HomeMy WebLinkAboutFinal Review_100% to Finals CITY OF SAN LUIS OBISPO PUBLIC WORKS DEPARTMENT Battery Electric Bus Infrastructure Final PS&E Project Review Meeting Date/Time: July 16, 2025 2:30PM-3:30PM Facilitator: SG Meeting Location: Conference room 1 Recorder: SG Attendees: Wyatt Banker-Hix, Brian Nelson, Emma Laplante Purpose Review comments and proceed to final PS&E Desired Outcomes Reach consensus on comments and proceed to Final plans AGENDA Item 100% Comments How it was addressed on Finals 1. Plan Comments Page 2  Add a limit of concrete removal on the plans to direct the contractor  Limits shown with verified sizing and location on plans  Dowel into the existing concrete for the new concrete  Detail added to the plans addressing this, confirmed with James that the detail was sufficient.  Add length to the keynote for fencing  Length was added  The wrong keynote number was used  Corrected on finals Page 5   The power block foundation and anchor bolt needed to be reviewed by a structural engineer for strength  AKA confirmed that a structural engineer reviewed and there is no issue with either design. Page 9   Relocating the pull boxes to not be in the wheel pathway to limit additional maintenance and potential issues  Met Keone on site and discussed the location of the pull boxes. They were moved to the center of the white line. Page 10   Branch circuit trench detail needed to show what was out there (ie, concrete depth, AB depth), not just native  Detail updated to show actual site section. New Comments  Should the contractor be switched to an electrical or kept as class B  Class A licence not B  Add project file location (is this city plan location?)  I will add file location to the plans  Is there a minimum width of concrete repair? If it is a narrow trench where no rebar is present do we need to add it? does it still need to be doweled in?  The current design/detail is sufficient.  The smaller trenches for the conduits need to show width or add it to the callouts with the width  2. Special Provision (New Comments)  Current walkthrough is July 30 th but comment says to reschedule   Should add alt bid items for class II aggregate base and concrete paving be combined?  Change the DBE requirement to 0.5% on page 27 Tech Specs  Extra bullet point  Used if instead of of  Remove bullet E from page 48  Remove I from page 52 bullet B  Remove the directional burial from the spec on page 60  Action Items Description Owner Due Date Next Meeting: TDB