Prepared By: Manny Guzman, Engineer II
M -tmg D.� 1 -3 -2012
It- N-1-
SUBJECT: CHORRO STREET RECONSTRUCTION MEASURE Y PROJECT,
SPECIFICATION NO. 91043
RECOMMENDATIONS
1. Approve plans and specifications for the Chorro Street Reconstruction Project, Specification
No. 91043.
2. Authorize staff to advertise for bids and authorize the City Manager to award the contract if the
lowest responsible bid for the Chorro Street Reconstruction Project is within the Engineer's
Estimate of $300,000.
DISCUSSION
The City's Pavement Maintenance Plan (PMP) was adopted by Council on April 14, 1998. The key
elements of the PMP include establishment of eight pavement maintenance areas within the City
and a maintenance plan in which each of these areas will receive maintenance over an eight -year
period. A ninth area, the downtown, is designated to receive maintenance on an annual basis.
On October 6, 2009 Council gave new direction for the PMP to give a higher priority to arterial and
downtown streets. Since 2006, several projects have been completed that repaired portions of
arterial roadways and downtown streets, Broad, Higuera, Osos, Santa Rosa, Foothill, Los Osos
Valley Road, and Johnson. This particular project includes the resurfacing of Chorro, from Palm to
Higuera.
Chorro Street, from Palm to Higuera, is an older street originally constructed of Portland cement
concrete. Approximately 35 years ago, the concrete street was overlaid with asphalt concrete in
order to provide a smoother pavement surface. This wearing surface has now deteriorated to a
condition warranting replacement. Additionally near the intersection of Chorro and Monterey, the
road has started to sink causing an uneven roadway surface. This project will remove portions of
the roadway and re- compact the existing base in an effort to stabilize the existing road.
Additional investigation and stabilization work maybe required once the cause of the roadway
settlement has been found.
Also included is this project is the upgrading of all ramps between Palm and Higuera to existing
Americans with Disability Act (ADA) standards. A total of 10 existing street corners will be
retrofitted with new curb ramps or truncated domes to meet current ADA standards.
C3 -1
Chorro Street Reconstruction Spec. No. 91043 Paqe 2
Construction Impact Mitigation
To minimize the impact of construction to this high pedestrian volume shopping area, staff has
worked with the Downtown Association to determine the least disruptive approach to completing
this project.
The project has been prepared to limit the contractor's work hours from 7:00 AM to 4:00 PM.
The contractor will be allowed to work nine hour days so that the total duration of this project is
as short as possible. This approach was approved by the Downtown Association's Economic
Activity Committee and these provisions are included in the project's specifications.
Also discussed with the Downtown Association was the timing of the project. After considering
all factors involved and to minimize the impacts to the downtown merchants and to avoid the
time of year with the greatest likelihood for rain, the project has been scheduled to begin in April
2012.
CONCURRENCES
1. The Downtown Association's Economic Activity Committee has recommended that start
of construction be scheduled for April 9, 2012 and that hours of work be limited as
discussed in this report.
2. The Community Development Department has completed an Initial Study and issued a
Mitigated Negative Declaration.
FISCAL IMPACT
Street Reconstruction & Resurfacing Account
Currently there is $100,074 available in the Street Reconstruction & Resurfacing (R &R) Master
Account to support this request. Approximately $162,000 will be transfered to the Street R & R
Master Account from the Microsurfacing Summer 2010 project, Spec. No. 90986. Construction
has been completed for the Microsurfacing Summer 2010 project and the final report is pending,
which will transfer the remaining balance to the Street R &R Master Account. An additional
$250,000 will be transferred from the Monterey Street paving project, Specification No. 91008 to
this project. The Monterey project has also been completed. Once these transfers have occurred,
there will be sufficient funding in the Street R &R account to support this request.
The water and sewer utility improvement budget is currently available in the water fund and
sewer fund master accounts. This funding supports the adjustment of water and sewer facilities to
the new pavement elevations. This funding support will come from the Water Distribution
System Improvements Master account and the Collection System Improvements Master account
as detailed in the table below. Currently, there is $589,000 available in the Water Distribution
System Improvements Master account and $1,415,000 in the Collection System Improvements
Master account.
Typically projects request a 10% to 15% contingency to cover unanticipated work during
construction. A 20% contingency is requested for this project because the cause of the sinking
C3 -2
Chorro Street Reconstruction Spec. No. 91043 Page 3
road near the intersection of Chorro and Monterey is still unknown and staff anticipates
additional work may be needed to correct underlying issues with the street.
This project will be funded 96% through Measure Y Funds.
Estimated Project Cost by Funding Source
Total for Construction
Funds to Be Available:
ATTACHMENT
Location Map
$388,750 $10,000 $1,200 $399,950
$512,074 $589,000 $1,415,000
AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE
Plans and Special Provisions
T: \Council Agenda Reports \Public Works CAR \2012 \CIP \91043 Chorro St Reconstruction \91043 CAR Advertise.doc
C3 -3
(90346)
(90227)
(90239)
Street R &R
Water Fund
Sewer Fund
Total
Account
Distribution
Collections
Project
Engineer's Estimate:
$290,000
$9,000
$1,000
$300,000
Contingencies:
$70,000
$1,000
$200
$71,200
Cultural Resources Monitoring:
$25,000
$0
$0
$25,000
Material Testing:
$3,000
$0
$0
$3,000
Printing:
$750
$0
$0
$750
Total for Construction
Funds to Be Available:
ATTACHMENT
Location Map
$388,750 $10,000 $1,200 $399,950
$512,074 $589,000 $1,415,000
AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE
Plans and Special Provisions
T: \Council Agenda Reports \Public Works CAR \2012 \CIP \91043 Chorro St Reconstruction \91043 CAR Advertise.doc
C3 -3
MISSION
v VENABLE
tia CENTER
09
� VIEw
ATTACHMENT
—11 WILSON ❑ Li
GARFIELD
a
S
IRAN w =
<-,
s °2
ITT- p�� ;;o z 9lT Qp�� �VD
-� PHILLIPS z ��
o PEACH
Q�G� v"OF U
yA
JENNIFER
P#' Of LLJ
BIANCHI
HIGH m 2
�O� RACHELCT. v
wUU Ll V1 z
Q
S DERC K a � LOREN
m co
cn
S = a m BRANCH = Y = ° OUNDHO E
3 ourH SOUTH W s m
r cr
a o Y g ¢ FUN ON
BRIDGE o � o uj
CHORRO STREET RECONSTRUCTION 91043