Loading...
HomeMy WebLinkAbout2000034-03 Bid ResultsItem No. Item Description Unit of  Measure Estimated  Quantity Unit Price Total Unit Price Total Unit Price Total 1 Containment for Removal of Heavy Metal‐Bearing Coatings LS 1 ‐‐‐ 45,000$           ‐‐‐ 74,000$           ‐‐‐ 100,245$         2 Remove Exterior Coatings and Recoat Exterior Surfaces.  LS 1 ‐‐‐ 98,000$           ‐‐‐ 84,000$           ‐‐‐ 115,250$         3 Remove Interior Coatings and Recoat Interior Surfaces  LS 1 ‐‐‐ 86,000$           ‐‐‐ 105,000$         ‐‐‐ 102,160$         4 Remove and Dispose of Existing Roof and Rafter Systems LS 1 ‐‐‐ 35,000$           ‐‐‐ 37,000$           ‐‐‐ 82,530$           5 Furnish and Install Free‐Spanning Aluminum Roof LS 1 ‐‐‐ 150,000$         ‐‐‐ 212,300$         ‐‐‐ 151,450$         6 Cathodic Protection System LS 1 ‐‐‐ 25,000$           ‐‐‐ 38,000$           ‐‐‐ 35,650$           7 Disposal of Removed Heavy Metal‐Bearing Tank Coatings  LS 1 ‐‐‐ 13,000$           ‐‐‐ 32,000$           ‐‐‐ 12,815$           8 Replace Top Three Ladder Rungs/Supports and Extend Existing Ladder LS 1 ‐‐‐ 5,000$              ‐‐‐ 54,000$           ‐‐‐ 13,190$           9 Tank Disinfection and VOC Testing LS 1 ‐‐‐ 5,000$              ‐‐‐ 5,700$              ‐‐‐ 3,495$              10 OSHA Compliance LS 1 ‐‐‐ 1,000$              ‐‐‐ 3,500$              ‐‐‐ 1,300$              11 Health and Safety Plan LS 1 ‐‐‐ 1$                     ‐‐‐ 1,500$              ‐‐‐ 3,730$              12 11‐Month Inspection of Coating Systems LS 1 ‐‐‐ 3,000$              ‐‐‐ 6,000$              ‐‐‐ 2,915$              13 Extend Tank Shell Height 3 Feet   LS 1 ‐‐‐ 45,202$           ‐‐‐ 34,000$           ‐‐‐ 74,970$           Wash Water Tank No. 1 Rehabilitation, Spec. No. 2000034‐03 Bid Opening Date: November 30,2023 Paso Robles Tank, Inc. Euro Style Management Spiess Construction Co., Inc. BID TOTAL 511,203$                                     687,000$                                     699,700$