Loading...
HomeMy WebLinkAboutContractors Last 10 yrProject Madonna-LOVR Rehabilitation LOVR at 101 and SLO Creek Bridge Widening and Interchange 2016 LOVR & Calle Joaquin Traffic Signal Mod to Add Protected Only Left Turns Year 2017 2016 2021 Prime Prime Sub Sub Sub Sub Sub Sub Sub Sub Sub Sub Sub Prime Sub Sub Sub Sub Sub Sub Sub Sub Sub Sub Sub Sub Sub Sub Sub Sub Sub Prime Contractor(s) Granite Abrasive Blasting and Powder Coating Coastline Commercial Sweepers D M C Sweepers, Inc Flash Flud Water Trucking Lee Wilson Electric Company Pavement Coatings Co Pavement Engineering Inc Pavement Recycling Systems Inc RMC Sweep Statewide Traffic Safety and Signs Super Seal & Stripe Granite Advanced Geosolutions Austin Enterprises Bragg Crane C&W Construction Specialties Cal Stripe Inc Cell-Crete Co CMC Rebar G3 Quality, Inc JLS Concrete Pumping JTS, Inc KCI Environmental, Inc Padre & Assoc Pavement Recycling Systems Inc S & G Drilling Statewide Traffic Safety and Signs Tipco Engineering Inc Underground Specialties Lee Wilson Electric Company work type Logistics, grinding, SWPPP, digout repair, cold plane, pavement concrete curb Thermo Grinder Operator & Vehicle Sweeper Machine Operator & Vehicle Sweeper Machine Operator & Vehicle Water Truck Operator & Vehicle Traffic Signal Camera Install Microsurfacing FDR Inspection Cold Plane, AC/Cement & Lime Treatment Sweeper Machine Operator & Vehicle Traffic control Striping / Pavement Markers Logistics, grinding, SWPPP, pavement, concrete curb Wick Drains Saw and Seal Joints Crane Operator & Vehicle Fencing and Safety Stripe removal Fill placement Rebar Inspection, Material Testing Concrete Supply Tree Removal Erosion Control, Landscape Geotechnical Grinding Rumble Strip Drilling Traffic control Piling Electrical, Lighting Electrical start 8/5/2017 10/9/2017 8/12/2017 8/26/2017 9/23/2017 8/26/2017 10/7/2017 9/11/2017 8/12/2017 9/1/2017 10/14/2017 10/7/2017 10/17/2014 11/22/2014 12/18/2015 1/18/2015 6/20/2015 10/18/2014 11/6/2015 12/10/2014 8/9/2014 2/14/2015 10/19/2014 12/28/2014 12/5/2014 10/26/2014 12/5/2014 10/12/2014 4/25/2015 11/3/2014 Summer 2021 end 2/10/2018 10/9/2017 10/28/2017 11/4/2017 10/7/2017 12/30/2017 11/18/2017 10/8/2017 2/10/2018 10/9/2017 10/21/2017 2/24/2018 7/14/2016 11/22/2014 2/5/2016 3/8/2015 6/4/2016 6/4/2016 11/13/2015 6/4/2016 5/1/2016 2/21/2015 11/16/2016 6/4/2016 7/3/2015 5/14/2016 2/20/2015 6/4/2016 3/5/2016 5/29/2016 Summer 2021 1 11 12 13 14 24 25 26 27 28 39 40 41 42 43 55 56 57 58 68 69 70 71 72 82 83 84 85 86 96 97 98 99 100 111 112 113 114 115 126 127 128 129 130 132 142 143 144 145 146 147 158 159 160 161 162 172 173 174 175 176 186 187 191 201 202 203 204 205 215 216 217 230 231 232 233 243 244 245 Date 8/15/2017 8/16/2017 8/17/2017 8/18/2017 8/21/2017 8/22/2017 8/23/2017 8/24/2017 8/25/2017 8/28/2017 8/29/2017 8/30/2017 8/31/2017 9/1/2017 9/5/2017 9/6/2017 9/7/2017 9/8/2017 9/11/2017 9/12/2017 9/13/2017 9/14/2017 9/15/2017 9/18/2017 9/19/2017 9/20/2017 9/21/2017 9/22/2017 9/25/2017 9/26/2017 9/27/2017 9/28/2017 9/29/2017 1/2/2017 1/3/2017 1/4/2017 1/5/2017 1/6/2017 1/9/2017 1/10/2017 1/11/2017 1/12/2017 1/13/2017 1/13/2017 1/16/2017 1/17/2017 1/18/2017 1/18/2017 1/19/2017 1/20/2017 1/23/2017 1/24/2017 1/25/2017 1/26/2017 1/27/2017 1/30/2017 1/31/2017 1/1/2017 1/2/2017 1/3/2017 1/6/2017 1/7/2017 1/12/2017 1/13/2017 1/14/2017 1/15/2017 1/16/2017 1/17/2017 1/20/2017 1/21/2017 1/22/2017 1/28/2017 1/29/2017 1/30/2017 1/1/2017 1/4/2017 1/5/2017 1/6/2017 Granite onsite today mobilizing for project start-up. Traffic control and Construction Area Signs were placed. Potholing began onsite. Granite continued potholing on Madonna Road and Los Osos Valley Road. Layout began for the bike land edge grind with Marco and Granite. Granite started and completed the bike lane edge grind. Granite complete SWPPP items around the site. Granite Construction performing 10” AC digouts along Los Osos Valley Road. Granite continuing 10” AC digouts along Los Osos Valley Road. Granite continuing 10” AC digouts along Los Osos Valley Road. Granite continuing 10” AC digouts along Los Osos Valley Road. Held weekly meeting at City and coordination meeting in field with the Gas Company. Continuing 10” AC digouts along Los Osos Valley Road. Granite Construction continued 10” digout base repairs at various locations at Los Osos Valley Road. Granite potholing utilities including Gas Company high pressure lines. Granite Construction continued 10” digout base repairs at various locations at Los Osos Valley Road. Granite potholing utilities including Gas Company high pressure lines. Granite Construction continued 10” digout base repairs at various locations at Los Osos Valley Road. Granite potholing utilities including Gas Company high pressure lines. Granite Construction continued 10” digout base repairs at various locations at Los Osos Valley Road. Lee Wilson Electric installing traffic signal camera systems. Granite Construction continued 10” digout base repairs at various locations at Los Osos Valley Road. Lee Wilson Electric installing traffic signal camera systems. Contractor continuing 10” digout base repairs on Los Osos Valley Road. Contractor continuing 10” digout base repairs on Los Osos Valley Road. Starting 5” cold plane grinding in area of full depth reclamation on Madonna. Contractor continuing 10” digout base repairs on Los Osos Valley Road. Continuing 5” cold plane grinding in area of full depth reclamation on Madonna. Contractor continuing 10” digout base repairs on Los Osos Valley Road. Continuing 5” cold plane grinding in area of full depth reclamation on Madonna. Lee Wilson installing additional traffic signal camera hardware. Granite finished 10” base repairs and continued to cold plane on Madonna Road in preparation for Full Depth Reclamation (FDR) Continued to cold plane on Madonna Road and dust control. Completed to cold plane on Madonna Road and continued dust control watering. Started Full Depth Reclamation (FDR) on Madonna Road by pulverizing roadway 18” deep, starting on outside lanes. Poured concrete curb and gutter and sidewalk and maintaining dust control. Full Depth Reclamation underway, inspection by PEI. Lime treatment continued Westbound from the box culvert to the shopping center. Dust control throughout the day. Continued Full Depth Reclamation. Granite cutting fine grade in the outside Westbound lane. Dust control throughout the day. Continued Full Depth Reclamation in outside lanes. PRS completed lime injection on Eastbound outside lane. Continued Full Depth Reclamation procedures. Full Depth Reclamation continued in outside lanes, nearly complete. Signal utility conduits were hit by Full Depth Reclamation operations at Madonna and Oceanaire, but repaired by the end of the day. Dust control scheduled for the weekend as well. Pavement Engineering Incorporated onsite leading Full Depth Reclamation inspection. Granite, along with Pavement Recycling System completed Full Depth Reclamation inspection eastbound #2 lane. Continued Full Depth Reclamation inspection. Traffic swapped to phase 2. Dust control with the water truck performed all day. Granite and PRS injected lime into #1 lines. Continued Full Depth Reclamation inspection. Granite performed Full Depth Reclamation cement treatment. Crews demolished ramp at El Mercado and Madonna then placed and compacted base rock. El Mercado and Madonna eastbound signal was “knocked out” but repaired within 2 hours. Continued Full Depth Reclamation inspection. Granite completed Full Depth Reclamation cement treatment to the Laguna box culvert #1 lanes both directions. Full Depth Reclamation treatment is completed to PEI and City satisfaction. Dust control and water truck operated all day. Formed and poured southwest and southeast concrete ramps on the corner of Madonna Plaza. PEI onsite leading HMA paving over the Laguna box culvert. HMA pavement placed 5” thick over box culvert. Granite fine grading over Madonna Road lane #1, both east and west bound. Prepping for HMA overlay next week. Granite placing Hot Mix Asphalt on Madonna Road. Base course on inside lane “3/4” HMA with a 2 ½” lift.” Technical oversite and inspection by PEI. Filippin Engineering personal onsite as well. Continued Hot Mix Asphalt placement, base course on outside land. Hot Mix Asphalt top lift placed on outside lanes, “2 ½” lift”. Hot Mix Asphalt top lift placement on inside lanes “2 ½” lift”. Overlay complete temporary tapped for traffic control. Miscellaneous work on site including digout repair and punchlist. Super Seal and Stripe onsite to remove existing thermo striping. Granite doing pavement, punchlist and adjusting utilities to grade. Super Seal and Stripe onsite to remove existing thermo striping. Granite doing pavement, Punchlist and adjusting utilities to grade. Super Seal and Stripe onsite to remove existing thermo striping. Granite doing pavement, Punchlist and adjusting utilities to grade. Continued thermos striping removal. Granite and surveyor performing monument work on Madonna Road. PRS doing micro calibration at Cold Canyon Landfill. Continued thermos stripe removal. PRS continuing calibration at Cold Canyon Landfill. Granite onsite for punchlist and other miscellaneous details. Placing Microsurfacing during day-shifts on Monday and Tuesday and night shifts Wednesday through Friday. Pavement Coating Co. (PCC) placed micro surfacing on LOVR from the city limits to Royal Way, outside lanes. Granite staff onsite for support. PCC placed micro surfacing on LOVR from the city limits to Royal Way, inside lanes. Granite staff onsite for support. Dayshift - PCC worked partial dayshift to finish up micro surfacing on LOVR from the city limits to Royal Way. Nightshift – PCC and Granite worked 7 pm to 6 am to place micro surfacing on LOVR from Royal Way to Calle Joaquin, outside lanes. Nightshift - PCC worked 7 pm to 6 am to place micro surfacing on portions of Madonna Road and finished inside lanes on LOVR from Royal Way to Calle Joaquin. Nightshift - PCC worked 7 pm to 6 am to place micro surfacing on Madonna Road from near Laguna Lake to the 101 Night-work - Granite completed Madonna Road micro-surfacing application. Granite placed micro surface in various areas to make repairs where delamination had occurred. Night-work - Sweeper onsite doing cleanup. Granite refreshing temporary tabs on various locations throughout the project. Sweeper onsite doing cleanup. Granite refreshing temporary tabs on various locations throughout the project. No active work underway onsite…pending striping layout. Granite refreshing temporary tabs on various locations throughout the project. Night Work – Super Seal and Stripe performed striping layout based on the City’s traffic division staff striping modifications. Night Work – Super Seal and Stripe performed striping layout based on the City’s traffic division staff striping modifications. Night Work – Super Seal and Stripe completed striping layout based on the City’s traffic division staff striping modifications. City’s traffic division staff reviewed layout in field by Super Seal and Stripe. City responded with a formal acceptance of the stripe layout with some comment. No other substantial field work throughout the week. Just striping layout and review. Night Work – Super Seal and Stripe completed lanes lines on LOVR. Granite removed floppy tabs throughout the night ahead of striping. Night Work – Super Seal and Stripe continued lanes lines on Madonna Road – striping the centerlines, turn pockets, dash lines and bike/edge line. Granite onsite for coordination and removing floppy tabs ahead of the striping throughout the night. Pavement Coatings onsite during the day to perform micro surfacing and punch list repair. Night-work - Super Seal and Stripe onsite to continue thermo-plastic striping and marker placement on LOVR and Madonna. Night-work - Super Seal and Stripe onsite to continue thermo-plastic striping and marker placement on LOVR and Madonna. Striping placement halted on Wednesday night due to drizzle and wet pavement. Striping placement not proceeding due to wet pavement. Striping placement not proceeding due to wet pavement. Night-work – Super Seal and Stripe continued placement of thermo-plastic striping throughout. Night-work – Super Seal and Stripe continued thermo placement, working on arrows on LOVR. Night-work – Continued placement of thermo arrows on LOVR and on Madonna Road. Night-work – Super Seal and Stripe continued placement of thermo-plastic striping throughout. Placing green bike lane, arrows, stop bars, etc. Night-work – Super Seal and Stripe continued placement of thermo-plastic striping throughout. Placing green bike lane, arrows, stop bars, etc. Night-work – Super Seal and Stripe continued placement of thermo-plastic striping throughout. Placing green bike lane, arrows, stop bars, etc. Night-work – Super Seal and Stripe continued placement of thermo-plastic striping throughout. Placing green bike lane, arrows, stop bars, etc. Night-work – Super Seal and Stripe continued placement of thermo-plastic bike legends throughout. Night-work – Super Seal and Stripe finished placement of thermo-plastic bike legends, arrows, and stencil work. Night-work – Super Seal and Stripe finished placement of thermo-plastic hashing and crosswalks.