Loading...
HomeMy WebLinkAboutSLO Building Prototype Comparison Survey from MGT-amended by DMCity of San Luis Obispo Building Prototype Comparison Survey Alteration/Addition - ADU - 600 SQ FT - $250,000 Valuation Valuation/Sq Ft Building Plan Check Building Inspection Total Alteration/Addition - SFR - 679 SQ FT - $125,000 Valuation Valuation/Sq Ft Building Plan Check Building Inspection Total New ADU - 900 SQ FT - $200,000 Valuation Valuation/Sq Ft Building Plan Check Building Inspection Total New Commercial - 30,986 SQ FT - $3,000,000 Valuation Valuation/Sq Ft Building Plan Check Building Inspection Total New Single Family - 1,900 SQ FT - $250,000 Valuation Valuation/Sq Ft Building Plan Check Building Inspection Total SLO Current Fee 600 SQ FT 799.19 2157.6 2956.79 SLO Current Fee 679 SQ FT 1968.95 2525.05 4494 SLO Current Fee 900 SQ FT 2690.04 2724.74 5414.78 SLO Current Fee 30,986 SQ FT 14720 15417.48 30137.48 SLO Current Fee 1,900 SQ FT 4298.99 4354.72 8653.71 SLO Proposed Fee 600 SQ FT 3240 3240 6480 SLO Proposed Fee 679 SQ FT 2580.2 2390.08 4970.28 SLO Proposed Fee 900 SQ FT 3501 3888 7389 SLO Proposed Fee 30,986 SQ FT 19831.04 22309.92 42140.96 SLO Proposed Fee 1,900 SQ FT 4921 5795 10716 SLO County 600 SQ FT 768 53.4 821.4 SLO County 679 SQ FT 869.12 604.31 1473.43 SLO County 900 SQ FT 1152 801 1953 SLO County 30,986 SQ FT 21125 13500 34625 SLO County 1,900 SQ FT 2432 1691 4123 City of Santa Barbara 600 SQ FT 1260.5 1260.5 2521 City of Santa Barbara 679 SQ FT 1987 1987 3974 City of Santa Barbara 900 SQ FT 4680.9 12872.7 17553.6 City of Santa Barbara 30,986 SQ FT 10765.2 20297.8 31063 City of Santa Barbara 1,900 SQ FT 5668.76 21152.76 26821.52 City of Ventura 600 SQ FT 845.26 404.25 1249.51 City of Ventura 679 SQ FT 992.25 624.75 1617 City of Ventura 900 SQ FT 1234.59 2411.71 3646.3 City of Ventura 30,986 SQ FT 18020.3 20408.5 38428.8 City of Ventura 1,900 SQ FT 1414.9 2613.81 4028.71 City of Monterey 250000 2706.5 4201.99 6908.49 City of Monterey 125000 1647.75 2573.24 4220.99 City of Monterey 200000 2283 3550.49 5833.49 City of Monterey 3000000 17942.22 27648 45590.22 City of Monterey 250000 2706.5 4201.99 6908.49 Average 1395.065 1480.035 2875.1 Average 1374.03 1447.325 2821.355 Average 2337.6225 4908.975 7246.5975 Average 16963.18 20463.575 37426.755 Average 3055.54 7414.89 10470.43 Median 1052.88 832.375 1885.255 Median 1320 1305.875 2795.5 Median 1758.795 2981.1 4739.895 Median 17981.26 20353.15 36526.9 Median 2569.25 3407.9 5515.745 Notes: MGT's original analysis for Ventura used alt/adds for non-residential - incorrect fee category. I used Residential Alteration (remodel) structural MGT's analysis of Santa Barbara only included the base fee, not the additional square footage increment For Santa Barbara I used the Remodels R3 including kitchen/bath fee on Misc. schedule and split 50/50 between PC and Insp MGT's analysis for SLO County used TI -Assembly, High Hazard, Educational Institutional. I used Residential (Single Family) Notes: MGT's original analysis for Ventura used alt/adds for non-residential - incorrect fee category. I used Residential Additions For Santa Barbara I used the Room Addition fee on the Misc. schedule split between PC and Insp MGT's analysis for SLO County used TI -Assembly, High Hazard, Educational Institutional. I used Residential (Single Family) MGT's analysis for SLO County used TI -Assembly, High Hazard, Educational Institutional. I used Residential (Single Family) MGT's analysis for SLO County used Factory and Industrial, Storage. I used Business, Mercantile SLO county 12,500 sq ft max Oakland Building Prototype Comparison Survey Residential Combo, Addition - ADU (construct foundation and instal detached 947 sq ft HCD-approved manufactured ADU (3b, 2ba). Valuation/Sq Ft Building Plan Check Building Inspection Total Residential Combo, New - To construct new three-story SFD with attached ADU (3112 s/f) and attached garage. 4 b/3 ba, kitchen, living room, dining room and exterior balcony. Attached ADU 1b/1ba, kitchen, and living room. To include related mechanical, electrical, and plumbing. Valuation/Sq Ft Building Plan Check Building Inspection Total Residential Min Fee - Water Heater Replacement (no plan check) Building Inspection (Min Fee) Total Building Non-Residential (Mixed Use) New - 5 story mixed-use building on a vacant lot consisting of 10 residential units. 30,144 total sq ft Valuation/Sq Ft Building Plan Check Building Inspection Total Oakland Current Fees 75680 1600 1280 2880 Oakland Current Fees 835300 8466.15 6772.92 15239.07 Oakland Current Fees 118 118 Oakland Current Fees 4000000 33066.25 26453 59519.25 Long Beach 75680 1188.2107 1397.895 2586.1057 Long Beach 835300 6371.43 7495.8 13867.23 Long Beach 113.4 113.4 Long Beach 4000000 24315.1313 32420.175 56735.3063 Sacramento 75680 374 891 1265 Sacramento 835300 4949.1209 6068.4811 11017.602 Sacramento 168 168 Sacramento 4000000 21170 25894 47064 San Fransisco 75680 1318.38 564.56 1882.94 San Fransisco 835300 5775.7 2477.55 8253.25 San Fransisco 174 174 San Fransisco 4000000 25751 11062 36813 San Leandro 75680 1351.984 1689.98 3041.964 San Leandro 835300 7225.36 9031.7 16257.06 San Leandro 209 209 San Leandro 4000000 19455.2 24319 43774.2 San Jose 947 Sq Ft 1632 2232 3864 San Jose 3112 Sq Ft 14668 10881 25549 San Jose 193 193 San Jose 30,144 Sq Ft 35904 45192 81096 Average 1172.915 1355.087 2528.0019 Average 7797.9222 7190.9062 14988.8284 Average 171.48 171.48 Average 25319.0662 27777.435 53096.5013 Projects 1 Fees Residential Combo valuation sqft Address fee Application Bedroom Tax CBSC (California Building Standards Commiosion City - CBSC CITY _SMIP CO Electrical Inspections General Plan Surcharge Inspection Mechanical Inspections Plan Check Plumbing Inspections Record Management & Tech Enhancement Fee SMIP ( Strong Motion Instrumentation Program) Zoning Conditions Zoning Inspections Total 75680 947 192 1280 192 1600 192 0 0 3456 52.5 76 300 2.7 0.3 0.38 762 454.08 753.89 7.19 2 14.75% on all above fees * * * * * Does not charge Record Management & Tech Enhancement Fee Building Combo - NEW To construct new three-story SFD with attached ADU (3112 s/f) and attached garage. New SFD to consist of 4 bedrooms, 3 bathrooms, kitchen, living room, dining room and exterior balcony. Attached ADU to consist of 1 bedroom and 1 bathroom, kitchen, and living room. To include related mechanical, electrical, and plumbing. Address for new Lot A SFD to be 4249 SAINT ANDREWS RD. Valuation Sqft Address fee Application Bedroom Tax CBSC (California Building Standards Commiosion City - CBSC CITY _SMIP CO - 2 for both addresses Construction Site Monitoring Electrical Inspections General Plan Surcharge Inspection Mechanical Inspections Parking Review Plan Check Plumbing Inspections Process Coordination Site Plan Review SMIP ( Strong Motion Instrumentation Program) Zoning Conditions Zoning Inspections School Tax School Tax - City Record Management & Tech Enhancement Fee Affordable Housing Impact Fee - at Final Affordable Housing Impact Fee - At Issuance Capital Improvement Impact Fee Transportation Impact fee 835300 3112 52.5 76 500 30.6 3.4 11.69 1524 433 1015.94 5011.8 6772.92 1015.94 500 8466.15 1015.94 203.19 712 222.19 1855 1180 12578.53 389.03 6426.55 4845.91 4845.91 1212 2424 63324.19 14.75% on all above fees Water Heater Replacement Valuation Sqft Application Inspection Record Management & Tech Enhancement Fee Minimum Fee permit 0 76 118 28.62 222.62 no plan check 3 Building Non-Residential (Mixed Use) New Construction of a 5 story mixed-use building on a vacant lot consisting of 10 residential units (0 of which are to be affordable units) with approximately 650 sf commercial and parking garage for residents at ground floor. 14.75% on all above fees * * * * Valuation Sqft Address fee Application Bedroom Tax CBSC (California Building Standards Commiosion City - CBSC CITY _SMIP CO (Certificate of Occupancy) Construction Site Monitoring General Plan Surcharge Inspection Parking Review Plan Check Process Coordination Site Plan Review SMIP ( Strong Motion Instrumentation Program) Zoning Conditions Zoning Inspections School Tax School Tax - City Record Management & Tech Enhancement Fee Affordable Housing Impact Fee - at Final Affordable Housing Impact Fee - At Issuance Capital Improvement Impact Fee Transportation Impact fee Electrical Inspections Mechanical Inspections Plumbing Inspections 4000000 see box 146 76 2000 144 16 56 762 433 24000 26453 500 33066.25 793.59 712 1064 10070 4559 54299.67 1679.37 23722.41 107520 107520 9090 9705.16 418387.45 30144 4 Non - Residential - Alteration Fees ** no Plan Check required SOFT DEMOLITION OF INTERIOR NON-STRUCTURAL BUILDING COMPONENTS WITHIN AN EXISTING VACANT 147,577 SQUARE FOOT WAREHOUSE ONLY. DEMOLITION INCLUDES BUT IS NOT LIMITED TO: INTERIOR PARTITION WALLS, CEILINGS, MILLWORK, FINISHES, PLUMBING FIXTURES, LIGHT FIXTURES, ELECTRICAL OUTLETS, ELECTRICAL SUB PANELS / DISTRIBUTION, MECHANICAL DISTRIBUTION, FIRE SPRINKLER HEADS, AND LOW VOLTAGE ELECTRICAL SYSTEMS. SEPARTE TI PERMIT WILL NEED TO BE OBTAINED, IF REQUIRED. valuation sqft Application CBSC (California Building Standards Commiosion City - CBSC CITY _SMIP General Plan Surcharge Inspection Record Management & Tech Enhancement Fee SMIP ( Strong Motion Instrumentation Program) Total 180000 0 76 7.2 0.8 2.52 1080 2320 521.21 47.08 4054.81 No sqft