Staff received the following questions regarding Item #8a on the agenda for the October
6, 2026, City Council meeting. Questions are below with staff’s response shown in italics:
1) When exiting campus, the road goes from 1-lane on campus, to 2-lanes at
the Grand/Slack intersection, then back to 1-lane. What is the purpose of this
configuration rather than just one continuous lane?
On urban streets, the traffic capacity is generally constrained at intersections. The
purpose of providing two lanes on Grand Avenue in the southbound direction
through the Slack Street intersection is to reduce traffic delays and queueing
exiting the Cal Poly campus during peak periods, including the typical weekday
afternoon commute and after larger on-campus special events. Based on traffic
analysis prepared by the City, and corroborated by traffic analysis prepared by Cal
Poly’s transportation engineering consultant, if only a single lane was provided
along southbound Grand Avenue at Slack Street, peak period traffic queues exiting
the campus would increase by >200 feet and the southbound approach would
experience delays and level of service (LOS) below the City’s adopted thresholds.
If desired by the Council, staff could pursue (A) an option that maintains two lanes
on southbound Grand Avenue from Cal Poly to the US 101 freeway, or (B) explore
an option that retains one southbound lane continuously exiting Cal Poly,
eliminating the one-to-two-to-one lane transition. However, each of these
alternatives would introduce trade-offs in terms of reduced width for multimodal
facilities (with Option A), or increased congestion exiting the Cal Poly campus (with
Option B). Further, Option B would require street design changes within Cal Poly’s
right-of-way, which would be dependent on Cal Poly’s approval of this modification,
and resulting increase in congestion exiting the campus.
If a roundabout was installed at the Grand/Slack intersection, as recommended for
future consideration, a single lane could be provided entering/exiting campus on
Grand while maintaining efficient traffic operations.
Item #8a – GRAND AVENUE PAVING PROJECT STUDY SESSION Page 2
2) The right turn onto the SB 101 ramp is shown as a right turn yield to through
bicycles. Can you explain the reasoning for this rather than a merge? There
is also concern about the speed of overtaking bicycles given this is going
downhill.
With the initial Grand Avenue pilot installation, the design strategy for the
southbound Grand approach to the US 101 SB On-Ramp intersection was to stripe
a dedicated right turn lane and bike lane to the left of this turn lane, which allowed
vehicles to merge across the bike lane before making a right-turn onto the freeway
ramp. While in some locations, this can be an effective strategy to reduce potential
for vehicle vs. bicycle “right hook” conflicts, unfortunately, this design approach
was not very effective at this location during the initial pilot installation.
Following the initial pilot installation observations, southbound drivers often did not
merge into the dedicated right-turn lane at this intersection—instead, drivers would
often make a wide sweeping right turn from the through lane at higher speeds. For
this reason, the pilot roadway striping was modified in early 2026 to remove the
dedicated right-turn lane and add dashed bike lane striping to provide a tighter
radius corner to encourage drivers to instead merge into the dashed bike lane and
navigate the turn at slower speeds. Staff have generally observed slower turning
speeds and improved bicyclist visibility with the revised striping design, and have
received similar positive feedback from the adjacent preschool representatives.
Staff understands the concerns with high speeds along the downhill slope on
southbound Grand Avenue—both for vehicles and cyclists, as this does introduce
additional potential for conflict at intersections and driveways. The current concept
designs include features such as radar speed feedback signs, additional bulbouts
to reduce turning speeds, and additional streetlighting and warning signage to
increase visibility of conflict points. Staff recommends exploring a future
roundabout as the ideal engineering solution to both reduce speeds and manage
conflicts at this intersection.
If the Council is interested in revisiting the potential to provide a dedicated
southbound right-turn lane with a bike lane aligned to the left of the turn lane at this
location, staff can evaluate this design option and explore strategies to increase
proper use of this turn lane beyond what was observed during the initial pilot
project.
Item #8a – GRAND AVENUE PAVING PROJECT STUDY SESSION Page 3
Southbound Grand Ave & US 101 SB On-Ramp - Original Pilot Project Striping
Configuration
Southbound Grand Ave & US 101 SB On-Ramp - Revised Pilot Project Striping
Configuration
3) Why is on-street parking being maintained on Grand? Is there evidence that
this parking is needed? Could additional buffering be provided to the bike
lanes if the parking was removed?
The current concept designs retain on-street parking along Grand Avenue where
it currently exists. The on-street parking along Grand Avenue is well utilized during
the Cal Poly academic year, and a residential parking district is currently in place
along the east side of Grand Avenue between US 101 and Slack Street to manage
residential parking demand.
Item #8a – GRAND AVENUE PAVING PROJECT STUDY SESSION Page 4
While buffered bike lanes have been provided along the full extent of Grand
Avenue, removal of on-street parking would be needed to extend the limits of
physically protected bike lanes, as ultimately recommended in the City’s Active
Transportation Plan. Staff can pursue this design option, if desired by the City
Council, but would recommend conducting additional noticing and outreach to the
properties in the vicinity.
4) There is a proposed raised crosswalk at Fredericks St. Why was this not
proposed at all side streets?
Cost/funding constraints are the primary reason why raised crosswalks have not
been proposed at all side streets along Grand Avenue. In particular, raised
crosswalks can create additional challenges and costs to accommodate
stormwater drainage. Staff is proposing a raised crosswalk at the Fredericks side
street, as this location has a history of turning vehicle vs. bicycle crashes, including
a fatal crash involving a cyclist in 2023. If desired by the Council, staff can evaluate
additional side street locations for raised crosswalks, but this would likely require
reducing project scope/costs at other locations to stay within the available funding.