Location: 761 Grove St
X-streets: Mill, Phillips
Project Name: Sewer lateral replacement
Contractor: Izzy Plumbing
Jacob Springer
805-406-0596
Sewer: T: 0 B: 18
— Frontage Improvements Complete/Upgraded
— Curb Ramp Complete/Upgraded
— City Fiber — Bus Route ✓ Sewer Wye
ENCROACHMENT PERMIT
Right of Way
ENCR-2729-2021
USA #: N/A
Other permits required:
Bldg Dept
Description of Work:
Replace sewer lateral to the main using trenchless technology. Trenchless
lateral replacements require a video submittal to be emailed after
replacement. All work to be done to City Standard Specifications &
Engineering Standards. Traffic and pedestrian controls per City Appendix G &
MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554
two working days prior to the start of work and one working day prior to each
subsequent inspection. Permittee is responsible for calling for final
inspection so the permit can be closed. Also, please call the Public Works
inspection hotline at 805-781-7554 to coordinate wye installation two working
days in advance.
All work performed within the right-of-way shall conform to the City of San Luis Obispo Engineering Standard Details
and Standard Specifications.
You are responsible for liability for personal injury and / or property damage caused by this work or your failure to do what you are
obligated to do. If a claim of such liability is made against the City or any of its departments, officers, or employees, you shall, and
hereby agree to, defend and indemnify the City and hold the City harmless from any claims, including costs of defense and attorney
fees.
All work shall be completed and the right-of-way restored by: January 28, 2022
AGREEMENT: I have read this permit and acknowledge receipt of the City of San Luis Obispo Encroachment Permit
General Provisions and _ pages of attached special conditions which I have read, agree to, and acknowledge as a
part of this permit.
Signature
Print Name
DEPT. offPUBLIC WORKS
Issued By
Final Inspection By
Date
C -��
Date
Date
&The City of San Luis Obispo is committed to include the disabled in all of its services, programs and activities.
Telecommunications Device for the Deaf (805) 781-7410.
_mot
r
� �• Gy
FA-MILO,
1000
Built in 1952
Construction Company:
Contractor's License Num.:
QSP Num (for SWPPP):
Responsible Person:
Mailing Address:
Office Phone Number:
Cell Phone Number:
Email Address:
Project Location:
Description of Work:
Water Pollution Prevention Tracking Information
Municipal Stormwater BMP E.10.a Compliance Form
Water Pollution Control Manager Information
IZZY PLUMBING
892651
JACOB SPRINGER
843 VIA ESTEBAN
8054060596
JACOB@ IZZYPLUMBING.NET
Distance to Nearest Creek or Storm Drain:
Area of Disturbance
Construction Phase (circle one)
❑ Encroachment Permit
❑ Building Permit
❑ Capital Improvement Plan
Date Permit Issued:
Estimated Completion Date:
Project Information
761 Grove st
SEWER LATERAL REPLACEMENT
20'
Street
On -Site
Construction Permit Type (completed by City Staff)
Permit Number:
Permit Number:
Spec. Number:
Construction Permit Status (completed by City Staff)
Pollution Prevention Plan Type (completed by City Staff)
❑ SWPPP Approval Date:
❑ WPCP (Included with Plans) Approval Date:
❑ WPCP (Minor) Approval Date:
Water Pollution Control Plan for Minor Projects
Best Management Practices (BMP)
BMP to be Implemented Standard
p Specification BMP Description
r,nnrl Nnsico400nino RMDe
❑x
Equipment Maintenance
13-4.03C
Maintain, repair, fuel, storage location, inspect vehicles
Stockpile Management
13-4.03C(3)
Cover Stockpile, Place Waddles
0
Sweeping
13-4.03F
Sweep work area daily and prior to rain events
❑x
Spill Management
13-4.03
Plan and materials for mitigating spills onsite
Wacta Mann omant RMDe
❑x
Saw -cut Slurry
13-4.03E(7)
Vacuum slurry and contain
❑x
Washout
13-9
Plastic lined washout areas for concrete and tools
❑x
Portable toilets
13-4.031)(4)
Provide and ensure secondary containment
❑x
Solid waste
5-1.31
Contain and remove trash from site daily
wnrK 1nPrlflr KMNC Irnorlr nnrl nrlrl nil +F»f -1.n
❑
Creek Protection Controls
13-10
BM Ps and Controls to protect adjacent waterways
❑
Storm Drain Inlet Protection
13-6
Gravel bags and entrance
❑
Construction Entrance
13-7
BMPs to eliminate tracking from construction site
BMP Maintenance
❑x Inspect, Document, Clean & Repair 1 13-1.03 1 Daily maintenance of required BMPs
Acknowledgment
I have read, understood, and agree to the requirements of:
1. This WPCP
2. City of San Luis Obispo's Engineering Standard and Specifications
3. State of California's General Construction Permit
I understand and agree that:
1. Additional BMPs may be required during the course of the work to ensure the protection of local water quality
2. You must take corrective actions to protect local water quality
3. Failure to comply with all requirements could cause:
a. All construction work to be stopped until compliance is achieved
b. Permit to be revoked
c. Lose the privilege to work within the City right-of-way for 2 years
Water P utjnn'Cai(tTol M
Jacob Springer
Water Pollution Control Manager Printed Name
Date