HomeMy WebLinkAboutCity of SLO Transit Yard_Load CalcsCITY SPECIFICATION NO.DATE:PROJECT TITLE:
SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONBATTERY ELECTRIC BUS CHARGING INFRASTRUCTURE
EPEPHGHG01/16/20252000403XAPPROVED: __/__/____EXPIRES: 12.31.2025PRELIMINARYNOT FOR CONSTRUCTIONTHIS DOCUMENT HAS BEENPREPARED FOR GENERALINFORMATION PURPOSES ONLY,AND SHALL NOT BE USED FORBIDDING, PRICING, PERMITS, OROTHER OFFICIAL PURPOSES.SINGLE LINE DIAGRAM2 (E) XFMR-MAINPG&E PADMOUNTTRANSFORMER277/480V, 3-PHASE, 4WPG&E PRIMARYSERVICEM(E)PG&EMETER(E)1,600AT1,600AF3PALSIG(E) "MSB-1" MAIN SERVICE SWITCHBOARD1,600A, 277/480V, 3-PHASE, 4W, NEMA 3R, 65KAIC(E)400AT400AF3P(E)#2/0GNDNEUTRALGNDPG&ESCOPE OF WORKCITY OF SAN LUIS OBISPOSCOPE OF WORK(E) MAIN SERVICE SWITCHBOARD400A, 480V, 3-PHASE, 4W(E)100AT225AF3P(E)100AT225AF3P(E)100AT225AF3P(E)100AT225AF3P(SPARE)(SPARE)(N)350AT400AF3P(F)350AT400AF3P(F)350AT400AF3PMPG&EMETER(E)350AT400AF3P(E)100AT400AF3P(E)100AT400AF3P(EI LOADS TO REMAIN)(E)PULL BOX 6(E)PULL BOX 5(E)PULL BOX 4(E)PULL BOX 3(E)PULL BOX 2(E)PULL BOX 1(E)VEHICLECHARGERNO. 12(E)VEHICLECHARGERNO. 11(N)VEHICLECHARGERNO. 10(N)VEHICLECHARGERNO. 9(N)VEHICLECHARGERNO. 8(N)VEHICLECHARGERNO. 7(N)VEHICLECHARGERNO. 6(N)VEHICLECHARGERNO. 5(F) VEHICLECHARGERNO. 4(F) VEHICLECHARGERNO. 3(F) VEHICLECHARGERNO. 2(F) VEHICLECHARGERNO. 1(E)MANHOLE(N)POWERBLOCK 1#REFERENCE NOTES1.(E) PG&E PADMOUNT TRANSFORMER. 300KVA2.PROVIDE NEW 350AT/400AF BREAKER IN EXISTING SPACE. NEW BREAKER TO MATCHEXISTING AIC RATING.3.CHARGE POINT POWERBLOCK, INPUT 480V, 3PH, 3W. LOCATED ON CONCRETE PAD. SEESITE PLAN FOR ADDITIONAL INFORMATION.4.INTERCEPT AND EXTEND EXISTING 4" CONDUIT. PROVIDE NEW WIRING IN EXISTINGCONDUIT AS INDICATED ON FEEDER SCHEDULE.5.EXISTING 4" CONDUIT FOR FUTURE USE.6.EXISITNG 2" CONDUIT FOR FUTURE USE.7.(E) CHARGE POINT CPE 250 EV CHARGER, INPUT 480V, 3PH, 32, 62.5KW.8.CHARGEPOINT EXPRESS PLUS CHARGING STATION.(N)350AT400AF3P221(N)POWERBLOCK 233(N)350AT400AF3P2(N)POWERBLOCK 334444445555565656567788888866SCOPE OF WORK:THIS PROJECT INSTALLS (6) CHARGE POINT EXPRESS PLUS CHARGING STATIONS AND (3)POWER BLOCKS WITH (15) POWER MODULES. THE REMAINING (4) DC CHARGINGSTATIONS AND (3) POWER BLOCKS WILL BE INSTALLED IN FUTURE PHASES TO ACHIEVE THEFULL BUILD OUT.SCALE:SINGLE LINE DIAGRAM