HomeMy WebLinkAboutSpecNo2000403_Engineer Estimate_20250520BASE BID 1 CLEARING AND GRUBBING 1 LS $3,000.00 $3,000.00 2 REMOVE CHAIN LINK FENCE 20 LF $50.00 $1,000.00 3 CONCRETE REMOVAL 268 SF $15.00 $4,020.00 4 CLASS II AGGREGATE BASE 6 CY $250.00 $1,500.00 5 CHAIN LINK FENCE 53 LF $200.00 $10,600.00 6 POTHOLE EXISTING UTILITIES 4 EA $1,500.00 $6,000.00 7 POWER BLOCK CONCRETE PAD 1 LS $50,000.00 $50,000.00 8 POWER BLOCK MOUNTING PLATES 6 EA $100.00 $600.00 9 SET POWER BLOCK 2 EA $500.00 $1,000.00 10 MODIFY CHARGING STATION CONCRETE PAD AND SET CHARGER 4 EA $1,500.00 $6,000.00 11 PULL BOXES 3 EA $5,000.00 $15,000.00 12 CONDUIT, BENDS, AND MATERIAL 1 LS $23,000.00 $23,000.00 13 CONDUCTORS 1 LS $70,000.00 $70,000.00 14 CIRCUIT BREAKERS 1 LS $1,700.00 $1,700.00 15 BOLLARDS 4 EA $3,000.00 $12,000.00 16 CONCRETE PAVEMENT 268 SF $40.00 $10,720.00 17 CONSTRUCTION SURVEY 1 LS $5,000.00 $5,000.00 BASE BID SUBTOTAL = $221,140.00 Contingency (15% of Total) = $33,171.00 BASE BID TOTAL = $254,311.00 BID ALTERNATE 1 A1 CONCRETE REMOVAL 134 SF $15.00 $2,010.00 A2 SET POWER BLOCK 1 EA $500.00 $500.00 A3 MODIFY CHARGING STATION CONCRETE PAD AND SET CHARGER 2 EA $1,500.00 $3,000.00 A4 PULL BOXES 1 EA $5,000.00 $5,000.00 A5 CONDUIT, BENDS, AND MATERIAL 1 LS $2,000.00 $2,000.00 A6 CONDUCTORS 1 LS $20,000.00 $20,000.00 A7 CONCRETE PAVEMENT 134 SF $40.00 $5,360.00 BID ALTERNATE 1 SUBTOTAL = $37,870.00 Contingency (15% of Total) = $5,680.50 ALTERNATE 1 TOTAL = $43,550.50 APPROXIMATE QUANTITY UNIT OF MEASURE UNIT COST TOTAL ITEM COST EA = Each, LS = Lump Sum, LF = Lineal Feet, SF= Square Feet, SY = Square Yard, CY = Cubic Yard In providing opinions of probable construction costs, the City must understand that AKA Engineering has no control over the costs or the price of labor, equipment or materials, or over the Contractor's method of pricing, and that the opinions of probable costs provided herein are made on the basis of AKA Engineering's qualifications and experience. AKA Engineering makes no warranty, expressed or implied, as to the accuracy of such opinions as compared to bid or actual costs. ITEM NO. ITEM DESCRIPTION TOTAL ITEM COST BATTERY ELECTRIC BUS CHARGING INFRASTRUCTURE PROJECT CITY PROJECT #2000403 ENGINEERS OPINION OF PROBABLE CONSTRUCTION COST CITY OF SAN LUIS OBISPO, CA May 20, 2025 ITEM NO. ITEM DESCRIPTION APPROXIMATE QUANTITY UNIT OF MEASURE UNIT COST 1