Loading...
HomeMy WebLinkAbout05/21/1996, C-6 - WATER RECLAMATION FACILITY DIGESTER #1 REPAIR, SPECIFICATION NO. 520.9667.512.553 council "` � z1199b j acEnaa Report hem Nmbff , CITY OF SAN LU I S 0 B I S P 0 FROM: Michael D. McCluskey, Director f Public WoAs Prepared By: Barbara Lynch, Civil Engineer SUBJECT. Water Reclamation Facility Digester #1 Repair, Specification No. 520.9667.512.553 CAO RECOMME DATION Approve Contract with Spiess Construction Co., Inc. in the amount of S 73,378.00 for the Water Reclamation Facility Digester #1 Repair and authorize the Mayor to execute the contract. DLSCUSSION Cleaning and repair of the digesters at the Water Reclamation Facility is a routine project completed approximately every 5 years. The harsh environment at the facility necessitates routine maintenance programs to prevent the need for major facility replacements. The City has already completed a contract to remove the sludge from the digester and clean it. This project will replace the interior coating and make necessary equipment repairs and replacements. FISCAL IMPACT A total of $120,000 in the sewer fund (Wastewater Reclamation Facility, Major Equipment Maintenance) was approved for the cleaning and repair of Digester No. 1 as part of the 1995-95 budget (Appendix B, Capital Improvement Plan , page 63). The project was divided into three phases: $30,000 to empty and clean the digester (contracted awarded previously), $40,000 to purchase replacement equipment (purchases completed); $50,000 to coat the interior and repair and replace the necessary equipment. The engineer's estimate for this project at the time of bidding was $58,000. On May 7th bids were opened for the repair project. Bids were over the engineers estimate and with contingencies, $30,000 over the budget. Staff will not be awarding either of the alternate bid items as these are not vital to plant operation. As indicated in the previous staff report to advertise the project, staff recommends the additional $30,000 necessary for the project be taken from the Water Reclamation Facility, Major Equipment Maintenance capital improvement account This will postpone the overhaul of the cogeneration plant and the cleaning and repair of digester #2. The cogeneration project was to be deferred anyway due to changes in Air Pollution Control Regulations and is being reevaluated. Digester #1 is one year behind when it was originally planned. Delaying Digester 42 one year to 1997-'98 will therefore not present a problem. Attachments Bid Summary Agreement 7b- 1 CL s q O 00000000900000000 0 y� J 0 0 0 0 0 0 0 0 0 0 0 0 0 O' 0 0 O LU O O O O O O 0 N 0 0 0 0 0 0 N 0 0 m 0 J2 O Q O C w t0 O w 0 co K Q w O m N O' 0 O No LL m r a N m W 0 w w w N w m N w O U 3 m w w w w w w w W OC m O 00 o o o 00 0 o 0 0 0 0 0 0 li c r w o 0 0 0 0 0 0 0 0 0 0 0 0 0 00 # Z Z U O O O O O O N Q 6 6 m 0 O ui O O O 0 0 0 0 0 o N /7 Q �- N O O O m J W C ❑ y m Q 0 0 O N W) W 00 co W d f- 0. dLL Nm � 0 Nv W W 0 0 0 0 0 0 0 0 0 0 0 0 00 0 00 O O = Q w O o O G O G G G w 0 0 0 G 0 0 0 0 co F. U O O O O O O N N m 0 N O O O n in to n /A N ❑ ¢ O Q m t9 O O m l9 N A O1 01 to O W n �_ N V/ F d O m w Q N t� w Q w f0 N CO W 0)- - O � w ww V V wwwwwn win w J u w w zao 0 0 00 0 0 0 0 0 0 0 0 0 00 C ` F w o 0 0 0 0 o O o 0 0 0 0 00 0 0 G d0000a6 oieadv �: mvio 00 0 O t00 l09 O O Q N OI l7 Q Flo 00 ^ N p d 0 0 Q N n io �L ' U O N o 0 0 0 0 0 0 0808000000 0 J 0 0 0 0 0 0 0 0 ' 0 0 0 0 0 0 0 O LU G G C G C o O G O 666666 0 0 O } F 0 0 0 0 0 OD O m t0 N O to O O O n 0 0 n it 0 N O O Iq 10 m N OI O M V RI O N O O N O w w w _f0 ~ d w w K w w w w K w K N N q 0 (� it w w w W Q 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O �R ? rG F W 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 V U0) 0 0 0 0 0 0 C N N O O Ili U), G 00 Z y Z ¢ 0 0 0 000 O � � N N � Q � O O O Z w w 7 d 00 m O Q O 001 1 Z � LL! Q a m 0 0 0 0 o ^ d no j � m v. 000 � � ' 0 —9n O F F O 1° L++ O O !— 20 N N N N N LL LL LL LL LL LL LL N y y ❑ =) -i J J J J J J J J J J J 0 J ❑_ J J _❑ Z m m 0 P ir U m c c c w ct m ` — — m m a ❑ X Q$ R m m m m m mcL m mW 1y3 Ut mN Nm LuwdcE a W UiA 2 UN CW n C 10 1 ZNciQOmAmWO : 1 CITY OF SAN LUIS OBISPO CALIFORNIA AGREEMIIVT THIS AGREENENT, made on this day of , 19_, by and between the City of San Luis Obispo,San Luis Obispo County,California,hereinafter called the Owner,and Spiess Construction Conu m ,Inc., hereinafter called the Contractor. WITNESSETM That the Owner and the Contractor for the consideration stated herein agree as follows: ARTICLE 1,SCOPE OF WORK: The Contractor shall perform everything required to be performed,shall provide and furnish all of the labor, materials, necessary tools, expendable equipment, and all utility and transportation services required to complete all the work of construction of Water Reclamation Facility Digester No 1 Repair. Specification No. 96-67B in strict accordance with the plans and specifications therefor, including any and all Addenda,adopted by the Owner, in strict compliance with the Contract Documents hereinafter enumerated. It is agreed that said labor,materials,tools,equipment,and services shall be Furnished and said work performed and completed under the direction and supervision and subject to the approval of the Owner or its authorized representatives. ARTICLE A CONTRACT PRICE. The owner shall pay the Contractor as full consideration for the faithful performance of this Contract, subject to any additions or deductions as provided in the Contract Documents, the contract prices as follows: Item Item Unit of Estimated Item Price Total No. Measure Quantity (in figures) (in figures) 1. Sandblasting (approx. 4400 SF) LS 1 - $10,000.00 2. Interior Coating (approx. 4400 SF) LS 1 -- $ 8,400.00 3. Exterior Painting (approx. 100 SF) LS 1 -- ---- $ 600.00 4. Remove & reinstall gas diffuser& LS 1 $ 4,300.00 heat exchanger assemblies 5. (S)Remove existing and install LS 1 ------- — $ 2,000.00 City furnished equipment 6. Modify gas dome water seal LS 1 $ 7,000.00 7. (S) Install hot water piping system, LF 180 $ 49.00 $ 8,820.00 galvanized 8. (S) Install gas piping, 3" galvanized LF 80 $ 54.00 $ 4,320.00 9. (S) Install gas piping, 2" galvanized LF 6 $ 98.00 $ 588.00 10. (S) Install gas piping, stainless LF 50 $134.00 $ 6,700.00 1 (S) Install gas piping, schedule 80 LF 50 $ 47.00 $ 2,350.00 11. PVC 12. Remove existing and install new LF 100 $ 88.00 $ 8,800.00 handrailing 13. Crack Sealing SF 100 $ 85.00 $ 8,500.00 14. Comply with OSHA LS 1 -------- $ 1,000.00 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BID TOTAL: $ 73,378.00 Payments are to be made to the Contractor in accordance with and subject to the provisions embodied in the documents made a part of this Contract: Should any dispute arise respecting the true value of any work omitted,or of any extra work which the Contractor may be required to do, or respecting the size of any payment to the Contractor, during the performance of this Contract, said dispute shall be decided by the Owner and its decision shall be final,and conclusive. ARTICLE M COMPONENT PARTS OF THIS CONTRACT: The Contract consists of the following documents, all of which are as fully a part thereof as if herein set out in full, if not attached, as if hereto attached: 1. Notice to Contractors and information for bidders. 2. Contract General Conditions and Technical Specifications. 3. Accepted Proposal. 4. Public Contract code Section 10285.1 Statement and 10162 Questionnaire. 5. Noncollusion Declaration. 6. Plans. 7. List of Subcontractors. 8. Agreement and Bonds. 9. Insurance Requirements and Forms. ARTICLE IV. It is further expressly agreed by and between the parties hereto that should there be any conflict between the terms of this instrument and the bid or proposal of said Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terns of said proposal conflicting herewith. IN WITNESS WHEREOF,the parties to these presents have hereunto set their hands this year and date first above written. By: CITY OF SAN LUIS OBISPO Date: MAYOR ATTEST: CITY CLERK 2