HomeMy WebLinkAbout02-24-2025_Battery Electric Bus Charging InfrastructureBASIS OF BEARINGS:THE BASIS OF BEARINGS FOR THIS SURVEY ARE BASED ON THEWORLD GEODETIC SYSTEM OF 1984 (WGS84) REFERENCEFRAME, AND CONSTRAINED TO THE CALIFORNIA STATECOORDINATE SYSTEM, ZONE 5, US SURVEY FEET, ASDETERMINED BY RTK GPS OBSERVATIONS ON POINT 8038 ASSHOWN ON THE CITY OF SAN LUIS OBISPO "HORIZONTALCONTROL NETWORK" (JANUARY 2007) HAVING A PUBLISHEDVALUE OF N-2302425.292 E-5765491.182.BENCHMARK:THE ELEVATIONS SHOWN HEREON ARE NAVD88 ASDETERMINED BY MEASUREMENTS ON POINT #53 AS SHOWN ONTHE CITY OF SAN LUIS OBISPO "BENCHMARK SYSTEM" (2020)HAVING A PUBLISHED ELEVATION OF 134.37'.Reference Documents:City Standard Specifications - August 2020 EditionCity Engineering Standards - August 2020 Edition1.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR ORPERMITTEE TO CONTACT "UNDERGROUND SERVICE ALERT OFNORTHERN CALIFORNIA" BY PHONE AT 8-1-1 FORTY-EIGHT (48)HOURS PRIOR TO START OF CONSTRUCTION FOR LOCATION OFPOWER, TELEPHONE, OIL AND NATURAL GAS UNDERGROUNDFACILITIES. CONTRACTOR OR PERMITTEE SHALL ALSOCONTACT THE APPROPRIATE AGENCY FOR THE LOCATION OFCABLE T.V., WATER, SEWER, DRAINAGE OR UNDERGROUNDFACILITIES.2.THE CONTRACTOR SHALL POSSESS A CLASS LICENSE AT THETIME OF BID OPENING.index to planssheet no.descriptiongeneral notes:datum:san luis obispo county, californialegend:BATTERY ELECTRIC BUSCHARGING INFRASTRUCTURE1TITLE SHEET2SITE PLAN3CIVIL DETAILS4STRUCTURAL NOTES5STRUCTURAL NOTES6STRUCTURAL DETAILS7SYMBOLS AND GENERAL NOTES8SINGLE LINE DIAGRAM9ELECTRICAL SITE PLAN10ELECTRICAL DETAILSAPPROVED BYSPECIFICATION NO.DATEofSHEETBrian A. Nelson, City Engineer R.C.E. C79870 Approved Date102/24/202520004031FILE NO./LOCATIONXX XX, 2025No. C 79870B
R
I
AN A. NELSONCIVILR EGISTER
E
D
PROFESSIONAL ENGINEERSTATE OF CALI
FORNIA NO. 75284K
E
ONE K. KAUOR EGISTE
R
E
D PROFESSIONAL ENGINEERSTATE OF CALIFORN
I
A EXP.CIVILADDRESS: 29 PRADO ROAD, SAN LUIS OBISPO, CAAPN:053-052-005OWNER: CITY OF SAN LUIS OBISPOproject location:
08999RIGHTONLY 08999RIGHTONLY08999RIGHTONLY08999RIGHTONLY 08999LEFTONLY08999LEFTONLY08999LEFTONLY08999LEFTONLY089990899908999089990899908999089990899908999089990899908999NO PARKING
08999RIGHTONLY08999RIGHTONLY08999RIGHTONLYNO PARKINGNO PARKING
08999RIGHTONLYCITY SPECIFICATION NO.DATE:PROJECT TITLE:
SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONBATTERY ELECTRIC BUS CHARGING INFRASTRUCTURE
KKKKAKAK02/24/2025200040310APPROVED: __/__/____NO. 75284K
E
ONE K. KAUOR EGISTE
R
E
D PROFESSIONAL ENGINEERSTATE OF CALIFORNI
A EXP.CIVIL1" = 20'SITE PLAN2
CITY SPECIFICATION NO.DATE:PROJECT TITLE:
SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONBATTERY ELECTRIC BUS CHARGING INFRASTRUCTURE
KKKKAKAK02/24/2025200040310APPROVED: __/__/____NO. 75284K
E
ONE K. KAUOR EGISTE
R
E
D PROFESSIONAL ENGINEERSTATE OF CALIFORNI
A EXP.CIVILAS SHOWNCIVIL DETAILS3
CITY SPECIFICATION NO.DATE:PROJECT TITLE:
SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONBATTERY ELECTRIC BUS CHARGING INFRASTRUCTURE
KKKKAKAK02/24/2025200040310APPROVED: __/__/____NO. 75284K
E
ONE K. KAUOR EGISTE
R
E
D PROFESSIONAL ENGINEERSTATE OF CALIFORNI
A EXP.CIVILAS SHOWNSTRUCTURAL NOTES4
CITY SPECIFICATION NO.DATE:PROJECT TITLE:
SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONBATTERY ELECTRIC BUS CHARGING INFRASTRUCTURE
KKKKAKAK02/24/2025200040310APPROVED: __/__/____NO. 75284K
E
ONE K. KAUOR EGISTE
R
E
D PROFESSIONAL ENGINEERSTATE OF CALIFORNI
A EXP.CIVILAS SHOWNSTRUCTURAL NOTES5
CITY SPECIFICATION NO.DATE:PROJECT TITLE:
SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONBATTERY ELECTRIC BUS CHARGING INFRASTRUCTURE
KKKKAKAK02/24/2025200040310APPROVED: __/__/____NO. 75284K
E
ONE K. KAUOR EGISTE
R
E
D PROFESSIONAL ENGINEERSTATE OF CALIFORNI
A EXP.CIVIL1" = 20'STRUCTURAL DETAILS6