HomeMy WebLinkAbout2025-04-01_SLO EV Charging - Additional Trenching Exhibit08999RIGHTONLY 08999RIGHTONLY08999RIGHTONLY08999RIGHTONLY 08999LEFTONLY08999LEFTONLY08999LEFTONLY08999LEFTONLY089990899908999089990899908999089990899908999089990899908999NO PARKING
08999RIGHTONLY08999RIGHTONLY08999RIGHTONLYNO PARKINGNO PARKING
08999RIGHTONLY81-910DC01ADC02ADC03AET01AET02AET03AAC01BAC02BAC03BAC01AAC02AAC03A(E)MH1DC01BDC02BDC03BET01BET02BET03B2(E)VEHICLECHARGERNO 12(E) PB67(TYP)(E)VEHICLECHARGERNO 112(N)EVPL10ET01CDC01C(E) PB5(N)EVPL9DC01DET01D(N)EVPL8ET02CDC02C(E) PB4(N)EVPL7DC02DET02D(N)EVPL6ET03CDC03C(E) PB3(N)EVPL5DC03DET03D(F)EVPL4(E) PB2(F)EVPL33(F)EVPL2(E) PB1(F)EVLP1(E)"MSB-1"111122DC02BDC03BET02BET03BDC03BET03B2222333546(F)EVPB4(F)EVPB5(F)EVPB6(N)EVPB3(N)EVPB2(N)EVPB1CITY SPECIFICATION NO.DATE:PROJECT TITLE:
SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONBATTERY ELECTRIC BUS CHARGING INFRASTRUCTURE
EPEPHGHG03/19/20252000403XAPPROVED: __/__/____EXPIRES: 12.31.2025PRELIMINARYNOT FOR CONSTRUCTIONTHIS DOCUMENT HAS BEENPREPARED FOR GENERALINFORMATION PURPOSES ONLY,AND SHALL NOT BE USED FORBIDDING, PRICING, PERMITS, OROTHER OFFICIAL PURPOSES.50% CONSTRUCTION DOCUMENTS
GECE #2437ELECTRICAL SITE PLAN4SCALE:ELECTRICAL SITE PLAN1" = 20'-0"#REFERENCE NOTES1.CHARGE POINT CPE 250 EV CHARGER, 2 TOTAL.2.CITY TO INSTALL ELECTRIC VEHICLE CHARGINGSTATIONS ON EXISTING CONCRETE PAD, 6 TOTAL.3.FUTURE ELECTRIC VEHICLE CHARGING STATIONS, 4TOTAL.4.NEW CONCRETE PAD FOR POWER BLOCKS PERSTRUCTURAL.5.POWER BLOCKS PROVIDED BY THE CITY, 3 TOTAL.6.FUTURE POWER BLOCKS.7.EXISTING PULL BOX.8.EXISTING MAIN ELECTRICAL SERVICE, "MSB-1".9.EXISTING PG&E TRANSFORMER, "T-1984H".10.EXISTING FLUSH IN GRADE MANHOLE VAULT AS PERSINGLE LINE DIAGRAM.11.EXISTING FEEDERS SCHEDULED TO REMAIN.SCALE:1/4" = 1'-0"POWER BLOCK DETAIL1