Quantity
Buildings Square Feet 26,822
Land Acres 4.14
Vehicles Vehicles 31.0
Equipment Integrated Unit 1.0
II. Existing Fire & Rescue Facilities EDU Calculation
Land Use Type
Number of
Persons Served
Number of Units/
Non-Res 1,000 SF
Residents per Unit/
Persons Served per
1,000 Non-Res. SF
EDUs per Unit/
per 1,000 Non-Res SF
Total
Number of EDUs
Residential 47,788 22,845 2.09 1.00 22,845
Subtotal Residential 47,788 22,845 NA NA 22,845
Hotel 999 1,598 0.63 0.60 955
Commercial Retail 8,609 6,261,332 1.38 1.31 8,231
Office 5,618 3,745,250 1.50 1.43 5,371
Industry 3,325 4,433,036 0.75 0.72 3,179
Institutional / Other 723 482,104 1.50 1.43 691
Subtotal Non-Residential 19,274 14,923,320 18,428
Total 67,062 NA NA 41,273
III. Existing Facility Standard
Facility Units per
Facility Type [3]Facility Units Quantity1,000 Persons Served
Buildings Square Feet 26,822 400
Land Acres 4.14 0.062
Vehicles Vehicles 31 0.462
Equipment Integrated Unit 1 0.015
IV. Future Fire & Rescue Facilities EDU Calculation
Land Use Type
Number of
Persons Served [1]
Number of Units/
Non-Res 1,000 SF
Residents per Unit/
Persons Served per
1,000 Non-Res. SF]
EDUs per Unit/
per 1,000 Non-Res SF
Total
Number of EDUs
Residential 9,379 4,483 2.09 1.00 4,483
Subtotal Residential 9,379 4,483 NA NA 4,483
Hotel 87 140 0.63 0.60 83
Commercial Retail 753 547,476 1.38 1.31 720
Office 491 327,476 1.50 1.43 470
Industry 291 387,614 0.75 0.72 278
Institutional / Other 63 42,154 1.50 1.43 60
Subtotal Non-Residential 1,685 1,304,859 NA NA 1,611
Total 11,064 NA NA 6,095 47,367
V. Future Facility Standard
Fire
Existing
Funds
Balance
Facility UnitsFacilities Units Funded
Facility Type Facility Units per 1,000 Persons Served by New Development
Buildings Square Feet 400 4,425
Land Acres 0.062 0.682
Vehicles Vehicles 0.462 5.114
Equipment Integrated Unit 0.014912 0.165
VI. General Fire & Rescue Summary Cost Data
Facility Units Funded Total Facility Cost for
Facility Type Facility Units by Future Development Cost Per Unit Future Development Cost per EDU
Buildings Square Feet 4,425 $1,000 $4,425,081 $726
Land Acres 0.682 $1,577,093 $1,076,138 $177
Vehicles Vehicles 5.114 $480,560 $2,457,760 $403
Equipment Integrated Unit 0.165 $4,584,337 $756,322 $124
Ofsetting Revenue $0
Total $8,715,300 $1,430
VII Land Use Fees Units / Sq. Ft Costs Financed by DIF
Residential $1,430 4,483 $6,411,205
Hotel $855 140 $119,395
Commercial Retail $1,880 547,476 $1,029,201
Office $2,051 327,476 $671,588
Industry $1,025 387,614 $397,460
Institutional / Other $2,051 42,154 $86,450
$8,715,300
VIII Land Use Fees Units / Sq. Ft Costs Financed by DIF
Residential $0.93 4,483 $6,411,205
Hotel $855 140 $119,395
Commercial Retail $1.88 547,476 $1,029,201
Office $2.05 327,476 $671,588
Industry $1.03 387,614 $397,460
Institutional / Other $2.05 42,154 $86,450
$8,715,300
IX Land Use Fees
Single Family (per SF) $0.93
Multi-Family (per SF)$0.93 Average Square Feet
Mobile Home (per SF) $0.93 Single Family Residential 1847
Hotel (per room)$855 Multi Family Residential 1000
Commercial Retail (per SF)$1.88
Office (per SF)$2.05
Industry (per SF)$1.03
Institutional / Other (per SF)$2.05 Combined Ave Square Feet 1531
Calculated Fee per Sq. Ft.$0.93
APPENDIX A-1
CITY OF SAN LUIS OBISPO, CALIFORNIA
FIRE FACILITIES FEE CALCULATION
Table I - Inventory of Existing Facilities
This table contains the inventory numbers provided to DTA by the City
Note: Since the Equipment and Property Total of $4,584,337 is not divided by any units - it is described as one integrated unit
Table II - Existing Facilities EDU Calculations
These are the current Demographics and land use numbers generated by DTA
This is how Equivalent Dwelling Units (EDUs) are calculated
Table III - Existing Facility Standards - This table calculates the Level of Service (LOS)
DTA uses the information from Table 1 to determine the existing facility standards per 1,000 residents
This is the basis for calculating the Level of Service (LOS) which is the basis of this methodology
Current 2023 level of service standards are as follows
For every 1,000 persons served there are 400 square feet of building space.
For every 1,000 persons served there are .062 acres of land
For every 1,000 persons served there are .462 vehicles
For every 1,000 persons served there are .015 units of equipment
Persons Served Assumption (example)
1,000 residents = 1000 persons served
1000 employees = (1,000 x 50%) = 500 persons served
Table IV - Existing Facility Standards
These are the projected Demographics and land use numbers (Growth) out to 2043 generated by DTA
This is the "Delta" in growth between 2023 and 2043
Table V - Future Facility Standards
This table presents the new development that must be added to maintain the same level of service
calculated in Table III.
Maintain 2043 level of service standards are as follows
For every 1,000 persons served there are 400 square feet of building space.
For every 1,000 persons served there are .062 acres of land
For every 1,000 persons served there are .462 vehicles
For every 1,000 persons served there are .015 units of equipment
Table VI - Future Facility Standards
This table calculates the total facility costs for new development and the EDUs.1
2
Table VII- Land Use Costs 3
This table presents calculated residential fees per unit and non-residential per square foot and room4
5
Table VIII- Land Use Costs 6
This table presents calculated residential fees per square foot using information from 7
the table below and non-residential fees per square foot and room 8
9
Average Square Feet (Per Building Permit Information)10
Single Family Residential 11
Multi Family Residential 12
Combined Ave Square Feet 13
Calculated Fee per Sq. Ft.14
15
16
Table IX- Land Use Costs 17
This Table presents the development Impact Fees as they are presented in this study.18