HomeMy WebLinkAbout1000535 - Bid ResultsBid Item Item Description Unit of Measure Estimated Quantity Unit Cost Unit Cost Total Cost Unit Cost Total Cost 1 Water Pollution Control Plan LS 1 --- ---$22,940.16 2 Remove Trees and Brush LS 1 --- ---$9,902.23 3 Remove Asphalt Pavement SQFT 45,500 $4.16221 $4.16 $189,280.00 4 Remove Concrete Pavement SQFT 12,000 $7.34052 $7.34 $88,080.00 5 Remove Catch Basin EA 3 $4,555.02384 $4,555.02 $13,665.06 6 Remove Chain Link Fence LF 16 $37.13335 $37.13 $594.08 7 Demo Light Post Concrete Footing LS 1 --- ---$792.18 8 3" Drain Rock TON 8 $132.02968 $132.03 $1,056.24 9 Class 8 RSP Fabric SQFT 450 $19.80445 $19.80 $8,910.00 10 Class II Aggregate Base CY 1065 $101.93559 $101.94 $108,566.10 11 Hot Mix Asphalt Pavement TON 2655 $147.87748 $147.88 $392,621.40 12 Asphalt Containment Berm LF 960 $31.95606 $31.96 $30,681.60 13 Concrete Pavement SQFT 23,650 $13.15803 $13.16 $311,234.00 14 Chain Link Fence LF 45 $165.03710 $165.04 $7,426.80 15 Utility Adjustment to Finished Grade - Valves and Cleanouts EA 9 $1,095.84631 $1,095.85 $9,862.65 16 Utility Adjustment to Finished Grade - Manholes EA 2 $3,300.74191 $3,300.74 $6,601.48 17 Striping - Thermoplastic LS 1 --- ---$13,070.94 18 Pothole Existing Utilities EA 10 $1,419.31902 $1,419.32 $14,193.20 19 Containment Area Catch Basins LS 1 --- ---$14,523.26 20 New 1600A switchboard material for installation LS 1 --- ---$159,362.33 21 New concrete pad for 1600A switchboard LS 1 --- ---$13,971.38 22 New Flat Top Manhole material and installation LS 1 --- ---$31,026.97 23 Pull Boxes EA 7 $13,004.92313 $13,004.92 $91,034.44 24 Charger Concrete Pad EA 12 $3,164.52249 $3,164.52 $37,974.24 25 Charger universal plates EA 12 $48.08521 $48.09 $577.08 26 Conduit, bends, and material LS 1 --- ---$128,068.79 27 Trenching for conduits LS 1 --- ---$89,780.18 28 Bollards EA 52 $2,463.90227 $2,463.90 $128,122.80 29 Circuit Breakers LS 1 --- ---$7,447.13 30 Conductors LS 1 --- ---$19,744.89 31 Construction Survey LS 1 --- ---$10,237.57 32 Coordination with PG&E LS 1 --- ---$3,300.74 33 Compliance with Required Federal Clauses LS 1 --- ---$1,320.30 34 Triaxial Geogrid Allowance SQFT 6400 $6.27141 $6.27 $40,128.00 35 Pothole for Future Solar Pole Locations (15' depth) EA 15 $1,287.28934 $1,287.29 $19,309.35 - - **Bid results were corrected to fix an arithmetic error on the bid results *Bid was rejected because it was received late, and was not publicly opened. Transit Yard EV Charging Infrastructure, Specification NO. 1000535** Anderson Burton Construction, Inc. Edwards Construction, Inc.* Total:$2,025,407.57