Madonna-LOVR Rehabilitation
LOVR at 101 and SLO Creek Bridge Widening and Interchange 2016
LOVR & Calle Joaquin Traffic Signal Mod to Add Protected Only Left Turns
Year
2017
2016
2021
Prime
Prime
Sub
Sub
Sub
Sub
Sub
Sub
Sub
Sub
Sub
Sub
Sub
Prime
Sub
Sub
Sub
Sub
Sub
Sub
Sub
Sub
Sub
Sub
Sub
Sub
Sub
Sub
Sub
Sub
Sub
Prime
Contractor(s)
Granite
Abrasive Blasting and Powder Coating
Coastline Commercial Sweepers
D M C Sweepers, Inc
Flash Flud Water Trucking
Lee Wilson Electric Company
Pavement Coatings Co
Pavement Engineering Inc
Pavement Recycling Systems Inc
RMC Sweep
Statewide Traffic Safety and Signs
Super Seal & Stripe
Granite
Advanced Geosolutions
Austin Enterprises
Bragg Crane
C&W Construction Specialties
Cal Stripe Inc
Cell-Crete Co
CMC Rebar
G3 Quality, Inc
JLS Concrete Pumping
JTS, Inc
KCI Environmental, Inc
Padre & Assoc
Pavement Recycling Systems Inc
S & G Drilling
Statewide Traffic Safety and Signs
Tipco Engineering Inc
Underground Specialties
Lee Wilson Electric Company
work type
Logistics, grinding, SWPPP, digout repair, cold plane, pavement concrete curb
Thermo Grinder Operator & Vehicle
Sweeper Machine Operator & Vehicle
Sweeper Machine Operator & Vehicle
Water Truck Operator & Vehicle
Traffic Signal Camera Install
Microsurfacing
FDR Inspection
Cold Plane, AC/Cement & Lime Treatment
Sweeper Machine Operator & Vehicle
Traffic control
Striping / Pavement Markers
Logistics, grinding, SWPPP, pavement, concrete curb
Wick Drains
Saw and Seal Joints
Crane Operator & Vehicle
Fencing and Safety
Stripe removal
Fill placement
Rebar
Inspection, Material Testing
Concrete Supply
Tree Removal
Erosion Control, Landscape
Geotechnical
Grinding Rumble Strip
Drilling
Traffic control
Piling
Electrical, Lighting
Electrical
start
8/5/2017
10/9/2017
8/12/2017
8/26/2017
9/23/2017
8/26/2017
10/7/2017
9/11/2017
8/12/2017
9/1/2017
10/14/2017
10/7/2017
10/17/2014
11/22/2014
12/18/2015
1/18/2015
6/20/2015
10/18/2014
11/6/2015
12/10/2014
8/9/2014
2/14/2015
10/19/2014
12/28/2014
12/5/2014
10/26/2014
12/5/2014
10/12/2014
4/25/2015
11/3/2014
Summer 2021
end
2/10/2018
10/9/2017
10/28/2017
11/4/2017
10/7/2017
12/30/2017
11/18/2017
10/8/2017
2/10/2018
10/9/2017
10/21/2017
2/24/2018
7/14/2016
11/22/2014
2/5/2016
3/8/2015
6/4/2016
6/4/2016
11/13/2015
6/4/2016
5/1/2016
2/21/2015
11/16/2016
6/4/2016
7/3/2015
5/14/2016
2/20/2015
6/4/2016
3/5/2016
5/29/2016
Summer 2021
1
11
12
13
14
24
25
26
27
28
39
40
41
42
43
55
56
57
58
68
69
70
71
72
82
83
84
85
86
96
97
98
99
100
111
112
113
114
115
126
127
128
129
130
132
142
143
144
145
146
147
158
159
160
161
162
172
173
174
175
176
186
187
191
201
202
203
204
205
215
216
217
230
231
232
233
243
244
245
Date
8/15/2017
8/16/2017
8/17/2017
8/18/2017
8/21/2017
8/22/2017
8/23/2017
8/24/2017
8/25/2017
8/28/2017
8/29/2017
8/30/2017
8/31/2017
9/1/2017
9/5/2017
9/6/2017
9/7/2017
9/8/2017
9/11/2017
9/12/2017
9/13/2017
9/14/2017
9/15/2017
9/18/2017
9/19/2017
9/20/2017
9/21/2017
9/22/2017
9/25/2017
9/26/2017
9/27/2017
9/28/2017
9/29/2017
1/2/2017
1/3/2017
1/4/2017
1/5/2017
1/6/2017
1/9/2017
1/10/2017
1/11/2017
1/12/2017
1/13/2017
1/13/2017
1/16/2017
1/17/2017
1/18/2017
1/18/2017
1/19/2017
1/20/2017
1/23/2017
1/24/2017
1/25/2017
1/26/2017
1/27/2017
1/30/2017
1/31/2017
1/1/2017
1/2/2017
1/3/2017
1/6/2017
1/7/2017
1/12/2017
1/13/2017
1/14/2017
1/15/2017
1/16/2017
1/17/2017
1/20/2017
1/21/2017
1/22/2017
1/28/2017
1/29/2017
1/30/2017
1/1/2017
1/4/2017
1/5/2017
1/6/2017
Granite onsite today mobilizing for project start-up. Traffic control and Construction Area Signs were placed. Potholing began onsite.
Granite continued potholing on Madonna Road and Los Osos Valley Road. Layout began for the bike land edge grind with Marco and Granite.
Granite started and completed the bike lane edge grind.
Granite complete SWPPP items around the site.
Granite Construction performing 10” AC digouts along Los Osos Valley Road.
Granite continuing 10” AC digouts along Los Osos Valley Road.
Granite continuing 10” AC digouts along Los Osos Valley Road.
Granite continuing 10” AC digouts along Los Osos Valley Road. Held weekly meeting at City and coordination meeting in field with the Gas Company.
Continuing 10” AC digouts along Los Osos Valley Road.
Granite Construction continued 10” digout base repairs at various locations at Los Osos Valley Road. Granite potholing utilities including Gas Company high pressure lines.
Granite Construction continued 10” digout base repairs at various locations at Los Osos Valley Road. Granite potholing utilities including Gas Company high pressure lines.
Granite Construction continued 10” digout base repairs at various locations at Los Osos Valley Road. Granite potholing utilities including Gas Company high pressure lines.
Granite Construction continued 10” digout base repairs at various locations at Los Osos Valley Road. Lee Wilson Electric installing traffic signal camera systems.
Granite Construction continued 10” digout base repairs at various locations at Los Osos Valley Road. Lee Wilson Electric installing traffic signal camera systems.
Contractor continuing 10” digout base repairs on Los Osos Valley Road.
Contractor continuing 10” digout base repairs on Los Osos Valley Road. Starting 5” cold plane grinding in area of full depth reclamation on Madonna.
Contractor continuing 10” digout base repairs on Los Osos Valley Road. Continuing 5” cold plane grinding in area of full depth reclamation on Madonna.
Contractor continuing 10” digout base repairs on Los Osos Valley Road. Continuing 5” cold plane grinding in area of full depth reclamation on Madonna. Lee Wilson installing additional
traffic signal camera hardware.
Granite finished 10” base repairs and continued to cold plane on Madonna Road in preparation for Full Depth Reclamation (FDR)
Continued to cold plane on Madonna Road and dust control.
Completed to cold plane on Madonna Road and continued dust control watering.
Started Full Depth Reclamation (FDR) on Madonna Road by pulverizing roadway 18” deep, starting on outside lanes.
Poured concrete curb and gutter and sidewalk and maintaining dust control.
Full Depth Reclamation underway, inspection by PEI. Lime treatment continued Westbound from the box culvert to the shopping center. Dust control throughout the day.
Continued Full Depth Reclamation. Granite cutting fine grade in the outside Westbound lane. Dust control throughout the day.
Continued Full Depth Reclamation in outside lanes. PRS completed lime injection on Eastbound outside lane.
Continued Full Depth Reclamation procedures.
Full Depth Reclamation continued in outside lanes, nearly complete. Signal utility conduits were hit by Full Depth Reclamation operations at Madonna and Oceanaire, but repaired by the
end of the day. Dust control scheduled for the weekend as well.
Pavement Engineering Incorporated onsite leading Full Depth Reclamation inspection. Granite, along with Pavement Recycling System completed Full Depth Reclamation inspection eastbound
#2 lane.
Continued Full Depth Reclamation inspection. Traffic swapped to phase 2. Dust control with the water truck performed all day. Granite and PRS injected lime into #1 lines.
Continued Full Depth Reclamation inspection. Granite performed Full Depth Reclamation cement treatment. Crews demolished ramp at El Mercado and Madonna then placed and compacted base
rock. El Mercado and Madonna eastbound signal was “knocked out” but repaired within 2 hours.
Continued Full Depth Reclamation inspection. Granite completed Full Depth Reclamation cement treatment to the Laguna box culvert #1 lanes both directions. Full Depth Reclamation treatment
is completed to PEI and City satisfaction. Dust control and water truck operated all day. Formed and poured southwest and southeast concrete ramps on the corner of Madonna Plaza.
PEI onsite leading HMA paving over the Laguna box culvert. HMA pavement placed 5” thick over box culvert. Granite fine grading over Madonna Road lane #1, both east and west bound. Prepping
for HMA overlay next week.
Granite placing Hot Mix Asphalt on Madonna Road. Base course on inside lane “3/4” HMA with a 2 ½” lift.” Technical oversite and inspection by PEI. Filippin Engineering personal onsite
as well.
Continued Hot Mix Asphalt placement, base course on outside land.
Hot Mix Asphalt top lift placed on outside lanes, “2 ½” lift”.
Hot Mix Asphalt top lift placement on inside lanes “2 ½” lift”. Overlay complete temporary tapped for traffic control.
Miscellaneous work on site including digout repair and punchlist.
Super Seal and Stripe onsite to remove existing thermo striping. Granite doing pavement, punchlist and adjusting utilities to grade.
Super Seal and Stripe onsite to remove existing thermo striping. Granite doing pavement, Punchlist and adjusting utilities to grade.
Super Seal and Stripe onsite to remove existing thermo striping. Granite doing pavement, Punchlist and adjusting utilities to grade.
Continued thermos striping removal. Granite and surveyor performing monument work on Madonna Road. PRS doing micro calibration at Cold Canyon Landfill.
Continued thermos stripe removal. PRS continuing calibration at Cold Canyon Landfill. Granite onsite for punchlist and other miscellaneous details.
Placing Microsurfacing during day-shifts on Monday and Tuesday and night shifts Wednesday through Friday.
Pavement Coating Co. (PCC) placed micro surfacing on LOVR from the city limits to Royal Way, outside lanes. Granite staff onsite for support.
PCC placed micro surfacing on LOVR from the city limits to Royal Way, inside lanes. Granite staff onsite for support.
Dayshift - PCC worked partial dayshift to finish up micro surfacing on LOVR from the city limits to Royal Way.
Nightshift – PCC and Granite worked 7 pm to 6 am to place micro surfacing on LOVR from Royal Way to Calle Joaquin, outside lanes.
Nightshift - PCC worked 7 pm to 6 am to place micro surfacing on portions of Madonna Road and finished inside lanes on LOVR from Royal Way to Calle Joaquin.
Nightshift - PCC worked 7 pm to 6 am to place micro surfacing on Madonna Road from near Laguna Lake to the 101
Night-work - Granite completed Madonna Road micro-surfacing application.
Granite placed micro surface in various areas to make repairs where delamination had occurred. Night-work - Sweeper onsite doing cleanup.
Granite refreshing temporary tabs on various locations throughout the project. Sweeper onsite doing cleanup.
Granite refreshing temporary tabs on various locations throughout the project. No active work underway onsite…pending striping layout.
Granite refreshing temporary tabs on various locations throughout the project.
Night Work – Super Seal and Stripe performed striping layout based on the City’s traffic division staff striping modifications.
Night Work – Super Seal and Stripe performed striping layout based on the City’s traffic division staff striping modifications.
Night Work – Super Seal and Stripe completed striping layout based on the City’s traffic division staff striping modifications.
City’s traffic division staff reviewed layout in field by Super Seal and Stripe.
City responded with a formal acceptance of the stripe layout with some comment. No other substantial field work throughout the week. Just striping layout and review.
Night Work – Super Seal and Stripe completed lanes lines on LOVR. Granite removed floppy tabs throughout the night ahead of striping.
Night Work – Super Seal and Stripe continued lanes lines on Madonna Road – striping the centerlines, turn pockets, dash lines and bike/edge line. Granite onsite for coordination and
removing floppy tabs ahead of the striping throughout the night.
Pavement Coatings onsite during the day to perform micro surfacing and punch list repair.
Night-work - Super Seal and Stripe onsite to continue thermo-plastic striping and marker placement on LOVR and Madonna.
Night-work - Super Seal and Stripe onsite to continue thermo-plastic striping and marker placement on LOVR and Madonna.
Striping placement halted on Wednesday night due to drizzle and wet pavement.
Striping placement not proceeding due to wet pavement.
Striping placement not proceeding due to wet pavement.
Night-work – Super Seal and Stripe continued placement of thermo-plastic striping throughout.
Night-work – Super Seal and Stripe continued thermo placement, working on arrows on LOVR.
Night-work – Continued placement of thermo arrows on LOVR and on Madonna Road.
Night-work – Super Seal and Stripe continued placement of thermo-plastic striping throughout. Placing green bike lane, arrows, stop bars, etc.
Night-work – Super Seal and Stripe continued placement of thermo-plastic striping throughout. Placing green bike lane, arrows, stop bars, etc.
Night-work – Super Seal and Stripe continued placement of thermo-plastic striping throughout. Placing green bike lane, arrows, stop bars, etc.
Night-work – Super Seal and Stripe continued placement of thermo-plastic striping throughout. Placing green bike lane, arrows, stop bars, etc.
Night-work – Super Seal and Stripe continued placement of thermo-plastic bike legends throughout.
Night-work – Super Seal and Stripe finished placement of thermo-plastic bike legends, arrows, and stencil work.
Night-work – Super Seal and Stripe finished placement of thermo-plastic hashing and crosswalks.