HomeMy WebLinkAbout2000034-03 Bid ResultsItem No. Item Description
Unit of
Measure
Estimated
Quantity Unit Price Total Unit Price Total Unit Price Total
1 Containment for Removal of Heavy Metal‐Bearing Coatings LS 1 ‐‐‐ 45,000$ ‐‐‐ 74,000$ ‐‐‐ 100,245$
2 Remove Exterior Coatings and Recoat Exterior Surfaces. LS 1 ‐‐‐ 98,000$ ‐‐‐ 84,000$ ‐‐‐ 115,250$
3 Remove Interior Coatings and Recoat Interior Surfaces LS 1 ‐‐‐ 86,000$ ‐‐‐ 105,000$ ‐‐‐ 102,160$
4 Remove and Dispose of Existing Roof and Rafter Systems LS 1 ‐‐‐ 35,000$ ‐‐‐ 37,000$ ‐‐‐ 82,530$
5 Furnish and Install Free‐Spanning Aluminum Roof LS 1 ‐‐‐ 150,000$ ‐‐‐ 212,300$ ‐‐‐ 151,450$
6 Cathodic Protection System LS 1 ‐‐‐ 25,000$ ‐‐‐ 38,000$ ‐‐‐ 35,650$
7 Disposal of Removed Heavy Metal‐Bearing Tank Coatings LS 1 ‐‐‐ 13,000$ ‐‐‐ 32,000$ ‐‐‐ 12,815$
8 Replace Top Three Ladder Rungs/Supports and Extend Existing Ladder LS 1 ‐‐‐ 5,000$ ‐‐‐ 54,000$ ‐‐‐ 13,190$
9 Tank Disinfection and VOC Testing LS 1 ‐‐‐ 5,000$ ‐‐‐ 5,700$ ‐‐‐ 3,495$
10 OSHA Compliance LS 1 ‐‐‐ 1,000$ ‐‐‐ 3,500$ ‐‐‐ 1,300$
11 Health and Safety Plan LS 1 ‐‐‐ 1$ ‐‐‐ 1,500$ ‐‐‐ 3,730$
12 11‐Month Inspection of Coating Systems LS 1 ‐‐‐ 3,000$ ‐‐‐ 6,000$ ‐‐‐ 2,915$
13 Extend Tank Shell Height 3 Feet LS 1 ‐‐‐ 45,202$ ‐‐‐ 34,000$ ‐‐‐ 74,970$
Wash Water Tank No. 1 Rehabilitation, Spec. No. 2000034‐03
Bid Opening Date: November 30,2023 Paso Robles Tank, Inc. Euro Style Management Spiess Construction Co., Inc.
BID TOTAL 511,203$ 687,000$ 699,700$